    L T BER T ND

    Dl

    :

    Journal

    Of Building Contruction Interior

    Material

    Prices

    Cf

    .

    .

    HAR@A

    ~ Y U I N BAHAN SAN@UNAN

    K N ~ Y R U K ~ I D A N I N Y ~ R H R

    Contact :

    Jl. Kembang

    Raya No.

    11

    A Kwitang Senen Jakar ta

    Pusat

    Te l 021) 31925229;

    31925234

    Fax: 021) 3901710

    Pin 26

    BDC 162 HP: 0856-9496-1397

    Email :

    [email protected]

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    3/56

    A.

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    11.

    12.

    13.

    14.

    15.

    16.

    17.

    18.

    19.

    20.

    21.

    22.

    23.

    24.

    25.

    26.

    27.

    28.

    29.

    30.

    31.

    32.

    33.

    34

    35.

    36.

    37.

    38.

    39.

    40.

    41.

    42.

    43.

    44.

    Eo Sf

    > JOURNAL

    OF

    BUILDING

    CONSTRUCTION

    INTERIOR MATERIAL PRICE

    PROPINSI JAWA BARAT

    DAFTAR

    HARGA

    BAHAN DAN

    UPAH

    PEKERJA

    KOTABEKASI

    DAFTAR

    HARGA BAHAN

    BANGUNAN

    AGREGAT KASAR, BAHAN PEREKAT BAHAN JADINYA

    Pasir Urug

    m3

    130.000

    Sirtu

    m3

    125.000

    PasirTeras

    m3

    125,000

    Pasir Pasang Kali

    m3

    170.000

    Pasir Beton

    m3

    176.000

    Abu Batu

    m3

    161.000

    Batu Gosok (Apung)

    kg

    18.000

    Batu Pecah Mesin 1/2

    m3

    190.000

    Batu Pecah Mesin 2/3

    m3

    185.000

    Batu Pecah Mesin 3/5

    m3

    185.000

    Batu Pecah Mesin 5/7

    m3

    180.000

    Batu Belah Pondasi

    m3

    160.000

    Batu Bronjol (Untuk Bronjong)

    m3

    140.000

    Batu Koral Beton Kali

    m3

    135.000

    BatuTempel Hitam

    m2

    110.000

    Batu Pinggir Beton 1Ox20x35

    bh

    17.000

    Batu Pinggir Beton 15x35x50 (K-225)

    bh

    43.000

    BatuTelor

    m3

    150.000

    Batako Kecil 8x1

    Ox20 bh

    1.100

    Batako Besar 8x20x30

    bh

    1.600

    Con Blok 8x20x40

    bh

    3.500

    Bata Merah Bakar Kelas I

    bh

    600

    Bata Merah Bakar Kelas

    II

    bh

    500

    Bata Merah Oven (Kiingker)

    bh

    2.500

    Roster Beton 20x20

    bh

    6.000

    Roster Beton 30x30

    bh

    8.000

    Grass Blok 20x20

    bh

    11.000

    Grass Blok 30x45

    bh

    15.000

    Paving Blok Natural 8cm

    m2

    46.000

    Paving Blok Warna 8cm

    m2

    56.000

    Paving Blok Natural 6cm m2 36.000

    Paving Blok Warna Scm

    m2

    42.000

    Kanstin Paving Blok

    m1

    22.000

    Semen PC Tiga Roda 50Kg

    zak 63.500

    Semen Putih

    zak

    74.000

    Kanstin Jalan ukuran Besar (Bina Marga) 1

    bh

    = 60cm

    bh

    36.000

    Readymix Beton K 300, tanpa pampa (Selang)

    m3

    780.000

    Readymix Beton K 225, tanpa pampa (Selang)

    m3

    710.000

    Readymix Beton K 175, tanpa pampa (Selang)

    m3

    650.000

    Kapur Pasang/ Kapur Tembok

    m3

    86.000

    KapurSirih

    kg

    6.400

    SemenWarna

    kg

    7.000

    Tanah Liat m3 52.000

    Air

    2.000

    HUNXXI

    JURNAL

    H RG

    SATUAN BAHAN BANGUNAN, KONSTRUKSI

    149.000

    138.000

    138.000

    203.000

    190.000

    172.000

    20.000

    230.000

    220.000

    210.000

    210.000

    175.000

    150.000

    150.000

    135.000

    20.000

    45.000

    165.000

    1.500

    1.800

    3.800

    700

    550

    3.100

    6.500

    9.000

    15.000

    17.000

    48.000

    59.000

    38.000

    44.000

    26.000

    65.000

    80.000

    40.000

    825.000

    760.000

    680.000

    94.000

    6.800

    8.100

    55.000

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    4/56

    I

    JOURNAL OF BUILDING CONSTRUCTION, INTERIOR MATERIAL PRICE

    tt

    :::

    0

    tt

    -

    B.

    BAHAN FINISHING:

    LABURAN

    PENGISI DAN ALATNYA

    n

    1.

    PlamirTembok

    kg

    12.000

    13.000

    2. Cat Tembok ICI Eksterior (Beton)

    kg

    92.000

    98.000

    3.

    Cat Tembok ICIInterior (Piafond dan dinding)

    kg

    58.000

    62.000

    4.

    Cat Tembok Vinilex

    kg

    16.000

    18.000

    5.

    Cat Dasar ICI untuk Interior (2 pelapis)

    ltr

    40.000

    45.000

    6.

    CatTembok Sanlex

    kg

    14.000

    15.000

    ll

    7.

    Cat Tahan Asam

    kg

    43.000

    45.000

    ):: .

    8. PelapisAikali ICI (Cat Dasar Beton Eksterior)

    ltr

    48.000

    50.000

    9.

    Cat Marka I Spotlight

    kg

    47.000

    50.000

    10.

    Water Profing Emulsion

    kg

    38.000 41.000

    11.

    Water Profing Membrance

    m2

    82.000

    85.000

    '

    12.

    Pool Cat tembok

    bh

    18.000

    22.000

    13.

    KapeTembok

    bh

    6.000

    7.000

    14.

    Kape Kayu

    bh

    7.000

    8.000

    15.

    Soligneum 1 Blok

    51tr

    41.000

    43.000

    16.

    Plincote

    kg

    28.000

    32.000

    17.

    Pengawetan Kayu

    m3

    320.000

    330.000

    18.

    Pengopenan Kayu

    m3

    351.000

    360.000

    19.

    Kuas

    3

    bh

    9.000

    12.000

    20.

    Oker

    kg

    25.000

    28.000

    21. Oyan

    bks

    4.000 5.000

    22.

    Olen (Pewarna Plitur)

    bks

    2.000 3.000

    23.

    Spiritus

    ltr

    12.000

    15.000

    24.

    Bahan Plitur Kripik (Sirlak India)

    kg

    150.000

    160.000

    25.

    Dempul Lain

    kg

    22.000

    25.000

    26.

    Dempul Plitur

    kg

    27.000

    34.000

    27.

    Dempul Halus

    lmfra

    (Wood Filter)

    kg

    29.000

    40.000

    28.

    Terpentin

    ltr

    6.000

    8.000

    29.

    linerA

    ltr

    16.000 20.000

    30.

    TinerB

    ltr

    20.000 22.000

    31.

    Kumpon

    kg

    26.000 28.000

    32.

    Melamik

    kg

    40.000

    42.000

    33.

    Dempul Plastik

    kg 33.000 37.000

    34.

    Dempul Duco

    kg

    40.000 45.000

    35.

    Am pel

    as

    lbr

    3.000

    4.000

    36.

    Dempul Kayu Cap Kucing

    kg

    23.000

    25.000

    37.

    Meni Kayu/ Besi

    kg

    20.000

    22.000

    38.

    Sincromat

    kg

    32.000

    35.00

    39.

    Cat Kayu Sieve

    kg

    44.000

    45.000

    40.

    Cat Besi Sieve

    kg

    44.000

    45.000

    41.

    Cat Besi Duco Danaglos/ICI

    kg

    84.000 86.000

    42.

    CatBron

    kg

    35.000

    37.000

    c.

    BAHAN

    KAYU

    BERIKUT BAHAN J DINY

    1.

    Bambu dia. 5 s/d 7

    bt

    13.000 14.000

    2.

    Bambu dia. 7 s.d 10

    bt

    18.000

    20.000

    3.

    Bambu Gombong

    bt

    40.000

    45.000

    4.

    Kayu Papan Tarentang

    m3

    1.800.000

    2.000.000

    494

    JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI INTERIOR

    Eotst 4

    TAHUN XX 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    5/56

    0

    JOURNAL OF BUILDING

    CONSTRUCTION INTERIOR MATERIAL

    PRICE

    0

    ,

    5

    Kayu Kamper Singkil I Kapur (

    K

    Samarinda Kelas II)

    m3

    7.655.000

    7.900.000

    6

    Kayu Balok Borneo Super

    m3

    4.000.000

    4.500.000

    I)

    7

    Kayu Papan Borneo Super

    m3 4.200.000 5.000.000

    -

    Kayu Balok Kamper Medan (Kruing)

    m3

    6.000.000

    6.300.000

    Kayu Papan Kamper Medan (Kruing)

    m3

    6.500.000

    7.000.000

    10

    Kayu Balok Kamper Banjar

    m3

    5.900.000

    6.800.000

    1

    Kayu Papan Kamper Banjar

    m3

    7.000.000

    7.500.000

    12

    Kayu Balok Kamper Samarinda

    m3

    9.600.000

    10.000.000

    3

    Kayu Papan Kamper Samarinda

    m3

    9.800.000

    10.400.000

    14.

    Kayu Balok Rasamala

    m3

    2.800.000

    3.400.000

    15

    Kayu Jati Jatim

    I

    Jateng tua dia. 70em

    m3

    17.000.000

    18.000.000

    16.

    Kayu Jati Jatim

    I

    Jateng tua dia. 40em

    m3

    13.800.000 14.000.000

    17

    Kayu Jati Jabar tua dia. 40em

    m3

    9.500.000

    10.250.000

    'i

    18

    Kayu Jati Jabar tua dia. 40em kebawah m3 9.000.000 9.400.000

    19

    Kayu Hutan Kelas I (Segeng, Mahoni, Laban)

    m3

    3.200.000 3.600.000

    20.

    Kayu Albasia

    m3

    700.000 775.000

    21

    Dol ken 5 s.d 7

    bt

    15.000

    16.000

    22

    Dol ken 7 s.d 10

    bt

    22.000

    25.000

    23

    List profil kamper 1x 1em

    m1

    5.100

    7.000

    24.

    List profil kamper 2x1em

    m1

    6.500

    7.000

    25

    List profil kamper

    4x1

    em

    m1

    11.000

    13.000

    26

    List profil kamper 5x1 em

    m1

    14.000 17.000

    27

    List profil kamper 10x1.5em

    m1

    24.000

    26.000

    28.

    Pegangan Tangga Profil Jati

    m1

    85.000 90.000

    29

    Pegangan Tangga Profil Kamper

    m1

    54.000

    65.000

    30

    Kayu reng

    2 3

    Borneo Super

    m1

    2.800 3.100

    31

    Kayu reng 2 3 kamper Banjar

    m1

    4.000 4.200

    32

    Kayu reng 3 4 Kamper Banjar

    m1

    7.700 8.000

    D.

    BAHAN PENUTUP RANGKA PLAFOND

    1

    Bahan Plafond Eternit mm (Bola Dunia)

    m2

    12.000 13.000

    2

    Bahan Plafon Harflex 5mm 120x240

    lbr

    52.000 56.000

    3

    Bahan PlafondAsbes Semen 5mm

    m2

    15.000 17.000

    4

    Gypsum 120x240 t=9mm Ex.

    DN

    Qayabord)

    lbr

    56.000

    60.000

    5

    Gypsum 120x240 t=9mm Ex. Luar

    lbr

    68.000

    70.000

    6

    AkustikAmstrong 60x120

    lbr

    92.000 95.000

    7

    List Profil gypsum L= 10 CM m 13.000 15.000

    8

    Tepung Gypsum

    kg

    6.000 7.000

    E.

    BAHAN KAYU LAPIS

    1

    Tripleks 3mm 120x240

    lbr

    43.000 45.000

    2

    Tripleks4mm 120x240

    lbr

    53.000

    55.000

    3

    Tripleks mm uk. pintu

    lbr

    38.000

    40.000

    4

    Tripleks 6mm 120x240

    lbr

    73.000

    78.000

    5

    Tripleks 9mm 120x240

    lbr

    105.000 110.000

    6

    JabarWood mm

    lbr

    82.000 90.000

    7

    Bilik Bambu (tanpa kulit)

    m2

    18.000 20.000

    8

    Bilik Bambu (dengan kulit)

    m2

    20.000

    23.000

    9

    Bilik Bambu Hitam Variasi (Motif)

    m2

    32.000 35.000

    Eotst

    34 TAHUN XX 2 15

    JURNAL

    HARGA

    SATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    495

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    6/56

    I

    JOURNAL OF BUILDING CONSTRUCTION INTERIOR MATERIAL

    PRICE

    t1

    ::

    0

    10.

