PROVINSI : ACEH KABUPATEN/KOTA : SABANG TAHUN ANGGARAN : 2014 PAKET PEKERJAAN : RESERVOIR 200 M3 LOKASI : PELABUHAN CT-3, KECAMATAN SUKAKARYA, SABANG NO. PEMBAYARAN : C.A.2 HARGA No. URAIAN PEKERJAAN SATUAN VOLUME (Rp.) I. PEKERJAAN PERSIAPAN Pengukuran 6,310.00 121.00 II. PEKERJAAN TANAH Galian tanah 54,600.00 293.11 Pasangan Batu Kosong 261,820.00 Urugan Sirtu, t = 5 cm 295,709.30 5.41 Urugan tanah 49,999.53 8.08 III. PEKERJAAN BETON Lantai kerja beton 1:3:6, t=5 cm ### 5.20 Plat beton bertulang 1:2:3, t=20 cm ### 7.04 Kolom beton bertulang 1:2:3 ### 3.40 Dinding beton bertulang 1:2:3, t=15 ### 16.85 Balok beton bertulang 1:2:3 ### 14.00 Plat tutup beton bertulang 1:2:3, t=15 ### 5.28 IV. PEKERJAAN PASANGAN DAN PLESTERAN Pasangan batu bata 1: 4 159,962.28 84.60 Plesteran 1: 4, tebal 15 mm 23,285.50 169.20 Water proofing 80,000.00 200.00 pasangan batu pondasi 656,499.00 - V. PEKERJAAN PENUTUP MANHOLE & KUNCI Penutup manhole 750,000.00 4.00 Engsel dan gembok 20,000.00 4.00 Tangga Galvanis 175,000.00 1.00 VI. PEKERJAAN PIPA DAN ACCESSORIES 1 PIPA INLET Pengadaan & pemasangan pipa GIP Ø 200 mm ### 20.00 Pengadaan & pemasangan bend CI 90o Ø 200 mm 577,544.00 8.00 2 PIPA OUTLET Pengadaan & pemasangan pipa GIP Ø 200 mm ### 25.00 Pengadaan & pemasangan gate valve CI Ø 200 mm 577,544.00 1.00 Pengadaan & pemasangan flange GIP Ø 200 mm 600,633.80 2.00 3 PIPA OVERPLOW

Upload: na-ja-ma

Post on 14-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: reservoir check vlm atas tanah.xlsx

ANALISA HARGA SATUAN

PROVINSI : ACEHKABUPATEN/KOTA : SABANGTAHUN ANGGARAN : 2014PAKET PEKERJAAN : RESERVOIR 200 M3LOKASI : PELABUHAN CT-3, KECAMATAN SUKAKARYA, SABANGNO. PEMBAYARAN : C.A.2

HARGAKONTRAK AWAL

No. URAIAN PEKERJAAN SATUANVOLUME

(Rp.)

I. PEKERJAAN PERSIAPANPengukuran 6,310.00 121.00 M2

II. PEKERJAAN TANAHGalian tanah 54,600.00 293.11 M3Pasangan Batu Kosong 261,820.00

Urugan Sirtu, t = 5 cm 295,709.30 5.41 M3

Urugan tanah 49,999.53 8.08 M3

III. PEKERJAAN BETONLantai kerja beton 1:3:6, t=5 cm 1,526,273.55 5.20 M3Plat beton bertulang 1:2:3, t=20 cm 5,278,573.20 7.04 M3Kolom beton bertulang 1:2:3 5,278,573.20 3.40 M3Dinding beton bertulang 1:2:3, t=15 5,278,573.20 16.85 M3Balok beton bertulang 1:2:3 5,278,573.20 14.00 M3Plat tutup beton bertulang 1:2:3, t=15 5,278,573.20 5.28 M3

IV. PEKERJAAN PASANGAN DAN PLESTERANPasangan batu bata 1: 4 159,962.28 84.60 M2Plesteran 1: 4, tebal 15 mm 23,285.50 169.20 M2Water proofing 80,000.00 200.00 M2pasangan batu pondasi 656,499.00 - M3

V. PEKERJAAN PENUTUP MANHOLE & KUNCIPenutup manhole 750,000.00 4.00 BhEngsel dan gembok 20,000.00 4.00 BhTangga Galvanis 175,000.00 1.00 Bh

