DAFTAR REKAPITULASI BIAYA KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR PEKERJAAN : REHABILITASI BERAT/SEDANG PUSKESMAS NGEMPLAK LOKASI : KABUPATEN SLEMAN Th. ANGGARAN : 2010 No. MACAM PEKERJAAN I PEKERJAAN PERSIAPAN II PEKERJAAN TANAH DAN PASIR III PEKERJAAN PASANGAN IV PEKERJAAN BETON BERTULANG V PEKERJAAN PLESTERAN VI PEKERJAAN KAYU VII PEKERJAAN KONSTRUKSI ATAP, PENUTUP ATAP DAN PYAN VIII PEKERJAAN KERAMIK IX PEKERJAAN BESI DAN KACA X PEKERJAAN PENGGANTUNG DAN PENGUNCI XI PEKERJAAN SANITASI DAN SANITAIR XII PEKERJAAN LISTRIK XIII PEKERJAAN CAT-CATAN XIV PEKERJAAN LAIN-LAIN JUMLAH PPN 10 % JUMLAH TOTAL DIBULATKAN TERBILANG : SERATUS TIGA PULUH DUA JUTA TUJUH RATUS RIBU RUPIAH Yogyakarta, Ju CV. Agun Dire

Upload: next-geologist

Post on 21-Jun-2015

517 views

Category:

Documents


15 download

TRANSCRIPT

Page 1: RAB Atap Limas2 Print Jasa 0%

DAFTAR REKAPITULASI BIAYA

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTORPEKERJAAN : REHABILITASI BERAT/SEDANG PUSKESMAS NGEMPLAKLOKASI : KABUPATEN SLEMAN Th. ANGGARAN : 2010

No. MACAM PEKERJAAN JUMLAH TOTAL

( Rp. )

I PEKERJAAN PERSIAPAN 3,716,375.00 II PEKERJAAN TANAH DAN PASIR 1,019,374.22 III PEKERJAAN PASANGAN 19,096,316.74 IV PEKERJAAN BETON BERTULANG 15,985,698.34 V PEKERJAAN PLESTERAN 9,571,825.47 VI PEKERJAAN KAYU 32,780,929.11 VII PEKERJAAN KONSTRUKSI ATAP, PENUTUP ATAP DAN PYAN 15,085,280.90 VIII PEKERJAAN KERAMIK 8,632,717.18 IX PEKERJAAN BESI DAN KACA 1,059,328.00 X PEKERJAAN PENGGANTUNG DAN PENGUNCI 3,695,129.00 XI PEKERJAAN SANITASI DAN SANITAIR 6,550,996.40 XII PEKERJAAN LISTRIK 4,545,000.00 XIII PEKERJAAN CAT-CATAN 5,613,024.67 XIV PEKERJAAN LAIN-LAIN 250,000.00

JUMLAH 127,601,995.03

PPN 10 % 12,760,199.50

JUMLAH TOTAL 140,362,194.53

DIBULATKAN 140,362,000.00

TERBILANG : SERATUS TIGA PULUH DUA JUTA TUJUH RATUS RIBU RUPIAH

Yogyakarta, Juni 2010

CV. TRI GUNA

Agung Subroto, SE., MSi.Direktur

Page 2: RAB Atap Limas2 Print Jasa 0%

DAFTAR PERINCIAN BIAYA

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTORPEKERJAAN : REHABILITASI BERAT/SEDANG PUSKESMAS NGEMPLAKLOKASI : KABUPATEN SLEMAN Th. ANGGARAN : 2010

No. MACAM PEKERJAAN VOLUME SAT. HARGA SAT. JML. HARGA TOTAL ( Rp. ) ( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN1 Uitzet dan bouwplank 10.00 M' 34,855.00 348,550.00 2 Ijin Mendirikan Bangunan 1.00 Ls 500,000.00 500,000.00 3 Bongkar rangka atap lama 121.00 M2 8,825.00 1,067,825.00 4 Bongkar pasangan bata lama 1.00 Ls 1,800,000.00 1,800,000.00

3,716,375.00 II PEKERJAAN TANAH DAN PASIR1 Galian tanah pondasi 23.18 M3 13,520.00 313,447.68 2 Urugan tanah kembali 7.73 M3 6,482.00 50,092.90 3 Urugan tanah peninggian peil 6.94 M3 66,549.00 462,081.32 4 Urugan pasir bawah pondasi 2.79 M3 69,380.00 193,752.32

1,019,374.22 III PEKERJAAN PASANGAN 1 Pasangan pondasi batu kali menerus 1:3:10 28.23 M3 260,204.00 7,345,298.72

2 Pasangan bata merah trasram 1:2 35.32 M2 55,997.00 1,977,814.04 3 Pasangan bata merah (dinding & gunung-gunung) 1:3:10 223.49 M2 41,845.00 9,352,043.66 4 Roster beton uk . 25 x 15 28.00 bh 2,500.00 70,000.00 5 Pasangan batu tempel (batu candi) 2.56 M2 137,172.00 351,160.32

19,096,316.74 IV PEKERJAAN BETON BERTULANG1 Sloof 15/20 2.32 M3 2,422,685.00 5,616,752.90 2 Kolom skelet 12/12 92.00 M' 44,764.00 4,118,288.00 3 Kolom 15/15 0.15 M3 3,400,843.00 520,328.98 4 Ringbalk 11/15 96.60 M' 47,075.00 4,547,445.00 5 Balok Latieu 11/15 6.60 M' 47,075.00 310,695.00 6 Plat Luifel 0.32 M3 2,736,020.00 872,188.46

15,985,698.34 V PEKERJAAN PLESTERAN1 Plesteran bata merah (trasram) 1:2 70.64 M2 22,086.00 1,560,155.04 2 Plesteran bata merah (dinding & gunung-gunung) 1:3:10 410.98 M2 16,030.00 6,588,089.55 3 Sponengan sudut 1: 2 272.56 M' 5,223.00 1,423,580.88

9,571,825.47 VI PEKERJAAN KAYU1 Daun pintu panil kayu, ram kayu Bengkirai 3,5/12 9.80 M2 413,775.00 4,054,581.22 2 Daun pintu panil multiplek lps. Alm. foil, ram kayu Bk 3,5/12 1.44 M2 403,895.00 581,608.80 3 Daun Jendela, boven ram kayu Bengkirai 3,5/12 12.69 M2 418,020.00 5,304,673.80 4 Kusen pintu, jendela, 6/12 kayu Bengkirai baru 0.60 M3 8,732,400.00 5,249,290.15 5 Kusen pintu, jendela, 6/12 kayu Bengkirai lama 0.18 M3 932,400.00 170,718.71 6 Papan lisplank kayu Bengkirai baru 2/20 cm 43.46 M' 62,340.00 2,709,296.40 7 Papan lisplank Kayu lama 2/20 23.94 M' 11,940.00 285,843.60 8 Gording, murplat kayu Bengkirei 8/12 (baru) 0.12 M3 7,766,600.00 921,553.69 9 Gording, murplat kayu Bengkirei 8/12 lama 0.84 M3 616,600.00 514,984.32

10 Nok, Jurai kayu Bengkirei 8/12 (baru) 0.41 M3 7,766,600.00 3,222,455.54 11 Kuda-kuda kayu Bengkirai 8/12 (baru) 0.94 M3 7,906,700.00 7,409,368.57 12 Usuk Kruing, reng Bengkirai 5/7, 2/3 (baru) 2.86 M2 56,765.00 162,333.71 13 Usuk Kruing, reng Bengkirai 5/7, 2/3 (lama) 97.24 M2 22,565.00 2,194,220.60

32,780,929.11

VII PEKERJAAN PENUTUP ATAP DAN PYAN1 Atap genteng plentong Sekualitas Godean 100.10 M2 22,804.00 2,282,674.70 2 Atap asbes gelombang kecil 43.85 M2 25,147.00 1,102,733.67 3 Kerpusan Genteng plentong Sekualitas Godean 35.22 M' 40,330.00 1,420,422.60 4 Plafond hanger kayu kruing baru 97.24 M2 69,737.00 6,780,877.20 5 Plafond hanger kayu kruing lama 56.25 M2 19,674.00 1,106,662.50 6 Pasang langit-langit Eternit sekualitas 'Kerang Super' 153.49 M2 15,584.00 2,391,910.24

15,085,280.90 VIII PEKERJAAN KERAMIK1 Lantai keramik 30/30 cm sekualitas "MULIA" 96.77 M2 81,056.00 7,843,789.12 2 Keramik Dinding KM 20/25 cm sekualitas "MULIA" 8.40 M2 69,523.00 583,993.20 3 Lantai Keramik KM 20/20 cm sekualitas "MULIA" 2.50 M2 82,056.00 204,934.86

8,632,717.18 IX PEKERJAAN BESI DAN KACA1 Talang air, seng BJLS 28 8.00 M' 121,916.00 975,328.00 2 Baut dan mur 6.00 Kg 14,000.00 84,000.00

1,059,328.00 X PEKERJAAN PENGGANTUNG DAN PENGUNCI1 Slot tanam sekualitas "TANAYA" 7.00 Bh 109,130.00 763,910.00 2 Engsel pintu H 140 mm 12.00 Bh 18,591.00 223,092.00 3 Engsel jendela dan boven H 110 mm 68.00 Bh 16,370.00 1,113,160.00 4 Hak angin daun jendela/boven 8" 68.00 Bh 10,591.00 720,188.00 6 Grendel daun jendela/boven 3" 34.00 psg 13,591.00 462,094.00 7 Grendel daun pintu 6" dan 8" 1.00 psg 18,591.00 18,591.00 8 Handel daun jendela 4" 34.00 Bh 11,591.00 394,094.00

3,695,129.00 XI PEKERJAAN SANITASI DAN SANITAIR1 PVC 1/2" sekualitas "WAVIN" 16.00 M' 8,570.00 137,120.00 2 PVC 4" air kotoran/tinja sekualitas "WAVIN" 10.00 M' 41,277.00 412,770.00 3 PVC 3" air bekas/kotor sekualitas "WAVIN" 19.20 M' 31,977.00 613,958.40

Page 3: RAB Atap Limas2 Print Jasa 0%

No. MACAM PEKERJAAN VOLUME SAT. HARGA SAT. JML. HARGA TOTAL ( Rp. ) ( Rp. ) ( Rp. )

4 Closed Jongkok sekualitas'' INA'' 1.00 Bh 238,050.00 238,050.00 5 Floor Drain 1.00 Bh 19,465.00 19,465.00 6 Kran air 7.00 Bh 19,502.00 136,514.00 7 Wastafel sekualitas INA 5.00 Bh 797,625.00 3,988,125.00 8 Kithcen zink 1.00 Bh 150,000.00 150,000.00 9 Bak kontrol 1.00 Bh 154,994.00 154,994.00