    Wall

    Paper (Kelas Menengah)

    m2

    35.000

    45.000

    c

    11.

    Multipleks 9mm 120x240

    lbr

    118.000 121.000

    n

    12.

    Multipleks 2mm 120x240

    lbr

    145.000 149.000

    -

    13.

    Multipleks 18mm 120x240

    lbr

    210.000 215.000

    14.

    Playwood 18mm 120x240

    lbr

    230.000 250.000

    15.

    Teakwood 3mm 120x240

    lbr

    93.000

    95.000

    16.

    Teakwood4mm 120x240

    lbr

    98.000 105.000

    17.

    Teakwood

    3mm

    uk. Pintu

    lbr

    60.000

    65.000

    18.

    Teakwood 4mm uk. Pintu

    lbr

    70.000

    74.000

    19.

    Gypsum Board 9mm elephant

    lbr

    58.000

    60.000

    20. Tacon (tahan bakar) m2 85.000 90.000

    21.

    Supercon

    m2

    51.000

    55.000

    ''

    22.

    Melamin 4mm 120x240

    lbr

    75.000 82.000

    23.

    Melamin

    TOK 4mm

    lbr

    88.000 92.000

    24.

    Formika 120x240

    lbr

    160.000

    165.000

    25.

    Formika ukuran Pintu

    lbr

    93.000

    95.000

    F

    BAHAN LANTAI DAN

    PEL PIS DINDING

    1.

    Tegel PC 20x20

    bh

    2.400

    2.700

    2.

    Plin Tegel PC 1

    Ox20

    bh

    1.800

    2.500

    3.

    Tegel PC 30x30

    bh

    2.800

    3.000

    4.

    Plin Tegel PC 15x30

    bh

    2.750

    3.000

    5.

    Tegel Warna 20x20

    bh

    2.500

    2.800

    6.

    Plin Tegel Warna 10x20

    bh

    2.200

    2.400

    7

    Tegel Warna 30x30

    bh

    3.100 3.500

    8.

    Plin Tegel Warna 15x30

    bh

    2.500 2.800

    9.

    Tegel Wafel PC 20x20

    bh

    1.500

    1.600

    10.

    Tegel Wafel Warna 20x20

    bh

    2.100

    2.200

    11.

    Tegel Badak PC 30x30

    bh

    2.000 2.200

    12.

    Poslin 11x11 Warna Standard DN

    m2

    35.000

    37.000

    13.

    Poslin 11x11 Warna Khusus DN

    m2

    42.000

    45.000

    14.

    Keramik

    10x20 dan 20x20 KW I DN Putih

    I

    Poles

    m2

    39.000

    42.000

    15.

    Keramik 1Ox20

    KW

    I DN Corak I Warna I Anti Slip

    m2

    42.000

    46.000

    16.

    Keramik

    20x20 (KM)

    KW

    I DN

    Corakl Warnal

    Anti Slip m2 44.000 48.000

    17.

    Keramik 20x20 (KM) KW I DN Putih Poles

    m2

    37.000 42.000

    18.

    Keramik 20x25 Dinding KM KW I DN Corak

    m2

    43.000

    46.000

    19.

    Keramik 30x30

    KW

    I DN Putih Poles

    m2

    32.000 36.000

    20.

    Keramik 30x30 KW I DN

    Warnal

    Corak (Anti Slip)

    m2

    42.000 46.000

    21.

    Vynillantai Standard

    m2

    85.000

    90.000

    22.

    Karpel Kelas Baik LN

    m2

    500.000

    600.000

    23.

    Karpel Kelas Sedang LN

    m2

    250.000

    260.000

    24.

    Stairnosing Keramik 10120

    bh

    13.000

    15.000

    25.

    Stairnosing Fiber

    m1

    16.000

    18.000

    26.

    Taraso Kerang 30x30

    m2

    25.000

    26.000

    27. Plin taraso 1Ox30

    bh

    7.500 9.000

    28.

    Gran

    t

    Alam LN Uk. Besar

    m2

    1.500.000

    1.800.000

    29.

    Gran t Alam LN Uk. Kecil

    m2

    1.200.000

    1.300.000

    30.

    GranitAiam DN Uk. Besar

    m2

    1.000.000

    1.100.000

    31.

    Gran t Alam DN Uk. Kecil

    m2

    850.000

    900.000

    496

    JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    otst 4

    TAHUN XX

    2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    7/56

    JOURNAL

    OF

    BUILDING CONSTRUCTION INTERIOR &MATERIAL PRICE

    tt

    ::0

    tt

    32.

    Granito

    Tile Essensa uk. 40x40 polis

    m2

    233.000

    272.000

    33.

    Granito Tile Essensa uk. 40x40 unpolis

    m2

    195.000

    225.000

    C/

    34.

    Marmer Alam Lampung uk. Besar (60x90em) m2 400.000 450.000

    ....

    35.

    Marmer Alam Lampung uk. Kecil (60x60em)

    m2

    340.000

    355.000

    i;

    36.

    Marmer Alam Citatah uk. Besar (60x90cm)

    m2

    320.000

    340.000

    37.

    Marmer Alam Citatah uk. Kecil (60x60em)

    m2

    245.000

    275.000

    B.

    Marmer

    Sintetis

    m2

    110.000

    120.000

    39.

    Granito Tile Essensa 60x60 Polis

    m2

    19B.OOO

    215.000

    0.

    Granito Tile Essensa 60x60 unpolis

    m2

    225.000

    240.000

    41.

    Bata Karawang

    bh

    2.900

    3.500

    42.

    Campuran untuk kedap air (AM)

    ltr

    1B.OOO

    20.000

    G

    B H N S LUR N IR KOTORI BERSIH

    '

    . Grafe U

    20

    em'

    m1

    23.000 26.000

    2.

    Grafe U 30 em'

    m1

    30.000

    35.000

    3.

    Grafe U 40 em'

    m1

    42.000

    45.000

    4.

    Buis Beton dia. 20cm (1m')

    m1

    40.000

    45.000

    5.

    Buis Beton dia. 30cm (1m')

    m1

    53.000

    56.000

    6.

    Buis Beton dia.

    40cm

    (1m')

    m1

    70.000

    74.000

    7

    Buis Beton dia. 50cm (1m')

    stk

    84.000

    90.000

    B.

    Buis Beton dia. 60em (1m')

    stk

    101.000

    110.000

    9.

    Buis Beton dia. 100cm (0.50m)

    stk

    140.000

    150.000

    10.

    Buis Beton dia. BOem (0.50m)

    stk

    125.000 132.000

    11.

    BuisTanah dia 10cm (0.50m)

    stk

    9.000 10.000

    12.

    Buis Tanah dia. 15em (0.50m)

    stk

    12.000

    14.000

    13.

    Buis Tanah dia. 20em (0.50m)

    stk

    14.000 16.000

    14.

    Buis Tanah dia. 25em (0.50m)

    stk

    16.000

    1B.OOO

    15.

    lnjuk

    kg

    9.000

    10.000

    H

    B H N LOG M D N B H N J DINY

    1.

    Besi Beton U-24 Rata-rata

    kg

    9.500

    9.BOO

    2.

    Besi Beton U-39/ U-32 Rata-rata

    kg

    9.700

    11.000

    3.

    Pagar BRC Lengkap Tiang (Tanpa Pondasi)

    m2

    130.000 150.000

    4.

    Bondek

    m2

    120.000 135.000

    5.

    IWF Ex.

    ON

    Sll

    kg

    12.000 13.000

    6.

    IWF Ex. Jepang

    kg

    13.000

    14.000

    7

    Besi Profil

    ON

    Sll

    kg

    12.000

    13.000

    B.

    Besi Profil Ex. LN kg 11.000 12.000

    9.

    Besi CLip Channel

    kg

    11.000 12.000

    10.

    Ongkos Galvanis Besi

    kg

    3.400

    3.BOO

    11.

    Kawat Beton

    kg

    1B.OOO 20.000

    12.

    KawatOuri

    m1

    4.000 5.200

    13.

    Kawat Pengikat

    m1

    2.500 2.750

    14.

    Kawat Bronjong

    4mm

    kg

    22.000 25.000

    15.

    KawatTembaga

    kg

    20.000

    23.000

    16.

    Ram Nyamuk Hijau

    m2

    12.000 14.000

    17.

    Ram Kawat 1x1em

    m2

    13.000

    15.000

    1B.

    Ram A yam

    m2

    12.000 13.000

    19.

    Kawat Kasa 1x1em (Putih)

    m2

    25.000

    30.000

    20.

    Kawat Harmonika4em m2 26.000

    2B.OOO

    Eo S/34 T HUN XXI 2015

    JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI NTERIOR

    97

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    8/56

    I JOURNAL OF

    BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

    tt

    ::

    0

    't::

    -

    21.

    Kawai Harmonika 2cm

    m2

    22.000

    24.000

    I)

    22.

    Kawai

    Las Listrik

    kg

    23.000

    25.000

    -

    23.

    WiremeshM8

    m2

    65.000

    68.000

    i;;

    24.

    WiremeshM6

    m2

    46.000

    48.000

    25.

    Timah

    kg

    95.000

    98.000

    26.

    TimahHitam

    kg

    150.000

    160.000

    27.

    Ram NyamukAiuminium

    m2

    30.000

    32.000

    28.

    Plat Strip dia. 2x30mm (6 m1)

    bt

    27.000

    32.000

    29.

    Plat Strip dia. 3x30mm

    6 m1)

    bt

    42.000

    45.000

    30.

    Plat Aluminium 0.2mm

    m2

    19.000

    21.000

    31.

    Plat Aluminium 0.3mm

    m2 25.000 27.000

    32.

    Plat Aluminium 0.4mm

    m2

    35.000

    37.000

    '

    33.

    Plat Aluminium 0.5mm

    m2

    47.000

    49.000

    34.

    Plat Aluminium 0.6mm

    m2

    58.000

    63.000

    35.

    PlatAiuminium 1.0mm

    m2

    100.000

    13.000

    36.

    Kusen Aluminium

    Natural1.3mm

    t

    =

    1,3mm (4 )

    m1

    68.000

    72.000

    37.

    Kusen Aluminium Warna

    1.3mm

    t =1

    3mm

    (4 )

    m1

    85.000

    87.000

    38.

    Daun JendelaAiuminium Natural Tanpa kaca dan Accessories)

    m2

    65.000

    68.000

    39.

    Daun JendelaAiuminium

    Warna Tanpa kaca

    dan Accessories)

    m2

    72.000

    76.000

    40.

    Daun

    Pintu

    Aluminium

    Natural Tanpa kaca

    dan Accessories)

    m2

    68.000

    70.000

    41.

    Daun Pintu

    Aluminium

    Warna Tanpa kaca dan

    Accessories)

    m2

    72.000

    75.000

    42. Handle Aluminium (Tarikan PintuAiurniniurn) bh 35.000 40.000

    43.

    KaitAnginAiuminium

    ps

    65.000

    70.000

    44.

    Karel

    Aksesories Kusen/ Pintu Aluminium

    m1

    5.000

    6.000

    45.

    Seng Plat BJLS 30 dia. 6Dcm

    m1

    30.000

    32.000

    46.

    Seng Plat BJLS 30 dia. 90cm

    m1

    42.000

    44.000

    47.

    Plat Besi

    Tipis 1.2mm

    kg

    15.000

    16.000

    48.

    Plat Besi Tipis

    0.8mm

    kg

    22.000

    24.000

    49.

    Plat Besi 2mm s/d 5mm

    kg

    13.000

    14.000

    50.

    Plat Besi 6mm s/d 10mm

    kg

    13.000

    14.000

    51.

    Plat Besi 1Dmm keatas

    kg

    13.000

    14.000

    52.

    Lem kuning (aibon)

    kg

    34.000

    36.000

    53.

    Lem fox

    kg

    35.000

    36.000

    I.

    BAHANKACA

    1.

    Kaca Polos 2mm (ASAHI)

    m2

    40.000

    42.000

    2.

    Kaca Polos 3mm (ASAHI)

    m2

    50.000

    56.000

    3.

    Kaca Polos

    5mm

    (ASAHI)

    m2

    85.000

    90.000

    4.

    Kaca Rayben 5mm (ASAHI)

    m2

    125.000

    135.000

    5.

    Kaca Rayben 8mm (ASAHI)

    m2

    150.000

    160.000

    6.

    Kaca Rayben 12mm (ASAHI)

    m2

    205.000

    215.000

    7

    Kaca Patri Lokal Terpasang (ASAHI)

    m2

    680.000

    700.000

    8.

    Kaca Patri ex. Luar Negeri Terpasang

    m2

    3.000.000

    3.200.000

    9.

    Kaca 8mm Graver

    m2

    845.000

    850.000

    10. Glass Block ON 20x20 (Kedawung)

    bh

    20.000 24.000

    11.

    Glass Block ON 20x20 Ex. LN

    bh

    35.000

    38.000

    J

    B H N P KU D N MUR

    B UT

    1.

    Paku 1cm s/d 3cm

    kg

    20.000

    22.000

    2.

