ahs kontraktor electrical mehcanical of hs dki

117
ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA ANALISA HARGA SATUAN JASA PEMASANGAN INSTALASI LISTRIK NO JENIS PEKERJAAN HARGA BIAYA JUMLAH SATUAN (Rp.) DIBULATKAN (Rp.) (Rp.) 1 2 3 4 5 DASAR UPAH - Pekerja (pembantu tukang) upah minim - Tukang - Kepala Tukang - Mandor - Teknisi - Supervisi - Tenaga Ahli (Expert) 1 PEKERJA Upah 1 hari 17250 17250 Transfort 1 hari 8000 8000 Uang Makan 1 hari 7000 7000 32250 32250 32250 2 TUKANG Upah 1 hari 24500 24500 Transfort 1 hari 8000 8000 Uang Makan 1 hari 8000 8000 40500 40500 40500 3 TEKNISI Upah 1 hari 38250 38250 56250 Transfort 1 hari 8000 8000 Uang Makan 1 hari 10000 10000 56250 56250 56250 4 TENAGA AH Upah 1 hari 93500 93500 Transfort 1 hari 15000 15000 Uang Makan 1 hari 15000 15000 123500 123500

Upload: lukman-fauzi

Post on 14-Apr-2016

32 views

Category:

Documents


13 download

DESCRIPTION

AHS Kontraktor Electrical Mehcanical of HS DKI

TRANSCRIPT

Page 1: AHS Kontraktor Electrical Mehcanical of HS DKI

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN JASA

PEMASANGAN INSTALASI LISTRIK

NO JENIS PEKERJAAN HARGA BIAYA JUMLAH

SATUAN (Rp.) DIBULATKAN

(Rp.) (Rp.)

1 2 3 4 5

DASAR UPAH

- Pekerja (pembantu tukang) upah minim

- Tukang

- Kepala Tukang

- Mandor

- Teknisi

- Supervisi

- Tenaga Ahli (Expert)

1 PEKERJA

Upah 1 hari 17250 17250

Transfort 1 hari 8000 8000

Uang Makan 1 hari 7000 7000

32250 32250

32250

2 TUKANG

Upah 1 hari 24500 24500

Transfort 1 hari 8000 8000

Uang Makan 1 hari 8000 8000

40500 40500

40500

3 TEKNISI

Upah 1 hari 38250 38250 56250

Transfort 1 hari 8000 8000

Uang Makan 1 hari 10000 10000

56250 56250

56250

4 TENAGA AH

Upah 1 hari 93500 93500

Transfort 1 hari 15000 15000

Uang Makan 1 hari 15000 15000

123500 123500

Page 2: AHS Kontraktor Electrical Mehcanical of HS DKI

123500

5 SUPERVISI

Upah 1 hari 139750 139750

Transfort 1 hari 15000 15000 168750

Uang Makan 1 hari 20000 20000

174750 174750

168750

Page 3: AHS Kontraktor Electrical Mehcanical of HS DKI

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN

PEKERJAAN PEMASANGAN INSTALASI GARDU

Belum termasuk resiko,over head,keuntungan 10 % dan PPN 10 %

2004

NO JENIS PEKERJAAN

1 2

1a PEKERJAAN PEMASANGAN INSTALASI GARDU

1.1 Pemasangan kubikel LBS/PT/B1

- Tenaga Ahli Muda 0.38 Hari

2 Tukang

2 Pekerja

- Pengadaan/Pemasangan Angkur 4 Buah

1.2 Pemasangan Kubikel PGDB/PGDT

- Tenaga Ahli Muda 0.50 Hari

4 Tukang

2 Pekerja

- Pengadaan/Pemasangan Angkur 3 Buah

1.3 Pemasangan SACO

- Tenaga Ahli Muda 0.50 Hari

4 Tukang

2 Pekerja

- Pengadaan/Pemasangan Angkur 4 Buah

1.4 Pemasangan RMU.3 dan 4 Terminal(Panel Kontrol UPD)

- Tenaga Ahli Muda 0.50 Hari

4 Tukang

1 Pekerja

- Pengadaan/Pemasangan Angkur 4 Buah

1.5 Pemasangan RMU ( LBS,LBS,PB) ( Beton,Kiosk,Portal)

- Tenaga Ahli Muda 0.50 Hari

4 Tukang

2 Pekerja

- Pengadaan/Pemasangan Angkur 4 Buah

1.6 Pemasangan ( Peletakan ke posisi sebenarnya ) Trafo 100 kVA s/d 315 KVA

- Tenaga Ahli Muda 0.38 Hari

2 Tukang

3 Pekerja

1.7 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 400 kVA s/d 630 kVA

- Tenaga Ahli Muda 0.38 Hari

2 Tukang

5 Pekerja

Page 4: AHS Kontraktor Electrical Mehcanical of HS DKI

1.8 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.000 kVA s/d 1.250 KVA

- Tenaga Ahli Muda 0.38 Hari

2 Tukang

8 Pekerja

1.9 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.600 kVA s/d 2.000 KVA

- Tenaga Ahli Muda 0.38 Hari

2 Tukang

12 Pekerja

1.10 Bracket (Kabel Tray) dan Grounding

- Tenaga Ahli Muda 0.25 Hari

2 Tukang

1.11 Rak TR 4 Jurusan

- Tenaga Ahli Muda 0.13 Hari

2 Tukang

1.12 Rak TR 6 & 8 Jurusan

- Tenaga Ahli Muda 0.13 Hari

2 Tukang

1 Pekerja

1.13 Pemasangan LBS untuk Gardu Beton Open Type

- Tenaga Ahli Muda 0.38 Hari

2 Tukang

- Pengadaan/Pemasangan angkur 4 Pekerja

1.14 L.V.C.B Outdoor untuk gardu CANTOL

- Tenaga Ahli Muda 0.13 Hari

2 Tukang

1.15 L.V.S.B Outdoor untuk gardu Portal

- Tenaga Ahli Muda 0.13 Hari

2 Tukang

3 Pekerja

1.16 Single Core TM 3 x ( 1x 25 mm2 ) di MV Cell

- Tenaga Ahli Muda 0.67 Hari

0.67 Tukang

0.33 Pekerja

1.17 Single Core TM 3 x ( 1x 25 mm2 ) di Trafo

- Tenaga Ahli Muda 0.67 Hari

0.67 Tukang

0.33 Pekerja

1.18 Single Core TR 7 x ( 1x 240 mm2 ) di Trafo

- Tenaga Ahli Muda 0.25 Hari

Page 5: AHS Kontraktor Electrical Mehcanical of HS DKI

0.13 Tukang

0.13 Pekerja

1.19 Single Core TR 7 x ( 1x 240 mm2 ) di TR

- Tenaga Ahli Muda 0.25 Hari

0.13 Tukang

0.13 Pekerja

1.20 Pengadaan Penyangga Kabel TM 20 kV

- Tenaga Ahli Muda 0.13 Hari

1 Tukang

2 Pekerja

- Pengad/Pemas Besi U 85x45x6 mm 1 Meter

- Pengad/Pemas Klem Besi 1 Buah

1.21 IndikatormGangguan Tanah/GFD

- Tenaga Ahli Muda 0.13 Hari

2 Tukang

1.22 Pemasangan Instalasi Heater Kubikel

- Tenaga Ahli Muda 0.13 Hari

1 Tukang

1.23 Pengadaan Kabel Heater Kubikel 1 Meter

1.24 Pembersihan Ruangan Gardu 2 Pekerja

1.25 Bantuan Tenaga untuk Pengujian 2 Tukang

Pengopersian 2 Pekerja

1.b PEKERJAAN PEMBONGKARAN INSTALASI GARDU

1 No: 1 s/d 19 sama dengan Pekerjaan Pemasangan

2 Pembongkaran Terminal Indoor 20 KV di Cubikel 1 Pekerja

II PEMASANGAN APP TYPE KHUSUS IB,IC DAN IIF

2.1 Dengan Pondasi

- Galian tanah biasa/rumput untk pondasi 0.13 m3

- Pasang Batu Bata 0.26 m3

- Pasang Angkur 4 Buah

- Pasang Fisher 4 Buah

- Plesteran 1 PC: 2 Ps ( tebal 15 mm) 2.27 m2

- Acian Beton 2.27 m2

- Jasa Pelaksanaan Sipil 0.5 Hari

3 Tukang

- Jasa Pelaksanan Listrik 0.13 Hari

2 Tukang

2.2 Dengan Strain Hook

- Pasang Strain Hook 4 Buah

- Tenaga Ahli Muda 0.13 Hari

1 Tukang

2 Pekerja

Page 6: AHS Kontraktor Electrical Mehcanical of HS DKI

III PEKERJAAN PEMELIHARAAN INSTALASI GARDU

3.1 Kubikel TM

- Tenaga Ahli Muda 0.13 Hari

- Tukang 2 Tukang

- Majun 0.5 Kg

- YC.8513 ( Minyak Pembersih ) 0.5 Liter

- Pasline Putih Type G.658 SFG 0.25 Kg

3.2 Kubikel pengukuran ( PGDB )

- Tenaga Ahli Muda 0.13 Hari

- Tukang 2 Tukang

- Majun 0.5 Kg

- YC.8513 ( Minyak Pembersih ) 0.5 Liter

- Pasline Putih Type G.658 SFG 0.25 Kg

3.3 Trafo Distribusi

- Tenaga Ahli Muda 0.13 Hari

- Tukang 2 Tukang

- Majun 0.5 Kg

- YC.8513 ( Minyak Pembersih ) 0.5 Liter

3.4 Rak TR

- Tenaga Ahli Muda 0.13 Hari

- Tukang 1 Tukang

- Majun 0.25 Kg

- YC.8513 ( Minyak Pembersih ) 0.5 Liter

- Pasline Putih Type G.658 SFG 0.25 Kg

3.5 Detektor gangguan tanah/GFD

- Tukang 1 Tukang

- YC.8513 ( Minyak Pembersih ) 0.5 Kg

3.6 Pembersihan Ruangan Gardu

- Alat Vacum Cleaner 1 Buah

- Bahan Bakar/Olie 1 Liter

- Instalator 1 Tukang

IV PEKERJAAN LAIN - LAIN

4.1 Pemasangan Gardu Besi/Kios berikut Pondasi

a Pekerjaan Persiapan 1 Lokasi

b Pasang Bouplank 17 Meter

c Galian Tanah Biasa/Rumput 9 m3

d Urugan Pasir Padat 0.5 m3

e Pondasi Beton Tulang 1:2:3 4.6 m3

f Pantek Pipa Arde Komplit 4 Batang

g Plesteran 1:2 35 m2

h Acian Beton 35 m2

i Pasang Arde Keliling Pondasi 10 Kg

j Beton Lantai Kerja 1:2:3 6 m2

Page 7: AHS Kontraktor Electrical Mehcanical of HS DKI

k Pekerjaan Stel Kios

- Pelaksana 1 Ten.Ahl.Md

2 Tukang

3 Pekerja

l Pembuangan tanah keluar lokasi 9 M3

Angkutan Truk dengan Kap.3.m3

2 Pemasangan Gardu Kios Compact berikut Pondasi

a Pekerjaan Persiapan 1 Lokasi

b Pasang Bouplank 9 Meter

c Galian Tanah Biasa/Rumput 4.5 m3

d Urugan Pasir Padat 0.25 m3

e Pondasi Beton Tulang 1:2:3 2.3 m3

f Pantek Pipa Arde Komplit 4 Batang

g Plesteran 1:2 18 m2

h Acian Beton 18 m2

i Pasang Arde Keliling Pondasi 10 Kg

j Beton Lantai Kerja 1:2:3 3 m2

k Pekerjaan Stel Kios

- Pelaksana 1 Ten.Ahl.Md

2 Tukang

6 Pekerja

l Sewa Mobil Crane 0.88 Hari

m Pembuangan tanah keluar lokasi 4.5 Rit

Angkutan Truk dengan Kap.3 m3

3 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m

dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2)

4 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m

dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2)

Page 8: AHS Kontraktor Electrical Mehcanical of HS DKI

ANALISA HARGA SATUAN

PEKERJAAN PEMASANGAN INSTALASI GARDU

Belum termasuk resiko,over head,keuntungan 10 % dan PPN 10 %

HARGA BIAYA JUMLAH

SATUAN ( Rupiah ) DIBULATKAN

( Rupiah ) ( Rupiah )

3 4 5

123,500 46,312.50

40,500 81,000.00

32,250 64,500.00

3,738 14,952.00

206,764.50 206,760.00

123,500 61,750.00

40,500 162,000.00

32,250 64,500.00

3,738 11,214.00

299,464.00 299,460.00

123,500 61,750.00

40,500 162,000.00

32,250 64,500.00

3,738 14,952.00

303,202.00 303,200.00

123,500 61,750.00

40,500 162,000.00

32,250 32,250.00

3,738 14,952.00

270,952.00 270,950.00

123,500 61,750.00

40,500 162,000.00

32,250 64,500.00

3,738 14,952.00

303,202.00 303,200.00

123,500 46,312.50

40,500 81,000.00

32,250 96,750.00

224,062.50 224,060.00

123,500 46,312.50

40,500 81,000.00

32,250 161,250.00

Page 9: AHS Kontraktor Electrical Mehcanical of HS DKI

288,562.50 288,560.00

123,500 46,312.50

40,500 81,000.00

32,250 258,000.00

385,312.50 385,310.00

123,500 46,312.50

40,500 81,000.00

32,250 387,000.00

514,312.50 514,310.00

123,500 30,875.00

40,500 81,000.00

32,250 111,875.00 111,870.00

123,500 15,437.50

40,500 81,000.00

32,250 96,437.50 96,430.00

123,500 15,437.50

40,500 81,000.00

32,250 32,250.00

128,687.50 128,680.00

123,500 46,312.50

40,500 81,000.00

32,250 129,000.00

256,312.50 256,310.00

123,500 15,437.50

40,500 81,000.00

96,437.50 96,430.00

123,500 15,437.50

40,500 81,000.00

32,250 96,750.00

193,187.50 193,180.00

123,500 82,333.33

40,500 27,000.00

32,250 10,750.00

120,083.33 120,080.00

123,500 82,333.33

40,500 27,000.00

32,250 10,750.00

120,083.33 120,080.00

123,500 30,875.00

Page 10: AHS Kontraktor Electrical Mehcanical of HS DKI

40,500 5,062.50

32,250 4,031.25

39,968.75 39,960.00

123,500 30,875.00

40,500 5,062.50

32,250 4,031.25

39,968.75 39,960.00

123,500 15,437.50

40,500 40,500.00

32,250 64,500.00

15,600 15,600.00

1,950 1,950.00

137,987.50 137,980.00

123,500 15,437.50

40,500 81,000.00

96,437.50 96,430.00

123,500 15,437.50

40,500 40,500.00

55,937.50 55,930.00

2,210 2,210.00 2,210.00

26,250 52,500.00 52,500.00

37,500 75,000.00

26,250 52,500.00

127,500.00 127,500.00

26,250 26,250 26,250.00

20,386 2,650.18

201,578 52,410.28

3,738 14,952.00

1,430 5,720.00

10,777 24,463.79

4,420 10,033.40

123,500 61,750.00

40,500 121,500.00

123,500 16,055.00

40,500 81,000.00

390,534.65 390,530.00

6,500 26,000.00

123,500 15,437.50

40,500 40,500.00

32,250 64,500.00

Page 11: AHS Kontraktor Electrical Mehcanical of HS DKI

146,437.50 146,430.00

123,500 15,437.50

40,500 81,000.00

8,000 4,000.00

75,000 37,500.00

87,500 21,875.00

159,812.50 159,810.00

123,500 15,437.50

40,500 81,000.00

8,000 4,000.00

75,000 37,500.00

87,500 21,875.00

159,812.50 159,810.00

123,500 15,437.50

40,500 81,000.00

8,000 4,000.00

75,000 37,500.00

137,937.50 137,930.00

123,500 15,437.50

40,500 40,500.00

8,000 2,000.00

75,000 37,500.00

87,500 21,875.00

117,312.50 117,310.00

40,500 40,500.00

75,000 37,500.00

78,000.00 78,000.00

13,000 13,000.00

2,600 2,600.00

40,500 40,500.00

56,100.00 56,100.00

130,000 130,000.00

8,398 142,766.00

20,386 183,474.00

49,842 24,921.00

689,193 3,170,287.80

130,000 520,000.00

10,738 375,830.00

4,420 154,700.00

2,925 29,250.00

23,375 140,250.00

Page 12: AHS Kontraktor Electrical Mehcanical of HS DKI

123,500 123,500.00

40,500 81,000.00

32,250 96,750.00

21,125 190,125.00

5,362,853.80 5,362,850.00

130,000 130,000.00

8,398 75,582.00

7,878 35,451.00

49,842 12,460.50

689,193 1,585,143.90

130,000 520,000.00

10,738 193,284.00

4,420 79,560.00

2,925 29,250.00

23,375 70,125.00

123,500 123,500.00

40,500 81,000.00

32,250 193,500.00

112,500 98,437.50

0.00

3,227,293.90 3,227,290.00

39,000,000.00

650,000.00

43,225,000.00

650,000.00

Page 13: AHS Kontraktor Electrical Mehcanical of HS DKI

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN

PEKERJAAN SALURAN KABEL TEGANGAN RENDAH

Belum termasuk resiko, over head, keuntungan 10 % dan PPN 10 %

2004

NO. URAIAN PEKERJAAN

1 2

1. PEKERJAAN GALIAN, URUGAN DAN PEMADATAN

1.1 GALIAN URUGAN DAN PEMADATAN

PADA TANAH BIASA / TANAH RUMPUT

a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

- GALIAN TANAH BIASA/TN.RUMPUT = 0.32 m3

- URUGAN TANAH BIASA/TN.RUMPUT = 0.24 m3

- PEMADATAN = 0.40 m2

b. 3 Jalur (1,00 x 0,50 x 0,80 )

- GALIAN TANAH BIASA/TN.RUMPUT = 0.40 m3

- URUGAN TANAH BIASA/TN.RUMPUT = 0.30 m3

- PEMADATAN = 0.50 m2

c. 4 Jalur (1,00 x 0,65 x 0,80 )

- GALIAN TANAH BIASA/TN.RUMPUT = 0.52 m3

- URUGAN TANAH BIASA/TN.RUMPUT = 0.39 m3

- PEMADATAN = 0.65 m2

d. GALIAN PENYUNTIKAN KABEL PADA

TANAH BIASA/TN.RUMPUT (1,50 x 0,50 x 0,80 )

- GALIAN TANAH BIASA/TN.RUMPUT = 0.60 m3

- URUGAN TANAH BIASA/TN.RUMPUT = 0.45 m3

- PEMADATAN = 0.75 m2

e. GALIAN LUBANG SAMBUNGAN PADA

TANAH BIASA/TN.RUMPUT

( 1 s/d 2 Jalur = 1,50 X 0,50 X 0,80 )

- GALIAN TANAH BIASA/TN.RUMPUT = 0.72 m3

- URUGAN TANAH BIASA/TN.RUMPUT = 0.45 m3

- PEMADATAN = 0.75 m2

f. GALIAN LUBANG SAMBUNGAN PADA

TANAH BIASA/TANAH RUMPUT

( 3 s/d 4 Jalur = 1,50 X 0,85 X 0,80 )

- GALIAN TANAH BIASA/TN.RUMPUT = 1.02 m3

- URUGAN TANAH BIASA/TN.RUMPUT = 0.77 m3

- PEMADATAN = 1.28 m2

g. GALIAN LUBANG PENGEBORAN MANUAL PADA

Page 14: AHS Kontraktor Electrical Mehcanical of HS DKI

TANAH BIASA/TANAH RUMPUT

(2,00 X 1,50 X 3,00 )

