ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
% TERHADAP TOTAL BIAYA PROYEK = #REF! %
Lembar 1.2-1
HARGA JUMLAH
No. U R A I A N SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
A. Sewa Tanah M2 20,000 500 10,000,000
B. PERALATAN
Periksa lembar 1.2-2 260,300,000
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150 50,000 7,500,000
2 Kantor M2 60 75,000 4,500,000
3 Barak M2 60 45,000 2,700,000
4 Bengkel M2 100 25,000 2,500,000
5 Gudang, dan lain-lain M2 100 25,000 2,500,000
6 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 108 55,000 5,940,000
2 Soil & Aggregate Testing
Compaction Test Set 1 15,000,000 15,000,000
CBR Test Set 1 20,000,000 20,000,000
Specific Gravity Set 1 5,000,000 5,000,000
Atterberg Limits Set 1 5,000,000 5,000,000
Grain Size Analysis Set 1 12,500,000 12,500,000
Field Density Test by Sand Cone Methode Set 2 6,500,000 13,000,000
Moisture Content Set 2 6,000,000 12,000,000
Abrasion of Aggregate by Los Angeles Machine Bln 2 5,000,000 10,000,000
3 Bituminous Testing
Marshall Asphalt Test Set 1 20,000,000 20,000,000
Extraction Test, Centrifuge/Refflux Method Set 1 9,000,000 9,000,000
Specific Gravity for Coarse Aggregate Set 1 9,000,000 9,000,000
Specific Gravity for Fine Aggregate Set 1 9,000,000 9,000,000
Mix Air Viod Content (Accurate Method) Set 1 15,000,000 15,000,000
Core Drill Set 1 15,000,000 15,000,000
Metal Thermometer Set 1 1,000,000 1,000,000
Accessories and Tolls Set 1 5,000,000 5,000,000
Penetration Test Bln 6 1,000,000 6,000,000
Softening Point Set 1 6,000,000 6,000,000
Refusal Density Compactor Set 1 15,000,000 15,000,000
4 Concrete Testing
Slump Cone Set 1 500,000 500,000
Cylinder/Cube Mould for Compressive Strength Set 1 10,000,000 10,000,000
Beam Mould for Flexural Strength (RIGID) Set 1 10,000,000 10,000,000
Crushing Machine Set 1 50,000,000 50,000,000
5 Pendukung (Periksa Fasilitas Laboratorium) 225,000,000
6 Operasional (Periksa Fasilitas Laboratorium) 276,000,000
-
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT1 Perkuatan Jembatan Lama LS 1 100,000,000 100,000,0002 Pemeliharaan Jalan Kerja / Samping LS 1 100,000,000 100,000,0003 . . . . . . . . . . . . . . . . . . . . . . . . . . 0
4 . . . . . . . . . . . . . . . . . . . . . . . . . . 0
5 . . . . . . . . . . . . . . . . . . . . . . . . . . 0
6 . . . . . . . . . . . . . . . . . . . . . . . . . . 0
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1 5,000,000 5,000,000
2 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0
3 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0
4 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0
5 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0
6 . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0
F. DEMOBILISASI LS 1 78,090,000 78,090,000
Total Biaya Mobilisasi 1,353,030,000
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
1 ASPHALT MIXING PLANT E01 Unit 1 200,000,000 200,000,000
2 ASPHALT FINISHER E02 Unit 1 500,000 500,000
3 ASPHALT SPRAYER E03 Unit 1 100,000 100,000
4 BULLDOZER 100-150 HP E04 Unit 1 500,000 500,000
5 COMPRESSOR 4000-6500 L\M E05 Unit 1 150,000 150,000
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1 100,000 100,000
7 CRANE 10-15 TON E07 Unit 1 150,000 150,000
8 DUMP TRUCK 3.5 TON E08 Unit 18 150,000 2,700,000
9 DUMP TRUCK 10 TON E09 Unit 5 150,000 750,000
10 EXCAVATOR 80-140 HP E10 Unit 3 500,000 1,500,000
11 FLAT BED TRUCK 3-4 M3 E11 Unit 1 150,000 150,000
12 GENERATOR SET E12 Unit 1 300,000 300,000
13 MOTOR GRADER >100 HP E13 Unit 1 500,000 500,000
14 TRACK LOADER 75-100 HP E14 Unit 1 500,000 500,000
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1 500,000 500,000
16 THREE WHEEL ROLLER 6-8 T E16 Unit 2 500,000 1,000,000
17 TANDEM ROLLER 6-8 T. E17 Unit 1 500,000 500,000
18 TIRE ROLLER 8-10 T. E18 Unit 1 500,000 500,000
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1 500,000 500,000
20 CONCRETE VIBRATOR E20 Unit 5 50,000 250,000
21 STONE CRUSHER E21 Unit 1 40,000,000 40,000,000
22 WATER PUMP 70-100 mm E22 Unit 2 50,000 100,000
23 WATER TANKER 3000-4500 L. E23 Unit 1 150,000 150,000
24 PEDESTRIAN ROLLER E24 Unit 1 50,000 50,000
25 TAMPER E25 Unit 1 50,000 50,000
26 JACK HAMMER E26 Unit 2 50,000 100,000
27 FULVI MIXER E27 Unit 1 500,000 500,000
28 CONCRETE PUMP E28 Unit 2 500,000 1,000,000
29 TRAILER 20 TON E29 Unit 2 1,000,000 2,000,000
30 PILE DRIVER + HAMMER E30 Unit 2 1,000,000 2,000,000
31 CRANE ON TRACK 35 TON E31 Unit 2 1,000,000 2,000,000
32 WELDING SET E32 Unit 2 200,000 400,000
33 BORE PILE MACHINE E33 Unit 1 500,000 500,000
34 ASPHALT LIQUID MIXER E34 Unit 1 300,000 300,000
35 TRONTON E35 Unit 0
36 COLD MILLING MACHINE E37 Unit 0
37 ROCK DRILL BREAKER E36 Unit 0
38 COLD RECYCLER E38 Unit 0
39 HOT RECYCLER E39 Unit 0
-
40 AGGREGAT (CHIP) SPREADER E40 Unit 0
41 ASPHALT DISTRIBUTOR E41 Unit 0
42 SLIP FORM PAVER E42 Unit 0
43 CONCRETE PAN MIXER E43 Unit 0
44 CONCRETE BREAKER E44 Unit 0
45 ASPAHLT TANKER E45 Unit 0
46 CEMENT TANKER E46 Unit 0
47 CONDRETE MIXER (350) E47 Unit 0
48 VIBRATING RAMMER E48 Unit 0
49 TRUK MIXER (AGITATOR) E49 Unit 0
50 BORE PILE MACHINE E50 Unit 0
51 CRANE ON TRACK 75-100 TON E51 Unit 0
52
53
Total untuk Item B pada Lembar 1 260,300,000
-
SATUAN PENGUKURAN : Lump sum
HARGA SATUAN : Rp. 779,940,000.00
HARGA
SATUAN
I. Laboratory Building
1. Laboratory Building m2 108.00 55,000.00 5,940,000.00
SUB TOTAL 5,940,000.00
II. Soil & Aggregate Testing
1. Compaction Test Set 1.00 15,000,000.00 15,000,000.00 Beli
2. CBR Test Set 1.00 20,000,000.00 20,000,000.00 Beli
3 Specifc Gravity Set 1.00 5,000,000.00 5,000,000.00 Beli
4 Atterberg Limits Set 1.00 5,000,000.00 5,000,000.00 Beli
5 Grain Size Analysis Set 1.00 12,500,000.00 12,500,000.00 Beli
6 Field Density Test by Sand Cone Methode Set 2.00 6,500,000.00 13,000,000.00 Beli
7 Moisture Content Set 2.00 6,000,000.00 12,000,000.00 Beli
8 Abrasion of Aggregate by Los Angeles Machine Bln 2.00 5,000,000.00 10,000,000.00 Sewa
SUB TOTAL 92,500,000.00
III. Bituminous Testing
1. Marshall Asphalt Test Set 1.00 20,000,000.00 20,000,000.00 Beli
2. Extraction Test, Centrifuge/Reflux Method Set 1.00 9,000,000.00 9,000,000.00 Beli
3 Specific Gravity of Coarse Aggregate Set 1.00 9,000,000.00 9,000,000.00 Beli
4 Specific Gravity of Fine Aggregate Set 1.00 9,000,000.00 9,000,000.00 Beli
5 Mix Air Viod Content (Accurate Method) Set 1.00 15,000,000.00 15,000,000.00 Beli
6 Core Drill Set 1.00 15,000,000.00 15,000,000.00 Beli
7 Metal Thermometer Set 1.00 1,000,000.00 1,000,000.00 Beli
8 Accessories and Tolls Set 1.00 5,000,000.00 5,000,000.00 Beli
9 Penetration Test Bln 6.00 1,000,000.00 6,000,000.00 Beli
10 Softening Point Set 1.00 6,000,000.00 6,000,000.00 Beli
11 Refusal Density Compactor Set 1.00 15,000,000.00 15,000,000.00 Beli
SUB TOTAL 110,000,000.00
IV. Concrete Testing
1 Slump Cone Set 1.00 500,000.00 500,000.00 Beli
2 Cylinder/Cube Mould for Compressive Strength Set 1.00 10,000,000.00 10,000,000.00 Beli
3 Beam Mould for Flexural Strength Set 1.00 10,000,000.00 10,000,000.00 Beli
4 Crushing Machine Set 1.00 50,000,000.00 50,000,000.00 Beli
SUB TOTAL 70,500,000.00
V. Peralatan pendukung
1 Mobil Pick Up Unit 2.00 100,000,000.00 200,000,000.00 Beli
2 Komputer + Printer Set 1.00 10,000,000.00 10,000,000.00 Beli
3 Furniture Set 1.00 15,000,000.00 15,000,000.00 Beli
SUB TOTAL 225,000,000.00
VI. Operasional
Teknisi Laboratorium Bln 12.00 8,000,000.00 96,000,000.00
Tenaga Kerja Terampil Bln 60.00 3,000,000.00 180,000,000.00
SUB TOTAL 276,000,000.00
VII. Test Luar
Test Luar, sesuai kebutuhan atau atas Ls 1.00 0.00 0.00
perintah Direksi SUB TOTAL 0.00
FASILITAS LABORATORIUM
TOTAL KETERANGANNO. URAIAN SATUAN VOLUME
-
TOTAL HARGA ( I - VII ) Rp 779,940,000.00
Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
-
No Nama Alat Kode Kuantitas Sat Target
No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat
per hari total Tiap Jam per item
