  • 5/23/2018 Vella Koil

    1/103

    CITY DEVELOPMENT PLAN

    VELLAKOIL MUNICIPALITY

    Final Re ort

    August 2009

    Submitted to Submitted bye o mm ss onera e o un c pa

    Adminis tration

    6th Floor, Ezhilagam Annex Building

    Chepauk, Chennai 600 005

    n a v . .

    No. 11/6, 18th East Street,

    Thiruvanmiyur

    Chennai 600 041

  • 5/23/2018 Vella Koil

    2/103

    CITY DEVELOPMENT PLAN

    VELLAKOIL MUNICIPALITY

    Final Report

    December 2009

    Submittedto Submittedby

    TheCommissonerateofMunicipalAdministration SMEC(India)Pvt.Ltd

    6thFloor,EzhilagamAnexBuilding No.11/6,18thEastStreet,

    Chepauk,Chennai600005 Thiruvanmiyur,

    Chennai600041

  • 5/23/2018 Vella Koil

    3/103

  • 5/23/2018 Vella Koil

    4/103

  • 5/23/2018 Vella Koil

    5/103

  • 5/23/2018 Vella Koil

    6/103

    Final Report City Development Plan for Vellakoil Municipality

    CITY DEVELOPMENT PLAN - VELLAKOIL MUNICIPALITY

    EXECUTIVE SUMMARY

    1. CITY DEVELOPMENT PLAN CONTEXT and CONTENT

    The Commissioner of Municipal Administration (CMA), Government of Tamil Nadu, under the Third Tamil

    Nadu Urban Development Programme (TNUDP III) has taken effective steps to assist the Urban LocalBodies (ULBs) in the State, particularly the Grade III municipalities to strengthen and improve the financial

    position for effective capital investment management and service delivery to the public. These ULBs spread

    over the State, are service centres to the surrounding rural areas, offering marketing, physical and social

    infrastructure facilities. These centres have potential for future growth, and therefore, it is essential to

    formulate a City Development Plan (CDP) for these urban centres and immediate implementation of reforms

    in these ULBs for better management. In this regard, the CMA has appointed SMEC India Pvt. Ltd as

    Consultants for preparing a comprehensive City Development Plan (CDP) for four of the Grade III Municipal

    Towns in the Thanjavur region.

    2. SWOT and VISION

    Vellakoil, a Grade III Municipality in Tiruppurdistrict is located at a distance of 48 km, east of Coimbatore

    and 60km, south of Erode town. The area of the town is 64.75 sq.km and the population is 34,438 as per

    census 2001. The latitude and longitude of this town are 83641N and 783 30E respectively. It is well

    connected by road to the surrounding urban centres.

    Vellakoil municipality is a prominent commercial center for agro products like oil, vanaspathy and textiles.

    The town and its surroundings has high concentration of power loom & handloom weaving, textile

    processing units, rice milling, edible oil expelling units, paper products and basic metal products industries

    etc.

    The City Development Plan is a tool which adapts a participative approach to planning, and implementing

    projects as stakeholder workshops; involving users, elected councillors, line agencies, private organizations,

    NGOs and CBOs. Some of the core issues which emerged during interaction with stakeholders include

    provision of adequate and quality water supply to all the residents of the city, improvement in solid waste

    management and sewerage systems in the town (both currently impacting the physical environment in a

    negative manner), rejuvenation of water bodies, and road improvement and improving the financial and

    technical capacity of the municipal body.

    A town level SWOT analysis, with reference to its regional context has been done based on feedback from

    stakeholder workshops and analysis of the status of various sectors of the city.

    SWOT Analysis for Vellakoil Municipality

    STRENGTH WEAKNESS

    Access to Erode, a major node for textile,leather & agriculture, timber based industries

    Crippling Environmental pollution to odais & agriculturalhinterland

    Good connectivity with nearby Urban centres Absence of recreational facilities

    Nh-67 bisecting the town Need to expedite infrastructure improvementsPerennial source of water from River Cauvery Inadequate social infrastructure facilities

    High Urban literacy rate at 75% Extensive Municipal area Increased demand forpenetration of Municipal servicesFertile agricultural hinterland

    Excellent industrial base of textile, bricks, agrobased timber & leather

    Absence of rail connectivity

    OPPORTUNITIES THREATS

    Availability of land for future development Rising land and labour costs

    Co-operative mindset of community. Increased Environmental regulations & falling margins

    Access to Higher Educational Institutions Low skill, low technology manufacturing units

    Opposition to leather based industries /brick industriesSource: Feedback from stakeholders meeting and analysis.

  • 5/23/2018 Vella Koil

    7/103

    Final Report City Development Plan for Vellakoil Municipality

    The town of Vellakoil is visualized as An clean and green town; economical ly self sustaining, with

    access to physical and social infrastructure .

    Supporting this vision is a set of development objectives, defined along various sectors of infrastructure. It

    covers the current status, issues in the sector, likely future demand, strategies for improvement and

    identified projects to meet these objectives. The sectors covered in the CDP for Vellakoil include water

    supply, sewerage and sanitation, solid waste management, storm water drains, street lights, slum

    improvement and other remunerative and social projects.

    3. CITY INVESTMENT PLAN

    The summary of sector-wise investment requirements and prioritisation is given in the following table. The

    total investment required would be over Rs. 9018.42 lakhs.

    Capital Investment Needs for Vellakoil

    S.N Physical Infrastructure facilities Amount

    ( in lakhs)

    1 Water Supply 1199.12

    2 Sewerage System 3300.00

    3 Storm Water Drains 300.00

    4 Solid Waste management 800.00

    5 Roads 2043.00

    7 Bus Shelter 10.00

    8 Street Lights 182.00

    9 Slum Improvement 709.00

    10 Parks and Play Fields 20.00

    11 Market 150.00

    12 Public Convenience 35.00

    13 Burial Ground 100.00

    14 E-Governance 16.00

    15 Urban Greenery 10.00

    16 Other Projects 100.00

    17 Updation of Database on GIS Platform 4000

    18 Property Mapping 4.30

    Total 9018.42

    4. FINANCIAL PERFORMANCE OF VELLAKOIL MUNICIPALITY

    The summary of the financial status of Vellakoil municipality is as follows:

    In the case of Vellakoil Municipality, it is observed that the Municipality has shown net deficit in all

    the 5 years. Prior to depreciation, the Municipality has shown surplus in 4 out of the last 5 years

    except 2006-07. Thus the Municipality has earned cash surplus in 4 years.

    The average current collection efficiency of the municipality is very good as compared as to other

    municipalities in the district in case of all the sources of income and is around 95% - 100%. The

    arrears collection performance in respect of Property Tax and Other Income needs to be improved. The broad financial analysis of the Vellakoil Municipality finances reveal that the Municipality has to

    gradually increase its own sources of income and collection efficiency for servicing the additional

    borrowings in the future.

    The Municipalitys borrowings are high at Rs. 236 lakhs compared to its income. This may result

    high debt service in future years. So the Municipalitys capacity to borrow further funds depends on

    its capacity to increase its revenues.

    To summarise, the overall income pattern of Vellakovil Municipality indicates both positive and negative

    features. The positive trends are on the income side, where the Municipality has higher growth rate and

    good collection performance.

  • 5/23/2018 Vella Koil

    8/103

    Final Report City Development Plan for Vellakoil Municipality

    5. PROPOSED REFORMS IN URBAN MANAGEMENT

    In the Final Report a detailed action plan and implementation schedule to aid the effective execution of the

    business plan would be furnished. Achieving the set objectives would require a high degree of commitment

    from the municipality and active support of the council and the state government.

    The municipality will be expected to adopt measures to improve property tax base, ensure

    operational efficiency in street lighting and water supply, computerisation of Municipal functions,

    introduce charges for SWM, timely auditing and online publishing of account statements , asset

    management plan , capacity building initiatives in the engineering, health and accounts sections.

    The Municipal council may assume charge of increase in water charges, removal of public

    fountains, privatisation initiatives, and premobilisation of deposits, parking / advertisement

    regularisation plan and execution of property mapping exercise. The council would also be required

    to include charges for SWM (non-domestic) and regularise unauthorised layouts.

    The expectations from the State Government are fast track litigation for disputed properties,

    enacting Community Participation law, facilitating private participation in investments, ensuring

    transparency in accounting and creating public awareness on the roles and responsibilities of the

    citizens.

    6. ESTIMATION OF INVESTMENT CAPACITY

    The borrowing and investment capacities of the town are arrived considering the revenue income

    and expenditure under the sustainable scenario, after implementation of the mandatory reforms

    proposed in this report.

    The investment capacity for the sustainable scenario can be summed up as below:

    Summary of Borrow ing and Investment Capacity

    Descript ion Scenar io I Scenar io II Scenar io III

    Borrowing Capacity Rs. 373.26lacs Rs. 744.13 lacs Rs. 937.48 lacs

    Investment Capacity Rs. 1493.02 lacs Rs. 4134.08 lacs Rs. 5208.24 lacs

    Investment Requirement - Rs. 9018.12 lacs Rs. 9018.12 lacsSustainable investment capacity % - IC / IR - 46% 57.75%

    Scenario I- Estimation of Investment Capacity on as is where basis

    Scenario II- Estimation of Investment Capacity with Projects & Growth Rate of 7.5% for Devolution Funds

    Scenario III - Estimation of Investment Capacity with Projects & Growth Rate of 10% for Devolution Funds.

    7. INFERENCE

    The investment capacity of Vellakoil Municipality on As is Where Basis works out to Rs. 1493

    lacs.

    The investment capacity of Vellakoil Municipality works to 46% in case of Scenario II (Growth

    Rate of Devolution Funds assumed @ 7.5% p.a.) and 58% in case of Scenario III (Growth

    Rate of Devolution Funds assumed @ 10% p.a.).

