  • ITEM PEMBAYARAN NO. : 1.2

    JENIS PEKERJAAN : MOBILISASI

    % TERHADAP TOTAL BIAYA PROYEK = #REF! %

    Lembar 1.2-1

    HARGA JUMLAH

    No. U R A I A N SATUAN VOL. SATUAN HARGA

    (Rp.) (Rp.)

    A. Sewa Tanah M2 20,000 500 10,000,000

    B. PERALATAN

    Periksa lembar 1.2-2 260,300,000

    C. FASILITAS KONTRAKTOR

    1 Base Camp M2 150 50,000 7,500,000

    2 Kantor M2 60 75,000 4,500,000

    3 Barak M2 60 45,000 2,700,000

    4 Bengkel M2 100 25,000 2,500,000

    5 Gudang, dan lain-lain M2 100 25,000 2,500,000

    6 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0

    D. FASILITAS LABORATORIUM

    1 Ruang Laboratorium (sesuai Gambar) M2 108 55,000 5,940,000

    2 Soil & Aggregate Testing

    Compaction Test Set 1 15,000,000 15,000,000

    CBR Test Set 1 20,000,000 20,000,000

    Specific Gravity Set 1 5,000,000 5,000,000

    Atterberg Limits Set 1 5,000,000 5,000,000

    Grain Size Analysis Set 1 12,500,000 12,500,000

    Field Density Test by Sand Cone Methode Set 2 6,500,000 13,000,000

    Moisture Content Set 2 6,000,000 12,000,000

    Abrasion of Aggregate by Los Angeles Machine Bln 2 5,000,000 10,000,000

    3 Bituminous Testing

    Marshall Asphalt Test Set 1 20,000,000 20,000,000

    Extraction Test, Centrifuge/Refflux Method Set 1 9,000,000 9,000,000

    Specific Gravity for Coarse Aggregate Set 1 9,000,000 9,000,000

    Specific Gravity for Fine Aggregate Set 1 9,000,000 9,000,000

    Mix Air Viod Content (Accurate Method) Set 1 15,000,000 15,000,000

    Core Drill Set 1 15,000,000 15,000,000

    Metal Thermometer Set 1 1,000,000 1,000,000

    Accessories and Tolls Set 1 5,000,000 5,000,000

    Penetration Test Bln 6 1,000,000 6,000,000

    Softening Point Set 1 6,000,000 6,000,000

    Refusal Density Compactor Set 1 15,000,000 15,000,000

    4 Concrete Testing

    Slump Cone Set 1 500,000 500,000

    Cylinder/Cube Mould for Compressive Strength Set 1 10,000,000 10,000,000

    Beam Mould for Flexural Strength (RIGID) Set 1 10,000,000 10,000,000

    Crushing Machine Set 1 50,000,000 50,000,000

    5 Pendukung (Periksa Fasilitas Laboratorium) 225,000,000

    6 Operasional (Periksa Fasilitas Laboratorium) 276,000,000

  • E. MOBILISASI LAINNYA

    E.I. PEKERJAAN DARURAT1 Perkuatan Jembatan Lama LS 1 100,000,000 100,000,0002 Pemeliharaan Jalan Kerja / Samping LS 1 100,000,000 100,000,0003 . . . . . . . . . . . . . . . . . . . . . . . . . . 0

    4 . . . . . . . . . . . . . . . . . . . . . . . . . . 0

    5 . . . . . . . . . . . . . . . . . . . . . . . . . . 0

    6 . . . . . . . . . . . . . . . . . . . . . . . . . . 0

    E.II. LAIN-LAIN

    1 Komunikasi Lapangan Lengkap Set 1 5,000,000 5,000,000

    2 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0

    3 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0

    4 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0

    5 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0

    6 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0

    F. DEMOBILISASI LS 1 78,090,000 78,090,000

    Total Biaya Mobilisasi 1,353,030,000

    Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba

    serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

    ITEM PEMBAYARAN NO. : 1.2

    JENIS PEKERJAAN : MOBILISASI

    Lembar 1.2-2

    KODE HARGA JUMLAH

    No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA

    (Rp.) (Rp.)

    B. PERALATAN

    1 ASPHALT MIXING PLANT E01 Unit 1 200,000,000 200,000,000

    2 ASPHALT FINISHER E02 Unit 1 500,000 500,000

    3 ASPHALT SPRAYER E03 Unit 1 100,000 100,000

    4 BULLDOZER 100-150 HP E04 Unit 1 500,000 500,000

    5 COMPRESSOR 4000-6500 L\M E05 Unit 1 150,000 150,000

    6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1 100,000 100,000

    7 CRANE 10-15 TON E07 Unit 1 150,000 150,000

    8 DUMP TRUCK 3.5 TON E08 Unit 18 150,000 2,700,000

    9 DUMP TRUCK 10 TON E09 Unit 5 150,000 750,000

    10 EXCAVATOR 80-140 HP E10 Unit 3 500,000 1,500,000

    11 FLAT BED TRUCK 3-4 M3 E11 Unit 1 150,000 150,000

    12 GENERATOR SET E12 Unit 1 300,000 300,000

    13 MOTOR GRADER >100 HP E13 Unit 1 500,000 500,000

    14 TRACK LOADER 75-100 HP E14 Unit 1 500,000 500,000

    15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1 500,000 500,000

    16 THREE WHEEL ROLLER 6-8 T E16 Unit 2 500,000 1,000,000

    17 TANDEM ROLLER 6-8 T. E17 Unit 1 500,000 500,000

    18 TIRE ROLLER 8-10 T. E18 Unit 1 500,000 500,000

    19 VIBRATORY ROLLER 5-8 T. E19 Unit 1 500,000 500,000

    20 CONCRETE VIBRATOR E20 Unit 5 50,000 250,000

    21 STONE CRUSHER E21 Unit 1 40,000,000 40,000,000

    22 WATER PUMP 70-100 mm E22 Unit 2 50,000 100,000

    23 WATER TANKER 3000-4500 L. E23 Unit 1 150,000 150,000

    24 PEDESTRIAN ROLLER E24 Unit 1 50,000 50,000

    25 TAMPER E25 Unit 1 50,000 50,000

    26 JACK HAMMER E26 Unit 2 50,000 100,000

    27 FULVI MIXER E27 Unit 1 500,000 500,000

    28 CONCRETE PUMP E28 Unit 2 500,000 1,000,000

    29 TRAILER 20 TON E29 Unit 2 1,000,000 2,000,000

    30 PILE DRIVER + HAMMER E30 Unit 2 1,000,000 2,000,000

    31 CRANE ON TRACK 35 TON E31 Unit 2 1,000,000 2,000,000

    32 WELDING SET E32 Unit 2 200,000 400,000

    33 BORE PILE MACHINE E33 Unit 1 500,000 500,000

    34 ASPHALT LIQUID MIXER E34 Unit 1 300,000 300,000

    35 TRONTON E35 Unit 0

    36 COLD MILLING MACHINE E37 Unit 0

    37 ROCK DRILL BREAKER E36 Unit 0

    38 COLD RECYCLER E38 Unit 0

    39 HOT RECYCLER E39 Unit 0

  • 40 AGGREGAT (CHIP) SPREADER E40 Unit 0

    41 ASPHALT DISTRIBUTOR E41 Unit 0

    42 SLIP FORM PAVER E42 Unit 0

    43 CONCRETE PAN MIXER E43 Unit 0

    44 CONCRETE BREAKER E44 Unit 0

    45 ASPAHLT TANKER E45 Unit 0

    46 CEMENT TANKER E46 Unit 0

    47 CONDRETE MIXER (350) E47 Unit 0

    48 VIBRATING RAMMER E48 Unit 0

    49 TRUK MIXER (AGITATOR) E49 Unit 0

    50 BORE PILE MACHINE E50 Unit 0

    51 CRANE ON TRACK 75-100 TON E51 Unit 0

    52

    53

    Total untuk Item B pada Lembar 1 260,300,000

  • SATUAN PENGUKURAN : Lump sum

    HARGA SATUAN : Rp. 779,940,000.00

    HARGA

    SATUAN

    I. Laboratory Building

    1. Laboratory Building m2 108.00 55,000.00 5,940,000.00

    SUB TOTAL 5,940,000.00

    II. Soil & Aggregate Testing

    1. Compaction Test Set 1.00 15,000,000.00 15,000,000.00 Beli

    2. CBR Test Set 1.00 20,000,000.00 20,000,000.00 Beli

    3 Specifc Gravity Set 1.00 5,000,000.00 5,000,000.00 Beli

    4 Atterberg Limits Set 1.00 5,000,000.00 5,000,000.00 Beli

    5 Grain Size Analysis Set 1.00 12,500,000.00 12,500,000.00 Beli

    6 Field Density Test by Sand Cone Methode Set 2.00 6,500,000.00 13,000,000.00 Beli

    7 Moisture Content Set 2.00 6,000,000.00 12,000,000.00 Beli

    8 Abrasion of Aggregate by Los Angeles Machine Bln 2.00 5,000,000.00 10,000,000.00 Sewa

    SUB TOTAL 92,500,000.00

    III. Bituminous Testing

    1. Marshall Asphalt Test Set 1.00 20,000,000.00 20,000,000.00 Beli

    2. Extraction Test, Centrifuge/Reflux Method Set 1.00 9,000,000.00 9,000,000.00 Beli

    3 Specific Gravity of Coarse Aggregate Set 1.00 9,000,000.00 9,000,000.00 Beli

    4 Specific Gravity of Fine Aggregate Set 1.00 9,000,000.00 9,000,000.00 Beli

    5 Mix Air Viod Content (Accurate Method) Set 1.00 15,000,000.00 15,000,000.00 Beli

    6 Core Drill Set 1.00 15,000,000.00 15,000,000.00 Beli

    7 Metal Thermometer Set 1.00 1,000,000.00 1,000,000.00 Beli

    8 Accessories and Tolls Set 1.00 5,000,000.00 5,000,000.00 Beli

    9 Penetration Test Bln 6.00 1,000,000.00 6,000,000.00 Beli

    10 Softening Point Set 1.00 6,000,000.00 6,000,000.00 Beli

    11 Refusal Density Compactor Set 1.00 15,000,000.00 15,000,000.00 Beli

    SUB TOTAL 110,000,000.00

    IV. Concrete Testing

    1 Slump Cone Set 1.00 500,000.00 500,000.00 Beli

    2 Cylinder/Cube Mould for Compressive Strength Set 1.00 10,000,000.00 10,000,000.00 Beli

    3 Beam Mould for Flexural Strength Set 1.00 10,000,000.00 10,000,000.00 Beli

    4 Crushing Machine Set 1.00 50,000,000.00 50,000,000.00 Beli

    SUB TOTAL 70,500,000.00

    V. Peralatan pendukung

    1 Mobil Pick Up Unit 2.00 100,000,000.00 200,000,000.00 Beli

    2 Komputer + Printer Set 1.00 10,000,000.00 10,000,000.00 Beli

    3 Furniture Set 1.00 15,000,000.00 15,000,000.00 Beli

    SUB TOTAL 225,000,000.00

    VI. Operasional

    Teknisi Laboratorium Bln 12.00 8,000,000.00 96,000,000.00

    Tenaga Kerja Terampil Bln 60.00 3,000,000.00 180,000,000.00

    SUB TOTAL 276,000,000.00

    VII. Test Luar

    Test Luar, sesuai kebutuhan atau atas Ls 1.00 0.00 0.00

    perintah Direksi SUB TOTAL 0.00

    FASILITAS LABORATORIUM

    TOTAL KETERANGANNO. URAIAN SATUAN VOLUME

  • TOTAL HARGA ( I - VII ) Rp 779,940,000.00

    Catatan :

    1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

    yang dibayar kontrak) dan biaya lain-lainnya.

    2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.