    Paku

    4cm

    s/d ?em

    kg

    15.000

    17.000

    98

    JURNAL

    HARGA

    SATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    Eo1s

    34 TAHUN XXI 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    9/56

    JOURNAL OF

    BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

    :

    ::

    0

    :

    3

    Paku Scm s/d 12cm

    kg

    15.000

    17.000

    4.

    Paku Beton

    2cm

    s/d5cm

    bh

    400

    500

    (I)

    5.

    Paku Skrup

    kg

    20.000 22.000

    ....

    6.

    Paku Kait Lengkap

    bh

    800

    1.000

    Paku Cacing

    kg

    28.000

    30.000

    8.

    Besi Beugel Kuda-kuda

    kg

    15.000

    18.000

    .

    DukAngker

    bh

    3.200

    3.600

    10.

    Angker Mur Baut dia. 19 panjang 60cm

    bh

    28.000

    30.000

    1.

    Mur Baut HTB dia. 19 s/d 16 (5cm)

    bh

    8.600

    10.000

    12.

    MurBaut Biasadia.19 s/d 16 (15cm)

    bh

    4.000

    4.500

    13.

    Piser dia. 12 s/d 20cm

    bh

    2.000

    2.500

    K.

    B H N

    PERPIP N

    '

    .

    Besi Pip a untuk Hydrant BSP dia. 1 bt 265.000 278.000

    2.

    Besi Pipa untuk Hydrant BSP dia. 1.25

    bt

    285.000

    299.000

    3.

    Besi Pipa untuk Hydrant BSP dia. 1.5

    bt

    375.000

    393.000

    4.

    Besi Pipa untuk Hydrant BSP dia. 2

    bt

    485.000

    509.000

    5.

    Besi Pipa untuk Hydrant BSP dia. 2.5

    bt

    550.000

    577.000

    6.

    Besi Pipa untuk Hydrant BSP dia. 3

    bt

    750.000

    787.000

    7

    Besi Pipa untuk Hydrant BSP dia. 4

    bt

    1.100.000

    1.155.000

    8.

    Besi Pipa untuk Hydrant BSP dia. 6

    bt

    1.600.000 1.680.000

    9.

    Besi Pipa Hitam dia. 1 t=2mm

    bt

    150.000

    157.000

    10.

    Besi Pipa Hitam dia. 2 t=2mm

    bt

    285.000

    299.000

    11.

    Besi Pipa Hitam dia. 3 t=2mm

    bt

    380.000

    399.000

    12.

    Besi Pipa Hitam dia. 4

    t=2mm

    bt

    557.000

    584.000

    13.

    Besi Pipa Hitam dia. 6 t=2mm

    bt

    760.000

    798.000

    14.

    Pipa GIP MediumAdia. 1/2 (6 m1)

    bt

    135.000

    141.000

    15.

    Pipa GIP Medium Adia. 3/4 (6 m1)

    bt

    185.000

    194.000

    16.

    Pipa GIP Medium A dia. 1 (6 m1)

    bt

    275.000

    288.000

    17.

    Pipa GJP MediumAdia. 11/4 (6 m1)

    bt

    350.000

    367.000

    18.

    Pipa GJP Medium A dia. 1 1/2 (6 m1)

    bt

    415.000

    435.000

    19.

    Pipa GIP Medium Adia. 1 3/4 (6 m1)

    bt

    485.000 509.000

    20.

    Pipa GIP MediumAdia. 2 (6 m1)

    bt

    600.000

    630.000

    21.

    Pipa

    GJP

    Medium A dia. 2 1/2 (6 m1)

    bt

    785.000 824.000

    22.

    Pipa GJP MediumAdia. 3 (6 m1)

    bt

    835.000 876.000

    23.

    Pipa GJP MediumAdia.

    4

    (6 m1)

    bt

    1.250.000

    1.312.000

    24.

    Macam-macam Sambungan GIP dia. 1/2

    bh

    4.000 4.200

    25.

    Macam-macam Sambungan

    GJP

    dia. 3/4

    bh

    5.000 6.000

    26.

    Macam-macam Sambungan

    GJP

    dia. 1

    bh

    6.000

    6.500

    27.

    Macam-macam Sambungan

    GJP

    dia.

    11/4

    bh

    7.000 8.000

    28.

    Macam-macam Sambungan GIP dia. 11/2

    bh

    10.000

    12.000

    29.

    Macam-macam Sambungan GIP dia. 1 3/4

    bh

    13.000

    14.000

    30.

    Macam-macam Sambungan GIP dia. 2

    bh

    16.000

    18.000

    31.

    Macam-macam Sambungan

    GJP

    dia. 21/2

    bh

    26.000 28.000

    32.

    Macam-macam Sambungan

    GJP

    dia. 3

    bh

    40.000

    42.000

    33.

    Macam-macam Sambungan GIP dia. 4

    bh

    55.000

    60.000

    34.

    Pipa PVC RUCIKA type

    AW

    dia. 1/2

    bt

    30.000

    35.000

    35. Pipa PVC RUCIKA type

    AW

    dia. 3/4

    bt

    34.000

    67.000

    36.

    Pipa PVC RUCIKAtypeAW dia. 1

    bt

    46.000

    48.000

    EDISI 34 TAHUN XXI 2 15

    JURNAL

    HARGA

    8ATUAN BAHAN BANGUNAN, KoNSTRUKSI NTERIOR

    499

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    10/56

    I JOURNAL OF

    BUILDING CONSTRUCTION,

    INTERIOR

    & MATERIAL

    PRICE

    tJ

    ::tJ

    0

    J;

    37,

    Pipa PVC RUCIKA type

    AW

    dia. 11/4

    bt

    56.000 61.000

    38.

    Pipa PVC RUCI

    KA

    type AW dia. 1 1/2

    bt

    80.000 85.000

    (I)

    39.

    Pipa PVC RUCIKAtypeAW dia. 2

    bt

    130.000

    135.000

    -

    :

    40.

    Pipa PVC RUCIKA type AW dia. 2 1/2

    bt

    180.000 185.000

    41.

    Pipa PVC RUCIKA type AW dia. 3

    bt

    245.000 260.000

    42.

    Pipa PVC RUCIKAtypeAW dia. 4

    bt

    410.000 430.000

    43.

    Pipa PVC RUCI

    KA

    type AW dia. 6

    bt

    725.000 740.000

    44.

    Pipa PVC RUCIKAtypeAW dia. 8

    bt

    1.100.000 1.200.000

    Ill

    45.

    Pipa PVC

    MASPIONABU

    dia. 1/2 (AW)

    bt

    23.000

    24.000

    ::.

    46.

    Pipa PVC MASPION ABU dia. 3/4 (AW)

    bt

    28.000 32.000

    47.

    Pipa

    PVC

    MAS PION ABU dia. 1 (AW) bt 32.000 35.000

    48.

    Pipa PVC MASPION ABU dia. 1 1/4 (AW)

    bt

    46.000 48.000

    '

    49.

    Pipa

    PVC

    MAS PION ABU dia. 11/2 (AW)

    bt

    60.000 65.000

    50.

    Pipa PVC MAS PION ABU dia. 2 (AW)

    bt

    92.000 95.000

    51.

    Pipa PVC MAS PION ABU dia. 2 1/2 (AW)

    bt

    115.000 120.000

    52.

    Pipa PVC MASPION ABU dia. 3 (AW)

    bt

    175.000 185.000

    53.

    Pipa PVC MAS PION ABU dia. 4 (AW)

    bt

    260.000 265.000

    54.

    Macam-macam Sambungan Paralon dia. 1/2

    bh

    3.000 4.000

    55.

    Macam-macam Sambungan Paralon dia. 3/4

    bh

    3.500 4.500

    56.

    Macam-macam Sambungan Paralon dia. 1

    bh

    4.000 5.000

    57.

    Macam-macam Sambungan Paralon dia. 11/4

    bh

    5.000 6.000

    58.

    Macam-macam Sambungan Paralon dia. 1 1/2

    bh

    5.500 6.500

    59.

    Macam-macam Sambungan Paralon dia. 1 3/4

    bh

    6.000 6.500

    60.

    Macam-macam Sambungan Paralon dia. 2

    bh

    8.000 9.000

    61.

    Macam-macam Sambungan Paralon dia. 21/2

    bh

    11.000 13.000

    62.

    Macam-macam Sambungan Paralon dia. 3

    bh

    16.000 18.000

    63.

    Macam-macam Sambungan Paralon dia. 4

    bh

    22.000 24.000

    64.

    Sambungan Pipa PVC

    JenisAW

    4

    TY

    bh

    44.000 48.000

    65.

    Lem Paralon

    tb

    7.000 7.500

    66.

    Solatif Leideng

    gl

    2.000

    2.500

    67.

    Pipa PVC 4 berlobang jenis AW

    m1

    68.000 75.000

    L

    B H N S NITER

    1.

    Stop Kran 3/4 KIT

    bh

    75.000 85.000

    2.

    Stop Kran 1 KIT

    bh

    100.000 115.000

    3.

    Stop Kran 1 1/2 KIT

    bh

    170.000 185.000

    4.

    Stop Kran 2 KIT

    bh

    250.000

    265.000

    5.

    Stop Kran 2 1/2 KIT

    bh

    450.000 465.000

    6.

    Stop Kran 3 KIT

    bh

    680.000 705.000

    7

    Check Valve 1/2

    bh

    50.000 60.000

    8.

    Double Neple 1/2

    bh

    7.000 8.000

    9.

    Water Mur 1/2

    bh

    10.000 12.500

    10.

    GateWaive 1/2

    bh

    60.000 63.000

    11.

    Saringan

    Air

    Lt. KM Stainless Steel

    bh

    30.000 35.000

    12. Apoer Bath Tube

    bh

    120.000 125.000

    13.

    Kran Stainless Lokal Kait

    bh

    55.000 60.000

    14.

    Shower dengan liang

    bh

    200.000 240.000

    15.

    Shower tanpa liang

    bh

    150.000 185.000

    16.

    Kran tembok sun eui dia. 1/2

    bh

    50.000 60.000

    500

    JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI NTERIOR

    Eotst 4 TAHUN XXI 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    11/56

    Q>

    JOURNAL OF

    BUILDING CONSTRUCTION, INTERIOR &

    MATERIAL

    PRICE

    .,

    :::0

    0

    .,

    17.

    Kran tembok ITAP dia. 1/2

    bh

    40.000

    45.000

    18.

    Kran Bebek Sun eui 1/2

    bh

    95.000

    105.000

    19. Kran bebek ITAP 1/2

    bh

    75.000 85.000

    (I)

    ....

    20.

    Kran Panas Dingin San Eui Standard

    bh

    170.000

    185.000

    1.

    Bath Cape Washteren

    unit

    485.000

    510.000

    22.

    Tempat Sabun Poslin

    bh

    30.000

    35.000

    3.

    Wastafellengkap TOTO

    LW

    230

    unit

    1.900.000

    1.950.000

    24.

    Wastafel Lengkap INA

    unit

    950.000

    1.100.000

    25.

    Closet Jongkok Poslin warn a TOTO

    unit

    180.000

    200.000

    OJ

    26.

    Closet Jongkok Standard Putih Poslin TOTO

    unit

    160.000

    165.000

    ): .

    27.

    Closet Jongkok Lengkap Sistem

    Jet TOTO

    unit

    550.000

    585.000

    8.

    Closet Duduk Warna Standard TOTO C 240 Lengkap

    unit

    2.000.000

    2.200.000

    29.

    Wastafel Bulat Warna Standard Lengkap Toto

    unit

    950.000

    1.000.000

    '

    0.

    Closet duduk warn a standard lengkap INA

    bh

    950.000

    1.100.000

    31.

    Urinoir Lengkap

    TOTO

    warna standard lengkap

    unit

    1.650.000

    1.850.000

    32.

    Penyekat poslin urinoir

    TOTO

    bh

    420.000

    450.000

    33.

    Kitchen Zink Stainless Standard Lokal

    1

    lubang)

    bh

    150.000

    185.000

    34.

    Kitchen

    Zink Stainless Stainless

    Non Standard Franke 1 Lubang)

    bh

    250.000

    260.000

    35.

    Kitchen

    Zink

    Stainless Stainless Non Standard Franke

    2

    Lubang)

    bh

    420.000

    450.000

    M

    B H NPENUTUPLUB NG

    1.

    Atap Plastik Gelombang 80x180

    lbr

    23.000

    26.000

    2.

    Atap Fiber Glass Tipis 80x180 (Gelombang)

    lbr

    38.000

    40.000

    3.

    Atap Fiber Glass Tebal80x180 (Gelombang)

    lbr

    65.000

    72.000

    4.

    AtapAiuminium Natural USR 26 (JAINDO)

    m2

    135.000

    145.000

    5.

    A ap Aluminium Warn a USR 26 (JAINDO) m2 150.000 165.000

    6.

    AtapAsbes Gelombang

    Kecil mrn

    80x180

    lbr

    35.000

    38.000

    7

    AtapAsbes

    Gelombang Besar

    5mm

    105x180

    lbr

    46.000

    49.000

    8.

    Atap Tegola Kubota, Lengkap

    m2

    285.000

    290.000

    9.

    Atap Tegola Kwalitas Sedang

    m2

    170.000

    175.000

    10.

