Nomor & Periode Invoice : No. 12 Periode (Juni s/d Juli 2020) CERC Realisasi Invoice : 06 November 2020 Nomor Loan : Loan NCEP-Urban No. 8213-ID, NSUP IBRD No. 8636-ID, : NSUP Asian Infrastructure Investment Bank (AIIB) Loan No. 0004-IDN Nama Konsultan : PT. Kogas Driyap Konsultan Paket Pekerjaan : TECHNICAL MANAGEMENT CONSULTANT (TMC) PACKAGE - 6 Nomor & Tanggal Kontrak : HK.02.03/TMC-6/IBRD & AIIB/SATKER-PKPBM/25/2018, Tanggal 18 Desember 2018 Periode Kontrak : 18 Desember 2018 sd 17 Desember 2020 I. REMUNERASI 27,615,500,000 12,833,246,728 1,049,150,000 13,882,396,728 13,733,103,272 1.1. PROFESIONAL STAFF 24,857,000,000 11,475,476,109 882,566,667 12,358,042,775 12,498,957,225 1.2. SUPPORTING STAFF 2,758,500,000 1,357,770,620 166,583,333 1,524,353,953 1,234,146,047 II. DIRECT REIMBURSABLE COST 12,335,450,000 4,021,259,073 184,637,795 4,205,896,868 8,129,553,132 2.1. MOBILIZATION / DEMOBILIZATION 324,200,000 3,966,940 5,081,033 9,047,973 315,152,027 2.2. HOUSING ALLOWANCE 482,250,000 138,030,815 13,725,000 151,755,815 330,494,185 2.3. DUTY TRAVEL EXPENSES 1,426,170,000 285,269,681 0 285,269,681 1,140,900,319 A. SOUTH SULAWESI PROVINCE 248,450,000 76,079,615 0 76,079,615 172,370,385 B. NORTH SULAWESI PROVINCE 92,200,000 24,079,400 0 24,079,400 68,120,600 C. CENTRAL SULAWESI PROVINCE 245,000,000 11,899,700 0 11,899,700 233,100,300 D. GORONTALO PROVINCE 93,000,000 11,983,200 0 11,983,200 81,016,800 E. SOUTH EAST SULAWESI PROVINCE 132,520,000 37,856,666 0 37,856,666 94,663,334 F. MALUKU PROVINCE 217,500,000 40,347,300 0 40,347,300 177,152,700 G. NORTH MALUKU PROVINCE 114,300,000 19,955,400 0 19,955,400 94,344,600 H. PAPUA PROVINCE 138,000,000 25,623,700 0 25,623,700 112,376,300 I. WEST PAPUA PROVINCE 145,200,000 37,444,700 0 37,444,700 107,755,300 2.4. OFFICE OPERATIONAL EXPENSES 1,050,000,000 327,296,637 22,631,762 349,928,399 700,071,601 2.5. OFFICE EQUIPMENT EXPENSES 592,700,000 447,500,000 0 447,500,000 145,200,000 2.6. RENTAL EXPENSES 5,880,470,000 1,884,040,000 143,000,000 2,027,040,000 3,853,430,000 2.7. REPORT EXPENSES 182,035,000 30,455,000 200,000 30,655,000 151,380,000 2.8. SURVEY EXPENSES 2,397,625,000 904,700,000 0 904,700,000 1,492,925,000 III. COORDINATION MEETING AT PROVINCE 133,300,000 38,400,000 0 38,400,000 94,900,000 NATIONAL SLUM UPGRADING PROGRAM (NSUP) - FY 2019 KOTA TANPA KUMUH "KOTAKU" SATKER DIREKTORAT PENGEMBANGAN KAWASAN PERMUKIMAN (PKP) KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT NO KOMPOSISI BIAYA CONTRACT AMANDEMENT -03 SSIA KONTRAK INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

Upload: others

Post on 25-Jan-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

  • Nomor & Periode Invoice : No. 12 Periode (Juni s/d Juli 2020) CERC

    Realisasi Invoice : 06 November 2020

    Nomor Loan : Loan NCEP-Urban No. 8213-ID, NSUP IBRD No. 8636-ID,

    : NSUP Asian Infrastructure Investment Bank (AIIB) Loan No. 0004-IDN

    Nama Konsultan : PT. Kogas Driyap Konsultan

    Paket Pekerjaan : TECHNICAL MANAGEMENT CONSULTANT (TMC) PACKAGE - 6

    Nomor & Tanggal Kontrak : HK.02.03/TMC-6/IBRD & AIIB/SATKER-PKPBM/25/2018, Tanggal 18 Desember 2018

    Periode Kontrak : 18 Desember 2018 sd 17 Desember 2020

    I. REMUNERASI 27,615,500,000 12,833,246,728 1,049,150,000 13,882,396,728 13,733,103,272

    1.1. PROFESIONAL STAFF 24,857,000,000 11,475,476,109 882,566,667 12,358,042,775 12,498,957,225

    1.2. SUPPORTING STAFF 2,758,500,000 1,357,770,620 166,583,333 1,524,353,953 1,234,146,047

    II. DIRECT REIMBURSABLE COST 12,335,450,000 4,021,259,073 184,637,795 4,205,896,868 8,129,553,132

    2.1. MOBILIZATION / DEMOBILIZATION 324,200,000 3,966,940 5,081,033 9,047,973 315,152,027

    2.2. HOUSING ALLOWANCE 482,250,000 138,030,815 13,725,000 151,755,815 330,494,185

    2.3. DUTY TRAVEL EXPENSES 1,426,170,000 285,269,681 0 285,269,681 1,140,900,319

    A. SOUTH SULAWESI PROVINCE 248,450,000 76,079,615 0 76,079,615 172,370,385

    B. NORTH SULAWESI PROVINCE 92,200,000 24,079,400 0 24,079,400 68,120,600

    C. CENTRAL SULAWESI PROVINCE 245,000,000 11,899,700 0 11,899,700 233,100,300

    D. GORONTALO PROVINCE 93,000,000 11,983,200 0 11,983,200 81,016,800

    E. SOUTH EAST SULAWESI PROVINCE 132,520,000 37,856,666 0 37,856,666 94,663,334

    F. MALUKU PROVINCE 217,500,000 40,347,300 0 40,347,300 177,152,700

    G. NORTH MALUKU PROVINCE 114,300,000 19,955,400 0 19,955,400 94,344,600

    H. PAPUA PROVINCE 138,000,000 25,623,700 0 25,623,700 112,376,300

    I. WEST PAPUA PROVINCE 145,200,000 37,444,700 0 37,444,700 107,755,300

    2.4. OFFICE OPERATIONAL EXPENSES 1,050,000,000 327,296,637 22,631,762 349,928,399 700,071,601

    2.5. OFFICE EQUIPMENT EXPENSES 592,700,000 447,500,000 0 447,500,000 145,200,000

    2.6. RENTAL EXPENSES 5,880,470,000 1,884,040,000 143,000,000 2,027,040,000 3,853,430,000

    2.7. REPORT EXPENSES 182,035,000 30,455,000 200,000 30,655,000 151,380,000

    2.8. SURVEY EXPENSES 2,397,625,000 904,700,000 0 904,700,000 1,492,925,000

    III. COORDINATION MEETING AT PROVINCE 133,300,000 38,400,000 0 38,400,000 94,900,000

    NATIONAL SLUM UPGRADING PROGRAM (NSUP) - FY 2019

    KOTA TANPA KUMUH "KOTAKU"

    SATKER DIREKTORAT PENGEMBANGAN KAWASAN PERMUKIMAN (PKP)

    KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT

    NO KOMPOSISI BIAYACONTRACT

    AMANDEMENT -03SSIA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

  • NO KOMPOSISI BIAYACONTRACT

    AMANDEMENT -03SSIA KONTRAKINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

    3.1. WITH CITY TEAM 133,300,000 38,400,000 0 38,400,000 94,900,000

    IV. TOTAL [I + II + III ] 40,084,250,000 16,892,905,802 1,233,787,795 18,126,693,597 21,957,556,403

    V. TAX 10% 4,008,425,000 1,689,290,580 123,378,780 1,812,669,360 2,195,755,640

    VI. GRAND TOTAL 44,092,675,000 18,582,196,382 1,357,166,575 19,939,362,956 24,153,312,044

    VII. TEMUAN BPKB 0 0 (207,000,000) (207,000,000) 207,000,000

    VIII. ADVANCE PAYMENT 2,602,189,500 2,602,189,500 0 2,602,189,500 0

    IX. REPAYMENT ADVANCE PAYMENT 2,602,189,500 1,843,217,567 216,849,126 2,060,066,693 542,122,808

    IX. TOTAL INVOICE 40,084,250,000 17,651,877,735 809,938,669 18,461,816,404 21,622,433,596

  • I. REMUNERASI

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    1.1. PROFESIONAL STAFF 24,857,000,000 11,475,476,109 882,566,667 12,358,042,775 12,498,957,225

    A. REGIONAL LEVEL 2,380,000,000 1,488,748,485 152,000,000 1,640,748,485 739,251,515

    Province South Sulawesi (Makassar) - Regional Level

    A-1 Andi Amar Team Leader 24.00 17.35 2.00 19.35 4.65

    A-2 Yeni Iriani Infrastructure Specialist 20.00 8.21 0.00 8.21 11.79

    A-3 Andi Bachtiar Dharma Architect 24.00 16.77 2.00 18.77 5.23

    A-4 Sitti / Luciana Apriani Safeguard Specialist 22.00 15.65 1.00 16.65 5.35

    A-5 Tobe Name Additional Expert as Needed 0.00 0.00 0.00 0.00 0.00

    A-6 Hasriana Team Assistant 12.00 4.00 2.00 6.00 6.00

    B. CITY LEVEL (14 Priority City) 6,730,000,000 4,287,924,926 536,600,000 4,824,524,926 1,905,475,074

    Civil Engineering

    B-1 Nusbih/Stevie O. M./Wibowo S. D. Civil Engineering (Lead) Kota Manado 21.50 12.21 2.00 14.21 7.29

    B-2 Andi Sikki Civil Engineering (Lead) Kota Gorontalo 23.50 16.77 2.00 18.77 4.73

    B-3 Moh. Arief Civil Engineering (Lead) Kota Palu 0.00 0.00 0.00 0.00 0.00

    B-4 Andi Amran / Nur Senab Civil Engineering (Lead) Kota Makasar 18.00 9.14 0.00 9.14 8.86

    B-5 Asia Sabarudin Civil Engineering (Lead) Kabupten Gowa 23.50 16.12 2.00 18.12 5.38

    B-6 Rahmi Habir Civil Engineering (Lead) Kota Palopo 23.50 16.23 2.00 18.23 5.27

    B-7 Ulfa Tajudin Civil Engineering (Lead) Kota Pare-Pare 23.50 16.77 2.00 18.77 4.73

    B-8 Adiputera Civil Engineering (Lead) Kota Kendari 23.50 16.77 2.00 18.77 4.73

    B-9 Muhammad Saleh Civil Engineering (Lead) Kabupaten Kolaka 23.50 16.73 2.00 18.73 4.77

    B-10 Arif Ali / Jacub A. / M. Tafri Civil Engineering (Lead) Kota Tual 22.00 9.14 1.30 10.44 11.56

    B-11 Marzuki / Jembris Salawane Civil Engineering (Lead) Kota Ambon 22.00 12.12 2.00 14.12 7.88

    B-12 Aidin Jafar Civil Engineering (Lead) Kota Ternate 22.00 14.50 2.00 16.50 5.50

    B-13 Rahman Civil Engineering (Lead) Kota Sorong 23.50 16.23 2.00 18.23 5.27

    B-14 Baharuddin Civil Engineering (Lead) Kota Jayapura 23.50 14.39 2.00 16.39 7.11

    TEAM FOR CERC ACTIVITIES 8,037,000,000 3,284,200,000 0 3,284,200,000 4,752,800,000

    I. 4,281,000,000 3,284,200,000 0 3,284,200,000 996,800,000

    a. Penyusunan Masterplan Kawasan & DED Infrastruktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Karel Sri P Deputy Team Leader 5.00 5.00 0.00 5.00 0.00

    Ikwan syamsudin 14.00 0.00 0.00 0.00 14.00

    2 Washa Nasution / Procurement Specialist 2.63 2.63 0.00 2.63 0.00

    Teuku Lila Arga 15.37 0.00 0.00 0.00 15.37

    3 Dian Agus Widiarso Geologist 3.00 1.50 0.00 1.50 1.50

    4 Moh. Arief Civil Engineering - 1 0.00 0.00 0.00 0.00 0.00

    5 Belyn Bimbo Petherson Civil Engineering - 2 5.00 5.00 0.00 5.00 0.00

    6 Eko Setyo Nugroho Civil Engineering - 3 5.00 5.00 0.00 5.00 0.00

    7 Suyono Suratman Civil Engineering - 4 5.00 5.00 0.00 5.00 0.00

    8 Hartanto Civil Engineering - 5 5.00 5.00 0.00 5.00 0.00

    9 Arifianto Civil Engineering - 6 5.00 5.00 0.00 5.00 0.00

    10 Andri Civil Engineering - 7 5.00 5.00 0.00 5.00 0.00

    11 Naharuddin Civil Engineering - 8 5.00 5.00 0.00 5.00 0.00

    12 Naftali Pali Civil Engineering - 9 5.00 5.00 0.00 5.00 0.00

    13 Dedi Civil Engineering - 10 5.00 5.00 0.00 5.00 0.00

    14 Marwan B Nawer Civil Engineering - 11 2.00 0.00 0.00 0.00 2.00

    15 Fadlum Dai Hasjim Civil Engineering - 12 0.00 0.00 0.00 0.00 0.00

    16 Ramlan Civil Engineering - 13 2.00 0.00 0.00 0.00 2.00

    17 Abd. Gafur Civil Engineering - 14 2.00 0.00 0.00 0.00 2.00

    18 Bambang Setyono Civil Engineering - 15 2.00 0.00 0.00 0.00 2.00

    19 Rachmat Saleh Architect - 1 5.00 5.00 0.00 5.00 0.00

    20 Made Ardi Sasmita Architect - 2 5.00 5.00 0.00 5.00 0.00

    21 Syamsul Darwis Architect - 3 5.00 5.00 0.00 5.00 0.00

    22 Viqran Architect - 4 5.00 5.00 0.00 5.00 0.00

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI

    TENGAH

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    23 Anastiti Gita Rini Architect - 5 5.00 4.87 0.00 4.87 0.13