10 Sumur Peresapan 1.00 Bh 700,000.00 700,000.00 6,550,996.40

XII PEKERJAAN LISTRIK1 Psg Instalasi titik lampu dan lampu SL 18 W Sek. Philips 17.00 Ttk 160,000.00 2,720,000.00 2 Psg Instalasi titik lampu dan lampu SL 9 watt sek. PHILIPS 5.00 Ttk 155,000.00 775,000.00 4 Pasang Instalasi dan stop kontak Sekualitas BROCO 7.00 titik 150,000.00 1,050,000.00

4,545,000.00 XIII PEKERJAAN CAT-CATAN1 Cat Dinding (sekualitas MAXILITE) 445.62 M2 8,457.00 3,768,650.62 2 Cat Plafond (sekualitas MAXILITE) 153.49 M2 8,457.00 1,298,022.65 3 Cat kayu (sekualitas EMCO LUX) 19.93 M2 22,769.00 453,808.94 4 Cat kayu lama (sekualitas EMCO LUX) 4.79 M2 19,328.00 92,542.46

5,613,024.67 XIV PEKERJAAN LAIN-LAIN1 Pembersihan Lokasi 1.00 Ls 250,000.00 250,000.00

250,000.00

Page 4: RAB Atap Limas2 Print Jasa 0%

DAFTAR HARGA SATUAN BAHAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTORPEKERJAAN : REHABILITASI BERAT/SEDANG PUSKESMAS NGEMPLAKLOKASI : KABUPATEN SLEMAN Th. ANGGARAN : 2010

No. MACAM BAHAN SATUAN HARGA SATUAN

JENIS BATUAN, PC DAN TEGEL DLL1 Batu kali 1 M3 Rp. 65,000.00 2 Batu Bata Merah 1 Bh Rp. 250.00 3 Kerikil 1 M3 Rp. 85,000.00 4 Batu pecah (Split 2/3) 1 M3 Rp. 90,000.00 5 Pasir Pasang 1 M3 Rp. 72,000.00 6 Pasir Urug 1 M3 Rp. 50,000.00 7 Tanah Urug 1 M3 Rp. 45,000.00 8 Kapur Pasang 1 M3 Rp. 140,000.00 9 Portland Cemen (PC 40 Kg) 1 Zak Rp. 40,000.00 10 Portland Cemen (PC 50 Kg) 1 Zak Rp. 50,000.00 11 Portland Cemen Warna 1 Kg Rp. 2,000.00 12 Tegel Keramik 30/30 Sekualitas ' MULIA' 1 M2 Rp. 30,000.00 13 Tegel Keramik 20/20 ' MULIA' 1 M2 Rp. 31,000.00 14 Tegel Keramik 20/25 ' MULIA' 1 M2 Rp. 31,500.00 15 Batu tempel hitam (batu candi) 1 M2 Rp. 85,000.00 16 Buis beton diameter 80 cm x 0.5 m 1 Bh Rp. 38,000.00 17 Eternit t = 3 sekualitas "kerang super" 1 M2 Rp. 10,500.00 18 Roster beton uk 15 x 25 bh Rp. 2,500.00

JENIS BESI ATAU LOGAM DAN KACA1 Besi Beton Polos 1 Kg Rp. 8,000.00 2 Besi Beton Ulir 1 Kg Rp. 8,000.00 3 Besi strip 1 Kg Rp. 8,700.00 4 Bendrat (kawat beton) 1 Kg Rp. 12,000.00 5 Baut, mur 1 Kg Rp. 14,000.00 6 Paku Eternit 1 Kg Rp. 13,000.00 7 Paku reng 1 Kg Rp. 12,000.00 8 Paku 2" - 5" 1 Kg Rp. 12,000.00 9 Paku Skrup 1 Kg Rp. 13,500.00 10 Flin coat 1 Kg Rp. 16,500.00 11 Paku Asbes 1 Kg Rp. 13,500.00 12 Kaca Es 5 mm 1 M2 Rp. 65,000.00 13 Kaca Raiben 5 mm 1 M2 Rp. 70,000.00 14 Kaca Bening 5 mm 1 M2 Rp. 60,000.00 15 Seng BJLS 30 Lembaran, lebar = 60 cm 1 M' Rp. 21,000.00 16 Kitchen zink 1 unit Rp. 150,000.00

JENIS KAYU 1 Kayu Bengkirai Balok (6/12, 8/12, 8/14) 1 M3 Rp. 6,500,000.00 2 Kayu Bengkirai Papan (2/12, 2/15, 2/20, 2/25) 1 M3 Rp. 7,000,000.00 3 Kayu Kruing Balok (6/12, 8/12, 8/14) 1 M3 Rp. 4,250,000.00 4 Kayu Kruing usuk (4/6, 5/7) 1 M3 Rp. 4,250,000.00 5 Kayu Kruing usuk (4/6, 5/7) 1 M' Rp. 15,000.00 6 Kayu Bengkirai (pabrikan) Plepet 1 M' Rp. 2,500.00 7 Kayu Kruing Papan 1 M3 Rp. 4,700,000.00 8 Reng Bengkirai 1 M' Rp. 2,700.00 9 Kayu Papan Begisting (Sengon) 1 M3 Rp. 950,000.00 10 Kayu Steger (dolken / kaso) kayu glugu 1 Btg Rp. 18,000.00 11 Kayu Steger (dolken / kaso) kayu glugu 1 M3 Rp. 1,725,000.00 12 Multiplek 9 mm 1 Lbr Rp. 90,000.00 13 Multliplek 4 mm lapis aluminium foil 1 Lbr Rp. 65,000.00

JENIS PENUTUP ATAP 1 Genteng plentong Sekualitas Exs Godean 1 Bh Rp. 600.00 2 Genteng bubungan Sekualitas Exs Godean 1 Bh Rp. 2,000.00 3 Asbes gelombang kecil 200x1050x3 mm 1 Lbr Rp. 32,000.00 4 Bubungan asbes gelombang kecil 1 Lbr Rp. 25,000.00

Page 5: RAB Atap Limas2 Print Jasa 0%

No. MACAM BAHAN SATUAN HARGA SATUAN

JENIS CAT1 Cat Kayu Produk "EMCO LUX" 1 Kg Rp. 36,000.00 2 Cat Tembok Produk "CATYLAC" 1 Kg Rp. 11,000.00 3 Cat Tembok Produk "MAXILITE" 1 Kg Rp. 10,500.00 4 Minyak Bekisting 1 Kg Rp. 6,000.00 5 Meni besi 1 Ltr Rp. 13,500.00 6 Meni Kayu 1 Kg Rp. 13,000.00 7 Plamur 1 Kg Rp. 13,000.00

JENIS PIPA DAN ALAT SANITAIR1 Pipa PVC diameter 1/2 " sekualitas WAVIN 1 M' Rp. 3,250.00 2 Pipa PVC diameter 3/4 " sekualitas WAVIN 1 M' Rp. 4,000.00 3 Pipa PVC diameter 1 " sekualitas WAVIN 1 M' Rp. 5,500.00 4 Pipa PVC diameter 3 " sekualitas WAVIN 1 M' Rp. 15,500.005 Pipa PVC diameter 4 " sekualitas WAVIN 1 M' Rp. 21,500.006 Wastafel sekualitas 'INA' 1 bh Rp. 700,000.007 Kran Air 1 bh Rp. 15,000.00 8 Seal tape 1 bh Rp. 1,500.00 9 Floor Drain 1 bh Rp. 15,000.0010 Kloset jongkok sekualitas ''INA'' 1 Bh Rp. 85,000.00

JENIS ALAT PENGGANTUNG DAN PENGUNCI1 Slot tanam sekualitas "TANAYA" 1 Bh Rp. 100,000.00 2 Engsel pintu H 140 mm + pasang 1 Bh Rp. 12,000.00 3 Engsel jendela H 110 mm + pasang 1 Bh Rp. 9,000.00 4 Kait angin pintu 8" 1 Bh Rp. 5,000.00 5 Kait angin jendela 6" 1 Bh Rp. 4,000.00 6 Grendel jendela 3" 1 Bh Rp. 7,000.00 7 Grendel pintu 6" dan 8" 1 Bh Rp. 12,000.00 8 Handel jendela 4 " 1 Bh Rp. 5,000.00

Page 6: RAB Atap Limas2 Print Jasa 0%

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTORPEKERJAAN : REHABILITASI BERAT/SEDANG PUSKESMAS NGEMPLAKLOKASI : KABUPATEN SLEMAN Th. ANGGARAN : 2010

No. KETERANGAN WAKTU HARGA SATUAN

1 Tenaga / pekerja 1 Hari Rp. 30,000.00 2 Mandor 1 Hari Rp. 38,000.00 3 Tukang Batu 1 Hari Rp. 36,000.00 4 Tukang Kayu 1 Hari Rp. 37,000.00 5 Tukang Besi 1 Hari Rp. 36,000.00 6 Tukang Cat 1 Hari Rp. 35,500.00 7 Kepala Tukang 1 Hari Rp. 37,500.00 8 Penjaga Malam 1 Hari Rp. 27,500.00

DAFTAR HARGA SATUAN UPAH

Page 7: RAB Atap Limas2 Print Jasa 0%

Luas Pintu Luas Pintu Luas PintuP1 P2 P3

3.66 1.94 1.72

Luas Jendela Luas Jendela Luas BV Luas BVJ1 J2 1 2

1.54 0.80 0.67 0.35

Keliling Pintu Keliling Pintu Keliling PintuP1 P2 P3

5.9 5.1 5

Keliling Jendela Keliling Jendela Keliling BV Keliling BVJ1 J2 1 2

4.98 3.70 3.68 2.40

Keliling Pintu Keliling Pintu Keliling PintuP1 P2 P3

5.7 4.9 4.8

Keliling Jendela Keliling Jendela Keliling BV Keliling BVJ1 J2 1 2

4.98 3.70 3.68 2.40

Page 8: RAB Atap Limas2 Print Jasa 0%
Page 9: RAB Atap Limas2 Print Jasa 0%

LAPORAN HARIAN No. MACAM PEKERJAAN Tanggal Dikerjakan

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 pembersihan lokasi

2 bongkar dinding

3 bongkar pintu

4 bongkar boven

Pekerjaan pasangan

1 pasang dinding bata

2 pasang kembali pintu lama

3 pasang kolom praktis

4 plester dinding

5 pasang flapon

6 plester +ganti kerupus

7 pemasangan kaca ber pintu

8 pemasangan sekat grc

9 pemasangan polycarbonat

10 pengecatan tembok

11 pengecatan flapon

12 pengecatan kayu

13 bongkar pasang rollingdoor

14

15

NB: KETERANGAN TERLAMPIR

yogyakarta …,…2010 yogyakarta …,…2010 yogyakarta …,…2010petugas lapangan Cc Cc

jefri yayan mulyana indra wahyudi

Page 10: RAB Atap Limas2 Print Jasa 0%

DAFTAR ANALISA BIAYA PEKERJAAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTORPEKERJAAN : REHABILITASI BERAT/SEDANG PUSKESMAS NGEMPLAKLOKASI : KABUPATEN SLEMAN Th. ANGGARAN : 2010

