  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    1/66

    BUAT KWITANSI : => INDONESIA

    Number.: 009

    Rp. 534,364.000

    Number.: 009

    LIMA RATUS TIGA PULUH EMPAT RI

    UNTUK PEMBAYARAN DOKUMEN PREQ

    LIMA RATUS TIGA PULUH EMPAT RI

    UNTUK PEMBAYARAN DOKUMEN PREQ

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    2/66

    U$D. 534,364.000

    No AMOUNTH

    001 933,816,000.000

    002

    003

    004

    LIMA RATUS TIGA PULUH EMPAT RI

    UNTUK PEMBAYARAN DOKUMEN PREQ

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    3/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    4/66

    ISI KATA > INDONESIA atau FOREIGN

    Makassar, 6-Jul-2014

    Makassar, 6-Jul-2014

    SATTUANG SE.

    KWITANSI PEMBAYARAN/RECIVING OF PEYMENT

    PATAR HUTAJULUK

    U TIGA RATUS ENAM PULUH EMPAT RUPIAH

    ULIFICATION Yang Menerima

    PT PLN PIKITRING SULAWESI

    KWITANSI PEMBAYARAN/RECIVING OF PEYMENT

    PATAR HUTAJULUK

    U TIGA RATUS ENAM PULUH EMPAT RUPIAH

    ULIFICATION Yang MenerimaPT PLN PIKITRING SULAWESI

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    5/66

    Makassar, 6-Jul-2014

    TO SAYED

    Sembilan Ratus Tiga Puluh Tiga Juta Delapan Ratus Enam Belas Ribu Rupiah

    ( Rupiah )

    ( Rupiah )

    ( Rupiah )

    SATTUANG SE.

    PATAR HUTAJULUK

    U TIGA RATUS ENAM PULUH EMPAT RUPIAH

    ULIFICATION Yang Menerima

    PT PLN PIKITRING SULAWESI

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    6/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    7/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    8/66

    KWITANSI No. 1 Sembilan Ratus Tiga Puluh Tiga Juta Delapa

    933,816,000.000

    933816000 0

    933816000.000 0 0 0

    0 MILYAR

    KWITANSI No. 2 ( ( Rupiah )

    0.000

    0 0

    0.000 0 0 0

    0 MILYAR

    KWITANSI No. 3 ( ( Rupiah )

    0.000

    0 0

    0.000 0 0 0

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    9/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    10/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    11/66

    Ratus Enam Belas Ribu Rupiah

    933 9 3 3 Sembilan Ratus Tiga Puluh Tiga Juta

    933816000.000 0

    9 3 3 Sembilan Ratus Tiga Puluh

    BILLION AND 15 Juta Juta

    0.000 0

    0 0 0

    BILLION AND 0 Juta

    0.000 0

    0 0 0

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    12/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    13/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    14/66

    816 8 1 6 Delapan Ratus Enam Belas Ribu

    816000.000 16 16

    Tiga 8 1 6 Delapan Ratus Enam Belas

    MILLION AND 15 Ribu Ribu

    0.000 0

    0 0 0

    MILLION AND 0 Ribu

    0.000 0

    0 0 0

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    15/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    16/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    17/66

    000 0 0 0

    000.000 0

    0 0 0

    THOUSAND AND

    0 0

    0.000 0

    0 0 0

    THOUSAND AND

    0 0

    0.000 0

    0 0 0

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    18/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    19/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    20/66

    000 0 0 0

    0

    0 0 0

    0 0

    000 0 0 0

    0

    0 0 0

    0 0

    000 0 0 0

    0

    0 0 0

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    21/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    22/66

    SATUANANGKA

    1

    2

    3

    4

    56

    7

    8

    9

    PULUHAN

    G

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    23/66

    8

    9

    BELASAN

    ANGKA

    10

    1112

    13

    14

    15

    16

    17

    18

    19

    Koma KOMMA

    Rupi Rupiah DOLAR

    RATUSAN

    ANGKA1

    2

    Koma KOMMA 3

    Rupi Rupiah ) DOLAR 4

    5

    6

    7

    8

    Koma KOMMA 9

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    24/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    25/66

    Satu Satu ONE

    Dua Dua TWO

    Tiga Tiga THREE

    Empat Empat FOUR

    Lima Lima FIVEEnam Enam SIX

    Tujuh Tujuh SEVEN

    Delapan Delapan EIGHT

    Sembilan Sembilan NINE

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    26/66

    Delapan Puluh Delapan Puluh EIGHTY

    Sembilan Puluh Sembilan Puluh NINETY

    Sepuluh Sepuluh TEN

    Sebelas Sebelas ELEVENDua Belas Dua Belas TWELVE

    Tiga Belas Tiga Belas THIRTEEN

    Empat Belas Empat Belas FOURTEEN

    Lima Belas Lima Belas FIVETEEN

    Enam Belas Enam Belas SIXTEEN

    Tujuh Belas Tujuh Belas SEVENTEEN

    Delapan Belas Delapan Belas EIGHTEEN

    Sembilan Belas Sembilan Belas NINETEEN

    Seratus Seratus HUNDRED AND

    Dua Ratus Dua Ratus TWO HUNDRED AND

    Tiga Ratus Tiga Ratus THREE HUNDRED AND

    Empat Ratus Empat Ratus FOUR HUNDRED AND

    Lima Ratus Lima Ratus FIVE HUNDRED AND

    Enam Ratus Enam Ratus SIX HUNDRED AND

    Tujuh Ratus Tujuh Ratus SEVEN HUNDRED ANDDelapan Ratus Delapan Ratus EIGHT HUNDRED AND

    Sembilan Ratus Sembilan Ratus NINE HUNDRED AND

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    27/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    28/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    29/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    30/66

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    31/66

    I. PEKERJAAN PERSIAPAN Rp.

    II. PEKERJAAN TEBING & PROTEKSI P = 162 Meter Rp.

    III. PEKERJAAN SALURAN AIR PROTEKSI Rp.

    IV. PEKERJAAN PEMASANGAN RUMPUT TEBING Rp.

    V. PEKERJAAN RETAINING WALL Rp.

    VI. PEKERJAAN TANGGA MAIN ENTRANCE Rp.

    VII. PEKERJAAN AREA HALAMAN GEDUNG SERBAGUNA Rp.

    VIII. PEKERJAAN INSTALASI AIR DAN ELEKTRIKAL Rp.

    IX. PEKERJAAN LANDSCAPE Rp.

    X. PEKERJAAN PENDOPO (PLACE TO RELAX) DAN PEDESTRIAN Rp.

    XI. PEKERJAAN PEMBERSIHAN Rp.

    REAL COST ................... Rp.

    DIBULATKAN ................... Rp.

    Terbilang :

    Malili, 31 Agustus 2010Penawar,

    CV ANUGRAH GRIYA U

    SEMBILAN RATUS TIGA PULUH TIGA JUTA DELAPAN RATUS EN

    RUPIAH

    REKAPITULASI ANGGARAN BIAYA (

    TAHUN ANGGARAN 2010

    PEMERINTAH KABUPATEN LUWU TIMUR

    PENATAAN HALAMANRUMAH JABATAN BUPATI KAB. LUWU TIMU

    NO. URAIAN PEKERJAAN

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    32/66

    11,350,000.00

    187,248,340.11

    23,255,503.93

    15,866,977.50

    242,424,650.81

    90,403,851.41

    148,831,969.28

    36,125,987.77

    86,761,805.50

    89,047,399.70

    2,500,000.00

    933,816,486.01

    933,816,000.00

    TAMA

    AM BELAS RIBU

    AB)

    JUMLAH HARGA

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    33/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    I. PEKERJAAN PERSIAPAN

    1 Pembangunan Direksi Keet 1.000 Ls - 2,000,000.00 - 2,000,000

    2 Mobilisasi & Demobilisasi Alat 1.000 Ls - 5,000,000.00 - 5,000,000

    3 Pengadaan Papan Proyek 1.000 Ls - 350,000.00 - 350,000

    4 Pengujian/Quality Control 1.000 Ls - 1,500,000.00 - 1,500,000

    5 Pengadaan Listrik dan Air (Untuk Kerja) 1.000 Ls - 1,000,000.00 - 1,000,0006 Shop & Asbuilt Drawing 1.000 Ls - 1,500,000.00 - 1,500,000

    JUMLAH 11,350,000

    II. PEKERJAAN TEBING & PROTEKSI P = 162 Meter

    1 Cut & Fill Lahan 810.906 M3 38,464.29 - 31,190,920.07 31,190,920

    2 Mobilisasi Disposal Cuttingan 810.906 M3 12,500.00 10,136,325.00 - 10,136,325

    3 Urugan Pasir T = 10 Cm 12.960 M3 12,550.00 162,648.00 162,648.00 325,296

    4 Pas. Batu Kosong 32.400 M3 52,845.00 1,712,178.00 1,712,178.00 3,424,356

    5 Pas. Batu Kali 1 : 4 102.509 M' 94,125.00 41,682,209.58 9,648,659.63 51,330,869

    6 Plesteran Siar 1 : 2 468.900 M2 9,940.00 2,984,454.72 4,660,866.00 7,645,3207 Plesteran Biasa 1 : 3 163.250 M2 21,115.00 2,018,553.60 3,447,023.75 5,465,577

    8 Pek. Sloef dan Ringbalk 15/30

    - Pas. Bekisting 138.078 M2 19,625.00 4,261,087.08 2,709,780.75 6,970,867

    - Pembesian 1,918.023 Kg 646.50 24,742,496.70 1,240,001.87 25,982,498

    - Cor Beton 13.808 M3 306,500.00 11,245,304.24 4,232,152.00 15,477,456

    9 Pek. Kolom 15/30

    - Pas. Bekisting 142.161 M2 19,625.00 4,387,088.46 2,789,909.63 7,176,998

    - Pembesian 1,164.711 Kg 646.50 15,024,771.90 752,985.66 15,777,757

    - Cor Beton 4.616 M3 306,500.00 3,759,293.48 1,414,804.00 5,174,097

    10 Pipa Pengucur Incl. Ijuk Dia. 1,5" - 3" 19.500 Ls - 1,170,000.00 - 1,170,000

    JUMLAH 187,248,340

    350,000.00

    1,500,000.00

    84,000.00

    204,240.00

    NO SAT.URAIAN PEKERJAANBAHAN (Rp)

    2,000,000.00

    5,000,000.00

    VOLUME

    814,405.00

    30,860.00

    60,000.00

    -

    JUMLAH HARGA

    814,405.00

    406,620.00

    12,900.00

    1,000,000.00

    30,860.00

    12,900.00

    HARGA SATUAN

    RENCANA ANGGARAN BIAYA

    PEMERINTAH KABUPATEN LUWU TIMUR

    PENATAAN HALAMAN

    RUMAH JABATAN BUPATI KAB. LUWU TIMUR

    TAHUN ANGGARAN 2010

    12,364.806,364.80

    -

    TOTAL (Rp)

    1,000,000.00

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    34/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    III. PEKERJAAN SALURAN AIR PROTEKSI