    In value terms the investment capacity works out to Rs. 4135 lacs under Scenario II and Rs.

    5210 lacs under Scenario III.

    It may be observed that the investment capacity has improved with the introduction of new

    projects as compared to As is Where Basis scenario. The same is on account of the fact that

    the Municipality has large number of commercial and industrial assessments, which are

    presently untapped on account of water and sewerage connections.

    Thus it can be inferred that the investment capacity of the Municipality is around 46% of the

    total investment requirement.

  • 5/23/2018 Vella Koil

    9/103

    Final Report City Development Plan for Vellakoil Municipality

    Based on the above, it can be inferred that the Municipality can take up only the small projects,

    where the funding is mostly by way of Grants as given below :

    S.No. Particulars Total Priori ty Funding By

    A Physical Inf rastructure Facil it ies L : G : O

    I Water Supply

    a) Improvements to Water Supply 1199.20 A 0:90:10

    II Sewerage & Sanitation

    a) New Underground Sewerage Scheme 3300.00 A 37:35;28

    Total 4499.20

    The above two projects can be taken up by the Municipality as there are large number of

    commercial and industrial assessments and on stand alone basis these projects are viable at

    the funding pattern given above.

    Besides the above, the following other small projects can be taken up, where the funding

    pattern is mainly by way of grants and deposit mobilization :

    Priority pro jects suggested under CDP

    S.No. Particulars Total Priorit y Funding By

    A Phys ical Infrastructure Facil it ies L : G : O

    I Strom Water Drains

    a) Construction of new drains and providing mesh covers 300.00 A 0:90:10

    II Bus Shelter

    a) Construction of New Bus Shelter 10.00 A 100% Grant

    III Street Lights

    a) High mast lights at Old & New Bus Stand 14.00 A 100% Grant

    b) Retrofitting and energy saving devices 23.00 A ESCO

    c) Central Median lights at main roads for 3Km 45.00 A 0:90:10

    B Social Infrastructure Facilities

    I Slum Improvementsa) Improvement to Slums 709.00 B 100% Grant

    II Market

    a) Construction of Daily Market 75.00 A 100% ULB

    b) Construction of Weekly Market 75.00 A 100% ULB

    C Other Projects

    I Remunerative Projects

    a) Commercial Building (G+2) at Erode Road near 50.00 A 100% ULB

    Bus Stand

    II E-Governance

    a) E-Governance 16.00 A 100% Grant

    b) Updation of Database on GIS 40.00 C 0:90:10

    c) Property Mapping 4.30 A 100% ULBTotal 1361.30

    As regards other projects with large financial cost, the Municipality would require more support

    from the Government towards both capital cost and operation & maintenance expenses. Thus

    it would be possible to take up those projects if more support is provided by the Government

    and by improving own sources of income.

  • 5/23/2018 Vella Koil

    10/103

    Abbreviation and Acronyms

    ANM : Auxiliary Nurse Midwife

    AMT : Anna Marumalarchi Thittam

    BOT : Build, Operate and Transfer

    BPL : Below Poverty Line

    BSUP : Basic Services for Urban Poor

    CAA : Constitution Amendment Act

    CAGR : Compounded Annual Growth Rate

    CC : Cement Concrete

    CCP : City Corporate Plan

    CBED : Community Based Energy Development

    CDP : City Development Plan

    CETP : Common Effluent Treatment Plant

    CFC : Central Finance Commission

    CIP : Capital Investment Plan

    CPHEEO : Central Public Health & Environmental Engineering Organization

    CPM : Consultative Process Meeting

    D&O : Dangerous and Offensive Trade

    DFR : Draft Final Report

    DPR : Detailed Project Report:

    EAR : Environmental Assessment Report

    ECR : East Coast Road

    ESF : Environmental and Social Framework

    ETRP : Emergency Tsunami Reconstruction ProjectFY : Financial Year

    FOP : Financial Operating Plan

    GLR : Ground Level Reservoir

    G.S.T Road : Grand South Trunk Road

    Gm : Grams

    GoTN : Government of Tamil Nadu

    Ha : Hectares

    HP : Horse Power

    HSC : House Service ConnectionIHSDP : Integrated Housing & Slum Development Programme