1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK1 Kayu 5/7 0.0120 M3 1,725,000.00 20,700.002 Paku biasa 2" - 5" 0.0200 Kg 12,000.00 240.003 Kayu papan 3 /20 0.0070 M3 950,000.00 6,650.00

Tukang Kayu 0.1000 Oh 37,000.00 3,700.00 Pekerja 0.1000 Oh 30,000.00 3,000.00 Kepala tukang 0.0100 Oh 37,500.00 375.00 Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 34,855.00 Dibulatkan 34,855.00

M2 MEMBONGKAR ATAP, USUK / RENG DIPAKAI LAGI1 Tukang kayu 0.0600 Oh 37,000.00 2,220.002 Kepala tukang 0.0060 Oh 37,500.00 225.003 Pekerja 0.2000 Oh 30,000.00 6,000.004 Mandor 0.0100 Oh 38,000.00 380.00

Jumlah 8,825.00 Dibulatkan 8,825.00

1 M3 GALIAN TANAH BIASA SEDALAM 1 M1 Pekerja 0.4000 Oh 30,000.00 12,000.002 Mandor 0.0400 Oh 38,000.00 1,520.00

Jumlah 13,520.00 Dibulatkan 13,520.00

URUGAN KEMBALI1 Pekerja 0.1920 Oh 30,000.00 5,760.002 Mandor 0.0190 Oh 38,000.00 722.00

Jumlah 6,482.00 Dibulatkan 6,482.00

1M3 URUGAN TANAH1 Urug Tanah 1.2000 M3 45,000.00 54,000.00

Pekerja 0.3000 Oh 30,000.00 9,000.00 Mandor 0.0100 Oh 38,000.00 380.00 Jumlah 63,380.00 Jasa Pemborong 5 % 3,169.00 Total 66,549.00 Dibulatkan 66,549.00

1M3 URUGAN PASIR1 Pasir 1.2000 M3 50,000.00 60,000.00

Pekerja 0.3000 Oh 30,000.00 9,000.00 Mandor 0.0100 Oh 38,000.00 380.00 Jumlah 69,380.00 Dibulatkan 69,380.00

1M3 PASANGAN PONDASI BATU KALI ( 1Pc:3Kp:10Ps )1 PC ( 40 Kg ) 61.0000 Kg 1,000.00 61,000.002 Kapur pasang 0.1470 M3 140,000.00 20,580.003 Pasir pasang 0.4920 M3 72,000.00 35,424.004 Batu belah 15/20 1.1000 M3 65,000.00 71,500.00

Page 11: RAB Atap Limas2 Print Jasa 0%

Tukang Batu 0.6000 Oh 36,000.00 21,600.00 Kepala Tukang 0.0600 Oh 37,500.00 2,250.00 Pekerja 1.5000 Oh 30,000.00 45,000.00 Mandor 0.0750 Oh 38,000.00 2,850.00 Jumlah 260,204.00 Dibulatkan 260,204.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA ( 1Pc:2Ps)1 PC ( 40 Kg ) 18.9500 Kg 1,000.00 18,950.002 Pasir pasang 0.0380 M3 72,000.00 2,736.003 Bata merah 5x11x22 cm 70.0000 Bh 250.00 17,500.00

Tukang Batu 0.1000 Oh 36,000.00 3,600.00 Kepala Tukang 0.0100 Oh 37,500.00 375.00 Pekerja 0.3200 Oh 30,000.00 9,600.00 Mandor 0.0150 Oh 38,000.00 570.00 Jumlah 53,331.00 Jasa Pemborong 5 % 2,666.55 Total 55,997.55 Dibulatkan 55,997.00

1M2 PASANGAN BATA MERAH TEBAL 1/2 BATA ( 1pC:3kP:10 Ps)1 PC ( 40 Kg ) 4.5000 Kg 1,000.00 4,500.002 Pasir pasang 0.0500 M3 72,000.00 3,600.003 Kapur pasang 0.0150 M3 140,000.00 2,100.004 Bata merah 5x11x22 cm 70.0000 Bh 250.00 17,500.00

Tukang Batu 0.1000 Oh 36,000.00 3,600.00 Kepala Tukang 0.0100 Oh 37,500.00 375.00 Pekerja 0.3200 Oh 30,000.00 9,600.00 Mandor 0.0150 Oh 38,000.00 570.00 Jumlah 41,845.00 Dibulatkan 41,845.00

1 M2 PLESTERAN (1Pc:2Ps), TEBAL 15 MM1 PC ( 40 Kg ) 8.5200 Kg 1,000.00 8,520.002 Pasir pasang 0.0170 M3 72,000.00 1,224.00

Tukang Batu 0.1500 Oh 36,000.00 5,400.00 Kepala Tukang 0.0150 Oh 37,500.00 562.50 Pekerja 0.2000 Oh 30,000.00 6,000.00 Mandor 0.0100 Oh 38,000.00 380.00 Jumlah 22,086.50 Dibulatkan 22,086.00

1 M2 PLESTERAN (1Pc:3Ps), TEBAL 15 MM1 PC ( 40 Kg ) 6.4800 Kg 1,000.00 6,480.002 Pasir pasang 0.0190 M3 72,000.00 1,368.00

Tukang Batu 0.1500 Oh 36,000.00 5,400.00 Kepala Tukang 0.0150 Oh 37,500.00 562.50 Pekerja 0.2000 Oh 30,000.00 6,000.00 Mandor 0.0100 Oh 38,000.00 380.00 Jumlah 20,190.50 Dibulatkan 20,190.00

1 M2 PLESTERAN (1Pc:3Kp:10Ps), TEBAL 15 MM1 PC ( 40 Kg ) 1.8400 Kg 1,000.00 1,840.002 Pasir pasang 0.0140 M3 72,000.00 1,008.003 Kapur Pasang 0.0060 M3 140,000.00 840.00

Tukang Batu 0.1500 Oh 36,000.00 5,400.00 Kepala Tukang 0.0150 Oh 37,500.00 562.50

Page 12: RAB Atap Limas2 Print Jasa 0%

Pekerja 0.2000 Oh 30,000.00 6,000.00 Mandor 0.0100 Oh 38,000.00 380.00 Jumlah 16,030.50 Dibulatkan 16,030.00

1M3 PASANG KOSEN PINTU DAN JENDELA KAYU BORNEO1 Kayu borneo (Bengkirai) 1.2000 M3 6,500,000.00 7,800,000.00

Tukang Kayu 18.0000 Oh 37,000.00 666,000.00 Kepala Tukang 2.0000 Oh 37,500.00 75,000.00 Pekerja 6.0000 Oh 30,000.00 180,000.00 Mandor 0.3000 Oh 38,000.00 11,400.00 Jumlah 8,732,400.00 Dibulatkan 8,732,400.00

1M3 PASANG KOSEN PINTU DAN JENDELA KAYU BORNEO LAMA

Tukang Kayu 18.0000 Oh 37,000.00 666,000.00 Kepala Tukang 2.0000 Oh 37,500.00 75,000.00 Pekerja 6.0000 Oh 30,000.00 180,000.00 Mandor 0.3000 Oh 38,000.00 11,400.00 Jumlah 932,400.00 Dibulatkan 932,400.00

1M2 PASANG DAUN JENDELA/BOVEN KACA KAYU BORNEO1 Kayu Bengkirai 0.0350 M3 7,000,000.00 245,000.002 Kaca bening tebal 5 mm 1.1000 M2 60,000.00 66,000.00

Tukang Kayu 2.0000 Oh 37,000.00 74,000.00 Kepala Tukang 0.2000 Oh 37,500.00 7,500.00 Pekerja 0.8000 Oh 30,000.00 24,000.00 Mandor 0.0400 Oh 38,000.00 1,520.00 Jumlah 418,020.00 Dibulatkan 418,020.00

1M2 PASANG PINTU PANIL KAYU BORNEO 1 Kayu borneo papan (Bengkirai) 0.040 M3 7,000,000.00 280,000.00

Tukang Kayu 2.500 Oh 37,000.00 92,500.00 Kepala Tukang 0.250 Oh 37,500.00 9,375.00 Pekerja 1.000 Oh 30,000.00 30,000.00 Mandor 0.050 Oh 38,000.00 1,900.00 Jumlah 413,775.00 Dibulatkan 413,775.00

1M2 PASANG PINTU KAYU BORNEO (PANIL MULTIPLEK LAPIS ALM. FOIL)1 Kayu borneo papan (Bengkirai) 0.035 M3 7,000,000.00 245,000.00 2 Multiplek 9 mm lapis Aluminium Foil 0.350 Lbr 90,000.00 31,500.00

Tukang Kayu 2.500 Oh 37,000.00 92,500.00 Kepala Tukang 0.250 Oh 37,500.00 9,375.00 Pekerja 0.800 Oh 30,000.00 24,000.00 Mandor 0.040 Oh 38,000.00 1,520.00 Jumlah 403,895.00 Dibulatkan 403,895.00

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BORNEO1 Kayu borneo balok (bengkirei) 1.1000 M3 6,500,000.00 7,150,000.002 Besi strip 15.0000 Kg 8,700.00 130,500.003 Paku biasa 2" - 5" 0.8000 Kg 12,000.00 9,600.00

Page 13: RAB Atap Limas2 Print Jasa 0%

Tukang Kayu 12.0000 Oh 37,000.00 444,000.00 Kepala Tukang 1.2000 Oh 37,500.00 45,000.00 Pekerja 4.0000 Oh 30,000.00 120,000.00 Mandor 0.2000 Oh 38,000.00 7,600.00 Jumlah 7,906,700.00 Dibulatkan 7,906,700.00

1M3 PASANG NOK, JURAI KAYU BORNEO1 Kayu Bengkirei 1.1000 M3 6,500,000.00 7,150,000.00

Tukang Kayu 12.0000 Oh 37,000.00 444,000.00 Kepala Tukang 1.2000 Oh 37,500.00 45,000.00 Pekerja 4.0000 Oh 30,000.00 120,000.00 Mandor 0.2000 Oh 38,000.00 7,600.00

Jumlah 7,766,600.00 Dibulatkan 7,766,600.00

1M3 PASANG GORDING, MURPLAT KAYU BORNEO1 Kayu Kruing 1.1000 M3 4,250,000.00 4,675,000.00

Tukang Kayu 12.0000 Oh 37,000.00 444,000.00 Kepala Tukang 1.2000 Oh 37,500.00 45,000.00 Pekerja 4.0000 Oh 30,000.00 120,000.00 Mandor 0.2000 Oh 38,000.00 7,600.00

Jumlah 5,291,600.00 Dibulatkan 5,291,600.00

1M3 PASANG GORDING, MURPLAT KAYU BORNEO LAMA1 Kayu Kruing 1.1000 M3 4,250,000.00

Tukang Kayu 12.0000 Oh 37,000.00 444,000.00 Kepala Tukang 1.2000 Oh 37,500.00 45,000.00 Pekerja 4.0000 Oh 30,000.00 120,000.00 Mandor 0.2000 Oh 38,000.00 7,600.00