    1 Galian Tanah 102.750 M2 12,000.00 - 1,233,000.00 1,233,0

    2 Urugan Tanah Kembali & Pembersihan 25.688 M3 8,725.00 - 224,123.44 224,1

    3 Pas. Batu Bata 1 : 4 Saluran Air 59.150 M3 35,650.00 3,941,578.55 2,108,697.50 6,050,24 Plesteran Biasa 1 : 3 172.800 M2 9,940.00 1,099,837.44 1,717,632.00 2,817,4

    5 Rabat Beton Untuk Lantai Saluran 1 : 3 T = 10 Cm 18.250 M3 82,900.00 9,786,015.00 1,512,925.00 11,298,9

    6 Urugan Pasir T = 10 Cm 16.900 M3 12,550.00 1,419,600.00 212,095.00 1,631,6

    JUMLAH 23,255,5

    IV. PEKERJAAN PEMASANGAN RUMPUT TEBING

    1 Urugan Tanah Biasa 68.920 M3 11,375.00 4,135,200.00 783,965.00 4,919,1

    2 Penanaman Rumput Gajah Lokal 265.000 M2 7,500.00 8,960,312.50 1,987,500.00 10,947,8

    JUMLAH 15,866,9

    V. PEKERJAAN RETAINING WALL

    1 Timbunan Tanah Biasa 300.000 M3 11,375.00 18,000,000.00 3,412,500.00 21,412,5

    2 Pek. Pondasi Poer Plat 150 x 150 Cm (2 Buah)

    - Pek. Bekisting 18.000 M2 25,275.00 588,600.00 454,950.00 1,043,5

    - Pembesian 312.640 Kg 646.50 4,033,056.00 202,121.76 4,235,1

    - Lantai Kerja Dibawah Pondasi T = 5 Cm 4.725 M3 55,430.00 271,687.50 261,906.75 533,5

    - Cor Beton 13.500 M3 306,500.00 10,994,467.50 4,137,750.00 15,132,2

    3 Pek. Pondasi Poer Plat 120 x 120 Cm (8 Buah)

    - Pek. Bekisting 46.080 M2 25,275.00 1,506,816.00 1,164,672.00 2,671,4

    - Pembesian 892.528 Kg 646.50 11,513,611.20 577,019.35 12,090,6- Lantai Kerja Dibawah Pondasi T = 5 Cm 10.080 M3 55,430.00 579,600.00 558,734.40 1,138,3

    - Cor Beton 27.618 M3 306,500.00 22,492,237.29 8,464,917.00 30,957,1

    4 Pek. Pondasi Poer Plat 80 x 80 Cm (2 Buah)

    - Pek. Bekisting 5.120 M2 25,275.00 167,424.00 129,408.00 296,8

    - Pembesian 123.106 Kg 646.50 1,588,067.40 79,588.03 1,667,6

    - Lantai Kerja Dibawah Pondasi T = 5 Cm 1.680 M3 55,430.00 96,600.00 93,122.40 189,7

    - Cor Beton 2.048 M3 306,500.00 1,667,901.44 627,712.00 2,295,6

    93,664,4

    JUMLAH HARGA

    32,700.00

    TOTAL (RBAHAN (Rp)

    57,500.00

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN

    -

    -

    6,364.8066,637.00

    814,405.00

    60,000.00

    536,220.00

    60,000.00

    12,900.00

    32,700.00

    12,900.00

    814,405.00

    57,500.00

    84,000.00

    33,812.50

    12,900.00

    814,405.00

    32,700.00

    57,500.00

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    35/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    5 Pek. Sloef 20 x 25 Cm

    - Pek. Bekisting 14.620 M2 25,275.00 478,074.00 369,520.50 847,5

    - Pembesian 150.967 Kg 646.50 1,947,474.30 97,600.17 2,045,0

    - Cor Beton 1.620 M3 306,500.00 1,319,336.10 496,530.00 1,815,86 Pek. Balok 20 x 20 Cm

    - Pek. Bekisting 12.990 M2 25,275.00 424,773.00 328,322.25 753,0

    - Pembesian 146.209 Kg 646.50 1,886,096.10 94,524.12 1,980,6

    - Cor Beton 1.300 M3 306,500.00 1,058,726.50 398,450.00 1,457,1

    7 Pek. Kolom 25 x 25 Cm

    - Pek. Bekisting 93.600 M2 28,830.00 12,781,080.00 2,698,488.00 15,479,5

    - Pembesian 804.306 Kg 646.50 10,375,547.40 519,983.83 10,895,5

    - Cor Beton 5.850 M3 306,500.00 4,764,269.25 1,793,025.00 6,557,2

    8 Pek. Ringbalk 20 x 25 Cm

    - Pek. Bekisting 17.530 M2 25,275.00 573,231.00 443,070.75 1,016,3

    - Pembesian 180.040 Kg 646.50 2,322,516.00 116,395.86 2,438,9

    - Cor Beton 1.950 M3 306,500.00 1,588,089.75 597,675.00 2,185,7

    9 Pek. Dinding Retaining Wall

    - Pek. Bekisting 58.240 M2 29,630.00 17,271,072.00 1,725,651.20 18,996,7

    - Pembesian 1,515.000 Kg 646.50 19,543,500.00 979,447.50 20,522,9

    - Cor Beton 35.255 M3 306,500.00 28,711,441.07 10,805,504.25 39,516,9

    10 Pas. Batu Alam Purwakarta Stone Acak Lantai, Dinding & Kolom 80.780 M2 43,340.00 12,822,758.70 3,501,005.20 16,323,7

    11 Pas. Besi Hollow Warna Hitam 4 x 4 cm 17.000 M' 40,650.00 275,400.00 691,050.00 966,4

    12 Rabat Beton Untuk Lantai 1 : 3 T = 10 Cm 6.432 M3 82,900.00 3,448,967.04 533,212.80 3,982,113 Urugan Pasir Dibawah Lantai T = 10 Cm 6.432 M3 12,550.00 540,288.00 80,721.60 621,0

    14 Pek. Pengecatan Menggunakan Propan Kolom & Dinding 17.460 M2 4,087.50 285,994.80 71,367.75 357,3

    JUMLAH 242,424,6

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN JUMLAH HARGA

    TOTAL (R

    32,700.00

    12,900.00

    814,405.00

    16,380.00

    136,550.00

    536,220.0084,000.00

    12,900.00

    814,405.00

    32,700.00

    BAHAN (Rp)

    12,900.00

    814,405.00

    32,700.00

    12,900.00

    814,405.00

    296,550.00

    12,900.00

    814,405.00

    158,736.80

    16,200.00

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    36/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    VI. PEKERJAAN TANGGA MAIN ENTRANCE

    1 Galian Tanah 15.640 M3 12,000.00 - 187,680.00 187,6

    2 Urugan Tanah Kembali 3.910 M3 8,725.00 - 34,114.75 34,1

    3 Timbunan Tanah Biasa Bawah Tangga 209.184 M3 11,375.00 12,551,040.00 2,379,468.00 14,930,53 Pas. Batu Kosong 2.252 M3 52,845.00 459,948.48 119,006.94 578,9

    4 Urugan Pasir Bawah Pondasi Batu Kali T = 5 Cm 0.751 M3 12,550.00 63,084.00 9,425.05 72,5

    5 Pas. Pondasi Batu Kali 1 : 4 3.167 M3 94,125.00 1,287,765.54 298,093.88 1,585,8

    6 Pas. Batu Bata Untuk Kolom 1 : 3 32.242 M2 43,340.00 2,624,111.90 1,397,368.28 4,021,4

    7 Pas. Batu Bata Rolaag 1 : 3 63.504 M2 43,340.00 5,168,463.55 2,752,263.36 7,920,7

    8 Pas. Batu Bata 1 : 4 Untuk Dinding Tangga 180.960 M2 35,650.00 12,058,631.52 6,451,224.00 18,509,8

    9 361.920 M2 21,115.00 4,475,068.42 7,641,940.80 12,117,0

    10 Pek. Lantai Kerja Bawah Tangga T = 5 Cm 18.200 M3 55,430.00 1,046,500.00 1,008,826.00 2,055,3

    11 Urugan Pasir Dibawah Pasangan Kolom Batu Bata T = 10 Cm 1.180 M3 12,550.00 99,120.00 14,809.00 113,9

    12 Pas. Batu Alam Purwakarta Stone Acak Lantai dan Kolom 31.420 M3 43,340.00 4,987,510.26 1,361,742.80 6,349,2

    13 Pekerjaan Bordes Tangga

    - Pek. Bekisitng Untuk Bordes 6.010 M2 29,630.00 1,241,365.50 178,076.30 1,419,4

    - Pek. Pembesian Bordes 367.972 Kg 646.50 4,746,838.80 237,893.90 4,984,7

    - Cor Beton Bordes 3.420 M3 306,500.00 2,785,265.10 1,048,230.00 3,833,4

    14 Pek. Pengecatan Menggunakan Propan Pada Kolom 25.320 M2 4,087.50 414,741.60 103,495.50 518,2

    15 Pek. Pengecatan Dinding Tangga 180.960 M2 4,087.50 3,858,067.20 739,674.00 4,597,7

    16 Pas. Besi Hollow Warna Hitam 4 x 4 cm 115.620 M' 40,650.00 1,873,044.00 4,699,953.00 6,572,9

    JUMLAH 90,403,8

    VII. PEKERJAAN AREA HALAMAN GEDUNG SERBAGUNAPekerjaan Paving block

    1 Pek. Perkerasan Sirtu Dipadatkan T = 10 Cm 80.000 M3 11,375.00 12,000,000.00 910,000.00 12,910,0

    2 Pek. Urugan Pasir 40.000 M3 12,550.00 3,360,000.00 502,000.00 3,862,0

    3 Pek. Pas. Paving Block 800.000 M2 36,375.00 71,200,000.00 29,100,000.00 100,300,0

    JUMLAH 117,072,0

    Pekerjaan Kansteen

    1 Galian Tanah 8.673 M3 12,000.00 - 104,076.00 104,0

    2 Pek. Pas. Urugan Pasir 5.783 M3 12,550.00 485,730.00 72,570.38 558,3

    3 Pek. Pas. Kansteen L Type K.07.1 Uk. 60 x 50 x 15 115.650 M; 15,950.00 16,249,370.87 1,844,617.50 18,093,9

    4 Pek. Pas. Pelapisan Plesteran 37.008 M2 21,115.00 457,596.52 781,423.92 1,239,0

    JUMLAH 19,995,3

    140,504.72

    12,364.80

    84,000.00

    16,380.00

    -

    12,364.80

    150,000.00

    -

    81,388.00

    84,000.00

    406,620.00

    JUMLAH HARGA

    Plesteran Biasa Untuk Dinding Tangga 1 : 3

    206,550.00

    12,900.00

    814,405.00

    81,388.00

    158,736.80

    TOTAL (RBAHAN (Rp)

    89,000.00

    84,000.00

    60,000.00204,240.00

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN

    84,000.00

    -

    66,637.00

    21,320.00

    16,200.00

    57,500.00

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    37/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    Pekerjaan Bak Tanaman

    Bak Tanaman Type I (Bak Tanaman + Tempat Duduk)

    1 Galian Tanah 3.150 M3 12,000.00 - 37,800.00 37,8

    2 Urugan Tanah Kembali 0.788 M3 8,725.00 - 6,870.94 6,83 Pek. Pas. Urugan Pasir 0.188 M3 12,550.00 15,750.00 2,353.13 18,1

