K ERETA A PI R INGAN / L IGHT R AIL T RANSIT TERINTEGRASI DI WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI MINISTRY OF TRANSPORTATION PT ADHI KARYA (Persero) Tbk. KUNJUNGAN BANK INDONESIA 23 MARET 2017

Upload: dinhquynh

Post on 04-Mar-2018

240 views

Category:

Documents


14 download

TRANSCRIPT

KERETA API R INGAN / L IGHT RAIL TRANSIT

TERINTEGRASI DI WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASIMINISTRY OF TRANSPORTATION PT ADHI KARYA (Persero) Tbk.

KUNJUNGAN BANK INDONESIA2 3 M A R E T 2 0 1 7

GENERAL OVERVIEW1.

940 THOUSAND TRIPSBURDENS DKI JAKARTA EVERY WEEKDAYS

LRT JABODEBEK G E N E R A L OV E R V I E W

LRT JABODEBEK G E N E R A L OV E R V I E W

C H A N G E SP E R P R E S 9 8 TA H U N 2 0 1 5 P E R P R E S 6 5 TA H U N 2 0 1 6

SUBSECTION 2

• 1st sentence: Aditional scope of work for Depo

• 2nd sentence: The use of rail road width of 1.435 mm

• 5th sentence: The construction work of Jabodebek LRT is constructed since signed PERPRESS

SUBSECTION 3

• The change of flow and process of contractual timeline in LRT JABODEBEK

SUBSECTION 7

• The payment will be done in every service lines. PT Adhi Karya(Persero) Tbk will be paid after finishing and constructing every service lines.

• The fund will be allocated from Anggaran Belanja KementerianPerhubungan

• The contract agreement is done by the ministry of finance

SUBSECTION 8

• The price includes the bank interest in construction period (during construction) and the payment period

SUBSECTION 14

• Having License from the related area that is passed by LRT JABODEBEK routes

SUBSECTION 16

• PT KAI have been assigned as means organizer, operator, and sustainers

COORDINATIONCHART

Menteri Perhubungan

PT. Adhi Karya (Persero),TbkPembangunan Prasarana LRT

Badan Usaha Penyelenggara LRT

*)TenderPasal 16

Konsultan Pengawas

Pasal 5

Badan Pengawas Keuangan

PembangunanPasal 8

Oversight Committee

Pasal 15

Kemen. BUMNPasal 10

Kemen Agraria & Tata Ruang

Pasal 12

Pemprov DKI, JabarPemkot

Bekasi,Bogor, Depok

Pasal 13,14

Kemen. PUPERAPasal 11

PERPRES 98/2015Percepatan Penyelenggaraan Kereta Api Ringan/ Light Rail Transit

Terintegrasi di Wilayah Jakarta, Bogor, Depok dan Bekasi

Oversight Committee

Subsection 15

The Ministry of BUMN

Subsection 10

The Ministry of PUPERA

Subsection 11

The Ministry of Agrarian &

SpatialSubsection 12

The Government of DKI, Jabar,

Pemkot Bekasi, Bogor, DepokSubsection 13,14

Konsultan Pengawas

Pasal 5

Project-Government Auditor

Subsection 8

PT. Adhi Karya (Persero),Tbk

Design & Build Contractor

PT. Kereta Api IndonesiaOperator

Keputusan Menteri Perhubungan RI

No. KP 408/2015

The Ministry of Transportation

DecisionNo. KP 408/ 2015

The ministry of Transporation

Supervising ConsultantSubsection 5

Accelerating the Implementation of Integrated Light Rail Transit (LRT) in Jakarta, Depok, and Bekasi Project

(Jabodebek LRT)