1 2 3 4 5 6=4x5 7 8=7:6 9
1 Asphalt Mixing Plant E01
6.3 (1) 3 75 7 525 1 M2 0.002 0.0007
6.3 (2) 9 225 7 1575 1 M2 0.001 0.0009
6.3 (3) 9 225 7 1575 1 M2 0.001 0.0013
6.3(3a) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(4) 9 225 7 1575 1 M3 0.001 0.0448
6.3(4a) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(5a) 9 225 7 1575 1 M2 0.001 0.0019
6.3(5b) 9 225 7 1575 1 M2 0.001 0.0019
6.3(5c) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(5d) 2 50 7 350 1 Ton 0.003 0.0201
6.3(6a) 9 225 7 1575 1 M3 0.001 0.0466
6.3(6b) 9 225 7 1575 1 M3 0.001 0.0466
6.3(6c) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(6d) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(7a) 9 225 7 1575 1 M3 0.001 0.0466
6.3(7b) 9 225 7 1575 1 M3 0.001 0.0466
6.3(7c) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(7d) 9 225 7 1575 1 Ton 0.001 0.0201
8.1 (5) 9 225 7 1575 1 M3 0.001 0.0554
2 Asphalt Finisher E02
6.3 (1) 9 225 7 1575 1 M2 0.001 0.0013
6.3 (2) 9 225 7 1575 1 M2 0.001 0.0013
6.3 (3) 9 225 7 1575 1 M2 0.001 0.0013
6.3(3a) 9 225 7 1575 1 Ton 0.001 0.0191
6.3(4) 2 50 7 350 1 M3 0.003 0.0364
6.3(4a) 9 225 7 1575 1 Ton 0.001 0.0041
6.3(5a) 9 225 7 1575 1 M2 0.001 0.0013
6.3(5b) 9 225 7 1575 1 M2 0.001 0.0013
6.3(5c) 9 225 7 1575 1 Ton 0.001 0.0137
6.3(5d) 9 225 7 1575 1 Ton 0.001 0.0137
6.3(6a) 9 225 7 1575 1 M3 0.001 0.0255
Jadwal Pekerjaan
Jam Kerja
Peralatan Yang Diperlukan
Perhitungan Kebutuhan Alat untuk Mobilisasi
-
No Nama Alat Kode Kuantitas Sat Target
No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat
per hari total Tiap Jam per item
1 2 3 4 5 6=4x5 7 8=7:6 9
Jadwal Pekerjaan
Jam Kerja
Peralatan Yang Diperlukan
6.3(6b) 9 225 7 1575 1 M3 0.001 0.0255
6.3(6c) 9 225 7 1575 1 Ton 0.001 0.0110
6.3(6d) 9 225 7 1575 1 Ton 0.001 0.0110
6.3(7a) 9 225 7 1575 1 M3 0.001 0.0212
6.3(7b) 9 225 7 1575 1 M3 0.001 0.0212
6.3(7c) 9 225 7 1575 1 Ton 0.001 0.0092
6.3(7d) 9 225 7 1575 1 Ton 0.001 0.0092
6.4 (1) 9 225 7 1575 1 M2 0.001 0.0003
6.4 (2) 9 225 7 1575 1 M2 0.001 0.0003
6.4 (3) 9 225 7 1575 1 M2 0.001 0.0003
3 Asphalt Sprayer E03
6.6.1 9 225 7 1575 1 M3 0.001 0.0004
6.6.2 9 225 7 1575 1 M3 0.001 0.0004
8.1 (7) 9 225 7 1575 1 M3 0.001 0.0359
8.1 (9) 9 225 7 1575 1 Liter 0.001 0.0003
4 Bulldozer E04
9.7 7 175 7 1225 jam 0.000
5 Concrete Mixer E06
7.1(5) 4 100 7 700 m3 0.000
7.1(6) 4 100 7 700 m3 0.000
7.1(8) 4 100 7 700 m3 0.000
7.9 4 100 7 700 m3 0.000
9.18 7 175 7 1225 jam 0.000
6 Concrete Vibrator
7.1(5) 4 100 7 700 m3 0.000
7.1(6) 4 100 7 700 m3 0.000
7.1(8) 4 100 7 700 m3 0.000
7 Compressor E05
6.1(1) 9 225 7 1575 liter 0.000
9.17 7 175 7 1225 jam 0.000
8 Crane E07
9.12 7 175 7 1225 jam 0.000
9 Dump Truck E08
2.1 7 175 7 1225 m3 0.000
-
No Nama Alat Kode Kuantitas Sat Target
No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat
per hari total Tiap Jam per item
1 2 3 4 5 6=4x5 7 8=7:6 9
Jadwal Pekerjaan
Jam Kerja
Peralatan Yang Diperlukan
3.1(1) 6 150 7 1050 m3 0.000
3.2(2) 6 150 7 1050 m3 0.000
4.2(1) 7 175 7 1225 m3 0.000
5.1(1) 5 125 7 875 m3 0.000
5.1(2) 5 125 7 875 m3 0.000
6.1(1) 9 225 7 1575 liter 0.000
6.1(2) 9 225 7 1575 liter 0.000
6.3(5) 9 225 7 1575 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
8.1(1) 2 50 7 350 m3 0.000
8.1(5) 2 50 7 350 m3 0.000
8.4(4) 2 50 7 350 bh 0.000
8.4(6) 2 50 7 350 bh 0.000
9.4 7 175 7 1225 jam 0.000
10 Excavator E10
2.1 7 175 7 1225 m3 0.000
3.1(1) 6 150 7 1050 m3 0.000
9.11 7 175 7 1225 jam 0.000
11 Flat Bed Truck E11
9.5 7 175 7 1225 jam 0.000
12 Generator Set E12
6.3(5) 9 225 7 1575 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
8.1(5) 2 50 7 350 m3 0.000
13 Motor Grader E13
3.2(2) 6 150 7 1050 m3 0.000
3.3(1) 6 150 7 1050 m2 0.000
4.2(1) 7 175 7 1225 m3 0.000
5.1(1) 5 125 7 875 m3 0.000
5.1(2) 5 125 7 875 m3 0.000
9.8 7 175 7 1225 jam 0.000
-
No Nama Alat Kode Kuantitas Sat Target
No Item Pekerjaan Alat bulan Hari Kerja Pekerjaan Produksi koefisien alat
per hari total Tiap Jam per item
1 2 3 4 5 6=4x5 7 8=7:6 9
Jadwal Pekerjaan
Jam Kerja
Peralatan Yang Diperlukan
14 Pneumatic Tyred Roller
5.1(1) 7 175 7 1225 m3 0.000
5.1(2) 5 125 7 875 m3 0.000
6.3(5) 5 125 7 875 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
15 Tandem Roller E17
6.3(5) 9 225 7 1575 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
8.1(5) 2 50 7 350 m3 0.000
16 Vibrator Roller E19
3.2(2) 6 150 7 1050 m3 0.000
5.1(1) 5 125 7 875 m3 0.000
5.1(2) 5 125 7 875 m3 0.000
9.14 7 175 7 1225 jam 0.000
17 Water Tank E23
3.3(1) 6 150 7 1050 m2 0.000
4.2(1) 7 175 7 1225 m3 0.000
5.1(1) 5 125 7 875 m3 0.000
7.1(5) 4 100 7 700 m3 0.000
7.1(6) 4 100 7 700 m3 0.000
7.1(8) 4 100 7 700 m3 0.000
7.9 4 100 7 700 m3 0.000
8.1(1) 2 50 7 350 m3 0.000
9.6 7 175 7 1225 jam 0.000
18 Wheel Loader E15
3.2(2) 6 150 7 1050 m3 0.000
4.2(1) 7 175 7 1225 m3 0.000
5.1(1) 5 125 7 875 m3 0.000
5.1(2) 5 125 7 875 m3 0.000
6.3(5) 9 225 7 1575 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
8.1(1) 2 50 7 350 m3 0.000
8.1(5) 2 50 7 350 m3 0.000
9.9 7 175 7 1225 jam 0.000
19 Pedestrian Roller E24
8.1(1) 2 50 7 350 m3 0.000
-
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000001 0.00033 1 1
0.000001
0.000001
0.000013
0.000028
0.000013
0.000001
0.000001
0.000013
0.000057
0.000030
0.000030
0.000013
0.000013
0.000030
0.000030
0.000013
0.000013
0.000035
0.000001 0.00023 1 1
0.000001
0.000001
0.000012
0.000104
0.000003
0.000001
0.000001
0.000009
0.000009
0.000016
Peralatan Yang Diperlukan
Perhitungan Kebutuhan Alat untuk Mobilisasi
-
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
Peralatan Yang Diperlukan
0.000016
0.000007
0.000007
0.000013
0.000013
0.000006
0.000006
0.000000
0.000000
0.000000
0.000000 0.00002 1 1
0.000000
0.000023
0.000000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000 0.000 1 1
0.000
0.000 0.000 1 1
0.000 0.000 18 18
-
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
Peralatan Yang Diperlukan
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
-
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
Peralatan Yang Diperlukan
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
-
INFORMASI UMUM
No. U R A I A N I N F O R M A S I
1. Nama Kegiatan : Perencanaan Dinas Bina Marga Kabupaten Malang
2. Nama Paket : Perencanaan Pembangunan, Rehabilitasi/Pemeliharaan
Jalan dan Jembatan serta Bangunan Pelengkap
3. Propinsi / Kabupaten / Kotamadya : Jawa Timur / Kabupaten Malang
4. Lokasi pekerjaan Periksa lampiran
5. Kondisi jalan lama . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6. Panjang efektif ( lihat sketsa di bawah ) 5.0 Kilometer ( Leff = a + b )
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( . + .. + ) meter
8. Lebar Rencana ( bahu + perkerasan + bahu ) ( . + + ) meter
9. Penampang jalan, jenis dan volume pekerjaan pokok Lihat lampiran.
10. Jangka waktu pelaksanaan pekerjaan .. hari kalender
Atau : .. bulan (Periode Pelaksanaan)
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L = 20.25 Kilometer
Perhitungan didasarkan pada sketsa di bawah ini : L = { (c+a/2)*a + (c+b/2)*b } / (a+b)
21.00
2.50 Km = a 2.50 Km = b
A 11.50 B
Base Camp --------->
Kalkulasi Jarak Rata-Rata =
12. Jam kerja efektif dalam 1 hari 7.00 jam
13. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat
14. Tingkat Suku Bunga Investasi Alat 10.00 %
15. Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung
16. RINGKASAN METODE PELAKSANAAN
a. Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.
b. Pekerjaan Tanah dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c. Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
d. Pekerjaan Campuran Aspal Panas dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e. Pekerjaan Pasangan Batu dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
f. Pekerjaan Pengembalian Kondisi dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
g. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17. Lokasi Quarry Periksa lampiran.