    4 Timbunan Tanah Biasa (Bak Tanaman & Tempat Duduk) 6.025 M3 11,375.00 361,500.00 68,534.38 430,0

    5 Pas. Batu Bata 1 : 4 (Bak Tanaman & Tempat Duduk) 4.850 M2 35,650.00 323,189.45 172,902.50 496,0

    6 Plesteran Biasa 1 : 3 5.900 M2 21,115.00 72,952.32 124,578.50 197,5

    7 Acian 5.900 M2 45,550.00 66,522.50 268,745.00 335,2

    8 Pengecatan 5.900 M2 4,087.50 125,788.00 24,116.25 149,9

    JUMLAH 1,671,6

    Bak Tanaman Type II

    1 Galian Tanah 11.292 M3 12,000.00 - 135,504.00 135,5

    2 Urugan Tanah Kembali 2.823 M3 8,725.00 - 24,630.68 24,6

    3 Pek. Pas. Urugan Pasir 1.882 M3 12,550.00 158,088.00 23,619.10 181,7

    4 Timbunan Tanah Biasa Untuk Bak Tanaman 18.850 M3 11,375.00 1,131,000.00 214,418.75 1,345,4

    5 Pas. Batu Bata 1 : 4 Untuk Bak Tanaman 38.240 M2 35,650.00 2,548,198.88 1,363,256.00 3,911,4

    6 Plesteran Biasa 1 : 3 38.840 M2 21,115.00 480,248.83 820,106.60 1,300,3

    7 Acian 38.840 M2 45,550.00 437,921.00 1,769,162.00 2,207,0

    8 Pengecatan 38.840 M2 4,087.50 828,068.80 158,758.50 986,8

    JUMLAH 10,092,9

    TOTAL JUMLAH 148,831,9

    VIII. PEKERJAAN INSTALASI AIR DAN ELEKTRIKAL

    1 Instalasi Pemipaan

    - Dia. 3/4" 95.000 M' 4,539.00 5,937,500.00 431,205.00 6,368,7

    - Pas. Kran Air 3.000 Bh 5,675.00 75,750.00 17,025.00 92,7

    2 Pas. Instalasi Air Kotor Pipa Dia. 3" 25.500 M' 10,215.50 1,593,750.00 260,495.25 1,854,2

    3 Peralatan Bantu, Fitting Dan Accessories 1.000 Ls - 200,000.00 - 200,0

    JUMLAH 8,515,7

    1 Galian Tanah 45.900 M3 12,000.00 - 550,800.00 550,8

    2 Urugan Tanah Kembali Sisi Saluran 11.475 M3 8,725.00 - 100,119.38 100,1

    3 Pas. Batu Bata 1 : 4 20.400 M2 35,650.00 1,359,394.80 727,260.00 2,086,6

    4 Plesteran Biasa 1 : 3 175.800 M2 9,940.00 1,118,931.84 1,747,452.00 2,866,3

    5 Rabat Beton Untuk Lantai Saluran 1 : 3 T = 10 Cm 10.200 M3 82,900.00 5,469,444.00 845,580.00 6,315,0

    6 Urugan Pasir T = 5 Cm 0.510 M3 12,550.00 42,840.00 6,400.50 49,2

    JUMLAH 11,968,2

    84,000.00

    11,275.00

    21,320.00

    66,637.00

    12,364.80

    11,275.00

    21,320.00

    -

    60,000.00

    -

    84,000.00-

    60,000.00

    TOTAL (RJUMLAH HARGA

    62,500.00

    25,250.00

    -

    -

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN

    BAHAN (Rp)

    200,000.00

    Pekerjaan Instalasi Air Bersih dan Air Kotor

    Pekerjaan Saluran Air

    -

    66,637.00

    6,364.80

    536,220.00

    84,000.00

    62,500.00

    66,637.00

    12,364.80

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    38/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    1 Pengadaan dan Pemasangan Armature Lampu Penerangan

    berikut Komponen dan Kelengkapan Lainnya

    - Lampu Taman Type A 8.000 Bh 85,000.00 2,602,800.00 680,000.00 3,282,8- Lampu Taman Type B 4.000 Bh 85,000.00 3,001,400.00 340,000.00 3,341,4

    2 Instalasi Titik Lampu, Saklar, Stop Kontak Lengkap Dengan

    Bobokan dan Perapihan Kembali, Peralatan Bantu dan

    Accecories Sesuai Detail Gambar dan Spesifikasi Teknis.

    - Instalasi Ti tik Lampu Taman, Kabel NYA 3 x 2,5 mm Didalam 115.000 M' 24,585.00 6,190,565.00 2,827,275.00 9,017,8

    Pipe Conduit + Flexible Conduit 20 mm

    JUMLAH 15,642,0

    TOTAL JUMLAH 36,125,9

    IX. PEKERJAAN LANDSCAPE

    1 Penanaman Rumput Gajah Lokal 950.000 M2 7,500.00 32,121,875.00 7,125,000.00 39,246,8

    a. Penanaman Pohon (Tinggi Batang 2 Meter)

    1 Penanaman Pohon Angsana 14.000 Phn 1,087.50 2,247,598.06 15,225.00 2,262,8

    2 Penanaman Pohon Palm Ekor Tupai 18.000 Phn 1,087.50 4,599,768.94 19,575.00 4,619,3

    3 Penanaman Pohon Palm Putri 2.000 Phn 1,087.50 421,085.44 2,175.00 423,2

    4 Penanaman Pohon Palm Merah 2.000 Phn 1,087.50 721,085.44 2,175.00 723,2

    5 Penanaman Pohon Glodokan Tiang 8.000 Phn 1,087.50 1,684,341.75 8,700.00 1,693,0

    6 Penanaman Pohon Kiara Payung 2.000 Phn 1,087.50 521,085.44 2,175.00 523,2

    b. Penanaman Perdu/Semak1 Cemara Papua 10.000 Phn 1,087.50 1,605,427.19 10,875.00 1,616,3

    2 Cemara Udang 3.000 Phn 1,087.50 1,531,628.16 3,262.50 1,534,8

    3 Nusa Indah 12.000 Phn 1,087.50 1,926,512.63 13,050.00 1,939,5

    4 Bambu China 8.000 Phn 1,087.50 1,444,341.75 8,700.00 1,453,0

    5 Palm Kuning 6.000 Phn 1,087.50 963,256.31 6,525.00 969,7

    6 Palm Waregu 3.000 Phn 1,087.50 481,628.16 3,262.50 484,8

    7 Tree Colour 40.000 Phn 1,087.50 4,421,708.75 43,500.00 4,465,2

    8 Asoka 50.000 Phn 1,087.50 1,627,135.94 54,375.00 1,681,5

    9 Iris 50.000 Phn 1,087.50 2,527,135.94 54,375.00 2,581,5

    10 Agave Putih 30.000 Phn 1,087.50 2,716,281.56 32,625.00 2,748,9

    11 Nenas Kerang 20.000 Phn 1,087.50 1,810,854.38 21,750.00 1,832,6

    12 Bakung Air Mancur 50.000 Phn 1,087.50 1,277,135.94 54,375.00 1,331,5

    c. Penanaman Ground Cover

    1 Krokot 500.000 Polybag 1,087.50 6,771,359.38 543,750.00 7,315,1

    2 Kacang-Kacangan 500.000 Polybag 1,087.50 6,771,359.38 543,750.00 7,315,1

    JUMLAH 86,761,8

    360,542.72

    JUMLAH HARGA

    325,350.00

    Pekerjaan Instalasi Listrik dan Lampu

    255,542.72

    53,831.00

    750,350.00

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN

    TOTAL (RBAHAN (Rp)

    33,812.50

    160,542.72

    210,542.72

    160,542.72

    180,542.72

    160,542.72

    160,542.72

    110,542.72

    210,542.72

    160,542.72

    260,542.72

    510,542.72

    90,542.72

    32,542.72

    50,542.72

    90,542.72

    13,542.72

    13,542.72

    25,542.72

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    39/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    X.

    A. Pendopo

    Pekerjaan Tanah dan Beton

    1 Galian Tanah 11.800 M3 12,000.00 - 141,600.00 141,62 Urugan Tanah Kembali 2.950 M3 8,725.00 - 25,738.75 25,7

    3 Urugan Tanah Dibawah Lantai t = 60 cm 21.600 M3 52,845.00 1,541,700.00 1,141,452.00 2,683,

    4 Pas. Batu Kosong 2.160 M3 52,845.00 441,158.40 114,145.20 555,3

    5 Pas. Batu Kali 1 : 4 6.720 M' 94,125.00 2,732,486.40 632,520.00 3,365,0

    6 Urugan Pasir Dibawah Pondasi 1.080 M3 12,550.00 90,720.00 13,554.00 104,2

    7 Urugan Pasir Dibawah Lantai 1.800 M3 12,550.00 151,200.00 22,590.00 173,7

    8 Pek. Sloef Beton 15 x 20 0.720 M3 332,421.50 619,203.60 239,343.48 858,5

    9 Pek. Kolom Beton 18 x 18 1.652 M3 335,976.50 1,592,288.46 555,033.18 2,147,3

    10 Pek. Ringbalk 15 x 15 0.540 M3 332,421.50 464,402.70 179,507.61 643,9

    11 Pek. Balok Latei 13 x 13 0.203 M3 332,421.50 174,581.02 67,481.56 242,0

    12 Pek. Plat Kanopi 0.700 M2 336,776.50 723,698.50 235,743.55 959,4

    JUMLAH 11,900,1

    Pekerjaan Dinding dan Lantai

    1 Pas. Dinding Batu Bata 1 : 4 36.810 M3 35,650.00 2,452,907.97 1,312,276.50 3,765,

    2 Pek. Plesteran 1 : 3, T = 15 mm 73.620 M3 21,115.00 910,296.58 1,554,486.30 2,464,7

    3 Pek. Penebalan Plesteran + Profil Susun Sirih 18.300 M3 21,115.00 226,275.84 386,404.50 612,6

    4 Pek. Acian Tembok 73.620 M3 4,555.00 83,006.55 335,339.10 418,3

    5 Pek. Rabat Alas Lantai, t = 15 cm 0.180 M' 82,900.00 96,519.60 14,922.00 111,4

    6 Pek. Lantai Keramik 30 x 30 cm (Border + Tangga) 13.680 M3 67,750.00 963,572.25 926,820.00 1,890,37 Pek. Lantai Keramik 60 x 60 cm 30.000 M3 67,750.00 7,126,431.84 2,032,500.00 9,158,9

