Page 1 of 104 PENGADAAN KHS OSP-FO NO DESIGNATOR URAIAN PEKERJAAN SATUAN Paket 1 Pake Material Jasa Material A Kabel, Penyambungan dan Pekerjaan Sipil 1.1345 1.1002 0 1 DC-OF-SM-12D meter 8,677 3,003 8,414 2 DC-OF-SM-24D Idem 24 core meter 11,107 3,003 10,771 3 DC-OF-SM-48D Idem 48 core meter 15,949 3,003 15,467 4 DC-OF-SM-96D Idem 96 core meter 26,956 3,003 26,141 5 DC-OF-SM-144D Idem 144 core meter 38,573 3,653 37,407 6 DC-OF-SM-264D Idem 264 core meter 66,505 3,653 64,494 7 DC-OF-SM-288D Idem 288 core meter 71,216 3,647 69,063 8 DC-OF-SM-432D Idem 432 core meter 187,189 4,054 181,530 9 DC-OF-SM-960D Idem 960 core meter 336,947 4,054 326,759 10 AC-OF-SM-12D meter 11,742 4,183 11,387 11 AC-OF-SM-24D Idem 24 core meter 13,950 4,152 13,528 12 AC-OF-SM-48D Idem 48 core meter 20,137 4,152 19,529 13 AC-OF-SM-96D Idem 96 core meter 30,178 4,152 29,265 14 DC-OF-SM-12C meter 11,681 3,003 11,328 15 DC-OF-SM-24C Idem 24 core meter 16,460 3,003 15,963 16 DC-OF-SM-48C Idem 48 core meter 26,648 3,003 25,843 17 DC-OF-SM-96C Idem 96 core meter 49,491 3,003 47,995 18 AC-OF-SM-12C meter 15,153 4,152 14,695 19 AC-OF-SM-24C Idem 24 core meter 20,534 4,152 19,914 20 AC-OF-SM-48C Idem 48 core meter 31,993 4,152 31,026 21 AC-OF-SM-96C Idem 96 core meter 55,863 4,152 54,174 22 DC-OF-SM-8-SC meter 11,232 3,003 10,892 Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Upload: tamztechmanggadua

Post on 15-Apr-2016

576 views

Category:

Documents


153 download

TRANSCRIPT

Page 1: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 1 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material A Kabel, Penyambungan dan Pekerjaan Sipil 1.1345 1.1002

0

1 DC-OF-SM-12D meter 8,677 3,003 8,414

2 DC-OF-SM-24D Idem 24 core meter 11,107 3,003 10,771

3 DC-OF-SM-48D Idem 48 core meter 15,949 3,003 15,467

4 DC-OF-SM-96D Idem 96 core meter 26,956 3,003 26,141

5 DC-OF-SM-144D Idem 144 core meter 38,573 3,653 37,407

6 DC-OF-SM-264D Idem 264 core meter 66,505 3,653 64,494

7 DC-OF-SM-288D Idem 288 core meter 71,216 3,647 69,063

8 DC-OF-SM-432D Idem 432 core meter 187,189 4,054 181,530

9 DC-OF-SM-960D Idem 960 core meter 336,947 4,054 326,759

10 AC-OF-SM-12D meter 11,742 4,183 11,387

11 AC-OF-SM-24D Idem 24 core meter 13,950 4,152 13,528

12 AC-OF-SM-48D Idem 48 core meter 20,137 4,152 19,529

13 AC-OF-SM-96D Idem 96 core meter 30,178 4,152 29,265

14 DC-OF-SM-12C meter 11,681 3,003 11,328

15 DC-OF-SM-24C Idem 24 core meter 16,460 3,003 15,963

16 DC-OF-SM-48C Idem 48 core meter 26,648 3,003 25,843

17 DC-OF-SM-96C Idem 96 core meter 49,491 3,003 47,995

18 AC-OF-SM-12C meter 15,153 4,152 14,695

19 AC-OF-SM-24C Idem 24 core meter 20,534 4,152 19,914

20 AC-OF-SM-48C Idem 48 core meter 31,993 4,152 31,026

21 AC-OF-SM-96C Idem 96 core meter 55,863 4,152 54,174

22 DC-OF-SM-8-SC meter 11,232 3,003 10,892

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Page 2: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 2 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material23 DC-OF-SM-12-SC Idem 12 Core meter 13,927 3,003 13,506

24 DC-OF-SM-24-SC Idem 24 Core meter 18,757 3,003 18,190

25 AC-OF-SM-8-SC meter 13,478 4,152 13,070

26 AC-OF-SM-12-SC Idem 12 Core meter 17,018 4,152 16,503

27 AC-OF-SM-24-SC Idem 24 Core meter 21,224 4,152 20,583

28 SC-OF-SM-24 pcs 822,513 34,167 797,645

29 SC-OF-SM-48 Idem 12 - 48 core pcs 929,217 34,167 901,123

30 SC-OF-SM-96 Idem 12 - 96 core pcs 1,060,758 34,167 1,028,687

31 SC-OF-SM-144 Idem 12 - 144 core pcs 1,474,850 34,167 1,430,260

32 SC-OF-SM-288 Idem 12 - 288 core pcs 2,609,350 34,167 2,530,460

33 OS-SM-1 core - 58,753 -

34 AB-OF-SM-2D meter 2,165 2,412 2,099

35 AB-OF-SM-4D Idem 4 core meter 3,029 2,412 2,938

36 AB-OF-SM-8D Idem 8 core meter 5,626 2,412 5,456

37 AB-OF-SM-12D Idem 12 core meter 7,791 2,412 7,555

38 AB-OF-SM-24D Idem 24 core meter 11,097 3,417 10,761

39 AB-OF-SM-48D Idem 48 core meter 17,528 3,417 16,998

40 AB-OF-SM-72D Idem 72 core meter 28,132 3,417 27,282

41 AB-OF-SM-96D Idem 96 core meter 33,109 3,377 32,108

42 AB-OF-SM-144D Idem 144 core meter 51,071 3,859 49,527

43 AB-OF-SM-288D Idem 288 core meter 97,380 4,824 94,436

44 DC-OF-SM-1A meter 5,173 3,003 5,017

45 DC-OF-SM-2A idem 2 core meter 5,446 3,003 5,281

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Page 3: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 3 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material46 DC-OF-SM-1B meter 5,442 3,003 5,278

47 DC-OF-SM-2B idem 2 core meter 5,446 3,036 5,281

48 AC-OF-SM-1B meter 5,446 4,152 5,281

49 AC-OF-SM-2B idem 2 core meter 5,707 4,152 5,534

50 PC-APC-657-2 pcs 82,478 3,036 79,985

51 PC-APC-657-A1 additional per 1 meter pcs 5,173 1,503 5,017

52 PC-UPC-657-2 pcs 68,268 3,036 66,204

53 PC-UPC-657-A1 additional per 1 meter pcs 5,173 1,503 5,017

54 PC-APC-655-2 pcs 79,415 3,036 77,014

55 PC-APC-655-A1 additional per 1 meter pcs 5,173 1,503 5,017

56 PC-UPC-655-2 pcs 61,972 3,036 60,098

57 PC-UPC-655-A1 additional per 1 meter pcs 5,173 1,503 5,017

58 PC-APC-652-2 pcs 77,146 3,036 74,814

59 PC-APC-652-A1 additional per 1 meter pcs 5,173 1,503 5,017

60 PC-UPC-652-2 pcs 59,300 3,036 57,507

61 PC-UPC-652-A1 additional per 1 meter pcs 5,173 1,503 5,017

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Page 4: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 4 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material62 ODC-C-48 pcs 5,632,864 4,175,600 5,462,562

63 ODC-C-144 pcs 14,070,069 5,642,327 13,644,680

64 ODC-C-288 pcs 25,226,742 5,684,905 24,464,047

65 ODC-C-576 pcs 66,630,248 5,640,333 64,615,777

66 ODP-CA-8 pcs 1,327,365 136,669 1,287,234

67 ODP-CA-16 pcs 1,588,300 136,669 1,540,280

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Page 5: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 5 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material68 ODP-A-8 pcs 1,054,574 136,669 1,022,691

69 ODP-A-16 pcs 1,361,400 136,669 1,320,240

70 ODP-PB-8 pcs 1,021,050 136,427 990,180

71 ODP-PB-16 pcs 1,284,382 136,669 1,245,550

72 ODP-PL-8 pcs 2,376,514 136,669 2,304,664

73 ODP-PL-16 pcs 2,940,034 136,669 2,851,146

74 TC-SM-12 pcs 1,162,802 742,144 1,127,647

75 TC-SM-24 Idem 24 core pcs 1,634,750 1,484,288 1,585,325

76 TC-SM-48 Idem 48 core pcs 3,156,746 2,968,577 3,061,307

77 TC-SM-96 Idem 96 core pcs 5,442,197 5,937,154 5,277,659

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Page 6: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 6 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material78 FTB-SM-144SA pcs 11,912,250 525,686 11,552,100

79 TR-FTM-HIGH CAP pcs 16,393,570 525,686 15,897,934

80 RS-IN-SC-1P pcs 72,608 61,846 70,413

81 RS-IN-SC-2P idem 2 port pcs 106,643 125,053 103,419

82 PS-1-2-ODC pcs 299,006 34,000 289,966

83 PS-1-4-ODC Idem, 1 : 4 pcs 396,508 34,000 384,520

84 PS-1-8-ODP Idem, 1 : 8 pcs 631,826 34,000 612,723

85 PS-1-16-ODP Idem, 1 : 16 pcs 975,670 34,000 946,172

86 PS-2-2-ODC pcs 692,045 34,247 671,122

87 PS-2-4-ODC Idem, 2 : 4 pcs 816,840 34,247 792,144

88 SITAC Akuisisi Lahan SITAC ODC Node - 7,421,442 -

89 PU-S7.0-140 pcs 1,166,334 192,875 1,131,072

90 PU-S9.0-140 pcs 1,928,650 195,161 1,870,340

91 PU-C7.0-250 pcs 2,836,250 201,285 2,750,500

92 PU-C9.0-300 pcs 3,392,155 198,867 3,289,598

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Page 7: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 7 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs 526,175 60,713 510,267

94 PU-AS set 33,134 40,413 32,132

95 GB-G1 pcs 903,909 408,081 876,581

96 GB-G3 pcs 2,722,800 473,085 2,640,480

97 GB-G-INTG pcs 273,437 164,419 265,170

98 TC-02-ODC pcs 246,029 60,975 238,590

99 PP-OF-IN meter 27,001 4,041 26,185

100 PP-OF-OUT meter 26,680 4,041 25,873

101 DD-S3-1 meter 340,364 60,620 330,073

102 DD-S3-2 idem, 2 pipa meter 680,728 80,827 660,148

103 DD-S3-3 idem, 3 pipa meter 1,021,092 121,240 990,221

104 DD-V4-1 meter 64,761 60,620 62,803

105 DD-V4-2 Idem, 2 pipa meter 129,520 80,950 125,604

106 DD-V5-1 meter 62,619 60,620 60,726

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Page 8: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 8 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material107 DD-V5-2 Idem, 2 pipa meter 125,930 80,827 122,122

108 DD-DA-S1 meter 340,364 242,481 330,073

109 DD-DA-S2 idem, 2 pipa meter 680,728 484,962 660,148

110 DD-DA-S4 idem, 4 pipa meter 1,361,457 969,923 1,320,295

111 DD-BSS-S1 meter 438,484 242,481 425,227

112 DD-BSS-S2 Idem, 2 pipa meter 876,889 484,962 850,378

113 DD-BTS-S1 meter 436,783 242,481 423,577

114 DD-BTS-S2 idem, 2 pipa meter 873,565 484,962 847,154

115 DD-BTS-S4 idem, 4 pipa meter 1,736,900 735,171 1,684,387

116 HB-PS-1 meter 152,793 38,653 148,174

117 HB-PS-2 meter 314,514 46,384 305,005

118 HB-PS-4 meter 608,773 54,115 590,367

119 HB-PC-2 meter 517,332 46,384 501,691

120 HB-PC-4 meter 1,013,774 54,115 983,124

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Page 9: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 9 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material121 DD-BMR-1 track 1,021,092 22,264,326 990,221

122 DD-BMR-2 idem, 2 pipa track 2,042,185 33,396,489 1,980,443

123 DD-BMR-4 idem, 4 pipa track 4,084,369 44,528,653 3,960,884

124 DC-SD-28-1 meter 9,785 1,643 9,489

125 DC-SD-28-3 idem, 3 pipa meter 29,355 2,145 28,468

126 DC-SD-33-1 meter 10,517 1,643 10,199

127 DC-SD-33-2 idem, 2 pipa meter 21,334 2,136 20,689

128 DC-SD-43-1 meter 23,257 1,643 22,554

129 DC-SD-43-2 idem, 2 pipa meter 46,515 2,136 45,108

130 DCD-PVC-1 meter 14,358 1,623 13,924

131 DD-BM-100-1 meter 340,364 72,159 330,073

132 DD-BM-100-2 Idem, 2 pipa meter 680,728 74,837 660,148

133 DD-BM-50-1 meter 198,538 37,385 192,535

134 DD-BM-50-2 Idem, 2 pipa meter 394,500 37,385 382,573

135 DD-BM-HDPE-40-1 meter - 37,516 -

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter - 37,411 -

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Page 10: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 10 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material137 DD-BM-HDPE-50-1 meter - 37,516 -

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter - 37,385 -

139 DD-HDPE-40-1 meter 13,219 1,564 12,820

140 DD-HDPE-40-2 Idem 2 pipa meter 26,440 1,892 25,640

141 DD-HDPE-50-1 meter 22,463 1,564 21,784

142 DD-HDPE-50-2 Idem 2 pipa meter 44,926 1,892 43,568

143 DD-HDPE-40-1C meter 13,756 1,564 13,340

144 DD-HDPE-40-2C idem, 2 pipa meter 27,322 1,892 26,496

145 DD-ROD meter - 2,021 -

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter 39,762 80,827 38,560

147 DD-RV-CONCRETE m3 1,165,313 727,443 1,130,081

148 DD-DS-S1 meter 282,253 169,737 273,720

149 DD-DS-COD1-M meter 27,170 475,966 26,349

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Page 11: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 11 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material150 BC-TR-0.4 meter - 13,862 -

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter - 17,594 -

152 BC-TR-1 idem, kedalaman 1 meter meter - 26,390 -

153 BC-TR-2 idem, kedalaman 1,2 meter meter - 31,012 -

154 BC-TR-3 idem, kedalaman 1,3 meter meter - 32,987 -

155 BC-TR-4 idem, kedalaman 1,4 meter meter - 35,329 -

156 BC-TR-5 meter - 37,516 -

157 BCTR-ROCK meter - 214,660 -

158 BD-SK Titik 58,266 80,827 56,504

159 SMD-ABS-2A pcs 275,317 158,292 266,993

160 SMD-ABS-3A idem 3 cabang pcs 300,687 170,987 291,596

161 SMD-ABS-4A idem 4 cabang pcs 839,426 188,089 814,047

162 SMD-ABS-6A idem 6 cabang pcs 702,775 206,898 681,528

163 DD-MDSC-5/3.5 pcs 24,728 520 23,980

164 DD-MDSC-10/8 pcs 26,029 520 25,242

165 DD-MDSC-12/10 pcs 27,461 520 26,630

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Page 12: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 12 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material166 DD-MDDI-1A meter 5,928 1,861 5,749

167 DD-MDDI-2A Idem 2 way meter 8,062 2,450 7,818

168 DD-MDDI-4A Idem 4 way meter 12,742 2,805 12,357

169 DD-MDDI-7A Idem 7 way meter 18,073 2,828 17,527

170 DD-MDDI-12A Idem 12 way meter 27,174 3,251 26,353

171 DD-MDDI-19A Idem 19 way meter 37,870 3,785 36,725

172 DD-MDDI-24A Idem 24 way meter 46,271 4,320 44,872

173 DD-MDDI-1B meter 12,014 2,404 11,651

174 DD-MDDI-2B Idem 2 way meter 17,163 2,805 16,645

175 DD-MDDI-4B Idem 4 way meter 30,554 3,206 29,631

176 DD-MDDI-7B Idem 7 way meter 44,728 3,696 43,375

177 DD-MDDI-1C meter 14,198 3,028 13,768

178 DD-MDDI-2C Idem 2 way meter 20,461 3,473 19,842

179 DD-MDDI-4C Idem 4 way meter 36,666 4,321 35,557

180 DD-MDDI-7C Idem 7 way meter 53,959 4,631 52,327

181 DD-MDDB-1A meter 14,781 2,730 14,334

182 DD-MDDB-2A Idem 2 way meter 17,475 3,592 16,946

183 DD-MDDB-4A Idem 4 way meter 24,964 4,115 24,209

184 DD-MDDB-7A Idem 7 way meter 32,328 4,147 31,351

185 DD-MDDB-12A Idem 12 way meter 48,056 4,768 46,603

186 DD-MDDB-19A Idem 19 way meter 61,830 5,551 59,961

187 DD-MDDB-24A Idem 24 way meter 73,644 6,335 71,417

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Page 13: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 13 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUANPaket 1 Paket 2

Material Jasa Material188 DD-MDDB-1B meter 24,959 3,527 24,204

189 DD-MDDB-2B Idem 2 way meter 32,328 4,115 31,351

190 DD-MDDB-4B Idem 4 way meter 57,292 4,702 55,560

191 DD-MDDB-7B Idem 7 way meter 76,388 5,421 74,079

192 DD-MDDB-1C meter 29,109 4,441 28,229

193 DD-MDDB-2C Idem 2 way meter 38,069 5,095 36,918

194 DD-MDDB-4C Idem 4 way meter 67,777 6,287 65,727

195 DD-MDDB-7C Idem 7 way meter 90,867 6,792 88,120

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs 14,316 520 13,883

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs 14,316 520 13,883

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs 14,316 520 13,883

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs 6,580,100 2,714,357 6,381,160