18 Jumlah Jembatan = ...................... Buah Periksa lampiran.
19 Total Bentang Jembatan = .................. Buah Periksa lampiran.
20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19.00 Km = c
D
C
-
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. U R A I A N SATUAN ROYALTY QUARRY KET.
(Rp) ( Km )
1. M01 - P a s i r Pasang M3 20,000.00 23.00 Ke Base Camp
M01 - P a s i r Beton M3 22,500.00 21.00 Ke Lokasi Pek.
2. M02 - Batu Kali M3 30,000.00 18.00 Ke Lokasi Pek.
3. M06 - Batu Belah/Batu Quarry Besar M3 27,500.00 18.00 Ke Lokasi Pek.
4. M07 - G r a v e l M3 27,500.00 15.00 Ke Base Camp
5. M10 - Aspal Cement (Pelabuhan) KG 167.00 Ke Base Camp
6. M16 - S i r t u M3 22,500.00 20.00 Ke Lokasi Pek.
7. M44 - Pasir Urug M3 15,000.00 22.00 Ke Lokasi Pek.
8 M08 - Tanah Timbun M3 12,500.00 10.00 Ke Lokasi Pek.
9 M09 - Material Pilihan M3 22,500.00 15.00 Ke Lokasi Pek.
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
Lokasi Proyek - Base Camp = 8.73 km
Total Sumber Quarry Patumbak s/d Base Camp = 176.73 km
Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan = 50 km
Jarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan = 45 km
Jarak Quarry Pasir ke Base Camp diperkirakan = 18.73 km
Jarak Quarry Pasir ke Lokasi Proyek diperkirakan = 10 km
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan: Base Camp
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 23.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 20,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79
7 Berat volume pasir Bil 1.42 ton/m3
II. URUTAN KERJA
1 Pasir digali dengan Excavator
2 Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 50.9454 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,164.36 Rupiah
DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/Q1 x Bil) T1 8.29 menit
- Waktu tempuh isi = (L/v1) x 60 T2 34.50 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 23.00 menit
- Lain-lain T4 1.00 menit
Ts2 66.79 menit
Bersambung
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan: Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 5.25 M3 / Jam
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 62,105.52 Rupiah
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI BASE CAMP
Harga Satuan Dasar Pasir =
( RpM01 + Rp1 + Rp2 ) M01 92,269.88 Rupiah
Dibulatkan : M01 92,300.00 Rupiah
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 18.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 30,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79
7 Berat volume batu kali Bil 1.44 ton/m3
II. URUTAN KERJA
1 Batu kali digali dengan Excavator
2 Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
lokasi pekerjaan
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 40.75632 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 12,705.45 Rupiah
DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 10.22 menit
- Waktu tempuh isi = (L/v1) x 60 T2 27.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 18.00 menit
- Lain-lain T4 1.00 menit
Ts2 56.22 menit
Bersambung
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 6.15 M3 / Jam
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 53,013.26 Rupiah
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Batu kali =
( RpM02 + Rp1 + Rp2 ) M02 95,718.71 Rupiah
Dibulatkan : M02 95,700.00 Rupiah
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 18.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3 27,500.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 317,067.17
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 5,357.14
9 Berat volume batu belah Bil 1.60 ton/m3
II. URUTAN KERJA
1 Batu kali digali dengan Excavator
2 Batu kali dibelah oleh Pekerja
3 Dengan Wheel Loader batu belah dimuat
ke Dump Truck yang mengangkut batu
belah ke lokasi pekerjaan
III. PERHITUNGAN
3.a EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 40.75632 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 12,705.45 Rupiah
3.b WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kapasitas Produksi / Jam =
V x Fb x Fa x 60 Q2 59.76 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q2) x RpE15 Rp2 5,305.68 Rupiah
Bersambung
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
3.c DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 9.20 menit
- Waktu tempuh isi = (L/v1) x 60 T2 27.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 18.00 menit
- Lain-lain T4 1.00 menit
Ts2 55.20 menit
Kapasitas Produksi / Jam =
V x Fa x 60 Q3 5.64 M3 / Jam
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 57,832.55 Rupiah
3.d PEKERJA
Produksi menentukan : Excavator Q1 40.75632 M3 / Jam
Hasil galian batu / hari = Q1 x 7 Jam Qt 285.29424 M3 / 7 jam
Kebutuhan Pekerja P 15.00 Orang
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 1,971.65 Rupiah
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Batu belah =
( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) M06 105,315.32 Rupiah
Dibulatkan : M06 105,300.00 Rupiah
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan: Base Camp
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 15.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3 27,500.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79
7 Berat volume gravel Bil 2.20 ton/m3
II. URUTAN KERJA
1 Gravel digali dengan Excavator
2 Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut gravel ke
lokasi pekerjaan
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 40.75632 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 12,705.45 Rupiah
DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 6.69 menit
- Waktu tempuh isi = (L/v1) x 60 T2 22.50 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 15.00 menit
- Lain-lain T4 1.00 menit
Ts2 45.19 menit
Bersambung
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan: Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 5.01 M3 / Jam
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 65,100.77 Rupiah
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI BASE CAMP
Harga Satuan Dasar Gravel =
( RpM07 + Rp1 + Rp2 ) M07 105,306.22 Rupiah
Dibulatkan : M07 105,300.00 Rupiah
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 22,500.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79
7 Berat volume sirtu Bil 1.51 ton/m3
II. URUTAN KERJA
1 Sirtu digali dengan Excavator
2 Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut sirtu ke lokasi
Base Camp
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 50.9454 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,164.36 Rupiah
DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 7.80 menit
- Waktu tempuh isi = (L/v1) x 60 T2 30.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 20.00 menit
- Lain-lain T4 1.00 menit
Ts2 58.80 menit
Bersambung
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 5.61 M3 / Jam
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 58,137.47 Rupiah
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar Sirtu =
( RpM16 + Rp1 + Rp2 ) M16 90,801.82 Rupiah
Dibulatkan : M16 90,800.00 Rupiah
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 22.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 15,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79
7 Berat volume pasir urug Bil 1.42 ton/m3
II. URUTAN KERJA
1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 50.9454 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,164.36 Rupiah
DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 8.29 menit
- Waktu tempuh isi = (L/v1) x 60 T2 33.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 22.00 menit
- Lain-lain T4 1.00 menit
Ts2 64.29 menit
Bersambung
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 5.45 M3 / Jam
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 59,781.00 Rupiah
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar pasir urug =
( RpM44 + Rp1 + Rp2 ) M44 84,945.36 Rupiah
Dibulatkan : M44 84,900.00 Rupiah
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 21.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 22,500.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 517,827.26
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 326,087.79
7 Berat isi volume pasir beton Bil 1.69 ton/m3
II. URUTAN KERJA
1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.39 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 18,905.71 Rupiah
DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 12.96 menit
- Waktu tempuh isi = (L/v1) x 60 T1 31.50 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 21.00 menit
- Lain-lain T4 1.00 menit
Ts2 66.46 menit
Bersambung
-
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan: Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
Kapasitas Produksi / Jam =
V x Fa x 60 Q2 4.43 M3 / Jam
Ts2 x Bil
Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 73,547.07 Rupiah
IV. HARGA SATUAN DASAR BAHAN
DI LOKASI PEKERJAAN
Harga Satuan Dasar pasir urug =
( RpM44 + Rp1 + Rp2 ) M44 114,952.78 Rupiah
Dibulatkan : M44 115,000.00 Rupiah
-
HARGA
No. U R A I A N KODE SATUAN SATUAN KETERANGAN
( Rp.)