    24 Moh. Rachmat Syahrullah Architect - 6 5.00 4.87 0.00 4.87 0.13

    25 Ilham Halim Architect - 7 5.00 4.87 0.00 4.87 0.13

    26 Akbar Architect - 8 0.00 0.00 0.00 0.00 0.00

    27 Sunardi Architect - 9 0.00 0.00 0.00 0.00 0.00

    28 Budiarton Saada Environmental Specialist - 1 5.00 5.00 0.00 5.00 0.00

    29 Warsidi Environmental Specialist - 2 5.00 5.00 0.00 5.00 0.00

    30 Nasikhah Imamah Environmental Specialist - 3 5.00 5.00 0.00 5.00 0.00

    31 Arif Riyadi Environmental Specialist - 4 5.00 5.00 0.00 5.00 0.00

    32 Silviani Darwin Environmental Specialist - 5 5.00 5.00 0.00 5.00 0.00

    33 Jaka Purwanta Environmental Specialist - 6 0.00 0.00 0.00 0.00 0.00

    34 Arief Setianto MEP Specialist - 1 0.00 0.00 0.00 0.00 0.00

    35 Muhamad Habibi MEP Specialist - 2 0.00 0.00 0.00 0.00 0.00

    36 Agus Suprajitno MEP Specialist - 3 5.00 4.87 0.00 4.87 0.13

    37 Budi Sukoco MEP Specialist - 4 0.00 0.00 0.00 0.00 0.00

    38 Dedi Nugroho MEP Specialist - 5 0.00 0.00 0.00 0.00 0.00

    39 Luqman Assaffat MEP Specialist - 6 0.00 0.00 0.00 0.00 0.00

    40 Mochamad Subchan Mauludin MEP Specialist - 7 0.00 0.00 0.00 0.00 0.00

    41 Muh. Amin MEP Specialist - 8 0.00 0.00 0.00 0.00 0.00

    42 Victor Anggita Pratama MEP Specialist - 9 0.00 0.00 0.00 0.00 0.00

    43 Riyanto Ampulembang MEP Specialist - 10 0.00 0.00 0.00 0.00 0.00

    44 Andi Purnomo MEP Specialist - 11 0.00 0.00 0.00 0.00 0.00

    45 Hendri Sukma MEP Specialist - 12 0.00 0.00 0.00 0.00 0.00

    46 Judi Sujanto Safeguard Specialist - 1 0.00 0.00 0.00 0.00 0.00

    47 Indra Kurniawan Safeguard Specialist - 2 0.00 0.00 0.00 0.00 0.00

    48 Edy Sulistyanto Safeguard Specialist - 3 0.00 0.00 0.00 0.00 0.00

    49 Budhiarto Safeguard Assitant - 1 0.00 0.00 0.00 0.00 0.00

    50 Wisnu Safeguard Assitant - 2 0.00 0.00 0.00 0.00 0.00

    51 Ibnu Hamka Safeguard Assitant - 3 0.00 0.00 0.00 0.00 0.00

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Ali Abdullah Civil Engineering - 1 7.00 5.00 0.00 5.00 2.00

    2 Totok Haricahyono Civil Engineering - 2 5.00 5.00 0.00 5.00 0.00

    3 Helmi Undju Civil Engineering - 3 5.00 5.00 0.00 5.00 0.00

    4 Estiwo Kusumaningtyas Environmental Specialist - 1 7.00 5.00 0.00 5.00 2.00

    5 Soejanti Environmental Specialist - 2 5.00 5.00 0.00 5.00 0.00

    6 Julistyorini Environmental Specialist - 3 5.00 5.00 0.00 5.00 0.00

    7 Rizal Ibra MEP Specialist - 1 0.00 0.00 0.00 0.00 0.00

    8 Arif Utama MEP Specialist - 2 0.00 0.00 0.00 0.00 0.00

    9 Sarifudin MEP Specialist - 3 0.00 0.00 0.00 0.00 0.00

    II. PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 804,000,000 0 0 0 804,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    1 Miranti Sani / Totok D.Kuryanto Koordinator 4.00 0.00 0.00 0.00 4.00

    2 Ansar Infrastructure Specialist 2.00 0.00 0.00 0.00 2.00

    3 Akbar Nooriyan Civil Engineering/Architect - 1 0.00 0.00 0.00 0.00 0.00

    4 Agus Riyanto Civil Engineering/Architect - 2 0.00 0.00 0.00 0.00 0.00

    5 Djazuli Hasyim MEP 0.00 0.00 0.00 0.00 0.00

    b. Planning for Rehabilitation of UNDATA Hospital (Phase 1b)

    1 Ahwar Infrastructure Specialist 3.00 0.00 0.00 0.00 3.00

    2 Fahri Civil Engineering / Architect - 1 3.00 0.00 0.00 0.00 3.00

    3 Anhar Civil Engineering / Architect - 2 3.00 0.00 0.00 0.00 3.00

    4 Ketut Julianto MEP - 1 3.00 0.00 0.00 0.00 3.00

    5 To Be Name MEP - 2 3.00 0.00 0.00 0.00 3.00

    c. Planning for Rehabilitation of ANUTAPURA Hospital (Phase 1b)

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    1 Iswan Saba Infrastructure Specialist 3.00 0.00 0.00 0.00 3.00

    2 Farid N. Pettajama Civil Engineering / Architect - 1 3.00 0.00 0.00 0.00 3.00

    3 Fandi Rahmat Civil Engineering / Architect - 2 3.00 0.00 0.00 0.00 3.00

    4 Muhammad Rifat MEP - 1 3.00 0.00 0.00 0.00 3.00

    5 To Be Name MEP - 2 3.00 0.00 0.00 0.00 3.00

    III. 1,300,000,000 0 0 0 1,300,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    1 Archie Ariando Coordinator 5.00 0.00 0.00 0.00 5.00

    2 Muh. Zulkarnain / Irwan Fajriar Infrastructure Specialist 2.00 0.00 0.00 0.00 2.00

    3 Okto Sofyan / Dion Madyananta Civil Engineering/Architect -1 2.00 0.00 0.00 0.00 2.00

    4 Sonya Sonitha Civil Engineering/Architect -2 2.00 0.00 0.00 0.00 2.00

    5 Sunardi Civil Engineering/Architect -3 2.00 0.00 0.00 0.00 2.00

    6 Roni G. S. / Subagio Waluyo MEP 2.00 0.00 0.00 0.00 2.00

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    1 Irwan Fajriar Infrastructure Specialist - 1 2.00 0.00 0.00 0.00 2.00

    2 Dion Madyananta Civil Engineering/Architect - 1 2.00 0.00 0.00 0.00 2.00

    3 Subagiyo Civil Engineering/Architect - 2 2.00 0.00 0.00 0.00 2.00

    4 Anugerah Perdana Civil Engineering/Architect - 3 2.00 0.00 0.00 0.00 2.00

    5 Subagio Waluyo MEP 2.00 0.00 0.00 0.00 2.00

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 Akhmad Dofir Infrastructure Spcialist 3.00 0.00 0.00 0.00 3.00

    2 Atiek Untarti Civil Engineer/Architect - 1 3.00 0.00 0.00 0.00 3.00

    3 Harry Mufrizon Civil Engineer/Architect - 2 3.00 0.00 0.00 0.00 3.00

    4 Dwianto Rasisto Civil Engineer/Architect - 3 3.00 0.00 0.00 0.00 3.00

    5 Hendri Sukma MEP 3.00 0.00 0.00 0.00 3.00

    d. Planning for Multifunction Building of Tadulako University

    1 Sony Hartaman Coordinator 3.00 0.00 0.00 0.00 3.00

    2 Tobe Name Structure Engineer 3.00 0.00 0.00 0.00 3.00

    3 Tobe Name Architecture Engineer 3.00 0.00 0.00 0.00 3.00

    4 Tobe Name MEP Engineer 1 3.00 0.00 0.00 0.00 3.00

    5 Tobe Name MEP Engineer 2 3.00 0.00 0.00 0.00 3.00

    6 Tobe Name Quality Engineer 3.00 0.00 0.00 0.00 3.00

    IV. PLANNING FOR CONSTRUCTION OF 1600 UNITS HUNTAP IN DUYU AND POMBEWE 182,000,000 0 0 0 182,000,000

    a. Planning for Construction of 1600 units Huntap in Duyu and Pombewe

    1 Evita Sekarsari Coordinator 2.00 0.00 0.00 0.00 2.00

    2 Taufik Hidayat L Civil Engineer/Architect - 1 2.00 0.00 0.00 0.00 2.00

    3 Lukas Kompos MEP 2.00 0.00 0.00 0.00 2.00

    4 Joko Sudirman NS Geodetic Engineer 2.00 0.00 0.00 0.00 2.00

    V. PLANNING FOR CONSTRUCTION OF Kejati Building 471,000,000 0 0 0 471,000,000

    1 Tobe Name Coordinator 3.00 0.00 0.00 0.00 3.00

    2 Tobe Name BIM Engineer 3.00 0.00 0.00 0.00 3.00

    3 Tobe Name Civil Engineering 3.00 0.00 0.00 0.00 3.00

    4 Tobe Name Architect Engineer 3.00 0.00 0.00 0.00 3.00

    5 Tobe Name MEP Engineer 1 3.00 0.00 0.00 0.00 3.00

    6 Tobe Name MEP Engineer 2 3.00 0.00 0.00 0.00 3.00

    7 Tobe Name Quality Engineer 3.00 0.00 0.00 0.00 3.00

    VI. PLANNING FOR LANDSCAPE OF BPKP BUILDING 88,000,000 0 0 0 88,000,000

    1 Tobe Name Civil Engineer 1.00 0.00 0.00 0.00 1.00

    2 Tobe Name Landscape Engineering 1.00 0.00 0.00 0.00 1.00

    3 Tobe Name Architecture Engineer 1.00 0.00 0.00 0.00 1.00

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO

    UNIVERSITY

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    4 Tobe Name MEP Engineer 1.00 0.00 0.00 0.00 1.00

    VII. 176,000,000 0 0 0 176,000,000

    1 Ali Abdullah Civil Engineer -1 2.00 0.00 0 0.00 0.00 2.00

    2 Arief Widoseno Civil Engineer -2 2.00 0.00 0.00 0.00 2.00

    3 Tobe Name Environmental Engineer 2.00 0.00 0.00 0.00 2.00

    4 Tobe Name MEP Engineer 2.00 0.00 0.00 0.00 2.00

    VIII. PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 132,000,000 0 0 0 132,000,000

    1 Tobe Name Civil Engineer 2.00 0.00 0.00 0.00 2.00

    2 Tobe Name Environmental Specialist 2.00 0.00 0.00 0.00 2.00

    3 Tobe Name MEP Engineer 2.00 0.00 0.00 0.00 2.00

    IX. PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE 132,000,000 0 0 0 132,000,000

    1 Alamsyah Civil Engineer 2.00 0.00 0.00 0.00 2.00

    2 Asrullah Environmental Specialist 2.00 0.00 0.00 0.00 2.00

    3 Ramadhan MEP Engineer 2.00 0.00 0.00 0.00 2.00

    X. 88,000,000 0 0 0 88,000,000

    1 Muzakkir Civil Engineer 2.00 0.00 0.00 0.00 2.00

    2 Sarloca Environmental Engineer 2.00 0.00 0.00 0.00 2.00

    XI. PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha) 207,000,000 0 0 0 207,000,000

    1 Tobe Name Koordinator 3.00 0.00 0.00 0.00 3.00

    2 Hamka M. Noer Civil Engineer 3.00 0.00 0.00 0.00 3.00

    3 Ashudi Architecture Engineer 3.00 0.00 0.00 0.00 3.00

    XII. PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Talise (46 Ha) 132,000,000 0 0 0 132,000,000

    1 Arfan Karim Civil Engineer 3.00 0.00 0.00 0.00 3.00

    2 Alwarham Zakaria Architecture Engineer 3.00 0.00 0.00 0.00 3.00

    XIII. PLANNING OF LAND DEVELOPMENT FOR POMBEWE (41,86 Ha) 44,000,000 0 0 0 44,000,000

    1 Tobe Name Civil Engineer 1.00 0.00 0.00 0.00 1.00

    2 Tobe Name Architecture Engineer 1.00 0.00 0.00 0.00 1.00

    C. COST ESTIMATOR 2,850,000,000 933,879,972 20,000,000 953,879,972 1,896,120,028

    C-1 Felix Y. Bogar Cost Estimator Kota Manado 8.00 5.19 0.00 5.19 2.81

    C-2 Tobe Name Cost Estimator Kota Gorontalo 10.00 0.00 0.00 0.00 10.00

    C-3 Tobe Name Cost Estimator Kota Palu 0.00 0.00 0.00 0.00 0.00

    C-4 Tobe Name Cost Estimator Kota Makasar 6.00 0.00 0.00 0.00 6.00

    C-5 Ummu Kalsum Cost Estimator Kabupten Gowa 12.00 10.60 0.00 10.60 1.40

    C-6 Muhammad Basri Cost Estimator Kota Palopo 14.00 6.00 2.00 8.00 6.00

    C-7 Tobe Name Cost Estimator Kota Pare-Pare 10.00 0.00 0.00 0.00 10.00

    C-8 Rijal Ansaputra Cost Estimator Kota Kendari 10.00 7.63 0.00 7.63 2.37

    C-9 Tobe Name Cost Estimator Kabupaten Kolaka 10.00 0.00 0.00 0.00 10.00

    C-10 Tobe Name Cost Estimator Kota Tual 8.00 0.00 0.00 0.00 8.00

    C-11 Tobe Name Cost Estimator Kota Ambon 10.00 0.00 0.00 0.00 10.00

    C-12 Tobe Name Cost Estimator Kota Ternate 10.00 0.00 0.00 0.00 10.00

    C-13 Murdasal, ST Cost Estimator Kota Sorong 10.00 5.78 0.00 5.78 4.22

    C-14 Laorens Michell Ngutra Cost Estimator Kota Jayapura 10.00 4.65 0.00 4.65 5.35