    Aluminium Foile

    m2

    8.500

    12.000

    11.

    Atap Genteng Plentong pres Bakar Kw. I

    bh

    950

    1.100

    12.

    Atap Genteng Plentong pres Molen Oven

    Kw.

    1

    bh

    1.100

    1.250

    13.

    Atap Genteng Flam pres Molen Oven Jatiwangi

    bh

    1.200

    1.300

    14.

    Bubung Genteng pres Bulat ex. Jatiwangi

    bh

    4.500

    5.000

    15.

    Genteng Bubungan ex. Jatiwangi Segi Tiga

    bh

    4.000

    4.500

    16.

    Genteng Bubungan Beton

    bh

    6.000

    6.500

    17.

    Genteng Metal (Rainbow Roof)

    m2

    135.000

    140.000

    18.

    Genteng Metal hana

    m2

    100.000

    105.000

    19.

    Nok Alas Metal (Rainbow Roof)

    m1

    90.000

    94.000

    20.

    Nok Alas Metal hana

    m1

    52.000

    54.000

    21.

    Nok Pinggir Metal (Rainbow Roof)

    m1 65.000

    68.000

    22.

    Nok Pinggir Hana

    m1

    56.000

    58.000

    23.

    Wall Flasing (Rainbow Roof)

    m1

    65.000

    68.000

    24.

    Wall Flashing Hana

    m1

    55.000

    58.000

    25.

    Atap Genteng Beton

    Warna

    14,5/m2

    m2

    60.000

    62.000

    26.

    Genteng Beton Natural

    m2

    48.000

    53.000

    27.

    Sirap kelas I (801m2)

    bh

    1.300

    1.500

    28. Genteng Keramik Naturallntan 14,5/m2 m2 70.000 80.000

    EDISI 34 TAHUN XXI 2 15

    JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI NTERIOR

    501

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    12/56

    I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR MATERIAL PRICE

    tt

    ::0

    0

    tt

    29.

    Genteng Keramik G\asur Standard 14,5/m2

    m2

    80.000

    90.000

    I)

    30.

    Genteng Keramik G\asur Specia\14,5/m2

    m2

    110.000

    120.000

    -

    31.

    Genteng Keramik G\asur Premium 14,5/m2

    m2

    140.000

    150.000

    32.

    Genteng Murando Natura\1

    m2

    = 20bh

    bh

    2.300

    2.500

    33.

    Genteng Murando Glasur 1m2= 20bh

    bh

    2.500

    2.700

    34

    Bubung Murando Natural

    bh

    4.800

    5.000

    35.

    Bubung Murando G\asur

    bh

    6.000

    7.000

    36.

    Bubungan Genteng Keramik

    bh

    12.000

    13.000

    N

    B H N MEK N\K L

    1.

    Jockey Pump kap.

    80gln/menit

    100m1 (18.6kW) unit 35.000.000 37.000.000

    2.

    Electrical Pump kap. 750gln/ menit 120 m1 (90kW)

    unit

    120.000.000

    122.000.000

    '

    3.

    Diesel Pump kap. 750gln/ menit 120m1 (105kW)

    unit

    300.000.000

    305.000.000

    4.

    Presure Tank kap. 500\iter lengkap

    unit

    17.500.000

    18.000.000

    5.

    Hydran Box dalam gedung (lengkap)

    unit

    3.250.000

    3.350.000

    6.

    Fire House 1.5x30m

    +

    nose

    unit

    2.500.000

    2.750.000

    7

    Exhouse Fan H 600 W 60x60cm

    unit

    900.000

    950.000

    8.

    Exhouse Fan H 350 W CFM 50x50cm

    unit

    600.000

    635.000

    9.

    Exhouse Fan H 145 W 45x45cm

    unit

    450.000

    485.000

    10.

    AC Split 3PK setara TOSHIBA

    unit

    8.526.000

    8.672.000

    11.

    AC Split 2PK setara TOSHIBA Plasma

    unit

    6.648.000

    6.850.000

    12.

    AC

    Split 1 PK setara TOSHIBA Plasma unit

    3.750.000

    3.850.000

    13.

    Mesin

    AC

    Split TOSHIBA (Indoor/ Outdoor Unit)

    1 BTU

    1.600

    1.700

    0

    B H N ELEKTRIC L

    1.

    Kabel NYA 1x1.5 Prima (1 roll = 50m')

    ro\

    225.000

    240.000

    2.

    Kabel NYA 1x2.5 Prima

    (1

    roll = 50m')

    ro\

    275.000

    285.000

    3.

    Kabel NYM 2x1.5 Prima (1 roll = 50m')

    m'

    5.000 5.500

    4.

    Kabel NYM 3x1.5 Prima (1 ro\1 = 50m')

    m'

    5.800 6.000

    5.

    Kabel NYM 2x2.5 Prima (1 ro\1 = 50m')

    m'

    6.500

    7.000

    6.

    Kabel NYM 3x2.5 Prima

    (1

    ro\1 = 50m')

    m'

    8.500

    8.700

    7

    Kabel NYM 4x2.5 Prima (1

    ro\1

    = 50m')

    m'

    12.000 13.000

    8.

    Kabel NYM 2x4 Prima

    (1

    roll= 50m')

    m'

    11.000

    12.000

    9.

    Kabel NYM 3x4 Prima (1

    roll=

    50m')

    m'

    14.000

    16.000

    10.

    Kabel NYM

    4x4

    Prima

    (1 roll=

    50m') m' 16.000 18.000

    11.

    Kabel NYM 2x6 Supreme

    (1

    roll = 50m')

    m'

    18.000

    19.000

    12.

    Kabel NYM 3x6 Supreme (1 roll = 50m')

    m'

    20.000

    22.000

    13.

    Kabel NYM 4x6 Supreme

    (1

    ro\1 = 50m')

    m'

    24.000

    26.000

    14.

    Kabel NYM 2x1 0 Supreme

    (1

    ro\1 = 50m')

    m'

    19.000

    21.000

    15.

    Kabel NYM 3x1 0 Supreme

    (1

    roll= 50m')

    m'

    30.000

    32.000

    16.

    Kabel NYM 4x1 0 Supreme (1 ro\1 = 50m')

    m'

    32.000

    35.000

    17.

    Kabel NYM 4x16 Supreme (1 roll = 50m')

    m'

    42.000

    45.000

    18.

    Kabel NYY 2x4 Supreme (1

    ro\1

    = 50m')

    m'

    20.000 22.000

    19.

    Kabel NYY 3x4 Supreme

    (1

    roll = 50m')

    m'

    24.000 26.000

    20.

    Kabel NYY 4x4 Supreme

    (1

    roll= 50m')

    m'

    32.000

    35.000

    21. Kabel NYY 2x6 Supreme

    (1

    roll=

    50m') m' 26.000 29.000

    22.

    Kabel NYY 3x6 Supreme (1

    ro\1

    = 50m')

    m'

    36.000

    38.000

    23.

    Kabel NYY 4x6 Supreme (1

    ro\1

    = 50m')

    m'

    44.000

    46.000

    24.

    Kabel

    NYY

    2x1 0 Supreme (1

    ro\1

    = 50m')

    m'

    38.000

    40.000

    25.

    Kabel

    NYY

    3x1 0 Supreme (1 ro\1 = 50m')

    m'

    54.000 60.000

    502

    JuRNAL

    HARGA

    SATUAN BAHAN BANGUNAN, KoNSTRUKSI NTERIOR

    EDIS 34

    TAHUN

    XX 2015

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    13/56

    JOURNAL OF BUILDING CONSTRUCTION, INTERIOR MATERIAL PRICE I

    tt

    :::

    0

    26.

    Kabel NYM 4x10 Supreme

    1

    roll= 50m')

    m'

    68.000

    73.000

    27.

    Kabel NYM 4x16 Supreme 1 roll= 50m')

    m'

    84.000

    90.000

    (I)

    28.

    NSFB FUJI

    EA-100A

    bh

    530.000 550.000

    -

    9.

    NSFB FUJI EA-150A

    bh

    1.550.000

    1.600.000

    0.

    Rumah Panel 30x40x20cm (Kosong)

    unit

    160.000

    175.000

    31.

    Skring Kas 2 Group Biasa

    unit

    120.000

    130.000

    2.

    Skring Kas 3 Group Biasa

    unit

    150.000

    160.000

    33.

    Skring Kas 5 Group Biasa

    unit

    310.000

    320.000

    4.

    MCB 1 PHASE

    bh

    45.000

    50.000

    35.

    MCB 3 PHASE

    bh

    65.000

    70.000

    36.

    Tahanan 50A Merk Fuji

    bh

    340.000

    350.000

    37.

    Saklar Broko Tunggal Standard 1 Phase)

    bh

    16.000

    18.000

    38.

    Saklar Broko Seri Standard 1 Phase)

    bh

    20.000

    22.000

    9.

    Stop Kontak Broko Standard

    1

    Phase)

    bh

    16.000

    18.000

    40.

    Stop Kontak Broco 3 Phase (Out Bow)

    bh

    28.000

    30.000

    41.

    Stop Kontak Broco 3 Phase (In Bow)

    bh

    28.000

    30.000

    42.

    Stop Kontak Handle 3 Phase

    bh

    37.000

    42.000

    43.

    lnstalasi Titik Lampu I Stop kontak (upah dan alai)

    ttk

    115.000

    120.000

    44.

    Lampu Pijar 25

    Watt

    s/d 100

    Watt

    bh

    10.000

    12.000

    45.

    Lampu Neon TL Phillip 20W

    bh

    15.000

    17.000

    46.

    Lampu Neon TL Phillip 40W

    bh

    30.000

    34.000

    47.

    Trafo TL 20 W (Phillip)

    bh

    28.000

    30.000

    48.

    TrafoTL40W (Phillip)

    bh

    28.000

    30.000

    49.

    Trafo TL 20 W (Sinar)

    bh

    24.000

    26.000

    50.

    Trafo TL 40 W (Sinar)

    bh

    24.000

    26.000

    51.

    Stater Neon Phillip

    bh

    4.000 5.000

    52.

    Stater Neon Biasa

    bh

    2.500

    3.000

    53.

    Rumah TL In Bow/ Out Bow 2x20 W (Kosongan)

    bh

    72.000

    95.000

    54.

    Down Light SL 25 W Phillips

    bh

    65.000

    75.000

    55.

    Lampu SL Phillips 20W

    bh

    30.000

    35.000

    56.

    Lampu Sirkel TL 20W Lengkap

    bh

    50.000

    54.000

    57.

    Lampu Mercuri 80W

    bh

    135.000

    150.000

    58.

    Lampu Taman Tiang + Lampu 1 Buah

    bh

    165.000

    200.000

    59.

    Lampu Baret 30cm + Neon

    bh

    150.000

    160.000

    60.

    Lampu Neon Acrilic 2x40W Lengkap

    bh

    300.000

    325.000

    61.

    Jarum Penangkal Petir 16

    bh

    30.000

    35.000

    62. Kawai BC (Tembaga) kg 40.000 50.000

    63.

    Pentanahan Penangkal Petir

    ttk

    250.000

    265.000

    64.

    Pentanahan Panel

    ttk

    130.000

    140.000

    P

    B H N L T PENGG NTUNG D N KUNCI

    1.

    Kunci Silinder ALFA untuk Pintu Aluminium

    bh

    65.000

    70.000

    2.

    Tarikan Pintu Aluminium

    bh

    25.000

    30.000

    3.

    Kunci 2 Slagg ROYAL

    bh

    80.000

    85.000

    4.

    Rei Handerson Lengkap

    bh

    225.000

    270.000

    5.

    Ret Maraton I Pi ntu

    unit

    165.000

    200.000

    6.

    Kunci 2 Slagg Silinder SEIS asli type 210 s/d 226

    bh

    250.000

    275.000

    7

    Kunci 2 Slaag Ancor Asli

    bh

    175.000

    200.000

    8.

    Kunci 2 Slaag ISO

    bh

    140.000 150.000

    Eo1s1 4 TAHUN

    XXI 2 15

    JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI NTERIOR

    503

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    14/56

    I JOURNAL OF

    BUILDING CONSTRUCTION,

    INTERIOR

    MATERIAL PRICE

    tl

    ::

    'tl

    -

    9.

    Kunci KM Bulat Kualitas Biasa

    bh

    55.000

    60.000

    I)

    10.

    Kunci KM

    BulatALFA

    bh

    65.000

    75.000

    -

    11.

    Kunci 2 Slag Silinder Utama Standard

    bh

    190.000

    200.000

    12.

    Kunci Gembok Besar

    bh

    35.000

    40.000

    13.

    Kunci 2 Slag Kuda Terbang

    bh

    45.000

    50.000

    14.

    Espangolet

    ps

    25.000

    27.000

    15.

    Grendel15cm

    bh

    12.000

    13.000

    O

    16.

    Grendel5cm

    bh

    6.000

    7.000

    :b

    17.

    Hak Angin Kait Jendela Biasa

    ps

    12.000

    15.000

    18.

    HakANgin Jendela Antik

    ps

    15.000

    20.000

    19.