    IPT : Intermediate Public Transport

    ISP : Integrated Sanitation program

    IUDP : Integrated Urban Development Project

    JNNURM : Jawaharlal Nehru National Urban Renewal Mission

    Kg : Kilogram

    Km : Kilometer

    LAP : Local Assistance Programme

  • 5/23/2018 Vella Koil

    11/103

    LCS : Low Cost Sanitation

    Ll : Lakh Litres

    LPA : Local Planning Area

    Lpcd : Liters Per Capital per day

    M : Metres

    MIAM : Municipal Infrastructure Asset Management

    ML : Million Litres

    MLD : Million Litres per day

    MSW : Municipal Solid Waste

    NGO : Non Governmental Organisation

    NH : National Highway

    Nos : Numbers

    OHT : Over Head Tank

    O&M : Operation and Maintenance

    PAP : Project Affected Persons

    PHC : Primary Health CenterPPI : Pulse Polio Immunization

    PPP : Public Private Partnership

    PWD : Public Works Department

    SFC : State Finance Commission

    SH : State Highway

    SHG : Self Help Group

    Sq.km : Square Kilometers

    SST : Summer Storage Tank

    STP : Sewage Treatment PlantSWM : Solid Waste Management

    TEAP : Tsunami Emergency Assistance Project

    TNEB : Tamil Nadu Electricity Board

    TNRDC : Tamil Nadu Road Development Corporation

    TNSCB : Tamil Nadu Slum Clearance Board

    TNUDP : Tamil Nadu Urban Development Project

    TNUIFSL : Tamil Nadu Urban Infrastructure Financial Service Limited

    TPD : Tonnes Per Day

    TUFIDCO : Tamil Nadu Urban Finance and Infrastructure Development Corporation

    TWAD : Tamil Nadu Water Supply and Drainage Board

    UA : Urban Area

    UGD : Under Ground Drainage

    UIDSSMT : Urban Infrastructure Development Scheme for Small & Medium Towns

    ULB : Urban Local Body

    VAMBAY : Valmiki Ambedkar Awas Yojana

    WBM : Water Bound Macadem

    WSP : Waste Stabilization Pond

    WTP : Water Treatment Plant

  • 5/23/2018 Vella Koil

    12/103

    EXECUTIVE SUMMARY

    COUNCIL RESOLUTION

    ABBREVIATIONS AND ACRONYMS

    1 CONTEXT, CONCEPT AND CONTENTS OF CITY DEVELOPMENT PLAN

    1.1 Context of the Study 1

    1.2 Objectives 1

    1.3 Revice Meeting for Dtaft Final Reports 1

    2 TOWN PROFILE, PHYSICAL PLANNING AND GROWTH MANAGEMENT 4

    2.1 Regional Setting 4

    2.2 Physical Features 4

    2.3 Climate and Rainfall 4

    2.4 History of the Municipality 4

    2.5 Demographic Features 4

    2.5.1 Population and its Growth 4

    2.5.2 Population projection 6

    2.5.3 Sex ration and literacy 7

    2.6 Occupational Pattern 7

    2.7 Physical Planning and growth management issues 8

    2.8 Growth Management issues and solution initiatives 8

    3 VISION AND STRATEGIES FOR ECONOMIC DEVELOPMENT 9

    3.1 Stakeholders workshop and Vision statement 9

    3.2 SWOT Analysis 9

    3.3 Vision for Vellakoil Town 9

    3.4 Strategies for Economic Development 10

    3.5 Urban Infrastructure 11

    3.5.1 Sector wise Vision 11

    3.6 Performance and Demand Assessment 12

    3.7 Strategies for Poverty Reduction and Slum Upgradation 14

    4 ORGANISATIONAL STRUCTURE 15

    4.1 Elected Body 15

    Executive Wing 15

    4.2.1 General Administration 15

    4.2.2 Engineering Department 16

    4.2.3 Accounts Department 16

    4.2.4 Public Health Department 16

    4.2.5 Town Planning Department 16

    4.3 Staff Strength Position and vacancy position 16

    4.4 Issues in Human Resource 18

    4.5 Organisation Management 18

    5 INFRASTRUCTURE STATUS AND NEEDS ASSESSMENT 19

    5.1 Physical Infrastructure 19

    5.1.1 Water Supply 19

    5.1.2 Sewerage 21

    5.1.3 Storm Water Drains 215.1.4 Improvement to water bodies 22

    5.1.5 Soild Waste Management 23

    5.1.6 Roads 25

    5.1.7 Bus Stand 27

    5.1.8 Bus Shelter 27

    5.1.9 Street Lights 27

    CONTENT

  • 5/23/2018 Vella Koil

    13/103

    5.2 Social Infrastructure 29

    5.2.1 Slum Improvement 29

    5.2.2 Parks and Play fields 30

    5.2.3 Market 31

    5.2.4 Public Convenience 31

    5.2.5 Slaughter House 31

    5.2.6 Burial Ground 31

    5.2.7 E-Governance 32

    5.2.8 Urban Greenary 325.3 Other Projects 32

    5.3.1 Updation of Database On GIS Platform 32

    5.4 Proposals to be implemented by other Agencies 33

    5.5 Capital Investment Plan 34

    6 REFORMS AND ACTION PLAN FOR PROJECT IMPLEMENTATION 36

    6.1 Present Scenario in Urban Reforms 36

    6.2 Proposed Interventions at state level 37

    6.3 Proposed Interventions at Municipal level 38

    6.3.1 Reforms In Resource Mobilisation 39

    6.3.2 Privatisation Initiatives 42

    6.3.3 Energy and Resource efficiency 44

    6.3.4 Computerisation and E-governance 45

    6.3.5 Accounts and auditing 466.3.6 Institutional Management 46

    6.3.7 Reforms in Municipal Service Delivery 51

    7 ASSETS MANAGEMENT 52

    7.1 Activities of Asset Management Plan (AMP) 52

    7.2 Priority asset management options 53

    7.3 Land Assets 54

    7.4 Management Options for land assets 55

    7.5 Proposed New Assets 55

    8 FINANCIAL OPERATING PLAN 57

    8.1 Capital Investment Plan 57

    8.2 Other Projects and on going projects 59

    8.3 Means of Finance 608.4 Financial Sustainability 65

    8.5 Basic Assumptions for Projections 65

    8.5.1 Income 66

    8.5.2 Expenditure 71

    8.5.3 Collections 72

    8.5.4 Annuity Factor 73

    8.6 Project Cash Flows and FOP Results 73

    8.7 Impact of Potential Improvements 81

    8.8 Estimation of Investment Capacity 81

    8.9 Key Indicators 83

    8.10 Inference 83

    9 PUBLIC CONSULTATION PROCESS 86

  • 5/23/2018 Vella Koil

    14/103

    2.1 Population and growth 4

    2.2 Comparative statement of projected population 7

    2.3 Occupational Pattern - 2001 7

    3.1 SWOT Analysis 9

    3.2 Sector wise vision for the key Infrastructure 11

    3.3 Performance Indicators for key Municipal Services 12

    3.4 Demand for Municipal Services 134.1 Staff Strength 17

    4.2 Additional Staff Required 18

    5.1 Details of OHTs 20

    5.2 Water Tariff-Deposit Details 20

    5.3 Demand & Supply in Water Supply - Projection 20

    5.4 Storm water Drains - proposals 22

    5.5 Solid Waste management Proposals* 25

    5.6 Category of roads 26

    5.7 Road improvement - Proposals 26

    5.8 Existing street lights and energy consumption 27

    5.9 Street lights - Proposals 28

    5.10 Location of Existing Slum Areas 29

    5.11 Details of Existing Slum Areas 29

    5.12 Slum - Proposals 305.13 Market - proposals 31

    5.14 Proposals to be implemented by other Agencies 33

    5.15 Capital Investment Programme 34

    6.1 Road map Environmental Improvement 39

    6.2 Road Map - Improving revenue from own sources 40

    6.3 Road Map Improving revenue from user charges 41

    6.4 Road Map for Formation of new sustainable revenue bases 42

    6.5 Road Map for Privatization initiatives 44

    6.6 Road Map for Energy and Resource efficiency 45

    6.7 Road map for Computerization and E-Governance 46

    6.8 Technical Assistance for Elected representatives 47

    6.9 Technical Assistance for ULB staff 48

    6.10 Road map for Accounts & auditing and Institutional Management 49

    6.11 Road Map For Implementation Of All Projects 506.12 Reform Agenda - Municipal Service Delivery 51

    7.1 Priority Municipal Assets Vellakoil Municipality 53

    7.2 Proposed Use Land Asset 54

    7.3 New Assets for the year - 2010 to 2015 55

    8.1 Projects to be executed by the Municipality 57

    8.2 Projects to be executed by Other Agencies 59

    8.3 Projects under Implementation by the Municipality 59

    8.4 Multi Year Investment Plan and Means of Finance 60

    8.5 Consolidated Means of Finance 65

    8.6 Ratio of Property tax 66

    8.7 Water supply Charges - Existing 67

    8.8 House Service Connections - Percentage 68

    8.9 Sewage Charges 68

    8.10 Increase in Tariff - Sewage Charges 69

    8.11 Increase in Deposit - Sewage Charges 69

    8.12 Assumptions - Increase in Expenditure 71

    8.13 Assumptions O&M 71

    8.14 Assumptions Provision of doubtful debts 72

    8.15 Assumptions Property tax collection 72

    8.16 Assumptions Profession tax 72

    8.17 Assumptions Other Non Tax Income 72

    8.18 Assumptions Water Charges 72

    8.19 Assumptions Drainage Charges 73

    8.20 Terms of Loan Funding for Proposed Investments 73

    TABLES

  • 5/23/2018 Vella Koil

    15/103

    8.21 Consolidated Income & Expenditure for next 20 years (up to FY 2028-29) 74

    8.22 Consolidated Balance Sheet for next 20 years (up to FY 2028 29) 76

    8.23 Summary of Borrowing and Investment Capacity - Scenario I 82

    8.24 Summary of Borrowing and Investment Capacity - Scenario II 82

    8.25 Summary of Borrowing and Investment Capacity - Scenario III 83

    8.26 Key Indicators 83

    8.27 Priority Projects suggested under CDP 84

    8.27a Priority Projects suggested under CDP through Grants and Deposits 84

    9.1 Major issues and solution initiatives 879.2 Minutes of the consultative process meeting 87

    2.1 Occupational Pattern of Vellakoil -2001 7

    4.1 Status of Municipal Staff Strength 17

    4.2 Organisational structure of Vellakoil Municipality 17

    5.1 Functional Elements of a Municipal Solid Waste Management System 24

    2.1 Regional setting of the Town 5

    2.2 Town Map - Vellakoil Municipality 6

    1 Minutes of Meeting2 Population Projection

    3 Finance Working Sheets

    4 Urban Indicators

    FIGURES

    MAPS

    ANNEXURES

  • 5/23/2018 Vella Koil

    16/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    1

    1CONTEXT, CONCEPT AND CONTENTS OF CITY DEVELOPMENT PLAN

    1.1 CONTEXT OF THE STUDY

    The Commissioner of Municipal Administration (CMA), Government of Tamil Nadu, under theThird Tamil Nadu Urban Development Programme (TNUDP III) has taken effective steps to

    assist the Urban Local Bodies (ULBs) in the State, particularly the Grade III municipalities to

    strengthen and improve the financial position for effective capital investment management, and

    service delivery to the public. These ULBs spread over the State, are service centres to the

    surrounding rural areas, offering marketing, physical and social infrastructure facilities. These

    centres have a good potential for future growth, and therefore, it is essential to formulate a City

    Development Plan (CDP) for these urban centres and immediate implementation of reforms in

    these ULBs for better management. The CMA has begun the process of capacity building in

    these ULBs to enhance their performance. In this regard, the CMA has appointed Consultants for

    preparing comprehensive City Development Plan (CDP) for each of the Grade III Municipal

    Towns.

    1.2 OBJECTIVES

    The objectives of the study include:

    Defining the directions of growth of the town, and up gradation of services relevant to

    economic activities and development.

    Examination of the need for the projects identified by the Urban Local Bodies, and

    assessment of the demand in terms of gaps either as deficiency or as excess.

    Studying the status of essential urban infrastructural services and outlining broadly the

    needs. Defining specific rehabilitation and capital improvement needs of infrastructural facilities

    and services in all parts of the urban areas including slums.

    Analysis of improvement techniques and methods to enhance the local bodies resource

    positions and improve the management system that would sustain the proposed

    rehabilitation programmes.

    Identification of reforms required in administration and service delivery system of the

    urban local body.

    Studying improvements / changes required in the ULB setup to improve the O&M of

    assets.

    Identifying measures to address overall growth measures including service needs in a

    sustainable mode.

    1.3 REVIEW MEETING FOR DRAFT FINAL REPORTS

    On the review of the Final reports (Stage-IV) held at the RDMA office, Tiruppur on 10.11.09 for

    the towns of Kasipalayam, Surampatti, Veerappanchatram, Periyasemur and Vellakoil

    Municipalities, the Review Committee indicated certain remarks in the minutes of the meeting,

    and the Consultants updations are presented below:

  • 5/23/2018 Vella Koil

    17/103

    City Development Plan for Vellakoil Municipality Final Report

    2

    The consultants were asked to:

    S.N Points raised in the minutes of meeting Reply

    Vellakoil Municipality

    1. The cost and funding pattern for water supply improvement schemehas to be revised to Rs.1199.12 lakhs (Grant Rs.852.35 lakhs,

    TUFIDCO Loan Rs.300 lakhs and ULB contribution Rs.46.77

    lakhs). The O&M cost to be revised to Rs.49 lakhs.

    Since done. Refer chapter 5, sec

    2. Vellakoil Municipality has been annexed to Tiruppur District and the

    same needs to be updated in the report.

    Since updated.

    3. The Proposed cost for the construction of commercial building near

    Bus stand has to be revised to Rs.100 lakhs.

    Since done. The revised cost has

    4. The Weekly Market has to be given as Weekly Market/Shandy. Since done.

    Common Points

    1. The proposed years under CIP need to changed to 2010-11 to 2014-

    15 or as Years 1 to 5.

    Since done.

  • 5/23/2018 Vella Koil

    18/103

    City Development Plan for Vellakoil Municipality Final Report

    3

    Road map for City Development Plan

    The Table given below presents the stages and contents under each stage of the presentation of the CDP.

    Stage I

    Inception Report

    Stage II

    Interim Report

    Stage III

    Draft Final Report

    Town reconnaissance and

    Data collection.

    Consultations and Analysis Finalisation of

    Capital Investment Programme

    (CIP)

    Modules :

    - Strategic vision

    - Development objectives- Methodology

    Modules :

    - Demand assessment

    - Municipal Fiscal status- Investment needs

    - Stake holder consultation

    Modules :

    - Strategic plan

    - Capital InvestmentNeed(CIN)

    -Priority Asset management

  • 5/23/2018 Vella Koil

    19/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    4

    2TOWN PROFILE, PHYSICAL PLANNING AND GROWTH MANAGEMENT

    2.1 REGIONAL SETTING

    Vellakoil, a Grade III Municipality in Tiruppur district is located at a distance of 48 km, east of

    Coimbatore and 60km, south of Erode town. The area of the town is 64.75 sq.km and the

    population is 34,438 as per census 2001. The latitude and longitude of this town are 83641N

    and 783 30E respectively. It is well connected by road to the surrounding urban centres.