Jumlah 616,600.00 Dibulatkan 616,600.00

1M2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO1 Usuk kayu Kruing 5/7 2.2000 M' 15,000.00 33,000.002 Reng bengkirei 2/3 5.0000 M' 2,700.00 13,500.003 Paku biasa 2" - 5" 0.1500 Kg 12,000.00 1,800.00

4 Paku reng 0.1000 Kg 12,000.00 1,200.00

Tukang Kayu 0.1000 Oh 37,000.00 3,700.00 Kepala Tukang 0.0100 Oh 37,500.00 375.00 Pekerja 0.1000 Oh 30,000.00 3,000.00 Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 56,765.00 Dibulatkan 56,765.00

1M2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO LAMA1 Paku biasa 2" - 5" 0.1500 Kg 12,000.00 1,800.002 Reng bengkirei 2/3 5.0000 M' 2,700.00 13,500.00

Tukang Kayu 0.1000 Oh 37,000.00 3,700.00 Kepala Tukang 0.0100 Oh 37,500.00 375.00

Page 14: RAB Atap Limas2 Print Jasa 0%

Pekerja 0.1000 Oh 30,000.00 3,000.00 Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 22,565.00 Dibulatkan 22,565.00

1M2 PASANG RANGKA LANGIT-LANGIT (1 X 1) M, KAYU BORNEO1 Kayu borneo (Kruing) 0.0120 M3 4,250,000.00 51,000.002 Paku biasa 2"- 5" 0.1000 Kg 12,000.00 1,200.00

Tukang Kayu 0.2500 Oh 37,000.00 9,250.00 Kepala Tukang 0.0250 Oh 37,500.00 937.50 Pekerja 0.1500 Oh 30,000.00 4,500.00 Mandor 0.0750 Oh 38,000.00 2,850.00 Jumlah 69,737.50 Dibulatkan 69,737.00

1M2 PASANG RANGKA LANGIT-LANGIT (1 X 1) M, KAYU BORNEO LAMA1 Paku biasa 2"- 5" 0.1000 Kg 12,000.00 1,200.002 Plepet Kamper 1/3 cm ( Pabrikan ) 3.0000 M' 2,500.00

Tukang Kayu 0.2500 Oh 37,000.00 9,250.00 Kepala Tukang 0.0250 Oh 37,500.00 937.50 Pekerja 0.1500 Oh 30,000.00 4,500.00 Mandor 0.0750 Oh 38,000.00 2,850.00 Jumlah 18,737.50 Jasa Pemborong 5 % 936.88 Total 19,674.38 Dibulatkan 19,674.00

1M' PASANG LISPLANK UKURAN (2 X 20) CM, KAYU BORNEO1 Kayu borneo (Bengkirai) 0.0072 M3 7,000,000.00 50,400.002 Paku biasa 2"- 5" 0.0500 Kg 12,000.00 600.00

Tukang Kayu 0.2000 Oh 37,000.00 7,400.00 Kepala Tukang 0.0200 Oh 37,500.00 750.00 Pekerja 0.1000 Oh 30,000.00 3,000.00 Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 62,340.00 Dibulatkan 62,340.00

1M' PASANG LISPLANK UKURAN (2 X 20) CM, KAYU BORNEO LAMA1 Paku biasa 2"- 5" 0.0500 Kg 12,000.00 600.00

Tukang Kayu 0.2000 Oh 37,000.00 7,400.00 Kepala Tukang 0.0200 Oh 37,500.00 750.00 Pekerja 0.1000 Oh 30,000.00 3,000.00 Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 11,940.00 Dibulatkan 11,940.00

1M2 PASANG KACA, TEBAL 5 MM (KACA BENING)1 Kaca 1.1000 M3 60,000.00 66,000.00

Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang 0.0150 Oh 37,500.00 562.50 Pekerja 0.0150 Oh 30,000.00 450.00 Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 72,591.00 Dibulatkan 72,591.00

1M2 PASANG KACA, TEBAL 5 MM (KACA ES)1 Kaca 1.1000 M3 65,000.00 71,500.00

Page 15: RAB Atap Limas2 Print Jasa 0%

Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang 0.0150 Oh 37,500.00 562.50 Pekerja 0.0150 Oh 30,000.00 450.00 Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 78,091.00 Dibulatkan 78,091.00

1M2 PENGECATAN TEMBOK BARU(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 Plamir 0.1000 Kg 13,000.00 1,300.002 Cat dasar 0.1000 Kg 10,500.00 1,050.003 Cat penutup 2x 0.2800 Kg 10,500.00 2,940.00

Tukang Cat 0.0630 Oh 35,500.00 2,236.50 Kepala Tukang 0.0063 Oh 37,500.00 236.25 Pekerja 0.0200 Oh 30,000.00 600.00 Mandor 0.0025 Oh 38,000.00 95.00 Jumlah 8,457.75 Dibulatkan 8,457.00

1M2 PENGECATAN BIDANG KAYU BARU(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 Cat dasar 0.1700 Kg 36,000.00 6,120.002 Cat penutup 2X 0.2600 Kg 36,000.00 9,360.003 Cat meni 0.2000 Kg 13,000.00 2,600.004 Plamir kayu 0.1500 Kg 13,000.00 1,950.00

Tukang Cat 0.0090 Oh 35,500.00 319.50 Kepala Tukang 0.0060 Oh 37,500.00 225.00 Pekerja 0.0700 Oh 30,000.00 2,100.00 Mandor 0.0025 Oh 38,000.00 95.00 Jumlah 22,769.50 Dibulatkan 22,769.00

1M2 PENGECATAN BIDANG KAYU LAMA(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 1 LAPIS CAT PENUTUP)

1 Cat dasar 0.1700 Kg 36,000.00 6,120.002 Cat penutup 0.1700 Kg 36,000.00 6,120.004 Plamir kayu 0.1500 Kg 13,000.00 1,950.00

Tukang Cat 0.0750 Oh 35,500.00 2,662.50 Kepala Tukang 0.0075 Oh 37,500.00 281.25 Pekerja 0.0700 Oh 30,000.00 2,100.00 Mandor 0.0025 Oh 38,000.00 95.00 Jumlah 19,328.75 Dibulatkan 19,328.00

1M2 PASANG LANTAI KERAMIK 30x30 CM1 Ubin keramik 1.0000 M2 30,000.00 30,000.002 PC ( 40 Kg ) 11.3800 Kg 1,000.00 11,380.003 Pasir pasang 0.0420 M3 72,000.00 3,024.004 PC warna 1.5000 Kg 2,000.00 3,000.00

Tukang Batu 0.3500 Oh 36,000.00 12,600.00 Kepala Tukang 0.0350 Oh 37,500.00 1,312.50 Pekerja 0.6200 Oh 30,000.00 18,600.00 Mandor 0.0300 Oh 38,000.00 1,140.00 Jumlah 81,056.50 Dibulatkan 81,056.00

1M2 PASANG LANTAI KERAMIK 20X20 CM1 Ubin keramik 1.0000 M2 31,000.00 31,000.002 PC ( 40 Kg ) 11.3800 Kg 1,000.00 11,380.00

Page 16: RAB Atap Limas2 Print Jasa 0%

3 Pasir pasang 0.0420 M3 72,000.00 3,024.004 PC warna 1.5000 Kg 2,000.00 3,000.00

Tukang Batu 0.3500 Oh 36,000.00 12,600.00 Kepala Tukang 0.0350 Oh 37,500.00 1,312.50 Pekerja 0.6200 Oh 30,000.00 18,600.00 Mandor 0.0300 Oh 38,000.00 1,140.00 Jumlah 82,056.50 Dibulatkan 82,056.00

1M2 PASANG LANTAI KERAMIK 20X25 CM1 Ubin keramik 1.0000 M2 31,500.00 31,500.002 PC ( 40 Kg ) 9.3000 Kg 1,000.00 9,300.003 Pasir pasang 0.0180 M3 72,000.00 1,296.004 PC warna 1.5000 Kg 2,000.00 3,000.00

Tukang Batu 0.1000 Oh 36,000.00 3,600.00 Kepala Tukang 0.0450 Oh 37,500.00 1,687.50 Pekerja 0.6000 Oh 30,000.00 18,000.00 Mandor 0.0300 Oh 38,000.00 1,140.00 Jumlah 69,523.50 Dibulatkan 69,523.00

1M3 MEMBUAT BETON TUMBUK (1Pc:3Ps:5Kr)1 PC ( 40 Kg ) 218.0000 Kg 1,000.00 218,000.002 Pasir pasang 0.5200 M3 72,000.00 37,440.003 Krikil 0.8700 M3 85,000.00 73,950.00

Tukang Batu 0.2500 Oh 36,000.00 9,000.00 Kepala Tukang 0.0250 Oh 37,500.00 937.50 Pekerja 1.6500 Oh 30,000.00 49,500.00 Mandor 0.0800 Oh 38,000.00 3,040.00 Jumlah 391,867.50 Dibulatkan 391,867.00

1M2 PASANG ATAP GENTENG PLENTONG SEKUALITAS GODEAN

1 Genteng Tanah Liat 25.0000 Bh 600.00 15,000.00

Tukang Kayu 0.0750 Oh 36,000.00 2,700.00

Kepala Tukang 0.0080 Oh 37,500.00 300.00 Pekerja 0.1500 Oh 30,000.00 4,500.00 Mandor 0.0080 Oh 38,000.00 304.00 Jumlah 22,804.00 Dibulatkan 22,804.00

1M' PASANG NOK GENTENG PLENTONG SEKUALITAS GODEAN

1 Nok genteng 5.0000 Bh 2,000.00 10,000.00

2 PC ( 40 Kg ) 8.0000 Kg 1,000.00 8,000.00

3 Pasir pasang 0.0320 M3 72,000.00 2,304.00

Tukang Batu 0.2000 Oh 36,000.00 7,200.00

Kepala Tukang 0.0200 Oh 37,500.00 750.00

Pekerja 0.4000 Oh 30,000.00 12,000.00 Mandor 0.0020 Oh 38,000.00 76.00 Jumlah 40,330.00 Dibulatkan 40,330.00

1 M' PASANG LISPLANG UKURAN (2X20) CM, KAYU BORNEO1 Kayu Bengkirai, papan 0.0072 M3 7,000,000.00 50,400.002 Paku biasa 2" - 5" 0.0500 Kg 12,000.00 600.00

Page 17: RAB Atap Limas2 Print Jasa 0%

Pekerja 0.1000 Oh 30,000.00 3,000.00Tukang Kayu 0.2000 Oh 37,000.00 7,400.00Kepala Tukang 0.0200 Oh 37,500.00 750.00Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 62,340.00 Dibulatkan 62,340.00

SPONENGAN 1 PC : 2 PS (UNTUK GEDUNG)1 PC 0.5000 Kg 1,000.00 500.002 Pasir Pasang 0.0020 M3 72,000.00 144.00