    8 Pek. Rabat Lantai Overstek 0.650 M3 82,900.00 348,543.00 53,885.00 402,4

    JUMLAH 18,824,1

    Pekerjaan Atap dan Plafond

    1 Pek. Rangka Kayu dan Penutup Tripleks 3 mm 13.000 M2 23,695.00 1,235,000.00 308,035.00 1,543,0

    2 Pek. List Profil 24.000 M' 23,695.00 610,800.00 568,680.00 1,179,4

    3 Pek. Rangka Kayu dan Penutup Gypsumboard 9 mm 38.000 M2 23,695.00 3,807,600.00 900,410.00 4,708,0

    4 Pek. List Profil Kayu 5 x 5 Cornice Gypsum 24.000 M' 1,940.00 787,200.00 46,560.00 833,7

    5 Pek. Kuda-Kuda Kayu 0.114 M3 771,000.00 566,124.00 87,894.00 654,0

    6 Pek. Gording Kayu 5/10 0.410 M3 771,000.00 1,129,550.00 316,110.00 1,445,6

    7 Pek. Kasau dan Reng Kayu Kls II 5/10 77.596 M3 9,275.00 4,713,957.00 719,702.90 5,433,6

    8 Pek. Atap Multiroof 77.596 M2 13,055.00 3,886,007.68 1,013,015.78 4,899,0

    9 Pek. Nok dan Fleashing Metal 18.800 M' 24,650.00 1,056,560.00 463,420.00 1,519,9

    10 Pek. Listplank 2 (2 x 20) 49.000 M' 25,985.00 2,631,300.00 1,273,265.00 3,904,5

    JUMLAH 26,121,1

    56,200.00

    53,700.00

    4,966,000.00

    2,755,000.00

    60,750.00

    50,080.00

    TOTAL (RBAHAN (Rp)

    95,000.00

    25,450.00

    100,200.00

    70,436.57

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN

    963,855.00

    PEKERJAAN PENDOPO (PLACE TO RELAX) DAN PEDESTRIAN

    --

    71,375.00

    1,127.50

    536,220.00

    860,005.00

    860,005.00

    12,364.80

    12,364.80

    32,800.00

    204,240.00

    406,620.00

    84,000.00

    860,005.00

    84,000.00

    237,547.73

    536,220.00

    JUMLAH HARGA

    66,637.00

    1,033,855.00

    JUMLAH HARGAHARGA SATUAN

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    40/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    Pekerjaan Instalasi Listrik

    1 Pek. Lampu TL. 2 x 20 Watt + Kabel 2.000 Ttk - 400,000.00 - 400,0

    2 Pek. Downlight 18 Watt + Kabel 8.000 Ttk - 640,000.00 - 640,0

    3 Pek. Saklar Tunggal + Kabel 2.000 Ttk - 160,000.00 - 160,04 Pek. Saklar Ganda + Kabel 2.000 Ttk - 160,000.00 - 160,0

    5 Pek. Stop Kontak + Kabel 2.000 Ttk - 160,000.00 - 160,0

    6 Panel Induk MCB + kabel 1.000 Ttk - 120,000.00 - 120,0

    JUMLAH 1,640,0

    Pekerjaan Pedestrian (Kansteen & Stone Acak Depan Pendopo)

    1 Galian Tanah 9.774 M3 12,000.00 - 117,288.00 117,2

    2 Urugan Tanah Kembali 2.444 M3 8,725.00 - 21,319.54 21,3

    3 Pek. Perkerasan Sirtu Dipadatkan T = 10 Cm 7.200 M3 11,375.00 1,080,000.00 81,900.00 1,161,9

    4 Pek. Urugan Pasir T = 5 cm 3.600 M3 12,550.00 302,400.00 45,180.00 347,5

    5 Pas. Batu Alam Purwakarta Stone Acak Lantai 72.000 M2 43,340.00 11,429,049.60 3,120,480.00 14,549,5

    6 Pas. Batu Bata 1 : 4 Kansteen 63.450 M2 35,650.00 4,228,117.65 2,261,992.50 6,490,1

    7 Plesteran Biasa 1 : 3 79.947 M2 21,115.00 988,528.67 1,688,080.91 2,676,6

    JUMLAH 25,364,3

    Pekerjaan Pengecatan

    1 Pek. Pengecatan Tembok 73.620 M2 4,087.50 1,569,578.40 300,921.75 1,870,5

    2 Pek. Pengecatan Plafond 51.000 M2 4,087.50 1,087,320.00 208,462.50 1,295,7

    3 Pek. Pengecatan Kansteen 79.947 M2 4,087.50 1,704,470.04 326,783.36 2,031,2

    JUMLAH 5,197,5

    89,047,3XI. PEKERJAAN PEMBERSIHAN

    1 Pembersihan Lokasi Dari Sisa-Sisa Hasil Pekerjaan 1.000 Ls 2,500,000.00 - 2,500,000.00 2,500,0

    JUMLAH 2,500,0

    -

    -

    150,000.00

    84,000.00

    158,736.80

    21,320.00

    66,637.00

    12,364.80

    80,000.00

    80,000.0080,000.00

    80,000.00

    120,000.00

    21,320.00

    21,320.00

    JUMLAH HARGATOTAL (R

    BAHAN (Rp)

    200,000.00

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN

    -

    TOTAL PEKERJAAN PENDOPO & PEDESTRIAN

    ANALISA HARGA SATUAN PEKERJAAN (SNI)

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    41/66

    1 MENGGALI 1 M3 TANAH BIASA SEDALAM 1 METER

    - Pekerja 0.750 Oh 40,000.00Rp 30,000.00Rp

    - Mandor 0.025 Oh 55,000.00Rp 1,375.00Rp

    JUMLAH 31,375.00Rp

    2 CUTTINGAN 1 M3 TANAH BIASA

    - Alat 1.000 M3 35,714.29Rp 35,714.29Rp

    - Mandor 0.050 Oh 55,000.00Rp 2,750.00Rp

    JUMLAH 38,464.29Rp

    3 MENGURUG KEMBALI 1 M3 TANAH BIASA

    TENAGA :

    - Pekerja 0.192 Oh 40,000.00Rp 7,680.00Rp- Mandor 0.019 Oh 55,000.00Rp 1,045.00Rp

    JUMLAH 8,725.00Rp

    4 MENGURUG 1 M3 PASIR URUG

    BAHAN :

    - Pasir Urug 1.200 M3 70,000.00Rp 84,000.00Rp

    JUMLAH 84,000.00Rp

    TENAGA :

    - Pekerja 0.300 Oh 40,000.00Rp 12,000.00Rp

    - Mandor 0.010 Oh 55,000.00Rp 550.00Rp

    JUMLAH 12,550.00Rp

    5 TIMBUNAN 1 M3 TANAH

    BAHAN :

    - Tanah Urug Pilihan 1.200 M3 70,000.00Rp 84,000.00Rp

    - Tanah Urug Biasa 1.200 M3 50,000.00Rp 60,000.00Rp

    TENAGA :

    - Pekerja 0.250 Oh 40,000.00Rp 10,000.00Rp

    - Mandor 0.025 Oh 55,000.00Rp 1,375.00RpJUMLAH 11,375.00Rp

    Tanah Urug Pilihan 95,375.00Rp

    Tanah Urug Biasa 71,375.00Rp

    6 PEMADATAN 1 M3 SIRTU T = 15 CM

    BAHAN :

    - Sirtu 1.200 M3 125,000.00Rp 150,000.00Rp

    JUMLAH 150,000.00Rp

    TENAGA :

    - Pekerja 0.250 Oh 40,000.00Rp 10,000.00Rp- Mandor 0.025 Oh 55,000.00Rp 1,375.00Rp

    JUMLAH 11,375.00Rp

    ANALISA HARGA SATUAN PEKERJAAN (SNI)PEKERJAAN TANAH

    PEKERJAAN PONDASI DAN PASANGAN BATU

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    42/66

    1 MEMASANG 1 M3 PONDASI BATU KALI/GUNUNG 1 PC : 4 PP

    BAHAN :

    - Batu Kali/Gunung 1.200 M3 145,000.00Rp 174,000.00Rp

    - Semen Portland 163.000 Kg 1,140.00Rp 185,820.00Rp

    - Pasir Pasangan 0.520 M3 90,000.00Rp 46,800.00Rp

    JUMLAH 406,620.00Rp

    TENAGA :

    - Pekerja 1.500 Oh 40,000.00Rp 60,000.00Rp

    - Tukang Batu 0.600 Oh 45,000.00Rp 27,000.00Rp

    - Kepala Tukang 0.060 Oh 50,000.00Rp 3,000.00Rp

    - Mandor 0.075 Oh 55,000.00Rp 4,125.00Rp

    JUMLAH 94,125.00Rp

    2 MEMASANG 1 M3 BATU KOSONG (AANSTAMPING)BAHAN :

    - Batu Belah 15/20 1.200 M3 145,000.00Rp 174,000.00Rp

    - Pasir Urug 0.432 M3 70,000.00Rp 30,240.00Rp

    JUMLAH 204,240.00Rp

    TENAGA :

    - Pekerja 0.780 Oh 40,000.00Rp 31,200.00Rp

    - Tukang Batu 0.390 Oh 45,000.00Rp 17,550.00Rp

    - Kepala Tukang Batu 0.039 Oh 50,000.00Rp 1,950.00Rp

    - Mandor 0.039 Oh 55,000.00Rp 2,145.00Rp

    JUMLAH 52,845.00Rp

    3 MEMASANG 1 M2 DINDING BATU BATA MERAH UKURAN (5 x 11 x 22 ) CM TEBAL 1 BATA,

    CAMPURAN SPESI 1 PC : 4 PP

    BAHAN :

    - Batu Bata 70.000 Bh 400.00Rp 28,000.00Rp

    - Semen Portland 26.550 Kg 1,140.00Rp 30,267.00Rp

    - Pasir Pasangan 0.093 M3 90,000.00Rp 8,370.00Rp

    JUMLAH 66,637.00RpTENAGA :

    - Pekerja 0.600 Oh 40,000.00Rp 24,000.00Rp

    - Tukang Batu 0.200 Oh 45,000.00Rp 9,000.00Rp

    - Kepala Tukang 0.020 Oh 50,000.00Rp 1,000.00Rp

    - Mandor 0.030 Oh 55,000.00Rp 1,650.00Rp

    JUMLAH 35,650.00Rp

    4 MEMASANG 1 M2 PONDASI BATU BATA MERAH ROLAAG UKURAN (5 x 11 x 22 ) CM TEBAL 1 BATA,

    CAMPURAN SPESI 1 PC : 3 PP

    BAHAN :- Batu Bata 70.000 Bh 400.00Rp 28,000.00Rp

    - Semen Portland 4.200 Kg 1,140.00Rp 4,788.00Rp

    PEKERJAAN PONDASI DAN PASANGAN BATU

    PEKERJAAN PLESTERAN

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    43/66

    1 MEMASANG 1 M2 PLESTERAN SIAR 1 PC : 2 PP, TEBAL 15 CM

    BAHAN :

    - Semen Portland 4.320 Kg 1,140.00Rp 4,924.80Rp

    - Pasir Pasangan 0.016 M3 90,000.00Rp 1,440.00Rp

    JUMLAH 6,364.80RpTENAGA :

    - Pekerja 0.150 Oh 40,000.00Rp 6,000.00Rp

    - Tukang Batu 0.070 Oh 45,000.00Rp 3,150.00Rp

    - Kepala Tukang 0.007 Oh 50,000.00Rp 350.00Rp

    - Mandor 0.008 Oh 55,000.00Rp 440.00Rp

    JUMLAH 9,940.00Rp

    2 MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 CM

    BAHAN :- Semen Portland 8.320 Kg 1,140.00Rp 9,484.80Rp

    - Pasir Pasangan 0.032 M3 90,000.00Rp 2,880.00Rp

    JUMLAH 12,364.80Rp

    TENAGA :

