ANALISA HARGA SATUAN PEKERJAAN TANAMAN PEKERJAAN PERTAMANAN NON SNI Jenis Tanaman Sat Harga Upah Tanam Jumlah Jumlah + Dibulatkan Rp. Kebutuhan m3 Harga Rp. Rp. Rp. keuntungan 10% Rp. 1 1 unit Kiara payung 100-150 cm btg 40,000.00 0.13 76,400.00 39,250.00 88,800.00 97,680.00 97,700.00 2 1 m2 Bambu Jepang m2 105,300.00 0.03 76,400.00 39,250.00 146,937.50 161,631.25 161,600.00 3 1 unit Bambu kuning t = 1,50 m - 3,00 m btg 126,000.00 0.03 76,400.00 39,250.00 167,637.50 184,401.25 184,400.00 4 1 m2 Rumput Gajah m2 50,000.00 0.20 76,400.00 4,500.00 69,780.00 76,758.00 76,800.00 5 1 m2 Rumput Bermuda Tifway 419 m2 82,592.00 0.20 18,560.00 101,152.00 111,267.20 111,300.00 6 1 m2 Rumput peking m2 6,500.00 0.20 76,400.00 4,500.00 26,280.00 28,908.00 28,900.00 7 1 unit Nangka tinggi 40cm btg 3,580.00 0.02 76,400.00 3,750.00 8,858.00 9,743.80 9,700.00 8 1 unit Lili Paris btg 3,000.00 0.02 76,400.00 3,750.00 8,278.00 9,105.80 9,100.00 9 1 unit Klame of Irian btg 29,850.00 0.02 76,400.00 9,812.00 41,190.00 45,309.00 45,300.00 10 1 m2 Tanaman heloconia m2 8,900.00 0.02 76,400.00 4,500.00 14,928.00 16,420.80 16,400.00 11 1 unit Pohon bungur Jepang t= 1,5 s/d 3m btg 115,000.00 0.02 76,400.00 4,500.00 121,028.00 133,130.80 133,100.00 12 1 unit Pohon sukun t=1,5 s/d 3 m btg 75,000.00 0.13 76,400.00 39,250.00 123,800.00 136,180.00 136,200.00 13 1 unit Pohon ceremai btg 47,500.00 0.13 76,400.00 39,250.00 96,300.00 105,930.00 105,900.00 14 1 unit Pohon dadap merah btg 228,000.00 0.13 76,400.00 39,250.00 276,800.00 304,480.00 304,500.00 15 1 unit Pohon semak ekor tupai btg 32,500.00 0.02 76,400.00 39,250.00 73,278.00 80,605.80 80,600.00 16 1 unit Pohon kaca piring btg 29,000.00 0.02 76,400.00 19,625.00 50,153.00 55,168.30 55,200.00 17 1 unit Pohon trembesi t = 2,50 m - 3,00 m btg 397,500.00 0.13 76,400.00 39,250.00 446,300.00 490,930.00 490,900.00 18 1 unit Palem botol (2 s/d 3m) untuk asumsi Sawit btg 858,000.00 0.13 76,400.00 39,250.00 906,800.00 997,480.00 997,500.00 19 1 unit Palem Raja t=2-4 m untuk asumsi Sawit btg 214,500.00 0.13 76,400.00 39,250.00 263,300.00 289,630.00 289,600.00 20 1 unit Pohon Ketapang t = 2-4 m btg 228,000.00 0.13 76,400.00 39,250.00 276,800.00 304,480.00 304,500.00 21 1 unit Pohon semak mahkota duri btg 14,000.00 0.01 76,400.00 4,500.00 19,455.00 21,400.50 21,400.00 22 1 unit Pohon pisang - pisangan btg 12,000.00 0.02 76,400.00 4,500.00 18,028.00 19,830.80 19,800.00 23 1 unit Pohon semak hias taiwan beuty btg 12,500.00 0.01 76,400.00 4,500.00 17,955.00 19,750.50 19,800.00 24 1 unit Pohon hias bougenville t = 1,50 m btg 35,500.00 0.04 76,400.00 9,812.00 48,587.65 53,446.42 53,400.00 25 1 unit Pohon semak-semak Teh-Tehan btg 3,250.00 0.01 76,400.00 4,500.00 8,705.00 9,575.50 9,600.00 KODE Tanah subur

Upload: miftah-firdaus-rookavanka

Post on 07-Feb-2016

2.264 views

Category:

Documents


720 download

DESCRIPTION

BEKASI MFR.ST

TRANSCRIPT

Page 1: ANALISA HARGA SATUAN BEKASI

ANALISA HARGA SATUAN PEKERJAAN TANAMANPEKERJAAN PERTAMANAN NON SNI

Jenis Tanaman Sat Harga Upah Tanam Jumlah Jumlah + DibulatkanRp. Kebutuhan m3 Harga Rp. Rp. Rp. keuntungan 10% Rp.

1 1 unit Kiara payung 100-150 cm btg 40,000.00 0.13 76,400.00 39,250.00 88,800.00 97,680.00 97,700.002 1 m2 Bambu Jepang m2 105,300.00 0.03 76,400.00 39,250.00 146,937.50 161,631.25 161,600.003 1 unit Bambu kuning t = 1,50 m - 3,00 m btg 126,000.00 0.03 76,400.00 39,250.00 167,637.50 184,401.25 184,400.004 1 m2 Rumput Gajah m2 50,000.00 0.20 76,400.00 4,500.00 69,780.00 76,758.00 76,800.005 1 m2 Rumput Bermuda Tifway 419 m2 82,592.00 0.20 18,560.00 101,152.00 111,267.20 111,300.006 1 m2 Rumput peking m2 6,500.00 0.20 76,400.00 4,500.00 26,280.00 28,908.00 28,900.007 1 unit Nangka tinggi 40cm btg 3,580.00 0.02 76,400.00 3,750.00 8,858.00 9,743.80 9,700.008 1 unit Lili Paris btg 3,000.00 0.02 76,400.00 3,750.00 8,278.00 9,105.80 9,100.009 1 unit Klame of Irian btg 29,850.00 0.02 76,400.00 9,812.00 41,190.00 45,309.00 45,300.0010 1 m2 Tanaman heloconia m2 8,900.00 0.02 76,400.00 4,500.00 14,928.00 16,420.80 16,400.0011 1 unit Pohon bungur Jepang t= 1,5 s/d 3m btg 115,000.00 0.02 76,400.00 4,500.00 121,028.00 133,130.80 133,100.0012 1 unit Pohon sukun t=1,5 s/d 3 m btg 75,000.00 0.13 76,400.00 39,250.00 123,800.00 136,180.00 136,200.0013 1 unit Pohon ceremai btg 47,500.00 0.13 76,400.00 39,250.00 96,300.00 105,930.00 105,900.0014 1 unit Pohon dadap merah btg 228,000.00 0.13 76,400.00 39,250.00 276,800.00 304,480.00 304,500.0015 1 unit Pohon semak ekor tupai btg 32,500.00 0.02 76,400.00 39,250.00 73,278.00 80,605.80 80,600.0016 1 unit Pohon kaca piring btg 29,000.00 0.02 76,400.00 19,625.00 50,153.00 55,168.30 55,200.0017 1 unit Pohon trembesi t = 2,50 m - 3,00 m btg 397,500.00 0.13 76,400.00 39,250.00 446,300.00 490,930.00 490,900.0018 1 unit Palem botol (2 s/d 3m) untuk asumsi Sawit btg 858,000.00 0.13 76,400.00 39,250.00 906,800.00 997,480.00 997,500.0019 1 unit Palem Raja t=2-4 m untuk asumsi Sawit btg 214,500.00 0.13 76,400.00 39,250.00 263,300.00 289,630.00 289,600.0020 1 unit Pohon Ketapang t = 2-4 m btg 228,000.00 0.13 76,400.00 39,250.00 276,800.00 304,480.00 304,500.0021 1 unit Pohon semak mahkota duri btg 14,000.00 0.01 76,400.00 4,500.00 19,455.00 21,400.50 21,400.0022 1 unit Pohon pisang - pisangan btg 12,000.00 0.02 76,400.00 4,500.00 18,028.00 19,830.80 19,800.0023 1 unit Pohon semak hias taiwan beuty btg 12,500.00 0.01 76,400.00 4,500.00 17,955.00 19,750.50 19,800.0024 1 unit Pohon hias bougenville t = 1,50 m btg 35,500.00 0.04 76,400.00 9,812.00 48,587.65 53,446.42 53,400.0025 1 unit Pohon semak-semak Teh-Tehan btg 3,250.00 0.01 76,400.00 4,500.00 8,705.00 9,575.50 9,600.00

KODE Tanah subur

Page 2: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN PERSIAPANRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pembuatan pagar sementara dari kayu, seng atau dari kawat duri2. Pekerjaan pembuatan pagar dari kawat jaring dan beton pra cetak3. Pekerjaan pemasangan bouwplank4. Pembuatan kantor sementara, gudang bahan, rumah jaga dan bedeng buruh/pekerja5. Pekerjaan pembersihan lapangan dan pekerjaan bongkaran

A.1. 1 m' Pagar sementara dari kayu tinggi 2 meter1 Bahan

Dolken kayu Ø 8 - 10 /400 cm 1.2500 btg 18,260.00Rp. 22,825.00Rp.Semen Portland 2.5000 kg 1,360.00Rp. 3,400.00Rp.Pasir beton 0.0050 m3 194,700.00Rp. 973.50Rp.Koral beton 0.0090 m3 230,000.00Rp. 2,070.00Rp.Kayu 5/7 0.0720 m3 3,437,010.00Rp. 247,464.72Rp.Paku biasa 2"-5" 0.0600 kg 19,480.00Rp. 1,168.80Rp.Residu 0.4000 lt 4,300.00Rp. 1,720.00Rp.

Jumlah (1). 279,622.02Rp.

2 TenagaTukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Pekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0200 oh 100,000.00Rp. 2,000.00Rp.

Jumlah (2). 51,800.00Rp.

Jumlah (1) + (2) 331,422.02Rp.Keuntungan 10% 33,142.20Rp.Jumlah 364,564.22Rp.

KodeA.1. 1 m' Pagar sementara dari kayu tinggi 2 meter Dibulatkan 364,500.00Rp.

A.2. 1 m' Pagar sementara dari seng gelombang tinggi 2 meter1 Bahan

Dolken kayu Ø 8 - 10 /400 cm 1.2500 btg 18,260.00Rp. 22,825.00Rp.Semen Portland 2.5000 kg 1,360.00Rp. 3,400.00Rp.Seng gelombang 3" - 5" 1.2000 lbr 74,010.00Rp. 88,812.00Rp.Pasir beton 0.0050 m3 194,700.00Rp. 973.50Rp.Koral beton 0.0090 m3 230,000.00Rp. 2,070.00Rp.Kayu 5/7 0.0720 m3 3,437,010.00Rp. 247,464.72Rp.Paku biasa 2"-5" 0.0600 kg 19,480.00Rp. 1,168.80Rp.Residu 0.4000 lt 4,300.00Rp. 1,720.00Rp.

Jumlah (1). 368,434.02Rp.

2 TenagaTukang kayu setengah terampil 0.2000 oh 105,000.00Rp. 21,000.00Rp.Pekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0200 oh 100,000.00Rp. 2,000.00Rp.

Jumlah (2). 51,800.00Rp.

Jumlah (1) + (2) 420,234.02Rp.Keuntungan 10% 42,023.40Rp.Jumlah 462,257.42Rp.

KodeA.2. 1 m' Pagar sementara dari seng gelombang tinggi 2 meter Dibulatkan 462,200.00Rp.

A.2.a 1 m' Perbaikan pagar sementara tinggi 2 meter1 Bahan

Dolken kayu Ø 8 - 10 /400 cm 1.2500 btg 18,260.00Rp. 22,825.00Rp.Semen Portland 2.5000 kg 1,360.00Rp. 3,400.00Rp.Pasir beton 0.0050 m3 194,700.00Rp. 973.50Rp.Koral beton 0.0090 m3 230,000.00Rp. 2,070.00Rp.Kayu 5/7 0.0116 m3 3,437,010.00Rp. 39,697.47Rp.Paku biasa 2"-5" 0.0600 kg 19,480.00Rp. 1,168.80Rp.Residu 0.4000 lt 4,300.00Rp. 1,720.00Rp.

Jumlah (1). 71,854.77Rp.

2 TenagaTukang kayu setengah terampil 0.2000 oh 105,000.00Rp. 21,000.00Rp.Pekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0200 oh 100,000.00Rp. 2,000.00Rp.

Jumlah (2). 51,800.00Rp.

Jumlah (1) + (2) 123,654.77Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

A.

Page 3: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 12,365.48Rp.Jumlah 136,020.24Rp.

KodeA.2.a 1 m' Perbaikan pagar sementara tinggi 2 meter Dibulatkan 136,000.00Rp.

A.3. 1 m' Pagar sementara dari kawat duri tinggi 1.8 meter1 Bahan

Dolken kayu Ø 8 - 10 /400 cm 1.0000 btg 18,260.00Rp. 18,260.00Rp.Semen Portland 2.0000 kg 1,360.00Rp. 2,720.00Rp.Kawat duri 25.0000 kg 17,710.00Rp. 442,750.00Rp.Pasir beton 0.0050 m3 194,700.00Rp. 973.50Rp.Koral beton 0.0090 m3 230,000.00Rp. 2,070.00Rp.Paku biasa 2"-5" 0.0600 kg 19,480.00Rp. 1,168.80Rp.

Jumlah (1). 467,942.30Rp.

2 TenagaTukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Pekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0200 oh 100,000.00Rp. 2,000.00Rp.

Jumlah (2). 45,200.00Rp.

Jumlah (1) + (2) 513,142.30Rp.Keuntungan 10% 51,314.23Rp.Jumlah 564,456.53Rp.

KodeA.3. 1 m' Pagar sementara dari kawat duri tinggi 1.8 meter Dibulatkan 564,400.00Rp.

A.4. 1 m' Pengukuran dan pemasangan bouwplank1 Bahan

Kayu 5/7 0.0120 m3 3,437,010.00Rp. 41,244.12Rp.Paku biasa 2"-5" 0.0200 kg 19,480.00Rp. 389.60Rp.Kayu papan 3/20 0.0070 m3 1,874,730.00Rp. 13,123.11Rp.

Jumlah (1). 54,756.83Rp.

2 TenagaTukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Pekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 73,556.83Rp.Keuntungan 10% 7,355.68Rp.Jumlah 80,912.51Rp.

KodeA.4. 1 m' Pengukuran dan pemasangan bouwplank Dibulatkan 80,900.00Rp.

A.5. 1 m2 Pembuatan kantor sementara, dengan lantai plesteran1 Bahan

Dolken kayu Ø 8 - 10 /400 cm 1.2500 btg 18,260.00Rp. 22,825.00Rp.Kayu 0.1800 m3 3,437,010.00Rp. 618,661.80Rp.Paku biasa 2"-5" 0.8500 kg 19,480.00Rp. 16,558.00Rp.Besi strip 1.1000 kg 13,200.00Rp. 14,520.00Rp.Semen Portland 35.0000 kg 1,360.00Rp. 47,600.00Rp.Pasir pasang 0.1500 m3 203,500.00Rp. 30,525.00Rp.Pasir beton 0.1000 m3 194,700.00Rp. 19,470.00Rp.Koral beton 0.1500 m3 230,000.00Rp. 34,500.00Rp.Bata merah 30.0000 bh 650.00Rp. 19,500.00Rp.Seng plat 0.2500 lbr 132,830.00Rp. 33,207.50Rp.Jendela nako 2.0000 bh 11,510.00Rp. 23,020.00Rp.Kaca polos 0.0800 m2 90,750.00Rp. 7,260.00Rp.Kunci tanam 0.1500 bh 196,390.00Rp. 29,458.50Rp.Plywood 4 mm 0.0600 Lmb 69,190.00Rp. 4,151.40Rp.

Jumlah (1). 921,257.20Rp.

2 TenagaTukang kayu 2.0000 oh 105,000.00Rp. 210,000.00Rp.Tukang batu 1.0000 oh 100,000.00Rp. 100,000.00Rp.Pekerja 2.0000 oh 66,000.00Rp. 132,000.00Rp.Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 483,000.00Rp.

Jumlah (1) + (2) 1,404,257.20Rp.Keuntungan 10% 140,425.72Rp.Jumlah 1,544,682.92Rp.

KodeA.5. 1 m2 Pembuatan kantor sementara, dengan lantai plesteran Dibulatkan 1,544,600.00Rp.

A.6. 1 m2 Pembuatan gudang semen dan alat-alat

Page 4: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanDolken kayu Ø 8 - 10 /400 cm 1.7000 btg 18,260.00Rp. 31,042.00Rp.Kayu 0.2100 m3 3,437,010.00Rp. 721,772.10Rp.Paku biasa 2"-5" 0.3000 kg 19,480.00Rp. 5,844.00Rp.Semen Portland 10.5000 kg 1,360.00Rp. 14,280.00Rp.Pasir beton 0.0300 m3 194,700.00Rp. 5,841.00Rp.Koral beton 0.0500 m3 230,000.00Rp. 11,500.00Rp.Seng gelombang bjls 32 1.5000 lbr 74,010.00Rp. 111,015.00Rp.

Jumlah (1). 901,294.10Rp.

2 TenagaTukang kayu 2.0000 oh 105,000.00Rp. 210,000.00Rp.Pekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Kepala tukang 0.2000 oh 120,000.00Rp. 24,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 305,000.00Rp.

Jumlah (1) + (2) 1,206,294.10Rp.Keuntungan 10% 120,629.41Rp.Jumlah 1,326,923.51Rp.

KodeA.6. 1 m2 Pembuatan gudang semen dan alat-alat Dibulatkan 1,326,900.00Rp.

A.7. 1 m2 Pembuatan rumah jaga/kontruksi kayu1 Bahan

Dolken kayu Ø 8 - 10 /400 cm 3.0000 btg 18,260.00Rp. 54,780.00Rp.Kayu 0.2760 m3 3,437,010.00Rp. 948,614.76Rp.Paku biasa 2"-5" 0.7000 kg 19,480.00Rp. 13,636.00Rp.Seng gelombang bjls 32 1.5000 lbr 74,010.00Rp. 111,015.00Rp.

Jumlah (1). 1,128,045.76Rp.

2 TenagaTukang kayu 1.5000 oh 105,000.00Rp. 157,500.00Rp.Pekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Kepala tukang 0.1500 oh 120,000.00Rp. 18,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 246,500.00Rp.

Jumlah (1) + (2) 1,374,545.76Rp.Keuntungan 10% 137,454.58Rp.Jumlah 1,512,000.34Rp.

KodeA.7. 1 m2 Pembuatan rumah jaga/kontruksi kayu Dibulatkan 1,512,000.00Rp.

A.8. 1 m2 Membersihkan lapangan dan perataan1 Tenaga

Pekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (1). 11,600.00Rp.

Jumlah (1) 11,600.00Rp.Keuntungan 10% 1,160.00Rp.Jumlah 12,760.00Rp.

KodeA.8. 1 m2 Membersihkan lapangan dan perataan Dibulatkan 12,700.00Rp.

A.9. 1 m2 Pembuatan bedeng buruh1 Bahan

Dolken kayu Ø 8 - 10 /400 cm 1.2500 btg 18,260.00Rp. 22,825.00Rp.Kayu 0.1860 m3 3,437,010.00Rp. 639,283.86Rp.Paku biasa 2"-5" 0.3000 kg 19,480.00Rp. 5,844.00Rp.Semen Portland 18.0000 kg 1,360.00Rp. 24,480.00Rp.Pasir beton 0.0300 m3 194,700.00Rp. 5,841.00Rp.Koral beton 0.0500 m3 230,000.00Rp. 11,500.00Rp.Seng gelombang bjls 32 1.5000 lbr 74,010.00Rp. 111,015.00Rp.Plywood 4 mm 1.3500 lbr 69,190.00Rp. 93,406.50Rp.

Jumlah (1). 914,195.36Rp.

2 TenagaTukang kayu 2.0000 oh 105,000.00Rp. 210,000.00Rp.Pekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Kepala tukang 0.2000 oh 120,000.00Rp. 24,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 305,000.00Rp.

Jumlah (1) + (2) 1,219,195.36Rp.Keuntungan 10% 121,919.54Rp.Jumlah 1,341,114.90Rp.

KodeA.9. 1 m2 Pembuatan bedeng buruh Dibulatkan 1,341,100.00Rp.

Page 5: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

A.10. 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm1 Bahan

Kayu terentang 0.0360 m3 1,874,730.00Rp. 67,490.28Rp.Paku biasa 2"-5" 0.0800 kg 19,480.00Rp. 1,558.40Rp.Kayu kaso 5/7 1.0000 btg 47,736.25Rp. 47,736.25Rp.

Jumlah (1). 116,784.93Rp.

2 TenagaTukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.

Jumlah (2). 31,500.00Rp.

Jumlah (1) + (2) 148,284.93Rp.Keuntungan 10% 14,828.49Rp.Jumlah 163,113.42Rp.

KodeA.10. 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm Dibulatkan 163,100.00Rp.

A.11. 1 m2 Pembuatan stegger dari bambu, ukuran (40 x 50 x 20 ) cm1 Bahan

Bambu Ø 6 - 8 /600 cm 1.0000 btg 22,890.00Rp. 22,890.00Rp.Tali Ijuk 0.2500 kg 6,060.00Rp. 1,515.00Rp.

Jumlah (1). 24,405.00Rp.

2 TenagaTukang kayu 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0020 oh 120,000.00Rp. 240.00Rp.Pekerja 0.0130 oh 66,000.00Rp. 858.00Rp.Mandor 0.0170 oh 100,000.00Rp. 1,700.00Rp.

Jumlah (2). 29,048.00Rp.

Jumlah (1) + (2) 53,453.00Rp.Keuntungan 10% 5,345.30Rp.Jumlah 58,798.30Rp.

KodeA.11. 1 m2 Pembuatan stegger dari bambu, ukuran (40 x 50 x 20 ) cm Dibulatkan 58,700.00Rp.

A.12. 1 m2 Pembuatan jalan sementara1 Bahan

Batu belah 15/20 0.1500 m3 240,000.00Rp. 36,000.00Rp.Batu pecah 5/7 0.0900 m3 240,000.00Rp. 21,600.00Rp.Pasir pasang 0.0100 m3 203,500.00Rp. 2,035.00Rp.

Jumlah (1). 59,635.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 71,000.00Rp.

Jumlah (1) + (2) 130,635.00Rp.Keuntungan 10% 13,063.50Rp.Jumlah 143,698.50Rp.

KodeA.12. 1 m2 Pembuatan jalan sementara Dibulatkan 143,600.00Rp.

A.13. 1 m3 Bongkaran beton bertulang1 Tenaga

Pekerja 6.6670 oh 66,000.00Rp. 440,022.00Rp.Mandor 0.3330 oh 100,000.00Rp. 33,300.00Rp.

Jumlah (1). 473,322.00Rp.

Jumlah (1) 473,322.00Rp.Keuntungan 10% 47,332.20Rp.Jumlah 520,654.20Rp.

KodeA.13. 1 m3 Bongkaran beton bertulang Dibulatkan 520,600.00Rp.

A.14. 1 m3 Bongkaran dinding tembok bata merah1 Tenaga

Pekerja 6.6670 oh 66,000.00Rp. 440,022.00Rp.Mandor 0.0330 oh 100,000.00Rp. 3,300.00Rp.

Jumlah (1). 443,322.00Rp.

Jumlah (1) 443,322.00Rp.Keuntungan 10% 44,332.20Rp.Jumlah 487,654.20Rp.

KodeA.14. 1 m3 Bongkaran dinding tembok bata merah Dibulatkan 487,600.00Rp.

A.15. 1 m' Pasang pagar kawat jaring galvanis, tinggi 1,00 m1 Bahan

Pagar kawat jaring 0.4340 Lbr 68,800.00Rp. 29,859.20Rp.

Page 6: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 29,859.20Rp.

2 TenagaPekerja 0.0420 oh 66,000.00Rp. 2,772.00Rp.Kepala tukang 0.0040 oh 120,000.00Rp. 480.00Rp.Tukang 0.0020 oh 105,000.00Rp. 210.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 3,662.00Rp.

Jumlah (1) + (2) 33,521.20Rp.Keuntungan 10% 3,352.12Rp.Jumlah 36,873.32Rp.

KodeA.15. 1 m' Pasang pagar kawat jaring galvanis, tinggi 1,00 m Dibulatkan 36,800.00Rp.

A.16. 1 m' Pasang pagar beton pra cetak (5 x 50 x 213) cm1 Bahan

Panel beton pracetak 0.9860 Lbr 440,170.00Rp. 434,007.62Rp.Kolom beton pracetak 0.5250 btg 200,470.00Rp. 105,246.75Rp.Pasir beton 0.0740 m3 194,700.00Rp. 14,407.80Rp.Koral 2/3 0.1460 m3 220,000.00Rp. 32,120.00Rp.Semen Portland 45.0000 kg 1,360.00Rp. 61,200.00Rp.

Jumlah (1). 646,982.17Rp.

2 TenagaTukang batu 0.1250 oh 100,000.00Rp. 12,500.00Rp.Pekerja 0.3750 oh 66,000.00Rp. 24,750.00Rp.Kepala Tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0190 oh 100,000.00Rp. 1,900.00Rp.

Jumlah (2). 40,590.00Rp.

Jumlah (1) + (2) 687,572.17Rp.Keuntungan 10% 68,757.22Rp.Jumlah 756,329.39Rp.

KodeA.16. 1 m' Pasang pagar beton pra cetak (5 x 50 x 213) cm Dibulatkan 756,300.00Rp.

A.17. 1 bh Pasang papan nama proyek1 Bahan

Kayu kaso dan papan 0.1024 m3 3,437,010.00Rp. 351,949.82Rp.Triplek 4 mm 0.5000 lbr 69,190.00Rp. 34,595.00Rp.Cat kayu 1.0000 kg 40,710.00Rp. 40,710.00Rp.Minyak cat 0.5000 kg 8,600.00Rp. 4,300.00Rp.Paku 0.0250 kg 19,480.00Rp. 487.00Rp.Kwas 2.0000 bh 14,200.00Rp. 28,400.00Rp.

Jumlah (1). 460,441.82Rp.

2 TenagaTukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Pekerja 0.5000 oh 66,000.00Rp. 33,000.00Rp.Kepala Tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 92,000.00Rp.

Jumlah (1) + (2) 552,441.82Rp.Keuntungan 10% 55,244.18Rp.Jumlah 607,686.01Rp.

KodeA.17. 1 bh Pasang papan nama proyek Dibulatkan 607,600.00Rp.

A.18. 1 bh Pasang papan nama proyek Digital Printing1 Bahan

Kayu kaso 0.0290 m3 3,437,010.00Rp. 99,673.29Rp.Triplek 4 mm 0.5000 lbr 69,190.00Rp. 34,595.00Rp.Paku 0.0250 kg 19,480.00Rp. 487.00Rp.Banner Digital Printing 1 x 1 m 1.0000 m2 33,000.00Rp. 33,000.00Rp.

Jumlah (1). 167,755.29Rp.

2 TenagaTukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Pekerja 0.5000 oh 66,000.00Rp. 33,000.00Rp.Kepala Tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 92,000.00Rp.

Jumlah (1) + (2) 259,755.29Rp.Keuntungan 10% 25,975.53Rp.Jumlah 285,730.82Rp.

KodeA.18. 1 bh Pasang papan nama proyek Digital Printing Dibulatkan 285,700.00Rp.

Page 7: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

A.19. 1 Unit Pondasi tower crane ukuran 5x5x1,5m + tiang pancang 5x25x25 dalam 25m

B.2. Galian 46.3485 m3 70,200.00Rp. 3,253,664.70RpPengadaan Tiang pancang 25 x 25 120.0000 m1 330,600.00Rp. 39,672,000.00RpPemancangan 110.0000 m1 139,600.00Rp. 15,356,000.00RpSambungan tiang pancang 5.0000 joint 199,600.00Rp. 998,000.00RpPecah kepala tiang tiang pancang 5.0000 joint 175,600.00Rp. 878,000.00Rp

B.11. Urugan pasir 2.8090 m3 218,900.00Rp. 614,890.10RpG.1. Lantai kerja 1pc:3ps:5kr 1.4045 m3 807,400.00Rp. 1,133,993.30Rp

G.36.a Beton K300 37.5000 m3 1,108,700.00Rp. 41,576,250.00RpG.25. Pembesian 2,129.99 kg 16,900.00Rp. 35,996,888.39RpG.28. Bekisting 30.0000 m2 163,700.00Rp. 4,911,000.00Rp

Jumlah 144,390,686.49Rp.

KodeA.19. Dibulatkan 144,390,600.00Rp.

A.20. 1 Bln Sewa alat berat / Tower crane

a Alat & BBMSewa Crane 1.000 bln 95,000,000.00Rp 95,000,000.00RpSolar (industri) 2,250.000 ltr 11,600.00Rp 26,100,000.00Rp

b Mob demobSewa low bed 1.000 pp 5,794,117.65Rp 5,794,117.65RpSewa truk colt diesel (angkut ban mobile crane) 1.000 pp 5,058,823.53Rp 5,058,823.53RpAsuransi Alat dan Ekspedisi 1.000 pp 2,588,235.29Rp 2,588,235.29Rp

c TenagaOperator 30.000 Hr 200,000.00Rp 6,000,000.00Rp

Jumlah 140,541,176.47Rp.Keuntungan 10% 14,054,117.65Rp.Jumlah 154,595,294.12Rp.

KodeA.20. 1 Bln Sewa alat berat / Tower crane Dibulatkan 154,595,200.00Rp.

A.21. 1 Org Mobilisasi Tenaga Kerja

Tenaga kerja 1.0000 Org 90,000.00Rp. 90,000.00Rp

Jumlah 90,000.00Rp.

KodeA.21. 1 Org Mobilisasi Tenaga Kerja Dibulatkan 90,000.00Rp.

A.22. Dihitung 1 Bln Sarana dan Prasarana KerjaDihitung 1 Bln Penyediaan Listrik Kerja

Sewa Generator 1.0000 ls 390,000.00 390,000.00RpBahan bakar solar 182.0000 ltr 11,600.00 2,111,200.00RpPengkabelan 1.0000 ls 71,500.00 71,500.00RpOperator (harian perusahaan) 13.0000 ls 136,000.00 1,768,000.00Rp

Jumlah 4,340,700.00RpKeuntungan 10% 434,070.00RpJumlah 4,774,770.00Rp

Dihitung 1 Bln Penyediaan Listrik Kerja Dibulatkan : 4,774,770.00Rp.

Dihitung 1 Unit Penyediaan Sarana Air KerjaBor Pantek + pemipaan dalam sumur 1.0000 ls 4,400,000.00 4,400,000.00RpPemipaan site 20.0000 mtr 27,500.00 550,000.00RpPompa hisap Grunpos 450 watt 1.0000 ls 3,850,000.00 3,850,000.00Rp

Jumlah 8,800,000.00RpKeuntungan 10% 880,000.00RpJumlah 9,680,000.00Rp

Dihitung 1 Unit Penyediaan Sarana Air Kerja Dibulatkan : 9,680,000.00Rp.

Dihitung 1 Bln Sarana dan Prasarana Kerja 14,454,770.00Rp.

A.23. 1 Set Poto Progres Alat / Kamera 1.0000 unit 1,650,000.00 1,650,000.00Rp Cuci cetak 180.0000 lbr 2,200.00 396,000.00Rp

Jumlah 2,046,000.00RpKeuntungan 10% 204,600.00RpJumlah 2,250,600.00Rp

KodeA.23. 1 Set Poto Progres Dibulatkan : 2,250,600.00Rp.

A.24. 1 Set Asbuilt dwg.(1 asli + 2 copy)

Pondasi tower crane ukuran 5x5x1,5m + tiang pancang 5x25x25dalam 25m

1 Unit

Page 8: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Edit gambar 1.0000 ls -Rp Cetak A3 1.0000 ls 1,580,000.00 1,580,000.00Rp Cetak (poto copy) 1.0000 ls 500,000.00 500,000.00Rp Penjilidan 3.0000 buku 60,500.00 181,500.00Rp

Jumlah 2,261,500.00RpKeuntungan 10% 226,150.00RpJumlah 2,487,650.00Rp

KodeA.24. 1 Set Asbuilt dwg.(1 asli + 2 copy) Dibulatkan : 2,487,700.00Rp.

Page 9: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN TANAHRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan galian tanah biasa dan tanah keras dalam berbagai kedalaman2. Pekerjaan stripping / Pembuangan humus3. Pekerjaan pembuangan tanah4. Pekerjaan urugan kembali, urugan pasir, pemadatan tanah, perbaikan tanah sulit dan urugan sirtu5. Pekerjaan pembuatan jalan sementara

B.1. 1 m3 Galian tanah biasa sedalam 1 meter1 Tenaga

Pekerja 0.7500 oh 66,000.00Rp. 49,500.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Jumlah (1). 52,000.00Rp.

Jumlah (1) 52,000.00Rp.Keuntungan 10% 5,200.00Rp.Jumlah 57,200.00Rp.

KodeB.1. 1 m3 Galian tanah biasa sedalam 1 meter Dibulatkan 57,200.00Rp.

B.2. 1 m3 Galian tanah biasa sedalam 2 meter1 Tenaga

Pekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (1). 63,900.00Rp.

Jumlah (1) 63,900.00Rp.Keuntungan 10% 6,390.00Rp.Jumlah 70,290.00Rp.

KodeB.2. 1 m3 Galian tanah biasa sedalam 2 meter Dibulatkan 70,200.00Rp.

B.3. 1 m3 Galian tanah biasa sedalam 3 meter1 Tenaga

Pekerja 1.0500 oh 66,000.00Rp. 69,300.00Rp.Mandor 0.0670 oh 100,000.00Rp. 6,700.00Rp.

Jumlah (1). 76,000.00Rp.

Jumlah (1) 76,000.00Rp.Keuntungan 10% 7,600.00Rp.Jumlah 83,600.00Rp.

KodeB.3. 1 m3 Galian tanah biasa sedalam 3 meter Dibulatkan 83,600.00Rp.

B.4. 1 m3 Galian tanah keras sedalam 1 meter1 Tenaga

Pekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Mandor 0.0320 oh 100,000.00Rp. 3,200.00Rp.

Jumlah (1). 69,200.00Rp.

Jumlah (1) 69,200.00Rp.Keuntungan 10% 6,920.00Rp.Jumlah 76,120.00Rp.

KodeB.4. 1 m3 Galian tanah keras sedalam 1 meter Dibulatkan 76,100.00Rp.

B.5. 1 m3 Galian tanah cadas sedalam 1 meter1 Tenaga

Pekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Mandor 0.0600 oh 100,000.00Rp. 6,000.00Rp.

Jumlah (1). 105,000.00Rp.

Jumlah (1) 105,000.00Rp.Keuntungan 10% 10,500.00Rp.Jumlah 115,500.00Rp.

KodeB.5. 1 m3 Galian tanah cadas sedalam 1 meter Dibulatkan 115,500.00Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

B.

Page 10: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

B.6. 1 m3 Galian tanah lumpur sedalam 1 meter1 Tenaga

Pekerja 1.2000 oh 66,000.00Rp. 79,200.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (1). 83,700.00Rp.

Jumlah (1) 83,700.00Rp.Keuntungan 10% 8,370.00Rp.Jumlah 92,070.00Rp.

KodeB.6. 1 m3 Galian tanah lumpur sedalam 1 meter Dibulatkan 92,000.00Rp.

B.7. 1 m3 Galian stripping setinggi 1 meter1 Tenaga

Pekerja 0.0500 oh 66,000.00Rp. 3,300.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (1). 3,800.00Rp.

Jumlah (1) 3,800.00Rp.Keuntungan 10% 380.00Rp.Jumlah 4,180.00Rp.

KodeB.7. 1 m3 Galian stripping setinggi 1 meter Dibulatkan 4,100.00Rp.

B.8. 1 m3 Pembuangan tanah sejauh 30 meter1 Tenaga

Pekerja 0.3300 oh 66,000.00Rp. 21,780.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (1). 22,780.00Rp.

Jumlah (1) 22,780.00Rp.Keuntungan 10% 2,278.00Rp.Jumlah 25,058.00Rp.

KodeB.8. 1 m3 Pembuangan tanah sejauh 30 meter Dibulatkan 25,000.00Rp.

B.9. 1 m3 Urugan kembali Tanah Biasa (Bekas Galian 1 M)1 Tenaga

Pekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Mandor 0.0083 oh 100,000.00Rp. 833.33Rp.

Jumlah (1). 17,333.33Rp.

Jumlah (1) 17,333.33Rp.Keuntungan 10% 1,733.33Rp.Jumlah 19,066.67Rp.

KodeB.9. 1 m3 Urugan kembali Tanah Biasa (Bekas Galian 1 M) Dibulatkan 19,000.00Rp.

B.9a. 1 m3 Urugan kembali Tanah Biasa (Bekas Galian 2 M)1 Tenaga

Pekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (1). 21,300.00Rp.

Jumlah (1) 21,300.00Rp.Keuntungan 10% 2,130.00Rp.Jumlah 23,430.00Rp.

KodeB.9a. 1 m3 Urugan kembali Tanah Biasa (Bekas Galian 2 M) Dibulatkan 23,400.00Rp.

B.10. 1 m3 Memadatankan tanah (per 20 cm)1 Tenaga

Pekerja 0.5000 oh 66,000.00Rp. 33,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (1). 38,000.00Rp.

Jumlah (1) 38,000.00Rp.Keuntungan 10% 3,800.00Rp.Jumlah 41,800.00Rp.

KodeB.10. 1 m3 Memadatankan tanah (per 20 cm) Dibulatkan 41,800.00Rp.

B.11. 1 m3 Urugan pasir

Page 11: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanPasir urug 1.2000 m3 148,500.00Rp. 178,200.00Rp.

Jumlah (1). 178,200.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 20,800.00Rp.

Jumlah (1) + (2) 199,000.00Rp.Keuntungan 10% 19,900.00Rp.Jumlah 218,900.00Rp.

KodeB.11. 1 m3 Urugan pasir Dibulatkan 218,900.00Rp.

B.11.a 1 m3 Urugan pasir media tanam1 Bahan

Pasir urug 1.1000 m3 350,000.00Rp. 385,000.00Rp.Jumlah (1). 385,000.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 20,800.00Rp.

Jumlah (1) + (2) 405,800.00Rp.Keuntungan 10% 40,580.00Rp.Jumlah 446,380.00Rp.

KodeB.11.a 1 m3 Urugan pasir media tanam Dibulatkan 446,300.00Rp.

B.12. 1 m3 Lapisan pudel 1 kp : 3 Ps : 7 TL1 Bahan

Pasir urug 0.4000 m3 148,500.00Rp. 59,400.00Rp.Kapur padam 0.1350 m3 226,570.00Rp. 30,586.95Rp.Tanah liat 0.9480 m3 90,200.00Rp. 85,509.60Rp.

Jumlah (1). 175,496.55Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang batu 0.4000 oh 100,000.00Rp. 40,000.00Rp.Kepala tukang 0.0400 oh 120,000.00Rp. 4,800.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 105,600.00Rp.

Jumlah (1) + (2) 281,096.55Rp.Keuntungan 10% 28,109.66Rp.Jumlah 309,206.21Rp.

KodeB.12. 1 m3 Lapisan pudel 1 kp : 3 Ps : 7 TL Dibulatkan 309,200.00Rp.

B.13. 1 m3 Lapisan pudel 1 kp : 5 TL1 Bahan

Kapur padam 0.2480 m3 226,570.00Rp. 56,189.36Rp.Tanah liat 1.2400 m3 90,200.00Rp. 111,848.00Rp.

Jumlah (1). 168,037.36Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang batu 0.4000 oh 100,000.00Rp. 40,000.00Rp.Kepala tukang 0.0400 oh 120,000.00Rp. 4,800.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 105,600.00Rp.

Jumlah (1) + (2) 273,637.36Rp.Keuntungan 10% 27,363.74Rp.Jumlah 301,001.10Rp.

KodeB.13. 1 m3 Lapisan pudel 1 kp : 5 TL Dibulatkan 301,000.00Rp.

B.14. 1 m3 Memasang lapisan ijuk tebal 10 cm1 Bahan

Ijuk 6.0000 m3 9,360.00Rp. 56,160.00Rp.

Page 12: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 56,160.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 11,400.00Rp.

Jumlah (1) + (2) 67,560.00Rp.Keuntungan 10% 6,756.00Rp.Jumlah 74,316.00Rp.

KodeB.14. 1 m3 Memasang lapisan ijuk tebal 10 cm Dibulatkan 74,300.00Rp.

B.15. 1 m3 Urugan sirtu1 Bahan

Sirtu 1.2000 m3 138,050.00Rp. 165,660.00Rp.Jumlah (1). 165,660.00Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Jumlah (2). 19,000.00Rp.

Jumlah (1) + (2) 184,660.00Rp.Keuntungan 10% 18,466.00Rp.Jumlah 203,126.00Rp.

KodeB.15. 1 m3 Urugan sirtu Dibulatkan 203,100.00Rp.

B.16. 1 m3 Urugan tanah merah1 Bahan

Tanah Merah 1.2000 m3 90,200.00Rp. 108,240.00Rp.Jumlah (1). 108,240.00Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Jumlah (2). 19,000.00Rp.

Jumlah (1) + (2) 127,240.00Rp.Keuntungan 10% 12,724.00Rp.Jumlah 139,964.00Rp.

KodeB.16. 1 m3 Urugan tanah merah Dibulatkan 139,900.00Rp.

Dihitung 1 m2 Penyemprotan anti rayap1 Bahan

1.000 m2 18,150.00 18,150.00Jumlah (1). 18,150.00

2 TenagaPekerja 0.107 hari 66,000.00 7,040.00Mandor 0.018 hari 100,000.00 1,777.78

Jumlah (2). 8,817.78

Jumlah (1) + (2) 26,967.78Keuntungan 10% 2,696.78Jumlah 29,664.56

KodeDihitung 1 m2 Penyemprotan anti rayap Dibulatkan 29,600.00

Dihitung 1 btg Pasang cerucuk dolken f 7-10 cm - pj-4 m, jarak 60cm1 Bahan

Cerucuk dolken 1.100 btg 18,260.00 20,086.00Jumlah (1). 20,086.00

2 TenagaPekerja 0.270 Hari 66,000.00 17,820.00Mandor 0.027 Hari 100,000.00 2,700.00

Jumlah (2). 20,520.00

Jumlah (1) + (2) 40,606.00

Anti rayap metode spray System ( Basileum 505 EC - formulaaktif phoxim )

Page 13: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 4,060.60Jumlah 44,666.60

KodeDihitung 1 btg Pasang cerucuk dolken f 7-10 cm - pj-4 m, jarak 60cm Dibulatkan 44,600.00

Dihitung 1 m3 Base coaarse CBR 80 % kelas A1 Bahan

Batu + pasir urug 1.100 m3 235,948.00 259,542.80Jumlah (1). 259,542.80

2 TenagaPekerja 1.000 oh 66,000.00 66,000.00Mandor 0.100 oh 100,000.00 10,000.00

3 Biaya Pemadatan B.10. 1.0000 m3 41,800.00 41,800.00Jumlah (2). 117,800.00

Jumlah (1) + (2) 377,342.80Keuntungan 10% 37,734.28Jumlah 415,077.08

KodeDihitung 1 m3 Base coaarse CBR 80 % kelas A Dibulatkan 415,000.00

Dihitung 1 m3 Base coaarse CBR 30 % kelas B1 Bahan

Batu + pasir urug 1.100 m3 181,293.00 199,422.30Jumlah (1). 199,422.30

2 TenagaPekerja 1.000 oh 66,000.00 66,000.00Mandor 0.100 oh 100,000.00 10,000.00

3 Biaya Pemadatan B.10. 1.0000 m3 41,800.00 41,800.00Jumlah (2). 117,800.00

Jumlah (1) + (2) 317,222.30Keuntungan 10% 31,722.23Jumlah 348,944.53

KodeDihitung 1 m3 Base coaarse CBR 30 % kelas B Dibulatkan 348,900.00

Page 14: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN PONDASIRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pebuatan pondasi batu kali, dalam berbagai komposisi spesi2. Pemasangan aanstamping/ batu kosong3. Pembuatan pondasi sumuran4. Pembuatan tiang pancang

C.1. 1 m3 Pasang pondasi batu kali, 1 pc : 1 ps1 Bahan

Batu belah 15/20 cm 1.1000 m3 240,000.00Rp. 264,000.00Rp.Semen Portland 392.0000 kg 1,360.00Rp. 533,120.00Rp.Pasir pasang 0.3140 m3 203,500.00Rp. 63,899.00Rp.

Jumlah (1). 861,019.00Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 1,051,519.00Rp.Keuntungan 10% 105,151.90Rp.Jumlah 1,156,670.90Rp.

KodeC.1. 1 m3 Pasang pondasi batu kali, 1 pc : 1 ps Dibulatkan 1,156,600.00Rp.

C.2. 1 m3 Pasang pondasi batu kali, 1 pc : 2 ps1 Bahan

Batu belah 15/20 cm 1.1000 m3 240,000.00Rp. 264,000.00Rp.Semen Portland 267.0000 kg 1,360.00Rp. 363,120.00Rp.Pasir pasang 0.4270 m3 203,500.00Rp. 86,894.50Rp.

Jumlah (1). 714,014.50Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 904,514.50Rp.Keuntungan 10% 90,451.45Rp.Jumlah 994,965.95Rp.

KodeC.2. 1 m3 Pasang pondasi batu kali, 1 pc : 2 ps Dibulatkan 994,900.00Rp.

C.3. 1 m3 Pasang pondasi batu kali, 1 pc : 2,5 ps1 Bahan

Batu belah 15/20 cm 1.1000 m3 240,000.00Rp. 264,000.00Rp.Semen Portland 234.0000 kg 1,360.00Rp. 318,240.00Rp.Pasir pasang 0.4560 m3 203,500.00Rp. 92,796.00Rp.

Jumlah (1). 675,036.00Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 865,536.00Rp.Keuntungan 10% 86,553.60Rp.Jumlah 952,089.60Rp.

KodeC.3. 1 m3 Pasang pondasi batu kali, 1 pc : 2,5 ps Dibulatkan 952,000.00Rp.

C.4. 1 m3 Pasang pondasi batu kali, 1 pc : 3 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Semen Portland 202.0000 kg 1,360.00Rp. 274,720.00Rp.Pasir pasang 0.4850 m3 203,500.00Rp. 98,697.50Rp.

Jumlah (1). 661,417.50Rp.

2 Tenaga

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

C.

Page 15: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 851,917.50Rp.Keuntungan 10% 85,191.75Rp.Jumlah 937,109.25Rp.

KodeC.4. 1 m3 Pasang pondasi batu kali, 1 pc : 3 ps Dibulatkan 937,100.00Rp.

C.5. 1 m3 Pasang pondasi batu kali, 1 pc : 4 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Semen Portland 163.0000 kg 1,360.00Rp. 221,680.00Rp.Pasir pasang 0.5200 m3 203,500.00Rp. 105,820.00Rp.

Jumlah (1). 615,500.00Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 806,000.00Rp.Keuntungan 10% 80,600.00Rp.Jumlah 886,600.00Rp.

KodeC.5. 1 m3 Pasang pondasi batu kali, 1 pc : 4 ps Dibulatkan 886,600.00Rp.

C.6. 1 m3 Pasang pondasi batu kali, 1 pc : 5 ps1 Bahan

Batu belah 15/20 cm 1.0000 m3 240,000.00Rp. 240,000.00Rp.Semen Portland 80.0000 kg 1,360.00Rp. 108,800.00Rp.Pasir pasang 0.5440 m3 203,500.00Rp. 110,704.00Rp.

Jumlah (1). 459,504.00Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 650,004.00Rp.Keuntungan 10% 65,000.40Rp.Jumlah 715,004.40Rp.

KodeC.6. 1 m3 Pasang pondasi batu kali, 1 pc : 5 ps Dibulatkan 715,000.00Rp.

C.7. 1 m3 Pasang pondasi batu kali, 1 pc : 6 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Semen Portland 117.0000 kg 1,360.00Rp. 159,120.00Rp.Pasir pasang 0.5610 m3 203,500.00Rp. 114,163.50Rp.

Jumlah (1). 561,283.50Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 751,783.50Rp.Keuntungan 10% 75,178.35Rp.Jumlah 826,961.85Rp.

KodeC.7. 1 m3 Pasang pondasi batu kali, 1 pc : 6 ps Dibulatkan 826,900.00Rp.

C.8. 1 m3 Pasang pondasi batu kali, 1 pc : 8 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Semen Portland 91.0000 kg 1,360.00Rp. 123,760.00Rp.Pasir pasang 0.5840 m3 203,500.00Rp. 118,844.00Rp.

Jumlah (1). 530,604.00Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.

Page 16: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 721,104.00Rp.Keuntungan 10% 72,110.40Rp.Jumlah 793,214.40Rp.

KodeC.8. 1 m3 Pasang pondasi batu kali, 1 pc : 8 ps Dibulatkan 793,200.00Rp.

C.9. 1 m3 Pasang pondasi batu kali, 1 kp : 1 sm : 1 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Kapur pasang 0.2290 kg 226,570.00Rp. 51,884.53Rp.Semen merah 0.2290 m3 222,750.00Rp. 51,009.75Rp.Pasir pasang 0.5440 m3 203,500.00Rp. 110,704.00Rp.

Jumlah (1). 501,598.28Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 692,098.28Rp.Keuntungan 10% 69,209.83Rp.Jumlah 761,308.11Rp.

KodeC.9. 1 m3 Pasang pondasi batu kali, 1 kp : 1 sm : 1 ps Dibulatkan 761,300.00Rp.

C.10. 1 m3 Pasang pondasi batu kali, 1 kp : 1 sm : 2 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Kapur pasang 0.1700 kg 226,570.00Rp. 38,516.90Rp.Semen merah 0.1700 m3 222,750.00Rp. 37,867.50Rp.Pasir pasang 0.3400 m3 203,500.00Rp. 69,190.00Rp.

Jumlah (1). 433,574.40Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 624,074.40Rp.Keuntungan 10% 62,407.44Rp.Jumlah 686,481.84Rp.

KodeC.10. 1 m3 Pasang pondasi batu kali, 1 kp : 1 sm : 2 ps Dibulatkan 686,400.00Rp.

C.11. 1 m3 Pasang pondasi batu kali, 1 pc : 1/4 kp : 4 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Semen Portland 156.0000 kg 1,360.00Rp. 212,160.00Rp.Kapur pasang 0.0320 m3 226,570.00Rp. 7,250.24Rp.Pasir pasang 0.5840 m3 203,500.00Rp. 118,844.00Rp.

Jumlah (1). 626,254.24Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 816,754.24Rp.Keuntungan 10% 81,675.42Rp.Jumlah 898,429.66Rp.

KodeC.11. 1 m3 Pasang pondasi batu kali, 1 pc : 1/4 kp : 4 ps Dibulatkan 898,400.00Rp.

C.12. 1 m3 Pasang pondasi batu kali, 1 pc : 3 kp : 10 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Semen Portland 61.0000 kg 1,360.00Rp. 82,960.00Rp.Kapur pasang 0.1470 m3 226,570.00Rp. 33,305.79Rp.Pasir pasang 0.4920 m3 203,500.00Rp. 100,122.00Rp.

Jumlah (1). 504,387.79Rp.

Page 17: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 694,887.79Rp.Keuntungan 10% 69,488.78Rp.Jumlah 764,376.57Rp.

KodeC.12. 1 m3 Pasang pondasi batu kali, 1 pc : 3 kp : 10 ps Dibulatkan 764,300.00Rp.

C.13. 1 m3 Pasang pondasi batu kali, 1/4 pc : 1 kp : 4 ps1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Semen Portland 41.0000 kg 1,360.00Rp. 55,760.00Rp.Kapur pasang 0.1310 m3 226,570.00Rp. 29,680.67Rp.Pasir pasang 0.5230 m3 203,500.00Rp. 106,430.50Rp.

Jumlah (1). 479,871.17Rp.

2 TenagaPekerja 1.5000 oh 66,000.00Rp. 99,000.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala Tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 190,500.00Rp.

Jumlah (1) + (2) 670,371.17Rp.Keuntungan 10% 67,037.12Rp.Jumlah 737,408.29Rp.

KodeC.13. 1 m3 Pasang pondasi batu kali, 1/4 pc : 1 kp : 4 ps Dibulatkan 737,400.00Rp.

C.14. 1 m3 Pasang pondasi batu kosong1 Bahan

Batu belah 15/20 cm 1.2000 m3 240,000.00Rp. 288,000.00Rp.Pasir urug 0.4320 m3 148,500.00Rp. 64,152.00Rp.

Jumlah (1). 352,152.00Rp.

2 TenagaPekerja 0.7800 oh 66,000.00Rp. 51,480.00Rp.Tukang batu 0.3900 oh 100,000.00Rp. 39,000.00Rp.Kepala Tukang 0.0390 oh 120,000.00Rp. 4,680.00Rp.Mandor 0.0390 oh 100,000.00Rp. 3,900.00Rp.

Jumlah (2). 99,060.00Rp.

Jumlah (1) + (2) 451,212.00Rp.Keuntungan 10% 45,121.20Rp.Jumlah 496,333.20Rp.

KodeC.14. 1 m3 Pasang pondasi batu kosong Dibulatkan 496,300.00Rp.

C.15. 1 m3 Pasang pondasi siklop 40 % batu kali1 Bahan

Besi beton 75.0000 kg 13,200.00Rp. 990,000.00Rp.Semen Portland 202.0000 kg 1,360.00Rp. 274,720.00Rp.Pasir beton 0.3200 m3 194,700.00Rp. 62,304.00Rp.Koral beton 0.4900 m3 220,000.00Rp. 107,800.00Rp.Kawat beton 0.8000 kg 16,500.00Rp. 13,200.00Rp.

Jumlah (1). 1,448,024.00Rp.

2 TenagaPekerja 3.0000 oh 66,000.00Rp. 198,000.00Rp.Tukang batu 0.8500 oh 100,000.00Rp. 85,000.00Rp.Kepala Tukang 0.0850 oh 120,000.00Rp. 10,200.00Rp.Mandor 0.1500 oh 100,000.00Rp. 15,000.00Rp.

Jumlah (2). 308,200.00Rp.

Jumlah (1) + (2) 1,756,224.00Rp.Keuntungan 10% 175,622.40Rp.Jumlah 1,931,846.40Rp.

KodeC.15. 1 m3 Pasang pondasi siklop 40 % batu kali Dibulatkan 1,931,800.00Rp.

C.16. 1 m3 Pasang pondasi sumuran diameter 100 cm1 Bahan

Batu belah 15/20 0.4500 m3 240,000.00Rp. 108,000.00Rp.Semen Portland 194.0000 kg 1,360.00Rp. 263,840.00Rp.Pasir beton 0.3120 m3 194,700.00Rp. 60,746.40Rp.

Page 18: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Koral beton 0.4680 m3 220,000.00Rp. 102,960.00Rp.Jumlah (1). 535,546.40Rp.

2 TenagaPekerja 2.4000 oh 66,000.00Rp. 158,400.00Rp.Tukang batu 0.8000 oh 100,000.00Rp. 80,000.00Rp.Kepala Tukang 0.0800 oh 120,000.00Rp. 9,600.00Rp.Mandor 0.1190 oh 100,000.00Rp. 11,900.00Rp.

Jumlah (2). 259,900.00Rp.

Jumlah (1) + (2) 795,446.40Rp.Keuntungan 10% 79,544.64Rp.Jumlah 874,991.04Rp.

KodeC.16. 1 m3 Pasang pondasi sumuran diameter 100 cm Dibulatkan 874,900.00Rp.

C.17. 1 m' Pembuatan tiang pancang (40x40) cm , beton bertulang1 Bahan

Pasir urug darat 0.0190 m3 148,500.00Rp. 2,821.50Rp.Pasir beton 0.0940 m3 194,700.00Rp. 18,301.80Rp.Koral beton 0.1500 m3 220,000.00Rp. 33,000.00Rp.Semen Portland 60.5000 kg 1,360.00Rp. 82,280.00Rp.Besi beton 45.0000 kg 13,200.00Rp. 594,000.00Rp.Kawat beton 0.9000 kg 16,500.00Rp. 14,850.00Rp.Kayu kaso 5/7 0.0320 m3 4,061,920.00Rp. 129,981.44Rp.Paku 0.1200 kg 19,480.00Rp. 2,337.60Rp.Minyak bekisting 0.0900 lt 7,260.00Rp. 653.40Rp.Plamur tembok 0.2400 kg 13,320.00Rp. 3,196.80Rp.

Jumlah (1). 881,422.54Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.6700 oh 100,000.00Rp. 67,000.00Rp.Kepala Tukang 0.0670 oh 120,000.00Rp. 8,040.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 146,040.00Rp.

Jumlah (1) + (2) 1,027,462.54Rp.Keuntungan 10% 102,746.25Rp.Jumlah 1,130,208.79Rp.

KodeC.17. 1 m' Pembuatan tiang pancang (40x40) cm , beton bertulang Dibulatkan 1,130,200.00Rp.

C.18. 1 m' Pembuatan tiang pancang (35x35) cm , beton bertulang1 Bahan

Pasir urug darat 0.0160 m3 148,500.00Rp. 2,376.00Rp.Pasir beton 0.0800 m3 194,700.00Rp. 15,576.00Rp.Koral beton 0.1250 m3 220,000.00Rp. 27,500.00Rp.Semen Portland 49.0000 kg 1,360.00Rp. 66,640.00Rp.Besi beton 34.5000 kg 13,200.00Rp. 455,400.00Rp.Kawat beton 0.7000 kg 16,500.00Rp. 11,550.00Rp.Kayu kaso 5/7 0.0270 m3 4,061,920.00Rp. 109,671.84Rp.Paku 0.1200 kg 19,480.00Rp. 2,337.60Rp.Minyak bekisting 0.0900 lt 7,260.00Rp. 653.40Rp.Plamur tembok 0.2000 kg 13,320.00Rp. 2,664.00Rp.

Jumlah (1). 694,368.84Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang batu 0.5000 oh 100,000.00Rp. 50,000.00Rp.Kepala Tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 112,800.00Rp.

Jumlah (1) + (2) 807,168.84Rp.Keuntungan 10% 80,716.88Rp.Jumlah 887,885.72Rp.

KodeC.18. 1 m' Pembuatan tiang pancang (35x35) cm , beton bertulang Dibulatkan 887,800.00Rp.

C.19. 1 m3 Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah1 Bahan

Batu belah 15/20 cm 0.4800 m3 240,000.00Rp. 115,200.00Rp.PC 194.0000 kg 1,360.00Rp. 263,840.00Rp.Pasir beton 0.3120 m3 194,700.00Rp. 60,746.40Rp.Kerikil 0.4680 m3 220,000.00Rp. 102,960.00Rp.Besi Beton 126.0000 kg 13,200.00Rp. 1,663,200.00Rp.Kawat Beton 1.8000 kg 16,500.00Rp. 29,700.00Rp.

Jumlah (1). 439,786.40Rp.

2 Tenaga

Page 19: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 3.4000 oh 66,000.00Rp. 224,400.00Rp.Tukang batu 0.8500 oh 100,000.00Rp. 85,000.00Rp.Kepala Tukang 0.0850 oh 120,000.00Rp. 10,200.00Rp.Mandor 0.1700 oh 100,000.00Rp. 17,000.00Rp.

Jumlah (2). 336,600.00Rp.

Jumlah (1) + (2) 776,386.40Rp.Keuntungan 10% 77,638.64Rp.Jumlah 854,025.04Rp.

KodeC.19. 1 m3 Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belahDibulatkan 854,000.00Rp.

c.20. 1M' Tiang Pancang 40 x 40

1. Upah : - Tiang pancang 40x40CM 1.000 m1 455,400.00Rp. 455,400.00Rp

Jumlah 455,400.00Rp.Keuntungan 10% 45,540.00Rp.Jumlah 500,940.00Rp.

Kodec.20. 1M' Tiang Pancang 40 x 40 Dibulatkan 500,900.00Rp.

C.21. 1M1 Biaya Upah Pemancangan 40 x 40

1. Upah : - Pemancangan dengan jacking pile 1.0000 m1 112,500.00Rp. 112,500.00Rp. - Handling tiang pancang 1.0000 m1 12,000.00Rp. 12,000.00Rp. - Keamanan alat 1.0000 m1 2,200.00Rp. 2,200.00Rp.

Jumlah 126,700.00Rp.Keuntungan 10% 12,670.00Rp.Jumlah 139,370.00Rp.

KodeC.21. 1M1 Biaya Upah Pemancangan 40 x 40 Dibulatkan 139,300.00Rp.

C.22. 1Joint Sambungan Tiang pancang

1. Bahan : - Joint plate Sq. 400 1.0000 JOINT 660,000.00Rp. 660,000.00Rp.2. Upah : - Sambungan las tiang pancang 1.0000 JOINT 165,000.00Rp. 165,000.00Rp.

Jumlah 825,000.00Rp.Keuntungan 10% 82,500.00Rp.Jumlah 907,500.00Rp.

KodeC.22. 1Joint Sambungan Tiang pancang Dibulatkan 907,500.00Rp.

C.23. Joint Potong Tiang Pancang

1. Upah : - Potong kepala tiang pancang 1.0000 JOINT 145,200.00Rp. 145,200.00Rp.

Jumlah 145,200.00Rp.Keuntungan 10% 14,520.00Rp.Jumlah 159,720.00Rp.

KodeC.23. Joint Potong Tiang Pancang Dibulatkan 159,700.00Rp.

C.24. 1 titik PDA Test + Analisa CAPWAP

1. Upah : - PDA Test 1.0000 Titik 7,500,000.00 7,500,000.00Rp.

Jumlah 7,500,000.00Rp.Keuntungan 10% 750,000.00Rp.Jumlah 8,250,000.00Rp.

KodeC.24. 1 titik PDA Test + Analisa CAPWAP Dibulatkan 8,250,000.00Rp.

C.25. 11 1 M³ Pasang pondasi batu kali Aanstamping 248,300.00Batu Belah 1.2000 m³ 115,000.00 138,000.00Pasir Urug 0.3000 org 100,000.00 30,000.00Pekerja 0.7800 org 60,000.00 46,800.00Tukang Batu 0.3900 org 70,000.00 27,300.00Kepala Tukang 0.0390 org 75,000.00 2,925.00Mandor 0.0390 org 85,000.00 3,315.00

Jumlah 248,340.00C.26. 1 M³ Fondasi Plat Setempat

G.5. Membuat beton bertulang 1 pc : 2 ps : 3 kr 1.00 1 m3 806,500.00 806,500.00RpG.25. Pembesian dengan besi polos atau besi ulir 100.00 1 kg 16,900.00 1,690,000.00Rp

Page 20: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.29. Pasang bekisting untuk sloof 1.00 G.29. 174,100.00 174,100.00RpJumlah 2,670,600.00Rp

B.25. Pemancangan Tiang Pancang 25X25 cm m 1.000 Mini pile □ 250 x 250 mm, panjang 12 m m 1.000 160,000.00 160,000.00

Mandor oh 0.125 80,000.00 10,000.00Sewa Crane 30 ton Jam 0.218 130,000.00 28,340.00Sewa Hammer Tiang Pancang Jam 0.218 150,000.00 32,700.00

Jumlah 231,040.00B.26. Penyambungan Tiang Pancang 25x25 cm bh 1.000

Joint sambungan Tiang Pancang bh 1.000 30,000.00 30,000.00 Kawat Las Electroda kg 0.500 35,000.00 17,500.00 Oli lt 0.050 30,000.00 1,500.00 Solar lt 1.000 6,500.00 6,500.00 Sewa Welding Set hr 0.050 50,000.00 2,500.00 Tukang Las oh 0.250 70,000.00 17,500.00

Jumlah 75,500.00B.27. Pemotongan ujung tiang pancang 25x25 cm ttk 1.000

Pekerja oh 0.420 60,000.00 25,200.00 Tukang Las oh 0.250 70,000.00 17,500.00 Mandor oh 0.020 80,000.00 1,600.00

Jumlah 44,300.00

Page 21: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN DINDINGRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pasangan bata merah berbagai ketebalan dan spesi2. Pekerjaan conblock berbagai dimensi dan spesi3. Pekerjaan pemasangan roster atau bata berongga4. Pekerjaan pasangan anyaman bambu untuk dinding rumah sederhana

D.1. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 1 ps1 Bahan

Batu bata 5 x 11 x 22 140.0000 bh 650.00Rp. 91,000.00Rp.Semen Portland 64.0300 kg 1,360.00Rp. 87,080.80Rp.Pasir pasang 0.0590 m3 203,500.00Rp. 12,006.50Rp.

Jumlah (1). 190,087.30Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 65,000.00Rp.

Jumlah (1) + (2) 255,087.30Rp.Keuntungan 10% 25,508.73Rp.Jumlah 280,596.03Rp.

KodeD.1. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 1 ps Dibulatkan 280,500.00Rp.

D.2. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 2 ps1 Bahan

Batu bata 5 x 11 x 22 140.0000 bh 650.00Rp. 91,000.00Rp.Semen Portland 43.5000 kg 1,360.00Rp. 59,160.00Rp.Pasir pasang 0.0800 m3 203,500.00Rp. 16,280.00Rp.

Jumlah (1). 166,440.00Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 65,000.00Rp.

Jumlah (1) + (2) 231,440.00Rp.Keuntungan 10% 23,144.00Rp.Jumlah 254,584.00Rp.

KodeD.2. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 2 ps Dibulatkan 254,500.00Rp.

D.3. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 3 ps1 Bahan

Batu bata 5 x 11 x 22 140.0000 bh 650.00Rp. 91,000.00Rp.Semen Portland 32.9500 kg 1,360.00Rp. 44,812.00Rp.Pasir pasang 0.0910 m3 203,500.00Rp. 18,518.50Rp.

Jumlah (1). 154,330.50Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 65,000.00Rp.

Jumlah (1) + (2) 219,330.50Rp.Keuntungan 10% 21,933.05Rp.Jumlah 241,263.55Rp.

KodeD.3. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 3 ps Dibulatkan 241,200.00Rp.

D.4. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 4 ps1 Bahan

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

D.

Page 22: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Batu bata 5 x 11 x 22 140.0000 bh 650.00Rp. 91,000.00Rp.Semen Portland 26.5500 kg 1,360.00Rp. 36,108.00Rp.Pasir pasang 0.0930 m3 203,500.00Rp. 18,925.50Rp.

Jumlah (1). 146,033.50Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 65,000.00Rp.

Jumlah (1) + (2) 211,033.50Rp.Keuntungan 10% 21,103.35Rp.Jumlah 232,136.85Rp.

KodeD.4. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 4 ps Dibulatkan 232,100.00Rp.

D.5. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 5 ps1 Bahan

Batu bata 5 x 11 x 22 140.0000 bh 650.00Rp. 91,000.00Rp.Semen Portland 22.2000 kg 1,360.00Rp. 30,192.00Rp.Pasir pasang 0.1020 m3 203,500.00Rp. 20,757.00Rp.

Jumlah (1). 141,949.00Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 65,000.00Rp.

Jumlah (1) + (2) 206,949.00Rp.Keuntungan 10% 20,694.90Rp.Jumlah 227,643.90Rp.

KodeD.5. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 5 ps Dibulatkan 227,600.00Rp.

D.6. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 6 ps1 Bahan

Batu bata 5 x 11 x 22 140.0000 bh 650.00Rp. 91,000.00Rp.Semen Portland 18.5000 kg 1,360.00Rp. 25,160.00Rp.Pasir pasang 0.1220 m3 203,500.00Rp. 24,827.00Rp.

Jumlah (1). 140,987.00Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 65,000.00Rp.

Jumlah (1) + (2) 205,987.00Rp.Keuntungan 10% 20,598.70Rp.Jumlah 226,585.70Rp.

KodeD.6. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 6 ps Dibulatkan 226,500.00Rp.

D.7. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 3 kp : 10 ps1 Bahan

Batu bata 5 x 11 x 22 140.0000 bh 650.00Rp. 91,000.00Rp.Semen Portland 10.0800 kg 1,360.00Rp. 13,708.80Rp.Pasir pasang 0.0925 m3 203,500.00Rp. 18,823.75Rp.Kapur pasang 0.0275 m3 226,570.00Rp. 6,230.68Rp.

Jumlah (1). 129,763.23Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 65,000.00Rp.

Jumlah (1) + (2) 194,763.23Rp.Keuntungan 10% 19,476.32Rp.

Page 23: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 214,239.55Rp.KodeD.7. 1 m2 Pasangan bata merah tebal 1 bata, 1 pc : 3 kp : 10 ps Dibulatkan 214,200.00Rp.

D.8. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 1 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 27.8000 kg 1,360.00Rp. 37,808.00Rp.Pasir pasang 0.0280 m3 203,500.00Rp. 5,698.00Rp.

Jumlah (1). 89,006.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 121,506.00Rp.Keuntungan 10% 12,150.60Rp.Jumlah 133,656.60Rp.

KodeD.8. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 1 ps Dibulatkan 133,600.00Rp.

D.9. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 2 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 18.9500 kg 1,360.00Rp. 25,772.00Rp.Pasir pasang 0.0380 m3 203,500.00Rp. 7,733.00Rp.

Jumlah (1). 79,005.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 111,505.00Rp.Keuntungan 10% 11,150.50Rp.Jumlah 122,655.50Rp.

KodeD.9. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 2 ps Dibulatkan 122,600.00Rp.

D.10. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 3 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 14.3700 kg 1,360.00Rp. 19,543.20Rp.Pasir pasang 0.0400 m3 203,500.00Rp. 8,140.00Rp.

Jumlah (1). 73,183.20Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 105,683.20Rp.Keuntungan 10% 10,568.32Rp.Jumlah 116,251.52Rp.

KodeD.10. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 3 ps Dibulatkan 116,200.00Rp.

D.11. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 4 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 11.5000 kg 1,360.00Rp. 15,640.00Rp.Pasir pasang 0.0430 m3 203,500.00Rp. 8,750.50Rp.

Jumlah (1). 69,890.50Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.

Page 24: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 102,390.50Rp.Keuntungan 10% 10,239.05Rp.Jumlah 112,629.55Rp.

KodeD.11. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 4 ps Dibulatkan 112,600.00Rp.

D.12. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 5 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 9.6800 kg 1,360.00Rp. 13,164.80Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.

Jumlah (1). 67,822.30Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 100,322.30Rp.Keuntungan 10% 10,032.23Rp.Jumlah 110,354.53Rp.

KodeD.12. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 5 ps Dibulatkan 110,300.00Rp.

D.13. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 6 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 8.3200 kg 1,360.00Rp. 11,315.20Rp.Pasir pasang 0.0490 m3 203,500.00Rp. 9,971.50Rp.

Jumlah (1). 66,786.70Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 99,286.70Rp.Keuntungan 10% 9,928.67Rp.Jumlah 109,215.37Rp.

KodeD.13. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 6 ps Dibulatkan 109,200.00Rp.

D.14. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 8 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 6.5000 kg 1,360.00Rp. 8,840.00Rp.Pasir pasang 0.0500 m3 203,500.00Rp. 10,175.00Rp.

Jumlah (1). 64,515.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 97,015.00Rp.Keuntungan 10% 9,701.50Rp.Jumlah 106,716.50Rp.

KodeD.14. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 8 ps Dibulatkan 106,700.00Rp.

D.15. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 3 kp : 10 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen Portland 4.5000 kg 1,360.00Rp. 6,120.00Rp.Pasir pasang 0.0500 m3 203,500.00Rp. 10,175.00Rp.Kapur pasang 0.0150 m3 226,570.00Rp. 3,398.55Rp.

Page 25: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 65,193.55Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 97,693.55Rp.Keuntungan 10% 9,769.36Rp.Jumlah 107,462.91Rp.

KodeD.15. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 3 kp : 10 ps Dibulatkan 107,400.00Rp.

D.16. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 kp : 1 sm : 1 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen merah 0.0180 m3 1,360.00Rp. 24.48Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Kapur pasang 0.0180 m3 226,570.00Rp. 4,078.26Rp.

Jumlah (1). 53,265.74Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 85,765.74Rp.Keuntungan 10% 8,576.57Rp.Jumlah 94,342.31Rp.

KodeD.16. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 kp : 1 sm : 1 ps Dibulatkan 94,300.00Rp.

D.17. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 kp : 1 sm : 2 ps1 Bahan

Batu bata 5 x 11 x 22 70.0000 bh 650.00Rp. 45,500.00Rp.Semen merah 0.0140 m3 1,360.00Rp. 19.04Rp.Pasir pasang 0.0280 m3 203,500.00Rp. 5,698.00Rp.Kapur pasang 0.0140 m3 226,570.00Rp. 3,171.98Rp.

Jumlah (1). 54,389.02Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 86,889.02Rp.Keuntungan 10% 8,688.90Rp.Jumlah 95,577.92Rp.

KodeD.17. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 kp : 1 sm : 2 ps Dibulatkan 95,500.00Rp.

D.18. 1 m2 Pasangan dinding hollowblock (HB. 20) campuran 1 PC : 3 Pasir1 Bahan

Hollow block (HB 20) 12.5000 bh 7,150.00Rp. 89,375.00Rp.Semen Portland 30.3200 kg 1,360.00Rp. 41,235.20Rp.Pasir pasang 0.7280 m3 203,500.00Rp. 148,148.00Rp.Besi beton polos 0.2800 kg 13,200.00Rp. 3,696.00Rp.

Jumlah (1). 282,454.20Rp.

2 TenagaPekerja 0.3500 oh 66,000.00Rp. 23,100.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0175 oh 100,000.00Rp. 1,750.00Rp.

Jumlah (2). 41,650.00Rp.

Jumlah (1) + (2) 324,104.20Rp.Keuntungan 10% 32,410.42Rp.Jumlah 356,514.62Rp.

Page 26: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeD.18. 1 m2 Pasangan dinding hollowblock (HB. 20) campuran 1 PC : 3 Pasir Dibulatkan 356,500.00Rp.

D.19. 1 m2 Pasangan dinding hollowblock (HB. 20) campuran 1 PC : 4 Pasir1 Bahan

Hollow block (HB 20) 12.5000 bh 7,150.00Rp. 89,375.00Rp.Semen Portland 24.2600 kg 1,360.00Rp. 32,993.60Rp.Pasir pasang 0.7720 m3 203,500.00Rp. 157,102.00Rp.Besi beton polos 0.2800 kg 13,200.00Rp. 3,696.00Rp.

Jumlah (1). 283,166.60Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0180 oh 100,000.00Rp. 1,800.00Rp.

Jumlah (2). 38,400.00Rp.

Jumlah (1) + (2) 321,566.60Rp.Keuntungan 10% 32,156.66Rp.Jumlah 353,723.26Rp.

KodeD.19. 1 m2 Pasangan dinding hollowblock (HB. 20) campuran 1 PC : 4 Pasir Dibulatkan 353,700.00Rp.

D.20. 1 m2 Pasangan dinding hollowblock (HB. 15) campuran 1 PC : 3 Pasir1 Bahan

Hollow block (HB 15) 12.5000 bh 6,270.00Rp. 78,375.00Rp.Semen Portland 22.7400 kg 1,360.00Rp. 30,926.40Rp.Pasir pasang 0.5500 m3 203,500.00Rp. 111,925.00Rp.Besi beton polos 0.2800 kg 13,200.00Rp. 3,696.00Rp.

Jumlah (1). 224,922.40Rp.

2 TenagaPekerja 0.3200 oh 66,000.00Rp. 21,120.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala Tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0160 oh 100,000.00Rp. 1,600.00Rp.

Jumlah (2). 36,160.00Rp.

Jumlah (1) + (2) 261,082.40Rp.Keuntungan 10% 26,108.24Rp.Jumlah 287,190.64Rp.

KodeD.20. 1 m2 Pasangan dinding hollowblock (HB. 15) campuran 1 PC : 3 Pasir Dibulatkan 287,100.00Rp.

D.21. 1 m2 Pasangan dinding hollowblock (HB. 15) campuran 1 PC : 4 Pasir1 Bahan

Hollow block (HB 15) 12.5000 bh 6,270.00Rp. 78,375.00Rp.Semen Portland 18.2000 kg 1,360.00Rp. 24,752.00Rp.Pasir pasang 0.5820 m3 203,500.00Rp. 118,437.00Rp.Besi beton polos 0.2800 kg 13,200.00Rp. 3,696.00Rp.

Jumlah (1). 225,260.00Rp.

2 TenagaPekerja 0.3200 oh 66,000.00Rp. 21,120.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala Tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0160 oh 100,000.00Rp. 1,600.00Rp.

Jumlah (2). 36,160.00Rp.

Jumlah (1) + (2) 261,420.00Rp.Keuntungan 10% 26,142.00Rp.Jumlah 287,562.00Rp.

KodeD.21. 1 m2 Pasangan dinding hollowblock (HB. 15) campuran 1 PC : 4 Pasir Dibulatkan 287,500.00Rp.

D.22. 1 m2 Pasangan dinding hollowblock (HB. 10) campuran 1 PC : 3 Pasir1 Bahan

Hollow block (HB 10) 12.5000 bh 5,390.00Rp. 67,375.00Rp.Semen Portland 15.1600 kg 1,360.00Rp. 20,617.60Rp.Pasir pasang 0.3640 m3 203,500.00Rp. 74,074.00Rp.Besi beton polos 0.2800 kg 13,200.00Rp. 3,696.00Rp.

Jumlah (1). 165,762.60Rp.