- HS SAMA DENGAN HS SKTM

Catatan :

- Rp. 20.386,15 -HS.Sipil Hal.2-No.02

- Rp. 9.464, -HS.DKI Hal.2-TN.10

- Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 TN.24

1.2. GALIAN URUGAN DAN PEMADATAN

PADA TANAH KERAS / TANAH KORAL

a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

- GALIAN TANAH KERAS / KORAL = 0.32 m3

- URUGAN TANAH KERAS / KORAL = 0.24 m3

- PEMADATAN = 0.40 m2

b. 3 jalur ( 1,00 x 0,50 x 0,80 )

- GALIAN TANAH KERAS / KORAL = 0.40 m3

- URUGAN TANAH KERAS / KORAL = 0.30 m3

- PEMADATAN = 0.50 m2

c. 4 jalur ( 1,00 x 0,65 x 0,80 )

- GALIAN TANAH KERAS / KORAL = 0.52 m3

- URUGAN TANAH KERAS / KORAL = 0.39 m3

- PEMADATAN = 0.65 m2

d. GALIAN PENYUNTIKAN KABEL PADA

TANAH KERAS / KORAL

- GALIAN TANAH KERAS / KORAL = 0.60 m3

- URUGAN TANAH KERAS / KORAL = 0.45 m3

- PEMADATAN = 0.75 m2

e. GALIAN LUBANG SAMBUNGAN PADA

TANAH KERAS / KORAL

( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )

- GALIAN TANAH KERAS / KORAL = 0.72 m3

- URUGAN TANAH KERAS / KORAL = 0.54 m3

- PEMADATAN = 0.90 m2

f. GALIAN LUBANG SAMBUNGAN PADA

TANAH KERAS / KORAL

( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )

- GALIAN TANAH KERAS / KORAL = 1.02 m3

- URUGAN TANAH KERAS / KORAL = 0.77 m3

- PEMADATAN = 1.28 m2

g. GALIAN LUBANG PENGEBORAN MANUAL PADA

TANAH KERAS / KORAL

( 2,00 x 1,50 x 3,00 )

- HS SAMA DENGAN HS SKTM

Page 15: AHS Kontraktor Electrical Mehcanical of HS DKI

Catatan :

- Rp. 24.233,23 HS.Sipil Hal.1 No.06

1.3. GALIAN URUGAN DAN PEMADATAN

PADA CONBLOK / INTERBLOK

a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

- BONGKAR CONBLOK / INTERBLOK = 0.60 m2

- GALIAN TANAH KERAS = 0.30 m3

- URUGAN TANAH KERAS = 0.16 m3

- PEMADATAN = 0.40 m2

b. 3 jalur ( 1,00 x 0,50 x 0,80 )

- BONGKAR CONBLOK / INTERBLOK = 0.70 m2

- GALIAN TANAH KERAS = 0.37 m3

- URUGAN TANAH KERAS = 0.20 m3

- PEMADATAN = 0.50 m2

c. 4 jalur ( 1,00 x 0,65 x 0,80 )

- BONGKAR CONBLOK / INTERBLOK = 0.85 m2

- GALIAN TANAH KERAS = 0.48 m3

- URUGAN TANAH KERAS = 0.26 m3

- PEMADATAN = 0.65 m2

d. GALIAN PENYUNTIKAN KABEL PADA

CONBLOK / INTERBLOK ( 1,50 X 0,50 X 0,80 )

- BONGKAR CONBLOK / INTERBLOK = 1.05 m2

- GALIAN TANAH KERAS = 0.56 m3

- URUGAN TANAH KERAS = 0.30 m3

- PEMADATAN = 0.75 m2

e. GALIAN LUBANG SAMBUNGAN PADA

CONBLOK / INTERBLOK ( 1,50 X 0,60 X 0,80 )

( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )

- BONGKAR CONBLOK / INTERBLOK = 1.20 m2

- GALIAN TANAH KERAS = 0.67 m3

- URUGAN TANAH KERAS = 0.36 m3

- PEMADATAN = 0.90 m2

f. GALIAN LUBANG SAMBUNGAN PADA

CONBLOK / INTERBLOK ( 1,50 X 0,85 X 0,80 )

( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )

- BONGKAR CONBLOK / INTERBLOK = 1.58 m2

- GALIAN TANAH KERAS = 0.94 m3

- URUGAN TANAH KERAS = 0.51 m3

- PEMADATAN = 1.28 m2

g. GALIAN LUBANG PENGEBORAN MANUAL PADA

CONBLOK / INTERBLOK ( 1,50 X 0,85 X 0,80 )

( 2,00 x 1,50 x 3,00 )

Page 16: AHS Kontraktor Electrical Mehcanical of HS DKI

- HS SAMA DENGAN HS SKTM

Catatan :

- Rp. 1.600,2 --HS DKI Hal.38 BKR.59

Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.4. GALIAN URUGAN DAN PEMADATAN

PADA UBIN BADAK / KERAMIK / FLOOR BETON BIASA

a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

- BONGKAR U.BADAK / F.BETON BIASA = 0.60 m2

- GALIAN TANAH KERAS = 0.29 m3

- URUGAN TANAH KERAS = 0.17 m3

- PEMADATAN = 0.40 m2

b. 3 jalur ( 1,00 x 0,50 x 0,80 )

- BONGKAR U.BADAK / F.BETON BIASA = 0.70 m2

- GALIAN TANAH KERAS = 0.36 m3

- URUGAN TANAH KERAS = 0.21 m3

- PEMADATAN = 0.50 m2

c. 4 jalur ( 1,00 x 0,65 x 0,80 )

- BONGKAR U.BADAK / F.BETON BIASA = 0.85 m2

- GALIAN TANAH KERAS = 0.47 m3

- URUGAN TANAH KERAS = 0.27 m3

- PEMADATAN = 0.65 m2

d. GALIAN PENYUNTIKAN KABEL PADA

UBIN BADAK / F.BETON BIASA ( 1,50 X 0,50 X 0,80 )

- BONGKAR U.BADAK / F.BETON BIASA = 1.05 m2

- GALIAN TANAH KERAS = 0.54 m3

- URUGAN TANAH KERAS = 0.32 m3

- PEMADATAN = 0.75 m2

e. GALIAN LUBANG SAMBUNGAN PADA

UBIN BADAK / F.BETON BIASA

( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )

- BONGKAR U.BADAK / F.BETON BIASA = 1.20 m2

- GALIAN TANAH KERAS = 0.65 m3

- URUGAN TANAH KERAS = 0.38 m3

- PEMADATAN = 0.90 m2

f. GALIAN LUBANG SAMBUNGAN PADA

UBIN BADAK / F.BETON BIASA

( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )

- BONGKAR U.BADAK / F.BETON BIASA = 1.78 m2

- GALIAN TANAH KERAS = 0.92 m3

- URUGAN TANAH KERAS = 0.54 m3

- PEMADATAN = 1.28 m2

g. GALIAN LUBANG PENGEBORAN MANUAL PADA

Page 17: AHS Kontraktor Electrical Mehcanical of HS DKI

UBIN BADAK / F.BETON BIASA ( 2,00 x 1,50 x 3,00 )

HS SAMA DENGAN HARGA SKTM

Catatan :

Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.5. GALIAN URUGAN DAN PEMADATAN

PADA FLOOR BETON COR

a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

- BONGKAR FLOOR BETON COR = 0.04 m2

- GALIAN TANAH KERAS = 0.29 m3

- URUGAN TANAH KERAS = 0.15 m3

- PEMADATAN = 0.40 m2

b. 3 jalur ( 1,00 x 0,50 x 0,80 )

- BONGKAR FLOOR BETON COR = 0.05 m2

- GALIAN TANAH KERAS = 0.37 m3

- URUGAN TANAH KERAS = 0.19 m3

- PEMADATAN = 0.50 m2

c. 4 jalur ( 1,00 x 0,65 x 0,80 )

- BONGKAR FLOOR BETON COR = 0.60 m2

- GALIAN TANAH KERAS = 0.47 m3

- URUGAN TANAH KERAS = 0.25 m3

- PEMADATAN = 0.75 m2

d. GALIAN PENYUNTIKAN KABEL PADA

FLOOR BETON COR ( 1,50 x 0,50 x 0,80 )

- BONGKAR FLOOR BETON COR = 0.07 m2

- GALIAN TANAH KERAS = 0.55 m3

- URUGAN TANAH KERAS = 0.29 m3

- PEMADATAN = 0.75 m2

e. GALIAN LUBANG SAMBUNGAN PADA

FLOOR BETON COR

( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )

- BONGKAR FLOOR BETON COR = 1.08 m2

- GALIAN TANAH KERAS = 0.66 m3

- URUGAN TANAH KERAS = 0.34 m3

- PEMADATAN = 0.90 m2

f. GALIAN LUBANG SAMBUNGAN PADA

FLOOR BETON COR

( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )

- BONGKAR FLOOR BETON COR = 0.11 m2

- GALIAN TANAH KERAS = 0.93 m3

- URUGAN TANAH KERAS = 0.48 m3

- PEMADATAN = 1.28 m2

g. GALIAN LUBANG PENGEBORAN MANUAL PADA

Page 18: AHS Kontraktor Electrical Mehcanical of HS DKI

FLOOR BETON COR ( 2,00 x 1,50 x 3,00 )

HS SAMA DENGAN HARGA SKTM

Catatan :

- Rp. 212.815,30-- HS.DKI hAL.33 - bkr.03

Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.6. GALIAN URUGAN DAN PEMADATAN

PADA FLOOR BETON BERTULANG

a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

- BONGKAR FLOOR BETON BERTULANG = 0.01 m2

- GALIAN TANAH KERAS = 0.28 m3

- URUGAN TANAH KERAS = 0.16 m3

- PEMADATAN = 0.40 m2

b. 3 jalur ( 1,00 x 0,50 x 0,80 )

- BONGKAR FLOOR BETON BERTULANG = 0.01 m2

- GALIAN TANAH KERAS = 0.35 m3

- URUGAN TANAH KERAS = 0.20 m3

- PEMADATAN = 0.50 m2

c. 4 jalur ( 1,00 x 0,65 x 0,80 )

- BONGKAR FLOOR BETON BERTULANG = 0.09 m2

- GALIAN TANAH KERAS = 0.46 m3

- URUGAN TANAH KERAS = 0.26 m3

- PEMADATAN = 0.65 m2

d. GALIAN PENYUNTIKAN KABEL PADA

FLOOR BETON BERTULANG ( 1,50 x 0,50 x 0,80 )

- BONGKAR FLOOR BETON BERTULANG = 1.11 m2

- GALIAN TANAH KERAS = 0.53 m3

- URUGAN TANAH KERAS = 0.30 m3

- PEMADATAN = 0.75 m2

e. GALIAN LUBANG SAMBUNGAN PADA

FLOOR BETON BERTULANG

( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )

- BONGKAR FLOOR BETON BERTULANG = 1.12 m2

- GALIAN TANAH KERAS = 0.63 m3

- URUGAN TANAH KERAS = 0.36 m3

- PEMADATAN = 0.90 m2

f. GALIAN LUBANG SAMBUNGAN PADA

FLOOR BETON BERTULANG

( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )

- BONGKAR FLOOR BETON BERTULANG = 0.16 m2

- GALIAN TANAH KERAS = 0.89 m3

- URUGAN TANAH KERAS = 0.51 m3

- PEMADATAN = 1.28 m2

Page 19: AHS Kontraktor Electrical Mehcanical of HS DKI

g. GALIAN LUBANG PENGEBORAN MANUAL PADA

FLOOR BETON BERTULANG ( 2,00 x 1,50 x 3,00 )

HS SAMA DENGAN HARGA SKTM

Catatan :

- Rp. 295.701.25,- - HS.SIPIL Hal.36 - BKR.04

Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.7. GALIAN URUGAN DAN PEMADATAN

PADA A S P A L / H O T M I X

a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )

- BONGKAR ASPAL / HOTMIX = 0.40 m2

- GALIAN TANAH BERBATU = 0.30 m3

b. 3 jalur ( 1,00 x 0,50 x 0,80 )

- BONGKAR ASPAL / HOTMIX = 0.50 m2

- GALIAN TANAH BERBATU = 0.38 m3

c. 4 jalur ( 1,00 x 0,65 x 0,80 )

- BONGKAR ASPAL / HOTMIX = 0.65 m2

- GALIAN TANAH BERBATU = 0.49 m3

d. GALIAN PENYUNTIKAN KABEL PADA

ASPAL / HOTMIX ( 1,50 x 0,50 x 080 )

- BONGKAR ASPAL / HOTMIX = 0.75 m2

- GALIAN TANAH BERBATU = 0.56 m3

e. GALIAN LUBANG SAMBUNGAN PADA

A S P A L / H O T M I X

( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )

- BONGKAR ASPAL / HOTMIX = 0.90 m2

- GALIAN TANAH BERBATU = 0.68 m3

f. GALIAN LUBANG SAMBUNGAN PADA

A S P A L / H O T M I X

( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )

- BONGKAR ASPAL / HOTMIX = 1.28 m2

- GALIAN TANAH BERBATU = 0.96 m3

g. GALIAN LUBANG PENGEBORAN MANUAL PADA

A S P A L / H O T M I X

- HS SAMA DENGAN HS SKTM

1.8. POMPONGAN

- Pekerja 0.33 Pekerja

Catatan :

- Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07

- Rp.40.751,- - HS Sipil Hal.2 No.07

2 PENARIKAN , PENYAMBUNGAN DAN TERMINASI KABEL

Page 20: AHS Kontraktor Electrical Mehcanical of HS DKI

2.1. Penarikan Kabel 4 x 16 S/D 50 mm2

Gelar Kabel / hari = 750 meter

- Teknisi 1.00 orang

- Mandor 1.00 Mandor

- Pekerja 65.00 Pekerja

Rp.3.575,- --HS DKI Hal.33--BKR-09

2.2. Penarikan Kabel 4 x 70 s/d 150 mm2

Gelar Kabel / hari = 600 meter

- Tenaga Ahli Muda 1.00 Orang

- Teknisi 1.00 Orang

- Pekerja 65.00 Pekerja

2.3. Penyambungan Kabel

- Tenaga Ahli Muda 0.25 Orang

- Tukang / Instalator 1.00 Tuk./ Ins

- Pekerja 1.00 Pekerja

2.4. Terminasi Kabel Indoor

- Tenaga Ahli Muda 0.25 Orang

- Tukang / Instalator 1.00 Tuk./ Ins

- Pekerja 1.00 Pekerja

2.5. Terminasi Kabel Outdoor

- Tenaga Ahli Muda 0.25 Orang

- Tukang / Instalator 1.00 Tuk./ Ins

- Pekerja 2.00 Pekerja

3. MATERIAL PELENGKAP BERIKUT PEMASANGAN

- Keramik Tanda Peringatan Kabel PLN

Ukuran (22,5 x 30 x 4) Cm - Sertifikat LMK

- Batu Merah

- Pasir Urug Darat

- Buis Beton O 20 Cm

- Papan Penahan Tanah

- PVC O 4" type AW

Catatan :

Rp. 5.107 = Rp.572.000,- (Harga Papan / M3)

4 x 28 lembar papan / M3

4. PENGEBORAN / CROSSING

4.1. Pengeboran dgn menggunakan Bor Manual/Hari dapat 8 M

- Teknisi 1.00 Orang

- Tukang Kayu 1.00 T.kayu

- Pekerja 5.00 Pekerja

- Papan penahan tanah (2x3x2) + (3x1,5x2)x2x0,03 =

(12 + 9) x 2 = 21 x 2 = 42 x 0,03 = 1.26 M3

- Dolken 5/7 = 12.00 Batang

Page 21: AHS Kontraktor Electrical Mehcanical of HS DKI

- Paku = 1.00 Kg

4.2. Pengeboran dengan menggunakan Mesin Khusus

5 PERBAIKAN BEKAS GALIAN ( BERIKUT MATERIAL )

5.1. T.Biasa/T.Rumput (perbaikan/pemadatan sudah termasuk

dlm pek galian)

5.2. T.Keras/Koral (perbaikan/pemadatan sudah termasuk

dlm pek galian)

5.3. Conblok (Interblok) / M2

5.4. Ubin Badak

5.5. Floor Beton Biasa

5.6. Floor Beton Cor

5.7. Floor Beton Bertulang

5.8. Shat Sheet

5.9. Aspal Biasa / Penetrasi

Penetrasi tebal 5 Cm

Macadam tebal 20 Cm

Sirtu Tebal 30 Cm

5.10. Aspal Hotmix 3/5/20/32

Hotmix tebal 3 Cm

Tack Coating

Penetrasi tebal 5 Cm

Macadam 20 Cm

Sirtu 32 Cm

5.11. Aspal Hotmix 5/5/20/28

Hotmix tebal 5 Cm

Tack Coating

Penetrasi tebal 5 Cm

Macadam 20 Cm

Sirtu 32 Cm = 32/30

5.12. Aspal Hotmix 7/5/20/28

Hotmix tebal 7 Cm

Tack Coating

Penetrasi tebal 5 Cm

Macadam 20 Cm

Sirtu 28 Cm = 28/30

5.13. Perbaikan Keramik

- Pasang Keramik 10 x 20 1.00 m2

- Pasang Keramik 20 x 20 1.00 m2

- Pasang Keramik 30 x 20 1.00 m2

5.14. Perbaikan rumput disesuaikan dgn HS DKI/Pertanaman

( Dalam bestek biaya perbaikan rumput/taman tidak

dicantumkan dan akan dibayar sesuai realisasi berdasarkan

Page 22: AHS Kontraktor Electrical Mehcanical of HS DKI

bukti yang dapat dipertanggung jawabkan ).