200 MH-HH2 pcs 4,603,674 2,066,404 4,464,488

201 HH-PIT-P-HA pcs 867,461 183,294 841,235

202 HH-PIT-P-ODP pcs 2,836,250 273,403 2,750,500

203 HH-PIT-P-ODC pcs 10,755,060 515,884 10,429,896

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs 920,846 714,884 893,006

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core - 59,409 -

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Page 14: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 14 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

A Kabel, Penyambungan dan Pekerjaan Sipil

0

1 DC-OF-SM-12D meter

2 DC-OF-SM-24D Idem 24 core meter

3 DC-OF-SM-48D Idem 48 core meter

4 DC-OF-SM-96D Idem 96 core meter

5 DC-OF-SM-144D Idem 144 core meter

6 DC-OF-SM-264D Idem 264 core meter

7 DC-OF-SM-288D Idem 288 core meter

8 DC-OF-SM-432D Idem 432 core meter

9 DC-OF-SM-960D Idem 960 core meter

10 AC-OF-SM-12D meter

11 AC-OF-SM-24D Idem 24 core meter

12 AC-OF-SM-48D Idem 48 core meter

13 AC-OF-SM-96D Idem 96 core meter

14 DC-OF-SM-12C meter

15 DC-OF-SM-24C Idem 24 core meter

16 DC-OF-SM-48C Idem 48 core meter

17 DC-OF-SM-96C Idem 96 core meter

18 AC-OF-SM-12C meter

19 AC-OF-SM-24C Idem 24 core meter

20 AC-OF-SM-48C Idem 48 core meter

21 AC-OF-SM-96C Idem 96 core meter

22 DC-OF-SM-8-SC meter

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

PENGADAAN KHS OSP-FO TAHUN 2014-2017

Paket 2 Paket 3

Jasa Material Jasa 1.1731

2,948 8,972 3,304

2,948 11,485 3,304

2,948 16,491 3,304

2,948 27,873 3,304

3,587 39,885 4,020

3,587 68,768 4,020

3,581 73,639 4,013

3,980 193,558 4,460

3,980 348,411 4,460

4,107 12,142 4,603

4,076 14,424 4,568

4,076 20,823 4,568

4,076 31,204 4,568

2,948 12,078 3,304

2,948 17,021 3,304

2,948 27,555 3,304

2,948 51,175 3,304

4,076 15,669 4,568

4,076 21,233 4,568

4,076 33,081 4,568

4,076 57,763 4,568

2,948 11,614 3,304

Page 15: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 15 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

23 DC-OF-SM-12-SC Idem 12 Core meter

24 DC-OF-SM-24-SC Idem 24 Core meter

25 AC-OF-SM-8-SC meter

26 AC-OF-SM-12-SC Idem 12 Core meter

27 AC-OF-SM-24-SC Idem 24 Core meter

28 SC-OF-SM-24 pcs

29 SC-OF-SM-48 Idem 12 - 48 core pcs

30 SC-OF-SM-96 Idem 12 - 96 core pcs

31 SC-OF-SM-144 Idem 12 - 144 core pcs

32 SC-OF-SM-288 Idem 12 - 288 core pcs

33 OS-SM-1 core

34 AB-OF-SM-2D meter

35 AB-OF-SM-4D Idem 4 core meter

36 AB-OF-SM-8D Idem 8 core meter

37 AB-OF-SM-12D Idem 12 core meter

38 AB-OF-SM-24D Idem 24 core meter

39 AB-OF-SM-48D Idem 48 core meter

40 AB-OF-SM-72D Idem 72 core meter

41 AB-OF-SM-96D Idem 96 core meter

42 AB-OF-SM-144D Idem 144 core meter

43 AB-OF-SM-288D Idem 288 core meter

44 DC-OF-SM-1A meter

45 DC-OF-SM-2A idem 2 core meter

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Paket 2 Paket 3

Jasa Material Jasa 2,948 14,401 3,304

2,948 19,395 3,304

4,076 13,936 4,568

4,076 17,597 4,568

4,076 21,946 4,568

33,543 850,498 37,593

33,543 960,832 37,593

33,543 1,096,849 37,593

33,543 1,525,030 37,593

33,543 2,698,130 37,593

57,680 - 64,643

2,368 2,238 2,653

2,368 3,132 2,653

2,368 5,817 2,653

2,368 8,056 2,653

3,354 11,474 3,759

3,354 18,124 3,759

3,354 29,089 3,759

3,315 34,236 3,715

3,789 52,808 4,246

4,736 100,693 5,308

2,948 5,349 3,304

2,948 5,631 3,304

Page 16: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 16 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

46 DC-OF-SM-1B meter

47 DC-OF-SM-2B idem 2 core meter

48 AC-OF-SM-1B meter

49 AC-OF-SM-2B idem 2 core meter

50 PC-APC-657-2 pcs

51 PC-APC-657-A1 additional per 1 meter pcs

52 PC-UPC-657-2 pcs

53 PC-UPC-657-A1 additional per 1 meter pcs

54 PC-APC-655-2 pcs

55 PC-APC-655-A1 additional per 1 meter pcs

56 PC-UPC-655-2 pcs

57 PC-UPC-655-A1 additional per 1 meter pcs

58 PC-APC-652-2 pcs

59 PC-APC-652-A1 additional per 1 meter pcs

60 PC-UPC-652-2 pcs

61 PC-UPC-652-A1 additional per 1 meter pcs

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Paket 2 Paket 3

Jasa Material Jasa 2,948 5,627 3,304

2,981 5,631 3,341

4,076 5,631 4,568

4,076 5,901 4,568

2,981 85,284 3,341

1,476 5,349 1,654

2,981 70,591 3,341

1,476 5,349 1,654

2,981 82,117 3,341

1,476 5,349 1,654

2,981 64,081 3,341

1,476 5,349 1,654

2,981 79,771 3,341

1,476 5,349 1,654

2,981 61,318 3,341

1,476 5,349 1,654

Page 17: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 17 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

62 ODC-C-48 pcs

63 ODC-C-144 pcs

64 ODC-C-288 pcs

65 ODC-C-576 pcs

66 ODP-CA-8 pcs

67 ODP-CA-16 pcs

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Paket 2 Paket 3

Jasa Material Jasa 4,099,340 5,824,515 4,594,232

5,539,281 14,548,786 6,208,009

5,581,081 26,085,052 6,254,855

5,537,323 68,897,262 6,205,815

134,173 1,372,527 150,371

134,173 1,642,340 150,371

Page 18: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 18 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

68 ODP-A-8 pcs

69 ODP-A-16 pcs

70 ODP-PB-8 pcs

71 ODP-PB-16 pcs

72 ODP-PL-8 pcs

73 ODP-PL-16 pcs

74 TC-SM-12 pcs

75 TC-SM-24 Idem 24 core pcs

76 TC-SM-48 Idem 48 core pcs

77 TC-SM-96 Idem 96 core pcs

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Paket 2 Paket 3

Jasa Material Jasa 134,173 1,090,455 150,371

134,173 1,407,720 150,371

133,936 1,055,790 150,105

134,173 1,328,081 150,371

134,173 2,457,372 150,371

134,173 3,040,065 150,371

728,590 1,202,365 816,549

1,457,181 1,690,370 1,633,098

2,914,361 3,264,151 3,266,197

5,828,723 5,627,361 6,532,394

Page 19: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 19 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

78 FTB-SM-144SA pcs

79 TR-FTM-HIGH CAP pcs

80 RS-IN-SC-1P pcs

81 RS-IN-SC-2P idem 2 port pcs

82 PS-1-2-ODC pcs

83 PS-1-4-ODC Idem, 1 : 4 pcs

84 PS-1-8-ODP Idem, 1 : 8 pcs

85 PS-1-16-ODP Idem, 1 : 16 pcs

86 PS-2-2-ODC pcs

87 PS-2-4-ODC Idem, 2 : 4 pcs

88 SITAC Akuisisi Lahan SITAC ODC Node

89 PU-S7.0-140 pcs

90 PU-S9.0-140 pcs

91 PU-C7.0-250 pcs

92 PU-C9.0-300 pcs

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Paket 2 Paket 3

Jasa Material Jasa 516,085 12,317,550 578,389

516,085 16,951,342 578,389

60,716 75,078 68,046

122,769 110,271 137,591

33,379 309,180 37,409

33,379 409,998 37,409

33,379 653,323 37,409

33,379 1,008,866 37,409

33,621 715,591 37,680

33,621 844,632 37,680

7,285,904 - 8,165,492

185,053 1,206,017 206,859

187,298 1,994,270 209,375

193,310 2,932,750 216,113

190,936 3,507,569 213,452

Page 20: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 20 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs

94 PU-AS set

95 GB-G1 pcs

96 GB-G3 pcs

97 GB-G-INTG pcs

98 TC-02-ODC pcs

99 PP-OF-IN meter

100 PP-OF-OUT meter

101 DD-S3-1 meter

102 DD-S3-2 idem, 2 pipa meter

103 DD-S3-3 idem, 3 pipa meter

104 DD-V4-1 meter

105 DD-V4-2 Idem, 2 pipa meter

106 DD-V5-1 meter

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Paket 2 Paket 3

Jasa Material Jasa 59,604 544,078 66,799

39,675 34,262 44,465

400,628 934,664 448,994

464,445 2,815,440 520,515

161,416 282,741 180,903

59,862 254,400 67,089

3,967 27,920 4,446

3,967 27,588 4,446

59,513 351,944 66,698

79,351 703,889 88,931

119,026 1,055,833 133,395

59,513 66,964 66,698

79,472 133,927 89,066

59,513 64,749 66,698

Page 21: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 21 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

107 DD-V5-2 Idem, 2 pipa meter

108 DD-DA-S1 meter

109 DD-DA-S2 idem, 2 pipa meter

110 DD-DA-S4 idem, 4 pipa meter

111 DD-BSS-S1 meter

112 DD-BSS-S2 Idem, 2 pipa meter

113 DD-BTS-S1 meter

114 DD-BTS-S2 idem, 2 pipa meter

115 DD-BTS-S4 idem, 4 pipa meter

116 HB-PS-1 meter

117 HB-PS-2 meter

118 HB-PS-4 meter

119 HB-PC-2 meter

120 HB-PC-4 meter

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Paket 2 Paket 3

Jasa Material Jasa 79,351 130,214 88,931

238,053 351,944 266,792

476,105 703,889 533,582

952,209 1,407,779 1,067,164

238,053 453,403 266,792

476,105 906,724 533,582

238,053 451,644 266,792

476,105 903,287 533,582

721,744 1,795,996 808,877

37,947 157,992 42,528

45,537 325,215 51,035

53,126 629,485 59,540

45,537 534,934 51,035

53,126 1,048,267 59,540

Page 22: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 22 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

121 DD-BMR-1 track

122 DD-BMR-2 idem, 2 pipa track

123 DD-BMR-4 idem, 4 pipa track

124 DC-SD-28-1 meter

125 DC-SD-28-3 idem, 3 pipa meter

126 DC-SD-33-1 meter

127 DC-SD-33-2 idem, 2 pipa meter

128 DC-SD-43-1 meter

129 DC-SD-43-2 idem, 2 pipa meter

130 DCD-PVC-1 meter

131 DD-BM-100-1 meter

132 DD-BM-100-2 Idem, 2 pipa meter

133 DD-BM-50-1 meter

134 DD-BM-50-2 Idem, 2 pipa meter

135 DD-BM-HDPE-40-1 meter

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Paket 2 Paket 3

Jasa Material Jasa 21,857,711 1,055,833 24,496,477

32,786,566 2,111,668 36,744,715

43,715,421 4,223,335 48,992,954

1,613 10,118 1,808

2,105 30,354 2,360

1,613 10,875 1,808

2,097 22,060 2,350

1,613 24,049 1,808

2,097 48,097 2,350

1,594 14,847 1,786

69,122 351,944 77,253

71,751 703,889 80,199

34,982 205,293 38,991

34,982 407,922 38,991

35,111 - 39,136

35,008 - 39,020

Page 23: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 23 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

137 DD-BM-HDPE-50-1 meter

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter

139 DD-HDPE-40-1 meter

140 DD-HDPE-40-2 Idem 2 pipa meter

141 DD-HDPE-50-1 meter

142 DD-HDPE-50-2 Idem 2 pipa meter

143 DD-HDPE-40-1C meter

144 DD-HDPE-40-2C idem, 2 pipa meter

145 DD-ROD meter

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter

147 DD-RV-CONCRETE m3

148 DD-DS-S1 meter

149 DD-DS-COD1-M meter

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Paket 2 Paket 3

Jasa Material Jasa 35,111 - 39,136

34,982 - 38,991

1,536 13,669 1,721

1,858 27,339 2,082

1,536 23,227 1,721

1,858 46,455 2,082

1,536 14,224 1,721

1,858 28,252 2,082

1,984 - 2,223

79,351 41,115 88,931

714,157 1,204,961 800,374

166,637 291,857 186,754

467,273 28,095 523,684

Page 24: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 24 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

150 BC-TR-0.4 meter

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter

152 BC-TR-1 idem, kedalaman 1 meter meter

153 BC-TR-2 idem, kedalaman 1,2 meter meter

154 BC-TR-3 idem, kedalaman 1,3 meter meter

155 BC-TR-4 idem, kedalaman 1,4 meter meter

156 BC-TR-5 meter

157 BCTR-ROCK meter

158 BD-SK Titik

159 SMD-ABS-2A pcs

160 SMD-ABS-3A idem 3 cabang pcs

161 SMD-ABS-4A idem 4 cabang pcs

162 SMD-ABS-6A idem 6 cabang pcs

163 DD-MDSC-5/3.5 pcs

164 DD-MDSC-10/8 pcs

165 DD-MDSC-12/10 pcs

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Paket 2 Paket 3

Jasa Material Jasa 11,889 - 13,110

15,553 - 17,217

24,188 - 26,895

28,726 - 31,980

30,665 - 34,153

32,964 - 36,730

35,111 - 39,136

209,020 - 234,040

79,351 60,248 88,931

155,401 284,684 174,162

167,864 310,917 188,129

184,654 867,986 206,946

203,119 726,686 227,641

511 25,569 573

511 26,914 573

511 28,395 573

Page 25: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 25 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

166 DD-MDDI-1A meter

167 DD-MDDI-2A Idem 2 way meter

168 DD-MDDI-4A Idem 4 way meter

169 DD-MDDI-7A Idem 7 way meter

170 DD-MDDI-12A Idem 12 way meter

171 DD-MDDI-19A Idem 19 way meter

172 DD-MDDI-24A Idem 24 way meter

173 DD-MDDI-1B meter

174 DD-MDDI-2B Idem 2 way meter

175 DD-MDDI-4B Idem 4 way meter

176 DD-MDDI-7B Idem 7 way meter

177 DD-MDDI-1C meter

178 DD-MDDI-2C Idem 2 way meter

179 DD-MDDI-4C Idem 4 way meter

180 DD-MDDI-7C Idem 7 way meter

181 DD-MDDB-1A meter

182 DD-MDDB-2A Idem 2 way meter

183 DD-MDDB-4A Idem 4 way meter

184 DD-MDDB-7A Idem 7 way meter

185 DD-MDDB-12A Idem 12 way meter

186 DD-MDDB-19A Idem 19 way meter

187 DD-MDDB-24A Idem 24 way meter

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Paket 2 Paket 3

Jasa Material Jasa 1,827 6,130 2,047

2,405 8,336 2,695

2,754 13,175 3,086

2,776 18,688 3,112

3,191 28,099 3,577

3,716 39,158 4,164

4,241 47,845 4,753

2,360 12,423 2,645

2,754 17,747 3,086

3,148 31,594 3,528

3,629 46,250 4,067

2,972 14,681 3,331

3,410 21,157 3,822

4,242 37,913 4,754

4,546 55,794 5,095

2,680 15,284 3,004

3,527 18,069 3,952

4,040 25,813 4,527

4,072 33,428 4,563

4,681 49,691 5,246

5,449 63,934 6,107

6,219 76,149 6,970

Page 26: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 26 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

188 DD-MDDB-1B meter

189 DD-MDDB-2B Idem 2 way meter

190 DD-MDDB-4B Idem 4 way meter

191 DD-MDDB-7B Idem 7 way meter

192 DD-MDDB-1C meter

193 DD-MDDB-2C Idem 2 way meter

194 DD-MDDB-4C Idem 4 way meter

195 DD-MDDB-7C Idem 7 way meter

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs

200 MH-HH2 pcs

201 HH-PIT-P-HA pcs

202 HH-PIT-P-ODP pcs

203 HH-PIT-P-ODC pcs

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Paket 2 Paket 3

Jasa Material Jasa 3,463 25,808 3,881

4,040 33,428 4,527

4,617 59,242 5,174

5,322 78,987 5,964

4,360 30,100 4,886

5,002 39,364 5,605

6,172 70,083 6,917

6,668 93,959 7,473

511 14,803 573

511 14,803 573

511 14,803 573

2,664,784 6,803,980 2,986,490

2,028,665 4,760,308 2,273,575

179,947 896,976 201,671

268,410 2,932,750 300,814

506,463 11,120,988 567,605

701,828 952,177 786,556

58,324 - 65,365

Page 27: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 27 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

A Kabel, Penyambungan dan Pekerjaan Sipil

0

1 DC-OF-SM-12D meter

2 DC-OF-SM-24D Idem 24 core meter

3 DC-OF-SM-48D Idem 48 core meter

4 DC-OF-SM-96D Idem 96 core meter

5 DC-OF-SM-144D Idem 144 core meter

6 DC-OF-SM-264D Idem 264 core meter

7 DC-OF-SM-288D Idem 288 core meter

8 DC-OF-SM-432D Idem 432 core meter

9 DC-OF-SM-960D Idem 960 core meter

10 AC-OF-SM-12D meter

11 AC-OF-SM-24D Idem 24 core meter

12 AC-OF-SM-48D Idem 48 core meter

13 AC-OF-SM-96D Idem 96 core meter

14 DC-OF-SM-12C meter

15 DC-OF-SM-24C Idem 24 core meter

16 DC-OF-SM-48C Idem 48 core meter

17 DC-OF-SM-96C Idem 96 core meter

18 AC-OF-SM-12C meter

19 AC-OF-SM-24C Idem 24 core meter

20 AC-OF-SM-48C Idem 48 core meter

21 AC-OF-SM-96C Idem 96 core meter

22 DC-OF-SM-8-SC meter

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

PENGADAAN KHS OSP-FO TAHUN 2014-2017

Paket 4 Paket 5

Material Jasa Material 1.0337

7,648 2,856 7,906

9,790 2,856 10,120

14,058 2,856 14,532

23,760 2,856 24,561

34,000 3,475 35,146

58,621 3,475 60,596

62,773 3,469 64,889

164,997 3,856 170,557

297,000 3,856 307,009

10,350 3,979 10,699

12,296 3,949 12,710

17,750 3,949 18,348

26,600 3,949 27,496

10,296 2,856 10,643

14,509 2,856 14,998

23,489 2,856 24,281

43,624 2,856 45,094

13,357 3,949 13,807

18,100 3,949 18,710

28,200 3,949 29,150

49,240 3,949 50,899

9,900 2,856 10,234

Page 28: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 28 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