2 Tenaga

Page 27: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 198,262.60Rp.Keuntungan 10% 19,826.26Rp.Jumlah 218,088.86Rp.

KodeD.22. 1 m2 Pasangan dinding hollowblock (HB. 10) campuran 1 PC : 3 Pasir Dibulatkan 218,000.00Rp.

D.23. 1 m2 Pasangan dinding hollowblock (HB. 10) campuran 1 PC : 4 Pasir1 Bahan

Hollow block (HB 10) 12.5000 bh 5,390.00Rp. 67,375.00Rp.Semen Portland 12.1300 kg 1,360.00Rp. 16,496.80Rp.Pasir pasang 0.3880 m3 203,500.00Rp. 78,958.00Rp.Besi beton polos 0.2800 kg 13,200.00Rp. 3,696.00Rp.

Jumlah (1). 166,525.80Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 199,025.80Rp.Keuntungan 10% 19,902.58Rp.Jumlah 218,928.38Rp.

KodeD.23. 1 m2 Pasangan dinding hollowblock (HB. 10) campuran 1 PC : 4 Pasir Dibulatkan 218,900.00Rp.

D.24. 1 m2 Pasangan dinding conblock (CB. 20)1 Bahan

Concrete block (CB 20) 12.5000 bh 7,700.00Rp. 96,250.00Rp.Semen Portland 14.0500 kg 1,360.00Rp. 19,108.00Rp.Pasir beton 0.0040 m3 194,700.00Rp. 778.80Rp.Pasir pasang 0.0240 m3 203,500.00Rp. 4,884.00Rp.Besi beton polos 3.8700 kg 13,200.00Rp. 51,084.00Rp.Paku biasa 2" - 5" 0.0060 kg 19,480.00Rp. 116.88Rp.Kayu terentang 0.0010 m3 1,718,510.00Rp. 1,718.51Rp.Kawat beton 0.0300 kg 16,500.00Rp. 495.00Rp.Koral beton 0.0050 m3 230,000.00Rp. 1,150.00Rp.

Jumlah (1). 175,585.19Rp.

2 TenagaPekerja 0.3700 oh 66,000.00Rp. 24,420.00Rp.Tukang batu 0.1570 oh 100,000.00Rp. 15,700.00Rp.Tukang besi 0.0070 oh 100,000.00Rp. 700.00Rp.Kepala Tukang 0.0164 oh 120,000.00Rp. 1,968.00Rp.Mandor 0.0185 oh 100,000.00Rp. 1,850.00Rp.

Jumlah (2). 44,638.00Rp.

Jumlah (1) + (2) 220,223.19Rp.Keuntungan 10% 22,022.32Rp.Jumlah 242,245.51Rp.

KodeD.24. 1 m2 Pasangan dinding conblock (CB. 20) Dibulatkan 242,200.00Rp.

D.25. 1 m2 Pasangan dinding conblock (CB. 15)1 Bahan

Concrete block (CB 15) 12.5000 bh 7,150.00Rp. 89,375.00Rp.Semen Portland 10.4600 kg 1,360.00Rp. 14,225.60Rp.Pasir beton 0.0030 m3 194,700.00Rp. 584.10Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.Besi beton polos 0.8700 kg 13,200.00Rp. 11,484.00Rp.Paku biasa 2" - 5" 0.0040 kg 19,480.00Rp. 77.92Rp.Kayu terentang 0.0010 m3 1,718,510.00Rp. 1,718.51Rp.Kawat beton 0.0200 kg 16,500.00Rp. 330.00Rp.Koral beton 0.0040 m3 230,000.00Rp. 920.00Rp.

Jumlah (1). 125,227.13Rp.

2 TenagaPekerja 0.3400 oh 66,000.00Rp. 22,440.00Rp.

Page 28: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang batu 0.1300 oh 100,000.00Rp. 13,000.00Rp.Tukang besi 0.0070 oh 100,000.00Rp. 700.00Rp.Kepala Tukang 0.0137 oh 120,000.00Rp. 1,644.00Rp.Mandor 0.0170 oh 100,000.00Rp. 1,700.00Rp.

Jumlah (2). 39,484.00Rp.

Jumlah (1) + (2) 164,711.13Rp.Keuntungan 10% 16,471.11Rp.Jumlah 181,182.24Rp.

KodeD.25. 1 m2 Pasangan dinding conblock (CB. 15) Dibulatkan 181,100.00Rp.

D.26. 1 m2 Pasangan dinding conblock (CB. 10)1 Bahan

Concrete block (CB 10) 12.5000 bh 6,600.00Rp. 82,500.00Rp.Semen Portland 7.2000 kg 1,360.00Rp. 9,792.00Rp.Pasir beton 0.0020 m3 194,700.00Rp. 389.40Rp.Pasir pasang 0.0210 m3 203,500.00Rp. 4,273.50Rp.Besi beton polos 2.5400 kg 13,200.00Rp. 33,528.00Rp.Paku biasa 2" - 5" 0.0030 kg 19,480.00Rp. 58.44Rp.Kayu terentang 0.0010 m3 1,718,510.00Rp. 1,718.51Rp.Kawat beton 0.0150 kg 16,500.00Rp. 247.50Rp.Koral beton 0.0030 m3 230,000.00Rp. 690.00Rp.

Jumlah (1). 133,197.35Rp.

2 TenagaPekerja 0.3400 oh 66,000.00Rp. 22,440.00Rp.Tukang batu 0.1070 oh 100,000.00Rp. 10,700.00Rp.Tukang besi 0.0070 oh 100,000.00Rp. 700.00Rp.Kepala Tukang 0.0114 oh 120,000.00Rp. 1,368.00Rp.Mandor 0.0170 oh 100,000.00Rp. 1,700.00Rp.

Jumlah (2). 36,908.00Rp.

Jumlah (1) + (2) 170,105.35Rp.Keuntungan 10% 17,010.54Rp.Jumlah 187,115.89Rp.

KodeD.26. 1 m2 Pasangan dinding conblock (CB. 10) Dibulatkan 187,100.00Rp.

D.27. 1 m2 Pasangan dinding latai1 Bahan

Bondbeam 40x20x20 2.5000 bh 48,400.00Rp. 121,000.00Rp.Semen Portland 5.1000 kg 1,360.00Rp. 6,936.00Rp.Pasir beton 0.0800 m3 194,700.00Rp. 15,576.00Rp.Besi beton polos 1.5000 kg 13,200.00Rp. 19,800.00Rp.Koral beton 0.1500 m3 230,000.00Rp. 34,500.00Rp.

Jumlah (1). 197,812.00Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang batu 0.0300 oh 100,000.00Rp. 3,000.00Rp.Tukang besi 0.0300 oh 100,000.00Rp. 3,000.00Rp.Kepala Tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 13,820.00Rp.

Jumlah (1) + (2) 211,632.00Rp.Keuntungan 10% 21,163.20Rp.Jumlah 232,795.20Rp.

KodeD.27. 1 m2 Pasangan dinding latai Dibulatkan 232,700.00Rp.

D.28. 1 m2 Pasang dinding roster/terawang (12 x 11 x 24) campuran 1 PC :3 Psr1 Bahan

Roster/terawang 30.0000 bh 15,690.00Rp. 470,700.00Rp.Semen Portland 14.0000 kg 1,360.00Rp. 19,040.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 496,252.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Page 29: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 528,752.00Rp.Keuntungan 10% 52,875.20Rp.Jumlah 581,627.20Rp.

KodeD.28. 1 m2 Pasang dinding roster/terawang (12 x 11 x 24) campuran 1 PC :3 Psr Dibulatkan 581,600.00Rp.

D.29. 1 m2 Pasang dinding roster/terawang (12 x 11 x 24) campuran 1 PC : 4 Psr1 Bahan

Roster/terawang 30.0000 bh 15,690.00Rp. 470,700.00Rp.Semen Portland 11.0000 kg 1,360.00Rp. 14,960.00Rp.Pasir pasang 0.0350 m3 203,500.00Rp. 7,122.50Rp.

Jumlah (1). 492,782.50Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 525,282.50Rp.Keuntungan 10% 52,528.25Rp.Jumlah 577,810.75Rp.

KodeD.29. 1 m2 Pasang dinding roster/terawang (12 x 11 x 24) campuran 1 PC : 4 Psr Dibulatkan 577,800.00Rp.

D.30. 1 m2 Pasangan bata berongga ukuran ( 5 x 11 x 24) cm campuran 1 PC : 3 Psr1 Bahan

Bata berongga 70.0000 bh 370.00Rp. 25,900.00Rp.Semen Portland 14.0000 kg 1,360.00Rp. 19,040.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 51,452.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 89,552.00Rp.Keuntungan 10% 8,955.20Rp.Jumlah 98,507.20Rp.

KodeD.30. 1 m2 Pasangan bata berongga ukuran ( 5 x 11 x 24) cm campuran 1 PC : 3 PsrDibulatkan 98,500.00Rp.

D.31. 1 m2 Pasangan dinding anyaman bambu, rangka kayu1 Bahan

Bilik bambu 1.5000 m2 36,000.00Rp. 54,000.00Rp.Kayu 5/7 0.0140 m3 3,437,010.00Rp. 48,118.14Rp.Paku 0.0120 kg 19,480.00Rp. 233.76Rp.List kayu 2/4 0.0030 m3 6,147,530.00Rp. 18,442.59Rp.

Jumlah (1). 120,794.49Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang batu 0.0500 oh 100,000.00Rp. 5,000.00Rp.Kepala Tukang 0.0050 oh 120,000.00Rp. 600.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 12,400.00Rp.

Jumlah (1) + (2) 133,194.49Rp.Keuntungan 10% 13,319.45Rp.Jumlah 146,513.94Rp.

KodeD.31. 1 m2 Pasangan dinding anyaman bambu, rangka kayu Dibulatkan 146,500.00Rp.

D.32. 1 m2 Pasangan dinding partisi double gybsum tebal 9 mm1 Bahan

Gybsum 9 mm 0.7700 lbr 21,006.94Rp. 16,175.35Rp.Balok Kayu Borneo Super 0.0150 m3 3,437,010.00Rp. 51,555.15Rp.Paku kaso 0.0200 kg 18,720.00Rp. 374.40Rp.Paku Gypsum 0.2000 kg 21,890.00Rp. 4,378.00Rp.

Jumlah (1). 72,482.90Rp.

Page 30: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaTukang Kayu 0.7000 oh 105,000.00Rp. 73,500.00Rp.Kepala Tukang Kayu 0.0700 oh 120,000.00Rp. 8,400.00Rp.Pekerja 0.3500 oh 66,000.00Rp. 23,100.00Rp.Mandor 0.1260 oh 120,000.00Rp. 15,120.00Rp.

Jumlah (2). 120,120.00Rp.

Jumlah (1) + (2) 192,602.90Rp.Keuntungan 10% 19,260.29Rp.Jumlah 211,863.19Rp.

KodeD.32. 1 m2 Pasangan dinding partisi double gybsum tebal 9 mm Dibulatkan 211,800.00Rp.

D32.a 1 m2

1 BahanHollow 40 x 40 mm 5.5000 m' 12,650.00Rp. 69,575.00Rp.Paku sekrup 0.2200 kg 13,360.00Rp. 2,939.20Rp.GRC Board 2.4 x 1.2 x 0.08 2.0000 m2 24,583.33Rp. 49,166.67Rp.coumpond 0.0600 zak 122,960.00Rp. 7,377.60Rp.

Jumlah (1). 129,058.47Rp.

2 TenagaPekerja 0.5600 oh 66,000.00Rp. 36,960.00Rp.Tukang kayu 0.6400 oh 105,000.00Rp. 67,200.00Rp.Kepala tukang 0.1600 oh 120,000.00Rp. 19,200.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 131,360.00Rp.

Jumlah (1) + (2) 260,418.47Rp.Keuntungan 10% 26,041.85Rp.Jumlah 286,460.31Rp.

KodeD32.a 1

m2 Dibulatkan Rp. 286,400.00

D.33. 1 m2 Pasangan Hebel tb. 10 cm1 Bahan

Hebel tb. 10 cm 11.0000 bh 9,410.00Rp. 103,510.00Rp.Mortar MU 380 11.4300 Kg 3,275.00Rp. 37,433.25Rp.

Jumlah (1). 140,943.25Rp.

2 TenagaPekerja 0.3200 oh 66,000.00Rp. 21,120.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 33,820.00Rp.

Jumlah (1) + (2) 174,763.25Rp.Keuntungan 10% 17,476.33Rp.Jumlah 192,239.58Rp.

KodeD.33. 1 m2 Pasangan Hebel tb. 10 cm Dibulatkan 192,200.00Rp.

D.34 1 m2 Pasang dinding roster/terawang (20 x 20 x 11) campuran 1 PC :3 Psr1 Bahan

Roster/terawang beton 25.000 bh 15,690.00 392,250.00Semen Portland 14.000 kg 1,360.00 19,040.00Pasir pasang 0.032 m3 203,500.00 6,512.00

Jumlah (1). 417,802.00

2 TenagaPekerja 0.300 oh 66,000.00 19,800.00Tukang batu 0.100 oh 100,000.00 10,000.00Kepala Tukang 0.0100 oh 120,000.00 1,200.00Mandor 0.0150 oh 100,000.00 1,500.00

Jumlah (2). 32,500.00Jumlah (1) + (2) 450,302.00Keuntungan 10% 45,030.20Jumlah 495,332.20

KodeD.34 1 m2 Pasang dinding roster/terawang (20 x 20 x 11) campuran 1 PC :3 Psr Dibulatkan 495,300.00

DInding GRC dobel, uk. (120 x 240) tebal 8mm + dobel rangka hollow40 x 40 mm (60 x60)

DInding GRC dobel, uk. (120 x 240) tebal 8mm + dobel rangkahollow 40 x 40 mm (60 x60)

Page 31: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

D.35 1 m2 Ornamen dinding, Paving type Fullpave t. 6 cm (20 x 20) campuran 1 PC :3 Psr1 Bahan

Paving type Fullpave t. 6 cm (20 x 20) 1.050 m2 84,750.00 88,987.50Semen Portland 14.000 kg 1,360.00 19,040.00Pasir pasang 0.032 m3 203,500.00 6,512.00

Jumlah (1). 114,539.50

2 TenagaPekerja 0.300 oh 66,000.00 19,800.00Tukang batu 0.100 oh 100,000.00 10,000.00Kepala Tukang 0.0100 oh 120,000.00 1,200.00Mandor 0.0150 oh 100,000.00 1,500.00

Jumlah (2). 32,500.00Jumlah (1) + (2) 147,039.50Keuntungan 10% 14,703.95Jumlah 161,743.45

KodeD.35 1 m2 Ornamen dinding, Paving type Fullpave t. 6 cm (20 x 20) campuran 1 PC :3 PsrDibulatkan 161,700.00

Page 32: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN PLESTERANRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pembuatan plesteran dalam berbagai ketebalandan campuran2. Pekerjaan berapen pondasi dan plesteran kedap air dengan menggunakan tambahan bahan kimia

E.1. 1 m2 Plesteran 1 pc : 1 ps, tebal 15 mm1 Bahan

Semen Portland 15.5040 kg 1,360.00Rp. 21,085.44Rp.Pasir pasang 0.0160 m3 203,500.00Rp. 3,256.00Rp.

Jumlah (1). 24,341.44Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 62,441.44Rp.Keuntungan 10% 6,244.14Rp.Jumlah 68,685.58Rp.

KodeE.1. 1 m2 Plesteran 1 pc : 1 ps, tebal 15 mm Dibulatkan 68,600.00Rp.

E.2. 1 m2 Plesteran 1 pc : 2 ps, tebal 15 mm1 Bahan

Semen Portland 10.2240 kg 1,360.00Rp. 13,904.64Rp.Pasir pasang 0.0200 m3 203,500.00Rp. 4,070.00Rp.

Jumlah (1). 17,974.64Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 56,074.64Rp.Keuntungan 10% 5,607.46Rp.Jumlah 61,682.10Rp.

KodeE.2. 1 m2 Plesteran 1 pc : 2 ps, tebal 15 mm Dibulatkan 61,600.00Rp.

E.3. 1 m2 Plesteran 1 pc : 3 ps, tebal 15 mm1 Bahan

Semen Portland 7.7760 kg 1,360.00Rp. 10,575.36Rp.Pasir pasang 0.0230 m3 203,500.00Rp. 4,680.50Rp.

Jumlah (1). 15,255.86Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 53,355.86Rp.Keuntungan 10% 5,335.59Rp.Jumlah 58,691.45Rp.

KodeE.3. 1 m2 Plesteran 1 pc : 3 ps, tebal 15 mm Dibulatkan 58,600.00Rp.

E.4. 1 m2 Plesteran 1 pc : 4 ps, tebal 15 mm

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

E.

Page 33: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanSemen Portland 6.2400 kg 1,360.00Rp. 8,486.40Rp.Pasir pasang 0.0240 m3 203,500.00Rp. 4,884.00Rp.

Jumlah (1). 13,370.40Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 51,470.40Rp.Keuntungan 10% 5,147.04Rp.Jumlah 56,617.44Rp.

KodeE.4. 1 m2 Plesteran 1 pc : 4 ps, tebal 15 mm Dibulatkan 56,600.00Rp.

E.5. 1 m2 Plesteran 1 pc : 5 ps, tebal 15 mm1 Bahan

Semen Portland 5.1840 kg 1,360.00Rp. 7,050.24Rp.Pasir pasang 0.0260 m3 203,500.00Rp. 5,291.00Rp.

Jumlah (1). 12,341.24Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 50,441.24Rp.Keuntungan 10% 5,044.12Rp.Jumlah 55,485.36Rp.

KodeE.5. 1 m2 Plesteran 1 pc : 5 ps, tebal 15 mm Dibulatkan 55,400.00Rp.

E.6. 1 m2 Plesteran 1 pc : 6 ps, tebal 15 mm1 Bahan

Semen Portland 4.4160 kg 1,360.00Rp. 6,005.76Rp.Pasir pasang 0.0270 m3 203,500.00Rp. 5,494.50Rp.

Jumlah (1). 11,500.26Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 49,600.26Rp.Keuntungan 10% 4,960.03Rp.Jumlah 54,560.29Rp.

KodeE.6. 1 m2 Plesteran 1 pc : 6 ps, tebal 15 mm Dibulatkan 54,500.00Rp.

E.7. 1 m2 Plesteran 1 pc : 7 ps, tebal 15 mm1 Bahan

Semen Portland 3.9360 kg 1,360.00Rp. 5,352.96Rp.Pasir pasang 0.0280 m3 203,500.00Rp. 5,698.00Rp.

Jumlah (1). 11,050.96Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Page 34: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 49,150.96Rp.Keuntungan 10% 4,915.10Rp.Jumlah 54,066.06Rp.

KodeE.7. 1 m2 Plesteran 1 pc : 7 ps, tebal 15 mm Dibulatkan 54,000.00Rp.

E.8. 1 m2 Plesteran 1 pc : 8 ps, tebal 15 mm1 Bahan

Semen Portland 3.4560 kg 1,360.00Rp. 4,700.16Rp.Pasir pasang 0.0290 m3 203,500.00Rp. 5,901.50Rp.

Jumlah (1). 10,601.66Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 48,701.66Rp.Keuntungan 10% 4,870.17Rp.Jumlah 53,571.83Rp.

KodeE.8. 1 m2 Plesteran 1 pc : 8 ps, tebal 15 mm Dibulatkan 53,500.00Rp.

E.9. 1 m2 Plesteran 1 pc : 0.5 kp : 3 ps, tebal 15 mm1 Bahan

Semen Portland 5.7600 kg 1,360.00Rp. 7,833.60Rp.Kapur padam 0.0030 m3 226,570.00Rp. 679.71Rp.Pasir pasang 0.0130 m3 203,500.00Rp. 2,645.50Rp.

Jumlah (1). 11,158.81Rp.

2 TenagaPekerja 0.3600 oh 66,000.00Rp. 23,760.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala Tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0180 oh 100,000.00Rp. 1,800.00Rp.

Jumlah (2). 39,000.00Rp.

Jumlah (1) + (2) 50,158.81Rp.Keuntungan 10% 5,015.88Rp.Jumlah 55,174.69Rp.

KodeE.9. 1 m2 Plesteran 1 pc : 0.5 kp : 3 ps, tebal 15 mm Dibulatkan 55,100.00Rp.

E.10. 1 m2 Plesteran 1 pc : 2 kp : 8 ps, tebal 15 mm1 Bahan

Semen Portland 3.0000 kg 1,360.00Rp. 4,080.00Rp.Kapur padam 0.0050 m3 226,570.00Rp. 1,132.85Rp.Pasir pasang 0.0200 m3 203,500.00Rp. 4,070.00Rp.

Jumlah (1). 9,282.85Rp.

2 TenagaPekerja 0.3600 oh 66,000.00Rp. 23,760.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala Tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0180 oh 100,000.00Rp. 1,800.00Rp.

Jumlah (2). 39,000.00Rp.

Jumlah (1) + (2) 48,282.85Rp.Keuntungan 10% 4,828.29Rp.Jumlah 53,111.14Rp.

KodeE.10. 1 m2 Plesteran 1 pc : 2 kp : 8 ps, tebal 15 mm Dibulatkan 53,100.00Rp.

E.11. 1 m2 Plesteran 1 kp : 1 sm : 1 ps, tebal 15 mm1 Bahan

Semen merah 0.0090 m3 222,750.00Rp. 2,004.75Rp.Kapur padam 0.0090 m3 226,570.00Rp. 2,039.13Rp.

Page 35: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pasir pasang 0.0090 m3 203,500.00Rp. 1,831.50Rp.Jumlah (1). 5,875.38Rp.

2 TenagaPekerja 0.3600 oh 66,000.00Rp. 23,760.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala Tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0180 oh 100,000.00Rp. 1,800.00Rp.

Jumlah (2). 39,000.00Rp.

Jumlah (1) + (2) 44,875.38Rp.Keuntungan 10% 4,487.54Rp.Jumlah 49,362.92Rp.

KodeE.11. 1 m2 Plesteran 1 kp : 1 sm : 1 ps, tebal 15 mm Dibulatkan 49,300.00Rp.

E.12. 1 m2 Plesteran 1 kp : 1 sm : 2 ps, tebal 15 mm1 Bahan

Semen merah 0.0070 m3 222,750.00Rp. 1,559.25Rp.Kapur padam 0.0070 m3 226,570.00Rp. 1,585.99Rp.Pasir pasang 0.0150 m3 203,500.00Rp. 3,052.50Rp.

Jumlah (1). 6,197.74Rp.

2 TenagaPekerja 0.3600 oh 66,000.00Rp. 23,760.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala Tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0180 oh 100,000.00Rp. 1,800.00Rp.

Jumlah (2). 39,000.00Rp.

Jumlah (1) + (2) 45,197.74Rp.Keuntungan 10% 4,519.77Rp.Jumlah 49,717.51Rp.

KodeE.12. 1 m2 Plesteran 1 kp : 1 sm : 2 ps, tebal 15 mm Dibulatkan 49,700.00Rp.

E.13. 1 m2 Plesteran 1 pc : 2 ps, tebal 20 mm1 Bahan

Semen Portland 13.6320 kg 1,360.00Rp. 18,539.52Rp.Pasir pasang 0.0270 m3 203,500.00Rp. 5,494.50Rp.

Jumlah (1). 24,034.02Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0220 oh 100,000.00Rp. 2,200.00Rp.

Jumlah (2). 51,000.00Rp.

Jumlah (1) + (2) 75,034.02Rp.Keuntungan 10% 7,503.40Rp.Jumlah 82,537.42Rp.

KodeE.13. 1 m2 Plesteran 1 pc : 2 ps, tebal 20 mm Dibulatkan 82,500.00Rp.

E.14. 1 m2 Plesteran 1 pc : 3 ps, tebal 20 mm1 Bahan

Semen Portland 10.3680 kg 1,360.00Rp. 14,100.48Rp.Pasir pasang 0.0310 m3 203,500.00Rp. 6,308.50Rp.

Jumlah (1). 20,408.98Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 40,860.00Rp.

Jumlah (1) + (2) 61,268.98Rp.

Page 36: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 6,126.90Rp.Jumlah 67,395.88Rp.

KodeE.14. 1 m2 Plesteran 1 pc : 3 ps, tebal 20 mm Dibulatkan 67,300.00Rp.

E.15. 1 m2 Plesteran 1 pc : 4 ps, tebal 20 mm1 Bahan

Semen Portland 8.3200 kg 1,360.00Rp. 11,315.20Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 17,827.20Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0220 oh 100,000.00Rp. 2,200.00Rp.

Jumlah (2). 51,000.00Rp.

Jumlah (1) + (2) 68,827.20Rp.Keuntungan 10% 6,882.72Rp.Jumlah 75,709.92Rp.

KodeE.15. 1 m2 Plesteran 1 pc : 4 ps, tebal 20 mm Dibulatkan 75,700.00Rp.

E.16. 1 m2 Plesteran 1 pc : 5 ps, tebal 20 mm1 Bahan

Semen Portland 6.9120 kg 1,360.00Rp. 9,400.32Rp.Pasir pasang 0.0350 m3 203,500.00Rp. 7,122.50Rp.

Jumlah (1). 16,522.82Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0220 oh 100,000.00Rp. 2,200.00Rp.

Jumlah (2). 51,000.00Rp.

Jumlah (1) + (2) 67,522.82Rp.Keuntungan 10% 6,752.28Rp.Jumlah 74,275.10Rp.

KodeE.16. 1 m2 Plesteran 1 pc : 5 ps, tebal 20 mm Dibulatkan 74,200.00Rp.

E.17. 1 m2 Plesteran 1 pc : 6 ps, tebal 20 mm1 Bahan

Semen Portland 5.8880 kg 1,360.00Rp. 8,007.68Rp.Pasir pasang 0.0360 m3 203,500.00Rp. 7,326.00Rp.

Jumlah (1). 15,333.68Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0220 oh 100,000.00Rp. 2,200.00Rp.

Jumlah (2). 51,000.00Rp.

Jumlah (1) + (2) 66,333.68Rp.Keuntungan 10% 6,633.37Rp.Jumlah 72,967.05Rp.

KodeE.17. 1 m2 Plesteran 1 pc : 6 ps, tebal 20 mm Dibulatkan 72,900.00Rp.

E.18. 1 m2 Plesteran 1 kp : 1 sm : 2 ps, tebal 20 mm1 Bahan

Semen merah 0.0090 m3 222,750.00Rp. 2,004.75Rp.Kapur padam 0.0090 m3 226,570.00Rp. 2,039.13Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.

Jumlah (1). 7,706.88Rp.

Page 37: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.4400 oh 66,000.00Rp. 29,040.00Rp.Tukang batu 0.2200 oh 100,000.00Rp. 22,000.00Rp.Kepala Tukang 0.0220 oh 120,000.00Rp. 2,640.00Rp.Mandor 0.0220 oh 100,000.00Rp. 2,200.00Rp.

Jumlah (2). 55,880.00Rp.

Jumlah (1) + (2) 63,586.88Rp.Keuntungan 10% 6,358.69Rp.Jumlah 69,945.57Rp.

KodeE.18. 1 m2 Plesteran 1 kp : 1 sm : 2 ps, tebal 20 mm Dibulatkan 69,900.00Rp.

E.19. 1 m2 Plesteran 1 pc : 2 ps, tebal 25 mm1 Bahan

Semen Portland 15.5000 kg 1,360.00Rp. 21,080.00Rp.Pasir pasang 0.0130 m3 203,500.00Rp. 2,645.50Rp.

Jumlah (1). 23,725.50Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 43,500.00Rp.

Jumlah (1) + (2) 67,225.50Rp.Keuntungan 10% 6,722.55Rp.Jumlah 73,948.05Rp.

KodeE.19. 1 m2 Plesteran 1 pc : 2 ps, tebal 25 mm Dibulatkan 73,900.00Rp.

E.20. 1 m2 Plesteran 1 pc : 5 ps, tebal 15 mm1 Bahan

Semen Portland 5.1840 kg 1,360.00Rp. 7,050.24Rp.Pasir pasang 0.0260 m3 203,500.00Rp. 5,291.00Rp.

Jumlah (1). 12,341.24Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang batu 0.0750 oh 100,000.00Rp. 7,500.00Rp.Kepala Tukang 0.0075 oh 120,000.00Rp. 900.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 19,050.00Rp.

Jumlah (1) + (2) 31,391.24Rp.Keuntungan 10% 3,139.12Rp.Jumlah 34,530.36Rp.

KodeE.20. 1 m2 Plesteran 1 pc : 5 ps, tebal 15 mm Dibulatkan 34,500.00Rp.

E.21. 1 m2 Plesteran 1 pc : 4 ps, tebal 25 mm1 Bahan

Semen Portland 9.4800 kg 1,360.00Rp. 12,892.80Rp.Pasir pasang 0.0380 m3 203,500.00Rp. 7,733.00Rp.

Jumlah (1). 20,625.80Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 43,500.00Rp.

Jumlah (1) + (2) 64,125.80Rp.Keuntungan 10% 6,412.58Rp.Jumlah 70,538.38Rp.

KodeE.21. 1 m2 Plesteran 1 pc : 4 ps, tebal 25 mm Dibulatkan 70,500.00Rp.

Page 38: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

E.22. 1 m2 Plesteran 1 pc : 5 ps, tebal 25 mm1 Bahan

Semen Portland 7.9400 kg 1,360.00Rp. 10,798.40Rp.Pasir pasang 0.0390 m3 203,500.00Rp. 7,936.50Rp.

Jumlah (1). 18,734.90Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 43,500.00Rp.

Jumlah (1) + (2) 62,234.90Rp.Keuntungan 10% 6,223.49Rp.Jumlah 68,458.39Rp.

KodeE.22. 1 m2 Plesteran 1 pc : 5 ps, tebal 25 mm Dibulatkan 68,400.00Rp.

E.23. 1 m2 Plesteran 1 pc : 2 ps, tebal 30 mm1 Bahan

Semen Portland 18.6500 kg 1,360.00Rp. 25,364.00Rp.Pasir pasang 0.0350 m3 203,500.00Rp. 7,122.50Rp.

Jumlah (1). 32,486.50Rp.

2 TenagaPekerja 0.3200 oh 66,000.00Rp. 21,120.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala Tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 50,620.00Rp.

Jumlah (1) + (2) 83,106.50Rp.Keuntungan 10% 8,310.65Rp.Jumlah 91,417.15Rp.

KodeE.23. 1 m2 Plesteran 1 pc : 2 ps, tebal 30 mm Dibulatkan 91,400.00Rp.

E.24. 1 m2 Plesteran 1 pc : 3 ps, tebal 30 mm1 Bahan

Semen Portland 14.1500 kg 1,360.00Rp. 19,244.00Rp.Pasir pasang 0.0390 m3 203,500.00Rp. 7,936.50Rp.

Jumlah (1). 27,180.50Rp.

2 TenagaPekerja 0.3200 oh 66,000.00Rp. 21,120.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala Tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 50,620.00Rp.

Jumlah (1) + (2) 77,800.50Rp.Keuntungan 10% 7,780.05Rp.Jumlah 85,580.55Rp.

KodeE.24. 1 m2 Plesteran 1 pc : 3 ps, tebal 30 mm Dibulatkan 85,500.00Rp.

E.25. 1 m2 Plesteran 1 pc : 4 ps, tebal 30 mm1 Bahan

Semen Portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.

Jumlah (1). 24,023.80Rp.

2 TenagaPekerja 0.3200 oh 66,000.00Rp. 21,120.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala Tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Page 39: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 50,620.00Rp.

Jumlah (1) + (2) 74,643.80Rp.Keuntungan 10% 7,464.38Rp.Jumlah 82,108.18Rp.

KodeE.25. 1 m2 Plesteran 1 pc : 4 ps, tebal 30 mm Dibulatkan 82,100.00Rp.

E.26. 1 m2 Plesteran 1 pc : 5 ps, tebal 30 mm1 Bahan

Semen Portland 8.1900 kg 1,360.00Rp. 11,138.40Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.

Jumlah (1). 20,295.90Rp.

2 TenagaPekerja 0.3200 oh 66,000.00Rp. 21,120.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala Tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 50,620.00Rp.

Jumlah (1) + (2) 70,915.90Rp.Keuntungan 10% 7,091.59Rp.Jumlah 78,007.49Rp.

KodeE.26. 1 m2 Plesteran 1 pc : 5 ps, tebal 30 mm Dibulatkan 78,000.00Rp.

E.27. 1 m2 Berapen 1 pc : 3 ps, tebal 30 mm1 Bahan

Semen Portland 7.0700 kg 1,360.00Rp. 9,615.20Rp.Pasir pasang 0.0210 m3 203,500.00Rp. 4,273.50Rp.

Jumlah (1). 13,888.70Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang batu 0.0700 oh 100,000.00Rp. 7,000.00Rp.Kepala Tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 18,540.00Rp.

Jumlah (1) + (2) 32,428.70Rp.Keuntungan 10% 3,242.87Rp.Jumlah 35,671.57Rp.

KodeE.27. 1 m2 Berapen 1 pc : 3 ps, tebal 30 mm Dibulatkan 35,600.00Rp.

E.28. 1 m2 Berapen 1 pc : 5 ps, tebal 15 mm1 Bahan

Semen Portland 5.1840 kg 1,360.00Rp. 7,050.24Rp.Pasir pasang 0.0260 m3 203,500.00Rp. 5,291.00Rp.

Jumlah (1). 12,341.24Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang batu 0.0750 oh 100,000.00Rp. 7,500.00Rp.Kepala Tukang 0.0075 oh 120,000.00Rp. 900.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 19,050.00Rp.

Jumlah (1) + (2) 31,391.24Rp.Keuntungan 10% 3,139.12Rp.Jumlah 34,530.36Rp.

KodeE.28. 1 m2 Berapen 1 pc : 5 ps, tebal 15 mm Dibulatkan 34,500.00Rp.

E.29. 1 m2 Plesteran beton 1 pc : 2 ps, tebal 15 mm1 Bahan

Semen Portland 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.

Page 40: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 16,311.00Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 40,860.00Rp.

Jumlah (1) + (2) 57,171.00Rp.Keuntungan 10% 5,717.10Rp.Jumlah 62,888.10Rp.

KodeE.29. 1 m2 Plesteran beton 1 pc : 2 ps, tebal 15 mm Dibulatkan 62,800.00Rp.

E.30. 1 m2 Plesteran beton 1 pc : 3 ps, tebal 15 mm1 Bahan

Semen Portland 7.0700 kg 1,360.00Rp. 9,615.20Rp.Pasir pasang 0.0210 m3 203,500.00Rp. 4,273.50Rp.

Jumlah (1). 13,888.70Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 40,860.00Rp.

Jumlah (1) + (2) 54,748.70Rp.Keuntungan 10% 5,474.87Rp.Jumlah 60,223.57Rp.

KodeE.30. 1 m2 Plesteran beton 1 pc : 3 ps, tebal 15 mm Dibulatkan 60,200.00Rp.

E.31. 1 m2 Plesteran skoning lebar 10 mm 1 pc : 2 ps1 Bahan

Semen Portland 0.5000 kg 1,360.00Rp. 680.00Rp.Pasir pasang 0.0130 m3 203,500.00Rp. 2,645.50Rp.

Jumlah (1). 3,325.50Rp.

2 TenagaPekerja 0.0800 oh 66,000.00Rp. 5,280.00Rp.Tukang batu 0.4000 oh 100,000.00Rp. 40,000.00Rp.Kepala Tukang 0.0400 oh 120,000.00Rp. 4,800.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 50,480.00Rp.

Jumlah (1) + (2) 53,805.50Rp.Keuntungan 10% 5,380.55Rp.Jumlah 59,186.05Rp.

KodeE.31. 1 m2 Plesteran skoning lebar 10 mm 1 pc : 2 ps Dibulatkan 59,100.00Rp.

E.32. 1 m2 Plesteran Granito 1 pc warna : 2 granito, tebal 10 mm1 Bahan

PC warna 10.0000 kg 4,200.00Rp. 42,000.00Rp.Batu granito 15.0000 kg 6,060.00Rp. 90,900.00Rp.

Jumlah (1). 132,900.00Rp.

2 TenagaPekerja 0.4500 oh 66,000.00Rp. 29,700.00Rp.Tukang batu 0.2250 oh 100,000.00Rp. 22,500.00Rp.Kepala Tukang 0.0225 oh 120,000.00Rp. 2,700.00Rp.Mandor 0.0225 oh 100,000.00Rp. 2,250.00Rp.

Jumlah (2). 57,150.00Rp.

Jumlah (1) + (2) 190,050.00Rp.Keuntungan 10% 19,005.00Rp.Jumlah 209,055.00Rp.

Page 41: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeE.32. 1 m2 Plesteran Granito 1 pc warna : 2 granito, tebal 10 mm Dibulatkan 209,000.00Rp.

E.33 1 m2 Plesteran teraso 1 pc warna : 2 batu teraso, tebal 10 mm1 Bahan

PC warna 10.0000 kg 4,200.00Rp. 42,000.00Rp.Batu teraso 15.0000 kg 3,830.00Rp. 57,450.00Rp.

Jumlah (1). 99,450.00Rp.

2 TenagaPekerja 0.4500 oh 66,000.00Rp. 29,700.00Rp.Tukang batu 0.2250 oh 100,000.00Rp. 22,500.00Rp.Kepala Tukang 0.0225 oh 120,000.00Rp. 2,700.00Rp.Mandor 0.0225 oh 100,000.00Rp. 2,250.00Rp.

Jumlah (2). 57,150.00Rp.

Jumlah (1) + (2) 156,600.00Rp.Keuntungan 10% 15,660.00Rp.Jumlah 172,260.00Rp.

KodeE.33 1 m2 Plesteran teraso 1 pc warna : 2 batu teraso, tebal 10 mm Dibulatkan 172,200.00Rp.

E.34. 1 m2 Plesteran ciprat 1 pc : 2 ps1 Bahan

Semen Portland 4.3200 kg 1,360.00Rp. 5,875.20Rp.Pasir pasang 0.0060 m3 203,500.00Rp. 1,221.00Rp.

Jumlah (1). 7,096.20Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,500.00Rp.

Jumlah (1) + (2) 39,596.20Rp.Keuntungan 10% 3,959.62Rp.Jumlah 43,555.82Rp.

KodeE.34. 1 m2 Plesteran ciprat 1 pc : 2 ps Dibulatkan 43,500.00Rp.

E.35. 1 m2 Finishing siar pasangan dinding bata merah (=20 m')1 Bahan

Semen Portland 3.1080 kg 1,360.00Rp. 4,226.88Rp.Jumlah (1). 4,226.88Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang batu 0.0750 oh 100,000.00Rp. 7,500.00Rp.Kepala Tukang 0.0075 oh 120,000.00Rp. 900.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 19,050.00Rp.

Jumlah (1) + (2) 23,276.88Rp.Keuntungan 10% 2,327.69Rp.Jumlah 25,604.57Rp.

KodeE.35. 1 m2 Finishing siar pasangan dinding bata merah (=20 m') Dibulatkan 25,600.00Rp.

E.36. 1 m2 Finishing siar pasangan dinding conblok ekpose (=8 m')1 Bahan

Semen Portland 1.6000 kg 1,360.00Rp. 2,176.00Rp.Jumlah (1). 2,176.00Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang batu 0.0350 oh 100,000.00Rp. 3,500.00Rp.Kepala Tukang 0.0040 oh 120,000.00Rp. 480.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Page 42: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 9,000.00Rp.

Jumlah (1) + (2) 11,176.00Rp.Keuntungan 10% 1,117.60Rp.Jumlah 12,293.60Rp.

KodeE.36. 1 m2 Finishing siar pasangan dinding conblok ekpose (=8 m') Dibulatkan 12,200.00Rp.

E.37. 1 m2 Finishing siar pasangan batu kali adukan 1 PC : 2 Psr1 Bahan

Semen Portland 6.3400 kg 1,360.00Rp. 8,622.40Rp.Pasir pasang 0.0120 m3 203,500.00Rp. 2,442.00Rp.

Jumlah (1). 11,064.40Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala Tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 38,100.00Rp.

Jumlah (1) + (2) 49,164.40Rp.Keuntungan 10% 4,916.44Rp.Jumlah 54,080.84Rp.

KodeE.37. 1 m2 Finishing siar pasangan batu kali adukan 1 PC : 2 Psr Dibulatkan 54,000.00Rp.

E.38. 1 m2 Pekerjaan Acian1 Bahan

Semen Portland 3.2500 kg 1,360.00Rp. 4,420.00Rp.Jumlah (1). 4,420.00Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 25,400.00Rp.

Jumlah (1) + (2) 29,820.00Rp.Keuntungan 10% 2,982.00Rp.Jumlah 32,802.00Rp.

KodeE.38. 1 m2 Pekerjaan Acian Dibulatkan 32,800.00Rp.

E.39. 1 m2 Plesteran waterfroof batacote 3 lapis1 Bahan

Semen Portland 0.5000 kg 1,360.00Rp. 680.00Rp.Batacote 2.9000 kg 38,230.00Rp. 110,867.00Rp.Pasir pasang 0.0060 m3 203,500.00Rp. 1,221.00Rp.

Jumlah (1). 112,768.00Rp.

2 TenagaPekerja 0.3000 oh 66,000.00Rp. 19,800.00Rp.Tukang batu 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala Tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 43,700.00Rp.

Jumlah (1) + (2) 156,468.00Rp.Keuntungan 10% 15,646.80Rp.Jumlah 172,114.80Rp.

KodeE.39. 1 m2 Plesteran waterfroof batacote 3 lapis Dibulatkan 172,100.00Rp.

E.40. 1 m2 Plesteran waterfroof batacote 1 lapis1 Bahan

Semen Portland 0.1700 kg 1,360.00Rp. 231.20Rp.Batacote 0.9700 kg 38,230.00Rp. 37,083.10Rp.

Page 43: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pasir pasang 0.0020 m3 203,500.00Rp. 407.00Rp.Jumlah (1). 37,721.30Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang batu 0.0670 oh 100,000.00Rp. 6,700.00Rp.Kepala Tukang 0.0067 oh 120,000.00Rp. 804.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 14,604.00Rp.

Jumlah (1) + (2) 52,325.30Rp.Keuntungan 10% 5,232.53Rp.Jumlah 57,557.83Rp.

KodeE.40. 1 m2 Plesteran waterfroof batacote 1 lapis Dibulatkan 57,500.00Rp.

E.41. 1 m2 Pekerjaan Acian Hebel1 Bahan

Semen Mortar MU 200 3.2500 kg 3,631.25Rp. 11,801.56Rp.Jumlah (1). 11,801.56Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala Tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 25,400.00Rp.

Jumlah (1) + (2) 37,201.56Rp.Keuntungan 10% 3,720.16Rp.Jumlah 40,921.72Rp.

KodeE.41. 1 m2 Pekerjaan Acian Hebel Dibulatkan 40,900.00Rp.

AN - 5 1 M² Plesteran dinding semen mortar D-200 33,200.00Adukan mortar Drymix D-200 0.069 zak 56,175.00 3,862.03Pekerja 0.240 org 60,000.00 14,400.00Tukang Batu 0.180 org 70,000.00 12,600.00Kepala Tukang 0.018 org 75,000.00 1,350.00Mandor 0.012 org 85,000.00 1,020.00

Jumlah 33,232.03

Page 44: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN KAYURuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pembuatan/pemasangan kusen pintu/jendela berbagai jenis kelas kayu2. Pekerjaan pembuatan pintu panel, pintu klamp, pintu/jendela jalusi, pintu/jendela kaca dan pintu teakwood3. Pekerjaan pembuatan kuda-kuda atap, pasang kaso dan reng untuk atap genteng4. Pekerjaan pembuatan rangka langit-langit5. Pekerjaan pembauatn rangka dinding dan pemasangan dinding pemisah6. Pekerjaan pemasangan lisplank kayu dab list plafond

F.1. 1 m3 Pasang kusen pintu dan jendela, kayu kelas I1 Bahan

Balok Kayu 1.1000 m3 10,311,020.00Rp. 11,342,122.00Rp.Paku 1.2500 kg 18,720.00Rp. 23,400.00Rp.Lem 1.0000 kg 34,660.00Rp. 34,660.00Rp.

Jumlah (1). 11,400,182.00Rp.

2 TenagaPekerja 7.0000 oh 66,000.00Rp. 462,000.00Rp.Tukang kayu 21.0000 oh 105,000.00Rp. 2,205,000.00Rp.Kepala tukang 2.1000 oh 120,000.00Rp. 252,000.00Rp.Mandor 0.3500 oh 100,000.00Rp. 35,000.00Rp.

Jumlah (2). 2,954,000.00Rp.

Jumlah (1) + (2) 14,354,182.00Rp.Keuntungan 10% 1,435,418.20Rp.Jumlah 15,789,600.20Rp.

KodeF.1. 1 m3 Pasang kusen pintu dan jendela, kayu kelas I Dibulatkan 15,789,600.00Rp.

F.2. 1 m3 Pasang kusen pintu dan jendela kayu kelas II atau III1 Bahan

Kayu balok 1.2000 m3 7,655,150.00Rp. 9,186,180.00Rp.Paku 1.2500 kg 18,720.00Rp. 23,400.00Rp.Lem 1.0000 kg 34,660.00Rp. 34,660.00Rp.

Jumlah (1). 9,186,180.00Rp.

2 TenagaPekerja 6.0000 oh 66,000.00Rp. 396,000.00Rp.Tukang kayu 18.0000 oh 105,000.00Rp. 1,890,000.00Rp.Kepala tukang 1.8000 oh 120,000.00Rp. 216,000.00Rp.Mandor 0.3000 oh 100,000.00Rp. 30,000.00Rp.

Jumlah (2). 2,532,000.00Rp.

Jumlah (1) + (2) 11,718,180.00Rp.Keuntungan 10% 1,171,818.00Rp.Jumlah 12,889,998.00Rp.

KodeF.2. 1 m3 Pasang kusen pintu dan jendela kayu kelas II atau III Dibulatkan 12,889,900.00Rp.

F.2.a 1 m3 Pasang kusen pintu dan jendela kayu singkil1 Bahan

Kayu singkil, balok 1.2000 m3 7,108,420.00Rp. 8,530,104.00Rp.Jumlah (1). 8,530,104.00Rp.

2 TenagaPekerja 6.0000 oh 66,000.00Rp. 396,000.00Rp.Tukang kayu 18.0000 oh 105,000.00Rp. 1,890,000.00Rp.Kepala tukang 1.8000 oh 120,000.00Rp. 216,000.00Rp.Mandor 0.3000 oh 100,000.00Rp. 30,000.00Rp.

Jumlah (2). 2,532,000.00Rp.

Jumlah (1) + (2) 11,062,104.00Rp.Keuntungan 10% 1,106,210.40Rp.Jumlah 12,168,314.40Rp.

KodeF.2.a 1 m3 Pasang kusen pintu dan jendela kayu singkil Dibulatkan 12,168,300.00Rp.

F.2.b 1 m3 Pasang kusen pintu dan jendela kayu borneo1 Bahan

Kayu borneo, balok 1.2000 m3 3,437,010.00Rp. 4,124,412.00Rp.Jumlah (1). 4,124,412.00Rp.

2 TenagaPekerja 6.0000 oh 66,000.00Rp. 396,000.00Rp.Tukang kayu 18.0000 oh 105,000.00Rp. 1,890,000.00Rp.Kepala tukang 1.8000 oh 120,000.00Rp. 216,000.00Rp.Mandor 0.3000 oh 100,000.00Rp. 30,000.00Rp.

Jumlah (2). 2,532,000.00Rp.

Jumlah (1) + (2) 6,656,412.00Rp.Keuntungan 10% 665,641.20Rp.Jumlah 7,322,053.20Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

F.

Page 45: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeF.2.b 1 m3 Pasang kusen pintu dan jendela kayu borneo Dibulatkan 7,322,000.00Rp.

F.2.c 1 m3 Pasang kusen pintu dan jendela kayu damar laut1 Bahan

Kayu damar laut, balok 1.2000 m3 9,600,000.00Rp. 11,520,000.00Rp.Jumlah (1). 11,520,000.00Rp.

2 TenagaPekerja 6.0000 oh 66,000.00Rp. 396,000.00Rp.Tukang kayu 18.0000 oh 105,000.00Rp. 1,890,000.00Rp.Kepala tukang 1.8000 oh 120,000.00Rp. 216,000.00Rp.Mandor 0.3000 oh 100,000.00Rp. 30,000.00Rp.

Jumlah (2). 2,532,000.00Rp.

Jumlah (1) + (2) 14,052,000.00Rp.Keuntungan 10% 1,405,200.00Rp.Jumlah 15,457,200.00Rp.

KodeF.2.c 1 m3 Pasang kusen pintu dan jendela kayu damar laut Dibulatkan 15,457,200.00Rp.

F.3. 1 m2 Pasang pintu klamp standar kayu kelas III1 Bahan

Kayu kamper, papan 0.0400 m3 6,663,140.00Rp. 266,525.60Rp.Paku 5 - 7 0.0500 kg 18,720.00Rp. 936.00Rp.

Jumlah (1). 267,461.60Rp.

2 TenagaPekerja 0.3500 oh 66,000.00Rp. 23,100.00Rp.Tukang kayu 1.0500 oh 105,000.00Rp. 110,250.00Rp.Kepala tukang 0.1050 oh 120,000.00Rp. 12,600.00Rp.Mandor 0.0175 oh 100,000.00Rp. 1,750.00Rp.

Jumlah (2). 147,700.00Rp.

Jumlah (1) + (2) 415,161.60Rp.Keuntungan 10% 41,516.16Rp.Jumlah 456,677.76Rp.

KodeF.3. 1 m2 Pasang pintu klamp standar kayu kelas III Dibulatkan 456,600.00Rp.

F.3.a 1 m2 Pasang pintu klamp kayu borneo1 Bahan

Kayu borneo, papan 0.0360 m3 3,749,460.00Rp. 134,980.56Rp.Paku biasa 2" - 5" 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 135,954.56Rp.

2 TenagaPekerja 0.3500 oh 66,000.00Rp. 23,100.00Rp.Tukang kayu 1.0500 oh 105,000.00Rp. 110,250.00Rp.Kepala tukang 0.1050 oh 120,000.00Rp. 12,600.00Rp.Mandor 0.0175 oh 100,000.00Rp. 1,750.00Rp.

Jumlah (2). 147,700.00Rp.

Jumlah (1) + (2) 283,654.56Rp.Keuntungan 10% 28,365.46Rp.Jumlah 312,020.02Rp.

KodeF.3.a 1 m2 Pasang pintu klamp kayu borneo Dibulatkan 312,000.00Rp.

F.4. 1 m2 Pasang pintu panel kayu kelas I atau II1 Bahan

Papan Kayu 0.0400 m3 10,779,700.00Rp. 431,188.00Rp.Lem kayu 0.5000 kg 34,660.00Rp. 17,330.00Rp.

Jumlah (1). 448,518.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang kayu 3.0000 oh 105,000.00Rp. 315,000.00Rp.Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 422,000.00Rp.

Jumlah (1) + (2) 870,518.00Rp.Keuntungan 10% 87,051.80Rp.Jumlah 957,569.80Rp.

KodeF.4. 1 m2 Pasang pintu panel kayu kelas I atau II Dibulatkan 957,500.00Rp.

F.4.a 1 m2 Pasang pintu panel kayu kamper1 Bahan

Kayu kamper, papan 0.0400 m3 10,779,700.00Rp. 431,188.00Rp.Lem kayu 0.5000 kg 34,660.00Rp. 17,330.00Rp.

Jumlah (1). 448,518.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang kayu 3.0000 oh 105,000.00Rp. 315,000.00Rp.

Page 46: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 422,000.00Rp.

Jumlah (1) + (2) 870,518.00Rp.Keuntungan 10% 87,051.80Rp.Jumlah 957,569.80Rp.

KodeF.4.a 1 m2 Pasang pintu panel kayu kamper Dibulatkan 957,500.00Rp.

F.5. 1 m2 Pasang pintu dan jendela kaca kayu kelas I atau II1 Bahan

Papan Kayu 0.0240 m3 10,779,700.00Rp. 258,712.80Rp.Lem kayu 0.3000 kg 34,660.00Rp. 10,398.00Rp.

Jumlah (1). 269,110.80Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang kayu 2.4000 oh 105,000.00Rp. 252,000.00Rp.Kepala tukang 0.2400 oh 120,000.00Rp. 28,800.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 337,600.00Rp.

Jumlah (1) + (2) 606,710.80Rp.Keuntungan 10% 60,671.08Rp.Jumlah 667,381.88Rp.

KodeF.5. 1 m2 Pasang pintu dan jendela kaca kayu kelas I atau II Dibulatkan 667,300.00Rp.

F.5.a 1 m2 Pasang pintu dan jendela kaca kayu singkil1 Bahan

Kayu singkil, papan 0.0360 m3 7,655,150.00Rp. 275,585.40Rp.Lem kayu 0.3000 kg 34,660.00Rp. 10,398.00Rp.

Jumlah (1). 285,983.40Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang kayu 2.4000 oh 105,000.00Rp. 252,000.00Rp.Kepala tukang 0.2400 oh 120,000.00Rp. 28,800.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 337,600.00Rp.

Jumlah (1) + (2) 623,583.40Rp.Keuntungan 10% 62,358.34Rp.Jumlah 685,941.74Rp.

KodeF.5.a 1 m2 Pasang pintu dan jendela kaca kayu singkil Dibulatkan 685,900.00Rp.

F.5.b 1 m2 Pasang pintu dan jendela kaca kayu meranti1 Bahan

Kayu meranti, papan 0.0360 m3 4,530,600.00Rp. 163,101.60Rp.Lem kayu 0.3000 kg 34,660.00Rp. 10,398.00Rp.

Jumlah (1). 173,499.60Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang kayu 2.4000 oh 105,000.00Rp. 252,000.00Rp.Kepala tukang 0.2400 oh 120,000.00Rp. 28,800.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 337,600.00Rp.

Jumlah (1) + (2) 511,099.60Rp.Keuntungan 10% 51,109.96Rp.Jumlah 562,209.56Rp.

KodeF.5.b 1 m2 Pasang pintu dan jendela kaca kayu meranti Dibulatkan 562,200.00Rp.

F.5.c 1 m2 Pasang pintu dan jendela kaca kayu borneo1 Bahan

Kayu borneo, papan 0.0360 m3 3,749,460.00Rp. 134,980.56Rp.Lem kayu 0.3000 kg 34,660.00Rp. 10,398.00Rp.

Jumlah (1). 145,378.56Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang kayu 2.4000 oh 105,000.00Rp. 252,000.00Rp.Kepala tukang 0.2400 oh 120,000.00Rp. 28,800.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 337,600.00Rp.

Jumlah (1) + (2) 482,978.56Rp.Keuntungan 10% 48,297.86Rp.Jumlah 531,276.42Rp.

KodeF.5.c 1 m2 Pasang pintu dan jendela kaca kayu borneo Dibulatkan 531,200.00Rp.

F.6. 1 m2 Pasang pintu dan jendela jalusi kayu kelas I atau II

Page 47: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanPapan Kayu 0.0640 m3 10,779,700.00Rp. 689,900.80Rp.Lem kayu 0.5000 kg 34,660.00Rp. 17,330.00Rp.

Jumlah (1). 707,230.80Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang kayu 3.0000 oh 105,000.00Rp. 315,000.00Rp.Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 422,000.00Rp.

Jumlah (1) + (2) 1,129,230.80Rp.Keuntungan 10% 112,923.08Rp.Jumlah 1,242,153.88Rp.

KodeF.6. 1 m2 Pasang pintu dan jendela jalusi kayu kelas I atau II Dibulatkan 1,242,100.00Rp.

F.7. 1 m2 Pasang pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)1 Bahan

Kayu papan 0.0250 m3 10,779,700.00Rp. 269,492.50Rp.Paku 1 - 2.5 cm 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.5000 lt 34,660.00Rp. 17,330.00Rp.Ply wood 90 x 220 cm x 4 mm 1.0000 lbr 69,190.00Rp. 69,190.00Rp.

Jumlah (1). 356,669.20Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang kayu 2.1000 oh 105,000.00Rp. 220,500.00Rp.Kepala tukang 0.2100 oh 120,000.00Rp. 25,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 295,400.00Rp.

Jumlah (1) + (2) 652,069.20Rp.Keuntungan 10% 65,206.92Rp.Jumlah 717,276.12Rp.

KodeF.7. 1 m2 Pasang pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)Dibulatkan 717,200.00Rp.

F.8. 1 m2 Pasang pintu kayu lapis (plywood) rangkap, rangka expose kayu kelas I atau II1 Bahan

Kayu papan 0.0256 m3 10,779,700.00Rp. 275,960.32Rp.Paku 1 - 2.5 cm 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.5000 lt 34,660.00Rp. 17,330.00Rp.Ply wood 90 x 220 cm x 4 mm 1.0000 lbr 66,170.00Rp. 66,170.00Rp.

Jumlah (1). 360,117.02Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang kayu 2.4000 oh 105,000.00Rp. 252,000.00Rp.Kepala tukang 0.2400 oh 120,000.00Rp. 28,800.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 337,600.00Rp.

Jumlah (1) + (2) 697,717.02Rp.Keuntungan 10% 69,771.70Rp.Jumlah 767,488.72Rp.

KodeF.8. 1 m2 Pasang pintu kayu lapis (plywood) rangkap, rangka expose kayu kelas I atau II Dibulatkan 767,400.00Rp.

F.9. 1 m2 Pasang jalusi kusen, kayu kelas I atau II1 Bahan

Kayu papan 0.0600 m3 10,779,700.00Rp. 646,782.00Rp.Paku 1 - 2.5 cm 0.1500 kg 21,890.00Rp. 3,283.50Rp.

Jumlah (1). 650,065.50Rp.

2 TenagaPekerja 0.6700 oh 66,000.00Rp. 44,220.00Rp.Tukang kayu 2.0000 oh 105,000.00Rp. 210,000.00Rp.Kepala tukang 0.2000 oh 120,000.00Rp. 24,000.00Rp.Mandor 0.3350 oh 100,000.00Rp. 33,500.00Rp.

Jumlah (2). 311,720.00Rp.

Jumlah (1) + (2) 961,785.50Rp.Keuntungan 10% 96,178.55Rp.Jumlah 1,057,964.05Rp.

KodeF.9. 1 m2 Pasang jalusi kusen, kayu kelas I atau II Dibulatkan 1,057,900.00Rp.

F.9.a 1 m2 Pasang jalusi mati kusen kayu kamper1 Bahan

Kayu kamper, papan 0.0600 m3 10,779,700.00Rp. 646,782.00Rp.Paku biasa 1/2" - 1" 0.1500 kg 21,890.00Rp. 3,283.50Rp.

Jumlah (1). 650,065.50Rp.

2 TenagaPekerja 0.6700 oh 66,000.00Rp. 44,220.00Rp.

Page 48: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang kayu 2.0000 oh 105,000.00Rp. 210,000.00Rp.Kepala tukang 0.2000 oh 120,000.00Rp. 24,000.00Rp.Mandor 0.3350 oh 100,000.00Rp. 33,500.00Rp.

Jumlah (2). 311,720.00Rp.

Jumlah (1) + (2) 961,785.50Rp.Keuntungan 10% 96,178.55Rp.Jumlah 1,057,964.05Rp.

KodeF.9.a 1 m2 Pasang jalusi mati kusen kayu kamper Dibulatkan 1,057,900.00Rp.

F.9.b 1 m2 Pasang jalusi mati kusen kayu singkil1 Bahan

Kayu singkil, papan 0.0270 m3 7,655,150.00Rp. 206,689.05Rp.Paku biasa 1/2" - 1" 0.1500 kg 21,890.00Rp. 3,283.50Rp.

Jumlah (1). 209,972.55Rp.

2 TenagaPekerja 0.6700 oh 66,000.00Rp. 44,220.00Rp.Tukang kayu 2.0000 oh 105,000.00Rp. 210,000.00Rp.Kepala tukang 0.2000 oh 120,000.00Rp. 24,000.00Rp.Mandor 0.3350 oh 100,000.00Rp. 33,500.00Rp.

Jumlah (2). 311,720.00Rp.

Jumlah (1) + (2) 521,692.55Rp.Keuntungan 10% 52,169.26Rp.Jumlah 573,861.81Rp.

KodeF.9.b 1 m2 Pasang jalusi mati kusen kayu singkil Dibulatkan 573,800.00Rp.

F.10. 1 m2 Pasang pintu plywood rangkap, rangka kayu borneo1 Bahan

Kayu borneo, papan 0.0250 m3 3,749,460.00Rp. 93,736.50Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.5000 lt 34,660.00Rp. 17,330.00Rp.Ply wood 4' x 8' x 4 mm 1.0000 lbr 69,190.00Rp. 69,190.00Rp.

Jumlah (1). 180,913.20Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang kayu 2.1000 oh 105,000.00Rp. 220,500.00Rp.Kepala tukang 0.2100 oh 120,000.00Rp. 25,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 295,400.00Rp.

Jumlah (1) + (2) 476,313.20Rp.Keuntungan 10% 47,631.32Rp.Jumlah 523,944.52Rp.

KodeF.10. 1 m2 Pasang pintu plywood rangkap, rangka kayu borneo Dibulatkan 523,900.00Rp.

F.11. 1 m2 Pasang pintu teakwood rangkap, rangka expose kayu kelas I1 Bahan

Kayu papan 0.0250 m3 10,779,700.00Rp. 269,492.50Rp.Paku 1 - 2.5 cm 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.3000 lt 34,660.00Rp. 10,398.00Rp.Teakwood 90 cm x 220 cm x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.

Jumlah (1). 358,727.20Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang kayu 2.4000 oh 105,000.00Rp. 252,000.00Rp.Kepala tukang 0.2400 oh 120,000.00Rp. 28,800.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 337,600.00Rp.

Jumlah (1) + (2) 696,327.20Rp.Keuntungan 10% 69,632.72Rp.Jumlah 765,959.92Rp.

KodeF.11. 1 m2 Pasang pintu teakwood rangkap, rangka expose kayu kelas I Dibulatkan 765,900.00Rp.

F.11.a 1 m2 Pasang pintu teakwood rangkap, rangka kayu singkil1 Bahan

Kayu singkil, papan 0.0250 m3 7,655,150.00Rp. 191,378.75Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.3000 lt 34,660.00Rp. 10,398.00Rp.Teakwood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.

Jumlah (1). 280,613.45Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang kayu 2.1000 oh 105,000.00Rp. 220,500.00Rp.Kepala tukang 0.2100 oh 120,000.00Rp. 25,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 295,400.00Rp.

Page 49: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 576,013.45Rp.Keuntungan 10% 57,601.35Rp.Jumlah 633,614.80Rp.

KodeF.11.a 1 m2 Pasang pintu teakwood rangkap, rangka kayu singkil Dibulatkan 633,600.00Rp.

F.11.b 1 m2 Pasang pintu teakwood rangkap, rangka kayu meranti1 Bahan

Kayu meranti, papan 0.0196 m3 4,530,600.00Rp. 88,799.76Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.3000 lt 34,660.00Rp. 10,398.00Rp.Teakwood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.

Jumlah (1). 178,034.46Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang kayu 2.1000 oh 105,000.00Rp. 220,500.00Rp.Kepala tukang 0.2100 oh 120,000.00Rp. 25,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 295,400.00Rp.

Jumlah (1) + (2) 473,434.46Rp.Keuntungan 10% 47,343.45Rp.Jumlah 520,777.91Rp.

KodeF.11.b 1 m2 Pasang pintu teakwood rangkap, rangka kayu meranti Dibulatkan 520,700.00Rp.

F.12. 1 m2 Pasang pintu teakwood rangkap lapis formika, rangka expose kayu kelas II1 Bahan

Kayu kamper, papan 0.0250 m3 7,655,150.00Rp. 191,378.75Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.8000 lt 34,660.00Rp. 27,728.00Rp.Teakwood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Formika 0.5000 lbr 63,250.00Rp. 31,625.00Rp.

Jumlah (1). 329,568.45Rp.

2 TenagaPekerja 0.8500 oh 66,000.00Rp. 56,100.00Rp.Tukang kayu 2.5500 oh 105,000.00Rp. 267,750.00Rp.Kepala tukang 0.2550 oh 120,000.00Rp. 30,600.00Rp.Mandor 0.0425 oh 100,000.00Rp. 4,250.00Rp.

Jumlah (2). 358,700.00Rp.

Jumlah (1) + (2) 688,268.45Rp.Keuntungan 10% 68,826.85Rp.Jumlah 757,095.30Rp.

KodeF.12. 1 m2 Pasang pintu teakwood rangkap lapis formika, rangka expose kayu kelas II Dibulatkan 757,000.00Rp.

F.12.a 1 m2 Pasang pintu plywood & formika, rangka kayu kamper1 Bahan

Kayu kamper, papan 0.0196 m3 10,779,700.00Rp. 211,282.12Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.8000 lt 34,660.00Rp. 27,728.00Rp.Ply wood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Formica 0.5000 lbr 63,250.00Rp. 31,625.00Rp.

Jumlah (1). 349,471.82Rp.

2 TenagaPekerja 0.8500 oh 66,000.00Rp. 56,100.00Rp.Tukang kayu 2.5500 oh 105,000.00Rp. 267,750.00Rp.Kepala tukang 0.2550 oh 120,000.00Rp. 30,600.00Rp.Mandor 0.0425 oh 100,000.00Rp. 4,250.00Rp.

Jumlah (2). 358,700.00Rp.

Jumlah (1) + (2) 708,171.82Rp.Keuntungan 10% 70,817.18Rp.Jumlah 778,989.00Rp.

KodeF.12.a 1 m2 Pasang pintu plywood & formika, rangka kayu kamper Dibulatkan 778,900.00Rp.

F.12.b 1 m2 Pasang pintu teakwood & formika, rangka kayu jati1 Bahan

Kayu jati, papan 0.0196 m3 24,996,400.00Rp. 489,929.44Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.8000 lt 34,660.00Rp. 27,728.00Rp.Teakwood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Formica 0.5000 lbr 63,250.00Rp. 31,625.00Rp.

Jumlah (1). 628,119.14Rp.

2 TenagaPekerja 0.8500 oh 66,000.00Rp. 56,100.00Rp.Tukang kayu 2.5500 oh 105,000.00Rp. 267,750.00Rp.Kepala tukang 0.2550 oh 120,000.00Rp. 30,600.00Rp.Mandor 0.0425 oh 100,000.00Rp. 4,250.00Rp.

Jumlah (2). 358,700.00Rp.

Page 50: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 986,819.14Rp.Keuntungan 10% 98,681.91Rp.Jumlah 1,085,501.05Rp.

KodeF.12.b 1 m2 Pasang pintu teakwood & formika, rangka kayu jati Dibulatkan 1,085,500.00Rp.

F.13. 1 m2 Pasang pintu teakwood & formika, rangka kayu kamper (divernis)1 Bahan

Kayu kamper, papan 0.0196 m3 10,779,700.00Rp. 211,282.12Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.8000 lt 34,660.00Rp. 27,728.00Rp.Teakwood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Vernis 0.5000 lt 49,500.00Rp. 24,750.00Rp.Formica 0.5000 lbr 63,250.00Rp. 31,625.00Rp.

Jumlah (1). 374,221.82Rp.

2 TenagaPekerja 0.8500 oh 66,000.00Rp. 56,100.00Rp.Tukang kayu 2.5500 oh 105,000.00Rp. 267,750.00Rp.Kepala tukang 0.2550 oh 120,000.00Rp. 30,600.00Rp.Mandor 0.0425 oh 100,000.00Rp. 4,250.00Rp.

Jumlah (2). 358,700.00Rp.

Jumlah (1) + (2) 732,921.82Rp.Keuntungan 10% 73,292.18Rp.Jumlah 806,214.00Rp.

KodeF.13. 1 m2 Pasang pintu teakwood & formika, rangka kayu kamper (divernis) Dibulatkan 806,200.00Rp.

F.14. 1 m2 Pasang pintu teakwood & alumunium, rangka kayu singkil (divernis)1 Bahan

Kayu kamper, papan 0.0250 m3 7,655,150.00Rp. 191,378.75Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.8000 lt 34,660.00Rp. 27,728.00Rp.Teakwood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Vernis 0.5000 lt 49,500.00Rp. 24,750.00Rp.Alumunium 0.5000 lbr 54,640.00Rp. 27,320.00Rp.

Jumlah (1). 350,013.45Rp.

2 TenagaPekerja 0.8500 oh 66,000.00Rp. 56,100.00Rp.Tukang kayu 2.5500 oh 105,000.00Rp. 267,750.00Rp.Kepala tukang 0.2550 oh 120,000.00Rp. 30,600.00Rp.Mandor 0.0425 oh 100,000.00Rp. 4,250.00Rp.

Jumlah (2). 358,700.00Rp.

Jumlah (1) + (2) 708,713.45Rp.Keuntungan 10% 70,871.35Rp.Jumlah 779,584.80Rp.

KodeF.14. 1 m2 Pasang pintu teakwood & alumunium, rangka kayu singkil (divernis) Dibulatkan 779,500.00Rp.

F.14.a 1 m2 Pasang pintu teakwood & alumunium, rangka kayu meranti (divernis)1 Bahan

Kayu meranti, papan 0.0196 m3 4,530,600.00Rp. 88,799.76Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.8000 lt 34,660.00Rp. 27,728.00Rp.Teakwood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Vernis 0.5000 lt 49,500.00Rp. 24,750.00Rp.Alumunium 0.5000 lbr 54,640.00Rp. 27,320.00Rp.

Jumlah (1). 247,434.46Rp.

2 TenagaPekerja 0.8500 oh 66,000.00Rp. 56,100.00Rp.Tukang kayu 2.5500 oh 105,000.00Rp. 267,750.00Rp.Kepala tukang 0.2550 oh 120,000.00Rp. 30,600.00Rp.Mandor 0.0425 oh 100,000.00Rp. 4,250.00Rp.

Jumlah (2). 358,700.00Rp.

Jumlah (1) + (2) 606,134.46Rp.Keuntungan 10% 60,613.45Rp.Jumlah 666,747.91Rp.

KodeF.14.a 1 m2 Pasang pintu teakwood & alumunium, rangka kayu meranti (divernis) Dibulatkan 666,700.00Rp.

F.15. 1 m2 Pasang pintu formika double, rangka kayu jati1 Bahan

Kayu jati, papan 0.0196 m3 24,996,400.00Rp. 489,929.44Rp.Paku biasa 1/2" - 1" 0.3000 kg 21,890.00Rp. 6,567.00Rp.Lem kayu 1.2000 lt 34,660.00Rp. 41,592.00Rp.Plywood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Formica 1.0000 lbr 63,250.00Rp. 63,250.00Rp.

Jumlah (1). 679,518.44Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang kayu 2.6000 oh 105,000.00Rp. 273,000.00Rp.

Page 51: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kepala tukang 0.2600 oh 120,000.00Rp. 31,200.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 375,200.00Rp.

Jumlah (1) + (2) 1,054,718.44Rp.Keuntungan 10% 105,471.84Rp.Jumlah 1,160,190.28Rp.

KodeF.15. 1 m2 Pasang pintu formika double, rangka kayu jati Dibulatkan 1,160,100.00Rp.

F.15.a 1 m2 Pasang pintu formika double, rangka kayu kamper1 Bahan

Kayu kamper, papan 0.0196 m3 10,779,700.00Rp. 211,282.12Rp.Paku biasa 1/2" - 1" 0.3000 kg 21,890.00Rp. 6,567.00Rp.Lem kayu 1.2000 lt 34,660.00Rp. 41,592.00Rp.Plywood 4' x 8' x 4 mm 1.0000 lbr 78,180.00Rp. 78,180.00Rp.Formica 1.0000 lbr 63,250.00Rp. 63,250.00Rp.

Jumlah (1). 400,871.12Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang kayu 2.6000 oh 105,000.00Rp. 273,000.00Rp.Kepala tukang 0.2600 oh 120,000.00Rp. 31,200.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 375,200.00Rp.

Jumlah (1) + (2) 776,071.12Rp.Keuntungan 10% 77,607.11Rp.Jumlah 853,678.23Rp.

KodeF.15.a 1 m2 Pasang pintu formika double, rangka kayu kamper Dibulatkan 853,600.00Rp.

F.16. 1 m3 Pasang kontruksi kuda-kuda expose, kayu kelas I1 Bahan

Kayu balok 1.2000 m3 10,311,020.00Rp. 12,373,224.00Rp.Besi strip tebal 5 mm 15.0000 kg 13,200.00Rp. 198,000.00Rp.Paku 12 cm 5.6000 kg 19,480.00Rp. 109,088.00Rp.

Jumlah (1). 12,680,312.00Rp.

2 TenagaPekerja 6.7000 oh 66,000.00Rp. 442,200.00Rp.Tukang kayu 20.1000 oh 105,000.00Rp. 2,110,500.00Rp.Kepala tukang 2.0100 oh 120,000.00Rp. 241,200.00Rp.Mandor 0.3350 oh 100,000.00Rp. 33,500.00Rp.

Jumlah (2). 2,827,400.00Rp.

Jumlah (1) + (2) 15,507,712.00Rp.Keuntungan 10% 1,550,771.20Rp.Jumlah 17,058,483.20Rp.

KodeF.16. 1 m3 Pasang kontruksi kuda-kuda expose, kayu kelas I Dibulatkan 17,058,400.00Rp.

F.16.a 1 m3 Pasang kontruksi kuda-kuda kayu jati expose1 Bahan

Kayu jati, balok 1.2000 m3 22,652,990.00Rp. 27,183,588.00Rp.Besi strip 15.0000 kg 13,200.00Rp. 198,000.00Rp.Paku biasa 2" - 5" 5.6000 kg 19,480.00Rp. 109,088.00Rp.

Jumlah (1). 27,490,676.00Rp.

2 TenagaPekerja 6.7000 oh 66,000.00Rp. 442,200.00Rp.Tukang kayu 20.1000 oh 105,000.00Rp. 2,110,500.00Rp.Kepala tukang 2.0100 oh 120,000.00Rp. 241,200.00Rp.Mandor 0.3350 oh 100,000.00Rp. 33,500.00Rp.

Jumlah (2). 2,827,400.00Rp.

Jumlah (1) + (2) 30,318,076.00Rp.Keuntungan 10% 3,031,807.60Rp.Jumlah 33,349,883.60Rp.

KodeF.16.a 1 m3 Pasang kontruksi kuda-kuda kayu jati expose Dibulatkan 33,349,800.00Rp.

F.17. 1 m3 Pasang kontruksi kuda-kuda konvensional, kayu kelas I1 Bahan

Kayu balok 1.1000 m3 10,311,020.00Rp. 11,342,122.00Rp.Besi strip tebal 5 mm 15.0000 kg 13,200.00Rp. 198,000.00Rp.Paku 12 cm 5.6000 kg 19,480.00Rp. 109,088.00Rp.

Jumlah (1). 11,649,210.00Rp.

2 TenagaPekerja 4.0000 oh 66,000.00Rp. 264,000.00Rp.Tukang kayu 12.0000 oh 105,000.00Rp. 1,260,000.00Rp.Kepala tukang 1.2000 oh 120,000.00Rp. 144,000.00Rp.Mandor 0.2000 oh 100,000.00Rp. 20,000.00Rp.

Jumlah (2). 1,688,000.00Rp.

Jumlah (1) + (2) 13,337,210.00Rp.

Page 52: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 1,333,721.00Rp.Jumlah 14,670,931.00Rp.

KodeF.17. 1 m3 Pasang kontruksi kuda-kuda konvensional, kayu kelas I Dibulatkan 14,670,900.00Rp.

F.17.a 1 m3 Pasang kontruksi kuda-kuda konvensional kayu kamper1 Bahan

Kayu kamper, balok 1.1000 m3 10,311,020.00Rp. 11,342,122.00Rp.Besi strip 15.0000 kg 13,200.00Rp. 198,000.00Rp.Paku biasa 2" - 5" 5.6000 kg 19,480.00Rp. 109,088.00Rp.

Jumlah (1). 11,649,210.00Rp.

2 TenagaPekerja 4.0000 oh 66,000.00Rp. 264,000.00Rp.Tukang kayu 12.0000 oh 105,000.00Rp. 1,260,000.00Rp.Kepala tukang 1.2000 oh 120,000.00Rp. 144,000.00Rp.Mandor 0.2000 oh 100,000.00Rp. 20,000.00Rp.

Jumlah (2). 1,688,000.00Rp.

Jumlah (1) + (2) 13,337,210.00Rp.Keuntungan 10% 1,333,721.00Rp.Jumlah 14,670,931.00Rp.

KodeF.17.a 1 m3 Pasang kontruksi kuda-kuda konvensional kayu kamper Dibulatkan 14,670,900.00Rp.

F.17.b 1 m3 Pasang kontruksi kuda-kuda konvensional, kayu singkil1 Bahan

Kayu balok 1.1000 m3 7,108,420.00Rp. 7,819,262.00Rp.Besi strip tebal 5 mm 15.0000 kg 13,200.00Rp. 198,000.00Rp.Paku 12 cm 5.6000 kg 19,480.00Rp. 109,088.00Rp.

Jumlah (1). 8,126,350.00Rp.

2 TenagaPekerja 4.0000 oh 66,000.00Rp. 264,000.00Rp.Tukang kayu 12.0000 oh 105,000.00Rp. 1,260,000.00Rp.Kepala tukang 1.2000 oh 120,000.00Rp. 144,000.00Rp.Mandor 0.2000 oh 100,000.00Rp. 20,000.00Rp.

Jumlah (2). 1,688,000.00Rp.

Jumlah (1) + (2) 9,814,350.00Rp.Keuntungan 10% 981,435.00Rp.Jumlah 10,795,785.00Rp.