  • No Nama Alat Kode Kuantitas Sat Target

    No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat

    per hari total Tiap Jam per item

    1 2 3 4 5 6=4x5 7 8=7:6 9

    1 Asphalt Mixing Plant E01

    6.3 (1) 3 75 7 525 1 M2 0.002 0.0007

    6.3 (2) 9 225 7 1575 1 M2 0.001 0.0009

    6.3 (3) 9 225 7 1575 1 M2 0.001 0.0013

    6.3(3a) 9 225 7 1575 1 Ton 0.001 0.0201

    6.3(4) 9 225 7 1575 1 M3 0.001 0.0448

    6.3(4a) 9 225 7 1575 1 Ton 0.001 0.0201

    6.3(5a) 9 225 7 1575 1 M2 0.001 0.0019

    6.3(5b) 9 225 7 1575 1 M2 0.001 0.0019

    6.3(5c) 9 225 7 1575 1 Ton 0.001 0.0201

    6.3(5d) 2 50 7 350 1 Ton 0.003 0.0201

    6.3(6a) 9 225 7 1575 1 M3 0.001 0.0466

    6.3(6b) 9 225 7 1575 1 M3 0.001 0.0466

    6.3(6c) 9 225 7 1575 1 Ton 0.001 0.0201

    6.3(6d) 9 225 7 1575 1 Ton 0.001 0.0201

    6.3(7a) 9 225 7 1575 1 M3 0.001 0.0466

    6.3(7b) 9 225 7 1575 1 M3 0.001 0.0466

    6.3(7c) 9 225 7 1575 1 Ton 0.001 0.0201

    6.3(7d) 9 225 7 1575 1 Ton 0.001 0.0201

    8.1 (5) 9 225 7 1575 1 M3 0.001 0.0554

    2 Asphalt Finisher E02

    6.3 (1) 9 225 7 1575 1 M2 0.001 0.0013

    6.3 (2) 9 225 7 1575 1 M2 0.001 0.0013

    6.3 (3) 9 225 7 1575 1 M2 0.001 0.0013

    6.3(3a) 9 225 7 1575 1 Ton 0.001 0.0191

    6.3(4) 2 50 7 350 1 M3 0.003 0.0364

    6.3(4a) 9 225 7 1575 1 Ton 0.001 0.0041

    6.3(5a) 9 225 7 1575 1 M2 0.001 0.0013

    6.3(5b) 9 225 7 1575 1 M2 0.001 0.0013

    6.3(5c) 9 225 7 1575 1 Ton 0.001 0.0137

    6.3(5d) 9 225 7 1575 1 Ton 0.001 0.0137

    6.3(6a) 9 225 7 1575 1 M3 0.001 0.0255

    Jadwal Pekerjaan

    Jam Kerja

    Peralatan Yang Diperlukan

    Perhitungan Kebutuhan Alat untuk Mobilisasi

  • No Nama Alat Kode Kuantitas Sat Target

    No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat

    per hari total Tiap Jam per item

    1 2 3 4 5 6=4x5 7 8=7:6 9

    Jadwal Pekerjaan

    Jam Kerja

    Peralatan Yang Diperlukan

    6.3(6b) 9 225 7 1575 1 M3 0.001 0.0255

    6.3(6c) 9 225 7 1575 1 Ton 0.001 0.0110

    6.3(6d) 9 225 7 1575 1 Ton 0.001 0.0110

    6.3(7a) 9 225 7 1575 1 M3 0.001 0.0212

    6.3(7b) 9 225 7 1575 1 M3 0.001 0.0212

    6.3(7c) 9 225 7 1575 1 Ton 0.001 0.0092

    6.3(7d) 9 225 7 1575 1 Ton 0.001 0.0092

    6.4 (1) 9 225 7 1575 1 M2 0.001 0.0003

    6.4 (2) 9 225 7 1575 1 M2 0.001 0.0003

    6.4 (3) 9 225 7 1575 1 M2 0.001 0.0003

    3 Asphalt Sprayer E03

    6.6.1 9 225 7 1575 1 M3 0.001 0.0004

    6.6.2 9 225 7 1575 1 M3 0.001 0.0004

    8.1 (7) 9 225 7 1575 1 M3 0.001 0.0359

    8.1 (9) 9 225 7 1575 1 Liter 0.001 0.0003

    4 Bulldozer E04

    9.7 7 175 7 1225 jam 0.000

    5 Concrete Mixer E06

    7.1(5) 4 100 7 700 m3 0.000

    7.1(6) 4 100 7 700 m3 0.000

    7.1(8) 4 100 7 700 m3 0.000

    7.9 4 100 7 700 m3 0.000

    9.18 7 175 7 1225 jam 0.000

    6 Concrete Vibrator

    7.1(5) 4 100 7 700 m3 0.000

    7.1(6) 4 100 7 700 m3 0.000

    7.1(8) 4 100 7 700 m3 0.000

    7 Compressor E05

    6.1(1) 9 225 7 1575 liter 0.000

    9.17 7 175 7 1225 jam 0.000

    8 Crane E07

    9.12 7 175 7 1225 jam 0.000

    9 Dump Truck E08

    2.1 7 175 7 1225 m3 0.000

  • No Nama Alat Kode Kuantitas Sat Target

    No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat

    per hari total Tiap Jam per item

    1 2 3 4 5 6=4x5 7 8=7:6 9

    Jadwal Pekerjaan

    Jam Kerja

    Peralatan Yang Diperlukan

    3.1(1) 6 150 7 1050 m3 0.000

    3.2(2) 6 150 7 1050 m3 0.000

    4.2(1) 7 175 7 1225 m3 0.000

    5.1(1) 5 125 7 875 m3 0.000

    5.1(2) 5 125 7 875 m3 0.000

    6.1(1) 9 225 7 1575 liter 0.000

    6.1(2) 9 225 7 1575 liter 0.000

    6.3(5) 9 225 7 1575 m2 0.000

    6.3(6) 9 225 7 1575 m3 0.000

    6.3(6)a 9 225 7 1575 m3 0.000

    6.3(7) 9 225 7 1575 m3 0.000

    8.1(1) 2 50 7 350 m3 0.000

    8.1(5) 2 50 7 350 m3 0.000

    8.4(4) 2 50 7 350 bh 0.000

    8.4(6) 2 50 7 350 bh 0.000

    9.4 7 175 7 1225 jam 0.000

    10 Excavator E10

    2.1 7 175 7 1225 m3 0.000

    3.1(1) 6 150 7 1050 m3 0.000

    9.11 7 175 7 1225 jam 0.000

    11 Flat Bed Truck E11

    9.5 7 175 7 1225 jam 0.000

    12 Generator Set E12

    6.3(5) 9 225 7 1575 m2 0.000

    6.3(6) 9 225 7 1575 m3 0.000

    6.3(6)a 9 225 7 1575 m3 0.000

    6.3(7) 9 225 7 1575 m3 0.000

    8.1(5) 2 50 7 350 m3 0.000

    13 Motor Grader E13

    3.2(2) 6 150 7 1050 m3 0.000

    3.3(1) 6 150 7 1050 m2 0.000

    4.2(1) 7 175 7 1225 m3 0.000

    5.1(1) 5 125 7 875 m3 0.000

    5.1(2) 5 125 7 875 m3 0.000

    9.8 7 175 7 1225 jam 0.000

  • No Nama Alat Kode Kuantitas Sat Target

    No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat

    per hari total Tiap Jam per item

    1 2 3 4 5 6=4x5 7 8=7:6 9

    Jadwal Pekerjaan

    Jam Kerja

    Peralatan Yang Diperlukan

    14 Pneumatic Tyred Roller

    5.1(1) 7 175 7 1225 m3 0.000

    5.1(2) 5 125 7 875 m3 0.000

    6.3(5) 5 125 7 875 m2 0.000

    6.3(6) 9 225 7 1575 m3 0.000

    6.3(6)a 9 225 7 1575 m3 0.000

    6.3(7) 9 225 7 1575 m3 0.000

    15 Tandem Roller E17

    6.3(5) 9 225 7 1575 m2 0.000

    6.3(6) 9 225 7 1575 m3 0.000

    6.3(6)a 9 225 7 1575 m3 0.000

    6.3(7) 9 225 7 1575 m3 0.000

    8.1(5) 2 50 7 350 m3 0.000

    16 Vibrator Roller E19

    3.2(2) 6 150 7 1050 m3 0.000

    5.1(1) 5 125 7 875 m3 0.000

    5.1(2) 5 125 7 875 m3 0.000

    9.14 7 175 7 1225 jam 0.000

    17 Water Tank E23

    3.3(1) 6 150 7 1050 m2 0.000

    4.2(1) 7 175 7 1225 m3 0.000

    5.1(1) 5 125 7 875 m3 0.000

    7.1(5) 4 100 7 700 m3 0.000

    7.1(6) 4 100 7 700 m3 0.000

    7.1(8) 4 100 7 700 m3 0.000

    7.9 4 100 7 700 m3 0.000

    8.1(1) 2 50 7 350 m3 0.000

    9.6 7 175 7 1225 jam 0.000

    18 Wheel Loader E15

    3.2(2) 6 150 7 1050 m3 0.000

    4.2(1) 7 175 7 1225 m3 0.000

    5.1(1) 5 125 7 875 m3 0.000

    5.1(2) 5 125 7 875 m3 0.000

    6.3(5) 9 225 7 1575 m2 0.000

    6.3(6) 9 225 7 1575 m3 0.000

    6.3(6)a 9 225 7 1575 m3 0.000

    6.3(7) 9 225 7 1575 m3 0.000

    8.1(1) 2 50 7 350 m3 0.000

    8.1(5) 2 50 7 350 m3 0.000

    9.9 7 175 7 1225 jam 0.000

    19 Pedestrian Roller E24

    8.1(1) 2 50 7 350 m3 0.000

  • jumlah alat jumlah minimal kebut. di

    per item alat lapangan

    10=8x9 11 12 13

    0.000001 0.00033 1 1

    0.000001

    0.000001

    0.000013

    0.000028

    0.000013

    0.000001

    0.000001

    0.000013

    0.000057

    0.000030

    0.000030

    0.000013

    0.000013

    0.000030

    0.000030

    0.000013

    0.000013

    0.000035

    0.000001 0.00023 1 1

    0.000001

    0.000001

    0.000012

    0.000104

    0.000003

    0.000001

    0.000001

    0.000009

    0.000009

    0.000016

    Peralatan Yang Diperlukan

    Perhitungan Kebutuhan Alat untuk Mobilisasi

  • jumlah alat jumlah minimal kebut. di

    per item alat lapangan

    10=8x9 11 12 13

    Peralatan Yang Diperlukan

    0.000016

    0.000007

    0.000007

    0.000013

    0.000013

    0.000006

    0.000006

    0.000000

    0.000000

    0.000000

    0.000000 0.00002 1 1

    0.000000

    0.000023

    0.000000

    0.000 0.000 1 1

    0.000 0.000 1 1

    0.000

    0.000

    0.000

    0.000

    0.000 0.000 1 1

    0.000

    0.000

    0.000 0.000 1 1

    0.000

    0.000 0.000 1 1

    0.000 0.000 18 18

  • jumlah alat jumlah minimal kebut. di

    per item alat lapangan

    10=8x9 11 12 13

    Peralatan Yang Diperlukan

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000 0.000 3 3

    0.000

    0.000

    0.000 0.000 1 1

    0.000 0.000 1 1

    0.000

    0.000

    0.000

    0.000

    0.000 0.000 1 1

    0.000

    0.000

    0.000

    0.000

    0.000

  • jumlah alat jumlah minimal kebut. di

    per item alat lapangan

    10=8x9 11 12 13

    Peralatan Yang Diperlukan

    0.000 0.000 1 1

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000 0.000 1 1

    0.000

    0.000

    0.000

    0.000

    0.000 0.000 1 1

    0.000

    0.000

    0.000

    0.000 0.000 1 1

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000 0.000 3 3

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000

    0.000 0.000 1 1

  • INFORMASI UMUM

    No. U R A I A N I N F O R M A S I

    1. Nama Kegiatan : Perencanaan Dinas Bina Marga Kabupaten Malang

    2. Nama Paket : Perencanaan Pembangunan, Rehabilitasi/Pemeliharaan

    Jalan dan Jembatan serta Bangunan Pelengkap

    3. Propinsi / Kabupaten / Kotamadya : Jawa Timur / Kabupaten Malang

    4. Lokasi pekerjaan Periksa lampiran

    5. Kondisi jalan lama . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    6. Panjang efektif ( lihat sketsa di bawah ) 5.0 Kilometer ( Leff = a + b )

    7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( . + .. + ) meter

    8. Lebar Rencana ( bahu + perkerasan + bahu ) ( . + + ) meter

    9. Penampang jalan, jenis dan volume pekerjaan pokok Lihat lampiran.

    10. Jangka waktu pelaksanaan pekerjaan .. hari kalender

    Atau : .. bulan (Periode Pelaksanaan)

    11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L = 20.25 Kilometer

    Perhitungan didasarkan pada sketsa di bawah ini : L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

    21.00

    2.50 Km = a 2.50 Km = b

    A 11.50 B

    Base Camp --------->

    Kalkulasi Jarak Rata-Rata =

    12. Jam kerja efektif dalam 1 hari 7.00 jam

    13. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat

    14. Tingkat Suku Bunga Investasi Alat 10.00 %

    15. Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung

    16. RINGKASAN METODE PELAKSANAAN

    a. Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

    b. Pekerjaan Tanah dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    c. Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    d. Pekerjaan Campuran Aspal Panas dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    e. Pekerjaan Pasangan Batu dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    f. Pekerjaan Pengembalian Kondisi dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    g. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    17. Lokasi Quarry Periksa lampiran.