23 DC-OF-SM-12-SC Idem 12 Core meter

24 DC-OF-SM-24-SC Idem 24 Core meter

25 AC-OF-SM-8-SC meter

26 AC-OF-SM-12-SC Idem 12 Core meter

27 AC-OF-SM-24-SC Idem 24 Core meter

28 SC-OF-SM-24 pcs

29 SC-OF-SM-48 Idem 12 - 48 core pcs

30 SC-OF-SM-96 Idem 12 - 96 core pcs

31 SC-OF-SM-144 Idem 12 - 144 core pcs

32 SC-OF-SM-288 Idem 12 - 288 core pcs

33 OS-SM-1 core

34 AB-OF-SM-2D meter

35 AB-OF-SM-4D Idem 4 core meter

36 AB-OF-SM-8D Idem 8 core meter

37 AB-OF-SM-12D Idem 12 core meter

38 AB-OF-SM-24D Idem 24 core meter

39 AB-OF-SM-48D Idem 48 core meter

40 AB-OF-SM-72D Idem 72 core meter

41 AB-OF-SM-96D Idem 96 core meter

42 AB-OF-SM-144D Idem 144 core meter

43 AB-OF-SM-288D Idem 288 core meter

44 DC-OF-SM-1A meter

45 DC-OF-SM-2A idem 2 core meter

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Paket 4 Paket 5

Material Jasa Material 12,276 2,856 12,690

16,533 2,856 17,090

11,880 3,949 12,280

15,000 3,949 15,506

18,708 3,949 19,338

725,000 32,500 749,433

819,054 32,500 846,656

935,000 32,500 966,510

1,300,000 32,500 1,343,810

2,300,000 32,500 2,377,510

- 55,886 -

1,908 2,294 1,972

2,670 2,294 2,760

4,959 2,294 5,126

6,867 2,294 7,098

9,781 3,250 10,111

15,450 3,250 15,971

24,797 3,250 25,633

29,184 3,212 30,168

45,016 3,671 46,533

85,835 4,589 88,728

4,560 2,856 4,714

4,800 2,856 4,962

Page 29: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 29 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

46 DC-OF-SM-1B meter

47 DC-OF-SM-2B idem 2 core meter

48 AC-OF-SM-1B meter

49 AC-OF-SM-2B idem 2 core meter

50 PC-APC-657-2 pcs

51 PC-APC-657-A1 additional per 1 meter pcs

52 PC-UPC-657-2 pcs

53 PC-UPC-657-A1 additional per 1 meter pcs

54 PC-APC-655-2 pcs

55 PC-APC-655-A1 additional per 1 meter pcs

56 PC-UPC-655-2 pcs

57 PC-UPC-655-A1 additional per 1 meter pcs

58 PC-APC-652-2 pcs

59 PC-APC-652-A1 additional per 1 meter pcs

60 PC-UPC-652-2 pcs

61 PC-UPC-652-A1 additional per 1 meter pcs

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Paket 4 Paket 5

Material Jasa Material 4,797 2,856 4,959

4,800 2,888 4,962

4,800 3,949 4,962

5,030 3,949 5,200

72,700 2,888 75,150

4,560 1,430 4,714

60,175 2,888 62,203

4,560 1,430 4,714

70,000 2,888 72,359

4,560 1,430 4,714

54,625 2,888 56,466

4,560 1,430 4,714

68,000 2,888 70,292

4,560 1,430 4,714

52,270 2,888 54,031

4,560 1,430 4,714

Page 30: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 30 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

62 ODC-C-48 pcs

63 ODC-C-144 pcs

64 ODC-C-288 pcs

65 ODC-C-576 pcs

66 ODP-CA-8 pcs

67 ODP-CA-16 pcs

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Paket 4 Paket 5

Material Jasa Material 4,965,063 3,971,844 5,132,386

12,402,000 5,367,000 12,819,947

22,236,000 5,407,500 22,985,353

58,730,937 5,365,103 60,710,170

1,170,000 130,000 1,209,429

1,400,000 130,000 1,447,180

Page 31: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 31 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

68 ODP-A-8 pcs

69 ODP-A-16 pcs

70 ODP-PB-8 pcs

71 ODP-PB-16 pcs

72 ODP-PL-8 pcs

73 ODP-PL-16 pcs

74 TC-SM-12 pcs

75 TC-SM-24 Idem 24 core pcs

76 TC-SM-48 Idem 48 core pcs

77 TC-SM-96 Idem 96 core pcs

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Paket 4 Paket 5

Material Jasa Material 929,550 130,000 960,876

1,200,000 130,000 1,240,440

900,000 129,770 930,330

1,132,113 130,000 1,170,265

2,094,768 130,000 2,165,362

2,591,480 130,000 2,678,813

1,024,947 705,930 1,059,488

1,440,943 1,411,860 1,489,502

2,782,500 2,823,720 2,876,270

4,797,000 5,647,440 4,958,659

Page 32: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 32 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

78 FTB-SM-144SA pcs

79 TR-FTM-HIGH CAP pcs

80 RS-IN-SC-1P pcs

81 RS-IN-SC-2P idem 2 port pcs

82 PS-1-2-ODC pcs

83 PS-1-4-ODC Idem, 1 : 4 pcs

84 PS-1-8-ODP Idem, 1 : 8 pcs

85 PS-1-16-ODP Idem, 1 : 16 pcs

86 PS-2-2-ODC pcs

87 PS-2-4-ODC Idem, 2 : 4 pcs

88 SITAC Akuisisi Lahan SITAC ODC Node

89 PU-S7.0-140 pcs

90 PU-S9.0-140 pcs

91 PU-C7.0-250 pcs

92 PU-C9.0-300 pcs

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Paket 4 Paket 5

Material Jasa Material 10,500,000 500,034 10,853,850

14,450,040 500,034 14,937,006

64,000 58,828 66,157

94,000 118,951 97,168

263,558 32,341 272,440

349,500 32,341 361,278

556,920 32,341 575,688

860,000 32,341 888,982

610,000 32,575 630,557

720,000 32,575 744,264

- 7,059,300 -

1,028,060 198,000 1,062,706

1,700,000 200,175 1,757,290

2,500,000 206,000 2,584,250

2,990,000 203,700 3,090,763

Page 33: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 33 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs

94 PU-AS set

95 GB-G1 pcs

96 GB-G3 pcs

97 GB-G-INTG pcs

98 TC-02-ODC pcs

99 PP-OF-IN meter

100 PP-OF-OUT meter

101 DD-S3-1 meter

102 DD-S3-2 idem, 2 pipa meter

103 DD-S3-3 idem, 3 pipa meter

104 DD-V4-1 meter

105 DD-V4-2 Idem, 2 pipa meter

106 DD-V5-1 meter

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Paket 4 Paket 5

Material Jasa Material 463,795 57,750 479,425

29,206 38,441 30,190

796,747 388,168 823,597

2,400,000 450,000 2,480,880

241,020 156,396 249,142

216,861 58,000 224,169

23,800 3,844 24,602

23,517 3,844 24,310

300,012 57,662 310,122

600,025 76,883 620,246

900,037 115,324 930,368

57,083 57,662 59,007

114,165 77,000 118,012

55,195 57,662 57,055

Page 34: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 34 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

107 DD-V5-2 Idem, 2 pipa meter

108 DD-DA-S1 meter

109 DD-DA-S2 idem, 2 pipa meter

110 DD-DA-S4 idem, 4 pipa meter

111 DD-BSS-S1 meter

112 DD-BSS-S2 Idem, 2 pipa meter

113 DD-BTS-S1 meter

114 DD-BTS-S2 idem, 2 pipa meter

115 DD-BTS-S4 idem, 4 pipa meter

116 HB-PS-1 meter

117 HB-PS-2 meter

118 HB-PS-4 meter

119 HB-PC-2 meter

120 HB-PC-4 meter

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Paket 4 Paket 5

Material Jasa Material 111,000 76,883 114,741

300,012 230,649 310,122

600,025 461,297 620,246

1,200,050 922,594 1,240,492

386,500 230,649 399,525

772,930 461,297 798,978

385,000 230,649 397,975

770,000 461,297 795,949

1,530,983 699,297 1,582,577

134,679 36,767 139,218

277,227 44,121 286,570

536,600 51,474 554,683

456,000 44,121 471,367

893,587 51,474 923,701

Page 35: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 35 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

121 DD-BMR-1 track

122 DD-BMR-2 idem, 2 pipa track

123 DD-BMR-4 idem, 4 pipa track

124 DC-SD-28-1 meter

125 DC-SD-28-3 idem, 3 pipa meter

126 DC-SD-33-1 meter

127 DC-SD-33-2 idem, 2 pipa meter

128 DC-SD-43-1 meter

129 DC-SD-43-2 idem, 2 pipa meter

130 DCD-PVC-1 meter

131 DD-BM-100-1 meter

132 DD-BM-100-2 Idem, 2 pipa meter

133 DD-BM-50-1 meter

134 DD-BM-50-2 Idem, 2 pipa meter

135 DD-BM-HDPE-40-1 meter

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Paket 4 Paket 5

Material Jasa Material 900,037 21,177,900 930,368

1,800,075 31,766,850 1,860,738

3,600,149 42,355,800 3,721,474

8,625 1,563 8,916

25,875 2,040 26,747

9,270 1,563 9,582

18,805 2,032 19,439

20,500 1,563 21,191

41,000 2,032 42,382

12,656 1,544 13,083

300,012 74,453 310,122

600,025 77,000 620,246

175,000 41,375 180,898

347,730 41,375 359,449

- 41,500 -

- 41,400 -

Page 36: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 36 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

137 DD-BM-HDPE-50-1 meter

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter

139 DD-HDPE-40-1 meter

140 DD-HDPE-40-2 Idem 2 pipa meter

141 DD-HDPE-50-1 meter

142 DD-HDPE-50-2 Idem 2 pipa meter

143 DD-HDPE-40-1C meter

144 DD-HDPE-40-2C idem, 2 pipa meter

145 DD-ROD meter

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter

147 DD-RV-CONCRETE m3

148 DD-DS-S1 meter

149 DD-DS-COD1-M meter

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Paket 4 Paket 5

Material Jasa Material - 41,500 -

- 41,375 -

11,652 1,488 12,045

23,305 1,800 24,090

19,800 1,488 20,467

39,600 1,800 40,935

12,125 1,488 12,534

24,083 1,800 24,895

- 1,922 -

35,048 76,883 36,229

1,027,160 691,946 1,061,775

248,791 161,454 257,175

23,949 452,740 24,756

Page 37: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 37 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

150 BC-TR-0.4 meter

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter

152 BC-TR-1 idem, kedalaman 1 meter meter

153 BC-TR-2 idem, kedalaman 1,2 meter meter

154 BC-TR-3 idem, kedalaman 1,3 meter meter

155 BC-TR-4 idem, kedalaman 1,4 meter meter

156 BC-TR-5 meter

157 BCTR-ROCK meter

158 BD-SK Titik

159 SMD-ABS-2A pcs

160 SMD-ABS-3A idem 3 cabang pcs

161 SMD-ABS-4A idem 4 cabang pcs

162 SMD-ABS-6A idem 6 cabang pcs

163 DD-MDSC-5/3.5 pcs

164 DD-MDSC-10/8 pcs

165 DD-MDSC-12/10 pcs

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Paket 4 Paket 5

Material Jasa Material - 19,000 -

- 22,550 -

- 30,917 -

- 35,313 -

- 37,192 -

- 39,420 -

- 41,500 -

- 210,000 -

51,358 76,883 53,089

242,677 150,568 250,855

265,039 162,643 273,971

739,908 178,911 764,843

619,458 196,802 640,334

21,796 495 22,531

22,943 495 23,716

24,205 495 25,021

Page 38: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 38 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

166 DD-MDDI-1A meter

167 DD-MDDI-2A Idem 2 way meter

168 DD-MDDI-4A Idem 4 way meter

169 DD-MDDI-7A Idem 7 way meter

170 DD-MDDI-12A Idem 12 way meter

171 DD-MDDI-19A Idem 19 way meter

172 DD-MDDI-24A Idem 24 way meter

173 DD-MDDI-1B meter

174 DD-MDDI-2B Idem 2 way meter

175 DD-MDDI-4B Idem 4 way meter

176 DD-MDDI-7B Idem 7 way meter

177 DD-MDDI-1C meter

178 DD-MDDI-2C Idem 2 way meter

179 DD-MDDI-4C Idem 4 way meter

180 DD-MDDI-7C Idem 7 way meter

181 DD-MDDB-1A meter

182 DD-MDDB-2A Idem 2 way meter

183 DD-MDDB-4A Idem 4 way meter

184 DD-MDDB-7A Idem 7 way meter

185 DD-MDDB-12A Idem 12 way meter

186 DD-MDDB-19A Idem 19 way meter

187 DD-MDDB-24A Idem 24 way meter

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Paket 4 Paket 5

Material Jasa Material 5,225 1,770 5,402

7,106 2,330 7,346

11,231 2,668 11,610

15,930 2,690 16,467

23,953 3,092 24,760

33,380 3,600 34,505

40,785 4,109 42,159

10,590 2,287 10,947

15,129 2,668 15,638

26,932 3,050 27,840

39,425 3,516 40,754

12,514 2,880 12,936

18,035 3,304 18,643

32,319 4,110 33,408

47,562 4,405 49,164

13,028 2,597 13,468

15,403 3,417 15,922

22,004 3,914 22,746

28,496 3,945 29,456

42,359 4,535 43,786

54,500 5,280 56,337

64,913 6,026 67,100

Page 39: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 39 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

188 DD-MDDB-1B meter

189 DD-MDDB-2B Idem 2 way meter

190 DD-MDDB-4B Idem 4 way meter

191 DD-MDDB-7B Idem 7 way meter

192 DD-MDDB-1C meter

193 DD-MDDB-2C Idem 2 way meter

194 DD-MDDB-4C Idem 4 way meter

195 DD-MDDB-7C Idem 7 way meter

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs

200 MH-HH2 pcs

201 HH-PIT-P-HA pcs

202 HH-PIT-P-ODP pcs

203 HH-PIT-P-ODC pcs

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Paket 4 Paket 5

Material Jasa Material 22,000 3,355 22,741

28,496 3,914 29,456

50,500 4,473 52,202

67,332 5,156 69,601

25,658 4,224 26,523

33,556 4,846 34,687

59,741 5,980 61,755

80,094 6,461 82,794

12,619 495 13,044

12,619 495 13,044

12,619 495 13,044

5,800,000 2,581,905 5,995,460

4,057,888 1,965,570 4,194,639

764,620 174,350 790,388

2,500,000 260,062 2,584,250

9,480,000 490,711 9,799,476

811,676 680,000 839,029

- 56,510 -

Page 40: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 40 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

A Kabel, Penyambungan dan Pekerjaan Sipil

0

1 DC-OF-SM-12D meter

2 DC-OF-SM-24D Idem 24 core meter

3 DC-OF-SM-48D Idem 48 core meter

4 DC-OF-SM-96D Idem 96 core meter

5 DC-OF-SM-144D Idem 144 core meter

6 DC-OF-SM-264D Idem 264 core meter

7 DC-OF-SM-288D Idem 288 core meter

8 DC-OF-SM-432D Idem 432 core meter

9 DC-OF-SM-960D Idem 960 core meter

10 AC-OF-SM-12D meter

11 AC-OF-SM-24D Idem 24 core meter

12 AC-OF-SM-48D Idem 48 core meter

13 AC-OF-SM-96D Idem 96 core meter

14 DC-OF-SM-12C meter

15 DC-OF-SM-24C Idem 24 core meter

16 DC-OF-SM-48C Idem 48 core meter

17 DC-OF-SM-96C Idem 96 core meter

18 AC-OF-SM-12C meter

19 AC-OF-SM-24C Idem 24 core meter

20 AC-OF-SM-48C Idem 48 core meter

21 AC-OF-SM-96C Idem 96 core meter

22 DC-OF-SM-8-SC meter

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

PENGADAAN KHS OSP-FO TAHUN 2014-2017

Paket 5 Paket 6

Jasa Material Jasa 1.2369

2,700 9,460 3,376

2,700 12,109 3,376

2,700 17,388 3,376

2,700 29,389 3,376

3,285 42,055 4,108

3,285 72,508 4,108

3,280 77,644 4,102

3,645 204,085 4,559

3,645 367,359 4,559

3,762 12,802 4,704

3,733 15,209 4,669

3,733 21,955 4,669

3,733 32,902 4,669

2,700 12,735 3,376

2,700 17,946 3,376

2,700 29,054 3,376

2,700 53,959 3,376

3,733 16,521 4,669

3,733 22,388 4,669

3,733 34,881 4,669

3,733 60,905 4,669

2,700 12,245 3,376

Page 41: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 41 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