1 Pasir Pasang (Sedang) M01b M3 105,000.00 Base Camp
2 Pasir Beton (Kasar) M01a M3 110,000.00 Base Camp
3 Pasir Halus (untuk HRS) M01c M3 105,000.00 Base Camp
4 Pasir Urug (ada unsur lempung) M01d M3 78,000.00 Base Camp
5 Batu Kali M02 M3 105,000.00 Lokasi Pekerjaan
6 Agregat Kasar M03 M3 162,018.16 Base Camp
7 Agregat Halus M04 M3 162,018.16 Base Camp
8 F i l l e r M05 Kg 1,125.00 Proses/Base Camp
9 Batu Belah / Kerakal M06 M3 115,000.00 Lokasi Pekerjaan
10 G r a v e l M07 M3 96,000.00 Base Camp
11 Bahan Tanah Timbunan M08 M3 12,500.00 Borrow Pit/quarry
12 Bahan Pilihan M09 M3 28,500.00 quarry
13 Aspal M10 KG 7,851.60 Base Camp
Aspal Curah M10a KG 6,174.38
14 Kerosen / Minyak Tanah M11 LITER 9,210.00 Base Camp
15 Semen / PC (40kg) M12 Zak 45,000.00 Base Camp
16 Semen / PC (kg) M12 Kg 1,125.00 Base Camp
17 Besi Beton M13 Kg 9,000.00 Lokasi Pekerjaan
18 Kawat Beton M14 Kg 12,000.00 Lokasi Pekerjaan
19 Kawat Bronjong M15 Kg 13,500.00 Lokasi Pekerjaan
20 S i r t u M16 M3 96,000.00 Lokasi Pekerjaan
21 Cat Marka (Non Thermoplas) M17a Kg 22,500.00 Lokasi Pekerjaan
22 Cat Marka (Thermoplastic) M17b Kg 27,500.00 Lokasi Pekerjaan
23 P a k u M18 Kg 12,000.00 Lokasi Pekerjaan
24 Kayu Perancah M19 M3 2,850,000.00 Lokasi Pekerjaan
25 B e n s i n (Industri) M20 LITER 8,337.00 Pertamina
26 S o l a r (Industri) M21 LITER 9,198.00 Pertamina
B e n s i n (Non Industri) M20a LITER 4,500.00 Pertamina
S o l a r (Non Industri) M21a LITER 4,500.00 Pertamina
27 Minyak Pelumas / Olie M22 LITER 30,000.00 Pertamina
28 Plastik Filter M23 M2 15,000.00 Lokasi Pekerjaan
29 Pipa Galvanis Dia. 1.6" M24 Batang 160,000.00 Lokasi Pekerjaan
30 Pipa Porus M25 M' 40,000.00 Lokasi Pekerjaan
31 Bahan Agr.Base Kelas A M26 M3 183,855.81 Base Camp
32 Bahan Agr.Base Kelas B M27 M3 163,335.25 Base Camp
33 Bahan Agr.Base Kelas C M28 M3 148,771.71 Base Camp
34 Bahan Agr.Base Kelas C2 M29 M3 0.00 Tidak tersedia
35 Geotextile M30 M2 27,500.00 Lokasi Pekerjaan
36 Aspal Emulsi M31 Kg 5,000.00 Base Camp
37 Gebalan Rumput M32 M2 15,000.00 Lokasi Pekerjaan
38 Thinner M33 LITER 12,000.00 Lokasi Pekerjaan
39 Glass Bead M34 Kg 28,600.00 Lokasi Pekerjaan
40 Pelat Rambu (Eng. Grade) M35a BH 176,000.00 Lokasi Pekerjaan
41 Pelat Rambu (High I. Grade) M35b BH 216,500.00 Lokasi Pekerjaan
42 Rel Pengaman M36 M' 412,500.00 Lokasi Pekerjaan
43 Beton K-250 M37 M3 918,233.40 Lokasi Pekerjaan
44 Baja Tulangan (Polos) U24 M39a Kg 10,500.00 Lokasi Pekerjaan
45 Baja Tulangan (Ulir) D32 M39b Kg 11,500.00 Lokasi Pekerjaan
46 Kapur M40 M3 850,000.00 Hasil Proses
47 Chipping M41 M3 162,018.16 Base Camp
48 Chipping (kg) M41kg Kg 115.73 Base Camp
49 Cat M42 Kg 27,500.00 Base Camp
50 Pemantul Cahaya (Reflector) M43 Bh. 12,600.00 Base Camp
51 Pasir Urug M44 M3 78,000.00 Base Camp
52 Arbocell M45 Kg. 32,000.00 Base Camp
53 Baja Bergelombang M46 Kg 12,500.00 Lokasi Pekerjaan
54 Beton K-125 M47 M3 593,685.70 Lokasi Pekerjaan
55 Baja Struktur M48 Kg 11,500.00 Pelabuhan terdekat
56 Tiang Pancang Baja M49 M' 25,247.37 Lokasi Pekerjaan
57 Tiang Pancang Beton Pratekan M50 M3 423,957.93 Pelabuhan terdekat
58 Kawat Las M51 Dos 16,000.00 Lokasi Pekerjaan
59 Pipa Baja M52 Kg 15,000.00 Pelabuhan terdekat
60 Minyak Fluks M53 Liter 6,237.00 Base Camp
61 Bunker Oil M54 Liter 3,000.00 Base Camp
62 Asbuton Halus M55 Ton 325,000.00 Base Camp
63 Baja Prategang M56 Kg 10,000.00 Base Camp
64 Baja Tulangan (Polos) U32 M57a Kg 11,000.00 Lokasi Pekerjaan
DAFTAR
HARGA DASAR SATUAN BAHAN
-
65 Baja Tulangan (Ulir) D39 M39c Kg 11,500.00 Lokasi Pekerjaan
66 Baja Tulangan (Ulir) D48 M39d Kg 12,000.00 Lokasi Pekerjaan
67 PCI Girder L=17m M58a Buah 86,000,000.00 Pelabuhan terdekat
68 PCI Girder L=21m M58b Buah 97,000,000.00 Pelabuhan terdekat
69 PCI Girder L=26m M58c Buah 124,000,000.00 Pelabuhan terdekat
70 PCI Girder L=32m M58d Buah 157,000,000.00 Pelabuhan terdekat
71 PCI Girder L=36m M58e Buah 168,000,000.00 Pelabuhan terdekat
72 PCI Girder L=41m M58f Buah 192,000,000.00 Pelabuhan terdekat
73 Beton K-300 M59 M3 885,469.98 Lokasi Pekerjaan
74 M60 M3 611,252.67 Lokasi Pekerjaan
75 Cerucuk M61 M 15,000.00
76 Elastomer M62 buah 300,000.00
77 Bahan pengawet: kreosot M63 liter 5,000.00
78 Mata Kucing M64 buah 75,000.00
79 Anchorage M65 buah 600,000
80 Anti strpping agent M66 liter 24,000.00
81 Bahan Modifikasi M67 Kg 1,000.00
82 Beton K-500 M68 M3 1,019,398.03
83 Beton K-400 M69 M3 910,868.50
84 Ducting (Kabel prestress) M70 M' 150,000.00
85 Ducting (Strand prestress) M71 M' 50,000.00
86 Beton K-350 M72 M3 896,720.47
87 Multipleks 12 mm M73 Lbr 181,500.00
88 Elastomer jenis 1 M74a buah 385,500.00 Base Camp
89 Elastomer jenis 2 M74b buah 650,000.00 Base Camp
90 Elastomer jenis 3 M74c buah 838,000.00 Base Camp
91 Expansion Tipe Joint Asphaltic Plug M75d M 1,000,000.00 Base Camp
92 Expansion Join Tipe Rubber M75e M 1,200,000.00 Base Camp
93 Expansion Join Baja Siku M75f M 275,000.00 Base Camp
94 Marmer M76 Buah 400,000.00 Base Camp
95 Kerb Type A M77 Buah 45,000.00 Base Camp
96 Paving Block M78 Buah 40,000.00 Lokasi Pekerjaan
97 Mini Timber Pile M79 Buah 27,000.00 Lokasi Pekerjaan
98 Expansion Joint Tipe Torma M80 M1 1,200,000.00 Lokasi Pekerjaan
99 Strip Bearing M81 Buah 229,500.00 Lokasi Pekerjaan
100 Joint Socket Pile 35x35 M82 Set 607,500.00 Lokasi Pekerjaan
101 Joint Socket Pile 16x16x16 M83 Set 67,500.00 Lokasi Pekerjaan
102 Mikro Pile 16x16x16 M84 M1 60,750.00 Lokasi Pekerjaan
103 Matras Concrete M85 Buah 405,000.00 Lokasi Pekerjaan
104 Assetilline M86 Botol 229,500.00 Lokasi Pekerjaan
105 Oxygen M87 Botol 114,750.00 Lokasi Pekerjaan
106 Batu Bara M88 Kg 600.00 Lokasi Pekerjaan
107 Pipa Galvanis Dia 3" M24a M 110,000.00
108 Pipa Galvanis Dia 1,5" M24b M 55,000.00
109 Agregat Pecah Mesin 0-5 mm M91 M3 162,018.16 Base Camp
110 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 162,018.16 Base Camp
111 Agregat Pecah Mesin 20-30 mm M93 M3 162,018.16 Base Camp
112 Joint Sealent M94 Kg 34,100.00
113 Cat Anti Karat M95 Kg 35,750.00
114 Expansion Cap M96 M2 6,050.00
115 Polytene 125 mikron M97 Kg 19,250.00
116 Curing Compound M98 Ltr 38,500.00
117 Kayu Acuan M99 M3 176,000.00
118 Additive M67a Ltr 38,500.00
119 Casing M100 M2 9,000.00
120
121
122
-
HARGA
NO. KODE SATUAN SATUAN KETERANGAN
( Rp.)
1 Pekerja (L01) Jam 5,357.14 37,500.00
2 Tukang (L02) Jam 7,142.86 50,000.00
3 M a n d o r (L03) Jam 8,571.43 60,000.00
4 Operator (L04) Jam 7,428.57 52,000.00
5 Pembantu Operator (L05) Jam 5,714.29 40,000.00
6 Sopir / Driver (L06) Jam 6,428.57 45,000.00
7 Pembantu Sopir / Driver (L07) Jam 5,000.00 35,000.00
8 Mekanik (L08) Jam 7,857.14 55,000.00
9 Pembantu Mekanik (L09) Jam 7,142.86 50,000.00
10 Kepala Tukang (L10) Jam 7,500.00 52,500.00
U R A I A N
DAFTAR
HARGA SATUAN UPAH
-
HARGA
NO. KODE SATUAN SATUAN KETERANGAN
( Rp.)