    18 Jumlah Jembatan = ...................... Buah Periksa lampiran.

    19 Total Bentang Jembatan = .................. Buah Periksa lampiran.

    20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    21 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    22 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    19.00 Km = c

    D

    C

  • HARGA & JARAK RATA-RATA

    DARI SUMBER BAHAN (QUARRY)

    HARGA JARAK

    No. U R A I A N SATUAN ROYALTY QUARRY KET.

    (Rp) ( Km )

    1. M01 - P a s i r Pasang M3 20,000.00 23.00 Ke Base Camp

    M01 - P a s i r Beton M3 22,500.00 21.00 Ke Lokasi Pek.

    2. M02 - Batu Kali M3 30,000.00 18.00 Ke Lokasi Pek.

    3. M06 - Batu Belah/Batu Quarry Besar M3 27,500.00 18.00 Ke Lokasi Pek.

    4. M07 - G r a v e l M3 27,500.00 15.00 Ke Base Camp

    5. M10 - Aspal Cement (Pelabuhan) KG 167.00 Ke Base Camp

    6. M16 - S i r t u M3 22,500.00 20.00 Ke Lokasi Pek.

    7. M44 - Pasir Urug M3 15,000.00 22.00 Ke Lokasi Pek.

    8 M08 - Tanah Timbun M3 12,500.00 10.00 Ke Lokasi Pek.

    9 M09 - Material Pilihan M3 22,500.00 15.00 Ke Lokasi Pek.

    Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3

    Catatan :

    Patumbak - Medan = 10 km

    Medan - Lokasi Proyek = 165.20 km

    Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km

    Lokasi Proyek - Base Camp = 8.73 km

    Total Sumber Quarry Patumbak s/d Base Camp = 176.73 km

    Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan = 50 km

    Jarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan = 45 km

    Jarak Quarry Pasir ke Base Camp diperkirakan = 18.73 km

    Jarak Quarry Pasir ke Lokasi Proyek diperkirakan = 10 km

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M01a - Pasir Pasang

    Lokasi : Quarry

    Tujuan: Base Camp

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    I. ASUMSI

    1 Menggunakan alat berat

    2 Kondisi Jalan : baik

    3 Jarak Quarry ke lokasi Base Camp L 23.00 Km

    4 Harga satuan pasir di Quarry RpM01 1.00 M3 20,000.00

    5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26

    6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79

    7 Berat volume pasir Bil 1.42 ton/m3

    II. URUTAN KERJA

    1 Pasir digali dengan Excavator

    2 Excavator sekaligus memuat pasir hasil

    galian ke dalam Dump Truck

    3 Dump Truck mengangkut pasir ke lokasi

    Base Camp

    III. PERHITUNGAN

    EXCAVATOR (E10)

    Kapasitas Bucket V 0.93 M3

    Faktor Bucket Fb 1.10 -

    Faktor Efisiensi alat Fa 0.83 -

    Waktu siklus Ts1

    - Menggali / memuat T1 0.50 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.00 menit

    Kap. Prod. / jam =

    V x Fb x Fa x 60 Q1 50.9454 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,164.36 Rupiah

    DUMP TRUCK (E09)

    Kapasitas bak V 10.00 ton

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2

    - Muat = (V x 60)/Q1 x Bil) T1 8.29 menit

    - Waktu tempuh isi = (L/v1) x 60 T2 34.50 menit

    - Waktu tempuh kosong = (L/v2) x 60 T3 23.00 menit

    - Lain-lain T4 1.00 menit

    Ts2 66.79 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M01a - Pasir Pasang

    Lokasi : Quarry

    Tujuan: Base Camp

    Lanjutan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    Kapasitas Produksi / Jam =

    V x Fa x 60 Q2 5.25 M3 / Jam

    Ts2 x Bil

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 62,105.52 Rupiah

    IV. HARGA SATUAN DASAR BAHAN

    DI LOKASI BASE CAMP

    Harga Satuan Dasar Pasir =

    ( RpM01 + Rp1 + Rp2 ) M01 92,269.88 Rupiah

    Dibulatkan : M01 92,300.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M02 - Batu Kali

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    I. ASUMSI

    1 Menggunakan alat berat

    2 Kondisi Jalan : baik

    3 Jarak Quarry ke Lokasi Pekerjaan L 18.00 Km

    4 Harga satuan batu kali di Quarry RpM02 1.00 M3 30,000.00

    5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26

    6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79

    7 Berat volume batu kali Bil 1.44 ton/m3

    II. URUTAN KERJA

    1 Batu kali digali dengan Excavator

    2 Excavator sekaligus memuat batu kali

    hasil galian ke dalam Dump Truck

    3 Dump Truck mengangkut batu kali ke

    lokasi pekerjaan

    III. PERHITUNGAN

    EXCAVATOR (E10)

    Kapasitas Bucket V 0.93 M3

    Faktor Bucket Fb 1.10 -

    Faktor Efisiensi alat Fa 0.83 -

    Waktu siklus Ts1

    - Menggali / memuat T1 0.75 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.25 menit

    Kap. Prod. / jam =

    V x Fb x Fa x 60 Q1 40.75632 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 12,705.45 Rupiah

    DUMP TRUCK (E09)

    Kapasitas bak V 10.00 ton

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2

    - Muat = (V x 60)/(Q1 x Bil) T1 10.22 menit

    - Waktu tempuh isi = (L/v1) x 60 T2 27.00 menit

    - Waktu tempuh kosong = (L/v2) x 60 T3 18.00 menit

    - Lain-lain T4 1.00 menit

    Ts2 56.22 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M02 - Batu Kali

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    Lanjutan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    Kapasitas Produksi / Jam =

    V x Fa x 60 Q2 6.15 M3 / Jam

    Ts2 x Bil

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 53,013.26 Rupiah

    IV. HARGA SATUAN DASAR BAHAN

    DI LOKASI PEKERJAAN

    Harga Satuan Dasar Batu kali =

    ( RpM02 + Rp1 + Rp2 ) M02 95,718.71 Rupiah

    Dibulatkan : M02 95,700.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M06 - Batu Belah

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    I. ASUMSI

    1 Menggunakan alat berat

    2 Kondisi Jalan : baik

    3 Jarak Quarry ke Lokasi Pekerjaan L 18.00 Km

    4 Harga satuan batu kali di Quarry RpM06 1.00 M3 27,500.00

    5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26

    6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79

    7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 317,067.17

    8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 5,357.14

    9 Berat volume batu belah Bil 1.60 ton/m3

    II. URUTAN KERJA

    1 Batu kali digali dengan Excavator

    2 Batu kali dibelah oleh Pekerja

    3 Dengan Wheel Loader batu belah dimuat

    ke Dump Truck yang mengangkut batu

    belah ke lokasi pekerjaan

    III. PERHITUNGAN

    3.a EXCAVATOR (E10)

    Kapasitas Bucket V 0.93 M3

    Faktor Bucket Fb 1.10 -

    Faktor Efisiensi alat Fa 0.83 -

    Waktu siklus Ts1

    - Menggali / memuat T1 0.75 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.25 menit

    Kap. Prod. / jam =

    V x Fb x Fa x 60 Q1 40.75632 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 12,705.45 Rupiah

    3.b WHEEL LOADER (E15)

    Kapasitas Bucket V 1.50 M3

    Faktor Bucket Fb 1.00 -

    Faktor Efisiensi Alat Fa 0.83 -

    Waktu sklus Ts1

    - Muat T1 0.75 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.25 menit

    Kapasitas Produksi / Jam =

    V x Fb x Fa x 60 Q2 59.76 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q2) x RpE15 Rp2 5,305.68 Rupiah

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M06 - Batu Belah

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    Lanjutan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    3.c DUMP TRUCK (E09)

    Kapasitas bak V 10.00 ton

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2

    - Muat = (V x 60)/(Q1 x Bil) T1 9.20 menit

    - Waktu tempuh isi = (L/v1) x 60 T2 27.00 menit

    - Waktu tempuh kosong = (L/v2) x 60 T3 18.00 menit

    - Lain-lain T4 1.00 menit

    Ts2 55.20 menit

    Kapasitas Produksi / Jam =

    V x Fa x 60 Q3 5.64 M3 / Jam

    Ts2 x Bil

    Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 57,832.55 Rupiah

    3.d PEKERJA

    Produksi menentukan : Excavator Q1 40.75632 M3 / Jam

    Hasil galian batu / hari = Q1 x 7 Jam Qt 285.29424 M3 / 7 jam

    Kebutuhan Pekerja P 15.00 Orang

    Biaya Pekerja / M3 =

    { (7 Jam x P) : Qt } x RpL01 Rp4 1,971.65 Rupiah

    IV. HARGA SATUAN DASAR BAHAN

    DI LOKASI PEKERJAAN

    Harga Satuan Dasar Batu belah =

    ( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) M06 105,315.32 Rupiah

    Dibulatkan : M06 105,300.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M07 - Gravel

    Lokasi : Quarry

    Tujuan: Base Camp

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    I. ASUMSI

    1 Menggunakan alat berat

    2 Kondisi Jalan : baik

    3 Jarak Quarry ke Lokasi Pekerjaan L 15.00 Km

    4 Harga satuan Gravel di Quarry RpM07 1.00 M3 27,500.00

    5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26

    6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79

    7 Berat volume gravel Bil 2.20 ton/m3

    II. URUTAN KERJA

    1 Gravel digali dengan Excavator

    2 Excavator sekaligus memuat gravel

    hasil galian ke dalam Dump Truck

    3 Dump Truck mengangkut gravel ke

    lokasi pekerjaan

    III. PERHITUNGAN

    EXCAVATOR (E10)

    Kapasitas Bucket V 0.93 M3

    Faktor Bucket Fb 1.10 -

    Faktor Efisiensi alat Fa 0.83 -

    Waktu siklus Ts1

    - Menggali / memuat T1 0.75 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.25 menit

    Kap. Prod. / jam =

    V x Fb x Fa x 60 Q1 40.75632 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 12,705.45 Rupiah

    DUMP TRUCK (E09)

    Kapasitas bak V 10.00 ton

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2

    - Muat = (V x 60)/(Q1 x Bil) T1 6.69 menit

    - Waktu tempuh isi = (L/v1) x 60 T2 22.50 menit

    - Waktu tempuh kosong = (L/v2) x 60 T3 15.00 menit

    - Lain-lain T4 1.00 menit

    Ts2 45.19 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M07 - Gravel

    Lokasi : Quarry

    Tujuan: Base Camp

    Lanjutan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    Kapasitas Produksi / Jam =

    V x Fa x 60 Q2 5.01 M3 / Jam

    Ts2 x Bil

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 65,100.77 Rupiah

    IV. HARGA SATUAN DASAR BAHAN

    DI LOKASI BASE CAMP

    Harga Satuan Dasar Gravel =

    ( RpM07 + Rp1 + Rp2 ) M07 105,306.22 Rupiah

    Dibulatkan : M07 105,300.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M16 - Sirtu

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    I. ASUMSI

    1 Menggunakan alat berat

    2 Kondisi Jalan : baik

    3 Jarak Quarry ke lokasi Base Camp L 20.00 Km

    4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 22,500.00

    5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26

    6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79

    7 Berat volume sirtu Bil 1.51 ton/m3

    II. URUTAN KERJA

    1 Sirtu digali dengan Excavator

    2 Excavator sekaligus memuat sirtu hasil

    galian ke dalam Dump Truck

    3 Dump Truck mengangkut sirtu ke lokasi

    Base Camp

    III. PERHITUNGAN

    EXCAVATOR (E10)

    Kapasitas Bucket V 0.93 M3

    Faktor Bucket Fb 1.10 -

    Faktor Efisiensi alat Fa 0.83 -

    Waktu siklus Ts1

    - Menggali / memuat T1 0.50 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.00 menit

    Kap. Prod. / jam =

    V x Fb x Fa x 60 Q1 50.9454 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,164.36 Rupiah

    DUMP TRUCK (E09)