Tukang Batu 0.0380 Oh 36,000.00 1,368.00Kepala Tukang 0.0380 Oh 37,500.00 1,425.00Pekerja 0.0570 Oh 30,000.00 1,710.00Mandor 0.0020 Oh 38,000.00 76.00 Jumlah 5,223.00 Dibulatkan 5,223.00

1 M2 PASANG DINDING BATU TEMPEL (BATU CANDI)1 Batu Tempel Hitam (batu candi) 1.0500 M2 85,000.00 89,250.002 PC 11.7500 Kg 1,000.00 11,750.003 Pasir Pasang 0.0350 M3 72,000.00 2,520.00

Tukang Batu 0.3500 Oh 36,000.00 12,600.00Kepala Tukang 0.0350 Oh 37,500.00 1,312.50Pekerja 0.6200 Oh 30,000.00 18,600.00Mandor 0.0300 Oh 38,000.00 1,140.00 Jumlah 137,172.50 Dibulatkan 137,172.00

1 M2 LANGIT-LANGIT ETERNIT 1 X 1 M1 Plat Eternit 1.1000 m2 10,500.00 11,550.002 Paku Eternit 0.0100 kg 13,000.00 130.00

Tukang Kayu 0.0700 Oh 37,000.00 2,590.00Kepala Tukang 0.0070 Oh 37,500.00 262.50Pekerja 0.0300 Oh 30,000.00 900.00Mandor 0.0040 Oh 38,000.00 152.00 Jumlah 15,584.50 Dibulatkan 15,584.00

1M' PASANG TALANG MIRING, SENG BJLS 28, PAPAN KAYU KRUING Seng plat 0.5000 Lbr 21,000.00 10,500.00 Paku Biasa 1/2" - 1" 0.0150 Kg 12,000.00 180.00 Kayu Kruing papan 0.0190 M3 4,700,000.00 89,300.00 Flin coat 0.3000 Kg 16,500.00 4,950.00

Tukang Kayu 0.4000 Oh 37,000.00 14,800.00 Kepala Tukang 0.0250 Oh 37,500.00 937.50 Pekerja 0.0400 Oh 30,000.00 1,200.00 Mandor 0.0013 Oh 38,000.00 49.40 Jumlah 121,916.90 Dibulatkan 121,916.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1/2 " Pipa PVC 1.2000 M' 3,250.00 3,900.00 Perlengkapan 0.3500 Harga Pipa 3,250.00 1,137.50

Pekerja 0.0360 Oh 30,000.00 1,080.00 Tukang Batu 0.0600 Oh 36,000.00 2,160.00

Page 18: RAB Atap Limas2 Print Jasa 0%

Kepala Tukang 0.0060 Oh 37,500.00 225.00 Mandor 0.0018 Oh 38,000.00 68.40 Jumlah 8,570.90 Dibulatkan 8,570.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3 " Pipa PVC 1.2000 M' 15,500.00 18,600.00 Perlengkapan 0.3500 Harga Pipa 15,500.00 5,425.00

Pekerja 0.0810 Oh 30,000.00 2,430.00 Tukang Batu 0.1350 Oh 36,000.00 4,860.00 Kepala Tukang 0.0135 Oh 37,500.00 506.25 Mandor 0.0041 Oh 38,000.00 155.80 Jumlah 31,977.05 Dibulatkan 31,977.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4 " Pipa PVC 1.2000 M' 21,500.00 25,800.00 Perlengkapan 0.3500 Harga Pipa 21,500.00 7,525.00

Pekerja 0.0810 Oh 30,000.00 2,430.00 Tukang Batu 0.1350 Oh 36,000.00 4,860.00 Kepala Tukang 0.0135 Oh 37,500.00 506.25 Mandor 0.0041 Oh 38,000.00 155.80 Jumlah 41,277.05 Dibulatkan 41,277.00

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN1 Kloset Jongkok Porselen 1.000 Buah 85,000.00 85,000.00 2 Semen Portland 6.000 Kg 1,000.00 6,000.00 3 Pasir pasang 0.010 M3 72,000.00 720.00

Tukang Batu 1.500 Oh 36,000.00 54,000.00 Kepala Tukang 1.500 Oh 37,500.00 56,250.00 Pekerja 1.000 Oh 30,000.00 30,000.00 Mandor 0.160 Oh 38,000.00 6,080.00 Jumlah 238,050.00 Dibulatkan 238,050.00

MEMASANG 1 BUAH KRAN AIR BIASA1 Kran air 1.000 Buah 15,000.00 15,000.00 2 Seal tape 0.025 Bh 1,500.00 37.50

Tukang Batu 0.100 Oh 36,000.00 3,600.00 Kepala Tukang 0.010 Oh 37,500.00 375.00 Pekerja 0.010 Oh 30,000.00 300.00 Mandor 0.005 Oh 38,000.00 190.00 Jumlah 19,502.50 Dibulatkan 19,502.00

PEKERJAAN PASANG 1 BUAH FLOORDRAIN1 Floordrain 1.0000 Bh 15,000.00 15,000.00

Tukang Batu 0.100 Oh 36,000.00 3,600.00 Kepala Tukang 0.010 Oh 37,500.00 375.00 Pekerja 0.010 Oh 30,000.00 300.00 Mandor 0.005 Oh 38,000.00 190.00 Jumlah 19,465.00 Dibulatkan 19,465.00

Page 19: RAB Atap Limas2 Print Jasa 0%

PEKERJAAN PASANG 1 BUAH WASTAFEL1 Wastafel 1.0000 Bh 700,000.00 700,000.00

Tukang Batu 1.450 Oh 36,000.00 52,200.00 Kepala Tukang 0.150 Oh 37,500.00 5,625.00 Pekerja 1.200 Oh 30,000.00 36,000.00 Mandor 0.100 Oh 38,000.00 3,800.00 Jumlah 797,625.00 Dibulatkan 797,625.00

MEMASANG 1 BUAH BAK KONTROL TERTUTUP UKURAN 40 X 40 X 40 CM1 Batu bata 56.0000 M2 250.00 14,000.00 2 Semen Portland 44.0000 Kg 1,000.00 44,000.00 3 Pasir pasang 0.0700 M3 72,000.00 5,040.00 4 Batu kerikil 0.0700 M3 85,000.00 5,950.00 5 Besi beton 1.6000 Kg 8,000.00 12,800.00

Tukang Batu 1.0150 Oh 36,000.00 36,540.00 Kepala Tukang 0.0015 Oh 37,500.00 56.25 Pekerja 1.2000 Oh 30,000.00 36,000.00 Mandor 0.0160 Oh 38,000.00 608.00 Jumlah 154,994.25 Dibulatkan 154,994.00

PEKERJAAN 1 M³ MEMBUAT BETON, Mutu Beton f'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,581 Semen Portland 371.0000 Kg 1,000.00 371,000.00 2 Pasir pasang 0.4986 M3 72,000.00 35,899.20 3 Batu pecah (Split 2/3 cm) 0.7756 M3 90,000.00 69,804.00 4 Air 215.0000 lt 100.00 21,500.00

Tukang Batu 0.2750 Oh 36,000.00 9,900.00 Kepala Tukang 0.0280 Oh 37,500.00 1,050.00 Pekerja 1.6500 Oh 30,000.00 49,500.00 Mandor 0.0830 Oh 38,000.00 3,154.00 Jumlah 561,807.20 Dibulatkan 561,807.00

1Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR1 Besi beton (Polos / Ulir) 1.0500 Kg 8,000.00 8,400.00 2 Kawat beton (Bendrat) 0.0150 Kg 12,000.00 180.00

Tukang Besi 0.0070 Oh 36,000.00 252.00 Kepala Tukang 0.0007 Oh 37,500.00 26.25 Pekerja 0.0070 Oh 30,000.00 210.00 Mandor 0.0003 Oh 38,000.00 11.40 Jumlah 9,079.65 Dibulatkan 9,079.00

1M2 PASANG BEKISTING (Untuk Sloof)1 Kayu Terentang 0.0450 M3 950,000.00 42,750.00 2 Paku Biasa 2" - 5" 0.3000 Kg 12,000.00 3,600.00 3 Minyak bekisting 0.1000 Lt 6,000.00 600.00

Tukang Kayu 0.2600 Oh 37,000.00 9,620.00 Kepala Tukang Kayu 0.0260 Oh 37,500.00 975.00 Pekerja 0.3000 Oh 30,000.00 9,000.00 Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 66,735.00 Dibulatkan 66,735.00

Page 20: RAB Atap Limas2 Print Jasa 0%

1M2 PASANG BEKISTING (Untuk Kolom)1 Kayu Terentang 0.0400 M3 950,000.00 38,000.00 2 Paku Biasa 2" - 5" 0.4000 Kg 12,000.00 4,800.00 3 Minyak bekisting 0.2000 Lt 6,000.00 1,200.00 4 Balok Kayu Borneo (Kruing) 0.0150 M3 4,250,000.00 63,750.00 5 Multiplek 9 mm 0.3500 Lbr 90,000.00 31,500.00 6 Dolken kayu galam 8 -10cm / 4 m 2.0000 Btg 18,000.00 36,000.00

Tukang Kayu 0.2600 Oh 37,000.00 9,620.00 Kepala Tukang Kayu 0.0260 Oh 37,500.00 975.00 Pekerja 0.3000 Oh 30,000.00 9,000.00 Mandor 0.0050 Oh 38,000.00 190.00 Jumlah 195,035.00 Dibulatkan 195,035.00

1M2 PASANG BEKISTING (Untuk Balok)1 Kayu Terentang 0.0400 M3 950,000.00 38,000.00 2 Paku Biasa 2" - 5" 0.4000 Kg 12,000.00 4,800.00 3 Minyak bekisting 0.2000 Lt 6,000.00 1,200.00 4 Balok Kayu Borneo (Kruing) 0.0180 M3 4,250,000.00 76,500.00 5 Multiplek 9 mm 0.3500 Lbr 90,000.00 31,500.00 6 Dolken kayu galam 8 -10cm / 4 m 2.0000 Btg 18,000.00 36,000.00

Tukang Kayu 0.3300 Oh 37,000.00 12,210.00 Kepala Tukang Kayu 0.0330 Oh 37,500.00 1,237.50 Pekerja 0.3200 Oh 30,000.00 9,600.00 Mandor 0.0060 Oh 38,000.00 228.00 Jumlah 211,275.50 Dibulatkan 211,275.00

1M2 PASANG BEKISTING (Untuk Lantai)1 Kayu Terentang 0.0400 M3 950,000.00 38,000.00 2 Paku Biasa 2" - 5" 0.4000 Kg 12,000.00 4,800.00 3 Minyak bekisting 0.2000 Lt 6,000.00 1,200.00 4 Balok Kayu Borneo (Kruing) 0.0150 M3 4,250,000.00 63,750.00 5 Multiplek 9 mm 0.3500 Lbr 90,000.00 31,500.00 6 Dolken kayu galam 8 -10cm / 4 m 6.0000 Btg 18,000.00 108,000.00