23 DC-OF-SM-12-SC Idem 12 Core meter

24 DC-OF-SM-24-SC Idem 24 Core meter

25 AC-OF-SM-8-SC meter

26 AC-OF-SM-12-SC Idem 12 Core meter

27 AC-OF-SM-24-SC Idem 24 Core meter

28 SC-OF-SM-24 pcs

29 SC-OF-SM-48 Idem 12 - 48 core pcs

30 SC-OF-SM-96 Idem 12 - 96 core pcs

31 SC-OF-SM-144 Idem 12 - 144 core pcs

32 SC-OF-SM-288 Idem 12 - 288 core pcs

33 OS-SM-1 core

34 AB-OF-SM-2D meter

35 AB-OF-SM-4D Idem 4 core meter

36 AB-OF-SM-8D Idem 8 core meter

37 AB-OF-SM-12D Idem 12 core meter

38 AB-OF-SM-24D Idem 24 core meter

39 AB-OF-SM-48D Idem 48 core meter

40 AB-OF-SM-72D Idem 72 core meter

41 AB-OF-SM-96D Idem 96 core meter

42 AB-OF-SM-144D Idem 144 core meter

43 AB-OF-SM-288D Idem 288 core meter

44 DC-OF-SM-1A meter

45 DC-OF-SM-2A idem 2 core meter

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Paket 5 Paket 6

Jasa Material Jasa 2,700 15,184 3,376

2,700 20,450 3,376

3,733 14,694 4,669

3,733 18,554 4,669

3,733 23,140 4,669

30,726 896,753 38,422

30,726 1,013,088 38,422

30,726 1,156,502 38,422

30,726 1,607,970 38,422

30,726 2,844,870 38,422

52,835 - 66,068

2,169 2,360 2,712

2,169 3,303 2,712

2,169 6,134 2,712

2,169 8,494 2,712

3,073 12,098 3,842

3,073 19,110 3,842

3,073 30,671 3,842

3,037 36,098 3,797

3,471 55,680 4,340

4,338 106,169 5,425

2,700 5,640 3,376

2,700 5,937 3,376

Page 42: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 42 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

46 DC-OF-SM-1B meter

47 DC-OF-SM-2B idem 2 core meter

48 AC-OF-SM-1B meter

49 AC-OF-SM-2B idem 2 core meter

50 PC-APC-657-2 pcs

51 PC-APC-657-A1 additional per 1 meter pcs

52 PC-UPC-657-2 pcs

53 PC-UPC-657-A1 additional per 1 meter pcs

54 PC-APC-655-2 pcs

55 PC-APC-655-A1 additional per 1 meter pcs

56 PC-UPC-655-2 pcs

57 PC-UPC-655-A1 additional per 1 meter pcs

58 PC-APC-652-2 pcs

59 PC-APC-652-A1 additional per 1 meter pcs

60 PC-UPC-652-2 pcs

61 PC-UPC-652-A1 additional per 1 meter pcs

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Paket 5 Paket 6

Jasa Material Jasa 2,700 5,933 3,376

2,730 5,937 3,414

3,733 5,937 4,669

3,733 6,222 4,669

2,730 89,923 3,414

1,352 5,640 1,691

2,730 74,430 3,414

1,352 5,640 1,691

2,730 86,583 3,414

1,352 5,640 1,691

2,730 67,566 3,414

1,352 5,640 1,691

2,730 84,109 3,414

1,352 5,640 1,691

2,730 64,653 3,414

1,352 5,640 1,691

Page 43: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 43 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

62 ODC-C-48 pcs

63 ODC-C-144 pcs

64 ODC-C-288 pcs

65 ODC-C-576 pcs

66 ODP-CA-8 pcs

67 ODP-CA-16 pcs

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Paket 5 Paket 6

Jasa Material Jasa 3,754,981 6,141,286 4,695,514

5,073,962 15,340,034 6,344,867

5,112,251 27,503,708 6,392,747

5,072,168 72,644,296 6,342,625

122,902 1,447,173 153,686

122,902 1,731,660 153,686

Page 44: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 44 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

68 ODP-A-8 pcs

69 ODP-A-16 pcs

70 ODP-PB-8 pcs

71 ODP-PB-16 pcs

72 ODP-PL-8 pcs

73 ODP-PL-16 pcs

74 TC-SM-12 pcs

75 TC-SM-24 Idem 24 core pcs

76 TC-SM-48 Idem 48 core pcs

77 TC-SM-96 Idem 96 core pcs

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Paket 5 Paket 6

Jasa Material Jasa 122,902 1,149,760 153,686

122,902 1,484,280 153,686

122,685 1,113,210 153,414

122,902 1,400,310 153,686

122,902 2,591,019 153,686

122,902 3,205,402 153,686

667,386 1,267,757 834,550

1,334,772 1,782,302 1,669,101

2,669,545 3,441,674 3,338,202

5,339,090 5,933,409 6,676,404

Page 45: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 45 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

78 FTB-SM-144SA pcs

79 TR-FTM-HIGH CAP pcs

80 RS-IN-SC-1P pcs

81 RS-IN-SC-2P idem 2 port pcs

82 PS-1-2-ODC pcs

83 PS-1-4-ODC Idem, 1 : 4 pcs

84 PS-1-8-ODP Idem, 1 : 8 pcs

85 PS-1-16-ODP Idem, 1 : 16 pcs

86 PS-2-2-ODC pcs

87 PS-2-4-ODC Idem, 2 : 4 pcs

88 SITAC Akuisisi Lahan SITAC ODC Node

89 PU-S7.0-140 pcs

90 PU-S9.0-140 pcs

91 PU-C7.0-250 pcs

92 PU-C9.0-300 pcs

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Paket 5 Paket 6

Jasa Material Jasa 472,732 12,987,450 591,140

472,732 17,873,254 591,140

55,616 79,162 69,546

112,456 116,269 140,624

30,575 325,995 38,234

30,575 432,297 38,234

30,575 688,854 38,234

30,575 1,063,734 38,234

30,797 754,509 38,511

30,797 890,568 38,511

6,673,862 - 8,345,504

172,387 1,271,607 210,771

174,443 2,102,730 213,342

179,950 3,092,250 220,228

177,775 3,698,331 217,509

Page 46: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 46 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs

94 PU-AS set

95 GB-G1 pcs

96 GB-G3 pcs

97 GB-G-INTG pcs

98 TC-02-ODC pcs

99 PP-OF-IN meter

100 PP-OF-OUT meter

101 DD-S3-1 meter

102 DD-S3-2 idem, 2 pipa meter

103 DD-S3-3 idem, 3 pipa meter

104 DD-V4-1 meter

105 DD-V4-2 Idem, 2 pipa meter

106 DD-V5-1 meter

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Paket 5 Paket 6

Jasa Material Jasa 54,597 573,668 68,272

36,342 36,125 45,445

366,974 985,496 458,892

425,430 2,968,560 531,990

147,857 298,118 184,891

54,833 268,235 68,568

3,634 29,438 4,544

3,634 29,088 4,544

54,514 371,085 68,168

72,685 742,171 90,891

109,027 1,113,256 136,336

54,514 70,606 68,168

72,796 141,211 91,029

54,514 68,271 68,168

Page 47: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 47 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

107 DD-V5-2 Idem, 2 pipa meter

108 DD-DA-S1 meter

109 DD-DA-S2 idem, 2 pipa meter

110 DD-DA-S4 idem, 4 pipa meter

111 DD-BSS-S1 meter

112 DD-BSS-S2 Idem, 2 pipa meter

113 DD-BTS-S1 meter

114 DD-BTS-S2 idem, 2 pipa meter

115 DD-BTS-S4 idem, 4 pipa meter

116 HB-PS-1 meter

117 HB-PS-2 meter

118 HB-PS-4 meter

119 HB-PC-2 meter

120 HB-PC-4 meter

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Paket 5 Paket 6

Jasa Material Jasa 72,685 137,296 90,891

218,056 371,085 272,673

436,110 742,171 545,345

872,220 1,484,342 1,090,691

218,056 478,062 272,673

436,110 956,037 545,345

218,056 476,207 272,673

436,110 952,413 545,345

661,115 1,893,673 826,709

34,760 166,584 43,466

41,712 342,902 52,160

48,664 663,721 60,853

41,712 564,026 52,160

48,664 1,105,278 60,853

Page 48: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 48 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

121 DD-BMR-1 track

122 DD-BMR-2 idem, 2 pipa track

123 DD-BMR-4 idem, 4 pipa track

124 DC-SD-28-1 meter

125 DC-SD-28-3 idem, 3 pipa meter

126 DC-SD-33-1 meter

127 DC-SD-33-2 idem, 2 pipa meter

128 DC-SD-43-1 meter

129 DC-SD-43-2 idem, 2 pipa meter

130 DCD-PVC-1 meter

131 DD-BM-100-1 meter

132 DD-BM-100-2 Idem, 2 pipa meter

133 DD-BM-50-1 meter

134 DD-BM-50-2 Idem, 2 pipa meter

135 DD-BM-HDPE-40-1 meter

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Paket 5 Paket 6

Jasa Material Jasa 20,021,587 1,113,256 25,036,513

30,032,380 2,226,513 37,554,770

40,043,173 4,453,024 50,073,027

1,478 10,668 1,848

1,929 32,005 2,412

1,478 11,466 1,848

1,921 23,260 2,402

1,478 25,356 1,848

1,921 50,713 2,402

1,460 15,654 1,825

64,467 371,085 78,696

66,875 742,171 81,707

33,195 216,458 39,592

33,195 430,107 39,592

33,313 - 39,739

33,219 - 39,621

Page 49: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 49 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

137 DD-BM-HDPE-50-1 meter

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter

139 DD-HDPE-40-1 meter

140 DD-HDPE-40-2 Idem 2 pipa meter

141 DD-HDPE-50-1 meter

142 DD-HDPE-50-2 Idem 2 pipa meter

143 DD-HDPE-40-1C meter

144 DD-HDPE-40-2C idem, 2 pipa meter

145 DD-ROD meter

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter

147 DD-RV-CONCRETE m3

148 DD-DS-S1 meter

149 DD-DS-COD1-M meter

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Paket 5 Paket 6

Jasa Material Jasa 33,313 - 39,739

33,195 - 39,592

1,407 14,412 1,759

1,702 28,826 2,128

1,407 24,491 1,759

1,702 48,981 2,128

1,407 14,997 1,759

1,702 29,788 2,128

1,817 - 2,272

72,685 43,351 90,891

654,166 1,270,494 818,019

152,639 307,730 190,871

428,020 29,623 535,229

Page 50: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 50 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

150 BC-TR-0.4 meter

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter

152 BC-TR-1 idem, kedalaman 1 meter meter

153 BC-TR-2 idem, kedalaman 1,2 meter meter

154 BC-TR-3 idem, kedalaman 1,3 meter meter

155 BC-TR-4 idem, kedalaman 1,4 meter meter

156 BC-TR-5 meter

157 BCTR-ROCK meter

158 BD-SK Titik

159 SMD-ABS-2A pcs

160 SMD-ABS-3A idem 3 cabang pcs

161 SMD-ABS-4A idem 4 cabang pcs

162 SMD-ABS-6A idem 6 cabang pcs

163 DD-MDSC-5/3.5 pcs

164 DD-MDSC-10/8 pcs

165 DD-MDSC-12/10 pcs

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Paket 5 Paket 6

Jasa Material Jasa 12,042 - 13,140

15,398 - 17,337

23,308 - 27,228

27,464 - 32,426

29,240 - 34,646

31,347 - 37,280

33,313 - 39,739

192,613 - 238,940

72,685 63,525 90,891

142,347 300,167 178,001

153,763 327,827 192,277

169,142 915,192 211,509

186,057 766,208 232,659

468 26,959 585

468 28,378 585

468 29,939 585

Page 51: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 51 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

166 DD-MDDI-1A meter

167 DD-MDDI-2A Idem 2 way meter

168 DD-MDDI-4A Idem 4 way meter

169 DD-MDDI-7A Idem 7 way meter

170 DD-MDDI-12A Idem 12 way meter

171 DD-MDDI-19A Idem 19 way meter

172 DD-MDDI-24A Idem 24 way meter

173 DD-MDDI-1B meter

174 DD-MDDI-2B Idem 2 way meter

175 DD-MDDI-4B Idem 4 way meter

176 DD-MDDI-7B Idem 7 way meter

177 DD-MDDI-1C meter

178 DD-MDDI-2C Idem 2 way meter

179 DD-MDDI-4C Idem 4 way meter

180 DD-MDDI-7C Idem 7 way meter

181 DD-MDDB-1A meter

182 DD-MDDB-2A Idem 2 way meter

183 DD-MDDB-4A Idem 4 way meter

184 DD-MDDB-7A Idem 7 way meter

185 DD-MDDB-12A Idem 12 way meter

186 DD-MDDB-19A Idem 19 way meter

187 DD-MDDB-24A Idem 24 way meter

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Paket 5 Paket 6

Jasa Material Jasa 1,673 6,463 2,092

2,203 8,790 2,755

2,522 13,892 3,154

2,543 19,704 3,180

2,923 29,627 3,655

3,403 41,288 4,256

3,885 50,447 4,858

2,162 13,098 2,704

2,522 18,713 3,154

2,883 33,312 3,606

3,324 48,765 4,157

2,723 15,479 3,405

3,124 22,308 3,906

3,886 39,975 4,859

4,164 58,829 5,208

2,455 16,115 3,070

3,230 19,052 4,040

3,700 27,217 4,627

3,730 35,246 4,664

4,287 52,393 5,361

4,992 67,411 6,242

5,697 80,291 7,124

Page 52: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 52 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

188 DD-MDDB-1B meter

189 DD-MDDB-2B Idem 2 way meter

190 DD-MDDB-4B Idem 4 way meter

191 DD-MDDB-7B Idem 7 way meter

192 DD-MDDB-1C meter

193 DD-MDDB-2C Idem 2 way meter

194 DD-MDDB-4C Idem 4 way meter

195 DD-MDDB-7C Idem 7 way meter

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs

200 MH-HH2 pcs

201 HH-PIT-P-HA pcs

202 HH-PIT-P-ODP pcs

203 HH-PIT-P-ODC pcs

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Paket 5 Paket 6

Jasa Material Jasa 3,172 27,212 3,966

3,700 35,246 4,627

4,229 62,464 5,288

4,874 83,283 6,095

3,993 31,737 4,994

4,581 41,505 5,729

5,653 73,894 7,070

6,108 99,069 7,638

468 15,608 585

468 15,608 585

468 15,608 585

2,440,933 7,174,020 3,052,328

1,858,250 5,019,202 2,323,697

164,830 945,758 206,117

245,863 3,092,250 307,445

463,918 11,725,812 580,119

642,872 1,003,962 803,896

53,425 - 66,806

Page 53: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 53 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

A Kabel, Penyambungan dan Pekerjaan Sipil

0

1 DC-OF-SM-12D meter

2 DC-OF-SM-24D Idem 24 core meter

3 DC-OF-SM-48D Idem 48 core meter

4 DC-OF-SM-96D Idem 96 core meter

5 DC-OF-SM-144D Idem 144 core meter

6 DC-OF-SM-264D Idem 264 core meter

7 DC-OF-SM-288D Idem 288 core meter

8 DC-OF-SM-432D Idem 432 core meter

9 DC-OF-SM-960D Idem 960 core meter

10 AC-OF-SM-12D meter

11 AC-OF-SM-24D Idem 24 core meter

12 AC-OF-SM-48D Idem 48 core meter

13 AC-OF-SM-96D Idem 96 core meter

14 DC-OF-SM-12C meter

15 DC-OF-SM-24C Idem 24 core meter

16 DC-OF-SM-48C Idem 48 core meter

17 DC-OF-SM-96C Idem 96 core meter

18 AC-OF-SM-12C meter

19 AC-OF-SM-24C Idem 24 core meter

20 AC-OF-SM-48C Idem 48 core meter

21 AC-OF-SM-96C Idem 96 core meter

22 DC-OF-SM-8-SC meter

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Paket 7 Paket 8

Material Jasa Material 1.1503 1.3097

8,797 3,205 10,017

11,261 3,205 12,822

16,171 3,205 18,412

27,331 3,205 31,118

39,110 3,900 44,530

67,431 3,900 76,775

72,208 3,894 82,214

189,796 4,328 216,097

341,639 4,328 388,981

11,906 4,466 13,555

14,144 4,432 16,104

20,418 4,432 23,247

30,598 4,432 34,838

11,843 3,205 13,485

16,690 3,205 19,002

27,020 3,205 30,764

50,181 3,205 57,134

15,364 4,432 17,494

20,820 4,432 23,706

32,438 4,432 36,934

56,641 4,432 64,490

11,388 3,205 12,966

Page 54: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 54 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

23 DC-OF-SM-12-SC Idem 12 Core meter

24 DC-OF-SM-24-SC Idem 24 Core meter

25 AC-OF-SM-8-SC meter

26 AC-OF-SM-12-SC Idem 12 Core meter

27 AC-OF-SM-24-SC Idem 24 Core meter

28 SC-OF-SM-24 pcs

29 SC-OF-SM-48 Idem 12 - 48 core pcs

30 SC-OF-SM-96 Idem 12 - 96 core pcs

31 SC-OF-SM-144 Idem 12 - 144 core pcs

32 SC-OF-SM-288 Idem 12 - 288 core pcs

33 OS-SM-1 core

34 AB-OF-SM-2D meter

35 AB-OF-SM-4D Idem 4 core meter

36 AB-OF-SM-8D Idem 8 core meter

37 AB-OF-SM-12D Idem 12 core meter

38 AB-OF-SM-24D Idem 24 core meter

39 AB-OF-SM-48D Idem 48 core meter

40 AB-OF-SM-72D Idem 72 core meter

41 AB-OF-SM-96D Idem 96 core meter

42 AB-OF-SM-144D Idem 144 core meter

43 AB-OF-SM-288D Idem 288 core meter

44 DC-OF-SM-1A meter

45 DC-OF-SM-2A idem 2 core meter

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Paket 7 Paket 8

Material Jasa Material 14,121 3,205 16,078

19,018 3,205 21,653

13,666 4,432 15,559

17,255 4,432 19,646

21,520 4,432 24,502

833,968 36,475 949,533

942,158 36,475 1,072,715

1,075,531 36,475 1,224,570

1,495,390 36,475 1,702,610

2,645,690 36,475 3,012,310

- 62,721 -

2,195 2,575 2,499

3,071 2,575 3,497

5,704 2,575 6,495

7,899 2,575 8,994

11,251 3,647 12,810

17,772 3,647 20,235

28,524 3,647 32,477

33,570 3,605 38,222

51,782 4,120 58,957

98,736 5,150 112,418

5,245 3,205 5,972

5,521 3,205 6,287

Page 55: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 55 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