    Pekerja 0.260 Oh 40,000.00Rp 10,400.00Rp

    Tukang Batu 0.200 Oh 45,000.00Rp 9,000.00Rp

    Kepala Tukang Batu 0.020 Oh 50,000.00Rp 1,000.00Rp

    Mandor 0.013 Oh 55,000.00Rp 715.00Rp

    JUMLAH 21,115.00Rp3 MEMASANG 10 M2 ACIAN PLESTERAN 1 PC : 8 KPR

    BAHAN :

    - Semen Portland 3.750 Kg 1,140.00Rp 4,275.00Rp

    - Kapur 0.100 M3 70,000.00Rp 7,000.00Rp

    JUMLAH 11,275.00Rp

    JUMLAH 1 M2 1,127.50Rp

    TENAGA :

    - Tukang Cat 1.000 Oh 45,000.00Rp 45,000.00Rp

    - Mandor 0.010 Oh 55,000.00Rp 550.00Rp

    JUMLAH 45,550.00Rp

    JUMLAH 1 M2 4,555.00Rp

    PEKERJAAN BEKISTING

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    44/66

    1 MEMASANG 1 M2 BEKISTING PONDASI POERPLAT

    BAHAN :

    - Kayu Kelas III / Papan 0.025 M3 1,000,000.00Rp 25,000.00Rp

    - Paku Biasa 0.300 Kg 23,000.00Rp 6,900.00Rp

    - Minyak Bekisting 0.100 Ltr 8,000.00Rp 800.00RpJUMLAH 32,700.00Rp

    TENAGA :

    - Pekerja 0.300 Oh 40,000.00Rp 12,000.00Rp

    - Tukang Kayu 0.260 Oh 45,000.00Rp 11,700.00Rp

    - Kepala Tukang 0.026 Oh 50,000.00Rp 1,300.00Rp

    - Mandor 0.005 Oh 55,000.00Rp 275.00Rp

    JUMLAH 25,275.00Rp

    2 MEMASANG 1 M2 BEKISTING SLOEF BETON

    BAHAN :

    - Kayu Kelas III / Papan 0.025 M3 1,000,000.00Rp 25,000.00Rp

    - Paku Biasa 0.300 Kg 23,000.00Rp 6,900.00Rp

    - Minyak Bekisting 0.100 Ltr 8,000.00Rp 800.00Rp

    JUMLAH 32,700.00Rp

    TENAGA :

    - Pekerja 0.300 Oh 40,000.00Rp 12,000.00Rp

    - Tukang Kayu 0.260 Oh 45,000.00Rp 11,700.00Rp

    - Kepala Tukang 0.026 Oh 50,000.00Rp 1,300.00Rp- Mandor 0.005 Oh 55,000.00Rp 275.00Rp

    JUMLAH 25,275.00Rp

    3 MEMASANG 1 M2 BEKISTING KOLOM

    BAHAN :

    - Kayu Kelas III / Papan 0.020 M3 1,000,000.00Rp 20,000.00Rp

    - Paku Biasa 0.400 Kg 23,000.00Rp 9,200.00Rp

    - Minyak Bekisting 0.200 Ltr 8,000.00Rp 1,600.00Rp

    - Kayu Kelas II / Balok 0.015 M3 2,500,000.00Rp 37,500.00Rp

    - Multipleks 6 mm 0.350 Lbr 95,000.00Rp 33,250.00Rp

    - Kayu Dolken 2.000 Btg 17,500.00Rp 35,000.00Rp

    JUMLAH 136,550.00Rp

    TENAGA :

    - Pekerja 0.300 Oh 40,000.00Rp 12,000.00Rp

    - Tukang Kayu 0.330 Oh 45,000.00Rp 14,850.00Rp

    - Kepala Tukang 0.033 Oh 50,000.00Rp 1,650.00Rp

    - Mandor 0.006 Oh 55,000.00Rp 330.00Rp

    JUMLAH 28,830.00Rp4 MEMASANG 1 M2 BEKISTING BALOK

    BAHAN :

    Kayu Kelas III / Papan 0 020 M3 1 000 000 00Rp 20 000 00Rp

    5 MEMASANG 1 M2 BEKISTING DINDING

    BAHAN :

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    45/66

    BAHAN :

    - Kayu Kelas III / Papan 0.030 M3 1,000,000.00Rp 30,000.00Rp

    - Paku Biasa 0.400 Kg 23,000.00Rp 9,200.00Rp

    - Minyak Bekisting 0.200 Ltr 8,000.00Rp 1,600.00Rp

    - Kayu Kelas II / Balok 0.020 M3 2,500,000.00Rp 50,000.00Rp- Formite/Penjaga Jarak Bekisting/Spacer 4.000 Btg 30,000.00Rp 120,000.00Rp

    - Multipleks 6 mm 0.350 Lbr 95,000.00Rp 33,250.00Rp

    - Kayu Dolken 3.000 Btg 17,500.00Rp 52,500.00Rp

    JUMLAH 296,550.00Rp

    TENAGA :

    - Pekerja 0.320 Oh 40,000.00Rp 12,800.00Rp

    - Tukang Kayu 0.330 Oh 45,000.00Rp 14,850.00Rp

    - Kepala Tukang 0.033 Oh 50,000.00Rp 1,650.00Rp

    - Mandor 0.006 Oh 55,000.00Rp 330.00RpJUMLAH 29,630.00Rp

    6 MEMASANG 1 M2 BEKISTING LANTAI

    BAHAN :

    - Kayu Kelas III / Papan 0.020 M3 1,000,000.00Rp 20,000.00Rp

    - Paku Biasa 0.400 Kg 23,000.00Rp 9,200.00Rp

    - Minyak Bekisting 0.200 Ltr 8,000.00Rp 1,600.00Rp

    - Kayu Kelas II / Balok 0.015 M3 2,500,000.00Rp 37,500.00Rp

    - Multipleks 6 mm 0.350 Lbr 95,000.00Rp 33,250.00Rp

    - Kayu Dolken 6.000 Btg 17,500.00Rp 105,000.00Rp

    JUMLAH 206,550.00Rp

    TENAGA :

    - Pekerja 0.320 Oh 40,000.00Rp 12,800.00Rp

    - Tukang Kayu 0.330 Oh 45,000.00Rp 14,850.00Rp

    - Kepala Tukang 0.033 Oh 50,000.00Rp 1,650.00Rp

    - Mandor 0.006 Oh 55,000.00Rp 330.00Rp

    JUMLAH 29,630.00Rp

    7 MEMASANG 1 M2 BEKISTING RINGBALKBAHAN :

    - Kayu Kelas III / Papan 0.030 M3 1,000,000.00Rp 30,000.00Rp

    - Paku Biasa 0.020 Kg 23,000.00Rp 460.00Rp

    - Minyak Bekisting 0.050 Ltr 8,000.00Rp 400.00Rp

    JUMLAH 30,860.00Rp

    TENAGA :

    - Pekerja 0.100 Oh 40,000.00Rp 4,000.00Rp

    - Tukang Kayu 0.330 Oh 45,000.00Rp 14,850.00Rp

    - Kepala Tukang 0.010 Oh 50,000.00Rp 500.00Rp

    - Mandor 0.005 Oh 55,000.00Rp 275.00Rp

    JUMLAH 19,625.00Rp

    3 O 300

    PEKERJAAN BETON

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    46/66

    1 MEMBUAT 1 M3 BETON K.300

    BAHAN :

    - Semen PC (Tonasa) 500.000 Kg 1,140.00Rp 570,000.00Rp

    - Pasir Beton 0.453 M3 135,000.00Rp 61,155.00Rp

    - Koral Beton/Split 0.733 M3 250,000.00Rp 183,250.00RpJUMLAH 814,405.00Rp

    TENAGA :

    - Pekerja 6.000 Oh 40,000.00Rp 240,000.00Rp

    - Tukang Batu 1.000 Oh 45,000.00Rp 45,000.00Rp

    - Kepala Tukang 0.100 Oh 50,000.00Rp 5,000.00Rp

    - Mandor 0.300 Oh 55,000.00Rp 16,500.00Rp

    JUMLAH 306,500.00Rp

    2 MEMBUAT 1 M3 BETON TUMBUK, 1 PC : 3 PS : 5 KR

    BAHAN :

    - Semen Portland 218.000 Kg 1,140.00Rp 248,520.00Rp

    - Pasir Beton 0.520 M3 135,000.00Rp 70,200.00Rp

    - Koral Beton/Split 0.870 M3 250,000.00Rp 217,500.00Rp

    JUMLAH 536,220.00Rp

    TENAGA :

    - Pekerja 1.650 Oh 40,000.00Rp 66,000.00Rp

    - Tukang Batu 0.250 Oh 45,000.00Rp 11,250.00Rp

    - Kepala Tukang 0.025 Oh 50,000.00Rp 1,250.00Rp- Mandor 0.080 Oh 55,000.00Rp 4,400.00Rp

    JUMLAH 82,900.00Rp

    3 MEMBUAT 1 M3 LANTAI KERJA, 1 PC : 3 PS : 5 KR

    BAHAN :

    - Semen Portland 10.000 Kg 1,140.00Rp 11,400.00Rp

    - Pasir Beton 0.260 M3 135,000.00Rp 35,100.00Rp

    - Koral Beton/Split 0.044 M3 250,000.00Rp 11,000.00Rp

    JUMLAH 57,500.00Rp

    TENAGA :

    - Pekerja 1.150 Oh 40,000.00Rp 46,000.00Rp

    - Tukang Batu 0.200 Oh 45,000.00Rp 9,000.00Rp

    - Kepala Tukang 0.002 Oh 50,000.00Rp 100.00Rp

    - Mandor 0.006 Oh 55,000.00Rp 330.00Rp

    JUMLAH 55,430.00Rp

    4 MEMASANG 1 M2 KANSTEEN BETON K.225

    BAHAN :

    - Cansteen Beton 15/30/50 2.000 Bh 70,000.00Rp 140,000.00Rp- Semen Portland 0.048 Kg 1,140.00Rp 54.72Rp

    - Pasir Pasang 0.005 M3 90,000.00Rp 450.00Rp

    JUMLAH 140 504 72Rp

    LANTAI

    PEKERJAAN LANTAI, ATAP DAN PLAFOND

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    47/66

    LANTAI1 MEMASANG 1 M2 LANTAI KERAMIK WARNA (TEKSTUR & MOTIF)

    BAHAN :

    - Tegel Keramik Kw 1 20 x 20 20.000 M2 3,800.00Rp 76,000.00Rp

    - Tegel Keramik Kw 1 30 x 30 11.111 M2 4,400.00Rp 48,888.84Rp- Tegel Keramik Kw 1 40 x 40 6.250 M2 8,000.00Rp 50,000.00Rp