Tukang Kayu 0.3300 Oh 37,000.00 12,210.00 Kepala Tukang Kayu 0.0330 Oh 37,500.00 1,237.50 Pekerja 0.3200 Oh 30,000.00 9,600.00 Mandor 0.0060 Oh 38,000.00 228.00 Jumlah 270,525.50 Dibulatkan 270,525.00

1 M3 BETON SLOOF 15 x 20 cm1 Beton cor 1.000 M3 561,807.00 561,807.00 2 Besi beton 143.711 Kg 9,079.00 1,304,753.18 3 Cetakan ( 2X Pakai) 16.667 M2 66,735.00 556,125.00

Jumlah 2,422,685.18 Dibulatkan 2,422,685.00

1 M3 BETON KOLOM 15 x 15 cm1 Beton cor 1.000 M3 561,807.00 561,807.00 2 Besi beton 153.578 Kg 9,079.00 1,394,332.64 3 Cetakan ( 2X Pakai) 14.815 M2 195,035.00 1,444,703.70

Jumlah 3,400,843.35 Dibulatkan 3,400,843.00

1 M3 BETON RING BALK 15 x 20 cm1 Beton cor 1.000 M3 561,807.00 561,807.00 2 Besi beton 143.711 Kg 9,079.00 1,304,753.18 3 Cetakan ( 2X Pakai) 16.667 M2 211,275.00 1,760,625.00

Jumlah 3,627,185.18 Dibulatkan 3,627,185.00

Page 21: RAB Atap Limas2 Print Jasa 0%

1 M3 BETON LATIEU 15 x 20 cm1 Beton cor K-225 1.000 M3 561,807.00 561,807.00 2 Besi beton 139.322 Kg 9,079.00 1,264,906.46 3 Cetakan ( 2X Pakai) 16.667 M2 211,275.00 1,760,625.00

Jumlah 3,587,338.46 Dibulatkan 3,587,338.00

1 M3 BETON PLAT LUIFEL T= 8 CM1 Beton cor K-225 1.000 M3 561,807.00 561,807.00 2 Besi beton 90.4933 Kg 9,079.00 821,588.97 3 Cetakan 5.000 M2 270,525.00 1,352,625.00

Jumlah 2,736,020.97 Dibulatkan 2,736,020.00

1 m' Membuat Kolom praktis beton bertulang 12 x 12Kayu terentang 0.002 m3 950,000.00 1,900.00 Paku biasa 2'-5" 0.010 kg 12,000.00 120.00 Besi beton polos 3.000 kg 8,000.00 24,000.00 Kawat beton 0.450 kg 12,000.00 5,400.00 Semen portland 4.000 kg 1,000.00 4,000.00 Pasir beton 0.006 m3 72,000.00 432.00 koral beton 0.009 m3 85,000.00 765.00 Tukang besi 0.020 org/hr 36,000.00 720.00 Tukang batu 0.020 org/hr 36,000.00 720.00 Tukang kayu 0.020 org/hr 37,000.00 740.00 Kepala tukang 0.006 org/hr 37,500.00 225.00 Pekerja 0.180 org/hr 30,000.00 5,400.00 Mandor 0.009 org/hr 38,000.00 342.00 Jumlah 44,764.00 Dibulatkan 44,764.00

1 m' Membuat ring balok beton bertulang 10 x 15Kayu terentang 0.003 m3 950,000.00 2,850.00 Paku biasa 2'-5" 0.020 kg 12,000.00 240.00 Besi beton polos 3.600 kg 8,000.00 28,800.00 Kawat beton 0.050 kg 12,000.00 600.00 Semen portland 5.500 kg 1,000.00 5,500.00 Pasir beton 0.009 m3 72,000.00 648.00 koral beton 0.015 m3 85,000.00 1,275.00 Tukang besi 0.033 org/hr 36,000.00 1,188.00 Tukang batu 0.033 org/hr 36,000.00 1,188.00 Tukang kayu 0.033 org/hr 37,000.00 1,221.00 Kepala tukang 0.010 org/hr 37,500.00 375.00 Pekerja 0.100 org/hr 30,000.00 3,000.00 Mandor 0.005 org/hr 38,000.00 190.00 Jumlah 47,075.00 Dibulatkan 47,075.00

PEKERJAAN PASANG 1 BUAH ENGSEL PINTU1 Engsel Pintu 1.0000 Bh 12,000.00 12,000.00

Pekerja 0.0150 Oh 30,000.00 450.00 Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang Kayu 0.0150 Oh 37,500.00 562.50 Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 18,591.00 Dibulatkan 18,591.00

PEKERJAAN PASANG 1 BUAH ENGSEL JENDELA1 Engsel Jendela 1.0000 Bh 9,000.00 9,000.00

Pekerja 0.0150 Oh 30,000.00 450.00 Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang Kayu 0.0150 Oh 37,500.00 562.50

Page 22: RAB Atap Limas2 Print Jasa 0%

Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 15,591.00 Jasa Pemborong 5 % 779.55 Total 16,370.55 Dibulatkan 16,370.00

PEKERJAAN PASANG 1 BUAH KUNCI SELOT1 Kunci Selot 1.0000 Bh 100,000.00 100,000.00

Pekerja 0.0200 Oh 30,000.00 600.00 Tukang Kayu 0.2000 Oh 37,000.00 7,400.00 Kepala Tukang Kayu 0.0200 Oh 37,500.00 750.00 Mandor 0.0100 Oh 38,000.00 380.00 Jumlah 109,130.00 Dibulatkan 109,130.00

PEKERJAAN PASANG 1 BUAH GRENDEL PINTU1 Grendel Pintu 1.0000 Bh 12,000.00 12,000.00

Pekerja 0.0150 Oh 30,000.00 450.00 Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang Kayu 0.0150 Oh 37,500.00 562.50 Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 18,591.00 Dibulatkan 18,591.00

PEKERJAAN PASANG 1 BUAH GRENDEL JENDELA1 Grendel Jendela 1.0000 Bh 7,000.00 7,000.00

Pekerja 0.0150 Oh 30,000.00 450.00 Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang Kayu 0.0150 Oh 37,500.00 562.50 Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 13,591.00 Dibulatkan 13,591.00

PEKERJAAN PASANG 1 BUAH HANDLE JENDELA1 Handel Jendela 1.0000 Bh 5,000.00 5,000.00

Pekerja 0.0150 Oh 30,000.00 450.00 Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang Kayu 0.0150 Oh 37,500.00 562.50 Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 11,591.00 Dibulatkan 11,591.00

PEKERJAAN PASANG 1 BUAH HAK ANGIN1 Handel Jendela 1.0000 Bh 4,000.00 4,000.00

Pekerja 0.0150 Oh 30,000.00 450.00 Tukang Kayu 0.1500 Oh 37,000.00 5,550.00 Kepala Tukang Kayu 0.0150 Oh 37,500.00 562.50 Mandor 0.0008 Oh 38,000.00 28.50 Jumlah 10,591.00 Dibulatkan 10,591.00

1M2 PASANG ATAP ASBES GELOMBANG KECIL1 Asbes gelombang 0.5100 Lbr 32,000.00 16,320.00 2 Paku asbes 0.1200 Kg 13,500.00 1,620.00

Tukang Kayu 0.0670 Oh 37,000.00 2,479.00 Kepala Tukang 0.0070 Oh 37,500.00 262.50 Pekerja 0.1400 Oh 30,000.00 4,200.00 Mandor 0.0070 Oh 38,000.00 266.00 Jumlah 25,147.50 Dibulatkan 25,147.00

Page 23: RAB Atap Limas2 Print Jasa 0%

1Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR1 Besi beton (Polos / Ulir) 1.0500 Kg 8,000.00 8,400.00 2 Kawat beton (Bendrat) 0.0150 Kg 12,000.00 180.00

Tukang Besi 0.0070 Oh 36,000.00 252.00 Kepala Tukang 0.0007 Oh 37,500.00 26.25 Pekerja 0.0070 Oh 30,000.00 210.00 Mandor 0.0003 Oh 38,000.00 11.40 Jumlah 9,079.65 Jasa Pemborong 10 % 907.96 Total 9,987.62 Dibulatkan 9,987.00

1M3 MEMBUAT BETON K 2501 PC ( 50 Kg ) 384.0000 Kg 1,000.00 384,000.00 2 Pasir pasang 0.4490 M3 72,000.00 32,328.00 3 Batu pecah (Split 2/3 cm) 0.7696 Kg 90,000.00 69,264.00

Tukang Batu 0.2750 Oh 36,000.00 9,900.00 Kepala Tukang 0.0280 Oh 37,500.00 1,050.00 Pekerja 1.6500 Oh 30,000.00 49,500.00 Mandor 0.0830 Oh 38,000.00 3,154.00 Jumlah 549,196.00 Jasa Pemborong 10 % 54,919.60 Total 604,115.60 Dibulatkan 604,115.00

1M2 PASANG BEKISTING (Untuk Pondasi)1 Kayu Kelas III 0.0400 M3 4,250,000.00 170,000.00 2 Paku 5 cm - 10 cm 0.3000 Kg 12,000.00 3,600.00 3 Minyak bekisting 0.1000 Lt 6,000.00 600.00

Tukang Kayu 0.2600 Oh 37,000.00 9,620.00 Kepala Tukang Kayu 0.0260 Oh 37,500.00 975.00 Pekerja 0.5200 Oh 30,000.00 15,600.00 Mandor 0.0260 Oh 38,000.00 988.00 Jumlah 201,383.00 Jasa Pemborong 10 % 20,138.30 Total 221,521.30 Dibulatkan 221,521.00

1M2 PASANG BEKISTING (Untuk Sloof)1 Kayu Kelas III 0.0450 M3 4,250,000.00 191,250.00 2 Paku 5 cm - 10 cm 0.3000 Kg 12,000.00 3,600.00 3 Minyak bekisting 0.1000 Lt 6,000.00 600.00

Tukang Kayu 0.2600 Oh 37,000.00 9,620.00 Kepala Tukang Kayu 0.0260 Oh 37,500.00 975.00 Pekerja 0.5200 Oh 30,000.00 15,600.00 Mandor 0.0260 Oh 38,000.00 988.00 Jumlah 222,633.00 Jasa Pemborong 10 % 22,263.30 Total 244,896.30 Dibulatkan 244,896.00

1M2 PASANG BEKISTING (Untuk Kolom)1 Kayu Kelas III 0.0400 M3 4,250,000.00 170,000.00 2 Paku 5 cm - 10 cm 0.4000 Kg 12,000.00 4,800.00 3 Minyak bekisting 0.2000 Lt 6,000.00 1,200.00 4 Balok Kayu Kelas II 0.0150 M3 4,700,000.00 70,500.00 5 Plywood 9 mm 0.3500 Lbr 90,000.00 31,500.00 6 Scafolding 1.0000 Unit 25,000.00 25,000.00

Tukang Kayu 0.3300 Oh 37,000.00 12,210.00 Kepala Tukang Kayu 0.0330 Oh 37,500.00 1,237.50 Pekerja 0.6600 Oh 30,000.00 19,800.00 Mandor 0.0330 Oh 38,000.00 1,254.00 Jumlah 337,501.50 Jasa Pemborong 10 % 33,750.15