    Kapasitas bak V 10.00 ton

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2

    - Muat = (V x 60)/(Q1 x Bil) T1 7.80 menit

    - Waktu tempuh isi = (L/v1) x 60 T2 30.00 menit

    - Waktu tempuh kosong = (L/v2) x 60 T3 20.00 menit

    - Lain-lain T4 1.00 menit

    Ts2 58.80 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M16 - Sirtu

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    Lanjutan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    Kapasitas Produksi / Jam =

    V x Fa x 60 Q2 5.61 M3 / Jam

    Ts2 x Bil

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 58,137.47 Rupiah

    IV. HARGA SATUAN DASAR BAHAN

    DI LOKASI PEKERJAAN

    Harga Satuan Dasar Sirtu =

    ( RpM16 + Rp1 + Rp2 ) M16 90,801.82 Rupiah

    Dibulatkan : M16 90,800.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M44 - Pasir Urug

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    I. ASUMSI

    1 Menggunakan alat berat

    2 Kondisi Jalan : baik

    3 Jarak Quarry ke lokasi pekerjaan L 22.00 Km

    4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 15,000.00

    5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26

    6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79

    7 Berat volume pasir urug Bil 1.42 ton/m3

    II. URUTAN KERJA

    1 pasir urug digali dengan Excavator

    2 Excavator sekaligus memuat pasir urug

    hasil galian ke dalam Dump Truck

    3 Dump Truck mengangkut pasir urug

    ke lokasi pekerjaan

    III. PERHITUNGAN

    EXCAVATOR (E10)

    Kapasitas Bucket V 0.93 M3

    Faktor Bucket Fb 1.10 -

    Faktor Efisiensi alat Fa 0.83 -

    Waktu siklus Ts1

    - Menggali / memuat T1 0.50 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.00 menit

    Kap. Prod. / jam =

    V x Fb x Fa x 60 Q1 50.9454 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,164.36 Rupiah

    DUMP TRUCK (E09)

    Kapasitas bak V 10.00 ton

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2

    - Muat = (V x 60)/(Q1 x Bil) T1 8.29 menit

    - Waktu tempuh isi = (L/v1) x 60 T2 33.00 menit

    - Waktu tempuh kosong = (L/v2) x 60 T3 22.00 menit

    - Lain-lain T4 1.00 menit

    Ts2 64.29 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M44 - Pasir Urug

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    Lanjutan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    Kapasitas Produksi / Jam =

    V x Fa x 60 Q2 5.45 M3 / Jam

    Ts2 x Bil

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 59,781.00 Rupiah

    IV. HARGA SATUAN DASAR BAHAN

    DI LOKASI PEKERJAAN

    Harga Satuan Dasar pasir urug =

    ( RpM44 + Rp1 + Rp2 ) M44 84,945.36 Rupiah

    Dibulatkan : M44 84,900.00 Rupiah

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M1c- Pasir Beton

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    I. ASUMSI

    1 Menggunakan alat berat

    2 Kondisi Jalan : baik

    3 Jarak Quarry ke lokasi pekerjaan L 21.00 Km

    4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 22,500.00

    5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26

    6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79

    7 Berat isi volume pasir beton Bil 1.69 ton/m3

    II. URUTAN KERJA

    1 pasir urug digali dengan Excavator

    2 Excavator sekaligus memuat pasir urug

    hasil galian ke dalam Dump Truck

    3 Dump Truck mengangkut pasir urug

    ke lokasi pekerjaan

    III. PERHITUNGAN

    EXCAVATOR (E10)

    Kapasitas Bucket V 0.50 M3

    Faktor Bucket Fb 1.10 -

    Faktor Efisiensi alat Fa 0.83 -

    Waktu siklus Ts1

    - Menggali / memuat T1 0.50 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.00 menit

    Kap. Prod. / jam =

    V x Fb x Fa x 60 Q1 27.39 M3 / Jam

    Ts1

    Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 18,905.71 Rupiah

    DUMP TRUCK (E09)

    Kapasitas bak V 10.00 ton

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2

    - Muat = (V x 60)/(Q1 x Bil) T1 12.96 menit

    - Waktu tempuh isi = (L/v1) x 60 T1 31.50 menit

    - Waktu tempuh kosong = (L/v2) x 60 T2 21.00 menit

    - Lain-lain T4 1.00 menit

    Ts2 66.46 menit

    Bersambung

  • ANALISA HARGA DASAR SATUAN BAHAN

    Jenis : M1c- Pasir Beton

    Lokasi : Quarry

    Tujuan: Lokasi Pekerjaan

    Lanjutan

    HARGA

    No. URAIAN KODE KOEF. SATUAN SATUAN

    (Rp.)

    Kapasitas Produksi / Jam =

    V x Fa x 60 Q2 4.43 M3 / Jam

    Ts2 x Bil

    Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 73,547.07 Rupiah

    IV. HARGA SATUAN DASAR BAHAN

    DI LOKASI PEKERJAAN

    Harga Satuan Dasar pasir urug =

    ( RpM44 + Rp1 + Rp2 ) M44 114,952.78 Rupiah

    Dibulatkan : M44 115,000.00 Rupiah

  • HARGA

    No. U R A I A N KODE SATUAN SATUAN KETERANGAN

    ( Rp.)

