Daftar Harga Bahan

No Uraian Harga Satuan

1 Batu Belah 230,000 M3

2 Semen 1,400 Kg

3 Pasir Pasang 265,000 M3

4 Pipa Gip Medium 1,250,000 M1

5 Blok Anker 350,000 Bh

6 Suddel Support 250,000 Bh

7 Ekspansion Joint 750,000 Bh

8 Pasir Cor 250,000 M3

9 Sewa Molen 150,000 Unit

10 Air 25 Liter

11 Kerikil 270,000 M3

Daftar Upah

No Uraian Upah1 Mandor 150,000 2 Kepala Tukang 135,000 3 Tukang Pipa 120,000 4 Pekerja 100,000

JADWAL WAKTU PELAKSANAAN

Provinsi : BANTENKabupaten /Kota : TANGERANG CIOMAS

NO URAIAN PEKERJAAN SATUAN VOL

BULAN JANUARI S/D JUNI 2015

KETERANGANJANUARI PEBRUARI MARET APRIL MEI JUNI

Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4 Mgg 1 Mgg 2 Mgg 3 Mgg 4

I PEKERJAAN PERSIAPAN

1 Papan Nama Proyek ls 1 300,000 300,000 0.007 0.01

2 Pengukuran Patok ls 1 750,000 750,000 0.017 0.01 0.01

3 Rambu Rambu Peringatan dan K3 ls 1 1,200,000 1,200,000 0.027 0.01 0.01 0.01 0.01

4 Barak Kerja dan Gudang ls 1 22,000,000 22,000,000 0.486 0.12 0.12 0.12 0.12

5 Dokumentasi dan Alat Komunikasi HT ls 1 7,500,000 7,500,000 0.166 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