Page 23: AHS Kontraktor Electrical Mehcanical of HS DKI

ANALISA HARGA SATUAN

PEKERJAAN SALURAN KABEL TEGANGAN RENDAH

Belum termasuk resiko, over head, keuntungan 10 % dan PPN 10 %

HARGA JUMLAH JUMLAH

SATUAN BIAYA DIBULATKAN

(RUPIAH) (RUPIAH) (RUPIAH)

3 4 5

20,386.15 6,523.57

9,464.00 2,271.36

3,713.30 1,485.32

10,280.25

20,386.15 8,154.46

9,464.00 2,839.20

3,713.30 1,856.65

12,850.31

20,386.15 10,600.80

9,464.00 3,690.96

3,713.30 2,413.65

16,705.40

20,386.15 12,231.69

9,464.00 4,258.80

3,713.30 2,784.98

19,275.47

20,386.15 14,678.03

9,464.00 4,258.80

3,713.30 2,784.98

21,721.80

20,386.15 20,793.87

9,464.00 7,239.96

3,713.30 4,734.46

32,768.29

Page 24: AHS Kontraktor Electrical Mehcanical of HS DKI

0.00

7880 - Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 2136

3445 - Rp. 11.139,9 =6xRp.1068-HS.DKI HAl.3 4408.24

2140 - Rp. 20.386,15 -HS.Sipil Hal.2-No.02 7878

- Rp. 30.579,- (300/200)x7878 HS. Sipil H 11817

- Rp. 9.464, -HS.DKI Hal.2-TN.10 3445

24,233.23 7,754.63

9,464.00 2,271.36

3,713.30 1,485.32

11,511.31

24,233.23 9,693.29

9,464.00 2,839.20

3,713.30 1,856.65

14,389.14

24,233.23 12,601.28

9,464.00 3,690.96

3,713.30 2,413.65

18,705.88

24,233.23 14,539.94

9,464.00 4,258.80

3,713.30 2,784.98

21,583.71

24,233.23 17,447.93

9,464.00 5,110.56

3,713.30 3,341.97

25,900.46

24,233.23 24,717.89

9,464.00 7,239.96

3,713.30 4,734.46

36,692.31

0.00

Page 25: AHS Kontraktor Electrical Mehcanical of HS DKI

1,600.20 960.12

24,233.23 7,173.04

9,464.00 1,514.24

3,713.30 1,485.32

11,132.72

1,600.20 1,120.14

24,233.23 8,966.30

9,464.00 1,892.80

3,713.30 1,856.65

13,835.89

1,600.20 1,360.17

24,233.23 11,656.18

9,464.00 2,460.64

3,713.30 2,413.65

17,890.64

1,600.20 1,680.21

24,233.23 13,449.44

9,464.00 2,839.20

3,713.30 2,784.98

20,753.83

1,600.20 1,920.24

24,233.23 16,139.33

9,464.00 3,407.04

3,713.30 3,341.97

24,808.58

1,600.20 2,520.32

24,233.23 22,864.05

9,464.00 4,826.64

3,713.30 4,734.46

34,945.47

Page 26: AHS Kontraktor Electrical Mehcanical of HS DKI

0.00

1,600.20 960.12

24,233.23 6,979.17

9,464.00 1,571.02

3,713.30 1,485.32

10,995.63

1,600.20 1,120.14

24,233.23 8,723.96

9,464.00 1,987.44

3,713.30 1,856.65

13,688.19

1,600.20 1,360.17

24,233.23 11,341.15

9,464.00 2,583.67

3,713.30 2,413.65

17,698.64

1,600.20 1,680.21

24,233.23 13,085.94

9,464.00 2,981.16

3,713.30 2,784.98

20,532.29

1,600.20 1,920.24

24,233.23 15,703.13

9,464.00 3,577.39

3,713.30 3,341.97

24,542.74

1,600.20 2,840.36

24,233.23 22,246.11

9,464.00 5,067.97

3,713.30 4,734.46

34,888.89

Page 27: AHS Kontraktor Electrical Mehcanical of HS DKI

0.00

212,815.30 8,938.24

24,233.23 7,076.10

9,464.00 1,438.53

3,713.30 1,485.32

18,938.19

212,815.30 10,427.95

24,233.23 8,845.13

9,464.00 1,798.16

3,713.30 1,856.65

22,927.89

212,815.30 126,625.10

24,233.23 11,498.67

9,464.00 2,337.61

3,713.30 2,784.98

143,246.35

212,815.30 15,641.92

24,233.23 13,267.69

9,464.00 2,697.24

3,713.30 2,784.98

34,391.83

212,815.30 230,691.79

24,233.23 15,921.23

9,464.00 3,236.69

3,713.30 3,341.97

253,191.68

212,815.30 23,409.68

24,233.23 22,553.87

9,464.00 4,585.31

3,713.30 4,734.46

55,283.32

Page 28: AHS Kontraktor Electrical Mehcanical of HS DKI

0.00

295,701.25 1,774.21

24,233.23 6,785.30

9,464.00 1,514.24

3,713.30 1,485.32

11,559.07

295,701.25 2,069.91

24,233.23 8,481.63

9,464.00 1,892.80

3,713.30 1,856.65

14,300.99

295,701.25 25,134.61

24,233.23 11,026.12

9,464.00 2,460.64

3,713.30 2,413.65

41,035.01

295,701.25 326,749.88

24,233.23 12,722.45

9,464.00 2,839.20

3,713.30 2,784.98

345,096.50

295,701.25 331,185.40

24,233.23 15,266.93

9,464.00 3,407.04

3,713.30 3,341.97

353,201.34

295,701.25 46,572.95

24,233.23 21,628.16

9,464.00 4,826.64

3,713.30 4,734.46

77,762.20

Page 29: AHS Kontraktor Electrical Mehcanical of HS DKI

0.00

11,766.92 4,706.77

40,751.00 12,225.30

16,932.07

11,766.92 5,883.46

40,751.00 15,281.63

21,165.09

11,766.92 7,648.50

40,751.00 19,866.11

27,514.61

11,766.92 8,825.19

40,751.00 22,922.44

31,747.63

11,766.92 10,590.23

40,751.00 27,506.93

38,097.15

11,766.92 15,002.82

40,751.00 38,966.11

53,968.93

32,250.00 10,750.00 10,750.00

- Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07

- Rp.40.751,- - HS Sipil Hal.2 No.07

- Rp. 1.856.65 - HS.DKI Hal.3 TN.24

Page 30: AHS Kontraktor Electrical Mehcanical of HS DKI

123,500.00 123,500.00

56,250.00 56,250.00

32,250.00 2,096,250.00

2,276,000.00 0

750

3,034.67 3,034.67

123,500.00 123,500.00

56,250.00 56,250.00

32,250.00 2,096,250.00

2,276,000.00

600.00

3,793.33 3,793.33

123,500.00 30,875.00

40,500.00 40,500.00

32,250.00 32,250.00

103,625.00

123,500.00 30,875.00

40,500.00 40,500.00

32,250.00 32,250.00 21093.75 42187.5

103,625.00

123,500.00 30,875.00

40,500.00 40,500.00

32,250.00 64,500.00

135,875.00

845.00 850.00

137.00 140.00

49,959.00 49,960.00

11,102.00 11,100.00

5,107.00 5,110.00

20,215.00 20,220.00

56,250.00 56,250.00

40,500.00 40,500.00

32,250.00 161,250.00

258,000.00

572,000.00 720,720.00

3,250.00 39,000.00

Page 31: AHS Kontraktor Electrical Mehcanical of HS DKI

2,600.00 2,600.00

1,020,320.00

8.00

Sesuai 127,540.00 127,540.00

Kontrak

22,697.00 22,700.00

26,707.00 26,710.00

14,053.00 14,050.00

26,083.00 26,080.00

75,200.00 75,200.00

10,920.00 10,920.00

13,314.00 13,314.00

17,186.00 17,186.00

16,190.00 16,190.00

46,690.00 46,690.00

12,517.00 12,517.00

3,188.00 3,188.00

13,314.00 13,314.00

17,186.00 17,186.00

16,190.00 16,190.00

62,395.00 62,390.00

20,744.00 20,744.00

3,188.00 3,188.00

13,314.00 13,314.00

17,186.00 17,186.00

16,190.00 16,190.00

70,622.00 70,620.00

28,972.00 28,972.00

3,188.00 3,188.00

13,314.00 13,314.00

17,186.00 17,186.00

16,190.00 16,190.00

78,850.00 78,850.00

37,999.00 38,000.00

40,742.00 40,740.00

33,440.00 43,470.00

Page 32: AHS Kontraktor Electrical Mehcanical of HS DKI
Page 33: AHS Kontraktor Electrical Mehcanical of HS DKI

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN

PEKERJAAN : SUTR DAN SAMBUNGAN LISTRIK

Belum Termasuk resiko, over head, keuntungan 10 % dan PPN 10 %

2004

HARGA

NO. JENIS PEKERJAAN SATUAN

(RUPIAH)

1 2 3

1 PENANAMAN TIANG BESI 9 METER

1.1 Tiang Besi 9 meter 200 daN

- Pengeboran Tanah/ 0.33333333 Mandor 56,250.00

Mendirikan Tiang 1.66666667 Tukang 40,500.00

1.2 Tiang Besi 9 meter 350 daN

- Pengeboran Tanah/ 0.33333333 Mandor 56,250.00

Mendirikan Tiang 2 Tukang 40,500.00

1.3 Tiang Besi 9 meter 500 daN

- Pengeboran Tanah/ 0.33333333 Mandor 56,250.00

Mendirikan Tiang 2 Tukang 40,500.00

1.4 Tiang Besi 9 meter 800 daN

- Pengeboran Tanah/ 0.33333333 Mandor 56,250.00

Mendirikan Tiang 2.66666667 Tukang 40,500.00

1.5 Tiang Besi 9 meter 1.200 daN

- Pengeboran Tanah/ 0.33333333 Mandor 56,250.00

Mendirikan Tiang 3.33333333 Tukang 40,500.00

2 PENGECATAN TIANG BESI 9 METER

2.1 Tiang Besi 9 meter 200 daN 3.175 m2 10,257.00

2.2 Tiang Besi 9 meter 350 daN 3.954 m2 10,257.00

2.3 Tiang Besi 9 meter 500 daN 4.376 m2 10,257.00

2.4 Tiang Besi 9 meter 800 daN 5.506 m2 10,257.00

2.5 Tiang Besi 9 meter 1.200 daN 6.423 m2 10,257.00

3 PENANAMAN TIANG BETON 9 METER

3.1 Tiang Beton 9 meter 200 daN

- Pengeboran Tanah/ 0.33333333 Mandor 56,250.00

Mendirikan Tiang 2.66666667 Tukang 40,500.00

3.2 Tiang beton 9 meter 350 daN

- Pengeboran Tanah/ 0.33333333 Mandor 56,250.00

Mendirikan Tiang 3.33333333 Tukang 40,500.00

3.3 Tiang beton 9 meter 500 daN

- Pengeboran Tanah/ 0.5 Mandor 56,250.00

Page 34: AHS Kontraktor Electrical Mehcanical of HS DKI

Mendirikan Tiang 4 Tukang 40,500.00

3.4 Tiang beton 9 meter 800 daN

- Pengeboran Tanah/ 0.5 Mandor 56,250.00

Mendirikan Tiang 4.5 Tukang 40,500.00

3.5 Tiang beton 9 meter 1.200 daN

- Pengeboran Tanah/ 0.5 Mandor 56,250.00

Mendirikan Tiang 5 Tukang 40,500.00

4 PEMBUATAN PONDASI TIANG BESI/BETON 9 METER

4.1 Pondasi Tiang 9 meter Type A

- Galian Tanah biasa/rumput 0.60 m3 7,878.00

- Sirtu dipadatkan 0.60 m3 89,842.00

- Beton Block 1:2:3 0.03 m3 687,193.00

- Urugan Pasir 0.03 m3 49,842.00

4.2 Ponsdasi Tiang 9 meter Type B

- Galian Tanah biasa/rumput 0.50 m3 7,878.00

- Beton Tumbuk 1:2:3 0.38 m3 216,242.00

- Beton Block 1:2:3 0.03 m3 687,193.00

- Urugan Pasir 0.03 m3 49,842.00

4.3 Pondasi Tiang 9 meter Type C

- Galian Tanah biasa/rumput 0.60 m3 7,878.00

- Beton Tumbuk 1:2:3 0.54 m3 216,242.00

- Beton Block 1:2:3 0.03 m3 687,193.00

- Urugan Pasir 0.03 m3 49,842.00

4.4 Pondasi Tiang 9 meter Type D

- Galian Tanah biasa/rumput 0.50 m3 7,878.00

- Beton Tumbuk 1:2:3 0.38 m3 216,242.00

- Beton Block 1:2:3 0.10 m3 687,193.00

- Urugan Pasir 0.03 m3 49,842.00

4.5 Pondasi Tiang 9 meter Type E

- Galian Tanah biasa/rumput 0.60 m3 7,878.00

- Beton Tumbuk 1:2:3 0.54 m3 216,242.00

- Beton Block 1:2:3 0.20 m3 687,193.00

- Urugan Pasir 0.03 m3 49,842.00

5 PEMASANGAN/PERBAIKAN KUTR

5.1 Pemasangan KUTR 4 Kawat BC 25/50 mm2

- Penarikan KUTR 1 Gawang 0.5 Mandor 56,250.00

2 Tukang 40,500.00

1.5 Pekerja 32,250.00

5.2 Pemasangan Twisted Cable 3 x 35 s/d 70 mm2 + N

- Penarikan KUTR 1 Gawang 0.33333333 Mandor 56,250.00

1.33333333 Tukang 40,500.00

Page 35: AHS Kontraktor Electrical Mehcanical of HS DKI

1.33333333 Pekerja 32,250.00

5.3 Pemasangan SL 1 Phase Twisted/Kawat Udara

- Sambungan Rumah (SR) 0.25 Mandor 56,250.00

1 Tukang 40,500.00

5.4 Pemasangan SL 3 Phase Twisted/Kawat Udara

- Sambungan Rumah (SR) 0.5 Mandor 56,250.00

1 Tukang 40,500.00

5.5 Perbaikan KUTR Kendor BC Sama dengan pasang 157,500.00

5.6 Perbaikan KUTR Kendor Twisted Sama dengan pasang 115,750.00

5.7 Pemasangan / Montage Joint Sleve Uk.35 s/d 70 mm2 Set (4 Bh)

0.125 Mandor 56,250.00

0.125 Tukang 40,500.00

5.8 Pemasangan / Montage Conector Uk.35 s/d 70 mm2 Set (4 Bh)

0.0625 Mandor 56,250.00

0.125 Tukang 40,500.00

5.9 Pemasangan / Perbaikan Jumper SUTR/Phase (Buah)

- Mandor Pengawas 0.08333333 Mandor 56,250.00

- Tukang 0.08333333 Tukang 40,500.00

- Pekerja 0.08333333 Pekerja 32,250.00

5.10 Pemasangan Suspension Assemby (Set)

- Mandor Pengawas 0.08333333 Mandor 56,250.00

- Tukang 0.25 Tukang 40,500.00

- Pekerja 0.5 Pekerja 32,250.00

5.11 Pemasangan Dead End Essembly (Set)

- Mandor Pengawas 0.08333333 Mandor 56,250.00

- Tukang 0.33333333 Tukang 40,500.00

- Pekerja 0.66666667 Pekerja 32,250.00

5.12 Pemasangan Pelindung Listrik & Mekanik (Bundle end Protection)

- Mandor Pengawas 0.08333333 Mandor 56,250.00

- Tukang 0.25 Tukang 40,500.00

- Pekerja 0.5 Pekerja 32,250.00

5.13 Pemasangan/Penanaman Pipa Arde (1,5 inc per 1,5 mtr) perbatang

0.25 Pemasangan 26,000.00

Pengadaan pipa Arde (1.5 inc per 1,5 m) 0.25 Pemasangan 50,718.00

5.14 Pemasangan Pipa Arde (1,5 inc) & (6) pengikat (3) dipipa (3) dikabel

0.25 Mandor 56,250.00

0.5 Tukang 40,500.00

5.15 Pemasangan Pipa Opstyg (2,5) & (6) pengikat (3) dipipa (3) dikabel

Page 36: AHS Kontraktor Electrical Mehcanical of HS DKI

0.25 Mandor 56,250.00

0.5 Tukang 40,500.00

6 PERBAIKAN PONDASI DAN TIANG MIRING 9 METER

( BESI DAN BETON )

6.1 Pondasi Tiang 9 meter Type A

- Galian tanah biasa/rumput 0.42 m3 7,878.00

- Sirtu dipadatkan 0.42 m3 49,842.00

6.2 Pondasi Tiang 9 meter Type B

- Galian tanah biasa/rumput 0.35 m3 7,878.00

- Beton tumbuk 1:2:3 0.27 m3 216,242.00

6.3 Pondasi Tiang 9 meter Type C

- Galian tanah biasa/rumput 0.42 m3 7,878.00

- Beton tumbuk 1:2:3 0.38 m3 216,242.00

6.4 Pondasi Tiang 9 meter Type D

- Galian tanah biasa/rumput 0.35 m3 7,878.00

- Beton tumbuk 1:2:3 0.27 m3 216,242.00

6.5 Pondasi Tiang 9 meter Type E

- Galian tanah biasa/rumput 0.42 m3 7,878.00

- Beton tumbuk 1:2:3 0.38 m3 216,242.00

7 PEMBONGKARAN TIANG BESI

7.1 Pembongkaran Tiang Besi 9/200 daN Sama Dengan Pasang 86,250.00

7.2 Pembongkaran Tiang Besi 9/350 daN Sama Dengan Pasang 99,750.00

7.3 Pembongkaran Tiang Besi 9/500 daN Sama Dengan Pasang 99,750.00

7.4 Pembongkaran Tiang Besi 9/800 daN Sama Dengan Pasang 126,750.00

7.5 Pembongkaran Tiang Besi 9/1200 daN Sama Dengan Pasang 153,750.00

7.6 Pembongkaran Drak Skur sama dengan pasang Tiang Besi 9/200 86,250.00

7.7 Pembongkaran Drak Skur sama dengan pasang arde KUTR

1 / 4 Pemasang 26,000.00

7.8 Bongkar Pasang Box SKTR

Panel Utama 1 Mandor 56,250.00

1 Tukang 40,500.00

1 Pekerja 32,250.00

7.9 Panel Pembagi 0.5 Mandor 56,250.00

1 Tukang 40,500.00

1 Pekerja 32,250.00

8 PEMBONGKARAN TIANG BETON

8.1 Pembongkaran Tiang Beton 9/200 daN Sama Dengan Pasang 126,750.00

8.2 Pembongkaran Tiang Beton 9/350 daN Sama Dengan Pasang 153,750.00

8.3 Pembongkaran Tiang Beton 9/500 daN Sama Dengan Pasang 190,125.00

8.4 Pembongkaran Tiang Beton 9/800 daN Sama Dengan Pasang 210,375.00

8.5 Pembongkaran Tiang Beton 9/1200 daN Sama Dengan Pasang 230,625.00

Page 37: AHS Kontraktor Electrical Mehcanical of HS DKI

9 PEMBONGKARAN KUTR

9.1 Kawat Udara 4 kawat BC 25/50 mm2 Sama Dengan Pasang 157,500.00

9.2 Twisted kabel 3 x 35 s/d 70 mm2 + N Sama Dengan Pasang 115,750.00

9.3 Pembongkaran Travers SUTR 0.08333333 Mandor 56,250.00

8 Tukang 40,500.00

10 PERBAIKAN LISTRIK (SL)

10.1 SL 1 Phase Twisted / Kawat Udara 0.50 Pasang 18,644.00

10.2 SL 3 Phase Twisted / Kawat Udara 0.50 Pasang 24,375.00

11 PEMBONGKARAN 7 REHABILITASI SAMBUNGAN LISTRIK SL

11.1 SL 1 Phase Twisted / Kawat Udara 1 Pasang 18,694.00

11.2 SL 3 Phase Twisted / Kawat Udara 1 Pasang 24,375.00

11.3 Rehabilitasi SL 1 Phase akibat penggeseran tiang

- Pelaksana 1 / 2 Pasang 18,694.00

12 PEKERJAAN LAIN - LAIN

12.1 Menyetel KWH meter 1 phase pada tutup OK.I & memasang MCB

- Mandor Pengawas 0.04545455 Mandor 53,250.00

- Tukang 0.27272727 Tukang 37,500.00

12.2 Menyetel KWH meter 3 phase pada tutup OK.III & memasang MCB

1 0.2 Mandor 56,250.00

0.4 Tukang 40,500.00

12.3 Pemasangan APP Type Khusus I A

- Pelaksana 0.5 Mandor 56,250.00

1 Tukang 40,500.00

12.4 Pemasangan Box TR

- Galian Pondasi tanah biasa / rumput 0.41 m3 7,878.00

- Pondasi Batu Merah 0.135 m3 201,578.00

- Pelaksana 0.5 Mandor 56,250.00

1 Tukang 40,500.00

12.5 Potong Cabang pohon dengan minimal dari hantaran

- Pekerjaan Penebangan 0.33333333 Mandor 56,250.00

1 Tukang 40,500.00

1 Pekerja 32,250.00

Page 38: AHS Kontraktor Electrical Mehcanical of HS DKI

ANALISA HARGA SATUAN

PEKERJAAN : SUTR DAN SAMBUNGAN LISTRIK

Belum Termasuk resiko, over head, keuntungan 10 % dan PPN 10 %

BIAYA JUMLAH

DIBULATKAN

(RUPIAH) (RUPIAH)