    I 670,000,000 535,333,333 0 535,333,333 134,666,667

    a. Penyusunan Masterplan Kawasan & DED Infrastruktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Muhammad Mirza Cost Estimator - 1 5.00 4.87 0.00 4.87 0.13

    2 Arif Rahman Cost Estimator - 2 5.00 4.87 0.00 4.87 0.13

    3 Muhammad Afandy Radjab Cost Estimator - 3 0.00 0.00 0.00 0.00 0.00

    MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI

    TENGAH

    PLANNING OF HOUSE WATER CONNECTION (SR) FOR 1.800 UNITS HOUSES IN TONDO-1

    PLANNING FOR CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN

    POMBEWE (SPAM POMBEWE)

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    4 Irfan Cost Estimator - 4 5.00 4.87 0.00 4.87 0.13

    5 Dwi Wahyuningsih Cost Estimator - 5 5.00 4.87 0.00 4.87 0.13

    6 Puswanto Cost Estimator - 6 5.00 4.87 0.00 4.87 0.13

    7 Sulfiani S. Pangeja Cost Estimator - 7 5.00 4.87 0.00 4.87 0.13

    8 Imam Bohari Cost Estimator - 8 2.00 0.00 0.00 0.00 2.00

    9 Ardhy Budi W Cost Estimator - 9 2.00 0.00 0.00 0.00 2.00

    10 Haryanti Cost Estimator - 10 2.00 0.00 0.00 0.00 2.00

    11 Dian Nugrah Cost Estimator - 11 2.00 0.00 0.00 0.00 2.00

    12 Andre Pamuji Wilantolo Cost Estimator - 12 0.00 0.00 0.00 0.00 0.00

    13 Andi Ismanto Cost Estimator - 13 0.00 0.00 0.00 0.00 0.00

    14 Sugiyarto Cost Estimator - 14 0.00 0.00 0.00 0.00 0.00

    15 Ari Dirgantara Cost Estimator - 15 0.00 0.00 0.00 0.00 0.00

    16 Panji Agus Purwantono Cost Estimator - 16 0.00 0.00 0.00 0.00 0.00

    17 Saiful Afifudin Cost Estimator - 17 0.00 0.00 0.00 0.00 0.00

    18 Nurhcholis Laminula Cost Estimator - 18 0.00 0.00 0.00 0.00 0.00

    19 Muhamad Syarif Cost Estimator - 19 0.00 0.00 0.00 0.00 0.00

    20 Datumuseng Sabdullah Cost Estimator - 20 0.00 0.00 0.00 0.00 0.00

    21 Puguh C. Nugroho Cost Estimator - 21 0.00 0.00 0.00 0.00 0.00

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Aprianto M. Alwi Cost Estimator - 1 5.00 4.87 0.00 4.87 0.13

    2 Andre Pamuji Wilantomo Cost Estimator - 2 5.00 4.87 0.00 4.87 0.13

    3 Muh. Gunawan Cost Estimator - 3 5.00 4.87 0.00 4.87 0.13

    4 M. Afandy Radjab Cost Estimator - 4 5.00 4.87 0.00 4.87 0.13

    5 Andi Ismanto Cost Estimator - 5 5.00 4.87 0.00 4.87 0.13

    6 Arief Widoseno Cost Estimator - 6 2.00 0.00 0.00 0.00 2.00

    7 Tobe Name Cost Estimator - 7 2.00 0.00 0.00 0.00 2.00

    II PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 120,000,000 0 0 0 120,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    b. Planning for Rehabilitation of UNDATA Hospital Phase 1b

    1 Fenny Cost Estimator - 1 3.00 0.00 0.00 0.00 3.00

    2 To be name Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    c. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    1 Arief Romansyah Cost Estimator - 1 3.00 0.00 0.00 0.00 3.00

    2 To be name Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    III 450,000,000 0 0 0 450,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    1 To be name Cost Estimator - 1 3.00 0.00 0.00 0.00 3.00

    2 To be name Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    3 To be name Cost Estimator - 3 3.00 0.00 0.00 0.00 3.00

    4 To be name Cost Estimator - 4 3.00 0.00 0.00 0.00 3.00

    5 To be name Cost Estimator - 5 3.00 0.00 0.00 0.00 3.00

    6 To be name Cost Estimator - 6 3.00 0.00 0.00 0.00 3.00

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 To be name Cost Estimator - 1 3.00 0.00 0.00 0.00 3.00

    2 To be name Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    3 To be name Cost Estimator - 3 3.00 0.00 0.00 0.00 3.00

    4 To be name Cost Estimator - 4 3.00 0.00 0.00 0.00 3.00

    5 To be name Cost Estimator - 5 3.00 0.00 0.00 0.00 3.00

    6 To be name Cost Estimator - 6 3.00 0.00 0.00 0.00 3.00

    d. Planning for Multifunction Building of Tadulako University

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO

    UNIVERSITY

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    1 Cucu Cost Estimator - 1 3.00 0.00 0.00 0.00 3.00

    2 Iman Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    3 Shandy Cost Estimator - 3 3.00 0.00 0.00 0.00 3.00

    IV 40,000,000 0 0 0 40,000,000

    a. Planning for Construction of 1.600 units Huntap in Duyu, Pombewe and Satelit

    1 Eko Hardiono Cost Estimator - 1 2.00 0.00 0.00 0.00 2.00

    2 Tobe Name Cost Estimator - 2 2.00 0.00 0.00 0.00 2.00

    V. PLANNING FOR CONSTRUCTION OF KEJATI BUILDING 60,000,000 0 0 0 60,000,000

    1 Shandy Cost Estimator - 1 3.00 0.00 0.00 0.00 3.00

    2 To be name Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    V. PLANNING FOR LANDSCAPE OF BPKP BUILDING 10,000,000 0 0 0 10,000,000

    1 Cucu Cost Estimator 1.00 0.00 0.00 0.00 1.00

    VI 20,000,000 0 0 0 20,000,000

    1 To be name Cost Estimator 2.00 0.00 0 0.00 0.00 2.00

    VII. PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 14,1 Ha 20,000,000 0 0 0 20,000,000

    1 To be name Cost Estimator 2.00 0.00 0.00 0 0.00 2.00

    VIII. PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE 20,000,000 0 0 0 20,000,000

    1 Imam Bohari Cost Estimator 2.00 0.00 0.00 0.00 0 2.00 20,000,000

    IX 20,000,000 0 0 0 20,000,000

    1 Andi Faried M. Cost Estimator 2.00 0.00 0.00 0.00 2.00

    X. 60,000,000 0 0 0 60,000,000

    1 Ahmad Fandhi Cost Estimator - 1 3.00 0.00 0 0.00 0.00 3.00

    2 Aulia Annisa Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    XI. 60,000,000 0 0 0 60,000,000

    1 Nuralim Hartih Cost Estimator - 1 3.00 0.00 0.00 0.00 3.00

    2 Atik Verawaty Cost Estimator - 2 3.00 0.00 0.00 0.00 3.00

    XII. 20,000,000 0 0 0 20,000,000

    1 Aulia Annisa Cost Estimator - 1 1.00 0.00 0.00 0.00 1.00

    2 Atik Verawaty Cost Estimator - 2 1.00 0.00 0.00 0.00 1.00

    D. INSPECTOR 1,440,000,000 339,241,935 108,000,000 447,241,935 992,758,065

    D-1 Tobe Name Inspector Kota Manado 10.00 0.00 0.00 0.00 10.00

    D-2 Muis Manyoe Inspector Kota Gorontalo 12.00 7.33 2.00 9.33 2.67

    D-3 Tobe Name Inspector Kota Palu 0.00 0.00 0.00 0.00 0.00

    D-4 Tobe Name Inspector Kota Makasar 6.00 0.00 0.00 0.00 6.00

    D-5 Tobe Name Inspector Kabupten Gowa 12.00 0.00 0.00 0.00 12.00

    D-6 Tobe Name Inspector Kota Palopo 12.00 0.00 0.00 0.00 12.00

    D-7 A. Ady Darmawan Inspector Kota Pare-Pare 12.00 0.39 2.00 2.39 9.61

    D-8 Rijalansa Putra/Sadikin Inspector Kota Kendari -1 12.00 7.30 2.00 9.30 2.70

    Mahmud Rivai Inspector Kota Kendari -2 12.00 7.94 2.00 9.94 2.06

    D-9 M. Ramli Ngguro Inspector Kabupaten Kolaka 12.00 9.00 2.00 11.00 1.00

    D-10 Tobe Name Inspector Kota Tual 12.00 0.00 0.00 0.00 12.00

    D-11 Tobe Name Inspector Kota Ambon 12.00 0.00 0.00 0.00 12.00

    D-12 Tobe Name Inspector Kota Ternate 12.00 0.00 0.00 0.00 12.00

    D-13 Tobe Name Inspector Kota Sorong 12.00 0.00 0.00 0.00 12.00

    PLANNING FOR CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN

    POMBEWE

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha)

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha)

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TALISE

    PLANNING FOR CONSTRUCTION OF 1.600 UNITS HUNTAP IN DUYU, POMBEWE AND SATELIT

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR POMEWE (54 Ha)

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    D-14 M. Iqbal, AMD Inspector Kota Jayapura 12.00 5.73 2.00 7.73 4.27

    E. SURVEYOR 2,000,000,000 503,216,072 62,133,333 565,349,406 1,434,650,594

    E-1 Tobe Name Surveyor Kota Manado 2.00 0.00 0.00 0.00 2.00

    E-2 Judin Lahab Surveyor Kota Gorontalo 10.00 7.33 2.00 9.33 0.67

    E-3 Tobe Name Surveyor Kota Palu 0.00 0.00 0.00 0.00 0.00

    E-4 Tobe Name Surveyor Kota Makasar 6.00 0.00 0.00 0.00 6.00

    E-5 Taufan Mahyudin Surveyor Kabupten Gowa 10.00 1.60 0.00 1.60 8.40

    E-6 Tobe Name Surveyor Kota Palopo 8.00 0.00 0.00 0.00 8.00

    E-7 Muh. Zulfahmi AR S. Surveyor Kota Pare-Pare 10.00 0.39 2.00 2.39 7.61

    E-8 Ading Suryanto Surveyor Kota Kendari -1 10.00 10.00 0.00 10.00 0.00

    Ading Suryanto Surveyor Kota Kendari -2 10.00 1.13 0.00 1.13 8.87

    E-9 Rabbul Izzat H. Surveyor Kabupaten Kolaka 12.00 9.00 1.00 10.00 2.00

    E-10 Agustinus C. L./Taufik Hidayat Surveyor Kota Tual 8.00 3.80 0.77 4.57 3.43

    E-11 Tobe Name Surveyor Kota Ambon 10.00 0.00 0.00 0.00 10.00

    E-12 Tobe Name Surveyor Kota Ternate 10.00 0.00 0.00 0.00 10.00

    E-13 Tobe Name Surveyor Kota Sorong 10.00 0.00 0.00 0.00 10.00

    E-14 Muh. Iqbal / Jean Alan Bayao Surveyor Kota Jayapura 12.00 9.65 2.00 11.65 0.35

    I. 224,000,000 160,000,000 0 160,000,000 64,000,000

    a. Penyusunan Masterplan Kawasan & DED Infrastruktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Herman Surveyor - 1 2.00 0.00 0.00 0.00 2.00

    2 Muh. Wahyullah Tahir Surveyor - 2 2.00 0.00 0.00 0.00 2.00

    3 Muh. Aksan Surveyor - 3 2.00 0.00 0.00 0.00 2.00

    4 Muh. Fajrin Surveyor - 4 2.00 0.00 0.00 0.00 2.00

    17 Bekti Astuti Surveyor - 17 5.00 5.00 0.00 5.00 0.00

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Darma Noldi Mariso Surveyor - 1 5.00 5.00 0.00 5.00 0.00

    2 Amiruddin Surveyor - 2 5.00 5.00 0.00 5.00 0.00

    3 M. Hadi Virgianto Akbar Surveyor - 3 5.00 5.00 0.00 5.00 0.00

    II. PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 192,000,000 0 0 0 192,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    1 Tobe Name Surveyor - 1 2.00 0.00 0.00 0.00 2.00