    1 Pasir Pasang (Sedang) M01b M3 105,000.00 Base Camp

    2 Pasir Beton (Kasar) M01a M3 110,000.00 Base Camp

    3 Pasir Halus (untuk HRS) M01c M3 105,000.00 Base Camp

    4 Pasir Urug (ada unsur lempung) M01d M3 78,000.00 Base Camp

    5 Batu Kali M02 M3 105,000.00 Lokasi Pekerjaan

    6 Agregat Kasar M03 M3 162,018.16 Base Camp

    7 Agregat Halus M04 M3 162,018.16 Base Camp

    8 F i l l e r M05 Kg 1,125.00 Proses/Base Camp

    9 Batu Belah / Kerakal M06 M3 115,000.00 Lokasi Pekerjaan

    10 G r a v e l M07 M3 96,000.00 Base Camp

    11 Bahan Tanah Timbunan M08 M3 12,500.00 Borrow Pit/quarry

    12 Bahan Pilihan M09 M3 28,500.00 quarry

    13 Aspal M10 KG 7,851.60 Base Camp

    Aspal Curah M10a KG 6,174.38

    14 Kerosen / Minyak Tanah M11 LITER 9,210.00 Base Camp

    15 Semen / PC (40kg) M12 Zak 45,000.00 Base Camp

    16 Semen / PC (kg) M12 Kg 1,125.00 Base Camp

    17 Besi Beton M13 Kg 9,000.00 Lokasi Pekerjaan

    18 Kawat Beton M14 Kg 12,000.00 Lokasi Pekerjaan

    19 Kawat Bronjong M15 Kg 13,500.00 Lokasi Pekerjaan

    20 S i r t u M16 M3 96,000.00 Lokasi Pekerjaan

    21 Cat Marka (Non Thermoplas) M17a Kg 22,500.00 Lokasi Pekerjaan

    22 Cat Marka (Thermoplastic) M17b Kg 27,500.00 Lokasi Pekerjaan

    23 P a k u M18 Kg 12,000.00 Lokasi Pekerjaan

    24 Kayu Perancah M19 M3 2,850,000.00 Lokasi Pekerjaan

    25 B e n s i n (Industri) M20 LITER 8,337.00 Pertamina

    26 S o l a r (Industri) M21 LITER 9,198.00 Pertamina

    B e n s i n (Non Industri) M20a LITER 4,500.00 Pertamina

    S o l a r (Non Industri) M21a LITER 4,500.00 Pertamina

    27 Minyak Pelumas / Olie M22 LITER 30,000.00 Pertamina

    28 Plastik Filter M23 M2 15,000.00 Lokasi Pekerjaan

    29 Pipa Galvanis Dia. 1.6" M24 Batang 160,000.00 Lokasi Pekerjaan

    30 Pipa Porus M25 M' 40,000.00 Lokasi Pekerjaan

    31 Bahan Agr.Base Kelas A M26 M3 183,855.81 Base Camp

    32 Bahan Agr.Base Kelas B M27 M3 163,335.25 Base Camp

    33 Bahan Agr.Base Kelas C M28 M3 148,771.71 Base Camp

    34 Bahan Agr.Base Kelas C2 M29 M3 0.00 Tidak tersedia

    35 Geotextile M30 M2 27,500.00 Lokasi Pekerjaan

    36 Aspal Emulsi M31 Kg 5,000.00 Base Camp

    37 Gebalan Rumput M32 M2 15,000.00 Lokasi Pekerjaan

    38 Thinner M33 LITER 12,000.00 Lokasi Pekerjaan

    39 Glass Bead M34 Kg 28,600.00 Lokasi Pekerjaan

    40 Pelat Rambu (Eng. Grade) M35a BH 176,000.00 Lokasi Pekerjaan

    41 Pelat Rambu (High I. Grade) M35b BH 216,500.00 Lokasi Pekerjaan

    42 Rel Pengaman M36 M' 412,500.00 Lokasi Pekerjaan

    43 Beton K-250 M37 M3 918,233.40 Lokasi Pekerjaan

    44 Baja Tulangan (Polos) U24 M39a Kg 10,500.00 Lokasi Pekerjaan

    45 Baja Tulangan (Ulir) D32 M39b Kg 11,500.00 Lokasi Pekerjaan

    46 Kapur M40 M3 850,000.00 Hasil Proses

    47 Chipping M41 M3 162,018.16 Base Camp

    48 Chipping (kg) M41kg Kg 115.73 Base Camp

    49 Cat M42 Kg 27,500.00 Base Camp

    50 Pemantul Cahaya (Reflector) M43 Bh. 12,600.00 Base Camp

    51 Pasir Urug M44 M3 78,000.00 Base Camp

    52 Arbocell M45 Kg. 32,000.00 Base Camp

    53 Baja Bergelombang M46 Kg 12,500.00 Lokasi Pekerjaan

    54 Beton K-125 M47 M3 593,685.70 Lokasi Pekerjaan

    55 Baja Struktur M48 Kg 11,500.00 Pelabuhan terdekat

    56 Tiang Pancang Baja M49 M' 25,247.37 Lokasi Pekerjaan

    57 Tiang Pancang Beton Pratekan M50 M3 423,957.93 Pelabuhan terdekat

    58 Kawat Las M51 Dos 16,000.00 Lokasi Pekerjaan

    59 Pipa Baja M52 Kg 15,000.00 Pelabuhan terdekat

    60 Minyak Fluks M53 Liter 6,237.00 Base Camp

    61 Bunker Oil M54 Liter 3,000.00 Base Camp

    62 Asbuton Halus M55 Ton 325,000.00 Base Camp

    63 Baja Prategang M56 Kg 10,000.00 Base Camp

    64 Baja Tulangan (Polos) U32 M57a Kg 11,000.00 Lokasi Pekerjaan

    DAFTAR

    HARGA DASAR SATUAN BAHAN

  • 65 Baja Tulangan (Ulir) D39 M39c Kg 11,500.00 Lokasi Pekerjaan

    66 Baja Tulangan (Ulir) D48 M39d Kg 12,000.00 Lokasi Pekerjaan

    67 PCI Girder L=17m M58a Buah 86,000,000.00 Pelabuhan terdekat

    68 PCI Girder L=21m M58b Buah 97,000,000.00 Pelabuhan terdekat

    69 PCI Girder L=26m M58c Buah 124,000,000.00 Pelabuhan terdekat

    70 PCI Girder L=32m M58d Buah 157,000,000.00 Pelabuhan terdekat

    71 PCI Girder L=36m M58e Buah 168,000,000.00 Pelabuhan terdekat

    72 PCI Girder L=41m M58f Buah 192,000,000.00 Pelabuhan terdekat

    73 Beton K-300 M59 M3 885,469.98 Lokasi Pekerjaan

    74 M60 M3 611,252.67 Lokasi Pekerjaan

    75 Cerucuk M61 M 15,000.00

    76 Elastomer M62 buah 300,000.00

    77 Bahan pengawet: kreosot M63 liter 5,000.00

    78 Mata Kucing M64 buah 75,000.00

    79 Anchorage M65 buah 600,000

    80 Anti strpping agent M66 liter 24,000.00

    81 Bahan Modifikasi M67 Kg 1,000.00

    82 Beton K-500 M68 M3 1,019,398.03

    83 Beton K-400 M69 M3 910,868.50

    84 Ducting (Kabel prestress) M70 M' 150,000.00

    85 Ducting (Strand prestress) M71 M' 50,000.00

    86 Beton K-350 M72 M3 896,720.47

    87 Multipleks 12 mm M73 Lbr 181,500.00

    88 Elastomer jenis 1 M74a buah 385,500.00 Base Camp

    89 Elastomer jenis 2 M74b buah 650,000.00 Base Camp

    90 Elastomer jenis 3 M74c buah 838,000.00 Base Camp

    91 Expansion Tipe Joint Asphaltic Plug M75d M 1,000,000.00 Base Camp

    92 Expansion Join Tipe Rubber M75e M 1,200,000.00 Base Camp

    93 Expansion Join Baja Siku M75f M 275,000.00 Base Camp

    94 Marmer M76 Buah 400,000.00 Base Camp

    95 Kerb Type A M77 Buah 45,000.00 Base Camp

    96 Paving Block M78 Buah 40,000.00 Lokasi Pekerjaan

    97 Mini Timber Pile M79 Buah 27,000.00 Lokasi Pekerjaan

    98 Expansion Joint Tipe Torma M80 M1 1,200,000.00 Lokasi Pekerjaan

    99 Strip Bearing M81 Buah 229,500.00 Lokasi Pekerjaan

    100 Joint Socket Pile 35x35 M82 Set 607,500.00 Lokasi Pekerjaan

    101 Joint Socket Pile 16x16x16 M83 Set 67,500.00 Lokasi Pekerjaan

    102 Mikro Pile 16x16x16 M84 M1 60,750.00 Lokasi Pekerjaan

    103 Matras Concrete M85 Buah 405,000.00 Lokasi Pekerjaan

    104 Assetilline M86 Botol 229,500.00 Lokasi Pekerjaan

    105 Oxygen M87 Botol 114,750.00 Lokasi Pekerjaan

    106 Batu Bara M88 Kg 600.00 Lokasi Pekerjaan

    107 Pipa Galvanis Dia 3" M24a M 110,000.00

    108 Pipa Galvanis Dia 1,5" M24b M 55,000.00

    109 Agregat Pecah Mesin 0-5 mm M91 M3 162,018.16 Base Camp

    110 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 162,018.16 Base Camp

    111 Agregat Pecah Mesin 20-30 mm M93 M3 162,018.16 Base Camp

    112 Joint Sealent M94 Kg 34,100.00

    113 Cat Anti Karat M95 Kg 35,750.00

    114 Expansion Cap M96 M2 6,050.00

    115 Polytene 125 mikron M97 Kg 19,250.00

    116 Curing Compound M98 Ltr 38,500.00

    117 Kayu Acuan M99 M3 176,000.00

    118 Additive M67a Ltr 38,500.00

    119 Casing M100 M2 9,000.00

    120

    121

    122

  • HARGA

    NO. KODE SATUAN SATUAN KETERANGAN

    ( Rp.)

    1 Pekerja (L01) Jam 5,357.14 37,500.00

    2 Tukang (L02) Jam 7,142.86 50,000.00

    3 M a n d o r (L03) Jam 8,571.43 60,000.00

    4 Operator (L04) Jam 7,428.57 52,000.00

    5 Pembantu Operator (L05) Jam 5,714.29 40,000.00

    6 Sopir / Driver (L06) Jam 6,428.57 45,000.00

    7 Pembantu Sopir / Driver (L07) Jam 5,000.00 35,000.00

    8 Mekanik (L08) Jam 7,857.14 55,000.00

    9 Pembantu Mekanik (L09) Jam 7,142.86 50,000.00

    10 Kepala Tukang (L10) Jam 7,500.00 52,500.00

    U R A I A N

    DAFTAR

    HARGA SATUAN UPAH

  • HARGA

    NO. KODE SATUAN SATUAN KETERANGAN

    ( Rp.)

    1 Pasir Pasang (Sedang) M01b M3 105,000.00 Base Camp

    2 Pasir Beton (Kasar) M01a M3 110,000.00 Base Camp

    3 Pasir Halus (untuk HRS) M01c M3 105,000.00 Base Camp

    4 Pasir Urug (ada unsur lempung) M01d M3 78,000.00 Base Camp

    5 Batu Kali M02 M3 105,000.00 Lokasi Pekerjaan

    6 Agregat Kasar M03 M3 162,018.16 Base Camp

    7 Agregat Halus M04 M3 162,018.16 Base Camp

    8 F i l l e r M05 Kg 1,125.00 Proses/Base Camp

    9 Batu Belah / Kerakal M06 M3 115,000.00 Lokasi Pekerjaan

    10 G r a v e l M07 M3 96,000.00 Base Camp

    11 Bahan Tanah Timbunan M08 M3 12,500.00 Borrow Pit/quarry

    12 Bahan Pilihan M09 M3 28,500.00 Quarry

    13 Aspal M10 KG 7,851.60 Base Camp

    Aspal Curah M10a KG 6,174.38

    14 Kerosen / Minyak Tanah M11 LITER 9,210.00 Base Camp

    15 Semen / PC (40kg) M12 Zak 45,000.00 Base Camp

    16 Semen / PC (kg) M12 Kg 1,125.00 Base Camp

    17 Besi Beton M13 Kg 9,000.00 Lokasi Pekerjaan

    18 Kawat Beton M14 Kg 12,000.00 Lokasi Pekerjaan

    19 Kawat Bronjong M15 Kg 13,500.00 Lokasi Pekerjaan

    20 S i r t u M16 M3 96,000.00 Lokasi Pekerjaan

    21 Cat Marka (Non Thermoplas) M17a Kg 22,500.00 Lokasi Pekerjaan

    22 Cat Marka (Thermoplastic) M17b Kg 27,500.00 Lokasi Pekerjaan

    23 P a k u M18 Kg 12,000.00 Lokasi Pekerjaan

    24 Kayu Perancah M19 M3 2,850,000.00 Lokasi Pekerjaan

    25 B e n s i n (Industri) M20 LITER 8,337.00 Pertamina

    26 S o l a r (Industri) M21 LITER 9,198.00 Pertamina

    B e n s i n (Non Industri) M20a LITER 4,500.00

    S o l a r (Non Industri) M21a LITER 4,500.00

    27 Minyak Pelumas / Olie M22 LITER 30,000.00 Pertamina

    28 Plastik Filter M23 M2 15,000.00 Lokasi Pekerjaan

    29 Pipa Galvanis Dia. 1.6" M24 Batang 160,000.00 Lokasi Pekerjaan

    30 Pipa Porus M25 M' 40,000.00 Lokasi Pekerjaan

    31 Bahan Agr.Base Kelas A M26 M3 183,855.81 Base Camp

    32 Bahan Agr.Base Kelas B M27 M3 163,335.25 Base Camp

    33 Bahan Agr.Base Kelas C M28 M3 148,771.71 Base Camp

    34 Bahan Agr.Base Kelas C2 M29 M3 0.00 Tidak tersedia

    35 Geotextile M30 M2 27,500.00 Lokasi Pekerjaan

    36 Aspal Emulsi M31 Kg 5,000.00 Base Camp

    37 Gebalan Rumput M32 M2 15,000.00 Lokasi Pekerjaan

    38 Thinner M33 LITER 12,000.00 Lokasi Pekerjaan

    39 Glass Bead M34 Kg 28,600.00 Lokasi Pekerjaan

    40 Pelat Rambu (Eng. Grade) M35a BH 176,000.00 Lokasi Pekerjaan

    41 Pelat Rambu (High I. Grade) M35b BH 216,500.00 Lokasi Pekerjaan

    42 Rel Pengaman M36 M' 412,500.00 Lokasi Pekerjaan

    43 Beton K-250 M37 M3 918,233.40 Lokasi Pekerjaan

    44 Baja Tulangan (Polos) U24 M39a Kg 10,500.00 Lokasi Pekerjaan

    45 Baja Tulangan (Ulir) D32 M39b Kg 11,500.00 Lokasi Pekerjaan

    46 Kapur M40 M3 850,000.00 Hasil Proses

    47 Chipping M41 M3 162,018.16 Base Camp

    48 Chipping (kg) M41kg Kg 115.73 Base Camp

    49 Cat M42 Kg 27,500.00 Base Camp

    50 Pemantul Cahaya (Reflector) M43 Bh. 12,600.00 Base Camp

    51 Pasir Urug M44 M3 78,000.00 Base Camp

    52 Arbocell M45 Kg. 32,000.00 Base Camp

    53 Baja Bergelombang M46 Kg 12,500.00 Lokasi Pekerjaan

    54 Beton K-125 M47 M3 593,685.70 Lokasi Pekerjaan

    55 Baja Struktur M48 Kg 11,500.00 Pelabuhan terdekat

    56 Tiang Pancang Baja M49 M' 25,247.37 Lokasi Pekerjaan

    57 Tiang Pancang Beton Pratekan M50 M3 423,957.93 Pelabuhan terdekat

    58 Kawat Las M51 Dos 16,000.00 Lokasi Pekerjaan

    59 Pipa Baja M52 Kg 15,000.00 Pelabuhan terdekat

    60 Minyak Fluks M53 Liter 6,237.00 Base Camp

    61 Bunker Oil M54 Liter 3,000.00 Base Camp

    62 Asbuton Halus M55 Ton 325,000.00 Base Camp

    63 Baja Prategang M56 Kg 10,000.00 Base Camp

    64 Baja Tulangan (Polos) U32 M57a Kg 11,000.00 Lokasi Pekerjaan

    65 Baja Tulangan (Ulir) D39 M39c Kg 11,500.00 Lokasi Pekerjaan

    U R A I A N

    DAFTAR

    HARGA DASAR SATUAN BAHAN

  • 66 Baja Tulangan (Ulir) D48 M39d Kg 12,000.00 Lokasi Pekerjaan

    67 PCI Girder L=17m M58a Buah 86,000,000.00 Pelabuhan terdekat

    68 PCI Girder L=21m M58b Buah 97,000,000.00 Pelabuhan terdekat

    69 PCI Girder L=26m M58c Buah 124,000,000.00 Pelabuhan terdekat

    70 PCI Girder L=32m M58d Buah 157,000,000.00 Pelabuhan terdekat

    71 PCI Girder L=36m M58e Buah 168,000,000.00 Pelabuhan terdekat

    72 PCI Girder L=41m M58f Buah 192,000,000.00 Pelabuhan terdekat

    73 Beton K-300 M59 M3 885,469.98 Lokasi Pekerjaan

    74 Beton K-175 M60 M3 611,252.67 Lokasi Pekerjaan

    75 Cerucuk M61 M 15,000.00

    76 Elastomer M62 buah 300,000.00

    77 Bahan pengawet: kreosot M63 liter 5,000.00

    78 Mata Kucing M64 buah 75,000.00

    79 Anchorage M65 buah 600,000.00

    80 Anti strpping agent M66 liter 24,000.00

    81 Bahan Modifikasi M67 Kg 1,000.00

    82 Beton K-500 M68 M3 1,019,398.03

    83 Beton K-400 M69 M3 910,868.50

    84 Ducting (Kabel prestress) M70 M' 150,000.00

    85 Ducting (Strand prestress) M71 M' 50,000.00

    86 Beton K-350 M72 M3 896,720.47

    87 Multipleks 12 mm M73 Lbr 181,500.00

    88 Elastomer jenis 1 M74a buah 385,500.00 Base Camp

    89 Elastomer jenis 2 M74b buah 650,000.00 Base Camp

    90 Elastomer jenis 3 M74c buah 838,000.00 Base Camp

    91 Expansion Tipe Joint Asphaltic Plug M75d M 1,000,000.00 Base Camp

    92 Expansion Join Tipe Rubber M75e M 1,200,000.00 Base Camp

    93 Expansion Join Baja Siku M75f M 275,000.00 Base Camp

    94 Marmer M76 Buah 400,000.00 Base Camp

    95 Kerb Type A M77 Buah 45,000.00 Base Camp

    96 Paving Block M78 Buah 40,000.00 Lokasi Pekerjaan

    97 Mini Timber Pile M79 Buah 27,000.00 Lokasi Pekerjaan

    98 Expansion Joint Tipe Torma M80 M1 1,200,000.00 Lokasi Pekerjaan

    99 Strip Bearing M81 Buah 229,500.00 Lokasi Pekerjaan

    100 Joint Socket Pile 35x35 M82 Set 607,500.00 Lokasi Pekerjaan

    101 Joint Socket Pile 16x16x16 M83 Set 67,500.00 Lokasi Pekerjaan

    102 Mikro Pile 16x16x16 M84 M1 60,750.00 Lokasi Pekerjaan

    103 Matras Concrete M85 Buah 405,000.00 Lokasi Pekerjaan

    104 Assetilline M86 Botol 229,500.00 Lokasi Pekerjaan

    105 Oxygen M87 Botol 114,750.00 Lokasi Pekerjaan

    106 Batu Bara M88 Kg 600.00 Lokasi Pekerjaan

    107 Pipa Galvanis Dia 3" M24a M 110,000.00

    108 Pipa Galvanis Dia 1,5" M24b M 55,000.00

    109 Agregat Pecah Mesin 0-5 mm M91 M3 162,018.16 Base Camp

    110 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 162,018.16 Base Camp

    111 Agregat Pecah Mesin 20-30 mm M93 M3 162,018.16 Base Camp

    112 Joint Sealent M94 Kg 34,100.00

    113 Cat Anti Karat M95 Kg 35,750.00

    114 Expansion Cap M96 M2 6,050.00

    115 Polytene 125 mikron M97 Kg 19,250.00

    116 Curing Compound M98 Ltr 38,500.00

    117 Kayu Acuan M99 M3 176,000.00

    118 Additive M67a Ltr 38,500.00

    119 Casing M100 M2 9,000.00

    120

  • HARGA SEWA

    ALAT ALAT/JAM KETERANGAN

    (di luar PPN)