4 5

18,750.00 0.33333333

67,500.00 1.66666667

86,250.00

18,750.00 0.33333333

81,000.00 2

99,750.00

18,750.00 0.33333333

81,000.00 2

99,750.00

18,750.00 0.33333333

108,000.00 2.66666667

126,750.00

18,750.00 0.33333333

135,000.00 3.33333333

153,750.00

32,566.00 32,570.00

40,556.00 40,560.00

44,885.00 44,890.00

56,475.00 56,480.00

65,881.00 65,890.00

18,750.00 0.33333333

108,000.00 2.66666667

126,750.00

18,750.00 0.33333333

135,000.00 3.33333333

153,750.00

28,125.00 0.5

Page 39: AHS Kontraktor Electrical Mehcanical of HS DKI

162,000.00 4

190,125.00

28,125.00 0.5

182,250.00 4.5

210,375.00

28,125.00 0.5

202,500.00 5

230,625.00

47,268.00

29,905.00

20,616.00

1,495.00

99,280.00

3,939.00

82,172.00

20,616.00

1,495.00

108,220.00

4,727.00

116,771.00

20,616.00

1,495.00

143,610.00

3,939.00

82,172.00

68,719.00

1,495.00

156,330.00

4,727.00

116,771.00

137,439.00

1,495.00

260,430.00

28,125.00

81,000.00

48,375.00

157,500.00

18,750.00

54,000.00

Page 40: AHS Kontraktor Electrical Mehcanical of HS DKI

43,000.00

115,750.00

14,062.50

40,500.00

54,562.50

28,125.00

40,500.00

68,625.00

157,500.00 157,500.00

115,750.00 115,750.00

7,031.25

5,062.50

12,093.75

3,515.63

5,062.50

8,578.13

4,687.50

3,375.00

2,687.50

10,750.00

4,687.50

10,125.00

16,125.00

30,937.50

4,687.50

13,500.00

21,500.00

39,687.50

4,687.50

10,125.00

16,125.00

30,937.50

6,500.00

12,680.00

19,180.00

14,062.50

20,250.00

34,312.50

Page 41: AHS Kontraktor Electrical Mehcanical of HS DKI

14,062.50

20,250.00

34,312.50

3,309.00

20,934.00

24,240.00

2,727.00

58,385.00

61,140.00

3,309.00

82,172.00

85,480.00

2,752.00

58,385.00

61,143.00

3,309.00

82,172.00

85,480.00

86,250.00 86,250.00

99,750.00 99,750.00

99,750.00 99,750.00

126,750.00 126,750.00

153,750.00 153,750.00

86,250.00 86,250.00

6,500.00 6,500.00

56,250.00

40,500.00

32,250.00

129,000.00

28,125.00

40,500.00

32,250.00

100,875.00

126,750.00 126,750.00

153,750.00 153,750.00

190,125.00 190,125.00

210,375.00 210,375.00

230,625.00 230,625.00

Page 42: AHS Kontraktor Electrical Mehcanical of HS DKI

157,500.00 157,500.00

115,750.00 115,750.00

4,687.50

324,000.00

328,687.50

9,347.00 9,350.00

12,188.00 12,190.00

18,694.00 18,690.00

24,375.00 24,380.00

9,347.00 9,350.00

2,420.45

10,227.27

12,647.73

11,250.00

16,200.00

27,450.00

28,125.00

40,500.00

68,625.00

3,230.00

27,213.00

28,125.00

40,500.00

99,068.00

18,750.00

40,500.00

32,250.00

91,500.00

Page 43: AHS Kontraktor Electrical Mehcanical of HS DKI

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN

PEKERJAAN SALURAN KABEL TEGANGAN MENENGAH

Biaya belum termasuk resiko,overhead,keuntungan 10% dan PPN 10%

2004

NO URAIAN PEKERJAAN

01 02

I PEKERJAAN GALIAN-URUGAN DAN PEMADATAN

1 TANAH BIASA/TANAH RUMPUT

a 1 dan 2 jalur (1,00 x0,50 x 1,30 )

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

b 3 Jalur (1,00 x 0,60 x1,20)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

c 4 Jalur (1,00 x 0,80 x1,20)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

d 5 dan 6 Jalur (1,00 x 0,60 x1,40)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

e 7 dan 8 Jalur (1,00 x 0,80 x1,40)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

f 9 dan 10 Jalur (1,00 x 1,00 x1,40)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

g 11 dan 12 Jalur (1,00 x 1,00 x1,40)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

Page 44: AHS Kontraktor Electrical Mehcanical of HS DKI

h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

i Penyuntikan Kabel (1,50 x 0,50 x 1,10 )

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

j Galian Lub.Sambungan 1 s/d 2 jalur(2,00x1,30x1,20)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

k Galian Lub.Pengeboran Manual (2,00 x 1,50 x 3,00)

- Galian Tanah biasa/Rumput =

- Urugan Tanah Biasa/rumput =

- Pemadatan =

Catatan :

- Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 TN.24

- Rp. 11.139,9 =6xRp.1068-HS.DKI HAl.3 TN.24

- Rp. 20.386,15 -HS.Sipil Hal.2-No.02

- Rp. 30.579,- (300/200)x7878 HS. Sipil Hal.2 No.02

- Rp. 9.464, -HS.DKI Hal.2-TN.10

2 TANAH KERAS/TANAH KORAL

a 1 dan 2 Jalur (1,00x0,50x1,30)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

b 3 Jalur (1,00x0,60x1,20)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

c 4 Jalur (1,00x0,80x1,20)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

d 5 dan 6 Jalur (1,00x0,60x1,20)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

e 7 dan 8 Jalur (1,00x0,80x1,40)

- Galian Tanah Keras/Koral =

Page 45: AHS Kontraktor Electrical Mehcanical of HS DKI

- Urugan Tanah Keras/Koral =

- Pemadatan =

f 9 dan 10 Jalur (1,00x100x1,40)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

g 11 dan 12 Jalur (1,00x1,20x1,40)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

h 13,14 dan 15 Jalur (1,00x1,00x1,60)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

i Penyuntikan Kabel (1,50x0,50x1,10)

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

j Galian Lub. Sambungan 1s/d2 Jalur ( 2,00x1,30x1,20 )

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

k Galian Lub. Pengeboran Manual ( 2,00x1,50x3,00 )

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

l Galian Lub. Sambungan 1s/d2 Jalur ( 2,00x1,30x1,20 )

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

m Galian Lub. Pengeboran Manual ( 2,00x1,50x300 )

- Galian Tanah Keras/Koral =

- Urugan Tanah Keras/Koral =

- Pemadatan =

Catatan:

- Rp. 24.233,23 HS.Sipil Hal.1 No.06

- Rp. 36.349,84. 300/200xRp.10.504 HS. Sipil Hal.1-No.06

3 CONBLOCK/INTERBLOCK

a 1 dan 2 Jalur (1,00x0,40x1,20)

- Bongkar Conblock/Interblok =

Page 46: AHS Kontraktor Electrical Mehcanical of HS DKI

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

b 3 Jalur (1,00x0,60x1,20)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

c 4 Jalur (1,00x0,80x1,20)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

d 5 dan 6 Jalur (1,00x0,60x1,40)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

e 7 dan 8 Jalur (1,00x0,80x1,40)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

f 9 dan 10 Jalur (1,00x1,00x1,40)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

i Penyuntikan Kabel (1,50 x 0,50 x 1,10)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

Page 47: AHS Kontraktor Electrical Mehcanical of HS DKI

- Pemadatan =

j Galian Lub.Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

k Galian Lub.Pengeboran Manual (2,00 x 1,50 x 3,00)

- Bongkar Conblock/Interblok =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

Catatan :

- Rp. 1.600,2 --HS DKI Hal.38 BKR.59

- Pekerjaan bongkar di tambah 10 cm kiri dan kanan dari lebar

galian.

4 UBIN BADAK/KERAMIK/FLOOR BETON BIASA

a 1 dan 2 Jalur (1,00 x 0,40 x 1,20 )

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

b 3 Jalur (1,00 x 0,60 x 1,20 )

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

c 4 Jalur (1,00 x 0,80 x 1,20 )

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

d 5 dan 6 Jalur (1,00 x 0,60 x 1,40 )

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

e 7 dan 8 Jalur (1,00 x 0,80 x 1,40 )

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

Page 48: AHS Kontraktor Electrical Mehcanical of HS DKI

f 9 dan 10 Jalur (1,00 x 1,00 x 1,40 )

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

g 11 dan 12 Jalur (1,00 x 1,20 x 1,40 )

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

h 13, 14 dan 15 Jalur (1,00 x 1,00 x 1,60)

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

i Penyuntikan Kabel (1,50 x 0,50 x 1,10)

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

i Galian Lub. Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

k Galian Lub. Pengeboran (2,00 x 1,50 x 3,00)

- Bongkar Ubin Badak/F.Beton Biasa =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

5 FLOOR BETON COR

a 1 dan 2 Jalur (1,00 x 0,40 x 1,20)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

b 3 Jalur (1,00 x 0,60 x 1,20)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

c 4 Jalur (1,00 x 0,80 x 1,20)

Page 49: AHS Kontraktor Electrical Mehcanical of HS DKI

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

d 5 dan 6 Jalur (1,00 x 0,60 x 1,40)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

e 7 dan 8 Jalur (1,00 x 0,80 x 1,40)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

f 9 dan 10 Jalur (1,00 x 1,00 x 1,40)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

i Penyuntikan Kabel (1,50 x 0,50 x 1,10)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

j Galian Lub. Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

k Galian Lub. Pengeboran Manual (2,00 x 1,50 x 3,00)

- Bongkar Floor Beton cor =

- Galian Tanah Keras =

Page 50: AHS Kontraktor Electrical Mehcanical of HS DKI

- Urugan Tanah Keras =

- Pemadatan =

Catatan :

- Rp. 212.815,30-- HS.DKI hAL.33 - bkr.03

6 FLOOR BETON BERTULANG

a 1 dan 2 (1,00 x 0,40 x 1,20)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

b 3 Jalur (1,00 x 0,60 x 1,20)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

c 4 Jalur (1,00 x 0,80 x 1,20)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

d 5 dan 6 Jalur (1,00 x 0,60 x 1,40)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

e 7 dan 8 Jalur (1,00 x 0,80 x 1,40)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

f 9 dan 10 Jalur (1,00 x 1,00 x 1,40)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)

Page 51: AHS Kontraktor Electrical Mehcanical of HS DKI

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

i Penuntikan Kabel (1,50 x 0,50 x 1,10)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

j Galian Lub. Sumbangan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

k Galian Lub. Pengeboran Manual (2,00 x 1,50 x 3,00)

- Bongkar Floor Beton Bertulang =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

Catatan :

- Rp. 295.701.25,- - HS.SIPIL Hal.36 - BKR.04

7 ASPAL BIASA/HOTMIX

a 1 dan 2 Jalur (1,00 x 1,40 x 1,20)

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

b 3 Jalur (1,00 x 0,60 x 1,20)

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

c 4 Jalur (1,00 x 0,80 x 1,20)

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

d 5 dan 6 Jalur (1,00 x 0,60 x 1,40)

- Bongkar Aspal/Hotmix =

Page 52: AHS Kontraktor Electrical Mehcanical of HS DKI

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

e 7 dan 8 Jalur (1,00 x 0,80 x 1,40)

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

f 9 dan 10 Jalur (1,00 x 1,00 x 1,40)

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

h 13, 14 dan 15 Jalur (1,00 x 1,00 x 1,60)

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

i Penyuntikan Kabel ( 1,50 x 0,50 x 1,10 )

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

j Galian Lub. Sambungan 1 s/d Jalur ( 2,00 x 1,30 x 1,20 )

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

k Galian Lub. Pengeboran Manual ( 2,00 x 1,50 x 3,00 )

- Bongkar Aspal/Hotmix =

- Galian Tanah Berbatu =

Page 53: AHS Kontraktor Electrical Mehcanical of HS DKI

- Galian Tanah Keras =

- Urugan Tanah Keras =

- Pemadatan =

8 POMPONGAN

- Pekerja

Catatan :

- Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07

- Rp.40.751,- - HS Sipil Hal.2 No.07

- Rp. 1.856.65 - HS.DKI Hal.3 TN.24

II PENARIKAN DAN PENYAMBUNGAN

1 a Penarikan/Penggelaran Kabel 3 x 150 mm2

1 Hari / 8 Jam = 600 Meter

- Tenaga Ahli Muda 1

- Teknisi 1

- Pekerja 75

Biaya Penggelaran Kabel / Meter = 2.598.500 / 600

b Penarikan/Penggelaran Kabel 3 x 240 mm2

1 Hari / 8 Jam = 500 Meter

- Tenaga Ahli Muda 1

- Teknisi 1

- Pekerja 75

Biaya Penggelaran Kabel / Meter = 2.598,500 / 500

c Penarikan/Penggelaran Kabel 3 x 300 mm2

1 Hari / 8 Jam = 500 Meter

- Tenaga Ahli Muda 1

- Teknisi 1

- Pekerja 75

Biaya Penggelaran Kabel / Meter = 2.598.500 / 500

2 Penyambungan SKTM 20 KV 3 x 150 / 240 / 300 mm2

a Dengan Pola S / E

1 Hari / 6 Jam = 1 Set

- Tenaga Ahli Muda (Jointer) 0.5

- Tukang 3 Orang 0.5

- Supervisi Pabrikan

Main Kontraktor 50%

3 Terminasi Kabel Indoor 20 KV 3 x 150,3 x 240,3 x 300 mm2

a Dengan Pola S / E

1 Hari / 4 Jam = 1 Set

- Tenaga Ahli Muda (Jointer) 0.5

- Tukang 3 Orang 0.5

Page 54: AHS Kontraktor Electrical Mehcanical of HS DKI

- Supervisi Pabrikan

Main Kontraktor 50%

b Terminasi Kabel Outdoor 20 KV 3 x 150,3 x 240,3 x 300 mm2

Dengan Pola S / E

1 Hari / 4 Jam = 1 Set

- Tenaga Ahli Muda (Jointer) 0.5

- Tukang 3 Orang 0.5

- Supervisi Pabrikan

Main Kontraktor 50%

III MATERIAL PELENGKAP

a Pengadaan dan Pemas.Patok Tanda Kabel 20 KV PLN

- Beton Bertulang 1:2:3 = 0.012 m3

- Angkatan ( Rit ) 1/ 40 Buah

b Pengadaan dan Pemasangan Tanda Mof Kabel 20 KV PLN

- Beton Bertulang 1:2:3 = 0.012 m3

- Angkatan ( Rit ) 1/ 40 Buah

c Pengadaan & Pemasangan Batu Bata Merah ( 5x10x20 )

d Pengad. & Pemas.Timah Lebel Uk.(5cm x 25cm x 1,2mm)

- Harga Timah = Rp.5.200.000/Ton

- 1 Ton timah Dpt = 6.000 buah Timah lebel

- Bahan timah = Rp.5.200.000/6.000 buah

- Pekerja = 2/ 60 Buah

- Angkutan ( Rit ) = 1/ 4,000 Buah

Catatan :

- Beton 1:2:3 / m3 (100 kg) Rp.687.193,- HS.SIPIL No.34

- Angkutan Rp. 65.000,-/Rit HS.DKI Hal.122 - 15007

- Rp.137,- (Harga Batu Bata Rp.130 + ongkos Pasang Rp.7,-)

e Pengad. & Pemasangan Keramik Tanda Peringan Kabel PLN

- Bahan (0,225 x 0,30) + Produksi

- Biaya Penyusutan

- Angkutan dari pabrik ke lokasi pekerjaan

- Ongkos Pasang

(*) Catatan :

Sumber Analisa dan Pabrikan

f Pengadaan/pemasangan pasir urug darat sepanjang galian

dan lubang sambungan kabel 20 KV PLN.

g Pengad.&Pemas.pipa Buis Beton Konstruksi Khusus O 20cm/mtr

h Pengad.& Pemas.Pipa Pralon O 6 Insi type AW / meter

i Pengad.& Pemasangan Besi Kanal UNP 120.55.7 Double

Page 55: AHS Kontraktor Electrical Mehcanical of HS DKI

- UNP .120.55.7 = 26.80 Kg/Mtr Double

j Pengad.& Pemasangan Besi Kanal UNP 140.60.7 Double

- UNP .140.60.7 = 32.00 Kg/Mtr Double

Catatan :

- Rp. 4.200,- Hs Sipil No.44

- Rp. 49.960,- Hs.Sipil No.7

- Rp. 11.100,- HS.Sipil No.50

- Rp. 33.220,- Hs.Sipil No.45

IV PENGEBORAN CROSSING JALAN

a Crossing / Boring Manual

Boring Manual = 1 Hari = 8 meter

- Mandor 1

- Tukang Kayu 1

- Pekerja 5

- Papan Penahan Tanah 1.26

- Dolken 5/7 12

- Paku 1

Harga Pengeboran Meter = 127,570.00

b Boring Mesin(Lihat HS.Boring Mesin/sesuai Kontrak)

c Ijin Boring Jalan Tol Jasa Marga (4 Jalur)

d Ijin Boring Rel Kereta Api/PJKA (Dalam Bestek sewa lahan

tidak dicantumkan dan akan di bayar sesuai realisasi

berdasarkan bukti yang dapat diPertanggungJawabkan

- Biaya Penguatan 1 Spoor

- Biaya Penguatan 2 Spoor

- Biaya Penguatan 3 Spoor

- Biaya Penguatan 4 Spoor

V PERBAIKAN BEKAS GALIAN KABEL ( BERIKUT MATERIAL )

a Tanah Biasa/Tanah Rumput ( Pekerjaan Perbaikan/pemadatan

sudah termasuk dalan pekerjaan galian )

b Tanah Keras/Koral ( Pekerjaan perbaikan / pemadatan sudah

pekrjaan galian

c Conblock/Interblock

- Pengadaan Conblock/Interblock

Abu-abu segi 16 tebal 6 cm =

- Ongkos Kerja =

- Lapisan Pasir Tebal 5 cm =

- Lapisan Sirtu Tebal 9 cm =

(*) Rp. 640 = Rp. 31.980/50 buah

d Ubin Badak

- Ubin badak 30x30 cm adukan 1:3 =

Alas Pasir Tebal 5 cm

e Floor Beton Biasa

- Lap.F.Beton Biasa 1:3 Tebal 5 cm =

Page 56: AHS Kontraktor Electrical Mehcanical of HS DKI

- Lapisan Pasir Tebal 5 cm =

Catatan : (*)

- Lapisan Pasir tebal 20 cm/m2 Rp.12.960 - HS.SKI Hal.36-LBJ.03

- Lapisan Sirtu tebal 30 cm/m2 Rp.16.190-HS.DKI Hal.25-LBJ.13

- Rp. 216.240,- Hs. Sipil No.136

- Rp. 233.750,- Hs. Sipil No. 27

- Rp. 687.190 - Hs. Sipil No. 34

- Rp. 26.710 Hs. DKI Lt.03 +LBJ.04(16.960 + 9.750)

- Rp. 572.000,- Hs.DKI Hal.108 - 3007

- Rp. 3.250,- Hs.DKI Hal.108 - 3034

- Rp. 2.600,- Hs.DKI Hal.118 - 12001

- Rp. 31.980,- Hs.DKI Hal. 31 - TBJ.04

- Rp. 5.000,- Hs.DKI Hal.31 - TBJ.04

f Floor Beton Cor

- Lap.Floor Beton cor 1:3:5 Tebal 7 c =

- Lapisan Pasir Tebal 15 cm =

g Beton Bertulang

- Lap.Floor Cor 1:3 tebal 10 cm =

- Lapisan Pasir Tebal 10 cm =

h Shand sheet =

i Aspal Biasa/Penetrasi : 5/20/30

- Lapisan Penetrasi Tebal 5 cm =

- Lapisan Macadam Tebal 20 cm =

- Lapisan Sirtu Tebal 30 cm =

j Aspal Hotmix : 5/5/20/30 ( Jalan kelas III )