    - Tegel Keramik Kw 1 60 x 60 3.000 M2 72,000.00Rp 216,000.00Rp

    - Batu Alam 20 x 20 20.000 M2 70,000.00Rp 1,400,000.00Rp

    - Semen Portland 5.875 Kg 1,140.00Rp 6,697.73Rp

    - Pasir Pasangan 0.095 M3 90,000.00Rp 8,550.00Rp

    - Semen Warna 1.500 Kg 4,200.00Rp 6,300.00Rp

    Tegel Keramik 20 x 20 97,547.73Rp

    Tegel Keramik 30 x 30 70,436.57Rp

    Tegel Keramik 40 x 40 71,547.73Rp

    Tegel Keramik 60 x 60 237,547.73Rp

    Batu Alam 20 x 20 1,421,547.73Rp

    TENAGA :

    - Pekerja 1.000 Oh 40,000.00Rp 40,000.00Rp

    - Tukang Batu 0.500 Oh 45,000.00Rp 22,500.00Rp

    - Kepala Tukang 0.050 Oh 50,000.00Rp 2,500.00Rp

    - Mandor 0.050 Oh 55,000.00Rp 2,750.00Rp

    JUMLAH 67,750.00Rp

    ATAP1 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KAYU KLS. I LOKAL

    BAHAN :

    - Balok Kayu Kls. I Lokal 1.100 M3 4,500,000.00Rp 4,950,000.00Rp

    - Paku Biasa 2-5" 0.800 Kg 20,000.00Rp 16,000.00Rp

    Jumlah 4,966,000.00Rp

    TENAGA :

    - Pekerja 4.000 Oh 40,000.00Rp 160,000.00Rp- Tukang Batu 12.000 Oh 45,000.00Rp 540,000.00Rp

    - Kepala Tukang 1.200 Oh 50,000.00Rp 60,000.00Rp

    - Mandor 0.200 Oh 55,000.00Rp 11,000.00Rp

    JUMLAH 771,000.00Rp

    2 MEMASANG 1 M3 GORDING DAN SKUR ANGIN KAYU KLS. II

    BAHAN :

    - Balok Kayu Kls. II Lokal 1.100 M3 2,500,000.00Rp 2,750,000.00Rp

    - Paku Biasa 2-5" 0.250 Kg 20,000.00Rp 5,000.00Rp

    Jumlah 2,755,000.00Rp

    TENAGA :

    - Pekerja 4.000 Oh 40,000.00Rp 160,000.00Rp

    5 MEMASANG 1 M' NOK ATAP METAL

    BAHAN :

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    48/66

    BAHAN :

    - Nok Atap Metal Roof 1.100 M3 50,000.00Rp 55,000.00Rp

    - Paku Biasa 2-5" 0.060 Kg 20,000.00Rp 1,200.00Rp

    Jumlah 56,200.00Rp

    TENAGA :- Pekerja 0.250 Oh 40,000.00Rp 10,000.00Rp

    - Tukang Batu 0.150 Oh 45,000.00Rp 6,750.00Rp

    - Kepala Tukang 0.015 Oh 50,000.00Rp 750.00Rp

    - Mandor 0.130 Oh 55,000.00Rp 7,150.00Rp

    JUMLAH 24,650.00Rp

    6 MEMASANG 1 M' LISTPLANK PAPAN KAYU KLS. I LOKAL

    BAHAN :

    - Papan Kayu Kls. I Lokal 0.011 M3 5,000,000.00Rp 52,500.00Rp

    - Paku Biasa 2-5" 0.060 Kg 20,000.00Rp 1,200.00RpJumlah 53,700.00Rp

    TENAGA :

    - Pekerja 0.140 Oh 40,000.00Rp 5,600.00Rp

    - Tukang Batu 0.400 Oh 45,000.00Rp 18,000.00Rp

    - Kepala Tukang 0.040 Oh 50,000.00Rp 2,000.00Rp

    - Mandor 0.007 Oh 55,000.00Rp 385.00Rp

    JUMLAH 25,985.00Rp

    PLAFOND1 MEMASANG 1 M2 RANGKA DAN PLAFOND TRIPLEKS (Rangka Kayu Kls. II Lokal)BAHAN :

    - Balok Kayu Kls. II Lokal 0.022 M3 2,500,000.00Rp 55,000.00Rp

    - Tripleks 3 mm 0.520 Lbr 70,000.00Rp 36,400.00Rp

    - Gypsumboard 9 mm 0.520 Lbr 80,000.00Rp 41,600.00Rp

    - Paku Biasa 2-5" 0.180 Kg 20,000.00Rp 3,600.00Rp

    Tripleks 3 mm 95,000.00Rp

    Gypsumboard 9 mm 100,200.00Rp

    TENAGA :

    - Pekerja 0.180 Oh 40,000.00Rp 7,200.00Rp

    - Tukang Batu 0.320 Oh 45,000.00Rp 14,400.00Rp

    - Kepala Tukang 0.032 Oh 50,000.00Rp 1,600.00Rp

    - Mandor 0.009 Oh 55,000.00Rp 495.00Rp

    JUMLAH 23,695.00Rp

    2 MEMASANG 1 M' LIST KAYU PROFIL (List Sudut)

    BAHAN :

    - List Kayu Profil 1.050 M' 5,000.00Rp 5,250.00Rp- List Gypsum 1.050 M' 12,000.00Rp 12,600.00Rp

    - Paku Biasa 2-5" 1.010 Kg 20,000.00Rp 20,200.00Rp

    Li t K P fil 25 450 00R

    1 MEMASANG 1 M2 PAVING BLOCK TYPE A

    PEKERJAAN PAVING BLOCK

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    49/66

    1 MEMASANG 1 M2 PAVING BLOCK TYPE A

    BAHAN :

    - Paving Block Kotak 50.000 M2 1,500.00Rp 75,000.00Rp

    - Pasir Urug 0.200 M3 70,000.00Rp 14,000.00Rp

    JUMLAH 89,000.00RpTENAGA :

    - Pekerja 0.500 Oh 40,000.00Rp 20,000.00Rp

    - Tukang Batu 0.300 Oh 45,000.00Rp 13,500.00Rp

    - Kepala Tukang 0.030 Oh 50,000.00Rp 1,500.00Rp

    - Mandor 0.025 Oh 55,000.00Rp 1,375.00Rp

    JUMLAH 36,375.00Rp

    2 MEMASANG 1 M2 PAVING BLOCK TYPE B

    BAHAN :

    - Paving Block Segi Delapan 50.000 M2 2,500.00Rp 125,000.00Rp

    - Pasir Urug 0.200 M3 70,000.00Rp 14,000.00Rp

    JUMLAH 139,000.00Rp

    TENAGA :

    - Pekerja 0.500 Oh 40,000.00Rp 20,000.00Rp

    - Tukang Batu 0.300 Oh 45,000.00Rp 13,500.00Rp

    - Kepala Tukang 0.030 Oh 50,000.00Rp 1,500.00Rp

    - Mandor 0.025 Oh 55,000.00Rp 1,375.00Rp

    JUMLAH 36,375.00Rp3 MEMASANG 1 M2 PAVING BLOCK TYPE C

    BAHAN :

    - Paving Block Segi Tiga 50.000 M2 2,000.00Rp 100,000.00Rp

    - Pasir Urug 0.200 M3 70,000.00Rp 14,000.00Rp

    JUMLAH 114,000.00Rp

    TENAGA :

    - Pekerja 0.500 Oh 40,000.00Rp 20,000.00Rp

    - Tukang Batu 0.300 Oh 45,000.00Rp 13,500.00Rp

    - Kepala Tukang 0.030 Oh 50,000.00Rp 1,500.00Rp

    - Mandor 0.025 Oh 55,000.00Rp 1,375.00Rp

    JUMLAH 36,375.00Rp

    1 PENGECATAN 1 M2 TEMBOK BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR

    PEKERJAAN PENGECATAN

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    50/66

    ( ),

    2 LAPIS CAT PENUTUP (EXTERIOR)

    BAHAN :

    - Plamir 0.100 Kg 53,000.00Rp 5,300.00Rp

    - Cat Dasar 0.100 Kg 25,000.00Rp 2,500.00Rp- Cat Penutup 2x 0.260 Kg 52,000.00Rp 13,520.00Rp

    JUMLAH 21,320.00Rp

    TENAGA :

    - Pekerja 0.020 Oh 40,000.00Rp 800.00Rp

    - Tukang Cat 0.063 Oh 45,000.00Rp 2,835.00Rp

    - Kepala Tukang 0.0063 Oh 50,000.00Rp 315.00Rp

    - Mandor 0.0025 Oh 55,000.00Rp 137.50Rp

    JUMLAH 4,087.50Rp

    2 PENGECATAN 1 M2 PROPAN (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR2 LAPIS CAT PENUTUP (EXTERIOR)

    BAHAN :

    - Cat Penutup 2x Coat (Propan) 0.260 Kg 63,000.00Rp 16,380.00Rp

    JUMLAH 16,380.00Rp

    TENAGA :

    - Pekerja 0.020 Oh 40,000.00Rp 800.00Rp

    - Tukang Cat 0.063 Oh 45,000.00Rp 2,835.00Rp

    - Kepala Tukang 0.0063 Oh 50,000.00Rp 315.00Rp- Mandor 0.0025 Oh 55,000.00Rp 137.50Rp

    JUMLAH 4,087.50Rp

    PEKERJAAN PIPA, SANITAIR DAN LISTRIK

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    51/66

    1 MEMASANG 1 M' PIPA PVC TIPE AW Dia. 3/4"

    BAHAN :

    - Pipa PVC 1.000 Bh 45,000.00Rp 45,000.00Rp

    - Perlengkapan 0.350 Ls 50,000.00Rp 17,500.00RpJUMLAH 62,500.00Rp

    TENAGA :

    - Pekerja 0.036 Oh 40,000.00Rp 1,440.00Rp

    - Tukang Pipa 0.060 Oh 45,000.00Rp 2,700.00Rp

    - Kepala Tukang 0.006 Oh 50,000.00Rp 300.00Rp

    - Mandor 0.0018 Oh 55,000.00Rp 99.00Rp

    JUMLAH 4,539.00Rp

    2 MEMASANG 1 M' PIPA PVC TIPE AW Dia. 3"

    BAHAN :

    - Pipa PVC 1.000 Bh 45,000.00Rp 45,000.00Rp

    - Perlengkapan 0.350 Ls 50,000.00Rp 17,500.00Rp

    JUMLAH 62,500.00Rp

    TENAGA :

    - Pekerja 0.081 Oh 40,000.00Rp 3,240.00Rp

    - Tukang Pipa 0.135 Oh 45,000.00Rp 6,075.00Rp

    - Kepala Tukang 0.0135 Oh 50,000.00Rp 675.00Rp

    - Mandor 0.0041 Oh 55,000.00Rp 225.50RpJUMLAH 10,215.50Rp

    3 MEMASANG 1 BH KRAN AIR Dia. 3/4" ATAU 1/2"

    BAHAN :

    - Kran Air 1.000 Bh 25,000.00Rp 25,000.00Rp

    - Seal tape 0.025 Bh 10,000.00Rp 250.00Rp

    JUMLAH 25,250.00Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Tukang Pipa 0.100 Oh 45,000.00Rp 4,500.00Rp- Kepala Tukang 0.010 Oh 50,000.00Rp 500.00Rp