46 DC-OF-SM-1B meter

47 DC-OF-SM-2B idem 2 core meter

48 AC-OF-SM-1B meter

49 AC-OF-SM-2B idem 2 core meter

50 PC-APC-657-2 pcs

51 PC-APC-657-A1 additional per 1 meter pcs

52 PC-UPC-657-2 pcs

53 PC-UPC-657-A1 additional per 1 meter pcs

54 PC-APC-655-2 pcs

55 PC-APC-655-A1 additional per 1 meter pcs

56 PC-UPC-655-2 pcs

57 PC-UPC-655-A1 additional per 1 meter pcs

58 PC-APC-652-2 pcs

59 PC-APC-652-A1 additional per 1 meter pcs

60 PC-UPC-652-2 pcs

61 PC-UPC-652-A1 additional per 1 meter pcs

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Paket 7 Paket 8

Material Jasa Material 5,518 3,205 6,283

5,521 3,241 6,287

5,521 4,432 6,287

5,786 4,432 6,588

83,627 3,241 95,215

5,245 1,605 5,972

69,219 3,241 78,811

5,245 1,605 5,972

80,521 3,241 91,679

5,245 1,605 5,972

62,835 3,241 71,542

5,245 1,605 5,972

78,220 3,241 89,060

5,245 1,605 5,972

60,126 3,241 68,458

5,245 1,605 5,972

Page 56: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 56 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

62 ODC-C-48 pcs

63 ODC-C-144 pcs

64 ODC-C-288 pcs

65 ODC-C-576 pcs

66 ODP-CA-8 pcs

67 ODP-CA-16 pcs

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Paket 7 Paket 8

Material Jasa Material 5,711,312 4,457,601 6,502,743

14,266,021 6,023,384 16,242,899

25,578,071 6,068,837 29,122,489

67,558,197 6,021,255 76,919,908

1,345,851 145,899 1,532,349

1,610,420 145,899 1,833,580

Page 57: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 57 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

68 ODP-A-8 pcs

69 ODP-A-16 pcs

70 ODP-PB-8 pcs

71 ODP-PB-16 pcs

72 ODP-PL-8 pcs

73 ODP-PL-16 pcs

74 TC-SM-12 pcs

75 TC-SM-24 Idem 24 core pcs

76 TC-SM-48 Idem 48 core pcs

77 TC-SM-96 Idem 96 core pcs

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Paket 7 Paket 8

Material Jasa Material 1,069,261 145,899 1,217,432

1,380,360 145,899 1,571,640

1,035,270 145,641 1,178,730

1,302,269 145,899 1,482,728

2,409,612 145,899 2,743,518

2,980,979 145,899 3,394,061

1,178,997 792,265 1,342,373

1,657,516 1,584,530 1,887,203

3,200,710 3,169,061 3,644,240

5,517,989 6,338,122 6,282,631

Page 58: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 58 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

78 FTB-SM-144SA pcs

79 TR-FTM-HIGH CAP pcs

80 RS-IN-SC-1P pcs

81 RS-IN-SC-2P idem 2 port pcs

82 PS-1-2-ODC pcs

83 PS-1-4-ODC Idem, 1 : 4 pcs

84 PS-1-8-ODP Idem, 1 : 8 pcs

85 PS-1-16-ODP Idem, 1 : 16 pcs

86 PS-2-2-ODC pcs

87 PS-2-4-ODC Idem, 2 : 4 pcs

88 SITAC Akuisisi Lahan SITAC ODC Node

89 PU-S7.0-140 pcs

90 PU-S9.0-140 pcs

91 PU-C7.0-250 pcs

92 PU-C9.0-300 pcs

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Paket 7 Paket 8

Material Jasa Material 12,078,150 561,188 13,751,850

16,621,881 561,188 18,925,217

73,619 66,023 83,821

108,128 133,499 123,112

303,171 36,296 345,182

402,030 36,296 457,740

640,625 36,296 729,398

989,258 36,296 1,126,342

701,683 36,559 798,917

828,216 36,559 942,984

- 7,922,652 -

1,182,577 198,908 1,346,450

1,955,510 201,349 2,226,490

2,875,750 207,886 3,274,250

3,439,397 205,305 3,916,003

Page 59: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 59 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs

94 PU-AS set

95 GB-G1 pcs

96 GB-G3 pcs

97 GB-G-INTG pcs

98 TC-02-ODC pcs

99 PP-OF-IN meter

100 PP-OF-OUT meter

101 DD-S3-1 meter

102 DD-S3-2 idem, 2 pipa meter

103 DD-S3-3 idem, 3 pipa meter

104 DD-V4-1 meter

105 DD-V4-2 Idem, 2 pipa meter

106 DD-V5-1 meter

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Paket 7 Paket 8

Material Jasa Material 533,503 64,813 607,432

33,596 43,142 38,251

916,498 435,641 1,043,500

2,760,720 505,035 3,143,280

277,245 175,523 315,664

249,455 65,093 284,023

27,377 4,314 31,171

27,052 4,314 30,800

345,104 64,714 392,926

690,209 86,286 785,853

1,035,313 129,428 1,178,778

65,663 64,714 74,762

131,324 86,417 149,522

63,491 64,714 72,289

Page 60: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 60 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

107 DD-V5-2 Idem, 2 pipa meter

108 DD-DA-S1 meter

109 DD-DA-S2 idem, 2 pipa meter

110 DD-DA-S4 idem, 4 pipa meter

111 DD-BSS-S1 meter

112 DD-BSS-S2 Idem, 2 pipa meter

113 DD-BTS-S1 meter

114 DD-BTS-S2 idem, 2 pipa meter

115 DD-BTS-S4 idem, 4 pipa meter

116 HB-PS-1 meter

117 HB-PS-2 meter

118 HB-PS-4 meter

119 HB-PC-2 meter

120 HB-PC-4 meter

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Paket 7 Paket 8

Material Jasa Material 127,683 86,286 145,377

345,104 258,857 392,926

690,209 517,714 785,853

1,380,418 1,035,427 1,571,705

444,591 258,857 506,199

889,101 517,714 1,012,306

442,866 258,857 504,235

885,731 517,714 1,008,469

1,761,090 784,821 2,005,128

154,921 41,264 176,389

318,894 49,517 363,084

617,251 57,769 702,785

524,537 49,517 597,223

1,027,893 57,769 1,170,331

Page 61: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 61 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

121 DD-BMR-1 track

122 DD-BMR-2 idem, 2 pipa track

123 DD-BMR-4 idem, 4 pipa track

124 DC-SD-28-1 meter

125 DC-SD-28-3 idem, 3 pipa meter

126 DC-SD-33-1 meter

127 DC-SD-33-2 idem, 2 pipa meter

128 DC-SD-43-1 meter

129 DC-SD-43-2 idem, 2 pipa meter

130 DCD-PVC-1 meter

131 DD-BM-100-1 meter

132 DD-BM-100-2 Idem, 2 pipa meter

133 DD-BM-50-1 meter

134 DD-BM-50-2 Idem, 2 pipa meter

135 DD-BM-HDPE-40-1 meter

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Paket 7 Paket 8

Material Jasa Material 1,035,313 23,767,957 1,178,778

2,070,626 35,651,936 2,357,558

4,141,251 47,535,914 4,715,115

9,921 1,754 11,296

29,764 2,289 33,888

10,663 1,754 12,141

21,631 2,281 24,629

23,581 1,754 26,849

47,162 2,281 53,698

14,558 1,733 16,576

345,104 74,236 392,926

690,209 77,094 785,853

201,303 37,112 229,198

399,994 37,112 455,422

- 37,252 -

- 37,140 -

Page 62: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 62 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

137 DD-BM-HDPE-50-1 meter

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter

139 DD-HDPE-40-1 meter

140 DD-HDPE-40-2 Idem 2 pipa meter

141 DD-HDPE-50-1 meter

142 DD-HDPE-50-2 Idem 2 pipa meter

143 DD-HDPE-40-1C meter

144 DD-HDPE-40-2C idem, 2 pipa meter

145 DD-ROD meter

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter

147 DD-RV-CONCRETE m3

148 DD-DS-S1 meter

149 DD-DS-COD1-M meter

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Paket 7 Paket 8

Material Jasa Material - 37,252 -

- 37,112 -

13,403 1,670 15,261

26,808 2,020 30,523

22,776 1,670 25,932

45,552 2,020 51,864

13,947 1,670 15,880

27,703 2,020 31,542

- 2,157 -

40,316 86,286 45,902

1,181,542 776,571 1,345,271

286,184 181,200 325,842

27,549 508,110 31,366

Page 63: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 63 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

150 BC-TR-0.4 meter

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter

152 BC-TR-1 idem, kedalaman 1 meter meter

153 BC-TR-2 idem, kedalaman 1,2 meter meter

154 BC-TR-3 idem, kedalaman 1,3 meter meter

155 BC-TR-4 idem, kedalaman 1,4 meter meter

156 BC-TR-5 meter

157 BCTR-ROCK meter

158 BD-SK Titik

159 SMD-ABS-2A pcs

160 SMD-ABS-3A idem 3 cabang pcs

161 SMD-ABS-4A idem 4 cabang pcs

162 SMD-ABS-6A idem 6 cabang pcs

163 DD-MDSC-5/3.5 pcs

164 DD-MDSC-10/8 pcs

165 DD-MDSC-12/10 pcs

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Paket 7 Paket 8

Material Jasa Material - 12,001 -

- 15,985 -

- 25,375 -

- 30,309 -

- 32,418 -

- 34,918 -

- 37,252 -

- 226,360 -

59,077 86,286 67,264

279,151 168,982 317,834

304,874 182,534 347,122

851,116 200,792 969,058

712,563 220,871 811,304

25,072 556 28,546

26,391 556 30,048

27,843 556 31,701

Page 64: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 64 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

166 DD-MDDI-1A meter

167 DD-MDDI-2A Idem 2 way meter

168 DD-MDDI-4A Idem 4 way meter

169 DD-MDDI-7A Idem 7 way meter

170 DD-MDDI-12A Idem 12 way meter

171 DD-MDDI-19A Idem 19 way meter

172 DD-MDDI-24A Idem 24 way meter

173 DD-MDDI-1B meter

174 DD-MDDI-2B Idem 2 way meter

175 DD-MDDI-4B Idem 4 way meter

176 DD-MDDI-7B Idem 7 way meter

177 DD-MDDI-1C meter

178 DD-MDDI-2C Idem 2 way meter

179 DD-MDDI-4C Idem 4 way meter

180 DD-MDDI-7C Idem 7 way meter

181 DD-MDDB-1A meter

182 DD-MDDB-2A Idem 2 way meter

183 DD-MDDB-4A Idem 4 way meter

184 DD-MDDB-7A Idem 7 way meter

185 DD-MDDB-12A Idem 12 way meter

186 DD-MDDB-19A Idem 19 way meter

187 DD-MDDB-24A Idem 24 way meter

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Paket 7 Paket 8

Material Jasa Material 6,011 1,986 6,844

8,174 2,615 9,307

12,919 2,994 14,710

18,325 3,019 20,864

27,553 3,470 31,371

38,397 4,040 43,718

46,915 4,612 53,416

12,181 2,567 13,869

17,402 2,994 19,814

30,980 3,423 35,273

45,351 3,946 51,635

14,395 3,232 16,390

20,746 3,708 23,621

37,176 4,613 42,328

54,710 4,944 62,291

14,987 2,915 17,063

17,718 3,835 20,173

25,312 4,393 28,819

32,779 4,427 37,321

48,725 5,090 55,477

62,691 5,926 71,379

74,669 6,763 85,016

Page 65: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 65 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

188 DD-MDDB-1B meter

189 DD-MDDB-2B Idem 2 way meter

190 DD-MDDB-4B Idem 4 way meter

191 DD-MDDB-7B Idem 7 way meter

192 DD-MDDB-1C meter

193 DD-MDDB-2C Idem 2 way meter

194 DD-MDDB-4C Idem 4 way meter

195 DD-MDDB-7C Idem 7 way meter

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs

200 MH-HH2 pcs

201 HH-PIT-P-HA pcs

202 HH-PIT-P-ODP pcs

203 HH-PIT-P-ODC pcs

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Paket 7 Paket 8

Material Jasa Material 25,307 3,765 28,813

32,779 4,393 37,321

58,090 5,020 66,140

77,452 5,787 88,185

29,515 4,741 33,604

38,599 5,439 43,948

68,721 6,711 78,243

92,133 7,251 104,900

14,516 556 16,527

14,516 556 16,527

14,516 556 16,527

6,671,740 2,897,672 7,596,260

4,667,789 2,205,959 5,314,616

879,542 195,673 1,001,423

2,875,750 291,868 3,274,250

10,904,844 550,725 12,415,956

933,671 763,164 1,063,052

- 63,421 -

Page 66: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 66 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

A Kabel, Penyambungan dan Pekerjaan Sipil

0

1 DC-OF-SM-12D meter

2 DC-OF-SM-24D Idem 24 core meter

3 DC-OF-SM-48D Idem 48 core meter

4 DC-OF-SM-96D Idem 96 core meter

5 DC-OF-SM-144D Idem 144 core meter

6 DC-OF-SM-264D Idem 264 core meter

7 DC-OF-SM-288D Idem 288 core meter

8 DC-OF-SM-432D Idem 432 core meter

9 DC-OF-SM-960D Idem 960 core meter

10 AC-OF-SM-12D meter

11 AC-OF-SM-24D Idem 24 core meter

12 AC-OF-SM-48D Idem 48 core meter

13 AC-OF-SM-96D Idem 96 core meter

14 DC-OF-SM-12C meter

15 DC-OF-SM-24C Idem 24 core meter

16 DC-OF-SM-48C Idem 48 core meter

17 DC-OF-SM-96C Idem 96 core meter

18 AC-OF-SM-12C meter

19 AC-OF-SM-24C Idem 24 core meter

20 AC-OF-SM-48C Idem 48 core meter

21 AC-OF-SM-96C Idem 96 core meter

22 DC-OF-SM-8-SC meter

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Paket 8 Paket 9

Jasa Material Jasa 1.3045

3,331 9,977 3,180

3,331 12,771 3,180

3,331 18,339 3,180

3,331 30,995 3,180

4,053 44,353 3,869

4,053 76,471 3,869

4,046 81,888 3,863

4,497 215,239 4,293

4,497 387,437 4,293

4,641 13,502 4,430

4,606 16,040 4,397

4,606 23,155 4,397

4,606 34,700 4,397

3,331 13,431 3,180

3,331 18,927 3,180

3,331 30,642 3,180

3,331 56,908 3,180

4,606 17,424 4,397

4,606 23,611 4,397

4,606 36,787 4,397

4,606 64,234 4,397

3,331 12,915 3,180

Page 67: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 67 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

23 DC-OF-SM-12-SC Idem 12 Core meter

24 DC-OF-SM-24-SC Idem 24 Core meter

25 AC-OF-SM-8-SC meter

26 AC-OF-SM-12-SC Idem 12 Core meter

27 AC-OF-SM-24-SC Idem 24 Core meter

28 SC-OF-SM-24 pcs

29 SC-OF-SM-48 Idem 12 - 48 core pcs

30 SC-OF-SM-96 Idem 12 - 96 core pcs

31 SC-OF-SM-144 Idem 12 - 144 core pcs

32 SC-OF-SM-288 Idem 12 - 288 core pcs

33 OS-SM-1 core

34 AB-OF-SM-2D meter

35 AB-OF-SM-4D Idem 4 core meter

36 AB-OF-SM-8D Idem 8 core meter

37 AB-OF-SM-12D Idem 12 core meter

38 AB-OF-SM-24D Idem 24 core meter

39 AB-OF-SM-48D Idem 48 core meter

40 AB-OF-SM-72D Idem 72 core meter

41 AB-OF-SM-96D Idem 96 core meter

42 AB-OF-SM-144D Idem 144 core meter

43 AB-OF-SM-288D Idem 288 core meter

44 DC-OF-SM-1A meter

45 DC-OF-SM-2A idem 2 core meter

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Paket 8 Paket 9

Jasa Material Jasa 3,331 16,014 3,180

3,331 21,567 3,180

4,606 15,497 4,397

4,606 19,568 4,397

4,606 24,405 4,397

37,905 945,763 36,186

37,905 1,068,456 36,186

37,905 1,219,708 36,186

37,905 1,695,850 36,186

37,905 3,000,350 36,186

65,180 - 62,223

2,675 2,489 2,554

2,675 3,483 2,554

2,675 6,469 2,554

2,675 8,958 2,554

3,790 12,759 3,619

3,790 20,155 3,619

3,790 32,348 3,619

3,746 38,071 3,576

4,281 58,723 4,087

5,352 111,972 5,109

3,331 5,949 3,180

3,331 6,262 3,180

Page 68: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 68 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

46 DC-OF-SM-1B meter

47 DC-OF-SM-2B idem 2 core meter

48 AC-OF-SM-1B meter

49 AC-OF-SM-2B idem 2 core meter

50 PC-APC-657-2 pcs

51 PC-APC-657-A1 additional per 1 meter pcs

52 PC-UPC-657-2 pcs

53 PC-UPC-657-A1 additional per 1 meter pcs

54 PC-APC-655-2 pcs

55 PC-APC-655-A1 additional per 1 meter pcs

56 PC-UPC-655-2 pcs

57 PC-UPC-655-A1 additional per 1 meter pcs

58 PC-APC-652-2 pcs

59 PC-APC-652-A1 additional per 1 meter pcs

60 PC-UPC-652-2 pcs

61 PC-UPC-652-A1 additional per 1 meter pcs

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Paket 8 Paket 9

Jasa Material Jasa 3,331 6,258 3,180

3,368 6,262 3,215

4,606 6,262 4,397

4,606 6,562 4,397

3,368 94,837 3,215

1,668 5,949 1,592

3,368 78,498 3,215

1,668 5,949 1,592

3,368 91,315 3,215

1,668 5,949 1,592

3,368 71,258 3,215

1,668 5,949 1,592

3,368 88,706 3,215

1,668 5,949 1,592

3,368 68,186 3,215

1,668 5,949 1,592

Page 69: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 69 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