Page 24: RAB Atap Limas2 Print Jasa 0%

Total 371,251.65 Dibulatkan 371,251.00

Page 25: RAB Atap Limas2 Print Jasa 0%

1M2 PASANG BEKISTING (Untuk Balok)1 Kayu Kelas III 0.0400 M3 4,250,000.00 170,000.00 2 Paku 5 cm - 10 cm 0.4000 Kg 12,000.00 4,800.00 3 Minyak bekisting 0.2000 Lt 6,000.00 1,200.00 4 Balok Kayu Kelas II 0.0180 M3 4,700,000.00 84,600.00 5 Plywood 9 mm 0.3500 Lbr 90,000.00 31,500.00 6 Scafolding 1.0000 Unit 25,000.00 25,000.00

Tukang Kayu 0.3300 Oh 37,000.00 12,210.00 Kepala Tukang Kayu 0.0330 Oh 37,500.00 1,237.50 Pekerja 0.6600 Oh 30,000.00 19,800.00 Mandor 0.0330 Oh 38,000.00 1,254.00 Jumlah 351,601.50 Jasa Pemborong 10 % 35,160.15 Total 386,761.65 Dibulatkan 386,761.00

1M2 PASANG BEKISTING (Untuk Lantai)1 Kayu Kelas III 0.0400 M3 4,250,000.00 170,000.00 2 Paku 5 cm - 10 cm 0.4000 Kg 12,000.00 4,800.00 3 Minyak bekisting 0.2000 Lt 6,000.00 1,200.00 4 Balok Kayu Kelas II 0.0150 M3 4,700,000.00 70,500.00 5 Plywood 9 mm 0.3500 Lbr 90,000.00 31,500.00 6 Scafolding 1.0000 Unit 25,000.00 25,000.00

Tukang Kayu 0.3300 Oh 37,000.00 12,210.00 Kepala Tukang Kayu 0.0330 Oh 37,500.00 1,237.50 Pekerja 0.6600 Oh 30,000.00 19,800.00 Mandor 0.0330 Oh 38,000.00 1,254.00 Jumlah 337,501.50 Jasa Pemborong 10 % 33,750.15 Total 371,251.65 Dibulatkan 371,251.00

1M3 MEMBUAT SLOOF BETON BERTULANG 20/401 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 175.6500 Kg 9,987.00 1,754,216.55 3 Cetakan 12.5000 M2 244,896.00 3,061,200.00

Jumlah 5,419,531.55 Dibulatkan 5,419,531.00

1M3 MEMBUAT FOOTPLAT BETON BERTULANG 1 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 168.5600 Kg 9,987.00 1,683,408.72 3 Cetakan 4.0000 M2 110,760.50 443,042.00

Jumlah 2,730,565.72 Dibulatkan 2,730,565.00

1M3 MEMBUAT KOLOM BETON BERTULANG 15/151 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 100.0000 Kg 9,987.00 998,700.00 3 Cetakan 22.2222 M2 371,251.00 8,250,022.22

Jumlah 9,852,837.22 Dibulatkan 9,852,837.00

1M3 MEMBUAT KOLOM BETON BERTULANG 45/701 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 139.6540 Kg 9,987.00 1,394,724.18 3 Cetakan 3.1746 M2 371,251.00 1,178,574.60

Jumlah 3,177,413.78 Dibulatkan 3,177,413.00

1M3 MEMBUAT KOLOM BETON BERTULANG 45/501 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 107.2844 Kg 9,987.00 1,071,449.75 3 Cetakan 4.4444 M2 371,251.00 1,650,004.44

Jumlah 3,325,569.19 Dibulatkan 3,325,569.00

1M3 MEMBUAT KOLOM BULAT BETON BERTULANG DIAMETER 50

Page 26: RAB Atap Limas2 Print Jasa 0%

1 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 102.2844 Kg 9,987.00 1,021,514.75 3 Cetakan 5.0955 M2 371,251.00 1,891,724.84

Jumlah 3,517,354.59 Dibulatkan 3,517,354.00

Page 27: RAB Atap Limas2 Print Jasa 0%

1M3 MEMBUAT KOLOM BETON BERTULANG 20/451 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 50.0000 Kg 9,987.00 499,350.00 3 Cetakan 11.1111 M2 371,251.00 4,125,011.11

Jumlah 5,228,476.11 Dibulatkan 5,228,476.00

1M3 MEMBUAT BALOK BETON BERTULANG B1a 40/501 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 237.1222 Kg 9,987.00 2,368,139.63 3 Cetakan 5.0000 M2 386,761.00 1,933,805.00

Jumlah 4,906,059.63 Dibulatkan 4,906,059.00

1M3 MEMBUAT BALOK BETON BERTULANG B1b 30/501 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 154.3444 Kg 9,987.00 1,541,437.97 3 Cetakan 6.6667 M2 386,761.00 2,578,406.67

Jumlah 4,723,959.63 Dibulatkan 4,723,959.00

1M3 MEMBUAT BALOK BETON BERTULANG B2 30/401 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 260.6167 Kg 9,987.00 2,602,778.65 3 Cetakan 8.3333 M2 386,761.00 3,223,008.33

Jumlah 6,429,901.98 Dibulatkan 6,429,901.00

1M3 MEMBUAT BALOK BETON BERTULANG B3 20/401 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 316.0500 Kg 9,987.00 3,156,391.35 3 Cetakan 12.5000 M2 386,761.00 4,834,512.50

Jumlah 8,595,018.85 Dibulatkan 8,595,018.00

1M3 MEMBUAT BALOK BETON BERTULANG B4 15/201 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 150.0000 Kg 9,987.00 1,498,050.00 3 Cetakan 16.6667 M2 386,761.00 6,446,016.67

Jumlah 8,548,181.67 Dibulatkan 8,548,181.00

1M3 MEMBUAT BALOK BETON BERTULANG 20/301 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 173.6921 Kg 9,987.00 1,734,663.30 3 Cetakan 16.6667 M2 386,761.00 6,446,016.67

Jumlah 8,784,794.97 Dibulatkan 8,784,794.00

1M3 MEMBUAT PLAT BETON BERTULANG 1 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 102.8333 Kg 9,987.00 1,026,996.50 3 Cetakan 8.3333 M2 371,251.00 3,093,758.33

Jumlah 4,724,869.83 Dibulatkan 4,724,869.00

1M3 MEMBUAT PLAT LISTPLANK BETON BERTULANG 1 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 80.0000 Kg 9,987.00 798,960.00 3 Cetakan 14.2857 M2 371,251.00 5,303,585.71

Jumlah 6,706,660.71 Dibulatkan 6,706,660.00

1M3 MEMBUAT TANGGA BETON BERTULANG 1 Beton cor K-250 1.0000 M3 604,115.00 604,115.00 2 Besi beton 213.1200 Kg 9,987.00 2,128,429.44 3 Cetakan 6.6667 M2 371,251.00 2,475,006.67

Jumlah 5,207,551.11 Dibulatkan 5,207,551.00

Page 28: RAB Atap Limas2 Print Jasa 0%

1M3 MEMBUAT BETON TUMBUK (1Pc:3Ps:5Kr) 1 PC ( 40 Kg ) 218.0000 KG 1,000.00 218,000.00 2 Pasir pasang 0.5200 M3 72,000.00 37,440.00 3 Krikil 0.8700 M3 85,000.00 73,950.00

Tukang Batu 0.2500 Oh 36,000.00 9,000.00 Kepala Tukang 0.0250 Oh 37,500.00 937.50 Pekerja 1.6500 Oh 30,000.00 49,500.00 Mandor 0.0800 Oh 38,000.00 3,040.00 Jumlah 391,867.50 Jasa Pemborong 10 % 39,186.75 Total (dalam M3) 431,054.25 Dibulatkan 431,054.00

Page 29: RAB Atap Limas2 Print Jasa 0%

PEKERJAAN BATAKO (1 M2)1 PC ( 40 Kg ) 10.4500 Kg 1,000.00 10,450.002 Pasir pasang 0.0380 M3 72,000.00 2,736.003 Batako 12.5000 Bh 2,100.00 26,250.00

Tukang Batu 0.1200 Oh 36,000.00 4,320.00 Kepala Tukang 0.0120 Oh 37,500.00 450.00 Pekerja 0.3200 Oh 30,000.00 9,600.00 Mandor 0.0150 Oh 38,000.00 570.00 Jumlah 54,376.00 Jasa Pemborong 10 % 5,437.60 Jumlah 59,813.60 Dibulatkan 59,813.00

6.30 1M2 PASANG ATAP GENTENG KERAMIK GLASUUR1 Genteng Keramik Glaseur 11.0000 Bh 600.00 6,600.002 Paku biasa 2"-5" 0.0300 Kg 12,000.00 360.00

Tukang Kayu 0.1000 Oh 36,000.00 3,600.00 Kepala Tukang 0.0100 Oh 37,500.00 375.00 Pekerja 0.2000 Oh 30,000.00 6,000.00 Mandor 0.0100 Oh 38,000.00 380.00 Jumlah 17,315.00 Jasa Pemborong 10 % 1,731.50 Total 19,046.50 Dibulatkan 19,046.00

6.34 1M' PASANG NOK GENTENG KERAMIK GLASEUR1 Nok Genteng Keramik Glaseur 3.5000 Bh 2,000.00 7,000.002 PC ( 40 Kg ) 10.8000 Kg 1,000.00 10,800.003 Pasir pasang 0.0320 M3 72,000.00 2,304.004 Paku biasa 2"-5" 0.0300 Kg 12,000.00 360.00

Tukang Batu 0.2000 Oh 36,000.00 7,200.00 Kepala Tukang 0.0200 Oh 37,500.00 750.00 Pekerja 0.4000 Oh 30,000.00 12,000.00 Mandor 0.0200 Oh 38,000.00 760.00 Jumlah 41,174.00 Jasa Pemborong 10 % 4,117.40 Total 45,291.40 Dibulatkan 45,291.00

6.3 1M2 LANGIT-LANGIT ASBES (1 X 1) M, TEBAL 4 MM1 Plat asbes 1.1000 M3 #REF! #REF!2 Paku eternit 0.0100 Kg 13,000.00 130.00

Tukang Kayu 0.0700 Oh 37,000.00 2,590.00 Kepala Tukang 0.0070 Oh 37,500.00 262.50 Pekerja 0.0300 Oh 30,000.00 900.00 Mandor 0.0015 Oh 38,000.00 57.00 Jumlah #REF! Jasa Pemborong 10 % #REF!

Page 30: RAB Atap Limas2 Print Jasa 0%

Total #REF! Dibulatkan #REF!

