8MODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADIMODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADI 2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKAN 2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKAN DENGAN MODUL HARD TANKDENGAN MODUL HARD TANK
3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN 3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN (DURASI : 9 JAM)(DURASI : 9 JAM)
4. INSTALASI SPAR (TOWING)4. INSTALASI SPAR (TOWING)
OPERASI UPENDING (MEMBALIKKAN POSISI)OPERASI UPENDING (MEMBALIKKAN POSISI) 5. INSTALASI DECK5. INSTALASI DECK
-
9SPAR PLATFORM YANG TELAH BEROPERASISPAR PLATFORM YANG TELAH BEROPERASI InstalasiInstalasi AnjunganAnjungan MinyakMinyak LepasLepas PantaiPantai
Link ke file WMN (?) transportasi spar buoy
FPSO (Floating Production, Storage and Offloading)
PRINSIP STABILITASPRINSIP STABILITAS
Pada benda terapung bekerja gaya berat dangaya apung Keseimbangan Statik Fi = 0
3 Kondisi Keseimbang Statik: Stabil: Selalu kembali ke posisi awal
Netral: Dapat berhenti pada segala posisi
Tidak stabil: Tidak kembali ke posisi awal
HUKUM ARCHIMEDESHUKUM ARCHIMEDES
Berat (massa) benda terapung = berat(massa) zat cair yang dipindahkan
Volume bagian benda yang tenggelambergantung dari rapat massa zat cair () air laut = 1025 kg/m3
HUKUM ARCHIMEDESHUKUM ARCHIMEDES
Gaya gravitasi:G = mshipg =Wship
Gaya apung (buoyancy):B = waterVdisplaced
Berat Benda Terapung:Wship = waterVdisplaced
-
10
HUKUM ARCHIMEDESHUKUM ARCHIMEDES
Titik Pusat Gravitasi (G)Titik kerja gaya gravitasi (berat) strukturterapung. Disebut juga Titik BeratGaya ke arah bawah.
Titik Pusat Gaya Apung (B)Titik kerja gaya apung dari bagian strukturdi bawah air. Gaya ke arah atas
HUKUM ARCHIMEDESHUKUM ARCHIMEDES
Titik Pusat Gravity (G): Bergantung dari distribusi massa kapal G tetap (tidak berubah posisi) bila kapal bergerak
Titik Pusat Gaya Apung (B): B dapat berubah posisi bila kapal bergerak
Bergantung dari luas & bentuk bidang basah
HUKUM ARCHIMEDESHUKUM ARCHIMEDES
G
HUKUM ARCHIMEDESHUKUM ARCHIMEDES
MOMENMOMEN
Arah putaran momenbergantung pada posisi G dan B, dua macammoment: Righting moment:
mengembalikan kapal padaposisi semula (tegak)
Upsetting moment:cenderung menyebabkankapal terbalik
Besar righting moment: RM = W * GZ (kg-m) GZ: lengan momen (m)
TITIK TITIK METACENTERMETACENTER
Definisi: Titik perpotonganantara garis kerjagaya apung bilakapal dimiringkandengan sudut kecil
-
11
Tinggi Metacenter(GM) Jarak dari Titik
Gravitasi ke TitikMetacenter
GZ = GM*sin
TITIK TITIK METACENTERMETACENTER TITIK TITIK METACENTERMETACENTER
Hubungan G dan M G dibawah M: kapal stabil G = M: kapal netral G diatas M: kapal tidak stabil
STABILSTABIL TIDAK STABILTIDAK STABIL
T
L
BH
==
gHBL
W
H
T
D ==
g
HD
W41 2
Contoh Stabilitas Struktur Terapung
Klik di Sini
PIPA PENYALUR PIPA PENYALUR BAWAH LAUTBAWAH LAUT
(Subsea Pipeline)
-
12
SUBSEA PIPELINE SUBSEA PIPELINE
PIPA PENYALUR BAWAH LAUTPIPA PENYALUR BAWAH LAUT
PENDAHULUANPENDAHULUAN
PERMINTAAN AKAN MINYAK & GAS BUMI YANG SEMAKIN MENINGKAT MEMBERIKAN DAMPAK PERKEMBANGAN YANG CUKUP SIGNIFIKAN PADA PROYEK-PROYEK KONSTRUKSI LEPAS PANTAI
PIPA BAWAH LAUT PIPA BAWAH LAUT SUBSEA PIPELINE SUBSEA PIPELINE
Next
REKAYASA PIPA PENYALURREKAYASA PIPA PENYALUR
SUBSEA PIPELINE ENGINEERINGSUBSEA PIPELINE ENGINEERING
Pipeline(Pipa Penyalur)
Piping
PENDAHULUANPENDAHULUAN
PipaPipa bawahbawah lautlaut
PipaPipa didi daratdarat
REKAYASA PIPA BAWAH LAUT
PotonganPotongan MelintangMelintang PipaPipa Pipa Selimut Anti Korosi
FBE Adhesive Polypropelene
Selimut Beton
SUBSEA PIPELINE ENGINEERINGSUBSEA PIPELINE ENGINEERING
PEMILIHAN RUTE PIPAPEMILIHAN RUTE PIPA
Rute jalur pipa yang dipilih adalah: Teraman, termudah cara instalasinya, & terpendek jarakrutenya
-
13
WALL THICKNESS WALL THICKNESS (KETEBALAN DINDING PIPA)(KETEBALAN DINDING PIPA)
( )2
i o
t
P P Dt
SMYS k =
SYARAT TEKANAN INTERNAL SYARAT TEKANAN INTERNAL
DnVDnV 19811981
ASME B31.4 & B31.8ASME B31.4 & B31.8
SPDt = 2
yES = 72.0
APLIKASI SELIMUT BETON
SELIMUT BETONSELIMUT BETON AnalisaAnalisa BentanganBentangan BebasBebas PipaPipa (Free Span)(Free Span)
Free span dapat terjadi sebagai konsekuensi dari pemasangan pipa didasarlaut yang tidak rata, terjadi erosi dan scouring
AnalisaAnalisa Free SpanFree Span
KONTUR DASAR LAUTKONTUR DASAR LAUT
AnalisaAnalisa Free SpanFree Span
Analisa dinamis (VIV, vortex induced vibration)
dinamisdinamis
-
14
ANalisaANalisa Free SpanFree Span
Vortex shedding frequencyVortex shedding frequency
tot
tv D
VSf =
dinamisdinamis TerlihatTerlihat span yang span yang menggantungmenggantung butuhbutuh support support segerasegera
REMEDIASI FREESPAN PADA PIPAREMEDIASI FREESPAN PADA PIPA
Span yang Span yang telahtelah diberidiberi support rock dumpingsupport rock dumping
REMEDIASI FREESPAN PADA PIPAREMEDIASI FREESPAN PADA PIPA
PIPE LAYING - LAY BARGE METHOD (S-LAY & J-LAY) Pengelasan pipa di atas Barge High Cost (lay barge daily rate) Open Sea (lokasi laut terbuka) Laut Relatif Dalam
RENTIS TOWING METHOD Pengelasan pipa di daratditarik ke laut Relatif lebih murah dibanding cara konvensional Cocok untuk lokasi tertutup (i.e di dalam dermaga)
REEL BARGE METHOD Metode horisontal & vertikal
METODE PEMASANGAN PIPA BAWAH LAUTMETODE PEMASANGAN PIPA BAWAH LAUT
INSTALASI PIPA BAWAH LAUT (PIPELAYING)INSTALASI PIPA BAWAH LAUT (PIPELAYING) METODE PIPE LAYING (KONVENSIONAL)METODE PIPE LAYING (KONVENSIONAL)
MODEL SMODEL S--LAYLAY
-
15
MODEL SMODEL S--LAYLAY
METODE PIPE LAYING (KONVENSIONAL)METODE PIPE LAYING (KONVENSIONAL) KAPAL INSTALASI PIPA GENERASI PERTAMAKAPAL INSTALASI PIPA GENERASI PERTAMA
Next
METODE INSTALASI LAYBARGE (JMETODE INSTALASI LAYBARGE (J--LAY)LAY)
JJ--LAYLAY
METODE INSTALASI REEL BARGEMETODE INSTALASI REEL BARGE
zz PREPRE--TRENCHINGTRENCHING
Penggalian Sebelum pipa di gelar Kondisi tanah yang keras
z POST TRENCHING
Penggalian setelah pipa digelar Kondisi tanah lunak
METODE PENANAMAN PIPA BAWAH LAUTMETODE PENANAMAN PIPA BAWAH LAUT POST TRENCHINGPOST TRENCHINGPOST TRENCHING