Harga Paket Dinding Panjat Fiberglass 3 x 15 Meter .. LEADNo. I.1 2 3 4 5 6 7

ITEM PEKERJAAN Pekerjaan PersiapanDesign & Gambar Administrasi Survai & Pengukuran Pembersihan Lokasi Soilt Test / Sondir Pemasangan Bouwplank Mobilisasi & Demobilisasi

Satuan

Volume

Harga/Unit

Jumlah Harga

Ls Ls Ls Ls Ls Ls Ls

1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp Rp Rp Rp Rp Rp Rp

1,150,000 575,000 1,725,000 1,725,000 4,025,000 1,725,000 1,150,000

Rp Rp Rp Rp Rp Rp Rp

1,150,000 575,000 1,725,000 1,725,000 4,025,000 1,725,000 1,150,000

II.1 2 3 4 5 6 7 8 9 10 11 12 13 14

Pekerjaan PondasiGalian tanah Pondasi Galian tanah Bor Pile/Stross f 30 cm Uruggan tanah bawah pondasi Lantai kerja adukan beton 1:3:5 Beton bor pile/Stross f 30 cm Pondasi batu kali camp 1:5 Kolom beton 20/20 Sloof beton 15/20 Poor beton 20/20 Baut mur Anchor f 24mm Besi plat landas 10mm Besi plat sepatu 10mm Uruggan & pemadatan tanah Lantai rabat beton 1:2:3 M3 M M3 Ls M3 M3 M3 M3 M3 Bh Bh Bh M3 M3 6.00 8.80 3.08 1.00 1.08 0.20 0.72 0.72 0.39 16.00 4.00 4.00 15.36 3.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 57,500 633,000 87,000 98,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 29,000 230,000 575,000 35,000 575,000 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 345,000 5,570,400 267,960 98,000 1,863,000 345,000 1,242,000 1,242,000 672,750 464,000 920,000 2,300,000 537,600 1,725,000

III.1 2 3 4 5 6 7 8 9 10 11

Rangka UtamaTiang utama besi siku 7 Pengikat horizontal besi siku 6 Pengikat diagonal besi siku 5 Plat simpul besi 5mm Mur baut f 14mm Mur baut f 12mm Mur baut f 10mm Tower painting zinkromate by ICI incl Thiner Erection Setting & Sortir Kg Kg Kg Bh Bh Bh Bh Klg Klg Kg Kg 450.00 555.00 655.00 32.00 156.00 96.00 128.00 6.00 5.00 1660.00 1660.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 22,000 22,000 22,000 22,000 4,100 3,500 3,000 110,000 75,000 5,000 1,500 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 9,900,000 12,210,000 14,410,000 704,000 639,600 336,000 384,000 660,000 375,000 8,300,000 2,490,000

IV.

Pengerjaan Pengecatan1 Tower painting primer by ICI incl 2 Thiner Klg Klg 8.00 Rp 8.00 Rp 110,000 75,000 Rp Rp 880,000 600,000

3 Pengecatan

M2

135.00 Rp

11,500

Rp

1,552,500

V.

Transport1 Delivery material 2 Bongkar muat Kg Kg 1705.00 1705.00 Rp Rp 1,300 600 Rp Rp 2,216,500 1,023,000

VI.

Panel Imprin's Fiberglass1 Flat, S25, S50, Logo 2 Roof Bh Bh 42.00 Rp 3.00 Rp 1,725,000 2,015,000 Rp Rp 72,450,000 6,045,000

TotalSolo, Januari 2010 Hormat Kami,

PT CARTENZ INDONESIAKeterangan : 1. Harga belum termasuk akomodasi pemasangan, survey lokasi, penginapan, transportasi dan makan selama pengerjaan 2. Harga belum termasuk pajak (apabila dikenakan) 3. Biaya transport delivery material dan bongkar muat diluar JABAR akan diperhitungkan menurut jauh-dekatnya lokasi

Meter ..Sub Total Rp 12,075,000Gambar, Maket Schedule & Laporan

Keterangan

Rp

17,592,710

Rp

50,408,600Sambungan dengan baut & mur

Rp

3,032,500Pengecatan tegak

Rp

3,239,500Lokasi Jawa Barat

Rp

78,495,000

Rp

164,843,310

an selama pengerjaan

uh-dekatnya lokasi

Harga Paket Dinding Panjat Panel Imprin's Fiberglass 4 x 15 MeterNo. I.1 2 3 4 5 6 7