KodeF.17.b 1 m3 Pasang kontruksi kuda-kuda konvensional, kayu singkil Dibulatkan 10,795,700.00Rp.

F.17.c 1 m3 Pasang kontruksi kuda-kuda konvensional, kayu kelas III1 Bahan

Kayu balok 1.1000 m3 6,147,530.00Rp. 6,762,283.00Rp.Besi strip tebal 5 mm 15.0000 kg 13,200.00Rp. 198,000.00Rp.Paku 12 cm 5.6000 kg 19,480.00Rp. 109,088.00Rp.

Jumlah (1). 7,069,371.00Rp.

2 TenagaPekerja 4.0000 oh 66,000.00Rp. 264,000.00Rp.Tukang kayu 12.0000 oh 105,000.00Rp. 1,260,000.00Rp.Kepala tukang 1.2000 oh 120,000.00Rp. 144,000.00Rp.Mandor 0.2000 oh 100,000.00Rp. 20,000.00Rp.

Jumlah (2). 1,688,000.00Rp.

Jumlah (1) + (2) 8,757,371.00Rp.Keuntungan 10% 875,737.10Rp.Jumlah 9,633,108.10Rp.

KodeF.17.c 1 m3 Pasang kontruksi kuda-kuda konvensional, kayu kelas III Dibulatkan 9,633,100.00Rp.

F.18. 1 m3 Pasang kontruksi gordeng, kayu singkil1 Bahan

Kayu balok 1.1000 m3 7,108,420.00Rp. 7,819,262.00Rp.Besi strip tebal 5 mm 15.0000 kg 13,200.00Rp. 198,000.00Rp.Paku 12 cm 3.0000 kg 19,480.00Rp. 58,440.00Rp.

Jumlah (1). 8,075,702.00Rp.

2 TenagaPekerja 2.4000 oh 66,000.00Rp. 158,400.00Rp.Tukang kayu 7.2000 oh 105,000.00Rp. 756,000.00Rp.Kepala tukang 0.7200 oh 120,000.00Rp. 86,400.00Rp.Mandor 0.1200 oh 100,000.00Rp. 12,000.00Rp.

Jumlah (2). 1,012,800.00Rp.

Jumlah (1) + (2) 9,088,502.00Rp.Keuntungan 10% 908,850.20Rp.Jumlah 9,997,352.20Rp.

KodeF.18. 1 m3 Pasang kontruksi gordeng, kayu singkil Dibulatkan 9,997,300.00Rp.

F.19. 1 m2 Pasang rangka atap reng + kaso genteng keramik kayu kelas II1 Bahan

Page 53: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kayu kaso 5 x7 cm 0.0140 m3 3,437,010.00Rp. 48,118.14Rp.reng 2x3 cm 0.0036 m3 3,437,010.00Rp. 12,373.24Rp.Paku biasa 5 - 10 cm 0.2500 kg 19,480.00Rp. 4,870.00Rp.

Jumlah (1). 65,361.38Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 84,161.38Rp.Keuntungan 10% 8,416.14Rp.Jumlah 92,577.51Rp.

KodeF.19. 1 m2 Pasang rangka atap reng + kaso genteng keramik kayu kelas II Dibulatkan 92,500.00Rp.

F.20. 1 m2 Pasang rangka atap reng + kaso genteng beton kayu kelas II1 Bahan

Kayu kaso 5 x7 cm 0.0140 m3 3,437,010.00Rp. 48,118.14Rp.reng 2x3 cm 0.0072 m3 3,437,010.00Rp. 24,746.47Rp.Paku biasa 5 - 10 cm 0.2500 kg 19,480.00Rp. 4,870.00Rp.

Jumlah (1). 77,734.61Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 96,534.61Rp.Keuntungan 10% 9,653.46Rp.Jumlah 106,188.07Rp.

KodeF.20. 1 m2 Pasang rangka atap reng + kaso genteng beton kayu kelas II Dibulatkan 106,100.00Rp.

F.20.a 1 m2 Pasang kaso + reng genteng beton kayu borneo1 Bahan

Kayu borneo, balok kaso 5/7 0.0140 m3 3,437,010.00Rp. 48,118.14Rp.Kayu borneo, balok reng 3/4 0.0072 m3 3,437,010.00Rp. 24,746.47Rp.Paku biasa 2" - 5" 0.2500 kg 19,480.00Rp. 4,870.00Rp.

Jumlah (1). 77,734.61Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 96,534.61Rp.Keuntungan 10% 9,653.46Rp.Jumlah 106,188.07Rp.

KodeF.20.a 1 m2 Pasang kaso + reng genteng beton kayu borneo Dibulatkan 106,100.00Rp.

F.21. 1 m2 Pasang rangka atap sirap, kayu kelas II1 Bahan

Kayu kelas II 0.1650 m3 3,437,010.00Rp. 567,106.65Rp.Paku biasa 5 - 10 cm 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 571,002.65Rp.

2 TenagaPekerja 0.1200 oh 66,000.00Rp. 7,920.00Rp.Tukang kayu 0.1200 oh 105,000.00Rp. 12,600.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 22,560.00Rp.

Jumlah (1) + (2) 593,562.65Rp.Keuntungan 10% 59,356.27Rp.Jumlah 652,918.92Rp.

KodeF.21. 1 m2 Pasang rangka atap sirap, kayu kelas II Dibulatkan 652,900.00Rp.

F.21.a 1 m2 Pasang kaso + reng atap sirap kayu kamper1 Bahan

Kayu kamper, balok 0.0165 m3 10,311,020.00Rp. 170,131.83Rp.Paku biasa 2" - 5" 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 174,027.83Rp.

2 TenagaPekerja 0.1200 oh 66,000.00Rp. 7,920.00Rp.Tukang kayu 0.1200 oh 105,000.00Rp. 12,600.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.

Page 54: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.Jumlah (2). 22,560.00Rp.

Jumlah (1) + (2) 196,587.83Rp.Keuntungan 10% 19,658.78Rp.Jumlah 216,246.61Rp.

KodeF.21.a 1 m2 Pasang kaso + reng atap sirap kayu kamper Dibulatkan 216,200.00Rp.

F.21.b 1 m2 Pasang kaso + reng atap sirap kayu borneo1 Bahan

Kayu borneo, balok 0.0165 m3 3,437,010.00Rp. 56,710.67Rp.Paku biasa 2" - 5" 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 60,606.67Rp.

2 TenagaPekerja 0.1200 oh 66,000.00Rp. 7,920.00Rp.Tukang kayu 0.1200 oh 105,000.00Rp. 12,600.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 22,560.00Rp.

Jumlah (1) + (2) 83,166.67Rp.Keuntungan 10% 8,316.67Rp.Jumlah 91,483.33Rp.

KodeF.21.b 1 m2 Pasang kaso + reng atap sirap kayu borneo Dibulatkan 91,400.00Rp.

F.22. 1 m2 Pasang kaso + reng genteng monier kayu jati1 Bahan

Kayu jati, balok 0.0140 m3 22,652,990.00Rp. 317,141.86Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 320,063.86Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 338,863.86Rp.Keuntungan 10% 33,886.39Rp.Jumlah 372,750.25Rp.

KodeF.22. 1 m2 Pasang kaso + reng genteng monier kayu jati Dibulatkan 372,700.00Rp.

F.22.a 1 m2 Pasang kaso + reng genteng monier kayu kamper1 Bahan

Kayu kamper, balok 0.0140 m3 10,311,020.00Rp. 144,354.28Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 147,276.28Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 166,076.28Rp.Keuntungan 10% 16,607.63Rp.Jumlah 182,683.91Rp.

KodeF.22.a 1 m2 Pasang kaso + reng genteng monier kayu kamper Dibulatkan 182,600.00Rp.

F.23. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00) m, kayu jati1 Bahan

Kayu jati, balok 0.0120 m3 22,652,990.00Rp. 271,835.88Rp.Paku biasa 2" - 5" 0.1000 kg 19,480.00Rp. 1,948.00Rp.

Jumlah (1). 273,783.88Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 46,650.00Rp.

Jumlah (1) + (2) 320,433.88Rp.Keuntungan 10% 32,043.39Rp.Jumlah 352,477.27Rp.

KodeF.23. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00) m, kayu jati Dibulatkan 352,400.00Rp.

F.24. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00) m, kayu borneo 5/71 Bahan

Page 55: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kayu borneo, balok (5/7) 0.0077 m3 3,437,010.00Rp. 26,464.98Rp.Paku biasa 2" - 5" 0.1000 kg 19,480.00Rp. 1,948.00Rp.

Jumlah (1). 28,412.98Rp.

2 TenagaPekerja 0.0750 oh 66,000.00Rp. 4,950.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0375 oh 100,000.00Rp. 3,750.00Rp.

Jumlah (2). 26,250.00Rp.

Jumlah (1) + (2) 54,662.98Rp.Keuntungan 10% 5,466.30Rp.Jumlah 60,129.27Rp.

KodeF.24. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00) m, kayu borneo 5/7 Dibulatkan 60,100.00Rp.

F.25. 1 m2 Pasang rangka langit-langit ( 50 x 100) cm, kayu borneo 5/71 Bahan

Kayu borneo, balok (5/7) 0.0154 m3 3,437,010.00Rp. 52,929.95Rp.Paku biasa 5 - 10 cm 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 56,825.95Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 52,500.00Rp.

Jumlah (1) + (2) 109,325.95Rp.Keuntungan 10% 10,932.60Rp.Jumlah 120,258.55Rp.

KodeF.25. 1 m2 Pasang rangka langit-langit ( 50 x 100) cm, kayu borneo 5/7 Dibulatkan 120,200.00Rp.

F.25.a 1 m2 Pasang rangka langit-langit ( 50 x 100) cm, kayu kelas III1 Bahan

Kayu kaso 5 x 7 cm 0.0154 m3 3,437,010.00Rp. 52,929.95Rp.Paku biasa 5 - 10 cm 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 56,825.95Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 46,650.00Rp.

Jumlah (1) + (2) 103,475.95Rp.Keuntungan 10% 10,347.60Rp.Jumlah 113,823.55Rp.

KodeF.25.a 1 m2 Pasang rangka langit-langit ( 50 x 100) cm, kayu kelas III Dibulatkan 113,800.00Rp.

F.26. 1 m2 Pasang rangka langit-langit ( 60 x 60) cm, kayu borneo 5/71 Bahan

Kayu borneo, balok (5/7) 0.0163 m3 3,437,010.00Rp. 56,023.26Rp.Paku biasa 5 - 10 cm 0.2500 kg 19,480.00Rp. 4,870.00Rp.

Jumlah (1). 60,893.26Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 49,300.00Rp.

Jumlah (1) + (2) 110,193.26Rp.Keuntungan 10% 11,019.33Rp.Jumlah 121,212.59Rp.

KodeF.26. 1 m2 Pasang rangka langit-langit ( 60 x 60) cm, kayu borneo 5/7 Dibulatkan 121,200.00Rp.

F.26.a 1 m2 Pasang rangka langit-langit ( 60 x 60) cm, kayu kelas III1 Bahan

Kayu kaso 5 x 7 cm 0.0163 m3 3,437,010.00Rp. 56,023.26Rp.Paku biasa 5 - 10 cm 0.2500 kg 19,480.00Rp. 4,870.00Rp.

Jumlah (1). 60,893.26Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 49,300.00Rp.

Page 56: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 110,193.26Rp.Keuntungan 10% 11,019.33Rp.Jumlah 121,212.59Rp.

KodeF.26.a 1 m2 Pasang rangka langit-langit ( 60 x 60) cm, kayu kelas III Dibulatkan 121,200.00Rp.

F.27. 1 m2 Pasang rangka langit-langit ( 60 x 120) cm, kayu borneo 5/71 Bahan

Kayu borneo, balok (5/7) 0.0082 m3 3,437,010.00Rp. 28,183.48Rp.Paku biasa 5 - 10 cm 0.1250 kg 19,480.00Rp. 2,435.00Rp.

Jumlah (1). 30,618.48Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 24,650.00Rp.

Jumlah (1) + (2) 55,268.48Rp.Keuntungan 10% 5,526.85Rp.Jumlah 60,795.33Rp.

KodeF.27. 1 m2 Pasang rangka langit-langit ( 60 x 120) cm, kayu borneo 5/7 Dibulatkan 60,700.00Rp.

F.28. 1 m3 Pasang penggantung plafond kayu borneo1 Bahan

Kayu borneo 1.0500 m3 3,437,010.00Rp. 3,608,860.50Rp.Paku biasa 2" - 5" 0.7500 kg 19,480.00Rp. 14,610.00Rp.

Jumlah (1). 3,608,860.50Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 49,300.00Rp.

Jumlah (1) + (2) 3,658,160.50Rp.Keuntungan 10% 365,816.05Rp.Jumlah 4,023,976.55Rp.

KodeF.28. 1 m3 Pasang penggantung plafond kayu borneo Dibulatkan 4,023,900.00Rp.

F.29. 1 m2 Pasang rangka langit-langit ( 30 x 60) cm, kayu kamper1 Bahan

Kayu kamper, balok 0.0230 m3 10,311,020.00Rp. 237,153.46Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 240,075.46Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 49,300.00Rp.

Jumlah (1) + (2) 289,375.46Rp.Keuntungan 10% 28,937.55Rp.Jumlah 318,313.01Rp.

KodeF.29. 1 m2 Pasang rangka langit-langit ( 30 x 60) cm, kayu kamper Dibulatkan 318,300.00Rp.

F.29.a 1 m2 Pasang rangka langit-langit ( 30 x 60) cm, kayu borneo1 Bahan

Kayu borneo, balok 0.0230 m3 3,437,010.00Rp. 79,051.23Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 81,973.23Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 49,300.00Rp.

Jumlah (1) + (2) 131,273.23Rp.Keuntungan 10% 13,127.32Rp.Jumlah 144,400.55Rp.

KodeF.29.a 1 m2 Pasang rangka langit-langit ( 30 x 60) cm, kayu borneo Dibulatkan 144,400.00Rp.

F.30. 1 m2 Pasang rangka langit-langit ( 30 x 30) cm, kayu jati1 Bahan

Kayu jati, balok 0.0270 m3 22,652,990.00Rp. 611,630.73Rp.Paku biasa 2" - 5" 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 615,526.73Rp.

Page 57: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang kayu 0.3500 oh 105,000.00Rp. 36,750.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 58,700.00Rp.

Jumlah (1) + (2) 674,226.73Rp.Keuntungan 10% 67,422.67Rp.Jumlah 741,649.40Rp.

KodeF.30. 1 m2 Pasang rangka langit-langit ( 30 x 30) cm, kayu jati Dibulatkan 741,600.00Rp.

F.30.a 1 m2 Pasang rangka langit-langit ( 30 x 30) cm, kayu kamper1 Bahan

Kayu kamper, balok 0.0270 m3 10,311,020.00Rp. 278,397.54Rp.Paku biasa 2" - 5" 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 282,293.54Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang kayu 0.3500 oh 105,000.00Rp. 36,750.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 58,700.00Rp.

Jumlah (1) + (2) 340,993.54Rp.Keuntungan 10% 34,099.35Rp.Jumlah 375,092.89Rp.

KodeF.30.a 1 m2 Pasang rangka langit-langit ( 30 x 30) cm, kayu kamper Dibulatkan 375,000.00Rp.

F.30.b 1 m2 Pasang rangka langit-langit ( 30 x 30) cm, kayu borneo1 Bahan

Kayu borneo, balok 0.0270 m3 3,437,010.00Rp. 92,799.27Rp.Paku biasa 2" - 5" 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 96,695.27Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang kayu 0.3500 oh 105,000.00Rp. 36,750.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 58,700.00Rp.

Jumlah (1) + (2) 155,395.27Rp.Keuntungan 10% 15,539.53Rp.Jumlah 170,934.80Rp.

KodeF.30.b 1 m2 Pasang rangka langit-langit ( 30 x 30) cm, kayu borneo Dibulatkan 170,900.00Rp.

F.31. 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu kelas I1 Bahan

Kayu papan 0.0072 m3 7,655,150.00Rp. 55,117.08Rp.Paku biasa 5 - 7 cm 0.1000 kg 19,480.00Rp. 1,948.00Rp.

Jumlah (1). 57,065.08Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 87,565.08Rp.Keuntungan 10% 8,756.51Rp.Jumlah 96,321.59Rp.

KodeF.31. 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu kelas I Dibulatkan 96,300.00Rp.

F.31.a 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu kelas II1 Bahan

Kayu papan 0.0072 m3 6,663,140.00Rp. 47,974.61Rp.Paku biasa 5 - 7 cm 0.1000 kg 19,480.00Rp. 1,948.00Rp.

Jumlah (1). 49,922.61Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 80,422.61Rp.Keuntungan 10% 8,042.26Rp.Jumlah 88,464.87Rp.

Page 58: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeF.31.a 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu kelas II Dibulatkan 88,400.00Rp.

F.31.b 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu jati1 Bahan

Kayu jati, papan 0.0072 m3 24,996,400.00Rp. 179,974.08Rp.Paku biasa 2" - 5" 0.1000 kg 19,480.00Rp. 1,948.00Rp.

Jumlah (1). 181,922.08Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 212,422.08Rp.Keuntungan 10% 21,242.21Rp.Jumlah 233,664.29Rp.

KodeF.31.b 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu jati Dibulatkan 233,600.00Rp.

F.31.c 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu kamper1 Bahan

Kayu kamper, papan 0.0072 m3 10,779,700.00Rp. 77,613.84Rp.Paku biasa 2" - 5" 0.1000 kg 19,480.00Rp. 1,948.00Rp.

Jumlah (1). 79,561.84Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 110,061.84Rp.Keuntungan 10% 11,006.18Rp.Jumlah 121,068.02Rp.

KodeF.31.c 1 m' Pasang lisplang ukuran (3 x 20) cm, kayu kamper Dibulatkan 121,000.00Rp.

F.32. 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu kelas I1 Bahan

Kayu papan 0.0108 m3 7,655,150.00Rp. 82,675.62Rp.Paku biasa 5 - 7 cm 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 83,649.62Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 114,149.62Rp.Keuntungan 10% 11,414.96Rp.Jumlah 125,564.58Rp.

KodeF.32. 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu kelas I Dibulatkan 125,500.00Rp.

F.32.a 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu kelas II1 Bahan

Kayu papan 0.0108 m3 6,663,140.00Rp. 71,961.91Rp.Paku biasa 5 - 7 cm 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 72,935.91Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 103,435.91Rp.Keuntungan 10% 10,343.59Rp.Jumlah 113,779.50Rp.

KodeF.32.a 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu kelas II Dibulatkan 113,700.00Rp.

F.32.b 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu jati1 Bahan

Kayu jati, papan 0.0108 m3 24,996,400.00Rp. 269,961.12Rp.Paku biasa 2" - 5" 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 270,935.12Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.

Page 59: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 301,435.12Rp.Keuntungan 10% 30,143.51Rp.Jumlah 331,578.63Rp.

KodeF.32.b 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu jati Dibulatkan 331,500.00Rp.

F.32.c 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu kamper1 Bahan

Kayu kamper, papan 0.0108 m3 10,779,700.00Rp. 116,420.76Rp.Paku biasa 2" - 5" 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 117,394.76Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 30,500.00Rp.

Jumlah (1) + (2) 147,894.76Rp.Keuntungan 10% 14,789.48Rp.Jumlah 162,684.24Rp.

KodeF.32.c 1 m' Pasang lisplang ukuran (3 x 30) cm, kayu kamper Dibulatkan 162,600.00Rp.

F.33. 1 m' Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kamper1 Bahan

Kayu kamper, papan 0.0144 m3 10,779,700.00Rp. 155,227.68Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 158,149.68Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 45,750.00Rp.

Jumlah (1) + (2) 203,899.68Rp.Keuntungan 10% 20,389.97Rp.Jumlah 224,289.65Rp.

KodeF.33. 1 m' Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kamper Dibulatkan 224,200.00Rp.

F.34. 1 m' Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kamper1 Bahan

Kayu kamper, papan 0.0096 m3 10,779,700.00Rp. 103,485.12Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 106,407.12Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 45,750.00Rp.

Jumlah (1) + (2) 152,157.12Rp.Keuntungan 10% 15,215.71Rp.Jumlah 167,372.83Rp.

KodeF.34. 1 m' Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kamper Dibulatkan 167,300.00Rp.

F.34.a 1 m' Pasang lisplang ukuran 2 x (2 x 20) cm, kayu borneo1 Bahan

Kayu borneo, papan 0.0096 m3 3,749,460.00Rp. 35,994.82Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 38,916.82Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 45,750.00Rp.

Jumlah (1) + (2) 84,666.82Rp.Keuntungan 10% 8,466.68Rp.Jumlah 93,133.50Rp.

KodeF.34.a 1 m' Pasang lisplang ukuran 2 x (2 x 20) cm, kayu borneo Dibulatkan 93,100.00Rp.

Page 60: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

F.35. 1 m' Pasang lisplang GRC ukuran (0.9 x 20)/(0.9 x 15) cm, kayu borneo1 Bahan

Lysplank GRC 20x2.4x0.9 1.2000 m' 31,740.00Rp. 38,088.00Rp.Lysplank GRC 15x2.4x0.9 1.2000 m' 28,580.00Rp. 34,296.00Rp.Paku sekrup GRC 9.0000 bh 13.36Rp. 120.24Rp.Alat bantu (0,5% Bahan) 1.0000 m' 3,016.67Rp. 3,016.67Rp.

Jumlah (1). 75,520.91Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 45,750.00Rp.

Jumlah (1) + (2) 121,270.91Rp.Keuntungan 10% 12,127.09Rp.Jumlah 133,398.00Rp.

KodeF.35. 1 m' Pasang lisplang GRC ukuran (0.9 x 20)/(0.9 x 15) cm, kayu borneo Dibulatkan 133,300.00Rp.

F.36. 1 m2 Pasang rangka dinding pemisah kayu kamper1 Bahan

Kayu kamper, balok 0.0195 m3 10,779,700.00Rp. 210,204.15Rp.kayu kamper, papan 0.0070 m3 10,311,020.00Rp. 72,177.14Rp.Paku biasa 2" - 5" 0.1000 kg 19,480.00Rp. 1,948.00Rp.

Jumlah (1). 284,329.29Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.4500 oh 105,000.00Rp. 47,250.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 70,050.00Rp.

Jumlah (1) + (2) 354,379.29Rp.Keuntungan 10% 35,437.93Rp.Jumlah 389,817.22Rp.

KodeF.36. 1 m2 Pasang rangka dinding pemisah kayu kamper Dibulatkan 389,800.00Rp.

F.37. 1 m2 Pasang rangka dinding pemisah (60 x 120), kayu borneo1 Bahan

Kayu borneo, balok 0.0280 m3 3,749,460.00Rp. 104,984.88Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 107,906.88Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.4500 oh 105,000.00Rp. 47,250.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 63,300.00Rp.

Jumlah (1) + (2) 171,206.88Rp.Keuntungan 10% 17,120.69Rp.Jumlah 188,327.57Rp.

KodeF.37. 1 m2 Pasang rangka dinding pemisah (60 x 120), kayu borneo Dibulatkan 188,300.00Rp.

F.38. 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper1 Bahan

Kayu kamper, balok 0.0280 m3 10,779,700.00Rp. 301,831.60Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.Lem kayu 0.5600 Lt 34,660.00Rp. 19,409.60Rp.Teakwood 4' x 8' x 4mm 0.8600 lbr 78,180.00Rp. 67,234.80Rp.

Jumlah (1). 391,398.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.4500 oh 105,000.00Rp. 47,250.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 63,300.00Rp.

Jumlah (1) + (2) 454,698.00Rp.Keuntungan 10% 45,469.80Rp.Jumlah 500,167.80Rp.

KodeF.38. 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper Dibulatkan 500,100.00Rp.

F.39. 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper1 Bahan

Kayu kamper, balok 0.0280 m3 10,779,700.00Rp. 301,831.60Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.Lem kayu 0.5600 Lt 34,660.00Rp. 19,409.60Rp.Plywood 4' x 8' x 4mm 0.8600 lbr 78,180.00Rp. 67,234.80Rp.

Page 61: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 391,398.00Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.6000 oh 105,000.00Rp. 63,000.00Rp.Kepala tukang 0.0600 oh 120,000.00Rp. 7,200.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 84,400.00Rp.

Jumlah (1) + (2) 475,798.00Rp.Keuntungan 10% 47,579.80Rp.Jumlah 523,377.80Rp.

KodeF.39. 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper Dibulatkan 523,300.00Rp.

F.40. 1 m2 Pasang dinding lambrizing dari papan jati1 Bahan

Kayu jati, papan 0.0070 m3 24,996,400.00Rp. 174,974.80Rp.Paku biasa 2" - 5" 0.1000 kg 19,480.00Rp. 1,948.00Rp.Paku sekrup 3,5 " 0.1500 kg 21,890.00Rp. 3,283.50Rp.

Jumlah (1). 180,206.30Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang kayu 1.8000 oh 105,000.00Rp. 189,000.00Rp.Kepala tukang 0.1800 oh 120,000.00Rp. 21,600.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 253,200.00Rp.

Jumlah (1) + (2) 433,406.30Rp.Keuntungan 10% 43,340.63Rp.Jumlah 476,746.93Rp.

KodeF.40. 1 m2 Pasang dinding lambrizing dari papan jati Dibulatkan 476,700.00Rp.

F.41. 1 m2 Pasang dinding lambriziring plywood ukuran 120 x 240 M1 Bahan

Plywood 4' x 8' x 4 mm 0.4000 lbr 78,180.00Rp. 31,272.00Rp.Paku biasa 1/2" - 1" 0.0500 kg 21,890.00Rp. 1,094.50Rp.

Jumlah (1). 32,366.50Rp.

2 TenagaPekerja 0.0250 oh 66,000.00Rp. 1,650.00Rp.Tukang kayu 0.0750 oh 105,000.00Rp. 7,875.00Rp.Kepala tukang 0.0075 oh 120,000.00Rp. 900.00Rp.Mandor 0.0010 oh 100,000.00Rp. 100.00Rp.

Jumlah (2). 10,525.00Rp.

Jumlah (1) + (2) 42,891.50Rp.Keuntungan 10% 4,289.15Rp.Jumlah 47,180.65Rp.

KodeF.41. 1 m2 Pasang dinding lambriziring plywood ukuran 120 x 240 M Dibulatkan 47,100.00Rp.

F.42 1 m' Pasang dinding bilik, rangka kayu kelas III1 Bahan

Bilik bambu 1.5000 m2 36,000.00Rp. 54,000.00Rp.kaso - kaso 5 x 7cm 0.0140 m3 3,437,010.00Rp. 48,118.14Rp.Paku 0.0120 kg 19,480.00Rp. 233.76Rp.List kayu 2/4 0.0030 m3 1,718,510.00Rp. 5,155.53Rp.

Jumlah (1). 107,507.43Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.0500 oh 105,000.00Rp. 5,250.00Rp.Kepala tukang 0.0050 oh 120,000.00Rp. 600.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 12,950.00Rp.

Jumlah (1) + (2) 120,457.43Rp.Keuntungan 10% 12,045.74Rp.Jumlah 132,503.17Rp.

KodeF.42 1 m' Pasang dinding bilik, rangka kayu kelas III Dibulatkan 132,500.00Rp.

F.43 1 m2 Pasang pintu triplek & formika, rangka kayu kamper1 Bahan

Kayu kamper, papan 0.0196 m3 10,779,700.00Rp. 211,282.12Rp.Paku biasa 1/2" - 1" 0.0300 kg 21,890.00Rp. 656.70Rp.Lem kayu 0.8000 lt 34,660.00Rp. 27,728.00Rp.Triplek 120 x 240 cm x 4 mm 1.0000 lbr 69,190.00Rp. 69,190.00Rp.Formica 0.5000 lbr 63,250.00Rp. 31,625.00Rp.

Jumlah (1). 340,481.82Rp.

2 TenagaPekerja 0.8500 oh 66,000.00Rp. 56,100.00Rp.Tukang kayu 2.5500 oh 105,000.00Rp. 267,750.00Rp.

Page 62: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kepala tukang 0.2550 oh 120,000.00Rp. 30,600.00Rp.Mandor 0.0425 oh 100,000.00Rp. 4,250.00Rp.

Jumlah (2). 358,700.00Rp.

Jumlah (1) + (2) 699,181.82Rp.Keuntungan 10% 69,918.18Rp.Jumlah 769,100.00Rp.

KodeF.43 1 m2 Pasang pintu triplek & formika, rangka kayu kamper Dibulatkan 769,100.00Rp.

F.44. 1 Pek. kusen type P1 2.0000 unitPasang kusen alluminium 4" 5.8000 m¹ 161,200.00Rp 934,960.00Pasang pintu teakwood rangkap, rangka expose kayu kelas I 3.3600 m² 765,900.00Rp 2,573,424.00Pasang kunci tanam terpisah ex. Dekson (Untuk pintu engkel) 2.0000 unit 422,900.00 845,800.00Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS 2.0000 buah 209,600.00 419,200.00Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 6.0000 buah 76,500.00 459,000.00Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.0000 m³ 75,000.00 150,000.00Cat Kayu/besi Duco 6.7200 m³ 73,500.00 493,920.00

5,876,304.00RpF.45. 2 Pek. kusen type Pj.1 2.000 unit

Pasang kusen alluminium 4" 9.180 m¹ 161,200.00 1,479,816.00Pasang kaca polos 5 mm 15.700 m² 144,900.00 2,274,930.00Pasang kunci tanam terpisah ex. Dekson (Untuk pintu engkel) 2.000 buah 422,900.00 845,800.00Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS 2.000 buah 209,600.00 419,200.00Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 6.000 buah 76,500.00 459,000.00Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.000 buah 75,000.00 150,000.00

5,628,746.00F.45 3 Pek. kusen type J.1 2.000 unit

Pasang kusen alluminium 4" 20.200 m² 161,200.00 3,256,240.00Pasang kaca polos 5 mm 8.360 m² 144,900.00 1,211,364.00

4,467,604.00F.46. 4 Pek. kusen type BV1 3.000 unit

Pasang kusen alluminium 4" 3.600 m² 161,200.00 580,320.00Pasang kaca polos 5 mm 0.900 m² 144,900.00 130,410.00

710,730.00F.47. 5 Pek. kusen type BV2 8.000 unit

Pasang kusen alluminium 4" 35.200 m² 161,200.00 5,674,240.00Pasang kaca polos 5 mm 7.200 m² 144,900.00 1,043,280.00

6,717,520.00F.48. 6 Pek. kusen type BV3 12.000 unit

Pasang kusen alluminium 4" 14.4 m² 161,200.00 2,321,280.00Pasang kaca polos 5 mm 1.08 m² 144,900.00 156,492.00

2,477,772.00

F.49. Pintu Type P5Kusen alumunium anodize 4" 1.372 m¹ 175,440.00 240,773.86Daun pintu jalusi alumunium 0.649 m² 588,210.00 381,513.01Pull plate PP DKS PP004 1.000 psg 204,000.00 204,000.00Mortise lock MTS L DKS 8585 RL SN 1.000 bh 311,666.67 311,666.67Cylinder CYL DKS DC 65 mm 1.000 bh 126,720.00 126,720.00Hinges ES S/S EL 4x3x3 mm 2BB 2.000 bh 22,825.00 45,650.00Upah Instal 15% 1.000 ls 196,548.53 196,548.53

Jumlah 1,506,872.06Dibulatkan 1,506,900.00

F.50. Pintu Type P3Kusen alumunium anodize 4" 5.1800 m¹ 206,520.00Rp 1,069,773.60RpDaun pintu teakwood rangka kayu kamper samarinda 1.8173 m² 745,560.00Rp 1,354,906.19RpKaca dark grey 5 mm 0.1515 m² 111,000.00Rp 16,816.50RpFinish melamik 6.1200 m² 60,750.00Rp 371,790.00RpLever Handle LHP 2228 AZ 2.0000 psg 204,000.00Rp 408,000.00RpMortise lock MTS L DKS 8585 RL SN 1.0000 bh 311,666.67Rp 311,666.67RpCylinder CYL DKS DC 65 mm 1.0000 bh 126,720.00Rp 126,720.00RpDoor closer 1.0000 bh 571,000.00Rp 571,000.00RpHinges ES S/S EL 4x3x3 mm 2BB 3.0000 bh 50,875.00Rp 152,625.00RpUpah Instal 15% 1.0000 ls 657,494.69Rp 657,494.69Rp

Jumlah 5,040,792.65RpDibulatkan 5,040,800.00Rp

Page 63: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN BETONRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pembuatan beton tumbuk dan beton normal untuk pekerjaan beton bertulang2. Pekerjaan pembuatan tiang pancang prestres beton3. Pekerjaan pemasangan water stop dan bekisting berbagai komponen struktur bangunan4. Pekerjaan pembuatan sloof, kolom praktis dan ring balok

G.1. 1 m3 Membuat beton tumbuk 1 pc : 3 ps : 5 kr1 Bahan

Semen Portland 218.0000 kg 1,360.00Rp. 296,480.00Rp.Pasir beton 0.5200 m3 194,700.00Rp. 101,244.00Rp.Koral beton 0.8700 m3 220,000.00Rp. 191,400.00Rp.

Jumlah (1). 589,124.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 734,024.00Rp.Keuntungan 10% 73,402.40Rp.Jumlah 807,426.40Rp.

KodeG.1. 1 m3 Membuat beton tumbuk 1 pc : 3 ps : 5 kr Dibulatkan 807,400.00Rp.

G.2. 1 m3 Membuat beton tumbuk, 1 pc : 3 ps : 6 kr1 Bahan

Semen Portland 197.0000 kg 1,360.00Rp. 267,920.00Rp.Pasir beton 0.4700 m3 194,700.00Rp. 91,509.00Rp.Koral beton 0.9400 m3 220,000.00Rp. 206,800.00Rp.

Jumlah (1). 566,229.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 711,129.00Rp.Keuntungan 10% 71,112.90Rp.Jumlah 782,241.90Rp.

KodeG.2. 1 m3 Membuat beton tumbuk, 1 pc : 3 ps : 6 kr Dibulatkan 782,200.00Rp.

G.3. 1 m3 Membuat beton tumbuk, 1 pc : 4 ps : 6 kr1 Bahan

Semen Portland 173.0000 kg 1,360.00Rp. 235,280.00Rp.Pasir beton 0.5700 m3 194,700.00Rp. 110,979.00Rp.Koral beton 0.8700 m3 220,000.00Rp. 191,400.00Rp.

Jumlah (1). 537,659.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 682,559.00Rp.Keuntungan 10% 68,255.90Rp.Jumlah 750,814.90Rp.

KodeG.3. 1 m3 Membuat beton tumbuk, 1 pc : 4 ps : 6 kr Dibulatkan 750,800.00Rp.

G.3.a 1 bh Membuat beton neut kusen1 Bahan

Semen Portland 1.2000 kg 1,360.00Rp. 1,632.00Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

G.

+harga dasar dan upah stadion 2014.xlsx

Page 64: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pasir beton 0.0100 m3 194,700.00Rp. 1,947.00Rp.Koral beton 0.0100 m3 220,000.00Rp. 2,200.00Rp.

Jumlah (1). 5,779.00Rp.

2 TenagaPekerja 0.0200 oh 66,000.00Rp. 1,320.00Rp.Tukang batu 0.0400 oh 100,000.00Rp. 4,000.00Rp.Kepala tukang 0.0020 oh 120,000.00Rp. 240.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 6,360.00Rp.

Jumlah (1) + (2) 12,139.00Rp.Keuntungan 10% 1,213.90Rp.Jumlah 13,352.90Rp.

KodeG.3.a 1 bh Membuat beton neut kusen Dibulatkan 13,300.00Rp.

G.4. 1 m2 Membuat lantai kerja beton tumbuk, 1 pc : 3 ps : 5 kr, tebal 5 cm1 Bahan

Semen Portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir beton 0.0260 m3 194,700.00Rp. 5,062.20Rp.Koral beton 0.0440 m3 220,000.00Rp. 9,680.00Rp.

Jumlah (1). 28,342.20Rp.

2 TenagaPekerja 1.1500 oh 66,000.00Rp. 75,900.00Rp.Tukang batu 0.0200 oh 100,000.00Rp. 2,000.00Rp.Kepala tukang 0.0020 oh 120,000.00Rp. 240.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 78,740.00Rp.

Jumlah (1) + (2) 107,082.20Rp.Keuntungan 10% 10,708.22Rp.Jumlah 117,790.42Rp.

KodeG.4. 1 m2 Membuat lantai kerja beton tumbuk, 1 pc : 3 ps : 5 kr, tebal 5 cm Dibulatkan 117,700.00Rp.

G.5. 1 m3 Membuat beton bertulang 1 pc : 2 ps : 3 kr1 Bahan

Semen Portland 232.0000 kg 1,360.00Rp. 315,520.00Rp.Pasir beton 0.5200 m3 194,700.00Rp. 101,244.00Rp.Koral beton 0.7800 m3 220,000.00Rp. 171,600.00Rp.

Jumlah (1). 588,364.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 733,264.00Rp.Keuntungan 10% 73,326.40Rp.Jumlah 806,590.40Rp.

KodeG.5. 1 m3 Membuat beton bertulang 1 pc : 2 ps : 3 kr Dibulatkan 806,500.00Rp.

G.6. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 4 kr1 Bahan

Semen Portland 280.0000 kg 1,360.00Rp. 380,800.00Rp.Pasir beton 0.4500 m3 194,700.00Rp. 87,615.00Rp.Koral beton 0.9000 m3 220,000.00Rp. 198,000.00Rp.

Jumlah (1). 666,415.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 811,315.00Rp.Keuntungan 10% 81,131.50Rp.Jumlah 892,446.50Rp.

KodeG.6. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 4 kr Dibulatkan 892,400.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 65: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.7. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 2,5 kr1 Bahan

Semen Portland 352.0000 kg 1,360.00Rp. 478,720.00Rp.Pasir beton 0.5600 m3 194,700.00Rp. 109,032.00Rp.Koral beton 0.7000 m3 220,000.00Rp. 154,000.00Rp.

Jumlah (1). 741,752.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 886,652.00Rp.Keuntungan 10% 88,665.20Rp.Jumlah 975,317.20Rp.

KodeG.7. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 2,5 kr Dibulatkan 975,300.00Rp.

G.8. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 3 kr1 Bahan

Semen Portland 357.0000 kg 1,360.00Rp. 485,520.00Rp.Pasir beton 0.4200 m3 194,700.00Rp. 81,774.00Rp.Koral beton 0.5400 m3 220,000.00Rp. 118,800.00Rp.

Jumlah (1). 686,094.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 830,994.00Rp.Keuntungan 10% 83,099.40Rp.Jumlah 914,093.40Rp.

KodeG.8. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 3 kr Dibulatkan 914,000.00Rp.

G.9. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 2,5 kr1 Bahan

Semen Portland 500.0000 kg 1,360.00Rp. 680,000.00Rp.Pasir beton 0.4700 m3 194,700.00Rp. 91,509.00Rp.Koral beton 0.7800 m3 220,000.00Rp. 171,600.00Rp.

Jumlah (1). 943,109.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 1,088,009.00Rp.Keuntungan 10% 108,800.90Rp.Jumlah 1,196,809.90Rp.

KodeG.9. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 2,5 kr Dibulatkan 1,196,800.00Rp.

G.10. 1 m3 Membuat beton bertulang, 1 pc : 1 ps : 2 kr1 Bahan

Semen Portland 479.0000 kg 1,360.00Rp. 651,440.00Rp.Pasir beton 0.3700 m3 194,700.00Rp. 72,039.00Rp.Koral beton 0.7400 m3 220,000.00Rp. 162,800.00Rp.

Jumlah (1). 886,279.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 1,031,179.00Rp.+harga dasar dan upah stadion 2014.xlsx

Page 66: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 103,117.90Rp.Jumlah 1,134,296.90Rp.

KodeG.10. 1 m3 Membuat beton bertulang, 1 pc : 1 ps : 2 kr Dibulatkan 1,134,200.00Rp.

G.11. 1 m3 Membuat tiang pancang prestressed beton1 Bahan

Semen Portland 440.0000 kg 1,360.00Rp. 598,400.00Rp.Pasir beton 0.5000 m3 194,700.00Rp. 97,350.00Rp.Koral beton 0.8000 m3 220,000.00Rp. 176,000.00Rp.Rapidrant 2.4600 gln 55,250.00Rp. 135,915.00Rp.

Jumlah (1). 1,007,665.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 1,152,565.00Rp.Keuntungan 10% 115,256.50Rp.Jumlah 1,267,821.50Rp.

KodeG.11. 1 m3 Membuat tiang pancang prestressed beton Dibulatkan 1,267,800.00Rp.

G.12. 1 m3 Membuat beton dengan puzzdith - 100 XR1 Bahan

Semen Portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.Puzzdith - 100 XR 1.0000 lt -Rp. -Rp.

Jumlah (1). 740,298.00Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0800 oh 100,000.00Rp. 8,000.00Rp.

Jumlah (2). 144,900.00Rp.

Jumlah (1) + (2) 885,198.00Rp.Keuntungan 10% 88,519.80Rp.Jumlah 973,717.80Rp.

KodeG.12. 1 m3 Membuat beton dengan puzzdith - 100 XR Dibulatkan 973,700.00Rp.

G.13. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 3 kr1 Bahan

Semen Portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.

Jumlah (1). 740,298.00Rp.

2 TenagaPekerja 2.0000 oh 66,000.00Rp. 132,000.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 1.0000 oh 100,000.00Rp. 100,000.00Rp.

Jumlah (2). 271,200.00Rp.

Jumlah (1) + (2) 1,011,498.00Rp.Keuntungan 10% 101,149.80Rp.Jumlah 1,112,647.80Rp.

KodeG.13. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 3 kr Dibulatkan 1,112,600.00Rp.

G.14. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 4 kr1 Bahan

Semen Portland 291.0000 kg 1,360.00Rp. 395,760.00Rp.Pasir beton 0.4700 m3 194,700.00Rp. 91,509.00Rp.Koral beton 0.9300 m3 220,000.00Rp. 204,600.00Rp.

Jumlah (1). 691,869.00Rp.

2 TenagaPekerja 2.0000 oh 66,000.00Rp. 132,000.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 67: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 1.0000 oh 100,000.00Rp. 100,000.00Rp.

Jumlah (2). 271,200.00Rp.

Jumlah (1) + (2) 963,069.00Rp.Keuntungan 10% 96,306.90Rp.Jumlah 1,059,375.90Rp.

KodeG.14. 1 m3 Membuat beton bertulang, 1 pc : 2 ps : 4 kr Dibulatkan 1,059,300.00Rp.

G.15. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 3 kr1 Bahan

Semen Portland 367.0000 kg 1,360.00Rp. 499,120.00Rp.Pasir beton 0.4400 m3 194,700.00Rp. 85,668.00Rp.Koral beton 0.8800 m3 220,000.00Rp. 193,600.00Rp.

Jumlah (1). 778,388.00Rp.

2 TenagaPekerja 2.0000 oh 66,000.00Rp. 132,000.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 1.0000 oh 100,000.00Rp. 100,000.00Rp.

Jumlah (2). 271,200.00Rp.

Jumlah (1) + (2) 1,049,588.00Rp.Keuntungan 10% 104,958.80Rp.Jumlah 1,154,546.80Rp.

KodeG.15. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 3 kr Dibulatkan 1,154,500.00Rp.

G.16. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 2,5 kr1 Bahan

Semen Portland 400.0000 kg 1,360.00Rp. 544,000.00Rp.Pasir beton 0.4800 m3 194,700.00Rp. 93,456.00Rp.Koral beton 0.8000 m3 220,000.00Rp. 176,000.00Rp.

Jumlah (1). 813,456.00Rp.

2 TenagaPekerja 2.0000 oh 66,000.00Rp. 132,000.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 1.0000 oh 100,000.00Rp. 100,000.00Rp.

Jumlah (2). 271,200.00Rp.

Jumlah (1) + (2) 1,084,656.00Rp.Keuntungan 10% 108,465.60Rp.Jumlah 1,193,121.60Rp.

KodeG.16. 1 m3 Membuat beton bertulang, 1 pc : 1,5 ps : 2,5 kr Dibulatkan 1,193,100.00Rp.

G.25. 1 kg Pembesian dengan besi polos atau besi ulir1 Bahan

Besi beton (polos/ulir) 1.0500 kg 13,200.00Rp. 13,860.00Rp.Kawat beton 0.0150 kg 16,500.00Rp. 247.50Rp.

Jumlah (1). 14,107.50Rp.

2 TenagaPekerja 0.0070 oh 66,000.00Rp. 462.00Rp.Tukang besi 0.0070 oh 100,000.00Rp. 700.00Rp.Kepala tukang 0.0007 oh 120,000.00Rp. 84.00Rp.Mandor 0.0004 oh 100,000.00Rp. 40.00Rp.

Jumlah (2). 1,286.00Rp.

Jumlah (1) + (2) 15,393.50Rp.Keuntungan 10% 1,539.35Rp.Jumlah 16,932.85Rp.

KodeG.25. 1 kg Pembesian dengan besi polos atau besi ulir Dibulatkan 16,900.00Rp.

G.29. 1 m2 Pasang bekisting untuk sloof1 Bahan

Kayu terentang 0.0450 m3 1,874,730.00Rp. 84,362.85Rp.Paku biasa 2" - 5" 0.3000 kg 19,480.00Rp. 5,844.00Rp.Minyak beksisting 0.1000 Lt 7,260.00Rp. 726.00Rp.

Jumlah (1). 90,932.85Rp.

2 Tenaga+harga dasar dan upah stadion 2014.xlsx

Page 68: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.5200 oh 66,000.00Rp. 34,320.00Rp.Tukang kayu 0.2600 oh 105,000.00Rp. 27,300.00Rp.Kepala tukang 0.0260 oh 120,000.00Rp. 3,120.00Rp.Mandor 0.0260 oh 100,000.00Rp. 2,600.00Rp.

Jumlah (2). 67,340.00Rp.

Jumlah (1) + (2) 158,272.85Rp.Keuntungan 10% 15,827.29Rp.Jumlah 174,100.14Rp.

KodeG.29. 1 m2 Pasang bekisting untuk sloof Dibulatkan 174,100.00Rp.

G.30. 1 m2 Pasang bekisting untuk kolom1 Bahan

Kayu terentang 0.0400 m3 1,874,730.00Rp. 74,989.20Rp.Paku biasa 2" - 5" 0.4000 kg 19,480.00Rp. 7,792.00Rp.Minyak beksisting 0.2000 Lt 7,260.00Rp. 1,452.00Rp.Balok kayu borneo 0.0150 m3 3,437,010.00Rp. 51,555.15Rp.Plywood tebal 9 mm 0.3500 lbr 158,630.00Rp. 55,520.50Rp.Dolken kayu galam 8-10 / 4 mm 2.0000 btg 18,260.00Rp. 36,520.00Rp.

Jumlah (1). 227,828.85Rp.

2 TenagaPekerja 0.6600 oh 66,000.00Rp. 43,560.00Rp.Tukang kayu 0.3300 oh 105,000.00Rp. 34,650.00Rp.Kepala tukang 0.0330 oh 120,000.00Rp. 3,960.00Rp.Mandor 0.0330 oh 100,000.00Rp. 3,300.00Rp.

Jumlah (2). 85,470.00Rp.

Jumlah (1) + (2) 313,298.85Rp.Keuntungan 10% 31,329.89Rp.Jumlah 344,628.74Rp.

KodeG.30. 1 m2 Pasang bekisting untuk kolom Dibulatkan 344,600.00Rp.

G.31. 1 m2 Pasang bekisting untuk balok1 Bahan

Kayu terentang 0.0400 m3 1,874,730.00Rp. 74,989.20Rp.Paku biasa 2" - 5" 0.4000 kg 19,480.00Rp. 7,792.00Rp.Minyak beksisting 0.2000 Lt 7,260.00Rp. 1,452.00Rp.Balok kayu borneo 0.0180 m3 3,437,010.00Rp. 61,866.18Rp.Plywood tebal 9 mm 0.3500 lbr 158,630.00Rp. 55,520.50Rp.Dolken kayu galam 8-10 / 4 mm 2.0000 btg 18,260.00Rp. 36,520.00Rp.

Jumlah (1). 238,139.88Rp.

2 TenagaPekerja 0.6600 oh 66,000.00Rp. 43,560.00Rp.Tukang kayu 0.3300 oh 105,000.00Rp. 34,650.00Rp.Kepala tukang 0.0330 oh 120,000.00Rp. 3,960.00Rp.Mandor 0.0330 oh 100,000.00Rp. 3,300.00Rp.

Jumlah (2). 85,470.00Rp.

Jumlah (1) + (2) 323,609.88Rp.Keuntungan 10% 32,360.99Rp.Jumlah 355,970.87Rp.

KodeG.31. 1 m2 Pasang bekisting untuk balok Dibulatkan 355,900.00Rp.

G.32. 1 m2 Pasang bekisting untuk lantai1 Bahan

Kayu terentang 0.0400 m3 1,874,730.00Rp. 74,989.20Rp.Paku biasa 2" - 5" 0.4000 kg 19,480.00Rp. 7,792.00Rp.Minyak beksisting 0.2000 Lt 7,260.00Rp. 1,452.00Rp.Balok kayu borneo 0.0150 m3 3,437,010.00Rp. 51,555.15Rp.Plywood tebal 9 mm 0.3500 lbr 158,630.00Rp. 55,520.50Rp.Dolken kayu galam 8-10 / 4 mm 6.0000 btg 18,260.00Rp. 109,560.00Rp.

Jumlah (1). 300,868.85Rp.

2 TenagaPekerja 0.6600 oh 66,000.00Rp. 43,560.00Rp.Tukang kayu 0.3300 oh 105,000.00Rp. 34,650.00Rp.Kepala tukang 0.0330 oh 120,000.00Rp. 3,960.00Rp.Mandor 0.0330 oh 100,000.00Rp. 3,300.00Rp.

Jumlah (2). 85,470.00Rp.

Jumlah (1) + (2) 386,338.85Rp.+harga dasar dan upah stadion 2014.xlsx

Page 69: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 38,633.89Rp.Jumlah 424,972.74Rp.

KodeG.32. 1 m2 Pasang bekisting untuk lantai Dibulatkan 424,900.00Rp.

G.33. 1 m2 Pasang bekisting untuk dinding1 Bahan

Kayu terentang 0.0300 m3 1,874,730.00Rp. 56,241.90Rp.Paku biasa 2" - 5" 0.4000 kg 19,480.00Rp. 7,792.00Rp.Minyak beksisting 0.2000 Lt 7,260.00Rp. 1,452.00Rp.Balok kayu borneo 0.0200 m3 3,437,010.00Rp. 68,740.20Rp.Plywood tebal 9 mm 0.3500 lbr 158,630.00Rp. 55,520.50Rp.Dolken kayu galam 8-10 / 4 mm 3.0000 btg 18,260.00Rp. 54,780.00Rp.Formtie/penjaga jarak bekisting/spacer 4.0000 bh

Jumlah (1). 244,526.60Rp.

2 TenagaPekerja 0.6600 oh 66,000.00Rp. 43,560.00Rp.Tukang kayu 0.3300 oh 105,000.00Rp. 34,650.00Rp.Kepala tukang 0.0330 oh 120,000.00Rp. 3,960.00Rp.Mandor 0.0330 oh 100,000.00Rp. 3,300.00Rp.

Jumlah (2). 85,470.00Rp.

Jumlah (1) + (2) 329,996.60Rp.Keuntungan 10% 32,999.66Rp.Jumlah 362,996.26Rp.

KodeG.33. 1 m2 Pasang bekisting untuk dinding Dibulatkan 362,900.00Rp.

G.34. 1 m2 Pasang bekisting untuk tangga1 Bahan

Kayu terentang 0.0300 m3 1,874,730.00Rp. 56,241.90Rp.Paku biasa 2" - 5" 0.4000 kg 19,480.00Rp. 7,792.00Rp.Minyak beksisting 0.1500 Lt 7,260.00Rp. 1,089.00Rp.Balok kayu borneo 0.0150 m3 3,437,010.00Rp. 51,555.15Rp.Plywood tebal 9 mm 0.3500 lbr 158,630.00Rp. 55,520.50Rp.Dolken kayu galam 8-10 / 4 mm 2.0000 btg 18,260.00Rp. 36,520.00Rp.

Jumlah (1). 208,718.55Rp.

2 TenagaPekerja 0.6600 oh 66,000.00Rp. 43,560.00Rp.Tukang kayu 0.3300 oh 105,000.00Rp. 34,650.00Rp.Kepala tukang 0.0330 oh 120,000.00Rp. 3,960.00Rp.Mandor 0.0330 oh 100,000.00Rp. 3,300.00Rp.

Jumlah (2). 85,470.00Rp.

Jumlah (1) + (2) 294,188.55Rp.Keuntungan 10% 29,418.86Rp.Jumlah 323,607.41Rp.

KodeG.34. 1 m2 Pasang bekisting untuk tangga Dibulatkan 323,600.00Rp.

G.35. 1 m3 Membuat beton dengan mutu K 225 (Site Mix)1 Bahan

Semen portland 371.0000 kg 1,360.00Rp. 504,560.00Rp.Pasir beton 0.4986 m3 194,700.00Rp. 97,077.42Rp.Koral beton 0.7756 m3 220,000.00Rp. 170,632.00Rp.Air 215.0000 ltr 200.00Rp. 43,000.00Rp.

Jumlah (1). 815,269.42Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Kepala tukang 0.0280 oh 120,000.00Rp. 3,360.00Rp.Mandor 0.0830 oh 100,000.00Rp. 8,300.00Rp.

Jumlah (2). 148,060.00Rp.

Jumlah (1) + (2) 963,329.42Rp.Keuntungan 10% 96,332.94Rp.Jumlah 1,059,662.36Rp.

KodeG.35. 1 m3 Membuat beton dengan mutu K 225 (Site Mix) Dibulatkan 1,059,600.00Rp.

G.35.a 1 m3 Membuat beton dengan mutu K 175 (Site Mix)1 Bahan

Semen portland 326.0000 kg 1,360.00Rp. 443,360.00Rp.+harga dasar dan upah stadion 2014.xlsx

Page 70: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pasir beton 0.5429 m3 194,700.00Rp. 105,702.63Rp.Koral beton 0.7622 m3 220,000.00Rp. 167,684.00Rp.Air 215.0000 ltr 200.00Rp. 43,000.00Rp.

Jumlah (1). 759,746.63Rp.

2 TenagaPekerja 1.6500 oh 66,000.00Rp. 108,900.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Kepala tukang 0.0280 oh 120,000.00Rp. 3,360.00Rp.Mandor 0.0830 oh 100,000.00Rp. 8,300.00Rp.

Jumlah (2). 148,060.00Rp.

Jumlah (1) + (2) 907,806.63Rp.Keuntungan 10% 90,780.66Rp.Jumlah 998,587.29Rp.

KodeG.35.a 1 m3 Membuat beton dengan mutu K 175 (Site Mix) Dibulatkan 998,500.00Rp.

G.36. 1 m3 Membuat beton dengan mutu K 225 (Ready Mix) + pompa beton1 Bahan

Ready Mix 1.0000 m3 815,930.00Rp. 815,930.00Rp.Jumlah (1). 815,930.00Rp.

2 AlatSewa Pompa Beton 0.1200 jam 375,000.00Rp. 45,000.00Rp.

Jumlah (2). 45,000.00Rp.

3 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.1380 oh 100,000.00Rp. 13,800.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (3). 86,960.00Rp.

Jumlah (1)+(2)+(3) 947,890.00Rp.Keuntungan 10% 94,789.00Rp.Jumlah 1,042,679.00Rp.

KodeG.36. 1 m3 Membuat beton dengan mutu K 225 (Ready Mix) + pompa beton Dibulatkan 1,042,600.00Rp.

G.36.a 1 m3 Membuat beton dengan mutu K 300 (Ready Mix) + pompa beton1 Bahan

Ready Mix 1.0000 m3 876,020.00Rp. 876,020.00Rp.Jumlah (1). 876,020.00Rp.

2 AlatSewa Pompa Beton 0.1200 jam 375,000.00Rp. 45,000.00Rp.

Jumlah (2). 45,000.00Rp.

3 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.1380 oh 100,000.00Rp. 13,800.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 86,960.00Rp.

Jumlah (1)+(2)+(3) 1,007,980.00Rp.Keuntungan 10% 100,798.00Rp.Jumlah 1,108,778.00Rp.

KodeG.36.a 1 m3 Membuat beton dengan mutu K 300 (Ready Mix) + pompa beton Dibulatkan 1,108,700.00Rp.

G.36.b 1 m3 Membuat beton dengan mutu K 225 (Ready Mix)1 Bahan

Ready Mix 1.0000 m3 815,930.00Rp. 815,930.00Rp.Jumlah (1). 815,930.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.1380 oh 100,000.00Rp. 13,800.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 86,960.00Rp.

Jumlah (1) + (2) 902,890.00Rp.Keuntungan 10% 90,289.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 71: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 993,179.00Rp.Kode

G.36.b 1 m3 Membuat beton dengan mutu K 225 (Ready Mix) Dibulatkan 993,100.00Rp.

G.36.c 1 m3 Membuat beton dengan mutu K 175 (Ready Mix)1 Bahan

Ready Mix 1.0000 m3 755,840.00Rp. 755,840.00Rp.Jumlah (1). 755,840.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.1380 oh 100,000.00Rp. 13,800.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 86,960.00Rp.

Jumlah (1) + (2) 842,800.00Rp.Keuntungan 10% 84,280.00Rp.Jumlah 927,080.00Rp.

KodeG.36.c 1 m3 Membuat beton dengan mutu K 175 (Ready Mix) Dibulatkan 927,000.00Rp.

G.36.d 1 m3 Membuat beton dengan mutu K 300 (Ready Mix)1 Bahan

Ready Mix 1.0000 m3 876,020.00Rp. 876,020.00Rp.Jumlah (1). 876,020.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.1380 oh 100,000.00Rp. 13,800.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 86,960.00Rp.

Jumlah (1) + (2) 962,980.00Rp.Keuntungan 10% 96,298.00Rp.Jumlah 1,059,278.00Rp.

KodeG.36.d 1 m3Membuat beton dengan mutu K 300 (Ready Mix) Dibulatkan 1,059,200.00Rp.

G.36.e 1 m3 Membuat beton dengan mutu K 350 (Ready Mix)1 Bahan

Ready Mix 1.0000 m3 907,500.00Rp. 907,500.00Rp.Jumlah (1). 907,500.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.1380 oh 100,000.00Rp. 13,800.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 86,960.00Rp.

Jumlah (1) + (2) 994,460.00Rp.Keuntungan 10% 99,446.00Rp.Jumlah 1,093,906.00Rp.

KodeG.36.e 1 m3 Membuat beton dengan mutu K 350 (Ready Mix) Dibulatkan 1,093,900.00Rp.

G.36.f 1 m3 Membuat beton dengan mutu K 350 (Ready Mix) + Pompa Beton1 Bahan

Ready Mix 1.0000 m3 907,500.00Rp. 907,500.00Rp.Jumlah (1). 907,500.00Rp.

2 AlatSewa Pompa Beton 0.1200 jam 375,000.00Rp. 45,000.00Rp.

Jumlah (2). 45,000.00Rp.3 Tenaga

Pekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.1380 oh 100,000.00Rp. 13,800.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 86,960.00Rp.

Jumlah (1)+(2)+(3) 1,039,460.00Rp.Keuntungan 10% 103,946.00Rp.Jumlah 1,143,406.00Rp.

Kode+harga dasar dan upah stadion 2014.xlsx

Page 72: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.36.f 1 m3 Membuat beton dengan mutu K 350 (Ready Mix) + Pompa Beton Dibulatkan 1,143,400.00Rp.

G.37. 1 m2 Pasang jembatan untuk pengecoran beton1 Bahan

Kayu terentang 0.0264 m3 1,874,730.00Rp. 49,492.87Rp.Paku biasa 2" - 5" 0.6000 kg 19,480.00Rp. 11,688.00Rp.Dolken kayu galam 8-10 / 4 mm 0.5000 btg 18,260.00Rp. 9,130.00Rp.

Jumlah (1). 70,310.87Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.0500 oh 105,000.00Rp. 5,250.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0750 oh 100,000.00Rp. 7,500.00Rp.

Jumlah (2). 28,650.00Rp.

Jumlah (1) + (2) 98,960.87Rp.Keuntungan 10% 9,896.09Rp.Jumlah 108,856.96Rp.

KodeG.37. 1 m2 Pasang jembatan untuk pengecoran beton Dibulatkan 108,800.00Rp.

G.38. 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting)1 Bahan

Kayu terentang 0.2000 m3 1,874,730.00Rp. 374,946.00Rp.Paku biasa 2" - 5" 1.5000 kg 19,480.00Rp. 29,220.00Rp.Minyak bekisiting 0.4000 lt 7,260.00Rp. 2,904.00Rp.Besi beton polos 157.5000 kg 13,200.00Rp. 2,079,000.00Rp.Kawat beton 2.2500 kg 16,500.00Rp. 37,125.00Rp.Semen portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.

Jumlah (1). 3,263,493.00Rp.

2 TenagaPekerja 5.3000 oh 66,000.00Rp. 349,800.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Tukang kayu 1.3000 oh 105,000.00Rp. 136,500.00Rp.Tukang besi 1.0500 oh 100,000.00Rp. 105,000.00Rp.Kepala tukang 0.2620 oh 120,000.00Rp. 31,440.00Rp.Mandor 0.2650 oh 100,000.00Rp. 26,500.00Rp.

Jumlah (2). 676,740.00Rp.

Jumlah (1) + (2) 3,940,233.00Rp.Keuntungan 10% 394,023.30Rp.Jumlah 4,334,256.30Rp.

KodeG.38. 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting) Dibulatkan 4,334,200.00Rp.

G.38.a 1 m3 Membuat Beton Struktur P1/P2 K 225 Pondasi Besi 80 kg (tb. 37,5 cm)

1 Pasang bekisting untuk pondasi G.28. 1.0000 m2 163,700.00Rp. 163,700.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 80.0000 kg 16,900.00Rp. 1,352,000.00Rp.

Jumlah 2,575,300.00Rp.Kode

G.38.a 1 m3 Membuat Beton Struktur P1/P2 K 225 Pondasi Besi 80 kg (tb. 37,5 cm)Dibulatkan 2,575,300.00Rp.

G.38.b 1 m3 Membuat Beton Struktur Pile cap tipe P3

1 Pasang bekisting untuk pondasi ( 2 x pakai ) G.28. 3.7974 m2 163,700.00Rp. 621,637.91Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 201.0000 kg 16,900.00Rp. 3,396,900.00Rp.

Jumlah 5,112,437.91Rp.Kode

G.38.b 1 m3 Membuat Beton Struktur Pile cap tipe P3 Dibulatkan 5,112,400.00Rp.

G.38.c 1 m3 Membuat Beton Struktur Pile cap tipe P4

1 Pasang bekisting untuk pondasi ( 2 x pakai ) G.28. 2.1053 m2 163,700.00Rp. 344,631.58Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.5000 kg 16,900.00Rp. 3,050,450.00Rp.

Jumlah 4,488,981.58Rp.+harga dasar dan upah stadion 2014.xlsx

Page 73: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeG.38.c 1 m3 Membuat Beton Struktur Pile cap tipe P4 Dibulatkan 4,488,900.00Rp.

G.38.d 1 m3 Membuat Beton Struktur Pile cap tipe P5

1 Pasang bekisting untuk pondasi ( 2 x pakai ) G.28. 1.6667 m2 163,700.00Rp. 272,833.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 146.2000 kg 16,900.00Rp. 2,470,780.00Rp.

Jumlah 3,837,513.33Rp.Kode

G.38.d 1 m3 Membuat Beton Struktur Pile cap tipe P5 Dibulatkan 3,837,500.00Rp.

G.38.e 1 m3 Membuat Beton Struktur Pile cap tipe P12

1 Pasang bekisting untuk pondasi ( 2 x pakai ) G.28. 1.1103 m2 163,700.00Rp. 181,752.44Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 174.4000 kg 16,900.00Rp. 2,947,360.00Rp.

Jumlah 4,223,012.44Rp.Kode

G.38.e 1 m3 Membuat Beton Struktur Pile cap tipe P12 Dibulatkan 4,223,000.00Rp.

G.39. 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting)1 Bahan

Kayu terentang 0.2700 m3 1,874,730.00Rp. 506,177.10Rp.Paku biasa 2" - 5" 2.0000 kg 19,480.00Rp. 38,960.00Rp.Minyak bekisiting 0.6000 lt 7,260.00Rp. 4,356.00Rp.Besi beton bolos 210.0000 kg 13,200.00Rp. 2,772,000.00Rp.Kawat beton 3.0000 kg 16,500.00Rp. 49,500.00Rp.Semen portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.

Jumlah (1). 4,111,291.10Rp.

2 TenagaPekerja 5.6500 oh 66,000.00Rp. 372,900.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Tukang kayu 1.5600 oh 105,000.00Rp. 163,800.00Rp.Tukang besi 1.4000 oh 100,000.00Rp. 140,000.00Rp.Kepala tukang 0.3230 oh 120,000.00Rp. 38,760.00Rp.Mandor 0.2830 oh 100,000.00Rp. 28,300.00Rp.

Jumlah (2). 771,260.00Rp.

Jumlah (1) + (2) 4,882,551.10Rp.Keuntungan 10% 488,255.11Rp.Jumlah 5,370,806.21Rp.

KodeG.39. 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting) Dibulatkan 5,370,800.00Rp.

G.39.a 1 m3 Membuat Beton Struktur SL1 K 225 Sloof 20/30 Besi 210 kg

1 Pasang bekisting untuk sloof G.29. 2.5000 m2 174,100.00Rp. 435,250.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 210.0000 kg 16,900.00Rp. 3,549,000.00Rp.

Jumlah 5,043,850.00Rp.Kode

G.39.a 1 m3 Membuat Beton Struktur SL1 K 225 Sloof 20/30 Besi 210 kg Dibulatkan 5,043,800.00Rp.

G.39.b 1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 230 kg

1 Pasang bekisting untuk sloof G.29. 3.3333 m2 174,100.00Rp. 580,327.53Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 230.0000 kg 16,900.00Rp. 3,887,000.00Rp.

Jumlah 5,526,927.53Rp.Kode

G.39.b 1 m3 Membuat Beton Struktur SL2 K 225 Sloof 15/30 Besi 230 kg Dibulatkan 5,526,900.00Rp.

G.39.c 1 m3 Membuat Beton Struktur SL3 K 225 Sloof 15/20 Besi 180 kg

1 Pasang bekisting untuk sloof G.29. 3.3333 m2 174,100.00Rp. 580,327.53Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.0000 kg 16,900.00Rp. 3,042,000.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 74: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 4,681,927.53Rp.Kode

G.39.c 1 m3 Membuat Beton Struktur SL3 K 225 Sloof 15/20 Besi 180 kg Dibulatkan 4,681,900.00Rp.

G.39.d 1 m3 Membuat Beton Struktur SL4 K 225 Sloof 15/25 Besi 170 kg

1 Pasang bekisting untuk sloof G.29. 3.3333 m2 174,100.00Rp. 580,327.53Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 170.0000 kg 16,900.00Rp. 2,873,000.00Rp.

Jumlah 4,512,927.53Rp.Kode

G.39.d 1 m3 Membuat Beton Struktur SL4 K 225 Sloof 15/25 Besi 170 kg Dibulatkan 4,512,900.00Rp.

G.39.e 1 m3 Membuat Beton Struktur tipe TB.11 Pasang bekisting untuk sloof ( 2 x pakai ) G.29. 5.4167 m2 174,100.00Rp. 943,041.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 144.9247 kg 16,900.00Rp. 2,449,228.09Rp.

Jumlah 4,486,169.75Rp.Kode

G.39.e 1 m3 Membuat Beton Struktur tipe TB.1 Dibulatkan 4,486,100.00Rp.

G.39.f 1 m3 Membuat Beton Struktur tipe TB.21 Pasang bekisting untuk sloof ( 2 x pakai ) G.29. 4.1964 m2 174,100.00Rp. 730,598.21Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 118.5090 kg 16,900.00Rp. 2,002,801.80Rp.

Jumlah 3,827,300.01Rp.KodeG.39.f 1 m3 Membuat Beton Struktur tipe TB.2 Dibulatkan 3,827,300.00Rp.

G.39.g 1 m3 Membuat Beton Struktur tipe TB.31 Pasang bekisting untuk sloof ( 2 x pakai ) G.29. 4.1964 m2 174,100.00Rp. 730,598.21Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 89.3936 kg 16,900.00Rp. 1,510,752.50Rp.

Jumlah 3,335,250.71Rp.Kode

G.39.g 1 m3 Membuat Beton Struktur tipe TB.3 Dibulatkan 3,335,200.00Rp.

G.39.h 1 m3 Membuat Beton Struktur tipe TB.41 Pasang bekisting untuk sloof ( 2 x pakai ) G.29. 4.2969 m2 174,100.00Rp. 748,085.94Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 86.1068 kg 16,900.00Rp. 1,455,204.77Rp.

Jumlah 3,297,190.71Rp.Kode

G.39.h 1 m3 Membuat Beton Struktur tipe TB.4 Dibulatkan 3,297,100.00Rp.

G.39.i 1 m3 Membuat Beton Struktur tipe TB.51 Pasang bekisting untuk sloof ( 2 x pakai ) G.29. 4.2969 m2 174,100.00Rp. 748,085.94Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 92.2959 kg 16,900.00Rp. 1,559,801.03Rp.

Jumlah 3,401,786.97Rp.KodeG.39.i 1 m3 Membuat Beton Struktur tipe TB.5 Dibulatkan 3,401,700.00Rp.

G.39.j 1 m3 Membuat Beton Struktur tipe TB.61 Pasang bekisting untuk sloof ( 2 x pakai ) G.29. 4.2969 m2 174,100.00Rp. 748,085.94Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 157.3033 kg 16,900.00Rp. 2,658,425.25Rp.

Jumlah 4,500,411.19Rp.KodeG.39.j 1 m3 Membuat Beton Struktur tipe TB.6 Dibulatkan 4,500,400.00Rp.

G.40. 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting)1 Bahan

Kayu terentang 0.4000 m3 1,874,730.00Rp. 749,892.00Rp.Paku biasa 2" - 5" 4.0000 kg 19,480.00Rp. 77,920.00Rp.Minyak bekisiting 2.0000 lt 7,260.00Rp. 14,520.00Rp.Besi beton bolos 315.0000 kg 13,200.00Rp. 4,158,000.00Rp.Kawat beton 4.5000 kg 16,500.00Rp. 74,250.00Rp.Semen portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 75: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.Kayu borneo balok 0.1500 m3 3,437,010.00Rp. 515,551.50Rp.Plywood 9 mm 3.5000 lbr 158,630.00Rp. 555,205.00Rp.Dolken dia. 8 cm/4 m 20.0000 btg 18,260.00Rp. 365,200.00Rp.

Jumlah (1). 7,250,836.50Rp.

2 TenagaPekerja 7.0500 oh 66,000.00Rp. 465,300.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Tukang kayu 1.6500 oh 105,000.00Rp. 173,250.00Rp.Tukang besi 2.1000 oh 100,000.00Rp. 210,000.00Rp.Kepala tukang 0.4030 oh 120,000.00Rp. 48,360.00Rp.Mandor 0.3530 oh 100,000.00Rp. 35,300.00Rp.

Jumlah (2). 959,710.00Rp.

Jumlah (1) + (2) 8,210,546.50Rp.Keuntungan 10% 821,054.65Rp.Jumlah 9,031,601.15Rp.

KodeG.40. 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting) Dibulatkan 9,031,600.00Rp.

G.40.a 1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 1 K 225 Besi 240 kg

1 Pasang bekisting untuk kolom G.30. 3.0952 m2 344,600.00Rp. 1,066,605.92Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 240.0000 kg 16,900.00Rp. 4,056,000.00Rp.

Jumlah 6,182,205.92Rp.Kode

G.40.a 1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 1 K 225 Besi 240 kg Dibulatkan 6,182,200.00Rp.

G.40.b 1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 1 K 225 Besi 220 kg

1 Pasang bekisting untuk kolom G.30. 4.0000 m2 344,600.00Rp. 1,378,400.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 220.0000 kg 16,900.00Rp. 3,718,000.00Rp.

Jumlah 6,156,000.00Rp.Kode

G.40.b 1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 1 K 225 Besi 220 kg Dibulatkan 6,156,000.00Rp.

G.40.c 1 m3 Membuat Beton Struktur K1.A Kolom 25/30 Lt. 1 K 225 Besi 320 kg

1 Pasang bekisting untuk kolom G.30. 3.6667 m2 344,600.00Rp. 1,263,544.82Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 320.0000 kg 16,900.00Rp. 5,408,000.00Rp.

Jumlah 7,731,144.82Rp.Kode

G.40.c 1 m3 Membuat Beton Struktur K1.A Kolom 25/30 Lt. 1 K 225 Besi 320 kg Dibulatkan 7,731,100.00Rp.

G.40.d 1 m3 Membuat Beton Struktur K2 Kolom 20/20 LT. 1 K 225 Besi 200 kg

1 Pasang bekisting untuk kolom G.30. 5.0000 m2 344,600.00Rp. 1,723,000.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 200.0000 kg 16,900.00Rp. 3,380,000.00Rp.

Jumlah 6,162,600.00Rp.Kode

G.40.d 1 m3 Membuat Beton Struktur K2 Kolom 20/20 LT. 1 K 225 Besi 200 kg Dibulatkan 6,162,600.00Rp.

G.40.e 1 m3 Membuat Beton Struktur K3 Kolom 25/25 Lt. 1 K 225 Besi 230 kg

1 Pasang bekisting untuk kolom G.30. 4.0000 m2 344,600.00Rp. 1,378,400.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 230.0000 kg 16,900.00Rp. 3,887,000.00Rp.

Jumlah 6,325,000.00Rp.Kode

G.40.e 1 m3 Membuat Beton Struktur K3 Kolom 25/25 Lt. 1 K 225 Besi 230 kg Dibulatkan 6,325,000.00Rp.

G.40.f 1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 2 K 225 Besi 170 kg

1 Pasang bekisting untuk kolom G.30. 3.0952 m2 344,600.00Rp. 1,066,605.92Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 76: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

3 Pembesian dengan besi polos atau besi ulir G.25. 170.0000 kg 16,900.00Rp. 2,873,000.00Rp.

Jumlah 4,999,205.92Rp.KodeG.40.f 1 m3 Membuat Beton Struktur K1 Kolom 30/35 Lt. 2 K 225 Besi 170 kg Dibulatkan 4,999,200.00Rp.

G.40.g 1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 2 K 225 Besi 200 kg

1 Pasang bekisting untuk kolom G.30. 4.0000 m2 344,600.00Rp. 1,378,400.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 200.0000 kg 16,900.00Rp. 3,380,000.00Rp.

Jumlah 5,818,000.00Rp.Kode

G.40.g 1 m3 Membuat Beton Struktur K2 Kolom 25/25 Lt. 2 K 225 Besi 200 kg Dibulatkan 5,818,000.00Rp.

G.40.h 1 m3 Membuat Beton Struktur K1.B Kolom 25/30 Lt. 2 K 225 Besi 230 kg

1 Pasang bekisting untuk kolom G.30. 3.6667 m2 344,600.00Rp. 1,263,544.82Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 230.0000 kg 16,900.00Rp. 3,887,000.00Rp.

Jumlah 6,210,144.82Rp.Kode

G.40.h 1 m3 Membuat Beton Struktur K1.B Kolom 25/30 Lt. 2 K 225 Besi 230 kg Dibulatkan 6,210,100.00Rp.

G.40.i 1 m3 Membuat Beton Struktur K1.C Kolom 25/30 LT. 2 K 225 Besi 170 kg

1 Pasang bekisting untuk kolom G.30. 3.6667 m2 344,600.00Rp. 1,263,544.82Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 170.0000 kg 16,900.00Rp. 2,873,000.00Rp.

Jumlah 5,196,144.82Rp.KodeG.40.i 1 m3 Membuat Beton Struktur K1.C Kolom 25/30 LT. 2 K 225 Besi 170 kg Dibulatkan 5,196,100.00Rp.

G.40.j 1 m3 Membuat Beton Struktur K2 Kolom 20/20 Lt. 2 K 225 Besi 200 kg

1 Pasang bekisting untuk kolom G.30. 5.0000 m2 344,600.00Rp. 1,723,000.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 200.0000 kg 16,900.00Rp. 3,380,000.00Rp.

Jumlah 6,162,600.00Rp.KodeG.40.j 1 m3 Membuat Beton Struktur K2 Kolom 20/20 Lt. 2 K 225 Besi 200 kg Dibulatkan 6,162,600.00Rp.

G.40.k 1 m3 Membuat Beton Struktur K4 Kolom 15/15 K 225 Besi 210 kg

1 Pasang bekisting untuk kolom G.30. 6.6667 m2 344,600.00Rp. 2,297,344.82Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 210.0000 kg 16,900.00Rp. 3,549,000.00Rp.

Jumlah 6,905,944.82Rp.Kode

G.40.k 1 m3 Membuat Beton Struktur K4 Kolom 15/15 K 225 Besi 210 kg Dibulatkan 6,905,900.00Rp.

G.40.l 1 m3 Membuat Beton Struktur KP Kolom Praktis K 225 Besi 150 kg

1 Pasang bekisting untuk kolom G.30. 6.6667 m2 344,600.00Rp. 2,297,344.82Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 150.0000 kg 16,900.00Rp. 2,535,000.00Rp.

Jumlah 5,891,944.82Rp.KodeG.40.l 1 m3 Membuat Beton Struktur KP Kolom Praktis K 225 Besi 150 kg Dibulatkan 5,891,900.00Rp.