- Lapisan Hotmix tebal 5 cm =

- Lapisan tebal Coating BC.II =

- Lapisan Penetrasi Tebal 5 cm =

- Lapisan Macadam Tebal 20 cm =

- Lapisan Sirtu Tebal 30 cm =

k Aspal Hotmix : 5/5/20/40 ( Jalan kelas II )

- Lapisan Hotmix tebal 5 cm =

- Lapisan tebal Coating BC.II =

- Lapisan Penetrasi Tebal 5 cm =

- Lapisan Macadam Tebal 20 cm =

- Lapisan Sirtu Tebal 40 cm =

l Aspal Hotmix : 5/5/20/70 ( Crossing Open Cut Jalan kelas II )

- Lapisan Hotmix tebal 5 cm =

- Lapisan tebal Coating BC.II =

- Lapisan Penetrasi Tebal 5 cm =

Page 57: AHS Kontraktor Electrical Mehcanical of HS DKI

- Lapisan Macadam Tebal 20 cm =

- Lapisan Sirtu Tebal 70 cm =

m Aspal Hotmix : 7/5/20/40 ( Jalan kelas I )

- Lapisan Hotmix tebal 7 cm =

- Lapisan tebal Coating BC.II =

- Lapisan Penetrasi Tebal 5 cm =

- Lapisan Macadam Tebal 20 cm =

- Lapisan Sirtu Tebal 40 cm =

n Aspal Hotmix : 7/5/20/70 ( Crossing Open Cut Jalan kelas I )

- Lapisan Hotmix tebal 7 cm =

- Lapisan tebal Coating BC.II =

- Lapisan Penetrasi Tebal 5 cm =

- Lapisan Macadam Tebal 20 cm =

- Lapisan Sirtu Tebal 70 cm =

o Aspal Hotmix : 7/5/20/30 ( Jalan kelas IV )

- Lapisan Hotmix tebal 3 cm =

- Lapisan tebal Coating BC.II =

- Lapisan Penetrasi Tebal 5 cm =

- Lapisan Macadam Tebal 20 cm =

- Lapisan Sirtu Tebal 70 cm =

p Ubin Keramik

- Pasang Keramik 10 x 20 =

- Pasang Keramik 20 x 20 =

- Pasang Keramik 30 x 30 =

q Rumput / Taman

- Perbaikan rumput/taman disesuaikan dengan HS.DKI/Pertamanan

( Dalam bestek biaya perbaikan rumput/taman tidak dicantumkan dan

akan dibayar sesuai realisasi berdasarkan bukti yang dapat di

pertanggung jawabkan )

Catatan (*)

- Rp. 13.320 Hs.DKI hal.30 LAJ.04 - Rp. 12.520,21 Hs.DKI Hal.49 - Rp. 38.000 - HS.Sipil No.84

- Rp. 17.200 Hs.DKI hal.36 LBJ.07 - Rp. 20.745 Hs.DKI Hal.49 - Rp. 40740 - HS.Sipil No.80

- Rp. 10.920, - Hs.DKI hal.36 LBJ.17 - Rp. 28.970 Hs.DKI Hal.49 - Rp. 43.470 - HS.Sipil No.81

- Rp. 16.200 Hs.DKI hal.36 LBJ.13 - Rp. 22.025 Hs.DKI Hal.36 LBJ.14

- Rp. 3.200 - Hs.DKI hal.30 LBJ.07

VI PERBAIKAN BEKAS GALIAN PADA LUB.SAMBUNGAN

- HS. sama dengan HS. Perbaikan Bekas Galian Kabel

VII PERBAIKAN BEKAS GALIAN PADA LUB.PENGEBORAN

- HS. sama dengan HS. Perbaikan Bekas Galian Kabel

VIII PERBAIKAN BEKAS GALIAN PADA LUB.PENYUNTIKAN

Page 58: AHS Kontraktor Electrical Mehcanical of HS DKI

- HS. sama dengan HS. Perbaikan Bekas Galian Kabel

IX PEKERJAAN LAIN-LAIN

a Pembuangan tanah bekas galian dengan truck kapasitas

3 s/d 4m3 jarak>20 Km (Volume yang di buang =Lebar galianx

(tinggi lapisan pasir urug + lapisan penutup galian)xpanjang

(trace galian)

b Penjagaan

- 1 Pekerja/Hari

c Penyediaan tenaga untuk bantu pengujian kabel TM PLN

- Pekerja 2

- Instalatir 2

d Pemasangan arrester 20 KV termasuk pentanahan

( Sama dengan HS.SUTM )

- Pmasangan arresterdan pengadaan dudukan arreter

- Pengadaan/Pemasangan pipa arde 0 1,5 inci - 6 mtr

X BIAYA PENGURUSAN IJIN

1 Pemda DKI

a SPS BKJS ( Pengawasan,Perencanaan) 60% RAB perbaikan

b Q. Control pada hotmix/km 1,000/ 100 x 1 Titik

c Q. Control pada hotmix/km 1,000/ 100 x 1 Titik

d Proctor ( b + c )/ Km

e SPS.DTK ( Trace dan Gambar )

f Pengurusan

2 Diluar Pemda DKI dan Instalasi lain

a Biaya Restribusi

b Pengurusan

3 Perum Otorita Jatiluhur/ Pengairan

a Biaya sewa lahan (Dalam bestek sewa lahan tidak dicantumkan

dan akan dibayar sesuai realisasi berdasarkan bukti - bukti

yang dapat dipertanggungjawabkan)

b Pengurusan ke Jatiluhur Purwakarta

Catatan :

Rp- Rp 21.25,- HS.DKI hal.5-AG.11

XI PENGANGKUTAN KABEL

1 Angkutan kabel TM./Meter

a Angkutan SKTM 10 - 50 meter

b Angkutan SKTM 50 - 100 meter

c Angkutan SKTM 100 - 200 meter

2 Angkutan kabel TM./ haspel

a Angkutan SKTM 1 Haspel

b Angkutan SKTM 2 Haspel

c Angkutan SKTM 3 Haspel

Page 59: AHS Kontraktor Electrical Mehcanical of HS DKI

XII DIREKSI KEET

a Pengdaan dan Pemasangan Diteksi Kett 2 x 4 meter = 8 m2

untuk pekerjaan dengan masa kerja :

- 1 s/d 30 HKL = 1/3 x 8 m2

- 31 s/d 180 HKL = 1/2 x 8 m2

- 181 s/d 360 HKL = 1/1 x m2

b Pengadaan dan Pemasangan Pagar dari seng

Gelombang ( 1,80 mtr/2 )

- Seng gelombang ( 180 x 90 x 0,2 ) = 2.00 lembar

- Kaso 5/7 = 2.50 batang

- Paku = 0.06 KG.

- Cat = 1.00 KG.

- Pekerja = 0.75

- Tukang Kayu = 0.075

Harga pagar pengaman per meter = Rp. 72.45/1,80 = Rp.40.25,-

karena dianggap 3 kali pakai rusak maka harga pagar pengaman /meter

menjadi Rp.40.040/3

Catatan :

- HS. Angkutan kabel TM sesuai HS.Biaya Jasa Angkutan

- Rp. 193.400,- HS.Sipil No.143 - Rp.14.365,- HS.DKI Hal.118/11035

- 1/3 Direksi Keet dianggap 3 kali pakai Rp.11.830,- HS DKI Hal. 111/6001

- 1/2 Direksi Keet dianggap 2 kali pakai - Rp.2.600 HS.DKI Hal.118-12001

- Rp.8.215 = Rp.591.500/72 batang - HS.DKI Hal.108 - 3027

XIII DOKUMENTASI

a Foto dokumentasi 2 x 36 lembar berwarna

- Film = 1 rool

- Cuci film = 1 roll

- Cetak 2 x 36 = 72 lembar

b Foto dokumentasi perlembar berwarna

- Film = 1 rool

- Cuci film = 1 roll

- Cetak 1 x 36 = 72 lembar

c As.build drawing 1 : 200 (1 kalkir + 5 blue print + 1 film )

Sesuai panjang galian, kanal dan crossing.

- Mengambar 1 km Trace

- Tenaga Ahli Muda (D - 2) = 2 jam/ 1 orang

- Petugas Survey (E - 5) = 8 jam/1 orang

- Pekerja = 2 Orang

- Tukang Gambar ( E - 5 ) = 32 Jam

- Kertas kalkir ukuran = 0.30 x 5

- Cetak Blue Print = 5 lembar

- Cetak film Ukuran = 0.30 x 5

Biaya Menggambar / Meter = 559.078/1.000 =

Page 60: AHS Kontraktor Electrical Mehcanical of HS DKI

d As.Build Drawing 1:5000 (1 kalkir + 5 blue print) print gambar spindle

- Tenaga Ahli Muda ( D - 2 ) = 1 jam /1 Orang

- Tukang Gambar (E - 5 ) = 16 Jam/1 Orang

1

- Kertas Kalkir Ukuran = 1 Meter

- Cetak Blue Print

Catatan (*)

- Rp.10.400,- Hs.DKI Hal.122 - 15001

- Rp.2.600,- Hs.DKI Hal.122 - 15002

- Rp.520,- Hs.DKI Hal.122 - 15003

Page 61: AHS Kontraktor Electrical Mehcanical of HS DKI

ANALISA HARGA SATUAN

PEKERJAAN SALURAN KABEL TEGANGAN MENENGAH

Biaya belum termasuk resiko,overhead,keuntungan 10% dan PPN 10%

HARGA JUMLAH JUMLAH

SATUAN BIAYA DIBULATKAN

(Rp.) (Rp.) (Rp.)