ITEM PEKERJAAN Pekerjaan PersiapanDesign & Gambar Administrasi Survai & Pengukuran Pembersihan Lokasi Soilt Test / Sondir Pemasangan Bouwplank Mobilisasi & Demobilisasi

Satuan

Volume

Harga/Unit

Jumlah Harga

Ls Ls Ls Ls Ls Ls Ls

1.00 1.00 1.00 1.00 1.00 1.00 1.00

Rp Rp Rp Rp Rp Rp Rp

1,150,000 575,000 1,725,000 1,725,000 4,025,000 1,725,000 1,150,000

Rp Rp Rp Rp Rp Rp Rp

1,150,000 575,000 1,725,000 1,725,000 4,025,000 1,725,000 1,150,000

II.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Pekerjaan PondasiGalian tanah Pondasi Galian tanah Bor Pile f 30 cm Uruggan tanah bawah pondasi Lantai kerja adukan beton 1:3:5 Beton bor pile f 30 cm Pondasi batu kali camp 1:5 Plat beton 15/20 Kolom beton 20/20 Sloof beton 15/20 Poor beton 20/20 Baut mur Anchor f 24mm Besi plat landas 10mm Besi plat sepatu 10mm Uruggan & pemadatan tanah Lantai rabat beton 1:2:3 M3 M3 M3 Ls M3 M3 M3 M3 M3 M3 Bh Bh Bh M3 M3 12.00 1.89 4.03 1.00 1.08 0.35 2.69 1.08 1.26 0.67 24.00 6.00 6.00 26.88 4.20 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 57,500 633,000 87,000 98,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 29,000 69,000 230,000 35,000 575,000 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 690,000 1,196,370 350,610 98,000 1,863,000 603,750 4,640,250 1,863,000 2,173,500 1,155,750 696,000 414,000 1,380,000 940,800 2,415,000

III. Rangka Utama1 2 3 4 5 6 7 8 9 10 11 12 Tiang utama besi siku 8 Tiang utama besi siku 7 Pengikat horizontal besi siku 6 Pengikat diagonal besi siku 5 Plat simpul besi 5mm Mur baut f 14mm Mur baut f 12mm Mur baut f 10mm Zinkromate by Kansai Thiner Erection Setting & Sortir Kg Kg Kg Kg Bh Bh Bh Bh Klg Klg Kg Kg 475.00 325.00 655.00 725.00 24.00 148.00 168.00 142.00 7.00 4.00 2180.00 2180.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 22,000 22,000 22,000 22,000 22,000 4,100 3,500 2,900 110,000 75,000 5,000 1,500 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 956,000 7,150,000 14,410,000 15,950,000 528,000 606,800 588,000 411,800 770,000 300,000 10,900,000 3,270,000

IV. Pengerjaan Pengecatan1 Tower painting primer by ICI incl Klg 8.00 Rp 110,000 Rp 880,000

2 Thiner 3 Pengecatan

Klg M2

8.00 Rp 180.00 Rp

75,000 11,500

Rp Rp

600,000 2,070,000

V.

Transport1 Delivery material 2 Bongkar muat Kg Kg 2240.00 Rp 2240.00 Rp 1,200 600 Rp Rp 2,688,000 1,344,000

VI. Panel Imprin's Fiberglass1 Flat, S25, S50 2 Roof Bh Bh 56.00 Rp 4.00 Rp 1,725,000 2,015,000 Rp Rp 96,600,000 8,060,000

Total NILAI JADI PEMBULATANSolo, Januari 2010 Hormat Kami,

PT CARTENZ INDONESIAKeterangan : 1. Harga belum termasuk akomodasi pemasangan, survey lokasi, penginapan, transportasi dan makan selama pengerjaan 2. Harga belum termasuk pajak (apabila dikenakan) 3. Biaya transport delivery material dan bongkar muat diluar JABAR akan diperhitungkan menurut jauh-dekatnya lokasi

s 4 x 15 MeterSub Total Rp 12,075,000Gambar, Maket Schedule & Laporan

Keterangan

Rp

20,480,030-

Rp

55,840,600Sambungan dengan baut & mur

Rp

3,550,000Pengecatan tegak

Rp

4,032,000Lokasi Jawa Barat

Rp

104,660,000

Rp

200,637,630

makan selama pengerjaan

rut jauh-dekatnya lokasi

Harga Paket Dinding Panjat Multiplek 3 x 15 Meter ..No. I.1 2 3 4 5 6

ITEM PEKERJAAN Pekerjaan PersiapanDesign & Gambar Administrasi Survai & Pengukuran Pembersihan Lokasi Pemasangan Bouwplank Mobilisasi & Demobilisasi