    2 Tobe Name Surveyor - 2 2.00 0.00 0.00 0.00 2.00

    3 Tobe Name Surveyor - 3 2.00 0.00 0.00 0.00 2.00

    4 Tobe Name Surveyor - 4 2.00 0.00 0.00 0.00 2.00

    b. Planning for Rehabilitation of UNDATA Hospital Phase 1b

    1 Sugeng Mulyono Surveyor - 1 2.00 0.00 0.00 0.00 2.00

    2 Tri Sucipta Adi K Surveyor - 2 2.00 0.00 0.00 0.00 2.00

    3 Tobe Name Surveyor - 3 2.00 0.00 0.00 0.00 2.00

    4 Tobe Name Surveyor - 4 2.00 0.00 0.00 0.00 2.00

    c. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    1 Muhammad Rahmad Surveyor - 1 2.00 0.00 0.00 0.00 2.00

    2 Try Sutrasol Surveyor - 2 2.00 0.00 0.00 0.00 2.00

    3 Tobe Name Surveyor - 3 2.00 0.00 0.00 0.00 2.00

    4 Tobe Name Surveyor - 4 2.00 0.00 0.00 0.00 2.00

    III. 368,000,000 0 0 0 368,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    1 Trisno Yuwono Surveyor - 1 2.00 0.00 0.00 0.00 2.00

    2 Rendi Surveyor - 2 2.00 0.00 0.00 0.00 2.00

    3 Andi Toto Surveyor - 3 2.00 0.00 0.00 0.00 2.00

    4 Anggihtyar Surveyor - 4 2.00 0.00 0.00 0.00 2.00

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO

    UNIVERSITY

    MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI

    TENGAH

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    5 Ardiansah Badja Surveyor - 5 2.00 0.00 0.00 0.00 2.00

    6 Ayub Surveyor - 6 2.00 0.00 0.00 0.00 2.00

    7 Candra Nugraha Surveyor - 7 2.00 0.00 0.00 0.00 2.00

    8 Irwan Wungguli Surveyor - 8 2.00 0.00 0.00 0.00 2.00

    9 M Yusuf Amd Surveyor - 9 2.00 0.00 0.00 0.00 2.00

    10 Ketrin Surveyor - 10 2.00 0.00 0.00 0.00 2.00

    11 Sasmito YP ST Surveyor - 11 2.00 0.00 0.00 0.00 2.00

    12 Isra Asri Surveyor - 12 2.00 0.00 0.00 0.00 2.00

    13 Kamrus Ah T Surveyor - 13 2.00 0.00 0.00 0.00 2.00

    14 Ahmad Abdul Haq Surveyor - 14 2.00 0.00 0.00 0.00 2.00

    15 Fardi ST Surveyor - 15 2.00 0.00 0.00 0.00 2.00

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 Tobe Name Surveyor - 1 2.00 0.00 0.00 0.00 2.00

    2 Tobe Name Surveyor - 2 2.00 0.00 0.00 0.00 2.00

    3 Tobe Name Surveyor - 3 2.00 0.00 0.00 0.00 2.00

    4 Tobe Name Surveyor - 4 2.00 0.00 0.00 0.00 2.00

    5 Tobe Name Surveyor - 5 2.00 0.00 0.00 0.00 2.00

    6 Tobe Name Surveyor - 6 2.00 0.00 0.00 0.00 2.00

    d. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    1 Tobe Name Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Tobe Name Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    3 Tobe Name Surveyor - 3 1.00 0.00 0.00 0.00 1.00

    4 Tobe Name Surveyor - 4 1.00 0.00 0.00 0.00 1.00

    IV. 32,000,000 0 0 0 32,000,000

    a. Planning for Construction of 630 units Huntap in Duyu, Pombewe and Satelit

    1 Tobe Name Surveyor - 1 2.00 0.00 0.00 0.00 2.00

    2 Tobe Name Surveyor - 2 2.00 0.00 0.00 0.00 2.00

    V. 32,000,000 0 0 0 32,000,000

    1 Tobe Name Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Tobe Name Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    3 Tobe Name Surveyor - 3 1.00 0.00 0.00 0.00 1.00

    4 Tobe Name Surveyor - 4 1.00 0.00 0.00 0.00 1.00

    VI. 8,000,000 0 0 0 8,000,000

    1 Tobe Name Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    VII. 24,000,000 0 0 0 24,000,000

    1 Ardhy Budhi Widyarta Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Herman Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    3 Tobe Name Surveyor - 3 1.00 0.00 0.00 0.00 1.00

    VIII. 16,000,000 0 0 0 16,000,000

    1 Tobe Name Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Tobe Name Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    IX. 16,000,000 0 0 0 16,000,000

    1 Muh. Wahyullah Taher Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Muh. Aksan Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    X. 16,000,000 0 0 0 16,000,000

    1 Tobe Name Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Tobe Name Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    PLANNING FOR CONSTRUCTION OF 1600 UNITS HUNTAP IN DUYU, POMBEWE AND SATELIT

    PLANNING FOR CONSTRUCTION OF KEJATI Building

    PLANNING FOR LANDSCAPE OF BPKP Building

    PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 14,1 Ha

    PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE

    PLANNING OF CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN POMBEWE

    PLANNING OF HOUSE WATER CONNECTION (SR) FOR 1.800 UNITS HOUSES IN TONDO-1

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    XI. 16,000,000 0 0 0 16,000,000

    1 Ardhy Budhi Widyarta Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Herman Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    XII. 16,000,000 0 0 0 16,000,000

    1 Muh. Wahyullah Taher Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Muh. Aksan Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    XIII. 16,000,000 0 0 0 16,000,000

    1 Ardhy Budhi Widyarta Surveyor - 1 1.00 0.00 0.00 0.00 1.00

    2 Herman Surveyor - 2 1.00 0.00 0.00 0.00 1.00

    F. DRAFTER 1,420,000,000 638,264,718 3,833,333 642,098,051 777,901,949

    F-1 Abd. Rafli Rifai G. Drafter Kota Manado 10.00 8.00 0.00 8.00 2.00

    F-2 Tobe Name Drafter Kota Gorontalo 8.00 0.00 0.00 0.00 8.00

    F-3 Tobe Name Drafter Kota Palu 0.00 0.00 0.00 0.00 0.00

    F-4 Ardie Adyana Yusuf Drafter Kota Makasar 9.00 1.45 0.00 1.45 7.55

    F-5 Agus Syahnuarto Drafter Kabupten Gowa 11.00 10.60 0.00 10.60 0.40

    F-6 Muh. Natsir / Muh. Zulfahmi Amril Drafter Kota Palopo 10.00 9.90 0.00 9.90 0.10

    F-7Rusman Jamaluddin /

    M. Zulfahmi AmrilDrafter Kota Pare-Pare 10.00 9.03 0.00 9.03 0.97

    F-8 Ardan Fitra Wardana Drafter Kota Kendari 10.00 8.63 0.00 8.63 1.37

    F-9 Gunawansyah Drafter Kabupaten Kolaka 10.00 10.00 0.00 10.00 0.00

    F-10 Rio Dafcar Efruan/Muzakir Drafter Kota Tual 10.00 3.80 0.77 4.57 5.43

    F-11 Tobe Name Drafter Kota Ambon 10.00 0.00 0.00 0.00 10.00

    F-12 Ibnu Ashar Ganda Drafter Kota Ternate 12.00 11.00 0.00 11.00 1.00

    F-13 Surianti, ST Drafter Kota Sorong 10.00 5.78 0.00 5.78 4.22

    F-14 Muhammad Rifai Drafter Kota Jayapura 10.00 5.65 0.00 5.65 4.35

    I. 285,000,000 219,000,000 0 219,000,000 66,000,000

    a. Penyusunan Master Plan dan DED Infrastuktur Permukiman

    (SPAL, SPAM, Drainase, Jalan Lingkungan, TPS 3R, Sarana RTP, Kesehatan, Pendidikan, Ibadah)

    1 Aulia Annisa Drafter - 1 2.00 0.00 0.00 0.00 2.00

    2 Arief Hidayat Drafter - 2 2.00 0.00 0.00 0.00 2.00

    3 Junaedi Drafter - 3 2.00 0.00 0.00 0.00 2.00

    4 Fitri Dwi Indarti Drafter - 4 2.00 0.00 0.00 0.00 2.00

    5 Wafa Maulana Akmal Drafter - 16 5.00 4.87 0.00 4.87 0.13

    6 Arfan Hasanudin Drafter - 21 5.00 4.87 0.00 4.87 0.13

    7 Rini Rizky Drafter - 22 5.00 4.87 0.00 4.87 0.13

    8 Igma Ade Drafter - 23 5.00 4.87 0.00 4.87 0.13

    9 Agus Prawito Drafter - 24 5.00 4.87 0.00 4.87 0.13

    10 Hastomo Drafter - 25 5.00 4.87 0.00 4.87 0.13

    b. Penyusunan DED Air Minum Perpipaan (dari Intake sd Reservoar Kawasan)

    1 Moh. Affandi Drafter - 2 5.00 4.87 0.00 4.87 0.13

    2 Afandi Didik Nur Ichsan Drafter - 3 5.00 4.87 0.00 4.87 0.13

    3 Akhmad Fajri Syahfitra Drafter - 4 5.00 4.87 0.00 4.87 0.13

    4 Paramudita Yudha Pratama Drafter - 5 2.00 0.00 0.00 0.00 2.00

    5 Kurniawan Krisna Afandi Drafter - 6 2.00 0.00 0.00 0.00 2.00

    II. PLANNING FOR REHABILITATION OF HOSPITAL AND HEALTH FACILITIES 60,000,000 0 0 0 60,000,000

    a. Planning (SID) for Rehabilitation of Hospital and Health Facilities

    b. Planning for Rehabilitation of UNDATA Hospital Phase 1b

    Najamuddin Drafter - 1 3.00 0.00 0.00 0.00 3.00

    Ahmad Raditya Drafter - 2 3.00 0.00 0.00 0.00 3.00

    MENDUKUNG KEGIATAN TANGGAP DARURAT, REHAB & REKON PASCA BENCANA DI SULAWESI

    TENGAH

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR POMBEWE (54 Ha)

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Talise

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha)

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    c. Planning for Rehabilitation of ANUTAPURA Hospital Phase 1b

    Rizky Arif Rahman Ilyas Drafter - 1 3.00 0.00 0.00 0.00 3.00

    Muhardin Drafter - 2 3.00 0.00 0.00 0.00 3.00

    III. 195,000,000 0 0 0 195,000,000

    a. Planning (SID) for Rehabilitation and Reconstruction of Elementary Education Facilities

    b. Planning for Rehabilitation and Reconstruction of Elementary Education Facilities (Phase I & II)

    1 To be name Drafter - 1 2.00 0.00 0.00 0.00 2.00

    2 To be name Drafter - 2 2.00 0.00 0.00 0.00 2.00

    3 To be name Drafter - 3 2.00 0.00 0.00 0.00 2.00

    4 To be name Drafter - 4 2.00 0.00 0.00 0.00 2.00

    5 To be name Drafter - 5 2.00 0.00 0.00 0.00 2.00

    6 To be name Drafter - 6 2.00 0.00 0.00 0.00 2.00

    c. Planning for Rehabilitation of Tadulako University (Phase 1b)

    1 To Be Name Drafter - 1 3.00 0.00 0.00 0.00 3.00

    2 To Be Name Drafter - 2 3.00 0.00 0.00 0.00 3.00

    3 To Be Name Drafter - 3 3.00 0.00 0.00 0.00 3.00

    4 To Be Name Drafter - 4 3.00 0.00 0.00 0.00 3.00

    5 To Be Name Drafter - 5 3.00 0.00 0.00 0.00 3.00

    6 To Be Name Drafter - 6 3.00 0.00 0.00 0.00 3.00

    d. Planning for Multifunction Building of Tadulako University

    1 To Be Name Drafter - 1 3.00 0.00 0.00 0.00 3.00

    2 To Be Name Drafter - 2 3.00 0.00 0.00 0.00 3.00

    3 To Be Name Drafter - 3 3.00 0.00 0.00 0.00 3.00

    IV. 30,000,000 0 0 0 30,000,000

    a. Planning for Construction of 630 units Huntap in Duyu, Pombewe and Satelit

    1 Gina Agustina Drafter - 1 2.00 0.00 0.00 0.00 2.00

    2 Dian Trisnadi Drafter - 2 2.00 0.00 0.00 0.00 2.00

    3 Tri Munawan Drafter - 3 2.00 0.00 0.00 0.00 2.00

    V. 0 0 0 45,000,000

    1 Tobe Name Drafter - 1 3.00 0.00 0.00 0.00 3.00

    2 Tobe Name Drafter - 2 3.00 0.00 0.00 0.00 3.00

    3 Tobe Name Drafter - 3 3.00 0.00 0.00 0.00 3.00

    VI. 5,000,000 0 0 0 5,000,000

    1 Tobe Name Drafter - 1 1.00 0.00 0.00 0.00 1.00

    VII. 20,000,000 0 0 0

    1 Tobe Name Drafter - 1 2.00 0.00 0.00 0.00 2.00

    2 Tobe Name Drafter - 2 2.00 0.00 0.00 0.00 2.00

    VIII. 20,000,000 0 0 0 20,000,000

    1 Tobe Name Drafter - 1 2.00 0.00 0.00 0.00 2.00

    2 Tobe Name Drafter - 2 2.00 0.00 0.00 0.00 2.00

    IX. 20,000,000 0 0 0 20,000,000

    1 Budiman Drafter - 1 2.00 0.00 0.00 0.00 2.00

    2 M. Adrian Drafter - 2 2.00 0.00 0.00 0.00 2.00

    X. 20,000,000 0 0 0 20,000,000

    1 Adriansyah Drafter - 1 2.00 0.00 0.00 0.00 2.00

    PLANNING FOR REHABILITATION OF ELEMENTARY EDUCATION FACILITES AND TADULAKO

    UNIVERSITY

    PLANNING FOR CONSTRUCTION OF 630 UNITS HUNTAP IN DUYU, POMBEWE AND SATELIT

    PLANNING FOR CONSTRUCTION OF KEJATI Building

    PLANNING OF SPAM FOR HUNTAP BALAROA SATELITE

    PLANNING FOR LANSEKAP OF BPKP Building

    PLANNING OF HOUSE WATER CONNECTION (SR) FOR 1.800 UNITS HOUSES IN TONDO-1

    PLANNING OF CONSTRUCTION OF INTAKES, TRANSMISSION PIPES AND RESERVOIRS IN POMBEWE

    PLANNING OF SPAM FOR HUNTAP DUYU (230 units) 14,1 Ha

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    2 Tobe Name Drafter - 2 2.00 0.00 0.00 0.00 2.00