    Hak Angin Sendok Stainless I Kuningan

    bh

    25.000 27.000

    ''

    20.

    Nako Lengkap Tralis 1 Daun

    dn

    20.000

    25.000

    21.

    S\oot pintu berikut Rantai

    bh

    25.000

    27.000

    22.

    Sloot Jendela Tunggal

    bh

    9.500

    12.000

    23.

    Engsel Pintu Uni\on Standard Besar 5

    ps

    25.000

    30.000

    24.

    Engse\ Jendela Unilon

    ps

    20.000

    25.000

    25.

    Engsel patrun

    ps

    10.000

    12.000

    26.

    Engsel Harmonika

    m1

    15.000

    20.000

    27.

    Door Closer Kelas Standard (Kelas Sedang)

    unit

    145.000

    150.000

    28.

    Door Closer Kelas Standard (Kelas Baik)

    unit

    225.000 265.000

    29.

    Door Closer Kelas Rendah

    unit

    80.000 90.000

    30. Tarikan A\mari Rata-rata

    bh

    8.500 10.000

    31.

    Seng BJLS 30 Iebar 60cm (1 roll 50m')

    m1

    28.000 30.000

    32.

    Seng BJLS 30 Iebar 90cm 1 roll 50m')

    m1

    40.000

    45.000

    Q

    BAHAN

    PENGIKAT UNTUK KONSTRUKSI

    JALAN

    1.

    Hotmixjadi Berikut

    alai

    dan bahan bakar (T = 5cm, 9m2)

    ton

    950.000

    1.100.000

    2.

    Aspal (ESO) 1 Drum 150Kg

    kg

    8.300

    8.600

    3.

    Aspal Curah

    kg

    7.400

    7.800

    4.

    Aspal RC 70 (Cilacap)

    kg

    7.800

    8.000

    R

    BAHAN PENGHISAP AIR SUMUR DALAM

    1.

    PompaKodok

    unit

    175.000 185.000

    2.

    Pompa Dragon legal

    unit

    250.000

    265.000

    3.

    Pompa Dragon Asli

    unit

    320.000

    330.000

    4.

    Mesin Pompa

    Air

    1OOW- San yo

    unit

    575.000

    625.000

    5.

    Mesin Pompa

    Air 150W

    Sanyo

    unit

    780.000

    825.000

    6.

    Mesin Pompa Air 250W - Sanyo

    unit

    3.400.000 3.600.000

    7

    Mesin Pompa Air 450W Sanyo

    unit

    5.100.000 5.250.000

    8.

    Pompa Submersible Kap. 150\iter/ menit 3kW

    unit

    20.000.000 22.500.000

    9.

    Gear Pump kap. 60\iter/ menit

    unit

    11.000.000 12.000.000

    10.

    Deep Well dengan kelengkapannya kap. 150\iter/ menit

    unit

    155.000.000 155.500.000

    11.

    HandOi\Pump

    unit

    3.800.000 4.000.000

    s

    BAHAN

    PENAMPUNG AIR

    1.

    Tangki Air Fiber Glass 0.5m3 (Penguin)

    bh

    750.000

    800.000

    2.

    Tangki Air Fiber Glass 1m3 (Penguin)

    bh

    1.200.000 1.300.000

    3.

    Tangki

    Air

    Fiber Glass 2m3 (Penguin)

    bh

    2.350.000 2.600.000

    4.

    Bak KM Fiber 60x60

    bh

    185.000

    200.000

    5.

    Bak teraso WC 40x40

    bh

    175.000

    190.000

    6.

    Bak KM Teraso 60x60

    bh

    220.000

    250.000

    504

    JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI INTERIOR

    oJSJ 4 TAHUN XXI 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    15/56

    JOURNAL OF BUILOING CONSTRUCTION INTERIOR

    &

    MATERIAL PRICE I

    0

    T.

    BIAYAQUALITYCONTROL IZIN-IZIN PENGUKIRAN

    BIASA DAN BIAYA PENYAMBUNGAN

    (I)

    1.

    Penyambungan Listrik PLN

    1watt

    1.200 1.200

    2.

    Sondir Rata-rata

    1

    ttk

    265.000 265.000

    3.

    Pengukuran

    Site+

    Patak

    m2

    1.400

    1.400

    4.

    Biaya Tes Jalan (Quality Control) ttk

    85.000 85.000

    .

    Biaya Tes 1 Macam Beton

    1 spl

    180.000 180.000

    6.

    Biaya pengujian Bahan Agregat

    1 spl

    65.000

    65.000

    Biaya Pengujian Listr ik+gambar+trafo Adm 1 watt

    400 400

    8.

    lzin sumur artesis lengkap

    unit

    5.500.000 5.500.000

    .

    Penyambungan PDAM untuk rumah unit

    1.250.000 1.250.000

    10.

    Geolistrik

    1

    ttk

    315.000 315.000

    i

    u.

    ALATTUKANG

    1.

    Palu 0,5kg

    h

    45.000

    50.000

    2.

    Cangkul

    bh

    40.000

    45.000

    3.

    Singkup bh

    35.000 40.000

    4.

    Sekrop

    bh

    35.000 40.000

    5.

    Pengki

    bh

    10.000 12.000

    6.

    Lingg

    s

    bh

    45.000 48.000

    7

    Roo Meter 50 Meter (Bahan Plastik)

    bh

    70.000 80.000

    8.

    Roo Meter 5 Meter (Bahan Besi)

    bh

    9.

    Selang Plastik untuk

    Water

    Pas dia. 0,5cm

    m'

    10.

    Water Pas Aluminium 60 CM

    bh

    v.

    STANDARD RATA-RATASEWAALAT BESAR ALAT

    MEKANIK TRUK KENDARAAN RODA DAN LAIN NYA

    1.

    Sewa Me sin Gil as 8 Ton s/d 1Oton

    hari

    300.000 312.000

    2.

    Tirud Roller 3Jam/hari

    hari

    240.000 249.000

    3.

    Tam

    dam Roller 6-8

    Ton

    5Jam/ Hari

    hari

    360.000

    374.000

    4.

    Tamdam Roller8-10Ton 5Jam/ Hari

    hari

    320.000

    332.000

    5.

    RollerViberator- Ped 1 ton 4 Jam/ hari

    hari

    294.000 306.000

    6.

    Roller Viberator- Self7 ton 5 Jam/ hari

    hari

    330.000 342.000

    7.

    Roller 3 Whelled- 8

    Ton

    5

    Jam/

    hari

    hari

    198.000 205.000

    8.

    Roller Pneumatic 8-15 Ton 5 Jam/ hari hari

    342.000

    354.000

    9.

    Loader Wheeled 5

    Jam/

    hari

    hari

    450.000 468.000

    10.

    Sewa Kran 30

    Ton

    hari 5.400.000 5.616.000

    11.

    Sewa Exavator Backhoe 5 Jam/ hari

    jam

    150.000 156.000

    12.

    Sewa Draklint

    jam

    174.000

    180.000

    13.

    Whell Loader

    jam

    150.000

    156.000

    14.

    Buldozer 4 jam/hari

    jam

    138.000 144.000

    15.

    Ecavator Hydr 1m3

    jam

    150.000

    156.000

    16.

    Backu

    jam

    150.000

    156.000

    17.

    Motor Grader 5 Jam/ hr

    jam

    180.000 187.000

    18.

    Pheumatic Drill

    hammer

    3 Jam/

    hr hari

    234.000 245.000

    19.

    Vibro Roller

    hari

    210.000 220.000

    EDISJ 4 TAHUN XXI 2 15

    JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    505

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    16/56

    I

    JOURNAL

    OF

    BUILDING CONSTR UCTION, INTERIOR MATERIAL PRICE

    0

    tl

    0

    20.

    Stone Crusher

    hari

    210.000

    220.000

    (I)

    21.

    AMP

    hari

    245.000

    330.000

    -

    22.

    Teractor Equament 2Jam/hari

    hari

    108.000

    115.000

    23.

    ScreningPient 5 Jam/ hari

    hari

    360.000

    375.000

    24.

    Asphalt Finisher

    hari

    330.000

    345.000

    25.

    Asphalt Melting Kalte

    hari

    174.000

    180.000

    26.

    Asphalt Spayer

    hari

    120.000

    125.000

    27.

    Asphal Mixing Plant

    hari

    300.000

    312.000

    28.

    Sprayer Self Prop 10001 4jam/hr hari 300.000 312.000

    29.

    Tamper, Viberator Plate 3Jam/hari

    hari

    240.000

    250.000

    '

    30.

    Crusher/ SCR

    hari

    900.000

    936.000

    31.

    ConcreteMixer0.125m3

    hari

    120.000

    125.000

    32.

    Concrete

    Mixer

    0.5m3

    hari

    150.000

    156.000

    33.

    Concrete Viberator

    hari

    120.000

    125.000

    34.

    Pick Up

    hari

    210.000

    220.000

    35.

    Dump Truck 3.5 Ton

    hari

    420.000

    436.000

    36.

    Dump

    Truck 5 Ton 4

    Jam/

    hari

    hari

    480.000

    500.000

    37.

    Flatbed Truck 3.5 Ton

    hari

    330.000

    345.000

    38.

    Truck 3/4 (Colt Disel)

    hari

    300.000

    312.000

    39.

    Truck Foso

    hari

    780.000

    820.000

    40.

    Mesin Las Listrik 18 pk 8 jam

    hari

    180.000

    190.000

    41.

    Mesin

    PompaAir3

    hari

    120.000

    125.000

    42.

    Stamper 8jam

    hari

    150.000

    156.000

    43.

    Compresor

    Air

    hari

    120.000

    125.000

    44.

    Pump Water (5cm)

    30m3/

    hari

    hari

    120.000

    125.000

    45.

    TraillerTowed 1 Ton 3 Jam/hari

    hari 102.000

    110.000

    46.

    WaterTank Truck 2 Jam/ hari

    hari 180.000

    190.000

    w

    BAHAN

    BAKAR DAN PELUMAS

    1.

    MinyakTanah

    ltr

    9.500

    12.000

    2.

    Kayu Bakar dari Kayu

    Karel

    m3 185.000

    200.000

    3.

    Bahan Bakar Residu

    ltr 1.300

    1.400

    4.

    Minyak Solar

    ltr 5.500

    5.500

    5.

    Bensin Premium

    ltr 6.500

    6.500

    6.

    Plus Oil

    ltr 1.600

    1.700

    7.

    Oli Mesran

    40

    SAE

    ltr 30.000

    36.000

    8.

    Elpiji/ Botol

    12kg 78.000

    80.000

    9.

    Asitilin

    I

    Botol

    15.1 kg

    82.000

    86.000

    10.

    Angin (02)

    I

    Botol

    btl 90.000

    93.000

    11.

    Kawai Las Listrik

    kg 23.000

    25.000

    12.

    Karbit

    19.000

    21.000

    506

    JURNAL

    HARGA

    SATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    Eo1s1 34 TAHUN XXI 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    17/56

    1. Pekerja

    2. Tukang Batu

    3.

    Kepala Tukang Batu

    4.

    Tukang Kayu

    5.

    Kepala Tukang Kayu

    6. Tukang Cat/ pelitur

    7. Kepala Tukang Cat/ pelitur

    8.

    Tukang Besi Beton

    9.

    Kepala T ukang Besi Beton

    10.

    Tukang Besi Profil

    11. Kepala T ukang Besi Profil

    12.

    Mandor

    13.

    Operator Alat Besar

    > JOURNAL OF BUILDING CONSTRUCTION INTERIOR MATERIAL

    PRICE

    I

    DAFTAR HARGA UPAH

    KOTABEKASI

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    hari/8jam

    62.000

    76.000

    90.000

    78.000

    92.000

    76.000

    90.000

    78.000

    92.000

    78.000

    92.000

    105.000

    109.000

    14.

    Pembantu Operator/ mekanik hari/8jam 62.000

    15.

    SupirTruck hari/8jam 93.000

    16. KenekTruk

    hari/8jam 62.000

    17.

    Penjaga Malam hari/8jam 78.000

    ED SI 34 TAHUN XXI 2015 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    507

    'tl

    ::

    0

    I)

    -

    ''

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    18/56

    '0

    ::0

    0

    : 2

    :;:

    (I)

    -

    ""'

    I JOURNAL OF

    BUILDING

    CONSTRUCTION,

    INTERIOR & MATERIAL

    PRICE

    HARGA SATUAI\i PEKERJAAI\i

    KOTABEKASI

    A001

    A002

    A003

    A004

    A005

    A006

    A007

    A008

    A009

    A010

    A011

    A012

    A013

    A014

    A015

    A016

    A017

    A018

    A019

    A020

    A021

    A022

    A023

    A024

    A025

    A026

    1 M2 Pekerjaan Pengukurab Kembali (Site)

    1 M1 Pekerjaan Pasangan Bouwplank

    1 M2 Los Kerja/ Gudang

    1 M2 Pekerjaan Kantor Oireksi

    1 M2 Papan Nama Proyek

    1 M2 Pagar Pengamanan Proyek

    1 M3 Pekerjaan Galian Tanah Biasa Max. Kedalaman 1M'

    1 M3 Pekerjaan Galian Tanah Biasa Max. Kedalaman 2M'

    1 M3 Pekerjaan GaHan Tanah Biasa

    Max.

    Kedalaman 3M'

    1 M3 Pekerjaan Galian Tanah berbatu/ Tanah Keras Max. Kedalaman 1 M'

    1 M3 Pekerjaan Galian Tanah Cadas Max. Kedalaman 1 M'

    1 M3 Pekerjaan Galian Tanah Lumpur Max. Kedalaman 1 M'

    1 M2 Pekerjaan Striping Tebing Setinggi 1M' tebal = 20cm

    1 M3 Pekerjaan Pembuangan Oalam Radius

    15

    M

    1 M3 Urugan Tanah kembali

    1 M3 Pekerjaan Pemadatan Tanah Setiap 20cm

    1 M3 Pekerjaan Lapisan Pudel 1 KP : 3PP : 7 TL Untuk stabilitas tanah

    1 M3 Pekerjaan Lapisan Pudel 1

    KP

    : 5 TL untuk stabilitas tanah

    M2 e k e ~ a a n Pemasangan Lapisan lnjuk T = 10cm

    M3 Pekerjaan Perkerasan Sirtu Oipadatkan Setiap 20cm

    M2 Pekerjaan Pembuatan Jalan Sementara Tebal 20cm

    M3 Pekerjaan Galian Tanah Sumuran

    Max.

    Kedalaman

    1OM

    M3 Urugan Pakai ala besar tanah dari luar dipadatkan (5000m3)

    M3 Urugan Pasir Urug

    1 M3 Lantai Kerja Beton Mutu fc

    =

    7,4 Mpa K 100), slump 3-6)cm, w/c

    =

    0,87

    1 M3 Pasangan Pondasi Cycloof,

    60 beton

    campuran

    1PC: 2PB:

    3KR dan

    4QOfc

    1M3 Pasang Pondasi sumuran dia. 100 em

    1M3 Beton mutu fc=7,4 Mpa (K 100), SLUP (12+2)

    em,

    w/c=0,87

    1M3 Beton mutu fc=7,4 Mpa (K 100), SLUP (12+2) em, w/c=0,78

    1M3 Beton mutu fc=12,2 Mpa (K 150), SLUP (12+2)

    em,

    w/c=0,72

    1M3 Beton mutu fc=14,5 Mpa (K 175), SLUP (12+2) em, w/c=0,66

    1M3 Beton mutu fc=16,9 Mpa (K 200), SLUP (12+2) em, w/c=0,61

    1M3 Beton mutu fc=19,3 Mpa (K 225), SLUP (12+2) em, w/c=0,58

    1M3 Beton mutu fc=21,7 Mpa (K 250), SLUP (12+2) em, w/c=0,56

    1M3 Beton mutu fc=24,0 Mpa (K 275), SLUP (12+2)

    em,

    w/c=0,53

    1 M3 Beton Mutu fc = 26,4 Mpa (K300), slump (12+2)cm, w/c = 0.52

    1M3 Beton mutu fc=28,8 Mpa (K 325), SLUP (12+2)

    em,

    w/c=0,49

    1M3 Beton mutu fc=31,2 Mpa (K 350), SLUP (12+2) em, w/c=0,48

    A030 1 M3 Cor Beton K-175 Ready

    Mix

    Min

    6M3

    Berikut Siang

    A031

    1 M3 Cor Beton K-225 Ready Mix Min 6 M3 Berikut Siang

    A032 1 M3 Cor Beton K-300 Ready Mix Min 6 M3 Berikut Siang

    A033 1OKg Besi Beton terpasang Palos/ Ulir

    A034

    1

    Kg

    Pekerjaan Erection Konstruksi Kuda-kuda Besi

    A035 1 Kg Pekerjaan Baja IWF Ex.

    ON

    A036

    1 Kg Pekerjaan Konstruksi Besi Siku/ Profil Ex. ON

    A037

    10

    Cm

    Pekerjaan Pengelasan dengan Las Listrik tebal = kawat 4mm

    A038 1 Titik Melubang Konstruksi Besi dengan Bar

    A039 1 M2 Pekerjaan Bondex

    A040

    1 M2 Pekerjaan Wiremesh M8

    A041

    1 M2 Bekisting dengan papan

    A042

    1 M2 Bekisting Multipleks 9MM

    A043

    1 M2 Bekisting Multipleks 12MM

    A044 1 M2 Pasangan Stoat Werk

    508 JURNAL HARGA

    SATUAN

    BAHAN

    BANGUNAN, KONSTRUKSI

    NTERIOR

    3.300

    51.540

    586.520

    696.630

    806.490

    335.180

    54.030

    66.570

    79.340

    71.890

    109.230

    87.030

    3.980

    23.660

    18.000

    39.870

    242.990

    195 580

    71.360

    184.930

    109.660

    97.580

    101 070

    193.210

    707.510

    2.194.460

    842.120

    764.170

    800.970

    829.840

    863.980

    896.590

    920.980

    937.110

    964.780

    973.390

    1.005.930

    1.057.370

    958.740

    1.027.710

    1.108.170

    124.640

    1.670

    25.370

    25.370

    22.330

    6.930

    155.450

    89.150

    131.940

    130.080

    137.810

    198.420

    Eotst 4

    3.300

    57.990

    654.830

    781 270

    899.830

    361.660

    54.030

    66.570

    79.340

    71.890

    109.230

    87.030

    3.980

    23.660

    18.000

    39.870

    261.830

    201.860

    201.860

    201.860

    342.800

    97.580

    107.670

    218.290

    765.000

    2.277.150

    879.270

    811.100

    848.780

    878.240

    913.170

    946.380

    971.500

    987.760

    1.051.690

    1.024.360

    1.057.210

    1.108.750

    993.220

    1.085.180

    1.159.900

    128.440

    1.670

    26.630

    26.630

    23.710

    6.930

    172.710

    92.700

    141.460

    136.490

    144.510

    217.890

    TAHUN XX 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    19/56

    JOURNAL

    OF

    BUILDING CONSTRUCTION INTERIOR

    MATERIAL

    PRICE

    1:1

    ::

    0

    1:1

    M3 Pasangan Batu Kosong Anstamping)

    395.970

    -

    3 Pasangan Batu Bronjong

    407.550

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    20/56

    I

    JOURNAL

    OF

    BUILDING CONSTRUCTION, INTERIOR MATERIAL PRICE

    1 M2 Plesteran 1

    PC

    : 5PP, tebal 20cm

    1 M2 Plesteran 1

    PC

    : 6PP, tebal 20cm

    i 1 M2 Plesteran skoning 1

    PC

    : 2PP,Ibr 10 mm

    1 M2 Plesteran ciprat 1

    PC

    : 2PP

    1 M2 Finishing siar pasangan dinding bata merah (=20m')

    1 M2 Finishing siar pasangan dinding conblok ekspose (=8m')

    1 M2 Finishing siar pasangan batu kali adukan 1

    PC

    :2PP

    1 M2Acian

    PC

    1 Unit septitank 2.5x1.5x2m+rembesannya (kantor type besar)

    1 Unit septitank 2x1.5x2m+rembesannya (kantor type kecil)

    1 Unit septitank 1 5x1x1.5m+rembesannya (rumah kapasitas kecil)

    M2 Pengecatan Beton

    ICI

    Eksterior

    M2 Pengecatan Plafond dan dinding Interior

    ICI

    M2 Pengecatan Dinding Vinilex (3x)

    1 M2 Pengecatan Plafond Vinilex (3x)

    1 M2 Pengecatan Dinding Sanlex (3x)

    1 M2 Pengecatan Plafond Sanlex (3x)

    1 M2 Pengecatan Kayu (3x) Berikut Meni

    1 M2 Pengecatan Besi (3x)

    1 M2 Plituran Bangunan (Biasa)

    M2 Plituran Meubulair

    1 M2 Pasangan Rangka Plafond (50x100cm) Kayu Kamper Banjar

    1 M2 Pasangan Rangka Plafond (50x100cm) Kayu Borneo Super

    1 M2 Pasangan Rangka Plafond (60x60cm) Kayu Borneo Super

    1 M2 Pasangan Bahan Plafond Tripleks 4mm Penutup pada rangkanya

    1 M2 Pasangan Bahan Plafond Gypsum 9mm Penutup pada rangkanya

    1 M2

    Pasangan

    Bahan Plafond asbes semen 5mm

    Penutup

    pada rangkanya

    1 M2 Pasangan Bahan Plafon eternit 4mm (1

    x1)

    pada rangkanya

    1 M2 Pasangan Plafond akustik uk. (60x120)cm

    1 M2 Pasangan Bahan Plafon akustik uk. (60x120) em

    1 M2 Pasangan list profil gypsum

    1 M2 Pasangan list profil kayu kamper banjar 4x1

    1 M2 Pekerjaan lisplank kayu kamper banjar 3/30

    1 M2 Pekerjaan lisplank kayu kamper banjar 3/20

    1

    M2

    Pekljaan dinding

    pemisat. partisi

    teakwood

    rangkap, rangkap

    KY K. a ~ a r

    A112 1 M3 Kusen Kayu Kamper Banjarmasin

    A

    113

    1 M3 Kusen Kayu Borneo Super

    A114 1 M3 Kusen Kayu Kamper Samarinda

    A115

    1 M3 Kusen Kayu Jati Jabar Kelas 2

    A116 1 M2 Daun Pintu Panil Kayu Samarinda

    A117

    1 M2 Daun Pintu Panil Kayu Jati Jabar Kelas 2

    A118

    1 M2 Daun Pintu Double Teakwood Rangka Kayu Banjar

    A119

    1 M2 Daun Pintu Panil Teakwood Rangka Kayu Banjar

    1 M2 Daun Pintu Tripleks Ukuran Pintu Lapis Aluminium (KM/WC)

    1 M2 Daun Pintu Tripleks Ukuran Pintu Lapis Formika (KMIWC) Kayu Kamper

    1 M2 Daun Pintu Trip eks Lapis Seng Plat (KM/W C)

    1 M2 Daun Jendela Kaca (Tanpa Kaca) Kayu Kamper Samarinda

    1 M2 Daun Pintu Kaca (Tanpa Kaca) Kayu Kamper Samarinda

    1 M2 Daun Pintu/ Jendela Jalusi

    Kayu

    Kamper Samarinda

    M3 Kuda-kuda oversteik/ konsol kayu kamper banjar (expose)