03 04 05

0.65 m3 20,386.15 13,251.00 0.65

0.4 m3 9,464.00 3,785.60

0.4 m2 3,713.30 1,485.32

18,521.92 18,522

0.72 m3 20,386.15 14,678.03 0.72

0.6 m3 9,464.00 5,678.40

0.6 m2 3,713.30 2,227.98

22,584.41 22,584

0.96 m3 20,386.15 19,570.70

0.8 m3 9,464.00 7,571.20

0.8 m2 3,713.30 2,970.64

30,112.54 30,113

0.84 m3 20,386.15 17,124.37

0.6 m3 9,464.00 5,678.40

0.6 m2 3,713.30 2,227.98

25,030.75 25,031

1.12 m3 20,386.15 22,832.49

0.8 m3 9,464.00 7,571.20

0.8 m2 3,713.30 2,970.64

33,374.33 33,374

1.4 m3 20,386.15 28,540.61

1 m3 9,464.00 9,464.00

1 m2 3,713.30 3,713.30 5.835

41,717.91 41,718

1.66 m3 20,386.15 33,841.01

0.2 m3 9,464.00 1,892.80

0.2 m2 3,713.30 742.66

36,476.47 36,476

Page 62: AHS Kontraktor Electrical Mehcanical of HS DKI

1.6 m3 20,386.15 32,617.84

1 m3 9,464.00 9,464.00

1 m2 3,713.30 3,713.30

45,795.14 45,795

0.825 m3 20,386.15 16,818.57 0.825

0.75 m3 9,464.00 7,098.00

0.75 m2 3,713.30 2,784.98

26,701.55 26,702

3.12 m3 20,386.15 63,604.79 3.12

2.6 m3 9,464.00 24,606.40

2.6 m2 3,713.30 9,654.58

97,865.77 97,866

9 m3 30,579.00 275,211.00

8.4 m3 9,464.00 79,497.60

3 m2 11,139.90 33,419.70

388,128.30 388,128

2136 3713.3

4408.24 11139.9

7878

11817

3445

0.65 m3 24,233.23 15,751.60 0.65

0.4 m3 9,464.00 3,785.60

0.4 m2 3,713.30 1,485.32

21,022.52 21,022.52

0.72 m3 24,233.23 17,447.93

0.6 m3 9,464.00 5,678.40

0.6 m2 3,713.30 2,227.98

25,354.31 25,354.31

0.96 m3 24,233.23 23,263.90

0.8 m3 9,464.00 7,571.20

0.8 m2 3,713.30 2,970.64

33,805.74 33,805.74

0.84 m3 24,233.23 20,355.91

0.6 m3 9,464.00 5,678.40

0.6 m2 3,713.30 2,227.98

28,262.29 28,262.29

1.12 m3 24,233.23 27,141.22

Page 63: AHS Kontraktor Electrical Mehcanical of HS DKI

0.6 m3 9,464.00 5,678.40

0.8 m2 3,713.30 2,970.64

35,790.26 35,790.26

1.4 m3 24,233.23 33,926.52

1 m3 9,464.00 9,464.00

1 m2 3,713.30 3,713.30

47,103.82 47,103.82

1.68 m3 24,233.23 40,711.83

1.2 m3 9,464.00 11,356.80

1.2 m2 3,713.30 4,455.96

56,524.59 56,524.59

1.6 m3 24,233.23 38,773.17

1 m3 9,464.00 9,464.00

1 m2 3,713.30 3,713.30

51,950.47 51,950.47

0.825 m3 24,233.23 19,992.41

0.75 m3 9,464.00 7,098.00

0.75 m2 3,713.30 2,784.98

29,875.39 29,875.39

3.12 m3 24,233.23 75,607.68

2.6 m3 9,464.00 24,606.40

2.6 m2 3,713.30 9,654.58

109,868.66 109,868.66

9 m3 24,233.23 218,099.07

2.6 m3 9,464.00 24,606.40

2.6 m2 3,713.30 9,654.58

252,360.05 252,360.05

3.12 m3 24,233.23 75,607.68 1.5

2.6 m3 9,464.00 24,606.40 14196

2.6 m2 3,713.30 9,654.58 5569.5

109,868.66 109,868.66

9 m3 36,349.84 327,148.56 9

8.4 m3 9,464.00 79,497.60 14197.5

3 m2 3,713.30 11,139.90

417,786.06 417,786.06

10504

15756

0.6 m2 1,600.20 960.12

Page 64: AHS Kontraktor Electrical Mehcanical of HS DKI

0.456 m3 24,233.23 11,050.35

0.32 m3 9,464.00 3,028.48

0.4 m2 3,713.30 1,485.32

16,524.27 16,524.27

0.8 m2 1,600.20 1,280.16

0.654 m3 24,233.23 15,848.53

0.48 m3 9,464.00 4,542.72

0.6 m2 3,713.30 2,227.98

23,899.39 23,899.39

1 m2 1,600.20 1,600.20

0.912 m3 24,233.23 22,100.71

0.64 m3 9,464.00 6,056.96

0.8 m2 3,713.30 2,970.64

32,728.51 32,728.51

0.8 m2 1,600.20 1,280.16

0.804 m3 24,233.23 19,483.52

0.48 m3 9,464.00 4,542.72

0.6 m2 3,713.30 2,227.98

27,534.38 27,534.38

1 m2 1,600.20 1,600.20

1.072 m3 24,233.23 25,978.02

0.64 m3 9,464.00 6,056.96

0.8 m2 3,713.30 2,970.64

36,605.82 36,605.82

1.2 m2 1,600.20 1,920.24

1.34 m3 24,233.23 32,472.53

0.8 m3 9,464.00 7,571.20

1 m2 3,713.30 3,713.30

45,677.27 45,677.27

1.4 m2 1,600.20 2,240.28

1.608 m3 24,233.23 38,967.03

0.96 m3 9,464.00 9,085.44

1.2 m2 3,713.30 4,455.96

54,748.71 54,748.71

1.2 m2 1,600.20 1,920.24

1.54 m3 24,233.23 37,319.17

0.8 m3 9,464.00 7,571.20

1 m2 3,713.30 3,713.30

50,523.91 50,523.91

1.05 m2 1,600.20 1,680.21

0.78 m3 24,233.23 18,901.92

0.63 m3 9,464.00 5,962.32

Page 65: AHS Kontraktor Electrical Mehcanical of HS DKI

0.75 m2 3,713.30 2,784.98

29,329.42 29,329.42

3 m2 1,600.20 4,800.60

2.964 m3 24,233.23 71,827.29

2.444 m3 9,464.00 23,130.02

2.6 m2 3,713.30 9,654.58

109,412.49 109,412.49

3.4 m2 1,600.20 5,440.68

8.82 m3 36,349.84 320,605.59

8.22 m3 9,464.00 77,794.08

3 m2 3,713.30 11,139.90

414,980.25 414,980.25

0.6 m2 1,600.20 960.12

0.446 m3 24,233.23 10,808.02

0.328 m3 9,464.00 3,104.19

0.4 m2 3,713.30 1,485.32

16,357.65 16,357.65

0.8 m2 1,600.20 1,280.16

0.672 m3 24,233.23 16,284.73

0.492 m3 9,464.00 4,656.29

0.6 m2 3,713.30 2,227.98

24,449.16 24,449.16

1 m2 1,600.20 1,600.20

0.896 m3 24,233.23 21,712.97

0.656 m3 9,464.00 6,208.38

0.8 m2 3,713.30 2,970.64

32,492.20 32,492.20

0.8 m2 1,600.20 1,280.16

0.792 m3 24,233.23 19,192.72

0.492 m3 9,464.00 4,656.29

0.6 m2 3,713.30 2,227.98

27,357.15 27,357.15

1 m2 1,600.20 1,600.20

1.056 m3 24,233.23 25,590.29

0.656 m3 9,464.00 6,208.38

0.8 m2 3,713.30 2,970.64

36,369.51 36,369.51

Page 66: AHS Kontraktor Electrical Mehcanical of HS DKI

1.2 m2 1,600.20 1,920.24

1.32 m3 24,233.23 31,987.86

0.82 m3 9,464.00 7,760.48

1 m2 3,713.30 3,713.30

45,381.88 45,381.88

1.4 m2 1,600.20 2,240.28

1.584 m3 24,233.23 38,385.44

0.984 m3 9,464.00 9,312.58

1.2 m2 3,713.30 4,455.96

54,394.25 54,394.25

1.2 m2 1,600.20 1,920.24

1.52 m3 24,233.23 36,834.51

0.82 m3 9,464.00 7,760.48

1 m2 3,713.30 3,713.30

50,228.53 50,228.53

1.05 m2 1,600.20 1,680.21

0.765 m3 24,233.23 18,538.42

0.6525 m3 9,464.00 6,175.26

0.75 m2 3,713.30 2,784.98

29,178.87 29,178.87

3 m2 1,600.20 4,800.60

2.912 m3 24,233.23 70,567.17

2.522 m3 9,464.00 23,868.21

2.6 m2 3,713.30 9,654.58

108,890.55 108,890.55

3.4 m2 1,600.20 5,440.68

8.75 m3 36,349.84 318,061.10

8.31 m3 9,464.00 78,645.84

3 m2 3,713.30 11,139.90

413,287.52 413,287.52

0.042 m3 212,815.30 8,938.24 33585.72

0.452 m3 24,233.23 10,953.42

0.312 m3 9,464.00 2,952.77

0.42 m2 3,713.30 1,559.59

24,404.02 24,404.02 0.072

0.056 m3 212,815.30 11,917.66

0.678 m3 24,233.23 16,430.13

0.468 m3 9,464.00 4,429.15

0.6 m2 3,713.30 2,227.98

35,004.92 35,004.92

Page 67: AHS Kontraktor Electrical Mehcanical of HS DKI

0.07 m3 212,815.30 14,897.07 0.096

0.904 m3 24,233.23 21,906.84

0.624 m3 9,464.00 5,905.54

0.8 m2 3,713.30 2,970.64

45,680.09 45,680.09

0.056 m3 212,815.30 11,917.66

0.798 m3 24,233.23 19,338.12

0.468 m3 9,464.00 4,429.15

0.6 m2 3,713.30 2,227.98

37,912.91 37,912.91

0.07 m3 212,815.30 14,897.07

1.064 m3 24,233.23 25,784.16

0.624 m3 9,464.00 5,905.54

0.8 m2 3,713.30 2,970.64

49,557.40 49,557.40

0.084 m3 212,815.30 17,876.49

1.33 m3 24,233.23 32,230.20

0.728 m3 9,464.00 6,889.79

1 m2 3,713.30 3,713.30

60,709.77 60,709.77

0.098 m3 212,815.30 20,855.90

1.596 m3 24,233.23 38,676.24

0.936 m3 9,464.00 8,858.30

1.2 m2 3,713.30 4,455.96

72,846.40 72,846.40

0.084 m3 212,815.30 17,876.49

1.53 m3 24,233.23 37,076.84

0.78 m3 9,464.00 7,381.92

1 m2 3,713.30 3,713.30

66,048.55 66,048.55

0.0735 m3 212,815.30 15,641.92

0.7725 m3 24,233.23 18,720.17

0.6225 m3 9,464.00 5,891.34

0.75 m2 3,713.30 2,784.98

43,038.41 43,038.41

0.21 m3 212,815.30 44,691.21

2.938 m3 24,233.23 71,197.23

2.418 m3 9,464.00 22,883.95

0.6 m2 3,713.30 2,227.98

141,000.37 141,000.37

0.238 m3 212,815.30 50,650.04

8.79 m3 24,233.23 213,010.09

Page 68: AHS Kontraktor Electrical Mehcanical of HS DKI

8.19 m3 9,464.00 77,510.16

3 m2 3,713.30 11,139.90

352,310.19 352,310.19

79970

0.06 m3 295,701.25 17,742.08 0.06

0.44 m3 24,233.23 10,662.62 0.44

0.32 m3 9,464.00 3,028.48 0.32

0.3 m2 3,713.30 1,113.99 0.39981273

32,547.17 32,547.17

0.08 m3 295,701.25 23,656.10

0.66 m3 24,233.23 15,993.93

0.48 m3 9,464.00 4,542.72

0.6 m2 3,713.30 2,227.98

46,420.73 46,420.73

0.1 m3 295,701.25 29,570.13

0.88 m3 24,233.23 21,325.24

0.64 m3 9,464.00 6,056.96

0.8 m2 3,713.30 2,970.64

59,922.97 59,922.97

0.08 m3 295,701.25 23,656.10

0.78 m3 24,233.23 18,901.92

0.48 m3 9,464.00 4,542.72

0.6 m2 3,713.30 2,227.98

49,328.72 49,328.72

0.1 m3 295,701.25 29,570.13

1.04 m3 24,233.23 25,202.56

0.64 m3 9,464.00 6,056.96

0.8 m2 3,713.30 2,970.64

63,800.28 63,800.28

0.12 m3 295,701.25 35,484.15

1.3 m3 24,233.23 31,503.20

0.8 m3 9,464.00 7,571.20

1 m2 3,713.30 3,713.30

78,271.85 78,271.85

0.14 m3 295,701.25 41,398.18

1.56 m3 24,233.23 37,803.84

0.96 m3 9,464.00 9,085.44

1.2 m2 3,713.30 4,455.96

92,743.41 92,743.41

Page 69: AHS Kontraktor Electrical Mehcanical of HS DKI

0.12 m3 295,701.25 35,484.15

1.5 m3 24,233.23 36,349.85

0.8 m3 9,464.00 7,571.20

1 m2 3,713.30 3,713.30

83,118.50 83,118.50

0.105 m3 295,701.25 31,048.63

0.75 m3 24,233.23 18,174.92

0.6 m3 9,464.00 5,678.40

1.75 m2 3,713.30 6,498.28

61,400.23 61,400.23

0.3 m3 295,701.25 88,710.38

2.86 m3 24,233.23 69,307.04

2.34 m3 9,464.00 22,145.76

2.6 m2 3,713.30 9,654.58

189,817.75 189,817.75

0.34 m3 295,701.25 100,538.43

8.7 m3 24,233.23 210,829.10

8.1 m3 9,464.00 76,658.40

3 m2 3,713.30 11,139.90

399,165.83 399,165.83

0.4 m2 11,766.92 4,706.77

0.26 m3 40,751.00 10,595.26

0.2 m3 24,233.23 4,846.65

0.12 m3 9,464.00 1,135.68

0.4 m2 1,856.65 742.66

22,027.01 22,027.01

0.6 m2 11,766.92 7,060.15

0.39 m3 40,751.00 15,892.89

0.3 m3 24,233.23 7,269.97

0.18 m3 9,464.00 1,703.52

0.6 m2 1,856.65 1,113.99

33,040.52 33,040.52

0.8 m2 11,766.92 9,413.54

0.52 m3 40,751.00 21,190.52

0.4 m3 24,233.23 9,693.29

0.24 m3 9,464.00 2,271.36

0.8 m2 1,856.65 1,485.32

44,054.03 44,054.03

0.6 m2 11,766.92 7,060.15

Page 70: AHS Kontraktor Electrical Mehcanical of HS DKI

0.39 m3 40,751.00 15,892.89

0.42 m3 24,233.23 10,177.96

0.18 m3 9,464.00 1,703.52

0.6 m2 1,856.65 1,113.99

35,948.51 35,948.51

0.8 m2 11,766.92 9,413.54

0.52 m3 40,751.00 21,190.52

0.56 m3 24,233.23 13,570.61

0.24 m3 9,464.00 2,271.36

0.8 m2 1,856.65 1,485.32

47,931.34 47,931.34

1 m2 11,766.92 11,766.92

0.65 m3 40,751.00 26,488.15

0.7 m3 24,233.23 16,963.26

0.3 m3 9,464.00 2,839.20

1 m2 1,856.65 1,856.65

59,914.18 59,914.18

1.2 m2 11,766.92 14,120.30

0.78 m3 40,751.00 31,785.78

0.84 m3 24,233.23 20,355.91

0.36 m3 9,464.00 3,407.04

1.2 m2 1,856.65 2,227.98

71,897.02 71,897.02

1 m2 11,766.92 11,766.92

0.65 m3 40,751.00 26,488.15

0.9 m3 24,233.23 21,809.91

0.3 m3 9,464.00 2,839.20

1 m2 1,856.65 1,856.65

64,760.83 64,760.83

0.75 m2 11,766.92 8,825.19

0.4875 m3 40,751.00 19,866.11

0.3 m3 24,233.23 7,269.97

0.225 m3 9,464.00 2,129.40

0.75 m2 1,856.65 1,392.49

39,483.16 39,483.16

2.6 m2 11,766.92 30,593.99

1.69 m3 40,751.00 68,869.19

1.3 m3 24,233.23 31,503.20

0.78 m3 9,464.00 7,381.92

2.6 m2 1,856.65 4,827.29

143,175.59 143,175.59

3 m2 11,766.92 35,300.76

1.95 m3 40,751.00 79,464.45

Page 71: AHS Kontraktor Electrical Mehcanical of HS DKI

6.9 m3 24,233.23 167,209.29

6.3 m3 9,464.00 59,623.20

3 m2 1,856.65 5,569.95

347,167.65 347,167.65

0.3 pekerja 32,250.00 10,750.00 10,750.00

3575

15769

1068

Tenaga.Ah.Muda 123,500.00 123,500.00

Teknisi 56,250.00 56,250.00

Pekerja 32,250.00 2,418,750.00

2,598,500.00

4,330.83 4,330.00

Tenaga.Ah.Muda 123,500.00 123,500.00

Teknisi 56,250.00 56,250.00

Pekerja 32,250.00 2,418,750.00

2,598,500.00

5,197.00 5,190.00

Tenaga.Ah.Muda 123,500.00 123,500.00

Teknisi 56,250.00 56,250.00

Pekerja 32,250.00 2,418,750.00

2,598,500.00

5,197.00 5,190.00

Tenaga.Ah.Muda 123,500.00 61,750.00

Tukang 40,500.00 20,250.00

82,000.00

174,750.00

169,375.00

426,125.00 426,125.00

Tenaga.Ah.Muda 123,500.00 61,750.00

Tukang 40,500.00 20,250.00

82,000.00

Page 72: AHS Kontraktor Electrical Mehcanical of HS DKI

174,750.00

169,375.00

426,125.00 426,125.00

Tenaga.Ah.Muda 123,500.00 61,750.00

Tukang 40,500.00 20,250.00

82,000.00

174,750.00

169,375.00

426,125.00 426,125.00

687,193.00 8,246.00

65,000.00 1,625.00

9,871.00 9,870.00

687,193.00 8,246.00

65,000.00 1,625.00

9,871.00 9,870.00

136.00

867.00

32,250.00 1,075.00 0.03

65,000.00 16,250.00

18,192.00 18,192.00

449.00 449.00

104.00 104.00

260.00 260.00

98.00 96.00

909.00 910.00

49,959.00

11,102.00

33,215.00

Page 73: AHS Kontraktor Electrical Mehcanical of HS DKI

112,533.00

134,368.00

Mandor 56,250.00 56,250.00

Tk.Kayu 40,500.00 40,500.00

Pekerja 32,250.00 161,250.00

m3 572,000.00 720,720.00

batang 3,250.00 39,000.00

kg 2,600.00 2,600.00

1,020,320.00

127,570.00 127,540.00 127,540.00

91,130.00

2,073,500.00

3,822,000.00

5,505,500.00

7,252,700.00

15 buah 640.00 9,594.00

1 m2 5,005.00 5,005.00

1 m2 12,961.00 3,240.00

1 m2 16,189.00 4,857.00

22,696.00 22,700.00

1 m2 26,707.00 26,707.00

26,707.00 26,710.00

1.00 m2/(5/100) 216,242.00 10,812.10 0.05 10812.1

Page 74: AHS Kontraktor Electrical Mehcanical of HS DKI

1.00 m2/(5/20) 12,961.00 3,240.25 0.25

14,052.35 14,052.35

1.00 m2/(7/100) 233,753.00 11,687.65 0.05

1.00 m2/(15/20) 12,961.00 9,720.75 0.75

21,408.40 21,408.40

1.00 m2/(10/100) 687,193.00 68,719.30 0.1

1.00 m2/(10/20) 12,961.00 6,480.50 0.5

75,199.80 75,199.80

1.00 m2 10,920.00 10,926.00 10,930.00

1.00 m2 13,313.00 13,313.00

1.00 m2 17,186.00 17,186.00

1.00 m2 16,190.00 16,190.00

46,689.00 46,700.00

1.00 m2 20,744.00 20,744.00

1.00 m2 3,188.00 3,188.00

1.00 m2 13,314.00 13,314.00

1.00 m2 17,186.00 17,186.00

1.00 m2 16,190.00 16,190.00

70,622.00 70,630.00

1.00 m2 20,744.00 20,744.00

1.00 m2 3,188.00 3,188.00

1.00 m2 13,314.00 13,314.00

1.00 m2 17,186.00 17,186.00

1.00 m2 22,024.00 22,024.00

76,456.00 76,460.00

1.00 m2 20,744.00 20,744.00

1.00 m2 3,188.00 3,188.00

1.00 m2 13,314.00 13,314.00

Page 75: AHS Kontraktor Electrical Mehcanical of HS DKI

1.00 m2 17,186.00 17,186.00

1.00 m2 (70/40) 22,024.00 38,541.00

92,973.00 92,980.00

1.00 m2 28,972.00 28,972.00

1.00 m2 3,188.00 3,188.00

1.00 m2 13,314.00 13,314.00

1.00 m2 17,186.00 17,186.00

1.00 m2 22,024.00 22,024.00

84,684.00 84,680.00

1.00 m2 28,972.00 28,972.00

1.00 m2 3,188.00 3,188.00

1.00 m2 13,314.00 13,314.00

1.00 m2 17,186.00 17,186.00

1.00 m2 (70/40) 22,024.00 38,541.00

101,201.00 101,201.00

1.00 m2 12,517.00 12,517.00

1.00 m2 3,188.00 3,188.00

1.00 m2 13,314.00 13,314.00

1.00 m2 17,186.00 17,186.00

1.00 m2 16,190.00 16,190.00

62,395.00 62,390.00

1.00 m2 37,999.00 37,999.00 38,000.00

1.00 m2 40,742.00 40,742.00 40,740.00

1.00 m2 43,472.00 43,472.00 43,470.00

Page 76: AHS Kontraktor Electrical Mehcanical of HS DKI

21,125.00 21,130.00

32,250.00 32,250.00 32,250.00

Pekerja 32,250.00 64,500.00

Instalatir 13,000.00 26,000.00

90,500.00 90,500.00

118,872.00 118,872.00

76,713.00 76,713.00

195,585.00 195,585.00

58,570.00 585,700.00 585,700.00

10,790.00 107,900.00 107,900.00

75,660.00 151,320.00 151,320.00

501,260.00 501,260.00 501,260.00

130.00 130.00 130.00

65.00 65.00 65.00

65.00 65.00 65.00

86,125.00 86,125.00

105,625.00 105,625.00

105,625.00 105,625.00

160,225.00 160,225.00

160,255.00 160,255.00

290,225.00 290,225.00

Page 77: AHS Kontraktor Electrical Mehcanical of HS DKI

148,772.00 396,725.00 396,725.00

148,772.00 595,088.00 595,088.00

148,772.00 1,190,176.00 1,190,176.00

11,050.00 22,100.00

6,319.00 15,798.00

2,600.00 156.00

9,100.00 9,100.00

9,750.00 7,313.00

13,000.00 975.00

55,442.00

10,400.00 10,400.00

2,600.00 2,600.00

520.00 37,440.00

50,440.00 50,440.00

10,400.00 10,400.00

2,600.00 2,600.00

520.00 18,720.00

31,720.00 881.00

11,089.00 22,178.00

9,620.00 76,960.00

9,750.00 19,500.00

9,620.00 307,840.00

3,900.00 19,500.00

3,120.00 15,600.00

19,500.00 97,500.00

559,078.00

559.00 559.00

Page 78: AHS Kontraktor Electrical Mehcanical of HS DKI

11,089.00 11,089.00

9,620.00 153,920.00

13,000.00 13,000.00

3,900.00 3,900.00

1,950.00 9,750.00

191,659.00 191,659.00

Page 79: AHS Kontraktor Electrical Mehcanical of HS DKI

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN

PEKERJAAN : SALURAN UDARA TEGANGAN MENENGAH

Belum termasuk resiko,over head,keuntungan 10% dan PPN 10%

2004

HARGA

NO URAIAN PEKERJAAN SATUAN

(Rp.)

1 2 3

I PEKERJAAN PEMASANGAN

1 TIANG TUNGGAL

1.a Tiang besi 11 meter 200 daN

-Mendirikan Tiang 1/3 Teknisi 56,250

2 Tukang 32,250

1.b Tiang besi 11 meter 350 daN

-Mendirikan Tiang 1/3 Teknisi 56,250

2 1/3 Tukang 32,250

1.c Tiang besi 11 meter 500 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

3 1/2 Tukang 32,250

1.d Tiang besi 13 meter 350 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

3 1/2 Tukang 32,250

1.e Tiang besi 13 meter 500 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

4 Tukang 32,250

1.f Tiang beton 11 meter 200 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

4 1/2 Tukang 32,250

1.g Tiang beton 11 meter 350 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

5 1/2 Tukang 32,250

1.h Tiang beton 11 meter 500 daN

Tiang beton 11 meter 350 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

6 Tukang 32,250

1.i Tiang beton 11 meter 800 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

6 Tukang 32,250

1.j Tiang beton 13 meter 350 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

7 Tukang 32,250

Page 80: AHS Kontraktor Electrical Mehcanical of HS DKI

1.k Tiang beton 13 meter 500 daN

-Mendirikan Tiang 1/2 Teknisi 56,250

7 Tukang 32,250

2 PEMASANGAN TIANG BESI & BETON DOUBLE

( 2 X Biaya Pemasangan Tiang Tunggal )

3 PEMBUATAN PONDASI TIANG BESI & BETON

3.a Pondasi Tiang 11 meter Type A

- Galian tanah biasa/rumput 0.9 M3 20,386

- Sirtu dipadatkan 0.67 M3 49,959

- Beton block 1:2:3 0.03 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.b Pondasi Tiang 11 meter Type B

- Galian tanah biasa/rumput 0.6 M3 20,386

- Beton Tumbuk 1:2:3 0.47 M3 216,242

- Beton block 1:2:3 0.03 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.c Pondasi Tiang 11 meter Type C

- Galian tanah biasa/rumput 0.08 M3 20,386

- Beton Tumbuk 1:2:3 0.67 M3 216,242

- Beton block 1:2:3 0.03 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.d Pondasi Tiang 11 meter Type D

- Galian tanah biasa/rumput 0.8 M3 20,386

- Beton Tumbuk 1:2:3 0.47 M3 216,242

- Beton block 1:2:3 0.1 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.e Pondasi Tiang 11 meter Type E

- Galian tanah biasa/rumput 0.8 M3 20,386

- Beton Tumbuk 1:2:3 0.67 M3 216,242

- Beton block 1:2:3 0.2 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.f Pondasi Tiang 13 meter Type A

- Galian tanah biasa/rumput 0.9 M3 20,386

- Beton Tumbuk 1:2:3 0.78 M3 216,242

- Beton block 1:2:3 0.03 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.g Pondasi Tiang 13 meter Type B

- Galian tanah biasa/rumput 0.9 M3 20,386

- Beton Tumbuk 1:2:3 0.54 M3 216,242

Page 81: AHS Kontraktor Electrical Mehcanical of HS DKI

- Beton block 1:2:3 0.03 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.h Pondasi Tiang 13 meter Type C

- Galian tanah biasa/rumput 0.9 M3 20,386

- Beton Tumbuk 1:2:3 0.78 M3 216,242

- Beton block 1:2:3 0.03 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.i Pondasi Tiang 13 meter Type D

- Galian tanah biasa/rumput 0.9 M3 20,386

- Beton Tumbuk 1:2:3 0.54 M3 216,242

- Beton block 1:2:3 0.1 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.j Pondasi Tiang 13 meter Type E

- Galian tanah biasa/rumput 0.9 M3 20,386

- Beton Tumbuk 1:2:3 0.78 M3 216,242

- Beton block 1:2:3 0.2 M3 687,193

- Urugan pasir 0.03 M3 49,959

3.k PEMASANGAN TIANG BESI & BETON DOUBLE

( 2 X Biaya pemasangan Tiang Tunggal )