    XI. 30,000,000 0 0 0 30,000,000

    1 Junaedi Drafter - 1 3.00 0.00 0.00 0.00 3.00

    2 Muh Aswin Drafter - 2 3.00 0.00 0.00 0.00 3.00

    XII. 30,000,000 0 0 0 30,000,000

    1 Haryanti Drafter - 1 3.00 0.00 0.00 0.00 3.00

    2 Dian Nugrah Putra Drafter - 2 3.00 0.00 0.00 0.00 3.00

    XIII. 10,000,000 0 0 0 10,000,000

    1 Tobe Name Drafter - 1 1.00 0.00 0.00 0.00 1.00

    2 Tobe Name Drafter - 2 1.00 0.00 0.00 0.00 1.00

    24,857,000,000 11,475,476,109 882,566,667 12,358,042,775 12,498,957,225

    1.2. SUPPORTING STAFF

    CONTRACT AMANDEMENT -03

    MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    1.2. SUPPORTING STAFF 2,758,500,000 1,357,770,620 166,583,333 1,524,353,953 1,234,146,047

    a. Regional Team South Sulawesi Province 756,000,000 531,333,333 62,750,000 594,083,333 161,916,667

    1 Ashar Office Manager 24.00 17.00 2.00 19.00 5.00

    2 Muhammad Sasli Tabrani Secretary 24.00 17.00 2.00 19.00 5.00

    3 Nurmiati Computer Operator-1 24.00 17.00 2.00 19.00 5.00

    4 Rahmat Kurniawan / Riswan Computer Operator-2 24.00 16.67 2.00 18.67 5.33

    5 Asriyanti/ Iriyanie/Sri Rahayu Office Girl 24.00 17.00 1.90 18.90 5.10

    6 M. Rilwan/ J.B. Nuhung DG. Sila Security 24.00 16.00 2.00 18.00 6.00

    7 Nurfadianzah / Maskur Security 24.00 17.00 2.00 19.00 5.00

    b. City Level Office at 14 Kota/Kab 1,260,000,000 626,437,286 103,833,333 730,270,620 529,729,380

    1 Feybi I Batubuaja Secretary/Operator Computer Kota Manado 20.00 10.10 2.00 12.10 7.90

    2 Darmawaty Secretary/Operator Computer Kota Gorontalo 20.00 9.00 2.00 11.00 9.00

    3 To be name Secretary/Operator Computer Kota Palu 0.00 0.00 0.00 0.00 0.00

    4 Indah A. Purbani Secretary/Operator Computer Kota Makasar 12.00 1.50 0.00 1.50 10.50

    5 Magrifah Burhan Secretary/Operator Computer Kabupten Gowa 20.00 15.00 2.00 17.00 3.00

    6 Hatriansyah Harbi Secretary/Operator Computer Kota Palopo 20.00 15.00 2.00 17.00 3.00

    7 Andi DianTenrigangka Secretary/Operator Computer Kota Pare-Pare 20.00 15.00 2.00 17.00 3.00

    8 Suhardan Secretary/Operator Computer Kota Kendari 20.00 7.77 2.00 9.77 10.23

    9 Nursyamsu, SE Secretary/Operator Computer Kab. Kolaka 20.00 9.82 2.00 11.82 8.18

    10Ester K. R. / Martina S. S./

    M. Ichsan R. Secretary/Operator Computer Kota Tual 20.00 5.80 0.77 6.57 13.43

    11 Rino Papilaya Secretary/Operator Computer Kota Ambon 20.00 8.52 2.00 10.52 9.48

    12 Nur Daniah M. Said Secretary/Operator Computer Kota Ternate 20.00 10.00 2.00 12.00 8.00

    13 M. Akshar, S.Pg Secretary/Operator Computer Kota Sorong 20.00 10.78 2.00 12.78 7.22

    14 Fahri Egha Randang Secretary/Operator Computer Kota Jayapura 20.00 7.00 0.00 7.00 13.00

    c. CERC Activities 742,500,000 200,000,000 0 200,000,000 542,500,000

    1 Ana Wardhiyah/ Sugiono Secretary - 1 5.00 5.00 0.00 5.00 0.00

    2 Andi Farint Octaviani Secretary - 2 5.00 5.00 0.00 5.00 0.00

    3 Sugiono Secretary - 3 16.00 0.00 0.00 0.00 16.00

    4 Fadel Muhammad Secretary for Planning for Rehab of Hospital

    and Health Facilities 4.00 0.00 0.00 0.00 4.00

    5 Ketrin Secretary for Planning for Rehab of Elementary

    Education Facilities and Tadulako University 5.00 0.00 0.00 0.00 5.00

    6 Handoyo Secretary for Planning for Construction 630 units

    huntap in duyu, Pombewe and Satelit 2.00 0.00 0.00 0.00 2.00

    7 To be name Secretary for Multifunction Building of Tadulako

    University 3.00 0.00 0.00 0.00 3.00

    NO NAMA POSISIINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR TONDO 2 (65.31 Ha)

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Talise (42,51 Ha)

    PLANNING OF LAND CLEARING AND LAND DEVELOPMENT FOR Pombewe (54 Ha)

    Sub Total 1.1

  • MM RATE TOTAL MM TOTAL MM RATE TOTAL MM TOTAL RATE TOTAL

    INVOICE SAAT INI INVOICE S/D SAAT ININO

    SISA KONTRAKNAMA POSISI

    CONTRACT

    AMANDEMENT -03INVOICE LALU

    8 To be name Secretary for Construction of Kejati Building 3.00 0.00 0.00 0.00 3.00

    9 To be name Secretary for Landscape of BPKP Building 1.00 0.00 0.00 0.00 1.00

    10 To be name Secretary for Urgent Activity 6.00 0.00 0.00 0.00 6.00

    11 Susi Sutianah Computer Operator - 1 5.00 5.00 0.00 5.00 0.00

    12 Totok Widarto Computer Operator - 2 5.00 5.00 0.00 5.00 0.00

    13 Rahmi Mispun Computer Operator - 3 5.00 5.00 0.00 5.00 0.00

    14 Jamal Ismail Computer Operator - 4 5.00 5.00 0.00 5.00 0.00

    15 To be name Computer Operator - 5 0.00 0.00 0.00 0.00 0.00

    16 To be name Computer Operator - 6 0.00 0.00 0.00 0.00 0.00

    17 Aldilla Computer Operator for Planning for Rehab of Hospital and Health

    Facilities 4.00 0.00 0.00 0.00 4.00

    18 Neni Purwanti Computer Operator for Planning for Rehab of Hospital and Health

    Facilities 4.00 0.00 0.00 0.00 4.00

    19 Ferra Computer Operator for Planning for Rehab of Elementary Education

    Facilities and Tadulako University 5.00 0.00 0.00 0.00 5.00

    20 Ahmed Computer Operator for Planning for Rehab of Elementary Education

    Facilities and TadulakoUniversity 5.00 0.00 0.00 0.00 5.00

    21 To be name Computer Operator for Planning for Construction 630 units huntap in

    duyu, Pombewe and Satelit 2.00 0.00 0.00 0.00 2.00

    22 To be name Computer Operator for Planning for Construction 630 units huntap in

    duyu, Pombewe and Satelit 2.00 0.00 0.00 0.00 2.00

    23 To be name Computer Operator for Multifunction Building of Tadulako University 3.00 0.00 0.00 0.00 3.00

    24 To be name Computer Operator for Construction of Kejati Building 3.00 0.00 0.00 0.00 3.00

    25 To be name Computer Operator for Landscape of BPKP Building 1.00 0.00 0.00 0.00 1.00

    26 To be name Computer Operator for Urgent Activity 6.00 0.00 0.00 0.00 6.00

    27 Hasan/Misna Office Boy - 1 21.00 5.00 0.00 5.00 16.00

    28 Husein Office Boy - 2 5.00 5.00 0.00 5.00 0.00

    29 Siswadi Office Boy for Planning for Rehab of Hospital and Health Facilities 4.00 0.00 0.00 0.00 4.00

    30 Misna Office Boy for Planning for Rehab of Elementary Education Facilities

    and Tadulako University 5.00 0.00 0.00 0.00 5.00

    31 To be name Office Boy for Planning for Construction 630 units

    huntap in duyu, Pombewe and Satelit 2.00 0.00 0.00 0.00 2.00

    32 To be name Office Boy for Multifunction Building of Tadulako

    University 3.00 0.00 0.00 0.00 3.00

    33 To be name Office Boy for Construction of Kejati Building 3.00 0.00 0.00 0.00 3.00

    34 To be name Office Boy for Landscape of BPKP Building 1.00 0.00 0.00 0.00 1.00

    35 To be name Office Boy for Urgent Activity 6.00 0.00 0.00 0.00 6.00

    36 Slamet Security - 1 21.00 5.00 0.00 5.00 16.00

    37 Asmari Security - 2 5.00 5.00 0.00 5.00 0.00

    38 Roni Setiawan Security for Planning for Rehab of Hospital and Health Facilities 4.00 0.00 0.00 0.00 4.00

    39 To be name Security for Planning for Rehab of Elementary

    Education Facilities and Tadulako University 5.00 0.00 0.00 0.00 5.00

    40 To be name Security for Planning for Construction 630 units huntap in duyu,

    Pombewe and Satelit 2.00 0.00 0.00 0.00 2.00

    2,758,500,000 1,357,770,620 166,583,333 1,524,353,953 1,234,146,047

    27,615,500,000 12,833,246,728 1,049,150,000 13,882,396,728 13,733,103,272TOTAL REMUNERASI

    Sub Total 1.2

  • II. DIRECT REIMBURSABLE COST

    2.1. MOBILIZATION / DEMOBILIZATION

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.1.1. Reguler Team 92,200,000 3,966,940 5,081,033 9,047,973 83,152,027

    a Jakarta - Makasar ( Return ) 13 Trip 6 3,100,000 18,600,000 0 0 0.00 3,100,000 0 0 0 6 18,600,000

    b Jakarta - Manado ( Return ) 2 Trip 2 4,300,000 8,600,000 1 1,339,840 1.00 4,300,000 1,577,308 2 2,917,148 1 5,682,852

    c Jakarta - Palu ( Return ) 1 Trip 1 4,000,000 4,000,000 0 0 0.00 4,000,000 0 0 0 1 4,000,000

    d Jakarta - Gorontalo ( Return ) 2 Trip 2 4,200,000 8,400,000 0 0 0.00 4,200,000 0 0 0 2 8,400,000

    e Jakarta - Kendari ( Return ) 4 Trip 2 3,800,000 7,600,000 1 984,100 0.00 3,800,000 0 1 984,100 2 6,615,900

    f Jakarta - Ambon ( Return ) 4 Trip 2 5,000,000 10,000,000 0 0 1.00 5,000,000 3,503,725 1 3,503,725 1 6,496,275

    g Jakarta - Ternate ( Return ) 2 Trip 2 4,500,000 9,000,000 0 0 0.00 4,500,000 0 0 0 2 9,000,000

    h Jakarta - Jayapura ( Return ) 2 Trip 2 7,000,000 14,000,000 0 0 0.00 7,000,000 0 0 0 2 14,000,000

    i Jakarta - Manokwari ( Return ) 2 Trip 2 6,000,000 12,000,000 1 1,643,000 0.00 6,000,000 0 1 1,643,000 2 10,357,000

    2.1.2. For CERC Team 232,000,000 0 0 0 232,000,000

    a 5 4,000,000 20,000,000 0 0 0.00 4,000,000 0 0 0 5 20,000,000

    b 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    c 12 4,000,000 48,000,000 0 0 0.00 4,000,000 0 0 0 12 48,000,000

    d 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    e 6 4,000,000 24,000,000 0 0 0.00 4,000,000 0 0 0 6 24,000,000

    f 7 4,000,000 28,000,000 0 0 0.00 4,000,000 0 0 0 7 28,000,000

    g 4 4,000,000 16,000,000 0 0 0.00 4,000,000 0 0 0 4 16,000,000

    h 4 4,000,000 16,000,000 0 0 0.00 4,000,000 0 0 0 4 16,000,000

    i 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    j 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    k 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    l 3 4,000,000 12,000,000 0 0 0.00 4,000,000 0 0 0 3 12,000,000

    m 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    n 2 4,000,000 8,000,000 0 0 0.00 4,000,000 0 0 0 2 8,000,000

