ASSALAMUALAIKUM WR.WB

KELOMPOK : INJECTION MOLDINGFAKULTAS TEKNIK INDUSTRI

KANDAR PURNOMO 41613310030MIFTAKHUL HUDA 41613310003M.ZAINUL ALWAN 41613310013FAIZAL IRWANSYAH A 41613310022

Page 2: Tugas pltf new.pptx.1

SKETSA LAYOUT PLANT 1

PRODUKSI BOTOL BAYGON

Page 3: Tugas pltf new.pptx.1

GUDANG BARANG JADI UTILITY

MOLDREPAIR

AREA PRODUKSI

GUDANG BAHAN BAKU

MUSHOLA

KANTIN RESTROOM

TOILET

FINISHGOOD

LOCKEROFFICE

Page 4: Tugas pltf new.pptx.1

P L Acc2.98 149 48 96

Motor 20.00 8.00 15.00 2,400.00 3.6 180 10.417 5.2083Mobil Kecil 150.00 2.46 6.56 2,420.64

4,820.64Man 80.00 3.40 1.00 272.00Woman 15.00 3.40 1.00 51.00 15 15 3.4 3.4

323.00Man 15.00 2.98 1.00 44.70 8 8 1 1Woman 8.00 3.60 1.00 28.80Guest man 2.00 2.98 1.00 5.96Man Prod 30.00 2.98 1.00 89.40 GM 250Woman Prod 8.00 3.60 1.00 28.80 Man 200Guest woman 1.00 3.60 1.00 3.60 SPV 150

201.26Office 23.00 10.42 5.20 1,246.23 Acc 125Produksi 38.00 10.42 5.20 2,058.99 Engin 125

3,305.22Offices Administrasi 15.00 125.00 1.00 1,875.00 Clerk 85

Produksi 8.00 200.00 1.00 1,600.003,475.00

12,125.12

Parking

Locker

Total (feet²)

Toilet

Total (feet²)

Total (feet²)

Total (feet²)

Total (feet²)

Area Item Qty (feet/emplyee))

Grand Total (feet²)

Basic Toilet Basic Kantin

Basic Parking Basic Locker

Basic Offices

Kantin

EMPLOYEE SERVICE

Page 5: Tugas pltf new.pptx.1

PROSES PRODUKSI BOTOL BAYGON

PENGERINGANMATERIAL MACHINING PACKING 1

PRODUCT TRANSIT

LABELINGPACKING 2FINISH GOOD

WIP 2

WIP 1

WIP 3

Page 6: Tugas pltf new.pptx.1

LAYOUT MATERIAL HANDLING

Page 7: Tugas pltf new.pptx.1

LAYOUT PRODUKSI

Page 8: Tugas pltf new.pptx.1

1 m

1 m

4 m

0,5 m

0,75 m1,5 m

1,5 m

0,5 m

1 m2 m

P= 1+1+4+0,5+0,75 = 7,25 ml= 2+1,5+1 = 4,5 m

L= pxl = 7,25 = 32,625 m2

LAYOUT MESIN ASB

Page 9: Tugas pltf new.pptx.1

58 M

20 M

LUAS = 58 X 20 =1160 M

2

Page 10: Tugas pltf new.pptx.1

22 M

60 M

30 M

60 M

50 M28 M90 M40 M

264 M

188 M

DENAH BANGUNAN

TOTAL LUAS BANGUNAN DAN TANAH == 264 X 188 =

49.632 M2

AREA PARKIR MOBIL

Page 11: Tugas pltf new.pptx.1

TERIMAKASIH