    1 ASPHALT MIXING PLANT E01 294.0 60 T/Jam 2,000,000,000 5,919,391.87

    2 ASPHALT FINISHER E02 72.4 10 Ton 1,200,000,000 491,723.38

    3 ASPHALT SPRAYER E03 4.0 850 Liter 87,000,000 48,334.62

    4 BULLDOZER 100-150 HP E04 155.0 - - 1,034,000,000 545,742.12

    5 COMPRESSOR 4000-6500 L\M E05 60.0 5,000 5,000 110,000,000 153,723.93

    6 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500 Liter 175,500,000 169,604.80

    7 CRANE 10-15 TON E07 138.0 15 Ton 1,488,000,000 635,687.38

    8 DUMP TRUCK 3.5 TON E08 100.0 4 Ton 120,000,000 234,758.83

    9 DUMP TRUCK 10 TON E09 125.0 10 Ton 300,000,000 326,087.79

    10 EXCAVATOR 80-140 HP E10 133.0 1 M3 1,098,250,000 517,827.26

    11 FLAT BED TRUCK 3-4 M3 E11 190.0 10 ton 300,000,000 454,926.88

    12 GENERATOR SET E12 180.0 135 KVA 150,000,000 414,357.47

    13 MOTOR GRADER >100 HP E13 135.0 10,800 10,800 982,000,000 480,308.46

    14 TRACK LOADER 75-100 HP E14 70.0 1 M3 542,000,000 262,286.80

    15 WHEEL LOADER 1.0-1.6 M3 E15 96.0 2 M3 564,000,000 317,067.17

    16 THREE WHEEL ROLLER 6-8 T E16 55.0 8 Ton 350,000,000 192,925.32

    17 TANDEM ROLLER 6-8 T. E17 82.0 8 Ton 350,000,000 245,001.84

    18 TIRE ROLLER 8-10 T. E18 100.5 9 Ton 717,600,000 358,090.65

    19 VIBRATORY ROLLER 5-8 T. E19 82.0 7 Ton 918,787,500 430,811.40

    20 CONCRETE VIBRATOR E20 5.5 25 25 4,000,000 27,774.90

    21 STONE CRUSHER E21 220.0 50 T/Jam 1,000,000,000 861,046.67

    22 WATER PUMP 70-100 mm E22 6.0 - - 5,000,000 26,156.43

    23 WATER TANKER 3000-4500 L. E23 100.0 4,000 Liter 105,000,000 229,744.54

    24 PEDESTRIAN ROLLER E24 8.8 835 Ton 150,000,000 84,153.76

    25 TAMPER E25 4.7 121 Ton 17,000,000 32,755.65

    26 JACK HAMMER E26 0.0 1,330 1,330 35,000,000 21,051.42

    27 FULVI MIXER E27 345.0 2,005 2,005 900,000,000 1,106,229.33

    28 CONCRETE PUMP E28 100.0 8 M3 112,500,000 229,708.36

    29 TRAILER 20 TON E29 175.0 20 Ton 600,000,000 477,019.85

    30 PILE DRIVER + HAMMER E30 25.0 3 Ton 875,000,000 259,075.87

    31 CRANE ON TRACK 35 TON E31 125.0 35 Ton 850,000,000 433,225.18

    32 WELDING SET E32 40.0 250 Amp 17,500,000 94,247.54

    33 BORE PILE MACHINE E33 150.0 2,000 Meter 2,250,000,000 776,246.83

    34 ASPHALT LIQUID MIXER E34 5.0 1,000 Liter 15,000,000 26,524.84

    35 TRONTON E35 150.0 15 Ton 450,000,000 489,817.69

    36 COLD MILLING E36 248.0 1,000 m 4,945,000,000 1,595,703.62

    37 ROCK DRILL BREAKER E37 3.0 - - 900,000,000 276,643.04

    38 COLD RECYCLER E38 900.0 2 M 5,244,000,000 2,856,229.72

    39 HOT RECYCLER E39 400.0 3 M 29,250,000,000 7,365,748.27

    40 AGGREGAT (CHIP) SPREADER E40 115.0 4 M 395,000,000 441,739.30

    41 ASPHALT DISTRIBUTOR E41 115.0 4,000 Liter 395,000,000 324,240.68

    42 SLIP FORM PAVER E42 105.0 3 M 1,337,142,857 498,256.54

    43 CONCRETE PAN MIXER E43 134.0 600 Liter 1,000,000,000 543,731.80

    44 CONCRETE BREAKER E44 290.0 20 m3/jam 900,000,000 758,547.41

    45 ASPAHLT TANKER E45 190.0 4,000 liter 500,000,000 502,864.52

    46 CEMENT TANKER E46 190.0 4,000 liter 500,000,000 466,072.52

    47 CONDRETE MIXER (350) E47 20.0 350 liter 35,000,000 62,565.61

    48 VIBRATING RAMMER E48 4.2 80 KG 20,000,000 31,296.07

    49 TRUK MIXER (AGITATOR) E49 220.0 5 M3 500,000,000 528,656.29

    50 BORE PILE MACHINE E50 125.0 60 CM 1,170,000,000 562,412.62

    51 CRANE ON TRACK 75-100 TON E51 200.0 75 Ton 900,000,000 582,445.84

    52 BLENDING EQUIPMENT E52 50.0 30 Ton 500,000,000 183,284.81

    53 ASPHALT LIQUID MIXER E34a 40.0 20,000 Liter 150,000,000 123,712.64

    KODE HP KAP.No. URAIAN

    DAFTAR

    HARGA SEWA ALAT PER JAM KERJA

  • DAFTAR HARGA SATUAN PEKERJAAN

    DINAS BINA MARGA KABUPATEN MALANG

    TAHUN ANGGARAN 2011

    NO. CODE URAIAN PEKERJAAN SATUAN HARGA

    ANALISA SATUAN

    (Rupiah)

    a b c d e

    DIVISI 1. UMUM

    1.2 (3) Pengukuran LS

    1.2 (4) Mobilisasi LS

    DEVISI 2. PEKERJAAN DRAINASE

    1 2.1 Galian untuk Selokan Drainase dan Saluran Air (+buangan) M3

    53,329.64

    2 2.2 Pasangan Batu dengan Mortar (+siaran) M3

    511,726.48

    3 2.3 (1) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm M1

    422,151.24

    4 2.3 (2) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm sampai 70 cm M1

    580,116.60

    5 2.3 (3) Gorong Pipa Beton Bertulang, Diameter Dalam 70 cm sampai 100 cm M1

    910,486.92

    6 2.3 (4) Gorong2 Pipa Beton Bertulang, Diameter Dalam 100 cm sampai 130 cm M

    11,459,951.08

    7 2.3 (7) Gorong2 Pipa Beton Tanpa Tulangan diameter dalam 20 cm sampai 30 cm M

    1118,358.47

    DIVISI 3. PEKERJAAN TANAH

    1 3.1 (1) Galian Biasa (+buangan) M3

    53,265.51

    2 3.1 (2) Galian Batu/ Padas (+buangan) M3

    106,149.39

    3 3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter M3

    43,140.34

    4 3.1 (4) Galian Struktur dengan kedalaman 2 - 4 meter M3

    81,916.55

    5 3.1 (5) Galian Struktur dengan kedalaman 4 - 6 meter M3

    95,674.86

    6 3.1 (9) Biaya Tambahan untuk Pengangkutan Hasil Galian dengan Jarak melebihi 5 km M3/Km 7,680.37

    7 3.2 (1) Timbunan Biasa dari selain Galian Sumber Bahan M3

    96,245.54

    8 3.2 (2) Timbunan Pilihan M3

    175,314.54

    9 3.2 (3) Timbunan Pilihan diatas Tanah Rawa (diukur diatas bak truk) M3

    144,369.48

    10 3.2.(4) Timbunan Batu dengan Manual M3

    235,358.10

    11 3.3 Penyiapan Badan Jalan M2

    3,140.95

    12 A.028 Urugan Pasir M3

    115,885.00

    DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN

    1 4.2 (1) Lapis Pondasi Agregat Kelas A M3

    290,113.17

    2 4.2 (2) Lapis Pondasi Agregat Kelas B M3

    264,062.08

    3 4.2 (3) Semen untuk Lapis Pondasi Semen Tanah Ton 1,454,726.89

    4 4.2 (4) Lapis Pondasi Semen Tanah M3

    201,403.90

    5 4.2 (5) Agregat Penutup BURTU M2

    7,425.38

    6 4.2 (6) Bahan Aspal untuk Pekerjaan Pelaburan Liter 9,971.34

    7 4.2 (7) Lapis Resap Pengikat Liter 10,504.45

    DIVISI 5. PERKERASAN BERBUTIR

    1 5.1 (1) Lapis Pondasi Agregat Kelas A M3

    284,618.61

    2 5.1 (2) Lapis Pondasi Agregat Kelas B M3

    254,439.47

    3 5.2 (1) Lapis Pondasi Agregat Kelas C M3

    238,116.49

    4 5.4 (1) Semen untuk Lapis Pondasi Semen Tanah Ton 1,501,395.81

    5 5.4 (2) Lapis Pondasi Tanah Semen M3

    173,437.94

    6 5.5 (1) Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) M3

    474,768.10

    7 5.5 (2) Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) M3

    533,040.23

    8 5.6 (1) Lapis Pondasi beton Bo (LPB Bo) M3

    645,697.81

    9 5.7 (1) Lapis Pondasi Batu Belah (Telford) ( + Batu Tepi) M2

    61,857.19

    DIVISI 6. PERKERASAN ASPAL

    1 6.1 (1) Lapis Resap Pengikat Liter 9,741.92

    2 6.1 (2) Lapis Perekat Liter 9,538.37

    3 6.2 (1) Agregat Penutup BURTU M2

    8,244.53

    4 6.2 (2) Agregat Penutup BURDA M2

    13,793.86

    5 6.2 (3) Bahan Aspal untuk Pekerjaan Pelaburan Liter 9,334.82

    6 6.3 (1) Latasir Kelas A (SS-A) M2

    37,292.45

    7 6.3 (2) Latasir Kelas B (SS-B) M2

    46,515.51

    8 6.3 (3) Lataston Lapis Aus (HRS-WC) M2

    69,073.95

    9 6.3(3a) Lataston Lapis Aus (HRS-WC) Leveling Ton 1,030,497.03

    10 6.3(4) Lataston Lapis Pondasi (HRS-Base) M3

    2,062,899.82

    11 6.3(4a) Lataston Lapis Pondasi (HRS-Base) Leveling Ton 915,400.00

    12 6.3(5a) Laston Lapis Aus (AC-WC) M2

    92,643.23

    13 6.3(5c) Laston Lapis Aus (AC-WC) Leveling Ton 972,501.43

    14 6.3(6a) Laston Lapis Antara (AC-BC) M3

    2,210,388.49

    15 6.3(6c) Laston Lapis Antara (AC-BC) Leveling Ton 954,029.81

    16 6.3(7a) Laston Lapis Pondasi (AC-Base) M3

    2,204,686.76

    17 6.3(7c) Laston Lapis Pondasi (AC-Base) Leveling Ton 919,043.42

    18 6.6.1 Lapis Permukaan Penetrasi Macadam M3

    1,401,844.26

    19 6.6.2 Lapis Fondasi atau Perata Penetrasi Macadam M3

    1,337,984.23

  • NO. CODE URAIAN PEKERJAAN SATUAN HARGA

    ANALISA SATUAN

    (Rupiah)