    TOTAL MOBILIZATION / DEMOBILIZATION 324,200,000 3,966,940 5,081,033 9,047,973 315,152,027

    INVOICE S/D SAAT INI SSIA KONTRAKNO URAIAN

    CONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI

    Jakarta - Palu ( Return ) for Construction 1600 units Huntap in

    Duyu and Pombewe

    Jakarta - Palu ( Return ) for Rehab of Elementary Education

    Facilities and Tadulako University

    Jakarta - Palu ( Return ) for Rehab of Hospital and Health Facilities

    Jakarta - Palu ( Return ) for Huntap Specialist

    Jakarta - Palu ( Return ) for Multifunction Building of Tadulako

    University

    Jakarta - Palu ( Return ) for Construction of Kejati Building

    Jakarta - Palu ( Return ) for Landscape of BPKP Building

    Jakarta - Palu ( Return ) of SPAM for Huntap Pombewe

    (1.500 units) 104 Ha

    Jakarta - Palu ( Return ) of Land Development for Pombewe (54 Ha)

    Jakarta - Palu ( Return ) of SPAM for Huntap Duyu (230 units)

    14,1 Ha

    Jakarta - Palu ( Return ) of SPAM for Huntap Balaroa Satelite

    Jakarta - Palu ( Return ) of House Water Connection (SR) for

    1.800 units Houses in Tondo-1

    Jakarta - Palu ( Return ) of Land Clearing and Land Development

    for Tondo 2 (65.31 Ha)

    Jakarta - Palu ( Return ) of Land Clearing and Land Development

    for Talise(42.51 Ha)

  • 2.2. HOUSING ALLOWANCE (Juni - Juli 2020)

    CONTRACT AMANDEMENT -03

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.2.1. Regional Team 85,500,000 30,954,545 3,750,000 34,704,545 50,795,455

    a Team Leader Andi Amar 24.00 750,000 18,000,000 17.00 12,750,000 2.00 750,000 1,500,000 19.00 14,250,000 5.00 3,750,000

    b Infrastructure Specialist Yeni Iriani 20.00 750,000 15,000,000 0.00 0 0.00 750,000 0 0.00 0 20.00 15,000,000

    c Architect Andi Bachtiar D. 24.00 750,000 18,000,000 16.77 12,579,545 2.00 750,000 1,500,000 18.77 14,079,545 5.23 3,920,455

    d Safeguard Specialist Sitti / Luciana Apriani 22.00 750,000 16,500,000 7.50 5,625,000 1.00 750,000 750,000 8.50 6,375,000 13.50 10,125,000

    e Additional Expert as Needed Tobe Name 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    2.2.2. Civil Level Team 234,000,000 72,901,270 9,975,000 82,876,271 151,123,729

    a Civil Engineering (Lead) Kota Manado Nusbih I./Wibowo S.D. 24.00 750,000 18,000,000 6.68 5,013,158 2.00 750,000 1,500,000 8.68 6,513,158 15.32 11,486,842

    b Civil Engineering (Lead) Kota Gorontalo Andi Sikki 24.00 750,000 18,000,000 16.77 12,576,923 2.00 750,000 1,500,000 18.77 14,076,923 5.23 3,923,077

    c Civil Engineering (Lead) Kota Palu Moh. Arief 0.00 750,000 0 0.00 0 0.00 750,000 0 0.00 0 0.00 0

    d Civil Engineering (Lead) Kota Makasar Andi Amran 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    e Civil Engineering (Lead) Kabupten Gowa Asia Sabarudin 24.00 750,000 18,000,000 16.12 12,086,538 2.00 750,000 1,500,000 18.12 13,586,538 5.88 4,413,462

    f Civil Engineering (Lead) Kota Palopo Rahmi Habir 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    g Civil Engineering (Lead) Kota Pare-Pare Ulfah Tajudin 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    h Civil Engineering (Lead) Kota Kendari Adiputera 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    i Civil Engineering (Lead) Kabupaten Kolaka Muhammad Saleh 24.00 750,000 18,000,000 16.73 12,548,077 2.00 750,000 1,500,000 18.73 14,048,077 5.27 3,951,923

    j Civil Engineering (Lead) Kota Tual Jacob A.L.R/M. Tafri 24.00 750,000 18,000,000 7.14 5,352,273 1.30 750,000 975,000 8.44 6,327,273 15.56 11,672,727

    k Civil Engineering (Lead) Kota Ambon Marzuki 24.00 750,000 18,000,000 3.12 2,336,538 0.00 750,000 0 3.12 2,336,538 20.88 15,663,462

    l Civil Engineering (Lead) Kota Ternate Aidin Jafar 24.00 750,000 18,000,000 0.00 0 0.00 750,000 0 0.00 0 24.00 18,000,000

    m Civil Engineering (Lead) Kota Sorong Rahman 24.00 750,000 18,000,000 16.23 12,170,455 2.00 750,000 1,500,000 18.23 13,670,455 5.77 4,329,545

    n Civil Engineering (Lead) Kota Jayapura Baharuddin 24.00 750,000 18,000,000 14.42 10,817,308 2.00 750,000 1,500,000 16.42 12,317,308 7.58 5,682,692

    2.2.3. For CERC Team 162,750,000 34,175,000 0 34,175,000 128,575,000

    a 82.00 750,000 61,500,000 45.57 34,175,000 0.00 750,000 0 45.57 34,175,000 36.43 27,325,000

    b 10.00 750,000 7,500,000 0.00 0 0.00 750,000 0 0.00 0 10.00 7,500,000

    c 33.00 750,000 24,750,000 0.00 0 0.00 750,000 0 0.00 0 33.00 24,750,000

    d 8.00 750,000 6,000,000 0.00 0 0.00 750,000 0 0.00 0 8.00 6,000,000

    e 18.00 750,000 13,500,000 0.00 0 0.00 750,000 0 0.00 0 18.00 13,500,000

    f 21.00 750,000 15,750,000 0.00 0 0.00 750,000 0 0.00 0 21.00 15,750,000

    g 4.00 750,000 3,000,000 0.00 0 0.00 750,000 0 0.00 0 4.00 3,000,000

    h 8.00 750,000 6,000,000 0.00 0 0.00 750,000 0 0.00 0 8.00 6,000,000

    i 6.00 750,000 4,500,000 0.00 0 0.00 750,000 0 0.00 0 6.00 4,500,000

    j 6.00 750,000 4,500,000 0.00 0 0.00 750,000 0 0.00 0 6.00 4,500,000

    k 4.00 750,000 3,000,000 0.00 0 0.00 750,000 0 0.00 0 4.00 3,000,000

    l 9.00 750,000 6,750,000 0.00 0 0.00 750,000 0 0.00 0 9.00 6,750,000

    m 6.00 750,000 4,500,000 0.00 0 0.00 750,000 0 0.00 0 6.00 4,500,000

    n 2.00 750,000 1,500,000 0.00 0 0.00 750,000 0 0.00 0 2.00 1,500,000

    482,250,000 138,030,815 13,725,000 151,755,816 330,494,184

    SSIA KONTRAKNO URAIAN

    INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

    TOTAL 2.2.

    Professional Staff for Huntap

    Professional Staff for Rehab of Hospital and Health Facilities

    Professional Staff for Rehab of Elementary Education Facilities and

    Tadulako University

    Professional Staff for Construction 1600 units Huntap in Duyu and

    Pombewe

    Professional Staff for Multifunction Building of Tadulako University

    Professional Staff for Construction of Kejati Building

    Professional Staff for Landscape of BPKP Building

    Professional Staff of SPAM for Huntap Pombewe (1.500 units) 104 Ha

    Jakarta - Palu ( Return ) of Land Clearing and Land Development for

    Pombewe (54 Ha)

    Professional Staff of SPAM for Huntap Duyu (230 units) 14,1 Ha

    Professional Staff of SPAM for Huntap Balaroa Satelite

    Professional Staff of House Water Connection (SR) for 1.800 units

    Houses in Tondo-1

    Professional Staff of Land Clearing and Land Development for

    Tondo 2 (65.31 Ha)

    Professional Staff of Land Clearing and Land Development for

    Talise (42.51 Ha)

  • 2.3. DUTY TRAVEL EXPENSES

    A. SOUTH SULAWESI PROVINCE (Juni - Juli 2020)

    CONTRACT AMANDEMENT -03

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 248,450,000 76,079,615 0 76,079,615 172,370,385

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS SOUTH SULAWESI PROVINCE 24,000,000 7,950,000 0 7,950,000 16,050,000

    1 From Kota Makasar to Kab. Gowa 0% 50% 100% Pers Days

    Inland Transport 1 1 1 2 1 Trip 6 150,000 900,000 3 450,000 0 150,000 0 3 450,000 3 450,000

    Accomodation 1 1 1 2 1 m/d 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    OSA 1 1 1 2 2 m/d 12 100,000 1,200,000 5 500,000 0 100,000 0 5 500,000 7 700,000

    2 From Kota Makasar to Kota Pare pare 0% 50% 100% Pers Days

    Inland Transport 1 1 1 2 1 Trip 9 200,000 1,800,000 7 1,400,000 0 200,000 0 7 1,400,000 2 400,000

    Accomodation 1 1 1 2 1 m/d 6 300,000 1,800,000 3 900,000 0 300,000 0 3 900,000 3 900,000

    OSA 1 1 1 2 2 m/d 15 100,000 1,500,000 11 1,100,000 0 100,000 0 11 1,100,000 4 400,000

    3 From Kota Makasar to Kota Palopo 0% 50% 100% Pers Days

    Inland Transport 1 1 1 2 1 Trip 6 2,000,000 12,000,000 4 1,200,000 0 2,000,000 0 4 1,200,000 2 10,800,000

    Accomodation 1 1 1 2 1 m/d 6 300,000 1,800,000 5 1,500,000 0 300,000 0 5 1,500,000 1 300,000

    OSA 1 1 1 2 2 m/d 12 100,000 1,200,000 9 900,000 0 100,000 0 9 900,000 3 300,000

    2.3.2. FROM KAB/KOTA TO PROVINCE/SATKER PKP FOR COORDINATION MEETING 48,950,000 4,900,000 0 4,900,000 44,050,000

    1 From Kab. Gowa to Kota Makasar 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 13 150,000 1,950,000 4 600,000 0 150,000 0 4 600,000 9 1,350,000

    OSA 10 1 2 m/d 26 100,000 2,600,000 6 600,000 0 100,000 0 6 600,000 20 2,000,000

    Accomodation 13 300,000 3,900,000 0 0 0 300,000 0 0 0 13 3,900,000

    2 From Kota Pare pare to Kota Makasar 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 9 200,000 1,800,000 4 800,000 0 200,000 0 4 800,000 5 1,000,000

    OSA 10 1 2 m/d 31 100,000 3,100,000 8 800,000 0 100,000 0 8 800,000 23 2,300,000

    Accomodation 22 300,000 6,600,000 0 0 0 300,000 0 0 0 22 6,600,000

    3 From Kota Palopo to Kota Makassar 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 2,000,000 20,000,000 4 1,200,000 0 2,000,000 0 4 1,200,000 6 18,800,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 9 900,000 0 100,000 0 9 900,000 21 2,100,000

    Accomodation 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    2.3.2.A FROM REGIONAL TO KAB/KOTA FOR COORDINATION MEETING 50,500,000 2,950,000 0 2,950,000 47,550,000

    1 From Kota Makasar to Kab. Gowa 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 150,000 1,500,000 7 1,050,000 0 150,000 0 7 1,050,000 3 450,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 7 700,000 0 100,000 0 7 700,000 23 2,300,000

    Acomodation 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    2 From Kota Makasar to Kota Pare-Pare 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 200,000 2,000,000 0 0 0 200,000 0 0 0 10 2,000,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 0 0 0 100,000 0 0 0 30 3,000,000

    Acomodation 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    3 From Kota Makasar to Kota Palopo 0% 50% 100% Pers Days

    Inland Transport 10 1 1 Trip 10 2,000,000 20,000,000 1 300,000 0 2,000,000 0 1 300,000 9 19,700,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 3 300,000 0 100,000 0 3 300,000 27 2,700,000

    Acomodation 20 300,000 6,000,000 2 600,000 0 300,000 0 2 600,000 18 5,400,000

    2.3.3. TO JAKARTA 125,000,000 60,279,615 0 60,279,615 64,720,385

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 25 3,100,000 77,500,000 17 49,279,615 0 3,100,000 0 17 49,279,615 8 28,220,385

    Inland travel in Jakarta 4 2 1 Trip 25 300,000 7,500,000 17 5,100,000 0 300,000 0 17 5,100,000 8 2,400,000

    Hotel Accomodation 4 2 3 Trip 75 400,000 30,000,000 0 0 0 400,000 0 0 0 75 30,000,000

    OSA 4 2 4 Trip 100 100,000 10,000,000 59 5,900,000 0 100,000 0 59 5,900,000 41 4,100,000

    248,450,000 76,079,615 0 76,079,615 172,370,385

    SSIA KONTRAK

    TOTAL OF DUTY TRAVEL SOUTH SULAWESI PROVINCE

    NO URAIANINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    B. NORTH SULAWESI PROVINCE (Juni - Juli 2020)

    CONTRACT AMANDEMENT -03

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 92,200,000 24,079,400 0 24,079,400 68,120,600

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS NORTH SULAWESI PROVINCE 22,200,000 9,041,600 0 9,041,600 13,158,400

    1 From Kota Makasar to Kota Manado 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 2,800,000 16,800,000 3 6,941,600 0 2,800,000 0 3 6,941,600 3 9,858,400