    - Mandor 0.005 Oh 55,000.00Rp 275.00Rp

    JUMLAH 5,675.00Rp

    4 MEMASANG 1 M' PIPA LISTRIK PVC TIPE AW Dia. 5/8"

    - Pipa PVC 1.200 M' 50,000.00Rp 60,000.00Rp

    - Perlengkapan 0.350 Ls 30,000.00Rp 10,500.00Rp

    JUMLAH 60,000.00Rp

    TENAGA :- Pekerja 0.036 Oh 40,000.00Rp 1,440.00Rp

    - Tukang Pipa 0.060 Oh 45,000.00Rp 2,700.00Rp

    Kepala Tukang 0 006 Oh 50 000 00Rp 300 00Rp

    6 MEMASANG 1 M' BESI HOLLOW 4 x 4 CM

    - Besi Hollow 4 x 4 Cm 1.350 M' 12,000.00Rp 16,200.00Rp

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    52/66

    JUMLAH 16,200.00Rp

    TENAGA :

    - Pekerja 0.600 Oh 40,000.00Rp 24,000.00Rp

    - Tukang Besi 0.300 Oh 45,000.00Rp 13,500.00Rp

    - Kepala Tukang 0.030 Oh 50,000.00Rp 1,500.00Rp

    - Mandor 0.030 Oh 55,000.00Rp 1,650.00Rp

    JUMLAH 40,650.00Rp

    7 MEMASANG 1 BH LAMPU TAMAN TYPE A

    - Lampu SL-25 Watt 1.000 Bh 325,000.00Rp 325,000.00Rp

    - Alat Bantu 0.010 Ls 35,000.00Rp 350.00Rp

    JUMLAH 325,350.00Rp

    TENAGA :

    - Pembantu Tukang Listrik 1.000 Oh 40,000.00Rp 40,000.00Rp- Tukang Listrik 1.000 Oh 45,000.00Rp 45,000.00Rp

    JUMLAH 85,000.00Rp

    8 MEMASANG 1 BH LAMPU TAMAN TYPE B

    - Lampu PJU Mercury-HTI 250 Watt 1.000 Bh 750,000.00Rp 750,000.00Rp

    - Alat Bantu 0.010 Ls 35,000.00Rp 350.00Rp

    JUMLAH 750,350.00Rp

    TENAGA :

    - Pembantu Tukang Listrik 1.000 Oh 40,000.00Rp 40,000.00Rp

    - Tukang Listrik 1.000 Oh 45,000.00Rp 45,000.00Rp

    JUMLAH 85,000.00Rp

    PEKERJAAN LANDSCAPE

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    53/66

    1 MEMASANG 1 M2 RUMPUT GAJAH LOKAL

    BAHAN :

    - Tanah Subur 1.000 M3 8,000.00Rp 8,000.00Rp

    - Pupuk Urea 1.000 Kg 750.00Rp 750.00Rp- Rumput Gajah Lokal 1.000 M2 15,000.00Rp 15,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 33,812.50Rp

    TENAGA :

    - Pekerja 0.050 Oh 40,000.00Rp 2,000.00Rp

    - Mandor 0.100 Oh 55,000.00Rp 5,500.00Rp

    JUMLAH 7,500.00Rp2 MENANAM 1 PHN ANGSANA

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Angsana Tinggi 2 Meter 1.000 Phn 150,000.00Rp 150,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 160,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp

    3 MENANAM 1 PHN PALM EKOR TUPAI

    BAHAN :- Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Palm Ekor Tupai Tinggi 2 Meter 1.000 Phn 245,000.00Rp 245,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 255,542.72Rp

    TENAGA :

    Pekerja 0 010 Oh 40 000 00Rp 400 00Rp

    4 MENANAM 1 PHN PALM PUTRI

    BAHAN :

    Galian Lubang Tanam (20 x 20 x 20 Cm) 0 008 M3 31 375 00Rp 251 00Rp

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    54/66

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Palm Putri Tinggi 2 Meter 1.000 Phn 200,000.00Rp 200,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 210,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp5 MENANAM 1 PHN PALM MERAH

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Palm Merah Tinggi 2 Meter 1.000 Phn 350,000.00Rp 350,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 360,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp

    6 MENANAM 1 PHN GLODOKAN TIANG

    BAHAN :- Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Glodokan Tiang Tinggi 2 Meter 1.000 Phn 200,000.00Rp 200,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 210,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    8 MENANAM 1 PHN CEMARA PAPUA

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0 008 M3 31 375 00Rp 251 00Rp

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    55/66

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Cemara Papua 1.000 Phn 150,000.00Rp 150,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 160,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp9 MENANAM 1 PHN CEMARA UDANG

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Cemara Udang 1.000 Phn 500,000.00Rp 500,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 510,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp

    10 MENANAM 1 PHN NUSA INDAH

    BAHAN :- Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Nusa Indah 1.000 Phn 150,000.00Rp 150,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 160,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    12 MENANAM 1 PHN PALM KUNING

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0 008 M3 31 375 00Rp 251 00Rp

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    56/66

    Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Palm Kuning 1.000 Phn 150,000.00Rp 150,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 160,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp13 MENANAM 1 PHN PALM WAREGU

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Palm Waregu 1.000 Phn 150,000.00Rp 150,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 160,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp

    14 MENANAM 1 PHN TREE COLOUR

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    57/66

    g ( ) ,p p

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Tree Colour 1.000 Phn 100,000.00Rp 100,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 110,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp15 MENANAM 1 PHN ASOKA

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Asoka 1.000 Phn 22,000.00Rp 22,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 32,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp

    16 MENANAM 1 PHN IRIS

    BAHAN :- Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Iris 1.000 Phn 40,000.00Rp 40,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 50,542.72RpTENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    18 MENANAM 1 PHN BAKUNG AIR MANCUR

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    58/66

    g ( )

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Pohon Bakung Air Mancur 1.000 Phn 15,000.00Rp 15,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 25,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp19 MENANAM 1 POLYBAG KROKOT

    BAHAN :

    - Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Krokot 1.000 Polybag 3,000.00Rp 3,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 13,542.72Rp

    TENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    - Mandor 0.013 Oh 55,000.00Rp 687.50Rp

    JUMLAH 1,087.50Rp

    20 MENANAM 1 POLYBAG KACANG-KACANGAN

    BAHAN :- Galian Lubang Tanam (20 x 20 x 20 Cm) 0.008 M3 31,375.00Rp 251.00Rp

    - Tanah Subur 0.005 M3 8,000.00Rp 40.00Rp

    - Pupuk Kandang 0.300 Kg 500.00Rp 150.00Rp

    - Urugan Tanah Kembali 0.005 M3 7,843.75Rp 39.22Rp

    - Kacang-Kacangan 1.000 Polybag 3,000.00Rp 3,000.00Rp

    - Treatment/Pemeliharaan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Angkutan 1.000 Ls 5,000.00Rp 5,000.00Rp

    - Alat Bantu 0.013 Ls 5,000.00Rp 62.50Rp

    JUMLAH 13,542.72RpTENAGA :

    - Pekerja 0.010 Oh 40,000.00Rp 400.00Rp

    DAFTAR HARGA SATUAN BAHAN

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    59/66

    HARGA

    ( Rp. )

    1 Batu Kali/Gunung M3 145,000.00

    2 Sirtu M3 125,000.00

    3 Pasir Beton M3 135,000.00

    4 Kerikil Beton/Split M3 250,000.00

    5 Timbunan Pilihan M3 70,000.00

    6 Timbunan Biasa/Tanah Urug M3 50,000.00

    7 Pasir Kasar/Pasir Beton M3 110,000.00

    8 Pasir Halus/Pasir Pasangan M3 90,000.00

    9 Balok Kayu Kelas I M3 4,500,000.00

    10 Balok Kayu Kelas II M3 2,500,000.00

    11 Balok Kayu Kelas III M3 950,000.00

    12 Papan Kayu Kelas I M3 5,000,000.00

    13 Papan Kayu Kelas III M3 1,000,000.00

    14 Atap Metalroof Lbr 45,000.00

    15 Nok Atap Metal Bh 50,000.00

    16 Multipleks 6 mm Lbr 95,000.0017 Dolken Kayu Galam Dia. 8-10/4 Meter Btg 17,500.00

    18 Formite/Spacer Btg 30,000.00

    19 Semen (PC) 50 Kg Kg 1,140.00

    20 Semen Warna Kg 4,200.00

    21 Kawat Beton Kg 20,000.00

    22 Besi Beton Kg 12,000.00

    23 Paku Biasa 2" - 5" Kg 20,000.00

    24 Paku Biasa 5 cm - 12 cm Kg 23,000.0025 Paku Sekrup Kg 25,000.00

    26 Kansteen Beton K.225 Bh 70,000.00

    27 Tripleks 3 mm Uk. 122 x 244 cm Lbr 70,000.00

    28 Gypsumboard 9 mm Lbr 80,000.00

    29 List Kayu Profil M' 5,000.00

    30 List Profil Gypsum M' 12,000.00

    31 Batu Bata Bh 400.00

    32 Tegel Keramik Kw. 20 x 20 Bh 3,800.0033 Tegel Keramik Kw. 30 x 30 Bh 4,400.00

    34 Tegel Keramik Kw. 40 x 40 Bh 8,000.00

    KETSATUANJENIS BAHANNO

    HARGA

    ( Rp. )NO JENIS BAHAN SATUAN KET

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    60/66

    ( Rp. )

    57 Rumput Gajah Lokal M2 15,000.00

    58 Tanah Subur M3 8,000.00

    59 Pupuk Urea Kg 750.0060 Pupuk Kandang Kg 500.00

    Pohon :

    61 Angsana Phn 150,000.00

    62 Palm Ekor Tupai Phn 245,000.00

    63 Palm Putri Phn 200,000.00

    64 Palm Merah Phn 350,000.00

    65 Glodokan Tiang Phn 200,000.00

    66 Kiara Payung Phn 250,000.00Semak/Perdu :

    66 Cemara Papua Phn 150,000.00

    67 Cemara Udang Phn 500,000.00

    68 Palm Kuning Phn 150,000.00

    69 Palm Waregu Phn 150,000.00

    70 Nusa Indah Phn 150,000.00

    71 Bambu China Phn 170,000.00

    72 Tree Colour Phn 100,000.00

    73 Agave Putih Phn 100,000.00

    74 Iris Phn 40,000.00

    75 Nenas Kerang Phn 80,000.00

    76 Bakung Air Mancur Phn 15,000.00

    77 Asoka Phn 22,000.00

    Ground Cover :

    78 Krokot Polybag 3,000.00

    79 Kacang-Kacangan Polybag 3,000.00

    DAFTAR UPAH KERJA

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    61/66

    HARGA UPAH

    ( Rp. )