G.40.m 1 m3 Membuat Beton Struktur K1 1500 x 2347,5

1 Pasang bekisting untuk kolom G.30. 2.1853 m2 344,600.00Rp. 753,055.59Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 138.5357 kg 16,900.00Rp. 2,341,252.49Rp.

Jumlah 4,188,208.09Rp.Kode

G.40.m 1 m3 Membuat Beton Struktur K1 1500 x 2347,5 Dibulatkan 4,188,200.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 77: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.40.n 1 m3 Membuat Beton Struktur K1 1500 x 2089

1 Pasang bekisting untuk kolom G.30. 2.2907 m2 344,600.00Rp. 789,385.29Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 150.6962 kg 16,900.00Rp. 2,546,766.32Rp.

Jumlah 4,430,051.61Rp.Kode

G.40.n 1 m3 Membuat Beton Struktur K1 1500 x 2089 Dibulatkan 4,430,000.00Rp.

G.40.o 1 m3 Membuat Beton Struktur K1 1500 x 1894

1 Pasang bekisting untuk kolom G.30. 2.3893 m2 344,600.00Rp. 823,352.62Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 159.8944 kg 16,900.00Rp. 2,702,214.92Rp.

Jumlah 4,619,467.54Rp.Kode

G.40.o 1 m3 Membuat Beton Struktur K1 1500 x 1894 Dibulatkan 4,619,400.00Rp.

G.40.p 1 m3 Membuat Beton Struktur K1 Kepala Kolom

1 Pasang bekisting untuk kolom G.30. 2.3893 m2 344,600.00Rp. 823,352.62Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 203.6221 kg 16,900.00Rp. 3,441,213.37Rp.

Jumlah 5,358,465.99Rp.Kode

G.40.p 1 m3 Membuat Beton Struktur K1 Kepala Kolom Dibulatkan 5,358,400.00Rp.

G.40.q 1 m3 Membuat Beton Struktur K2 900 x 900

1 Pasang bekisting untuk kolom G.30. 4.4444 m2 344,600.00Rp. 1,531,555.56Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 123.7934 kg 16,900.00Rp. 2,092,108.68Rp.

Jumlah 4,717,564.23Rp.Kode

G.40.q 1 m3 Membuat Beton Struktur K2 900 x 900 Dibulatkan 4,717,500.00Rp.

G.40.r 1 m3 Membuat Beton Struktur K3 & K3D 700 x 700

1 Pasang bekisting untuk kolom G.30. 5.7143 m2 344,600.00Rp. 1,969,142.86Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 128.9055 kg 16,900.00Rp. 2,178,503.48Rp.

Jumlah 5,241,546.34Rp.KodeG.40.r 1 m3 Membuat Beton Struktur K3 & K3D 700 x 700 Dibulatkan 5,241,500.00Rp.

G.40.s 1 m3 Membuat Beton Struktur K3 & K3D 700 x 700

1 Pasang bekisting untuk kolom G.30. 5.7143 m2 344,600.00Rp. 1,969,142.86Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 219.1909 kg 16,900.00Rp. 3,704,325.68Rp.

Jumlah 6,767,368.54Rp.Kode

G.40.s 1 m3 Membuat Beton Struktur K3 & K3D 700 x 700 Dibulatkan 6,767,300.00Rp.

G.40.t 1 m3 Membuat Beton Struktur K3A & K3E 700 x 700

1 Pasang bekisting untuk kolom G.30. 5.7143 m2 344,600.00Rp. 1,969,142.86Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 207.3696 kg 16,900.00Rp. 3,504,545.69Rp.

Jumlah 6,567,588.55Rp.KodeG.40.t 1 m3 Membuat Beton Struktur K3A & K3E 700 x 700 Dibulatkan 6,567,500.00Rp.

G.40.u 1 m3 Membuat Beton Struktur K3A & K3E 700 x 700

1 Pasang bekisting untuk kolom G.30. 5.7143 m2 344,600.00Rp. 1,969,142.86Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 282.0970 kg 16,900.00Rp. 4,767,439.15Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 78: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 7,830,482.01Rp.Kode

G.40.u 1 m3 Membuat Beton Struktur K3A & K3E 700 x 700 Dibulatkan 7,830,400.00Rp.

G.40.v 1 m3 Membuat Beton Struktur K4 700 x 700

1 Pasang bekisting untuk kolom G.30. 5.7143 m2 344,600.00Rp. 1,969,142.86Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 335.0213 kg 16,900.00Rp. 5,661,860.65Rp.

Jumlah 8,724,903.50Rp.Kode

G.40.v 1 m3 Membuat Beton Struktur K4 700 x 700 Dibulatkan 8,724,900.00Rp.

G.41. 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting)1 Bahan

Kayu terentang 0.3200 m3 1,874,730.00Rp. 599,913.60Rp.Paku biasa 2" - 5" 3.2000 kg 19,480.00Rp. 62,336.00Rp.Minyak bekisiting 1.6000 lt 7,260.00Rp. 11,616.00Rp.Besi beton bolos 210.0000 kg 13,200.00Rp. 2,772,000.00Rp.Kawat beton 3.0000 kg 16,500.00Rp. 49,500.00Rp.Semen portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.Kayu borneo balok 0.1400 m3 3,437,010.00Rp. 481,181.40Rp.Plywood 9 mm 2.8000 lbr 158,630.00Rp. 444,164.00Rp.Dolken dia. 8 cm/4 m 16.0000 btg 18,260.00Rp. 292,160.00Rp.

Jumlah (1). 5,453,169.00Rp.

2 TenagaPekerja 6.3500 oh 66,000.00Rp. 419,100.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Tukang kayu 1.6500 oh 105,000.00Rp. 173,250.00Rp.Tukang besi 1.4000 oh 100,000.00Rp. 140,000.00Rp.Kepala tukang 0.3330 oh 120,000.00Rp. 39,960.00Rp.Mandor 0.3175 oh 100,000.00Rp. 31,750.00Rp.

Jumlah (2). 831,560.00Rp.

Jumlah (1) + (2) 6,284,729.00Rp.Keuntungan 10% 628,472.90Rp.Jumlah 6,913,201.90Rp.

KodeG.41. 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting) Dibulatkan 6,913,200.00Rp.

G.41.a 1 m3 Membuat Beton Struktur B1 Balok 30/55 K 225 Besi 180 kg

1 Pasang bekisting untuk balok G.31. 7.0303 m2 355,900.00Rp. 2,502,083.77Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.0000 kg 16,900.00Rp. 3,042,000.00Rp.

Jumlah 6,586,683.77Rp.Kode

G.41.a 1 m3 Membuat Beton Struktur B1 Balok 30/55 K 225 Besi 180 kg Dibulatkan 6,586,600.00Rp.

G.41.b 1 m3 Membuat Beton Struktur B2 Balok 20/40 K 225 Besi 170 kg

1 Pasang bekisting untuk balok G.31. 9.5000 m2 355,900.00Rp. 3,381,050.00Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 170.0000 kg 16,900.00Rp. 2,873,000.00Rp.

Jumlah 7,296,650.00Rp.Kode

G.41.b 1 m3 Membuat Beton Struktur B2 Balok 20/40 K 225 Besi 170 kg Dibulatkan 7,296,600.00Rp.

G.41.c 1 m3 Membuat Beton Struktur B3 Balok 20/30 K 225 Besi 210 kg

1 Pasang bekisting untuk balok G.31. 9.3333 m2 355,900.00Rp. 3,321,721.47Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 210.0000 kg 16,900.00Rp. 3,549,000.00Rp.

Jumlah 7,913,321.47Rp.Kode

G.41.c 1 m3 Membuat Beton Struktur B3 Balok 20/30 K 225 Besi 210 kg Dibulatkan 7,913,300.00Rp.

G.41.d 1 m3 Membuat Beton Struktur B4 Balok 15/25 K 225 Besi 200 kg

+harga dasar dan upah stadion 2014.xlsx

Page 79: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 Pasang bekisting untuk balok G.31. 10.9333 m2 355,900.00Rp. 3,891,161.47Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 200.0000 kg 16,900.00Rp. 3,380,000.00Rp.

Jumlah 8,313,761.47Rp.Kode

G.41.d 1 m3 Membuat Beton Struktur B4 Balok 15/25 K 225 Besi 200 kg Dibulatkan 8,313,700.00Rp.

G.41.e 1 m3 Membuat Beton Struktur B5 Balok 20/30 K 225 Besi 230 kg

1 Pasang bekisting untuk balok G.31. 9.3333 m2 355,900.00Rp. 3,321,721.47Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 230.0000 kg 16,900.00Rp. 3,887,000.00Rp.

Jumlah 8,251,321.47Rp.Kode

G.41.e 1 m3 Membuat Beton Struktur B5 Balok 20/30 K 225 Besi 230 kg Dibulatkan 8,251,300.00Rp.

G.41.f 1 m3 Membuat Beton Struktur B6 Balok 20/60 K 225 Besi 150 kg

1 Pasang bekisting untuk balok G.31. 9.6667 m2 355,900.00Rp. 3,440,378.53Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 150.0000 kg 16,900.00Rp. 2,535,000.00Rp.

Jumlah 7,017,978.53Rp.KodeG.41.f 1 m3 Membuat Beton Struktur B6 Balok 20/60 K 225 Besi 150 kg Dibulatkan 7,017,900.00Rp.

G.41.g 1 m3 Membuat Beton Struktur B1 Balok 25/50 K 225 Besi 230 kg

1 Pasang bekisting untuk balok G.31. 8.0800 m2 355,900.00Rp. 2,875,672.00Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 230.0000 kg 16,900.00Rp. 3,887,000.00Rp.

Jumlah 7,805,272.00Rp.Kode

G.41.g 1 m3 Membuat Beton Struktur B1 Balok 25/50 K 225 Besi 230 kg Dibulatkan 7,805,200.00Rp.

G.41.h 1 m3 Membuat Beton Struktur 2B1 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 184.1517 kg 16,900.00Rp. 3,112,164.23Rp.

Jumlah 6,875,314.23Rp.Kode

G.41.h 1 m3 Membuat Beton Struktur 2B1 400 x 800 Dibulatkan 6,875,300.00Rp.

G.41.i 1 m3 Membuat Beton Struktur 2B2 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 119.2298 kg 16,900.00Rp. 2,014,983.20Rp.

Jumlah 5,778,133.20Rp.KodeG.41.i 1 m3 Membuat Beton Struktur 2B2 400 x 800 Dibulatkan 5,778,100.00Rp.

G.41.j 1 m3 Membuat Beton Struktur 2B3 500 x 800

1 Pasang bekisting untuk balok G.31. 6.5000 m2 355,900.00Rp. 2,313,350.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 108.9362 kg 16,900.00Rp. 1,841,021.07Rp.

Jumlah 5,248,271.07Rp.KodeG.41.j 1 m3 Membuat Beton Struktur 2B3 500 x 800 Dibulatkan 5,248,200.00Rp.

G.41.k 1 m3 Membuat Beton Struktur 2B4 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 144.0540 kg 16,900.00Rp. 2,434,511.96Rp.

Jumlah 6,197,661.96Rp.Kode

+harga dasar dan upah stadion 2014.xlsx

Page 80: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.41.k 1 m3 Membuat Beton Struktur 2B4 400 x 800 Dibulatkan 6,197,600.00Rp.

G.41.l 1 m3 Membuat Beton Struktur 2B5 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 86.0315 kg 16,900.00Rp. 1,453,933.18Rp.

Jumlah 5,217,083.18Rp.KodeG.41.l 1 m3 Membuat Beton Struktur 2B5 400 x 800 Dibulatkan 5,217,000.00Rp.

G.41.m 1 m3 Membuat Beton Struktur 2B7 400 x 700

1 Pasang bekisting untuk balok G.31. 7.8571 m2 355,900.00Rp. 2,796,357.14Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 103.2465 kg 16,900.00Rp. 1,744,865.39Rp.

Jumlah 5,635,122.53Rp.Kode

G.41.m 1 m3 Membuat Beton Struktur 2B7 400 x 700 Dibulatkan 5,635,100.00Rp.

G.41.n 1 m3 Membuat Beton Struktur 2B8 300 x 600

1 Pasang bekisting untuk balok G.31. 10.0000 m2 355,900.00Rp. 3,559,000.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 158.8305 kg 16,900.00Rp. 2,684,235.20Rp.

Jumlah 7,337,135.20Rp.Kode

G.41.n 1 m3 Membuat Beton Struktur 2B8 300 x 600 Dibulatkan 7,337,100.00Rp.

G.41.o 1 m3 Membuat Beton Struktur 2B9 300 x 600

1 Pasang bekisting untuk balok G.31. 10.0000 m2 355,900.00Rp. 3,559,000.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 119.2754 kg 16,900.00Rp. 2,015,753.52Rp.

Jumlah 6,668,653.52Rp.Kode

G.41.o 1 m3 Membuat Beton Struktur 2B9 300 x 600 Dibulatkan 6,668,600.00Rp.

G.41.p 1 m3 Membuat Beton Struktur 2B10 300 x 400

1 Pasang bekisting untuk balok G.31. 11.6667 m2 355,900.00Rp. 4,152,166.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 226.0529 kg 16,900.00Rp. 3,820,293.46Rp.

Jumlah 9,066,360.13Rp.Kode

G.41.p 1 m3 Membuat Beton Struktur 2B10 300 x 400 Dibulatkan 9,066,300.00Rp.

G.41.q 1 m3 Membuat Beton Struktur 2B11 200 x 400

1 Pasang bekisting untuk balok G.31. 15.0000 m2 355,900.00Rp. 5,338,500.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 165.6277 kg 16,900.00Rp. 2,799,108.50Rp.

Jumlah 9,231,508.50Rp.Kode

G.41.q 1 m3 Membuat Beton Struktur 2B11 200 x 400 Dibulatkan 9,231,500.00Rp.

G.41.r 1 m3 Membuat Beton Struktur 3B1 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 86.0315 kg 16,900.00Rp. 1,453,933.18Rp.

Jumlah 5,217,083.18Rp.KodeG.41.r 1 m3 Membuat Beton Struktur 3B1 400 x 800 Dibulatkan 5,217,000.00Rp.

G.41.s 1 m3 Membuat Beton Struktur 3B2 400 x 700

1 Pasang bekisting untuk balok G.31. 7.8571 m2 355,900.00Rp. 2,796,357.14Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 81: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

3 Pembesian dengan besi polos atau besi ulir G.25. 169.5170 kg 16,900.00Rp. 2,864,838.13Rp.

Jumlah 6,755,095.28Rp.Kode

G.41.s 1 m3 Membuat Beton Struktur 3B2 400 x 700 Dibulatkan 6,755,000.00Rp.

G.41.t 1 m3 Membuat Beton Struktur 3B3 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 128.6838 kg 16,900.00Rp. 2,174,756.09Rp.

Jumlah 5,937,906.09Rp.KodeG.41.t 1 m3 Membuat Beton Struktur 3B3 400 x 800 Dibulatkan 5,937,900.00Rp.

G.41.u 1 m3 Membuat Beton Struktur 3B6 300 x 800

1 Pasang bekisting untuk balok G.31. 9.1667 m2 355,900.00Rp. 3,262,416.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 108.3243 kg 16,900.00Rp. 1,830,680.80Rp.

Jumlah 6,186,997.46Rp.Kode

G.41.u 1 m3 Membuat Beton Struktur 3B6 300 x 800 Dibulatkan 6,186,900.00Rp.

G.41.v 1 m3 Membuat Beton Struktur 3B7 300 x 600

1 Pasang bekisting untuk balok G.31. 10.0000 m2 355,900.00Rp. 3,559,000.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 107.2938 kg 16,900.00Rp. 1,813,264.40Rp.

Jumlah 6,466,164.40Rp.Kode

G.41.v 1 m3 Membuat Beton Struktur 3B7 300 x 600 Dibulatkan 6,466,100.00Rp.

G.41.w 1 m3 Membuat Beton Struktur 3B8 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 114.3659 kg 16,900.00Rp. 1,932,783.71Rp.

Jumlah 5,695,933.71Rp.Kode

G.41.w 1 m3 Membuat Beton Struktur 3B8 400 x 800 Dibulatkan 5,695,900.00Rp.

G.41.x 1 m3 Membuat Beton Struktur 3B9 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 127.5344 kg 16,900.00Rp. 2,155,331.25Rp.

Jumlah 5,918,481.25Rp.Kode

G.41.x 1 m3 Membuat Beton Struktur 3B9 400 x 800 Dibulatkan 5,918,400.00Rp.

G.41.y 1 m3 Membuat Beton Struktur 3B10 400 x 800

1 Pasang bekisting untuk balok G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 127.5344 kg 16,900.00Rp. 2,155,331.25Rp.

Jumlah 5,918,481.25Rp.Kode

G.41.y 1 m3 Membuat Beton Struktur 3B10 400 x 800 Dibulatkan 5,918,400.00Rp.

G.41.z 1 m3 Membuat Beton Struktur 4B1 300 x 800

1 Pasang bekisting untuk balok G.31. 9.1667 m2 355,900.00Rp. 3,262,416.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 230.8741 kg 16,900.00Rp. 3,901,772.87Rp.

Jumlah 8,258,089.54Rp.Kode

G.41.z 1 m3 Membuat Beton Struktur 4B1 300 x 800 Dibulatkan 8,258,000.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 82: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.41.aa 1 m3 Membuat Beton Struktur 4B3 300 x 700

1 Pasang bekisting untuk balok G.31. 9.5238 m2 355,900.00Rp. 3,389,523.81Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 216.8003 kg 16,900.00Rp. 3,663,924.52Rp.

Jumlah 8,147,348.33Rp.Kode

G.41.aa 1 m3 Membuat Beton Struktur 4B3 300 x 700 Dibulatkan 8,147,300.00Rp.

G.41.ab 1 m3 Membuat Beton Struktur 4B4 500 x 1000/800

1 Pasang bekisting untuk balok G.31. 6.2222 m2 355,900.00Rp. 2,214,488.89Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 134.2655 kg 16,900.00Rp. 2,269,087.40Rp.

Jumlah 5,577,476.29Rp.Kode

G.41.ab 1 m3 Membuat Beton Struktur 4B4 500 x 1000/800 Dibulatkan 5,577,400.00Rp.

G.41.ac 1 m3 Membuat Beton Struktur 4B5 300 x 700

1 Pasang bekisting untuk balok G.31. 9.5238 m2 355,900.00Rp. 3,389,523.81Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 167.0750 kg 16,900.00Rp. 2,823,566.80Rp.

Jumlah 7,306,990.61Rp.Kode

G.41.ac 1 m3 Membuat Beton Struktur 4B5 300 x 700 Dibulatkan 7,306,900.00Rp.

G.41.ad 1 m3 Membuat Beton Struktur 4B6 300 x 700

1 Pasang bekisting untuk balok G.31. 9.5238 m2 355,900.00Rp. 3,389,523.81Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 148.5959 kg 16,900.00Rp. 2,511,270.52Rp.

Jumlah 6,994,694.33Rp.Kode

G.41.ad 1 m3 Membuat Beton Struktur 4B6 300 x 700 Dibulatkan 6,994,600.00Rp.

G.41.ae 1 m3 Membuat Beton Struktur 4B7 300 x 600

1 Pasang bekisting untuk balok G.31. 10.0000 m2 355,900.00Rp. 3,559,000.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 95.5733 kg 16,900.00Rp. 1,615,188.70Rp.

Jumlah 6,268,088.70Rp.Kode

G.41.ae 1 m3 Membuat Beton Struktur 4B7 300 x 600 Dibulatkan 6,268,000.00Rp.

G.41.af 1 m3 Membuat Beton Struktur 4B8 300 x 800

1 Pasang bekisting untuk balok G.31. 9.1667 m2 355,900.00Rp. 3,262,416.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.7675 kg 16,900.00Rp. 3,054,971.40Rp.

Jumlah 7,411,288.06Rp.Kode

G.41.af 1 m3 Membuat Beton Struktur 4B8 300 x 800 Dibulatkan 7,411,200.00Rp.

G.41.ag 1 m3 Membuat Beton Struktur 4B9 300 x 400

1 Pasang bekisting untuk balok G.31. 11.6667 m2 355,900.00Rp. 4,152,166.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 189.0707 kg 16,900.00Rp. 3,195,295.62Rp.

Jumlah 8,441,362.29Rp.Kode

G.41.ag 1 m3 Membuat Beton Struktur 4B9 300 x 400 Dibulatkan 8,441,300.00Rp.

G.41.ah 1 m3 Membuat Beton Struktur 4B10 800 x 1000

1 Pasang bekisting untuk balok G.31. 4.5000 m2 355,900.00Rp. 1,601,550.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 72.8245 kg 16,900.00Rp. 1,230,734.17Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 83: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 3,926,184.17Rp.Kode

G.41.ah 1 m3 Membuat Beton Struktur 4B10 800 x 1000 Dibulatkan 3,926,100.00Rp.

G.41.ai 1 m3 Membuat Beton Struktur 4B12 300 x 800

1 Pasang bekisting untuk balok G.31. 9.1667 m2 355,900.00Rp. 3,262,416.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 185.6317 kg 16,900.00Rp. 3,137,175.21Rp.

Jumlah 7,493,491.88Rp.Kode

G.41.ai 1 m3 Membuat Beton Struktur 4B12 300 x 800 Dibulatkan 7,493,400.00Rp.

G.41.aj 1 m3 Membuat Beton Struktur 4B16 300 x 800

1 Pasang bekisting untuk balok G.31. 9.1667 m2 355,900.00Rp. 3,262,416.67Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.2937 kg 16,900.00Rp. 3,046,963.07Rp.

Jumlah 7,403,279.74Rp.Kode

G.41.aj 1 m3 Membuat Beton Struktur 4B16 300 x 800 Dibulatkan 7,403,200.00Rp.

G.41.ak 1 m3 Membuat Beton Struktur tambahan trap balok

1 Pasang bekisting untuk balok G.31. 4.0816 m2 355,900.00Rp. 1,452,653.06Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 206.6528 kg 16,900.00Rp. 3,492,432.28Rp.

Jumlah 6,038,985.34Rp.Kode

G.41.ak 1 m3 Membuat Beton Struktur tambahan trap balok Dibulatkan 6,038,900.00Rp.

G.41.al 1 m3 Membuat Beton Struktur ATB1 800 x 1000

1 Pasang bekisting untuk balok G.31. 4.5000 m2 355,900.00Rp. 1,601,550.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 101.2777 kg 16,900.00Rp. 1,711,593.28Rp.

Jumlah 4,407,043.28Rp.Kode

G.41.al 1 m3 Membuat Beton Struktur ATB1 800 x 1000 Dibulatkan 4,407,000.00Rp.

G.42. 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting)1 Bahan

Kayu terentang 0.3200 m3 1,874,730.00Rp. 599,913.60Rp.Paku biasa 2" - 5" 3.2000 kg 19,480.00Rp. 62,336.00Rp.Minyak bekisiting 1.6000 lt 7,260.00Rp. 11,616.00Rp.Besi beton bolos 157.5000 kg 13,200.00Rp. 2,079,000.00Rp.Kawat beton 2.2500 kg 16,500.00Rp. 37,125.00Rp.Semen portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.Kayu borneo balok 0.1200 m3 3,437,010.00Rp. 412,441.20Rp.Plywood 9 mm 2.8000 lbr 158,630.00Rp. 444,164.00Rp.Dolken dia. 8 cm/4 m 32.0000 btg 18,260.00Rp. 584,320.00Rp.

Jumlah (1). 4,971,213.80Rp.

2 TenagaPekerja 5.3000 oh 66,000.00Rp. 349,800.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Tukang kayu 1.3000 oh 105,000.00Rp. 136,500.00Rp.Tukang besi 1.0500 oh 100,000.00Rp. 105,000.00Rp.Kepala tukang 0.2650 oh 120,000.00Rp. 31,800.00Rp.Mandor 0.2650 oh 100,000.00Rp. 26,500.00Rp.

Jumlah (2). 677,100.00Rp.

Jumlah (1) + (2) 5,648,313.80Rp.Keuntungan 10% 564,831.38Rp.Jumlah 6,213,145.18Rp.

KodeG.42. 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting) Dibulatkan 6,213,100.00Rp.

G.42.a 1 m3 Membuat Plat Topian tb. 10 cm Beton K 225 Besi 100 kg

+harga dasar dan upah stadion 2014.xlsx

Page 84: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 Pasang bekisting untuk lantai G.32. 3.0000 m2 424,900.00Rp. 1,274,700.00Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 100.0000 kg 16,900.00Rp. 1,690,000.00Rp.

Jumlah 4,007,300.00Rp.Kode

G.42.a 1 m3 Membuat Plat Topian tb. 10 cm Beton K 225 Besi 100 kg Dibulatkan 4,007,300.00Rp.

G.42.b 1 m3 Membuat Plat Lantai tb. 12 cm Beton K 225 Besi 130 kg

1 Pasang bekisting untuk lantai G.32. 8.3333 m2 424,900.00Rp. 3,540,819.17Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 130.0000 kg 16,900.00Rp. 2,197,000.00Rp.

Jumlah 6,780,419.17Rp.Kode

G.42.b 1 m3 Membuat Plat Lantai tb. 12 cm Beton K 225 Besi 130 kg Dibulatkan 6,780,400.00Rp.

G.42.c 1 m3 Membuat Plat Tempat Duduk tb. 10 cm Beton K 225 Besi 80 kg

1 Pasang bekisting untuk balok G.31. 3.0000 m2 355,900.00Rp. 1,067,700.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 80.0000 kg 16,900.00Rp. 1,352,000.00Rp.

Jumlah 3,479,300.00Rp.Kode

G.42.c 1 m3 Membuat Plat Tempat Duduk tb. 10 cm Beton K 225 Besi 80 kg Dibulatkan 3,479,300.00Rp.

G.42.d 1 m3 Membuat Plat Dak tb. 10 cm Beton K 225 Besi 100 kg

1 Pasang bekisting untuk lantai G.32. 10.0000 m2 424,900.00Rp. 4,249,000.00Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 100.0000 kg 16,900.00Rp. 1,690,000.00Rp.

Jumlah 6,981,600.00Rp.Kode

G.42.d 1 m3 Membuat Plat Dak tb. 10 cm Beton K 225 Besi 100 kg Dibulatkan 6,981,600.00Rp.

G.42.e 1 m3 Membuat Pelat Lantai beton S.1 T = 140 mm

1 Pasang bekisting untuk lantai G.32. 1.7857 m2 424,900.00Rp. 758,750.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) + pompa betonG.36.f 1.0000 m3 1,143,400.00Rp. 1,143,400.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 100.8256 kg 16,900.00Rp. 1,703,951.89Rp.

Jumlah 3,606,101.89Rp.Kode

G.42.e 1 m3 Membuat Pelat Lantai beton S.1 T = 140 mm Dibulatkan 3,606,100.00Rp.

G.42.f 1 m3 Membuat Pelat Lantai beton S.4 T = 120 mm

1 Pasang bekisting untuk lantai G.32. 8.3333 m2 424,900.00Rp. 3,540,833.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) + pompa betonG.36.f 1.0000 m3 1,143,400.00Rp. 1,143,400.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 101.8000 kg 16,900.00Rp. 1,720,420.00Rp.

Jumlah 6,404,653.33Rp.KodeG.42.f 1 m3 Membuat Pelat Lantai beton S.4 T = 120 mm Dibulatkan 6,404,600.00Rp.

G.42.g 1 m3 Membuat Pelat Lantai beton S.4' T = 120 mm

1 Pasang bekisting untuk lantai G.32. 8.3333 m2 424,900.00Rp. 3,540,833.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) + pompa betonG.36.f 1.0000 m3 1,143,400.00Rp. 1,143,400.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 101.8000 kg 16,900.00Rp. 1,720,420.00Rp.

Jumlah 6,404,653.33Rp.Kode

G.42.g 1 m3 Membuat Pelat Lantai beton S.4' T = 120 mm Dibulatkan 6,404,600.00Rp.

G.42.h 1 m3 Membuat Pelat Lantai beton S.5 T = 120 mm

1 Pasang bekisting untuk lantai G.32. 8.3333 m2 424,900.00Rp. 3,540,833.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) + pompa betonG.36.f 1.0000 m3 1,143,400.00Rp. 1,143,400.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 113.1000 kg 16,900.00Rp. 1,911,390.00Rp.

Jumlah 6,595,623.33Rp.Kode

+harga dasar dan upah stadion 2014.xlsx

Page 85: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.42.h 1 m3 Membuat Pelat Lantai beton S.5 T = 120 mm Dibulatkan 6,595,600.00Rp.

G.42.i 1 m3 Membuat Pelat Lantai beton S.7 T = 120 mm

1 Pasang bekisting untuk lantai G.32. 8.3333 m2 424,900.00Rp. 3,540,833.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) + pompa betonG.36.f 1.0000 m3 1,143,400.00Rp. 1,143,400.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 90.5000 kg 16,900.00Rp. 1,529,450.00Rp.

Jumlah 6,213,683.33Rp.KodeG.42.i 1 m3 Membuat Pelat Lantai beton S.7 T = 120 mm Dibulatkan 6,213,600.00Rp.

G.42.j 1 m3 Membuat Pelat Lantai beton S.8 T = 120 mm

1 Pasang bekisting untuk lantai G.32. 8.3333 m2 424,900.00Rp. 3,540,833.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) + pompa betonG.36.f 1.0000 m3 1,143,400.00Rp. 1,143,400.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 124.4000 kg 16,900.00Rp. 2,102,360.00Rp.

Jumlah 6,786,593.33Rp.KodeG.42.j 1 m3 Membuat Pelat Lantai beton S.8 T = 120 mm Dibulatkan 6,786,500.00Rp.

G.43. 1 m3 Membuat dinding beton bertulang (200 kg besi + bekisting)1 Bahan

Kayu terentang 0.2500 m3 1,874,730.00Rp. 468,682.50Rp.Paku biasa 2" - 5" 3.0000 kg 19,480.00Rp. 58,440.00Rp.Minyak bekisiting 1.2000 lt 7,260.00Rp. 8,712.00Rp.Besi beton bolos 210.0000 kg 13,200.00Rp. 2,772,000.00Rp.Kawat beton 3.0000 kg 16,500.00Rp. 49,500.00Rp.Semen portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.Kayu borneo balok 0.1050 m3 3,437,010.00Rp. 360,886.05Rp.Plywood 9 mm 2.5000 lbr 158,630.00Rp. 396,575.00Rp.Dolken dia. 8 cm/4 m 14.0000 btg 18,260.00Rp. 255,640.00Rp.

Jumlah (1). 5,110,733.55Rp.

2 TenagaPekerja 5.6500 oh 66,000.00Rp. 372,900.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Tukang kayu 1.5600 oh 105,000.00Rp. 163,800.00Rp.Tukang besi 1.4000 oh 100,000.00Rp. 140,000.00Rp.Kepala tukang 0.3230 oh 120,000.00Rp. 38,760.00Rp.Mandor 0.2830 oh 100,000.00Rp. 28,300.00Rp.

Jumlah (2). 771,260.00Rp.

Jumlah (1) + (2) 5,881,993.55Rp.Keuntungan 10% 588,199.36Rp.Jumlah 6,470,192.91Rp.

KodeG.43. 1 m3 Membuat dinding beton bertulang (200 kg besi + bekisting) Dibulatkan 6,470,100.00Rp.

G.44. 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting)1 Bahan

Kayu terentang 0.2500 m3 1,874,730.00Rp. 468,682.50Rp.Paku biasa 2" - 5" 3.0000 kg 19,480.00Rp. 58,440.00Rp.Minyak bekisiting 0.9000 lt 7,260.00Rp. 6,534.00Rp.Besi beton bolos 210.0000 kg 13,200.00Rp. 2,772,000.00Rp.Kawat beton 3.0000 kg 16,500.00Rp. 49,500.00Rp.Semen portland 336.0000 kg 1,360.00Rp. 456,960.00Rp.Pasir beton 0.5400 m3 194,700.00Rp. 105,138.00Rp.Koral beton 0.8100 m3 220,000.00Rp. 178,200.00Rp.Kayu borneo balok 0.1050 m3 3,437,010.00Rp. 360,886.05Rp.Plywood 9 mm 2.5000 lbr 158,630.00Rp. 396,575.00Rp.Dolken dia. 8 cm/4 m 9.0000 btg 18,260.00Rp. 164,340.00Rp.

Jumlah (1). 5,017,255.55Rp.

2 TenagaPekerja 5.6500 oh 66,000.00Rp. 372,900.00Rp.Tukang batu 0.2750 oh 100,000.00Rp. 27,500.00Rp.Tukang kayu 1.5600 oh 105,000.00Rp. 163,800.00Rp.Tukang besi 1.4000 oh 100,000.00Rp. 140,000.00Rp.Kepala tukang 0.3230 oh 120,000.00Rp. 38,760.00Rp.Mandor 0.2830 oh 100,000.00Rp. 28,300.00Rp.

Jumlah (2). 771,260.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 86: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 5,788,515.55Rp.Keuntungan 10% 578,851.56Rp.Jumlah 6,367,367.11Rp.

KodeG.44. 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting) Dibulatkan 6,367,300.00Rp.

G.44.a 1 m3 Membuat Lantai & Trap Tangga Beton K 225 Besi 180 kg

1 Pasang bekisting untuk tangga G.34. 5.0000 m2 323,600.00Rp. 1,618,000.00Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.0000 kg 16,900.00Rp. 3,042,000.00Rp.

Jumlah 5,702,600.00Rp.Kode

G.44.a 1 m3 Membuat Lantai & Trap Tangga Beton K 225 Besi 180 kg Dibulatkan 5,702,600.00Rp.

G.44.b 1 m3 Membuat Plat Bordes tb. 12 cm Beton K 225 Besi 130 kg

1 Pasang bekisting untuk lantai G.32. 4.1667 m2 424,900.00Rp. 1,770,430.83Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 130.0000 kg 16,900.00Rp. 2,197,000.00Rp.

Jumlah 5,010,030.83Rp.Kode

G.44.b 1 m3 Membuat Plat Bordes tb. 12 cm Beton K 225 Besi 130 kg Dibulatkan 5,010,000.00Rp.

G.44.c 1 m3 Membuat Beton Struktur B7 Balok Tangga 20/25 K 225 Besi 150 kg

1 Pasang bekisting untuk balok G.31. 4.6000 m2 355,900.00Rp. 1,637,140.00Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) + pompa betonG.36. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 150.0000 kg 16,900.00Rp. 2,535,000.00Rp.

Jumlah 5,214,740.00Rp.Kode

G.44.c 1 m3 Membuat Beton Struktur B7 Balok Tangga 20/25 K 225 Besi 150 kg Dibulatkan 5,214,700.00Rp.

G.44.d 1 m3 Membuat Beton Tangga Type 1

1 Pasang begisting tangga 2 x pakai G.34. 6.6667 m2 323,600.00Rp. 2,157,333.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 115.1173 kg 16,900.00Rp. 1,945,482.93Rp.

Jumlah 5,196,716.27Rp.Kode

G.44.d 1 m3 Membuat Beton Tangga Type 1 Dibulatkan 5,196,700.00Rp.

G.44.e 1 m3 Membuat Beton Balok Tangga BT1A 300 x 700

1 Pasang begisting balok 2 x pakai G.31. 9.5238 m2 355,900.00Rp. 3,389,523.81Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 269.5057 kg 16,900.00Rp. 4,554,646.21Rp.

Jumlah 9,038,070.02Rp.Kode

G.44.e 1 m3 Membuat Beton Balok Tangga BT1A 300 x 700 Dibulatkan 9,038,000.00Rp.

G.44.f 1 m3 Membuat Beton Balok Tangga BT1B 400 x 800

1 Pasang begisting balok 2 x pakai G.31. 7.5000 m2 355,900.00Rp. 2,669,250.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 187.2864 kg 16,900.00Rp. 3,165,140.99Rp.

Jumlah 6,928,290.99Rp.KodeG.44.f 1 m3 Membuat Beton Balok Tangga BT1B 400 x 800 Dibulatkan 6,928,200.00Rp.

G.44.g 1 m3 Membuat Beton Balok Tangga BT1C 200 x 400

1 Pasang begisting balok 2 x pakai G.31. 15.0000 m2 355,900.00Rp. 5,338,500.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 201.0159 kg 16,900.00Rp. 3,397,168.80Rp.

Jumlah 9,829,568.80Rp.Kode

G.44.g 1 m3 Membuat Beton Balok Tangga BT1C 200 x 400 Dibulatkan 9,829,500.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 87: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.44.h 1 m3 Membuat Beton Tanggulan tangga

1 Pasang begisting G.29. 10.0000 m2 174,100.00Rp. 1,741,000.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 178.1474 kg 16,900.00Rp. 3,010,690.82Rp.

Jumlah 5,845,590.82Rp.Kode

G.44.h 1 m3 Membuat Beton Tanggulan tangga Dibulatkan 5,845,500.00Rp.

G.44.i 1 m3 Membuat Beton Tangga Type 10

1 Pasang begisting tangga 2 x pakai G.34. 6.6667 m2 323,600.00Rp. 2,157,333.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 131.5627 kg 16,900.00Rp. 2,223,409.07Rp.

Jumlah 5,474,642.40Rp.KodeG.44.i 1 m3 Membuat Beton Tangga Type 10 Dibulatkan 5,474,600.00Rp.

G.44.j 1 m3 Membuat Beton Tangga Type 11

1 Pasang begisting tangga 2 x pakai G.34. 6.6667 m2 323,600.00Rp. 2,157,333.33Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.e 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 131.5627 kg 16,900.00Rp. 2,223,409.07Rp.

Jumlah 5,474,642.40Rp.KodeG.44.j 1 m3 Membuat Beton Tangga Type 11 Dibulatkan 5,474,600.00Rp.

G.45. 1 m' Membuat kolom penguat beton bertulang (11 x 11) cm1 Bahan

Kayu terentang 0.0020 m3 1,874,730.00Rp. 3,749.46Rp.Paku biasa 2" - 5" 0.0100 kg 19,480.00Rp. 194.80Rp.Besi beton polos 3.0000 kg 13,200.00Rp. 39,600.00Rp.Kawat beton 0.4500 kg 16,500.00Rp. 7,425.00Rp.Semen portland 4.0000 kg 1,360.00Rp. 5,440.00Rp.Pasir beton 0.0060 m3 194,700.00Rp. 1,168.20Rp.Koral beton 0.0090 m3 220,000.00Rp. 1,980.00Rp.

Jumlah (1). 59,557.46Rp.

2 TenagaPekerja 0.1800 oh 66,000.00Rp. 11,880.00Rp.Tukang batu 0.0200 oh 100,000.00Rp. 2,000.00Rp.Tukang kayu 0.0200 oh 105,000.00Rp. 2,100.00Rp.Tukang besi 0.0200 oh 100,000.00Rp. 2,000.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0090 oh 100,000.00Rp. 900.00Rp.

Jumlah (2). 19,600.00Rp.

Jumlah (1) + (2) 79,157.46Rp.Keuntungan 10% 7,915.75Rp.Jumlah 87,073.21Rp.

KodeG.45. 1 m' Membuat kolom penguat beton bertulang (11 x 11) cm Dibulatkan 87,000.00Rp.

G.46. 1 m' Membuat ring balok beton bertulang (10 x 15) cm1 Bahan

Kayu terentang 0.0030 m3 1,874,730.00Rp. 5,624.19Rp.Paku biasa 2" - 5" 0.0200 kg 19,480.00Rp. 389.60Rp.Besi beton polos 3.6000 kg 13,200.00Rp. 47,520.00Rp.Kawat beton 0.0500 kg 16,500.00Rp. 825.00Rp.Semen portland 5.5000 kg 1,360.00Rp. 7,480.00Rp.Pasir beton 0.0090 m3 194,700.00Rp. 1,752.30Rp.Koral beton 0.0150 m3 220,000.00Rp. 3,300.00Rp.

Jumlah (1). 66,891.09Rp.

2 TenagaPekerja 0.2970 oh 66,000.00Rp. 19,602.00Rp.Tukang batu 0.0330 oh 100,000.00Rp. 3,300.00Rp.Tukang kayu 0.0330 oh 105,000.00Rp. 3,465.00Rp.Tukang besi 0.0330 oh 100,000.00Rp. 3,300.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0150 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,367.00Rp.

+harga dasar dan upah stadion 2014.xlsx

Page 88: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 99,258.09Rp.Keuntungan 10% 9,925.81Rp.Jumlah 109,183.90Rp.

KodeG.46. 1 m' Membuat ring balok beton bertulang (10 x 15) cm Dibulatkan 109,100.00Rp.

G.46.a 1 m3 Membuat Beton Struktur RB1 Ring Balk 20/30 K 225 Besi 160 kg

1 Pasang bekisting untuk balok G.31. 2.5000 m2 355,900.00Rp. 889,750.00Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 160.0000 kg 16,900.00Rp. 2,704,000.00Rp.

Jumlah 4,653,350.00Rp.Kode

G.46.a 1 m3 Membuat Beton Struktur RB1 Ring Balk 20/30 K 225 Besi 160 kg Dibulatkan 4,653,300.00Rp.

G.46.b 1 m3 Membuat Beton Struktur RB2 Ring Balk 15/30 K 225 Besi 170 kg

1 Pasang bekisting untuk balok G.31. 3.3333 m2 355,900.00Rp. 1,186,321.47Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 170.0000 kg 16,900.00Rp. 2,873,000.00Rp.

Jumlah 5,118,921.47Rp.Kode

G.46.b 1 m3 Membuat Beton Struktur RB2 Ring Balk 15/30 K 225 Besi 170 kg Dibulatkan 5,118,900.00Rp.

G.46.c 1 m3 Membuat Beton Struktur RB3 Ring Balk 15/25 K 225 Besi 180 kg

1 Pasang bekisting untuk balok G.31. 3.3333 m2 355,900.00Rp. 1,186,321.47Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.0000 kg 16,900.00Rp. 3,042,000.00Rp.

Jumlah 5,287,921.47Rp.Kode

G.46.c 1 m3 Membuat Beton Struktur RB3 Ring Balk 15/25 K 225 Besi 180 kg Dibulatkan 5,287,900.00Rp.

G.46.d 1 m3 Membuat Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 180 kg

1 Pasang bekisting untuk balok G.31. 3.3333 m2 355,900.00Rp. 1,186,321.47Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 180.0000 kg 16,900.00Rp. 3,042,000.00Rp.

Jumlah 5,287,921.47Rp.Kode

G.46.d 1 m3 Membuat Beton Struktur RB4 Ring Balk 15/20 K 225 Besi 180 kg Dibulatkan 5,287,900.00Rp.

G.46.e 1 m3 Membuat Beton Struktur RBP Ring Balk Praktis 15/15 K 225 Besi 100 kg

1 Pasang bekisting untuk balok G.31. 3.3333 m2 355,900.00Rp. 1,186,321.47Rp.2 Membuat beton dengan mutu K 225 (Site Mix) G.35. 1.0000 m3 1,059,600.00Rp. 1,059,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 100.0000 kg 16,900.00Rp. 1,690,000.00Rp.

Jumlah 3,935,921.47Rp.Kode

G.46.e 1 m3 Membuat Beton Struktur RBP Ring Balk Praktis 15/15 K 225 Besi 100 kgDibulatkan 3,935,900.00Rp.

G.47. 1 m2 Pasang Plat Bondek1 Bahan

Plat Bondek 1.1000 m2 138,000.00Rp. 151,800.00Rp.Jumlah (1). 151,800.00Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang Besi 0.2000 oh 100,000.00Rp. 20,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 35,800.00Rp.

Jumlah (1) + (2) 187,600.00Rp.Keuntungan 10% 18,760.00Rp.Jumlah 206,360.00Rp.

KodeG.47. 1 m2 Pasang Plat Bondek Dibulatkan 206,300.00Rp.

G.48. 1 m3 Membuat Beton Struktur Lantai Tb. 12 cm K 225 menggunakan Bondek (Besi Beton 100 kg)

+harga dasar dan upah stadion 2014.xlsx

Page 89: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 Pasang Plat Bondek G.31. 8.3333 m2 206,300.00Rp. 1,719,159.79Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) G.35. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 100.0000 kg 16,900.00Rp. 1,690,000.00Rp.

Jumlah 4,451,759.79Rp.KodeG.48. 1 m3 Membuat Beton Struktur Lantai Tb. 12 cm K 225 menggunakan Bondek (Besi Beton 100 kg)Dibulatkan 4,451,700.00Rp.

G.49. 1 m3 Membuat Beton Struktur Lantai Tb. 12 cm K 225 menggunakan Bondek (Wire Mesh M.10)

1 Pasang Plat Bondek G.31. 8.3333 m2 206,300.00Rp. 1,719,159.79Rp.2 Membuat beton dengan mutu K 225 (Ready Mix) G.35. 1.0000 m3 1,042,600.00Rp. 1,042,600.00Rp.3 Pas. Whire Mase M. 10 G.27. 70.9138 kg 17,300.00Rp. 1,226,808.74Rp.

Jumlah 3,988,568.53Rp.KodeG.49. 1 m3 Membuat Beton Struktur Lantai Tb. 12 cm K 225 menggunakan Bondek (Wire Mesh M.10)Dibulatkan 3,988,500.00Rp.

G.50. 1 m3 GROUTING1 Bahan

Sement Grout 1.100 m3 9,625,000.00 10,587,500.00Pasir beton 0.031 m3 194,700.00 6,035.70

Jumlah (1). 10,593,535.70

2 TenagaTukang 0.300 hari 100,000.00 30,000.00Pekerja 0.375 hari 66,000.00 24,750.00Kepala Tukang 0.020 hari 120,000.00 2,400.00Mandor 0.002 hari 100,000.00 200.00

Jumlah (2). 57,350.00

Jumlah (1) + (2) 10,650,885.70Keuntungan 10% 1,065,088.57Jumlah 11,715,974.27

KodeG.50. 1 m3 GROUTING Dibulatkan 11,715,900.00

G.51. 1 m3 Membuat Beton Join Precast

1 Pasang bekisting G.29. 0.1500 m2 174,100.00Rp. 26,115.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 102.7500 kg 16,900.00Rp. 1,736,475.00Rp.

Jumlah 2,856,490.00Rp.KodeG.51. 1 m3 Membuat Beton Join Precast Dibulatkan 2,856,400.00Rp.

G.52. 1 m3 Membuat Beton Tanggulan Precast 200 x 420

1 Pasang bekisting G.29. 10.5000 m2 174,100.00Rp. 1,828,050.00Rp.2 Membuat beton dengan mutu K 350 (Ready Mix) G.36.d 1.0000 m3 1,093,900.00Rp. 1,093,900.00Rp.3 Pembesian dengan besi polos atau besi ulir G.25. 120.3285 kg 16,900.00Rp. 2,033,551.14Rp.

Jumlah 4,955,501.14Rp.KodeG.52. 1 m3 Membuat Beton Tanggulan Precast 200 x 420 Dibulatkan 4,955,500.00Rp.

G.53. 1 Unit Sparing Pralon d 3"1 Bahan

Pralon f 3" setara AW 0.0750 btg 157,050.00 11,778.75Jumlah (1). 11,778.75

2 TenagaTukang pipa 0.0250 hari 100,000.00 2,500.00Pekerja 0.0125 hari 66,000.00 825.00Kepala Tukang 0.0025 hari 120,000.00 300.00Mandor 0.0013 hari 100,000.00 125.00

Jumlah (2). 3,750.00

Jumlah (1) + (2) 15,528.75Keuntungan 10% 1,552.88Jumlah 17,081.63

Kode+harga dasar dan upah stadion 2014.xlsx

Page 90: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.53. 1 Unit Sparing Pralon d 3" Dibulatkan 17,000.00

G.54. 1 bh Pelat beton Prestressed Precast Tipe. 11 Bahan

Ukuran 350 x 100cm + sandaran lantai l=35cm 1.0000 bh 2,658,140.00 2,658,140.00Jumlah (1). 2,658,140.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 265,814.00 265,814.00

Jumlah (2). 265,814.00

Jumlah (1) + (2) 2,923,954.00Keuntungan 10% 292,395.40Jumlah 3,216,349.40

KodeG.54. 1 bh Pelat beton Prestressed Precast Tipe. 1 Dibulatkan 3,216,300.00

G.55. 1 bh Pelat beton Prestressed Precast Tipe. 1A, 1B1 Bahan

Ukuran 300 x 220cm + sandaran lantai l=35cm 1.0000 bh 3,772,950.00 3,772,950.00Jumlah (1). 3,772,950.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 377,295.00 377,295.00

Jumlah (2). 377,295.00

Jumlah (1) + (2) 4,150,245.00Keuntungan 10% 415,024.50Jumlah 4,565,269.50

KodeG.55. 1 bh Pelat beton Prestressed Precast Tipe. 1A, 1B Dibulatkan 4,565,200.00

G.56. 1 bh Pelat beton Prestressed Precast Tipe. 21 Bahan

Ukuran 350 x 100cm + sandaran lantai l=40cm 1.0000 bh 2,564,430.00 2,564,430.00Jumlah (1). 2,564,430.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 256,443.00 256,443.00

Jumlah (2). 256,443.00

Jumlah (1) + (2) 2,820,873.00Keuntungan 10% 282,087.30Jumlah 3,102,960.30

KodeG.56. 1 bh Pelat beton Prestressed Precast Tipe. 2 Dibulatkan 3,102,900.00

G.57. 1 bh Pelat beton Prestressed Precast Tipe. 2A1 Bahan

Ukuran 350 x 200cm + sandaran lantai l=40cm 1.0000 bh 3,762,750.00 3,762,750.00Jumlah (1). 3,762,750.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 376,275.00 376,275.00

Jumlah (2). 376,275.00

Jumlah (1) + (2) 4,139,025.00Keuntungan 10% 413,902.50Jumlah 4,552,927.50

KodeG.57. 1 bh Pelat beton Prestressed Precast Tipe. 2A Dibulatkan 4,552,900.00

G.58. 1 bh Pelat beton Prestressed Precast Tipe. 2B1 Bahan

Ukuran 350 x 180cm + sandaran lantai l=40cm 1.0000 bh 3,466,550.00 3,466,550.00Jumlah (1). 3,466,550.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 346,655.00 346,655.00

Jumlah (2). 346,655.00

Jumlah (1) + (2) 3,813,205.00Keuntungan 10% 381,320.50

+harga dasar dan upah stadion 2014.xlsx

Page 91: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 4,194,525.50KodeG.58. 1 bh Pelat beton Prestressed Precast Tipe. 2B Dibulatkan 4,194,500.00

G.59. 1 bh Pelat beton Prestressed Precast Tipe. 31 Bahan

Ukuran 350 x 180cm + sandaran lantai l=45cm 1.0000 bh 2,646,250.00 2,646,250.00Jumlah (1). 2,646,250.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 264,625.00 264,625.00

Jumlah (2). 264,625.00

Jumlah (1) + (2) 2,910,875.00Keuntungan 10% 291,087.50Jumlah 3,201,962.50

KodeG.59. 1 bh Pelat beton Prestressed Precast Tipe. 3 Dibulatkan 3,201,900.00

G.60. 1 bh Pelat beton Prestressed Precast Tipe. 3A1 Bahan

Ukuran 360 x 200cm + sandaran lantai l=45cm 1.0000 bh 3,879,010.00 3,879,010.00Jumlah (1). 3,879,010.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 387,901.00 387,901.00

Jumlah (2). 387,901.00

Jumlah (1) + (2) 4,266,911.00Keuntungan 10% 426,691.10Jumlah 4,693,602.10

KodeG.60. 1 bh Pelat beton Prestressed Precast Tipe. 3A Dibulatkan 4,693,600.00

G.61. 1 bh Pelat beton Prestressed Precast Tipe. 3B1 Bahan

Ukuran 360 x 170cm + sandaran lantai l=45cm 1.0000 bh 3,539,630.00 3,539,630.00Jumlah (1). 3,539,630.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 353,963.00 353,963.00

Jumlah (2). 353,963.00

Jumlah (1) + (2) 3,893,593.00Keuntungan 10% 389,359.30Jumlah 4,282,952.30

KodeG.61. 1 bh Pelat beton Prestressed Precast Tipe. 3B Dibulatkan 4,282,900.00

G.62. 1 bh Pelat beton Prestressed Precast Tipe. 3D1 Bahan

1.0000 bh 5,031,070.00 5,031,070.00Jumlah (1). 5,031,070.00

2 TenagaUpah pemasangan + alat bantu 1.0000 bh 503,107.00 503,107.00

Jumlah (2). 503,107.00

Jumlah (1) + (2) 5,534,177.00Keuntungan 10% 553,417.70Jumlah 6,087,594.70

KodeG.62. 1 bh Pelat beton Prestressed Precast Tipe. 3D Dibulatkan 6,087,500.00

G.63. 1 m2 SCREED T : 4 cm + Aci kasar

1 BahanSement PC 0.2759 zak 1,360.00Rp 375.29RpPasir beton 0.0460 m3 194,700.00Rp 8,954.54Rp

Jumlah (1). 9,329.83Rp

2 TenagaTukang 0.3200 hari 100,000.00Rp 32,000.00Rp

#REF!

+harga dasar dan upah stadion 2014.xlsx

Page 92: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.2500 hari 66,000.00Rp 16,500.00RpKepala Tukang 0.0250 hari 120,000.00Rp 3,000.00RpMandor 0.0150 hari 100,000.00Rp 1,500.00Rp

Jumlah (2). 53,000.00Rp

Jumlah (1) + (2) 62,329.83RpKeuntungan 10% 6,232.98RpJumlah 68,562.81Rp

KodeG.63. 1 m2 SCREED T : 4 cm + Aci kasar Dibulatkan 68,500.00Rp

G.64. 1 m2 WATER PROOFING MEMBRANE SHEET1 Bahan

Water proofing Sheet 1.150 m2 68,370.00 78,610.94Pc. @ 50 kg 0.275 zak 68,000.00 18,700.00Pasir beton 0.031 m3 194,700.00 6,035.70

Jumlah (1). 103,346.64

2 TenagaTukang 0.200 hari 100,000.00 20,000.00Pekerja 0.030 hari 66,000.00 1,980.00Kepala Tukang 0.005 hari 120,000.00 600.00Mandor 0.002 hari 100,000.00 200.00

Jumlah (2). 22,780.00

Jumlah (1) + (2) 126,126.64Keuntungan 10% 12,612.66Jumlah 138,739.30

KodeG.64. 1 m2 WATER PROOFING MEMBRANE SHEET Dibulatkan 138,700.00

G.65. 1 1 M³ Pekerjaan Cor K-300 (Ready Mix) 1072400.00Bahan

Adukan Ready Mix K-300 1.000 m³ 932,000.00 932000.00Alat bantu (Pompa, Vibrator ) 0.015 ls 932,000.00 13980.00

UpahPekerja 0.750 oh 98,000.00 73500.00Tukang batu 0.350 oh 112,500.00 39375.00Kepala Tukang 0.095 oh 127,500.00 12112.50Mandor 0.010 oh 145,000.00 1450.00

Jumlah 1072417.50G.66. 1 1 kg Besi Beton Terpasang U-24 13400.00

Besi beton U - 24 1.050 kg 11,000.00 11550.00Kawat beton 0.015 kg 18,500.00 277.50Pekerja 0.007 org 98,000.00 686.00Tukang besi 0.007 org 112,500.00 787.50Kepala Tukang 0.001 org 127,500.00 89.25Mandor 0.0003 org 145,000.00 43.50

Jumlah 13433.75G.67. 1 1 M² Pas. WireMesh M-10 / Kawat Baja 201700.00

BahanBesi wiremesh M-8 2.100 m² 48,941.80 102777.78Kawat beton 0.020 Kg 18,500.00 370.00

UpahPekerja 0.010 oh 98,000.00 980.00Tukang besi 0.010 oh 112,500.00 1125.00Kepala Tukang 0.001 oh 127,500.00 127.50Mandor 0.001 oh 145,000.00 87.00

G.68. 1 1 M² Pekerjaan Pasang Bekisting Untuk Kolom & Dinding 201700.00Bahan

Kayu hutan kelas 1 (2 kali pakai) 0.048 m³ 2,060,000.00 48925.00Paku biasa 2' - 5' 0.300 kg 17,500.00 5250.00Minyak bekisting 0.200 ltr 12,500.00 2500.00Besi support 2.000 m³ 4,500.00 9000.00Multiplek 12 mm 0.344 lbr 157,500.00 27113.43U head 60 cm 0.213 bh 3,000.00 639.00Jack - base 60 cm 0.213 bh 2,750.00 585.75Mob / Demob scaffolding 1.000 ls 450.00 450.00Maintenance 1.000 ls 400.00 400.00Pekerja 0.660 oh 98,000.00 64680.00Tukang kayu 0.330 oh 112,500.00 37125.00Kepala Tukang 0.033 oh 127,500.00 4207.50Mandor 0.006 oh 145,000.00 870.00

Jumlah 201745.68G.69. 2 1 M² Pasang Bekisting Untuk Struktur 2X PakaiI (Balok, Lantai, Tangga & Listplank) 184200.00

Bahan Multiplek 12 mm (2x pakai) 50% 0.344 lbr 157,500.00 27113.43 Kayu hutan kelas 1 0.045 m³ 2,060,000.00 46350.00 Paku 0.300 kg 17,500.00 5250.00 Joint pin 0.213 bh 1,000.00 213.00 U head 60 cm 0.213 bh 3,000.00 639.00 Jack - base 60 cm 0.213 bh 2,500.00 532.50 Cross brace 0.110 bh 1,000.00 110.00 Wall tie 0.319 bh 2,000.00 638.00 Form oil 0.200 ltr 12,500.00 2500.00+harga dasar dan upah stadion 2014.xlsx

Page 93: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pipa suport 0.054 bh 4,500.00 243.00 Pipa pengikat 0.260 m¹ 4,500.00 1170.00 Betty scaffolding 0.107 bh 4,000.00 426.00 Mob / Demob scaffolding 1.000 ls 450.00 450.00 Maintenance 1.000 ls 400.00 400.00

Upah Pekerja 0.660 oh 98,000.00 64680.00 Tukang Kayu 0.270 oh 115,000.00 31050.00 Kepala tukang 0.017 oh 127,500.00 2167.50 Mandor 0.002 oh 145,000.00 246.50

Jumlah 184178.93G.70. 1 M³ Pasang Sloof,Kolom,Balok

G.29. Pasang bekisting untuk sloof 1.0000 1 m2 174,100.00Rp 174,100.00RpG.25. Pembesian dengan besi polos atau besi ulir 90.0000 1 kg 16,900.00Rp 1,521,000.00RpG.16. Membuat beton bertulang, 1 pc : 1,5 ps : 2,5 kr 1.0000 1 m3 1,193,100.00Rp 1,193,100.00Rp

Jumlah 2,888,200.00RpG.71. 1 M³ Pe,asangan Plat

G.32. Pasang bekisting untuk lantai 1.0000 1 m2 424,900.00Rp 424,900.00RpG.25. Pembesian dengan besi polos atau besi ulir 90.0000 1 kg 16,900.00Rp 1,521,000.00RpG.16. Membuat beton bertulang, 1 pc : 1,5 ps : 2,5 kr 1.0000 1 m3 1,193,100.00Rp 1,193,100.00Rp

Jumlah 3,139,000.00RpG.72. Pek.beton (sloop, Ring balok & kolom) K-175

G.30. Pasang bekisting untuk kolom 1.00Rp 344,600.00Rp 344,600.00RpG.46.e Membuat Beton Struktur RBP Ring Balk Praktis 15/15 K 225 Besi 100 kg 1.00Rp 3,935,900.00Rp 3,935,900.00Rp

Jumlah 4,280,500.00Rp

+harga dasar dan upah stadion 2014.xlsx

Page 94: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN PENUTUP ATAPRuang LingkupJenis pekerjaan yang dicakup meliputi :

2. Pekerjaan pemasangan sasalation/alumunium foil

H.1. 1 m2 Pasang atap genteng pelentong kecil1 Bahan

Genteng pelentong 25.0000 bh 1,890.00Rp. 47,250.00Rp.Jumlah (1). 47,250.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.0750 oh 105,000.00Rp. 7,875.00Rp.Kepala tukang 0.0080 oh 120,000.00Rp. 960.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 19,535.00Rp.

Jumlah (1) + (2) 66,785.00Rp.Keuntungan 10% 6,678.50Rp.Jumlah 73,463.50Rp.

KodeH.1. 1 m2 Pasang atap genteng pelentong kecil Dibulatkan 73,400.00Rp.

H.2. 1 m2 Pasang atap genteng kodok/glazur1 Bahan

Genteng kodok 25.0000 m3 2,150.00Rp. 53,750.00Rp.Jumlah (1). 53,750.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.0750 oh 105,000.00Rp. 7,875.00Rp.Kepala tukang 0.0080 oh 120,000.00Rp. 960.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 19,535.00Rp.

Jumlah (1) + (2) 73,285.00Rp.Keuntungan 10% 7,328.50Rp.Jumlah 80,613.50Rp.

KodeH.2. 1 m2 Pasang atap genteng kodok/glazur Dibulatkan 80,600.00Rp.

H.3. 1 m2 Pasang atap genteng pelentong super/besar1 Bahan

Genteng pelentong super 12.0000 bh 3,160.00Rp. 37,920.00Rp.Jumlah (1). 37,920.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.0600 oh 105,000.00Rp. 6,300.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 17,720.00Rp.

Jumlah (1) + (2) 55,640.00Rp.Keuntungan 10% 5,564.00Rp.Jumlah 61,204.00Rp.

KodeH.3. 1 m2 Pasang atap genteng pelentong super/besar Dibulatkan 61,200.00Rp.

H.3.a. 1 m2 Pasang rangka kaso + reng kayu borneo dan atap genteng morando1 Bahan

Genteng morando 18.0000 bh 2,400.00Rp. 43,200.00Rp.Kayu borneo, (Kaso 5 x 7 cm) 0.0088 m3 3,749,460.00Rp. 32,995.25Rp.Kayu borneo, (reng 2 x 3 cm) 0.0024 m3 3,749,460.00Rp. 8,998.70Rp.Paku biasa 2" - 5" 0.1500 kg 19,480.00Rp. 2,922.00Rp.

Jumlah (1). 88,115.95Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

H.

1. Pekerjaan pemasangan bahan atap keramik, genteng beton, asbes gelombang, fiber glass, genteng aspal, genteng metal, sirap,dan alumunium

Page 95: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang kayu 0.1600 oh 105,000.00Rp. 16,800.00Rp.Kepala tukang 0.0160 oh 120,000.00Rp. 1,920.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 36,520.00Rp.

Jumlah (1) + (2) 124,635.95Rp.Keuntungan 10% 12,463.60Rp.Jumlah 137,099.55Rp.

KodeH.3.a. 1 m2 Pasang rangka kaso + reng kayu borneo dan atap genteng morandoDibulatkan 137,000.00Rp.

H.3.b. 1 m2 Pasang atap genteng morando1 Bahan

Genteng morando 18.0000 bh 2,400.00Rp. 43,200.00Rp.Jumlah (1). 43,200.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.0600 oh 105,000.00Rp. 6,300.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 17,720.00Rp.

Jumlah (1) + (2) 60,920.00Rp.Keuntungan 10% 6,092.00Rp.Jumlah 67,012.00Rp.

KodeH.3.b. 1 m2 Pasang atap genteng morando Dibulatkan 67,000.00Rp.

H.4. 1 m' Pasang genteng bubung pelentong1 Bahan

Genteng bubung palentong 5.0000 bh 5,800.00Rp. 29,000.00Rp.Semen portland 8.0000 kg 1,360.00Rp. 10,880.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 46,392.00Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 50,000.00Rp.

Jumlah (1) + (2) 96,392.00Rp.Keuntungan 10% 9,639.20Rp.Jumlah 106,031.20Rp.

KodeH.4. 1 m' Pasang genteng bubung pelentong Dibulatkan 106,000.00Rp.

H.5. 1 m' Pasang bubung genteng kodok glazur1 Bahan

Genteng bubung kodok 5.0000 bh 4,840.00Rp. 24,200.00Rp.Semen portland 8.0000 kg 1,360.00Rp. 10,880.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 41,592.00Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 50,000.00Rp.

Jumlah (1) + (2) 91,592.00Rp.Keuntungan 10% 9,159.20Rp.Jumlah 100,751.20Rp.

KodeH.5. 1 m' Pasang bubung genteng kodok glazur Dibulatkan 100,700.00Rp.

H.6. 1 m' Pasang genteng bubung pelentong besar

Page 96: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanGenteng bubung pelentong 4.0000 bh 5,800.00Rp. 23,200.00Rp.Semen portland 8.0000 kg 1,360.00Rp. 10,880.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 40,592.00Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 50,000.00Rp.

Jumlah (1) + (2) 90,592.00Rp.Keuntungan 10% 9,059.20Rp.Jumlah 99,651.20Rp.

KodeH.6. 1 m' Pasang genteng bubung pelentong besar Dibulatkan 99,600.00Rp.

H.6.a. 1 m' Pasang genteng bubung morando ex jatiwangi1 Bahan

Genteng bubung morando ex jatiwangi 5.0000 bh 5,450.00Rp. 27,250.00Rp.Semen portland 8.0000 kg 1,360.00Rp. 10,880.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 44,642.00Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 50,000.00Rp.

Jumlah (1) + (2) 94,642.00Rp.Keuntungan 10% 9,464.20Rp.Jumlah 104,106.20Rp.

KodeH.6.a. 1 m' Pasang genteng bubung morando ex jatiwangi Dibulatkan 104,100.00Rp.

H.6.b. 1 m' Pasang genteng samping penutup lisplang morando ex jatiwangi1 Bahan

Genteng samping penutup lisplang morando ex jatiwangi 5.0000 bh 5,940.00Rp. 29,700.00Rp.Semen portland 8.0000 kg 1,360.00Rp. 10,880.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.

Jumlah (1). 47,092.00Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 50,000.00Rp.

Jumlah (1) + (2) 97,092.00Rp.Keuntungan 10% 9,709.20Rp.Jumlah 106,801.20Rp.

KodeH.6.b. 1 m' Pasang genteng samping penutup lisplang morando ex jatiwangi Dibulatkan 106,800.00Rp.

H.7. 1 m2 Pasang roof light fibreglass (180 x 90) cm1 Bahan

Roof light fibreglass 0.6000 lbr 70,330.00Rp. 42,198.00Rp.Paku biasa 1/2" - 1" 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 43,172.00Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 60,987.00Rp.

Page 97: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 6,098.70Rp.Jumlah 67,085.70Rp.

KodeH.7. 1 m2 Pasang roof light fibreglass (180 x 90) cm Dibulatkan 67,000.00Rp.

H.8. 1 m2 Pasang atap asbes gelombang (2.5 x 0.92 m) x 5 mm1 Bahan

Asbes gelombang 0.5000 lbr 68,680.00Rp. 34,340.00Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 36,677.60Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0750 oh 105,000.00Rp. 7,875.00Rp.Kepala tukang 0.0080 oh 120,000.00Rp. 960.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 18,875.00Rp.

Jumlah (1) + (2) 55,552.60Rp.Keuntungan 10% 5,555.26Rp.Jumlah 61,107.86Rp.

KodeH.8. 1 m2 Pasang atap asbes gelombang (2.5 x 0.92 m) x 5 mm Dibulatkan 61,100.00Rp.

H.9. 1 m2 Pasang atap asbes gelombang (2.25 x 0.92 m) x 5 mm1 Bahan

Asbes gelombang 0.6000 lbr 64,000.00Rp. 38,400.00Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 40,737.60Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0750 oh 105,000.00Rp. 7,875.00Rp.Kepala tukang 0.0080 oh 120,000.00Rp. 960.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 18,875.00Rp.

Jumlah (1) + (2) 59,612.60Rp.Keuntungan 10% 5,961.26Rp.Jumlah 65,573.86Rp.

KodeH.9. 1 m2 Pasang atap asbes gelombang (2.25 x 0.92 m) x 5 mm Dibulatkan 65,500.00Rp.

H.10. 1 m2 Pasang atap asbes gelombang (2.00 x 0.92 m) x 5 mm1 Bahan

Asbes gelombang 0.6000 lbr 48,200.00Rp. 28,920.00Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 31,257.60Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 18,130.00Rp.

Jumlah (1) + (2) 49,387.60Rp.Keuntungan 10% 4,938.76Rp.Jumlah 54,326.36Rp.

KodeH.10. 1 m2 Pasang atap asbes gelombang (2.00 x 0.92 m) x 5 mm Dibulatkan 54,300.00Rp.

H.11. 1 m2 Pasang atap asbes gelombang (1.8 x 0.92 m) x 5 mm1 Bahan

Asbes gelombang 0.7500 lbr 81,210.00Rp. 60,907.50Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 63,245.10Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Page 98: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 18,130.00Rp.

Jumlah (1) + (2) 81,375.10Rp.Keuntungan 10% 8,137.51Rp.Jumlah 89,512.61Rp.

KodeH.11. 1 m2 Pasang atap asbes gelombang (1.8 x 0.92 m) x 5 mm Dibulatkan 89,500.00Rp.

H.12. 1 m2 Pasang atap asbes gelombang (3.00 x 1.05 m) x 4 mm1 Bahan

Asbes gelombang 0.3500 lbr 75,020.00Rp. 26,257.00Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 28,594.60Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 18,130.00Rp.

Jumlah (1) + (2) 46,724.60Rp.Keuntungan 10% 4,672.46Rp.Jumlah 51,397.06Rp.

KodeH.12. 1 m2 Pasang atap asbes gelombang (3.00 x 1.05 m) x 4 mm Dibulatkan 51,300.00Rp.

H.13. 1 m2 Pasang atap asbes gelombang (2.70 x 1.05 m) x 4 mm1 Bahan

Asbes gelombang 0.4200 lbr 66,500.00Rp. 27,930.00Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 30,267.60Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 18,130.00Rp.

Jumlah (1) + (2) 48,397.60Rp.Keuntungan 10% 4,839.76Rp.Jumlah 53,237.36Rp.

KodeH.13. 1 m2 Pasang atap asbes gelombang (2.70 x 1.05 m) x 4 mm Dibulatkan 53,200.00Rp.

H.14. 1 m2 Pasang atap asbes gelombang (2.40 x 1.05 m) x 4 mm1 Bahan

Asbes gelombang 0.4400 lbr 58,080.00Rp. 25,555.20Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 27,892.80Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 45,707.80Rp.Keuntungan 10% 4,570.78Rp.Jumlah 50,278.58Rp.

KodeH.14. 1 m2 Pasang atap asbes gelombang (2.40 x 1.05 m) x 4 mm Dibulatkan 50,200.00Rp.

H.15. 1 m2 Pasang atap asbes gelombang (2.10 x 1.05 m) x 4 mm1 Bahan

Asbes gelombang 0.5100 lbr 52,030.00Rp. 26,535.30Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 28,872.90Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.

Page 99: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 46,687.90Rp.Keuntungan 10% 4,668.79Rp.Jumlah 51,356.69Rp.

KodeH.15. 1 m2 Pasang atap asbes gelombang (2.10 x 1.05 m) x 4 mm Dibulatkan 51,300.00Rp.

H.16. 1 m2 Pasang atap asbes gelombang (1.5 x 1.05 m) x 4 mm1 Bahan

Asbes gelombang 0.8000 lbr 39,930.00Rp. 31,944.00Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 34,281.60Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 52,096.60Rp.Keuntungan 10% 5,209.66Rp.Jumlah 57,306.26Rp.

KodeH.16. 1 m2 Pasang atap asbes gelombang (1.5 x 1.05 m) x 4 mm Dibulatkan 57,300.00Rp.

H.17. 1 m2 Pasang atap asbes gelombang (3.00 x 1.08 m) x 6 mm1 Bahan

Asbes gelombang 0.3700 lbr 85,890.00Rp. 31,779.30Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 34,116.90Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 51,931.90Rp.Keuntungan 10% 5,193.19Rp.Jumlah 57,125.09Rp.

KodeH.17. 1 m2 Pasang atap asbes gelombang (3.00 x 1.08 m) x 6 mm Dibulatkan 57,100.00Rp.

H.18. 1 m2 Pasang atap asbes gelombang (2.70 x 1.08 m) x 6 mm1 Bahan

Asbes gelombang 0.3800 lbr 82,850.00Rp. 31,483.00Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 33,820.60Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 51,635.60Rp.Keuntungan 10% 5,163.56Rp.Jumlah 56,799.16Rp.

KodeH.18. 1 m2 Pasang atap asbes gelombang (2.70 x 1.08 m) x 6 mm Dibulatkan 56,700.00Rp.

H.19. 1 m2 Pasang atap asbes gelombang (2.40 x 1.08 m) x 6 mm1 Bahan

Asbes gelombang 0.4600 lbr 75,010.00Rp. 34,504.60Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 36,842.20Rp.

Page 100: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 54,657.20Rp.Keuntungan 10% 5,465.72Rp.Jumlah 60,122.92Rp.

KodeH.19. 1 m2 Pasang atap asbes gelombang (2.40 x 1.08 m) x 6 mm Dibulatkan 60,100.00Rp.

H.20. 1 m2 Pasang atap asbes gelombang (2.10 x 1.08 m) x 6 mm1 Bahan

Asbes gelombang 0.4900 lbr 65,650.00Rp. 32,168.50Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 34,506.10Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 52,321.10Rp.Keuntungan 10% 5,232.11Rp.Jumlah 57,553.21Rp.

KodeH.20. 1 m2 Pasang atap asbes gelombang (2.10 x 1.08 m) x 6 mm Dibulatkan 57,500.00Rp.

H.21. 1 m2 Pasang atap asbes gelombang (1.80 x 1.08 m) x 6 mm1 Bahan

Asbes gelombang 0.5700 lbr 54,640.00Rp. 31,144.80Rp.Paku pancing 60 x 230 0.1200 kg 19,480.00Rp. 2,337.60Rp.

Jumlah (1). 33,482.40Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang kayu 0.0670 oh 105,000.00Rp. 7,035.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,815.00Rp.

Jumlah (1) + (2) 51,297.40Rp.Keuntungan 10% 5,129.74Rp.Jumlah 56,427.14Rp.

KodeH.21. 1 m2 Pasang atap asbes gelombang (1.80 x 1.08 m) x 6 mm Dibulatkan 56,400.00Rp.

H.22. 1 m' Pasang bubung stel gelombang 0.92 m1 Bahan

Bubungan stel gelombang 2.4000 lbr 31,250.00Rp. 75,000.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 264,720.00Rp.

2 TenagaPekerja 0.0840 oh 66,000.00Rp. 5,544.00Rp.Tukang kayu 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 20,629.00Rp.

Jumlah (1) + (2) 285,349.00Rp.Keuntungan 10% 28,534.90Rp.Jumlah 313,883.90Rp.

KodeH.22. 1 m' Pasang bubung stel gelombang 0.92 m Dibulatkan 313,800.00Rp.

H.23. 1 m' Pasang nok stel gelombang 1.05 m1 Bahan

Page 101: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Nok stel gelombang 2.1000 lbr 39,080.00Rp. 82,068.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 271,788.00Rp.

2 TenagaPekerja 0.0840 oh 66,000.00Rp. 5,544.00Rp.Tukang kayu 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 20,629.00Rp.

Jumlah (1) + (2) 292,417.00Rp.Keuntungan 10% 29,241.70Rp.Jumlah 321,658.70Rp.

KodeH.23. 1 m' Pasang nok stel gelombang 1.05 m Dibulatkan 321,600.00Rp.

H.24. 1 m' Pasang nok stel gelombang 1.08 m1 Bahan

Nok stel gelombang 2.0500 lbr 43,760.00Rp. 89,708.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 279,428.00Rp.

2 TenagaPekerja 0.0840 oh 66,000.00Rp. 5,544.00Rp.Tukang kayu 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 20,629.00Rp.

Jumlah (1) + (2) 300,057.00Rp.Keuntungan 10% 30,005.70Rp.Jumlah 330,062.70Rp.

KodeH.24. 1 m' Pasang nok stel gelombang 1.08 m Dibulatkan 330,000.00Rp.

H.25. 1 m' Pasang nok paten 0.92 m1 Bahan

Nok paten 1.2000 lbr 49,960.00Rp. 59,952.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 249,672.00Rp.

2 TenagaPekerja 0.0840 oh 66,000.00Rp. 5,544.00Rp.Tukang kayu 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 20,629.00Rp.

Jumlah (1) + (2) 270,301.00Rp.Keuntungan 10% 27,030.10Rp.Jumlah 297,331.10Rp.

KodeH.25. 1 m' Pasang nok paten 0.92 m Dibulatkan 297,300.00Rp.

H.26. 1 m' Pasang nok paten 1.05 m1 Bahan

Nok paten 1.2000 lbr 60,970.00Rp. 73,164.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 262,884.00Rp.

2 TenagaPekerja 0.0840 oh 66,000.00Rp. 5,544.00Rp.Tukang kayu 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 20,629.00Rp.

Jumlah (1) + (2) 283,513.00Rp.Keuntungan 10% 28,351.30Rp.Jumlah 311,864.30Rp.

KodeH.26. 1 m' Pasang nok paten 1.05 m Dibulatkan 311,800.00Rp.

Page 102: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

H.27. 1 m' Pasang nok paten 1.08 m1 Bahan

Nok paten 1.2000 lbr 67,170.00Rp. 80,604.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 270,324.00Rp.

2 TenagaPekerja 0.0840 oh 66,000.00Rp. 5,544.00Rp.Tukang kayu 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 20,629.00Rp.

Jumlah (1) + (2) 290,953.00Rp.Keuntungan 10% 29,095.30Rp.Jumlah 320,048.30Rp.

KodeH.27. 1 m' Pasang nok paten 1.08 m Dibulatkan 320,000.00Rp.