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 4 1,200,000 0 300,000 0 4 1,200,000 8 2,400,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 9 900,000 0 100,000 0 9 900,000 9 900,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 37,000,000 3,603,100 0 3,603,100 33,396,900

    1 From Kota Makasar to Kota Manado 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 10 2,800,000 28,000,000 1 2,303,100 0 2,800,000 0 1 2,303,100 9 25,696,900

    OSA 10 1 2 m/d 30 100,000 3,000,000 4 400,000 0 100,000 0 4 400,000 26 2,600,000

    Accomodation 20 300,000 6,000,000 3 900,000 0 300,000 0 3 900,000 17 5,100,000

    2.3.2.A FROM PROVINCE TO REGIONAL FOR COORDINATION MEETING 8,200,000 2,272,000 0 2,272,000 5,928,000

    1 From Kota Manado to Makasar 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 2 2,800,000 5,600,000 1 1,972,000 0 2,800,000 0 1 1,972,000 1 3,628,000

    OSA 10 1 2 m/d 8 100,000 800,000 3 300,000 0 100,000 0 3 300,000 5 500,000

    Acomodation 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    2.3.3. TO JAKARTA 24,800,000 9,162,700 0 9,162,700 15,637,300

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 4,300,000 17,200,000 2 7,962,700 0 4,300,000 0 2 7,962,700 2 9,237,300

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 2 600,000 0 300,000 0 2 600,000 2 600,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 6 600,000 0 100,000 0 6 600,000 10 1,000,000

    92,200,000 24,079,400 0 24,079,400 68,120,600

    SSIA KONTRAK

    TOTAL OF DUTY TRAVEL NORTH SULAWESI PROVINCE

    NO URAIANINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    C. CENTRAL SULAWESI PROVINCE (Juni - Juli 2020)

    CONTRACT AMANDEMENT -03

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 245,000,000 11,899,700 0 11,899,700 233,100,300

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS CENTRAL SULAWESI PROVINCE 21,000,000 11,899,700 0 11,899,700 9,100,300

    1 From Kota Makasar to Kota Palu 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 2,400,000 14,400,000 5 9,699,700 0 2,400,000 0 5 9,699,700 1 4,700,300

    Transport 1 1 1 2 1 Trip 6 200,000 1,200,000 5 1,000,000 0 200,000 0 5 1,000,000 1 200,000

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 0 0 0 300,000 0 0 0 12 3,600,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 12 1,200,000 0 100,000 0 12 1,200,000 6 600,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 17,500,000 0 0 0 17,500,000

    1 From Kota Makasar to Kota Palu 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 5 2,400,000 12,000,000 0 0 0 2,400,000 0 0 0 5 12,000,000

    OSA 10 1 2 m/d 10 100,000 1,000,000 0 0 0 100,000 0 0 0 10 1,000,000

    Accomodation 15 300,000 4,500,000 0 0 0 300,000 0 0 0 15 4,500,000

    2.3.3. TO JAKARTA 206,500,000 0 0 0 206,500,000

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 35 4,500,000 157,500,000 0 0 0 4,500,000 0 0 0 35 157,500,000

    Inland travel in Jakarta 4 2 1 Trip 35 300,000 10,500,000 0 0 0 300,000 0 0 0 35 10,500,000

    Hotel Accomodation 4 2 3 Trip 70 400,000 28,000,000 0 0 0 400,000 0 0 0 70 28,000,000

    OSA 4 2 4 Trip 105 100,000 10,500,000 0 0 0 100,000 0 0 0 105 10,500,000

    245,000,000 11,899,700 0 11,899,700 233,100,300

    SSIA KONTRAK

    TOTAL OF DUTY TRAVEL CENTRAL SULAWESI PROVINCE

    NO URAIANINVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    D. GORONTALO PROVINCE (Juni - Juli 2020)

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 93,000,000 11,983,200 0 11,983,200 81,016,800

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS GORONTALO PROVINCE 23,400,000 7,645,200 0 7,645,200 15,754,800

    1 From Kota Makasar to Kota Gorontalo 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 2,800,000 16,800,000 2 4,845,200 0 2,800,000 0 2 4,845,200 4 11,954,800

    Transport 1 1 1 2 1 Trip 6 200,000 1,200,000 2 400,000 0 200,000 0 2 400,000 4 800,000

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 6 1,600,000 0 300,000 0 6 1,600,000 6 2,000,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 8 800,000 0 100,000 0 8 800,000 10 1,000,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 37,000,000 0 0 0 37,000,000

    1 From Kota Makasar to Kota Gorontalo 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 10 2,800,000 28,000,000 0 0 0 2,800,000 0 0 0 10 28,000,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 0 0 0 100,000 0 0 0 30 3,000,000

    Accomodation 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    2.3.2.A FROM PROVINCE TO REGIONAL FOR COORDINATION MEETING 8,200,000 300,000 0 300,000 7,900,000

    1 From Kota Gorontalo to Makassar 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 2 2,800,000 5,600,000 0 0 0 2,800,000 0 0 0 2 5,600,000

    OSA 10 1 2 m/d 8 100,000 800,000 3 300,000 0 100,000 0 3 300,000 5 500,000

    Acomodation 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    2.3.3. TO JAKARTA 24,400,000 4,038,000 0 4,038,000 20,362,000

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 4,200,000 16,800,000 1 3,238,000 0 4,200,000 0 1 3,238,000 3 13,562,000

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 1 300,000 0 300,000 0 1 300,000 3 900,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 5 500,000 0 100,000 0 5 500,000 11 1,100,000

    93,000,000 11,983,200 0 11,983,200 81,016,800

    SSIA KONTRAK

    TOTAL OF DUTY TRAVEL GORONTALO PROVINCE

    CONTRACT AMANDEMENT -03NO URAIAN

    INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    E. SOUTH EAST SULAWESI PROVINCE (Juni - Juli 2020)

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 132,520,000 37,856,666 0 37,856,666 94,663,334

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS SOUTH EAST SULAWESI PROVINCE 34,620,000 21,164,800 0 21,164,800 13,455,200

    1 From Kota Makasar to Kab Kolaka 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 1,800,000 10,800,000 2 2,425,300 0 1,800,000 0 2 2,425,300 4 8,374,700

    Inland Transport 1 1 1 2 1 Trip 6 370,000 2,220,000 2 740,000 0 370,000 0 2 740,000 4 1,480,000

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 7 2,000,000 0 300,000 0 7 2,000,000 5 1,600,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 9 900,000 0 100,000 0 9 900,000 9 900,000

    2 From Kota Makasar to Kota Kendari

    Air Transport 1 1 1 2 1 Trip 6 1,800,000 10,800,000 6 10,299,500 0 1,800,000 0 6 10,299,500 0 500,500

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 10 3,000,000 0 300,000 0 10 3,000,000 2 600,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 18 1,800,000 0 100,000 0 18 1,800,000 0 0

    2.3.2. FROM KAB/KOTA TO PROVINCE/SATKER PKP FOR COORDINATION MEETING 8,700,000 2,655,000 0 2,655,000 6,045,000

    1 From Kab. Kolaka to Kota Kendari 0% 50% time Pers Days

    Air Transport 10 1 1 Trip 10 370,000 3,700,000 4 1,480,000 0 370,000 0 4 1,480,000 6 2,220,000

    OSA 10 1 2 m/d 20 100,000 2,000,000 9 900,000 0 100,000 0 9 900,000 11 1,100,000

    Accomodation 10 300,000 3,000,000 1 275,000 0 300,000 0 1 275,000 9 2,725,000

    2.3.2.A FROM PROVINCE & KAB/KOTA TO REGIONAL FOR COORDINATION MEETING 12,400,000 2,794,300 0 2,794,300 9,605,700

    1 From Kab. Kolaka to Makasar 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 2 1,800,000 3,600,000 1 997,000 0 1,800,000 0 1 997,000 1 2,603,000

    Acomodation 1 1 1 2 1 Trip 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    OSA 1 1 1 2 2 m/d 8 100,000 800,000 3 300,000 0 100,000 0 3 300,000 5 500,000

    2 From Kota Kendari to Makasar

    Air Transport 1 1 1 2 1 Trip 2 1,800,000 3,600,000 1 1,197,300 0 1,800,000 0 1 1,197,300 1 2,402,700

    Acomodation 1 1 1 2 2 m/d 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    OSA 1 1 1 2 3 m/d 8 100,000 800,000 3 300,000 0 100,000 0 3 300,000 5 500,000

    2.3.3. FROM REGIONAL TO PROVINCE & KOTA/KAB FOR COORDINATION MEETING 54,000,000 2,543,500 0 2,543,500 51,456,500

    1 From Kota Makasar to Kota Kendari 0% 50% time Pers Days

    Air Transport 10 1 1 Trip 10 1,800,000 18,000,000 1 1,243,500 0 1,800,000 0 1 1,243,500 9 16,756,500

    OSA 30 100,000 3,000,000 4 400,000 0 100,000 0 4 400,000 26 2,600,000

    Acomodation 10 1 3 m/d 20 300,000 6,000,000 3 900,000 0 300,000 0 3 900,000 17 5,100,000

    2 From Makasar to Kab. Kolaka 0% 50% time Pers Days

    Air Transport 10 1 1 Trip 10 1,800,000 18,000,000 0 0 0 1,800,000 0 0 0 10 18,000,000

    OSA 30 100,000 3,000,000 0 0 0 100,000 0 0 0 30 3,000,000

    Acomodation 10 1 3 m/d 20 300,000 6,000,000 0 0 0 300,000 0 0 0 20 6,000,000

    2.3.4. TO JAKARTA 22,800,000 8,699,066 0 8,699,066 14,100,934

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 3,800,000 15,200,000 2 7,099,066 0 3,800,000 0 2 7,099,066 2 8,100,934

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 2 600,000 0 300,000 0 2 600,000 2 600,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 10 1,000,000 0 100,000 0 10 1,000,000 6 600,000

    INVOICE S/D SAAT INI SSIA KONTRAKNO URAIAN

    CONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI

  • NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    INVOICE S/D SAAT INI SSIA KONTRAKNO URAIAN

    CONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI

    132,520,000 37,856,666 0 37,856,666 94,663,334TOTAL OF DUTY TRAVEL SOUTH EAST SULAWESI PROVINCE

  • 2.3. DUTY TRAVEL EXPENSES

    F. MALUKU PROVINCE (Juni - Juli 2020)

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 217,500,000 40,347,300 0 40,347,300 177,152,700

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS MALUKU PROVINCE 51,800,000 20,979,900 0 20,979,900 30,820,100

    1 From Kota Makasar to Kota Tual 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 3,800,000 22,800,000 2 7,600,000 0 3,800,000 0 2 7,600,000 4 15,200,000

    Accomodation 1 1 1 2 1 m/d 6 300,000 1,800,000 5 1,500,000 0 300,000 0 5 1,500,000 1 300,000

    OSA 1 1 1 2 2 m/d 12 100,000 1,200,000 7 700,000 0 100,000 0 7 700,000 5 500,000

    2 From Kota Makasar to Kota Ambon

    Air Transport 1 1 1 2 1 Trip 6 3,100,000 18,600,000 3 7,919,900 0 3,100,000 0 3 7,919,900 3 10,680,100

    Accomodation 1 1 1 2 1 m/d 17 300,000 5,100,000 8 2,160,000 0 300,000 0 8 2,160,000 9 2,940,000

    OSA 1 1 1 2 2 m/d 23 100,000 2,300,000 11 1,100,000 0 100,000 0 11 1,100,000 12 1,200,000

    2.3.2. FROM KAB/KOTA TO PROVINCE/SATKER PKP FOR COORDINATION MEETING 22,600,000 2,400,000 0 2,400,000 20,200,000

    1 From Kota Tual to Kota Ambon 0% 50% time Pers Days

    Transport 10 1 1 Trip 10 1,800,000 18,000,000 1 1,800,000 0 1,800,000 0 1 1,800,000 9 16,200,000

    OSA 10 1 2 m/d 19 100,000 1,900,000 6 600,000 0 100,000 0 6 600,000 13 1,300,000

    Accomodation 9 300,000 2,700,000 0 0 0 300,000 0 0 0 9 2,700,000

    2.3.3. FROM REGIONAL TO PROVINCE AND KAB/KOTA FOR COORDINATION MEETING 87,000,000 12,139,800 0 12,139,800 74,860,200

    1 From Makassar to Kota Ambon 0% 50% time Pers Days

    Air Transport 10 1 1 Trip 10 3,100,000 31,000,000 1 3,100,000 0 3,100,000 0 1 3,100,000 9 27,900,000

    OSA 10 1 2 m/d 30 100,000 3,000,000 2 200,000 0 100,000 0 2 200,000 28 2,800,000

    Acomodation 20 300,000 6,000,000 1 300,000 0 300,000 0 1 300,000 19 5,700,000

    2 From Makassar to Kota Tual

    Air Transport 10 3,800,000 38,000,000 2 6,939,800 0 3,800,000 0 2 6,939,800 8 31,060,200

    OSA 30 100,000 3,000,000 5 500,000 0 100,000 0 5 500,000 25 2,500,000

    Acomodation 20 300,000 6,000,000 4 1,100,000 0 300,000 0 4 1,100,000 16 4,900,000

    2.3.3.A FROM PROVINCE AND KAB/KOTA TO REGIONAL FOR COORDINATION MEETING 28,500,000 4,827,600 0 4,827,600 23,672,400

    1 From Kota Ambon to Makassar 0% 50% time Pers Days

    Air Transport 10 1 1 Trip 3 3,100,000 9,300,000 1 1,826,700 0 3,100,000 0 1 1,826,700 2 7,473,300