    a b c d e

    DIVISI 7. STRUKTUR

    1 7.1 (1) Beton K500 M3

    1,121,337.83

    2 7.1 (2) Beton K400 M3

    1,001,955.35

    3 7.1 (3) Beton K350 M3

    986,392.52

    4 7.1 (4) Beton K300 M3

    974,016.98

    5 7.1 (5) Beton K250 M3

    918,233.40

    6 7.1 (6) Beton K175 M3

    672,377.93

    7 7.1 (7) Beton Siklop K175 M3

    570,269.70

    8 7.1 (8) Beton K125 M3

    653,054.27

    9 7.3 (1) Baja Tulangan U24 Polos Kg 13,961.75

    10 7.3 (2) Baja Tulangan U32 Polos Kg 14,797.75

    11 7.3 (3) Baja Tulangan U32 Ulir Kg 15,402.75

    12 7.3 (4) Baja Tulangan U39 Ulir Kg 14,770.25

    13 7.3 (5) Baja Tulangan U48 Ulir Kg 16,007.75

    14 7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 16,901.50

    15 7.9 Pasangan Batu (+siaran) M3

    516,880.65

    16 7.10 (1) Pasangan Batu Kosong yang diisi Adukan M3

    494,812.97

    17 7.10 (2) Pasangan Batu Kosong M3

    192,087.50

    18 7.10 (3) Bronjong M3

    409,612.50

    19 7.18 Acuan Beton M2

    151,717.48

    20 7.19 Perancah M3

    3,913,249.73

    DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

    1 8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3

    271,692.69

    2 8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3

    256,379.09

    3 8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur) 230,602.99

    4 8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3

    1,275,189.67

    5 8.2(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3

    51,642.53

    6 8.2(2) Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm) M2

    37,455.27

    7 8.2(3) Pemotongan Pohon diameter 30 - 50 cm Buah 149,439.92

    8 8.2(4) Pemotongan Pohon diameter 50 - 75 cm Buah 214,783.19

    9 8.2(5) Pemotongan Pohon diameter > 75 cm Buah 418,561.86

    10 8.3.(2) Semak / Perdu M2

    21,285.00

    11 8.4.(1) Marka Jalan Termoplastik M2

    125,065.04

    12 8.4.(5) Patok Pengarah Buah 133,835.15

    13 8.4.(6) .(a) Patok Kilometer Buah 392,784.57

    14 8.4.(6) .(b) Patok Hektometer Buah 194,014.59

    15 8.4.(10) (a) Kerb Pracetak (Besar) M1

    84,352.60

    16 8.4.(10) (b) Kerb Pracetak (Kecil) M1

    63,465.28

    17 8.4.(12) (b) Perkerasan Blok Beton pada Trotoar dan Median M2

    73,430.31

    18 8.9 Plesteran 1 PC : 3 Psr M2

    30,305.55

    19 8.10 Pekerjaan Pengecatan M2

    19,734.00

    20 8.11 Pekerjaan Pengecatan Ulang M2

    15,059.00

    21 8.12 Pekerjaan Koral Sikat (Ampyangan) M2

    172,550.13

    DIVISI 9. PEKERJAAN HARIAN

    1 9.1 Mandor Jam 9,428.57

    2 9.2 Pekerja Biasa Jam 5,892.86

    3 9.3 Tukang Kayu, Tukang Batu, dsb Jam 7,857.14

    4 9.4 Dump Truck, kapasitas 3-4 m Jam 234,758.83

    5 9.5 Truk Bak Datar 3 - 4 ton Jam 454,926.88

    6 9.6 Truk Tangki 3000 - 4500 Liter Jam 229,744.54

    7 9.7 Bulldozer 100 - 150 PK Jam 532,599.27

    8 9.8 Motor Grader min 100 PK Jam 480,308.46

    9 9.9 Loader Roda Karet 1.0 - 1.6 M3 Jam 317,067.17

    10 9.10 Loader Roda Berantai 75 - 100 PK Jam 262,286.80

    11 9.11 Alat Penggali (Excavator) 80 - 140 PK Jam 517,827.26

    12 9.12 Crane 10 - 15 Ton Jam 635,687.38

    13 9.13 Penggilas Roda Besi 6 - 9 Ton Jam 245,001.84

    14 9.14 Penggilas Bervibrasi 5 - 8 Ton Jam 430,811.40

    15 9.15 Pemadat Bervibrasi 1.5 - 3.0 PK Jam 32,755.65

    16 9.16 Penggilas Roda Karet 8 - 10 Ton Jam 358,090.65

    17 9.17 Kompresor 4000 - 6500 Ltr/mnt Jam 153,723.93

    18 9.18 Beton Pengaduk (Molen) 0.3 - 0.6 M3 Jam 169,604.80

    19 9.19 Pompa Air 70 - 100 mm Jam 26,156.43

    20 9.20 Jack Hammer Jam 21,051.42

    Malang Pebruari 2011

    Kepala Dinas Bina Marga

    Kabupaten Malang

    Ir. MOCHAMAD ANWAR

    NIP. 19580921 198508 1 002

  • Kegiatan : Perencanaan Dinas Bina Marga Kabupaten Malang

    Paket : Perencanaan Pembangunan, Rehabilitasi/Pemeliharaan

    Jalan dan Jembatan serta Bangunan Pelengkap

    Prop / Kab. : Jawa Timur / Kabupaten Malang

    Uraian Jumlah Harga

    I DIVISI 1. UMUM -Rp

    II DIVISI 2. DRAINASE 20,436,571.66Rp

    III DIVISI 3. PEKERJAAN TANAH 2,289,603.56Rp

    IV DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN 2,238,207.21Rp

    V DIVISI 5. PERKERASAN BERBUTIR 3,459,816.65Rp

    VI DIVISI 6. PERKERASAN ASPAL 32,969,415.98Rp

    VII DIVISI 7. STRUKTUR 340,301,162.47Rp

    VIII DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 42,142,871.24Rp

    IX DIVISI 9. PEKERJAAN HARIAN 5,125,581.28Rp

    X DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN 11,023,487.61Rp

    TOTAL JUMLAH HARGA 459,986,717.65Rp

    PPN 10% 45,998,671.77Rp

    TOTAL PERKIRAAN HARGA PEKERJAAN 505,985,389.42Rp

    DIBULATKAN 505,980,000.00Rp

    TERBILANG :

    RENCANA ANGGARAN BIAYA

    No

    #NAME?

    Diperiksa PPK Kegiatan Perencanaan

    Pembangunan Jalan

    Ir. AVICENNA NIP.196802181997031003

    Disetujui PPTK Kegiatan Perencanaan

    Pembangunan Jalan

    Ir. AGUS SUGIANTO NIP.196108311992021003

    Malang,.......,........,.....2011 Dibuat Oleh,

    .................................... Team Leader

    Mengetahui/ Menyetujui, Pengguna Anggaran

    Kepala Dinas Bina Marga Kabupaten Malang

    Ir. MOCH. ANWAR NIP.195809211985081002

  • Kegiatan : Perencanaan Dinas Bina Marga Kabupaten Malang

    Nama Paket : Perencanaan Pembangunan, Rehabilitasi/Pemeliharaan

    Jalan dan Jembatan serta Bangunan Pelengkap

    Prop / Kab / Kodya : Jawa Timur / Kabupaten Malang

    Quantity

    No. Mata Uraian Satuan Perkiraan

    Pembayaran Kuantitas

    a b c d

    DIVISI 1. UMUM

    1.2 (3) Pengukuran LS

    1.2 (4) Mobilisasi LS

    Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 2. DRAINASE

    2.1 Galian untuk Selokan Drainase dan Saluran Air (+buangan) M3

    1.0

    2.2 Pasangan Batu dengan Mortar (+siaran dan Plesteran) M3

    1.0

    2.3 (1) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm M1

    1.0

    2.3 (2) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm sampai 70 cm M1

    1.0

    2.3 (3) Gorong Pipa Beton Bertulang, Diameter Dalam 70 cm sampai 100 cm M1

    1.0

    2.3 (4) Gorong2 Pipa Beton Bertulang, Diameter Dalam 100 cm sampai 130 cm M

    11.0

    2.3 (5) Gorong2 Beton Tanpa Tulang Diameter Dalam 140 cm sampai 150 cm M

    11.0

    2.3 (6) Gorong2 Pipa Baja Bergelombang Ton 1.0

    2.3 (7) Gorong2 Pipa Beton Tanpa Tulangan diameter dalam 20 cm sampai 30 cm M

    11.0

    2.4 (1) Timbunan Porous atau Bahan Penyaring (Filter) M3

    1.0

    2.4 (2) Anyaman Filter Plastik M2

    1.0

    2.4 (3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1 1.0

    Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 3. PEKERJAAN TANAH

    3.1 (1) Galian Biasa (+buangan) M3

    1.0

    3.1 (2) Galian Batu/ Padas (+buangan) M3

    1.0

    3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter M3

    1.0

    3.1 (4) Galian Struktur dengan kedalaman 2 - 4 meter M3

    1.0

    3.1 (5) Galian Struktur dengan kedalaman 4 - 6 meter M3

    1.0

    3.1 (6) Coferdam, Penyokong, Pengaku dan Pekerjaan yang berkaitan LS 1.0

    3.1 (7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3

    1.0

    3.1 (8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3

    1.0

    3.1 (9) Biaya Tambahan untuk Pengangkutan Hasil Galian dengan Jarak melebihi 5 km M3/Km 1.0