1 Pasir Pasang (Sedang) M01b M3 105,000.00 Base Camp
2 Pasir Beton (Kasar) M01a M3 110,000.00 Base Camp
3 Pasir Halus (untuk HRS) M01c M3 105,000.00 Base Camp
4 Pasir Urug (ada unsur lempung) M01d M3 78,000.00 Base Camp
5 Batu Kali M02 M3 105,000.00 Lokasi Pekerjaan
6 Agregat Kasar M03 M3 162,018.16 Base Camp
7 Agregat Halus M04 M3 162,018.16 Base Camp
8 F i l l e r M05 Kg 1,125.00 Proses/Base Camp
9 Batu Belah / Kerakal M06 M3 115,000.00 Lokasi Pekerjaan
10 G r a v e l M07 M3 96,000.00 Base Camp
11 Bahan Tanah Timbunan M08 M3 12,500.00 Borrow Pit/quarry
12 Bahan Pilihan M09 M3 28,500.00 Quarry
13 Aspal M10 KG 7,851.60 Base Camp
Aspal Curah M10a KG 6,174.38
14 Kerosen / Minyak Tanah M11 LITER 9,210.00 Base Camp
15 Semen / PC (40kg) M12 Zak 45,000.00 Base Camp
16 Semen / PC (kg) M12 Kg 1,125.00 Base Camp
17 Besi Beton M13 Kg 9,000.00 Lokasi Pekerjaan
18 Kawat Beton M14 Kg 12,000.00 Lokasi Pekerjaan
19 Kawat Bronjong M15 Kg 13,500.00 Lokasi Pekerjaan
20 S i r t u M16 M3 96,000.00 Lokasi Pekerjaan
21 Cat Marka (Non Thermoplas) M17a Kg 22,500.00 Lokasi Pekerjaan
22 Cat Marka (Thermoplastic) M17b Kg 27,500.00 Lokasi Pekerjaan
23 P a k u M18 Kg 12,000.00 Lokasi Pekerjaan
24 Kayu Perancah M19 M3 2,850,000.00 Lokasi Pekerjaan
25 B e n s i n (Industri) M20 LITER 8,337.00 Pertamina
26 S o l a r (Industri) M21 LITER 9,198.00 Pertamina
B e n s i n (Non Industri) M20a LITER 4,500.00
S o l a r (Non Industri) M21a LITER 4,500.00
27 Minyak Pelumas / Olie M22 LITER 30,000.00 Pertamina
28 Plastik Filter M23 M2 15,000.00 Lokasi Pekerjaan
29 Pipa Galvanis Dia. 1.6" M24 Batang 160,000.00 Lokasi Pekerjaan
30 Pipa Porus M25 M' 40,000.00 Lokasi Pekerjaan
31 Bahan Agr.Base Kelas A M26 M3 183,855.81 Base Camp
32 Bahan Agr.Base Kelas B M27 M3 163,335.25 Base Camp
33 Bahan Agr.Base Kelas C M28 M3 148,771.71 Base Camp
34 Bahan Agr.Base Kelas C2 M29 M3 0.00 Tidak tersedia
35 Geotextile M30 M2 27,500.00 Lokasi Pekerjaan
36 Aspal Emulsi M31 Kg 5,000.00 Base Camp
37 Gebalan Rumput M32 M2 15,000.00 Lokasi Pekerjaan
38 Thinner M33 LITER 12,000.00 Lokasi Pekerjaan
39 Glass Bead M34 Kg 28,600.00 Lokasi Pekerjaan
40 Pelat Rambu (Eng. Grade) M35a BH 176,000.00 Lokasi Pekerjaan
41 Pelat Rambu (High I. Grade) M35b BH 216,500.00 Lokasi Pekerjaan
42 Rel Pengaman M36 M' 412,500.00 Lokasi Pekerjaan
43 Beton K-250 M37 M3 918,233.40 Lokasi Pekerjaan
44 Baja Tulangan (Polos) U24 M39a Kg 10,500.00 Lokasi Pekerjaan
45 Baja Tulangan (Ulir) D32 M39b Kg 11,500.00 Lokasi Pekerjaan
46 Kapur M40 M3 850,000.00 Hasil Proses
47 Chipping M41 M3 162,018.16 Base Camp
48 Chipping (kg) M41kg Kg 115.73 Base Camp
49 Cat M42 Kg 27,500.00 Base Camp
50 Pemantul Cahaya (Reflector) M43 Bh. 12,600.00 Base Camp
51 Pasir Urug M44 M3 78,000.00 Base Camp
52 Arbocell M45 Kg. 32,000.00 Base Camp
53 Baja Bergelombang M46 Kg 12,500.00 Lokasi Pekerjaan
54 Beton K-125 M47 M3 593,685.70 Lokasi Pekerjaan
55 Baja Struktur M48 Kg 11,500.00 Pelabuhan terdekat
56 Tiang Pancang Baja M49 M' 25,247.37 Lokasi Pekerjaan
57 Tiang Pancang Beton Pratekan M50 M3 423,957.93 Pelabuhan terdekat
58 Kawat Las M51 Dos 16,000.00 Lokasi Pekerjaan
59 Pipa Baja M52 Kg 15,000.00 Pelabuhan terdekat
60 Minyak Fluks M53 Liter 6,237.00 Base Camp
61 Bunker Oil M54 Liter 3,000.00 Base Camp
62 Asbuton Halus M55 Ton 325,000.00 Base Camp
63 Baja Prategang M56 Kg 10,000.00 Base Camp
64 Baja Tulangan (Polos) U32 M57a Kg 11,000.00 Lokasi Pekerjaan
65 Baja Tulangan (Ulir) D39 M39c Kg 11,500.00 Lokasi Pekerjaan
U R A I A N
DAFTAR
HARGA DASAR SATUAN BAHAN
-
66 Baja Tulangan (Ulir) D48 M39d Kg 12,000.00 Lokasi Pekerjaan
67 PCI Girder L=17m M58a Buah 86,000,000.00 Pelabuhan terdekat
68 PCI Girder L=21m M58b Buah 97,000,000.00 Pelabuhan terdekat
69 PCI Girder L=26m M58c Buah 124,000,000.00 Pelabuhan terdekat
70 PCI Girder L=32m M58d Buah 157,000,000.00 Pelabuhan terdekat
71 PCI Girder L=36m M58e Buah 168,000,000.00 Pelabuhan terdekat
72 PCI Girder L=41m M58f Buah 192,000,000.00 Pelabuhan terdekat
73 Beton K-300 M59 M3 885,469.98 Lokasi Pekerjaan
74 Beton K-175 M60 M3 611,252.67 Lokasi Pekerjaan
75 Cerucuk M61 M 15,000.00
76 Elastomer M62 buah 300,000.00
77 Bahan pengawet: kreosot M63 liter 5,000.00
78 Mata Kucing M64 buah 75,000.00
79 Anchorage M65 buah 600,000.00
80 Anti strpping agent M66 liter 24,000.00
81 Bahan Modifikasi M67 Kg 1,000.00
82 Beton K-500 M68 M3 1,019,398.03
83 Beton K-400 M69 M3 910,868.50
84 Ducting (Kabel prestress) M70 M' 150,000.00
85 Ducting (Strand prestress) M71 M' 50,000.00
86 Beton K-350 M72 M3 896,720.47
87 Multipleks 12 mm M73 Lbr 181,500.00
88 Elastomer jenis 1 M74a buah 385,500.00 Base Camp
89 Elastomer jenis 2 M74b buah 650,000.00 Base Camp
90 Elastomer jenis 3 M74c buah 838,000.00 Base Camp
91 Expansion Tipe Joint Asphaltic Plug M75d M 1,000,000.00 Base Camp
92 Expansion Join Tipe Rubber M75e M 1,200,000.00 Base Camp
93 Expansion Join Baja Siku M75f M 275,000.00 Base Camp
94 Marmer M76 Buah 400,000.00 Base Camp
95 Kerb Type A M77 Buah 45,000.00 Base Camp
96 Paving Block M78 Buah 40,000.00 Lokasi Pekerjaan
97 Mini Timber Pile M79 Buah 27,000.00 Lokasi Pekerjaan
98 Expansion Joint Tipe Torma M80 M1 1,200,000.00 Lokasi Pekerjaan
99 Strip Bearing M81 Buah 229,500.00 Lokasi Pekerjaan
100 Joint Socket Pile 35x35 M82 Set 607,500.00 Lokasi Pekerjaan
101 Joint Socket Pile 16x16x16 M83 Set 67,500.00 Lokasi Pekerjaan
102 Mikro Pile 16x16x16 M84 M1 60,750.00 Lokasi Pekerjaan
103 Matras Concrete M85 Buah 405,000.00 Lokasi Pekerjaan
104 Assetilline M86 Botol 229,500.00 Lokasi Pekerjaan
105 Oxygen M87 Botol 114,750.00 Lokasi Pekerjaan
106 Batu Bara M88 Kg 600.00 Lokasi Pekerjaan
107 Pipa Galvanis Dia 3" M24a M 110,000.00
108 Pipa Galvanis Dia 1,5" M24b M 55,000.00
109 Agregat Pecah Mesin 0-5 mm M91 M3 162,018.16 Base Camp
110 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 162,018.16 Base Camp
111 Agregat Pecah Mesin 20-30 mm M93 M3 162,018.16 Base Camp
112 Joint Sealent M94 Kg 34,100.00
113 Cat Anti Karat M95 Kg 35,750.00
114 Expansion Cap M96 M2 6,050.00
115 Polytene 125 mikron M97 Kg 19,250.00
116 Curing Compound M98 Ltr 38,500.00
117 Kayu Acuan M99 M3 176,000.00
118 Additive M67a Ltr 38,500.00
119 Casing M100 M2 9,000.00
120
-
HARGA SEWA
ALAT ALAT/JAM KETERANGAN
(di luar PPN)
1 ASPHALT MIXING PLANT E01 294.0 60 T/Jam 2,000,000,000 5,919,391.87
2 ASPHALT FINISHER E02 72.4 10 Ton 1,200,000,000 491,723.38
3 ASPHALT SPRAYER E03 4.0 850 Liter 87,000,000 48,334.62
4 BULLDOZER 100-150 HP E04 155.0 - - 1,034,000,000 545,742.12
5 COMPRESSOR 4000-6500 L\M E05 60.0 5,000 5,000 110,000,000 153,723.93
6 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500 Liter 175,500,000 169,604.80
7 CRANE 10-15 TON E07 138.0 15 Ton 1,488,000,000 635,687.38
8 DUMP TRUCK 3.5 TON E08 100.0 4 Ton 120,000,000 234,758.83
9 DUMP TRUCK 10 TON E09 125.0 10 Ton 300,000,000 326,087.79
10 EXCAVATOR 80-140 HP E10 133.0 1 M3 1,098,250,000 517,827.26
11 FLAT BED TRUCK 3-4 M3 E11 190.0 10 ton 300,000,000 454,926.88
12 GENERATOR SET E12 180.0 135 KVA 150,000,000 414,357.47
13 MOTOR GRADER >100 HP E13 135.0 10,800 10,800 982,000,000 480,308.46
14 TRACK LOADER 75-100 HP E14 70.0 1 M3 542,000,000 262,286.80
15 WHEEL LOADER 1.0-1.6 M3 E15 96.0 2 M3 564,000,000 317,067.17
16 THREE WHEEL ROLLER 6-8 T E16 55.0 8 Ton 350,000,000 192,925.32
17 TANDEM ROLLER 6-8 T. E17 82.0 8 Ton 350,000,000 245,001.84
18 TIRE ROLLER 8-10 T. E18 100.5 9 Ton 717,600,000 358,090.65
19 VIBRATORY ROLLER 5-8 T. E19 82.0 7 Ton 918,787,500 430,811.40
20 CONCRETE VIBRATOR E20 5.5 25 25 4,000,000 27,774.90
21 STONE CRUSHER E21 220.0 50 T/Jam 1,000,000,000 861,046.67
22 WATER PUMP 70-100 mm E22 6.0 - - 5,000,000 26,156.43
23 WATER TANKER 3000-4500 L. E23 100.0 4,000 Liter 105,000,000 229,744.54