    Vellakoil municipality is a prominent commercial center for oil and vanaspathy. The regional

    setting of the town and the town map is shown in Map 2.1 and 2.2.

    2.2 PHYSICAL FEATURES

    Vellakoil is situated on Coimbatore Thiruchirapalli NH-67. The major arterials from the town are

    the Thiruchirapalli Coimbatore road running west to east, Erode Tharapuram road & Moolanurroad. The general gradient of the town slopes from North to South. The major soil found in this

    region is Black soil. The ground water table varies from 50m to 200m.

    2.3 CLIMATE AND RAINFALL

    The town and the surrounding region have a sub- tropical climate with temperatures varying from

    28 to 36C. Rainfall is intermittent, irregular and usually heavy during the southwest monsoon. The

    average annual rainfall ranges between 700-800 mm.

    2.4 HISTORY OF THE MUNICIPALITY

    Vellakoil was constituted as village panchayat during 1938 , upgraded to town panchayat in 1977

    and as Third Grade municipality in 2004. There are 21 wards in the Municipality.

    2.5 DEMOGRAPHIC FEATURES

    2.5.1 Population and its Growth

    Vellakoil population has grown in the past decade. As per the 2001 census, the town registered a

    population of 34438. The population growth rate of the town is19.3% during the period 1991-

    2001.

    Table 2.1 Population and growth.

    Source: Census of India.

    Year Population of Vel lakoil Growth rate

    1991 28,878 -

    2001 34,438 19.3

  • 5/23/2018 Vella Koil

    20/103

    City Development Plan for Vellakoil Municipality Final Report

    5

    Map 2.1 Regional setting of the Town

  • 5/23/2018 Vella Koil

    21/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    6

    GANAPATHYPALAYAM

    ARIYANDIPALAYAM

    THANEER

    PANTHAL

    PACHAGOUNDANVALASU

    UTTHAMAPALAYAMV

    ILLAGE

    14

    AGALARAIPALAYAMPUDUR

    THEETHAMPALAYAM

    THEETHAMPALAYAM

    15

    SIVANATHAPURAM

    SIVANATHAPURAM

    PUDUKADU

    ANNA NAGAR17

    19 18KAMARAJAPURAM

    DHARAPURAM

    ROAD

    67

    KATCHERI

    VALASU

    K.P.C NAGAR

    GANDHI NAGAR

    5

    KUMARAVALASU

    KUTTAKATTUPUDUR

    4KALLANKATTU

    VALASU

    THIRUVALLUVAR NAGAR

    D.R . NAGAR

    M.G.R.NAGAR

    SALAVAIYALLAR COLONY

    NACHIYAPPA GOUNDAN

    VALASU

    TO

    ERODE

    3

    2

    THIRUMANGALAM

    1

    UPPUPALAYAMVELAGOUNDANPALAYAM

    METTUPALAYAM VILLAGE

    PACH

    APALA

    YAM

    VILLA

    GE

    TOKOVAI

    KADAIYARAN VALASU

    SEERANGAGOUNDANVALASU

    T.C.ROAD

    L.K.C NAGAR

    K.P.C

    NAGAR

    20

    21

    8

    INDRA GANDHI NAGAR

    9

    10

    16

    SEMMANDAMPALAYAM

    ROAD M

    ULANURROAD

    TO TRICHY

    11

    SEMMANDAMPALAYAM

    SENAPATHYPALAYAM

    VILLAGE

    12

    KARATTUPALAYAM

    PULLACHELIPALAYAM

    NACHIPALAYAM

    13

    ORAMPUPALAYAM

    SUBRAMANIYAGOUNDANVALASU

    TO

    MULANUR

    MULAIYAMPOONDI VILLAGE

    LACHAMANAICKANPATTI

    VILLAGE

    TO DHARAPURAM KALIMOOPANPATTI

    RAJIV NAGAR

    VAIYAPURI NAGAR

    ARIVOLI NAGAR

    MADAMEDU

    MOOTHANAICKAN VALSU

    MANJAANGADU

    ARUN CRUSHER

    POTHIYAKADU

    CHERAN NAGAR

    MUTHU NAGAR

    E

    N

    NW

    SW

    NE

    SE

    S

    W

    Map 2.2 Town Map Vellakoi l Munic ipali ty

    2.5.2 Population projection

    Based on the growth rate for the past two decades, the future population of the town has been

    projected using various methods and are tabulated as below:

    1. Arithmetical Increase Method

    2. Geometric Increase Method

    3. Incremental Increase Method

    4. Method of least square

  • 5/23/2018 Vella Koil

    22/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    7

    Table 2.2 Comparative statement of projected popu lation

    Sl. no. MethodProjected Population for Vellakoil

    2010 2025 2040

    1 Arithmetical Increase 52208 72516 92823

    2 Geometrical increase 51620 81873 112132

    3 Incremental Increase 53348 94325 156681

    4 Method of Least Squares 49605 67605 85605

    Source: Analysis and calculations

    After a detailed analysis and comparison of each method, Geometrical increase method is found

    to be suitable and the population projections are based on the same. The details are given in

    Annexure-2. Therefore, the projected population for Vellakoil town is:

    1. Base year 2010 - 52,702

    2. Intermediate year 2025 - 88,836

    3. Ultimate year 2040 - 1,46,349

    2.5.3 Sex ratio and literacy

    The sex ratio in the town is 964 and the literacy rate is 75% higher than the national average of

    59.5%.

    2.6 OCCUPATIONAL PATTERN

    The work force participation of the town is 19,737 in 2001.As per the census 2001; more than

    80% of the work force is involved in the tertiary sector. The sector wise distribution of the work

    force is depicted in the table below:

    Table 2.3 Occupational Pattern, 2001

    Category of WorkersTotal

    % to

    Population

    % to Total work

    forceTotal workers 19,737 57 -

    Primary sector 1,526 4 8

    Secondary sector 1,252 4 6

    Tertiary sector 16,959 49 86

    Non-workers 14,701 43 -

    Source: Census of India 2001.

    Fig: 2.1 Occupational pattern of Vellakoil -2001

  • 5/23/2018 Vella Koil

    23/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    8

    2.7 PHYSICAL PLANNING AND GROWTH MANAGEMENT ISSUES

    The existing developmental issues and future potential are addressed below:

    The major arterials connecting the town to the surrounding urban centres are:

    Coimbatore Thiruchirapalli National Highway

    Erode Tharapuram road

    Moolanur road

    The Coimbatore Thiruchirapalli road is one of the major road, running west to east connecting thetown to major urban centres. The town has no railway connectivity. The nearest railway stations

    are in Erode, Karur and Tiruppur. The nearest Airports are at Coimbatore (88km) & Trichy (117km)

    The Major industrial activities in the town are hand loom and power loom, spinning mills, oil mills

    and brick manufacturing. Vellakoil is one of the major marketing centers for sunflower oil.

    Land use Pattern

    The land use pattern for Vellakoil is followed by the major activity areas in the Town. Commercial

    areas are mainly located along the major roads such as Erode road, Coimbatore Road, Trichy

    Road are radiates out from the centre of the town where the bus stand is located.

    The major developments are seen on the north along Erode road and on the west along

    Coimbatore Road, south along Moolanur and Tharapuram Road and east along Karur and Trichy

    road. More than 50 % of the land in the town constitutes undeveloped area comprising of lands

    under agricultural, unused vacant lands and waste lands.

    a. Residential

    Residential development has almost spread over the entire municipal area. The density varies from

    high to low from the centre of the town.

    b. Commercial and Industrial

    The main commercial areas are located along the major road network. Weekly Market is located

    near the bus stand in about 3 acres of land. The oil extracting industries and power loom/handloom

    industries are sporadically distributed in the town.

    2.8 GROWTH MANAGEMENT ISSUES AND SOLUTION INITIATIVES

    Need to strengthen Municipal Revenue base

    Low levels of revenue generation of Municipality leading to poor service delivery. The

    reforms to be under taken by the urban local body will be addressed in detail in the list of

    Reform Agenda suggested in the CDP.

    Need for guided development for a sustained economic growth

    The town has vast land for future development. But at present the industrial developments

    are sporadically distributed over the town. There is mixed land use in the town area causing

    congestion and unsafe environmental conditions.

    Thus, there is an immediate need for Master Plan and Detailed Development Plans forsustained economic growth and safe environment to live in.

    Need for Railway connectivity

    Discontinued Railway connectivity directly affecting the towns economy.

    Need land for fu ture development

    Inadequate municipal owned vacant land for implementing social, physical infrastructure

    facilities and remunerative developments.

  • 5/23/2018 Vella Koil

    24/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    9

    3VISION AND STRATEGIES FOR ECONOMIC DEVELOPMENT

    3.1 STAKEHOLDERS WORKSHOP AND VISION STATEMENT

    The City Development Plan is a tool which adapts a participative approach in planning andimplementing projects involving users, elected councilors, line agencies, private organizations,

    NGOs and CBOs. In this process, residents of various sections of the communities in the town were

    enquired into at random during reconnaissance survey and visits to all the sites of the projects

    identified by the Municipality and also otherwise suggested by the elders.

    The broad purpose of public participation is to involve the stakeholders in the development plan for

    the city. The Vision Statement has been firmed up based on the feed backs received from the stake

    holders and expert survey of the municipal services for the perspective year of 2030.The analysis

    and findings of the study are based on secondary data collected from respective departments and

    during the course of the study, data gaps if any were supplemented through primary survey. Adetailed analysis to find out the existing status of each admissible sector, cross-referring the norms

    and standards, demand and gaps based on present and future service requirements is done. A

    SWOT analysis was done based on the data collected on the resources and consultation with the

    stake holders in the following section. Accordingly, interventions are suggested.