4 PEKERJAAN PENGECATAN TIANG BESI ( Pek. Pemeliharaan )

4.a Tiang Besi 11 Meter 200 daN 5.09 M2 10,257

4.b Tiang Besi 11 Meter 350 daN 5.48 M2 10,257

4.c Tiang Besi 11 Meter 500 daN 5.84 M2 10,257

4.d Tiang Besi 11 Meter 800 daN 6.99 M2 10,257

4.e Tiang Besi 11 Meter 1200 daN 8.31 M2 10,257

4.f Tiang Besi 11 Meter 200 daN Double 10.18 M2 10,257

4.g Tiang Besi 11 Meter 200 daN Double 10.96 M2 10,257

4.h Tiang Besi 11 Meter 200 daN Double 11.68 M2 10,257

4.i Tiang Besi 13 Meter 200 daN 6.17 M2 10,257

4.j Tiang Besi 13 Meter 350 daN 6.88 M2 10,257

4.k Tiang Besi 13 Meter 500 daN 8.68 M2 10,257

4.l Tiang Besi 13 Meter 800 daN 8.50 M2 10,257

4.m Tiang Besi 13 Meter 1200 daN 10.12 M2 10,257

4.n Tiang Besi 13 Meter 200 daN Double 12.34 M2 10,257

4.o Tiang Besi 13 Meter 350 daN Double 13.76 M2 10,257

4.p Tiang Besi 13 Meter 500 daN Double 17.36 M2 10,257

5 PEMASANGAN / PENGADAAN TRAVERS

5.a Travers tunggal: UNP 12-1800 mm

- Pemasangan 1/12 Teknisi 56,250

2/ 3 Tukang 40,500

- Pengadaan 1 Buah 39,000

5.b Travers tunggal: UNP 12-2200 mm

- Pemasangan 1/ 6 Teknisi 56,250

Page 82: AHS Kontraktor Electrical Mehcanical of HS DKI

1 1/ 2 Tukang 40,500

- Pengadaan 1 Buah 49,634

5.c Travers tunggal: UNP 12-2400 mm

- Pemasangan 1/ 6 Teknisi 56,250

1 1/ 2 Tukang 40,500

- Pengadaan 1 Buah 54,600

5.d Pemasangan Suspensi Assembly

1/12 Teknisi 56,250

1/ 4 Tukang 40,500

1/ 2 Pekerja 32,250

5.e Pemasangan Small Angle Assembly

1/12 Teknisi 56,250

1/ 3 Tukang 40,500

2/ 3 Pekerja 32,250

5.f Pemasangan Large Angle Assembly

1/12 Teknisi 56,250

1/ 3 Tukang 40,500

1/ 2 Pekerja 32,250

5.g Pemasangan Daed End Assembly

1/12 Teknisi 56,250

1/ 3 Tukang 40,500

1/ 2 Pekerja 32,250

6 PEMASANGAN PIN ISOLATOR

- Pemasangan 1/10 Teknisi 56,250

1/10 Tukang 40,500

7 PEMASANGAN HANG ISOLATOR

- Pemasangan 1/ 8 Teknisi 56,250

1/ 8 Tukang 40,500

8 PEMASANGAN POLE TOP SWITCH

- Pemasangan 1 Teknisi 56,250

6 Tukang 40,500

2 Pekerja 32,250

9 PEMASANGAN PIPA ARDE (1,5 Inc per 6 mtr) per batang 26,000

PENGADAAN PIPA ARDE (1,5 Inc per 6 mtr) per batang 50,718

10 PENARIKAN KAWAT HANTARAN/Gawang (Jarak Mx.40 m)

10.a Kawat A3C 3 x 35 s/d 150 mm2

- Penarikan 1/ 3 Teknisi 56,250

2 Tukang 40,500

Page 83: AHS Kontraktor Electrical Mehcanical of HS DKI

1 1/ 3 Pekerja 32,250

10.b Kawat A3C 3 x 35 s/d 150 mm2

- Penarikan 1/ 2 Teknisi 56,250

3 Tukang 40,500

2 Pekerja 32,250

10.c SUTM Twisted Kabel 20 kV

- Penarikan 1/ 2 Teknisi 56,250

4 Tukang 40,500

5 Pekerja 32,250

10.d Pemasangan Terminal Outdoor 150 S/D 300 mm2/Set(=HS.SKTM)

10.e Pemasangan Kawat Pengikat Hantaran Isolator

1/10 Tukang 40,500

11 PEMASANGAN JUMPE /PHASE

- Mandor Pengawas 1/12 Teknisi 56,250

- Tukang 1/12 Tukang 40,500

- Pekerja 1/12 Pekerja 32,250

12 PEMASANGAN LBS TIANG SUTM

- Tenaga Ahli Muda 1/ 2 Hari 112,500

4 Tukang 40,500

2 Pekerja 32,250

- Sewa Crane 6 Jam 39,000

13 PENGADAAN DAN PEMASANGAN TANDA KILAT 20MKV

( 20 cm X 30 cm ), Tebal Plat 4mm

- Pengadaan 11,050

- Ongkos pasang 1,950

14 PENGADAAN DAN PEMASANGAN PENGHALANG PANJAT

- Pengadaan 29,445

- Ongkos pasang 1,950

- Pengelasan + Bahan

15 PEMASANGAN ARRESTER DAN PENGADAAN DUDUKAN

- Tenaga Ahli Muda 1/ 8 Hari 112,500

- Tukang 1 Tukang 40,500

- Pekerja 1/ 2 Pekerja 32,250

- Dudukan Arrester 1 set 56,628

- Angkutan 1/ 2 Rit 65,000

16 PEMASANGAN CUT OUT DAN PENGADAAN DUDUKAN

- Tenaga Ahli Muda 1/ 8 Hari 112,500

- Tukang 1 Tukang 40,500

- Pekerja 1/ 2 Pekerja 32,250

- Dudukan Arrester 1 set 56,628

Page 84: AHS Kontraktor Electrical Mehcanical of HS DKI

- Angkutan 1/ 2 Rit 65,000

16A PEMASANGAN TREE GUARD 1 GAWANG

- Teknisi 1/ 3 Teknisi 56,250

- Instalator 1 1/ 3 Tukang 40,500

- Pekerja 1 1/ 3 Pekerja 32,250

17 PEMELIHARAAN JARINGAN

- Majun 1/ 4 Kg 8,000

- YC 8513 type G658SF6 1/ 2 Ltr 75,000

- Pasline 1/ 4 Kg 87,500

- Mandor Pengawas 1/ 2 Teknisi 56,250

- Angkutan 1/ 2 Rit 65,000

18 PEMELIHARAAN CUT OUT

- Majun 1/25 Kg 8,000

- YC 8513 type G658SF6 3/10 Ltr 75,000

- Pasline 1/ 4 Kg 87,500

- Mandor Pengawas 1/ 3 Teknisi 56,250

- Angkutan 1/ 3 Rit 65,000

19 PEMELIHARAAN GARDY/BOX SEKERING

- Majun 1/ 4 Kg 8,000

- YC 8513 type G658SF6 1/ 2 Ltr 75,000

- Pasline 1/ 4 Kg 87,500

- Mandor Pengawas 1/ 2 Teknisi 56,250

- Angkutan 1/ 2 Rit 65,000

20 PEMELIHARAAN RAK TR PADA GARDU PORTAL

- Majun 1/ 4 Kg 8,000

-Spirtus 1/ 2 Ltr 7,150

- Pasline 1/ 4 Kg 87,500

- Mandor Pengawas 1/ 2 Teknisi 56,250

- Tukang 2 Tukang 40,500

- Pekerja 2 Pekerja 32,250

21 PEMELIHARAAN LBS di SUTM

- Majun 1/ 4 Kg 8,000

- YC 8513 type G658SF6 1/ 2 Ltr 75,000

- Pasline 1/ 4 Kg 87,500

- Mandor Pengawas 1/ 2 Teknisi 56,250

- Tukang 1/ 2 Tukang 40,500

- Pekerja 1/ 2 Pekerja 32,250

22 PENGADAAN DAN PEMASANGAN NOMOR GARDU

- Pengadaan 26,936

- Ongkos Pasang 1,950

II PEKERJAAN PEMBONGKARAN

Page 85: AHS Kontraktor Electrical Mehcanical of HS DKI

1 PEMBONGKARAN TIANG BESI DAN BETON

( sama dengan biaya pemasangan )

2 PEMBONGKARAN TIANG BESI DAN BETON sama dengan pemas tiang

DOUBLE ( sama dengan biaya pemasangan ) double yang sesuai ukuran

3 PEMBONGKARAN LBS TIANG SUTM ( sama dengan biaya pasang ) sama dgn by pemasangan

4 PEMBONGKARAN ARRESTER

- Mandor Pengawas 1/ 6 Teknisi 56,250

- Tukang 1/ 3 Tukang 40,500

- Pekerja 1/ 6 Pekerja 32,250

- Angkutan 1/ 6 Rit 65,000

5 PEMBONGKARAN CUT OUT

- Mandor Pengawas 1/ 6 Teknisi 56,250

- Tukang 1/ 3 Tukang 40,500

- Pekerja 1/ 6 Pekerja 32,250

- Angkutan 1/ 6 Rit 65,000

6 PEMBONGKARAN RAK TR PADA GARDU PORTAL

- Mandor Pengawas 1/ 2 Teknisi 56,250

- Tukang 2 Tukang 40,500

- Pekerja 1 Pekerja 32,250

7 PENGISIAN MINYAK TRAFO 1/ 2 Teknisi 56,250

1/ 2 Tukang 40,500

1/ 4 Pekerja 32,250

8 PEMBONGKARAN TERMINATING OUTDOOR 1/ 2 Teknisi 56,250

1/ 2 Tukang 40,500

1/ 4 Pekerja 32,250

9 Bongkar PIN ISOLATOR = biaya pasang x 1.2 3,575

10 Bonkar HANG ISOLATOR = Biaya pasang x 1.2 4,472

11 Bongkar Arde =Biaya pasang x 12 76,713

12 Bongkar Pole Top Switch = Biaya pasang x 1.2 132,860

13 Bongkar SUTM A3C = Biaya Pasang x 1.2 46,579

14 Bongkar SUTM A3CS = Biaya Pasang x 1.2 71,500

15 Bongkar SUTM Twisted = Biaya Pasang x 1.2 122,125

III. PEKERJAAN PERBAIKAN

1 PERBAIKAN TIANG BESI/BETON MIRING

BERIKUT PONDASI

1 . a Pondasi Tiang 11 meter Type A

- Galian tanah biasa/rumput 0.63 m3 20,386

- Sirtu dipadatkan 0.55 m3 49,959

Page 86: AHS Kontraktor Electrical Mehcanical of HS DKI

1 . b Pondasi Tiang 11 meter Type B

- Galian tanah biasa/rumput 0.55 m3 20,386

- Beton Tumbuk 1:2:3 0.33 m3 216,242

1 . c Pondasi Tiang 11 meter Type C

- Galian tanah biasa/rumput 0.65 m3 20,386

- Beton Tumbuk 1:2:3 0.47 m3 216,242

1 . d Pondasi Tiang 11 meter Type D

- Galian tanah biasa/rumput 0.56 m3 20,386

- Beton Tumbuk 1:2:3 0.33 m3 216,242

1 . e Pondasi Tiang 11 meter Type E

- Galian tanah biasa/rumput 0.56 m3 20,386

- Beton Tumbuk 1:2:3 0.47 m3 216,242

1 . f Pondasi Tiang 13 meter Type A

- Galian tanah biasa/rumput 0.63 m3 20,386

- Sirtu dipadatkan 0.55 m3 49,959

1 . g Pondasi Tiang 13 meter Type B

- Galian tanah biasa/rumput 0.42 m3 20,386

- Beton Tumbuk 1:2:3 0.38 m3 216,242

1 . h Pondasi Tiang 13 meter Type C

- Galian tanah biasa/rumput 0.63 m3 20,386

- Beton Tumbuk 1:2:3 0.55 m3 216,242

1 . i Pondasi Tiang 13 meter Type D

- Galian tanah biasa/rumput 0.63 m3 20,386

- Beton Tumbuk 1:2:3 0.38 m3 216,242

1 . j Pondasi Tiang 13 meter Type E

- Galian tanah biasa/rumput 0.56 m3 20,386

- Beton Tumbuk 1:2:3 0.47 m3 216,242

2 PERBAIKAN KAWAT KENDOR A3C 3x35 s/d 150 mm2

( 3 Hantaran )

-Perbaikan 1 s/d 5 Gawang 1.2 Pasang 46,579

-Perbaikan 6 s/d 10 Gawang 1.1 Pasang 46,579

3 PERBAIKAN KAWAT KENDOR A3C3 3x35 s/d 150 mm2

( 3 hantaran )

- Perbaikan 1 s/d 5Gawang 1.2 Pasang 89,375

- Perbaikan 6 s/d 10 Gawang 1.1 Pasang 89,375

4 PERBAIKAN SUTM TWISTED 3x70 s/d 90 MM2 ( Gawang )

- Perbaikan 1 s/d 5Gawang 1.2 Pasang 112,125

Page 87: AHS Kontraktor Electrical Mehcanical of HS DKI

- Perbaikan 6 s/d 10 Gawang 1.1 Pasang 112,125

5 PERBAIKAN JEMPER SUTM/ Phase

- Tenaga Ahli Muda 3/8 Hari 112,500

0.66 Tukang 40,500

6 PERBAIKAN TRAVES UNP 12 - 1800 mm sama dengan pasang 10,023

7 PERBAIKAN TRAVES UNP 12 - 2200 mm sama dengan pasang 22,204

8 PERBAIKAN TRAVES UNP 12 - 2400 mm sama dengan pasang 22,204

9 PERBAIKAN ISOLATOR TUMPU MIRING sama dengan pasang 3,575

IV LAIN - LAIN

1 PEMBERSIH BENAMG LAYANGAN SUTM/GAWANG

- Pembersihan 1/5 Teknisi 56,250

2/5 Tukang 40,500

2 PEMANGKASAN CABANG POHON SUTM/GAWANG

- Pemangkasan 1/5 Teknisi 56,250

4/5 Tukang 40,500

1 1/3 Pekerja 32,250

3 FOTO DOKUMENTASI : 36 LEMBAR

1/ 1 Rol Film 10,400

1/ 1 Cuci Film 2,600

36/ 1 Cetak 2x 520

Page 88: AHS Kontraktor Electrical Mehcanical of HS DKI

ANALISA HARGA SATUAN

PEKERJAAN : SALURAN UDARA TEGANGAN MENENGAH

Belum termasuk resiko,over head,keuntungan 10% dan PPN 10%

BIAYA JUMLAH

DIBULATKAN

(Rp.) (Rp.)

4 5

18,750.00

64,500.00

83,250.00 83,250.00

18,750.00

75,250.00

94,000.00 94,000.00

28,125.00

112,875.00

141,000.00 141,000.00

28,125.00

112,875.00

141,000.00 141,000.00

28,125.00

129,000.00

157,125.00 157,120.00

28,125.00

145,125.00

173,250.00 173,250.00

28,125.00

177,375.00

205,500.00 205,500.00

28,125.00

193,500.00

221,625.00 221,620.00

28,125.00

193,500.00

221,625.00 221,620.00

28,125.00

225,750.00

Page 89: AHS Kontraktor Electrical Mehcanical of HS DKI

253,875.00 253,870.00

28,125.00

225,750.00

253,875.00 253,870.00

- Galian Tanah= 0.65 m3

18,347.54 - Urugan Tanah= 0.4 m3

33,472.53 - Pemadatan = 0.4 m2

20,615.79

1,498.77

73,934.63 73,930.00

12,231.69

101,633.74

20,615.79

1,498.77

135,979.99 135,970.00

1,630.89

144,882.14

20,615.79

1,498.77

168,627.59 173,300.00

16,308.92

101,633.74

68,719.30

1,498.77

188,160.73 188,160.00

16,308.92

144,882.14

137,438.60

1,498.77

300,128.43 290,120.00

18,347.54

168,668.76

20,615.79

1,498.77

209,130.86 68,170.00

18,347.54

116,770.68

Page 90: AHS Kontraktor Electrical Mehcanical of HS DKI

20,615.79

1,498.77

157,232.78 145,980.00

18,347.54

168,668.76

20,615.79

1,498.77

209,130.86 197,880.00

18,347.54

116,770.68

68,719.30

1,498.77

205,336.29 194,080.00

18,347.54

168,668.76

137,438.60

1,498.77

325,953.67 314,700.00

52,208.00 52,210.00

56,208.00 56,210.00

59,901.00 59,900.00

71,696.00 71,700.00

85,236.00 85,240.00

104,416.00 104,420.00

112,417.00 112,420.00

119,802.00 119,800.00

63,286.00 63,290.00

70,568.00 70,570.00

68,517.00 68,520.00

87,185.00 87,190.00

103,801.00 103,800.00

126,571.00 126,570.00

141,136.00 141,140.00

178,062.00 178,060.00

4,687.50

27,000.00

39,000.00

70,687.50 70,680.00

9,375.00

Page 91: AHS Kontraktor Electrical Mehcanical of HS DKI

60,750.00

49,634.00

119,759.00 119,750.00

9,375.00

60,750.00

54,600.00

124,725.00 124,720.00

4,687.50

10,125.00

16,125.00

30,937.50 30,930.00

4,687.50

13,500.00

21,500.00

39,687.50 39,680.00

4,687.50

13,500.00

16,125.00

34,312.50 34,310.00

4,687.50

13,500.00

16,125.00

34,312.50 34,310.00

5,625.00

4,050.00

9,675.00 9,670.00

7,031.25

5,062.50

12,093.75 12,090.00

56,250.00

243,000.00

64,500.00

363,750.00 363,750.00

26,000.00

50,718.00

76,718.00 76,720.00

18,750.00

81,000.00

Page 92: AHS Kontraktor Electrical Mehcanical of HS DKI

43,000.00

142,750.00 142,750.00

28,125.00

121,500.00

64,500.00

214,125.00 214,120.00

28,125.00

162,000.00

161,250.00

351,375.00 351,370.00

187,343.00

4,050.00 4,050.00

4,687.50

3,375.00

2,687.50

10,750.00 10,750.00

56,250.00

162,000.00

64,500.00

234,000.00

516,750.00 516,750.00

11,050.00

1,950.00

13,000.00 13,000.00

29,445.00

1,950.00

31,395.00 31,400.00

14,062.50

40,500.00

16,125.00

56,628.00

32,500.00

159,815.50 159,810.00

14,062.50

40,500.00

16,125.00

56,628.00

Page 93: AHS Kontraktor Electrical Mehcanical of HS DKI

32,500.00

159,815.50 159,810.00

18,750.00

54,000.00

43,000.00

115,750.00 115,750.00

2,000.00

37,500.00

21,875.00

28,125.00

32,500.00

122,000.00 122,000.00

320.00

22,500.00

21,875.00

18,750.00

21,666.67

85,111.67 85,110.00

2,000.00

37,500.00

21,875.00

28,125.00

32,500.00

122,000.00 122,000.00

2,000.00

3,575.00

21,875.00

28,125.00

81,000.00

64,500.00

201,075.00 201,070.00

2,000.00

37,500.00

21,875.00

28,125.00

20,250.00

16,125.00

125,875.00 125,870.00

26,936.00

1,950.00

28,886.00 28,890.00

Page 94: AHS Kontraktor Electrical Mehcanical of HS DKI

sama dengan pemas tiang

double yang sesuai ukuran

sama dgn by pemasangan

20,580.00

9,375.00

13,500.00

5,375.00

10,833.33

39,083.33 39,080.00

9,375.00

13,500.00

5,375.00

10,833.33

39,083.33 39,080.00

28,125.00

81,000.00

32,250.00

141,375.00 141,370.00

28,125.00

20,250.00

8,062.50

56,437.50 56,430.00

28,125.00

20,250.00

8,062.50

56,437.50 56,430.00

4,290.00 4,290.00

5,366.00 5,370.00

92,056.00 92,060.00

159,432.00 159,430.00

55,895.00 55,900.00

85,800.00 85,800.00

134,550.00 134,550.00

12,843.27

27,477.45

Page 95: AHS Kontraktor Electrical Mehcanical of HS DKI

40,320.72 40,320.00

11,212.38

71,359.86

82,572.24 82,570.00

13,251.00

101,633.74

114,884.74 114,880.00

11,416.24

71,359.86

82,776.10 82,770.00

11,416.24

101,633.74

113,049.98 113,040.00

12,843.27

27,477.45

40,320.72 40,320.00

8,562.18

82,171.96

90,734.14 90,730.00

12,843.27

118,933.10

131,776.37 131,770.00

12,843.27

82,171.96

95,015.23 95,010.00

11,416.24

101,633.74

113,049.98 113,040.00

55,895.00 55,900.00

55,895.00 55,900.00

107,250.00 107,250.00

98,313.00 98,310.00

134,550.00 134,550.00

Page 96: AHS Kontraktor Electrical Mehcanical of HS DKI

134,550.00 134,550.00

42,187.50

26,730.00

68,917.50 68,910.00

10,023.00 10,020.00

22,204.00 22,200.00

22,204.00 22,200.00

3,575.00 3,580.00

11,250.00

16,200.00

27,450.00 27,450.00

11,250.00

32,400.00

43,000.00

86,650.00 86,650.00

10,400.00

2,600.00

18,720.00

31,720.00 31,720.00

Page 97: AHS Kontraktor Electrical Mehcanical of HS DKI

ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN

JASA PEKERJAAN ANGKUTAN

Biaya Belum termasuk resiko,overhead, keuntungan 10% dan PPN 10%

2004

HARGA

NO URAIAN PEKERJAAN SATUAN

(RUPIAH)