24 PEDESTRIAN ROLLER E24 8.8 835 Ton 150,000,000 84,153.76
25 TAMPER E25 4.7 121 Ton 17,000,000 32,755.65
26 JACK HAMMER E26 0.0 1,330 1,330 35,000,000 21,051.42
27 FULVI MIXER E27 345.0 2,005 2,005 900,000,000 1,106,229.33
28 CONCRETE PUMP E28 100.0 8 M3 112,500,000 229,708.36
29 TRAILER 20 TON E29 175.0 20 Ton 600,000,000 477,019.85
30 PILE DRIVER + HAMMER E30 25.0 3 Ton 875,000,000 259,075.87
31 CRANE ON TRACK 35 TON E31 125.0 35 Ton 850,000,000 433,225.18
32 WELDING SET E32 40.0 250 Amp 17,500,000 94,247.54
33 BORE PILE MACHINE E33 150.0 2,000 Meter 2,250,000,000 776,246.83
34 ASPHALT LIQUID MIXER E34 5.0 1,000 Liter 15,000,000 26,524.84
35 TRONTON E35 150.0 15 Ton 450,000,000 489,817.69
36 COLD MILLING E36 248.0 1,000 m 4,945,000,000 1,595,703.62
37 ROCK DRILL BREAKER E37 3.0 - - 900,000,000 276,643.04
38 COLD RECYCLER E38 900.0 2 M 5,244,000,000 2,856,229.72
39 HOT RECYCLER E39 400.0 3 M 29,250,000,000 7,365,748.27
40 AGGREGAT (CHIP) SPREADER E40 115.0 4 M 395,000,000 441,739.30
41 ASPHALT DISTRIBUTOR E41 115.0 4,000 Liter 395,000,000 324,240.68
42 SLIP FORM PAVER E42 105.0 3 M 1,337,142,857 498,256.54
43 CONCRETE PAN MIXER E43 134.0 600 Liter 1,000,000,000 543,731.80
44 CONCRETE BREAKER E44 290.0 20 m3/jam 900,000,000 758,547.41
45 ASPAHLT TANKER E45 190.0 4,000 liter 500,000,000 502,864.52
46 CEMENT TANKER E46 190.0 4,000 liter 500,000,000 466,072.52
47 CONDRETE MIXER (350) E47 20.0 350 liter 35,000,000 62,565.61
48 VIBRATING RAMMER E48 4.2 80 KG 20,000,000 31,296.07
49 TRUK MIXER (AGITATOR) E49 220.0 5 M3 500,000,000 528,656.29
50 BORE PILE MACHINE E50 125.0 60 CM 1,170,000,000 562,412.62
51 CRANE ON TRACK 75-100 TON E51 200.0 75 Ton 900,000,000 582,445.84
52 BLENDING EQUIPMENT E52 50.0 30 Ton 500,000,000 183,284.81
53 ASPHALT LIQUID MIXER E34a 40.0 20,000 Liter 150,000,000 123,712.64
KODE HP KAP.No. URAIAN
DAFTAR
HARGA SEWA ALAT PER JAM KERJA
-
DAFTAR HARGA SATUAN PEKERJAAN
DINAS BINA MARGA KABUPATEN MALANG
TAHUN ANGGARAN 2011
NO. CODE URAIAN PEKERJAAN SATUAN HARGA
ANALISA SATUAN
(Rupiah)
a b c d e
DIVISI 1. UMUM
1.2 (3) Pengukuran LS
1.2 (4) Mobilisasi LS
DEVISI 2. PEKERJAAN DRAINASE
1 2.1 Galian untuk Selokan Drainase dan Saluran Air (+buangan) M3
53,329.64
2 2.2 Pasangan Batu dengan Mortar (+siaran) M3
511,726.48
3 2.3 (1) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm M1
422,151.24
4 2.3 (2) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm sampai 70 cm M1
580,116.60
5 2.3 (3) Gorong Pipa Beton Bertulang, Diameter Dalam 70 cm sampai 100 cm M1
910,486.92
6 2.3 (4) Gorong2 Pipa Beton Bertulang, Diameter Dalam 100 cm sampai 130 cm M
11,459,951.08
7 2.3 (7) Gorong2 Pipa Beton Tanpa Tulangan diameter dalam 20 cm sampai 30 cm M
1118,358.47
DIVISI 3. PEKERJAAN TANAH
1 3.1 (1) Galian Biasa (+buangan) M3
53,265.51
2 3.1 (2) Galian Batu/ Padas (+buangan) M3
106,149.39
3 3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter M3
43,140.34
4 3.1 (4) Galian Struktur dengan kedalaman 2 - 4 meter M3
81,916.55
5 3.1 (5) Galian Struktur dengan kedalaman 4 - 6 meter M3
95,674.86
6 3.1 (9) Biaya Tambahan untuk Pengangkutan Hasil Galian dengan Jarak melebihi 5 km M3/Km 7,680.37
7 3.2 (1) Timbunan Biasa dari selain Galian Sumber Bahan M3
96,245.54
8 3.2 (2) Timbunan Pilihan M3
175,314.54
9 3.2 (3) Timbunan Pilihan diatas Tanah Rawa (diukur diatas bak truk) M3
144,369.48
10 3.2.(4) Timbunan Batu dengan Manual M3
235,358.10
11 3.3 Penyiapan Badan Jalan M2
3,140.95
12 A.028 Urugan Pasir M3
115,885.00
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
1 4.2 (1) Lapis Pondasi Agregat Kelas A M3
290,113.17
2 4.2 (2) Lapis Pondasi Agregat Kelas B M3
264,062.08
3 4.2 (3) Semen untuk Lapis Pondasi Semen Tanah Ton 1,454,726.89
4 4.2 (4) Lapis Pondasi Semen Tanah M3
201,403.90
5 4.2 (5) Agregat Penutup BURTU M2
7,425.38
6 4.2 (6) Bahan Aspal untuk Pekerjaan Pelaburan Liter 9,971.34
7 4.2 (7) Lapis Resap Pengikat Liter 10,504.45
DIVISI 5. PERKERASAN BERBUTIR
1 5.1 (1) Lapis Pondasi Agregat Kelas A M3
284,618.61
2 5.1 (2) Lapis Pondasi Agregat Kelas B M3
254,439.47
3 5.2 (1) Lapis Pondasi Agregat Kelas C M3
238,116.49
4 5.4 (1) Semen untuk Lapis Pondasi Semen Tanah Ton 1,501,395.81
5 5.4 (2) Lapis Pondasi Tanah Semen M3
173,437.94
6 5.5 (1) Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) M3
474,768.10
7 5.5 (2) Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) M3
533,040.23
8 5.6 (1) Lapis Pondasi beton Bo (LPB Bo) M3
645,697.81
9 5.7 (1) Lapis Pondasi Batu Belah (Telford) ( + Batu Tepi) M2
61,857.19
DIVISI 6. PERKERASAN ASPAL
1 6.1 (1) Lapis Resap Pengikat Liter 9,741.92
2 6.1 (2) Lapis Perekat Liter 9,538.37
3 6.2 (1) Agregat Penutup BURTU M2
8,244.53
4 6.2 (2) Agregat Penutup BURDA M2
13,793.86
5 6.2 (3) Bahan Aspal untuk Pekerjaan Pelaburan Liter 9,334.82
6 6.3 (1) Latasir Kelas A (SS-A) M2
37,292.45
7 6.3 (2) Latasir Kelas B (SS-B) M2
46,515.51
8 6.3 (3) Lataston Lapis Aus (HRS-WC) M2
69,073.95
9 6.3(3a) Lataston Lapis Aus (HRS-WC) Leveling Ton 1,030,497.03
10 6.3(4) Lataston Lapis Pondasi (HRS-Base) M3
2,062,899.82
11 6.3(4a) Lataston Lapis Pondasi (HRS-Base) Leveling Ton 915,400.00
12 6.3(5a) Laston Lapis Aus (AC-WC) M2
92,643.23
13 6.3(5c) Laston Lapis Aus (AC-WC) Leveling Ton 972,501.43
14 6.3(6a) Laston Lapis Antara (AC-BC) M3
2,210,388.49
15 6.3(6c) Laston Lapis Antara (AC-BC) Leveling Ton 954,029.81
16 6.3(7a) Laston Lapis Pondasi (AC-Base) M3
2,204,686.76
17 6.3(7c) Laston Lapis Pondasi (AC-Base) Leveling Ton 919,043.42
18 6.6.1 Lapis Permukaan Penetrasi Macadam M3
1,401,844.26
19 6.6.2 Lapis Fondasi atau Perata Penetrasi Macadam M3
1,337,984.23
-
NO. CODE URAIAN PEKERJAAN SATUAN HARGA
ANALISA SATUAN
(Rupiah)
a b c d e
DIVISI 7. STRUKTUR
1 7.1 (1) Beton K500 M3
1,121,337.83
2 7.1 (2) Beton K400 M3
1,001,955.35
3 7.1 (3) Beton K350 M3
986,392.52
4 7.1 (4) Beton K300 M3
974,016.98
5 7.1 (5) Beton K250 M3
918,233.40
6 7.1 (6) Beton K175 M3
672,377.93
7 7.1 (7) Beton Siklop K175 M3
570,269.70
8 7.1 (8) Beton K125 M3
653,054.27
9 7.3 (1) Baja Tulangan U24 Polos Kg 13,961.75
10 7.3 (2) Baja Tulangan U32 Polos Kg 14,797.75
11 7.3 (3) Baja Tulangan U32 Ulir Kg 15,402.75
12 7.3 (4) Baja Tulangan U39 Ulir Kg 14,770.25
13 7.3 (5) Baja Tulangan U48 Ulir Kg 16,007.75
14 7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 16,901.50
15 7.9 Pasangan Batu (+siaran) M3
516,880.65
16 7.10 (1) Pasangan Batu Kosong yang diisi Adukan M3
494,812.97
17 7.10 (2) Pasangan Batu Kosong M3
192,087.50
18 7.10 (3) Bronjong M3
409,612.50
19 7.18 Acuan Beton M2
151,717.48
20 7.19 Perancah M3
3,913,249.73
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
1 8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3
271,692.69
2 8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3
256,379.09
3 8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur) 230,602.99
4 8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3
1,275,189.67
5 8.2(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3
51,642.53
6 8.2(2) Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm) M2
37,455.27
7 8.2(3) Pemotongan Pohon diameter 30 - 50 cm Buah 149,439.92
8 8.2(4) Pemotongan Pohon diameter 50 - 75 cm Buah 214,783.19
9 8.2(5) Pemotongan Pohon diameter > 75 cm Buah 418,561.86
10 8.3.(2) Semak / Perdu M2
21,285.00
11 8.4.(1) Marka Jalan Termoplastik M2
125,065.04
12 8.4.(5) Patok Pengarah Buah 133,835.15
13 8.4.(6) .(a) Patok Kilometer Buah 392,784.57
14 8.4.(6) .(b) Patok Hektometer Buah 194,014.59
15 8.4.(10) (a) Kerb Pracetak (Besar) M1
84,352.60
16 8.4.(10) (b) Kerb Pracetak (Kecil) M1
63,465.28
17 8.4.(12) (b) Perkerasan Blok Beton pada Trotoar dan Median M2
73,430.31