    1 Mandor Orang / Hari 55,000.00

    2 Kepala Tukang Batu Orang / Hari 50,000.00

    3 Kepala Tukang Kayu Orang / Hari 50,000.00

    4 Kepala Tukang Besi Orang / Hari 50,000.00

    5 Kepala Tukang Listrik Orang / Hari 50,000.00

    6 Kepala Tukang Cat Orang / Hari 50,000.00

    7 Tukang Kayu Orang / Hari 45,000.00

    8 Tukang Batu Orang / Hari 45,000.00

    9 Tukang Besi Orang / Hari 45,000.00

    10 Tukang Cat Orang / Hari 45,000.00

    11 Tukang Listrik Orang / Hari 45,000.00

    12 Tukang Pipa Orang / Hari 45,000.00

    13 Pekerja Orang / Hari 40,000.00

    KETSATUANNO NAMA TENAGA KERJA

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    62/66

    1 2 3 4 1 2 3 4 1 2 3 4

    I. PEKERJAAN PERSIAPAN 1.215 0.608 0.608

    II. PEKERJAAN TEBING & PROTEKSI P = 162 Meter 20.052 4.010 4.010 4.010 4.010 4.010

    III. PEKERJAAN SALURAN AIR PROTEKSI 2.490 0.830 0.830 0.830

    IV. PEKERJAAN PEMASANGAN RUMPUT TEBING 1.699 0.566 0.566 0.566

    P

    V. PEKERJAAN RETAINING WALL 25.961 5.192 5.192 5.192 5.192 5.192

    VI. PEKERJAAN TANGGA MAIN ENTRANCE 9.681 2.420 2.420 2.420 2.420

    VII. PEKERJAAN AREA HALAMAN GEDUNG SERBAGUNA 15.938 3.985 3.985 3.985 3.985

    VIII. PEKERJAAN INSTALASI AIR DAN ELEKTRIKAL 3.869 1.934 1.934

    IX. PEKERJAAN LANDSCAPE 9.291 2.323 2.323 2.323 2.323

    X. PEKERJAAN PENDOPO (PLACE TO RELAX) DAN PEDESTRIAN 9.536 3.179 3.179 3.179

    XI. PEKERJAAN PEMBERSIHAN 0.268 0.134 0.134

    JUMLAH 100.00BOBOT 0.608 4.618 4.010 4.010 4.841 4.841 0.830 12.066 14.486 17.665 19.166 12.859

    BOBOT KUMULATIF - 0.608 5.226 9.236 13.247 18.087 22.928 23.758 35.824 50.310 67.974 87.141 100.000

    KETERANGAN: Malili,11 Oktober 20

    PROGRESS RENCANA Kontraktor Pelaksan

    PROGRESS REALISASI CV. ANUGRAH GRIYA U

    ANDI IRFAN

    BULAN OKTOBER BULAN NOVEMBER BULAN DESEMBER

    B U L A NJADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

    NO URAIAN PEKERJAANBOBOT

    (%)

    TABEL PERISTIWA

    ACTIVITY D ES EF LS LF S

    I 2 0 2 0 2 0

    II 3 0 3 0 5 2

    III 4 2 6 2 6 0

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    63/66

    III 4 2 6 2 6 0

    IV 4 6 10 6 10 0

    V 5 10 15 10 15 0

    VI 5 12 17 12 17 0VII 3 9 12 9 12 0

    VIII 6 13 19 13 19 0

    IX 3 14 17 14 17 0

    X 4 13 17 13 17 0

    XI 3 14 17 14 17 0

    XII 3 15 18 15 18 0

    XIII 4 11 15 11 15 0

    JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    64/66

    1 2 3 4 1 2 3 4 1 2 3 4

    I. PEKERJAAN PERSIAPAN 1.215 0.608 0.608

    II. PEKERJAAN TEBING & PROTEKSI P = 162 Meter 20.052 4.010 4.010 4.010 4.010 4.010

    III. PEKERJAAN SALURAN AIR PROTEKSI 2.490 0.830 0.830 0.830

    IV. PEKERJAAN PEMASANGAN RUMPUT TEBING 1.699 0.566 0.566 0.566

    V. PEKERJAAN RETAINING WALL 25.961 5.192 5.192 5.192 5.192 5.192

    VI. PEKERJAAN TANGGA MAIN ENTRANCE 9.681 2.420 2.420 2.420 2.420

    VII. PEKERJAAN AREA HALAMAN GEDUNG SERBAGUNA 15.938 3.985 3.985 3.985 3.985

    VIII. PEKERJAAN INSTALASI AIR DAN ELEKTRIKAL 3.869 1.934 1.934

    IX. PEKERJAAN LANDSCAPE 9.291 2.323 2.323 2.323 2.323

    X. PEKERJAAN PENDOPO (PLACE TO RELAX) DAN PEDESTRIAN 9.536 3.179 3.179 3.179

    XI. PEKERJAAN PEMBERSIHAN 0.268 0.134 0.134

    JUMLAH 100.00

    BOBOT 0.608 4.618 4.010 4.010 4.841 4.841 0.830 12.066 14.486 17.665 19.166 12.859

    BOBOT KUMULATIF - 0.608 5.226 9.236 13.247 18.087 22.928 23.758 35.824 50.310 67.974 87.141 100.000

    KETERANGAN: Malili, 31 AgustusPROGRESS RENCANA Kontraktor Pelak

    PROGRESS REALISASI CV. ANUGRAH GRIY

    ANDI IRFAN

    Kuasa Direkt

    NO URAIAN PEKERJAANBOBOT

    (%)

    B U L A N

    BULAN I BULAN II BULAN III

    RINCIAN PENGGUNAAN UANG MUKA

    PEMERINTAH KABUPATEN LUWU TIMUR

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    65/66

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    I. PEKERJAAN PERSIAPAN

    1 Pembangunan Direksi Keet 1.000 Ls - 2,000,000.00 - 2,000,000

    2 Mobilisasi & Demobilisasi Alat 1.000 Ls - 5,000,000.00 - 5,000,000

    3 Pengadaan Papan Proyek 1.000 Ls - 350,000.00 - 350,000

    4 Pengujian/Quality Control 1.000 Ls - 1,500,000.00 - 1,500,000

    5 Pengadaan Listrik dan Air (Untuk Kerja) 1.000 Ls - 1,000,000.00 - 1,000,000

    6 Shop & Asbuilt Drawing 1.000 Ls - 1,500,000.00 - 1,500,000JUMLAH 11,350,000

    II. PEKERJAAN TEBING & PROTEKSI P = 162 Meter

    1 Cut & Fill Lahan 810.906 M3 38,464.29 - 31,190,920.07 31,190,920

    2 Mobilisasi Disposal Cuttingan 810.906 M3 12,500.00 10,136,325.00 - 10,136,325

    3 Urugan Pasir T = 10 Cm 12.960 M3 12,550.00 162,648.00 162,648.00 325,296

    4 Pas. Batu Kosong 32.400 M3 52,845.00 1,712,178.00 1,712,178.00 3,424,356

    5 Pas. Batu Kali 1 : 4 102.509 M' 94,125.00 41,682,209.58 9,648,659.63 51,330,869

    6 Plesteran Siar 1 : 2 468.900 M2 9,940.00 2,984,454.72 4,660,866.00 7,645,320

    7 Plesteran Biasa 1 : 3 163.250 M2 21,115.00 2,018,553.60 3,447,023.75 5,465,5778 Pek. Sloef dan Ringbalk 15/30

    - Pas. Bekisting 138.078 M2 19,625.00 4,261,087.08 2,709,780.75 6,970,867

    - Pembesian 1,918.023 Kg 646.50 24,742,496.70 1,240,001.87 25,982,498

    - Cor Beton 13.808 M3 306,500.00 11,245,304.24 4,232,152.00 15,477,456

    9 Pek. Kolom 15/30

    - Pas. Bekisting 142.161 M2 19,625.00 4,387,088.46 2,789,909.63 7,176,998

    - Pembesian 1,164.711 Kg 646.50 15,024,771.90 752,985.66 15,777,757

    - Cor Beton 4.616 M3 306,500.00 3,759,293.48 1,414,804.00 5,174,097

    10 Pipa Pengucur Incl. Ijuk Dia. 1,5" - 3" 19.500 Ls - 1,170,000.00 - 1,170,000

    JUMLAH 187,248,340

    12,900.00

    814,405.00

    60,000.00

    30,860.00

    12,900.00

    814,405.00

    30,860.00

    -

    84,000.00

    204,240.00

    406,620.00

    6,364.80

    12,364.80

    350,000.00

    1,500,000.00

    1,000,000.00

    1,000,000.00

    -

    JUMLAH HARGATOTAL (Rp)

    BAHAN (Rp)

    2,000,000.00

    5,000,000.00

    PENATAAN HALAMAN

    RUMAH JABATAN BUPATI KAB. LUWU TIMUR

    TAHUN ANGGARAN 2010

    NO URAIAN PEKERJAAN VOLUME SAT.HARGA SATUAN

    TENAGA (Rp) BAHAN (Rp) TENAGA (Rp)

    III. PEKERJAAN SALURAN AIR PROTEKSI

    1 Galian Tanah 102 750 M2 31 375 00 - 3 223 781 25 3 223 7

    URAIAN PEKERJAANNOHARGA SATUAN

    SAT.VOLUMEJUMLAH HARGA

    TOTAL (RBAHAN (Rp)

    -

  • 5/22/2018 Rab Proteksi Rujab Bupati Stel Again

    66/66

    1 Galian Tanah 102.750 M2 31,375.00 3,223,781.25 3,223,7

    2 Urugan Tanah Kembali & Pembersihan 25.688 M3 8,725.00 - 224,123.44 224,1

    3 Pas. Batu Bata 1 : 4 Saluran Air 59.150 M3 35,650.00 3,941,578.55 2,108,697.50 6,050,2

    4 Plesteran Biasa 1 : 3 172.800 M2 9,940.00 1,099,837.44 1,717,632.00 2,817,45 Rabat Beton Untuk Lantai Saluran 1 : 3 T = 10 Cm 18.250 M3 82,900.00 9,786,015.00 1,512,925.00 11,298,9

    6 Urugan Pasir T = 10 Cm 16.900 M3 12,550.00 1,419,600.00 212,095.00 1,631,6

    JUMLAH 25,246,2

    IV. PEKERJAAN PEMASANGAN RUMPUT TEBING

    1 Urugan Tanah Biasa 68.920 M3 11,375.00 4,135,200.00 783,965.00 4,919,1

    2 Penanaman Rumput Gajah Lokal 265.000 M2 7,500.00 8,960,312.50 1,987,500.00 10,947,8

    JUMLAH 15,866,9

    V. PEKERJAAN RETAINING WALL

    1 Timbunan Tanah Biasa 300.000 M3 11,375.00 18,000,000.00 3,412,500.00 21,412,5

    2 Pek. Pondasi Poer Plat 150 x 150 Cm (2 Buah)

    - Pek. Bekisting 18.000 M2 25,275.00 588,600.00 454,950.00 1,043,5

    - Pembesian 312.640 Kg 646.50 4,033,056.00 202,121.76 4,235,1

    - Lantai Kerja Dibawah Pondasi T = 5 Cm 4.725 M3 55,430.00 271,687.50 261,906.75 533,5

    - Cor Beton 11.784 M3 306,500.00 9,596,704.20 3,611,704.05 13,208,4

    JUMLAH 40,433,2

    280,144,8

    280,144,8

    JUMLAH TOTAL

    JUMLAH TOTAL

    12,900.00

    57,500.00

    814,405.00

    60,000.00

    33,812.50

    60,000.00

    32,700.00

    66,637.00

    6,364.80536,220.00

    84,000.00

    -