62 ODC-C-48 pcs

63 ODC-C-144 pcs

64 ODC-C-288 pcs

65 ODC-C-576 pcs

66 ODP-CA-8 pcs

67 ODP-CA-16 pcs

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Paket 8 Paket 9

Jasa Material Jasa 4,632,362 6,476,925 4,422,251

6,259,532 16,178,409 5,975,618

6,306,767 29,006,862 6,020,711

6,257,320 76,614,507 5,973,506

151,619 1,526,265 144,742

151,619 1,826,300 144,742

Page 70: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 70 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

68 ODP-A-8 pcs

69 ODP-A-16 pcs

70 ODP-PB-8 pcs

71 ODP-PB-16 pcs

72 ODP-PL-8 pcs

73 ODP-PL-16 pcs

74 TC-SM-12 pcs

75 TC-SM-24 Idem 24 core pcs

76 TC-SM-48 Idem 48 core pcs

77 TC-SM-96 Idem 96 core pcs

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Paket 8 Paket 9

Jasa Material Jasa 151,619 1,212,598 144,742

151,619 1,565,400 144,742

151,351 1,174,050 144,486

151,619 1,476,841 144,742

151,619 2,732,625 144,742

151,619 3,380,586 144,742

823,326 1,337,043 785,982

1,646,652 1,879,710 1,571,965

3,293,305 3,629,771 3,143,930

6,586,609 6,257,687 6,287,860

Page 71: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 71 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

78 FTB-SM-144SA pcs

79 TR-FTM-HIGH CAP pcs

80 RS-IN-SC-1P pcs

81 RS-IN-SC-2P idem 2 port pcs

82 PS-1-2-ODC pcs

83 PS-1-4-ODC Idem, 1 : 4 pcs

84 PS-1-8-ODP Idem, 1 : 8 pcs

85 PS-1-16-ODP Idem, 1 : 16 pcs

86 PS-2-2-ODC pcs

87 PS-2-4-ODC Idem, 2 : 4 pcs

88 SITAC Akuisisi Lahan SITAC ODC Node

89 PU-S7.0-140 pcs

90 PU-S9.0-140 pcs

91 PU-C7.0-250 pcs

92 PU-C9.0-300 pcs

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Paket 8 Paket 9

Jasa Material Jasa 583,190 13,697,250 556,738

583,190 18,850,077 556,738

68,611 83,488 65,499

138,733 122,623 132,440

37,719 343,811 36,008

37,719 455,923 36,008

37,719 726,502 36,008

37,719 1,121,870 36,008

37,993 795,745 36,269

37,993 939,240 36,269

8,233,262 - 7,859,825

209,270 1,341,104 198,618

211,807 2,217,650 201,040

218,600 3,261,250 207,525

215,918 3,900,455 204,965

Page 72: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 72 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs

94 PU-AS set

95 GB-G1 pcs

96 GB-G3 pcs

97 GB-G-INTG pcs

98 TC-02-ODC pcs

99 PP-OF-IN meter

100 PP-OF-OUT meter

101 DD-S3-1 meter

102 DD-S3-2 idem, 2 pipa meter

103 DD-S3-3 idem, 3 pipa meter

104 DD-V4-1 meter

105 DD-V4-2 Idem, 2 pipa meter

106 DD-V5-1 meter

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Paket 8 Paket 9

Jasa Material Jasa 67,354 605,021 64,299

44,834 38,099 42,800

452,720 1,039,356 432,186

524,835 3,130,800 501,030

182,405 314,411 174,131

67,645 282,895 64,577

4,483 31,047 4,280

4,483 30,678 4,280

67,251 391,366 64,201

89,669 782,733 85,602

134,502 1,174,098 128,402

67,251 74,465 64,201

89,805 148,928 85,732

67,251 72,002 64,201

Page 73: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 73 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

107 DD-V5-2 Idem, 2 pipa meter

108 DD-DA-S1 meter

109 DD-DA-S2 idem, 2 pipa meter

110 DD-DA-S4 idem, 4 pipa meter

111 DD-BSS-S1 meter

112 DD-BSS-S2 Idem, 2 pipa meter

113 DD-BTS-S1 meter

114 DD-BTS-S2 idem, 2 pipa meter

115 DD-BTS-S4 idem, 4 pipa meter

116 HB-PS-1 meter

117 HB-PS-2 meter

118 HB-PS-4 meter

119 HB-PC-2 meter

120 HB-PC-4 meter

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Paket 8 Paket 9

Jasa Material Jasa 89,669 144,800 85,602

269,006 391,366 256,805

538,011 782,733 513,608

1,076,021 1,565,465 1,027,216

269,006 504,189 256,805

538,011 1,008,287 513,608

269,006 502,233 256,805

538,011 1,004,465 513,608

815,590 1,997,167 778,597

42,881 175,689 40,936

51,458 361,643 49,124

60,034 699,995 57,311

51,458 594,852 49,124

60,034 1,165,684 57,311

Page 74: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 74 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

121 DD-BMR-1 track

122 DD-BMR-2 idem, 2 pipa track

123 DD-BMR-4 idem, 4 pipa track

124 DC-SD-28-1 meter

125 DC-SD-28-3 idem, 3 pipa meter

126 DC-SD-33-1 meter

127 DC-SD-33-2 idem, 2 pipa meter

128 DC-SD-43-1 meter

129 DC-SD-43-2 idem, 2 pipa meter

130 DCD-PVC-1 meter

131 DD-BM-100-1 meter

132 DD-BM-100-2 Idem, 2 pipa meter

133 DD-BM-50-1 meter

134 DD-BM-50-2 Idem, 2 pipa meter

135 DD-BM-HDPE-40-1 meter

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Paket 8 Paket 9

Jasa Material Jasa 24,699,785 1,174,098 23,579,474

37,049,677 2,348,198 35,369,211

49,399,570 4,696,394 47,158,948

1,823 11,251 1,740

2,379 33,754 2,271

1,823 12,093 1,740

2,370 24,531 2,262

1,823 26,742 1,740

2,370 53,485 2,262

1,801 16,510 1,719

78,172 391,366 74,162

81,142 782,733 76,998

39,593 228,288 37,333

39,593 453,614 37,333

39,738 - 37,472

39,622 - 37,361

Page 75: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 75 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

137 DD-BM-HDPE-50-1 meter

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter

139 DD-HDPE-40-1 meter

140 DD-HDPE-40-2 Idem 2 pipa meter

141 DD-HDPE-50-1 meter

142 DD-HDPE-50-2 Idem 2 pipa meter

143 DD-HDPE-40-1C meter

144 DD-HDPE-40-2C idem, 2 pipa meter

145 DD-ROD meter

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter

147 DD-RV-CONCRETE m3

148 DD-DS-S1 meter

149 DD-DS-COD1-M meter

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Paket 8 Paket 9

Jasa Material Jasa 39,738 - 37,472

39,593 - 37,333

1,735 15,200 1,657

2,099 30,401 2,004

1,735 25,829 1,657

2,099 51,658 2,004

1,735 15,817 1,657

2,099 31,416 2,004

2,242 - 2,140

89,669 45,720 85,602

807,017 1,339,930 770,413

188,304 324,548 179,763

528,031 31,241 504,081

Page 76: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 76 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

150 BC-TR-0.4 meter

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter

152 BC-TR-1 idem, kedalaman 1 meter meter

153 BC-TR-2 idem, kedalaman 1,2 meter meter

154 BC-TR-3 idem, kedalaman 1,3 meter meter

155 BC-TR-4 idem, kedalaman 1,4 meter meter

156 BC-TR-5 meter

157 BCTR-ROCK meter

158 BD-SK Titik

159 SMD-ABS-2A pcs

160 SMD-ABS-3A idem 3 cabang pcs

161 SMD-ABS-4A idem 4 cabang pcs

162 SMD-ABS-6A idem 6 cabang pcs

163 DD-MDSC-5/3.5 pcs

164 DD-MDSC-10/8 pcs

165 DD-MDSC-12/10 pcs

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Paket 8 Paket 9

Jasa Material Jasa 13,497 - 12,421

17,637 - 16,373

27,395 - 25,689

32,523 - 30,584

34,714 - 32,676

37,313 - 35,156

39,738 - 37,472

236,260 - 225,080

89,669 66,997 85,602

175,607 316,572 167,642

189,691 345,743 181,087

208,664 965,210 199,200

229,530 808,083 219,119

577 28,433 551

577 29,929 551

577 31,575 551

Page 77: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 77 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

166 DD-MDDI-1A meter

167 DD-MDDI-2A Idem 2 way meter

168 DD-MDDI-4A Idem 4 way meter

169 DD-MDDI-7A Idem 7 way meter

170 DD-MDDI-12A Idem 12 way meter

171 DD-MDDI-19A Idem 19 way meter

172 DD-MDDI-24A Idem 24 way meter

173 DD-MDDI-1B meter

174 DD-MDDI-2B Idem 2 way meter

175 DD-MDDI-4B Idem 4 way meter

176 DD-MDDI-7B Idem 7 way meter

177 DD-MDDI-1C meter

178 DD-MDDI-2C Idem 2 way meter

179 DD-MDDI-4C Idem 4 way meter

180 DD-MDDI-7C Idem 7 way meter

181 DD-MDDB-1A meter

182 DD-MDDB-2A Idem 2 way meter

183 DD-MDDB-4A Idem 4 way meter

184 DD-MDDB-7A Idem 7 way meter

185 DD-MDDB-12A Idem 12 way meter

186 DD-MDDB-19A Idem 19 way meter

187 DD-MDDB-24A Idem 24 way meter

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Paket 8 Paket 9

Jasa Material Jasa 2,064 6,817 1,971

2,717 9,270 2,594

3,112 14,651 2,971

3,137 20,781 2,995

3,606 31,246 3,443

4,199 43,544 4,008

4,792 53,204 4,575

2,667 13,814 2,546

3,112 19,735 2,971

3,557 35,133 3,396

4,101 51,430 3,915

3,359 16,325 3,207

3,853 23,527 3,679

4,793 42,160 4,576

5,138 62,044 4,905

3,029 16,996 2,891

3,985 20,093 3,804

4,565 28,705 4,358

4,601 37,173 4,392

5,289 55,257 5,049

6,158 71,095 5,879

7,028 84,679 6,709

Page 78: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 78 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

188 DD-MDDB-1B meter

189 DD-MDDB-2B Idem 2 way meter

190 DD-MDDB-4B Idem 4 way meter

191 DD-MDDB-7B Idem 7 way meter

192 DD-MDDB-1C meter

193 DD-MDDB-2C Idem 2 way meter

194 DD-MDDB-4C Idem 4 way meter

195 DD-MDDB-7C Idem 7 way meter

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs

200 MH-HH2 pcs

201 HH-PIT-P-HA pcs

202 HH-PIT-P-ODP pcs

203 HH-PIT-P-ODC pcs

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Paket 8 Paket 9

Jasa Material Jasa 3,913 28,699 3,735

4,565 37,173 4,358

5,217 65,878 4,980

6,013 87,835 5,741

4,926 33,471 4,703

5,652 43,774 5,396

6,974 77,933 6,658

7,535 104,483 7,194

577 16,461 551

577 16,461 551

577 16,461 551

3,011,276 7,566,100 2,874,693

2,292,444 5,293,515 2,188,466

203,344 997,447 194,121

303,310 3,261,250 289,553

572,316 12,366,660 546,358

793,084 1,058,831 757,112

65,908 - 62,918

Page 79: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 79 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

A Kabel, Penyambungan dan Pekerjaan Sipil

0

1 DC-OF-SM-12D meter

2 DC-OF-SM-24D Idem 24 core meter

3 DC-OF-SM-48D Idem 48 core meter

4 DC-OF-SM-96D Idem 96 core meter

5 DC-OF-SM-144D Idem 144 core meter

6 DC-OF-SM-264D Idem 264 core meter

7 DC-OF-SM-288D Idem 288 core meter

8 DC-OF-SM-432D Idem 432 core meter

9 DC-OF-SM-960D Idem 960 core meter

10 AC-OF-SM-12D meter

11 AC-OF-SM-24D Idem 24 core meter

12 AC-OF-SM-48D Idem 48 core meter

13 AC-OF-SM-96D Idem 96 core meter

14 DC-OF-SM-12C meter

15 DC-OF-SM-24C Idem 24 core meter

16 DC-OF-SM-48C Idem 48 core meter

17 DC-OF-SM-96C Idem 96 core meter

18 AC-OF-SM-12C meter

19 AC-OF-SM-24C Idem 24 core meter

20 AC-OF-SM-48C Idem 48 core meter

21 AC-OF-SM-96C Idem 96 core meter

22 DC-OF-SM-8-SC meter

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Paket 10 Paket 11

Material Jasa Material 1.1549 1.3587

8,833 2,897 10,391

11,306 2,897 13,302

16,236 2,897 19,101

27,440 2,897 32,283

39,267 3,525 46,196

67,701 3,525 79,648

72,497 3,520 85,290

190,555 3,912 224,181

343,005 3,912 403,534

11,953 4,037 14,063

14,200 4,006 16,706

20,499 4,006 24,117

30,720 4,006 36,141

11,891 2,897 13,989

16,756 2,897 19,713

27,128 2,897 31,915

50,381 2,897 59,272

15,426 4,006 18,148

20,904 4,006 24,592

32,568 4,006 38,315

56,867 4,006 66,902

11,434 2,897 13,451

Page 80: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 80 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

23 DC-OF-SM-12-SC Idem 12 Core meter

24 DC-OF-SM-24-SC Idem 24 Core meter

25 AC-OF-SM-8-SC meter

26 AC-OF-SM-12-SC Idem 12 Core meter

27 AC-OF-SM-24-SC Idem 24 Core meter

28 SC-OF-SM-24 pcs

29 SC-OF-SM-48 Idem 12 - 48 core pcs

30 SC-OF-SM-96 Idem 12 - 96 core pcs

31 SC-OF-SM-144 Idem 12 - 144 core pcs

32 SC-OF-SM-288 Idem 12 - 288 core pcs

33 OS-SM-1 core

34 AB-OF-SM-2D meter

35 AB-OF-SM-4D Idem 4 core meter

36 AB-OF-SM-8D Idem 8 core meter

37 AB-OF-SM-12D Idem 12 core meter

38 AB-OF-SM-24D Idem 24 core meter

39 AB-OF-SM-48D Idem 48 core meter

40 AB-OF-SM-72D Idem 72 core meter

41 AB-OF-SM-96D Idem 96 core meter

42 AB-OF-SM-144D Idem 144 core meter

43 AB-OF-SM-288D Idem 288 core meter

44 DC-OF-SM-1A meter

45 DC-OF-SM-2A idem 2 core meter

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Paket 10 Paket 11

Material Jasa Material 14,178 2,897 16,679

19,094 2,897 22,463

13,720 4,006 16,141

17,324 4,006 20,381

21,606 4,006 25,419

837,303 32,971 985,058

945,925 32,971 1,112,849

1,079,832 32,971 1,270,385

1,501,370 32,971 1,766,310

2,656,270 32,971 3,125,010

- 56,696 -

2,204 2,327 2,592

3,084 2,327 3,628

5,727 2,327 6,738

7,931 2,327 9,330

11,296 3,297 13,289

17,843 3,297 20,992

28,638 3,297 33,692

33,705 3,259 39,652

51,989 3,724 61,163

99,131 4,656 116,624

5,266 2,897 6,196

5,544 2,897 6,522

Page 81: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 81 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

46 DC-OF-SM-1B meter

47 DC-OF-SM-2B idem 2 core meter

48 AC-OF-SM-1B meter

49 AC-OF-SM-2B idem 2 core meter

50 PC-APC-657-2 pcs

51 PC-APC-657-A1 additional per 1 meter pcs

52 PC-UPC-657-2 pcs

53 PC-UPC-657-A1 additional per 1 meter pcs

54 PC-APC-655-2 pcs

55 PC-APC-655-A1 additional per 1 meter pcs

56 PC-UPC-655-2 pcs

57 PC-UPC-655-A1 additional per 1 meter pcs

58 PC-APC-652-2 pcs

59 PC-APC-652-A1 additional per 1 meter pcs

60 PC-UPC-652-2 pcs

61 PC-UPC-652-A1 additional per 1 meter pcs

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Paket 10 Paket 11

Material Jasa Material 5,540 2,897 6,518

5,544 2,930 6,522

5,544 4,006 6,522

5,809 4,006 6,834

83,961 2,930 98,777

5,266 1,451 6,196

69,496 2,930 81,760

5,266 1,451 6,196

80,843 2,930 95,109

5,266 1,451 6,196

63,086 2,930 74,219

5,266 1,451 6,196

78,533 2,930 92,392

5,266 1,451 6,196

60,367 2,930 71,019

5,266 1,451 6,196

Page 82: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 82 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

62 ODC-C-48 pcs

63 ODC-C-144 pcs

64 ODC-C-288 pcs

65 ODC-C-576 pcs

66 ODP-CA-8 pcs

67 ODP-CA-16 pcs

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Paket 10 Paket 11

Material Jasa Material 5,734,151 4,029,436 6,746,031

14,323,070 5,444,822 16,850,597

25,680,356 5,485,909 30,212,053

67,828,359 5,442,897 79,797,724

1,351,233 131,885 1,589,679

1,616,860 131,885 1,902,180

Page 83: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 83 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

68 ODP-A-8 pcs

69 ODP-A-16 pcs

70 ODP-PB-8 pcs

71 ODP-PB-16 pcs

72 ODP-PL-8 pcs

73 ODP-PL-16 pcs

74 TC-SM-12 pcs

75 TC-SM-24 Idem 24 core pcs

76 TC-SM-48 Idem 48 core pcs

77 TC-SM-96 Idem 96 core pcs

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Paket 10 Paket 11

Material Jasa Material 1,073,537 131,885 1,262,980

1,385,880 131,885 1,630,440

1,039,410 131,652 1,222,830

1,307,477 131,885 1,538,201

2,419,248 131,885 2,846,161

2,992,900 131,885 3,521,044

1,183,711 716,166 1,392,595

1,664,145 1,432,332 1,957,809

3,213,509 2,864,664 3,780,583

5,540,055 5,729,328 6,517,684

Page 84: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 84 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