6.47 1M2 PASANG LANTAI KERAMIK 30X30 CM1 Ubin keramik 1.0000 M2 30,000.00 30,000.002 PC ( 40 Kg ) 11.3800 Kg 1,000.00 11,380.003 Pasir pasang 0.0420 M3 72,000.00 3,024.004 PC warna 1.5000 Kg 600.00 900.00

Tukang Batu 0.3500 Oh 36,000.00 12,600.00 Kepala Tukang 0.0350 Oh 37,500.00 1,312.50 Pekerja 0.6200 Oh 30,000.00 18,600.00 Mandor 0.0300 Oh 38,000.00 1,140.00 Jumlah 78,956.50 Jasa Pemborong 10 % 7,895.65 Total 86,852.15 Dibulatkan 86,852.00

MEMBONGKAR USUK/RENG TIDAK DIPAKAI LAGI (10 M2)Pekerja 2.0000 Oh 30,000.00 60,000.00Mandor 0.1000 Oh 38,000.00 3,800.00 Jumlah 63,800.00 Jasa Pemborong 10 % 6,380.00 Total 70,180.00Total Per-M2 7,018.00 Dibulatkan 7,018.00

MEMBONGKAR KUDA-KUDA TIDAK DIPAKAI LAGI ( 1 M3 )Pekerja 1.0000 Oh 30,000.00 30,000.00Mandor 0.2000 Oh 38,000.00 7,600.00 Jumlah 37,600.00 Jasa Pemborong 10 % 3,760.00 Total 41,360.00Total Per-M2 4,136.00 Dibulatkan 4,136.00

MEMBONGKAR GENTENG TIDAK DIPAKAI LAGI (10 M2)Pekerja 2.0000 Oh 30,000.00 60,000.00Mandor 0.1000 Oh 38,000.00 3,800.00 Jumlah 63,800.00 Jasa Pemborong 10 % 6,380.00 Total 70,180.00Total Per-M2 7,018.00 Dibulatkan 7,018.00

MEMBONGKAR ATAP TOTAL TIDAK DIPAKAI LAGI ( PER - M2 ) 18,172.00

Page 31: RAB Atap Limas2 Print Jasa 0%

SNI

Page 32: RAB Atap Limas2 Print Jasa 0%

Fott Plat 100 x 100 x 25 4.0000 12.5 16 Panjang Bh

1.552 1.25 8.0000 15.5200

12.5 16 Panjang Bh 1.552 1.25 8.0000 15.5200

20 12 Panjang Bh 42.1400 168.5600 0.888 1.25 5.0000 5.5500

20 12 Panjang Bh 0.888 1.25 5.0000 5.5500

Plat Dag 100 x 100 x 12 8.3333 20 10 Panjang Bh

0.617 1 5.0000 3.0850

20 10 Panjang Bh 6.1700 51.4167 102.8333 0.617 1 5.0000 3.0850

Plat Tangga 100 x 100 x 15 6.6667 10 12 Panjang Bh

0.888 1 10.0000 8.8800

12.5 12 Panjang Bh 15.9840 106.5600 213.1200 0.888 1 8.0000 7.1040

Plat listplank 100 x 100 x 10 10.0000 12.5 10 Panjang Bh

0.617 1 8.0000 4.9360

15 10 Panjang Bh 9.0493 90.4933 180.9867 0.617 1 6.6667 4.1133

Lisplank beton 100 x 100 x 10 14.2857 15 10 Panjang Bh

0.617 1 6.6667 4.1133

15 10 Panjang Bh 8.2267 117.5238 0.617 1 6.6667 4.1133

Plat Leuvel 100 x 100 x 10 14.2857 12.5 10 Panjang Bh

0.617 1 8.0000 4.9360

12.5 10 Panjang Bh 9.8720 141.0286 0.617 1 8.0000 4.9360

Plat talang 100 x 100 x 10 14.2857 12.5 10 Panjang Bh

0.617 1 8.0000 4.9360

12.5 10 Panjang Bh 9.8720 141.0286 282.0571 0.617 1 8.0000 4.9360

Sloof 15 x 20 6.6667 5.0000 33.3333

Page 33: RAB Atap Limas2 Print Jasa 0%

10 panjang Bh 0.617 1 4.0000 2.4680

4.3113 143.7111 15 8 panjang Bh

0.395 0.7 6.6667 1.8433

Ringbalk 15 x 20 6.6667 5.0000 33.3333 10 panjang Bh

0.617 1 4.0000 2.4680 4.3113 143.7111

15 8 panjang Bh 0.395 0.7 6.6667 1.8433

Sloof 20 x 40 5.0000 2.5000 12.5000 16 panjang Bh

1.552 1 6.0000 9.3120 14.0520 175.6500

10 8 panjang Bh 0.395 1.2 10.0000 4.7400

Kolom 45 x 70 2.2222 1.4286 3.1746 22 panjang Bh

2.98 1 10.0000 29.8000 43.9910 139.6540

10 10 panjang Bh 0.617 2.3 10.0000 14.1910

Kolom 20 x 20 5.0000 5.0000 25.0000 10 panjang Bh

0.617 1 4.0000 2.4680 4.5747 114.3667

15 8 panjang Bh 0.395 0.8 6.6667 2.1067

Kolom 45 x 50 2.2222 2.0000 4.4444 16 panjang Bh

1.552 1 8.0000 12.4160 24.1390 107.2844

10 10 panjang Bh 0.617 1.9 10.0000 11.7230

Kolom 15 x 25 6.6667 4.0000 26.6667 12 panjang Bh

0.888 1 4.0000 3.5520 7.5008 200.0213

12.5 10 panjang Bh 0.617 0.8 8.0000 3.9488

Kolom 25 x 25 4.0000 4.0000 16.0000 12 panjang Bh

0.888 1 6.0000 5.3280 10.2640 164.2240

12.5 10 panjang Bh 0.617 1 8.0000 4.9360

Kolom 12 x 12 8.3333 8.3333 69.4444 10 panjang Bh

Page 34: RAB Atap Limas2 Print Jasa 0%

0.617 1 4.0000 2.4680 3.4555 239.9653

20 8 panjang Bh 0.395 0.5 5.0000 0.9875

Kolom 15 x 15 6.6667 6.6667 44.4444 10 panjang Bh

0.617 1 4.0000 2.4680 3.4555 153.5778

20 8 panjang Bh 0.395 0.5 5.0000 0.9875

Balok Latai 12 x 18 8.3333 5.5556 46.2963 10 panjang Bh

0.617 1 4.0000 2.4680 3.7518 173.6921

20 8 panjang Bh 0.395 0.65 5.0000 1.2838

Beton Susut 6 x 12 16.6667 8.3333 138.8889 10 panjang Bh

0.617 1 2.0000 1.2340 1.6290 226.2500

20 8 panjang Bh 0.395 0.2 5.0000 0.3950

Balok 30 x 70 3.3333 1.4286 4.7619 19 panjang Bh

2.235 1 11.0000 24.5850 38.7010 184.2905

12 panjang Bh 0.888 1 2.0000 1.7760

10 10 panjang Bh 0.617 2 10.0000 12.3400

Balok 15 x 25 6.6667 4.0000 26.6667

12 panjang Bh 0.888 1 4.0000 3.5520

8.4880 226.3467 10 10 panjang Bh

0.617 0.8 10.0000 4.9360

Balok 30 x 60 B1 A 3.3333 1.6667 5.5556 22 panjang Bh

2.98 1 10.0000 29.8000 42.6820 237.1222

12 panjang Bh

Page 35: RAB Atap Limas2 Print Jasa 0%

0.888 1 2.0000 1.7760

10 10 panjang Bh 0.617 1.8 10.0000 11.1060

Balok 30 x 60 ( B1 B ) 3.3333 1.6667 5.5556 22 panjang Bh

2.98 1 5.0000 14.9000 27.7820 154.3444

12 panjang Bh 0.888 1 2.0000 1.7760

10 10 panjang Bh 0.617 1.8 10.0000 11.1060

Balok 30 x 40 3.3333 2.5000 8.3333 22 panjang Bh

2.98 1 7.0000 20.8600 31.2740 260.6167

12 panjang Bh 0.888 1 2.0000 1.7760

10 10 panjang Bh 0.617 1.4 10.0000 8.6380

Balok 20 x 30 5.0000 3.3333 16.6667 16 panjang Bh

1.552 1 5.0000 7.7600 13.1896 219.8267

12.5 10 panjang Bh 0.617 1.1 8.0000 5.4296

Balok 20 X 40 5.0000 2.5000 12.5000 19 panjang Bh

2.235 1 8.0000 17.8800 25.2840 316.0500

10 10 panjang Bh 0.617 1.2 10.0000 7.4040

Ring Balk 12 x 18 6.6667 5.0000 33.3333 12 panjang Bh

0.888 1 4.0000 3.5520 5.2637 175.4556

15 8 panjang Bh 0.395 0.65 6.6667 1.7117

Ring Balk 12 x 18 6.6667 5.0000 33.3333 10 panjang Bh

0.617 1 4.0000 2.4680 4.1797 139.3222

15 8 panjang Bh 0.395 0.65 6.6667 1.7117

Ring Balk 15 x 20 6.6667 5.0000 33.3333 12 panjang Bh

0.888 1 4.0000 3.5520 5.2637 175.4556

15 8 panjang Bh 0.395 0.65 6.6667 1.7117

Page 36: RAB Atap Limas2 Print Jasa 0%

Ring Balk 20 x 30 5.0000 3.3333 16.6667 16 panjang Bh

1.552 1 5.0000 7.7600 12.6960 211.6000

12.5 10 panjang Bh 0.617 1 8.0000 4.9360

Ring Balk 20 x 40 5.0000 3.3333 16.6667 16 panjang Bh

1.552 1 5.0000 7.7600 13.9300 232.1667

10 10 panjang Bh 0.617 1 10.0000 6.1700

Balok Latai 12 x 12 8.3333 8.3333 69.4444 10 panjang Bh

0.617 1 4.0000 2.4680 3.7320 259.1667

15 8 panjang Bh 0.395 0.48 6.6667 1.2640

Balok Susut 8 x 12 12.5000 8.3333 104.1667 10 panjang Bh

0.617 1 2.0000 1.2340 1.5500 161.4583

15 8 panjang Bh 0.395 0.12 6.6667 0.3160

Konsol beton 20 x 30 6.6667 4.0000 26.6667 12 panjang Bh

0.888 1 5.0000 4.4400 8.8824 236.8640

12.5 10 panjang Bh 0.617 0.9 8.0000 4.4424

Sloff 15 x 20 6.6667 5.0000 33.3333 12 panjang Bh

0.888 1 4.0000 3.5520 6.2257 207.5222

15 10 panjang Bh 0.617 0.65 6.6667 2.6737

KD-Baja Siku 50.50.5 50.50.5 panjang Bh

3.77 32.96 1.0000 124.2592 154.4192

trek stang50.50.5 30.1600

3.77 8 1.0000

Page 37: RAB Atap Limas2 Print Jasa 0%

Ringbalk 15 x 20 6.6667 5.0000 33.3333 10 panjang Bh

0.617 1 4.0000 2.4680 4.3113 143.7111

15 8 panjang Bh 0.395 0.7 6.6667 1.8433