LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN BIAYA) TERHADAP PELAKSANAAN PEKERJAAN PEMBANGUNAN RUMAH SUSUN TIPE T.24-3 LANTAI BENTANG PANJANG PADA PROYEK PEMBANGUNAN RUMAH MAHASISWA UNIV. HKBP NOMENSEN PEMATANGSIANTAR” Diajukan Oleh : GLADISYA PRATIWI NIM: 1605141017 PROGRAM STUDI MANAJEMEN REKAYASA KONSTRUKSI GEDUNG JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI MEDAN 2020

Upload: others

Post on 17-Oct-2021

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

LAPORAN TUGAS AKHIR

ANALISIS RAB (RENCANA ANGGARAN BIAYA) TERHADAP

PELAKSANAAN PEKERJAAN PEMBANGUNAN RUMAH SUSUN TIPE

T.24-3 LANTAI BENTANG PANJANG PADA PROYEK PEMBANGUNAN

RUMAH MAHASISWA UNIV. HKBP NOMENSEN

PEMATANGSIANTAR”

Diajukan Oleh :

GLADISYA PRATIWI

NIM: 1605141017

PROGRAM STUDI MANAJEMEN REKAYASA KONSTRUKSI GEDUNG

JURUSAN TEKNIK SIPIL

POLITEKNIK NEGERI MEDAN

2020

Page 2: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

iv

ABSTRAK

ANALISIS RAB (RENCANA ANGGARAN BIAYA) TERHADAP

PELAKSANAAN PEKERJAAN PEMBANGUNAN RUMAH SUSUN TIPE

T.24-3 LANTAI BENTANG PANJANG PADA PROYEK PEMBANGUNAN

RUMAH MAHASISWA UNIV. HKBP NOMENSEN

PEMATANGSIANTAR

Oleh: GLADISYA PRATIWI (1605141017)

Email: [email protected]

Jurusan Teknik Sipil, Program Studi Manajemen Rekayasa Konstruksi Gedung

Politeknik Negeri Medan, Jl. Almamater No. 1 Kampus USU 20155, Medan

Suatu perusahaan konstruksi perlu membuat strategi-strategi khusus untuk

memenangkang dan mendapatkan keuntungan dari suatu proyek konstruksi, salah

satunya dengan menghitung Rencana Anggran Biaya (RAB) dan Rencana

Anggaran Pelaksanaan (RAP). Rencana Anggara Biaya (RAB), adalah perkiraan

atau perhitungan biaya-biaya yang diperlukan untuk tiap pekerjaan dalam satu

proyek konstruksi, sehingga diperoleh total anggaran yang diperlukan untuk

menyelesaikan suatu proyek, sedangkan Rencana Anggaran Pelaksanaan (RAP)

merupakan perhitungan biaya yang real digunakan di lapangan dengan

memperhitungkan biaya-biaya tidak langsung yang digunakan pada proyek

tersebut. Penelitian ini bertujuan untuk menganalisis perbandingan biaya RAB

dengan RAP upah pekerjaan Pembangunan Rumah Mahasiswa Univ. HKBP

Nomensen P. Siantar. Dari hasil survei dan perhitungan, terdapat selisih biaya

yang cukup signifikan antara RAP dan RAB. Total harga seluruh pekerjaan dari

Pembangunan Rumah Susun Mahasiswa Univ. HKBP Nomensen Kota

Pematangsiantar dengan menggunakan metode Rencana Anggaran Biaya (RAB)

yakni menggunakan Analisa Harga Satuan Pekerjaan (AHSP) 2016 sebesar Rp

16.039.886.787,01 dan untuk total harga Rencana Anggaran Pelaksanaan (RAP)

sebesar Rp 12.882.810.502,24, sehingga diperoleh total selisih RAB dengan RAP

senilai Rp 3.157.076.284,77 atau 19,68%.

Kata Kunci: Rencana Anggaran Biaya, Rencana Anggaran Pelaksanaan, Selisih.

Page 3: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

v

ABSTRACT

ANALYSIS OF RAB TOWARDS IMPLEMENTATION OF TYPE BUILDING

WORK DEVELOPMENT T.24-3 FLOOR LENGTH FLOOR BY DOING

COMPARISON OF PRICE CALCULATION OF MATERIALS BASED ON

PANGLONG SURVEYS

By: gladisya pratiwi (1605141017)

Email: [email protected]

Civil Engineering Major, Building Construction Management Focus Major

State Polytecnic of Medan, Almamater Street No. 1 Campus USU 20155, Medan

A construction company needs to make specific strategies to support and

benefit from a construction project, one of which is by calculating the Budget

Plan (RAB) and the Implementation Budget Plan (RAP). Cost Budget Plan (RAB),

is an estimate or calculation of the costs required for each work in a construction

project, in order to obtain the total budget needed to complete a project, while the

Implementation Budget Plan (RAP) is a calculation of costs that are real used in

the field. by taking into account the indirect costs used in the project. This study

aims to analyze the comparison between the cost of the RAB and the RAP for the

work of the Univ. HKBP Nomensen P. Siantar. From the survey results and

calculations, there is a significant difference in costs between the RAP and the

RAB. The total price of all work from the Construction of Univ. HKBP Nomensen

Pematangsiantar City using the Cost Budget Plan (RAB) method, namely using

the 2016 Work Unit Price Analysis (AHSP) of IDR 16,039,886,787.01 and the

total price of the Implementation Budget Plan (RAP) of IDR 12,882,810,502.24,

in order to obtain the total difference between the RAB and the RAP is IDR

3,157,076,284.77 or 19.68%.

Keywords: Budget Plan, Budget Plan, Difference.

Page 4: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

vi

KATA PENGANTAR

Dengan Rahmat Tuhan Yang Maha Esa penulis telah menyelesaikan

Tugas Akhir dangan judul “Analisis RAB (Rencana Anggaran Biaya) Terhadap

Pelaksanaan Pekerjaan Pembangunan Rumah Susun Tipe T.24-3 Lantai Bentang

Panjang Pada Proyek Pembangunan Rumah Mahasiswa Univ. HKBP Nomensen

Pematangsiantar” Laporan Tugas Aknir ini untuk memperoleh gelar Sarjana

Terapan Teknik.

Dalam penulisan laporan Tugas Akhir ini, penulis banyak menemukan

kesulitan. Namun berkat dari bimbingan dan bantuan dari berbagai pihak baik

berupa material, waktu, tenaga, dan berupa informasi, sehingga laporan ini dapat

selesai dengan baik dan tepat waktu.

Dengan selesainya laporan Tugas Akhir ini tidak terlepas dari bantuan

banyak pihak yang telah memberikan masukan-masukan kepada penulis. Untuk

itu penulis mengucapkan banyak terimakasih kepada:

1. Bapak Abdul Rahman, S. E. Ak., M.Si., Politeknik Negeri Medan;

2. Bapak Ir. Samsudin Silaen, M.T., Ketua Jurusan Teknik Sipil Politeknik

Negeri Medan;

3. Bapak Palghe Tobing, S.T., M.T., Kepala Program Studi Manajemen Rekayasa

Konstruksi Gedung;

4. Bapak Samiran, S.T., M.T., dosen pembimbing Tugas Akhir;

5. Kedua orangtua penulis;

6. Civitas akademika Politeknik Negeri Medan.

7. Rekan-rekan mahasiswa Politeknik Negeri Medan, terkhusus kelas MRKG-8A

dan MRKG-8B

Dalam penyusunan Tugas Akhir ini penulis menyadari bahwa masih ada

beberapa hal yang harus disempurnakan. Oleh karena itu, kritik dan saran yang

membangun sangat penulis harapkan. Semoga Tugas Akhir ini berguna dan

bermanfaat bagi yang membacanya.

Page 5: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

vii

Medan, Juli 2020

GLADISYA PRATIWI

NIM: 1695141917

Page 6: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

viii

DAFTAR ISI

LEMBAR PERSETUJUAN..................................................................................ii

LEMBAR PENGESAHAN..................................................................................iii

ABSTRAK.............................................................................................................iv

ABSTRACT............................................................................................................v

KATA PENGANTAR...........................................................................................vi

DAFTAR ISI.........................................................................................................vii

DAFTAR TABEL..................................................................................................xi

DAFTAR GAMBAR............................................................................................xii

DAFTAR LAMPIRAN.......................................................................................xiii

BAB 1 PENDAHULUAN

1.1 Latar Belakang......................................................................1

1.2 Rumusan Masalah.................................................................2

1.3 Batasan Masalah...................................................................2

1.4 Tujuan Penulisan..................................................................3

1.5 Manfaat Penulisan................................................................3

1.6 Sistematika Penulisan...........................................................3

BAB 2 TINJAUAN PUSTAKA

2.1 Manajemen Proyek...............................................................5

2.2 Manajemen Biaya Proyek.....................................................7

2.3 Biaya Proyek........................................................................8

2.4 Analisa Harga Satuan (AHS)..............................................10

2.4.1 Analisa Harga Satuan

Pekerjaan(AHSP)....................................................10

2.4.2 Analisa Bahan Dan Upah........................................13

Page 7: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

ix

2.5 Perencanaan Biaya Proyek.................................................15

2.6 Estimasi Biaya....................................................................16

2.6.1 Resiko Estimasi......................................................19

2.6.2 Sumber Informasi Untuk Estimasi.........................19

2.7 Rencana Anggaran Biaya...................................................19

2.8 Perkembangan RAB Di Indonesia......................................21

2.9 Kegunaan RAB...................................................................22

2.10 Komponen Penyususn RAB...............................................23

2.11 Rencana Anggaran Pelaksanaan (RAP)..............................23

2.12 Perbedaan RAB dengan RAP.............................................24

2.13 Penilitia Terdahulu..............................................................25

BAB 3 METODOLOGI PENELITIAN

3.1 Metode Peneitian................................................................27

3.2 Objek Penelitian..................................................................28

3.3 Konsep Penelitian...............................................................28

3.4 Lokasi dan Waktu Penelitian…..………………………..28

3.4.1 Lokasi Penelitian …………………………….…….28

3.4.2 Waktu Penelitian…………………………………..29

3.5 Pengumpulan Data..............................................................29

3.5.1 Data Primer.............................................................29

3.5.2 Data Sekunder.........................................................29

3.5.3 Studi Pustka............................................................29

3.6 Analisa Data........................................................................30

3.6.1 Data Dafta Harga Bahan dan Upah........................30

3.6.2 Data Analisa SNI 2016...........................................30

3.6.3 Rencana Kerja dan Syarat-Syarat...........................30

3.6.4 Data Volume Pekerjaan..........................................30

3.6.5 Shop Drawing.........................................................31

3.7 Metode Pengolahan Data....................................................31

3.8 Pengloahan Data.................................................................31

Page 8: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

x

BAB 4 ANALISIS DAN PEMBAHASAN

4.1 Data Umum Proyek..........................................................33

4.2 Analisa dan Pembahasan..................................................33

BAB 5 PENUTUP

5.1 Simpulan...........................................................................38

5.2 Saran.................................................................................38

DAFTAR PUSTAKA

LAMPIRAN

Page 9: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

xi

DAFTAR TABEL

Tabel 2.1: Contoh Perhitungan AHSP Pekerjaan Bekisting Pondasi....................11

Tabel 2.2: Contoh Analisa Galian Tanah dengan Metode SNI...........................14

Tabel 4.1: Hasil Perhitungan RAB dan RAP Pekerjaan Persiapan......................34

Tabel 4.2: Hasil Perhitungan RAB dan RAP Pekerjaan Struktur Standard..........35

Tabel 4.3: Hasil Perhitungan RAB dan RAP Pekerjaan Struktur Non Standard...36

Page 10: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

xii

DAFTAR GAMBAR

Gambar 2.2: Skema Harga Satuan Pekerjaan.....................................................12

Gambar 3.1: Bagan Alir Penelitian…....................................................................27

Page 11: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

xiii

DAFTAR LAMPIRAN

Lampiran 1 Surat Kesediaan Dosen Pembimbing

Lampiran 2 Kartu Bimbingan Mahasiswa

Lampiran 3 Lembar Pengajuan Seminar Proposal TA

Lampiran 4 Daftar Harga Bahan Hasil Survei Toko Bangunan

Lampiran 5 Tabel RAB dan RAP

Lampiran 6 Foto Dokumentasi Survei Toko Bangunan

Lampiran 7 Soph Drawing

Lampiran 8 Surat Pernyataan

Page 12: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

1

BAB I

PENDAHULUAN

1.1 Latar Belakang

Pada suatu kegiatan proyek konstruksi Rencanaan Anggaran Biaya (RAB)

sangatlah penting untuk mendapatkan harga yang sesuai dengan apa yang ingin

dibangun, dan sangat membantu para kontraktor agar tidak mengalami kerugian.

Pada kenyataan yang terjadi di lapangan bahwa Rencana Anggaran Biaya (RAB)

tidak sama persis dengan Rencana Anggaran Pelaksanaan (RAP) dan itu terjadi

disetiap proyek yang dilaksanakan. Koefisien tenaga kerja yang didapat dari

kebutuhan tenaga kerja per volume pekerjaan nyatanya juga tidak merata disetiap

daerah yang berada di Indonesia yang disebut dengan metode SNI.

Pada umumnya kontraktor juga membuat harga sendiri yang tidak selalu

berpedoman pada analisa SNI. Di dalam pelaksanaan suatu proyek, dikenal juga

Rencana Anggaran Pelaksanaan (RAP). RAP merupakan perhitungan biaya

yang ril digunakan di lapangan dengan memperhitungkan biaya-biaya tidak

langsung yang tidak terdapat didalam Rencana Anggaran Biaya. Jadi dengan

adanya perhitungan RAP sebelum pengajuan tender, kontraktor dapat

mengestimasi nilai total penawaran harga pada suatu proyek agar biaya yang

ditawarkan nilainya tidak terlalu tinggi dan lebih mendekati biaya sebenarnya di

lapangan.

Oleh karena itu, penelitan ini akan membahas perbandingan Rencana

Anggaran Biaya (RAB) dengan dengan Rencana Anggaran Pelaksanaan (RAP)

pada pembangunan Universitas Islam Negeri Sumatera Utara dengan

menggunakan metode SNI, agar dapat melihat perbandingan biaya nyata dengan

biaya rencana dari data Rencana Anggaran Biaya (RAB) yang sudah diperoleh

dari proyek.

Terdapat beberapa jurnal dari penelitian terdahulu yang membahas tentang

perbandingan RAB dan RAP diantaranya :

1. Ilham Arbana tentang: Analisa Rencana Anggaran Biaya Terhadap

Pelaksanaan Pekerjaan Perumahan Dengan Melakukan Perbandingan

Perhitungan Harga Satuan Bahan Berdasarkan Survei Lapangan.

Page 13: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

2

Dengan tujuan untuk:

a) Mengetahui tingkat akurasi perhitungan RAB oleh kontraktor yang akan

digunakan sebagai dokumen kontrak proyek terhadap RAP.

b) Menganalisis perbandingan antara harga Rencana Anggaran Biaya (RAB)

dengan nilai harga satuan pekerjaan di lapangan (biaya nyata) antara upah

dan bahan.

2. Dewi Sekarsari dengan judul penelitian: Analisis Perbandingan Biaya Nyata

Dengan SNI, Pembangunan Ruko Di Daerah Sorong Papua Barat Terhadap

Daerah Manado Sulawesi Utara.