VI. PEKERJAAN PIPA DAN ACCESSORIES1 PIPA INLET

Pengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 20.00 M'Pengadaan & pemasangan bend CI 90o Ø 200 mm 577,544.00 8.00 Bh

2 PIPA OUTLETPengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 25.00 M'Pengadaan & pemasangan gate valve CI Ø 200 mm 577,544.00 1.00 BhPengadaan & pemasangan flange GIP Ø 200 mm 600,633.80 2.00 Bh

3 PIPA OVERPLOW

Page 2: reservoir check vlm atas tanah.xlsx

Pengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 6.00 M'Pengadaan & pemasangan bend CI 90o Ø 200 mm 577,544.00 4.00 Bh

4 PIPA PENGURASPengadaan & pemasangan pipa GIP Ø 150 mm 500,000.00 6.00 M'Pengadaan & pemasangan gate valve CI Ø 150 mm 1,839,295.00 1.00 BhPengadaan & pemasangan flange GIP Ø 150 mm 152,000.00 2.00 Bh

5 PIPA OVERPLOWPengadaan & pemasangan pipa GIP Ø 200 mm 1,020,954.93 12.00 M'Pengadaan & pemasangan bend CI 90o Ø 200 mm 577,544.00 1.00 Bh

6 PIPA VENTILASIPengadaan & pemasangan pipa GIP Ø 50 mm 80,000.00 2.00 M'Pengadaan & pemasangan tee GIP Ø 50-50-50 mm 210,000.00 2.00 Bh

JUMLAH

Page 3: reservoir check vlm atas tanah.xlsx

ANALISA HARGA SATUAN

KONTRAK AWAL PERUBAHAN VOLUME BERKURANG VOLUME BERTAMBAH

JML HARGA VOLUME JML HARGA VOLUME JML HARGA VOLUME

763,510.00 121.00 M2 763,510.00

16,003,806.00 14.07 M3 768,399.89 279.04 M3 15,235,406.11

1,599,787.31 6.40 M3 1,893,477.51 0.99 M3

403,996.23 10.73 M3 536,415.99 2.65 M3

7,936,622.44 5.68 M3 8,674,133.08 0.48 M3 37,161,155.30 20.39 M3 107,630,740.88 13.35 M3 17,947,148.86 2.87 M3 15,170,619.36 0.53 M3 2,776,529.50 88,943,958.34 16.93 M3 89,376,906.92 0.08 M3 73,900,024.74 13.94 M3 73,604,424.64 0.06 M3 295,600.10 27,870,866.47 15.29 M3 80,723,055.66 10.01 M3

13,532,808.46 60.11 M2 9,614,772.48 24.49 M2 3,918,035.98 3,939,906.60 120.21 M2 2,799,219.81 48.99 M2 1,140,686.79 16,000,000.00 221.97 M2 17,757,344.00 21.97 M2