    OSA 10 1 2 m/d 12 100,000 1,200,000 3 300,000 0 100,000 0 3 300,000 9 900,000

    Acomodation 9 300,000 2,700,000 0 0 0 300,000 0 0 0 9 2,700,000

    2 From Kota Tual to Makasar

    Air Transport 3 3,800,000 11,400,000 1 2,400,900 0 3,800,000 0 1 2,400,900 2 8,999,100

    OSA 12 100,000 1,200,000 3 300,000 0 100,000 0 3 300,000 9 900,000

    Acomodation 9 300,000 2,700,000 0 0 0 300,000 0 0 0 9 2,700,000

    2.3.4. TO JAKARTA 27,600,000 0 0 0 27,600,000

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 5,000,000 20,000,000 0 0 0 5,000,000 0 0 0 4 20,000,000

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 0 0 0 300,000 0 0 0 4 1,200,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 0 0 0 100,000 0 0 0 16 1,600,000

    217,500,000 40,347,300 0 40,347,300 177,152,700

    INVOICE S/D SAAT INI SSIA KONTRAK

    TOTAL OF DUTY TRAVEL MALUKU PROVINCE

    NO URAIANCONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    G. NORTH MALUKU PROVINCE (Juni - Juli 2020)

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 114,300,000 19,955,400 0 19,955,400 94,344,600

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS NORTH MALUKU PROVINCE 28,200,000 3,441,000 0 3,441,000 24,759,000

    1 From Kota Makasar to Kota Ternate 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 3,800,000 22,800,000 1 2,641,000 0 3,800,000 0 1 2,641,000 5 20,159,000

    Accomodation 1 1 1 2 2 Trip 12 300,000 3,600,000 2 500,000 0 300,000 0 2 500,000 10 3,100,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 3 300,000 0 100,000 0 3 300,000 15 1,500,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 47,000,000 3,484,900 0 3,484,900 43,515,100

    From Kota Makasar to Kota Ternate 0% 50% 100% Pers Days

    Transport 10 1 1 Trip 10 3,800,000 38,000,000 1 2,584,900 0 3,800,000 0 1 2,584,900 9 35,415,100

    OSA 10 1 2 m/d 30 100,000 3,000,000 3 300,000 0 100,000 0 3 300,000 27 2,700,000

    Accomodation 20 300,000 6,000,000 2 600,000 0 300,000 0 2 600,000 18 5,400,000

    2.3.2.A FROM PROVINCE TO REGIONAL FOR COORDINATION MEETING 13,500,000 2,429,500 0 2,429,500 11,070,500

    From Kota Ternate to Makasar 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 3 3,800,000 11,400,000 1 2,129,500 0 3,800,000 0 1 2,129,500 2 9,270,500

    OSA 10 1 2 m/d 12 100,000 1,200,000 3 300,000 0 100,000 0 3 300,000 9 900,000

    Acomodation 3 300,000 900,000 0 0 0 300,000 0 0 0 3 900,000

    2.3.3. TO JAKARTA 25,600,000 10,600,000 0 10,600,000 15,000,000

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 4,500,000 18,000,000 2 9,000,000 0 4,500,000 0 2 9,000,000 2 9,000,000

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 2 600,000 0 300,000 0 2 600,000 2 600,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 10 1,000,000 0 100,000 0 10 1,000,000 6 600,000

    114,300,000 19,955,400 0 19,955,400 94,344,600

    INVOICE S/D SAAT INI SSIA KONTRAK

    TOTAL OF DUTY TRAVEL NORTH MALUKU PROVINCE

    NO URAIANCONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI

  • 2.3. DUTY TRAVEL EXPENSES

    H. PAPUA PROVINCE (Juni - Juli 2020)

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 138,000,000 25,623,700 0 25,623,700 112,376,300

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS PAPUA PROVINCE 32,400,000 16,600,000 0 16,600,000 15,800,000

    1 From Kota Makasar to Kota Jayapura 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 4,500,000 27,000,000 3 13,500,000 0 4,500,000 0 3 13,500,000 3 13,500,000

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 7 2,100,000 0 300,000 0 7 2,100,000 5 1,500,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 10 1,000,000 0 100,000 0 10 1,000,000 8 800,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 58,000,000 5,000,000 0 5,000,000 53,000,000

    From Kota Makasar to Kota Jayapura 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 10 4,500,000 45,000,000 1 4,500,000 0 4,500,000 0 1 4,500,000 9 40,500,000

    Accomodation 10 1 1 m/d 30 300,000 9,000,000 1 300,000 0 300,000 0 1 300,000 29 8,700,000

    OSA 10 1 2 m/d 40 100,000 4,000,000 2 200,000 0 100,000 0 2 200,000 38 3,800,000

    2.3.2.A FROM PROVINCE TO REGIONAL FOR COORDINATION MEETING 12,000,000 4,023,700 0 4,023,700 7,976,300

    From Kota Jayapura to Makassar 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 2 4,500,000 9,000,000 1 3,723,700 0 4,500,000 0 1 3,723,700 1 5,276,300

    Acomodation 10 1 1 m/d 8 300,000 2,400,000 0 0 0 300,000 0 0 0 8 2,400,000

    OSA 10 1 2 m/d 6 100,000 600,000 3 300,000 0 100,000 0 3 300,000 3 300,000

    2.3.3. TO JAKARTA 35,600,000 0 0 0 35,600,000

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 7,000,000 28,000,000 0 0 0 7,000,000 0 0 0 4 28,000,000

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 0 0 0 300,000 0 0 0 4 1,200,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 0 0 0 100,000 0 0 0 16 1,600,000

    138,000,000 25,623,700 0 25,623,700 112,376,300

    INVOICE SAAT INI INVOICE S/D SAAT INI SSIA KONTRAK

    TOTAL OF DUTY TRAVEL PAPUA PROVINCE

    NO URAIANCONTRACT AMANDEMENT -03 INVOICE LALU

  • 2.3. DUTY TRAVEL EXPENSES

    I. WEST PAPUA PROVINCE (Juni - Juli 2020)

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.3. IN PROVINCE 145,200,000 37,444,700 0 37,444,700 107,755,300

    Status Status Status

    2.3.1. FOR SPOTCHECK PROGRES STATUS WEST PAPUA PROVINCE 32,400,000 3,891,500 0 3,891,500 28,508,500

    1 From Kota Makasar to Kota Sorong 0% 50% 100% Pers Days

    Air Transport 1 1 1 2 1 Trip 6 4,500,000 27,000,000 1 3,091,500 0 4,500,000 0 1 3,091,500 5 23,908,500

    Accomodation 1 1 1 2 2 m/d 12 300,000 3,600,000 2 500,000 0 300,000 0 2 500,000 10 3,100,000

    OSA 1 1 1 2 3 m/d 18 100,000 1,800,000 3 300,000 0 100,000 0 3 300,000 15 1,500,000

    2.3.2. FROM REGIONAL TO PROVINCE FOR COORDINATION MEETING 54,000,000 13,306,900 0 13,306,900 40,693,100

    1 From Kota Makasar to Kota Sorong 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 10 4,500,000 45,000,000 3 10,356,900 0 4,500,000 0 3 10,356,900 7 34,643,100

    OSA 10 1 2 m/d 30 100,000 3,000,000 10 1,000,000 0 100,000 0 10 1,000,000 20 2,000,000

    Accomodation 1 1 1 2 2 m/d 20 300,000 6,000,000 7 1,950,000 0 300,000 0 7 1,950,000 13 4,050,000

    2.3.2.A FROM PROVINCE TO REGIONAL FOR COORDINATION MEETING 11,600,000 3,285,900 0 3,285,900 8,314,100

    1 From Kota Sorong to Makassar 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 2 4,500,000 9,000,000 1 2,985,900 0 4,500,000 0 1 2,985,900 1 6,014,100

    OSA 10 1 2 m/d 8 100,000 800,000 3 300,000 0 100,000 0 3 300,000 5 500,000

    Acomodation 1 1 1 2 2 m/d 6 300,000 1,800,000 0 0 0 300,000 0 0 0 6 1,800,000

    2.3.2.B FROM KAB/KOTA TO PROVINCE/SATKER PKP FOR COORDINATION MEETING 15,600,000 3,360,400 0 3,360,400 12,239,600

    1 From Kota Sorong to Manokwari 0% 50% 100% Pers Days

    Air Transport 10 1 1 Trip 4 2,500,000 10,000,000 1 1,510,400 0 2,500,000 0 1 1,510,400 3 8,489,600

    In Land Transport 10 1 2 m/d 4 500,000 2,000,000 1 500,000 0 500,000 0 1 500,000 3 1,500,000

    OSA 1 1 1 2 2 m/d 12 100,000 1,200,000 6 600,000 0 100,000 0 6 600,000 6 600,000

    Acomodation 8 300,000 2,400,000 3 750,000 0 300,000 0 3 750,000 5 1,650,000

    2.3.3. TO JAKARTA 31,600,000 13,600,000 0 13,600,000 18,000,000

    FOR SEVERAL TRAINING AND COORDINATION TO JAKARTA BY REQUEST

    Air Transport 4 2 1 Trip 4 6,000,000 24,000,000 2 12,000,000 0 6,000,000 0 2 12,000,000 2 12,000,000

    Inland travel in Jakarta 4 2 1 Trip 4 300,000 1,200,000 2 600,000 0 300,000 0 2 600,000 2 600,000

    Hotel Accomodation 4 2 3 Trip 12 400,000 4,800,000 0 0 0 400,000 0 0 0 12 4,800,000

    OSA 4 2 4 Trip 16 100,000 1,600,000 10 1,000,000 0 100,000 0 10 1,000,000 6 600,000

    145,200,000 37,444,700 0 37,444,700 107,755,300

    INVOICE S/D SAAT INI SSIA KONTRAK

    TOTAL OF DUTY TRAVEL WEST PAPUA PROVINCE

    NO URAIANCONTRACT AMANDEMENT -03 INVOICE LALU INVOICE SAAT INI

  • 2.4. OFFICE OPERATIONAL EXPENSES (Juni - Juli 2020)

    NOS RATE TOTAL NOS TOTAL NOS RATE TOTAL NOS TOTAL NOS TOTAL

    2.4.1 OFFICE RUNNING COST 354,000,000 127,879,982 8,770,962 136,650,944 217,349,056

    2.4.1.1 Regional Team Province 48,000,000 33,001,022 3,662,647 36,663,669 11,336,331

    a South Sulawesi Province (Makasar) 1 mth 24 24.00 2,000,000 48,000,000 17.00 33,001,022 2.00 2,000,000 3,662,647 19.00 36,663,669 5.00 11,336,331

    2.4.1.2 City Level Office 5 Province at 9 Kab/Kota Priority 306,000,000 94,878,960 5,108,315 99,987,275 206,012,725

    a City Level Office at 14 Kota/Kab 14 x 24 mth + 18 363.00 750,000 272,250,000 153.00 94,878,960 11.00 750,000 5,108,315 164.00 99,987,275 199.00 172,262,725

    b for Rehab of Hospital and Health Facilities 10.00 750,000 7,500,000 0.00 0 0.00 750,000 0 0.00 0 10.00 7,500,000

    c 10.00 750,000 7,500,000 0.00 0 0.00 750,000 0 0.00 0 10.00 7,500,000

    d 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    e 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    f Planning for Construction of Kejati Building 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    g Planning for Landscape of BPKP Building 1.00 750,000 750,000 0.00 0 0.00 750,000 0 0.00 0 1.00 750,000

    h 2.00 750,000 1,500,000 0.00 0 0.00 750,000 0 0.00 0 2.00 1,500,000

    i Planning of SPAM for Huntap Duyu (230 units) 14,1 Ha 2.00 750,000 1,500,000 0.00 0 0.00 750,000 0 0.00 0 2.00 1,500,000

    j 2.00 750,000 1,500,000 0.00 0 0.00 750,000 0 0.00 0 2.00 1,500,000

    k 2.00 750,000 1,500,000 0.00 0 0.00 750,000 0 0.00 0 2.00 1,500,000

    l 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    m 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    n 1.00 750,000 750,000 0.00 0 0.00 750,000 0 0.00 0 1.00 750,000

    2.4.2 OFFICE SUPPLY & CONSUMABLE 354,000,000 129,655,250 7,830,300 137,485,550 216,514,450

    2.4.2.1 Regional Team Province 48,000,000 31,660,700 2,725,900 34,386,600 13,613,400

    a South Sulawesi Province (Makasar) 1 mth 24 24.00 2,000,000 48,000,000 17.00 31,660,700 2.00 2,000,000 2,725,900 19.00 34,386,600 5.00 13,613,400

    2.4.2.2 City Level Office 9 Province at 14 Kab/Kota Priority 306,000,000 97,994,550 5,104,400 103,098,950 202,901,050

    a City level office at 14 Kab/kota 14 x 24 mth + 18 363.00 750,000 272,250,000 161.00 97,994,550 11.00 750,000 5,104,400 172.00 103,098,950 191.00 169,151,050

    b for Rehab of Hospital and Health Facilities 10.00 750,000 7,500,000 0.00 0 0.00 750,000 0 0.00 0 10.00 7,500,000

    c 10.00 750,000 7,500,000 0.00 0 0.00 750,000 0 0.00 0 10.00 7,500,000

    d 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    e 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    f Planning for Construction of Kejati Building 3.00 750,000 2,250,000 0.00 0 0.00 750,000 0 0.00 0 3.00 2,250,000

    g Planning for Landscape of BPKP Building 1.00 750,000 750,000 0.00 0 0.00 750,000