18 8.9 Plesteran 1 PC : 3 Psr M2
30,305.55
19 8.10 Pekerjaan Pengecatan M2
19,734.00
20 8.11 Pekerjaan Pengecatan Ulang M2
15,059.00
21 8.12 Pekerjaan Koral Sikat (Ampyangan) M2
172,550.13
DIVISI 9. PEKERJAAN HARIAN
1 9.1 Mandor Jam 9,428.57
2 9.2 Pekerja Biasa Jam 5,892.86
3 9.3 Tukang Kayu, Tukang Batu, dsb Jam 7,857.14
4 9.4 Dump Truck, kapasitas 3-4 m Jam 234,758.83
5 9.5 Truk Bak Datar 3 - 4 ton Jam 454,926.88
6 9.6 Truk Tangki 3000 - 4500 Liter Jam 229,744.54
7 9.7 Bulldozer 100 - 150 PK Jam 532,599.27
8 9.8 Motor Grader min 100 PK Jam 480,308.46
9 9.9 Loader Roda Karet 1.0 - 1.6 M3 Jam 317,067.17
10 9.10 Loader Roda Berantai 75 - 100 PK Jam 262,286.80
11 9.11 Alat Penggali (Excavator) 80 - 140 PK Jam 517,827.26
12 9.12 Crane 10 - 15 Ton Jam 635,687.38
13 9.13 Penggilas Roda Besi 6 - 9 Ton Jam 245,001.84
14 9.14 Penggilas Bervibrasi 5 - 8 Ton Jam 430,811.40
15 9.15 Pemadat Bervibrasi 1.5 - 3.0 PK Jam 32,755.65
16 9.16 Penggilas Roda Karet 8 - 10 Ton Jam 358,090.65
17 9.17 Kompresor 4000 - 6500 Ltr/mnt Jam 153,723.93
18 9.18 Beton Pengaduk (Molen) 0.3 - 0.6 M3 Jam 169,604.80
19 9.19 Pompa Air 70 - 100 mm Jam 26,156.43
20 9.20 Jack Hammer Jam 21,051.42
Malang Pebruari 2011
Kepala Dinas Bina Marga
Kabupaten Malang
Ir. MOCHAMAD ANWAR
NIP. 19580921 198508 1 002
-
Kegiatan : Perencanaan Dinas Bina Marga Kabupaten Malang
Paket : Perencanaan Pembangunan, Rehabilitasi/Pemeliharaan
Jalan dan Jembatan serta Bangunan Pelengkap
Prop / Kab. : Jawa Timur / Kabupaten Malang
Uraian Jumlah Harga
I DIVISI 1. UMUM -Rp
II DIVISI 2. DRAINASE 20,436,571.66Rp
III DIVISI 3. PEKERJAAN TANAH 2,289,603.56Rp
IV DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN 2,238,207.21Rp
V DIVISI 5. PERKERASAN BERBUTIR 3,459,816.65Rp
VI DIVISI 6. PERKERASAN ASPAL 32,969,415.98Rp
VII DIVISI 7. STRUKTUR 340,301,162.47Rp
VIII DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 42,142,871.24Rp
IX DIVISI 9. PEKERJAAN HARIAN 5,125,581.28Rp
X DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN 11,023,487.61Rp
TOTAL JUMLAH HARGA 459,986,717.65Rp
PPN 10% 45,998,671.77Rp
TOTAL PERKIRAAN HARGA PEKERJAAN 505,985,389.42Rp
DIBULATKAN 505,980,000.00Rp
TERBILANG :
RENCANA ANGGARAN BIAYA
No
#NAME?
Diperiksa PPK Kegiatan Perencanaan
Pembangunan Jalan
Ir. AVICENNA NIP.196802181997031003
Disetujui PPTK Kegiatan Perencanaan
Pembangunan Jalan
Ir. AGUS SUGIANTO NIP.196108311992021003
Malang,.......,........,.....2011 Dibuat Oleh,
.................................... Team Leader
Mengetahui/ Menyetujui, Pengguna Anggaran
Kepala Dinas Bina Marga Kabupaten Malang
Ir. MOCH. ANWAR NIP.195809211985081002
-
Kegiatan : Perencanaan Dinas Bina Marga Kabupaten Malang
Nama Paket : Perencanaan Pembangunan, Rehabilitasi/Pemeliharaan
Jalan dan Jembatan serta Bangunan Pelengkap
Prop / Kab / Kodya : Jawa Timur / Kabupaten Malang
Quantity
No. Mata Uraian Satuan Perkiraan
Pembayaran Kuantitas
a b c d
DIVISI 1. UMUM
1.2 (3) Pengukuran LS
1.2 (4) Mobilisasi LS
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air (+buangan) M3
1.0
2.2 Pasangan Batu dengan Mortar (+siaran dan Plesteran) M3
1.0
2.3 (1) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm M1
1.0
2.3 (2) Gorong Pipa Beton Bertulang, Diameter Dalam 50 cm sampai 70 cm M1
1.0
2.3 (3) Gorong Pipa Beton Bertulang, Diameter Dalam 70 cm sampai 100 cm M1
1.0
2.3 (4) Gorong2 Pipa Beton Bertulang, Diameter Dalam 100 cm sampai 130 cm M
11.0
2.3 (5) Gorong2 Beton Tanpa Tulang Diameter Dalam 140 cm sampai 150 cm M
11.0
2.3 (6) Gorong2 Pipa Baja Bergelombang Ton 1.0
2.3 (7) Gorong2 Pipa Beton Tanpa Tulangan diameter dalam 20 cm sampai 30 cm M
11.0
2.4 (1) Timbunan Porous atau Bahan Penyaring (Filter) M3
1.0
2.4 (2) Anyaman Filter Plastik M2
1.0
2.4 (3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1 1.0
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 3. PEKERJAAN TANAH
3.1 (1) Galian Biasa (+buangan) M3
1.0
3.1 (2) Galian Batu/ Padas (+buangan) M3
1.0
3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter M3
1.0
3.1 (4) Galian Struktur dengan kedalaman 2 - 4 meter M3
1.0
3.1 (5) Galian Struktur dengan kedalaman 4 - 6 meter M3
1.0
3.1 (6) Coferdam, Penyokong, Pengaku dan Pekerjaan yang berkaitan LS 1.0
3.1 (7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3
1.0
3.1 (8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3
1.0
3.1 (9) Biaya Tambahan untuk Pengangkutan Hasil Galian dengan Jarak melebihi 5 km M3/Km 1.0
3.2 (1) Timbunan Biasa dari selain Galian Sumber Bahan M3
1.0
3.2 (2) Timbunan Pilihan M3
1.0
3.2 (3) Timbunan Pilihan diatas Tanah Rawa (diukur diatas bak truk) M3
1.0
3.2.(4) Timbunan Batu dengan Manual M3
1.0
3.2.(5) Timbunan Batu dengan Derek M3
1.0
3.2.(6) Timbunan Batu dengan Derek Ton 1.0
3.3 Penyiapan Badan Jalan M2
1.0
3.4 Pengupasan Permukaan Aspal Lama dan Pencampuran Kembali (tebal 15 cm) M3
1.0
3.5 Urugan Pasir M3
1.0
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2 (1) Lapis Pondasi Agregat Kelas A M3
1.0
4.2 (2) Lapis Pondasi Agregat Kelas B M3
1.0
4.2 (3) Semen untuk Lapis Pondasi Semen Tanah Ton 1.0
4.2 (4) Lapis Pondasi Semen Tanah M3
1.0
4.2 (5) Agregat Penutup BURTU M2
1.0
4.2 (6) Bahan Aspal untuk Pekerjaan Pelaburan Liter 1.0
4.2 (7) Lapis Resap Pengikat Liter 1.0
K-516 Konstruksi LPB Telford M2
DAFTAR KUANTITAS DAN HARGA
NOPEMBER 2009
-
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 5. PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A M3
1.0
5.1 (2) Lapis Pondasi Agregat Kelas B M3
1.0
5.2 (1) Lapis Pondasi Agregat Kelas C M3
1.0
5.4 (1) Semen untuk Lapis Pondasi Semen Tanah Ton 1.0
5.4 (2) Lapis Pondasi Tanah Semen M3
1.0
5.5 (1) Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) M3
1.0
5.6 (1) Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) M3
1.0
5.7 (1) Lapis Pondasi beton Bo (LPB Bo) M3
1.0
5.8 (1) Lapis Pondasi Batu Belah (Telford) ( dengan Batu Tepi) M2 1.0
W.3 Pasang Sytlag M2 1.0
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat Liter 1.0
6.1 (2) Lapis Perekat Liter 1.0
6.2 (1) Agregat Penutup BURTU M2
1.0
6.2 (2) Agregat Penutup BURDA M2
1.0
6.2 (3) Bahan Aspal untuk Pekerjaan Pelaburan Liter 1.0
6.3 (1) Latasir Kelas A (SS-A) M2
1.0
6.3 (2) Latasir Kelas B (SS-B) M2
1.0
6.3 (3) Lataston Lapis Aus (HRS-WC) M2
1.0
6.3(3a) Lataston Lapis Aus (HRS-WC) Leveling Ton 1.0
6.3(4) Lataston Lapis Pondasi (HRS-Base) M3
1.0
6.3(4a) Lataston Lapis Pondasi (HRS-Base) Leveling Ton 1.0
6.3(5a) Laston Lapis Aus (AC-WC) M2
1.0
6.3(5b) Laston Lapis Aus (AC-WC) Modifikasi M2
1.0
6.3(5c) Laston Lapis Aus (AC-WC) Leveling Ton 1.0
6.3(5d) Laston Lapis Aus (AC-WC) Modifikasi Leveling Ton 1.0
6.3(6a) Laston Lapis Antara (AC-BC) M3
1.0
6.3(6b) Laston Lapis Antara (AC-BC) Modifikasi M3
1.0
6.3(6c) Laston Lapis Antara (AC-BC) Leveling Ton 1.0
6.3(6d) Laston Lapis Antara (AC-BC) Modifikasi Leveling Ton 1.0
6.3(7a) Laston Lapis Pondasi (AC-Base) M3
1.0
6.3(7b) Laston Lapis Pondasi (AC-Base) Modifikasi M3
1.0
6.3(7c) Laston Lapis Pondasi (AC-Base) Leveling Ton 1.0
6.3(7d) Laston Lapis Pondasi (AC-Base) Modifikasi Leveling Ton 1.0
6.4 (1) Lasbutag M2
1.0
6.4 (2) Latasbusir Kelas A M2
1.0
6.4 (3) Latasbusir Kelas B M2
1.0
6.4 (4) Bitumen Asbuton Ton 1.0
6.4 (5) Bitumen Bahan Peremaja Ton 1.0
6.4 (6) Bahan Anti Pengelupasan (anti stripping agent) Liter 1.0
6.5 Campuran Aspal Dingin untuk Pelapisan M3
1.0
6.6.1 Lapis Permukaan Penetrasi Macadam M3
1.0
6.6.2 Lapis Fondasi atau Perata Penetrasi Macadam M3
1.0
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1) Beton K500 M3
1.0
7.1 (2) Beton K400 M3
1.0
7.1 (3) Beton K350 M3
1.0
7.1 (4) Beton K300 M3
1.0
7.1 (5) Beton K250 M3
1.0
7.1 (6) Beton K175 M3
1.0
7.1 (7) Beton Siklop K175 M3
1.0
7.1 (8) Beton K125 M3