78 FTB-SM-144SA pcs

79 TR-FTM-HIGH CAP pcs

80 RS-IN-SC-1P pcs

81 RS-IN-SC-2P idem 2 port pcs

82 PS-1-2-ODC pcs

83 PS-1-4-ODC Idem, 1 : 4 pcs

84 PS-1-8-ODP Idem, 1 : 8 pcs

85 PS-1-16-ODP Idem, 1 : 16 pcs

86 PS-2-2-ODC pcs

87 PS-2-4-ODC Idem, 2 : 4 pcs

88 SITAC Akuisisi Lahan SITAC ODC Node

89 PU-S7.0-140 pcs

90 PU-S9.0-140 pcs

91 PU-C7.0-250 pcs

92 PU-C9.0-300 pcs

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Paket 10 Paket 11

Material Jasa Material 12,126,450 507,284 14,266,350

16,688,351 507,284 19,633,269

73,914 59,681 86,957

108,561 120,676 127,718

304,383 32,810 358,096

403,638 32,810 474,866

643,187 32,810 756,687

993,214 32,810 1,168,482

704,489 33,048 828,807

831,528 33,048 978,264

- 7,161,660 -

1,187,306 187,009 1,396,825

1,963,330 189,215 2,309,790

2,887,250 195,125 3,396,750

3,453,151 192,791 4,062,513

Page 85: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 85 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs

94 PU-AS set

95 GB-G1 pcs

96 GB-G3 pcs

97 GB-G-INTG pcs

98 TC-02-ODC pcs

99 PP-OF-IN meter

100 PP-OF-OUT meter

101 DD-S3-1 meter

102 DD-S3-2 idem, 2 pipa meter

103 DD-S3-3 idem, 3 pipa meter

104 DD-V4-1 meter

105 DD-V4-2 Idem, 2 pipa meter

106 DD-V5-1 meter

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Paket 10 Paket 11

Material Jasa Material 535,637 58,587 630,158

33,730 38,998 39,682

920,163 393,796 1,082,540

2,771,760 456,525 3,260,880

278,354 158,664 327,474

250,453 58,841 294,649

27,487 3,900 32,337

27,160 3,900 31,953

346,484 58,498 407,626

692,969 77,998 815,254

1,039,453 116,996 1,222,880

65,925 58,498 77,559

131,849 78,117 155,116

63,745 58,498 74,993

Page 86: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 86 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

107 DD-V5-2 Idem, 2 pipa meter

108 DD-DA-S1 meter

109 DD-DA-S2 idem, 2 pipa meter

110 DD-DA-S4 idem, 4 pipa meter

111 DD-BSS-S1 meter

112 DD-BSS-S2 Idem, 2 pipa meter

113 DD-BTS-S1 meter

114 DD-BTS-S2 idem, 2 pipa meter

115 DD-BTS-S4 idem, 4 pipa meter

116 HB-PS-1 meter

117 HB-PS-2 meter

118 HB-PS-4 meter

119 HB-PC-2 meter

120 HB-PC-4 meter

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Paket 10 Paket 11

Material Jasa Material 128,194 77,998 150,816

346,484 233,993 407,626

692,969 467,986 815,254

1,385,938 935,972 1,630,508

446,369 233,993 525,138

892,657 467,986 1,050,180

444,637 233,993 523,100

889,273 467,986 1,046,199

1,768,132 709,437 2,080,147

155,541 37,300 182,988

320,169 44,761 376,668

619,719 52,220 729,078

526,634 44,761 619,567

1,032,004 52,220 1,214,117

Page 87: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 87 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

121 DD-BMR-1 track

122 DD-BMR-2 idem, 2 pipa track

123 DD-BMR-4 idem, 4 pipa track

124 DC-SD-28-1 meter

125 DC-SD-28-3 idem, 3 pipa meter

126 DC-SD-33-1 meter

127 DC-SD-33-2 idem, 2 pipa meter

128 DC-SD-43-1 meter

129 DC-SD-43-2 idem, 2 pipa meter

130 DCD-PVC-1 meter

131 DD-BM-100-1 meter

132 DD-BM-100-2 Idem, 2 pipa meter

133 DD-BM-50-1 meter

134 DD-BM-50-2 Idem, 2 pipa meter

135 DD-BM-HDPE-40-1 meter

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Paket 10 Paket 11

Material Jasa Material 1,039,453 21,484,980 1,222,880

2,078,907 32,227,469 2,445,762

4,157,812 42,969,959 4,891,522

9,961 1,586 11,719

29,883 2,070 35,156

10,706 1,586 12,595

21,718 2,061 25,550

23,675 1,586 27,853

47,351 2,061 55,707

14,616 1,566 17,196

346,484 69,988 407,626

692,969 72,572 815,254

202,108 36,430 237,773

401,593 36,430 472,461

- 36,557 -

- 36,455 -

Page 88: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 88 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

137 DD-BM-HDPE-50-1 meter

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter

139 DD-HDPE-40-1 meter

140 DD-HDPE-40-2 Idem 2 pipa meter

141 DD-HDPE-50-1 meter

142 DD-HDPE-50-2 Idem 2 pipa meter

143 DD-HDPE-40-1C meter

144 DD-HDPE-40-2C idem, 2 pipa meter

145 DD-ROD meter

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter

147 DD-RV-CONCRETE m3

148 DD-DS-S1 meter

149 DD-DS-COD1-M meter

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Paket 10 Paket 11

Material Jasa Material - 36,557 -

- 36,430 -

13,457 1,510 15,832

26,915 1,826 31,665

22,867 1,510 26,902

45,734 1,826 53,805

14,003 1,510 16,474

27,813 1,826 32,722

- 1,950 -

40,477 77,998 47,620

1,186,267 701,979 1,395,602

287,329 163,795 338,032

27,659 459,305 32,540

Page 89: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 89 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

150 BC-TR-0.4 meter

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter

152 BC-TR-1 idem, kedalaman 1 meter meter

153 BC-TR-2 idem, kedalaman 1,2 meter meter

154 BC-TR-3 idem, kedalaman 1,3 meter meter

155 BC-TR-4 idem, kedalaman 1,4 meter meter

156 BC-TR-5 meter

157 BCTR-ROCK meter

158 BD-SK Titik

159 SMD-ABS-2A pcs

160 SMD-ABS-3A idem 3 cabang pcs

161 SMD-ABS-4A idem 4 cabang pcs

162 SMD-ABS-6A idem 6 cabang pcs

163 DD-MDSC-5/3.5 pcs

164 DD-MDSC-10/8 pcs

165 DD-MDSC-12/10 pcs

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Paket 10 Paket 11

Material Jasa Material - 13,731 -

- 17,332 -

- 25,820 -

- 30,280 -

- 32,186 -

- 34,447 -

- 36,557 -

- 207,500 -

59,313 77,998 69,780

280,268 152,751 329,725

306,094 165,001 360,108

854,520 181,505 1,005,313

715,412 199,656 841,658

25,172 502 29,614

26,497 502 31,173

27,954 502 32,887

Page 90: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 90 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

166 DD-MDDI-1A meter

167 DD-MDDI-2A Idem 2 way meter

168 DD-MDDI-4A Idem 4 way meter

169 DD-MDDI-7A Idem 7 way meter

170 DD-MDDI-12A Idem 12 way meter

171 DD-MDDI-19A Idem 19 way meter

172 DD-MDDI-24A Idem 24 way meter

173 DD-MDDI-1B meter

174 DD-MDDI-2B Idem 2 way meter

175 DD-MDDI-4B Idem 4 way meter

176 DD-MDDI-7B Idem 7 way meter

177 DD-MDDI-1C meter

178 DD-MDDI-2C Idem 2 way meter

179 DD-MDDI-4C Idem 4 way meter

180 DD-MDDI-7C Idem 7 way meter

181 DD-MDDB-1A meter

182 DD-MDDB-2A Idem 2 way meter

183 DD-MDDB-4A Idem 4 way meter

184 DD-MDDB-7A Idem 7 way meter

185 DD-MDDB-12A Idem 12 way meter

186 DD-MDDB-19A Idem 19 way meter

187 DD-MDDB-24A Idem 24 way meter

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Paket 10 Paket 11

Material Jasa Material 6,035 1,796 7,100

8,207 2,364 9,655

12,971 2,707 15,260

18,398 2,729 21,645

27,663 3,137 32,544

38,551 3,652 45,353

47,103 4,169 55,415

12,230 2,320 14,388

17,472 2,707 20,555

31,104 3,094 36,593

45,532 3,567 53,567

14,453 2,922 17,003

20,829 3,352 24,505

37,325 4,170 43,911

54,929 4,469 64,622

15,047 2,635 17,702

17,789 3,467 20,928

25,413 3,971 29,897

32,910 4,002 38,717

48,920 4,601 57,553

62,942 5,357 74,049

74,968 6,113 88,197

Page 91: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 91 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

188 DD-MDDB-1B meter

189 DD-MDDB-2B Idem 2 way meter

190 DD-MDDB-4B Idem 4 way meter

191 DD-MDDB-7B Idem 7 way meter

192 DD-MDDB-1C meter

193 DD-MDDB-2C Idem 2 way meter

194 DD-MDDB-4C Idem 4 way meter

195 DD-MDDB-7C Idem 7 way meter

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs

200 MH-HH2 pcs

201 HH-PIT-P-HA pcs

202 HH-PIT-P-ODP pcs

203 HH-PIT-P-ODC pcs

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Paket 10 Paket 11

Material Jasa Material 25,408 3,404 29,891

32,910 3,971 38,717

58,323 4,538 68,615

77,762 5,231 91,484

29,633 4,285 34,862

38,754 4,916 45,592

68,995 6,067 81,171

92,501 6,555 108,824

14,574 502 17,145

14,574 502 17,145

14,574 502 17,145

6,698,420 2,619,343 7,880,460

4,686,455 1,994,071 5,513,452

883,060 176,878 1,038,889

2,887,250 263,833 3,396,750

10,948,452 497,826 12,880,476

937,405 689,860 1,102,824

- 57,329 -

Page 92: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 92 of 104

PENGADAAN KHS OSP-FO TAHUN 2014-2017

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

A Kabel, Penyambungan dan Pekerjaan Sipil

0

1 DC-OF-SM-12D meter

2 DC-OF-SM-24D Idem 24 core meter

3 DC-OF-SM-48D Idem 48 core meter

4 DC-OF-SM-96D Idem 96 core meter

5 DC-OF-SM-144D Idem 144 core meter

6 DC-OF-SM-264D Idem 264 core meter

7 DC-OF-SM-288D Idem 288 core meter

8 DC-OF-SM-432D Idem 432 core meter

9 DC-OF-SM-960D Idem 960 core meter

10 AC-OF-SM-12D meter

11 AC-OF-SM-24D Idem 24 core meter

12 AC-OF-SM-48D Idem 48 core meter

13 AC-OF-SM-96D Idem 96 core meter

14 DC-OF-SM-12C meter

15 DC-OF-SM-24C Idem 24 core meter

16 DC-OF-SM-48C Idem 48 core meter

17 DC-OF-SM-96C Idem 96 core meter

18 AC-OF-SM-12C meter

19 AC-OF-SM-24C Idem 24 core meter

20 AC-OF-SM-48C Idem 48 core meter

21 AC-OF-SM-96C Idem 96 core meter

22 DC-OF-SM-8-SC meter

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 652 D

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 12 core G 655 C

Pengadaan dan pemasangan Kabel Duct Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Paket 11 Paket 12

Jasa Material Jasa 1.4263

3,525 10,908 4,257

3,525 13,963 4,257

3,525 20,051 4,257

3,525 33,889 4,257

4,290 48,494 5,180

4,290 83,611 5,180

4,283 89,533 5,171

4,760 235,335 5,748

4,760 423,611 5,748

4,912 14,762 5,931

4,875 17,537 5,886

4,875 25,317 5,886

4,875 37,940 5,886

3,525 14,685 4,257

3,525 20,694 4,257

3,525 33,503 4,257

3,525 62,221 4,257

4,875 19,051 5,886

4,875 25,816 5,886

4,875 40,222 5,886

4,875 70,231 5,886

3,525 14,120 4,257

Page 93: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 93 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

23 DC-OF-SM-12-SC Idem 12 Core meter

24 DC-OF-SM-24-SC Idem 24 Core meter

25 AC-OF-SM-8-SC meter

26 AC-OF-SM-12-SC Idem 12 Core meter

27 AC-OF-SM-24-SC Idem 24 Core meter

28 SC-OF-SM-24 pcs

29 SC-OF-SM-48 Idem 12 - 48 core pcs

30 SC-OF-SM-96 Idem 12 - 96 core pcs

31 SC-OF-SM-144 Idem 12 - 144 core pcs

32 SC-OF-SM-288 Idem 12 - 288 core pcs

33 OS-SM-1 core

34 AB-OF-SM-2D meter

35 AB-OF-SM-4D Idem 4 core meter

36 AB-OF-SM-8D Idem 8 core meter

37 AB-OF-SM-12D Idem 12 core meter

38 AB-OF-SM-24D Idem 24 core meter

39 AB-OF-SM-48D Idem 48 core meter

40 AB-OF-SM-72D Idem 72 core meter

41 AB-OF-SM-96D Idem 96 core meter

42 AB-OF-SM-144D Idem 144 core meter

43 AB-OF-SM-288D Idem 288 core meter

44 DC-OF-SM-1A meter

45 DC-OF-SM-2A idem 2 core meter

Pengadaan dan pemasangan Kabel Udara Fiber Optik Single Mode 8 core G 652 D, "Easy to split"

Pengadaan dan pemasangan alat sambung (cabang/ lurus) untuk Fiber Optik kapasitas 12 - 24 core

Penyambungan Kabel Optik Single Mode kap 1 core dengan cara fusion splice

Pengadaan dan pemasangan Air Blown Cable Optik, Single Mode 2 core, G 652 D

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 A (indoor)

Paket 11 Paket 12

Jasa Material Jasa 3,525 17,509 4,257

3,525 23,581 4,257

4,875 16,944 5,886

4,875 21,395 5,886

4,875 26,683 5,886

40,118 1,034,068 48,445

40,118 1,168,217 48,445

40,118 1,333,591 48,445

40,118 1,854,190 48,445

40,118 3,280,490 48,445

68,986 - 83,304

2,832 2,721 3,419

2,832 3,808 3,419

2,832 7,073 3,419

2,832 9,794 3,419

4,012 13,951 4,844

4,012 22,036 4,844

4,012 35,368 4,844

3,965 41,625 4,788

4,531 64,206 5,472

5,665 122,426 6,840

3,525 6,504 4,257

3,525 6,846 4,257

Page 94: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 94 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

46 DC-OF-SM-1B meter

47 DC-OF-SM-2B idem 2 core meter

48 AC-OF-SM-1B meter

49 AC-OF-SM-2B idem 2 core meter

50 PC-APC-657-2 pcs

51 PC-APC-657-A1 additional per 1 meter pcs

52 PC-UPC-657-2 pcs

53 PC-UPC-657-A1 additional per 1 meter pcs

54 PC-APC-655-2 pcs

55 PC-APC-655-A1 additional per 1 meter pcs

56 PC-UPC-655-2 pcs

57 PC-UPC-655-A1 additional per 1 meter pcs

58 PC-APC-652-2 pcs

59 PC-APC-652-A1 additional per 1 meter pcs

60 PC-UPC-652-2 pcs

61 PC-UPC-652-A1 additional per 1 meter pcs

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn pelindung pipa G 657 B (outdoor)

Pengadaan dan pemasangan Kabel Serat Optic Penanggal Single Mode 1 core dgn kawat penggantung G.657 B (outdoor)

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.657

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.655C

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-APC To FC/LC/SC-APC), G.652 D

Pengadaan dan pemasangan Patch cord 2 meter, (FC/LC/SC-UPC To FC/LC/SC-UPC), G.652D

Paket 11 Paket 12

Jasa Material Jasa 3,525 6,842 4,257

3,565 6,846 4,305

4,875 6,846 5,886

4,875 7,174 5,886

3,565 103,692 4,305

1,765 6,504 2,132

3,565 85,827 4,305

1,765 6,504 2,132

3,565 99,841 4,305

1,765 6,504 2,132

3,565 77,912 4,305

1,765 6,504 2,132

3,565 96,988 4,305

1,765 6,504 2,132

3,565 74,553 4,305

1,765 6,504 2,132

Page 95: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 95 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

62 ODC-C-48 pcs

63 ODC-C-144 pcs

64 ODC-C-288 pcs

65 ODC-C-576 pcs

66 ODP-CA-8 pcs

67 ODP-CA-16 pcs

Pengadaan dan pemasangan ODC-Pole (Outdoor) with space for passive spliter, adaptor SC kap 48 core, berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 144 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 288 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan kabinet ODC (Outdoor) kap 576 core dengan space untuk spliter modular termasuk material adaptor SC, pigtail, pondasi berlapis keramik, lantai kerja keramik, patok pengaman (5 buah), berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Closure Aerial Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Paket 11 Paket 12

Jasa Material Jasa 4,902,844 7,081,669 5,920,431

6,625,025 17,688,973 8,000,050

6,675,018 31,715,207 8,060,420

6,622,683 83,767,935 7,997,223

160,472 1,668,771 193,778

160,472 1,996,820 193,778

Page 96: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 96 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

68 ODP-A-8 pcs

69 ODP-A-16 pcs

70 ODP-PB-8 pcs

71 ODP-PB-16 pcs

72 ODP-PL-8 pcs

73 ODP-PL-16 pcs

74 TC-SM-12 pcs

75 TC-SM-24 Idem 24 core pcs

76 TC-SM-48 Idem 48 core pcs

77 TC-SM-96 Idem 96 core pcs

Pengadaan dan pemasangan ODP type Indoor/wall Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type Indoor/wall Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 8 core berikut space pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP type outdoor/wall dan Pole Kap 16 core berikut space 2 pasive spliter (1:8), adapter SC,berikut pelabelan

Pengadaan dan pemasangan ODP ( Pilar ) kap 8 core termasuk pigtail, berikut space 1 splitter (1:8), pelabelan.