LRT JABODEBEK G E N E R A L OV E R V I E W

KABUPATEN BEKASI

KOTA BOGOR

KOTA DEPOK

KABUPATEN TANGERANG

KOTA TANGERANG

KOTA

TANGERANG

SELATAN

KABUPATEN BOGOR

PROVINSI DKI JAKARTA

KOTA BEKASI

Sta. Tanah Baru

Sta. Sentul Sirkuit

Sta. Cibinong

Sta. Ciracas

Sta. Kp. Rambutan

Sta. Taman Mini

14,3 km

18,3 km

10,5 km

7,8 km

25,0 km

Sta. Cibubur

LRT JABODEBEK G E N E R A L OV E R V I E W

TOTAL LENGTH - LRT : 81,6 KM

6 SERVICE LINE LRT Jabodebek1. Cawang - Cibubur: 14,3 km2. Cawang - Kuningan - D.Atas: 10,5 km3. Cawang – Bekasi Timur: 18,3 km4. D.Atas - Palmerah - Senayan: 7,8 km5. Cibubur - Bogor: 25,0 km6. Palmerah - Grogol: 5,7 km

SERVICE LINE 2016 2017 2018 2019

Cawang – Cibubur (SERVICE LINE 1)

Cawang – D. Atas (SERVICE LINE 2)

Cawang – Bekasi Timur (SERVICE LINE 3)

S C H E D U L E

1 s t P h a s e

2 n d P h a s e

Total of Stations : 16

Depo

1

Sta. TAMAN MINI

KM. 05+732

Sta. KP.RAMBUTAN

KM. 07+150

Sta. CIRACAS

KM. 08+770

Sta. CIBUBUR

KM. 14+230

TOTAL LENGTH

14,5 KM

NUMBER OF

STATION 4

LRT JABODEBEK S E R V I C E L I N E 1

2

Ciliwung

Sta. 01+407

Pancoran

Sta. 04+296

Kuningan

Sta. 06+048

Rasuna Said

Sta. 07+645

Setiabudi

Sta. 08+537

Dukuh Atas

Sta. 10+057

TOTAL LENGTH

10,5 KM

NUMBER OF

STATION 7

Cawang

Sta. 00+500

Cikoko

Sta. 02+100

LRT JABODEBEK S E R V I C E L I N E 2

3

Sta.

JATICEMPAKA

KM. 06+500

Sta. CIKUNIR 1

KM. 09+820

Sta. BEKASI BARAT

KM. 13+845

Sta. BEKASI TIMUR

KM. 18+000

Sta. CIKUNIR 2

KM. 11+081

NUMBER OF

STATION 5

TOTAL LENGTH

18,5 KM

LRT JABODEBEK S E R V I C E L I N E 3

SCOPE OFWORK

• Detail Design• System Integration• Civil Construction• Railway System

Manufacturing & Installation

• Study Demand• Alignment• Station Location• System Operation• Rolling Stock• Infrastructure (Civil &

Station)• Operation Facility • Depot

• Installation Test• Partial Acceptance Test• System Acceptance Test

• Technical Performance Test• Functional Performance

Test

DESIGN IMPLEMENTATION TESTING TRIAL RUNNING

“ADHI” as a Design & Bui ld Contractor

3LRT JABODEBEK S C O P E O F W O R K

TECHNOLOGY2.

LRT JABODEBEK LRT JABODEBEK T E C H N O L O G Y T Y P I C A L V I A D U C T

\

Concrete Plinth for ballastless system

Evacuation lane Anti- derailment wall

LRT JABODEBEK T E C H N O L O G Y T R A C K W O R K

S T A T I O NLRT JABODEBEK T E C H N I C A L V I E WLRT JABODEBEK STATION

STATION VIEW

CAWANG STATIONTYPICAL STATION

• The minimum height for the building is 2700mm(PERMEN PU No.19/PRT/M/2011 )

• If there is an obstacle such as advertisement’ pole, the minimum distance is 2400 mm(PERMEN PU No.19/PRT/M/2011 )

• The distance to the main road is 5.1 m (PERMEN PU No.19/PRT/M/2011 )

LRT JABODEBEK T E C H N I C A L V I E WLRT JABODEBEK STATION

T E H C N I C A L D ATALRT JABODEBEK S TAT I O N

The shape of building is curve and futuristic to give

a modern look but it is going to be simple and

light as well. The surface of the building will be using a sandwich panel sticking to

the building frame. It will make an efficiency in

function and the use of material.

