    A PEKERJAAN PERSIAPAN/PENDAHULUAN 86.075.000 

    B 1. PEKERJAAN STRUKTUR 691.557.325 

    B.1.1. PEKERJAAN STRUKTUR BAWAH ( SUB STRUCTURE )

    B.1.1.1 PEKERJAAN PONDASI TIANG PANCANG

    B.1.1.2 TEST PDA ( Pile Dynamic Analytics )

    B.1.1.3 PEKERJAAN TANAH DAN LANTAI KERJA

    B.1.1.4 PEKERJAAN STRUKTUR LANTAI BAWAH

    B.1.1.5 PEKERJAAN STRUKTUR LANTAI ATAS 338.864.400 

    B.1.1.6 PEKERJAAN STRUKTUR LANTAI ATAP 352.692.925 

    C PEKERJAAN ARSITEKTUR 3.570.568.463 

    C1 PEK. ARSITEKTUR LT. DASAR DAN LANTAI DUA 3.446.248.463 

    C2 PEK. ARSITEKTUR LT. ATAP 124.320.000 

    D PEKERJAAN PLUMBING 259.145.583 

    D1 PERALATAN UTAMA 55.475.275 

    D2 INSTALASI PIPA AIR BERSIH 16.917.564 

    D3 INSTALASI AIR KOTOR & AIR BEKAS 186.752.744 

    E PEKERJAAN ELEKTRIKAL 532.178.600 

    E.1 BIAYA PENYAMBUNGAN DAYA PLN

    E.2 PEKERJAAN TEGANGAN RENDAH 326.494.600 E.3 PEKERJAAN GENSET

    E.4 PEKERJAAN PENANGKAL PETIR 39.300.000 

    E.5 PEKERJAAN SYSTEM TATA SUARA DAN UDARA 166.384.000 

    F PEKERJAAN SITE DEVELOPMENT 128.502.900 

    JUMLAH TOTAL 5.268.027.871 

    PEMBULATAN 5.268.000.000 

    JUMLAH HARGA (Rp.)NO. URAIAN PEKERJAAN

    RENCANA ANGGARAN BIAYA

    MESJID BEKASI

    STRUKTUR PONDASI DAN BAWAH