5 Mobilisasi dan Demobilisasi ls 1 15,000,000 15,000,000 0.332 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

II PERIJINAN

1 Perijinan Pendirian Perusahaan Ls 1 8,500,000 8,500,000 0.188 0.05 0.05 0.05 0.05

III PERALATAN MESIN DAN EQUIPMENT

1 Mesin Press 300 T bh 1 900,000,000 900,000,000 19.899 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49

2 Mesin Press 110 T bh 1 350,000,000 350,000,000 7.739 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97

3 Mesin Bending bh 1 500,000,000 500,000,000 11.055 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38

4 Mesin Las bh 1 20,000,000 20,000,000 0.442 0.11 0.11 0.11 0.11

5 Mesin Bor bh 1 5,000,000 5,000,000 0.111 0.06 0.06

6 Mesin Press bh 1 200,000,000 200,000,000 4.422 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55

7 Mesin Bubut bh 1 150,000,000 150,000,000 3.317 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41

8 Mesin Gerinda bh 2 700,000 1,400,000 0.031 0.03

9 Manual Gas Cutting bh 1 7,000,000 7,000,000 0.155 0.04 0.04 0.04 0.04

10 Jig Welding bh 1 30,000,000 30,000,000 0.663 0.17 0.17 0.17 0.17

11 Manual Punch Machine bh 1 6,000,000 6,000,000 0.133 0.03 0.03 0.03 0.03

12 Crane 3 Ton bh 1 300,000,000 300,000,000 6.633 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

IV PERALATAN NON PRODUKSI

1 Komputer bh 4 3,500,000 14,000,000 0.310 0.08 0.08 0.08 0.08

2 Laptop bh 2 5,000,000 10,000,000 0.221 0.06 0.06 0.06 0.06

3 Meja dan Kursi bh 6 5,000,000 30,000,000 0.663 0.17 0.17 0.17 0.17

4 Telepon bh 1 1,000,000 1,000,000 0.022 0.01 0.01 0.01 0.01

5 Fax dan Printer bh 1 900,000 900,000 0.020 0.00 0.00 0.00 0.00

6 Server bh 1 5,000,000 5,000,000 0.111 0.03 0.03 0.03 0.03

V INFRASTRUKTUR

1 Gedung Ls 1 1,500,000,000 1,500,000,000 33.165 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51

2 Pendukung Infrastruktur Ls 1 20,000,000 20,000,000 0.442 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

VI PREPAID EXPENSES

1 Asuransi Ls 1 50,000,000 50,000,000 1.106 0.28 0.28 0.28 0.28

2 Iklan Ls 1 9,000,000 9,000,000 0.199 0.05 0.05 0.05 0.05

3 Legal Fees (10 thn) Ls 1 4,000,000 4,000,000 0.088 0.02 0.02 0.02 0.02

VII PEKERJAAN SIPIL -

1 Pekerjaan Bendungan Ls 1 80,989,530 80,989,530 1.791 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09

2 Pekerjaan Intake Ls 1 2,120,678 2,120,678 0.047 0.01 0.01 0.01 0.01

3 Pekerjaan Bak Penenang Ls 1 27,005,123 27,005,123 0.597 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07

4 Pekerjaan Saluran Hantar Ls 1 96,451,177 96,451,177 2.133 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11

5 Pekerjaan Pipa Pesat Ls 1 97,663,250 97,663,250 2.159 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18

6 Pekerjaan Gedung Central Ls 1 50,000,000 50,000,000 1.106 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

Jumlah Nilai Pekerjaan 4,522,779,758 100.00

Progress Rencana (%) 0.21 0.20 1.70 1.70 8.79 8.76 8.71 8.71 8.36 8.36 8.39 8.57 1.94 1.94 1.94 1.94 2.49 2.49 2.49 2.49 2.51 2.51 2.51 2.33

Kumulatif Rencana (%) -

0

.21

0

.42

2

.12

3

.82

1

2.61

2

1.38

3

0.08

3

8.79

4

7.14

5

5.50

6

3.89

7

2.46

7

4.40

7

6.33

7

8.27

8

0.20

8

2.69

8

5.17

8

7.66

9

0.15

9

2.65

9

5.16

9

7.67

1

00.0

0

JAKARTA, DESEMBER 2014PT MICROPOWER TURBIN INOVATION

SUGENG HARYONO Direktur Utama

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

BOBOT (%)

Pekerjaan PersiapanPEKERJAAN : PT MICROPOWER TURBIN INOVATION

LOKASI : CIOMAS TANGERANG BANTEN

No Uraian Satuan Volume

(1) (2) (3) (4) (5)

A. Papan Nama Proyek Ls 1 300,000

B. Pengukuran Patok Ls 1 750,000

C. Rambu Rambu Peringatan dan K3 Ls 1 1,200,000

D. Barak Kerja dan Gudang Ls 1 22,000,000

E. Dokumentasi dan Alat Komunikasi Ls 1 7,500,000

F. Mobilisasi dan Demobilisasi LS 1 15,000,000

Total Pekerjaan Persiapan

Harga Satuan Dasar (Rp)

Pekerjaan Persiapan

(6)

300,000

750,000

1,200,000

22,000,000

7,500,000

15,000,000

46,750,000

Harga (Rp)

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Bendungan

= 0.5 m x 0.5 m x 42 m= 10.5 m3

C2 Pasangan Dinding bendungan= ((0.5+0.3)/2 x 1.5 x 40 + 20 + 20 = 0.6 m2 x 80 m = 48 m3

C3 Pintu Besi 2 UnitBiaya Pembuatan Pintu Besi = 7, 500,000 x 2 unit = 7, 500,000 per Unit = 5, 500,000 per Unit x 2 = Rp 11,000,000

Maka total pasangan batu kali = 10.5 + 48 = 58.5 m3 maka biaya pasangan batu kali = 58.5 m3 x 993,713 ' = Rp 58, 132 , 210

D Plesteran Luas Plesteran = 1.5 m x 80 m ' = 120 M2Maka Biaya Plester , = 98,811 x 120 ' = Rp 11,857,320

Maka Total Biaya Bendungan = Rp 80,989,530

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Intake

= 0.5 x 0.5x (1.4) x 2= 0.5 x 0.5 x 1.4 x 2= 0.7 m3

C2 Pasangan Dinding = ((0.5+0.3)/2 x 1 x 1.4) + (0.44 x 0.44x 1.4 ) = 0.56 + 0.27 m3 = 0.83 m3

Maka total pasangan batu kali = 0.7+0.83 = 1.53 m3 maka biaya pasangan batu kali = 1.53 m3 x 993,713= Rp 1,520,380