Pengadaan dan pemasangan ODP ( Pilar ) kap 16 core termasuk pigtail, berikut space 2 splitter (1:8), pelabelan.

Pengadaan dan Pemasangan OTB termasuk terminasi dan penyambungan kabel optik Single mode kap 12 core serta Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box

Paket 11 Paket 12

Jasa Material Jasa 160,472 1,325,817 193,778

160,472 1,711,560 193,778

160,188 1,283,670 193,435

160,472 1,614,732 193,778

160,472 2,987,768 193,778

160,472 3,696,228 193,778

871,400 1,461,882 1,052,259

1,742,800 2,055,217 2,104,519

3,485,600 3,968,680 4,209,037

6,971,200 6,841,961 8,418,074

Page 97: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 97 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

78 FTB-SM-144SA pcs

79 TR-FTM-HIGH CAP pcs

80 RS-IN-SC-1P pcs

81 RS-IN-SC-2P idem 2 port pcs

82 PS-1-2-ODC pcs

83 PS-1-4-ODC Idem, 1 : 4 pcs

84 PS-1-8-ODP Idem, 1 : 8 pcs

85 PS-1-16-ODP Idem, 1 : 16 pcs

86 PS-2-2-ODC pcs

87 PS-2-4-ODC Idem, 2 : 4 pcs

88 SITAC Akuisisi Lahan SITAC ODC Node

89 PU-S7.0-140 pcs

90 PU-S9.0-140 pcs

91 PU-C7.0-250 pcs

92 PU-C9.0-300 pcs

Pengadaan dan Pemasangan ODF High Capacity tidak termasuk terminasi dengan kapasitas 144 core, Adapter (SC Connector), pigtail dan protection sleeve pada cassette/box dan manajemen core

Pengadaan dan Pemasangan Close Rack FTM High Capacity

Pemasangan dan terminasi Roset/Indoor Optical Outlet with SC Adaptor - kap 1 port berikut pigtail

Pengadaan dan pemasangan Passive Splitter 1:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan pemasangan Passive Splitter 2:2, type modular SC/UPC, for ODC, termasuk pigtail

Pengadaan dan Pemasangan Tiang Besi 7 meter, berikut cat & cor pondasi dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Besi 9 meter, berikut cat & cor dan assesories dengan kekuatan tarik 140 kg

Pengadaan dan Pemasangan Tiang Beton 7 meter, berikut assesories dengan kekuatan tarik 250 kg

Pengadaan dan Pemasangan Tiang Beton 9 meter, berikut assesories dengan kekuatan tarik 300 kg

Paket 11 Paket 12

Jasa Material Jasa 617,242 14,976,150 745,351

617,242 20,610,092 745,351

72,617 91,283 87,689

146,833 134,072 177,308

39,922 375,912 48,207

39,922 498,492 48,207

39,922 794,335 48,207

39,922 1,226,618 48,207

40,211 870,043 48,557

40,211 1,026,936 48,557

8,714,000 - 10,522,593

219,301 1,466,322 283,124

221,986 2,424,710 286,366

229,176 3,565,750 295,049

226,337 4,264,637 291,620

Page 98: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 98 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

93 GU-G Pengadaan dan Pemasangan Temberang Tarik pcs

94 PU-AS set

95 GB-G1 pcs

96 GB-G3 pcs

97 GB-G-INTG pcs

98 TC-02-ODC pcs

99 PP-OF-IN meter

100 PP-OF-OUT meter

101 DD-S3-1 meter

102 DD-S3-2 idem, 2 pipa meter

103 DD-S3-3 idem, 3 pipa meter

104 DD-V4-1 meter

105 DD-V4-2 Idem, 2 pipa meter

106 DD-V5-1 meter

Pengadaan dan Pemasangan Asesoris tiang eksisting

Pengadaan dan Pemasangan Grounding 1 titik rod pada ODP /kotak pembagi dengan tahanan maks 3 ohm

Pengadaan dan Pemasangan Grounding 3 titik rod pada ODC dengan tahanan maks 1 ohm

Pengadaan dan Pemasangan material Grounding di lokasi gedung eksisting dengan cara integrasi

Pengadaan dan Pemasangan Riser Pipe untuk pengaman kabel optik ke ODC Pole / titik naik KU diamater 2 inch panjang 3 meter

Pengadaan dan Pemasangan Pipe Protector Indoor Cable (PVC White) High Impact Conduit 20 mm

Pengadaan dan Pemasangan Pipe Protector Outdoor Cable ( PVC Black) High Impact Conduit 20 mm

Pengadaan dan pemasangan Pipa Besi Diameter 100 mm dan ketebalan pipa 3,65 mm untuk crossing 1 pipa bentang ≤ 6 meter

Pengadan dan Pemasangan Pipa Duct PVC diameter dalam 100 mm, ketebalan 4 mm, 1 pipa termasuk pengecoran

Pemasangan Pipa Duct dengan selubung pasir dia 100 mm dengan ketebalan 5,5 mm, 1 pipa ( crossing )

Paket 11 Paket 12

Jasa Material Jasa 71,287 661,511 86,082

47,452 41,657 57,300

479,155 1,136,400 578,603

555,480 3,423,120 670,770

193,055 343,767 233,124

71,595 309,309 86,455

4,745 33,946 5,730

4,745 33,542 5,730

71,178 427,907 85,951

94,904 855,816 114,602

142,356 1,283,723 171,902

71,178 81,417 85,951

95,049 162,834 114,776

71,178 78,725 85,951

Page 99: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 99 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

107 DD-V5-2 Idem, 2 pipa meter

108 DD-DA-S1 meter

109 DD-DA-S2 idem, 2 pipa meter

110 DD-DA-S4 idem, 4 pipa meter

111 DD-BSS-S1 meter

112 DD-BSS-S2 Idem, 2 pipa meter

113 DD-BTS-S1 meter

114 DD-BTS-S2 idem, 2 pipa meter

115 DD-BTS-S4 idem, 4 pipa meter

116 HB-PS-1 meter

117 HB-PS-2 meter

118 HB-PS-4 meter

119 HB-PC-2 meter

120 HB-PC-4 meter

Pengadaan dan pemasangan pipa Duct menempel pada jembatan existing menggunakan Pipa Galvanis diamenter 100 mm, tebal 3,65 mm, 1 pipa

Pengadaan dan pemasangan pipa Duct pada jembatan dengan self support berpenguatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan pipa Duct pada jembatan menggunakan Pipa besi Galv 1 pipa, bentang 6 - 12 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 1 tiang besi, bentang s/d 40 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang besi, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang besi, bentang ≥ 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 2 tiang beton, bentang s/d 100 meter

Pengadaan dan pemasangan Pipa Duct dengan system gantung 4 tiang beton, bentang ≥ 100 meter

Paket 11 Paket 12

Jasa Material Jasa 94,904 158,319 114,602

284,713 427,907 343,805

569,425 855,816 687,609

1,138,850 1,711,631 1,375,219

284,713 551,265 343,805

569,425 1,102,430 687,609

284,713 549,126 343,805

569,425 1,098,251 687,609

863,212 2,183,641 1,042,372

45,385 192,093 54,805

54,463 395,409 65,767

63,540 765,353 76,727

54,463 650,393 65,767

63,540 1,274,523 76,727

Page 100: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 100 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

121 DD-BMR-1 track

122 DD-BMR-2 idem, 2 pipa track

123 DD-BMR-4 idem, 4 pipa track

124 DC-SD-28-1 meter

125 DC-SD-28-3 idem, 3 pipa meter

126 DC-SD-33-1 meter

127 DC-SD-33-2 idem, 2 pipa meter

128 DC-SD-43-1 meter

129 DC-SD-43-2 idem, 2 pipa meter

130 DCD-PVC-1 meter

131 DD-BM-100-1 meter

132 DD-BM-100-2 Idem, 2 pipa meter

133 DD-BM-50-1 meter

134 DD-BM-50-2 Idem, 2 pipa meter

135 DD-BM-HDPE-40-1 meter

136 DD-BM-HDPE-40-2 Idem, 2 pipa meter

Pengadaan dan Pemasangan Boring pada Lintasan Kereta Api menggunakan 1 pipa Galvanis diameter 100 mm tebal 3,65 mm

Pengadaan dan Pemasangan 1 Subduct 28/32 mm pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 40/33 pada polongan route Duct

Pengadaan dan Pemasangan 1 Subduct 50/42 pada polongan route Duct

Pengadaan dan Pemasangan Duct Cable Penanggal diameter pipa PVC 2 inch (Class AW) 1 pipa

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 100 mm dan ketebalan 3,65 mm dengan cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pengadaan dan Pemasangan Pipa galvanis dengan ukuran diameter 50 mm dan ketebalan 2,7 mm cara boring manual /mesin 1 pipa dengan kedalaman minimal 150 cm

Pekerjaan Boring manual (rojok) HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Paket 11 Paket 12

Jasa Material Jasa 26,142,000 1,283,723 31,567,778

39,213,000 2,567,447 47,351,667

52,284,000 5,134,893 63,135,555

1,929 12,302 2,330

2,518 36,906 3,041

1,929 13,222 2,330

2,508 26,822 3,029

1,929 29,239 2,330

2,508 58,478 3,029

1,906 18,051 2,301

81,861 427,907 106,174

85,005 855,816 109,970

41,029 249,603 56,868

41,029 495,967 56,868

41,184 - 57,054

41,060 - 56,905

Page 101: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 101 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

137 DD-BM-HDPE-50-1 meter

138 DD-BM-HDPE-50-2 Idem, 2 pipa meter

139 DD-HDPE-40-1 meter

140 DD-HDPE-40-2 Idem 2 pipa meter

141 DD-HDPE-50-1 meter

142 DD-HDPE-50-2 Idem 2 pipa meter

143 DD-HDPE-40-1C meter

144 DD-HDPE-40-2C idem, 2 pipa meter

145 DD-ROD meter

146 DD-RV-1 Pekerjaan Perbaikan Route Duct / HDPE, 1 pipa. meter

147 DD-RV-CONCRETE m3

148 DD-DS-S1 meter

149 DD-DS-COD1-M meter

Pekerjaan Boring manual (rojok) HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 50/42 mm 1 pipa dengan kedalaman 1,5 meter

Pengadaan dan pemasangan pipa HDPE 40/33 mm 1 pipa dengan kedalaman 1,5 meter sudah termasuk connector HDPE tipe compression fitting

Pekerjaan Pembersihan pada route Duct yang kosong / Rodding Duct Existing.

Pekerjaan bobok dinding MH / HH termasuk perbaikan kembali

Pengadaan dan pemasangan duct baru dengan cara melakukan boring dibawah dasar parit/sungai dengan kedalaman 1,5 M dengan menggunakan PVC diamater 100 mm dan ketebalan 5,5 mm 1 pipa

Pengadaan dan pemasangan duct baru type COD, dengan mesin pengeboran (borring) dibawah parit, pada kedalaman 1,50 m di bawah dasar selokan, tanpa perlindungan PVC, 1 pipa

Paket 11 Paket 12

Jasa Material Jasa 41,184 - 57,054

41,029 - 56,868

1,837 16,619 2,218

2,222 33,240 2,683

1,837 28,241 2,218

2,222 56,481 2,683

1,837 17,294 2,218

2,222 34,350 2,683

2,373 - 2,865

94,904 49,989 114,602

854,138 1,465,038 1,031,415

199,299 354,851 240,663

558,862 34,158 674,854

Page 102: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 102 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

150 BC-TR-0.4 meter

151 BC-TR-0.6 idem, kedalaman 0,6 meter meter

152 BC-TR-1 idem, kedalaman 1 meter meter

153 BC-TR-2 idem, kedalaman 1,2 meter meter

154 BC-TR-3 idem, kedalaman 1,3 meter meter

155 BC-TR-4 idem, kedalaman 1,4 meter meter

156 BC-TR-5 meter

157 BCTR-ROCK meter

158 BD-SK Titik

159 SMD-ABS-2A pcs

160 SMD-ABS-3A idem 3 cabang pcs

161 SMD-ABS-4A idem 4 cabang pcs

162 SMD-ABS-6A idem 6 cabang pcs

163 DD-MDSC-5/3.5 pcs

164 DD-MDSC-10/8 pcs

165 DD-MDSC-12/10 pcs

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 0.4 meter

Pekerjaan Galian, Pengurugan kembali dan perbaikan kembali, pengisian pasir, warning tape dan tanda rute kabel serta tempat sambung kedalaman 1,5 meter

Pengadaan galian batu masif kedalaman 1,5 meter, panjang minimum 5 m, termasuk pengadaan marking post

Pekerjaan bobokan dan perbaikan Dinding Chamber / BTS / STO untuk lubang Sparing Kabel

Pengadaan dan pemasangan Alat Sambung Micro Duct cabang / lurus 2 cabang,termasuk gas block (seal).

Pengadaan dan Pemasangan Straight Connector 5/3,5 mm

Pengadaan dan Pemasangan Straight Connector 10/8 mm

Pengadaan dan Pemasangan Straight Connector 12/10 mm

Paket 11 Paket 12

Jasa Material Jasa 13,410 - 23,515

17,792 - 28,807

28,120 - 41,279

33,547 - 47,832

35,866 - 50,632

38,616 - 53,953

41,184 - 57,054

249,180 - 308,220

94,904 73,252 114,602

185,861 346,130 224,437

200,767 378,025 242,436

220,848 1,055,331 266,685

242,932 883,533 293,353

611 31,088 738

611 32,724 738

611 34,524 738

Page 103: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 103 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

166 DD-MDDI-1A meter

167 DD-MDDI-2A Idem 2 way meter

168 DD-MDDI-4A Idem 4 way meter

169 DD-MDDI-7A Idem 7 way meter

170 DD-MDDI-12A Idem 12 way meter

171 DD-MDDI-19A Idem 19 way meter

172 DD-MDDI-24A Idem 24 way meter

173 DD-MDDI-1B meter

174 DD-MDDI-2B Idem 2 way meter

175 DD-MDDI-4B Idem 4 way meter

176 DD-MDDI-7B Idem 7 way meter

177 DD-MDDI-1C meter

178 DD-MDDI-2C Idem 2 way meter

179 DD-MDDI-4C Idem 4 way meter

180 DD-MDDI-7C Idem 7 way meter

181 DD-MDDB-1A meter

182 DD-MDDB-2A Idem 2 way meter

183 DD-MDDB-4A Idem 4 way meter

184 DD-MDDB-7A Idem 7 way meter

185 DD-MDDB-12A Idem 12 way meter

186 DD-MDDB-19A Idem 19 way meter

187 DD-MDDB-24A Idem 24 way meter

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Install, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 5/3.5mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Paket 11 Paket 12

Jasa Material Jasa 2,185 7,453 2,638

2,876 10,136 3,473

3,293 16,019 3,977

3,321 22,721 4,010

3,817 34,164 4,609

4,444 47,610 5,366

5,072 58,172 6,125

2,823 15,104 3,409

3,293 21,578 3,977

3,765 38,413 4,546

4,340 56,232 5,241

3,555 17,849 4,293

4,078 25,724 4,925

5,073 46,096 6,126

5,438 67,837 6,566

3,206 18,582 3,871

4,218 21,969 5,093

4,831 31,385 5,834

4,870 40,643 5,880

5,598 60,416 6,760

6,518 77,733 7,870

7,438 92,585 8,982

Page 104: Rincian Harga Satuan OSP-FO Akses TELKOM 2014 SUC Version(1)

Page 104 of 104

NO DESIGNATOR URAIAN PEKERJAAN SATUAN

188 DD-MDDB-1B meter

189 DD-MDDB-2B Idem 2 way meter

190 DD-MDDB-4B Idem 4 way meter

191 DD-MDDB-7B Idem 7 way meter

192 DD-MDDB-1C meter

193 DD-MDDB-2C Idem 2 way meter

194 DD-MDDB-4C Idem 4 way meter

195 DD-MDDB-7C Idem 7 way meter

196 DD-MDEC-5/3.5 Pengadaan dan Pemasangan End Cap 5/3,5 mm pcs

197 DD-MDEC-10/8 Pengadaan dan Pemasangan End Cap 10/8 mm pcs

198 DD-MDEC-12/10 Pengadaan dan Pemasangan End Cap 12/10 mm pcs

B Manhole, Perbaikan dan Modifikasi

199 MH-HH1 pcs

200 MH-HH2 pcs

201 HH-PIT-P-HA pcs

202 HH-PIT-P-ODP pcs

203 HH-PIT-P-ODC pcs

204 MH-CA Pekerjaan Peninggian Tutup Manhole/Handhole pcs

205 CO-OF Pekerjaan Cut Over Kabel Serat Optik core

Pengadaan dan Pemasangan Micro Duct 10/8mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pengadaan dan Pemasangan Micro Duct 12/10mm, Direct Buried, 1 way, untuk Air / Water Blowing kabel FO termasuk connector

Pekerjaan Pembuatan Handhole Type HH1 ukuran dimensi dalam (P X L X T = 170x150x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan Handhole Type HH2 ukuran dimensi dalam (P X L X T = 120x130x165) cor beton 1 : 2 : 3

Pekerjaan Pembuatan HH Pit Portable Home Access beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODP beserta aksesorisnya

Pekerjaan Pembuatan HH Pit Portable ODC beserta aksesorisnya

Paket 11 Paket 12

Jasa Material Jasa 4,141 31,379 5,001

4,831 40,643 5,834

5,521 72,028 6,667

6,365 96,036 7,686

5,214 36,596 6,296

5,982 47,861 7,223

7,382 85,209 8,914

7,975 114,239 9,631

611 17,998 738

611 17,998 738

611 17,998 738

3,187,104 8,272,540 3,848,588

2,426,300 5,787,766 2,929,879

215,218 1,090,578 259,886

321,021 3,565,750 387,648

605,734 13,521,324 731,454

839,392 1,157,693 1,013,608

69,756 - 84,234