    3.2 SWOT ANALYSIS

    Table 3.1 SWOT Analysis

    STRENGTH WEAKNESS

    Access to Erode, a major node for textile, leather &

    agriculture, timber based industries

    Crippling Environmental pollution to odais & agricultura

    hinterlandGood connectivity with nearby Urban centres Absence of recreational facilities

    Nh-67 bisecting the town Need to expedite infrastructure improvements

    Perennial source of water from River Cauvery Inadequate social infrastructure facilities

    High Urban literacy rate at 75% Extensive Municipal area Increased demand for

    penetration of Municipal servicesFertile agricultural hinterland

    Excellent industrial base of textile, bricks, agro

    based timber & leatherAbsence of rail connectivity

    OPPORTUNITIES THREATS

    Availability of land for future development Rising land and labour costs

    Co-operative mindset of community. Increased Environmental regulations & falling margins

    Access to Higher Educational Institutions Low skill, low technology manufacturing unitsOpposition to leather based industries /brick industries

    Source: Feedback from stakeholders meeting and analysis.

    3.3. VISION FOR VELLAKOIL TOWN

    Vellakovil town is a major commercial centre for agro products and textiles. Based on the feed backs

    from stakeholder workshops and analysis of the town the vision statement for the town of

    VELLAKOIL is framed as

  • 5/23/2018 Vella Koil

    25/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    10

    An clean and green town; economically sel f sustain ing, wi th access to phys ical and socia

    infrastructure.

    3.4 STRATEGIES FOR ECONOMIC DEVELOPMENT

    The district has high concentration of power loom & handloom weaving, textile processing units, rice

    milling, edible oil expelling units, paper products and basic metal products industries etc.

    1. Benefit from the proximity to Erode and Tiruppur to generate further employment

    opportuni ties and economic development.

    Vellakoil is strategically located between Erode and Tiruppur, on the National Highway to Trichy

    .Thus there is a scope for further development of knitwear and readymade garments, especially for

    export oriented units. Provision of marketing centers, adequate housing, basic infrastructure

    facilities, medical, educational and recreational facilities would enhance overall growth of the town.

    2. Build on the industrial base to create further scope for development.

    a. Establishment of industrial estates

    b. Development of food processing industries

    c. Establishment of industrial parks and SEZs

    d. Guidance through research and training institutes

    e. Implementing Development centers and schemes for industrial and socia

    development

    a. Establishment of industrial estates

    There are 5 industrial estates in this district promoted by official agencies namely SIDCO

    Industrial Estate- Erode, SIDCO Industrial Estate -Dharapuram, SIDCO Industrial Estate -Nanja

    Uthukuli, TAHDCO Industrial Estate -Perundurai, Perundurai Industrial Estate.The proposed

    Industrial estates in the region are SIDCO Industrial Estate -Rasathivalasu, SIDCO Industria

    Estate Vadamugam -Kangayampalayam, SIDCO Industrial Estate -Chennimalai.

    As the SIPCOT Industrial Growth centre is at Perundurai providing all the necessary

    infrastructure facilities. There is a good scope for setting up industries like Textile Processing,

    Leather, Chemical, Engineering, Electrical & Electronics Industries.

    The Cabinet Committee on Economic Affairs gave its approval to the implementation of the

    Comprehensive Power loom Cluster Development Scheme at Erode (Tamil Nadu) as a Centra

    Sector Plan Scheme with a budget provision of Rs.70 crore. The implementation of the Scheme

    will benefit the weavers in developing / diversifying new designs and products, their skill up-

    gradation, up-gradation of their looms, providing a suitable workplace, market support etc. to

    improve their earnings and socio-economic conditions.

    b. Development of Food Processing Industries

    There is ample scope for development of Food Processing Industries in the district. Availability of

    technology and training is a problem for the aspiring entrepreneurs. Hence there is need for

  • 5/23/2018 Vella Koil

    26/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    11

    Food Technology & Training centre under the guidance of CFTRI, Mysore, in this district is

    recommended by the Industrial Potential Survey Report- Erode 2001 2002.

    c. Establishment of Industrial parks and SEZs

    Establishment of Garment Park in the region will support the industrial activity as Tiruppur is near

    to the town. Establishing Special Economic Zones (SEZs) for textile and agro products in the

    region will enhance the economy of the region.

    d. Implementing Development centers and schemes for industrial and socia

    development

    To develop handloom sector both Central & State Government are implementing various

    schemes through the office of the Assistant Director (Handloom & Textiles) at Erode. The

    schemes are

    Handloom Development Centre

    Project Package Scheme

    Help Package Scheme

    Housing scheme for weavers

    Export Package scheme

    To increase the productivity of power loom, the Government has introduced the Technology

    Upgratation Fund Scheme (TUFS) for undertaking modernization of textile industry. Utilisation of

    this fund will meet the requirement of power loom textile industry. By implementing export

    package scheme and help package schemes, the edible oil units may be further encouraged in

    production and marketing.

    3.5 URBAN INFRASTRUCTURE

    Infrastructure provision is perceived to have a significant impact on health, reducing incidence of

    illnesses which are related to an unhygienic living environment. Thus, infrastructure plays an

    inevitable role in the economic development and social well being of the town.

    3.5.1 Sector wise Vision

    The sector wise vision for the key infrastructure services are as given in the table below:

    Table 3.2 Sector wise vision for the key Infrastructure

    S.n Sector Vision statement

    1 Water Supply To check wastage and pilferage of water

    To generzate more revenue for efficient operation & maintenance of

    system and to supplement the capital works, in order to render the deliv

    of the service self sustaining over a period of time.

    2 Sewerage and

    sanitation

    To provide coverage of the sewerage facilities or LCS measures for s

    areas.

    To maintain high level of environmental hygiene generally in the town

    particularly the cleanliness of the water bodies

  • 5/23/2018 Vella Koil

    27/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    12

    3 Storm water drainage

    and improvement to

    water bodies

    To improve condition of storm water drains to handle run off water

    prevent water stagnation.

    Rejuvenate water bodies and improve recharge of ground water.

    To provide Rain Water Harvesting to improve the quality and quantity

    Ground water.

    4 Solid Waste

    management

    To provide a litter free town for the healthy living of the public.

    To minimize the O&M expenditure of SWM To involve private organizations to the extent possible

    5 Roads and Streets To provide safe, comfortable and speedy circulation network for

    residents and traffic

    To relieve congestion by adopting a traffic management plan

    To channelise by-passable traffic through arteries outside the town limit.

    6 Street lighting To provide sufficient illumination to the town, for safety of the people an

    adequately cope with the requirements of traffic.

    To optimize the use of electricity by adapting energy efficient technology

    7 Educational

    Institutions

    To Provide comfortable conducive physical infrastructure and so

    environment for the learning process

    8 Medicare To make quality preventive and curative care available accessible to the Public.

    To support people for healthy living and environment.

    3.6 PERFORMANCE AND DEMAND ASSESSMENT

    To assess the indicators of performance in each sector of infrastructure, the existing levels of key

    Municipal services is benchmarked against their norms and standards to arrive at performance

    assessment index .The norms and standards are based on SFC recommendation, Planning

    Commission recommendation, UDPFI guidelines, CPHEEO manual, best practices etc.

    The demand assessment for projects is arrived from the Stake holder consultative meetings

    discussions with officials, field visits and service analysis. The improvement needs proposed arebased on the demand and performance assessments with reference to short term and long term

    proposals for each sector.

    The Performance assessment index for the existing status against the norms and standards for

    water supply, sewerage, drainage, solid waste, street lighting and social facilities are illustrated in

    the table below:

    Table: 3.3 Performance Indicators for key Municipal Services

    Sl

    No

    Service Indicators Unit Normative

    Standard

    Current

    Status

    Performance of Key Water Supply Service Indicators

    1 Daily per capita supply lpcd 135 70

    2 Roads covered with distribution network Percent >100 96

    3 Storage Capacity with respect to supply Percent 33 45

    4 Property tax assessments covered by service connections Percent 85 27

    5 Proportion of non domestic service connections Percent >5.00 2.5

    Performance of Key Sewerage and Sanitation Service Indicators

    6 Roads covered by UGD network Percent 100 -

    7 Sewage contribution lpcd 100 -

    9 Assessment having access to UGD facility Percent 85 -

  • 5/23/2018 Vella Koil

    28/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    13

    10 Population covered by UGD Percent 85 -

    Performance of Key Storm water Drainage Service Indicators

    11 Road length covered with storm water drainage Percent 130 11

    Performance of Key Solid Waste Management Service Indicators

    12 Estimated waste generation Grams /

    capita/ day

    400 300

    13 Waste collected as per the estimate of ULB (w.r.t. wastegeneration)

    Percent 100 85

    Performance of Key Road Service ind icators

    14 Road density Km/sq.km 10-15 2.7

    15 Per capita road length meters 1.75 3.5

    16 Proportion of surfaced roads Percent 100 67

    Performance of Key Street Lighting Service indicators

    17 Spacing between lamp posts meters 30 87

    18 Proportion of fluorescent lamps (tube lights) w.r.t. total fixtures Percent 80 89

    19 Proportion of high power fixtures w.r.t. total fixtures Percent 20 11

    Performance of Key indicators for Slums

    20 Proportion of slum population to total city population Percent 100% to road length km 77.43 85.99 122.81 168.20

    Under Ground Sewerage System

    Network coverage @ 100% to road length km 77.43 85.99 122.81 168.20

    Storm Water Drains

    Requirement @ 130% to road length km 101 112 160 219

    Solid Waste Management

    Waste generation at 300 gms TPD 15.49 17.20 28.66 39.25

    Compost yard area requirement @ 1 acre per 10000 pop Acres 5 6 8 11

    Roads

    Road requirement with benchmark @ 1.5 to 2 m per capita

    road length km 77.43 85.99 122.81 168.20

    Street Lights

    Requirement @ 30 m gap between street lights Nos 2581 2866 4094 5607

    Parks and Open spaces

    Requirement @1.0 to 1.2 hectare per 1000 population Acres 127.5 141.59 202.23 276.97

    Community Hall and Library

    Requirement @ 1 per 15000 population (2000 sq.m) Nos 3 4 5 7

    Source: Analysis and calculations

  • 5/23/2018 Vella Koil

    29/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    14

    The chapters that follow propose projects needed to ensure efficient delivery of the services.