    3.2 (1) Timbunan Biasa dari selain Galian Sumber Bahan M3

    1.0

    3.2 (2) Timbunan Pilihan M3

    1.0

    3.2 (3) Timbunan Pilihan diatas Tanah Rawa (diukur diatas bak truk) M3

    1.0

    3.2.(4) Timbunan Batu dengan Manual M3

    1.0

    3.2.(5) Timbunan Batu dengan Derek M3

    1.0

    3.2.(6) Timbunan Batu dengan Derek Ton 1.0

    3.3 Penyiapan Badan Jalan M2

    1.0

    3.4 Pengupasan Permukaan Aspal Lama dan Pencampuran Kembali (tebal 15 cm) M3

    1.0

    3.5 Urugan Pasir M3

    1.0

    Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN

    4.2 (1) Lapis Pondasi Agregat Kelas A M3

    1.0

    4.2 (2) Lapis Pondasi Agregat Kelas B M3

    1.0

    4.2 (3) Semen untuk Lapis Pondasi Semen Tanah Ton 1.0

    4.2 (4) Lapis Pondasi Semen Tanah M3

    1.0

    4.2 (5) Agregat Penutup BURTU M2

    1.0

    4.2 (6) Bahan Aspal untuk Pekerjaan Pelaburan Liter 1.0

    4.2 (7) Lapis Resap Pengikat Liter 1.0

    K-516 Konstruksi LPB Telford M2

    DAFTAR KUANTITAS DAN HARGA

    NOPEMBER 2009

  • Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 5. PERKERASAN BERBUTIR

    5.1 (1) Lapis Pondasi Agregat Kelas A M3

    1.0

    5.1 (2) Lapis Pondasi Agregat Kelas B M3

    1.0

    5.2 (1) Lapis Pondasi Agregat Kelas C M3

    1.0

    5.4 (1) Semen untuk Lapis Pondasi Semen Tanah Ton 1.0

    5.4 (2) Lapis Pondasi Tanah Semen M3

    1.0

    5.5 (1) Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) M3

    1.0

    5.6 (1) Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) M3

    1.0

    5.7 (1) Lapis Pondasi beton Bo (LPB Bo) M3

    1.0

    5.8 (1) Lapis Pondasi Batu Belah (Telford) ( dengan Batu Tepi) M2 1.0

    W.3 Pasang Sytlag M2 1.0

    Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 6. PERKERASAN ASPAL

    6.1 (1) Lapis Resap Pengikat Liter 1.0

    6.1 (2) Lapis Perekat Liter 1.0

    6.2 (1) Agregat Penutup BURTU M2

    1.0

    6.2 (2) Agregat Penutup BURDA M2

    1.0

    6.2 (3) Bahan Aspal untuk Pekerjaan Pelaburan Liter 1.0

    6.3 (1) Latasir Kelas A (SS-A) M2

    1.0

    6.3 (2) Latasir Kelas B (SS-B) M2

    1.0

    6.3 (3) Lataston Lapis Aus (HRS-WC) M2

    1.0

    6.3(3a) Lataston Lapis Aus (HRS-WC) Leveling Ton 1.0

    6.3(4) Lataston Lapis Pondasi (HRS-Base) M3

    1.0

    6.3(4a) Lataston Lapis Pondasi (HRS-Base) Leveling Ton 1.0

    6.3(5a) Laston Lapis Aus (AC-WC) M2

    1.0

    6.3(5b) Laston Lapis Aus (AC-WC) Modifikasi M2

    1.0

    6.3(5c) Laston Lapis Aus (AC-WC) Leveling Ton 1.0

    6.3(5d) Laston Lapis Aus (AC-WC) Modifikasi Leveling Ton 1.0

    6.3(6a) Laston Lapis Antara (AC-BC) M3

    1.0

    6.3(6b) Laston Lapis Antara (AC-BC) Modifikasi M3

    1.0

    6.3(6c) Laston Lapis Antara (AC-BC) Leveling Ton 1.0

    6.3(6d) Laston Lapis Antara (AC-BC) Modifikasi Leveling Ton 1.0

    6.3(7a) Laston Lapis Pondasi (AC-Base) M3

    1.0

    6.3(7b) Laston Lapis Pondasi (AC-Base) Modifikasi M3

    1.0

    6.3(7c) Laston Lapis Pondasi (AC-Base) Leveling Ton 1.0

    6.3(7d) Laston Lapis Pondasi (AC-Base) Modifikasi Leveling Ton 1.0

    6.4 (1) Lasbutag M2

    1.0

    6.4 (2) Latasbusir Kelas A M2

    1.0

    6.4 (3) Latasbusir Kelas B M2

    1.0

    6.4 (4) Bitumen Asbuton Ton 1.0

    6.4 (5) Bitumen Bahan Peremaja Ton 1.0

    6.4 (6) Bahan Anti Pengelupasan (anti stripping agent) Liter 1.0

    6.5 Campuran Aspal Dingin untuk Pelapisan M3

    1.0

    6.6.1 Lapis Permukaan Penetrasi Macadam M3

    1.0

    6.6.2 Lapis Fondasi atau Perata Penetrasi Macadam M3

    1.0

    Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 7. STRUKTUR

    7.1 (1) Beton K500 M3

    1.0

    7.1 (2) Beton K400 M3

    1.0

    7.1 (3) Beton K350 M3

    1.0

    7.1 (4) Beton K300 M3

    1.0

    7.1 (5) Beton K250 M3

    1.0

    7.1 (6) Beton K175 M3

    1.0

    7.1 (7) Beton Siklop K175 M3

    1.0

    7.1 (8) Beton K125 M3

    1.0

    7.2 (1) Unit Pracetak Gelagar Tipe I bentang 16 m Buah 1.0

    7.2 (2) Unit Pracetak Gelagar Tipe I bentang 20 m Buah 1.0

    7.2 (3) Unit Pracetak Gelagar Tipe I bentang 22 m Buah 1.0

    7.2 (4) Unit Pracetak Gelagar Tipe I bentang 25 m Buah 1.0

    7.2 (5) Unit Pracetak Gelagar Tipe I bentang 28 m Buah 1.0

    7.2 (6) Unit Pracetak Gelagar Tipe I bentang 30 m Buah 1.0

    7.2 (7) Unit Pracetak Gelagar Tipe I bentang 31 m Buah 1.0

    7.2 (8) Unit Pracetak Gelagar Tipe I bentang 35 m Buah 1.0

  • 7.2 (9) Baja Prategang Kg 1.0

    7.2 (10) Pelat Berongga (Hollow Slab) pracetak bentang 21 m Buah 1.0

    7.2 (11) Beton Diafragma K350 termasuk pekerjaan penegangan setelah pengecoran (post tension) M3

    1.0

    7.3 (1) Baja Tulangan U24 Polos Kg 1.0

    7.3 (2) Baja Tulangan U32 Polos Kg 1.0

    7.3 (3) Baja Tulangan U32 Ulir Kg 1.0

    7.3 (4) Baja Tulangan U39 Ulir Kg 1.0

    7.3 (5) Baja Tulangan U48 Ulir Kg 1.0

    7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 1.0

    7.4 (1) Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan Kg 1.0

    7.4 (2) Baja Struktur Titik leleh 2800 kg/cm2 penyediaan dan pemasangan Kg 1.0

    7.4 (3) Baja Struktur Titik leleh 3500 kg/cm2 penyediaan dan pemasangan Kg 1.0

    7.5 (1) Pemasangan Jembatan Rangka Baja Kg 1.0

    7.5 (2) Pengangkutan Bahan Jembatan Kg 1.0

    7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1

    1.0

    7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2

    1.0

    7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2

    1.0

    7.6 (4) Dinding Turap Baja M2

    1.0

    7.6 (5) Dinding Turap Beton M2

    1.0

    7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan M3

    1.0

    7.6 (7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan M3

    1.0

    7.6 (8) Penyediaan Tiang Pancang Baja Kg 1.0

    7.6 (9) Penyediaan Tiang Pancang Beton Bertulang Pracetak M3

    1.0

    7.6 (10) Penyediaan Tiang Pancang Beton Pratekan Pracetak M3

    1.0

    7.6 (11) Pemancangan Tiang Pancang Kayu M1

    1.0

    7.6 (12) Pemancangan Tiang Pancang Pipa Baja : Diameter 400 mm M1

    1.0

    7.6 (13) Pemancangan Tiang Pancang Pipa Baja : Diameter 500 mm M1

    1.0

    7.6 (14) Pemancangan Tiang Pancang Pipa Baja : Diameter 600 mm M1

    1.0

    7.6 (15) Pemancangan Tiang Pancang Beton Pracetak :30 cm x 30 cm atau diameter 300 mm M1

    1.0

    7.6 (16) Pemancangan Tiang Pancang Beton Pracetak :40 cm x 40 cm atau diameter 400 mm M1

    1.0

    7.6 (17) Pemancangan Tiang Pancang Beton Pracetak :50 cm x 50 cm atau diameter 500 mm M1

    1.0

    7.6 (18) Tiang Bor Beton, dia. 600 mm M1

    1.0

    7.6 (19) Tiang Bor Beton, dia. 800 mm M1

    1.0

    7.6 (20) Tiang Bor Beton, dia. 1000 mm M1

    1.0

    7.6 (21) Tiang Bor Beton, dia. 1200 mm M1

    1.0

    7.6 (22) Tiang Bor Beton, dia. 1500 mm M1

    1.0

    7.6 (23) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(11) s/d M1

    1.0

    7.6.(17) bila Tiang Pancang Beton dikerjakan ditempat yang Berair 1.0

    7.6 (24) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(18) s/d M1

    1.0

    7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair 1.0

    7.6 (25) Pengujian Pembebanan pada Tiang dengan diameter sampai 600 mm Buah 1.0

    7.6 (26) Pengujian Pembebanan pada Tiang dengan diameter diatas 600 mm Buah 1.0

    7.7 (1) Penyediaan Dinding Sumuran Silinder, Diameter 250 cm M1

    1.0

    7.7 (2) Penyediaan Dinding Sumuran Silinder, Diameter 300 cm M1

    1.0

    7.7 (3) Penyediaan Dinding Sumuran Silinder, Diameter 350 cm M1

    1.0

    7.7 (4) Penyediaan Dinding Sumuran Silinder, Diameter 400 cm M1

    1.0

    7.7 (5) Penurunan Dinding Sumuran Silinder, Diameter 250 cm M1

    1.0

    7.7 (6) Penurunan Dinding Sumuran Silinder, Diameter 300 cm M1

    1.0

    7.7 (7) Penurunan Dinding Sumuran Silinder, Diameter 350 cm M1

    1.0

    7.7 (8) Penurunan Dinding Sumuran Silinder, Diameter 400 cm M1

    1.0

    7.9 Pasangan Batu (+siaran dan plesteran) M3

    1.0

    7.10 (1) Pasangan Batu Kosong yang diisi Adukan M3

    1.0

    7.10 (2) Pasangan Batu Kosong M3

    1.0

    7.10 (3) Bronjong M3

    1.0

    7.11 (1) Expansion Joint Tipe Asphaltic Plug M1

    1.0

    7.11 (2) Expansion Joint Tipe Rubber 1 (celah 21-41 mm) M1

    1.0

    7.11 (3) Expansion Joint Tipe Rubber 2 (celah 32-62 mm) M1

    1.0

    7.11 (4) Expansion Joint Tipe Rubber 3 (celah 42-82 mm) M1

    1.0

    7.11 (5) Joint Filler untuk Sambungan Konstruksi M1

    1.0

    7.11 (6) Expansion Joint Tipe Baja Bersudut M1

    1.0

    7.12 (1) Perletakan Logam Buah 1.0

    7.12 (2) Perletakan Elastomerik Jenis 1 (300 x 350 x 36) Buah 1.0

    7.12 (3) Perletakan Elastomerik Jenis 2 (350 x 400 x 39) Buah 1.0

    7.12 (4) Perletakan Elastomerik Jenis 3 (400 x 450 x 45) Buah 1.0

    7.12 (5) Perletakan Strip M1

    1.0

    7.13 Sandaran (Railing) M1

    1.0

    7.14 Papan Nama Jembatan Buah 1.0

    7.15.(1) Penmbongkaran Pasangan Batu M3

    1.0

    7.15.(2) Pembongkaran Beton M3

    1.0

    7.15.(3) Pembongkaran Beton Pratekan M3

    1.0

    7.15.(4) Pembongkaran Bangunan Gedung M2

    1.0

    7.15.(5) Pembongkaran Rangka Baja M2

    1.0

    7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M1

    1.0

    7.15.(7) Pembongkaran Lantai Jembatan Kayu M2

    1.0

  • 7.15.(8) Pembongkaran Jembatan Kayu M2

    1.0

    7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 / Km 1.0

    7.16 (1) Perkerasan Jalan Beton M3

    1.0

    7.17 (1) Wet Lean Concrete M2

    1.0

    7.17 (2) Sand Bedding (t = 4 cm) M2

    1.0

    7.18 Acuan Beton M2

    1.0

    7.19 Perancah M3

    1.0

    Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

    8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3

    1.0

    8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3

    1.0

    8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3

    (vol. gembur) 1.0

    8.1 (4) Waterbound Macadam untuk Pekerjaan Minor M3

    1.0

    8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3

    1.0

    8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor M3

    1.0

    8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3

    1.0

    8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor M3

    1.0

    8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter 1.0

    8.2(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3

    1.0

    8.2(2) Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm) M2

    1.0

    8.2(3) Pemotongan Pohon diameter 30 - 50 cm Buah 1.0

    8.2(4) Pemotongan Pohon diameter 50 - 75 cm Buah 1.0

    8.2(5) Pemotongan Pohon diameter > 75 cm Buah 1.0

    8.3.(1) Stabilisasi dengan Tanaman M2

    1.0

    8.3.(2) Semak / Perdu M2

    1.0

    8.3.(3) Pohon Buah 1.0

    8.4.(1) Marka Jalan Termoplastik M2

    1.0

    8.4.(2) Marka Jalan Bukan Termoplastik M2

    1.0

    8.4.(3) .(a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 1.0

    8.4.(3) .(b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah 1.0

    8.4.(4) .(a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 1.0

    8.4.(4) .(b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 1.0

    8.4.(5) Patok Pengarah Buah 1.0

    8.4.(6) .(a) Patok Kilometer Buah 1.0

    8.4.(6) .(b) Patok Hektometer Buah 1.0

    8.4.(7) Rel Pengaman M1

    1.0

    8.4.(8) Paku Jalan Buah 1.0

    8.4.(9) Mata Kucing Buah 1.0

    8.4.(10) (a) Kerb Pracetak (Besar) M1

    1.0

    8.4.(10) (b) Kerb Pracetak (Kecil) M1

    1.0

    8.4.(11) Kerb yang digunakan kembali M1

    1.0

    8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M2

    1.0

    8.5(1) Pengembalian Kondisi Lantai Jembatan Beton M2

    1.0

    8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu M2

    1.0

    8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2

    1.0

    8.6(1) Kerb Pracetak Pemisah Jalan (Concrete Barrier) M1

    1.0

    8.7(1) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt Buah 1.0

    8.7(2) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt Buah 1.0

    8.7(3) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah 1.0

    8.7(4) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah 1.0

    8.7(5) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah 1.0

    8.7(6) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah 1.0

    8.8(1) Pagar Pemisah Pedestrian Carbon Steel M1

    1.0

    8.8(2) Pagar Pemisah Pedestrian Galvanized M1

    1.0

    8.9 Plesteran 1 PC : 3 Psr M2

    1.0

    8.10 Pekerjaan Pengecatan M2

    1.0

    8.11 Pekerjaan Pengecatan Ulang M2

    1.0

    8.12 Pekerjaan Koral Sikat (Ampyangan) M2

    1.0

    Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa