laporan tugas akhir analisa survey micro demand …repository.ittelkom-pwt.ac.id/289/1/cover.pdf ·...

16
Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3 Teknik Telekomunikasi Sekolah Tinggi Teknologi Telematika Telkom Purwokerto Disusun Oleh: Ilham Iswandy Bancin NIM : D311012 PROGRAM STUDI D3 TEKNIK TELEKOMUNIKASI SEKOLAH TINGGI TEKNOLOGI TELEMATIKA TELKOM JL. D.I. PANJAITAN 128 PURWOKERTO 2014 LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND DAN PERENCANAAN JARINGAN FIBER TO THE X (FTTx) PADA AREA STO MAJAPAHIT SEMARANG

Upload: others

Post on 15-Jul-2020

35 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

Laporan Tugas Akhir Disusun Guna Memenuhi

Syarat Kelulusan Di Program Studi D3 Teknik Telekomunikasi

Sekolah Tinggi Teknologi Telematika Telkom Purwokerto

Disusun Oleh:

Ilham Iswandy Bancin

NIM : D311012

PROGRAM STUDI D3 TEKNIK TELEKOMUNIKASI

SEKOLAH TINGGI TEKNOLOGI TELEMATIKA TELKOM

JL. D.I. PANJAITAN 128 PURWOKERTO

2014

LAPORAN TUGAS AKHIR

ANALISA SURVEY MICRO DEMAND DAN PERENCANAAN JARINGAN

FIBER TO THE X (FTTx) PADA AREA STO MAJAPAHIT

SEMARANG

Page 2: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

i

LAPORAN TUGAS AKHIR

ANALISA SURVEY MICRO DEMAND DAN PERENCANAAN JARINGAN

FIBER TO THE X (FTTx) PADA AREA STO MAJAPAHIT

SEMARANG

Disusun Oleh :

Ilham Iswandy Bancin

D311012

PROGRAM STUDI D3 TEKNIK TELEKOMUNIKASI

SEKOLAH TINGGI TEKNOLOGI TELEMATIKA TELKOM

JL. D.I. PANJAITAN 128 PURWOKERTO

2014

Page 3: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3
Page 4: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3
Page 5: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3
Page 6: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

v

PRAKATA

Terima kasih dan puji syukur kepada Allah S.W.T. yang selalu memberi

rahmatnya kepada Penulis selama proses penulisan laporan Tugas Akhir ini dengan judul

“ANALISA SURVEY MICRO DEMAND DAN PERANCANGAN JARINGAN

FIBER TO THE X (FTTx) PADA AREA STO MAJAPAHIT SEMARANG” sehingga

laporan Tugas Akhir ini dapat terselesaikan. Penulisan laporan Tugas Akhir ini dibuat

sebagai salah satu pertanggung jawaban dan syarat untuk menyelesaikan pendidikan di

Sekolah Tinggi Teknologi Telematika Telkom Purwokerto. Laporan Tugas Akhir ini dapat

diselesaikan karena adanya dukungan dari keluarga, teman, lingkungan kampus dan semua

orang yang ada disekitar Penulis. Penulis mengucapkan terima kasih kepada pihak-pihak

yang telah membantu proses penyelesaian Tugas Akhir ini.

1. Bapak, Omak, Abang, Adek,kakak dan seluruh keluarga besar Penulis.

2. Bapak Alm. Basoeki Widyono selaku mantan Ketua Sekolah Tinggi Teknik

Telematika Telkom Purwokerto.

3. Bapak Eka Wahyudi S.T., M.Eng. selaku Pembimbing yang telah memberikan arahan

dalam proses penulisan Tugas Akhir ini.

4. Bapak dan Ibu dosen Sekolah Tinggi Teknik Telematika Telkom Purwokerto yang

telah memberikan ilmu pengetahuan selama perkuliahan.

5. Pihak PT. Telkom Akses Semarang atas kesempatan magang untuk perolehan data.

6. Teman-teman seperjuangan angkatan 2011 Sekolah Tinggi Teknik Telematika Telkom

Purwokerto.

7. Teman-teman DOTA 2 Player, MPK Team, serta teman-teman F2.

8. Dwi Agus Prianto, Royland Pangaribuan, dan teman-teman Valient.

9. Semua pihak yang tidak dapat disebutkan satu persatu.

Penulis menyadari laporan Tugas Akhir ini masih sangat jauh dari kesempurnaan

dan sangat banyak kekurangan yang harus dibenahi. Oleh karena itu Penulis menerima

saran dan masukan yang positif untuk dapat dijadikan acuan untuk penulisan laporan

kedepannya. Penulis berharap laporan ini bermanfaat bagi para Pembaca. Penulis

memohon maaf jika terdapat kesalahan atau kekeliruan dalam penulisan Tugas Akhir ini.

Untuk diskusi lebih lanjut mengenai laporan Tugas Akhir ini dapat menghubungi Penulis

melalui alamat email [email protected] atau dapat menghubungi nomor telepon

Page 7: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

vi

081226609771. Penulis mengucapkan terima kasih banyak untuk semua pihak yang telah

berperan dalam penulisan laporan Tugas Akhir ini. Sukses untuk kita semua.

Purwokerto, 08 Agustus 2014

Penulis.

Page 8: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

vii

DAFTAR ISI

Halaman Judul ....................................................................................................................... i

Halaman Pengesahan ............................................................................................................. ii

Halaman Pengujian .............................................................................................................. iii

Halaman Pernyataan ............................................................................................................ iv

Prakata ................................................................................................................................... v

Daftar Isi ............................................................................................................................. vii

Daftar gambar ...................................................................................................................... ix

Daftar Tabel ......................................................................................................................... xi

Daftar Singkatan ................................................................................................................. xii

Daftar lampiran ................................................................................................................... xiii

Abstract xv

Abstrak ............................................................................................................................... xiv

BAB I PENDAHULUAN ............................................................................................. 1

1.1 Latar Belakang ........................................................................................... 1

1.2 Rumusan Masalah ...................................................................................... 2

1.3 Tujuan & Manfaat ...................................................................................... 2

1.4 Batasan Masalah ........................................................................................ 3

1.5 Kaitan Judul Dengan Teknik Telekomunikasi ........................................... 3

1.6 Metodologi Penelitian ................................................................................ 3

BAB II DASAR TEORI ................................................................................................. 5

2.1 Struktur Fiber Optic ................................................................................... 6

2.2 Jenis-Jenis Fiber Optic............................................................................... 6

2.3 Karakteristik Transmisi Fiber Optic .......................................................... 9

2.4 Aksesoris Fiber Optic ............................................................................. 10

2.5 Fiber To The X (FTTx) ........................................................................... 14

2.6 Google Earth ........................................................................................... 16

2.7 KMLCSP Converter ................................................................................ 17

2.8 NOTEPAD++ .......................................................................................... 18

Page 9: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

viii

BAB III PEMODELAN SISTEM ................................................................................. 19

3.1 Metode Penyusunan Tugas Ahir ............................................................. 19

3.2 Metode Pengumpulan Data ..................................................................... 20

3.3 Pengolahan Data Hasil Survey ................................................................ 24

BAB IV ANALISA DAN HASIL ................................................................................. 36

4.1 Perancangan Dengan Konfigurasi One Stage ......................................... 36

4.2 Perancangan Dengan konfigurasi two Stage ........................................... 44

4.3 Analisa .................................................................................................... 58

4.4 Desain Boundary lainya .......................................................................... 60

BAB V PENUTUP ....................................................................................................... 66

5.1 Kesimpulan ............................................................................................. 66

5.2 Saran........................................................................................................ 68

DAFTAR PUSTAKA ......................................................................................................... 69

Page 10: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

ix

DAFTAR GAMBAR

Gambar 2.1 Jaringan Fiber Optic ....................................................................................... 5

Gambar 2.2 Struktur Fiber Optic ....................................................................................... 6

Gambar 2.3 Step Indeks Multimode Fiber ......................................................................... 7

Gambar 2.4 Step Indeks Single Mode Fiber ....................................................................... 8

Gambar 2.5 Grade Indeks Multi Mode fiber ...................................................................... 8

Gambar 2.6 Conector Fiber Optik ..................................................................................... 10

Gambar 2.7 Pigtail ........................................................................................................... 10

Gambar 2.8 Patch Cord .................................................................................................... 11

Gambar 2.9 Wall-Mount ................................................................................................... 11

Gambar 2.10 OTB ............................................................................................................. 12

Gambar 2.11 Join Closure ................................................................................................. 12

Gambar 2.12 Optical time Domain Reflectometer (OTDR) .............................................. 13

Gambar 2.13 Power Meter ................................................................................................ 13

Gambar 2.14 Fusion Splicer .............................................................................................. 14

Gambar 2.15 Arsitektur FTTx ........................................................................................... 15

Gambar 2.16 Aplikasi Google Earth ................................................................................. 16

Gambar 2.17 Aplikasi KMLCSV Converter ..................................................................... 17

Gambar 2.18 Aplikasi Notepad++ ..................................................................................... 18

Gambar 3.1 Flowchart Penyusunan Tugas Ahir ............................................................. 19

Gambar 3.2 Peng-input-an Data Survey .......................................................................... 25

Gambar 3.3 Peng-input-an Homepass ............................................................................. 26

Gambar 3.4 Penyimpanan Data nput-an .......................................................................... 27

Gambar 3.5 Penyimpanan Data dengan Format KML.................................................... 28

Gambar 3.6 Pemilihan File yang akan dikonversi .......................................................... 28

Gambar 3.7 Editing KML File menggunakan Notepad++ .............................................. 29

Gambar 3.8 Aplikasi Notepad++ ..................................................................................... 30

Gambar 3.9 Mencari File yang akan Di-rename ............................................................. 30

Gambar 3.10 Membuat nama baru File ............................................................................. 31

Gambar 3.11 Jalur Kabel Feeder ....................................................................................... 32

Gambar 4.1 Kabel Distribusi Pertama, Kedua dan Ketiga .............................................. 37

Page 11: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

x

Gambar 4.2 Jalur Kabel Distribusi Keempat, Kelima dan Keenam ................................ 38

Gambar 4.3 Jalur Kabel Distribusi Ketujuh, Kedelapan dan Kesembilan ...................... 39

Gambar 4.4 Jalur Kabel Distribusi Kesepuluh, Kesebelas dan Keduabelas ................... 39

Gambar 4.5 Jalur Kabel Distribusi Ketigabelas, Keempatbelas dan Kelimabelas .......... 40

Gambar 4.6 Jalur Kabel Distribusi Keenambelas dan Ketujuhbelas ............................... 40

Gambar 4.7 Hasil Perancangan One Stage ...................................................................... 41

Gambar 4.8 Jalur Kabel Distribusi Pertama .................................................................... 45

Gambar 4.9 Jalur Kabel Distribusi Kedua ....................................................................... 45

Gambar 4.10 Jalur Kabel Distribusi Ketiga..................................................................... 46

Gambar 4.11 Jalur Kabel Distribusi Keempat ................................................................... 47

Gambar 4.12 Jalur Kabel Distribusi Kelima ..................................................................... 48

Gambar 4.13 Hasil Perancangan dengan kombinasi PS 1:4 dan 1:8 ................................. 48

Gambar 4.14 Jalur Kabel Distribusi Pertama .................................................................. 52

Gambar 4.15 Jalur Kabel Distribusi Kedua ....................................................................... 53

Gambar 4.16 Jalur Kabel Distribusi Ketiga ...................................................................... 54

Gambar 4.17 Hasil Perancangan dengan kombinasi PS 1:2 dan 1:16 ............................... 54

Gambar 4.18 Letak dan Jalur Feeder pada Boundary ....................................................... 61

Gambar 4.19 Hasil Rancangan Optical Distribution Cabinet (ODC) Pertama ................. 61

Gambar 4.20 Hasil Rancangan Optical Distribution Cabinet (ODC) kedua .................... 62

Gambar 4.21 Boundary dan Jalur kabel Feeder ................................................................ 63

Gambar 4.22 Hasil Rancangan Boundary ......................................................................... 64

Page 12: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

xi

DAFTAR TABEL

Tabel 3.1 Spesifikasi Bangunan ............................................................................. 20

Tabel 3.2 Tabel Hasil Survey .................................................................................. 23

Table 3.3 Daftar Redaman setiap Perangkat .......................................................... 34

Tabel 3.4 Perhitungan Link Budget ....................................................................... 35

Tabel 3.5 Hasil Bill Of Quantity (BOQ) ................................................................ 35

Tabel 4.1 Hasil perhitungan Link Budged Konfigurasi 1:32 ................................. 42

Tabel 4.2 Hasil perhitungan Bill Of Quantity (BOQ) Konfigurasi 1:32 ................ 43

Tabel 4.3 Hasil perhitungan Link Budget Konfigurasi 1:4 dengan 1:18 ................ 50

Tabel 4.4 Hasil perhitungan Bill Of Quantity (BOQ) Konfigurasi 1:4 dengan 1:8 . 51

Tabel 4.5 Hasil perhitungan Link Budget Konfigurasi 1:4 dengan 1:18 ................ 56

Tabel 4.6 Hasil perhitungan Bill Of Quantity (BOQ) Konfigurasi 1:2 dengan 1:16 57

Tabel 4.7 Tabel Perbandingan Link Budget dari Tiga Konfigurasi ........................ 59

Tabel 4.8 Tabel Perbandingan Bill Of Quantity (BOQ) dari tiga konfigurasi ........ 60

Tabel 4.9 Hasil perhitungan Bill Of Quantity (BOQ) pada boundary ................... 62

Tabel 4.10 Hasil perhitungan Bill Of Quantity (BOQ) ............................................. 65

Tabel 4.11 Pemilihan Konfigurasi ............................................................................ 65

Page 13: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

xii

DAFTAR SINGKATAN

1. FTTH : Fiber To The Home

2. FTTx : Fiber To The X

3. FTTB : Fiber To Building

4. FTTC : Fiber To The Curb

5. FTTH : Fiber To The Home

6. FTTZ : Fiber To The Zone

7. STO : Sentral Telepon Otomat

8. OLT : Optical Line Terminal

9. ODF : Optical Distribution Frame

10. ODC : Optical Distribution Cabinet

11. ODP : Optical Distribution Point

12. OTP : Optical Terminal Premises

13. ONT : Optical Network Terminal

14. BoQ : Bill Of Quantity

15. Jarlokat : Jaringan lokal akses tembaga

16. FO : Fiber Optic

17. Jarlokaf : Jaringan lokal akses fiber

18. TKO : Titik Konversi Optic

19. O/E : Optical/Electrical

20. DSLAM : Digital Subscriber Line Access Multiplexer

21. MSAN : Multi Service Access Network

22. RK : Rumah Kabel

23. KP : Kotak Pembagi

24. IKR : Instalasi Kabel Rumah

25. TB : Terminal Bagi

26. UPC : Ultra Polish Contact

27. PS : Passive Spliter

Page 14: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

xiii

DAFTAR LAMPIRAN

1. FTA 18

2. Lembar Revisi

3. Hasil Rancangan 3 Boundary

Page 15: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

xiv

ABSTRAK

Perkembangan Teknologi Telekomunikasi saat ini semakin berkembang dimana

kebutuhan komunikasi tidak hanya layanan voice saja tetapi juga data dan video yang

membutuhkan bandwidth yang lebih besar serta kecepatan yang tinggi. sedangkan

kapasitas kabel Tembaga sangat terbatas untuk layanan multimedia dan layanan data,

karena kabel tembaga memiliki keterbatasan bandwidth yaitu sekitar 4 Mbps sehingga

dibutuhkan modernisasi agar mampu menyalurkan bandwidth yang lebih besar yaitu

menggunakn kabel Fiber Optic dimana kabel Fiber Optic memiliki bandwidth sampai

dengan 100 Mbps. Metode pengerjaan yaitu dengan Metode Observasi, Metode Interview

dan Metode Experiment. Jaringan Fiber To The X (FTTx) dirancang dengan konfigurasi

1:32, 1:4-1:8 dan 1:2-1:16. Loss link budget pada boundary dengan jumlah homepass 404

menggunakan ketiga konfigurasi yaitu 1:32, 1:4-1:8 dan 1:2-1:16 sesuai dengan ketentuan

Loss yang diberikan. Setiap konfigurasi pada boundary dengan jumlah homepass 404

memiliki kebutuhan Bill of Quantity (BoQ) yang berbeda-beda terutama pada kabel

distribusi, ODP dan kabel drop. Pada konfigurasi 1:32 membutuhkan 2,91 km kabel

distribusi, 55 ODP kapasitas 8 core dan 40.400 m kabel drop. Pada konfigurasi 1:4 dan 1:8

membutuhkan 2,97 km kabel distribusi, 55 ODP dan 40.400 m kabel drop. Pada

konfigurasi 1:2 dan 1:16 membutuhkan 1,85 km kabel distribusi, 42 ODP kapasitas 16

Core dan 40.400 m kabel drop. Konfigurasi yang efektif untuk pembangunan jaringan

Fiber To The X (FTTx) di area STO majapahit yaitu 1:2-1:16 karena konfigurasi ini sesuai

dengan keadaan lapangan yaitu dengan homepass yang banyak dan mengumpul.

Kata kunci : Fiber Optik, Tembaga, Jaringan Fiber to The X (FTTx), Link Budget, BoQ,

STO, Passive Splitter

Page 16: LAPORAN TUGAS AKHIR ANALISA SURVEY MICRO DEMAND …repository.ittelkom-pwt.ac.id/289/1/COVER.pdf · Laporan Tugas Akhir Disusun Guna Memenuhi Syarat Kelulusan Di Program Studi D3

xv

ABSTRACT

The expansion of telecommunication technolog is so fast, where the

telecommunication needs is not voice service only but include the data and video service

which need the large bandwidth and the hight speed data transfer.while the capacity of the

cooper cable is limited.becouse of the bandwidth of cooper cable is 4 Mbps only,so the

telecommunication developer need to doing modernization of the network where the

cooper cable has changed by fiber optic cable.the fiber optic cable have a large bandwidth

which is more or less than 100 Mbps. there are three Method to finishing this final project.

which is Observation method, Interview Method and Experiment method. Fiber To The X

(FTTx) Network designed by three Configuration, which is 1:32, 1:4-1:8 dan 1:2-1:16. The

average of Loss link budget for boundary with the total homepass 404 Hp designed by

three configuration which is 1:32, 1:4-1:8 dan 1:2-1:16 appropriate with Loss tolerance.

Every configuration in boundary which have 404 homepass have different requirement,

especially distribution cable, ODP and drop cable. Configuration 1:32 need 2,91 km

distribution cabel, 55 ODP with capacity 8 core and 40.400 m drop cable. Configuration

1:4 dan 1:8 need 2,97 km Distribution cable, 55 ODP with capacity 8 core dan 40.400 m

drop cable. Configuration 1:2 dan 1:16 need 1,85 km Distribution Cable, 42 ODP with

capacity 16 Core and 40.400 m drop cable. The right Configuration for Fiber To The X

(FTTx) network in STO Majapahit area is 1:2-1:16 because that configuration is suitable

with homepass location which the population crowded and concentrate.

Key Word : Fiber Optic, Cooper cable, Fiber to The X (FTTx) network, Link Budget,

BoQ, STO, Passive Splitter