1.0
7.2 (1) Unit Pracetak Gelagar Tipe I bentang 16 m Buah 1.0
7.2 (2) Unit Pracetak Gelagar Tipe I bentang 20 m Buah 1.0
7.2 (3) Unit Pracetak Gelagar Tipe I bentang 22 m Buah 1.0
7.2 (4) Unit Pracetak Gelagar Tipe I bentang 25 m Buah 1.0
7.2 (5) Unit Pracetak Gelagar Tipe I bentang 28 m Buah 1.0
7.2 (6) Unit Pracetak Gelagar Tipe I bentang 30 m Buah 1.0
7.2 (7) Unit Pracetak Gelagar Tipe I bentang 31 m Buah 1.0
7.2 (8) Unit Pracetak Gelagar Tipe I bentang 35 m Buah 1.0
-
7.2 (9) Baja Prategang Kg 1.0
7.2 (10) Pelat Berongga (Hollow Slab) pracetak bentang 21 m Buah 1.0
7.2 (11) Beton Diafragma K350 termasuk pekerjaan penegangan setelah pengecoran (post tension) M3
1.0
7.3 (1) Baja Tulangan U24 Polos Kg 1.0
7.3 (2) Baja Tulangan U32 Polos Kg 1.0
7.3 (3) Baja Tulangan U32 Ulir Kg 1.0
7.3 (4) Baja Tulangan U39 Ulir Kg 1.0
7.3 (5) Baja Tulangan U48 Ulir Kg 1.0
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 1.0
7.4 (1) Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan Kg 1.0
7.4 (2) Baja Struktur Titik leleh 2800 kg/cm2 penyediaan dan pemasangan Kg 1.0
7.4 (3) Baja Struktur Titik leleh 3500 kg/cm2 penyediaan dan pemasangan Kg 1.0
7.5 (1) Pemasangan Jembatan Rangka Baja Kg 1.0
7.5 (2) Pengangkutan Bahan Jembatan Kg 1.0
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1
1.0
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2
1.0
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2
1.0
7.6 (4) Dinding Turap Baja M2
1.0
7.6 (5) Dinding Turap Beton M2
1.0
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan M3
1.0
7.6 (7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan M3
1.0
7.6 (8) Penyediaan Tiang Pancang Baja Kg 1.0
7.6 (9) Penyediaan Tiang Pancang Beton Bertulang Pracetak M3
1.0
7.6 (10) Penyediaan Tiang Pancang Beton Pratekan Pracetak M3
1.0
7.6 (11) Pemancangan Tiang Pancang Kayu M1
1.0
7.6 (12) Pemancangan Tiang Pancang Pipa Baja : Diameter 400 mm M1
1.0
7.6 (13) Pemancangan Tiang Pancang Pipa Baja : Diameter 500 mm M1
1.0
7.6 (14) Pemancangan Tiang Pancang Pipa Baja : Diameter 600 mm M1
1.0
7.6 (15) Pemancangan Tiang Pancang Beton Pracetak :30 cm x 30 cm atau diameter 300 mm M1
1.0
7.6 (16) Pemancangan Tiang Pancang Beton Pracetak :40 cm x 40 cm atau diameter 400 mm M1
1.0
7.6 (17) Pemancangan Tiang Pancang Beton Pracetak :50 cm x 50 cm atau diameter 500 mm M1
1.0
7.6 (18) Tiang Bor Beton, dia. 600 mm M1
1.0
7.6 (19) Tiang Bor Beton, dia. 800 mm M1
1.0
7.6 (20) Tiang Bor Beton, dia. 1000 mm M1
1.0
7.6 (21) Tiang Bor Beton, dia. 1200 mm M1
1.0
7.6 (22) Tiang Bor Beton, dia. 1500 mm M1
1.0
7.6 (23) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(11) s/d M1
1.0
7.6.(17) bila Tiang Pancang Beton dikerjakan ditempat yang Berair 1.0
7.6 (24) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(18) s/d M1
1.0
7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair 1.0
7.6 (25) Pengujian Pembebanan pada Tiang dengan diameter sampai 600 mm Buah 1.0
7.6 (26) Pengujian Pembebanan pada Tiang dengan diameter diatas 600 mm Buah 1.0
7.7 (1) Penyediaan Dinding Sumuran Silinder, Diameter 250 cm M1
1.0
7.7 (2) Penyediaan Dinding Sumuran Silinder, Diameter 300 cm M1
1.0
7.7 (3) Penyediaan Dinding Sumuran Silinder, Diameter 350 cm M1
1.0
7.7 (4) Penyediaan Dinding Sumuran Silinder, Diameter 400 cm M1
1.0
7.7 (5) Penurunan Dinding Sumuran Silinder, Diameter 250 cm M1
1.0
7.7 (6) Penurunan Dinding Sumuran Silinder, Diameter 300 cm M1
1.0
7.7 (7) Penurunan Dinding Sumuran Silinder, Diameter 350 cm M1
1.0
7.7 (8) Penurunan Dinding Sumuran Silinder, Diameter 400 cm M1
1.0
7.9 Pasangan Batu (+siaran dan plesteran) M3
1.0
7.10 (1) Pasangan Batu Kosong yang diisi Adukan M3
1.0
7.10 (2) Pasangan Batu Kosong M3
1.0
7.10 (3) Bronjong M3
1.0
7.11 (1) Expansion Joint Tipe Asphaltic Plug M1
1.0
7.11 (2) Expansion Joint Tipe Rubber 1 (celah 21-41 mm) M1
1.0
7.11 (3) Expansion Joint Tipe Rubber 2 (celah 32-62 mm) M1
1.0
7.11 (4) Expansion Joint Tipe Rubber 3 (celah 42-82 mm) M1
1.0
7.11 (5) Joint Filler untuk Sambungan Konstruksi M1
1.0
7.11 (6) Expansion Joint Tipe Baja Bersudut M1
1.0
7.12 (1) Perletakan Logam Buah 1.0
7.12 (2) Perletakan Elastomerik Jenis 1 (300 x 350 x 36) Buah 1.0
7.12 (3) Perletakan Elastomerik Jenis 2 (350 x 400 x 39) Buah 1.0
7.12 (4) Perletakan Elastomerik Jenis 3 (400 x 450 x 45) Buah 1.0
7.12 (5) Perletakan Strip M1
1.0
7.13 Sandaran (Railing) M1
1.0
7.14 Papan Nama Jembatan Buah 1.0
7.15.(1) Penmbongkaran Pasangan Batu M3
1.0
7.15.(2) Pembongkaran Beton M3
1.0
7.15.(3) Pembongkaran Beton Pratekan M3
1.0
7.15.(4) Pembongkaran Bangunan Gedung M2
1.0
7.15.(5) Pembongkaran Rangka Baja M2
1.0
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M1
1.0
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
1.0
-
7.15.(8) Pembongkaran Jembatan Kayu M2
1.0
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 / Km 1.0
7.16 (1) Perkerasan Jalan Beton M3
1.0
7.17 (1) Wet Lean Concrete M2
1.0
7.17 (2) Sand Bedding (t = 4 cm) M2
1.0
7.18 Acuan Beton M2
1.0
7.19 Perancah M3
1.0
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3
1.0
8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3
1.0
8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3
(vol. gembur) 1.0
8.1 (4) Waterbound Macadam untuk Pekerjaan Minor M3
1.0
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3
1.0
8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor M3
1.0
8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3
1.0
8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor M3
1.0
8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter 1.0
8.2(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3
1.0
8.2(2) Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm) M2
1.0
8.2(3) Pemotongan Pohon diameter 30 - 50 cm Buah 1.0
8.2(4) Pemotongan Pohon diameter 50 - 75 cm Buah 1.0
8.2(5) Pemotongan Pohon diameter > 75 cm Buah 1.0
8.3.(1) Stabilisasi dengan Tanaman M2
1.0
8.3.(2) Semak / Perdu M2
1.0
8.3.(3) Pohon Buah 1.0
8.4.(1) Marka Jalan Termoplastik M2
1.0
8.4.(2) Marka Jalan Bukan Termoplastik M2
1.0
8.4.(3) .(a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 1.0
8.4.(3) .(b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah 1.0
8.4.(4) .(a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 1.0
8.4.(4) .(b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 1.0
8.4.(5) Patok Pengarah Buah 1.0
8.4.(6) .(a) Patok Kilometer Buah 1.0
8.4.(6) .(b) Patok Hektometer Buah 1.0
8.4.(7) Rel Pengaman M1
1.0
8.4.(8) Paku Jalan Buah 1.0
8.4.(9) Mata Kucing Buah 1.0
8.4.(10) (a) Kerb Pracetak (Besar) M1
1.0
8.4.(10) (b) Kerb Pracetak (Kecil) M1
1.0
8.4.(11) Kerb yang digunakan kembali M1
1.0
8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M2
1.0
8.5(1) Pengembalian Kondisi Lantai Jembatan Beton M2
1.0
8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu M2
1.0
8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2
1.0
8.6(1) Kerb Pracetak Pemisah Jalan (Concrete Barrier) M1
1.0
8.7(1) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt Buah 1.0
8.7(2) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt Buah 1.0
8.7(3) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah 1.0
8.7(4) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah 1.0
8.7(5) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah 1.0
8.7(6) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah 1.0
8.8(1) Pagar Pemisah Pedestrian Carbon Steel M1
1.0
8.8(2) Pagar Pemisah Pedestrian Galvanized M1
1.0
8.9 Plesteran 1 PC : 3 Psr M2
1.0
8.10 Pekerjaan Pengecatan M2
1.0
8.11 Pekerjaan Pengecatan Ulang M2
1.0
8.12 Pekerjaan Koral Sikat (Ampyangan) M2
1.0
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaa