8 MODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADI MODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADI 2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKAN 2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKAN DENGAN MODUL HARD TANK DENGAN MODUL HARD TANK 3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN 3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN (DURASI : 9 JAM) (DURASI : 9 JAM) 4. INSTALASI SPAR (TOWING) 4. INSTALASI SPAR (TOWING) OPERASI UPENDING (MEMBALIKKAN POSISI) OPERASI UPENDING (MEMBALIKKAN POSISI) 5. INSTALASI DECK 5. INSTALASI DECK

Upload: waisul

Post on 28-Sep-2015

22 views

Category:

Documents


4 download

DESCRIPTION

good

TRANSCRIPT

  • 8MODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADIMODUL HARD TANK (SATU BAGIAN) YANG SUDAH JADI 2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKAN 2. TRUSS HULL + SOFT TANK AKAN DIGABUNGKAN DENGAN MODUL HARD TANKDENGAN MODUL HARD TANK

    3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN 3. SPAR DIPINDAHKAN KE KAPAL BLACK MARLIN (DURASI : 9 JAM)(DURASI : 9 JAM)

    4. INSTALASI SPAR (TOWING)4. INSTALASI SPAR (TOWING)

    OPERASI UPENDING (MEMBALIKKAN POSISI)OPERASI UPENDING (MEMBALIKKAN POSISI) 5. INSTALASI DECK5. INSTALASI DECK

  • 9SPAR PLATFORM YANG TELAH BEROPERASISPAR PLATFORM YANG TELAH BEROPERASI InstalasiInstalasi AnjunganAnjungan MinyakMinyak LepasLepas PantaiPantai

    Link ke file WMN (?) transportasi spar buoy

    FPSO (Floating Production, Storage and Offloading)

    PRINSIP STABILITASPRINSIP STABILITAS

    Pada benda terapung bekerja gaya berat dangaya apung Keseimbangan Statik Fi = 0

    3 Kondisi Keseimbang Statik: Stabil: Selalu kembali ke posisi awal

    Netral: Dapat berhenti pada segala posisi

    Tidak stabil: Tidak kembali ke posisi awal

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    Berat (massa) benda terapung = berat(massa) zat cair yang dipindahkan

    Volume bagian benda yang tenggelambergantung dari rapat massa zat cair () air laut = 1025 kg/m3

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    Gaya gravitasi:G = mshipg =Wship

    Gaya apung (buoyancy):B = waterVdisplaced

    Berat Benda Terapung:Wship = waterVdisplaced

  • 10

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    Titik Pusat Gravitasi (G)Titik kerja gaya gravitasi (berat) strukturterapung. Disebut juga Titik BeratGaya ke arah bawah.

    Titik Pusat Gaya Apung (B)Titik kerja gaya apung dari bagian strukturdi bawah air. Gaya ke arah atas

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    Titik Pusat Gravity (G): Bergantung dari distribusi massa kapal G tetap (tidak berubah posisi) bila kapal bergerak

    Titik Pusat Gaya Apung (B): B dapat berubah posisi bila kapal bergerak

    Bergantung dari luas & bentuk bidang basah

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    G

    HUKUM ARCHIMEDESHUKUM ARCHIMEDES

    MOMENMOMEN

    Arah putaran momenbergantung pada posisi G dan B, dua macammoment: Righting moment:

    mengembalikan kapal padaposisi semula (tegak)

    Upsetting moment:cenderung menyebabkankapal terbalik

    Besar righting moment: RM = W * GZ (kg-m) GZ: lengan momen (m)

    TITIK TITIK METACENTERMETACENTER

    Definisi: Titik perpotonganantara garis kerjagaya apung bilakapal dimiringkandengan sudut kecil

  • 11

    Tinggi Metacenter(GM) Jarak dari Titik

    Gravitasi ke TitikMetacenter

    GZ = GM*sin

    TITIK TITIK METACENTERMETACENTER TITIK TITIK METACENTERMETACENTER

    Hubungan G dan M G dibawah M: kapal stabil G = M: kapal netral G diatas M: kapal tidak stabil

    STABILSTABIL TIDAK STABILTIDAK STABIL

    T

    L

    BH

    ==

    gHBL

    W

    H

    T

    D ==

    g

    HD

    W41 2

    Contoh Stabilitas Struktur Terapung

    Klik di Sini

    PIPA PENYALUR PIPA PENYALUR BAWAH LAUTBAWAH LAUT

    (Subsea Pipeline)

  • 12

    SUBSEA PIPELINE SUBSEA PIPELINE

    PIPA PENYALUR BAWAH LAUTPIPA PENYALUR BAWAH LAUT

    PENDAHULUANPENDAHULUAN

    PERMINTAAN AKAN MINYAK & GAS BUMI YANG SEMAKIN MENINGKAT MEMBERIKAN DAMPAK PERKEMBANGAN YANG CUKUP SIGNIFIKAN PADA PROYEK-PROYEK KONSTRUKSI LEPAS PANTAI

    PIPA BAWAH LAUT PIPA BAWAH LAUT SUBSEA PIPELINE SUBSEA PIPELINE

    Next

    REKAYASA PIPA PENYALURREKAYASA PIPA PENYALUR

    SUBSEA PIPELINE ENGINEERINGSUBSEA PIPELINE ENGINEERING

    Pipeline(Pipa Penyalur)

    Piping

    PENDAHULUANPENDAHULUAN

    PipaPipa bawahbawah lautlaut

    PipaPipa didi daratdarat

    REKAYASA PIPA BAWAH LAUT

    PotonganPotongan MelintangMelintang PipaPipa Pipa Selimut Anti Korosi

    FBE Adhesive Polypropelene

    Selimut Beton

    SUBSEA PIPELINE ENGINEERINGSUBSEA PIPELINE ENGINEERING

    PEMILIHAN RUTE PIPAPEMILIHAN RUTE PIPA

    Rute jalur pipa yang dipilih adalah: Teraman, termudah cara instalasinya, & terpendek jarakrutenya

  • 13

    WALL THICKNESS WALL THICKNESS (KETEBALAN DINDING PIPA)(KETEBALAN DINDING PIPA)

    ( )2

    i o

    t

    P P Dt

    SMYS k =

    SYARAT TEKANAN INTERNAL SYARAT TEKANAN INTERNAL

    DnVDnV 19811981

    ASME B31.4 & B31.8ASME B31.4 & B31.8

    SPDt = 2

    yES = 72.0

    APLIKASI SELIMUT BETON

    SELIMUT BETONSELIMUT BETON AnalisaAnalisa BentanganBentangan BebasBebas PipaPipa (Free Span)(Free Span)

    Free span dapat terjadi sebagai konsekuensi dari pemasangan pipa didasarlaut yang tidak rata, terjadi erosi dan scouring

    AnalisaAnalisa Free SpanFree Span

    KONTUR DASAR LAUTKONTUR DASAR LAUT

    AnalisaAnalisa Free SpanFree Span

    Analisa dinamis (VIV, vortex induced vibration)

    dinamisdinamis

  • 14

    ANalisaANalisa Free SpanFree Span

    Vortex shedding frequencyVortex shedding frequency

    tot

    tv D

    VSf =

    dinamisdinamis TerlihatTerlihat span yang span yang menggantungmenggantung butuhbutuh support support segerasegera

    REMEDIASI FREESPAN PADA PIPAREMEDIASI FREESPAN PADA PIPA

    Span yang Span yang telahtelah diberidiberi support rock dumpingsupport rock dumping

    REMEDIASI FREESPAN PADA PIPAREMEDIASI FREESPAN PADA PIPA

    PIPE LAYING - LAY BARGE METHOD (S-LAY & J-LAY) Pengelasan pipa di atas Barge High Cost (lay barge daily rate) Open Sea (lokasi laut terbuka) Laut Relatif Dalam

    RENTIS TOWING METHOD Pengelasan pipa di daratditarik ke laut Relatif lebih murah dibanding cara konvensional Cocok untuk lokasi tertutup (i.e di dalam dermaga)

    REEL BARGE METHOD Metode horisontal & vertikal

    METODE PEMASANGAN PIPA BAWAH LAUTMETODE PEMASANGAN PIPA BAWAH LAUT

    INSTALASI PIPA BAWAH LAUT (PIPELAYING)INSTALASI PIPA BAWAH LAUT (PIPELAYING) METODE PIPE LAYING (KONVENSIONAL)METODE PIPE LAYING (KONVENSIONAL)

    MODEL SMODEL S--LAYLAY

  • 15

    MODEL SMODEL S--LAYLAY

    METODE PIPE LAYING (KONVENSIONAL)METODE PIPE LAYING (KONVENSIONAL) KAPAL INSTALASI PIPA GENERASI PERTAMAKAPAL INSTALASI PIPA GENERASI PERTAMA

    Next

    METODE INSTALASI LAYBARGE (JMETODE INSTALASI LAYBARGE (J--LAY)LAY)

    JJ--LAYLAY

    METODE INSTALASI REEL BARGEMETODE INSTALASI REEL BARGE

    zz PREPRE--TRENCHINGTRENCHING

    Penggalian Sebelum pipa di gelar Kondisi tanah yang keras

    z POST TRENCHING

    Penggalian setelah pipa digelar Kondisi tanah lunak

    METODE PENANAMAN PIPA BAWAH LAUTMETODE PENANAMAN PIPA BAWAH LAUT POST TRENCHINGPOST TRENCHINGPOST TRENCHING