H.28. 1 m' Pasang nok stel rata 0.92 m1 Bahan

Nok stel rata 1.1000 lbr 70,330.00Rp. 77,363.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 267,083.00Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 24,310.00Rp.

Jumlah (1) + (2) 291,393.00Rp.Keuntungan 10% 29,139.30Rp.Jumlah 320,532.30Rp.

KodeH.28. 1 m' Pasang nok stel rata 0.92 m Dibulatkan 320,500.00Rp.

H.29. 1 m' Pasang nok stel rata 1.05 m1 Bahan

Nok stel rata 1.1000 lbr 82,850.00Rp. 91,135.00Rp.Paku sekrup 3.5" 6.0000 bh 31,620.00Rp. 189,720.00Rp.

Jumlah (1). 280,855.00Rp.

2 TenagaPekerja 0.0840 oh 66,000.00Rp. 5,544.00Rp.Tukang kayu 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 20,629.00Rp.

Jumlah (1) + (2) 301,484.00Rp.Keuntungan 10% 30,148.40Rp.Jumlah 331,632.40Rp.

KodeH.29. 1 m' Pasang nok stel rata 1.05 m Dibulatkan 331,600.00Rp.

H.30. 1 m2 Pasang atap genteng beton1 Bahan

Genteng beton 11.0000 bh 7,460.00Rp. 82,060.00Rp.Paku biasa 2" - 5" 0.0300 kg 19,480.00Rp. 584.40Rp.

Jumlah (1). 82,644.40Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 25,900.00Rp.

Jumlah (1) + (2) 108,544.40Rp.Keuntungan 10% 10,854.44Rp.

Page 103: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 119,398.84Rp.KodeH.30. 1 m2 Pasang atap genteng beton Dibulatkan 119,300.00Rp.

H.31. 1 m2 Pasang atap genteng aspal1 Bahan

Genteng aspal 6.9000 lbr 12,100.00Rp. 83,490.00Rp.Plywood 4" x 8" x 6 mm 0.3500 lbr 95,810.00Rp. 33,533.50Rp.Paku biasa 2" - 5" 0.0300 kg 19,480.00Rp. 584.40Rp.Plastic aerator 0.5000 bh 960.00Rp. 480.00Rp.

Jumlah (1). 118,087.90Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0030 oh 120,000.00Rp. 360.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 46,060.00Rp.

Jumlah (1) + (2) 164,147.90Rp.Keuntungan 10% 16,414.79Rp.Jumlah 180,562.69Rp.

KodeH.31. 1 m2 Pasang atap genteng aspal Dibulatkan 180,500.00Rp.

H.32. 1 m2 Pasang atap genteng metal1 Bahan

Genteng metal 1.0200 lbr 119,690.00Rp. 122,083.80Rp.Paku biasa 2" - 5" 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 125,979.80Rp.

2 TenagaPekerja 0.2000 oh 65,700.00Rp. 13,140.00Rp.Tukang kayu 0.1000 oh 98,000.00Rp. 9,800.00Rp.Kepala tukang 0.0100 oh 127,500.00Rp. 1,275.00Rp.Mandor 0.0010 oh 145,000.00Rp. 145.00Rp.

Jumlah (2). 24,360.00Rp.

Jumlah (1) + (2) 150,339.80Rp.Keuntungan 10% 15,033.98Rp.Jumlah 165,373.78Rp.

KodeH.32. 1 m2 Pasang atap genteng metal Dibulatkan 165,300.00Rp.

H.33. 1 m2 Pasang atap sirap1 Bahan

Genteng sirap 60.0000 lbr 143,600.00Rp. 8,616,000.00Rp.Paku biasa 1/2" - 1" 0.2000 kg 19,480.00Rp. 3,896.00Rp.

Jumlah (1). 8,619,896.00Rp.

2 TenagaPekerja 0.1660 oh 65,700.00Rp. 10,906.20Rp.Tukang kayu 0.2500 oh 98,000.00Rp. 24,500.00Rp.Kepala tukang 0.0250 oh 127,500.00Rp. 3,187.50Rp.Mandor 0.0080 oh 145,000.00Rp. 1,160.00Rp.

Jumlah (2). 39,753.70Rp.

Jumlah (1) + (2) 8,659,649.70Rp.Keuntungan 10% 865,964.97Rp.Jumlah 9,525,614.67Rp.

KodeH.33. 1 m2 Pasang atap sirap Dibulatkan 9,525,600.00Rp.

H.34. 1 m' Pasang nok genteng beton1 Bahan

Nok genteng beton 3.5000 bh 10,120.00Rp. 35,420.00Rp.Paku biasa 2" x 5" 0.0500 kg 19,480.00Rp. 974.00Rp.Semen abu-abu 10.8000 kg 1,360.00Rp. 14,688.00Rp.Pasir pasang 0.0320 m3 203,500.00Rp. 6,512.00Rp.Semen warna 1.0000 kg -Rp.

Jumlah (1). 57,594.00Rp.

2 Tenaga

Page 104: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.4000 oh 65,700.00Rp. 26,280.00Rp.Tukang kayu 0.2000 oh 98,000.00Rp. 19,600.00Rp.Kepala tukang 0.0200 oh 127,500.00Rp. 2,550.00Rp.Mandor 0.0200 oh 145,000.00Rp. 2,900.00Rp.

Jumlah (2). 51,330.00Rp.

Jumlah (1) + (2) 108,924.00Rp.Keuntungan 10% 10,892.40Rp.Jumlah 119,816.40Rp.

KodeH.34. 1 m' Pasang nok genteng beton Dibulatkan 119,800.00Rp.

H.35. 1 m' Pasang nok genteng aspal1 Bahan

Nok genteng aspal 2.0000 bh 12,100.00Rp. 24,200.00Rp.Paku biasa 2" x 5" 0.0500 kg 19,480.00Rp. 974.00Rp.Kayu borneo, balok 0.0035 m3 3,437,010.00Rp. 12,029.54Rp.

Jumlah (1). 37,203.54Rp.

2 TenagaPekerja 0.1250 oh 65,700.00Rp. 8,212.50Rp.Tukang kayu 0.2500 oh 98,000.00Rp. 24,500.00Rp.Kepala tukang 0.0250 oh 127,500.00Rp. 3,187.50Rp.Mandor 0.0060 oh 145,000.00Rp. 870.00Rp.

Jumlah (2). 36,770.00Rp.

Jumlah (1) + (2) 73,973.54Rp.Keuntungan 10% 7,397.35Rp.Jumlah 81,370.89Rp.

KodeH.35. 1 m' Pasang nok genteng aspal Dibulatkan 81,300.00Rp.

H.36. 1 m' Pasang nok genteng metal1 Bahan

Genteng decra bond 1.1000 bh 55,400.00Rp. 60,940.00Rp.Paku biasa 2" x 5" 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 61,914.00Rp.

2 TenagaPekerja 0.2500 oh 65,700.00Rp. 16,425.00Rp.Tukang kayu 0.1500 oh 98,000.00Rp. 14,700.00Rp.Kepala tukang 0.0150 oh 127,500.00Rp. 1,912.50Rp.Mandor 0.0130 oh 145,000.00Rp. 1,885.00Rp.

Jumlah (2). 34,922.50Rp.

Jumlah (1) + (2) 96,836.50Rp.Keuntungan 10% 9,683.65Rp.Jumlah 106,520.15Rp.

KodeH.36. 1 m' Pasang nok genteng metal Dibulatkan 106,500.00Rp.

H.37. 1 m' Pasang nok sirap1 Bahan

Seng plat 3" x 6" bjls 28 0.4000 lbr 51,870.00Rp. 20,748.00Rp.Paku biasa 1/2" - 1" 0.0600 kg 19,480.00Rp. 1,168.80Rp.Paku biasa 2" x 5" 0.0500 kg 19,480.00Rp. 974.00Rp.Kayu borneo, papan tebal 3 cm 0.0040 m3 3,749,460.00Rp. 14,997.84Rp.

Jumlah (1). 37,888.64Rp.

2 TenagaPekerja 0.1250 oh 65,700.00Rp. 8,212.50Rp.Tukang kayu 0.2500 oh 98,000.00Rp. 24,500.00Rp.Kepala tukang 0.0250 oh 127,500.00Rp. 3,187.50Rp.Mandor 0.0060 oh 145,000.00Rp. 870.00Rp.

Jumlah (2). 36,770.00Rp.

Jumlah (1) + (2) 74,658.64Rp.Keuntungan 10% 7,465.86Rp.Jumlah 82,124.50Rp.

KodeH.37. 1 m' Pasang nok sirap Dibulatkan 82,100.00Rp.

H.38. 1 m2 Pasang atap seng gelombang

Page 105: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanSeng gelombang 3" x 6" bkls 28 0.7000 lbr 39,350.00Rp. 27,545.00Rp.Paku biasa 1/2" - 1" 0.0200 kg 19,480.00Rp.

Jumlah (1). 27,545.00Rp.

2 TenagaPekerja 0.1200 oh 65,700.00Rp. 7,884.00Rp.Tukang kayu 0.0600 oh 98,000.00Rp. 5,880.00Rp.Kepala tukang 0.0060 oh 127,500.00Rp. 765.00Rp.Mandor 0.0060 oh 145,000.00Rp. 870.00Rp.

Jumlah (2). 15,399.00Rp.

Jumlah (1) + (2) 42,944.00Rp.Keuntungan 10% 4,294.40Rp.Jumlah 47,238.40Rp.

KodeH.38. 1 m2 Pasang atap seng gelombang Dibulatkan 47,200.00Rp.

H.39. 1 m2 Pasang atap nok seng1 Bahan

Seng plat 3" x 6" bjls 28 0.3000 lbr 51,870.00Rp. 15,561.00Rp.Paku biasa 1/2" - 1" 0.0400 kg 19,480.00Rp. 779.20Rp.

Jumlah (1). 16,340.20Rp.

2 TenagaPekerja 0.1500 oh 65,700.00Rp. 9,855.00Rp.Tukang kayu 0.0700 oh 98,000.00Rp. 6,860.00Rp.Kepala tukang 0.0080 oh 127,500.00Rp. 1,020.00Rp.Mandor 0.0060 oh 145,000.00Rp. 870.00Rp.

Jumlah (2). 18,605.00Rp.

Jumlah (1) + (2) 34,945.20Rp.Keuntungan 10% 3,494.52Rp.Jumlah 38,439.72Rp.

KodeH.39. 1 m2 Pasang atap nok seng Dibulatkan 38,400.00Rp.

H.40. 1 m2 Pasang atap alumunium1 Bahan

Atap alumunium gelombang tebal 0,55 1.0500 m3 85,890.00Rp. 90,184.50Rp.Paku hak panjang 15 cm 0.0200 kg 19,480.00Rp. 389.60Rp.

Jumlah (1). 90,574.10Rp.

2 TenagaPekerja 0.1500 oh 65,700.00Rp. 9,855.00Rp.Tukang kayu 0.7500 oh 98,000.00Rp. 73,500.00Rp.Kepala tukang 0.0080 oh 127,500.00Rp. 1,020.00Rp.Mandor 0.0060 oh 145,000.00Rp. 870.00Rp.

Jumlah (2). 85,245.00Rp.

Jumlah (1) + (2) 175,819.10Rp.Keuntungan 10% 17,581.91Rp.Jumlah 193,401.01Rp.

KodeH.40. 1 m2 Pasang atap alumunium Dibulatkan 193,400.00Rp.

H.41. 1 m2 Pasang nok alumunium1 Bahan

Nok strandar 40 cm 18, swg 22 1.2000 m2 70,330.00Rp. 84,396.00Rp.Paku hak panjang 15 cm 0.0400 kg 19,480.00Rp. 779.20Rp.

Jumlah (1). 85,175.20Rp.

2 TenagaPekerja 0.1000 oh 65,700.00Rp. 6,570.00Rp.Tukang kayu 1.0000 oh 98,000.00Rp. 98,000.00Rp.Kepala tukang 0.0100 oh 127,500.00Rp. 1,275.00Rp.Mandor 0.0100 oh 145,000.00Rp. 1,450.00Rp.

Jumlah (2). 107,295.00Rp.

Jumlah (1) + (2) 192,470.20Rp.Keuntungan 10% 19,247.02Rp.Jumlah 211,717.22Rp.

Kode

Page 106: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

H.41. 1 m2 Pasang nok alumunium Dibulatkan 211,700.00Rp.

H.42. 1 m2 Pasang alumunium foil/ sisalation1 Bahan

Sisalation/alumunium foil 1.0500 lbr 6,190.00Rp. 6,499.50Rp.Jumlah (1). 6,499.50Rp.

2 TenagaPekerja 0.1500 oh 65,700.00Rp. 9,855.00Rp.Tukang kayu 0.0500 oh 98,000.00Rp. 4,900.00Rp.Kepala tukang 0.0050 oh 127,500.00Rp. 637.50Rp.Mandor 0.0075 oh 145,000.00Rp. 1,087.50Rp.

Jumlah (2). 16,480.00Rp.

Jumlah (1) + (2) 22,979.50Rp.Keuntungan 10% 2,297.95Rp.Jumlah 25,277.45Rp.

KodeH.42. 1 m2 Pasang alumunium foil/ sisalation Dibulatkan 25,200.00Rp.

H.43. 1 m' Pasang talang alumunium1 Bahan

Alumunium seng 0.5000 m2 132,830.00Rp. 66,415.00Rp.Kayu Kaso 0.0084 m3 3,437,010.00Rp. 28,870.88Rp.

Jumlah (1). 95,285.88Rp.

2 TenagaPekerja 0.3000 oh 65,700.00Rp. 19,710.00Rp.Tukang kayu 0.1000 oh 98,000.00Rp. 9,800.00Rp.Kepala tukang 0.0100 oh 127,500.00Rp. 1,275.00Rp.Mandor 0.0150 oh 145,000.00Rp. 2,175.00Rp.

Jumlah (2). 32,960.00Rp.

Jumlah (1) + (2) 128,245.88Rp.Keuntungan 10% 12,824.59Rp.Jumlah 141,070.47Rp.

KodeH.43. 1 m' Pasang talang alumunium Dibulatkan 141,000.00Rp.

H.44. 1 1 kg Besi bulat Ø 7.56 cm 15,000.00RpBesi GIP Ø 2.5" 1.0000 kg 7,760.00Rp 7,760.00RpAlat bantu 1.0000 ls 750.00Rp 750.00RpPekerja terampil 0.0600 org 98,000.00Rp 5,880.00RpTukang besi terampil 0.0040 org 112,500.00Rp 450.00RpKep. Tukang besi 0.0010 org 127,500.00Rp 127.50RpMandor 0.0002 org 127,500.00Rp 25.50Rp

KodeH.44. 1 kg Pasang talang alumunium Dibulatkan 14,993.00Rp

H.45. 1 1 kg Besi bulat Ø 10 cm 13,100.00RpBesi GIP Ø 4" 1.0000 kg 5,932.00Rp 5,932.00RpAlat bantu 1.0000 ls 750.00Rp 750.00RpPekerja terampil 0.0600 org 98,000.00Rp 5,880.00RpTukang besi terampil 0.0040 org 110,000.00Rp 440.00RpKep. Tukang besi 0.0010 org 112,500.00Rp 112.50RpMandor 0.0002 org 112,500.00Rp 22.50Rp

Kode Jumlah 13,137.00RpH.45. 1 kg Besi bulat Ø 10 cm Dbulatkan 13,100.00Rp

H.46. 1 m2 Space frame1 Bahan

Komponen space frame : pipa Od 2,5"-16", balljoint T 84 - 300 M 16 / 42, base plate t=25mm + angkur M32-500 berikut Wind Tunnel Test1.0500 m2 1,627,480.00Rp 1,708,854.00RpJumlah (1). 1,708,854.00Rp

2 TenagaPekerja 1.5000 oh 66,000.00Rp 99,000.00RpTukang besi 0.7500 oh 105,000.00Rp 78,750.00RpKepala tukang 0.0625 oh 120,000.00Rp 7,500.00RpMandor 0.0625 oh 100,000.00Rp 6,250.00Rp

Jumlah (2). 191,500.00Rp

3 Finishing cat duco 2.1000 m2 66,883.48Rp 140,455.30RpJumlah (3). 140,455.30Rp

4 Wind Tunnel Test Jumlah (4). 62,546.04

Jumlah 1 s/d 4 2,103,355.34RpKeuntungan 10% 210,335.53RpJumlah 2,313,690.87Rp

Page 107: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeH.46. 1 m2 Space frame Dibulatkan 2,313,600.00

H.47. 1 m2 Komponen gording1 Bahan

Komponen gording : dudukan gording, gording primer ∅3"t=2.8"(STK41), skunder ∅2" t=2.8mm(STK41), klem gording primer & sekunder1.0500 m2 87,590.00Rp 91,969.50RpJumlah (1). 91,969.50Rp

2 TenagaPekerja 0.2000 oh 66,000.00Rp 13,200.00RpTukang besi 0.1000 oh 105,000.00Rp 10,500.00RpKepala tukang 0.0100 oh 120,000.00Rp 1,200.00RpMandor 0.0050 oh 100,000.00Rp 500.00Rp

Jumlah (2). 25,400.00Rp

3 Finishing cat duco 1.0500 m2 66,883.48Rp 70,227.65RpJumlah (3). 70,227.65Rp

Jumlah (1) s/d (3) 187,597.15RpKeuntungan 10% 18,759.71RpJumlah 206,356.86Rp

KodeH.47. 1 m2 Komponen gording Dibulatkan 206,300.00

H.48. 1 m2 Komponen catwalk1 Bahan

Komponen catwalk : dudukan catwalk ∅3" t=3mm, rangka baja CNP 125, siku 40.40.4, railling BSP Ø1" & expanded metal & kupingan lampu1.0500 m2 474,650.00Rp 498,382.50RpJumlah (1). 498,382.50Rp

2 TenagaPekerja 0.9950 oh 66,000.00Rp 65,670.00RpTukang besi 0.5000 oh 105,000.00Rp 52,500.00RpKepala tukang 0.0500 oh 120,000.00Rp 6,000.00RpMandor 0.0250 oh 100,000.00Rp 2,500.00Rp

Jumlah (2). 126,670.00Rp

3 Finishing cat duco 2.1000 m2 66,883.48Rp 140,455.30RpJumlah (3). 140,455.30Rp

Jumlah (1) s/d (3) 765,507.80RpKeuntungan 10% 76,550.78RpJumlah 842,058.58Rp

KodeH.48. 1 m2 Komponen catwalk Dibulatkan 842,000.00

H.49. 1 m2 Lisplank Bulnose-Zinc Alum1 Bahan

Lisplank Bulnose-Zinc Alum rangka pipa Ø2", hollow 40x40x2mm, hollow 20x40x1,6mm + dudukan gording & ACPt=4mm1.0500 m2 719,560.00Rp 755,538.00RpJumlah (1). 755,538.00Rp

2 TenagaPekerja 0.8000 oh 66,000.00Rp 52,800.00RpTukang besi 0.4000 oh 105,000.00Rp 42,000.00RpKepala tukang 0.0400 oh 120,000.00Rp 4,800.00RpMandor 0.0200 oh 100,000.00Rp 2,000.00Rp

Jumlah (2). 101,600.00Rp

3 Finishing cat duco 2.1000 m2 66,883.48Rp 140,455.30RpJumlah (3). 140,455.30Rp

Jumlah (1) s/d (3) 997,593.30RpKeuntungan 10% 99,759.33RpJumlah 1,097,352.63Rp

KodeH.49. 1 m2 Lisplank Bulnose-Zinc Alum Dibulatkan 1,097,300.00

H.50. 1 m2 Komponen Penutup atap geas Zipdeck1 Bahan

Standing seam (tapered) Colorbond TCT = 0,50mm (BMT), Alumunium Halter, Halter path termasuk bahan pelengkap1.0500 m2 348,920.00Rp 366,366.00RpJumlah (1). 366,366.00Rp

2 TenagaPekerja 0.1500 oh 66,000.00Rp 9,900.00RpTukang besi 0.7510 oh 105,000.00Rp 78,855.00RpKepala tukang 0.0080 oh 120,000.00Rp 960.00RpMandor 0.0060 oh 100,000.00Rp 600.00Rp

Page 108: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 90,315.00Rp

Jumlah (1) + (2) 456,681.00RpKeuntungan 10% 45,668.10RpJumlah 502,349.10Rp

KodeH.50. 1 m2 Komponen Penutup atap geas Zipdeck Dibulatkan 502,300.00

H.51. 1 m' Pasang talang datar1 Bahan

Dudukan talang siku 50.50.5, pipa ∅ 2" t=2mm STK 41, metal zincalume t=6mm, flshing zincalume t=6mm & corong talang Od 12"1.0500 m2 1,360,640.00Rp 1,428,672.00RpJumlah (1). 1,428,672.00Rp

2 TenagaPekerja 0.6250 oh 66,000.00Rp 41,250.00RpTukang besi 0.3125 oh 105,000.00Rp 32,812.50RpKepala tukang 0.0313 oh 120,000.00Rp 3,750.00RpMandor 0.0156 oh 100,000.00Rp 1,562.50Rp

Jumlah (2). 79,375.00Rp

Jumlah (1) + (2) 1,508,047.00RpKeuntungan 10% 150,804.70RpJumlah 1,658,851.70Rp

KodeH.51. 1 m' Pasang talang datar Dibulatkan 1,658,800.00

H.52. 1 1 M² Penutup Atap Metal 165300.00Atap Spandek zinc alum (color bond) 1.050 m² 135,000.00 141750.00Paku hak panjang 5 cm 0.020 kg 65,700.00 1314.00Tukang Kayu 0.050 org 115,000.00 5750.00Pekerja 0.150 org 98,000.00 14700.00Kepala Tukang 0.005 org 127,500.00 637.50Mandor 0.008 org 145,000.00 1160.00

Jumlah 165311.50H.53. 2 1 M² Pasang Plafond Gypsum, tebal 9 Mm 100,900.00

Gypsum (120x240x9) 0.347 lbr 60,500.00 21,006.94Furring joiner PN 204 2.500 m¹ 1,125.00 2,812.50Top Cross-rail PN200 1.000 m¹ 35,500.00 35,500.00TCR-FC Joiner PN210 3.000 bh 550.00 1,650.00Adjuster U Rod PN223S 3.500 bh 600.00 2,100.00Hanger Rod 3.500 m¹ 3,250.00 11,375.00Ramset / dina bolt 2.500 bh 3,500.00 8,750.00

H.54. 5 1 M¹ List Gypsum / Cornice 10 cm 20,600.00List Gypsum 10 cm 1.010 m' 12,500.00 12,625.00Compound 0.120 kg 4,625.00 555.00Pekerja 0.050 org 60,000.00 3,000.00Tukang kayu 0.050 org 75,000.00 3,750.00Kepala Tukang 0.005 org 80,000.00 400.00Mandor 0.003 org 85,000.00 255.00

H.55. 1 10 CM¹ Pengelasan dgn las listrik 23,200.00Bahan

Kawat las listrik 0.400 kg 23,600.00 9,440.00Solar 0.300 ltr 6,500.00 1,950.00Minyak Pelumas 0.040 ltr 30,000.00 1,200.00

TenagaTukang besi konstruksi 0.020 org 65,700.00 1,314.00Pekerja 0.040 org 115,000.00 4,600.00Kepala Tukang 0.002 org 98,000.00 196.00Mandor 0.002 org 127,500.00 255.00

AlatSewa alat 0.170 jam 25,000.00 4,250.00

Jumlah 23,205.00

Page 109: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN LANGIT-LANGITRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pembuatan langit-langit2. Pekerjaan pembuatan rangka dinding dan pemasangan dinding pemisah3. Pekerjaan pemasangan lisplnk kayu dan list palfond

I.1. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 6 mm1 Bahan

Pelat asbes tebal 6 mm 1.1000 Lbr 21,160.00Rp. 23,276.00Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.

Jumlah (1). 23,494.90Rp.

2 TenagaPekerja 0.0300 oh 66,000.00Rp. 1,980.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 10,570.00Rp.

Jumlah (1) + (2) 34,064.90Rp.Keuntungan 10% 3,406.49Rp.Jumlah 37,471.39Rp.

KodeI.1. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 6 mm Dibulatkan 37,400.00Rp.

I.2. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 5 mm1 Bahan

Pelat asbes tebal 5 mm 1.1000 Lbr 21,160.00Rp. 23,276.00Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.

Jumlah (1). 23,494.90Rp.

2 TenagaPekerja 0.0300 oh 66,000.00Rp. 1,980.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 10,570.00Rp.

Jumlah (1) + (2) 34,064.90Rp.Keuntungan 10% 3,406.49Rp.Jumlah 37,471.39Rp.

KodeI.2. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 5 mm Dibulatkan 37,400.00Rp.

I.3. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm1 Bahan

Pelat asbes tebal 4 mm 1.1000 Lbr 19,050.00Rp. 20,955.00Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.

Jumlah (1). 21,173.90Rp.

2 TenagaPekerja 0.0300 oh 66,000.00Rp. 1,980.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 10,570.00Rp.

Jumlah (1) + (2) 31,743.90Rp.Keuntungan 10% 3,174.39Rp.Jumlah 34,918.29Rp.

KodeI.3. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm Dibulatkan 34,900.00Rp.

I.4. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 3.5 mm1 Bahan

Pelat asbes tebal 6 mm 1.1000 Lbr 13,360.00Rp. 14,696.00Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

I.

Page 110: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Paku 0.0100 kg 21,890.00Rp. 218.90Rp.Jumlah (1). 14,914.90Rp.

2 TenagaPekerja 0.0300 oh 66,000.00Rp. 1,980.00Rp.Tukang kayu 0.0700 oh 105,000.00Rp. 7,350.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 10,570.00Rp.

Jumlah (1) + (2) 25,484.90Rp.Keuntungan 10% 2,548.49Rp.Jumlah 28,033.39Rp.

KodeI.4. 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 3.5 mm Dibulatkan 28,000.00Rp.

I.5. 1 m2 Langit-langit akustik (30 x 30) cm1 Bahan

Akustik ukuran 30 x 30 cm 12.0000 Lbr 54,450.00Rp. 653,400.00Rp.Paku 0.0500 kg 21,890.00Rp. 1,094.50Rp.

Jumlah (1). 654,494.50Rp.

2 TenagaPekerja 0.1200 oh 66,000.00Rp. 7,920.00Rp.Tukang kayu 0.1200 oh 105,000.00Rp. 12,600.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 22,560.00Rp.

Jumlah (1) + (2) 677,054.50Rp.Keuntungan 10% 67,705.45Rp.Jumlah 744,759.95Rp.

KodeI.5. 1 m2 Langit-langit akustik (30 x 30) cm Dibulatkan 744,700.00Rp.

I.6. 1 m2 Langit-langit akustik (30 x 60) cm1 Bahan

Akustik ukuran 30 x 60 cm 5.8000 Lbr 59,290.00Rp. 343,882.00Rp.Paku 0.0500 kg 21,890.00Rp. 1,094.50Rp.

Jumlah (1). 344,976.50Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 363,776.50Rp.Keuntungan 10% 36,377.65Rp.Jumlah 400,154.15Rp.

KodeI.6. 1 m2 Langit-langit akustik (30 x 60) cm Dibulatkan 400,100.00Rp.

I.7. 1 m2 Langit-langit akustik (60 x 120) cm1 Bahan

Akustik ukuran 60 x 120 cm 1.5000 Lbr 72,600.00Rp. 108,900.00Rp.Paku 0.0500 kg 21,890.00Rp. 1,094.50Rp.

Jumlah (1). 109,994.50Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 128,794.50Rp.Keuntungan 10% 12,879.45Rp.Jumlah 141,673.95Rp.

Kode

Page 111: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

I.7. 1 m2 Langit-langit akustik (60 x 120) cm Dibulatkan 141,600.00Rp.

I.8. 1 m2 Langit-langit triplek uk (120 x 240) tebal 3 mm1 Bahan

Triplek 3 mm 0.3750 Lbr 52,580.00Rp. 19,717.50Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 20,374.20Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 39,174.20Rp.Keuntungan 10% 3,917.42Rp.Jumlah 43,091.62Rp.

KodeI.8. 1 m2 Langit-langit triplek uk (120 x 240) tebal 3 mm Dibulatkan 43,000.00Rp.

I.9. 1 m2 Langit-langit triplek uk (120 x 240) tebal 4 mm1 Bahan

Triplek 4 mm 0.3750 Lbr 69,190.00Rp. 25,946.25Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 26,602.95Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 45,402.95Rp.Keuntungan 10% 4,540.30Rp.Jumlah 49,943.25Rp.

KodeI.9. 1 m2 Langit-langit triplek uk (120 x 240) tebal 4 mm Dibulatkan 49,900.00Rp.

I.10. 1 m2 Langit-langit triplek uk (120 x 240) tebal 6 mm1 Bahan

Triplek 6 mm 0.3750 Lbr 95,810.00Rp. 35,928.75Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 36,585.45Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 18,800.00Rp.

Jumlah (1) + (2) 55,385.45Rp.Keuntungan 10% 5,538.55Rp.Jumlah 60,924.00Rp.

KodeI.10. 1 m2 Langit-langit triplek uk (120 x 240) tebal 6 mm Dibulatkan 60,900.00Rp.

I.11. 1 m2 Langit-langit lambriziring kayu tebal 9 mm1 Bahan

kayu papan 0.0150 m3 7,655,150.00Rp. 114,827.25Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.

Jumlah (1). 115,046.15Rp.

2 TenagaPekerja 0.8000 oh 66,000.00Rp. 52,800.00Rp.Tukang kayu 0.8000 oh 105,000.00Rp. 84,000.00Rp.Kepala tukang 0.0800 oh 120,000.00Rp. 9,600.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 150,400.00Rp.

Page 112: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 265,446.15Rp.Keuntungan 10% 26,544.62Rp.Jumlah 291,990.77Rp.

KodeI.11. 1 m2 Langit-langit lambriziring kayu tebal 9 mm Dibulatkan 291,900.00Rp.

I.12. 1 m2 Langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm1 Bahan

Plywood 4' x 8' x 4 mm 0.3600 Lbr 69,190.00Rp. 24,908.40Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 25,565.10Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0035 oh 100,000.00Rp. 350.00Rp.

Jumlah (2). 16,670.00Rp.

Jumlah (1) + (2) 42,235.10Rp.Keuntungan 10% 4,223.51Rp.Jumlah 46,458.61Rp.

KodeI.12. 1 m2 Langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm Dibulatkan 46,400.00Rp.

I.13. 1 m2 Langit-langit plywood ( 30 x 60 ) cm, tebal 6 mm1 Bahan

Plywood 4' x 8' x 6 mm 0.3600 Lbr 95,810.00Rp. 34,491.60Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 35,148.30Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0035 oh 100,000.00Rp. 350.00Rp.

Jumlah (2). 16,670.00Rp.

Jumlah (1) + (2) 51,818.30Rp.Keuntungan 10% 5,181.83Rp.Jumlah 57,000.13Rp.

KodeI.13. 1 m2 Langit-langit plywood ( 30 x 60 ) cm, tebal 6 mm Dibulatkan 57,000.00Rp.

I.14. 1 m2 Langit-langit plywood ( 60 x 120 ) cm, tebal 4 mm1 Bahan

Plywood 4' x 8' x 4 mm 0.3750 Lbr 69,190.00Rp. 25,946.25Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 26,602.95Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0035 oh 100,000.00Rp. 350.00Rp.

Jumlah (2). 16,670.00Rp.

Jumlah (1) + (2) 43,272.95Rp.Keuntungan 10% 4,327.30Rp.Jumlah 47,600.25Rp.

KodeI.14. 1 m2 Langit-langit plywood ( 60 x 120 ) cm, tebal 4 mm Dibulatkan 47,600.00Rp.

I.15. 1 m2 Langit-langit plywood ( 60 x 120 ) cm, tebal 6 mm1 Bahan

Plywood 4' x 8' x 6 mm 0.3750 Lbr 95,810.00Rp. 35,928.75Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 36,585.45Rp.

2 Tenaga

Page 113: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0035 oh 100,000.00Rp. 350.00Rp.

Jumlah (2). 16,670.00Rp.

Jumlah (1) + (2) 53,255.45Rp.Keuntungan 10% 5,325.55Rp.Jumlah 58,581.00Rp.

KodeI.15. 1 m2 Langit-langit plywood ( 60 x 120 ) cm, tebal 6 mm Dibulatkan 58,500.00Rp.

I.16. 1 m2 Langit-langit teakwood ( 30 x 60 ) cm, tebal 4 mm1 Bahan

Teakwood 4' x 8' x 4 mm 0.3600 Lbr 78,180.00Rp. 28,144.80Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 28,801.50Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0035 oh 100,000.00Rp. 350.00Rp.

Jumlah (2). 16,670.00Rp.

Jumlah (1) + (2) 45,471.50Rp.Keuntungan 10% 4,547.15Rp.Jumlah 50,018.65Rp.

KodeI.16. 1 m2 Langit-langit teakwood ( 30 x 60 ) cm, tebal 4 mm Dibulatkan 50,000.00Rp.

I.17. 1 m2 Langit-langit teakwood ( 60 x 120 ) cm, tebal 4 mm1 Bahan

Teakwood 4' x 8' x 4 mm 0.3750 Lbr 78,180.00Rp. 29,317.50Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 29,974.20Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0035 oh 100,000.00Rp. 350.00Rp.

Jumlah (2). 16,670.00Rp.

Jumlah (1) + (2) 46,644.20Rp.Keuntungan 10% 4,664.42Rp.Jumlah 51,308.62Rp.

KodeI.17. 1 m2 Langit-langit teakwood ( 60 x 120 ) cm, tebal 4 mm Dibulatkan 51,300.00Rp.

I.18. 1 m2 Langit-langit lat kayu jati.1 Bahan

Kayu jati, papan 0.0240 m3 24,996,400.00Rp. 599,913.60Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.Paku sekrup 0.0500 kg 31,620.00Rp. 1,581.00Rp.

Jumlah (1). 601,713.50Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.6000 oh 105,000.00Rp. 63,000.00Rp.Kepala tukang 0.0600 oh 120,000.00Rp. 7,200.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 84,400.00Rp.

Jumlah (1) + (2) 686,113.50Rp.Keuntungan 10% 68,611.35Rp.Jumlah 754,724.85Rp.

KodeI.18. 1 m2 Langit-langit lat kayu jati. Dibulatkan 754,700.00Rp.

I.19. 1 m2 Langit-langit lat kayu ramin.

Page 114: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanKayu ramin 0.0240 lbr 80,580.00Rp. 1,933.92Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.Paku sekrup 0.0500 kg 31,620.00Rp. 1,581.00Rp.

Jumlah (1). 3,733.82Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.6000 oh 105,000.00Rp. 63,000.00Rp.Kepala tukang 0.0600 oh 120,000.00Rp. 7,200.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 84,400.00Rp.

Jumlah (1) + (2) 88,133.82Rp.Keuntungan 10% 8,813.38Rp.Jumlah 96,947.20Rp.

KodeI.19. 1 m2 Langit-langit lat kayu ramin. Dibulatkan 96,900.00Rp.

I.20. 1 m2 Langit-langit lat kayu kamper1 Bahan

Kayu kamper, papan 0.0240 lbr 10,779,700.00Rp. 258,712.80Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.Paku sekrup 0.0500 kg 31,620.00Rp. 1,581.00Rp.

Jumlah (1). 260,512.70Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.6000 oh 105,000.00Rp. 63,000.00Rp.Kepala tukang 0.0600 oh 120,000.00Rp. 7,200.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 84,400.00Rp.

Jumlah (1) + (2) 344,912.70Rp.Keuntungan 10% 34,491.27Rp.Jumlah 379,403.97Rp.

KodeI.20. 1 m2 Langit-langit lat kayu kamper Dibulatkan 379,400.00Rp.

I.21. 1 m2 Langit-langit soft board1 Bahan

Soft board 4' x 6' x 4 mm 0.3500 lbr 102,850.00Rp. 35,997.50Rp.Paku 0.0300 kg 21,890.00Rp. 656.70Rp.

Jumlah (1). 36,654.20Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 51,600.00Rp.

Jumlah (1) + (2) 88,254.20Rp.Keuntungan 10% 8,825.42Rp.Jumlah 97,079.62Rp.

KodeI.21. 1 m2 Langit-langit soft board Dibulatkan 97,000.00Rp.

I.22. 1 m2 Langit-langit akustik 60 x 120 cm + rangka alumunium1 Bahan

Profil aluminium "T" 3.6000 m' 78,650.00Rp. 283,140.00Rp.Kawat seng polos 0.1500 kg 16,500.00Rp. 2,475.00Rp.Ramset/dina bolt 1.0500 bh 3,920.00Rp. 4,116.00Rp.Akustik arm strong 60 x 120 cm 1.5000 lbr 72,600.00Rp. 108,900.00Rp.

Jumlah (1). 398,631.00Rp.

2 TenagaPekerja 0.5000 oh 66,000.00Rp. 33,000.00Rp.Tukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Page 115: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 94,000.00Rp.

Jumlah (1) + (2) 492,631.00Rp.Keuntungan 10% 49,263.10Rp.Jumlah 541,894.10Rp.

KodeI.22. 1 m2 Langit-langit akustik 60 x 120 cm + rangka alumunium Dibulatkan 541,800.00Rp.

I.23. 1 m' List langit-langit kayu profil1 Bahan

List kayu profil 1.0500 m' 7,590.00Rp. 7,969.50Rp.Paku 0.0100 kg 21,890.00Rp. 218.90Rp.

Jumlah (1). 8,188.40Rp.

2 TenagaPekerja 0.0500 oh 66,000.00Rp. 3,300.00Rp.Tukang kayu 0.0500 oh 105,000.00Rp. 5,250.00Rp.Kepala tukang 0.0050 oh 120,000.00Rp. 600.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 9,450.00Rp.

Jumlah (1) + (2) 17,638.40Rp.Keuntungan 10% 1,763.84Rp.Jumlah 19,402.24Rp.

KodeI.23. 1 m' List langit-langit kayu profil Dibulatkan 19,400.00Rp.

I.24. 1 m' List langit langit Profil Gypsum1 Bahan

List Profil Gypsum 1.0500 m' 17,500.00Rp. 18,375.00Rp.Tepung gypsum 0.1500 kg 3,074.00Rp. 461.10Rp.

Jumlah (1). 18,836.10Rp.

2 TenagaPekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Tukang kayu 0.0600 oh 105,000.00Rp. 6,300.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 11,280.00Rp.

Jumlah (1) + (2) 30,116.10Rp.Keuntungan 10% 3,011.61Rp.Jumlah 33,127.71Rp.

KodeI.24. 1 m' List langit langit Profil Gypsum Dibulatkan 33,100.00Rp.

I.25. 1 m2 Langit-langit asbes (1.00 x 1.00) m, tebal 3.2 mm, rangka borneo (50 x 100 m)1 Bahan

Kayu borneo, balok 5/7 0.0154 m3 3,437,010.00Rp. 52,929.95Rp.Paku biasa 0.2100 kg 19,480.00Rp. 4,090.80Rp.Asbes 1.00 x 1.00 m 1.1000 lbr 12,430.00Rp. 13,673.00Rp.

Jumlah (1). 70,693.75Rp.

2 TenagaPekerja 0.1800 oh 66,000.00Rp. 11,880.00Rp.Tukang kayu 0.3200 oh 105,000.00Rp. 33,600.00Rp.Kepala tukang 0.0032 oh 120,000.00Rp. 384.00Rp.Mandor 0.0770 oh 100,000.00Rp. 7,700.00Rp.

Jumlah (2). 53,564.00Rp.

Jumlah (1) + (2) 124,257.75Rp.Keuntungan 10% 12,425.78Rp.Jumlah 136,683.53Rp.

KodeI.25. 1 m2 Langit-langit asbes (1.00 x 1.00) m, tebal 3.2 mm, rangka borneo (50 x 100 m)Dibulatkan 136,600.00Rp.

I.26. 1 m2 Langit-langit plywood 4 mm + rangka kayu borneo (60 x 120 m)1 Bahan

Kayu borneo, balok 5/7 0.0082 m3 3,437,010.00Rp. 28,183.48Rp.Paku biasa 0.1550 kg 19,480.00Rp. 3,019.40Rp.Plywood 4' x 8' x 4 mm 0.3750 lbr 69,190.00Rp. 25,946.25Rp.

Page 116: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 57,149.13Rp.

2 TenagaPekerja 0.1700 oh 66,000.00Rp. 11,220.00Rp.Tukang kayu 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0090 oh 100,000.00Rp. 900.00Rp.

Jumlah (2). 41,370.00Rp.

Jumlah (1) + (2) 98,519.13Rp.Keuntungan 10% 9,851.91Rp.Jumlah 108,371.05Rp.

KodeI.26. 1 m2 Langit-langit plywood 4 mm + rangka kayu borneo (60 x 120 m) Dibulatkan 108,300.00Rp.

I.27. 1 m2 Langit-langit akustik (30 x 60) cm + rangka kayu borneo1 Bahan

Kayu borneo 0.0230 m3 3,437,010.00Rp. 79,051.23Rp.Paku 0.0600 kg 19,480.00Rp. 1,168.80Rp.Akustik 30 x 60 cm 5.8000 lbr 59,290.00Rp. 343,882.00Rp.

Jumlah (1). 424,102.03Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang kayu 0.4000 oh 105,000.00Rp. 42,000.00Rp.Kepala tukang 0.0400 oh 120,000.00Rp. 4,800.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 65,260.00Rp.

Jumlah (1) + (2) 489,362.03Rp.Keuntungan 10% 48,936.20Rp.Jumlah 538,298.23Rp.

KodeI.27. 1 m2 Langit-langit akustik (30 x 60) cm + rangka kayu borneo Dibulatkan 538,200.00Rp.

I.28. 1 m2 Langit-langit akustik (30 x 30) cm + rangka kayu borneo1 Bahan

Kayu borneo 0.0270 m3 3,437,010.00Rp. 92,799.27Rp.Paku 0.0600 kg 19,480.00Rp. 1,168.80Rp.Akustik 30 x 30 cm 11.5000 lbr 54,450.00Rp. 626,175.00Rp.

Jumlah (1). 720,143.07Rp.

2 TenagaPekerja 0.3100 oh 66,000.00Rp. 20,460.00Rp.Tukang kayu 0.4700 oh 105,000.00Rp. 49,350.00Rp.Kepala tukang 0.0470 oh 120,000.00Rp. 5,640.00Rp.Mandor 0.0155 oh 100,000.00Rp. 1,550.00Rp.

Jumlah (2). 77,000.00Rp.

Jumlah (1) + (2) 797,143.07Rp.Keuntungan 10% 79,714.31Rp.Jumlah 876,857.38Rp.

KodeI.28. 1 m2 Langit-langit akustik (30 x 30) cm + rangka kayu borneo Dibulatkan 876,800.00Rp.

I.29. 1 m2 Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm1 Bahan

Gypsum board ( 120 x 240 x 9) mm 0.3640 lbr 60,500.00Rp. 22,022.00Rp.Paku Triplek 0.1100 kg 21,890.00Rp. 2,407.90Rp.

Jumlah (1). 24,429.90Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.0500 oh 105,000.00Rp. 5,250.00Rp.Kepala tukang 0.0050 oh 120,000.00Rp. 600.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 12,950.00Rp.

Jumlah (1) + (2) 37,379.90Rp.Keuntungan 10% 3,737.99Rp.Jumlah 41,117.89Rp.

Page 117: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeI.29. 1 m2 Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm Dibulatkan 41,100.00Rp.

I.30.1 m2

1 BahanHollow 40 x 40 mm 4.6500 m' 12,650.00Rp. 58,822.50Rp.Paku sekrup 0.1100 kg 31,620.00Rp. 3,478.20Rp.Gypsum board ( 120 x 240 x 9) mm 0.3640 lbr 60,500.00Rp. 22,022.00Rp.coumpond 0.0300 zak 122,960.00Rp. 3,688.80Rp.Gypsum tape 0.0500 roll 27,710.00Rp. 1,385.50Rp.

Jumlah (1). 89,397.00Rp.

2 TenagaPekerja 0.2800 oh 66,000.00Rp. 18,480.00Rp.Tukang kayu 0.3200 oh 105,000.00Rp. 33,600.00Rp.Kepala tukang 0.0800 oh 120,000.00Rp. 9,600.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 65,680.00Rp.

Jumlah (1) + (2) 155,077.00Rp.Keuntungan 10% 15,507.70Rp.Jumlah 170,584.70Rp.

KodeI.30. 1

m2 Dibulatkan Rp. 170,500.00

I.31. 1 m2 Langit-langit GRC (0,60 x 1,20) m, tebal 4 mm1 Bahan

GRC Board 2.4 x 1.2 x 0.04 1.1000 lbr 35,400.00Rp. 38,940.00Rp.Paku Biasa 0.0100 kg 19,480.00Rp. 194.80Rp.

Jumlah (1). 39,134.80Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 16,720.00Rp.

Jumlah (1) + (2) 55,854.80Rp.Keuntungan 10% 5,585.48Rp.Jumlah 61,440.28Rp.

KodeI.31. 1 m2 Langit-langit GRC (0,60 x 1,20) m, tebal 4 mm Dibulatkan 61,400.00Rp.

I.32. 1 m2 Langit-langit GRC (0.60 x 1.20) m, tebal 4 mm, rangka borneo (60 x 120 m)1 Bahan

Kayu borneo, balok 5/7 0.0082 m3 3,437,010.00Rp. 28,183.48Rp.Paku Biasa 0.1350 bh 19,480.00Rp. 2,629.80Rp.GRC Board 2.4 x 1.2 x 0.04 1.1000 m2 35,400.00Rp. 38,940.00Rp.

Jumlah (1). 69,753.28Rp.

2 TenagaPekerja 0.1700 oh 66,000.00Rp. 11,220.00Rp.Tukang kayu 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0090 oh 100,000.00Rp. 900.00Rp.

Jumlah (2). 41,370.00Rp.

Jumlah (1) + (2) 111,123.28Rp.Keuntungan 10% 11,112.33Rp.Jumlah 122,235.61Rp.

KodeI.32. 1 m2 Langit-langit GRC (0.60 x 1.20) m, tebal 4 mm, rangka borneo (60 x 120 m)Dibulatkan 122,200.00Rp.

I.33.1 m2

1 BahanHollow 20 x 40 mm 2.7500 m' 11,000.00Rp. 30,250.00Rp.

Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm +rangka hollow 40 x 40 mm (60 x 60) termasuk penggantung

Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm + rangkahollow 40 x 40 mm (60 x 60) termasuk penggantung

Langit-langit GRC, uk. (120 x 240) tebal 4 mm + rangkahollow 20 x 40 mm (60 x 120) termasuk penggantung

Page 118: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Paku sekrup 0.1100 kg 31,620.00Rp. 3,478.20Rp.GRC Board 2.4 x 1.2 x 0.04 1.1000 m2 12,291.67Rp. 13,520.83Rp.coumpond 0.0300 zak 122,960.00Rp. 3,688.80Rp.

Jumlah (1). 50,937.83Rp.

2 TenagaPekerja 0.2800 oh 66,000.00Rp. 18,480.00Rp.Tukang kayu 0.3200 oh 105,000.00Rp. 33,600.00Rp.Kepala tukang 0.0800 oh 120,000.00Rp. 9,600.00Rp.Mandor 0.0400 oh 100,000.00Rp. 4,000.00Rp.

Jumlah (2). 65,680.00Rp.

Jumlah (1) + (2) 116,617.83Rp.Keuntungan 10% 11,661.78Rp.Jumlah 128,279.62Rp.

KodeI.33. 1

m2 Dibulatkan Rp. 128,200.00

I.34. 1 m2

1 BahanHollow 40 x 40 mm 2.000 btg 12,650.00Rp. 25,300.00Rp.Paku sekrup 0.100 kg 31,620.00Rp. 3,162.00Rp.### 1.500 lbr 38,720.00Rp. 58,080.00Rp.coumpond 0.030 zak 122,960.00Rp. 3,688.80Rp.Gypsum tape 0.050 roll 27,710.00Rp. 1,385.50Rp.Paku gypsum 0.110 kg 21,890.00Rp. 2,407.90Rp.

Jumlah (1). 94,024.20Rp.

2 TenagaPekerja 0.280 oh 66,000.00Rp. 18,480.00Rp.Tukang kayu 0.100 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.015 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.015 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,280.00Rp.

Jumlah (1) + (2) 126,304.20Rp.Keuntungan 10% 12,630.42Rp.Jumlah 138,934.62Rp.

KodeI.34. 1 m2 Dibulatkan 138,900.00Rp.

I.35 1 m21 Bahan

Hollow 40 x 40 mm 2.000 btg 12,650.00Rp. 25,300.00Rp.Paku sekrup 0.100 kg 31,620.00Rp. 3,162.00Rp.### 1.389 lbr 82,500.00Rp. 114,583.33Rp.coumpond 0.030 zak 122,960.00Rp. 3,688.80Rp.Gypsum tape 0.050 roll 27,710.00Rp. 1,385.50Rp.Paku gypsum 0.110 kg 21,890.00Rp. 2,407.90Rp.

Jumlah (1). 150,527.53Rp.

2 TenagaPekerja 0.280 oh 66,000.00Rp. 18,480.00Rp.Tukang kayu 0.100 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.015 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.015 oh 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 32,280.00Rp.

Jumlah (1) + (2) 182,807.53Rp.Keuntungan 10% 18,280.75Rp.Jumlah 201,088.29Rp.

KodeI.35 1 m2 Dibulatkan 201,000.00Rp.Langit-langit cilicate , uk. (120 x 240) tebal 9 mm + rangka hollow

40 x 40 mm (60 x 60) termasuk penggantung

Langit-langit GRC, uk. (120 x 240) tebal 4 mm + rangka hollow 20x 40 mm (60 x 120) termasuk penggantung

Langit-langit gypsum tile, uk. (60 x 120) tebal 9 mm + rangkahollow 40 x 40 mm (60 x 60) termasuk penggantung

Langit-langit gypsum tile, uk. (60 x 120) tebal 9 mm + rangkahollow 40 x 40 mm (60 x 60) termasuk penggantung

Langit-langit cilicate , uk. (120 x 240) tebal 9 mm + rangka

Page 119: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN SANITASIRuang LingkupJenis pekerjaan yang dicakup meliputi :

2. Pekerjaan pembuatan bak air dari pasangan batu bata dan teraso3. Pekerjaan pemasangan pipa saniter air kotor dan air bersih

J.1. Memasang 1 buah kloset duduk/monoblok1 Bahan

Kloset duduk/monoblok 1.0000 bh 2,145,000.00Rp. 2,145,000.00Rp.Perlengkapan 0.0600 Hrg kloset 128,700.00Rp. 7,722.00Rp.

Jumlah (1). 2,152,722.00Rp.

2 TenagaPekerja 3.3000 oh 66,000.00Rp. 217,800.00Rp.Tukang batu 1.1000 oh 100,000.00Rp. 110,000.00Rp.Kepala tukang 0.0010 oh 120,000.00Rp. 120.00Rp.Mandor 0.1600 oh 100,000.00Rp. 16,000.00Rp.

Jumlah (2). 343,920.00Rp.

Jumlah (1) + (2) 2,496,642.00Rp.Keuntungan 10% 249,664.20Rp.Jumlah 2,746,306.20Rp.

KodeJ.1. Memasang 1 buah kloset duduk/monoblok Dibulatkan 2,746,300.00Rp.

J.2. Memasang 1 buah kloset jongkok poselen1 Bahan

Kloset jongkok 1.0000 bh 545,090.00Rp. 545,090.00Rp.Semen Portland 6.0000 kg 1,360.00Rp. 8,160.00Rp.Pasir pasang 0.0100 m3 203,500.00Rp. 2,035.00Rp.

Jumlah (1). 555,285.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 1.5000 oh 100,000.00Rp. 150,000.00Rp.Kepala tukang 0.1500 oh 120,000.00Rp. 18,000.00Rp.Mandor 0.1600 oh 100,000.00Rp. 16,000.00Rp.

Jumlah (2). 250,000.00Rp.

Jumlah (1) + (2) 805,285.00Rp.Keuntungan 10% 80,528.50Rp.Jumlah 885,813.50Rp.

KodeJ.2. Memasang 1 buah kloset jongkok poselen Dibulatkan 885,800.00Rp.

J.3. Memasang 1 buah kloset jongkok teraso1 Bahan

Kloset jongkok teraso 1.0000 bh 98,750.00Rp. 98,750.00Rp.Bata merah 5 x 11 x 27 7.0000 bh 650.00Rp. 4,550.00Rp.Semen Portland 6.0000 kg 1,360.00Rp. 8,160.00Rp.Pasir pasang 0.0100 m3 203,500.00Rp. 2,035.00Rp.

Jumlah (1). 113,495.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 1.5000 oh 100,000.00Rp. 150,000.00Rp.Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp.Mandor 0.1100 oh 100,000.00Rp. 11,000.00Rp.

Jumlah (2). 263,000.00Rp.

Jumlah (1) + (2) 376,495.00Rp.Keuntungan 10% 37,649.50Rp.Jumlah 414,144.50Rp.

KodeJ.3. Memasang 1 buah kloset jongkok teraso Dibulatkan 414,100.00Rp.

J.4. Memasang 1 buah urinor1 Bahan

Urinor 1.0000 bh 2,255,000.00Rp. 2,255,000.00Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

J.

1. Pekerjaan pasangan kloset duduk, kloset jongkok, badculp, urinoir, bak mandi fibreglass, bak cuci piring, wastafel dan floordrain/saringan

Page 120: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Perlengkapan 0.3000 Hrg urinoir 676,500.00Rp. 202,950.00Rp.Semen Portland 6.0000 kg 1,360.00Rp. 8,160.00Rp.Pasir pasang 0.0100 m3 203,500.00Rp. 2,035.00Rp.

Jumlah (1). 2,468,145.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 1.0000 oh 100,000.00Rp. 100,000.00Rp.Kepala tukang 0.1000 oh 120,000.00Rp. 12,000.00Rp.Mandor 0.1000 oh 100,000.00Rp. 10,000.00Rp.

Jumlah (2). 188,000.00Rp.

Jumlah (1) + (2) 2,656,145.00Rp.Keuntungan 10% 265,614.50Rp.Jumlah 2,921,759.50Rp.

KodeJ.4. Memasang 1 buah urinor Dibulatkan 2,921,700.00Rp.

J.5. Memasang 1 buah wastafel1 Bahan

Wastafel 1.0000 bh 1,864,500.00Rp. 1,864,500.00Rp.Perlengkapan 0.1200Hrg wastafel 223,740.00Rp. 26,848.80Rp.Semen abu-abu 6.0000 kg 1,360.00Rp. 8,160.00Rp.Pasir pasang 0.0100 m3 203,500.00Rp. 2,035.00Rp.

Jumlah (1). 1,901,543.80Rp.

2 TenagaPekerja 1.2000 oh 66,000.00Rp. 79,200.00Rp.Tukang batu 1.4500 oh 100,000.00Rp. 145,000.00Rp.Kepala tukang 0.1500 oh 120,000.00Rp. 18,000.00Rp.Mandor 0.1000 oh 100,000.00Rp. 10,000.00Rp.

Jumlah (2). 252,200.00Rp.

Jumlah (1) + (2) 2,153,743.80Rp.Keuntungan 10% 215,374.38Rp.Jumlah 2,369,118.18Rp.

KodeJ.5. Memasang 1 buah wastafel Dibulatkan 2,369,100.00Rp.

J.6. Memasang 1 buah bak mandi teraso volume 0.3 m31 Bahan

Bak teraso 1.0000 bh 310,360.00Rp. 310,360.00Rp.Semen portland 6.0000 kg 1,360.00Rp. 8,160.00Rp.Pasir pasang 0.0100 m3 203,500.00Rp. 2,035.00Rp.

Jumlah (1). 320,555.00Rp.

2 TenagaPekerja 2.1000 oh 66,000.00Rp. 138,600.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala tukang 0.0700 oh 120,000.00Rp. 8,400.00Rp.Mandor 0.1100 oh 100,000.00Rp. 11,000.00Rp.

Jumlah (2). 233,000.00Rp.

Jumlah (1) + (2) 553,555.00Rp.Keuntungan 10% 55,355.50Rp.Jumlah 608,910.50Rp.

KodeJ.6. Memasang 1 buah bak mandi teraso volume 0.3 m3 Dibulatkan 608,900.00Rp.

J.7. Memasang 1 buah bak mandi fibreglass volume 0.3 m31 Bahan

Bak fibreglass 1.0000 bh 253,930.00Rp. 253,930.00Rp.Perlengkapan 0.1800 Hrg bak 253,930.00Rp. 45,707.40Rp.

Jumlah (1). 299,637.40Rp.

2 TenagaPekerja 1.8000 oh 66,000.00Rp. 118,800.00Rp.Tukang batu 2.7000 oh 100,000.00Rp. 270,000.00Rp.Kepala tukang 0.5400 oh 120,000.00Rp. 64,800.00Rp.Mandor 0.1100 oh 100,000.00Rp. 11,000.00Rp.

Jumlah (2). 464,600.00Rp.

Jumlah (1) + (2) 764,237.40Rp.Keuntungan 10% 76,423.74Rp.Jumlah 840,661.14Rp.

Kode

Page 121: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

J.7. Memasang 1 buah bak mandi fibreglass volume 0.3 m3 Dibulatkan 840,600.00Rp.

J.8. Memasang 1 buah bak mandi batu bata volume 0.3 m31 Bahan

Batu bata 0.4000 M3 585,000.00Rp. 234,000.00Rp.Semen portland 120.0000 kg 1,360.00Rp. 163,200.00Rp.pasir pasang 0.3000 m3 203,500.00Rp. 61,050.00Rp.porselen (11 x 11) cm 360.0000 bh 1,116.71Rp. 402,015.24Rp.Semen nat 0.0600 kg 4,200.00Rp. 252.00Rp.

Jumlah (1). 860,517.24Rp.

2 TenagaPekerja 6.0000 oh 66,000.00Rp. 396,000.00Rp.Tukang batu 3.0000 oh 100,000.00Rp. 300,000.00Rp.Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp.Mandor 0.3000 oh 100,000.00Rp. 30,000.00Rp.

Jumlah (2). 762,000.00Rp.

Jumlah (1) + (2) 1,622,517.24Rp.Keuntungan 10% 162,251.72Rp.Jumlah 1,784,768.96Rp.

KodeJ.8. Memasang 1 buah bak mandi batu bata volume 0.3 m3 Dibulatkan 1,784,700.00Rp.

J.9. Memasang 1 buah badkip porselen1 Bahan

Badkip 1.0000 bh 786,500.00Rp. 786,500.00Rp.Perlengkapan 0.2000 Hrg badkip 786,500.00Rp. 157,300.00Rp.

Jumlah (1). 943,800.00Rp.

2 TenagaPekerja 0.0000 oh 66,000.00Rp. -Rp.Tukang batu 0.0750 oh 100,000.00Rp. 7,500.00Rp.Kepala tukang 0.7500 oh 120,000.00Rp. 90,000.00Rp.Mandor 0.2500 oh 100,000.00Rp. 25,000.00Rp.

Jumlah (2). 122,500.00Rp.

Jumlah (1) + (2) 1,066,300.00Rp.

Page 122: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 106,630.00Rp.Jumlah 1,172,930.00Rp.

KodeJ.9. Memasang 1 buah badkip porselen Dibulatkan 1,172,900.00Rp.

J.10. Membuat 1 buah bak beton volume 1 m3 air1 Bahan

Beton 1 : 1 1/2 : 2 1/2 0.9000 m3 1,196,800.00Rp. 1,077,120.00Rp.Besi beton 180.0000 kg 16,900.00Rp. 3,042,000.00Rp.Kayu cetakan 0.8000 m3 1,874,730.00Rp. 1,499,784.00Rp.Ubin porselin 5.0000 m2 76,910.00Rp. 384,550.00Rp.Perlengkapan 0.1000Hrg total bhn 6,003,454.00Rp. 600,345.40Rp.

Jumlah (1). 6,603,799.40Rp.

2 TenagaPekerja 3.5000 oh 66,000.00Rp. 231,000.00Rp.Tukang batu 4.5000 oh 100,000.00Rp. 450,000.00Rp.Kepala tukang 0.9000 oh 120,000.00Rp. 108,000.00Rp.Mandor 0.9000 oh 100,000.00Rp. 90,000.00Rp.

Jumlah (2). 879,000.00Rp.

Jumlah (1) + (2) 7,482,799.40Rp.Keuntungan 10% 748,279.94Rp.Jumlah 8,231,079.34Rp.

KodeJ.10. Membuat 1 buah bak beton volume 1 m3 air Dibulatkan 8,231,000.00Rp.

J.11. Memasang 1 buah bak fibreglass volume 1 m3 air1 Bahan

Bak fibreglass 1.0000 bh 1,451,950.00Rp. 1,451,950.00Rp.Perlengkapan 0.1200 Hrg bak 1,451,950.00Rp. 174,234.00Rp.

Jumlah (1). 1,626,184.00Rp.

2 TenagaPekerja 3.0000 oh 66,000.00Rp. 198,000.00Rp.Tukang batu 4.5000 oh 100,000.00Rp. 450,000.00Rp.Kepala tukang 0.9000 oh 120,000.00Rp. 108,000.00Rp.Mandor 0.9000 oh 100,000.00Rp. 90,000.00Rp.

Jumlah (2). 846,000.00Rp.

Jumlah (1) + (2) 2,472,184.00Rp.Keuntungan 10% 247,218.40Rp.Jumlah 2,719,402.40Rp.

KodeJ.11. Memasang 1 buah bak fibreglass volume 1 m3 air Dibulatkan 2,719,400.00Rp.

J.12. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, diameter 15 cm1 Bahan

Pipa tanah 1.6000 bh 493,760.00Rp. 790,016.00Rp.Semen portland 0.6800 kg 1,360.00Rp. 924.80Rp.Pasir pasang 0.0130 m3 203,500.00Rp. 2,645.50Rp.Pasir urug 0.0110 m3 148,500.00Rp. 1,633.50Rp.

Jumlah (1). 795,219.80Rp.

2 TenagaPekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Tukang batu 0.0300 oh 100,000.00Rp. 3,000.00Rp.Kepala tukang 0.0030 oh 120,000.00Rp. 360.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 7,570.00Rp.

Jumlah (1) + (2) 802,789.80Rp.Keuntungan 10% 80,278.98Rp.Jumlah 883,068.78Rp.

KodeJ.12. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, diameter 15 cm Dibulatkan 883,000.00Rp.

J.13. 1 m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm1 Bahan

Pipa tanah dia 1/2 20 cm 1.6000 bh 33,900.00Rp. 54,240.00Rp.Semen portland 0.8700 kg 1,360.00Rp. 1,183.20Rp.Pasir pasang 0.0140 m3 203,500.00Rp. 2,849.00Rp.Pasir urug 0.0140 m3 148,500.00Rp. 2,079.00Rp.

Jumlah (1). 60,351.20Rp.

2 Tenaga

Page 123: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.0800 oh 66,000.00Rp. 5,280.00Rp.Tukang batu 0.0400 oh 100,000.00Rp. 4,000.00Rp.Kepala tukang 0.0040 oh 120,000.00Rp. 480.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 10,460.00Rp.

Jumlah (1) + (2) 70,811.20Rp.Keuntungan 10% 7,081.12Rp.Jumlah 77,892.32Rp.

KodeJ.13. 1 m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm Dibulatkan 77,800.00Rp.

J.13.a 1 m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 20 cm1 Bahan

Pipa beton dia 1/2 20 cm 1.1000 bh 33,900.00Rp. 37,290.00Rp.Semen portland 0.8700 kg 1,360.00Rp. 1,183.20Rp.Pasir pasang 0.0140 m3 203,500.00Rp. 2,849.00Rp.Pasir urug 0.0140 m3 148,500.00Rp. 2,079.00Rp.

Jumlah (1). 43,401.20Rp.

2 TenagaPekerja 0.0800 oh 66,000.00Rp. 5,280.00Rp.Tukang batu 0.0400 oh 100,000.00Rp. 4,000.00Rp.Kepala tukang 0.0040 oh 120,000.00Rp. 480.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 10,460.00Rp.

Jumlah (1) + (2) 53,861.20Rp.Keuntungan 10% 5,386.12Rp.Jumlah 59,247.32Rp.

KodeJ.13.a 1 m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 20 cmDibulatkan 59,200.00Rp.

J.13.b 1 m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 30 cm1 Bahan

Pipa beton dia 1/2 30 cm 1.1000 bh 33,900.00Rp. 37,290.00Rp.Semen portland 0.9300 kg 1,360.00Rp. 1,264.80Rp.Pasir pasang 0.0160 m3 203,500.00Rp. 3,256.00Rp.Pasir urug 0.0160 m3 148,500.00Rp. 2,376.00Rp.

Jumlah (1). 44,186.80Rp.

2 TenagaPekerja 0.0800 oh 66,000.00Rp. 5,280.00Rp.Tukang batu 0.0400 oh 100,000.00Rp. 4,000.00Rp.Kepala tukang 0.0040 oh 120,000.00Rp. 480.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 10,460.00Rp.

Jumlah (1) + (2) 54,646.80Rp.Keuntungan 10% 5,464.68Rp.Jumlah 60,111.48Rp.

KodeJ.13.b 1 m' Memasang pipa penyalur air limbah jenis pipa beton, diameter 1/2 30 cmDibulatkan 60,100.00Rp.

J.14. Memasang 1 m' pipa beton, diameter 15 cm - 20 cm1 Bahan

Pipa beton 1.1000 bh 43,770.00Rp. 48,147.00Rp.Batu bata 0.0270 m3 504,000.00Rp. 13,608.00Rp.Semen portland 3.9200 kg 1,360.00Rp. 5,331.20Rp.Pasir pasang 0.0560 m3 203,500.00Rp. 11,396.00Rp.Pasir urug 0.0240 m3 148,500.00Rp. 3,564.00Rp.

Jumlah (1). 82,046.20Rp.

2 TenagaPekerja 0.1400 oh 66,000.00Rp. 9,240.00Rp.Tukang batu 0.0700 oh 100,000.00Rp. 7,000.00Rp.Kepala tukang 0.0070 oh 120,000.00Rp. 840.00Rp.Mandor 0.0070 oh 100,000.00Rp. 700.00Rp.

Jumlah (2). 17,780.00Rp.

Jumlah (1) + (2) 99,826.20Rp.Keuntungan 10% 9,982.62Rp.Jumlah 109,808.82Rp.

KodeJ.14. Memasang 1 m' pipa beton, diameter 15 cm - 20 cm Dibulatkan 109,800.00Rp.

Page 124: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

J.15. Memasang 1 m' pipa beton, diameter 30 cm - 100 cm1 Bahan

Pipa beton 1.1000 bh 56,300.00Rp. 61,930.00Rp.Batu bata 0.5500 m3 504,000.00Rp. 277,200.00Rp.Semen portland 10.3000 kg 1,360.00Rp. 14,008.00Rp.Pasir pasang 0.0610 m3 203,500.00Rp. 12,413.50Rp.Pasir urug 0.0690 m3 148,500.00Rp. 10,246.50Rp.

Jumlah (1). 375,798.00Rp.

2 TenagaPekerja 0.3800 oh 66,000.00Rp. 25,080.00Rp.Tukang batu 0.1900 oh 100,000.00Rp. 19,000.00Rp.Kepala tukang 0.0190 oh 120,000.00Rp. 2,280.00Rp.Mandor 0.0190 oh 100,000.00Rp. 1,900.00Rp.

Jumlah (2). 48,260.00Rp.

Jumlah (1) + (2) 424,058.00Rp.Keuntungan 10% 42,405.80Rp.Jumlah 466,463.80Rp.

KodeJ.15. Memasang 1 m' pipa beton, diameter 30 cm - 100 cm Dibulatkan 466,400.00Rp.

J.16. Memasang 1 buah bak kontrol pas. Bata ukuran (30x30) cm t 35 cm1 Bahan

Batu bata 0.1450 m3 780,000.00Rp. 113,100.00Rp.Semen portland 44.0000 kg 1,360.00Rp. 59,840.00Rp.Pasir pasang 0.0700 m3 203,500.00Rp. 14,245.00Rp.Batu kerikil 0.0700 m3 220,000.00Rp. 15,400.00Rp.Besi beton 1.6000 kg 13,200.00Rp. 21,120.00Rp.Pasir beton 0.0600 m3 194,700.00Rp. 11,682.00Rp.

Jumlah (1). 235,387.00Rp.

2 TenagaPekerja 3.2000 oh 66,000.00Rp. 211,200.00Rp.Tukang batu 1.0150 oh 100,000.00Rp. 101,500.00Rp.Kepala tukang 0.0015 oh 120,000.00Rp. 180.00Rp.Mandor 0.0160 oh 100,000.00Rp. 1,600.00Rp.

Jumlah (2). 314,480.00Rp.

Jumlah (1) + (2) 549,867.00Rp.Keuntungan 10% 54,986.70Rp.Jumlah 604,853.70Rp.

KodeJ.16. Memasang 1 buah bak kontrol pas. Bata ukuran (30x30) cm t 35 cm Dibulatkan 604,800.00Rp.

J.17. Memasang 1 buah bak kontrol pas. Bata ukuran (45x45) cm T. 50 cm1 Bahan

Batu bata 0.2500 m3 780,000.00Rp. 195,000.00Rp.Semen portland 77.0000 kg 1,360.00Rp. 104,720.00Rp.Pasir pasang 0.1300 m3 203,500.00Rp. 26,455.00Rp.Batu kerikil 0.0200 m3 220,000.00Rp. 4,400.00Rp.Besi beton 2.6000 kg 13,200.00Rp. 34,320.00Rp.Pasir beton 0.0900 m3 194,700.00Rp. 17,523.00Rp.

Jumlah (1). 382,418.00Rp.

2 TenagaPekerja 1.4200 oh 66,000.00Rp. 93,720.00Rp.Tukang batu 0.4730 oh 100,000.00Rp. 47,300.00Rp.Kepala tukang 0.0470 oh 120,000.00Rp. 5,640.00Rp.Mandor 0.0710 oh 100,000.00Rp. 7,100.00Rp.

Jumlah (2). 153,760.00Rp.

Jumlah (1) + (2) 536,178.00Rp.Keuntungan 10% 53,617.80Rp.Jumlah 589,795.80Rp.

KodeJ.17. Memasang 1 buah bak kontrol pas. Bata ukuran (45x45) cm T. 50 cm Dibulatkan 589,700.00Rp.

J.18. Memasang 1 buah bak kontrol pas. Bata ukuran (60x60) cm T. 65 cm1 Bahan

Batu bata 0.3710 m3 504,000.00Rp. 186,984.00Rp.Semen portland 114.0000 kg 1,360.00Rp. 155,040.00Rp.Pasir pasang 0.1840 m3 203,500.00Rp. 37,444.00Rp.Batu kerikil 0.0330 m3 220,000.00Rp. 7,260.00Rp.Besi beton 4.8500 kg 13,200.00Rp. 64,020.00Rp.Pasir beton 0.1200 m3 194,700.00Rp. 23,364.00Rp.

Page 125: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 474,112.00Rp.

2 TenagaPekerja 2.1600 oh 66,000.00Rp. 142,560.00Rp.Tukang batu 0.7200 oh 100,000.00Rp. 72,000.00Rp.Kepala tukang 0.0720 oh 120,000.00Rp. 8,640.00Rp.Mandor 0.1080 oh 100,000.00Rp. 10,800.00Rp.Tukang gali 0.1000 oh

Jumlah (2). 234,000.00Rp.

Jumlah (1) + (2) 708,112.00Rp.Keuntungan 10% 70,811.20Rp.Jumlah 778,923.20Rp.

KodeJ.18. Memasang 1 buah bak kontrol pas. Bata ukuran (60x60) cm T. 65 cm Dibulatkan 778,900.00Rp.

J.19. Memasang 1 m' pipa galvanize diameter 1/2"1 Bahan

Pipa galvanize 1.2000 M' 29,100.00Rp. 34,920.00Rp.Perlengkapan 0.3500 Hrg pipa 29,100.00Rp. 10,185.00Rp.

Jumlah (1). 45,105.00Rp.

2 TenagaPekerja 0.0540 oh 66,000.00Rp. 3,564.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0270 oh 100,000.00Rp. 2,700.00Rp.

Jumlah (2). 16,344.00Rp.

Jumlah (1) + (2) 61,449.00Rp.Keuntungan 10% 6,144.90Rp.Jumlah 67,593.90Rp.

KodeJ.19. Memasang 1 m' pipa galvanize diameter 1/2" Dibulatkan 67,500.00Rp.

J.20. Memasang 1 m' pipa galvanize diameter 3/4"1 Bahan

Pipa galvanize 1.2000 M' 39,220.00Rp. 47,064.00Rp.Perlengkapan 0.3500 Hrg pipa 39,220.00Rp. 13,727.00Rp.

Jumlah (1). 60,791.00Rp.

2 TenagaPekerja 0.0540 oh 66,000.00Rp. 3,564.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0270 oh 100,000.00Rp. 2,700.00Rp.

Jumlah (2). 16,344.00Rp.

Jumlah (1) + (2) 77,135.00Rp.Keuntungan 10% 7,713.50Rp.Jumlah 84,848.50Rp.

KodeJ.20. Memasang 1 m' pipa galvanize diameter 3/4" Dibulatkan 84,800.00Rp.

J.21. Memasang 1 m' pipa galvanize diameter 1"1 Bahan

Pipa galvanize 1.2000 M' 49,340.00Rp. 59,208.00Rp.Perlengkapan 0.3500 Hrg pipa 49,340.00Rp. 17,269.00Rp.

Jumlah (1). 76,477.00Rp.

2 TenagaPekerja 0.0540 oh 66,000.00Rp. 3,564.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0270 oh 100,000.00Rp. 2,700.00Rp.

Jumlah (2). 16,344.00Rp.

Jumlah (1) + (2) 92,821.00Rp.Keuntungan 10% 9,282.10Rp.Jumlah 102,103.10Rp.

KodeJ.21. Memasang 1 m' pipa galvanize diameter 1" Dibulatkan 102,100.00Rp.

J.22. Memasang 1 m' pipa galvanize diameter 1 1/2"1 Bahan

Pipa galvanize 1.2000 M' 98,670.00Rp. 118,404.00Rp.

Page 126: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Perlengkapan 0.3500 Hrg pipa 98,670.00Rp. 34,534.50Rp.Jumlah (1). 152,938.50Rp.

2 TenagaPekerja 0.1080 oh 66,000.00Rp. 7,128.00Rp.Tukang batu 0.1800 oh 100,000.00Rp. 18,000.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0054 oh 100,000.00Rp. 540.00Rp.

Jumlah (2). 27,828.00Rp.

Jumlah (1) + (2) 180,766.50Rp.Keuntungan 10% 18,076.65Rp.Jumlah 198,843.15Rp.

KodeJ.22. Memasang 1 m' pipa galvanize diameter 1 1/2" Dibulatkan 198,800.00Rp.

J.23. Memasang 1 m' pipa galvanize diameter 3"1 Bahan

Pipa galvanize 1.2000 M' 145,750.00Rp. 174,900.00Rp.Perlengkapan 0.3500 Hrg pipa 145,750.00Rp. 51,012.50Rp.

Jumlah (1). 225,912.50Rp.

2 TenagaPekerja 0.1080 oh 66,000.00Rp. 7,128.00Rp.Tukang batu 0.1800 oh 100,000.00Rp. 18,000.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0054 oh 100,000.00Rp. 540.00Rp.

Jumlah (2). 27,828.00Rp.

Jumlah (1) + (2) 253,740.50Rp.Keuntungan 10% 25,374.05Rp.Jumlah 279,114.55Rp.

KodeJ.23. Memasang 1 m' pipa galvanize diameter 3" Dibulatkan 279,100.00Rp.

J.24. Memasang 1 m' pipa galvanize diameter 4"1 Bahan

Pipa galvanize 1.2000 M' 158,620.00Rp. 190,344.00Rp.Perlengkapan 0.3500 Hrg pipa 158,620.00Rp. 55,517.00Rp.

Jumlah (1). 245,861.00Rp.

2 TenagaPekerja 0.1350 oh 66,000.00Rp. 8,910.00Rp.Tukang batu 0.2250 oh 100,000.00Rp. 22,500.00Rp.Kepala tukang 0.0225 oh 120,000.00Rp. 2,700.00Rp.Mandor 0.0068 oh 100,000.00Rp. 680.00Rp.

Jumlah (2). 34,790.00Rp.

Jumlah (1) + (2) 280,651.00Rp.Keuntungan 10% 28,065.10Rp.Jumlah 308,716.10Rp.

KodeJ.24. Memasang 1 m' pipa galvanize diameter 4" Dibulatkan 308,700.00Rp.

J.25. Memasang 1 m' pipa PVC tipe AW diameter 1/2"1 Bahan

Pipa PVC 1.2000 M' 5,322.50Rp. 6,387.00Rp.Perlengkapan 0.3500 Hrg pipa 5,322.50Rp. 1,862.88Rp.

Jumlah (1). 8,249.88Rp.

2 TenagaPekerja 0.0360 oh 66,000.00Rp. 2,376.00Rp.Tukang batu 0.0600 oh 100,000.00Rp. 6,000.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0018 oh 100,000.00Rp. 180.00Rp.

Jumlah (2). 9,276.00Rp.

Jumlah (1) + (2) 17,525.88Rp.Keuntungan 10% 1,752.59Rp.Jumlah 19,278.46Rp.

KodeJ.25. Memasang 1 m' pipa PVC tipe AW diameter 1/2" Dibulatkan 19,200.00Rp.

J.26. Memasang 1 m' pipa PVC tipe AW diameter 3/4"1 Bahan

Pipa PVC 1.2000 M' 6,987.50Rp. 8,385.00Rp.

Page 127: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Perlengkapan 0.3500 Hrg pipa 6,987.50Rp. 2,445.63Rp.Jumlah (1). 10,830.63Rp.

2 TenagaPekerja 0.0360 oh 66,000.00Rp. 2,376.00Rp.Tukang batu 0.0600 oh 100,000.00Rp. 6,000.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0018 oh 100,000.00Rp. 180.00Rp.

Jumlah (2). 9,276.00Rp.

Jumlah (1) + (2) 20,106.63Rp.Keuntungan 10% 2,010.66Rp.Jumlah 22,117.29Rp.

KodeJ.26. Memasang 1 m' pipa PVC tipe AW diameter 3/4" Dibulatkan 22,100.00Rp.

J.27. Memasang 1 m' pipa PVC tipe AW diameter 1"1 Bahan

Pipa PVC 1.2000 M' 8,472.50Rp. 10,167.00Rp.Perlengkapan 0.3500 Hrg pipa 8,472.50Rp. 2,965.38Rp.

Jumlah (1). 13,132.38Rp.

2 TenagaPekerja 0.0360 oh 66,000.00Rp. 2,376.00Rp.Tukang batu 0.0600 oh 100,000.00Rp. 6,000.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0018 oh 100,000.00Rp. 180.00Rp.

Jumlah (2). 9,276.00Rp.

Jumlah (1) + (2) 22,408.38Rp.Keuntungan 10% 2,240.84Rp.Jumlah 24,649.21Rp.

KodeJ.27. Memasang 1 m' pipa PVC tipe AW diameter 1" Dibulatkan 24,600.00Rp.

J.28. Memasang 1 m' pipa PVC tipe AW diameter 1 1/2"1 Bahan

Pipa PVC 1.2000 M' 14,657.50Rp. 17,589.00Rp.Perlengkapan 0.3500 Hrg pipa 14,657.50Rp. 5,130.13Rp.

Jumlah (1). 22,719.13Rp.

2 TenagaPekerja 0.0360 oh 66,000.00Rp. 2,376.00Rp.Tukang batu 0.0600 oh 100,000.00Rp. 6,000.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0018 oh 100,000.00Rp. 180.00Rp.

Jumlah (2). 9,276.00Rp.

Jumlah (1) + (2) 31,995.13Rp.Keuntungan 10% 3,199.51Rp.Jumlah 35,194.64Rp.

KodeJ.28. Memasang 1 m' pipa PVC tipe AW diameter 1 1/2" Dibulatkan 35,100.00Rp.

J.28.a. Memasang 1 m' pipa PVC tipe AW diameter 1 1/2" untuk suling-suling1 Bahan

Pipa PVC 1.2000 M' 14,657.50Rp. 17,589.00Rp.-Rp.

Jumlah (1). 17,589.00Rp.

2 TenagaPekerja 0.0360 oh 66,000.00Rp. 2,376.00Rp.Tukang batu 0.0600 oh 100,000.00Rp. 6,000.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0018 oh 100,000.00Rp. 180.00Rp.

Jumlah (2). 9,276.00Rp.

Jumlah (1) + (2) 26,865.00Rp.Keuntungan 10% 2,686.50Rp.Jumlah 29,551.50Rp.

KodeJ.28.a. Memasang 1 m' pipa PVC tipe AW diameter 1 1/2" untuk suling-suling Dibulatkan 29,500.00Rp.

J.29. Memasang 1 m' pipa PVC tipe AW diameter 2"

Page 128: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanPipa PVC 1.2000 M' 19,965.00Rp. 23,958.00Rp.Perlengkapan 0.3500 Hrg pipa 19,965.00Rp. 6,987.75Rp.

Jumlah (1). 30,945.75Rp.

2 TenagaPekerja 0.0540 oh 66,000.00Rp. 3,564.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0027 oh 100,000.00Rp. 270.00Rp.

Jumlah (2). 13,914.00Rp.

Jumlah (1) + (2) 44,859.75Rp.Keuntungan 10% 4,485.98Rp.Jumlah 49,345.73Rp.

KodeJ.29. Memasang 1 m' pipa PVC tipe AW diameter 2" Dibulatkan 49,300.00Rp.

J.30. Memasang 1 m' pipa PVC tipe AW diameter 2 1/2"1 Bahan

Pipa PVC 1.2000 M' 29,865.00Rp. 35,838.00Rp.Perlengkapan 0.3500 Hrg pipa 29,865.00Rp. 10,452.75Rp.

Jumlah (1). 46,290.75Rp.

2 TenagaPekerja 0.0360 oh 66,000.00Rp. 2,376.00Rp.Tukang batu 0.0600 oh 100,000.00Rp. 6,000.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0018 oh 100,000.00Rp. 180.00Rp.

Jumlah (2). 9,276.00Rp.

Jumlah (1) + (2) 55,566.75Rp.Keuntungan 10% 5,556.68Rp.Jumlah 61,123.43Rp.

KodeJ.30. Memasang 1 m' pipa PVC tipe AW diameter 2 1/2" Dibulatkan 61,100.00Rp.

J.31. Memasang 1 m' pipa PVC tipe AW diameter 3"1 Bahan

Pipa PVC 1.2000 M' 39,262.50Rp. 47,115.00Rp.Perlengkapan 0.3500 Hrg pipa 39,262.50Rp. 13,741.88Rp.

Jumlah (1). 60,856.88Rp.

2 TenagaPekerja 0.0810 oh 66,000.00Rp. 5,346.00Rp.Tukang batu 0.1350 oh 100,000.00Rp. 13,500.00Rp.Kepala tukang 0.0135 oh 120,000.00Rp. 1,620.00Rp.Mandor 0.0041 oh 100,000.00Rp. 410.00Rp.

Jumlah (2). 20,876.00Rp.

Jumlah (1) + (2) 81,732.88Rp.Keuntungan 10% 8,173.29Rp.Jumlah 89,906.16Rp.

KodeJ.31. Memasang 1 m' pipa PVC tipe AW diameter 3" Dibulatkan 89,900.00Rp.

J.32. Memasang 1 m' pipa PVC tipe AW diameter 4"1 Bahan

Pipa PVC 1.1000 M' 65,550.00Rp. 72,105.00Rp.Perlengkapan 0.3500 Hrg pipa 65,550.00Rp. 22,942.50Rp.

Jumlah (1). 95,047.50Rp.

2 TenagaPekerja 0.0810 oh 66,000.00Rp. 5,346.00Rp.Tukang batu 0.1350 oh 100,000.00Rp. 13,500.00Rp.Kepala tukang 0.0135 oh 120,000.00Rp. 1,620.00Rp.Mandor 0.0041 oh 100,000.00Rp. 410.00Rp.

Jumlah (2). 20,876.00Rp.

Jumlah (1) + (2) 115,923.50Rp.Keuntungan 10% 11,592.35Rp.Jumlah 127,515.85Rp.

KodeJ.32. Memasang 1 m' pipa PVC tipe AW diameter 4" Dibulatkan 127,500.00Rp.

J.32.a Memasang 1 m' pipa PVC tipe AW diameter 6"

Page 129: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanPipa PVC 1.1000 M' 135,782.50Rp. 149,360.75Rp.Perlengkapan 0.3500 Hrg pipa 135,782.50Rp. 47,523.88Rp.

Jumlah (1). 196,884.63Rp.

2 TenagaPekerja 0.0810 oh 66,000.00Rp. 5,346.00Rp.Tukang batu 0.1350 oh 100,000.00Rp. 13,500.00Rp.Kepala tukang 0.0135 oh 120,000.00Rp. 1,620.00Rp.Mandor 0.0041 oh 100,000.00Rp. 410.00Rp.

Jumlah (2). 20,876.00Rp.

Jumlah (1) + (2) 217,760.63Rp.Keuntungan 10% 21,776.06Rp.Jumlah 239,536.69Rp.

KodeJ.32.a Memasang 1 m' pipa PVC tipe AW diameter 6" Dibulatkan 239,500.00Rp.

J.33. Memasang 1 bh bak cuci piring stainless steel1 Bahan

Bak cuci stainless steel 1.0000 bh 793,160.00Rp. 793,160.00Rp.Water drain + asesories 1.0000 set 198,550.00Rp. 198,550.00Rp.

Jumlah (1). 991,710.00Rp.

2 TenagaPekerja 0.0300 oh 66,000.00Rp. 1,980.00Rp.Tukang batu 0.3000 oh 100,000.00Rp. 30,000.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0015 oh 100,000.00Rp. 150.00Rp.

Jumlah (2). 35,730.00Rp.

Jumlah (1) + (2) 1,027,440.00Rp.Keuntungan 10% 102,744.00Rp.Jumlah 1,130,184.00Rp.

KodeJ.33. Memasang 1 bh bak cuci piring stainless steel Dibulatkan 1,130,100.00Rp.

J.34. Memasang 1 bh bak cuci piring teraso1 Bahan

Bak cuci teraso 1.0000 bh -Rp. -Rp.Water drain + asesories 1.0000 bh 198,550.00Rp. 198,550.00Rp.Semen portland 20.0000 kg 1,360.00Rp. 27,200.00Rp.Pasir 0.0500 m3 203,500.00Rp. 10,175.00Rp.

Jumlah (1). 235,925.00Rp.

2 TenagaPekerja 0.0500 oh 66,000.00Rp. 3,300.00Rp.Tukang batu 0.5000 oh 100,000.00Rp. 50,000.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 59,550.00Rp.

Jumlah (1) + (2) 295,475.00Rp.Keuntungan 10% 29,547.50Rp.Jumlah 325,022.50Rp.

KodeJ.34. Memasang 1 bh bak cuci piring teraso Dibulatkan 325,000.00Rp.

J.35. Memasang 1 bh kran diameter 3/4" atau 1/2"1 Bahan

Kran air 1.0000 bh 39,720.00Rp. 39,720.00Rp.Seal tape 0.0250 bh 1,100.00Rp. 27.50Rp.

Jumlah (1). 39,747.50Rp.

2 TenagaPekerja 0.0100 oh 66,000.00Rp. 660.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 12,360.00Rp.

Jumlah (1) + (2) 52,107.50Rp.Keuntungan 10% 5,210.75Rp.Jumlah 57,318.25Rp.

KodeJ.35. Memasang 1 bh kran diameter 3/4" atau 1/2" Dibulatkan 57,300.00Rp.

Page 130: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

J.36. Memasang 1 bh Floor drain1 Bahan

Floor drain 1.0000 bh 36,060.00Rp. 36,060.00Rp.Jumlah (1). 36,060.00Rp.

2 TenagaPekerja 0.0100 oh 66,000.00Rp. 660.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 12,360.00Rp.

Jumlah (1) + (2) 48,420.00Rp.Keuntungan 10% 4,842.00Rp.Jumlah 53,262.00Rp.

KodeJ.36. Memasang 1 bh Floor drain Dibulatkan 53,200.00Rp.

J.37. Memasang 1 bh kran besi1 Bahan

Kran Air Besi 1.0000 bh 36,060.00Rp. 36,060.00Rp.Pipa aw 1/2" 1.0000 btg 21,290.00Rp. 21,290.00Rp.Seal tape 1.0000 roll 1,100.00Rp. 1,100.00Rp.Lem pipa pvc 1.0000 tube 4,400.00Rp. 4,400.00Rp.

Jumlah (1). 62,850.00Rp.

2 TenagaPekerja 0.0100 oh 66,000.00Rp. 660.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 12,360.00Rp.

Jumlah (1) + (2) 75,210.00Rp.Keuntungan 10% 7,521.00Rp.Jumlah 82,731.00Rp.

KodeJ.37. Memasang 1 bh kran besi Dibulatkan 82,700.00Rp.

J.37.a. Memasang 1 bh kran Stainles Wastafel1 Bahan

Kran Wastafel 1.0000 bh 36,060.00Rp. 36,060.00Rp.Pipa aw 1/2" 1.0000 btg 21,290.00Rp. 21,290.00Rp.Seal tape 1.0000 roll 1,100.00Rp. 1,100.00Rp.Lem pipa pvc 1.0000 tube 4,400.00Rp. 4,400.00Rp.

Jumlah (1). 62,850.00Rp.

2 TenagaPekerja 0.0100 oh 66,000.00Rp. 660.00Rp.Tukang batu 0.1000 oh 100,000.00Rp. 10,000.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 12,360.00Rp.

Jumlah (1) + (2) 75,210.00Rp.Keuntungan 10% 7,521.00Rp.Jumlah 82,731.00Rp.

KodeJ.37.a. Memasang 1 bh kran Stainles Wastafel Dibulatkan 82,700.00Rp.

J.38. Membuat 1 unit septictank dan rembesan 2 X 1,5 X 1.5M1 Bahan

Pasir urug 0.2250 m3 148,500.00Rp. 33,412.50Rp.Pasir pasang/beton 1.2000 m3 194,700.00Rp. 233,640.00Rp.Koral beton 0.3400 m3 220,000.00Rp. 74,800.00Rp.Batu bata 910.0000 bh 650.00Rp. 591,500.00Rp.Semen pc 450.0000 kg 1,360.00Rp. 612,000.00Rp.Pipa PVC 4" AW 9.0000 m' 65,550.00Rp. 589,950.00Rp.Pipa GIP 1,5" 2.0000 m' 66,000.00Rp. 132,000.00Rp.Ijuk 9.0000 ikat 44,000.00Rp. 396,000.00Rp.Besi beton 30.0000 kg 13,200.00Rp. 396,000.00Rp.

Jumlah (1). 3,059,302.50Rp.

2 TenagaPekerja 15.5000 oh 66,000.00Rp. 1,023,000.00Rp.

Page 131: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang batu 6.1300 oh 100,000.00Rp. 613,000.00Rp.Kepala tukang 0.6130 oh 120,000.00Rp. 73,560.00Rp.Mandor 4.2200 oh 100,000.00Rp. 422,000.00Rp.

Jumlah (2). 2,131,560.00Rp.

Jumlah (1) + (2) 5,190,862.50Rp.Keuntungan 10% 519,086.25Rp.Jumlah 5,709,948.75Rp.

KodeJ.38. Membuat 1 unit septictank dan rembesan 2 X 1,5 X 1.5M Dibulatkan 5,709,900.00Rp.

J.39 1 Unit MONO BLOCK TOTO Type CW 420 J / S 51J std

a. Bahan: - C 420 J closet body komplit : 1.0000 set 2,145,000.00Rp. 2,145,000.00Rp. 1. S 51J low tank 2. TR 407 HV3 Tank trim + stop valve 3. TC 2J2 NV1 Seat & coper 4. T 53 P100 Seal Garket & Flange 5. T 53 DSR Screws & Cap / set

b. Upah: - Tukang 1.1000 oh 100,000.00Rp. 110,000.00Rp. - Pekerja 3.3000 oh 66,000.00Rp. 217,800.00Rp. - Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp. - Mandor 0.1600 oh 100,000.00Rp. 16,000.00Rp.

Jumlah 2,524,800.00Rp.Keuntungan 10% 252,480.00Rp.Jumlah 2,777,280.00Rp.

KodeJ.39 1 Unit MONO BLOCK TOTO Type CW 420 J / S 51J std Dibulatkan 2,777,200.00Rp.

J.39.a 1 Unit MONO BLOCK TOTO Type CW 661 JT1/SW 661 JPa. Bahan:

- W 661 JT1 closet body : 1.000 set 2,860,000.00Rp 2,860,000.00Rp 1. SW 661 JP low tank 2. W 661 CRJP Tank cover for SW 661 JP 3. X212CWS Dual flush tank trim W/O stop valve for SW420, SW660J (6/3 liters) 4. TC280 Duroplast seat & cover W/Metal Hinges 5. TX212CWS Insulation fitting set for CW660J, CW661JT1, CW668J

b. Upah: - Tukang 1.100 oh 100,000.00Rp 110,000.00Rp - Pekerja 3.300 oh 66,000.00Rp 217,800.00Rp - Kepala tukang 0.300 oh 120,000.00Rp 36,000.00Rp - Mandor 0.160 oh 100,000.00Rp 16,000.00Rp

Jumlah 3,239,800.00Rp.Keuntungan 10% 323,980.00Rp.Jumlah 3,563,780.00Rp.

KodeJ.39.a 1 Unit MONO BLOCK TOTO Type CW 661 JT1/SW 661 JP Dibulatkan 3,563,700.00Rp.

J.40 1 Unit Closet jongkok ex. Toto type CE 7a. Bahan:

- CE 7 1.000 bh 225,500.00Rp 225,500.00Rp - Semen 0.150 zak 1,360.00Rp 204.00Rp - Pasir pasang 0.100 m3 203,500.00Rp 20,350.00Rp

b. Upah: - Tukang 1.500 hari 100,000.00Rp 150,000.00Rp - Pekerja 1.000 hari 66,000.00Rp 66,000.00Rp - Kepala tukang 0.300 hari 120,000.00Rp 36,000.00Rp - Mandor 0.110 hari 100,000.00Rp 11,000.00Rp

Jumlah 509,054.00Rp.Keuntungan 10% 50,905.40Rp.Jumlah 559,959.40Rp.

KodeJ.40 1 Unit Closet jongkok ex. Toto type CE 7 Dibulatkan 559,900.00Rp.

J.41 1 Unit Urinal ex. Toto tipe U57M Muslim type urinala. Bahan:

- Urinal U57M Muslim type urinal 1.000 unit 2,255,000.00Rp 2,255,000.00Rp

Page 132: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

- T60P 1.000 unit 789,800.00Rp 789,800.00Rpb. Upah:

- Tukang 1.000 hari 100,000.00Rp 100,000.00Rp - Pekerja 1.000 hari 66,000.00Rp 66,000.00Rp - Kepala tukang 0.100 hari 120,000.00Rp 12,000.00Rp - Mandor 0.100 hari 100,000.00Rp 10,000.00Rp

Jumlah 3,232,800.00Rp.Keuntungan 10% 323,280.00Rp.Jumlah 3,556,080.00Rp.

KodeJ.41 1 Unit Urinal ex. Toto tipe U57M Muslim type urinal Dibulatkan 3,556,000.00Rp.

J.42 1 Unit Urinal partition ex. Toto tipe A100a. Bahan:

- Urinal partition w/fittings tipe A100 1.000 unit 1,006,500.00Rp 1,006,500.00Rpb. Upah:

- Tukang 1.000 hari 100,000.00Rp 100,000.00Rp - Pekerja 1.000 hari 66,000.00Rp 66,000.00Rp - Kepala tukang 0.100 hari 120,000.00Rp 12,000.00Rp - Mandor 0.100 hari 100,000.00Rp 10,000.00Rp

Jumlah 1,194,500.00Rp.Keuntungan 10% 119,450.00Rp.Jumlah 1,313,950.00Rp.

KodeJ.42 1 Unit Urinal partition ex. Toto tipe A100 Dibulatkan 1,313,900.00Rp.

J.43 1 Unit Wastafel ex. Toto tipe L 521 V1Aa. Bahan:

L 521 V1A 1.000 unit 1,864,500.00Rp 1,864,500.00Rp - T 205 MCB - T6 PV1 - TS 251 FT2N - TS 126 AR

b. Upah: - Tukang 1.450 hari 100,000.00Rp 145,000.00Rp - Pekerja 1.200 hari 66,000.00Rp 79,200.00Rp - Kepala tukang 0.150 hari 120,000.00Rp 18,000.00Rp - Mandor 0.100 hari 100,000.00Rp 10,000.00Rp

Jumlah 2,116,700.00Rp.Keuntungan 10% 211,670.00Rp.Jumlah 2,328,370.00Rp.

KodeJ.43 1 Unit Wastafel ex. Toto tipe L 521 V1A Dibulatkan 2,328,300.00Rp.

J.44 1 Unit KITCHEN ZINKa. Bahan:

- Kitchen zink setara ROYAL stinless 1.000 unit 577,500.00Rp 577,500.00Rpb. Upah:

- Tukang 0.300 hari 100,000.00Rp 30,000.00Rp - Pekerja 0.030 hari 66,000.00Rp 1,980.00Rp - Kepala tukang 0.030 oh 120,000.00Rp 3,600.00Rp - Mandor 0.0015 hari 100,000.00Rp 150.00Rp

Jumlah 613,230.00Rp.Keuntungan 10% 61,323.00Rp.Jumlah 674,553.00Rp.

KodeJ.44 1 Unit KITCHEN ZINK Dibulatkan 674,500.00Rp.

J.45 1 Bh Kran dinding ex. Toto tipe T 23B 13V7Na. Bahan:

Kran dinding T 23B 13V7N 1.000 bh 215,600.00Rp 215,600.00Rpb. Upah:

- Tukang 0.100 hari 100,000.00Rp 10,000.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Page 133: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 227,960.00Rp.Keuntungan 10% 22,796.00Rp.Jumlah 250,756.00Rp.

KodeJ.45 1 Bh Kran dinding ex. Toto tipe T 23B 13V7N Dibulatkan 250,700.00Rp.

J.46 1 Bh Kran dinding ex. Toto tipe T 30 AR13 V7Na. Bahan:

Kran dinding T 30 AR13 V7N 1.000 bh 345,400.00Rp 345,400.00Rpb. Upah:

- Tukang 0.100 hari 100,000.00Rp 10,000.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 357,760.00Rp.Keuntungan 10% 35,776.00Rp.Jumlah 393,536.00Rp.

KodeJ.46 1 Bh Kran dinding ex. Toto tipe T 30 AR13 V7N Dibulatkan 393,500.00Rp.

J.47 1 Unit Shower Spray untuk kloset ex. Toto tipe TX 403 S V3a. Bahan:

- Shower Spray TX 403 S V3 1.000 unit 358,600.00Rp 358,600.00Rp - TS 251 F ( stop kran ) 1.000 unit 181,500.00Rp 181,500.00Rp

b. Upah: - Tukang 0.100 hari 100,000.00Rp 10,000.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 552,460.00Rp.Keuntungan 10% 55,246.00Rp.Jumlah 607,706.00Rp.

KodeJ.47 1 Unit Shower Spray untuk kloset ex. Toto tipe TX 403 S V3 Dibulatkan 607,700.00Rp.

J.48 1 Unit Hand Shower set ex. Toto tipe THX 17ZB/ TX 402 XZa. Bahan:

- Hand shower set THX 17ZB/ TX 402 XZ 1.000 unit 611,600.00Rp 611,600.00Rpb. Upah:

- Tukang 0.150 hari 100,000.00Rp 15,000.00Rp - Pekerja 0.015 hari 66,000.00Rp 990.00Rp - Kepala tukang 0.015 hari 120,000.00Rp 1,800.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 629,890.00Rp.Keuntungan 10% 62,989.00Rp.Jumlah 692,879.00Rp.

KodeJ.48 1 Unit Hand Shower set ex. Toto tipe THX 17ZB/ TX 402 XZ Dibulatkan 692,800.00Rp.

J.49 1 Unit Shower Hed ex. TOTO tipe TX422S + TX452SF + TGB 9 MZNa. Bahan:

- Shower Hed ex. TOTO tipe TX422S + TX452SF + TGB 9 MZN1.000 unit 2,972,200.00Rp 2,972,200.00Rpb. Upah:

- Tukang 0.150 hari 100,000.00Rp 15,000.00Rp - Pekerja 0.015 hari 66,000.00Rp 990.00Rp - Kepala tukang 0.015 hari 120,000.00Rp 1,800.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 2,990,490.00Rp.Keuntungan 10% 299,049.00Rp.Jumlah 3,289,539.00Rp.

KodeJ.49 1 Unit Shower Hed ex. TOTO tipe TX422S + TX452SF + TGB 9 MZN Dibulatkan 3,289,500.00Rp.

J.50 1 Unit Floor draina. Bahan:

Floor drain TX 1 BN 1.000 bh 359,700.00Rp 359,700.00Rpb. Upah:

- Tukang 0.100 hari 100,000.00Rp 10,000.00Rp

Page 134: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

- Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 372,060.00Rp.Keuntungan 10% 37,206.00Rp.Jumlah 409,266.00Rp.

KodeJ.50 1 Unit Floor drain Dibulatkan 409,200.00Rp.

J.51 1 Unit Paper holder ex. Toto tipe TS 116 Ra. Bahan:

- TS 116 R 1.000 bh 365,200.00Rp 365,200.00Rpb. Upah:

- Tukang 0.055 hari 100,000.00Rp 5,500.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 373,060.00Rp.Keuntungan 10% 37,306.00Rp.Jumlah 410,366.00Rp.

KodeJ.51 1 Unit Paper holder ex. Toto tipe TS 116 R Dibulatkan 410,300.00Rp.

J.52 1 unit SOAP HOLDER ( Tempat sabun ) ex. Toto tipe S 156N coloura. Bahan:

- S 156N colour 1.000 bh 70,400.00Rp 70,400.00Rpb. Upah:

- Tukang 0.055 hari 100,000.00Rp 5,500.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 78,260.00Rp.Keuntungan 10% 7,826.00Rp.Jumlah 86,086.00Rp.

KodeJ.52 1 unit SOAP HOLDER ( Tempat sabun ) ex. Toto tipe S 156N colour Dibulatkan 86,000.00Rp.

J.53 1 Unit TX3A1 Grab Bar (Panjang 350 mm) ex. Totoa. Bahan:

- TX3A1 Grab Bar (Panjang 350 mm) 1.000 bh 590,700.00Rp 590,700.00Rpb. Upah:

- Tukang 0.100 hari 100,000.00Rp 10,000.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 603,060.00Rp.Keuntungan 10% 60,306.00Rp.Jumlah 663,366.00Rp.

KodeJ.53 1 Unit TX3A1 Grab Bar (Panjang 350 mm) ex. Toto Dibulatkan 663,300.00Rp.

J.54 1 Unit TX3A2 Grab Bar (Panjang 500 mm) ex. Totoa. Bahan:

- TX3A2 Grab Bar (Panjang 500 mm) 1.000 bh 716,100.00Rp 716,100.00Rpb. Upah:

- Tukang 0.100 hari 100,000.00Rp 10,000.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 728,460.00Rp.Keuntungan 10% 72,846.00Rp.Jumlah 801,306.00Rp.

KodeJ.54 1 Unit TX3A2 Grab Bar (Panjang 500 mm) ex. Toto Dibulatkan 801,300.00Rp.

J.55 1 Unit TX3A3 Grab Bar (Panjang 800 mm) ex. Toto

Page 135: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

a. Bahan:- TX3A3 Grab Bar (Panjang 800 mm) 1.000 bh 874,500.00Rp 874,500.00Rp

b. Upah: - Tukang 0.100 hari 100,000.00Rp 10,000.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 886,860.00Rp.Keuntungan 10% 88,686.00Rp.Jumlah 975,546.00Rp.

KodeJ.55 1 Unit TX3A3 Grab Bar (Panjang 800 mm) ex. Toto Dibulatkan 975,500.00Rp.

J.56 1 Unit Double Robe Hook ex. TOTO Type TS 118 WSa. Bahan:

- Double Robe Hook TOTO Type TS 118 WS 1.000 bh 148,500.00Rp 148,500.00Rpb. Upah:

- Tukang 0.100 hari 100,000.00Rp 10,000.00Rp - Pekerja 0.010 hari 66,000.00Rp 660.00Rp - Kepala tukang 0.010 hari 120,000.00Rp 1,200.00Rp - Mandor 0.005 hari 100,000.00Rp 500.00Rp

Jumlah 160,860.00RpKeuntungan 10% 16,086.00RpJumlah 176,946.00Rp

KodeJ.56 1 Unit Double Robe Hook ex. TOTO Type TS 118 WS Dibulatkan 176,900.00Rp

J.57 1 m' Memasang 1 m' Pipa besi BSP SCH. Ø 4”1 Bahan

Pipa besi BSP SCH. Ø 4” 1.200 M' 133,300.00Rp 159,960.00RpPerlengkapan 35% Hrg pipa 133,300.00Rp 46,655.00Rp

Jumlah (1). 206,615.00Rp

2 TenagaPekerja 0.135 oh 66,000.00Rp 8,910.00RpTukang 0.225 oh 100,000.00Rp 22,500.00RpKepala tukang 0.0225 oh 120,000.00Rp 2,700.00RpMandor 0.0068 oh 100,000.00Rp 680.00Rp

Jumlah (2). 34,790.00Rp

Jumlah (1) + (2) 241,405.00RpKeuntungan 10% 24,140.50RpJumlah 265,545.50Rp

KodeJ.57 Memasang 1 m' Pipa besi BSP SCH. Ø 4” Dibulatkan 265,500.00Rp

J.58 1 m' Memasang 1 m' Pipa besi BSP Ø 3" Medium B1 Bahan

Pipa besi BSP Ø 3" Medium B 1.200 M' 96,200.00Rp 115,440.00RpPerlengkapan 35% Hrg pipa 96,200.00Rp 33,670.00Rp

Jumlah (1). 149,110.00Rp

2 TenagaPekerja 0.108 oh 66,000.00Rp 7,128.00RpTukang 0.180 oh 100,000.00Rp 18,000.00RpKepala tukang 0.018 oh 120,000.00Rp 2,160.00RpMandor 0.0054 oh 100,000.00Rp 540.00Rp

Jumlah (2). 27,828.00Rp

Jumlah (1) + (2) 176,938.00RpKeuntungan 10% 17,693.80RpJumlah 194,631.80Rp

KodeJ.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B Dibulatkan 194,600.00Rp

J.59 1 m' Memasang pipa BSP diameter 2"1 Bahan

Pipa besi BSP Ø 2" hitam standar BOS 1.200 m' 45,800.00 54,960.00Perlengkapan 35% Hrg pipa 45,800.00 16,030.00

Jumlah (1). 70,990.00

2 Tenaga

Page 136: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.108 oh 66,000.00 7,128.00Tukang 0.180 oh 100,000.00 18,000.00Kepala tukang 0.018 oh 120,000.00 2,160.00Mandor 0.0054 oh 100,000.00 540.00

Jumlah (2). 27,828.00

Jumlah (1) + (2) 98,818.00Keuntungan 10% 9,881.80Jumlah 108,699.80

KodeJ.59 1 m' Memasang pipa BSP diameter 2" Dibulatkan 108,600.00

J.60 1 m' Memasang pipa BSP diameter 1 1/2"1 Bahan

Pipa BSP 1.200 M' 21,900.00 26,280.00Perlengkapan 35% Hrg pipa 21,900.00 7,665.00

Jumlah (1). 33,945.00

2 TenagaPekerja 0.108 oh 66,000.00 7,128.00Tukang 0.180 oh 100,000.00 18,000.00Kepala tukang 0.018 oh 120,000.00 2,160.00Mandor 0.0054 oh 100,000.00 540.00

Jumlah (2). 27,828.00

Jumlah (1) + (2) 61,773.00Keuntungan 10% 6,177.30Jumlah 67,950.30

KodeJ.60 1 m' Memasang pipa BSP diameter 1 1/2" Dibulatkan 67,900.00

J.61 1 m' Memasang pipa BSP diameter 2 1/2"1 Bahan

Pipa besi BSP Ø 2 1/2" hitam standar BOS 1.200 M' 72,700.00 87,240.00Perlengkapan 35% Hrg pipa 72,700.00 25,445.00

Jumlah (1). 112,685.00

2 TenagaPekerja 0.108 oh 66,000.00 7,128.00Tukang 0.180 oh 100,000.00 18,000.00Kepala tukang 0.018 oh 120,000.00 2,160.00Mandor 0.0054 oh 100,000.00 540.00

Jumlah (2). 27,828.00

Jumlah (1) + (2) 140,513.00Keuntungan 10% 14,051.30Jumlah 154,564.30

KodeJ.61 1 m' Memasang pipa BSP diameter 2 1/2" Dibulatkan 154,500.00

J.62 1 m' Memasang pipa stainless steel diameter 2"1 Bahan

Pipa Stainless steel Ø 2" 1.200 m' 282,560.00 339,072.00Perlengkapan 35% Hrg pipa 282,560.00 98,896.00

Jumlah (1). 437,968.00

2 TenagaPekerja 0.108 oh 66,000.00 7,128.00Tukang 0.180 oh 100,000.00 18,000.00Kepala tukang 0.018 oh 120,000.00 2,160.00Mandor 0.0054 oh 100,000.00 540.00

Jumlah (2). 27,828.00

Jumlah (1) + (2) 465,796.00Keuntungan 10% 46,579.60Jumlah 512,375.60

KodeJ.62 1 m' Memasang pipa stainless steel diameter 2" Dibulatkan 512,300.00

J.63 Memasang 1 m' pipa beton, diameter 100 cm1 Bahan

Pipa beton 1.100 bh 291,000.00Rp. 320,100.00Rp.Batu bata 0.550 m3 420.00Rp. 231.00Rp.Semen portland 10.300 kg 1,360.00Rp. 14,008.00Rp.Pasir pasang 0.061 m3 203,500.00Rp. 12,413.50Rp.Pasir urug 0.069 m3 148,500.00Rp. 10,246.50Rp.

Page 137: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 356,999.00Rp.

2 TenagaPekerja 0.380 oh 66,000.00Rp. 25,080.00Rp.Tukang batu 0.190 oh 100,000.00Rp. 19,000.00Rp.Kepala tukang 0.019 oh 120,000.00Rp. 2,280.00Rp.Mandor 0.019 oh 100,000.00Rp. 1,900.00Rp.

Jumlah (2). 48,260.00Rp.

Jumlah (1) + (2) 405,259.00Rp.Keuntungan 10% 40,525.90Rp.Jumlah 445,784.90Rp.

KodeJ.63 Memasang 1 m' pipa beton, diameter 100 cm Dibulatkan 445,700.00Rp.

J.64 Memasang 1 m' pipa beton, diameter 40 cm1 Bahan

Pipa beton 1.100 bh 70,330.00Rp. 77,363.00Rp.Batu bata 0.550 m3 420.00Rp. 231.00Rp.Semen portland 10.300 kg 1,360.00Rp. 14,008.00Rp.Pasir pasang 0.061 m3 203,500.00Rp. 12,413.50Rp.Pasir urug 0.069 m3 148,500.00Rp. 10,246.50Rp.

Jumlah (1). 114,262.00Rp.

2 TenagaPekerja 0.380 oh 66,000.00Rp. 25,080.00Rp.Tukang batu 0.190 oh 100,000.00Rp. 19,000.00Rp.Kepala tukang 0.019 oh 120,000.00Rp. 2,280.00Rp.Mandor 0.019 oh 100,000.00Rp. 1,900.00Rp.

Jumlah (2). 48,260.00Rp.

Jumlah (1) + (2) 162,522.00Rp.Keuntungan 10% 16,252.20Rp.Jumlah 178,774.20Rp.

KodeJ.64 Memasang 1 m' pipa beton, diameter 40 cm Dibulatkan 178,700.00Rp.

J.65. 1m' Pemasangan U-DITCH uk. 30 x 30 cmG.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 72.112 kg 16,900.00Rp 1,218,693.12RpG.33. - Bekisting pelat 25.000 m2 362,900.00Rp 9,072,500.00Rp

Jumlah 11,350,393.12Rp Dibulatkan 11,350,300.00Rp

KodeJ.65. 1m' Pemasangan U-DITCH uk. 30 x 30 cm 817,221.60Rp

J.66. 1m' Pemasangan U-DITCH uk. 40 x 40 cm

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 69.972 kg 16,900.00Rp 1,182,532.69RpG.33. - Bekisting pelat 25.000 m2 362,900.00Rp 9,072,500.00Rp

Jumlah 11,314,232.69Rp Dibulatkan 11,314,200.00Rp

KodeJ.66. 1m' Pemasangan U-DITCH uk. 40 x 40 cm 1,086,163.20Rp

J.67. 1m' Pemasangan U-DITCH uk. 60 x 60 cm

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 67.833 kg 16,900.00Rp 1,146,372.27RpG.33. - Bekisting pelat 25.000 m2 362,900.00Rp 9,072,500.00Rp

Jumlah 11,278,072.27Rp Dibulatkan 11,278,000.00Rp

KodeJ.67. 1m' Pemasangan U-DITCH uk. 60 x 60 cm 1,624,032.00Rp

J.68. 1m' Pemasangan U-DITCH uk. 80 x 80 cm

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 66.763 kg 16,900.00Rp 1,128,292.06RpG.33. - Bekisting pelat 25.000 m2 362,900.00Rp 9,072,500.00Rp

Jumlah 11,259,992.06Rp

Page 138: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Dibulatkan 11,259,900.00RpKodeJ.68. 1m' Pemasangan U-DITCH uk. 80 x 80 cm 2,161,900.80Rp

J.69. 1m' Pemasangan U-DITCH uk. 120 x 120 cm

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 83.776 kg 16,900.00Rp 1,415,822.40RpG.33. - Bekisting pelat 25.000 m2 362,900.00Rp 9,072,500.00Rp

Jumlah 11,547,522.40Rp Dibulatkan 11,547,500.00Rp

KodeJ.69. 1m' Pemasangan U-DITCH uk. 120 x 120 cm 4,988,520.00Rp

J.70. 1m3 TUTUP U-DITCH uk. 30 x 30 cm T=8CMTUTUP U-DITCH uk. 30 x 30 cm T=8CM

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 77.028 kg 16,900.00Rp 1,301,775.31RpG.33. - Bekisting pelat 12.500 m2 362,900.00Rp 4,536,250.00Rp

Kode Jumlah 6,897,225.31RpJ.70. 1m3 TUTUP U-DITCH uk. 30 x 30 cm T=8CM Dibulatkan 6,897,200.00Rp

J.71. 1m3 TUTUP U-DITCH uk. 40 x 40 cm T=8CM

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 96.285 kg 16,900.00Rp 1,627,219.14RpG.33. - Bekisting pelat 12.500 m2 362,900.00Rp 4,536,250.00Rp

Kode Jumlah 7,222,669.14RpJ.71. 1m3 TUTUP U-DITCH uk. 40 x 40 cm T=8CM Dibulatkan 7,222,600.00Rp

J.72. 1m3 TUTUP U-DITCH uk. 60 x 60 cm T=10CM

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 71.893 kg 16,900.00Rp 1,214,990.29RpG.33. - Bekisting pelat 10.000 m2 362,900.00Rp 3,629,000.00Rp

Kode Jumlah 5,903,190.29RpJ.72. 1m3 TUTUP U-DITCH uk. 60 x 60 cm T=10CM Dibulatkan 5,903,100.00Rp

J.73. 1m3 TUTUP U-DITCH uk. 80 x 80 cm T=12CM

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 83.190 kg 16,900.00Rp 1,405,917.34RpG.33. - Bekisting pelat 8.333 m2 362,900.00Rp 3,024,166.67Rp

Kode Jumlah 5,489,284.00RpJ.73. 1m3 TUTUP U-DITCH uk. 80 x 80 cm T=12CM Dibulatkan 5,489,200.00Rp

J.74. 1m3 TUTUP U-DITCH uk. 120 x 120 cm T=15CM

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 113.933 kg 16,900.00Rp 1,925,470.33RpG.33. - Bekisting pelat 6.667 m2 362,900.00Rp 2,419,333.33Rp

Kode Jumlah 5,404,003.66RpJ.74. 1m3 TUTUP U-DITCH uk. 120 x 120 cm T=15CM Dibulatkan 5,404,000.00Rp

J.75. 1m3 Pekerjaan Plat beton peninggi elevasi K300Pekerjaan Plat beton peninggi elevasi K300

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 71.893 kg 16,900.00Rp 1,214,990.29RpG.33. - Bekisting pelat 12.500 m2 362,900.00Rp 4,536,250.00Rp

Kode Jumlah 6,810,440.29RpJ.75. 1m3 Pekerjaan Plat beton peninggi elevasi K300 Dibulatkan 6,810,400.00Rp

J.76. 1bh BAK KONTROL uk. 80 x 80 cm

- Lantai dan dinding beton Beton K-300 t =8cm 0.368 m3 11,259,992.06Rp 4,143,677.08Rp - Tutup beton Beton K-300 t=12cm 0.080 m3 5,489,284.00Rp 439,142.72Rp

Kode Jumlah 4,582,819.80RpJ.76. 1bh BAK KONTROL uk. 80 x 80 cm Dibulatkan 4,582,800.00Rp

Page 139: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

J.77. 1bh BAK KONTROL uk. 100 x 100 cm

- Lantai dan dinding beton Beton K-300 t =10cm 0.602 m3 11,547,522.40Rp 6,948,837.08Rp - Tutup beton Beton K-300 t=12cm 0.144 m3 5,404,003.66Rp 778,176.53Rp

Kode Jumlah 7,727,013.61RpJ.77. 1bh BAK KONTROL uk. 100 x 100 cm Dibulatkan 7,727,000.00Rp

J.78. 1bh BAK KONTROL uk. 100 x 140 cm

- Lantai dan dinding beton Beton K-300 t =10cm 0.761 m3 11,547,522.40Rp 8,787,664.55Rp - Tutup beton Beton K-300 t=150cm 0.192 m3 5,404,003.66Rp 1,037,568.70Rp

Kode Jumlah 9,825,233.25RpJ.78. 1bh BAK KONTROL uk. 100 x 140 cm Dibulatkan 9,825,200.00Rp

J.79. 1 Unit Sumur unit bidang resapan Ø100cm

B.3. - Galian Tanah sumuran 27.475 m1 83,600.00Rp 2,296,910.00RpG.36.d - Beton K-300 0.960 m3 1,059,200.00Rp 1,016,832.00RpG.25. - Pembesian 7.488 kg 16,900.00Rp 126,547.20RpJ.63 - Pasang Buis Beton dia.100 cm 1.000 bh 445,700.00Rp 445,700.00RpE.24. - Adukan 1 PC : 3 PS tebal 30 mm 0.100 m3 85,500.00Rp 8,550.00Rpbahan - Kerikil sungai tak tersaring 27.475 m3 198,000.00Rp 5,440,050.00RpB.11. - Pasir Urug 0.196 m3 218,900.00Rp 42,904.40Rp

Kode Jumlah 9,377,493.60RpJ.79. 1 Unit Sumur unit bidang resapan Ø100cm Dibulatkan 9,377,400.00Rp

J.80. 1 Unit Tutup manhole 60 x 60 baja siku 40x40x4 & checkered plate 3mm

K.1. - Besi siku L 40,40,4 6.588 kg 29,100.00Rp 191,710.80RpK.1. - Checkered plate 3MM 11.907 kg 29,100.00Rp 346,493.70RpG.25. - Handle besi d 12 mm 0.444 kg 16,900.00Rp 7,502.42Rpbahan - Kunci Gembok 1.000 bh 61,770.00Rp 61,770.00RpN.30 - Finishing cat minyak 0.720 m2 73,500.00Rp 52,920.00Rp

Kode Jumlah 660,396.92RpJ.80. 1 Unit Tutup manhole 60 x 60 baja siku 40x40x4 & checkered plate 3mm Dibulatkan 660,300.00Rp

J.81. 1Unit Tutup manhole 40 x 50 baja siku 40x40x4 & checkered plate 3mm

K.1. - Besi siku L 40,40,4 16.470 kg 29,100.00Rp 479,277.00RpK.1. - Checkered plate 3MM 4.860 kg 29,100.00Rp 141,426.00RpG.25. - Handle besi d 12 mm 0.444 kg 16,900.00Rp 7,502.42Rpbahan - Kunci Gembok 1.000 bh 61,770.00Rp 61,770.00RpN.30 - Finishing cat minyak/duco 0.720 m2 73,500.00Rp 52,920.00Rp

Kode Jumlah 742,895.42RpJ.81. 1Unit Tutup manhole 40 x 50 baja siku 40x40x4 & checkered plate 3mm Dibulatkan 742,800.00Rp

J.82. 1bh Gril besi tutup saluran uk. 30 x 100 CM

K.1. - Besi siku L 40,40,4 9.620 kg 29,100.00Rp 279,942.00RpG.25. - Besi D 12mm ulir 9.140 kg 16,900.00Rp 154,463.45RpN.30 - Finishing cat minyak kayu besi 0.600 m2 73,500.00Rp 44,100.00Rp

Kode Jumlah 478,505.45RpJ.82. 1bh Gril besi tutup saluran uk. 30 x 100 CM Dibulatkan 478,500.00Rp

J.83. 1m' Plat duiker beton 8x80x100 ( U 60cm )

G.25. - Besi beton Ø10mm 18.244 kg 16,900.00Rp 308,319.09RpG.36.d - Beton K-300 0.064 m3 1,059,200.00Rp 67,788.80RpG.32. - Cetakan beton/bekisting multiplek 1.088 m2 424,900.00Rp 462,291.20Rp

Kode Jumlah 838,399.09RpJ.83. 1m' Plat duiker beton 8x80x100 ( U 60cm ) Dibulatkan 838,300.00Rp

J.84. 1m' Plat duiker beton 8x80x100 ( U 40cm )

G.25. - Besi beton Ø10mm 13.849 kg 16,900.00Rp 234,055.99RpG.36.d - Beton K-300 0.064 m3 1,059,200.00Rp 67,788.80RpG.32. - Cetakan beton/bekisting multiplek 0.856 m2 424,900.00Rp 363,714.40Rp

Page 140: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kode Jumlah 665,559.19RpJ.84. 1m' Plat duiker beton 8x80x100 ( U 40cm ) Dibulatkan 665,500.00Rp

J.85. 1m' Pemasangan U-DITCH uk. 100 x 100 cm

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 73.876 kg 16,900.00Rp 1,248,496.25RpG.32. - Bekisting pelat 20.000 m2 424,900.00Rp 8,498,000.00Rp

Jumlah 10,805,696.25Rp Dibulatkan 10,805,600.00Rp

KodeJ.85. 1m' Pemasangan U-DITCH uk. 100 x 100 cm 3,241,680.00Rp

J.86. 1m3 TUTUP U-DITCH uk. 100 x 100 cm T=15CM

G.36.d - Beton K-300 1.000 m3 1,059,200.00Rp 1,059,200.00RpG.25. - Pembesian 136.720 kg 16,900.00Rp 2,310,564.39RpG.32. - Bekisting pelat 6.667 m2 424,900.00Rp 2,832,666.67Rp

Kode Jumlah 6,202,431.06RpJ.86. 1m3 TUTUP U-DITCH uk. 100 x 100 cm T=15CM Dibulatkan 6,202,400.00Rp

J.87. 1bh BAK KONTROL uk. 60 x 60 cm

- Lantai dan dinding beton Beton K-300 t =10cm 0.186 m3 11,278,072.27Rp 2,093,210.21Rp - Tutup beton Beton K-300 t=12cm 0.051 m3 5,903,190.29Rp 302,243.34Rp

Kode Jumlah 2,395,453.56RpJ.87. 1bh BAK KONTROL uk. 60 x 60 cm Dibulatkan 2,395,400.00Rp

J.88. 1 unit Cermin (75x162,5cm) + beveled. 542,010.00Cermin (75x162,5cm) + beveled. 1.00 unit 521,640.00 521,640.00Pekerja 0.015 org 98,000.00 1,470.00Tukang kayu 0.150 org 112,500.00 16,875.00Kepala Tukang 0.015 org 127,500.00 1,912.50Mandor 0.00075 org 145,000.00 108.75

Jumlah 542,006.25

Page 141: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN BESI DAN ALUMUNIUMRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pemasangan rangka atap dan talang2. Pekerjaan pemasangan pintu/jendela, pintu alumunuim, jendela nako, pintu gulung, pintu lipat sunscreen, venetion dan vertical blind3. Pekerjaan pemasangan kawat kasa dan kawat burung

K.1. 1 kg Pasang 1 kg besi profil1 Bahan

Besi profil 1.1500 kg 13,200.00Rp. 15,180.00Rp.Jumlah (1). 15,180.00Rp.

2 TenagaTukang besi 0.0600 oh 105,000.00Rp. 6,300.00Rp.Pekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 11,280.00Rp.

Jumlah (1) + (2) 26,460.00Rp.Keuntungan 10% 2,646.00Rp.Jumlah 29,106.00Rp.

KodeK.1. 1 kg Pasang 1 kg besi profil Dibulatkan 29,100.00Rp.

K.1.a 1 kg Pasang rangka atap baja siku1 Bahan

Besi profil siku 1.1000 kg 13,200.00Rp. 14,520.00Rp.Meni Besi 0.0800 kg 21,640.00Rp. 1,731.20Rp.

Jumlah (1). 16,251.20Rp.

2 TenagaTukang besi 0.0600 oh 105,000.00Rp. 6,300.00Rp.Pekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 11,280.00Rp.

Jumlah (1) + (2) 27,531.20Rp.Keuntungan 10% 2,753.12Rp.Jumlah 30,284.32Rp.

KodeK.1.a 1 kg Pasang rangka atap baja siku Dibulatkan 30,200.00Rp.

K.1.b 1 kg Pasang rangka gording canal C baja1 Bahan

Baja Canal C 1.1000 kg 13,200.00Rp. 14,520.00Rp.Meni Besi 0.0800 kg 21,640.00Rp. 1,731.20Rp.

Jumlah (1). 16,251.20Rp.

2 TenagaTukang besi 0.0600 oh 105,000.00Rp. 6,300.00Rp.Pekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 11,280.00Rp.

Jumlah (1) + (2) 27,531.20Rp.Keuntungan 10% 2,753.12Rp.Jumlah 30,284.32Rp.

KodeK.1.b 1 kg Pasang rangka gording canal C baja Dibulatkan 30,200.00Rp.

K.2. 1 kg Pasang rangka atap kuda - kuda baja IWF1 Bahan

Besi baja WF 1.1500 kg 13,200.00Rp. 15,180.00Rp.Jumlah (1). 15,180.00Rp.

2 TenagaTukang besi 0.0600 oh 105,000.00Rp. 6,300.00Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

K.

Page 142: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 11,280.00Rp.

Jumlah (1) + (2) 26,460.00Rp.Keuntungan 10% 2,646.00Rp.Jumlah 29,106.00Rp.

KodeK.2. 1 kg Pasang rangka atap kuda - kuda baja IWF Dibulatkan 29,100.00Rp.

K.3. 1 kg Pekerjaan perakitan1 Bahan

Solar 0.0100 ltr 11,600.00Rp. 116.00Rp.Minyak Pelumas 0.0010 ltr 7,260.00Rp. 7.26Rp.

Jumlah (1). 123.26Rp.2 Alat

Alat bantu 0.0080 Jam 100,000.00Rp. 800.00Rp.Jumlah (2). 800.00Rp.

3 TenagaTukang besi 0.0010 oh 105,000.00Rp. 105.00Rp.Pekerja 0.0010 oh 66,000.00Rp. 66.00Rp.Kepala tukang 0.00001 oh 120,000.00Rp. 1.20Rp.Mandor 0.00005 oh 100,000.00Rp. 5.00Rp.

Jumlah (2). 177.20Rp.

Jumlah (1)+(2)+(3) 1,100.46Rp.Keuntungan 10% 110.05Rp.Jumlah 1,210.51Rp.

KodeK.3. 1 kg Pekerjaan perakitan Dibulatkan 1,200.00Rp.

K.4. 10 cm Pengelasan dengan las listrik1 Bahan

Kawat listrik 0.4000 Kg 5,566.00Rp. 2,226.40Rp.Solar 0.3000 ltr 11,600.00Rp. 3,480.00Rp.Minyak Pelumas 0.0400 ltr 7,260.00Rp. 290.40Rp.

Jumlah (1). 5,996.80Rp.2 Tenaga

Tukang besi 0.0010 oh 105,000.00Rp. 105.00Rp.Pekerja 0.0010 oh 66,000.00Rp. 66.00Rp.Kepala tukang 0.0001 oh 120,000.00Rp. 6.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 977.00Rp.

Jumlah (1) + (2) 6,973.80Rp.Keuntungan 10% 697.38Rp.Jumlah 7,671.18Rp.

KodeK.4. 10 cm Pengelasan dengan las listrik Dibulatkan 7,600.00Rp.

K.5. 1 m2 Pasang pintu besi baja1 Bahan

Pintu besi baja 1.0000 m2 357,500.00Rp. 357,500.00Rp.Jumlah (1). 357,500.00Rp.

2 TenagaTukang besi 0.6500 oh 105,000.00Rp. 68,250.00Rp.Pekerja 0.6500 oh 66,000.00Rp. 42,900.00Rp.Kepala tukang 0.0650 oh 120,000.00Rp. 7,800.00Rp.Mandor 0.0320 oh 100,000.00Rp. 3,200.00Rp.

Jumlah (2). 122,150.00Rp.

Jumlah (1) + (2) 479,650.00Rp.Keuntungan 10% 47,965.00Rp.Jumlah 527,615.00Rp.

KodeK.5. 1 m2 Pasang pintu besi baja Dibulatkan 527,600.00Rp.

K.6. 1 m2 Pasang jendela besi1 Bahan

Jendela besi 1.0000 m2 210,000.00Rp. 210,000.00Rp.Jumlah (1). 210,000.00Rp.

2 TenagaTukang besi kontruksi 1.0500 oh 105,000.00Rp. 110,250.00Rp.

Page 143: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 1.0500 oh 66,000.00Rp. 69,300.00Rp.Kepala tukang 0.1050 oh 120,000.00Rp. 12,600.00Rp.Mandor 0.0053 oh 100,000.00Rp. 525.00Rp.

Jumlah (2). 192,675.00Rp.

Jumlah (1) + (2) 402,675.00Rp.Keuntungan 10% 40,267.50Rp.Jumlah 442,942.50Rp.

KodeK.6. 1 m2 Pasang jendela besi Dibulatkan 442,900.00Rp.

K.7. 1 m2 Pasang jendela besi tahan api1 Bahan

Jendela besi tahan api 1.0000 m2 786,500.00Rp. 786,500.00Rp.Jumlah (1). 786,500.00Rp.

2 TenagaTukang besi kontruksi 1.2000 oh 105,000.00Rp. 126,000.00Rp.Pekerja 1.0220 oh 66,000.00Rp. 67,452.00Rp.Kepala tukang 0.1200 oh 120,000.00Rp. 14,400.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 208,452.00Rp.

Jumlah (1) + (2) 994,952.00Rp.Keuntungan 10% 99,495.20Rp.Jumlah 1,094,447.20Rp.

KodeK.7. 1 m2 Pasang jendela besi tahan api Dibulatkan 1,094,400.00Rp.

K.8. 1 m2 Pasang pintu rolling door besi1 Bahan

Pintu gulung besi 1.0000 m2 544,500.00Rp. 544,500.00Rp.Jumlah (1). 544,500.00Rp.

2 TenagaTukang besi kontruksi 1.2000 oh 105,000.00Rp. 126,000.00Rp.Pekerja 1.2000 oh 66,000.00Rp. 79,200.00Rp.Kepala tukang 0.1200 oh 120,000.00Rp. 14,400.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 220,200.00Rp.

Jumlah (1) + (2) 764,700.00Rp.Keuntungan 10% 76,470.00Rp.

Jumlah 841,170.00Rp.KodeK.8. 1 m2 Pasang pintu rolling door besi Dibulatkan 841,100.00Rp.

K.9. 1 m2 Pasang pintu lipat (folding door)1 Bahan

Pintu lipat 1.0000 m2 533,500.00Rp. 533,500.00Rp.Jumlah (1). 533,500.00Rp.

2 TenagaTukang besi kontruksi 0.4400 oh 105,000.00Rp. 46,200.00Rp.Pekerja 0.4400 oh 66,000.00Rp. 29,040.00Rp.Kepala tukang 0.0440 oh 120,000.00Rp. 5,280.00Rp.Mandor 0.0220 oh 100,000.00Rp. 2,200.00Rp.

Jumlah (2). 82,720.00Rp.

Jumlah (1) + (2) 616,220.00Rp.Keuntungan 10% 61,622.00Rp.Jumlah 677,842.00Rp.

KodeK.9. 1 m2 Pasang pintu lipat (folding door) Dibulatkan 677,800.00Rp.

K.10. 1 m2 Pasang pintu Sunscreen alluminium1 Bahan

Sunscreen alluminium 1.0000 m2 423,500.00Rp. 423,500.00Rp.Jumlah (1). 423,500.00Rp.

2 TenagaTukang besi kontruksi 0.8000 oh 105,000.00Rp. 84,000.00Rp.Pekerja 0.0800 oh 66,000.00Rp. 5,280.00Rp.Kepala tukang 0.0800 oh 120,000.00Rp. 9,600.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Page 144: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 99,280.00Rp.

Jumlah (1) + (2) 522,780.00Rp.Keuntungan 10% 52,278.00Rp.Jumlah 575,058.00Rp.

KodeK.10. 1 m2 Pasang pintu Sunscreen alluminium Dibulatkan 575,000.00Rp.

K.11. 1 m2 Pasang rolling door Alumunium1 Bahan

Roll door alumunium 1.0000 m2 183,390.00Rp. 183,390.00Rp.Jumlah (1). 183,390.00Rp.

2 TenagaTukang besi kontruksi 1.0000 oh 105,000.00Rp. 105,000.00Rp.Pekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Kepala tukang 0.1000 oh 120,000.00Rp. 12,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 188,000.00Rp.

Jumlah (1) + (2) 371,390.00Rp.Keuntungan 10% 37,139.00Rp.Jumlah 408,529.00Rp.

KodeK.11. 1 m2 Pasang rolling door Alumunium Dibulatkan 408,500.00Rp.

K.12. 1 m2 Pasang pintu alluminium1 Bahan

Pintu alluminium 1.0000 m2 290,440.00Rp. 290,440.00Rp.Jumlah (1). 290,440.00Rp.

2 TenagaTukang besi kontruksi 1.0500 oh 105,000.00Rp. 110,250.00Rp.Pekerja 1.0500 oh 66,000.00Rp. 69,300.00Rp.Kepala tukang 0.1050 oh 120,000.00Rp. 12,600.00Rp.Mandor 0.0052 oh 100,000.00Rp. 520.00Rp.

Jumlah (2). 192,670.00Rp.

Jumlah (1) + (2) 483,110.00Rp.Keuntungan 10% 48,311.00Rp.Jumlah 531,421.00Rp.

KodeK.12. 1 m2 Pasang pintu alluminium Dibulatkan 531,400.00Rp.

K.13. 1 m2 Pasang venetions blinds1 Bahan

Venetions blinds 1.0000 m2 157,300.00Rp. 157,300.00Rp.Jumlah (1). 157,300.00Rp.

2 TenagaTukang kayu 0.3500 oh 105,000.00Rp. 36,750.00Rp.Pekerja 0.3500 oh 66,000.00Rp. 23,100.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0175 oh 100,000.00Rp. 1,750.00Rp.

Jumlah (2). 65,800.00Rp.

Jumlah (1) + (2) 223,100.00Rp.Keuntungan 10% 22,310.00Rp.Jumlah 245,410.00Rp.

KodeK.13. 1 m2 Pasang venetions blinds Dibulatkan 245,400.00Rp.

K.14. 1 m2 Pasang verticals blinds1 Bahan

Verticals blinds 1.0000 m2 99,370.00Rp. 99,370.00Rp.Jumlah (1). 99,370.00Rp.

2 TenagaTukang kayu 0.3500 oh 105,000.00Rp. 36,750.00Rp.Pekerja 0.3500 oh 66,000.00Rp. 23,100.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0018 oh 100,000.00Rp. 175.00Rp.

Jumlah (2). 64,225.00Rp.

Jumlah (1) + (2) 163,595.00Rp.Keuntungan 10% 16,359.50Rp.

Page 145: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 179,954.50Rp.KodeK.14. 1 m2 Pasang verticals blinds Dibulatkan 179,900.00Rp.

K.15. 1 m2 Pasang terali besi1 Bahan

Besi strip 2 x 3 6.1770 m' 3,160.00Rp. 19,519.32Rp.Jumlah (1). 19,519.32Rp.

2 TenagaTukang las 1.6700 oh 89,250.00Rp. 149,047.50Rp.Pekerja 1.6700 oh 66,000.00Rp. 110,220.00Rp.Kepala tukang 0.1670 oh 120,000.00Rp. 20,040.00Rp.Mandor 0.0830 oh 100,000.00Rp. 8,300.00Rp.

Jumlah (2). 287,607.50Rp.

Jumlah (1) + (2) 307,126.82Rp.Keuntungan 10% 30,712.68Rp.Jumlah 337,839.50Rp.

KodeK.15. 1 m2 Pasang terali besi Dibulatkan 337,800.00Rp.

K.16. 1 m2 Pasang kawat harmonika1 Bahan

Kawat harmonika 1.1000 m2 21,510.00Rp. 23,661.00Rp.Paku biasa 1/2" - 1" 0.0200 kg 19,480.00Rp. 389.60Rp.Kayu kamper papan 0.0018 m3 10,779,700.00Rp. 19,403.46Rp.

Jumlah (1). 43,454.06Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0005 oh 100,000.00Rp. 50.00Rp.

Jumlah (2). 18,350.00Rp.

Jumlah (1) + (2) 61,804.06Rp.Keuntungan 10% 6,180.41Rp.Jumlah 67,984.47Rp.

KodeK.16. 1 m2 Pasang kawat harmonika Dibulatkan 67,900.00Rp.

K.17. 1 m2 Pasang kawat nyamuk1 Bahan

Kawat nyamuk 1.1000 m2 21,510.00Rp. 23,661.00Rp.Paku biasa 1/2" - 1" 0.0200 kg 19,480.00Rp. 389.60Rp.Kayu kamper papan 0.0018 m3 10,779,700.00Rp. 19,403.46Rp.

Jumlah (1). 43,454.06Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0005 oh 100,000.00Rp. 50.00Rp.

Jumlah (2). 18,350.00Rp.

Jumlah (1) + (2) 61,804.06Rp.Keuntungan 10% 6,180.41Rp.Jumlah 67,984.47Rp.

KodeK.17. 1 m2 Pasang kawat nyamuk Dibulatkan 67,900.00Rp.

K.18. 1 m2 Pasang kawat kassa1 Bahan

Kawat kassa 1.1000 m2 36,680.00Rp. 40,348.00Rp.Paku biasa 1/2" - 1" 0.0200 kg 19,480.00Rp. 389.60Rp.Kayu kamper papan 0.0018 m3 10,779,700.00Rp. 19,403.46Rp.

Jumlah (1). 60,141.06Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0005 oh 100,000.00Rp. 50.00Rp.

Jumlah (2). 18,350.00Rp.

Page 146: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 78,491.06Rp.Keuntungan 10% 7,849.11Rp.Jumlah 86,340.17Rp.

KodeK.18. 1 m2 Pasang kawat kassa Dibulatkan 86,300.00Rp.

K.19. 1 m2 Pasang kawat burung1 Bahan

Kawat burung 1.1000 m2 11,380.00Rp. 12,518.00Rp.Paku biasa 1/2" - 1" 0.0200 kg 19,480.00Rp. 389.60Rp.Kayu kamper papan 0.0018 m3 10,779,700.00Rp. 19,403.46Rp.

Jumlah (1). 32,311.06Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0005 oh 100,000.00Rp. 50.00Rp.

Jumlah (2). 18,350.00Rp.

Jumlah (1) + (2) 50,661.06Rp.Keuntungan 10% 5,066.11Rp.Jumlah 55,727.17Rp.

KodeK.19. 1 m2 Pasang kawat burung Dibulatkan 55,700.00Rp.

K.20. 1 m2 Pasang jendela nako & tralis1 Bahan

Jendela nako 1.1000 m2 8,850.00Rp. 9,735.00Rp.Paku biasa 1/2" - 1" atau sekrup 0.0200 kg 19,480.00Rp. 389.60Rp.Besi strip 7.0000 m' 3,160.00Rp. 22,120.00Rp.

Jumlah (1). 32,244.60Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0010 oh 100,000.00Rp. 100.00Rp.

Jumlah (2). 36,700.00Rp.

Jumlah (1) + (2) 68,944.60Rp.Keuntungan 10% 6,894.46Rp.Jumlah 75,839.06Rp.

KodeK.20. 1 m2 Pasang jendela nako & tralis Dibulatkan 75,800.00Rp.

K.21. 1 m2 Pasang talang datar, seng bjls 281 Bahan

Seng plat 3' x 6' bjls 28 1.0500 lbr 42,350.00Rp. 44,467.50Rp.Paku biasa 1/2" - 1" 0.0150 kg 19,480.00Rp. 292.20Rp.Kayu borneo, papan 0.0900 m3 3,749,460.00Rp. 337,451.40Rp.

Jumlah (1). 382,211.10Rp.

2 TenagaPekerja 0.2000 oh 66,000.00Rp. 13,200.00Rp.Tukang kayu 0.4000 oh 105,000.00Rp. 42,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 59,200.00Rp.

Jumlah (1) + (2) 441,411.10Rp.Keuntungan 10% 44,141.11Rp.Jumlah 485,552.21Rp.

KodeK.21. 1 m2 Pasang talang datar, seng bjls 28 Dibulatkan 485,500.00Rp.

K.22. 1 m2 Pasang talang miring, seng bjls 281 Bahan

Seng plat 3' x 6' bjls 28 0.5000 lbr 42,350.00Rp. 21,175.00Rp.Paku biasa 1/2" - 1" 0.0150 kg 19,480.00Rp. 292.20Rp.Kayu borneo, papan 0.0190 m3 3,749,460.00Rp. 71,239.74Rp.Flincote/menie besi 0.3000 kg 21,640.00Rp. 6,492.00Rp.

Jumlah (1). 99,198.94Rp.

2 TenagaPekerja 0.0400 oh 66,000.00Rp. 2,640.00Rp.

Page 147: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang kayu 0.4000 oh 105,000.00Rp. 42,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0013 oh 100,000.00Rp. 125.00Rp.

Jumlah (2). 47,765.00Rp.

Jumlah (1) + (2) 146,963.94Rp.Keuntungan 10% 14,696.39Rp.Jumlah 161,660.33Rp.

KodeK.22. 1 m2 Pasang talang miring, seng bjls 28 Dibulatkan 161,600.00Rp.

K.23. 1 m2 Pasang talang 1/2 lingkaran D-10 cm, seng bjls 281 Bahan

Seng plat 3' x 6' bjls 28 1.0500 lbr 42,350.00Rp. 44,467.50Rp.Paku biasa 1/2" - 1" 0.0100 kg 19,480.00Rp. 194.80Rp.Besi strip 0.5000 m3 3,160.00Rp. 1,580.00Rp.

Jumlah (1). 46,242.30Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang kayu 0.3000 oh 105,000.00Rp. 31,500.00Rp.Kepala tukang 0.0300 oh 120,000.00Rp. 3,600.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 45,750.00Rp.

Jumlah (1) + (2) 91,992.30Rp.Keuntungan 10% 9,199.23Rp.Jumlah 101,191.53Rp.

KodeK.23. 1 m2 Pasang talang 1/2 lingkaran D-10 cm, seng bjls 28 Dibulatkan 101,100.00Rp.

K.24. 1 m' Pasang kusen alluminium 3"1 Bahan

Alluminium kusen 3" 1.1000 m' 80,940.00Rp. 89,034.00Rp.Fisher 10.0000 bh 860.00Rp. 8,600.00Rp.Sealant 0.1000 kg 21,410.00Rp. 2,141.00Rp.Paku keling 10.0000 bh 610.00Rp. 6,100.00Rp.

Jumlah (1). 105,875.00Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang besi 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0013 oh 100,000.00Rp. 125.00Rp.

Jumlah (2). 18,425.00Rp.

Jumlah (1) + (2) 124,300.00Rp.Keuntungan 10% 12,430.00Rp.Jumlah 136,730.00Rp.

KodeK.24. 1 m' Pasang kusen alluminium 3" Dibulatkan 136,700.00Rp.

K.25. 1 m' Pasang kusen alluminium 4"1 Bahan

Alluminium kusen 4" 1.1000 m' 101,170.00Rp. 111,287.00Rp.Fisher 10.0000 bh 860.00Rp. 8,600.00Rp.Sealant 0.1000 kg 21,410.00Rp. 2,141.00Rp.Paku keling 10.0000 bh 610.00Rp. 6,100.00Rp.

Jumlah (1). 128,128.00Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang besi 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0013 oh 100,000.00Rp. 125.00Rp.

Jumlah (2). 18,425.00Rp.

Jumlah (1) + (2) 146,553.00Rp.Keuntungan 10% 14,655.30Rp.Jumlah 161,208.30Rp.

KodeK.25. 1 m' Pasang kusen alluminium 4" Dibulatkan 161,200.00Rp.

K.26. 1 m' Pasang kusen alluminium 3" warna1 Bahan

Alluminium kusen 3" warna 1.1000 m' 87,860.00Rp. 96,646.00Rp.

Page 148: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Fisher 2.0000 bh 860.00Rp. 1,720.00Rp.Sealant 0.0600 kg 21,410.00Rp. 1,284.60Rp.

Jumlah (1). 99,650.60Rp.

2 TenagaPekerja 0.0430 oh 66,000.00Rp. 2,838.00Rp.Tukang besi 0.0430 oh 105,000.00Rp. 4,515.00Rp.Kepala tukang 0.0043 oh 120,000.00Rp. 516.00Rp.Mandor 0.0021 oh 100,000.00Rp. 210.00Rp.

Jumlah (2). 8,079.00Rp.

Jumlah (1) + (2) 107,729.60Rp.Keuntungan 10% 10,772.96Rp.Jumlah 118,502.56Rp.

KodeK.26. 1 m' Pasang kusen alluminium 3" warna Dibulatkan 118,500.00Rp.

K.27. 1 m2 Pasang Pintu dan Jendela Kaca Rangka Alumunium1 Bahan

RANGKA Alluminium kusen 3" warna 4.3000 m' 29,166.67Rp. 125,416.67Rp.Fisher 8.0000 bh 860.00Rp. 6,880.00Rp.List Karet 4.0400 m' 5,430.00Rp. 21,937.20Rp.

Jumlah (1). 154,233.87Rp.

2 TenagaPekerja 0.0850 oh 66,000.00Rp. 5,610.00Rp.Tukang besi 0.0850 oh 105,000.00Rp. 8,925.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 16,115.00Rp.

Jumlah (1) + (2) 170,348.87Rp.Keuntungan 10% 17,034.89Rp.Jumlah 187,383.75Rp.

KodeK.27. 1 m2 Pasang Pintu dan Jendela Kaca Rangka Alumunium Dibulatkan 187,300.00Rp.

K.27.a 1 m2 Pasang Pintu dan Jendela Kaca Rangka Alumunium 3"1 Bahan

Rangka Alluminium kusen 3" 4.0000 m' 25,833.33Rp. 103,333.33Rp.Fisher 8.0000 bh 860.00Rp. 6,880.00Rp.List Karet 4.1000 m' 5,430.00Rp. 22,263.00Rp.

Jumlah (1). 132,476.33Rp.

2 TenagaPekerja 0.0850 oh 66,000.00Rp. 5,610.00Rp.Tukang besi 0.0850 oh 105,000.00Rp. 8,925.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 16,115.00Rp.

Jumlah (1) + (2) 148,591.33Rp.Keuntungan 10% 14,859.13Rp.Jumlah 163,450.47Rp.

KodeK.27.a 1 m2 Pasang Pintu dan Jendela Kaca Rangka Alumunium 3" Dibulatkan 163,400.00Rp.

K.28. 1 m' Pasang kusen alluminium 4" warna1 Bahan

Alluminium kusen 4" warna 1.1000 m' 107,610.00Rp. 118,371.00Rp.Fisher 10.0000 bh 860.00Rp. 8,600.00Rp.Sealant 0.1000 kg 21,410.00Rp. 2,141.00Rp.Paku keling 10.0000 bh 610.00Rp. 6,100.00Rp.

Jumlah (1). 135,212.00Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Tukang besi 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0013 oh 100,000.00Rp. 125.00Rp.

Jumlah (2). 18,425.00Rp.

Jumlah (1) + (2) 153,637.00Rp.Keuntungan 10% 15,363.70Rp.Jumlah 169,000.70Rp.

Page 149: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeK.28. 1 m' Pasang kusen alluminium 4" warna Dibulatkan 169,000.00Rp.

K.29. 1 m2 Rangka atap pelana baja ringan galvanize bentang L = 8 s/d 10 m'

BahanTrusses UK-75 =0,83 0.9500 m' 48,630.00Rp. 46,198.50Rp.Trusses UK-75 =0,53 1.7200 m' 31,550.00Rp. 54,266.00Rp.Roof Butten GD-B 0,48 4.4000 m' 15,840.00Rp. 69,696.00Rp.Wind Bracing PS-30 0.7300 m' 1,850.00Rp. 1,350.50Rp.Tensioner TS-2, T=0,30 MM 0.1100 bh 9,770.00Rp. 1,074.70Rp.Foot Plate PK-75, T=1,50 0.2600 bh 11,630.00Rp. 3,023.80Rp.Fascia Bracket FB-75, T=0.80 MM 0.2700 m' 4,200.00Rp. 1,134.00Rp.Plate Diafragma PLD-75, T=0,50 MM 4.9000 bh 1,850.00Rp. 9,065.00Rp.SDP.HWH #12x24x22 12.3200 bh 370.00Rp. 4,558.40Rp.SDP. Wafer#8x18x13 26.4000 bh 240.00Rp. 6,336.00Rp.Dynabolt M-10 0.6100 bh 3,210.00Rp. 1,958.10Rp.

Jumlah (1). 198,661.00Rp.

TenagaPekerja 0.5000 oh 66,000.00Rp. 33,000.00Rp.Tukang besi 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Jumlah (2). 64,750.00Rp.

Jumlah (1) + (2) 263,411.00Rp.Keuntungan 10% 26,341.10Rp.Jumlah 289,752.10Rp.

KodeK.29. 1 m2 Rangka atap pelana baja ringan galvanize bentang L = 8 s/d 10 m' Dibulatkan 289,700.00Rp.

K.30. 1 m2 Rangka atap limasan baja ringan galvanize bentang L = 8 s/d 10 m'

BahanTrusses UK-75 =0,83 1.0000 m' 48,630.00Rp. 48,630.00Rp.Trusses UK-75 =0,53 1.7200 m' 31,550.00Rp. 54,266.00Rp.Roof Butten GD-B 0,48 4.4000 m' 15,840.00Rp. 69,696.00Rp.Wind Bracing PS-30 0.7300 m' 1,850.00Rp. 1,350.50Rp.Tensioner TS-2, T=0,30 MM 0.1100 bh 9,770.00Rp. 1,074.70Rp.Foot Plate PK-75, T=1,50 0.2700 bh 11,630.00Rp. 3,140.10Rp.Fascia Bracket FB-75, T=0.80 MM 0.2700 m' 4,200.00Rp. 1,134.00Rp.Plate Diafragma PLD-75, T=0,50 MM 4.9000 bh 1,850.00Rp. 9,065.00Rp.SDP.HWH #12x24x22 12.3200 bh 370.00Rp. 4,558.40Rp.SDP. Wafer#8x18x13 26.4000 bh 240.00Rp. 6,336.00Rp.Dynabolt M-10 0.6100 bh 3,210.00Rp. 1,958.10Rp.

Jumlah (1). 201,208.80Rp.

TenagaPekerja 0.5000 oh 66,000.00Rp. 33,000.00Rp.Tukang besi 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Jumlah (2). 64,750.00Rp.

Jumlah (1) + (2) 265,958.80Rp.Keuntungan 10% 26,595.88Rp.Jumlah 292,554.68Rp.

KodeK.30. 1 m2 Rangka atap limasan baja ringan galvanize bentang L = 8 s/d 10 m' Dibulatkan 292,500.00Rp.

K.31. 1 m2 Rangka atap pelana baja ringan galvanize bentang L = 8 s/d 10 m' ( Profil C )

BahanTrusses C-75 t=0,8 mm 2.2500 m' 28,330.00Rp. 63,742.50Rp.Roof Butten GD-B 0,48 3.8500 m' 15,840.00Rp. 60,984.00Rp.SDP.HWH #12x24x22 12.3200 bh 370.00Rp. 4,558.40Rp.SDP. Wafer#8x18x13 26.4000 bh 240.00Rp. 6,336.00Rp.Dynabolt M-10 0.6100 bh 3,210.00Rp. 1,958.10Rp.

Jumlah (1). 137,579.00Rp.

TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang besi 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Page 150: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 35,125.00Rp.

Jumlah (1) + (2) 172,704.00Rp.Keuntungan 10% 17,270.40Rp.Jumlah 189,974.40Rp.

KodeK.31. 1 m2 Rangka atap pelana baja ringan galvanize bentang L = 8 s/d 10 m' ( Profil C )Dibulatkan 189,900.00Rp.

K.32. 1 m2 Rangka atap limasan baja ringan galvanize bentang L = 8 s/d 10 m' ( Profil C )

BahanTrusses C-75 t=0,8 mm 2.7200 m' 28,330.00Rp. 77,057.60Rp.Roof Butten GD-B 0,48 3.8500 m' 15,840.00Rp. 60,984.00Rp.SDP.HWH #12x24x22 12.3200 bh 370.00Rp. 4,558.40Rp.SDP. Wafer#8x18x13 26.4000 bh 240.00Rp. 6,336.00Rp.Dynabolt M-10 0.6100 bh 3,210.00Rp. 1,958.10Rp.

Jumlah (1). 150,894.10Rp.

TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang besi 0.1250 oh 105,000.00Rp. 13,125.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0250 oh 100,000.00Rp. 2,500.00Rp.

Jumlah (2). 35,125.00Rp.

Jumlah (1) + (2) 186,019.10Rp.Keuntungan 10% 18,601.91Rp.Jumlah 204,621.01Rp.

KodeK.32. 1 m2 Rangka atap limasan baja ringan galvanize bentang L = 8 s/d 10 m' ( Profil C )Dibulatkan 204,600.00Rp.

K.33 1 m2 Pasang variasi plat stainless steel t=1,2mm1 Bahan

Plat stainless steel t=1,2mm 1.000 m2 284,374.65Rp 284,374.65RpJumlah (1). 284,374.65Rp

2 TenagaTukang besi kontruksi 0.800 oh 105,000.00Rp 84,000.00RpPekerja 0.080 oh 66,000.00Rp 5,280.00RpKepala tukang 0.080 oh 120,000.00Rp 9,600.00RpMandor 0.004 oh 100,000.00Rp 400.00Rp

Jumlah (2). 99,280.00Rp

Jumlah (1) + (2) 383,654.65RpKeuntungan 10% 38,365.47RpJumlah 422,020.12Rp

KodeK.33 1 m2 Pasang variasi plat stainless steel t=1,2mm Dibulatkan 422,000.00Rp

K.34 1 kg Pasang 1 kg besi profil, hollow1 Bahan

Besi profil 1.150 kg 13,200.00 15,180.00Jumlah (1). 15,180.00

2 TenagaTukang besi 0.060 oh 105,000.00 6,300.00Pekerja 0.060 oh 66,000.00 3,960.00Kepala tukang 0.006 oh 120,000.00 720.00Mandor 0.003 oh 100,000.00 300.00

Jumlah (2). 11,280.00

Jumlah (1) + (2) 26,460.00Keuntungan 10% 2,646.00Jumlah 29,106.00

KodeK.34 1 kg Pasang 1 kg besi profil, hollow Dibulatkan 29,100.00

K.35 1 kg Pasang besi Expanded metal mesh t=4mm1 Bahan

Expanded metal mesh t=4mm 0.137 m2 260,416.67 35,729.17Jumlah (1). 35,729.17

2 TenagaTukang besi 0.060 oh 105,000.00 6,300.00Pekerja 0.060 oh 66,000.00 3,960.00Kepala tukang 0.006 oh 120,000.00 720.00

Page 151: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Mandor 0.003 oh 100,000.00 300.00Jumlah (2). 11,280.00

Jumlah (1) + (2) 47,009.17Keuntungan 10% 4,700.92Jumlah 51,710.08

KodeK.35 1 kg Pasang besi Expanded metal mesh t=4mm Dibulatkan 51,700.00

K.36 1 kg Pasang kusen lift chanal C.150.50.20.2,31 Bahan

lift chanal C.150.50.20.2,3 1.100 kg 13,200.00 14,520.00Meni Besi 0.080 kg 21,640.00 1,731.20

Jumlah (1). 16,251.20

2 TenagaTukang besi 0.060 oh 105,000.00 6,300.00Pekerja 0.060 oh 66,000.00 3,960.00Kepala tukang 0.006 oh 120,000.00 720.00Mandor 0.003 oh 100,000.00 300.00

Jumlah (2). 11,280.00

Jumlah (1) + (2) 27,531.20Keuntungan 10% 2,753.12Jumlah 30,284.32

KodeK.36 1 kg Pasang kusen lift chanal C.150.50.20.2,3 Dibulatkan 30,200.00

K.37 1 kg Pasang plat baja untuk pintu1 Bahan

Plat baja 1.150 kg 13,200.00 15,180.00Jumlah (1). 15,180.00

2 TenagaTukang besi 0.060 oh 105,000.00 6,300.00Pekerja 0.060 oh 66,000.00 3,960.00Kepala tukang 0.006 oh 120,000.00 720.00Mandor 0.003 oh 100,000.00 300.00

Jumlah (2). 11,280.00

Jumlah (1) + (2) 26,460.00Keuntungan 10% 2,646.00Jumlah 29,106.00

KodeK.37 1 kg Pasang plat baja untuk pintu Dibulatkan 29,100.00

K.38 1 kg Pasang 1 kg besi profil/plat/cahanal/siku1 Bahan

Besi profil 1.100 kg 13,200.00 14,520.00Meni Besi 0.080 kg 21,640.00 1,731.20

Jumlah (1). 16,251.20

2 TenagaTukang besi 0.060 oh 105,000.00 6,300.00Pekerja 0.060 oh 66,000.00 3,960.00Kepala tukang 0.006 oh 120,000.00 720.00Mandor 0.003 oh 100,000.00 300.00

Jumlah (2). 11,280.00

Jumlah (1) + (2) 27,531.20Keuntungan 10% 2,753.12Jumlah 30,284.32

KodeK.38 1 kg Pasang 1 kg besi profil/plat/cahanal/siku Dibulatkan 30,200.00

K.39 1 m2 Pasang pintu polding door metal ( lengkap + accessories )1 Bahan

Polding door metal ( lengkap + accessories ) 1.000 m2 533,500.00 533,500.00Jumlah (1). 533,500.00

2 TenagaTukang besi kontruksi 0.800 oh 105,000.00 84,000.00Pekerja 0.080 oh 66,000.00 5,280.00Kepala tukang 0.080 oh 120,000.00 9,600.00Mandor 0.004 oh 100,000.00 400.00

Jumlah (2). 99,280.00

Page 152: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 632,780.00Keuntungan 10% 63,278.00Jumlah 696,058.00

KodeK.39 1 m2 Pasang pintu polding door metal ( lengkap + accessories ) Dibulatkan 696,000.00

K.40 1 m2 Pasang jendela alluminium1 Bahan

jendela alluminium 1.000 m2 168,880.00 168,880.00Jumlah (1). 168,880.00

2 TenagaTukang besi kontruksi 1.050 oh 105,000.00 110,250.00Pekerja 1.050 oh 66,000.00 69,300.00Kepala tukang 0.105 oh 120,000.00 12,600.00Mandor 0.005 oh 100,000.00 520.00

Jumlah (2). 192,670.00

Jumlah (1) + (2) 361,550.00Keuntungan 10% 36,155.00Jumlah 397,705.00

KodeK.40 1 m2 Pasang jendela alluminium Dibulatkan 397,700.00

K.41. 1 Unit Kusen dan pintu tipe P.1

K.25. Pasang kusen alluminium 4" 6.300 m1 161,200.00Rp 1,015,560.00RpK.12. Pasang pintu alluminium 1.354 m2 531,400.00Rp 719,515.60RpL.24 Pasang kaca polos 6 mm 2.516 m2 169,800.00Rp 427,216.80RpL.25 Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)1.000 set 320,400.00Rp 320,400.00RpL.26 Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 2.000 psg 558,300.00Rp 1,116,600.00RpL.27 Pasang Flushbolt tipe FB-DEK-508 ex. Dekkson 2.000 bh 101,400.00Rp 202,800.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )1.000 bh 98,800.00Rp 98,800.00RpL.29 Floor hinge setara Dekson tipe FH-DKS-84-BD 1.000 set 1,428,900.00Rp 1,428,900.00Rp

Jumlah 5,329,792.40RpKodeK.41. 1 Unit Kusen dan pintu tipe P.1 Dibulatkan 5,329,700.00Rp

K.42. 1 Unit Kusen dan pintu tipe P.2 & P.2'

K.25. Pasang kusen alluminium 4" 5.311 m1 161,200.00Rp 856,133.20RpF.43 Pasang pintu triplek rangkap lapis formika, rangka tertutup kayu kamper (lebar sampe 90 cm)1.560 m2 769,100.00Rp 1,200,065.19RpK.33 Pasang variasi plat stainless steel t=1,2mm 0.162 m2 422,000.00Rp 68,448.40RpF.9.a Pasang jalusi mati kusen kayu kamper 0.183 m2 1,057,900.00Rp 193,913.07RpL.30 Pasang kunci pintu toilet terpisah ex. Dekkson 1.000 set 422,900.00Rp 422,900.00Rp

- Lockcase setara Dekson tipe MTS-L-8485-DC-SN-D60MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-BK-SN

L.31 Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS 1.000 psg 209,600.00Rp 209,600.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 3.000 bh 76,500.00Rp 229,500.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 1.000 bh 75,000.00Rp 75,000.00RpN.30 Cat Kayu/besi Duco 3.662 m2 73,500.00Rp 269,132.38Rp

Jumlah 3,524,692.23RpKodeK.42. 1 Unit Kusen dan pintu tipe P.2 & P.2' Dibulatkan 3,524,600.00Rp

K.43. 1 Unit Kusen dan pintu tipe P.3

K.25. Pasang kusen alluminium 4" 6.211 m1 161,200.00Rp 1,001,213.20RpF.43 Pasang pintu kayu lapis (triplek) rangkap, rangka tertutup kayu kamper Samarinda (lebar sampe 90 cm)3.329 m2 769,100.00Rp 2,560,064.72RpK.33 Pasang pariasi plat stainless steel t=1,2mm 0.342 m2 422,000.00Rp 144,408.40RpL.17. Pasang kaca polos 5 mm 0.350 m2 144,900.00Rp 50,715.00RpL.34 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu dobel) 1.000 set 441,200.00Rp 441,200.00Rp

- Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 ( pintu kayu ) 2.000 psg 558,300.00Rp 1,116,600.00RpL.36 Pasang selot tanam atas bawah 8+12" tipe FB-DKS-040-S/S ex. Dekkson ( untuk pintu dobel kons. Kayu )1.000 psg 206,000.00Rp 206,000.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )1.000 bh 98,800.00Rp 98,800.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 6.000 bh 76,500.00Rp 459,000.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.000 bh 75,000.00Rp 150,000.00RpN.30 Cat Kayu/besi Duco 6.990 m2 73,500.00Rp 513,777.13Rp

Jumlah 6,741,778.44Rp

Page 153: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeK.43. 1 Unit Kusen dan pintu tipe P.3 Dibulatkan 6,741,700.00Rp

K.44. 1 Unit Kusen dan pintu tipe P.4 & P.4'

K.25. Pasang kusen alluminium 4" 5.311 m1 161,200.00Rp 856,133.20RpF.43 Pasang pintu kayu lapis (triplek) rangkap, rangka tertutup kayu kamper Samarinda (lebar sampe 90 cm)1.569 m2 769,100.00Rp 1,206,618.69RpK.33 Pasang pariasi plat stainless steel t=1,2mm 0.162 m2 422,000.00Rp 68,448.40RpL.17. Pasang kaca polos 5 mm 0.175 m2 144,900.00Rp 25,357.50RpL.30 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu engkel) 1.000 set 422,900.00Rp 422,900.00Rp

- Lockcase setara Dekson tipe MTS-L-8485-DC-SN-D60MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 ( pintu kayu ) 1.000 psg 558,300.00Rp 558,300.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 3.000 bh 76,500.00Rp 229,500.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 1.000 bh 75,000.00Rp 75,000.00RpN.30 Cat Kayu/besi Duco 3.295 m2 73,500.00Rp 242,155.24Rp

Jumlah 3,684,413.02RpKodeK.44. 1 Unit Kusen dan pintu tipe P.4 & P.4' Dibulatkan 3,684,400.00Rp

K.45. 1 Unit Kusen dan pintu tipe P.5

K.25. Pasang kusen alluminium 4" 5.911 m1 161,200.00Rp 952,853.20RpF.43 Pasang pintu kayu lapis (triplek) rangkap, rangka tertutup kayu kamper Samarinda (lebar sampe 90 cm)2.860 m2 769,100.00Rp 2,199,794.43RpK.33 Pasang pariasi plat stainless steel t=1,2mm 0.282 m2 422,000.00Rp 119,150.01RpL.17. Pasang kaca polos 5 mm 0.175 m2 144,900.00Rp 25,357.50RpL.34 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu dobel) 1.000 set 441,200.00Rp 441,200.00Rp

- Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 ( pintu kayu ) 2.000 psg 558,300.00Rp 1,116,600.00RpL.36 Pasang selot tanam atas bawah 8+12" tipe FB-DKS-040-S/S ex. Dekkson ( untuk pintu dobel kons. Kayu )1.000 psg 206,000.00Rp 206,000.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )1.000 bh 98,800.00Rp 98,800.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 6.000 bh 76,500.00Rp 459,000.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.000 bh 75,000.00Rp 150,000.00RpN.30 Cat Kayu/besi Duco 6.006 m2 73,500.00Rp 441,474.80Rp

Jumlah 6,210,229.95RpKodeK.45. 1 Unit Kusen dan pintu tipe P.5 Dibulatkan 6,210,200.00Rp

K.46. 1 Unit Kusen dan pintu tipe P.6 & P.6'

K.25. Pasang kusen alluminium 4" 5.311 m1 161,200.00Rp 856,133.20RpF.43 Pasang pintu triplek rangkap lapis formika, rangka tertutup kayu kamper (lebar sampe 90 cm)1.560 m2 769,100.00Rp 1,200,065.19RpK.33 Pasang pariasi plat stainless steel t=1,2mm 0.162 m2 422,000.00Rp 68,448.40RpF.9.b Pasang jalusi mati kusen kayu kamper 0.183 m2 1,057,900.00Rp 193,913.07RpL.30 Pasang kunci pintu toilet terpisah ex. Dekkson 1.000 set 422,900.00Rp 422,900.00Rp

- Lockcase setara Dekson tipe MTS-L-8485-DC-SN-D60MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-BK-SN

L.31 Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS 1.000 psg 209,600.00Rp 209,600.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 3.000 bh 76,500.00Rp 229,500.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 1.000 bh 75,000.00Rp 75,000.00RpN.30 Cat Kayu/besi Duco 3.662 m2 73,500.00Rp 269,132.38Rp

Jumlah 3,524,692.23RpKodeK.46. 1 Unit Kusen dan pintu tipe P.6 & P.6' Dibulatkan 3,524,600.00Rp

K.47. 1 Unit Kusen dan pintu tipe P.7& P.7'

K.25. Pasang kusen alluminium 4" 5.111 m1 161,200.00Rp 823,893.20RpF.43 Pasang pintu triplek rangkap lapis formika, rangka tertutup kayu kamper (lebar sampe 90 cm)1.620 m2 769,100.00Rp 1,246,211.19RpK.33 Pasang pariasi plat stainless steel t=1,2mm 0.122 m2 422,000.00Rp 51,568.40RpF.9.b Pasang jalusi mati kusen kayu kamper 0.123 m2 1,057,900.00Rp 130,439.07RpL.30 Pasang kunci pintu toilet terpisah ex. Dekkson 1.000 set 422,900.00Rp 422,900.00Rp

- Lockcase setara Dekson tipe MTS-L-8485-DC-SN-D60MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-BK-SN

L.31 Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS 1.000 psg 209,600.00Rp 209,600.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ): 3.000 bh 76,500.00Rp 229,500.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 1.000 bh 75,000.00Rp 75,000.00RpN.30 Cat Kayu/besi Duco 3.662 m2 73,500.00Rp 269,132.38Rp

Page 154: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah 3,458,244.23RpKodeK.47. 1 Unit Kusen dan pintu tipe P.7& P.7' Dibulatkan 3,458,200.00Rp

K.48. 1 Unit Kusen dan pintu tipe P.8

K.34 Baja scuare tube 150.150.6mm 699.835 kg 29,100.00Rp 20,365,197.34RpK.34 Baja retangular 100.150.4mm 71.971 kg 29,100.00Rp 2,094,350.28RpK.34 Baja scuare tube 70.70.2mm 191.827 kg 29,100.00Rp 5,582,153.48RpK.34 Baja scuare tube 40.40.1,6mm 100.800 kg 29,100.00Rp 2,933,280.00RpL.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 6.000 psg 558,300.00Rp 3,349,800.00RpL.34 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu dobel) 3.000 set 441,200.00Rp 1,323,600.00Rp

- Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):18.000 bh 86,900.00Rp 1,564,200.00RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )6.000 psg 191,600.00Rp 1,149,600.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )3.000 bh 98,800.00Rp 296,400.00RpN.30 Cat Kayu/besi Duco 51.920 m2 73,500.00Rp 3,816,120.00Rp

Jumlah 42,474,701.09RpKodeK.48. 1 Unit Kusen dan pintu tipe P.8 Dibulatkan 42,474,700.00Rp

K.49. 1 Unit Kusen dan pintu tipe P.9

K.34 Baja scuare tube 150.150.6mm 682.179 kg 29,100.00Rp 19,851,398.42RpK.34 Baja retangular 100.150.4mm 35.985 kg 29,100.00Rp 1,047,175.14RpK.34 Baja scuare tube 70.70.2mm 126.674 kg 29,100.00Rp 3,686,206.30RpK.34 Baja scuare tube 40.40.1,6mm 68.310 kg 29,100.00Rp 1,987,821.00RpL.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 2.000 psg 558,300.00Rp 1,116,600.00RpL.34 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu dobel) 2.000 set 441,200.00Rp 882,400.00Rp

- Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):8.000 bh 86,900.00Rp 695,200.00RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )2.000 psg 191,600.00Rp 383,200.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )2.000 bh 98,800.00Rp 197,600.00RpN.30 Cat Kayu/besi Duco 38.267 m2 73,500.00Rp 2,812,613.77Rp

Jumlah 32,660,214.63RpKode

K.49. 1 Unit Kusen dan pintu tipe P.9 Dibulatkan 32,660,200.00Rp

K.50. 1 Unit Kusen dan pintu tipe P.10

K.34 Baja scuare tube 150.150.6mm 535.643 kg 29,100.00Rp 15,587,205.48RpK.34 Baja retangular 100.150.4mm 35.985 kg 29,100.00Rp 1,047,175.14RpK.34 Baja scuare tube 70.70.2mm 107.832 kg 29,100.00Rp 3,137,915.97RpK.34 Baja scuare tube 40.40.1,6mm 67.110 kg 29,100.00Rp 1,952,901.00RpL.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 2.000 psg 558,300.00Rp 1,116,600.00RpL.34 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu dobel) 2.000 set 441,200.00Rp 882,400.00Rp

- Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):8.000 bh 86,900.00Rp 695,200.00RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )2.000 psg 191,600.00Rp 383,200.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )2.000 bh 98,800.00Rp 197,600.00RpN.30 Cat Kayu/besi Duco 35.182 m2 73,500.00Rp 2,585,906.40Rp

Jumlah 27,586,103.99RpKodeK.50. 1 Unit Kusen dan pintu tipe P.10 Dibulatkan 27,586,100.00Rp

K.51. 1 Unit Kusen dan pintu tipe P.11

J.57 Memasang 1 m' Pipa besi BSP SCH. Ø 4” 11.875 m' 265,500.00Rp 3,152,812.50RpJ.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 80.900 m' 194,600.00Rp 15,743,140.00RpK.35 Pasang besi Expanded metal mesh t=4mm 637.324 kg 51,700.00Rp 32,949,661.14RpL.38 Sliding rail set ex. Dekkson tipe D4 ( untuk pintu geser & lipat )standar2.000 set 675,400.00Rp 1,350,800.00Rp

L.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):26.000 bh 86,900.00Rp 2,259,400.00RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )3.000 psg 191,600.00Rp 574,800.00Rp

bahan Kunci gembok/Padlock tipe PL-BC-BRS-70mm-KD 2.000 bh 170,280.00Rp 340,560.00RpN.30 Cat Kayu/besi Duco 67.925 m2 73,500.00Rp 4,992,487.50Rp

Jumlah 61,363,661.14RpKodeK.51. 1 Unit Kusen dan pintu tipe P.11 Dibulatkan 61,363,600.00Rp

Page 155: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

K.52. 1 Unit Kusen dan pintu tipe P.12

J.57 Memasang 1 m' Pipa besi BSP SCH. Ø 4” 9.388 m' 265,500.00Rp 2,492,381.25RpJ.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 113.031 m' 194,600.00Rp 21,995,832.60RpK.35 Pasang besi Expanded metal mesh t=4mm 741.150 kg 51,700.00Rp 38,317,455.00RpL.38 Sliding rail set ex. Dekkson tipe D4 ( untuk pintu geser & lipat )standar2.000 set 675,400.00Rp 1,350,800.00Rp

L.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):36.000 bh 86,900.00Rp 3,128,400.00RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )2.000 psg 191,600.00Rp 383,200.00Rp

bahan Kunci gembok/Padlock tipe PL-BC-BRS-70mm-KD 1.000 bh 170,280.00Rp 170,280.00RpN.30 Cat Kayu/besi Duco 75.440 m2 73,500.00Rp 5,544,840.00Rp

Jumlah 73,383,188.85RpKodeK.52. 1 Unit Kusen dan pintu tipe P.12 Dibulatkan 73,383,100.00Rp

K.53. 1 Unit Kusen dan pintu tipe P.13

K.36 Pasang kusen lift chanal C.150.50.20.2,3 30.008 kg 30,200.00Rp 906,241.60RpK.5. Pasang pintu besi baja + jalusi 3.159 m2 527,600.00Rp 1,666,724.80RpL.17. Pasang kaca polos 5 mm 0.175 m2 144,900.00Rp 25,357.50RpL.34 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu dobel) 1.000 set 441,200.00Rp 441,200.00Rp

- Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 2.000 psg 558,300.00Rp 1,116,600.00RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )1.000 psg 191,600.00Rp 191,600.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )1.000 bh 98,800.00Rp 98,800.00Rp

L.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):6.000 bh 86,900.00Rp 521,400.00RpL.39 Door closer ex. Dekkson tipe DCL-HOLT -BA/NA SERIES 1.000 bh 434,100.00Rp 434,100.00RpN.30 Cat Kayu/besi Duco 6.634 m2 73,500.00Rp 487,602.30Rp

Jumlah 5,889,626.20RpKodeK.53. 1 Unit Kusen dan pintu tipe P.13 Dibulatkan 5,889,600.00Rp

K.54. 1 Unit Kusen dan pintutipe P.14

J.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 62.322 m' 194,600.00 12,127,783.36K.37 Plat baja strip 65x6mm 164.276 kg 29,100.00 4,780,425.08L.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB : 16.000 bh 76,500.00 1,224,000.00L.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )4.000 psg 191,600.00 766,400.00

bahan Kunci gembok/Padlock tipe PL-BC-BRS-50mm-KD 4.000 bh 106,920.00 427,680.00N.30 Cat Kayu/besi Duco 21.437 m2 73,500.00 1,575,623.67

Jumlah 20,901,912.12KodeK.54. 1 Unit Kusen dan pintutipe P.14 Dibulatkan 20,901,900.00

K.55. 1 Unit Kusen dan pintu tipe P.15

K.36 Pasang kusen lift chanal C.150.50.20.2,3 9.160 kg 30,200.00Rp 239,076.00RpK.38 Pasang rangka siku 100x50x8 8.275 kg 30,200.00Rp 221,769.93RpG.25. Pembesian dengan besi polos atau besi ulir 45.931 kg 16,900.00Rp 702,743.48RpN.30 Cat Kayu/besi Duco 4.200 m2 73,500.00Rp 253,906.80Rp

Jumlah 1,417,496.22RpKodeK.55. 1 Unit Kusen dan pintu tipe P.15 Dibulatkan 1,417,400.00

K.56. 1 Unit Kusen dan pintu tipe P.16

K.39 Pasang pintu polding door metal ( lengkap + accessories ) 8.275 m2 696,000.00Rp 5,759,398.26RpN.30 Cat Kayu/besi Duco 16.550 m2 73,500.00Rp 1,216,424.63Rp

Jumlah 6,975,822.89RpKodeK.56. 1 Unit Kusen dan pintu tipe P.16 Dibulatkan 6,975,800.00

K.57. 1 Unit Kusen tipe PJ.1

K.25. Pasang kusen alluminium 4" 23.499 m1 161,200.00Rp 3,788,038.80RpK.12. Pasang pintu alluminium 1.826 m2 531,400.00Rp 970,181.76RpK.40 Pasang jendela alluminium 2.760 m2 397,700.00Rp 1,097,768.13RpL.24 Pasang kaca polos 6 mm 6.120 m2 169,800.00Rp 1,039,128.86RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):3.000 bh 76,500.00Rp 229,500.00RpL.25 Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)1.000 set 320,400.00Rp 320,400.00RpL.26 Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 1.000 psg 558,300.00Rp 558,300.00Rp

Page 156: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

L.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 1.000 bh 75,000.00Rp 75,000.00RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :4.000 psg 137,900.00Rp 551,600.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)4.000 bh 45,200.00Rp 180,800.00Rp

Jumlah 8,810,717.55RpKodeK.57. 1 Unit Kusen tipe PJ.1 Dibulatkan 8,810,700.00

K.58. 1 Unit Kusen tipe PJ.2

K.25. Pasang kusen alluminium 4" 42.750 m1 161,200.00Rp 6,891,300.00RpK.12. Pasang pintu alluminium 3.654 m2 531,400.00Rp 1,941,700.53RpK.40 Pasang jendela alluminium 5.521 m2 397,700.00Rp 2,195,536.26RpL.24 Pasang kaca polos 6 mm 12.892 m2 169,800.00Rp 2,189,026.49RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):6.000 bh 76,500.00Rp 459,000.00RpL.25 Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)1.000 set 320,400.00Rp 320,400.00RpL.26 Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 2.000 psg 558,300.00Rp 1,116,600.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.000 bh 75,000.00Rp 150,000.00RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :8.000 psg 137,900.00Rp 1,103,200.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)8.000 bh 45,200.00Rp 361,600.00Rp

Jumlah 16,728,363.27RpKodeK.58. 1 Unit Kusen tipe PJ.2 Dibulatkan 16,728,300.00

K.59. 1 Unit Kusen tipe PJ.3

K.25. Pasang kusen alluminium 4" 42.750 m1 161,200.00Rp 6,891,300.00RpK.12. Pasang pintu alluminium 3.654 m2 531,400.00Rp 1,941,700.53RpK.40 Pasang jendela alluminium 5.521 m2 397,700.00Rp 2,195,536.26RpL.24 Pasang kaca polos 6 mm 12.892 m2 169,800.00Rp 2,189,026.49RpL.29 Floor hinge setara Dekson tipe FH-DKS-84-BD 1.000 set 1,428,900.00Rp 1,428,900.00RpL.25 Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)1.000 set 320,400.00Rp 320,400.00RpL.26 Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 2.000 psg 558,300.00Rp 1,116,600.00RpL.27 Pasang Flushbolt tipe FB-DEK-508 ex. Dekkson 2.000 bh 101,400.00Rp 202,800.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )1.000 bh 98,800.00Rp 98,800.00RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :8.000 psg 137,900.00Rp 1,103,200.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)8.000 bh 45,200.00Rp 361,600.00Rp

Jumlah 17,849,863.27RpKodeK.59. 1 Unit Kusen tipe PJ.3 Dibulatkan 17,849,800.00

K.60. 1 Unit Kusen tipe PJ.4

K.25. Pasang kusen alluminium 4" 32.700 m1 161,200.00Rp 5,271,240.00RpK.12. Pasang pintu alluminium 3.654 m2 531,400.00Rp 1,941,700.53RpK.40 Pasang jendela alluminium 5.521 m2 397,700.00Rp 2,195,536.26RpL.24 Pasang kaca polos 6 mm 8.800 m2 169,800.00Rp 1,494,222.26RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):6.000 bh 76,500.00Rp 459,000.00RpL.25 Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)1.000 set 320,400.00Rp 320,400.00RpL.26 Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 2.000 psg 558,300.00Rp 1,116,600.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.000 bh 75,000.00Rp 150,000.00RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :8.000 psg 137,900.00Rp 1,103,200.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)8.000 bh 45,200.00Rp 361,600.00Rp

Jumlah 14,413,499.04RpKodeK.60. 1 Unit Kusen tipe PJ.4 Dibulatkan 14,413,400.00

K.61. 1 Unit Kusen tipe PJ.5 & PJ.5'

K.25. Pasang kusen alluminium 4" 42.750 m1 161,200.00Rp 6,891,300.00RpK.12. Pasang pintu alluminium 3.654 m2 531,400.00Rp 1,941,700.53RpK.40 Pasang jendela alluminium 5.521 m2 397,700.00Rp 2,195,536.26RpL.24 Pasang kaca polos 6 mm 12.892 m2 169,800.00Rp 2,189,026.49RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):6.000 bh 76,500.00Rp 459,000.00RpL.25 Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)1.000 set 320,400.00Rp 320,400.00RpL.26 Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 2.000 psg 558,300.00Rp 1,116,600.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.000 bh 75,000.00Rp 150,000.00RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :8.000 psg 137,900.00Rp 1,103,200.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)8.000 bh 45,200.00Rp 361,600.00Rp

Jumlah 16,728,363.27RpKodeK.61. 1 Unit Kusen tipe PJ.5 & PJ.5' Dibulatkan 16,728,300.00

Page 157: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

K.62. 1 Unit Kusen tipe J.1

K.25. Pasang kusen alluminium 4" 45.250 m1 161,200.00Rp 7,294,300.00RpK.40 Pasang jendela alluminium 6.901 m2 397,700.00Rp 2,744,420.32RpL.24 Pasang kaca polos 6 mm 11.022 m2 169,800.00Rp 1,871,600.97RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :10.000 psg 137,900.00Rp 1,379,000.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)10.000 bh 45,200.00Rp 452,000.00Rp

Jumlah 13,741,321.29RpKodeK.62. 1 Unit Kusen tipe J.1 Dibulatkan 13,741,300.00

K.63. 1 Unit Kusen tipe J.2

K.25. Pasang kusen alluminium 4" 20.999 m1 161,200.00Rp 3,385,038.80RpK.40 Pasang jendela alluminium 6.901 m2 397,700.00Rp 2,744,420.32RpL.24 Pasang kaca polos 6 mm 4.068 m2 169,800.00Rp 690,719.91RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :10.000 psg 137,900.00Rp 1,379,000.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)10.000 bh 45,200.00Rp 452,000.00Rp

Jumlah 8,651,179.03RpKodeK.63. 1 Unit Kusen tipe J.2 Dibulatkan 8,651,100.00

K.64. 1 Unit Kusen tipe J.3

K.25. Pasang kusen alluminium 4" 13.399 m1 161,200.00Rp 2,159,918.80RpL.24 Pasang kaca polos 6 mm 3.834 m2 169,800.00Rp 651,072.63Rp

Jumlah 2,810,991.43RpKodeK.64. 1 Unit Kusen tipe J.3 Dibulatkan 2,810,900.00

K.65. 1 Unit Kusen tipe J.4

K.25. Pasang kusen alluminium 4" 22.800 m1 161,200.00Rp 3,675,360.00RpL.24 Pasang kaca polos 6 mm 10.075 m2 169,800.00Rp 1,710,735.00Rp

Jumlah 5,386,095.00RpKodeK.65. 1 Unit Kusen tipe J.4 Dibulatkan 5,386,000.00

K.66. 1 Unit Kusen tipe J.5

K.25. Pasang kusen alluminium 4" 35.700 m1 161,200.00Rp 5,754,840.00RpK.40 Pasang jendela alluminium 5.521 m2 397,700.00Rp 2,195,536.26RpL.24 Pasang kaca polos 6 mm 7.738 m2 169,800.00Rp 1,313,843.97RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :8.000 psg 137,900.00Rp 1,103,200.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)8.000 bh 45,200.00Rp 361,600.00Rp

Jumlah 10,729,020.23RpKodeK.66. 1 Unit Kusen tipe J.5 Dibulatkan 10,729,000.00

K.67. 1 Unit Kusen tipe J.6

K.25. Pasang kusen alluminium 4" 28.151 m1 161,200.00Rp 4,537,941.20RpK.40 Pasang jendela alluminium 4.140 m2 397,700.00Rp 1,646,652.19RpL.24 Pasang kaca polos 6 mm 6.108 m2 169,800.00Rp 1,037,166.59RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :6.000 psg 137,900.00Rp 827,400.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)6.000 bh 45,200.00Rp 271,200.00Rp

Jumlah 8,320,359.98RpKodeK.67. 1 Unit Kusen tipe J.6 Dibulatkan 8,320,300.00

K.68. 1 Unit Kusen tipe J.7

K.25. Pasang kusen alluminium 4" 16.050 m1 161,200.00Rp 2,587,260.00RpK.40 Pasang jendela alluminium 4.140 m2 397,700.00Rp 1,646,652.19RpL.24 Pasang kaca polos 6 mm 2.441 m2 169,800.00Rp 414,431.95RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :6.000 psg 137,900.00Rp 827,400.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)6.000 bh 45,200.00Rp 271,200.00Rp

Jumlah 5,746,944.14Rp

Page 158: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeK.68. 1 Unit Kusen tipe J.7 Dibulatkan 5,746,900.00

K.69. 1 Unit Kusen tipe J.8

K.25. Pasang kusen alluminium 4" 11.350 m1 161,200.00Rp 1,829,620.00RpK.40 Pasang jendela alluminium 2.760 m2 397,700.00Rp 1,097,768.13RpL.24 Pasang kaca polos 6 mm 1.627 m2 169,800.00Rp 276,287.96RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :4.000 psg 137,900.00Rp 551,600.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)4.000 bh 45,200.00Rp 180,800.00Rp

Jumlah 3,936,076.09RpKodeK.69. 1 Unit Kusen tipe J.8 Dibulatkan 3,936,000.00

K.70. 1 Unit Kusen tipe BV.1

K.25. Pasang kusen alluminium 4" 3.800 m1 161,200.00Rp 612,560.00RpK.40 Pasang jendela alluminium 0.690 m2 397,700.00Rp 274,442.03RpL.17. Pasang kaca buram 5 mm 0.385 m2 144,900.00Rp 55,786.50RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :1.000 psg 137,900.00Rp 137,900.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)1.000 bh 45,200.00Rp 45,200.00Rp

Jumlah 1,125,888.53RpKodeK.70. 1 Unit Kusen tipe BV.1 Dibulatkan 1,125,800.00

Dihitung 1 Unit Kusen tipe BV.2K.71.

K.25. Pasang kusen alluminium 4" 6.800 m1 161,200.00Rp 1,096,160.00RpK.40 Pasang jendela alluminium 1.380 m2 397,700.00Rp 548,884.06RpL.17. Pasang kaca buram 5 mm 0.770 m2 144,900.00Rp 111,573.00RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :2.000 psg 137,900.00Rp 275,800.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)2.000 bh 45,200.00Rp 90,400.00Rp

Jumlah 2,122,817.06RpKode

Dihitung 1 Unit Kusen tipe BV.2 Dibulatkan 2,122,800.00

K.72. 1 m' Hand railling tipe 1 pipa BSP Ø3" dan dudukan pipa BSP Ø2"

J.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 1.050 m1 194,600.00Rp 204,330.00RpJ.59 Memasang pipa BSP diameter 2" 0.400 m1 108,600.00Rp 43,440.00RpN.30 Cat Kayu/besi Duco 0.310 m2 73,500.00Rp 22,790.51Rp

Jumlah 270,560.51RpKodeK.72. 1 m' Hand railling tipe 1 pipa BSP Ø3" dan dudukan pipa BSP Ø2" Dibulatkan 270,500.00

K.73. 1 m' Railling pagar berikut pintu tipe. 2 t=190cm ( Railling pemisah selasar el. + 5,250 )

J.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 2.200 m1 194,600.00Rp 428,120.00RpJ.59 Memasang pipa BSP diameter 2" 9.678 m1 108,600.00Rp 1,051,083.75RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):0.282 bh 76,500.00Rp 21,559.42RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )0.188 psg 191,600.00Rp 35,998.12Rp

bahan Kunci gembok/Padlock tipe PL-BC-BRS-50mm-KD 0.188 bh 106,920.00Rp 20,088.30RpN.30 Cat Kayu/besi Duco 1.900 m2 73,500.00Rp 139,650.00Rp

Jumlah 1,696,499.59RpKodeK.73. 1 m' Railling pagar berikut pintu tipe. 2 t=190cm ( Railling pemisah selasar el. + 5,250 )Dibulatkan 1,696,400.00

K.74. 1 m' Railling pagar tipe. 2 =160cm ( Railling pemisah sektor lt. tribun As. 11 & 18 )

J.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 2.200 m1 194,600.00Rp 428,120.00RpJ.59 Memasang pipa BSP diameter 2" 8.075 m1 108,600.00Rp 876,963.11RpN.30 Cat Kayu/besi Duco 1.900 m2 73,500.00Rp 139,650.00Rp

Jumlah 1,444,733.11RpKodeK.74. 1 m' Railling pagar tipe. 2 =160cm ( Railling pemisah sektor lt. tribun As. 11 & 18 )Dibulatkan 1,444,700.00

K.75. 1 m' Railling tipe. 3 ( Railling jalur antrian t=80cm)

J.59 Memasang pipa BSP diameter 2" 10.317 m1 108,600.00Rp 1,120,415.34RpK.35 Pasang besi Expanded metal mesh t=4mm 6.437 kg 51,700.00Rp 332,796.52Rp

Page 159: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

N.30 Cat Kayu/besi Duco 2.000 m2 73,500.00Rp 147,000.00Rp

Jumlah 1,600,211.86RpKodeK.75. 1 m' Railling tipe. 3 ( Railling jalur antrian t=80cm) Dibulatkan 1,600,200.00

K.76. 1 m' Railling tipe. 4 t=80 cm ( Railling pagar lt. tribun )

J.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 1.100 m1 194,600.00Rp 214,060.00RpJ.59 Memasang pipa BSP diameter 2" 3.100 m1 108,600.00Rp 336,660.00RpN.30 Cat Kayu/besi Duco 0.820 m2 73,500.00Rp 60,293.89Rp

Jumlah 611,013.89RpKodeK.76. 1 m' Railling tipe. 4 t=80 cm ( Railling pagar lt. tribun ) Dibulatkan 611,000.00

K.77. 1 m' Railling pagar tipe. 5 t=120cm ( Railling pagar lt. tribun )

J.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 1.100 m1 194,600.00Rp 214,060.00RpJ.59 Memasang pipa BSP diameter 2" 3.520 m1 108,600.00Rp 382,272.00RpN.30 Cat Kayu/besi Duco 0.893 m2 73,500.00Rp 65,625.14Rp

Jumlah 661,957.14RpKodeK.77. 1 m' Railling pagar tipe. 5 t=120cm ( Railling pagar lt. tribun ) Dibulatkan 661,900.00

K.78. 1 m' Railling pagar berikut pintu tipe. 5A t=120cm ( Railling TV platform )

J.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 4.860 m1 194,600.00Rp 945,846.51RpJ.59 Memasang pipa BSP diameter 2" 4.305 m1 108,600.00Rp 467,521.20RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):0.266 bh 76,500.00Rp 20,332.23RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )0.266 psg 191,600.00Rp 50,923.59Rp

bahan Kunci gembok/Padlock tipe PL-BC-BRS-50mm-KD 0.133 bh 106,920.00Rp 14,208.64RpN.30 Cat Kayu/besi Duco 1.821 m2 73,500.00Rp 133,808.36Rp

Jumlah 1,632,640.52RpKodeK.78. 1 m' Railling pagar berikut pintu tipe. 5A t=120cm ( Railling TV platform )Dibulatkan 1,632,600.00

K.79. 1 m' Railling pagar pagar pengaman tipe. 7 t=160cm

J.59 Memasang pipa BSP diameter 2" 3.000 m1 108,600.00Rp 325,800.00RpG.27. Besi Wire mesh M8-150 15.333 kg 17,300.00Rp 265,266.67RpN.30 Cat Kayu/besi Duco 9.600 m2 73,500.00Rp 705,600.00Rp

Jumlah 1,296,666.67RpKodeK.79. 1 m' Railling pagar pagar pengaman tipe. 7 t=160cm Dibulatkan 1,296,600.00

K.80. 1 m' Railling tangga BSP t=80 cm

J.61 Memasang pipa BSP diameter 2 1/2" 1.100 m1 154,500.00Rp 169,950.00RpJ.60 Memasang pipa BSP diameter 1 1/2" 2.800 m1 67,900.00Rp 190,120.00RpN.30 Cat Kayu/besi Duco 0.634 m2 73,500.00Rp 46,584.96Rp

Jumlah 406,654.96RpKodeK.80. 1 m' Railling tangga BSP t=80 cm Dibulatkan 406,600.00

K.81. 1 m' Hand Railling tangga

J.61 Memasang pipa BSP diameter 2 1/2" 1.100 m1 154,500.00Rp 169,950.00RpJ.60 Memasang pipa BSP diameter 1 1/2" 0.250 m1 67,900.00Rp 16,975.00RpN.30 Cat Kayu/besi Duco 0.282 m2 73,500.00Rp 20,690.32Rp

Jumlah 207,615.32RpKodeK.81. 1 m' Hand Railling tangga Dibulatkan 207,600.00

K.82. 1 unit Pintu tangga tipe 6

J.62 Memasang pipa stainless steel diameter 2" 5.400 m1 512,300.00Rp 2,766,420.00Rpbahan Plat stainless dudukan acrylic t=5mm 0.032 m2 284,374.65Rp 9,099.99Rpbahan Mur baut 8.000 bh 1,500.00Rp 12,000.00RpL.42 Pasang acrylic 8 mm 0.936 m2 563,500.00Rp 527,625.34RpL.27 Pasang Fushbolt tipe FB-DEK-508 ex. Dekkson 2.000 bh 101,400.00Rp 202,800.00Rp

Page 160: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Bahan Kunci gembok/Padlock tipe PL-BC-BRS-50mm-KD 1.000 bh 106,920.00Rp 106,920.00Rp

Jumlah 3,624,865.32RpKodeK.82. 1 unit Pintu tangga tipe 6 Dibulatkan 3,624,800.00

K.83. 1 Unit Kusen tipe PC TICKET BOOTH

K.25. Pasang kusen alluminium 4" 5.311 m1 161,200.00Rp 856,133.20RpF.43 Pasang pintu kayu lapis (triplek) rangkap, rangka tertutup kayu kamper Samarinda (lebar sampe 90 cm)1.573 m2 769,100.00Rp 1,210,102.71RpK.33 Pasang pariasi plat stainless steel t=1,2mm 0.141 m2 422,000.00Rp 59,575.01RpL.17. Pasang kaca polos 5 mm 0.170 m2 144,900.00Rp 24,635.03RpL.30 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu engkel) 1.000 set 422,900.00Rp 422,900.00Rp

- Lockcase setara Dekson tipe MTS-L-8485-DC-SN-D60MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.31 Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS 1.000 psg 209,600.00Rp 209,600.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):3.000 bh 76,500.00Rp 229,500.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 1.000 bh 75,000.00Rp 75,000.00RpN.30 Cat Kayu/besi Duco 3.147 m2 73,500.00Rp 231,289.95Rp

Jumlah 3,318,735.89RpKodeK.83. 1 Unit Kusen tipe PC TICKET BOOTH Dibulatkan 3,318,700.00

K.84. 1 Unit Kusen tipe JA TICKET BOOTH

K.25. Pasang kusen alluminium 4" 22.800 m1 161,200.00Rp 3,675,360.00RpK.40 Pasang jendela alluminium 4.140 m2 397,700.00Rp 1,646,652.19RpL.24 Pasang kaca polos 6 mm 5.746 m2 169,800.00Rp 975,602.88Rp

Jumlah 6,297,615.07RpKodeK.84. 1 Unit Kusen tipe JA TICKET BOOTH Dibulatkan 6,297,600.00

K.85. 1 Unit Kusen tipe PJ.1 POS JAGA

K.25. Pasang kusen alluminium 4" 11.050 m1 161,200.00Rp 1,781,260.00RpF.43 Pasang pintu kayu lapis (triplek) rangkap, rangka tertutup kayu kamper Samarinda (lebar sampe 90 cm)1.743 m2 769,100.00Rp 1,340,860.48RpK.40 Pasang jendela alluminium 5.521 m2 397,700.00Rp 2,195,536.26RpL.17. Pasang kaca polos 5 mm 1.490 m2 144,900.00Rp 215,901.00RpL.30 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu engkel) 1.000 set 422,900.00Rp 422,900.00Rp

- Lockcase setara Dekson tipe MTS-L-8485-DC-SN-D60MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.31 Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS 1.000 psg 209,600.00Rp 209,600.00RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):3.000 bh 76,500.00Rp 229,500.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 1.000 bh 75,000.00Rp 75,000.00RpN.30 Cat Kayu/besi Duco 3.487 m2 73,500.00Rp 256,282.01Rp

Jumlah 6,726,839.74RpKodeK.85. 1 Unit Kusen tipe PJ.1 POS JAGA Dibulatkan 6,726,800.00

K.86. 1 Unit Kusen tipe J.1 POS JAGA

K.25. Pasang kusen alluminium 4" 11.150 m1 161,200.00Rp 1,797,380.00RpK.40 Pasang jendela alluminium 1.350 m2 397,700.00Rp 536,895.00RpL.17. Pasang kaca polos 5 mm 7.738 m2 144,900.00Rp 1,121,177.81RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :2.000 psg 137,900.00Rp 275,800.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)2.000 bh 45,200.00Rp 90,400.00Rp

Jumlah 3,821,652.81RpKodeK.86. 1 Unit Kusen tipe J.1 POS JAGA Dibulatkan 3,821,600.00

K.87. 1 Unit Kusen tipe J.2 POS JAGA

K.25. Pasang kusen alluminium 4" 6.800 m1 161,200.00Rp 1,096,160.00RpL.17. Pasang kaca polos 5 mm 1.560 m2 144,900.00Rp 226,044.00Rp

Jumlah 1,322,204.00RpKodeK.87. 1 Unit Kusen tipe J.2 POS JAGA Dibulatkan 1,322,200.00

K.89. 1 Unit Kusen tipe P13 pintu baja Gardu PLN

K.36 Pasang kusen lift chanal C.150.50.20.2,3 29.760 kg 30,200.00Rp 898,752.00RpK.5. Pasang pintu besi baja 3.074 m2 527,600.00Rp 1,621,878.80Rp

Page 161: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

K.37 Pasang jalusi plat t=4mm 11.664 kg 29,100.00Rp 339,422.40RpL.17. Pasang kaca polos 5 mm 0.260 m2 144,900.00Rp 37,674.00RpL.34 Pasang kunci tanam terpisah ex. Dekson (Untuk pintu dobel) 1.000 set 441,200.00Rp 441,200.00Rp

- Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-DC-SN

L.35 Tubular Pull Handle setara Dekson tipe PH- 819 25x400 2.000 psg 558,300.00Rp 1,116,600.00RpL.37 Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )1.000 psg 191,600.00Rp 191,600.00RpL.28 Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )1.000 bh 98,800.00Rp 98,800.00Rp

L.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):6.000 bh 86,900.00Rp 521,400.00RpL.39 Door closer ex. Dekkson tipe DCL-HOLT -BA/NA SERIES 1.000 bh 434,100.00Rp 434,100.00RpN.30 Cat Kayu/besi Duco 6.148 m2 73,500.00Rp 451,888.14Rp

Jumlah 6,153,315.35RpKodeK.89. 1 Unit Kusen tipe P13 pintu baja Gardu PLN Dibulatkan 6,153,300.00

K.90. 1 Unit Kusen Bouwvwnlight tipe BV.1 Gardu PLN

K.36 Pasang kusen lift chanal C.150.50.20.2,3 46.822 kg 30,200.00Rp 1,414,036.48RpK.37 Pasang jalusi plat baja t=4mm 67.651 kg 29,100.00Rp 1,968,649.92RpN.30 Cat Kayu/besi Duco 4.648 m2 73,500.00Rp 341,628.00Rp

Jumlah 3,724,314.40RpKodeK.90. 1 Unit Kusen Bouwvwnlight tipe BV.1 Gardu PLN Dibulatkan 3,724,300.00

K.91. 1 Unit Kusen Bouwvwnlight tipe BV.2 Gardu PLN

K.36 Pasang kusen lift chanal C.150.50.20.2,3 18.451 kg 30,200.00Rp 557,226.24RpK.37 Pasang jalusi plat baja t=4mm 22.550 kg 29,100.00Rp 656,216.64RpN.30 Cat Kayu/besi Duco 1.624 m2 73,500.00Rp 119,364.00Rp

Jumlah 1,332,806.88RpKodeK.91. 1 Unit Kusen Bouwvwnlight tipe BV.2 Gardu PLN Dibulatkan 1,332,800.00

K.92. 1 Unit Kursi VIP setara PAKAR SEATING system tipe PS-09A (Terpasang)

Kursi setara PAKAR SEATING system tipe PS-09A 1.000 bh 968,000.00Rp 968,000.00RpJumlah (1). 968,000.00Rp

Jumlah (1) 968,000.00RpKeuntungan 10% 96,800.00RpJumlah 1,064,800.00Rp

KodeK.92. 1 Unit Kursi VIP setara PAKAR SEATING system tipe PS-09A (Terpasang) Dibulatkan 1,064,800.00

K.93. 1 Unit Kursi tribun setara PAKAR SEATING system tipe PS-05 (Terpasang)

Kursi setara PAKAR SEATING system tipe PS-05 1.000 bh 275,000.00Rp 275,000.00RpJumlah (1). 275,000.00Rp

Jumlah (1) 275,000.00RpKeuntungan 10% 27,500.00RpJumlah 302,500.00Rp

KodeK.93. 1 Unit Kursi tribun setara PAKAR SEATING system tipe PS-05 (Terpasang) Dibulatkan 302,500.00

K.94. 1 Unit Pintu gerbang Type 1

J.57 Memasang 1 m' Pipa besi BSP SCH. Ø 4” 45.198 m1 265,500.00Rp 12,000,069.00RpJ.58 Memasang 1 m' Pipa besi BSP SCH. Ø 3” 14.178 m1 194,600.00Rp 2,759,038.80RpJ.60 Memasang 1 m' Pipa besi BSP SCH. Ø 1 1/2” 126.000 m1 67,900.00Rp 8,555,400.00RpG.25. Tubular Pull Handle dari besi beton Ø 25" 11.554 kg 16,900.00Rp 195,266.30RpG.25. Pasang selot Flushbolt dari besi beton Ø 16" 6.310 kg 16,900.00Rp 106,641.43Rpbahan Kunci gembok/Padlock tipe PL-BC-BRS-70mm-KD + dudukan 3.000 bh 170,280.00Rp 510,840.00Rpbahan Roda bulat 12.000 bh 26,120.00Rp 313,440.00RpL.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):4.000 bh 86,900.00Rp 347,600.00RpN.30 Cat Kayu/besi Duco 33.357 m2 73,500.00Rp 2,451,716.79Rp

Jumlah 27,240,012.32RpKodeK.94. 1 Unit Pintu gerbang Type 1 Dibulatkan 27,240,000.00

K.95. 1 Unit Pintu gerbang Type 2

J.57 Memasang 1 m' Pipa besi BSP SCH. Ø 4” 22.612 m1 265,500.00Rp 6,003,486.00Rp

Page 162: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

J.58 Memasang 1 m' Pipa besi BSP SCH. Ø 3” 4.000 m1 194,600.00Rp 778,400.00RpJ.60 Memasang 1 m' Pipa besi BSP SCH. Ø 1 1/2” 66.000 m1 67,900.00Rp 4,481,400.00RpG.25. Tubular Pull Handle dari besi beton Ø 25" 11.554 kg 16,900.00Rp 195,266.30RpG.25. Pasang selot Flushbolt dari besi beton Ø 16" 6.310 kg 16,900.00Rp 106,641.43Rpbahan Kunci gembok/Padlock tipe PL-BC-BRS-70mm-KD + dudukan 3.000 bh 170,280.00Rp 510,840.00Rpbahan Roda bulat 12.000 bh 26,120.00Rp 313,440.00RpL.32.a Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Untuk pintu baja ):4.000 bh 86,900.00Rp 347,600.00RpN.30 Cat Kayu/besi Duco 16.332 m2 73,500.00Rp 1,200,384.95Rp

Jumlah 13,937,458.68RpKodeK.95. 1 Unit Pintu gerbang Type 2 Dibulatkan 13,937,400.00

K.96. 1 M1 Pagar Jona Aman Tinggi 3,00 m

J.57 Memasang 1 m' Pipa besi BSP SCH. Ø 4” 6.000 m1 265,500.00Rp 1,593,000.00RpJ.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 2.000 m1 194,600.00Rp 389,200.00RpJ.60 Memasang pipa BSP diameter 1 1/2" 33.000 m1 67,900.00Rp 2,240,700.00RpN.30 Cat Kayu/besi Duco 7.695 m2 73,500.00Rp 565,582.50Rp

Jumlah 4,788,482.50RpKodeK.96. 1 M1 Pagar Jona Aman Tinggi 3,00 m Dibulatkan 4,788,400.00

K.97. 1 M1 Pagar Jona Aman Tinggi 2,400 m

J.57 Memasang 1 m' Pipa besi BSP SCH. Ø 4” 4.400 m1 265,500.00Rp 1,168,200.00RpJ.58 Memasang 1 m' Pipa besi BSP Ø 3" Medium B 2.000 m1 194,600.00Rp 389,200.00RpJ.60 Memasang pipa BSP diameter 1 1/2" 33.000 m1 67,900.00Rp 2,240,700.00RpN.30 Cat Kayu/besi Duco 7.121 m2 73,500.00Rp 523,364.10Rp

Jumlah 4,321,464.10RpKodeK.97. 1 M1 Pagar Jona Aman Tinggi 2,400 m Dibulatkan 4,321,400.00

K.98. 1 Unit Kusen tipe PJ.6

K.25. Pasang kusen alluminium 4" 32.700 m1 161,200.00Rp 5,271,240.00RpK.12. Pasang pintu alluminium 3.654 m2 531,400.00Rp 1,941,700.53RpK.40 Pasang jendela alluminium 5.521 m2 397,700.00Rp 2,195,536.26RpL.24 Pasang kaca polos 6 mm 8.800 m2 169,800.00Rp 1,494,222.26RpL.32 Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):6.000 bh 76,500.00Rp 459,000.00RpL.25 Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)1.000 set 320,400.00Rp 320,400.00RpL.26 Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 2.000 psg 558,300.00Rp 1,116,600.00RpL.33 Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS 2.000 bh 75,000.00Rp 150,000.00RpL.40 Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit ) :8.000 psg 137,900.00Rp 1,103,200.00RpL.41 Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)8.000 bh 45,200.00Rp 361,600.00Rp

Jumlah 14,413,499.04RpKodeK.98. 1 Unit Kusen tipe PJ.6 Dibulatkan 14,413,400.00

K.99. 1 Unit Finishing Fasad huruf Y

1 Bahan : - Plat aluminium composit panel sheet t=4mm 52.460 m2 382,800.00Rp 20,081,688.00Rp - GRC 8mm 52.460 m2 192,390.00Rp 10,092,779.40Rp - Kawat las 25.181 kg 5,566.00Rp 140,156.33Rp - Rangka besi hollow 40.40.1,2 finish cat anti karat 26.230 btg 97,500.00Rp 2,557,425.00Rp

Jumlah 1 : 32,872,048.73Rp

2 Upah : - Kepala Tukang 0.525 Hari 120,000.00Rp 62,952.00Rp - Tukang besi konstruksi terampil 5.246 Hari 105,000.00Rp 550,830.00Rp - Pekerja 10.492 Hari 66,000.00Rp 692,472.00Rp - Mandor 0.262 Hari 100,000.00Rp 26,230.00Rp

Jumlah 2 : 1,332,484.00Rp

Jumlah 1 + 2 : 34,204,532.73RpKeuntungan 10 % : 3,420,453.27RpJumlah : 37,624,986.01Rp

KodeK.99. 1 Unit Finishing Fasad huruf Y Dibulatkan 37,624,900.00

K.100. 1 Unit Panel GRC Krawangan fasad

Page 163: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 Bahan : - GRC 8 mm + rangka + bahan penunjang 32.500 m2 823,820.00Rp 26,774,150.00Rp - Peralatan bantu 1.000 ls 49,429.20Rp 49,429.20Rp

Jumlah 1 : 26,823,579.20Rp

2 Upah : - Upah pemasangan + pembuatan decoratif carving 32.500 m2 96,120.00Rp 3,123,900.00Rp

Jumlah 2 : 3,123,900.00Rp3 Upah :

- Finishing cat Wheather sheel non keuntungan 32.500 m2 48,757.50Rp 1,584,618.75RpJumlah 2 : 1,584,618.75Rp

Jumlah 1 + 2 + 3 : 31,532,097.95RpKeuntungan 10 % : 3,153,209.80RpJumlah : 34,685,307.75Rp

KodeK.100. 1 Unit Panel GRC Krawangan fasad Dibulatkan 34,685,300.00

Page 164: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN KUNCI DAN KACARuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pemasangan berbagai kunci dan engsel pintu dan jendela2. Pekerjaan pemasangan rel pintu dorong dan door stop3. Pekerjaan pemasangan kaca berbagai ketebalan dan jenis

L.1. 1 bh Pasang kunci tanam antik1 Bahan

Kunci tanam antik 1.0000 bh 196,390.00Rp. 196,390.00Rp.Jumlah (1). 196,390.00Rp.

2 TenagaPekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Tukang kayu 0.6000 oh 105,000.00Rp. 63,000.00Rp.Kepala tukang 0.0600 oh 120,000.00Rp. 7,200.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 74,460.00Rp.

Jumlah (1) + (2) 270,850.00Rp.Keuntungan 10% 27,085.00Rp.Jumlah 297,935.00Rp.

KodeL.1. 1 bh Pasang kunci tanam antik Dibulatkan 297,900.00Rp.

L.2. 1 bh Pasang kunci tanam biasa1 Bahan

Kunci tanam biasa 1.0000 bh 196,390.00Rp. 196,390.00Rp.Jumlah (1). 196,390.00Rp.

2 TenagaPekerja 0.0100 oh 66,000.00Rp. 660.00Rp.Tukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0050 oh 100,000.00Rp. 500.00Rp.

Jumlah (2). 54,860.00Rp.

Jumlah (1) + (2) 251,250.00Rp.Keuntungan 10% 25,125.00Rp.Jumlah 276,375.00Rp.

KodeL.2. 1 bh Pasang kunci tanam biasa Dibulatkan 276,300.00Rp.

L.3. 1 bh Pasang kunci tanam kamar mandi1 Bahan

Kunci tanam kamar mandi 1.0000 bh 77,110.00Rp. 77,110.00Rp.Jumlah (1). 77,110.00Rp.

2 TenagaPekerja 0.0050 oh 66,000.00Rp. 330.00Rp.Tukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Kepala tukang 0.0050 oh 120,000.00Rp. 600.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 53,680.00Rp.

Jumlah (1) + (2) 130,790.00Rp.Keuntungan 10% 13,079.00Rp.Jumlah 143,869.00Rp.

KodeL.3. 1 bh Pasang kunci tanam kamar mandi Dibulatkan 143,800.00Rp.

L.4. 1 bh Pasang kunci silinder1 Bahan

Kunci silinder 1.0000 bh 130,920.00Rp. 130,920.00Rp.Jumlah (1). 130,920.00Rp.

2 Tenaga

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

L.

Page 165: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.0050 oh 66,000.00Rp. 330.00Rp.Tukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Kepala tukang 0.0050 oh 120,000.00Rp. 600.00Rp.Mandor 0.0003 oh 100,000.00Rp. 25.00Rp.

Jumlah (2). 53,455.00Rp.

Jumlah (1) + (2) 184,375.00Rp.Keuntungan 10% 18,437.50Rp.Jumlah 202,812.50Rp.

KodeL.4. 1 bh Pasang kunci silinder Dibulatkan 202,800.00Rp.

L.5. 1 bh Pasang engsel pintu1 Bahan

Engsel pintu 1.0000 bh 50,985.00Rp. 50,985.00Rp.Jumlah (1). 50,985.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 69,600.00Rp.Keuntungan 10% 6,960.00Rp.Jumlah 76,560.00Rp.

KodeL.5. 1 bh Pasang engsel pintu Dibulatkan 76,500.00Rp.

L.6. 1 bh Pasang engsel jendela kupu-kupu1 Bahan

Engsel jendela 1.0000 bh 28,710.00Rp. 28,710.00Rp.Jumlah (1). 28,710.00Rp.

2 TenagaPekerja 0.0100 oh 66,000.00Rp. 660.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0005 oh 100,000.00Rp. 50.00Rp.

Jumlah (2). 12,410.00Rp.

Jumlah (1) + (2) 41,120.00Rp.Keuntungan 10% 4,112.00Rp.Jumlah 45,232.00Rp.

KodeL.6. 1 bh Pasang engsel jendela kupu-kupu Dibulatkan 45,200.00Rp.

L.7. 1 bh Pasang engsel angin1 Bahan

Engsel angin 1.0000 bh 20,490.00Rp. 20,490.00Rp.Jumlah (1). 20,490.00Rp.

2 TenagaPekerja 0.0200 oh 66,000.00Rp. 1,320.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 25,720.00Rp.

Jumlah (1) + (2) 46,210.00Rp.Keuntungan 10% 4,621.00Rp.Jumlah 50,831.00Rp.

KodeL.7. 1 bh Pasang engsel angin Dibulatkan 50,800.00Rp.

L.8. 1 bh Pasang spring knip1 Bahan

Spring knip 1.0000 bh 4,230.00Rp. 4,230.00Rp.Jumlah (1). 4,230.00Rp.

Page 166: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 22,845.00Rp.Keuntungan 10% 2,284.50Rp.Jumlah 25,129.50Rp.

KodeL.8. 1 bh Pasang spring knip Dibulatkan 25,100.00Rp.

L.8.A 1 bh Pasang Grendel Pintu1 Bahan

Grendel Pintu 1.0000 bh 43,640.00Rp. 43,640.00Rp.Jumlah (1). 43,640.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 62,255.00Rp.Keuntungan 10% 6,225.50Rp.Jumlah 68,480.50Rp.

KodeL.8.A 1 bh Pasang Grendel Pintu Dibulatkan 68,400.00Rp.

L.9. 1 bh Pasang kait angin1 Bahan

Kait angin 1.0000 bh 14,720.00Rp. 14,720.00Rp.Jumlah (1). 14,720.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 33,335.00Rp.Keuntungan 10% 3,333.50Rp.Jumlah 36,668.50Rp.

KodeL.9. 1 bh Pasang kait angin Dibulatkan 36,600.00Rp.

L.10. 1 bh Pasang door closer1 Bahan

Door closer 1.0000 bh 493,760.00Rp. 493,760.00Rp.Jumlah (1). 493,760.00Rp.

2 TenagaPekerja 0.0500 oh 66,000.00Rp. 3,300.00Rp.Tukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 62,050.00Rp.

Jumlah (1) + (2) 555,810.00Rp.Keuntungan 10% 55,581.00Rp.Jumlah 611,391.00Rp.

KodeL.10. 1 bh Pasang door closer Dibulatkan 611,300.00Rp.

Page 167: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

L.11. 1 bh Pasang kunci selot1 Bahan

Kunci selot 1.0000 bh 11,260.00Rp. 11,260.00Rp.Jumlah (1). 11,260.00Rp.

2 TenagaPekerja 0.0200 oh 66,000.00Rp. 1,320.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0010 oh 100,000.00Rp. 100.00Rp.

Jumlah (2). 24,820.00Rp.

Jumlah (1) + (2) 36,080.00Rp.Keuntungan 10% 3,608.00Rp.Jumlah 39,688.00Rp.

KodeL.11. 1 bh Pasang kunci selot Dibulatkan 39,600.00Rp.

L.11.a 1 bh Pasang tarikan jendela1 Bahan

Tarikan jendela 1.0000 bh 15,440.00Rp. 15,440.00Rp.Jumlah (1). 15,440.00Rp.

2 TenagaPekerja 0.0200 oh 66,000.00Rp. 1,320.00Rp.Tukang kayu 0.2000 oh 105,000.00Rp. 21,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0010 oh 100,000.00Rp. 100.00Rp.

Jumlah (2). 24,820.00Rp.

Jumlah (1) + (2) 40,260.00Rp.Keuntungan 10% 4,026.00Rp.Jumlah 44,286.00Rp.

KodeL.11.a 1 bh Pasang tarikan jendela Dibulatkan 44,200.00Rp.

L.12. 1 bh Pasang pegangan pintu/door holder1 Bahan

Door holder 1.0000 bh 211,610.00Rp. 211,610.00Rp.Jumlah (1). 211,610.00Rp.

2 TenagaPekerja 0.0500 oh 66,000.00Rp. 3,300.00Rp.Tukang kayu 0.5000 oh 105,000.00Rp. 52,500.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 62,050.00Rp.

Jumlah (1) + (2) 273,660.00Rp.Keuntungan 10% 27,366.00Rp.Jumlah 301,026.00Rp.

KodeL.12. 1 bh Pasang pegangan pintu/door holder Dibulatkan 301,000.00Rp.

L.13. 1 bh Pasang door stop1 Bahan

Door stop 1.0000 bh 112,860.00Rp. 112,860.00Rp.Jumlah (1). 112,860.00Rp.

2 TenagaPekerja 0.0100 oh 66,000.00Rp. 660.00Rp.Tukang kayu 0.1000 oh 105,000.00Rp. 10,500.00Rp.Kepala tukang 0.0100 oh 120,000.00Rp. 1,200.00Rp.Mandor 0.0005 oh 100,000.00Rp. 50.00Rp.

Jumlah (2). 12,410.00Rp.

Jumlah (1) + (2) 125,270.00Rp.Keuntungan 10% 12,527.00Rp.Jumlah 137,797.00Rp.

Kode

Page 168: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

L.13. 1 bh Pasang door stop Dibulatkan 137,700.00Rp.

L.14. 1 bh Pasang rel pintu dorong1 Bahan

Rel pintu dorong 1.0000 bh 846,450.00Rp. 846,450.00Rp.Jumlah (1). 846,450.00Rp.

2 TenagaPekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Tukang kayu 0.6000 oh 105,000.00Rp. 63,000.00Rp.Kepala tukang 0.0600 oh 120,000.00Rp. 7,200.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 74,460.00Rp.

Jumlah (1) + (2) 920,910.00Rp.Keuntungan 10% 92,091.00Rp.Jumlah 1,013,001.00Rp.

KodeL.14. 1 bh Pasang rel pintu dorong Dibulatkan 1,013,000.00Rp.

L.15. 1 bh Pasang kunci lemari1 Bahan

Kunci lemari 1.0000 bh 29,450.00Rp. 29,450.00Rp.Jumlah (1). 29,450.00Rp.

2 TenagaPekerja 0.0250 oh 66,000.00Rp. 1,650.00Rp.Tukang kayu 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0013 oh 100,000.00Rp. 125.00Rp.

Jumlah (2). 31,025.00Rp.

Jumlah (1) + (2) 60,475.00Rp.Keuntungan 10% 6,047.50Rp.Jumlah 66,522.50Rp.

KodeL.15. 1 bh Pasang kunci lemari Dibulatkan 66,500.00Rp.

L.16. 1 m2 Pasang kaca , tebal 3 mm1 Bahan

Kaca 1.1000 m2 90,750.00Rp. 99,825.00Rp.Jumlah (1). 99,825.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 118,440.00Rp.Keuntungan 10% 11,844.00Rp.Jumlah 130,284.00Rp.

KodeL.16. 1 m2 Pasang kaca , tebal 3 mm Dibulatkan 130,200.00Rp.

L.17. 1 m2 Pasang kaca , tebal 5 mm1 Bahan

Kaca 1.1000 m2 102,850.00Rp. 113,135.00Rp.Jumlah (1). 113,135.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 131,750.00Rp.Keuntungan 10% 13,175.00Rp.Jumlah 144,925.00Rp.

Page 169: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeL.17. 1 m2 Pasang kaca , tebal 5 mm Dibulatkan 144,900.00Rp.

L.18. 1 m2 Pasang kaca , tebal 8 mm1 Bahan

Kaca 1.1000 m2 157,300.00Rp. 173,030.00Rp.Jumlah (1). 173,030.00Rp.

2 TenagaPekerja 0.0165 oh 66,000.00Rp. 1,089.00Rp.Tukang kayu 0.1650 oh 105,000.00Rp. 17,325.00Rp.Kepala tukang 0.0165 oh 120,000.00Rp. 1,980.00Rp.Mandor 0.0008 oh 100,000.00Rp. 80.00Rp.

Jumlah (2). 20,474.00Rp.

Jumlah (1) + (2) 193,504.00Rp.Keuntungan 10% 19,350.40Rp.Jumlah 212,854.40Rp.

KodeL.18. 1 m2 Pasang kaca , tebal 8 mm Dibulatkan 212,800.00Rp.

L.19. 1 m2 Pasang kaca buram, tebal 12 mm1 Bahan

Kaca buram/es 1.1000 m2 88,550.00Rp. 97,405.00Rp.Sealant 0.0500 kg 21,410.00Rp. 1,070.50Rp.

Jumlah (1). 98,475.50Rp.

2 TenagaPekerja 0.0250 oh 66,000.00Rp. 1,650.00Rp.Tukang kayu 0.2500 oh 105,000.00Rp. 26,250.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0013 oh 100,000.00Rp. 125.00Rp.

Jumlah (2). 31,025.00Rp.

Jumlah (1) + (2) 129,500.50Rp.Keuntungan 10% 12,950.05Rp.Jumlah 142,450.55Rp.

KodeL.19. 1 m2 Pasang kaca buram, tebal 12 mm Dibulatkan 142,400.00Rp.

L.20. 1 m2 Pasang kaca cermin, tebal 5 mm1 Bahan

Kaca cermin 1.1000 m2 182,600.00Rp. 200,860.00Rp.Jumlah (1). 200,860.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 219,475.00Rp.Keuntungan 10% 21,947.50Rp.Jumlah 241,422.50Rp.

KodeL.20. 1 m2 Pasang kaca cermin, tebal 5 mm Dibulatkan 241,400.00Rp.

L.21. 1 m2 Pasang kaca cermin, tebal 6 mm1 Bahan

Kaca cermin 1.1000 m2 220,000.00Rp. 242,000.00Rp.Jumlah (1). 242,000.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 260,615.00Rp.

Page 170: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 26,061.50Rp.Jumlah 286,676.50Rp.

KodeL.21. 1 m2 Pasang kaca cermin, tebal 6 mm Dibulatkan 286,600.00Rp.

L.22. 1 m2 Pasang kaca cermin, tebal 8 mm1 Bahan

Kaca cermin 1.1000 m2 292,600.00Rp. 321,860.00Rp.Jumlah (1). 321,860.00Rp.

2 TenagaPekerja 0.0165 oh 66,000.00Rp. 1,089.00Rp.Tukang kayu 0.1650 oh 105,000.00Rp. 17,325.00Rp.Kepala tukang 0.0165 oh 120,000.00Rp. 1,980.00Rp.Mandor 0.0008 oh 100,000.00Rp. 80.00Rp.

Jumlah (2). 20,474.00Rp.

Jumlah (1) + (2) 342,334.00Rp.Keuntungan 10% 34,233.40Rp.Jumlah 376,567.40Rp.

KodeL.22. 1 m2 Pasang kaca cermin, tebal 8 mm Dibulatkan 376,500.00Rp.

L.23. 1 m2 Pasang kaca "wireglass" tebal 5 mm1 Bahan

Kaca wireglass 1.1000 m2 145,200.00Rp. 159,720.00Rp.Jumlah (1). 159,720.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 178,335.00Rp.Keuntungan 10% 17,833.50Rp.Jumlah 196,168.50Rp.

KodeL.23. 1 m2 Pasang kaca "wireglass" tebal 5 mm Dibulatkan 196,100.00Rp.

L.23. 1 m2 Pasang kaca patri, tebal 5 mm1 Bahan

Kaca patri 1.1000 m2 423,500.00Rp. 465,850.00Rp.Jumlah (1). 465,850.00Rp.

2 TenagaPekerja 0.0150 oh 66,000.00Rp. 990.00Rp.Tukang kayu 0.1500 oh 105,000.00Rp. 15,750.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0008 oh 100,000.00Rp. 75.00Rp.

Jumlah (2). 18,615.00Rp.

Jumlah (1) + (2) 484,465.00Rp.Keuntungan 10% 48,446.50Rp.Jumlah 532,911.50Rp.

KodeL.23. 1 m2 Pasang kaca patri, tebal 5 mm Dibulatkan 532,900.00Rp.