    M3 Kuda-kuda Kayu Kamper Banjar

    M3 Konstruksi Gording Kamper Banjar

    1 M2 Rangka Atap Genteng Beton/ Keramik K-Banjar (Hanya Rangkanya)

    1 M2 Borneo

    63.470

    64.970

    46.440

    46.930

    38.690

    39.050

    22.550

    22.660

    10.790

    10.840

    47.310

    47.960

    28.680

    28.790

    10.944.340

    12.325.960

    7.050.050

    7.929.770

    4.121.080

    4.616.490

    73.990

    76.570

    67.790

    70.230

    47.530

    48.730

    50.720

    51.980

    33.490

    34.490

    33.380

    34.410

    61.100

    62.800

    61.310

    62.830

    93.290

    99.260

    108.690

    115.430

    150.910

    166.600

    118.720

    127.630

    119.410

    128.930

    39.510 40.400

    33.030

    38.870

    27.590

    30.030

    23.960

    25.190

    251.630

    259.900

    169.880

    174.940

    26.190

    28.670

    21.470

    23.800

    112.100

    118.260

    111.390

    117.550

    370.810

    406.090

    10.017.530

    11.209.380

    7.509.530 8.173.380

    14.207.270

    14.695.120

    13.481.270

    13.969.120

    812.180

    839.130

    776.980

    795.130

    571.090

    589.640

    583.410

    602.510

    622.790

    643.640

    624.440

    642.430

    628.730

    649.580

    559.650

    575.820

    559.650

    575.820

    1.070.900

    1.113.690

    10.468.630

    12.246.840

    8.963.940

    9.917.160

    8.221.270

    9.894.764

    158.700

    180.240

    98.550

    108.780

    Eo S/34 T HUN

    XX 2015

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    21/56

    JOURNAL

    OF BUILDING

    CONSTRUCTION,

    INTERIOR & MATERIAL PRICE

    I

    1 M2 Penutup Atap Sirap 4 Lapis)

    +

    Rangka Atap

    1

    M1

    Pekerjaan Bubungan Atap genteng ex. Jatiwangi

    1

    M1

    Pekerjaan Bubungan Atap genteng Beton

    1

    M1

    Pekerjaan Bubungan Atap genteng Keramik

    1

    M1

    Pasang Talang Datar/Jurai Seng BJLS 30, Lbr 90

    CM

    1

    M1

    Pekerjaan Pagar Depan Tralis Standard

    1

    M1

    Pekerjaan Pagar Belakang/ Samping

    1 M2 Pasang Onderlag Batu Selah T =20cm

    1 M2 Amparan Batu Pecah Mesin

    S/7

    t = 1

    Ocm

    1 M2 Amparan Batu Pecah Mesin 2/3 t =

    Scm

    1 M2 Lapisan Pengisi/ Penutup

    1 M2 Pengaspalan Manual

    1 M2 Hotmix

    Tangan

    T = 3cm (Jadi) untuk

    Hal

    &

    Jalan Kelas

    6

    Ton

    Kebawah

    1 M2 Hotmix Pakai Alat Besar T

    = Scm

    Kelas Jalan 8 Ton Lebih

    1 M2 Konstruksi Penetrasi Lengkap

    1

    M1

    Saluran Grefe Beton 1/2 20cm

    +

    pasangan

    1

    M1

    Saluran Grefe Beton 1/2 30cm

    +

    pasangan

    1 M2 Pasangan Paving Block warna 6

    em

    1 M2 Pasangan Paving Block warna 8

    em

    1

    M2

    Pasangan Paving Block Natural 6

    em

    1 M2 Pasangan Paving Block Natural 8

    em

    1 M3 Membongkar dinding bata

    M3 Membongkar dinding bata

    M2 Membongkar

    plesteran dinding

    M2 Membongkar genteng /sirap

    M2 Membongkar genteng /sirap

    1 M2 Membongkar rangka atap I reng kaso

    1 M2 Membongkar rangka atap I reng kaso

    1 M3 Membongkar Kuda-kuda Gording/ Balok

    1 M3 Membongkar Kuda-kuda Gording/ Balok

    1 M2 Membongkar plafon

    1 M2 Membongkar plafon

    232.200

    100.630

    10S.880

    129.190

    188.260

    1.212.090

    1.298.180

    92.1SO

    41.260

    26.490

    1S.310

    S6.260

    68.410

    119.770

    139.340

    194.070

    221.700

    130.710

    146.S40

    124.0SO

    13S.430

    146.790

    78.S90

    6.290

    2.S10

    38.830

    9.790

    19.S90

    871.420

    SS3.300

    29.100

    9.100

    Eotst 4

    TAHUN

    XXI

    2 15

    JURNAL HARGA 8ATUAN BAHAN BANGUNAN,

    KONSTRUKSI & INTERIOR

    262.120

    111.320

    116.270

    141.S40

    207.320

    1.269.010

    1.3SS.240

    102.870

    46.490

    29.960

    16.640

    S8.SOO

    70.8SO

    138.080

    1S1.600

    20S.390

    23S.920

    134.780

    1S1.7SO

    128.110

    139.S20

    146.790

    78.S90

    6.290

    2.S10

    38.830

    9.790

    19.S90

    871.420

    SS3.300

    29.100

    9.100

    S11

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    22/56

    [ JOURNAL OF BUILDING CONSTRUCTION, INTERIOR MATERIAL PRICE

    NO.

    1

    A001

    A002

    A003

    A004

    ADOS

    ANAUSA

    HARGA SATUAN PEKERJAAN

    KOTABEKASI

    URAIAN

    KOEF

    SAT.

    HARGA

    SAT HARGA SAT

    (MINIMUM) (MAXIMUM)

    2

    3

    4

    5

    6

    1 M2 PEK. PENGUKURAN KEMBALI

    (SITE)_

    Tukang Batu

    0.0100

    org

    76.000.00 76.000.00

    Pekerja

    0.0200

    org

    62.000.00 62.000.00

    Peralatan

    0.5000 lot 2.000.00 2.000.00

    Jumlah

    Keuntungan Max

    umlah

    Dibulatkan

    1

    M1 PEK.

    PASANGAN BOUWPLANK

    Kayu Borneo Super

    0.0100 rri

    4.000.000.00 4.500.000.00

    Paku

    5 - 7

    0.0380

    kg

    15.000.00

    17.000.00

    Onokos Pasano

    0.1550

    Is

    40.570.00 45.646.00

    Jumlah

    Keuntungan Max

    Jumlah

    Dibulatkan

    1 M2

    LOS

    KERJA

    I

    G UDANG

    Kayu Borneo Super

    0.1000

    rri

    4.000.000.00 4.500.000.00

    Paku5H7

    0.2500 kg

    15.000.00

    17.000.00

    Seng Glb

    BJLS

    30

    1.1000 lbr

    28.000.00 30.000.00

    Triplex3 mm

    0.5000

    lbr

    43.000.00 45.000.00

    PC(SOkg)

    0.1000

    zak

    63.500.00 65.000.00

    Peralatan

    0.0250 lot 462.400.00 516.250.00

    Onakos Pasana

    0.1250 Is

    473.960.00 529.156.25

    umlah

    Keuntunaan Max

    Jumlah

    Dibulatkan

    1 M2

    PEK.

    KANTOR DIREKSI

    Kayu Borneo Super

    0.1000

    rri

    4.000.000.00

    4.500.000.00

    Paku5-7

    0.2500 kg 15.000.00

    17.000.00

    Seng Glb BJLS 28 (

    80

    x 180 em )

    1.1000 lbr 28.000.00 30.000.00

    Triplex 3 mm

    0.5000 lbr 43.000.00 45.000.00

    PC 50kg)

    0.1000 zak 63.500.00

    65.000.00

    Pasir Pasang

    0.2500 rri 170.000.00 203.000.00

    Bata Merah

    70.0000 bh 500.00

    550.00

    Perala tan

    0.0200 lot 539.900.00

    605.500.00

    Ongkos Pasang

    0.1500

    Is

    550.698.00 617.610.00

    Jumlah

    Keuntungan Max

    Jumlah

    '

    1 M2 PAPAN NAMA

    PROYEK

    Kayu Borneo Super

    0.1300

    rri 4.000.000 4.500.000.00

    Paku5-7

    0.2500 kg

    15.000.00 17.000.00

    Cat Minyak

    1.0000

    Is

    55.549.00 57.099.00

    Penulisan

    0.1250 Is

    579.299.00 646.349.00

    Ongkos Pasang

    0.1250 Is

    651.711.38 727.142.63

    . l "ml"h

    Keuntunaan Max

    Jumlah

    Dibulatkan

    JUMLAH JUMLAH

    (MINIMUM) (MAXIMUM)

    7= 3x5l 8= 3x6l

    760.00

    760.00

    1.240.00 1.240.00

    1.000.00

    1.000.00

    3.000.00 3.000.00

    300.00 300.00

    3.300.00

    3.300.00

    40.000.00 45.000.00

    570.00 646.00

    6.288.35 7.075.13

    46.858.35 52.721.13

    4.685.84 5.272.11

    51.544.19 57.993.24

    51.540.00 57.990.00

    400.000.00 450.000.00

    3.750.00 4.250.00

    30.800.00 33.000.00

    21.500.00 22.500.00

    6.350.00 6.500.00

    11.560.00 12.906.25

    59.245.00 66.144.53

    533.205.00 595.300.78

    53.320.50 59.530.08

    586.525.50

    654.830.86

    586.520.00 654.830.00

    400.000.00 450.000.00

    3.750.00 4.250.00

    30.800.00 33.000.00

    21.500.00 22.500.00

    6.350.00 6.500.00

    42.500.00 50.750.00

    35.000.00 38.500.00

    10.798.00 12.110.00

    82.604.70 92.641.50

    633.302.70

    710.251.50

    63.330.27 71.025.15

    696.632.97 781.276.65

    696.6,0.00

    7R1 270 0 0_

    520.000.00 585.000.00

    3.750.00 4.250.00

    55.549.00 57.099.00

    72.412.38 80.793.63

    81.463.92 90.892.83

    733.175.,0

    R1R0>'45

    73.317.53

    81.803.55

    806.492.83 899.839.00

    806.490.00

    899.830.00

    512

    JuRNAL HARGA

    SATUAN BAHAN BANGUNAN, KONSTRUKSI

    NTERIOR

    EoJSI

    34

    TAHUN

    XXI 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    23/56

    JOURNAL

    OF

    BUILDING CONSTRUCTION,

    INTERIOR

    MATERIAL

    PRICE

    f

    HARGA

    SAT

    HARGA

    SAT.

    JUMLAH

    JUMLAH

    NO.

    URAIAN

    KOEF

    SAT.

    MINIMUM)

    MAXIMUM)

    MINIMUM)

    MAXIMUM)

    1

    2

    3

    4

    5

    6

    7= 3x5)

    8= 3x6)

    A006

    1 M2

    PAGAR PENGAMAN PROYEK

    Seng Glb BJLS

    28

    ( 80 x 180 )

    1.4300 lbr

    28.000.00 28.000.00

    40.040.000

    40.040.00

    Kayu

    Borneo

    Super

    0.0360

    m3

    4.000.000.00 4.500.000.00

    144.000.00

    162.000.00

    Paku

    5 7

    0.2000

    kg

    15.000.00 17.000.00

    3.000.00 3.400.00

    Pengecatan Cat Mlnyak 2x Bagian Luar

    1.8000

    m2

    37.160.00

    38.082.67 66.888.00

    68.548.80

    Ongkos Pasang

    0.2000

    is

    253.928.00 273.988.80

    50.785.60 54.797.76

    Jumlah

    304.713.60 328.786.56

    Keuntungan

    Max.

    30.471.36

    32.878.66

    Jumlah

    335.184.36 361.665.22

    Dibulatkan

    335.180.00 361.660.00

    A007

    M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M

    Pekerja

    0.7500

    oh 62.000.00 62.000.00

    46.500.00 45.500.00

    Mandor

    0.0250

    oh

    105.000.00 105.000.00 2.625.00 2.625.00

    Jum ah

    49.125.00 49.125.00

    Keuntungan Max.

    4.912.50 4.912.50

    Jumlah

    54.037.50 54.037.50

    Dibulatkan

    54.030.00 54.030.00

    A008

    1

    M3 PEK. GALIAN

    TANAH

    BIASA

    MAX

    KEDALAMAN

    2M'

    Pekerja

    0.9000

    oh

    62.000.00 62.000.00 55.800.00 55.800.00

    Mander

    0.0450

    oh

    105.000.00 105.000.00

    4.725.00 4.7525.00

    Jumlah

    60.525.00 60.525.00

    Keuntungan Max.

    6.052.50 6.052.50

    Jumlah

    66.577.50 66.577.50

    Dibulatkan

    66.570.00 66.570.00

    A009

    1 M3 PEK. GALl AN TANAH BIASA MAX KEDALAMAN 3M'

    Pekerja

    1.0500

    oh

    62.000.00 62.000.00 65.100.00 65.100.00

    Mander

    0.0670

    oh

    105.000.00 105.000.00 7.035.00

    7.035.00

    Jumlah 72.135.00 72.135.00

    Keuntungan Max.

    7.213.50 7.213.50

    Jumlah

    79.348.50

    79.348.50

    Dibulatkan

    79.340.00 79.340.00

    A010

    1M3

    PEK. GALIAN

    TANAH

    BERBATUITANAH

    KERAS MAX

    KEDALAMAN

    1M'

    Pekerja

    1.0000

    oh 62.000.00 62.000.00 62.000.00

    62.000.00

    Mander

    0.0320 oh 105.000.00 105.000.00

    3.360.00 3.360.00

    Jumlah

    65.360.00 65.360.00

    Keuntungan

    Max.

    6.536.00 6.536.00

    Jumlah

    71.896.00 71.896.00

    Dibulatkan

    71.890.00

    71.890.00

    A011

    1M3 PEK. GALlAN TANAH CADAS

    MAXKEDALAMAN

    1M

    Pekerja

    1.5000

    oh

    62.000.00

    66.000.00 93.000.00 93.000.00

    Mandor 0.0600

    oh

    105.000.00

    105.000.00 6.300.00 6.300.00

    Jumlah

    99.300.00 99.300.00

    Keuntungan Max.

    9.930.00 9.930.00

    Jumlah

    109.230.00

    109.230.00

    Dibulatkan

    109.230.00 109.230.00

    A012

    1M3 PEK.

    GALIAN

    TANAH

    LUMPUR

    MAX

    KEDALAMAN

    1M

    Pekerja 1.2000

    oh 62.000.00 62.000.00 74.400.00 74.400.00

    Mandor

    0.0450 oh 105.000.00 105.000.00 4.725.00 4.725.00

    umlah 79.125.00 79.125.00

    Keuntungan Max. 7.912.50 7.912.50

    Jumlah

    87.037.50

    87.037.50

    UIOUiatKan

    OI UOU UU

    0/.UJU.UU

    EDIS 34 TAHUN

    XXI 2 15

    JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    513

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    24/56

    I JOURNAL

    OF

    BUILDING CONSTRUCTION,

    INTERIOR

    MATERIAL

    PRICE

    NO. URAl AN

    KOEF

    SAT.

    HARGA

    SAT.

    HARGA

    SAT.

    JUMLAH JUMLAH

    MINIMUM) MAXIMUM)

    MINIMUM)

    MAXIMUM)

    1 2

    3

    4

    5 6

    7= 3x5)

    8= 3x6)

    A013

    1M2

    PEK. STRIPPINGTEBINGSETINGGI1

    M ,

    TEBAL=20

    CM

    Pekerja 0.0500 oh 62.000.00

    62.000.00

    3.100.00 3.100.00

    Mandor 0.0050

    oh

    105.000.00 105.000.00 525.00 525.00

    Jumlah

    3.625.00 3.625.00

    Keuntungan Max 362.50 362.50

    Jumlah 3.987.50 3.987.50

    Dibulatkan

    3.980.00

    3.980.00

    A014

    1 M3

    PEK.