1 2 3

1 BIAYA ANGKUTAN

1.1 Pick Up Per Rit 65,000.00

1.2 Truck Kecil /2 - 4 Ton Per Rit 84,500.00

1.3 Truck Kecil /5 - 7 Ton Per Rit 130,000.00

1.4 Truck Tronton /> 7 Ton Per Rit 214,500.00

1.5 Sepeda Motor Per Rit 7,150.00

1.6 Forklift 5 Ton Per Rit 14,300.00

1.7 Forklift 10 Ton Per Jam 21,450.00

1.8 Crane Per Jam 42,900.00

2 ANGKUTAN KUBIKEL ( 1 S/D 3 Bh ) 1 Rit 84,500.00

- Truck Kecil /2 - 4 ton 3 Jam 14,300.00

- Forklift 5 Ton 3 Mandor 56,250.00

- Pelaksana : 0.33 Pekerja 32,250.00

3 ANGKUTAN TRAFO 100 S/D 315 KVA

-Truck Kecil / 2-4 Ton 1 Rit 84,500.00

-Forklift 10 Ton 3 Jam 21,450.00

- Pelaksana 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

4 ANGKUTAN TRAFO 400 s/d 630 KVA

-Truck Kecil / 2-4 Ton 1 Rit 84,500.00

-Forklift 10 Ton 3 Jam 21,450.00

- Pelaksana 1 Mandor 56,250.00

2 Pekerja 32,250.00

5 ANGKUTAN TRAFO 400 s/d 1.250 KVA

-Truck Kecil / 2-4 Ton 1 Rit 84,500.00

-Forklift 10 Ton 3 Jam 21,450.00

=- Pelaksana 1 Mandor 56,250.00

2 Pekerja 32,250.00

6 ANGKUTAN TRAFO 1.000 s/d 1.250 KVA

Truck Tronton /> 7 Ton 1 Rit 214,500.00

-Forklift 10 Ton 3 Jam 21,450.00

-Pelaksana 1 Mandor 56,250.00

2 Pekerja 32,250.00

Page 98: AHS Kontraktor Electrical Mehcanical of HS DKI

7 ANGKUTAN RAK TR DAN PERLENGKAPANNYA

Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

8 ANGKUTAN SKTM 10 - 50 METER

Pick Up 1 Rit 65,000.00

- Pelaksana : 1 Mandor 56,250.00

0.67 Pekerja 32,250.00

9 ANGKUTAN SKTM 50 - 100 METER

Truck kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 1 / 2 Mandor 56,250.00

2 / 2 Pekerja 32,250.00

10 ANGKUTAN SKTM 100 - 200 METER

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 1 Mandor 56,250.00

1 Pekerja 32,250.00

11 ANGKUTAN SKTM 1 HASPEL

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Forklift 10 Ton 3 Mandor 56,250.00

- Pelaksana : 2 Pekerja 32,250.00

12 ANGKUTAN SKTM 2 HASPEL

- Truck Besar /5 - 7 Ton 1 Rit 130,000.00

- Forklift 10 Ton 3 Mandor 56,250.00

- Pelaksana 0.50 Pekerja 32,250.00

13 ANGKUTAN SKTM 3 HASPEL

- Truck Besar / > 7 Ton 1 Rit 214,500.00

- Forklift 10 Ton 3 Mandor 56,250.00

- Pelaksana 0.50 Pekerja 32,250.00

14 ANGKUTAN POLE TOP SWITCH 1 s/d 2 BUAH

-Pick Up 1 Rit 65,000.00

- Pelaksana : 1 Mandor 56,250.00

1.50 Pekerja 32,250.00

15 ANGKUTAN ISOLATOR 1 s/d 10 PETI

-Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

16 ANGKUTAN FITTING 1 s/d 30 SET

-Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

Page 99: AHS Kontraktor Electrical Mehcanical of HS DKI

17 ANGKUTAN KAWAT A3C 150 mm2 50 - 150 METER

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

18 ANGKUTAN KAWAT A3C 150 mm2 150 - 250 METER

-Truck kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

19 ANGKUTAN TIANG BESI 9/200 DAN (1 S/D 4 BT)

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

20 ANGKUTAN TIANG BESI 9/200 DAN (5 S/D 9 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

21 ANGKUTAN TIANG BESI 9/200 DAN (10 S/D 20 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

22 ANGKUTAN TIANG BESI 9/350 DAN (3 S/D 6 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

23 ANGKUTAN TIANG BESI 9/350 DAN (7 S/D 15 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

24 ANGKUTAN TIANG BESI 9/500 DAN (2 S/D 6 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

25 ANGKUTAN TIANG BESI 9/500 DAN (7 S/D 10 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

26 ANGKUTAN TIANG BESI 9/800 DAN (2 S/D 4 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

27 ANGKUTAN TIANG BESI 9/800 DAN (5 S/D 8 BT)

Page 100: AHS Kontraktor Electrical Mehcanical of HS DKI

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

28 ANGKUTAN TIANG BETON 9/200 DAN (1 S/D 6 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

29 ANGKUTAN TIANG BETON 9/350 DAN (1 S/D 5 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

30 ANGKUTAN TIANG BETON 9/500 DAN (1 S/D 4 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

31 ANGKUTAN TIANG BESI 11/200 DAN (1 S/D 3 BT)

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

32 ANGKUTAN TIANG BESI 11/200 DAN (4 S/D 8 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

33 ANGKUTAN TIANG BESI 11/200 DAN (9 S/D 20 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

34 ANGKUTAN TIANG BESI 11/350 DAN (2 S/D 6 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

35 ANGKUTAN TIANG BESI 11/350 DAN (7 S/D 15 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

36 ANGKUTAN TIANG BESI 11/500 DAN (2 S/D 4 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

37 ANGKUTAN TIANG BESI 11/500 DAN (5 S/D 10 BT)

Page 101: AHS Kontraktor Electrical Mehcanical of HS DKI

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

38 ANGKUTAN TIANG BESI 11/800 DAN (2 S/D 3 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

39 ANGKUTAN TIANG BESI 11/800 DAN (4 S/D 8 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

40 ANGKUTAN TIANG BESI 11/200 DAN (2 S/D 3 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

41 ANGKUTAN TIANG BESI 11/1200 DAN (4 S/D 7 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

42 ANGKUTAN TIANG BESI 13/1200 DAN (1 S/D 10 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

43 ANGKUTAN TIANG BESI 13/350 DAN (1 S/D 8 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

44 ANGKUTAN TIANG BESI 13/500 DAN (1 S/D 8 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

45 ANGKUTAN TIANG BESI 13/500 DAN (1 S/D 6 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

3 Pekerja 32,250.00

46 ANGKUTAN TIANG BESI 13/1200 DAN (1 S/D 6 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

3.50 Pekerja 32,250.00

47 ANGKUTAN TIANG BETON 11/200 DAN (1 S/D 4 BT)

Page 102: AHS Kontraktor Electrical Mehcanical of HS DKI

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

48 ANGKUTAN TIANG BETON 11/350 DAN (1 S/D 3 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

49 ANGKUTAN TIANG BETON 11/500 DAN (1 S/D 3 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

50 ANGKUTAN TIANG BETON 13/200 DAN (1 S/D 3 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2 Pekerja 32,250.00

51 ANGKUTAN TIANG BETON 13/350 DAN (1 S/D 2 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

52 ANGKUTAN TIANG BETON 13/500 DAN (1 S/D 2 BT)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

3 Pekerja 32,250.00

53 ANGKUTAN KABEL TWISTED 3x70+50 mm2 (10 S/D 250 MTR)

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

54 ANGKUTAN KABEL TWISTED 3x70+50 mm2 (250 S/D 500 MTR)

- Truck Kecil /2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

55 ANGKUTAN KABEL TWISTED 3x70+50 mm2 1 HASPEL

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

- Pekerja 1 Pekerja 32,250.00

- Sewa Forklift 5 Ton 2 Jam 14,300.00

56 ANGKUTAN KABEL TWISTED 3x70+50 mm2 2 HASPEL

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

- Pekerja 1 Pekerja 32,250.00

- Sewa Forklift 5 Ton 2 Jam 14,300.00

Page 103: AHS Kontraktor Electrical Mehcanical of HS DKI

57 ANGKUTAN KABEL TWISTED 3x70+50 mm2 3 - 4 HASPEL

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

- Pekerja 1 Pekerja 32,250.00

- Sewa Forklift 5 Ton 3 Jam 14,300.00

58 ANGKUTAN BC 25 - 50 mm2 S/D 500 Kg

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

59 ANGKUTAN BC 25 - 50 mm2 S/D 500 Kg - 1 Ton

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

60 ANGKUTAN BC 25 - 50 mm2 2 - 4 HASPEL

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

- Forklift 5 Ton 2 Jam 14,300.00

61 ANGKUTAN BC 25 - 50 mm2 5 - 8 HASPEL

- Truck Kecil / 2 - 4 Ton 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

- Forklift 5 Ton 4 Jam 14,300.00

62 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,

4x150 mm S/D 50 METER

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

63 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,

4x150 mm S/D 200 METER

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

64 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,

4x150 mm2, 200- 300 METER

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

65 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,

4x150 mm2, 1 - 2 HASPEL

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

Page 104: AHS Kontraktor Electrical Mehcanical of HS DKI

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

- Forklift 5 Ton 2 Jam 14,300.00

66 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,

4x150 mm2, 3 - 4 HASPEL

- Truck Kecil / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

- Forklift 5 Ton 3 Jam 14,300.00

67 ANGKUTAN APP TYPE KHUSUS IB,IC,IFF: (1 - 4 Buah)

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

- Sepeda Motor 1 Rit 7,150.00

68 ANGKUTAN APP 1.A (1 - 6 Buah)

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

69 ANGKUTAN APP TYPE KHUSUS IB,IC,IIF : ( 1 - 4 Buah)

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1 Pekerja 32,250.00

70 ANGKUTAN UPS 40 KVA, 1 BUAH

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

71 ANGKUTAN UPS 100 KVA, 1 BUAH

- Tuck Kecol / 2 - 4 Ton 1 Rit 84,500.00

- Pelaksana : 0.50 Mandor 56,250.00

2.50 Pekerja 32,250.00

72 ANGKUTAN GENSET 10 S/D 50 KVA, 1 BUAH

- Pick Up 1 Rit 65,000.00

- Pelaksana : 0.50 Mandor 56,250.00

1.50 Pekerja 32,250.00

73 ANGKUTAN PERALATAN KONTROL

a. Pengangkutan Lemari Spindel

a). Pick Up 1 Rit 65,000.00

b). Sewa Forklift 5 Ton 3 Jam 14,300.00

- Pelaksana : 0.50 Mandor 56,250.00

3 Pekerja 32,250.00

Page 105: AHS Kontraktor Electrical Mehcanical of HS DKI

b. Pengangkutan Lemari RTU = Angkutan Lemari Spindel

c. Pengangkutan Lemari MDF = Angkutan Lemari Spindel

d. Pengangkutan Lemari Rectifier Battery 48 V/110 Volt = Angkutan Lemari Spindel

e. Pengangkutan Lemari Box Radio Key Point = Angkutan Lemari Spindel

f. Pengangkutan Lemari Box Absorber = Angkutan Lemari Spindel

g. Pengangkutan Lemari Box DS = Angkutan Lemari Spindel

Page 106: AHS Kontraktor Electrical Mehcanical of HS DKI

ANALISA HARGA SATUAN

JASA PEKERJAAN ANGKUTAN

Biaya Belum termasuk resiko,overhead, keuntungan 10% dan PPN 10%

BIAYA JUMLAH

DIBULATKAN

(RUPIAH) (RUPIAH)

4 5

65,000.00

84,500.00

130,000.00

214,500.00

7,150.00

14,300.00

21,450.00

42,900.00

84,500.00

42,900.00

168,750.00

10,750.00

306,900.00 306,900.00

84,500.00

64,350.00

28,125.00

32,250.00

209,225.00 209,225.00

84,500.00

64,350.00

56,250.00

64,500.00

269,600.00 269,600.00

84,500.00

64,350.00

56,250.00

64,500.00

269,600.00 269,600.00

214,500.00

64,350.00

56,250.00

64,500.00

399,600.00 321,100.00

Page 107: AHS Kontraktor Electrical Mehcanical of HS DKI

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

65,000.00

28,125.00

21,500.00

114,625.00 114,625.00

84,500.00

112,500.00

64,500.00

261,500.00 261,500.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

168,750.00

64,500.00

317,750.00 317,750.00

130,000.00

168,750.00

16,125.00

314,875.00 314,875.00

214,500.00

168,750.00

16,125.00

399,375.00 399,375.00

65,000.00

28,125.00

48,375.00

141,500.00 141,500.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

Page 108: AHS Kontraktor Electrical Mehcanical of HS DKI

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

28,125.00

48,375.00

161,000.00 161,000.00

84,500.00

28,125.00

48,375.00

161,000.00 161,000.00

84,500.00

28,125.00

64,500.00

177,125.00 177,125.00

84,500.00

28,125.00

64,500.00

177,125.00 177,125.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

Page 109: AHS Kontraktor Electrical Mehcanical of HS DKI

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

84,500.00

28,125.00

48,375.00

161,000.00 161,000.00

84,500.00

28,125.00

64,500.00

177,125.00 177,125.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

28,125.00

48,375.00

161,000.00 161,000.00

84,500.00

28,125.00

48,375.00

161,000.00 161,000.00

84,500.00

28,125.00

64,500.00

177,125.00 177,125.00

Page 110: AHS Kontraktor Electrical Mehcanical of HS DKI

84,500.00

28,125.00

64,500.00

177,125.00 177,125.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

84,500.00

28,125.00

80,625.00

193,250.00 120,250.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

84,500.00

28,125.00

48,375.00

161,000.00 161,000.00

84,500.00

28,125.00

64,500.00

177,125.00 177,125.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

84,500.00

28,125.00

96,750.00

209,375.00 209,375.00

84,500.00

28,125.00

112,875.00

225,500.00 225,500.00

Page 111: AHS Kontraktor Electrical Mehcanical of HS DKI

84,500.00

28,125.00

48,375.00

161,000.00 161,000.00

84,500.00

28,125.00

64,500.00

177,125.00 177,125.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

84,500.00

28,125.00

64,500.00

177,125.00 115,380.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

84,500.00

28,125.00

96,750.00

209,375.00 209,375.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

65,000.00

28,125.00

32,250.00

28,600.00

153,975.00 153,975.00

84,500.00

28,125.00

32,250.00

28,600.00

Page 112: AHS Kontraktor Electrical Mehcanical of HS DKI

173,475.00 173,475.00

84,500.00

28,125.00

32,250.00

42,900.00

187,775.00 187,775.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

28,125.00

32,250.00

28,600.00

173,475.00 173,475.00

65,000.00

28,125.00

32,250.00

57,200.00

182,575.00 162,830.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

28,125.00

32,250.00

144,875.00 144,875.00

84,500.00

Page 113: AHS Kontraktor Electrical Mehcanical of HS DKI

28,125.00

32,250.00

28,600.00

173,475.00 173,475.00

84,500.00

28,125.00

32,250.00

42,900.00

187,775.00 187,775.00

28,125.00

32,250.00

7,150.00

67,525.00 67,525.00

65,000.00

28,125.00

32,250.00

125,375.00 125,375.00

65,000.00

28,125.00

32,250.00

125,375.00 86,130.00

65,000.00

28,125.00

80,625.00

173,750.00 173,750.00

84,500.00

28,125.00

80,625.00

193,250.00 193,250.00

65,000.00

28,125.00

48,375.00

141,500.00 141,500.00

65,000.00

42,900.00

28,125.00

96,750.00

Page 114: AHS Kontraktor Electrical Mehcanical of HS DKI

232,775.00 232,775.00

148,525.00 148,525.00

148,525.00 148,525.00

148,525.00 148,525.00

148,525.00 148,525.00

148,525.00 148,525.00

148,525.00 148,525.00

Page 115: AHS Kontraktor Electrical Mehcanical of HS DKI

-->

Bulan2005 2006 2007 2008

IHK Inflasi IHK Inflasi IHK Inflasi IHK InflasiJanuari 118,53 1,43 138,72 1,36 147,41 1,04 158,26 1,77Februari 118,33 -0,17 139,53 0,58 148,32 0,62 159,29 0,65Maret 120,59 1,91 139,57 0,03 148,67 0,24 160,81 0,95April 121,00 0,34 139,64 0,05 148,43 -0,16 161,73 0,57Mei 121,25 0,21 140,16 0,37 148,58 0,1 164,01 1,41Juni 121,86 0,5 140,79 0,45 148,92 0,23 110,08*) 2,46*)Juli 122,81 0,78 141,42 0,45 149,99 0,72 111,59 1,37Agustus 123,48 0,55 141,88 0,33 151,11 0,75 112,16 0,51

124,33 0,69 142,42 0,38 152,32 0,8 113,25 0,97

Oktober 135,15 8,7 143,65 0,86 153,53 0,79 113,76 0,45

136,92 1,31 144,14 0,34 153,81 0,18 113,9 0,12

136,86 -0,04 145,89 1,21 155,5 1,1 113,86 -0,04

17,11 6,6 6,59 11,06

September

November

Desember

Tingkat Inflasi

Page 116: AHS Kontraktor Electrical Mehcanical of HS DKI

2009 2010 2011 2012 2013IHK Inflasi IHK Inflasi IHK Inflasi IHK Inflasi IHK113,78 -0,07 118,01 0,84 126,29 0,89 130,9 0,76 136,88114,02 0,21 118,36 0,3 126,46 0,13 130,96 0,05 137,91114,27 0,22 118,19 -0,14 126,05 -0,32 131,05 0,07 138,78113,92 -0,31 118,37 0,15 125,66 -0,31 131,32 0,21 138,64113,97 0,04 118,71 0,29 125,81 0,12 131,41 0,07 138,6114,1 0,11 119,86 0,97 126,5 0,55 132,23 0,62 140,03114,61 0,45 121,74 1,57 127,35 0,67 133,16 0,7 144,63115,25 0,56 122,67 0,76 128,54 0,93 134,43 0,95 146,25

116,46 1,05 123,21 0,44 128,89 0,27 134,45 0,01 145,74

116,68 0,19 123,29 0,06 128,74 -0,12 134,67 0,16 145,87

116,65 -0,03 124,03 0,6 129,18 0,34 134,76 0,07 146,04

117,03 0,33 125,17 0,92 129,91 0,57 135,49 0,54 146,84

2,78 6,96 3,79 4,3

Page 117: AHS Kontraktor Electrical Mehcanical of HS DKI

2013Inflasi IHK Inflasi1,03 1,070,75 111,28 0,260,63 111,37 0,08-0,1 111,35 -0,02-0,03 111,53 0,161,03 112,01 0,433,29 113,05 0,931,12 113,58 0,47

-0,35 113,89 0,27

0,09 114,42 0,47

0,12 116,14 1,5

0,55 119 2,46

8,38 8,36

20142)

110,992)