D Plesteran Luas Plesteran = 1.+0.3+0.44+0.44+0.44+0.44 +1 x 1.4 ' = 3.9x 1.4 = 5.46 M2Maka Biaya Plester , = 98,811 x 5.46 ' = Rp 539,508

Lantai Kerja Menggunakan Molen No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA KERJAPekerja L.01 Oh 1.323 100,000 132,300 Tukang Batu L.02 OH 0.189 120,000 22,680 Kepala Tukang L.03 OH 0.019 135,000 2,565 Mandor L.04 OH 0.132 150,000 19,800

Jumlah Tenaga 177,345 B BAHAN

Semen Portlan Kg 247 1,400 345,800 Pasir Beton M3 0.621 250,000 155,250 Kerikil M3 0.74 270,000 199,800 Air L 215 25 5,375

Jumlah Bahan 706,225 C PERALATAN

Molen 0.35 m3 0.25 150,000 37,500

D Jumlah (A+B+C) 921,070 E Profit (10%) 92,107 F Harga Satuan Pekerjaan 1,013,177

Maka Biaya lantai Kerja untuk Tebal 10 cm = 0.06 M3 = 0.06 x 1,013,177 = 60,790

Maka Total Biaya Intake = 1,520,380 + 539,508 + 60,790 = Rp 2,120,678

Pemasangan Batu Kali Bak Penenang (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Bak Penenang

= 0.5 x 0.5x (8.4+4.2+8.4)= 0.5 x 0.5 x (21)= 5.25 m3

C2 Pasangan Dinding = (0.5+0.3)/2 x 1.46 x 21 = 12.26 m3

Maka total pasangan batu kali = 5.25+12.26 = 17.51 m3 maka biaya pasangan batu kali = 17.51 m3 x 993,713= Rp 17,399,914

D Plesteran

Luas Plesteran = 1.46 x 21x 2 ' = 61. 32 M2Maka Biaya Plester , = 98,811 x 61.32 ' = Rp 6,059,090

Lantai Kerja Menggunakan MolenNo Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA KERJAPekerja L.01 Oh 1.323 100,000 132,300 Tukang Batu L.02 OH 0.189 120,000 22,680 Kepala Tukang L.03 OH 0.019 135,000 2,565 Mandor L.04 OH 0.132 150,000 19,800

Jumlah Tenaga 177,345 B BAHAN

Semen Portlan Kg 247 1,400 345,800 Pasir Beton M3 0.621 250,000 155,250 Kerikil M3 0.74 270,000 199,800 Air L 215 25 5,375

Jumlah Bahan 706,225 C PERALATAN

Molen 0.35 m3 0.25 150,000 37,500

D Jumlah (A+B+C) 921,070 E Profit (10%) 92,107 F Harga Satuan Pekerjaan 1,013,177

Maka Biaya lantai Kerja untuk Tebal 10 cm = 3.5 M3 = 3.5 x 1,013,177 = 3,546,119

Maka Total Biaya Bak Penenang = 17,399,914 + 6,059,090+3,546,119 = Rp 27,005,123

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Total Volume Pasangan Batu Kali C1 Pondasi Saluran Hantar

= 0.5 x 0.5x 40 = 0.5 x 0.5 x 40 x 2= 20 m3

C2 Pasangan Dinding = ((0.5+0.3)/2x 1.5 x 40 x 2 = 48 m3

Maka total pasangan batu kali = 20+48 = 68 m3 maka biaya pasangan batu kali = 68 m3 x 993,713= Rp 67,572,484

D Plesteran Luas Plesteran = 1.5 x 40 x 2 ' = 120 M2Maka Biaya Plester , = 98,811 x 120 ' = Rp 11,857,320

Lantai Kerja Menggunakan MolenNo Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA KERJAPekerja L.01 Oh 1.323 100,000 132,300 Tukang Batu L.02 OH 0.189 120,000 22,680 Kepala Tukang L.03 OH 0.019 135,000 2,565 Mandor L.04 OH 0.132 150,000 19,800

Jumlah Tenaga 177,345 B BAHAN

Semen Portlan Kg 247 1,400 345,800 Pasir Beton M3 0.621 250,000 155,250 Kerikil M3 0.74 270,000 199,800 Air L 215 25 5,375

Jumlah Bahan 706,225 C PERALATAN

Molen 0.35 m3 0.25 150,000 37,500

D Jumlah (A+B+C) 921,070 E Profit (10%) 92,107 F Harga Satuan Pekerjaan 1,013,177

Maka Biaya lantai Kerja untuk Tebal 10 cm = 16.8 M3 = 16.8 x 1,013,177 = 17,021,373

Maka Total Biaya Saluran Hantar = 67,572,484 + 11,857,320+17,021,373 = Rp 96,451,177

Pemasangan 1 m Pipa GIP dia 500 mm (Sumber AHSP PU 2013)A. Pipa dia 500 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.469 100,000 146,900 Tukang Pipa L.02 OH 0.735 120,000 88,200 Mandor L.04 OH 0.147 150,000 22,050

Jumlah Tenaga 257,150 B BAHAN

Pipa Gip dia 500 mm Mtr 1 1,250,000 1,250,000

C PERALATAN

Hari 0

D Jumlah (A+B+C) 1,507,150 E Profit (10%) 150,715 F Harga Satuan Pekerjaan 1,657,865

B Blok Anker, Tumpuan Sadel (Suddel Support ) dan Ekpansion Join

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.469 - - Tukang Pipa L.02 OH 0.735 - -

Sewa Triport/Tackel & Handel Crane 2 Ton

Mandor L.04 OH 0.147 - - Jumlah Tenaga -

B BAHAN untuk 50 Meter1 Blok Anker Bh 2 350,000 700,000 2 Suddel Support Bh 10 250,000 2,500,000 3 Ekspansion Joint Bh 10 750,000 7,500,000

Total Bahan 10,700,000

C PERALATAN

D Jumlah (A+B+C) 10,700,000 E Profit (10%) 1,070,000 F Harga Satuan Pekerjaan 11,770,000

C Jadi Biaya Pipa Pesat (Penstock) untuk 50 Meter adalah = ' biaya Pemasangan 1 Meter Pipa x 50 meter + Acc '= 1,657,865 * 50 + (11,770000), = Rp 97,663,250

Pemasangan Batu Kali Intake (Sumber AHSP PU 2013)A. PEMASANGAN 1 M3 PONDASI BATU BELAH

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGAPekerja L.01 Oh 1.5 100,000 150,000 Tukang Batu L.02 OH 0.75 120,000 90,000 Kepala Tukang L.03 OH 0.075 135,000 10,125 Mandor L.04 OH 0.075 150,000 11,250

Jumlah Tenaga 261,375 B BAHAN

Batu Belah M3 1.2 230,000 276,000 Semen Portlan Kg 163 1,400 228,200 Pasir Pasang M3 0.52 265,000 137,800

Jumlah Bahan 642,000 C PERALATAN

D Jumlah (A+B+C) 903,375 E Profit (10%) 90,338 F Harga Satuan Pekerjaan 993,713

B Pemasangan 1 m2 Plesteran Tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA

Pekerja L.01 Oh 0.4 100,000 40,000 Tukang Batu L.02 OH 0.2 120,000 24,000 Kepala Tukang L.03 OH 0.02 135,000 2,700 Mandor L.04 OH 0.02 150,000 3,000

Jumlah Tenaga 69,700 B BAHAN

Semen Portlan Kg 8.32 1,400 11,648 Pasir Pasang M3 0.032 265,000 8,480

Jumlah Bahan 20,128 C PERALATAN

D Jumlah (A+B+C) 89,828 E Profit (10%) 8,983 F Harga Satuan Pekerjaan 98,811

C Gedung Central ukuran 5m x 5m Pondasi Batu kali Dinding Bata MerahAtap Rangka BajaMaka Harganya = per m2 = 2,000,000maka untuk luas 25 m2 maka biayanya = 25 x 2,000,000 = 50,000,000

Summery

1 Persiapan 46,750,000 2 Bendungan 80,989,5303 Intake 2,120,6784 Bak Penenang 27,005,1235 Saluran hantar 96,451,1776 Pipa Pesat 97,663,2507 Gedung Sentral 50,000,000

Total 400,979,758