    3.7 STRATEGIES FOR POVERTY REDUCTION AND SLUM UPGRADATION

    Towards Building Successful Slum-Upgrading Strategies

    Youth groups can be very effective.

    Youth SHGs can be encouraged and made active participants in developmental activities.

    Unlike Women SHGs, which are formed originally for social empowerment, Youth SHGs can

    aim at both economic empowerment and social empowerment as the primary focus. The

    focus can be on skill training for increasing their employability and promotion of economic

    activities.

    Group formation:

    The SHGs can be formed with unemployed youth in the age group of 18 to 35 years. Each

    group may comprise 10 to 20 members drawn from the below poverty line population.

    Youth SHGs can be beneficial in the following ways

    To engage the communities in development activities through a dialogue with the active

    participation of the youth (men and women) with a sense of commitment and integrity

    To equip the youth by building their skills, capacity and capability in managing

    development, so that, they can help build the capacity of the citizens to manage the affairs of

    the community on their own.

    Infrastructure provision

    Infrastructure provision brings indirect social and economic development, particularly for

    women. Improved infrastructure reduces womens work burden and gives them more time,

    increased space allows for more home-based economic activity, and lighting and better road

    coverage increase mobility and security at night. Infrastructure provision is perceived to have

    a significant impact on health, reducing incidence of illnesses which are related to an

    unhygienic living environment.

    Community halls are valuable for project work as well as for private and public socia

    activities, however, halls are prone to capture and maintenance can be a problem. They can

    also be used as location for health camps, balwadis (pre-schools), vocational training and

    neighborhood committee meetings. They can be used by the community for a variety of

    occasion such as religious ceremonies, marriages, political meetings etc. conflicts over use

    and maintenance are common, and control over the hall give some individuals power in the

    community.

    Balwadis (pre-schools) and Schools

    Both these institutions benefit poor and working families, especially working mothers. If

    timings of balwadis are appropriate, then they have a positive effect on the lives of working

    women, freeing them of childcare and giving more time to women to do paid as well as non-

    paid work.

    Medical facilities

    Frequent illnesses and consequent break from work is a major factor that costs the time and

    money of the low income group. The availability and accessibility to medical facilities as

    necessary needs to be addressed as a priority issue.

  • 5/23/2018 Vella Koil

    30/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal report TNUDP III

    15

    The organisational structure of the Vellakoil Municipality generally consists of administrative and

    executive wings.

    4.1 ELECTED BODY

    The Municipal Council, the political wing of the Vellakoil Municipality consists of 21 elected

    councilors. Each Councilor represents one electoral ward. The Councilors in turn elect the Chairman

    as head of the Municipal Council.

    Administ rat ive wing

    The administrative wing gives overall guidance to the municipal functions through set of committees

    Three committees have been formed namely, Appointment Committee, Contract Committee and

    Taxation and Appeal committee consisting of the Chairman, the Municipal Commissioner and

    elected Councilors as members. Appointment Committee is a statutory committee, and the

    Chairman of the Municipality is also the Chairman of the committee. The Committee is responsible

    for making appointments for posts which fall under the purview of the Appointing Committee.

    Contract Committee is another statutory committee and quotation of works is finalized by the

    Contract Committee. The Taxation Appeal Committee is responsible for hearing of appeals of the

    tax items.

    4.2 EXECUTIVE WING

    The executive wing is responsible for the Municipal operations and maintenance. The Executive

    Officer is the administrative head of the executive wing and is supported mainly by 5 department

    heads in the Municipal operation and maintenance. The organization structure of the Municipality

    comprises of 5 functional departments namely,

    1. General Administration

    2. Engineering and Water Supply Department

    3. Accounts Department

    4. Public Health Department, and

    5. Town Planning Department

    4.2.1 General Administ ration

    Vellakoil Municipality is a Grade Three Municipality. The Manager is the head of Administration, next

    to the Commissioner in the section of General Administration, and he is responsible for general

    supervision and administration of the Office. All establishment matters are dealt by the GeneralAdministration Section.

    Manager

    Manager is the Head of General Section. His duty includes general supervision of the ministerial

    staff, and maintenance of discipline in the office premises, ' and to sign receipts for all remittances

    made in the Municipal Treasury to acknowledge registered tapals, Money orders etc on behalf of the

    Commissioner. The Manager is the custodian of the cash collected by daily-checking of Chitta and

    4ORGANISATIONAL STRUCTURE

  • 5/23/2018 Vella Koil

    31/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal report TNUDP III

    16

    Cash and Petty cash, payment advance etc, and for the administration report by way of Annual

    Inspection of the office, checking of Personal Registers of all staff and subsidiary registers in respect

    of all the sections. All papers are routed through the Manager to the commissioner except the

    Engineering section and the Health section.

    All matters relating, to the Establishment including public health, maintenance of Increment &

    Punishment registers, maintenance of service registers, register of Probationers; maintenance oftemporary and permanent post sanction register, Pension & Gratuity for all Establishment Audit

    Register, issue of Office order, common office order book, maintenance of stock file, maintenance of

    personal register & audit objection register etc are looked up by the Manager.

    4.2.2 Engineering Department

    The Municipal Engineer is the over-all in-charge of Engineering Section. The Municipal Engineer is

    controlling the Overseer, Work Inspector, and Road Mazdoor, Water works Superintendent,

    Wiremen, Helper and Fitter working in the section. The Municipal Engineer looks after the

    maintenance of roads, street lights, road laying, and construction of building, drainage, maintenance

    of parks, head works and municipal vehicles. The other subordinate officers are assisting theEngineer to look after the above works.

    4.2.3 Accounts Department

    The Account Section is included in the General Section. The Accountant is the Head of the Wing

    controlling financial matters. It involves preparation of Budget and looks after the Accrual based

    Accounting System.

    4.2.4 Public Health Department

    Sanitary Officer is the overall in-charge of the Health Section. He looks after conservancy, sweeping

    streets, maintenance of drainage, controlling of epidemic diseases, ensuring of license to D&Otrades, Birth and Death Registration and issuing of certificate to birth and death registration

    Sanitary Inspector, Sanitary Supervisor and Sanitary Workers are assisting the Sanitary Officer. The

    Sanitary Officer is held responsible for the solid waste management. Pulse Polio Immunization

    camps are conducted every year under the section.

    4.2.5 Town Planning Department

    Town Planning Officer/Inspector is over all in-charge of the section. He looks after the work of

    preparation of Master Plan, Detailed Development Plan and maintains the land use registers as per

    the approved zoning uses. He is also responsible for licensing of plan approved, booking of

    unauthorized construction, approval of lay out plans with in the town limit, controlling and removingthe encroachment in the town. The Town Planning Inspector helps in planning the future

    development of the town and allied works.

    4.3 STAFF STRENGTH POSITION AND VACANCY POSITION

    As of now, there is 136 vacancies in the 177 sanctioned strength of the Municipal office. The

    vacancies are mostly under the Sanitation section.

  • 5/23/2018 Vella Koil

    32/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal report TNUDP III

    17

    Table 4.1 Staff Strength

    S.

    No

    Name of the

    department

    Sanctioned

    strength

    Working

    strength

    No. of post

    Vacant

    1 General Section 7 7 -

    2 Engineering Section 9 8 1

    3 Public Health Section 28 28 -

    Total 44 43 1

    Source: Vellakoil Municipality, 2008.

    Fig 4.1 Status of Municipal Staff Strength

    Fig 4.2 Organisational structure of Vellakoil Municipality

    Vellakoil MUNICIPALITY

    EX ECUTIVE BODY EL ECTE D BODY

    Ex ecu tiv e Off icer Ch ai rm an

    E ng i neer i ng

    s t a f f

    PublicHealt h staff

    A dm in ist ra tion

    /Reven ue St aff

    Vice Ch airm an an d

    war d Co un ci lo rs

    ProjectA pp ro va ls

    Wa terSu pp ly

    Dra ins

    Roa ds

    Street l igh ts

    Sol id wa ste ,

    Drai nag e,

    B i r th &

    Dea th

    Reg istrat ion

    Off ice

    Ad m in istr at i

    o n Acc ou nt s

    Ta x

    Colle ctio n

  • 5/23/2018 Vella Koil

    33/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal report TNUDP III

    18

    4.4 ISSUES IN HUMAN RESOURCE

    Out of the Sanctioned posts of 44, in all sections of the Municipality, 1 post is vacant. Considering

    the present and proposed quantum of work in the municipality, the vacant posts in Engineering

    Section, Public Health Section need to be filled up expediously.

    In view Privatization of Solid Waste Management and Maintenance of street lights through ESCO/

    Private agency, implementation of proposed improvements in infrastructure, the various sections of

    the municipality need to be strengthened with the following personnel:

    Table 4.2 Additional Staff Required

    S No Name of the Post Section No. of Personnel

    1 Accounts officer General 1

    2 Data Entry Operator General 1

    3 Revenue Inspector General 1

    4 Municipal Engineer Engineering 1

    5 Supervisors Engineering 1

    6 Overseers Engineering 1

    7 Public health Engineer Public Health 1

    8 Town Planning Officer Town Planning 1

    Total 8

    Source: Analysis and discussions with Municipal officials

    Besides appointing the additional staff, the existing staff in the Administrative, Engineering, Public

    Health, and Town Planning sections of the municipality needs to be given training in their respective

    field periodically towards capacity building to take up new assignments.