6.83 M3 4,484,001.09 6.83 M3

3,000,000.00 4.00 Bh 3,000,000.00

80,000.00 4.00 Bh 80,000.00

175,000.00 1.00 Bh 175,000.00

20,419,098.70 20.00 M' 20,419,098.70

4,620,352.00 8.00 Bh 4,620,352.00

25,523,873.37 25.00 M' 25,523,873.37

577,544.00 1.00 Bh 577,544.00

1,201,267.60 2.00 Bh 1,201,267.60

Page 4: reservoir check vlm atas tanah.xlsx

6,125,729.61 6.00 M' 6,125,729.61

2,310,176.00 4.00 Bh 2,310,176.00

3,000,000.00 6.00 M' 3,000,000.00

1,839,295.00 1.00 Bh 1,839,295.00

304,000.00 2.00 Bh 304,000.00

12,251,459.22 12.00 M' 12,251,459.22

577,544.00 1.00 Bh 577,544.00

160,000.00 2.00 M' 160,000.00

420,000.00 2.00 Bh 420,000.00

388,588,930.24 496,382,360.80 23,366,258.48

388,588,930.24

Page 5: reservoir check vlm atas tanah.xlsx

ANALISA HARGA SATUAN

VOLUME BERTAMBAH jumlah besi

JML HARGA Ø12 10,609.54 885.00 btg

Ø8 1,783.36 149.00 btg

D16 1,569.92 131.00 btg

293,690.20

132,419.76

737,510.64 70,469,585.59

432,948.57

52,852,189.19

1,757,344.00 4,484,001.09

Page 6: reservoir check vlm atas tanah.xlsx

131,159,689.04

Page 7: reservoir check vlm atas tanah.xlsx

Item Pekerjaan Keteran Panjang Lebar (m Tinggi (

I. PEKERJAAN PERSIAPANPengukuran

II. PEKERJAAN TANAHGalian tanah pondasi batu 0.27 37.9454

bak penguras 6.38 0.6

Pasangan Batu Kosong

Urugan Sirtu, t = 5 cm plat lantai 107.28 0.05permukaan balok 41.84 0.2

plat bak penguras 6.38 0.05bawah pondasi 37.9454 0.6 0.05

Urugan tanah 107.28 0.1

III. PEKERJAAN BETONLantai kerja beton 1:3:6, t=5 cm plat lantai 107.28 0.05

plat bak penguras 6.38 0.05

Plat beton bertulang 1:2:3, t=20 cm 101.9506 0.2

Kolom beton bertulang 1:2:3 0.04 2.850.04 3.45

Dinding beton bertulang 1:2:3, t=15 37.848 0.15 2.859.4 0.2 0.4

Balok beton bertulang 1:2:3 - balok 20 / 40 99.6 0.2 0.4 - balok 20 / 30 99.6 0.2 0.3

Plat tutup beton bertulang 1:2:3, t=15 101.9506 0.15

IV. PEKERJAAN PASANGAN DAN PLESTERANPasangan batu bata 1: 4 21.09 2.85

Plesteran 1: 4, tebal 15 mm

Water proofing 40.2454 3

Luas (m²)

Page 8: reservoir check vlm atas tanah.xlsx

101.2306

pasangan batu pondasi 0.18 37.9454

V. PEKERJAAN PENUTUP MANHOLE & KUNCIPenutup manholeEngsel dan gembokTangga Galvanis

VI. PEKERJAAN PIPA DAN ACCESSORIES1 PIPA INLET

Pengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan bend CI 90o Ø 200 mm

2 PIPA OUTLETPengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan gate valve CI Ø 200 mmPengadaan & pemasangan flange GIP Ø 200 mm

3 PIPA OVERPLOWPengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan bend CI 90o Ø 200 mm

4 PIPA PENGURASPengadaan & pemasangan pipa GIP Ø 150 mmPengadaan & pemasangan gate valve CI Ø 150 mmPengadaan & pemasangan flange GIP Ø 150 mm

5 PIPA OVERPLOWPengadaan & pemasangan pipa GIP Ø 200 mmPengadaan & pemasangan bend CI 90o Ø 200 mm

6 PIPA VENTILASIPengadaan & pemasangan pipa GIP Ø 50 mm

Pengadaan & pemasangan tee GIP Ø 50-50-50 mm

Page 9: reservoir check vlm atas tanah.xlsx

Jumlah volume sat

10.25 3.83 14.07

4.95 0.32 1.14 6.40

10.73

5.36 0.32 5.68

20.39

24 2.7361 0.138

2.874

16.180020.752

16.93202

7.9685.976

13.944

15.29259

60.1065

120.213

120.7362

Page 10: reservoir check vlm atas tanah.xlsx

101.2306221.96686.830172

4.00 4.00 4.00 4.00 1.00 1.00

20.00 20 8.00 8

25.00 25.00 1.00 1.00 2.00 2.00

6.00 6.00 4.00 4.00

6.00 6.00 1.00 1.00 2.00 2.00

12.00 12.00 1.00 1.00

2.00 2.00 2.00 2.00

Page 11: reservoir check vlm atas tanah.xlsx

BACKUP DATACALCULATION OF CONCRETE

Inspection Date & Time :

Structure : Retaining WallLocation : Relocation Road

Inspection Item : Concrete Type G

No Sket

1

Total

Page 12: reservoir check vlm atas tanah.xlsx

BACKUP DATACALCULATION OF CONCRETE

Unit Area Average Quantity Remarks

#REF! m3 Total Concrete

Prepared By

(the Contractor)

length (m)

Page 13: reservoir check vlm atas tanah.xlsx

1.30

0

1.40

0

2.8001.040

300

1.10

0

850 400

750

650

4.050

1

23