Satuan

Volume

Harga/Unit

Ls Ls Ls Ls Ls Ls

1.00 1.00 1.00 1.00 1.00 1.00

Rp Rp Rp Rp Rp Rp

575,000 575,000 575,000 575,000 575,000 575,000

II.1 2 3 4 5 6 7 8 9 10 11 12

Pekerjaan PondasiGalian tanah Pondasi Galian tanah Bor Pile/Stross f 30 cm Uruggan tanah bawah pondasi Lantai kerja adukan beton 1:3:5 Beton Bor Pile/Stross f 30 cm Pondasi batu kali camp 1:5 Sloof beton 15/20 Poor beton 20/20 Baut mur Anchor f 22mm Besi plat landas 4mm Besi plat sepatu 10mm Lantai rabat beton 1:2:3 M M M3 Ls M3 M3 M3 M3 Bh Bh Bh M3 3.60 12.00 3.08 1.00 1.08 0.20 0.72 0.39 16.00 4.00 4.00 3.00 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 69,000 87,000 87,000 98,000 1,725,000 1,725,000 1,725,000 1,725,000 29,000 57,500 405,000 405,000

III.1 2 3 4 5 6 7 8 9 10

Rangka UtamaTiang utama besi siku 7 Pengikat horizontal besi siku 6 Pengikat diagonal besi siku 5 Plat simpul besi 4mm Mur baut f 14mm Mur baut f 12mm Mur baut f 10mm Tower painting zinkromate Thiner Erection Kg Kg Kg Bh Bh Bh Bh Klg Klg Kg 390.50 491.40 662.40 32.00 156.00 96.00 128.00 12.00 3.00 1544.30 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 22,000 22,000 22,000 22,000 4,100 3,500 3,000 52,000 52,000 6,000

IV.

Pengerjaan Pengecatan1 Tower painting primer 2 Thiner 3 Pengecatan Klg Klg M2 8.00 Rp 8.00 Rp 135.00 Rp 52,000 52,000 11,500

V.

Transport1 Delivery material 2 Bongkar muat Kg Kg 1558.30 Rp 1558.30 Rp 3,500 1,500

VI.

Panel Imprin's Fiberglass1 Multiplek 18mm labur resin 2 Roof Bh Bh 14.00 Rp 0.00 Rp 632,500 2,015,000

TotalSolo, Januari 2010 Hormat Kami,

PT CARTENZ INDONESIAKeterangan : 1. Harga belum termasuk akomodasi pemasangan, survey lokasi, penginapan, transportasi dan makan selama pengerjaan 2. Harga belum termasuk pajak (apabila dikenakan) 3. Biaya transport delivery material dan bongkar muat diluar JABAR akan diperhitungkan menurut jauh-dekatnya lokasi

aket plek 3 x 15 Meter ..Jumlah Harga RpRp Rp Rp Rp Rp Rp 575,000 575,000 575,000 575,000 575,000 575,000

Sub Total 3,450,000

Keterangan

Gambar, Maket Schedule & Laporan

RpRp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 248,400 1,044,000 267,960 98,000 1,863,000 345,000 1,242,000 672,750 464,000 230,000 1,620,000 1,215,000

8,095,110-

RpRp Rp Rp Rp Rp Rp Rp Rp Rp Rp 8,591,000 10,810,800 14,572,800 704,000 639,600 336,000 384,000 624,000 156,000 9,265,800

46,084,000Sambungan dengan baut & mur

RpRp Rp Rp 416,000 416,000 1,552,500

2,384,500Pengecatan tegak

RpRp Rp 5,454,050 2,337,450

7,791,500Lokasi Dalam Kota

RpRp Rp 8,855,000 -

8,855,000

Rp

73,210,110

si dan makan selama pengerjaan menurut jauh-dekatnya lokasi