    4.5 ORGANIZATION MANAGEMENT

    As may be seen from various sections of the report particularly relating to service deliveries, there

    are gaps of various sizes which result in a shortage in the delivery system. This could be over come

    by certain specific options:

    In most of the service sections of the Municipality, there are only a few vacancies which could be

    filled up. A totally satisfactory system delivery of the services would require an efficient personne

    management system.

    The organization and delivery mechanism in some of the important personnel intensive

    service sectors have to be modernized. To mention the important few relate to solid waste

    management, where large number of workers and staff are involved, could be privatized.

    Scientific solid waste management need to be assigned to NGOs, voluntary organizations or

    even the respective resident associations in the various colonies. This is a remunerative

    venture as is proved in many places.

    Privatizing the repair and maintenance of water supply, collection of taxes and fees and

    maintenance of public assets particularly sanitary and public health units is a well known

    option. This also could be taken up as joint venture between urban local body and private

    sector.

  • 5/23/2018 Vella Koil

    34/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    19

    5INFRASTRUCTURE STATUS AND NEEDS ASSESSMENT

    5.1 PHYSICAL INFRASTRUCTURE

    5.1.1 WATER SUPPLY

    i) Existing Status

    a. Source and headworks:

    Vellakoil municipality is provided with water supply from River Amaravathy and from the Muthur-

    Kangeyam CWSS with River Cauvery as source. Since the flow in River Amaravathy is non-

    perennial, water supply from this source is not dependable.

    Indicators for Water supply

    Population (Census 2001) 34,438

    Present population 49,500

    Total area of the town 64.75 sq.km

    Total no. of wards 21

    Source

    Water supplied 30 Ll

    Length of distribution system 168 km

    Rate of supply 70 lpcd

    Storage

    No. of OHTs and total capacity 6 and 13.50 Ll

    Frequency of supply Once in 4 days, for 3 hrs

    Distribution

    No. of open wells 56

    No. of Hand pumps 136No. of power pumps 76

    No. of public fountains 471

    Total no. of service connections 4012

    Domestic connections 3910

    Commercial 57

    Industrial 45

    Muthur-Kangeyam Combined Water Supply Scheme

    The Muthur-Kangeyam CWSS covers 994 rural habitations, 2 municipalities and 7 town

    panchayats. The water requirement for Vellakoil municipality is being pumped from Metukadai

    sump. The present level of supply from Amaravathi scheme and Muthur-Kangeyam CWSS is 0.5and 2.5 MLD respectively. Due to the rate of increase in population, the Muthur-Kangayam

    CWSS is inadequate to meet the water demand.

    Formulating a new scheme for additional requirement of Vellakoil municipality, Kangayam Town

    Panchayat, omitted rural habitations and enhancing supply to 994 rural beneficiaries will cause

    overlapping and duplication of pipeline for the entire project area. Hence it is proposed to de-link

    Vellakoil Municipality and Kangayam Town Panchayat from the existing scheme and a separate

    CWSS is prepared for Vellakoil municipality and Kangayam Town Panchayat.

  • 5/23/2018 Vella Koil

    35/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    20

    b. Service Reservoirs

    There are totally 6 over head tanks in the town. The details of the Over head tanks are shown in

    Table 5.1.

    Table 5.1 Details o f OHTs

    S.No Location of OHT Capacity (Lakh litres)

    1 Salavaiyalar colony 1.00

    2 Natesan nagar 4.00

    3 Uppupalayam 3.50

    4 Municipal office 2.00

    5 Theethampalayam 1.50

    6 Sivananthapuram 1.50

    Total 13.50

    Source: Vellakoil Municipality

    c. Distribution system

    The total length of the existing distribution system is 168 km against a total length of roads

    174.50 km.

    d. Water Tariff

    The monthly tariff and deposits collected for water supply is as follows:

    Table No. 5.2:Water Tariff-Deposit Details

    Type of connection Deposit amount (in Rs) Flat rate /month (in Rs)

    Domestic 3000.00 65.00

    Commercial 6000.00 115.00

    Industrial 6000.00 105.00

    Source: Vellakoil Municipality

    ii) Water Supply Demand

    The population of the town is projected for the intermediate and ultimate years. The projected

    water demand is given in table 5.3

    Table 5.3 Demand & Supply in Water Supply - Projection

    Year PopulationSupply in

    MLD

    Demand @ 135

    lpcd

    Gap in

    MLD

    Floating

    population

    Floating population

    demand at 20 lpcd

    2001 34438 3.0 4.65 1.65 - -

    2010 51620 3.0 6.96 3.96 10000 0.20

    2025 81873 3.0 11.05 8.05 13000 0.26

    2040 112132 3.0 15.14 12.14 17000 0.34

    Source: Municipal records, Analysis and calculation

    The present floating population is taken as 10000. The annual increase of 2% is taken for

    calculating the projection. The per capita supply of 20 lpcd is proposed for floating population.

    The demand of water supply for the above period is calculated at 135 lpcd.

    iii) Demand Assessment

    The water supply improvement scheme has been prepared by TWAD Board which is awaiting

    fund release from Government of India. The issues in water supply are identified and remedial

  • 5/23/2018 Vella Koil

    36/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    21

    measures have been suggested. The water supply demand calculated by the TWAD Board for

    the intermediate population (2024) is 6.1 MLD and Ultimate year (2039) is 7.32 MLD.

    The town is experiencing high population growth as the town has a high potential for industrial

    growth. Therefore, the total demand of water supply calculated for intermediate period is 8.31

    MLD and ultimate period is 12.48 MLD.

    The present storage capacity of the service reservoirs is of 13.5 Ll. Therefore the storage

    requirement will be 12.48/3 = 4.16 MLD < 1.35 MLD (existing). Hence, additional storage of 1.42ML is required for intermediate period and 2.81 ML, required for the ultimate period.

    iv) Proposals

    The source proposed for this project is River Cauvery near Kodumudi. The proposed head works

    will be located just on the upstream of the existing headworks of Muthur-Kangeyam CWSS. It is

    proposed to draw 6.11 MLD for the intermediate stage and 7.32 MLD for the ultimate stage for

    Vellakoil alone.

    The salient features of the proposal are the head works, pump sets, raw water pumping main,

    treatment plant, clear water reservoir, clear water pump sets, pump house, Booster station,

    Laying of distribution system (feeder mains only) for 23 km and Construction of 4 OHTs at

    Melagoundanpalayam colony (1Ll), Muthur road (5Ll), Sivanathapuram (3 Ll) and Pudur road (2Ll). The per capita cost for this project is Rs.2926.00 and the cost per 1000 liters is Rs.8.05

    (schedule of rates 2007-08 + 10% price escalation).

    The installation cost of the water supply improvement scheme is Rs.1199.12 lakhs. The Annual

    Maintenance cost is Rs.49.00 lakhs.

    5.1.2 SEWERAGE

    i) Existing Status

    The town does not have an Under Ground Sewerage System. Disposal of the sewage is

    normally by way of individual facilities and the sullage is through the open drains. The main mode

    of individual disposal in the town is through septic tanks, low cost sanitation units and through

    public / community toilets.

    ii) Demand Assessment

    In order to improve the sanitation in the town, Under Ground Sewerage System is necessary with

    treatment facilities at terminal points.

    iii) Proposals

    The field survey for UGSS has been done by TWAD Board. Identification STP site is in progress.

    The total estimated cost of the proposed Under Ground Sewerage System for Vellakoil

    municipality is Rs.3300.00 lakhs. The Operation and Maintenance cost will be is Rs. 82.00lakhs.

    5.1.3 STORM WATER DRAINS

    i) Existing Status

    Vellakoil municipality has provided open storm water drains for a length of 19 km. The total

    length of the existing road length in the town is about 174.50 km. The percentage coverage of

    storm water drains is about 11%.

  • 5/23/2018 Vella Koil

    37/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    22

    At present, storm water drains carry the sullage and rain water which is ultimately let into the

    PAP channel (Parampikulam Aazhiyar Program) and Kurukampalayam Pirivu (proposed STP

    site) without any treatment. This imposes health and environmental hazard to the natural water

    system and needs to be addressed through a proper treatment and disposal facilities.

    ii) Issues

    The main issues persisting in the town due to the absence of a storm water drainage system aresummarized as follows:-

    Open drains creating unhygienic conditions

    Absence of Under Ground Drainage System in the town

    Water stagnation in low lying areas during rainy season

    iii) Demand Assessment

    The residential areas of the town are provided with open drains. The town area is 64.75 sq.km

    and about 75% of land are undeveloped, agricultural lands or barren lands. The storm water is

    carried by the natural drain network in these areas emptying into the channels.

    Absence of UGSS and storm water drains in the residential areas of the town are the major

    causes of land and water pollution. This situation degrades the environment by emanation of foul

    smell and unhealthy conditions due to stagnation at a number of points.

    iv) Proposals

    Proposals by consultants

    To develop a Comprehensive Drainage Master Plan channelizing the runoff along the

    natural contours so as to cover the entire town and implement in phases.

    Measures to be taken to improve, upgrade and clean the existing natural and man made

    storm water drains to the required functional level with the involvement of local

    community to ensure sustainable operation

    Provision of new drains in newly developing areas

    Table 5.4Storm water Drains - proposals

    S.No Description Capital Investment

    in lakhs

    1 Preparation of Comprehensive Drainage Master Plan 3.00

    2 Provision of new drains including newly developing area (15 km) 240.00

    3 Rejuvenation of entire existing drain network (19 km) 57.00

    Total 300.00

    Annual O & M 4.50

    Source: Analysis and discussions with municipal officials

    Therefore, the total investment required for the improvement of storm water drains (short term) is

    Rs.300.00 lakhs. The rest of the road length will be covered in the long term plan.