    PEMBUANGAN

    DALAM

    RADIUS

    15

    METER

    Pekerja

    0.3300

    oh

    62.000.00 62.000.00 20.460.00 20.460.00

    Mandor 0.0100 oh 105.000.00 105.000.00 1.050.00 1.050.00

    umlah 21.510.00 21.510.00

    Keuntungan Max 2.151.00 2.151.00

    Jumlah

    23.661.00 23.661.00

    Dibulatkan

    23.660.00 23.660.00

    A015

    1 M3 URUGAN TANAH KEMBALI

    Pekerja

    0.2500

    oh

    62.000.00 62.000.00 15.500.00 15.500.00

    Mandor

    0.0083

    oh

    105.000.00 105.000.00 87.150 871.50

    Jumlah

    16.371.50 16.371.50

    KeuntunQan Max 1.637.15

    1.637.15

    Jumlah

    18.008.85 18.008.65

    Dibulatkan

    18.000.00 18.000.00

    A016

    1 M PEK PEMADATAN ATANAH SETIAP 20 CM

    Pekerja

    0.5000

    oh

    62.000.00 62.000.00 31.000.00 31.000.00

    Mandor 0.0500 oh 105.000.00 105.000.00 5.250.00 5.250.00

    Jumtah

    36.250.00 36.250.00

    Keuntungan Max

    3.625.00 3.625.00

    Jumlah

    39.875.00 39.875.00

    Dlb olk

    A017

    1

    M3PEK.LAPISAN PUDEL 1KP:3PP:7TL UTKSTABILITASTANAH

    Pasir

    pasang

    0.4000

    m3

    170.000.00 203.000.00 68.000.00 81.200.00

    Kapur Padam

    0.1350

    m3

    86.000.00 94.000.00

    11.610.00

    12.690.00

    Tanah Liat 0.9480

    m3

    52.000.00 55.000.00

    49.296.00 52.140.00

    Pekerja 0.8000

    oh

    62.000.00 62.000.00 49.600.00 49.600.00

    Tukang batu

    0.4000

    oh

    76.000.00 76.000.00 30.400.00 30.400.00

    Kepala Tukang

    0.0400

    oh

    90.000.00 90.000.00 3.600.00

    3.600.00

    Mandor

    0.0800 oh 105.000.00 105.000.00

    8.400.00 8.400.00

    Jumlah

    22.906.00 238.030.00

    KeuntunQan

    Max

    22.090.60

    23.803.00

    Jumlah

    242.996.60 261.833.00

    Dibulatkan

    242.990.00 261.830.00

    A018

    1 M3

    PEK.

    LAPISAN PUDEL 1

    KP:5TL

    UTKSTABILITAS TANAH

    Kapur Padam

    0.2480

    m3

    86.000.00 94.000.00 21.328.00

    23.212.00

    Tanah Liat

    1.2400

    m3

    52.000.00 55.000.00

    64.480.00 68.200.00

    Pekerja

    0.8000 oh 62.000.00

    62.000.00 49.600.00 49.600.00

    Tukang batu

    0.4000

    oh

    76.000.00 76.000.00 30.400.00

    30.400.00

    Kepala Tukang

    batu

    0.0400

    oh

    90.000.00 90.000.00

    3.600.00 3.600.00

    Mandor

    0.0800

    oh

    105.000.00 105.000.00

    8.400.00 8.400.00

    umlah

    177.808.00 183.512.00

    Keuntungan

    Max

    17.780.80 18.351.20

    Jumlah

    195.588.80 201.863.20

    Dibulatkan

    195.580.00 201.860.00

    514

    JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI NTERIOR

    Eotst

    4

    TAHUN XXI 2 15

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    25/56

    JOURNAL OF BUILDING CONSTRUCTION, INTERIOR MATERIAL

    PRICE

    I

    NO.

    URAIAN

    KOEF

    SAT.

    HARGA SAT

    HARGA SAT

    JUMLAH

    JUMLAH

    (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)

    1

    2

    3 4 5 6

    7= 3x5)

    8= 3x6)

    A019

    1

    M PEK. PEMASANGAN LAPISAN IJUK

    T=

    10 CM

    lnjuk 6.0000

    kg 9.000.00

    10.000.00

    54.000.00 60.000.00

    Pekerja 0.1500 oh

    62.000.00

    62.000.00

    9.300.00

    9.300.00

    Mandor

    0.0150

    oh

    105.000.00 105.000.00 1.575.00 1.575.00

    Jumlah

    64.875.00

    70.875.00

    Keuntungan

    Max.

    6.487.50

    7.087.50

    Jumlah

    71.362.50

    77.962.50

    Dibulatkan 71.360.00 77.960.00

    A020

    1 M PEK. PERKERASAN SIRTU DIPADATKAN SETIAP 20 CM

    Sirtu ( Membeli Sirtu }

    1.2000

    m3

    125.000.00

    138.000.00

    150.000.00 165.000.00

    Pekerja

    0.2500

    oh

    62.000.00

    62.000.00

    15.500.00

    15.500.00

    Mandor

    0.0250

    oh

    105.000.00

    105.000.00 2.625.00 2.625.00

    Jumlah

    168.125.00

    183.725.00

    Keuntungan Max.

    16.812.50

    18.372.00

    Jumlah

    184.937.50 202.097.50

    Dibulatkan

    184.930.00 202.090.00

    A021

    1M3 PEK. PEMBUATAN

    JALAN

    SEMENTARA

    TEBAL 20

    CM

    Batu Belah 0.2500 m3

    160.000.00

    175.000.00 40.000.00 43.750.00

    Kerikil

    0.0300 m3 135.000.00 150.000.00 4.050.00 4.500.00

    Pasir Pasang

    0.0500

    m3

    170.000.00

    203.000.00

    8.500.00 10.150.00

    Pekerja

    0.5000

    oh

    62.000.00

    62.000.00

    31.000.00

    31.000.00

    Mandor

    0.1000

    oh

    105.000.00 105.000.00

    10.500.00

    10.500.00

    Alat Bantu Pek. Pemadatan

    Tanah

    1

    m2

    ) 0.0600 oh 94.050.00 99.900.00 5.643.00 5.994.00

    Jumlah

    99.693.00 105.894.00

    Keuntungan

    Max.

    9.969.30

    10.589.40

    Jumlah

    109.662,30

    116.483.40

    Dibulatkan

    109.660.00

    116.480.00

    A022

    1 M

    PEK. GALIAN

    TANAH SUMURAN MAX

    KEDALAMAN

    10M

    Pekerja

    1.1500

    oh

    62.000.00 62.000.00 71.300.00 71.300.00

    Mandor

    0.0250

    oh

    105.000.00 105.000.00 2.625.00 2.625.00

    Alat Bantu

    0.2000

    lot

    73.925.00 73.925.00 14.785.00 14.785.00

    Jumlah

    88.710.00

    88.710.00

    Keuntungan

    Max.

    8.871.00

    8.871.00

    Jumlah

    97.581.00

    97.581.00

    Dibulatkan

    97.580.00

    97.580.00

    A023

    1M

    URUGAN

    PAKAI ALAT BESAR TANAH DARI

    LUAR

    DIPA

    DATKAN (5000M31

    Pek.

    Ga ian (10 org) 50%

    0.6000

    m3

    60.525.00

    60.525.00

    18.157.50 15.157.50

    Pek. Galian

    Tanah Berbatu (10

    org)

    50% 0.6000 m3

    65.360.00

    65.360.00

    19.608.00

    19.608.00

    Pek. Grading Plant (10 org) 50%

    5.0000 m3 7.250.00 7.250.00

    18.125.00

    18.125.00

    Beli

    Tanah

    +

    Angkut Max.

    10

    km

    1.2000

    m3

    30.000.00 35.000.00 36.000.00 42.000.00

    Jumlah

    91.890.50 97.890.50

    Keuntunqan

    Max.

    9.189.05

    9.789.05

    Jumlah

    101.079.55 107.679.55

    Dibulatkan

    101.070.00 107.670.00

    A024 1 M

    URUGAN

    PASIR

    URUG

    Pasir Urug

    1.2000

    m2

    130.000.00 149.000.00 156.000.00 178.800.00

    Pekerja

    0.3000

    oh

    62.000.00 62.000.00 18.600.00 18.600.00

    Mandor 0.0100 oh

    105.000.00 105.000.00 1.050.00

    1.050.00

    JumJah

    175.650.00 198.450.00

    Keuntungan Max.

    17.565.00

    19.845.00

    Jumlah

    193.215.00

    218.295.00

    Dibulatkan

    193.210.00

    218.290.00

    otst 34 TAHUN XXI 2 15

    JURNAL HARGASATUAN

    BAHAN BANGUNAN, KONSTRUKSI INTERIOR 515

  • 7/24/2019 Jurnal Harga Kota Bekasi 2015

    26/56

    f

    JOURNAL OF

    BUILDING

    CONSTRUCTION, INTERIOR

    MATERIAL

    PRICE

    NO. URAIAN

    KOEF SAT.

    HARGA SAT. HARGA

    SAT

    JUMLAH JUMLAH

    MINIMUM) MAXIMUM) MINIMUM)

    MAXIMUM)

    1 2

    3 4 5 6

    7= 3x5) 8= 3x6)

    A025

    1

    M

    LANTAI KERJA BETON MUTU fc=7,4

    Mpa(K

    100),slump

    (3-6)cm,wlc=0,87

    Semen PC

    230.0000 kg

    1.270.00

    1.300.00 292.100.00 299.000.00

    Pasir beton

    893.0000 kg 125.71 135.71 112.262.86

    121.192.86

    Split Pecah Mesin

    2/3

    1.027.0000 kg 137.04

    162.96 140.737.04 167.362.96

    AIR

    200.0000

    llr

    2.00

    51.00

    400.00

    10.200.00

    Pekerja

    1.2000

    oh

    62.000.00

    62.000.00 74.400.00 74.400.00

    Tukang batu

    0.2000

    oh

    76.000.00

    76.000.00 15.200.00

    15.200.00

    Kepala Tukang batu

    0.0200

    oh 90.000.00

    90.000.00 1.800.00 1.800.00

    Mandor

    0.0600

    oh

    105.000.00

    105.000.00 6.300.00 6.300.00

    Jumlah

    643.199.89

    695.455.82

    Keuntunaan

    Max.

    64.319.99 69.545.58

    Jumlah

    707.519.98 765.001.40

    Oibulatkan

    707.510.00 765.000.00

    A026

    1

    M PAS.

    PONDASI CYCLOOF,60

    BETON

    CAMPUR 1

    PC:2PB:3KR DAN 40

    BATU

    SELAH

    Batu belah

    15/20

    cm(40 ) batu belah

    0.4800

    m3

    160.000.00

    175.000.00 76.800.00

    84.000.00

    Semen

    PC

    194.0000 kg

    1.270.00

    1.300.00 246.380.00

    252.200.00

    Pasir beton

    0.3120

    m3

    176.000.00

    190.000.00 54.912.00 59.280.00

    KR

    (SPLIT

    2/3) 0.4680

    m3

    185.000.00

    220.000.00 86.580.00 102.960.00

    Besi beton

    126.000

    kg

    9.500.00

    9.800.00 1.197.000.00 1. 234. 800. 00

    awai

    beton

    1.8000

    kg

    18.000.00

    20.000.00 32.400.00 36.000.00

    Pekerja 3.4000 oh 62.000.00

    62.000.00 210.800.00 210.800.00

    Tukang

    Batu

    0.8500

    oh

    76.000.00 76.000.00

    64.600.00 64.600.00

    Kepala Tukang Batu

    0.0850

    oh

    90.000.00

    90.000.00 7.650.00 7.650.00

    Mandor

    0.1700

    oh

    105.000.00 105.000.00 17.850.00 17.850.00

    Jumlah

    1.994.972.00

    2.070.140.00

    Keuntungan Max.

    199.497.20 207.014

    Jumlah

    2.194.469.20 2.277.154.00

    Oibulatkan

    2.194.460.00

    2.277.150.00

    A026a

    1

    M3 PAS PONDASI SUMURAN,OIA.100CM

    Batu Selah

    15/20

    cm(40 )

    0.4800

    m3

    160.000.00 175.000.00 76.800.00

    84.000.00

    Semen PC

    194.0000

    kg

    1.270.00

    1.300.00 246.380.00 252.200.00

    Pasir beton

    0.3120

    m3

    176.000.00

    190.000.00 54.912.00 59.280.00

    KR

    (SPLIT

    213)

    0.4680

    m3

    185.000.00

    220.000 86.580.00 102.960.00

    Pekerja 3.4000

    oh

    62.000.00 62.000.00

    210.800.00 210.800.00

    Tukang

    batu

    0.8500

    oh

    76.000.00 76.000.00

    64.600.00

    64.600.00

    Kepala Tukang batu

    0.0850

    oh

    90.000.00 90.000.00

    7.650.00

    7.650.00

    Mandor

    0 1700 oh

    10

    non

    nn

    1n