Dengan tujuan untuk: mendapatkan perbandingan antara harga biaya nyata

dengan harga biaya SNI pada Proyek Pembangunan Ruko di daerah Sorong–

Papua Barat dan daerah Manado–Sulawesi Utara.

3. Gia Rosalia Sangle Kuddi dengan judul penelitian: Studi Perbandingan Biaya

Pada Proyek Pembangunan Rumah Khusus Bagi Masyarakat Berpenghasilan

Rendah (MBR) Dan TNI Di Kab. Dogiyai Prov. Papua

Dengan tujuan untuk:

a) Mengidentifikasi jenis anggaran dan pengaruh terhadap keuntungan

kontraktor.

b) Menganalisis perbandingan selisih biaya rencana anggaran biaya dan

rencana anggaran pelaksanann upah pekerjaan dan material pada proyek

Pembangunan Rumah Khusus Bagi Masyarakat Berpenghasilan Rendah

(MBR) dan Anggota TNI di Kab. Dogiyai Prov. Papua berdasarkan nilai

RAB dan RAP.

c) Menghitung besarnya keuntungan total yang diperoleh dari selisih antara

RAB dengan RAP upah pekerjaan dan material, serta keuntungan tambahan

yang diperoleh dari selisih RAP dengan realisasi upah pekerjaan secara

nyata di lapangan.

1.2 Rumusan Masalah

Berdasarkan dengan latar belakang, rumusan masalah sebagai berikut:

Page 14: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

3

1. Berapa besa selisih Antara Rencana Anggaran Biaya (RAB) dengan Rencana

Anggaran Pelaksanaan (RAP)?

1.3 Batasan Masalah

Batasan permasalahan penelitian ini adalah:

1. Penelitian dilakukan pada Proyek Pembangunan Universitas Islam Negeri

Medan.

2. Perhitungan harga upah dan bahan berdasarkan harga satuan pekerjaan

dengan analisa SNI.

3. Harga satuan lapangan diperoleh dari beberapa panglong dan supplier.

1.4 Tujuan Penelitian

Tujuan dari penelitian ini adalah:

1. Untuk mengetahui harga satuan bahan dan upah raa-rata yang diambil dari

survei lapangan pada beberapa panglong.

2. Untuk mengetahui selisih Antara Rencana Anggaran Biaya (RAB) dan

Rencana Anggaran Pelaksanaan (RAP).

1.5 Manfaat Penelitian

Berdasarkan tujuan penelitian, diharapkan hasil penelitian ini dapat

memberikan manfaat dan konstribusi, antara lain:

1. Memberikan informasi serta menambah pengetahuan tentang keakuratan

biaya rencana dengan biaya nyata.

2. Memberi informasi tentang cara mengevaluasi perbandingan biaya RAB

dengan RAP.

1.6 Sistematika Penulisan

Sistematika dari penulisan skripsi ini adalah sebagai berikut:

Page 15: LAPORAN TUGAS AKHIR ANALISIS RAB (RENCANA ANGGARAN …

4

BAB I Pendahuluan

Pada bab ini membahas tentang latar belakang, rumusan masalah, batasan

masalah, tujuan penelitian, manfaat penelitian dan sistematika penulisan.

BAB II Tinjauan Pustaka

Pada bab ini membahas tentang dasar teori yang mendukung dengan

permasalahan yang diajukan.

BAB III Metodologi Penelitian

Pada bab ini membahas tentang metode-metode yang digunakan dalam

penelitian mengenai analisis perhitungan biaya.

BAB V Hasil dan Pembahasan

Pada bab ini berisikan tentang informasi hasil penelitian, dianalisis,

ditafsirkan, dikaitkan dengan kerangka analisis sehingga jelas bagaimana data

hasil penelitian dapat menjawab permasalahan dan tujuan pembahasan dalam

rangka teoritis yang ditemukan terdahulu.