    5.1.4 IMPROVEMENT TO WATER BODIES

    i) Existing Status

    There is no water body in the town maintained by the municipality. The PAP channel is the

    manmade channel maintained by the PWD.

  • 5/23/2018 Vella Koil

    38/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    23

    5.1.5 SOLID WASTE MANAGEMENT

    i) Existing status

    Vellakoil Municipality generates 14 MT of solid waste. Out of 21 wards, 8 wards in the town are

    privatized (SHG) for solid waste collection. The solid waste generated in the town is collected

    and segregated at source and dumped in the compost yard (3.50 acres) at

    Soriyankinathupalayam. An income of Rs.1000 per annum is generated through selling of thesegregated recyclable waste. The details on solid waste management are given below:

    Total waste generation per day - 14 MT

    Frequency of collection - daily

    Collection efficiency - 85% (12 MT)

    Collection points - 40

    Push cart - 49

    Tri cycle - 5

    Tipper Lorries - 2

    Tractor - 1

    Power tillers - 2

    ii) Issues

    Absence of scientific waste management and disposal

    Inadequate sanitary workers and supervisors of the 159 sanctioned sanitary workers,

    only 24 workers are available.

    The existing compost yard is not provided with adequate infrastructure facilities

    Easy access and availability of open lands has led to negligent dumping and unsanitary

    conditions.

    iii) Demand Assessment

    Currently, 14 MT of solid waste is generated with a per capita waste generation of 300 grams per

    day. In future years assuming the per capita generation of solid waste in the town at 400 gm/day,

    there will be corresponding addition of 30% to 40% in solid waste generation. Solid Waste

    Management is one of the principal sectors of expenditure in Urban Local Bodies. Hence, there

    is a need for scientific management of solid waste to cope with future demand.

    Of the Municipal waste in Tamil Nadu, 40 - 60% of the waste is biodegradable. Of this, on

    conversion, nearly 30% by weight forms the manure. Incidentally, the manure generated from

    Municipal waste is found to be richer in NPK values compared to the one available in the market.

    This has resulted in producing better yield of agricultural products both in quantity and quality.

    iv) Proposals

    The improvements proposed towards solid waste management are as follows.

    Integrated Solid Waste Management is the application of suitable techniques, technologies and

    management programs covering all types of solid wastes from all sources to achieve the twin

    objectives of waste reduction and effective management of waste still produced after waste

    reduction. Municipal solid waste management involves the application of Integrated Solid Waste

    Management to Municipal waste.

  • 5/23/2018 Vella Koil

    39/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    24

    The activities associated with the management of municipal solid wastes from the point of

    generation to final disposal can be grouped into the six functional elements:

    a. Waste generation

    b. Waste handling and sorting, storing

    c. Collection

    d. Sorting, processing and transformation

    e. Transfer and transportf. Disposal

    The inter-relationship between the functional elements is given in Fig 5.1

    Fig 5.1 Functional Elements of a Municipal Solid Waste Management System

    The objective of solid waste management is to reduce the quantity of solid waste disposed into

    land by recovery of materials and energy form the waste. This in turn results in lesser

    requirement of raw material and energy as inputs for technological processes.

    1. The municipality must focus on revenue enhancement by privatizing of waste

    management of the following components:

    a. Primary collection

    b. Transfer to collection pointsc. Transfer to compost yard

    d. Segregation of waste and option of

    i. Selling scraps/recyclable waste.

    ii. Treatment of biodegradable waste

    iii. Transfer to identified regional land fill sites

    e. Compost yard management and sale of manure.

    2. The management of biodegradable waste as a revenue generating activity may involve,

  • 5/23/2018 Vella Koil

    40/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    25

    production of manure from composting. Wind rows composting is an established

    technology for dealing with bio degradable waste, which is the suggested option for this

    Municipality. The necessary infrastructure is given in the proposals.

    3. Conducting IEC campaigns to facilitate effective waste segregation at source and proper

    disposal.

    4. Implementing collection of conservancy fee for primary collection of waste and levy on

    commercial and industrial establishments.5. Involvement of voluntary agencies, SHGs in the various components of solid waste

    management on BOT, BOOT basis.

    6. Need to organize the rag pickers into waste-management associations/groups under the

    supervision of the urban local body and the relevant residents associations or market

    associations.

    The CDP proposals based on analysis, discussion with Municipal officials and norms is given in

    the table below:

    Table 5.5 Solid Waste management Proposals*

    Sl.No Project details Cost in lakhs

    1

    Small vehicle with containers for door to door collection @ 160 litres capacity

    (220 Nos) 25.00

    2 Dumper placer vehicle (2 nos) 15.00

    3 Purchase of land for additional Compost yard (2.50 acres) 250.00

    4

    Improvements for existing and new compost yard - with one side compound

    wall, segregation sheds, internal roads and machineries for preparation of

    compost 200.00

    5 Proportionate cost for regional land fill site 300.00

    6 IEC activities 10.00

    Total 800.00

    Annual Operation and Maintenance cost 6.25

    Source: Analysis and calculations

    Therefore, the total investment required for improvement in Solid Waste Management is

    Rs.800.00.00 lakhs.

    *-No rational decisions on municipal solid wastes system are possible until data of composition

    and quantity of solid waste are available. The method and capacity of storage, the correct type of

    collection vehicle, the optimum size of crew and the frequency of collection depend mainly on

    volume and density of wastes. Climate also has some influence.

    5.1.6 ROADS

    i) Existing status

    The major roads connecting the town to the surrounding urban centers are:

    Coimbatore Thiruchirapalli National Highway

    Erode Tharapuram road

    Moolanur road

  • 5/23/2018 Vella Koil

    41/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    26

    The details of the municipal roads is given in table 5.6

    Table 5.6 Category of roads

    Category Length in km % to total length

    National Highway 5.00 -

    Municipal Roads

    CC Roads 10.36 6

    BT Roads 106.88 61

    Earthen Road / WBM 57.26 33

    Total Length of Municipal Roads 174.50 100

    Source: Vellakoil Municipality

    ii) Issues

    33% of the total Municipal roads are earthen and WBM roads

    Differential settlements and potholed surfaces on the existing BT roads

    Encroachments on main roads

    Unorganized parking along main roads

    Absence of traffic management plan- with demarcated pedestrian corridors, medians,signals and traffic islands

    iii) Demand Assessment

    The circulation network forms basic network of the town to move, to interact, and interlink the

    residentials, the work places, and other activity centers. A good road network is a necessity not

    only for growth and development of habitats, but also to sustain it in a progressive mode. The

    access roads in extension areas and the link roads, widening of major roads proposed in the

    DDPs need to be provided.

    iv) Proposals

    The town has 33% earthen road which should be upgraded to BT surface. Apart from this, the

    access roads in extension areas need to be covered. The projects proposed for the road

    improvement in Vellakoil town is as follows.

    Table 5.7 Road improvement - Proposals

    S.no Particulars Rs.in lakhs

    1 Upgradation of earthen road to BT (57 km) 1197.00

    2 Restoration of existing BT roads (106 km) 636.00

    3 Provision of medians (3km) 30.00

    4 Improvements to road geometry provision of

    medians, traffic islands, Signals, signages etc

    30.00

    5 Pedestrian platform along main roads 50.00

    6 Widening of main roads and link roads 100.00

    Total Rs.2043.00 lakhs

    O&M 22.00

    Source: Analysis and discussions with municipal officials

    Therefore, the total investment required for the road improvement is Rs.2043.00 lakhs.

  • 5/23/2018 Vella Koil

    42/103

    City Development Plan for Vellakoil Municipality SMEC India Pvt LtdFinal Report TNUDP III

    27

    5.1.7 BUS STAND

    i) Existing Status

    The town has a C class bus stand in an extent of 1 acre, within its limits maintained by the

    municipality. About 250 buses per day arrive in this bus stand. The municipality bus stand

    complex has 8 shops.

    ii) Issues

    The flooring is damaged with differential settlements

    Inadequate waiting sheds for passengers.

    Inadequate space for buses

    Inadequate space for parking of two wheelers

    Inadequate water and toilet facilities

    iii) Proposals

    In order to bring the bus stand to effective functioning, the cooperation from the private and

    government bus operators, drivers and conductors and the public is necessary. The proposed

    expansion of bus stand with basic facilities work is under progress.

    5.1.8 BUS SHELTER

    The 6 bus stops in the town are provided with bus shelters. The construction of bus shelter at Old

    bus stand area for Rs.5.00 lakhs under MLA fund is in progress. New bus shelters (5 nos) are

    proposed to be constructed at Erode road Arivoli Nagar stop, Trichy -Coimbatore main road

    opp. to municipal office, Karattupalayam Pirivu, Madamedu piruvu (Mulanoor road),

    Theethampalyam at a cost of Rs.10.00 lakhs.

    It is also proposed to restore the existing bus shelters and provide space for information boards,

    space for advertisement and hoardings in the bus shelters which will generate revenue for the

    Municipality. The provision of bus shelters can be done with the help of NGOs and community

    organisations, industries etc.

    5.1.9 STREET LIGHTS

    i) Existing status

    The town is lit by 1986 street lights of which 89% of lights constitute tube light. About 40 number

    of timer switches are provided covering all street lights to minimize the energy consumption. The

    break-up details of the street lights in the town are as follows

    Table 5.8 Exist ing st reet lights and energy consumption

    S.No Existing Light details Numbers Percentage distribution Consumption in w

    1 Tube lights (40w) 1777 89 97735

    2 Sodium Vapour lamp (250w) 205 10 578103 High Mast lights 4 1 -

    Total 1986 155545

    Per hour consumption 155545 W or (excluding high mast)

    155.545 kW/hr

    No of timer switches required 60

    Source: Municipal records, Analysis and calculations

    Therefore, the present level of energy consumption of street l