T E C H N I C A L V I E WLRT JABODEBEK STATION

R O O M O R G A N I Z AT I O NLRT JABODEBEK STATION

D E P O T L O C AT I O NLRT JABODEBEK

DEPO

RUTE 1: CIBUBUR – DUKUH ATAS

RUTE 2: BEKASI TIMUR – DUKUH ATAS

Bekasi Barat

Preliminary Operation PlanConcept of LRT Jabodebek Operation Plan

Bekasi Timur

LRT JABODEBEKPRELIMINARY OPERATION PLANCONCEPT OF LRT JABODEBEK OPERATION PLAN

LRT JABODEBEK T E C H N O L O G Y T R A I N C A PA C I T Y

M M

LRT JABODEBEK T E C H N O L O G Y

R A I LWAY SYST E M

Titik Integrasi

2. KAMPUNG RAMBUTAN STATION

1. DUKUH ATAS STATION

Keterangan:

Sky Bridge connects ST. Kampung Rambutan to Kp.

Rambutan terminal.

EXAMPLE

Note:

ST. Dukuh Atas is integrated with other mode of

transportation such as busway, krl, mrt, and so on.

LRT JABODEBEK INTEGRATION

THE PLAZA CONCEPT FOR MANAGING PASSENGERS

1. Stasiun Ciracas CIRACAS STATION

An access from the station to the plaza

B. Plaza As A Managing Area for Passengers

Plaza is used for a passenger transition area before or after going to the station building

A. A Connected Bridge by LRT

KUNINGAN STATION

A

B

PLAZA CONCEPT

A

BAn access from the station to the plaza

B. Plaza As A Managing Area for Passengers

Plaza is used for a passenger transition area before or after going to the station building

A. A Connected Bridge by LRT

LRT JABODEBEK STASION PLAZA

PLAZA CONCEPT

THE SCHEDULE OF CONSTRUCTION AND PROGRESS3.

DOCUMENTATION4.

LRT JABODEBEK SERVICE LINE 1CAWANG - CIBUBUR

LRT JABODEBEK SERVICE LINE 2CAWANG – DUKUH ATAS

LRT JABODEBEK SERVICE LINE 3CAWANG – BEKASI TIMUR

LRT JABODEBEK R E G U L A S I YA N G B E R L A K UPT ADHI KARYA (Persero) Tbk.

PT Adhi Karya (Persero) Tbk.

THANK YOUVisit us at www.adhi.co.id

For further information please contact:Ki Syahgolang Permata, Corporate Secretary

P. +62 21 797 5312 F. +62 21 797 5311 E. [email protected]

Disclaimer:Important Notice This document was prepared solely and exclusively for the parties presently being invited for the purpose of discussion. Neither this document nor any of its content may be reproduced, disclosed

or used without the prior written consent of PT Adhi Karya (Persero) Tbk.

This document may contain statements that convey future oriented expectations which represent the Company’s present views on the probable future events and financial plans. Such views arepresented on the basis of current assumptions, are exposed to various risks and are subject to considerable changes at any time. Presented assumptions are presumed correct, and based on thedata available on the date, which this document is assembled. The company warrants no assurance that such outlook will, in part of as a whole, eventually be materialized. Actual results maydiverge significantly from those projected. The information in this document is subject to change without notice, its accuracy is not verified or guaranteed, it may be incomplete or condensed andit may not contain all material information concerning the Company.

None of the Company, PT Adhi Karya (Persero) Tbk. or any person connected with any of them accepts any liability whatsoever for any loss howsoever arising from any use of this document or itscontents or otherwise arising in connection therewith.