L.24 1m2 Pasang kaca polos 6 mm

a. Bahan : Kaca 6mm polos 1.1000 m2 123,420.00Rp 135,762.00RpJumlah (1). 135,762.00Rp

b. Upah : Pekerja 0.0150 oh 66,000.00Rp 990.00RpTukang kayu 0.1500 oh 105,000.00Rp 15,750.00RpKepala tukang 0.0150 oh 120,000.00Rp 1,800.00RpMandor 0.0008 oh 100,000.00Rp 75.00Rp

Jumlah (2). 18,615.00Rp

Page 171: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 154,377.00RpKeuntungan 10% 15,437.70RpJumlah 169,814.70Rp

KodeL.24 1m2 Pasang kaca polos 6 mm Dibulatkan 169,800.00Rp

L.25 1 set Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)

a. Bahan : - Alumunium lock setara Dekson tipe KC-DKS-8128 1.0000 bh 237,600.00Rp 237,600.00RpJumlah (1). 237,600.00Rp

b. Upah : Pekerja 0.005 oh 66,000.00Rp 330.00RpTukang kayu 0.500 oh 105,000.00Rp 52,500.00RpKepala tukang 0.005 oh 120,000.00Rp 600.00RpMandor 0.0025 oh 100,000.00Rp 250.00Rp

Jumlah (2). 53,680.00Rp

Jumlah (1) + (2) 291,280.00RpKeuntungan 10% 29,128.00RpJumlah 320,408.00Rp

KodeL.25 1 set Pasang kunci tanam ex. Dekson tipe KC-DKS-8128 (Untuk pintu alumunium)Dibulatkan 320,400.00Rp

L.26 1 Psg Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 ( Pintu kaca & alumunium )

a. Bahan : Tubular Pull Handle PH- 801- 32x300 1.0000 Psg 445,500.00Rp 445,500.00RpJumlah (1). 445,500.00Rp

b. Upah : Pekerja 0.050 oh 66,000.00Rp 3,300.00RpTukang kayu 0.500 oh 105,000.00Rp 52,500.00RpKepala tukang 0.050 oh 120,000.00Rp 6,000.00RpMandor 0.0025 oh 100,000.00Rp 250.00Rp

Jumlah (2). 62,050.00Rp

Jumlah (1) + (2) 507,550.00RpKeuntungan 10% 50,755.00RpJumlah 558,305.00Rp

KodeL.26 1 Psg Tubular Pull Handle ex. Dekson tipe PH- 801- 32x300 ( Pintu kaca & alumunium )Dibulatkan 558,300.00Rp

L.27 1 bh Pasang Fushbolt tipe FB-DEK-508 ex. Dekkson ( untuk pintu ALUMUNIUM )

a. Bahan : Fushbolt tipe FB-DEK-508 ( untuk pintu ALUMUNIUM ) 1.0000 bh 66,520.00Rp 66,520.00RpJumlah (1). 66,520.00Rp

b. Upah : Pekerja 0.020 oh 66,000.00Rp 1,320.00RpTukang kayu 0.200 oh 105,000.00Rp 21,000.00RpKepala tukang 0.020 oh 120,000.00Rp 2,400.00RpMandor 0.010 oh 100,000.00Rp 1,000.00Rp

Jumlah (2). 25,720.00Rp

Jumlah (1) + (2) 92,240.00RpKeuntungan 10% 9,224.00RpJumlah 101,464.00Rp

KodeL.27 1 bh Pasang Fushbolt tipe FB-DEK-508 ex. Dekkson ( untuk pintu ALUMUNIUM )Dibulatkan 101,400.00Rp

L.28 1bh Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )

a. Bahan : DP 003-DKS-S/SSS 1.0000 bh 64,150.00Rp 64,150.00RpJumlah (1). 64,150.00Rp

b. Upah : Pekerja 0.020 oh 66,000.00Rp 1,320.00RpTukang kayu 0.200 oh 105,000.00Rp 21,000.00RpKepala tukang 0.020 oh 120,000.00Rp 2,400.00RpMandor 0.010 oh 100,000.00Rp 1,000.00Rp

Jumlah (2). 25,720.00Rp

Jumlah (1) + (2) 89,870.00RpKeuntungan 10% 8,987.00RpJumlah 98,857.00Rp

Page 172: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeL.28 1bh Pasang DP 003-DKS-S/SSS ex. Dekkson ( untuk dudukan Flushbolt bawah )Dibulatkan 98,800.00Rp

L.29 1 Set Floor hinge setara Dekson tipe FH-DKS-84-BD

a. Bahan : Floor hinge setara Dekson tipe FH-DKS-84-BD 1.0000 set 1,150,000.00Rp 1,150,000.00RpJumlah (1). 1,150,000.00Rp

b. Upah : Pekerja 0.500 oh 66,000.00Rp 33,000.00RpTukang kayu 1.000 oh 105,000.00Rp 105,000.00RpKepala tukang 0.050 oh 120,000.00Rp 6,000.00RpMandor 0.0500 oh 100,000.00Rp 5,000.00Rp

Jumlah (2). 149,000.00Rp

Jumlah (1) + (2) 1,299,000.00RpKeuntungan 10% 129,900.00RpJumlah 1,428,900.00Rp

KodeL.29 1 Set Floor hinge setara Dekson tipe FH-DKS-84-BD Dibulatkan 1,428,900.00Rp

L.30 1 Set Pasang kunci pintu toilet terpisah ex. Dekkson

a. Bahan : - Lockcase setara Dekson tipe MTS-L-8485-DC-SN-D60MM 1.0000 bh 226,310.00Rp 226,310.00Rp- Double Cylinder 60mm normal setara Dekson tipe CYL-DKS-D60MM-BK-SN1.0000 bh 104,540.00Rp 104,540.00Rp

Jumlah (1). 330,850.00Rp

b. Upah : Pekerja 0.005 oh 66,000.00Rp 330.00RpTukang kayu 0.500 oh 105,000.00Rp 52,500.00RpKepala tukang 0.005 oh 120,000.00Rp 600.00RpMandor 0.0025 oh 100,000.00Rp 250.00Rp

Jumlah (2). 53,680.00Rp

Jumlah (1) + (2) 384,530.00RpKeuntungan 10% 38,453.00RpJumlah 422,983.00Rp

KodeL.30 1 Set Pasang kunci pintu toilet terpisah ex. Dekkson Dibulatkan 422,900.00Rp

L.31 1 Psg Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS

a. Bahan : Lever Handle setara Dekson tipe LHTR-016 22mm-SSS 1.0000 set 178,200.00Rp 178,200.00RpJumlah (1). 178,200.00Rp

b. Upah : Pekerja 0.010 oh 66,000.00Rp 660.00RpTukang kayu 0.100 oh 105,000.00Rp 10,500.00RpKepala tukang 0.010 oh 120,000.00Rp 1,200.00RpMandor 0.0005 oh 100,000.00Rp 50.00Rp

Jumlah (2). 12,410.00Rp

Jumlah (1) + (2) 190,610.00RpKeuntungan 10% 19,061.00RpJumlah 209,671.00Rp

KodeL.31 1 Psg Pasang Lever Handle ex. Dekkson tipe LHTR-016 22mm-SSS Dibulatkan 209,600.00Rp

L.32 1 bh Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):

a. Bahan : Engsel 4" setara Dekson tipe ES-S/S-4x3x3-2BB 1.0000 bh 50,985.00Rp 50,985.00RpJumlah (1). 50,985.00Rp

b. Upah : Pekerja 0.015 oh 66,000.00Rp 990.00RpTukang kayu 0.150 oh 105,000.00Rp 15,750.00RpKepala tukang 0.015 oh 120,000.00Rp 1,800.00RpMandor 0.00075 oh 100,000.00Rp 75.00Rp

Jumlah (2). 18,615.00Rp

Jumlah (1) + (2) 69,600.00RpKeuntungan 10% 6,960.00RpJumlah 76,560.00Rp

KodeL.32 1 bh Engsel pintu ex. Dekson tipe ES-S/S-4x3x3-2BB ( Berikut setel pintu ):Dibulatkan 76,500.00Rp

Page 173: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

L.32.a 1 bh Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Berikut setel pintu ):

a. Bahan : Engsel 5" setara Dekson tipe ES-S/S-5x3x3-4BB 1.0000 bh 60,390.00Rp 60,390.00RpJumlah (1). 60,390.00Rp

b. Upah : Pekerja 0.015 oh 66,000.00Rp 990.00RpTukang kayu 0.150 oh 105,000.00Rp 15,750.00RpKepala tukang 0.015 oh 120,000.00Rp 1,800.00RpMandor 0.00075 oh 100,000.00Rp 75.00Rp

Jumlah (2). 18,615.00Rp

Jumlah (1) + (2) 79,005.00RpKeuntungan 10% 7,900.50RpJumlah 86,905.50Rp

KodeL.32.a 1 bh Engsel pintu 5" ex. Dekson tipe ES-S/S-5x3x3-4BB ( Berikut setel pintu ):Dibulatkan 86,900.00Rp

L.33 1 Psg Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS

a. Bahan : DOOR-STP-DKS-001-SSS/DOOR-STP-DKS-002-SSS 1.0000 Psg 55,830.00Rp 55,830.00RpJumlah (1). 55,830.00Rp

b. Upah : Pekerja 0.010 oh 66,000.00Rp 660.00RpTukang kayu 0.100 oh 105,000.00Rp 10,500.00RpKepala tukang 0.010 oh 120,000.00Rp 1,200.00RpMandor 0.0005 oh 100,000.00Rp 50.00Rp

Jumlah (2). 12,410.00Rp

Jumlah (1) + (2) 68,240.00RpKeuntungan 10% 6,824.00RpJumlah 75,064.00Rp

KodeL.33 1 Psg Door stop ex. Dekkson tipe DOOR-STP-DKS-001/002-SSS Dibulatkan 75,000.00Rp

L.34 1Set Pasang kunci tanam terpisah ex. Dekson MTS-L-84030 (Untuk pintu dobel)

a. Bahan : - Lockcase setara Dekson tipe MTS-L-84030-RL-DC-SN-D65MM 1.0000 bh 243,540.00Rp 243,540.00Rp

- Double Cylinder 60mm normal setaraDekson tipe CYL-DKS-D60MM-DC-SN

1.0000 bh 103,950.00Rp 103,950.00Rp

Jumlah (1). 347,490.00Rp

b. Upah : Pekerja 0.005 oh 66,000.00Rp 330.00RpTukang kayu 0.500 oh 105,000.00Rp 52,500.00RpKepala tukang 0.005 oh 120,000.00Rp 600.00RpMandor 0.0025 oh 100,000.00Rp 250.00Rp

Jumlah (2). 53,680.00Rp

Jumlah (1) + (2) 401,170.00RpKeuntungan 10% 40,117.00RpJumlah 441,287.00Rp

KodeL.34 1Set Pasang kunci tanam terpisah ex. Dekson MTS-L-84030 (Untuk pintu dobel)Dibulatkan 441,200.00Rp

L.35 1 Psg Tubular Pull Handle setara Dekson tipe PH- 819 25x400 ( pintu kayu )

a. Bahan : PH- 819 25x400 1.0000 Psg 445,500.00Rp 445,500.00RpJumlah (1). 445,500.00Rp

b. Upah : Pekerja 0.050 oh 66,000.00Rp 3,300.00RpTukang kayu 0.500 oh 105,000.00Rp 52,500.00RpKepala tukang 0.050 oh 120,000.00Rp 6,000.00RpMandor 0.0025 oh 100,000.00Rp 250.00Rp

Jumlah (2). 62,050.00Rp

Jumlah (1) + (2) 507,550.00RpKeuntungan 10% 50,755.00RpJumlah 558,305.00Rp

KodeL.35 1 Psg Tubular Pull Handle setara Dekson tipe PH- 819 25x400 ( pintu kayu )Dibulatkan 558,300.00Rp

Page 174: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

L.36 1 Psg Pasang selot tanam atas bawah 8+12" tipe FB-DKS-040-S/S ex. Dekkson ( untuk pintu dobel kons. Kayu )

a. Bahan : Fushbolt tanam atas bawah 8+12" tipe FB-DKS-040-S/S 1.0000 psg 125,230.00Rp 125,230.00RpJumlah (1). 125,230.00Rp

b. Upah : Pekerja 0.050 oh 66,000.00Rp 3,300.00RpTukang kayu 0.500 oh 105,000.00Rp 52,500.00RpKepala tukang 0.050 oh 120,000.00Rp 6,000.00RpMandor 0.0025 oh 100,000.00Rp 250.00Rp

Jumlah (2). 62,050.00Rp

Jumlah (1) + (2) 187,280.00RpKeuntungan 10% 18,728.00RpJumlah 206,008.00Rp

KodeL.36 1 Psg Pasang selot tanam atas bawah 8+12" tipe FB-DKS-040-S/S ex. Dekkson ( untuk pintu dobel kons. Kayu )Dibulatkan 206,000.00Rp

L.37 1bh Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )

a. Bahan : Fushbolt tipe FB-SQ-501-ZC 1.0000 bh 148,500.00Rp 148,500.00RpJumlah (1). 148,500.00Rp

b. Upah : Pekerja 0.020 oh 66,000.00Rp 1,320.00RpTukang kayu 0.200 oh 105,000.00Rp 21,000.00RpKepala tukang 0.020 oh 120,000.00Rp 2,400.00RpMandor 0.010 oh 100,000.00Rp 1,000.00Rp

Jumlah (2). 25,720.00Rp

Jumlah (1) + (2) 174,220.00RpKeuntungan 10% 17,422.00RpJumlah 191,642.00Rp

KodeL.37 1bh Pasang selot Fushbolt tipe FB-SQ-501-ZC ex. Dekkson ( untuk pintu besi )Dibulatkan 191,600.00Rp

L.38 1 set Sliding rail set ex. Dekkson tipe D4 ( untuk pintu geser & lipat )standar

a. Bahan : Sliding rail set ex. Dekkson tipe D4 1.0000 Psg 539,550.00Rp 539,550.00RpJumlah (1). 539,550.00Rp

b. Upah : Pekerja 0.060 oh 66,000.00Rp 3,960.00RpTukang kayu 0.600 oh 105,000.00Rp 63,000.00RpKepala tukang 0.060 oh 120,000.00Rp 7,200.00RpMandor 0.003 oh 100,000.00Rp 300.00Rp

Jumlah (2). 74,460.00Rp

Jumlah (1) + (2) 614,010.00RpKeuntungan 10% 61,401.00RpJumlah 675,411.00Rp

KodeL.38 1 set Sliding rail set ex. Dekkson tipe D4 ( untuk pintu geser & lipat )standarDibulatkan 675,400.00Rp

L.39 1 Set Door closer ex. Dekkson tipe DCL-HOLT -BA/NA SERIES

a. Bahan : Door closer tipe DCL-HOLT -BA/NA SERIES 1.000 set 332,640.00Rp 332,640.00RpJumlah (1). 332,640.00Rp

b. Upah : Pekerja 0.050 oh 66,000.00Rp 3,300.00RpTukang kayu 0.500 oh 105,000.00Rp 52,500.00RpKepala tukang 0.050 oh 120,000.00Rp 6,000.00RpMandor 0.003 oh 100,000.00Rp 250.00Rp

Jumlah (2). 62,050.00Rp

Jumlah (1) + (2) 394,690.00RpKeuntungan 10% 39,469.00RpJumlah 434,159.00Rp

KodeL.39 1 Set Door closer ex. Dekkson tipe DCL-HOLT -BA/NA SERIES Dibulatkan 434,100.00Rp

L.40 1 Psg Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit )

Page 175: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

a. Bahan : Friction stay tipe FS-DKS-12" 1.000 psg 99,690.00 99,690.00Jumlah (1). 99,690.00

b. Upah : Pekerja 0.020 hari 66,000.00 1,320.00Tukang kayu 0.200 hari 105,000.00 21,000.00Kepala tukang 0.020 hari 120,000.00 2,400.00Mandor 0.010 hari 100,000.00 1,000.00

Jumlah (2). 25,720.00

Jumlah (1) + (2) 125,410.00RpKeuntungan 10% 12,541.00RpJumlah 137,951.00Rp

KodeL.40 1 Psg Friction stay jendela ex. Dekson tipe FS-DKS-12" ( untuk jendela jungkit )Dibulatkan 137,900.00Rp

L.41 1 Bh Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)

a. Bahan : Casement Handle tipe CHW-4-LNA 1.0000 bh 15,440.00 15,440.00Jumlah (1). 15,440.00

b. Upah : Pekerja 0.020 hari 66,000.00 1,320.00Tukang kayu 0.200 hari 105,000.00 21,000.00Kepala tukang 0.020 hari 120,000.00 2,400.00Mandor 0.010 hari 100,000.00 1,000.00

Jumlah (2). 25,720.00

Jumlah (1) + (2) 41,160.00RpKeuntungan 10% 4,116.00RpJumlah 45,276.00Rp

KodeL.41 1 Bh Pasang tarikan jendela ex. Dekkson Casement Handle tipe CHW-4-LNA (untuk jendela alumunium)Dibulatkan 45,200.00Rp

L.42 1 m2 Pasang acrylic 8 mm

1 Bahanacrylic decoratf t=8 mm 1.1000 m2 448,800.00Rp 493,680.00Rp

Jumlah (1). 493,680.00Rp2 Tenaga

Pekerja 0.0150 hari 66,000.00Rp 990.00RpTukang kayu 0.1500 hari 105,000.00Rp 15,750.00RpKepala tukang 0.0150 hari 120,000.00Rp 1,800.00RpMandor 0.0008 hari 100,000.00Rp 75.00Rp

Jumlah (2). 18,615.00Rp

Jumlah (1) + (2) 512,295.00RpKeuntungan 10% 51,229.50RpJumlah 563,524.50Rp

KodeL.42 1 m2 Pasang acrylic 8 mm Dibulatkan 563,500.00Rp

Page 176: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN PENUTUP LANTAI DAN DINDINGRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan pemasangan lantai keramik, ubin abu-abu, teraso dan marmer2. Pekerjaan pemasangan vinyl dan karpet3. Pekerjaan pemasangan pelapis dinding dengan bahan keramik4. Pekerjaan pemasangan plint dari kayu

M.1. 1 m2 Pasang lantai unbin pc abu-abu ukuran 40x40 cm1 Bahan

Ubin abu-abu 40x40 cm 6.6300 bh 8,000.00Rp. 53,040.00Rp.Semen Portland 9.8000 kg 1,360.00Rp. 13,328.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.

Jumlah (1). 75,525.50Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang batu 0.1250 oh 100,000.00Rp. 12,500.00Rp.Kepala tukang 0.0125 oh 120,000.00Rp. 1,500.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 31,750.00Rp.

Jumlah (1) + (2) 107,275.50Rp.Keuntungan 10% 10,727.55Rp.Jumlah 118,003.05Rp.

KodeM.1. 1 m2 Pasang lantai unbin pc abu-abu ukuran 40x40 cm Dibulatkan 118,000.00Rp.

M.2. 1 m2 Pasang lantai unbin pc abu-abu ukuran 30x30 cm1 Bahan

Ubin abu-abu 30x30 cm 11.8700 bh 5,300.00Rp. 62,911.00Rp.Semen Portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.

Jumlah (1). 85,668.50Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.1300 oh 100,000.00Rp. 13,000.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 33,020.00Rp.

Jumlah (1) + (2) 118,688.50Rp.Keuntungan 10% 11,868.85Rp.Jumlah 130,557.35Rp.

KodeM.2. 1 m2 Pasang lantai unbin pc abu-abu ukuran 30x30 cm Dibulatkan 130,500.00Rp.

M.3. 1 m2 Pasang lantai unbin pc abu-abu ukuran 20x20 cm1 Bahan

Ubin abu-abu 20x20 cm 26.5000 bh 1,800.00Rp. 47,700.00Rp.Semen Portland 10.4000 kg 1,360.00Rp. 14,144.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.

Jumlah (1). 71,001.50Rp.

2 TenagaPekerja 0.2700 oh 66,000.00Rp. 17,820.00Rp.Tukang batu 0.1350 oh 100,000.00Rp. 13,500.00Rp.Kepala tukang 0.0135 oh 120,000.00Rp. 1,620.00Rp.Mandor 0.0135 oh 100,000.00Rp. 1,350.00Rp.

Jumlah (2). 34,290.00Rp.

Jumlah (1) + (2) 105,291.50Rp.Keuntungan 10% 10,529.15Rp.Jumlah 115,820.65Rp.

KodeM.3. 1 m2 Pasang lantai unbin pc abu-abu ukuran 20x20 cm Dibulatkan 115,800.00Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

M.

Page 177: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

M.4. 1 m2 Pasang lantai ubin warna ukuran 40x40 cm1 Bahan

Ubin warna 40x40 cm 6.6300 bh 88,000.00Rp. 583,440.00Rp.Semen Portland 9.8000 kg 1,360.00Rp. 13,328.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.3000 kg 4,200.00Rp. 5,460.00Rp.

Jumlah (1). 611,385.50Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang batu 0.1250 oh 100,000.00Rp. 12,500.00Rp.Kepala tukang 0.0125 oh 120,000.00Rp. 1,500.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 31,750.00Rp.

Jumlah (1) + (2) 643,135.50Rp.Keuntungan 10% 64,313.55Rp.Jumlah 707,449.05Rp.

KodeM.4. 1 m2 Pasang lantai ubin warna ukuran 40x40 cm Dibulatkan 707,400.00Rp.

M.5. 1 m2 Pasang lantai ubin warna ukuran 30x30 cm1 Bahan

Ubin warna 30x30 cm 11.8700 bh 6,000.00Rp. 71,220.00Rp.Semen Portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 100,277.50Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.1300 oh 100,000.00Rp. 13,000.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 33,020.00Rp.

Jumlah (1) + (2) 133,297.50Rp.Keuntungan 10% 13,329.75Rp.Jumlah 146,627.25Rp.

KodeM.5. 1 m2 Pasang lantai ubin warna ukuran 30x30 cm Dibulatkan 146,600.00Rp.

M.6. 1 m2 Pasang lantai ubin warna ukuran 20x20 cm1 Bahan

Ubin warna 20x20 cm 26.5000 bh 2,400.00Rp. 63,600.00Rp.Semen Portland 10.4000 kg 1,360.00Rp. 14,144.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.6200 kg 4,200.00Rp. 6,804.00Rp.

Jumlah (1). 93,705.50Rp.

2 TenagaPekerja 0.2700 oh 66,000.00Rp. 17,820.00Rp.Tukang batu 0.1350 oh 100,000.00Rp. 13,500.00Rp.Kepala tukang 0.0135 oh 120,000.00Rp. 1,620.00Rp.Mandor 0.0135 oh 100,000.00Rp. 1,350.00Rp.

Jumlah (2). 34,290.00Rp.

Jumlah (1) + (2) 127,995.50Rp.Keuntungan 10% 12,799.55Rp.Jumlah 140,795.05Rp.

KodeM.6. 1 m2 Pasang lantai ubin warna ukuran 20x20 cm Dibulatkan 140,700.00Rp.

M.7. 1 m2 Pasang lantai ubin teraso ukuran 40x40 cm1 Bahan

Ubin teraso 40x40 cm 6.6300 bh 928.00Rp. 6,152.64Rp.Semen Portland 9.8000 kg 1,360.00Rp. 13,328.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.3000 kg 4,200.00Rp. 5,460.00Rp.

Jumlah (1). 34,098.14Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.

Page 178: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang batu 0.1250 oh 100,000.00Rp. 12,500.00Rp.Kepala tukang 0.0125 oh 120,000.00Rp. 1,500.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 31,750.00Rp.

Jumlah (1) + (2) 65,848.14Rp.Keuntungan 10% 6,584.81Rp.Jumlah 72,432.95Rp.

KodeM.7. 1 m2 Pasang lantai ubin teraso ukuran 40x40 cm Dibulatkan 72,400.00Rp.

M.8. 1 m2 Pasang lantai ubin teraso ukuran 30x30 cm1 Bahan

Ubin teraso 30x30 cm 11.8700 bh 293.43Rp. 3,483.01Rp.Semen Portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 32,540.51Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.1300 oh 100,000.00Rp. 13,000.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 33,020.00Rp.

Jumlah (1) + (2) 65,560.51Rp.Keuntungan 10% 6,556.05Rp.Jumlah 72,116.56Rp.

KodeM.8. 1 m2 Pasang lantai ubin teraso ukuran 30x30 cm Dibulatkan 72,100.00Rp.

M.9. 1 m2 Pasang lantai ubin granito ukuran 40x40 cm1 Bahan

Ubin granito 40x40 cm 6.6300 bh 33,696.97Rp. 223,410.91Rp.Semen Portland 9.8000 kg 1,360.00Rp. 13,328.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.3000 kg 4,200.00Rp. 5,460.00Rp.

Jumlah (1). 251,356.41Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang batu 0.1250 oh 100,000.00Rp. 12,500.00Rp.Kepala tukang 0.0125 oh 120,000.00Rp. 1,500.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 31,750.00Rp.

Jumlah (1) + (2) 283,106.41Rp.Keuntungan 10% 28,310.64Rp.

Jumlah 311,417.05Rp.KodeM.9. 1 m2 Pasang lantai ubin granito ukuran 40x40 cm Dibulatkan 311,400.00Rp.

M.10. 1 m2 Pasang lantai ubin granito ukuran 30x30 cm1 Bahan

Ubin granito 30x30 cm 11.8700 bh 15,793.60Rp. 187,470.00Rp.Semen Portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 216,527.50Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.1300 oh 100,000.00Rp. 13,000.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 33,020.00Rp.

Jumlah (1) + (2) 249,547.50Rp.Keuntungan 10% 24,954.75Rp.Jumlah 274,502.25Rp.

Kode

Page 179: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

M.10. 1 m2 Pasang lantai ubin granito ukuran 30x30 cm Dibulatkan 274,500.00Rp.

M.11. 1 m2 Pasang lantai ubin teralux kerang ukuran 40x40 cm1 Bahan

Ubin teralux kerang 40x40 cm 6.6300 bh 2,323.20Rp. 15,402.82Rp.Semen Portland 9.8000 kg 1,360.00Rp. 13,328.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.3000 kg 4,200.00Rp. 5,460.00Rp.

Jumlah (1). 43,348.32Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang batu 0.1250 oh 100,000.00Rp. 12,500.00Rp.Kepala tukang 0.0125 oh 120,000.00Rp. 1,500.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 31,750.00Rp.

Jumlah (1) + (2) 75,098.32Rp.Keuntungan 10% 7,509.83Rp.Jumlah 82,608.15Rp.

KodeM.11. 1 m2 Pasang lantai ubin teralux kerang ukuran 40x40 cm Dibulatkan 82,600.00Rp.

M.12. 1 m2 Pasang lantai ubin teralux kerang ukuran 30x30 cm1 Bahan

Ubin teralux kerang 30x30 cm 11.8700 bh 687.45Rp. 8,160.00Rp.Semen Portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 37,217.50Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.1300 oh 100,000.00Rp. 13,000.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 33,020.00Rp.

Jumlah (1) + (2) 70,237.50Rp.Keuntungan 10% 7,023.75Rp.Jumlah 77,261.25Rp.

KodeM.12. 1 m2 Pasang lantai ubin teralux kerang ukuran 30x30 cm Dibulatkan 77,200.00Rp.

M.13. 1 m2 Pasang lantai ubin teralux marmer ukuran 60x60 cm1 Bahan

Ubin teralux marmer 60x60 cm 3.1000 bh 9,333.93Rp. 28,935.18Rp.Semen Portland 9.6000 kg 1,360.00Rp. 13,056.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 57,448.68Rp.

2 TenagaPekerja 0.2400 oh 66,000.00Rp. 15,840.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0120 oh 100,000.00Rp. 1,200.00Rp.

Jumlah (2). 30,480.00Rp.

Jumlah (1) + (2) 87,928.68Rp.Keuntungan 10% 8,792.87Rp.Jumlah 96,721.55Rp.

KodeM.13. 1 m2 Pasang lantai ubin teralux marmer ukuran 60x60 cm Dibulatkan 96,700.00Rp.

M.14. 1 m2 Pasang lantai ubin teralux marmer ukuran 40x40 cm1 Bahan

Ubin teralux marmer 40x40 cm 6.6300 bh 3,716.80Rp. 24,642.38Rp.Semen Portland 9.8000 kg 1,360.00Rp. 13,328.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.3000 kg 4,200.00Rp. 5,460.00Rp.

Jumlah (1). 52,587.88Rp.

Page 180: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang batu 0.1250 oh 100,000.00Rp. 12,500.00Rp.Kepala tukang 0.0125 oh 120,000.00Rp. 1,500.00Rp.Mandor 0.0125 oh 100,000.00Rp. 1,250.00Rp.

Jumlah (2). 31,750.00Rp.

Jumlah (1) + (2) 84,337.88Rp.Keuntungan 10% 8,433.79Rp.Jumlah 92,771.67Rp.

KodeM.14. 1 m2 Pasang lantai ubin teralux marmer ukuran 40x40 cm Dibulatkan 92,700.00Rp.

M.15. 1 m2 Pasang lantai ubin teralux marmer ukuran 30x30 cm1 Bahan

Ubin teralux marmer 30x30 cm 11.8700 bh 1,100.25Rp. 13,060.00Rp.Semen Portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 42,117.50Rp.

2 TenagaPekerja 0.2600 oh 66,000.00Rp. 17,160.00Rp.Tukang batu 0.1300 oh 100,000.00Rp. 13,000.00Rp.Kepala tukang 0.0130 oh 120,000.00Rp. 1,560.00Rp.Mandor 0.0130 oh 100,000.00Rp. 1,300.00Rp.

Jumlah (2). 33,020.00Rp.

Jumlah (1) + (2) 75,137.50Rp.Keuntungan 10% 7,513.75Rp.Jumlah 82,651.25Rp.

KodeM.15. 1 m2 Pasang lantai ubin teralux marmer ukuran 30x30 cm Dibulatkan 82,600.00Rp.

M.16. 1 m' Pasang plint ubin pc abu-abu ukuran 15x20 cm1 Bahan

Plint ubin 15x20 cm 5.3000 bh 2,530.00Rp. 13,409.00Rp.Semen Portland 1.6500 kg 1,360.00Rp. 2,244.00Rp.Pasir pasang 0.0040 m3 203,500.00Rp. 814.00Rp.

Jumlah (1). 16,467.00Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 32,937.00Rp.Keuntungan 10% 3,293.70Rp.Jumlah 36,230.70Rp.

KodeM.16. 1 m' Pasang plint ubin pc abu-abu ukuran 15x20 cm Dibulatkan 36,200.00Rp.

M.17. 1 m' Pasang plint ubin pc abu-abu ukuran 10x30 cm1 Bahan

Plint ubin 10x30 cm 3.5300 bh 3,410.00Rp. 12,037.30Rp.Semen Portland 1.2400 kg 1,360.00Rp. 1,686.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.

Jumlah (1). 14,334.20Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 30,804.20Rp.Keuntungan 10% 3,080.42Rp.Jumlah 33,884.62Rp.

KodeM.17. 1 m' Pasang plint ubin pc abu-abu ukuran 10x30 cm Dibulatkan 33,800.00Rp.

Page 181: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

M.18. 1 m' Pasang plint ubin pc abu-abu ukuran 10x40 cm1 Bahan

Plint ubin 10x40 cm 2.6500 bh 4,170.00Rp. 11,050.50Rp.Semen Portland 1.2400 kg 1,360.00Rp. 1,686.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.

Jumlah (1). 13,347.40Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 29,817.40Rp.Keuntungan 10% 2,981.74Rp.Jumlah 32,799.14Rp.

KodeM.18. 1 m' Pasang plint ubin pc abu-abu ukuran 10x40 cm Dibulatkan 32,700.00Rp.

M.19. 1 m' Pasang plint ubin pc warna ukuran 10x20 cm1 Bahan

Plint ubin pc warna 10x20 cm 5.3000 bh 960.00Rp. 5,088.00Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 7,668.90Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 24,138.90Rp.Keuntungan 10% 2,413.89Rp.Jumlah 26,552.79Rp.

KodeM.19. 1 m' Pasang plint ubin pc warna ukuran 10x20 cm Dibulatkan 26,500.00Rp.

M.20. 1 m' Pasang plint ubin pc warna ukuran 10x30 cm1 Bahan

Plint ubin pc warna 10x30 cm 3.5300 bh 1,450.00Rp. 5,118.50Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 7,699.40Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 24,169.40Rp.Keuntungan 10% 2,416.94Rp.Jumlah 26,586.34Rp.

KodeM.20. 1 m' Pasang plint ubin pc warna ukuran 10x30 cm Dibulatkan 26,500.00Rp.

M.21. 1 m' Pasang plint ubin pc warna ukuran 10x40 cm1 Bahan

Plint ubin pc warna 10x40 cm 2.6500 bh 1,590.00Rp. 4,213.50Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 6,794.40Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.

Page 182: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 23,264.40Rp.Keuntungan 10% 2,326.44Rp.Jumlah 25,590.84Rp.

KodeM.21. 1 m' Pasang plint ubin pc warna ukuran 10x40 cm Dibulatkan 25,500.00Rp.

M.22. 1 m' Pasang plint ubin teraso warna ukuran 10x30 cm1 Bahan

Plint ubin teraso warna 10x30 cm 3.5300 bh 1,270.00Rp. 4,483.10Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 7,064.00Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 23,534.00Rp.Keuntungan 10% 2,353.40Rp.Jumlah 25,887.40Rp.

KodeM.22. 1 m' Pasang plint ubin teraso warna ukuran 10x30 cm Dibulatkan 25,800.00Rp.

M.23. 1 m' Pasang plint ubin teraso ukuran 10x40 cm1 Bahan

Plint ubin teraso 10x40 cm 2.6500 bh 1,690.00Rp. 4,478.50Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 7,059.40Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 23,529.40Rp.Keuntungan 10% 2,352.94Rp.Jumlah 25,882.34Rp.

KodeM.23. 1 m' Pasang plint ubin teraso ukuran 10x40 cm Dibulatkan 25,800.00Rp.

M.24. 1 m' Pasang plint ubin granito ukuran 10x40 cm1 Bahan

Plint granito 10x40 cm 2.6500 bh 25,040.00Rp. 66,356.00Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 68,936.90Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 85,406.90Rp.Keuntungan 10% 8,540.69Rp.Jumlah 93,947.59Rp.

KodeM.24. 1 m' Pasang plint ubin granito ukuran 10x40 cm Dibulatkan 93,900.00Rp.

Page 183: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

M.25. 1 m' Pasang plint ubin granito ukuran 10x30 cm1 Bahan

Plint ubin granito 10x30 cm 3.5300 bh 21,880.00Rp. 77,236.40Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 79,817.30Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 96,287.30Rp.Keuntungan 10% 9,628.73Rp.Jumlah 105,916.03Rp.

KodeM.25. 1 m' Pasang plint ubin granito ukuran 10x30 cm Dibulatkan 105,900.00Rp.

M.26. 1 m' Pasang plint ubin teralux kerang ukuran 10x40 cm1 Bahan

Plint ubin teralux kerang 10x40 cm 2.6500 bh 3,630.00Rp. 9,619.50Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 12,200.40Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 28,670.40Rp.Keuntungan 10% 2,867.04Rp.Jumlah 31,537.44Rp.

KodeM.26. 1 m' Pasang plint ubin teralux kerang ukuran 10x40 cm Dibulatkan 31,500.00Rp.

M.27. 1 m' Pasang plint ubin teralux kerang ukuran 10x30 cm1 Bahan

Plint ubin teralux kerang 10x30 cm 3.5300 bh 2,720.00Rp. 9,601.60Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 12,182.50Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 28,652.50Rp.Keuntungan 10% 2,865.25Rp.Jumlah 31,517.75Rp.

KodeM.27. 1 m' Pasang plint ubin teralux kerang ukuran 10x30 cm Dibulatkan 31,500.00Rp.

M.28. 1 m' Pasang plint ubin teralux marmer ukuran 10x60 cm1 Bahan

Plint ubin teralux marmer 10x60 cm 1.7000 bh 871,166.67Rp. 1,480,983.33Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 1,483,564.23Rp.

2 Tenaga

Page 184: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 1,500,034.23Rp.Keuntungan 10% 150,003.42Rp.Jumlah 1,650,037.66Rp.

KodeM.28. 1 m' Pasang plint ubin teralux marmer ukuran 10x60 cm Dibulatkan 1,650,000.00Rp.

M.29. 1 m' Pasang plint ubin teralux marmer ukuran 10x40 cm1 Bahan

Plint ubin teralux marmer 10x40 cm 2.6500 bh 5,800.00Rp. 15,370.00Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 17,950.90Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 34,420.90Rp.Keuntungan 10% 3,442.09Rp.Jumlah 37,862.99Rp.

KodeM.29. 1 m' Pasang plint ubin teralux marmer ukuran 10x40 cm Dibulatkan 37,800.00Rp.

M.30. 1 m' Pasang plint ubin teralux marmer ukuran 10x30 cm1 Bahan

Plint ubin teralux marmer 10x30 cm 3.5300 bh 4,350.00Rp. 15,355.50Rp.Semen Portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 17,936.40Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 34,406.40Rp.Keuntungan 10% 3,440.64Rp.Jumlah 37,847.04Rp.

KodeM.30. 1 m' Pasang plint ubin teralux marmer ukuran 10x30 cm Dibulatkan 37,800.00Rp.

M.31. 1 m2 Pasang lantai teraso cor ditempat, tebal 3 cm1 Bahan

Bahan teraso cor 0.0036 m3 36,300.00Rp. 130.68Rp.Jumlah (1). 130.68Rp.

2 TenagaPekerja 0.3600 oh 66,000.00Rp. 23,760.00Rp.Tukang batu 0.1800 oh 100,000.00Rp. 18,000.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0180 oh 100,000.00Rp. 1,800.00Rp.

Jumlah (2). 45,720.00Rp.

Jumlah (1) + (2) 45,850.68Rp.Keuntungan 10% 4,585.07Rp.Jumlah 50,435.75Rp.

KodeM.31. 1 m2 Pasang lantai teraso cor ditempat, tebal 3 cm Dibulatkan 50,400.00Rp.

M.32. 1 m2 Pasang teralux cor ditempat, tebal 3 cm

Page 185: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanBahan teralux cor 0.0036 m3 36,300.00Rp. 130.68Rp.

Jumlah (1). 130.68Rp.

2 TenagaPekerja 0.3600 oh 66,000.00Rp. 23,760.00Rp.Tukang batu 0.1800 oh 100,000.00Rp. 18,000.00Rp.Kepala tukang 0.0180 oh 120,000.00Rp. 2,160.00Rp.Mandor 0.0180 oh 100,000.00Rp. 1,800.00Rp.

Jumlah (2). 45,720.00Rp.

Jumlah (1) + (2) 45,850.68Rp.Keuntungan 10% 4,585.07Rp.Jumlah 50,435.75Rp.

KodeM.32. 1 m2 Pasang teralux cor ditempat, tebal 3 cm Dibulatkan 50,400.00Rp.

M.33. 1 m2 Pasang ubin tahan asam1 Bahan

Ubin tahan asam 1.0500 m2 157,300.00Rp. 165,165.00Rp.Semen tahan asam 14.1400 kg 7,811.00Rp. 110,447.54Rp.Pasir pasang 0.0400 m3 203,500.00Rp. 8,140.00Rp.

Jumlah (1). 283,752.54Rp.

2 TenagaPekerja 0.2700 oh 66,000.00Rp. 17,820.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0135 oh 100,000.00Rp. 1,350.00Rp.

Jumlah (2). 35,970.00Rp.

Jumlah (1) + (2) 319,722.54Rp.Keuntungan 10% 31,972.25Rp.Jumlah 351,694.79Rp.

KodeM.33. 1 m2 Pasang ubin tahan asam Dibulatkan 351,600.00Rp.

M.34. 1 m2 Pasang lantai keramik artistik ukuran 10 x 20 cm1 Bahan

Ubin keramik artistik 10 x 20 cm 53.0000 bh 9,360.00Rp. 496,080.00Rp.Semen portland 8.1900 kg 1,360.00Rp. 11,138.40Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 2.7500 kg 4,200.00Rp. 11,550.00Rp.

Jumlah (1). 527,925.90Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 616,825.90Rp.Keuntungan 10% 61,682.59Rp.Jumlah 678,508.49Rp.

KodeM.34. 1 m2 Pasang lantai keramik artistik ukuran 10 x 20 cm Dibulatkan 678,500.00Rp.

M.35. 1 m2 Pasang lantai keramik artistik ukuran 10 x 10 cm1 Bahan

Ubin keramik artistik 106.0000 bh 8,600.00Rp. 911,600.00Rp.Semen portland 8.1900 kg 1,360.00Rp. 11,138.40Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 3.2000 kg 4,200.00Rp. 13,440.00Rp.

Jumlah (1). 945,335.90Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Page 186: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 1,034,235.90Rp.Keuntungan 10% 103,423.59Rp.Jumlah 1,137,659.49Rp.

KodeM.35. 1 m2 Pasang lantai keramik artistik ukuran 10 x 10 cm Dibulatkan 1,137,600.00Rp.

M.36. 1 m2 Pasang lantai keramik artistik 5 x 20 cm1 Bahan

Ubin keramik artistik 5 x 20 cm 106.0000 bh 7,840.00Rp. 831,040.00Rp.Semen portland 8.1900 kg 1,360.00Rp. 11,138.40Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 3.2000 kg 4,200.00Rp. 13,440.00Rp.

Jumlah (1). 864,775.90Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 953,675.90Rp.Keuntungan 10% 95,367.59Rp.Jumlah 1,049,043.49Rp.

KodeM.36. 1 m2 Pasang lantai keramik artistik 5 x 20 cm Dibulatkan 1,049,000.00Rp.

M.37. 1 m' Pasang plint keramik artistik 10 x 20 cm1 Bahan

Plint keramik artistik 10 x 20 cm 5.3000 bh 10,120.00Rp. 53,636.00Rp.Semen portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.0250 kg 4,200.00Rp. 105.00Rp.

Jumlah (1). 55,901.90Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 72,371.90Rp.Keuntungan 10% 7,237.19Rp.Jumlah 79,609.09Rp.

KodeM.37. 1 m' Pasang plint keramik artistik 10 x 20 cm Dibulatkan 79,600.00Rp.

M.38. 1 m' Pasang plint keramik artistik 10 x 10 cm1 Bahan

Plint keramik artistik 10 x 10 cm 10.6000 bh 9,360.00Rp. 99,216.00Rp.Semen portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.0500 kg 4,200.00Rp. 210.00Rp.

Jumlah (1). 101,586.90Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 118,056.90Rp.Keuntungan 10% 11,805.69Rp.Jumlah 129,862.59Rp.

KodeM.38. 1 m' Pasang plint keramik artistik 10 x 10 cm Dibulatkan 129,800.00Rp.

M.39. 1 m' Pasang plint keramik artistik 5 x 20 cm1 Bahan

Plint keramik artistik 5 x 20 cm 5.3000 bh 8,600.00Rp. 45,580.00Rp.Semen portland 0.5700 kg 1,360.00Rp. 775.20Rp.

Page 187: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pasir pasang 0.0015 m3 203,500.00Rp. 305.25Rp.Semen warna 0.0130 kg 4,200.00Rp. 54.60Rp.

Jumlah (1). 46,715.05Rp.

2 TenagaPekerja 0.0900 oh 66,000.00Rp. 5,940.00Rp.Tukang batu 0.0900 oh 100,000.00Rp. 9,000.00Rp.Kepala tukang 0.0090 oh 120,000.00Rp. 1,080.00Rp.Mandor 0.0045 oh 100,000.00Rp. 450.00Rp.

Jumlah (2). 16,470.00Rp.

Jumlah (1) + (2) 63,185.05Rp.Keuntungan 10% 6,318.51Rp.Jumlah 69,503.56Rp.

KodeM.39. 1 m' Pasang plint keramik artistik 5 x 20 cm Dibulatkan 69,500.00Rp.

M.40. 1 m' Pasang internal cove artistik (5 x 5 x20) cm1 Bahan

Internal cove ( 5 x 5 x 20 ) cm 5.3000 bh 12,520.00Rp. 66,356.00Rp.Semen portland 1.1400 kg 1,360.00Rp. 1,550.40Rp.Pasir pasang 0.0030 m3 203,500.00Rp. 610.50Rp.Semen warna 0.1000 kg 4,200.00Rp. 420.00Rp.

Jumlah (1). 68,936.90Rp.

2 TenagaPekerja 0.7500 oh 66,000.00Rp. 49,500.00Rp.Tukang batu 0.7500 oh 100,000.00Rp. 75,000.00Rp.Kepala tukang 0.0750 oh 120,000.00Rp. 9,000.00Rp.Mandor 0.0380 oh 100,000.00Rp. 3,800.00Rp.

Jumlah (2). 137,300.00Rp.

Jumlah (1) + (2) 206,236.90Rp.Keuntungan 10% 20,623.69Rp.Jumlah 226,860.59Rp.

KodeM.40. 1 m' Pasang internal cove artistik (5 x 5 x20) cm Dibulatkan 226,800.00Rp.

M.41. 1 m' Pasang plint vinyl tanpa adukan1 Bahan

Lt vinyl karet 30x30 kwl I 3.5000 bh 2,420.00Rp. 8,470.00Rp.Lem vinyl 0.0800 kg 108,900.00Rp. 8,712.00Rp.

Jumlah (1). 17,182.00Rp.

2 TenagaPekerja 0.0800 oh 66,000.00Rp. 5,280.00Rp.Tukang batu 0.0800 oh 100,000.00Rp. 8,000.00Rp.Kepala tukang 0.0080 oh 120,000.00Rp. 960.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 14,640.00Rp.

Jumlah (1) + (2) 31,822.00Rp.Keuntungan 10% 3,182.20Rp.Jumlah 35,004.20Rp.

KodeM.41. 1 m' Pasang plint vinyl tanpa adukan Dibulatkan 35,000.00Rp.

M.42. 1 m2 Pasang lantai keramik 10 x 20 cm1 Bahan

Keramik 10 x 20 cm 50.0000 bh 1,009.60Rp. 50,480.00Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 80,803.80Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 163,923.80Rp.

Page 188: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 16,392.38Rp.Jumlah 180,316.18Rp.

KodeM.42. 1 m2 Pasang lantai keramik 10 x 20 cm Dibulatkan 180,300.00Rp.

M.43. 1 m2 Pasang lantai keramik 15 x 15 cm1 Bahan

Keramik 15 x 15 cm 44.0000 bh 1,279.55Rp. 56,300.00Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 86,623.80Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 169,743.80Rp.Keuntungan 10% 16,974.38Rp.Jumlah 186,718.18Rp.

KodeM.43. 1 m2 Pasang lantai keramik 15 x 15 cm Dibulatkan 186,700.00Rp.

M.44. 1 m2 Pasang lantai keramik 20 x 20 cm1 Bahan

Keramik 20 x 20 cm 25.0000 bh 2,125.20Rp. 53,130.00Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 83,453.80Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 166,573.80Rp.Keuntungan 10% 16,657.38Rp.Jumlah 183,231.18Rp.

KodeM.44. 1 m2 Pasang lantai keramik 20 x 20 cm Dibulatkan 183,200.00Rp.

M.44.a 1 m2 Pasang lantai keramik 20 x 20 cm anti slip1 Bahan

Keramik 20 x 20 cm anti slip 26.5000 bh 2,276.80Rp. 60,335.20Rp.Semen portland 10.4000 kg 1,360.00Rp. 14,144.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.6200 kg 4,200.00Rp. 6,804.00Rp.

Jumlah (1). 90,440.70Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 179,340.70Rp.Keuntungan 10% 17,934.07Rp.Jumlah 197,274.77Rp.

KodeM.44.a 1 m2 Pasang lantai keramik 20 x 20 cm anti slip Dibulatkan 197,200.00Rp.

M.45. 1 m2 Pasang lantai keramik 25 x 25 cm1 Bahan

Ubin keramik 25 x 25 cm 16.0000 bh -Rp. -Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.

Page 189: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.Jumlah (1). 30,323.80Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 113,443.80Rp.Keuntungan 10% 11,344.38Rp.Jumlah 124,788.18Rp.

KodeM.45. 1 m2 Pasang lantai keramik 25 x 25 cm Dibulatkan 124,700.00Rp.

M.46. 1 m2 Pasang lantai keramik 15 x 20 cm1 Bahan

Ubin keramik 15 x 20 cm 35.0000 bh -Rp. -Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 30,323.80Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 113,443.80Rp.Keuntungan 10% 11,344.38Rp.Jumlah 124,788.18Rp.

KodeM.46. 1 m2 Pasang lantai keramik 15 x 20 cm Dibulatkan 124,700.00Rp.

M.47. 1 m2 Pasang lantai keramik 33 x 33 cm1 Bahan

Ubin keramik 33 x 33 cm 10.0000 bh -Rp. -Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 30,323.80Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 113,443.80Rp.Keuntungan 10% 11,344.38Rp.Jumlah 124,788.18Rp.

KodeM.47. 1 m2 Pasang lantai keramik 33 x 33 cm Dibulatkan 124,700.00Rp.

M.47.a 1 m2 Pasang lantai keramik 30 x 30 cm putih polos1 Bahan

Ubin keramik 30 x 30 cm 11.8700 bh 5,118.18Rp. 60,752.82Rp.Semen portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 89,810.32Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Page 190: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1) + (2) 178,710.32Rp.Keuntungan 10% 17,871.03Rp.Jumlah 196,581.35Rp.

KodeM.47.a 1 m2 Pasang lantai keramik 30 x 30 cm putih polos Dibulatkan 196,500.00Rp.

M.47.b 1 m2 Pasang lantai keramik 30 x 30 cm warna1 Bahan

Ubin keramik 30 x 30 cm warna 11.8700 bh 5,221.82Rp. 61,982.98Rp.Semen portland 10.0000 kg 1,360.00Rp. 13,600.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 91,040.48Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 179,940.48Rp.Keuntungan 10% 17,994.05Rp.Jumlah 197,934.53Rp.

KodeM.47.b 1 m2 Pasang lantai keramik 30 x 30 cm warna Dibulatkan 197,900.00Rp.

M.47.c 1 m2 Pasang lantai keramik 40 x 40 cm Putih Polos1 Bahan

Ubin keramik 40 x 40 cm Putih 2.6300 bh 11,260.00Rp. 29,613.80Rp.Semen portland 6.8000 kg 1,360.00Rp. 9,248.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.3000 kg 4,200.00Rp. 5,460.00Rp.

Jumlah (1). 53,479.30Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 142,379.30Rp.Keuntungan 10% 14,237.93Rp.Jumlah 156,617.23Rp.

KodeM.47.c 1 m2 Pasang lantai keramik 40 x 40 cm Putih Polos Dibulatkan 156,600.00Rp.

M.48. 1 m2 Pasang lantai keramik 33 x 33 cm anti slip1 Bahan

Ubin keramik 33 x 33 cm anti slip 10.0000 bh 5,221.82Rp. 52,218.18Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 82,541.98Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 165,661.98Rp.Keuntungan 10% 16,566.20Rp.Jumlah 182,228.18Rp.

KodeM.48. 1 m2 Pasang lantai keramik 33 x 33 cm anti slip Dibulatkan 182,200.00Rp.

M.49. 1 m2 Pasang lantai keramik 10 x 33 cm anti slip1 Bahan

Ubin keramik 10 x 33 cm anti slip 30.3030 bh 1,740.61Rp. 52,745.64Rp.Semen portland 11.3800 kg 1,360.00Rp. 15,476.80Rp.

Page 191: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pasir pasang 0.0420 m3 203,500.00Rp. 8,547.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 83,069.44Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 166,189.44Rp.Keuntungan 10% 16,618.94Rp.Jumlah 182,808.38Rp.

KodeM.49. 1 m2 Pasang lantai keramik 10 x 33 cm anti slip Dibulatkan 182,800.00Rp.

M.50. 1 m2 Pasang lantai mozaik 30 x 30 cm, ex lokal1 Bahan

Mozaik 30 x 30 cm 12.0000 bh -Rp. -Rp.Semen portland 14.1500 kg 1,360.00Rp. 19,244.00Rp.Pasir pasang 0.0390 m3 203,500.00Rp. 7,936.50Rp.Semen warna 2.0000 kg 4,200.00Rp. 8,400.00Rp.

Jumlah (1). 35,580.50Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 118,700.50Rp.Keuntungan 10% 11,870.05Rp.Jumlah 130,570.55Rp.

KodeM.50. 1 m2 Pasang lantai mozaik 30 x 30 cm, ex lokal Dibulatkan 130,500.00Rp.

M.51. 1 m2 Pasang lantai marmer1 Bahan

Marmer 1.0600 bh 196,833.33Rp. 208,643.33Rp.Semen portland 8.1900 kg 1,360.00Rp. 11,138.40Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 0.6500 kg 4,200.00Rp. 2,730.00Rp.

Jumlah (1). 231,669.23Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 320,569.23Rp.Keuntungan 10% 32,056.92Rp.Jumlah 352,626.16Rp.

KodeM.51. 1 m2 Pasang lantai marmer Dibulatkan 352,600.00Rp.

M.52. 1 m2 Pasang lantai karpet 100% wool1 Bahan

Feltex carpet 100% wool T-21 1.0500 m2 -Rp. -Rp.Lem vinyl 0.3500 kg -Rp. -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.1700 oh 66,000.00Rp. 11,220.00Rp.Tukang batu 0.1700 oh 100,000.00Rp. 17,000.00Rp.Kepala tukang 0.0170 oh 120,000.00Rp. 2,040.00Rp.Mandor 0.0090 oh 100,000.00Rp. 900.00Rp.

Jumlah (2). 31,160.00Rp.

Jumlah (1) + (2) 31,160.00Rp.

Page 192: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 3,116.00Rp.Jumlah 34,276.00Rp.

KodeM.52. 1 m2 Pasang lantai karpet 100% wool Dibulatkan 34,200.00Rp.

M.53. 1 m2 Pasang lantai karpet 80% wool, 20 % nylon1 Bahan

Carpet 80% wool, 20% nylon 1.0500 m2 -Rp. -Rp.Lem vinyl 0.3500 kg -Rp. -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.1700 oh 66,000.00Rp. 11,220.00Rp.Tukang batu 0.1700 oh 100,000.00Rp. 17,000.00Rp.Kepala tukang 0.0170 oh 120,000.00Rp. 2,040.00Rp.Mandor 0.0090 oh 100,000.00Rp. 900.00Rp.

Jumlah (2). 31,160.00Rp.

Jumlah (1) + (2) 31,160.00Rp.Keuntungan 10% 3,116.00Rp.Jumlah 34,276.00Rp.

KodeM.53. 1 m2 Pasang lantai karpet 80% wool, 20 % nylon Dibulatkan 34,200.00Rp.

M.54. 1 m2 Pasang underlayer, tebal 6 mm1 Bahan

Underlayer tebal 6 mm/ rubber corrgared 1.0500 m2 -Rp. -Rp.Lem 0.3500 kg 14,200.00Rp. 4,970.00Rp.

Jumlah (1). 4,970.00Rp.

2 TenagaPekerja 1.2000 oh 66,000.00Rp. 79,200.00Rp.Tukang batu 1.2000 oh 100,000.00Rp. 120,000.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 201,240.00Rp.

Jumlah (1) + (2) 206,210.00Rp.Keuntungan 10% 20,621.00Rp.Jumlah 226,831.00Rp.

KodeM.54. 1 m2 Pasang underlayer, tebal 6 mm Dibulatkan 226,800.00Rp.

M.55. 1 m2 Pasang lantai karpet1 Bahan

Carpet 1.0500 m2 -Rp. -Rp.Lem vinyl 0.3500 kg -Rp. -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.1700 oh 66,000.00Rp. 11,220.00Rp.Tukang batu 0.1700 oh 100,000.00Rp. 17,000.00Rp.Kepala tukang 0.0170 oh 120,000.00Rp. 2,040.00Rp.Mandor 0.0090 oh 100,000.00Rp. 900.00Rp.

Jumlah (2). 31,160.00Rp.

Jumlah (1) + (2) 31,160.00Rp.Keuntungan 10% 3,116.00Rp.Jumlah 34,276.00Rp.

KodeM.55. 1 m2 Pasang lantai karpet Dibulatkan 34,200.00Rp.

M.56. 1 m2 Pasang lantai parquet jati1 Bahan

Parquet jati 1.0500 m2 -Rp. -Rp.Lem vinyl 0.6000 kg -Rp. -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Page 193: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 88,900.00Rp.Keuntungan 10% 8,890.00Rp.Jumlah 97,790.00Rp.

KodeM.56. 1 m2 Pasang lantai parquet jati Dibulatkan 97,700.00Rp.

M.57. 1 m2 Pasang gymfloor1 Bahan

Gymfloor 1.0500 m2 -Rp. -Rp.Lem vinyl 0.6000 kg -Rp. -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.6500 oh 66,000.00Rp. 42,900.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0325 oh 100,000.00Rp. 3,250.00Rp.

Jumlah (2). 85,350.00Rp.

Jumlah (1) + (2) 85,350.00Rp.Keuntungan 10% 8,535.00Rp.Jumlah 93,885.00Rp.

KodeM.57. 1 m2 Pasang gymfloor Dibulatkan 93,800.00Rp.

M.58. 1 m2 Pasang dinding porselin 11 x 11 cm, putih1 Bahan

Porselin 11 x 11 cm 86.0000 bh -Rp. -Rp.Semen portland 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 22,611.00Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.5000 oh 100,000.00Rp. 50,000.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0500 oh 100,000.00Rp. 5,000.00Rp.

Jumlah (2). 127,000.00Rp.

Jumlah (1) + (2) 149,611.00Rp.Keuntungan 10% 14,961.10Rp.Jumlah 164,572.10Rp.

KodeM.58. 1 m2 Pasang dinding porselin 11 x 11 cm, putih Dibulatkan 164,500.00Rp.

M.59. 1 m2 Pasang dinding porselin 11 x 11 cm, warna1 Bahan

Porselin 11 x 11 cm, warna 83.0000 bh -Rp. -Rp.Semen portland 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 22,611.00Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.5000 oh 100,000.00Rp. 50,000.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 99,920.00Rp.

Jumlah (1) + (2) 122,531.00Rp.Keuntungan 10% 12,253.10Rp.Jumlah 134,784.10Rp.

KodeM.59. 1 m2 Pasang dinding porselin 11 x 11 cm, warna Dibulatkan 134,700.00Rp.

M.60. 1 m2 Pasang dinding porselin 15 x 15 cm, putih1 Bahan

Page 194: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Porselin 15 x 15 cm, putih 45.0000 bh -Rp. -Rp.Semen portland 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 22,611.00Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 93,000.00Rp.

Jumlah (1) + (2) 115,611.00Rp.Keuntungan 10% 11,561.10Rp.Jumlah 127,172.10Rp.

KodeM.60. 1 m2 Pasang dinding porselin 15 x 15 cm, putih Dibulatkan 127,100.00Rp.

M.61. 1 m2 Pasang dinding porselin 15 x 15 cm, warna1 Bahan

Porselin 15 x 15 cm, warna 45.0000 bh -Rp. -Rp.Semen portland 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 22,611.00Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 93,000.00Rp.

Jumlah (1) + (2) 115,611.00Rp.Keuntungan 10% 11,561.10Rp.Jumlah 127,172.10Rp.

KodeM.61. 1 m2 Pasang dinding porselin 15 x 15 cm, warna Dibulatkan 127,100.00Rp.

M.62. 1 m2 Pasang dinding porselin 10 x 20 cm, warna1 Bahan

Porselin 10 x 20 cm, warna 53.0000 bh -Rp. -Rp.Semen portland 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 2.7500 kg 4,200.00Rp. 11,550.00Rp.

Jumlah (1). 27,861.00Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 142,161.00Rp.Keuntungan 10% 14,216.10Rp.Jumlah 156,377.10Rp.

KodeM.62. 1 m2 Pasang dinding porselin 10 x 20 cm, warna Dibulatkan 156,300.00Rp.

M.63. 1 m2 Pasang dinding porselin 20 x 20 cm, warna1 Bahan

Porselin 20 x 20 cm, warna 26.5000 bh -Rp. -Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.9400 kg 4,200.00Rp. 8,148.00Rp.

Jumlah (1). 24,459.00Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.

Page 195: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 138,759.00Rp.Keuntungan 10% 13,875.90Rp.Jumlah 152,634.90Rp.

KodeM.63. 1 m2 Pasang dinding porselin 20 x 20 cm, warna Dibulatkan 152,600.00Rp.

M.64. 1 m2 Pasang dinding keramik artistik 10x20 cm1 Bahan

Keramik artistik 10x20 cm 53.0000 bh -Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 2.7500 kg 4,200.00Rp. 11,550.00Rp.

Jumlah (1). 27,861.00Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 142,161.00Rp.Keuntungan 10% 14,216.10Rp.Jumlah 156,377.10Rp.

KodeM.64. 1 m2 Pasang dinding keramik artistik 10x20 cm Dibulatkan 156,300.00Rp.

M.65. 1 m2 Pasang dinding keramik artistik 5 x 20 cm1 Bahan

Keramik artistik 5 x 20 cm 106.0000 bh -Rp. -Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 2.9000 kg 4,200.00Rp. 12,180.00Rp.

Jumlah (1). 28,491.00Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 142,791.00Rp.Keuntungan 10% 14,279.10Rp.Jumlah 157,070.10Rp.

KodeM.65. 1 m2 Pasang dinding keramik artistik 5 x 20 cm Dibulatkan 157,000.00Rp.

M.66. 1 m2 Pasang dinding keramik 10 x 20 cm1 Bahan

Keramik 10 x 20 cm 53.0000 bh -Rp. -Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 2.7500 kg 4,200.00Rp. 11,550.00Rp.

Jumlah (1). 27,861.00Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 142,161.00Rp.Keuntungan 10% 14,216.10Rp.Jumlah 156,377.10Rp.

KodeM.66. 1 m2 Pasang dinding keramik 10 x 20 cm Dibulatkan 156,300.00Rp.

M.67. 1 m2 Pasang dinding keramik 15 x 15 cm

Page 196: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanKeramik 15 x 15 cm 45.0000 bh -Rp. -Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.5000 kg 4,200.00Rp. 6,300.00Rp.

Jumlah (1). 22,611.00Rp.

2 TenagaPekerja 0.6000 oh 66,000.00Rp. 39,600.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 93,000.00Rp.

Jumlah (1) + (2) 115,611.00Rp.Keuntungan 10% 11,561.10Rp.Jumlah 127,172.10Rp.

KodeM.67. 1 m2 Pasang dinding keramik 15 x 15 cm Dibulatkan 127,100.00Rp.

M.68. 1 m2 Pasang dinding keramik 20 x 20 cm1 Bahan

Keramik 20 x 20 cm 26.5000 bh 2,114.80Rp. 56,042.20Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.9400 kg 4,200.00Rp. 8,148.00Rp.

Jumlah (1). 80,501.20Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 194,801.20Rp.Keuntungan 10% 19,480.12Rp.Jumlah 214,281.32Rp.

KodeM.68. 1 m2 Pasang dinding keramik 20 x 20 cm Dibulatkan 214,200.00Rp.

M.69. 1 m2 Pasang lantai ubin granito ukuran 40x40 cm1 Bahan

Ubin keramik 40 x 40 cm putih polos 6.6300 bh 11,260.00Rp. 74,653.80Rp.Semen Portland 9.8000 kg 1,360.00Rp. 13,328.00Rp.Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp.Semen warna 1.3000 kg 4,200.00Rp. 5,460.00Rp.

Jumlah (1). 102,599.30Rp.

2 TenagaPekerja 0.6750 oh 66,000.00Rp. 44,550.00Rp.Tukang batu 0.3380 oh 100,000.00Rp. 33,800.00Rp.Kepala tukang 0.0351 oh 120,000.00Rp. 4,212.00Rp.Mandor 0.0351 oh 100,000.00Rp. 3,510.00Rp.

Jumlah (2). 86,072.00Rp.

Jumlah (1) + (2) 188,671.30Rp.Keuntungan 10% 18,867.13Rp.Jumlah 207,538.43Rp.

KodeM.69. 1 m2 Pasang lantai ubin granito ukuran 40x40 cm Dibulatkan 207,500.00Rp.

M.69. 1 m2 Pasang dinding keramik 20 x 25 cm1 Bahan

Keramik 20 x 25 cm 21.0000 bh 2,707.00Rp. 56,847.00Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 1.9400 kg 4,200.00Rp. 8,148.00Rp.

Jumlah (1). 81,306.00Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.

Page 197: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 195,606.00Rp.Keuntungan 10% 19,560.60Rp.Jumlah 215,166.60Rp.

KodeM.69. 1 m2 Pasang dinding keramik 20 x 25 cm Dibulatkan 215,100.00Rp.

M.70. 1 m2 Pasang dinding keramik 10 x 20 cm1 Bahan

Keramik 10 x 20 cm 53.0000 bh -Rp. -Rp.Semen abu-abu 9.3000 kg 1,360.00Rp. 12,648.00Rp.Pasir pasang 0.0180 m3 203,500.00Rp. 3,663.00Rp.Semen warna 2.7500 kg 4,200.00Rp. 11,550.00Rp.

Jumlah (1). 27,861.00Rp.

2 TenagaPekerja 0.9000 oh 66,000.00Rp. 59,400.00Rp.Tukang batu 0.4500 oh 100,000.00Rp. 45,000.00Rp.Kepala tukang 0.0450 oh 120,000.00Rp. 5,400.00Rp.Mandor 0.0450 oh 100,000.00Rp. 4,500.00Rp.

Jumlah (2). 114,300.00Rp.

Jumlah (1) + (2) 142,161.00Rp.Keuntungan 10% 14,216.10Rp.Jumlah 156,377.10Rp.

KodeM.70. 1 m2 Pasang dinding keramik 10 x 20 cm Dibulatkan 156,300.00Rp.

M.71. 1 m2 Pasang dinding marmer ukuran 100 x 100 cm1 Bahan

Marmer 1.0600 m2 -Rp. -Rp.Paku 12 cm 3.0030 bh -Rp. -Rp.PC 12.4400 kg 1,360.00Rp. 16,918.40Rp.Pasir pasang 0.0250 m3 203,500.00Rp. 5,087.50Rp.Semen warna 0.6500 kg 4,200.00Rp. 2,730.00Rp.

Jumlah (1). 24,735.90Rp.

2 TenagaPekerja 1.3000 oh 66,000.00Rp. 85,800.00Rp.Tukang batu 0.6500 oh 100,000.00Rp. 65,000.00Rp.Kepala tukang 0.0650 oh 120,000.00Rp. 7,800.00Rp.Mandor 0.0650 oh 100,000.00Rp. 6,500.00Rp.

Jumlah (2). 165,100.00Rp.

Jumlah (1) + (2) 189,835.90Rp.Keuntungan 10% 18,983.59Rp.Jumlah 208,819.49Rp.

KodeM.71. 1 m2 Pasang dinding marmer ukuran 100 x 100 cm Dibulatkan 208,800.00Rp.

M.72. 1 m2 Pasang lantai karpet1 Bahan

Karpet 1.0500 m2 33,000.00Rp. 34,650.00Rp.Lem 0.3500 kg 14,200.00Rp. 4,970.00Rp.

Jumlah (1). 39,620.00Rp.

2 TenagaPekerja 0.1700 oh 66,000.00Rp. 11,220.00Rp.Tukang batu 0.1700 oh 100,000.00Rp. 17,000.00Rp.Kepala tukang 0.0170 oh 120,000.00Rp. 2,040.00Rp.Mandor 0.0090 oh 100,000.00Rp. 900.00Rp.

Jumlah (2). 31,160.00Rp.

Jumlah (1) + (2) 70,780.00Rp.Keuntungan 10% 7,078.00Rp.Jumlah 77,858.00Rp.

KodeM.72. 1 m2 Pasang lantai karpet Dibulatkan 77,800.00Rp.

M.73. 1 m2 Pasang Underlayer

Page 198: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

1 BahanUnderlayer/rubber corrugated 1.0500 m2 -Rp. -Rp.Lem 0.3500 kg 14,200.00Rp. 4,970.00Rp.

Jumlah (1). 4,970.00Rp.

2 TenagaPekerja 1.2000 oh 66,000.00Rp. 79,200.00Rp.Tukang batu 1.2000 oh 100,000.00Rp. 120,000.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 201,240.00Rp.

Jumlah (1) + (2) 206,210.00Rp.Keuntungan 10% 20,621.00Rp.Jumlah 226,831.00Rp.

KodeM.73. 1 m2 Pasang Underlayer Dibulatkan 226,800.00Rp.

M.74. 1 m2 Pasang lantai parquet1 Bahan

Parquet 1.0500 m2 -Rp. -Rp.Lem 0.6000 kg 14,200.00Rp. 8,520.00Rp.

Jumlah (1). 8,520.00Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 97,420.00Rp.Keuntungan 10% 9,742.00Rp.Jumlah 107,162.00Rp.

KodeM.74. 1 m2 Pasang lantai parquet Dibulatkan 107,100.00Rp.

M.75. 1 m2 Pasang dinding bata pelapis 7x3x24 cm1 Bahan

Bata pelapis dinding 63.0000 m2 -Rp. -Rp.Semen abu-abu 12.4400 kg 1,360.00Rp. 16,918.40Rp.Pasir pasang 0.0250 m3 203,500.00Rp. 5,087.50Rp.Semen Warna 2.7500 kg 4,200.00Rp. 11,550.00Rp.

Jumlah (1). 33,555.90Rp.

2 TenagaPekerja 1.0000 oh 66,000.00Rp. 66,000.00Rp.Tukang batu 0.5000 oh 100,000.00Rp. 50,000.00Rp.Kepala tukang 0.0500 oh 120,000.00Rp. 6,000.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 125,000.00Rp.

Jumlah (1) + (2) 158,555.90Rp.Keuntungan 10% 15,855.59Rp.Jumlah 174,411.49Rp.

KodeM.75. 1 m2 Pasang dinding bata pelapis 7x3x24 cm Dibulatkan 174,400.00Rp.

M.76. 1 m2 Pasang dinding bata klinker 5 x 5 x 241 Bahan

Bata pelapis klinker 80.0000 m2 -Rp. -Rp.Semen abu-abu 12.4400 kg 1,360.00Rp. 16,918.40Rp.Pasir pasang 0.0250 m3 203,500.00Rp. 5,087.50Rp.

Jumlah (1). 22,005.90Rp.

2 TenagaPekerja 0.6200 oh 66,000.00Rp. 40,920.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0300 oh 100,000.00Rp. 3,000.00Rp.

Jumlah (2). 83,120.00Rp.

Jumlah (1) + (2) 105,125.90Rp.

Page 199: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 10,512.59Rp.Jumlah 115,638.49Rp.

KodeM.76. 1 m2 Pasang dinding bata klinker 5 x 5 x 24 Dibulatkan 115,600.00Rp.

M.77. 1 m2 Pasang dinding paros1 Bahan

Batu paros 1.1000 m2 -Rp. -Rp.Semen abu-abu 11.7500 kg 1,360.00Rp. 15,980.00Rp.Pasir pasang 0.0350 m3 203,500.00Rp. 7,122.50Rp.

Jumlah (1). 23,102.50Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 112,002.50Rp.Keuntungan 10% 11,200.25Rp.Jumlah 123,202.75Rp.

KodeM.77. 1 m2 Pasang dinding paros Dibulatkan 123,200.00Rp.

M.78. 1 m2 Pasang dinding batu tempel hitam1 Bahan

Batu tempel hitam 1.1000 m2 -Rp. -Rp.Semen abu-abu 11.7500 kg 1,360.00Rp. 15,980.00Rp.Pasir pasang 0.0350 m3 203,500.00Rp. 7,122.50Rp.

Jumlah (1). 23,102.50Rp.

2 TenagaPekerja 0.7000 oh 66,000.00Rp. 46,200.00Rp.Tukang batu 0.3500 oh 100,000.00Rp. 35,000.00Rp.Kepala tukang 0.0350 oh 120,000.00Rp. 4,200.00Rp.Mandor 0.0350 oh 100,000.00Rp. 3,500.00Rp.

Jumlah (2). 88,900.00Rp.

Jumlah (1) + (2) 112,002.50Rp.Keuntungan 10% 11,200.25Rp.Jumlah 123,202.75Rp.

KodeM.78. 1 m2 Pasang dinding batu tempel hitam Dibulatkan 123,200.00Rp.

M.79. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL I1 Bahan

Vinyl karet 30 x30 cm KL I 11.8700 bh 2,420.00Rp. 28,725.40Rp.Lem vinyl 0.3500 kg 108,900.00Rp. 38,115.00Rp.

Jumlah (1). 66,840.40Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0080 oh 100,000.00Rp. 800.00Rp.

Jumlah (2). 27,500.00Rp.

Jumlah (1) + (2) 94,340.40Rp.Keuntungan 10% 9,434.04Rp.Jumlah 103,774.44Rp.

KodeM.79. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL I Dibulatkan 103,700.00Rp.

M.80. 1 m2 Pasang Wall paper lebar 50 cm1 Bahan

Wall paper 2.2000 m2 78,650.00Rp. 173,030.00Rp.Lem 0.2500 kg 99,370.00Rp. 24,842.50Rp.

Jumlah (1). 197,872.50Rp.

2 TenagaPekerja 0.3500 oh 66,000.00Rp. 23,100.00Rp.Tukang batu 0.1750 oh 100,000.00Rp. 17,500.00Rp.

Page 200: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kepala tukang 0.0170 oh 120,000.00Rp. 2,040.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 42,840.00Rp.

Jumlah (1) + (2) 240,712.50Rp.Keuntungan 10% 24,071.25Rp.Jumlah 264,783.75Rp.

KodeM.80. 1 m2 Pasang Wall paper lebar 50 cm Dibulatkan 264,700.00Rp.

M.81. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL II1 Bahan

Vinyl karet 30 x30 cm KL II 1.7600 bh -Rp. -Rp.Lem vinyl 0.0800 kg 108,900.00Rp. 8,712.00Rp.

Jumlah (1). 8,712.00Rp.

2 TenagaPekerja 0.0800 oh 66,000.00Rp. 5,280.00Rp.Tukang batu 0.0800 oh 100,000.00Rp. 8,000.00Rp.Kepala tukang 0.0080 oh 120,000.00Rp. 960.00Rp.Mandor 0.0040 oh 100,000.00Rp. 400.00Rp.

Jumlah (2). 14,640.00Rp.

Jumlah (1) + (2) 23,352.00Rp.Keuntungan 10% 2,335.20Rp.Jumlah 25,687.20Rp.

KodeM.81. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL II Dibulatkan 25,600.00Rp.

M.82. 1 m2 Pasang lantai vinyl asbes 30 x 30 cm1 Bahan

Vinyl asbes 30 x30 cm 11.0500 m2 -Rp. -Rp.Lem vinyl 0.3500 kg 108,900.00Rp. 38,115.00Rp.

Jumlah (1). 38,115.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 27,450.00Rp.

Jumlah (1) + (2) 65,565.00Rp.Keuntungan 10% 6,556.50Rp.Jumlah 72,121.50Rp.

KodeM.82. 1 m2 Pasang lantai vinyl asbes 30 x 30 cm Dibulatkan 72,100.00Rp.

M.83. 1 m2 Pasang lantai vinyl motif kembang 30 x 30 cm1 Bahan

Vinyl motif kembang ex DN 11.0500 m2 -Rp. -Rp.Lem vinyl 0.3500 kg 108,900.00Rp. 38,115.00Rp.

Jumlah (1). 38,115.00Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang batu 0.1500 oh 100,000.00Rp. 15,000.00Rp.Kepala tukang 0.0150 oh 120,000.00Rp. 1,800.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 27,450.00Rp.

Jumlah (1) + (2) 65,565.00Rp.Keuntungan 10% 6,556.50Rp.Jumlah 72,121.50Rp.

KodeM.83. 1 m2 Pasang lantai vinyl motif kembang 30 x 30 cm Dibulatkan 72,100.00Rp.

M.84 1 m2 Pasang wall covering lebar 50 cm1 Bahan

Vinyl wall covering, lebar 50 cm 1.1000 m2 -Rp. -Rp.Lem 0.2900 kg 108,900.00Rp. 31,581.00Rp.

Jumlah (1). 31,581.00Rp.

Page 201: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.7500 oh 66,000.00Rp. 49,500.00Rp.Tukang batu 0.1700 oh 100,000.00Rp. 17,000.00Rp.Kepala tukang 0.0170 oh 120,000.00Rp. 2,040.00Rp.Mandor 0.0085 oh 100,000.00Rp. 850.00Rp.

Jumlah (2). 69,390.00Rp.

Jumlah (1) + (2) 100,971.00Rp.Keuntungan 10% 10,097.10Rp.Jumlah 111,068.10Rp.

KodeM.84 1 m2 Pasang wall covering lebar 50 cm Dibulatkan 111,000.00Rp.

M.85 1 m2 Floor hardener ferrovax1 Bahan

Floor hardener ferrovax 5.0000 kg 6,180.00Rp. 30,900.00Rp.Jumlah (1). 30,900.00Rp.

2 TenagaPekerja 0.1200 oh 66,000.00Rp. 7,920.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 21,960.00Rp.

Jumlah (1) + (2) 52,860.00Rp.Keuntungan 10% 5,286.00Rp.Jumlah 58,146.00Rp.

KodeM.85 1 m2 Floor hardener ferrovax Dibulatkan 58,100.00Rp.

M.86 1 m2 Floor hardener mastercron1 Bahan

Mastercron "S" 5.0000 kg -Rp. -Rp.Jumlah (1). -Rp.

2 TenagaPekerja 0.1200 oh 66,000.00Rp. 7,920.00Rp.Tukang batu 0.1200 oh 100,000.00Rp. 12,000.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 21,960.00Rp.

Jumlah (1) + (2) 21,960.00Rp.Keuntungan 10% 2,196.00Rp.Jumlah 24,156.00Rp.

KodeM.86 1 m2 Floor hardener mastercron Dibulatkan 24,100.00Rp.

M.87 1 m2 Plint kayu 2 x 10 cm1 Bahan

Kayu jati, papan 0.0030 m3 24,996,400.00Rp. 74,989.20Rp.Paku skrup 3.5 " 0.0500 kg 19,480.00Rp. 974.00Rp.

Jumlah (1). 75,963.20Rp.

2 TenagaPekerja 0.1200 oh 66,000.00Rp. 7,920.00Rp.Tukang kayu 0.1200 oh 105,000.00Rp. 12,600.00Rp.Kepala tukang 0.0120 oh 120,000.00Rp. 1,440.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 22,560.00Rp.

Jumlah (1) + (2) 98,523.20Rp.Keuntungan 10% 9,852.32Rp.Jumlah 108,375.52Rp.

KodeM.87 1 m2 Plint kayu 2 x 10 cm Dibulatkan 108,300.00Rp.

M.88 1 m2 Pasang paving blok tebal 8 cm1 Bahan

Paving blok tebal 8 cm 1.0100 m2 94,870.00Rp. 95,818.70Rp.Pasir urug 0.0500 m3 148,500.00Rp. 7,425.00Rp.

Jumlah (1). 103,243.70Rp.

Page 202: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang batu 0.2500 oh 100,000.00Rp. 25,000.00Rp.Kepala tukang 0.0250 oh 120,000.00Rp. 3,000.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 44,800.00Rp.

Jumlah (1) + (2) 148,043.70Rp.Keuntungan 10% 14,804.37Rp.Jumlah 162,848.07Rp.

KodeM.88 1 m2 Pasang paving blok tebal 8 cm Dibulatkan 162,800.00Rp.

M.89 1m2 Lantai homogehous 60x60cm

a. Bahan: - Homogehous 60x60cm setara ex. Granito 1.1000 m2 287,290.00Rp. 316,019.00Rp. - Sement PC 8.8000 kg 1,360.00Rp. 11,968.00Rp. - Pasir pasang 0.0450 m3 203,500.00Rp. 9,157.50Rp. - Semen grouting / nat 0.2874 kg 4,200.00Rp. 1,207.28Rp.

Jumlah (1). 338,351.78Rp.

b. Upah: - Kepala Tukang 0.0450 hari 120,000.00Rp. 5,400.00Rp. - Tukang 0.2500 hari 100,000.00Rp. 25,000.00Rp. - Pekerja 0.1850 hari 66,000.00Rp. 12,210.00Rp. - Mandor 0.0150 hari 100,000.00Rp. 1,500.00Rp.

Jumlah (2). 44,110.00Rp.

Jumlah (1) + (2) 382,461.78Rp.Keuntungan 10% 38,246.18Rp.Jumlah 420,707.95Rp.

KodeM.89 1m2 Lantai homogehous 60x60cm Dibulatkan 420,700.00Rp.

M.90 1 m2 Lantai Vinyl

a. Bahan: - Vinyl 1.1000 m2 363,033.00Rp 399,336.30Rp - Lem 0.3500 kg 35,750.00Rp 12,512.50Rp

Jumlah (1). 411,848.80Rp

b. Upah: - Pekerja 0.150 hari 66,000.00Rp 9,900.00Rp - Tukang 0.150 hari 100,000.00Rp 15,000.00Rp - Kepala Tukang 0.015 hari 120,000.00Rp 1,800.00Rp - Mandor 0.008 hari 100,000.00Rp 800.00Rp

Jumlah (2). 27,500.00Rp

Jumlah (1) + (2) 439,348.80RpKeuntungan 10% 43,934.88RpJumlah 483,283.68Rp

KodeM.90 1 m2 Lantai Vinyl Dibulatkan 483,200.00Rp

M.91 1m' Plin homogenous 10x60cma. Bahan:

- Homogenous 10x60 setara Garanito 1.6667 bh 47,881.67Rp 79,802.78Rp - Sement / PC kwalitas 3 Roda 1.6500 kg 1,360.00Rp 2,244.00Rp - Pasir pasang 0.0032 m3 203,500.00Rp 651.20Rp - Semen warna 0.0167 kg 4,200.00Rp 70.00Rp

Jumlah (1). 82,767.98Rp

b. Upah: - Pekerja 0.0900 hari 66,000.00Rp 5,940.00Rp - Tukang 0.0900 hari 100,000.00Rp 9,000.00Rp - Kepala Tukang 0.0090 hari 120,000.00Rp 1,080.00Rp - Mandor 0.0045 hari 100,000.00Rp 450.00Rp

Jumlah (2). 16,470.00Rp

Jumlah (1) + (2) 99,237.98Rp

Page 203: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Keuntungan 10% 9,923.80RpJumlah 109,161.78Rp

KodeM.91 1m' Plin homogenous 10x60cm Dibulatkan 109,100.00Rp

M.92 1m' Plin keramik 10x40cma. Bahan:

- Keramik 10x40 2.6500 bh 2,815.00Rp 7,459.75Rp - Sement / PC kwalitas 3 Roda 1.1400 kg 1,360.00Rp 1,550.40Rp - Pasir pasang 0.0030 m3 203,500.00Rp 610.50Rp - Semen warna 0.1000 kg 4,200.00Rp 420.00Rp

Jumlah (1). 10,040.65Rp

b. Upah: - Pekerja 0.0900 hari 66,000.00Rp 5,940.00Rp - Tukang 0.0900 hari 100,000.00Rp 9,000.00Rp - Kepala Tukang 0.0090 hari 120,000.00Rp 1,080.00Rp - Mandor 0.0045 hari 100,000.00Rp 450.00Rp

Jumlah (2). 16,470.00Rp

Jumlah (1) + (2) 26,510.65RpKeuntungan 10% 2,651.07RpJumlah 29,161.72Rp

KodeM.92 1m' Plin keramik 10x40cm Dibulatkan 29,100.00Rp

M.93 1m' Plin keramik 10x30cma. Bahan:

- Keramik 10x30 3.3500 bh 1,740.61Rp 5,831.03Rp - Sement / PC kwalitas 3 Roda 1.1400 kg 1,360.00Rp 1,550.40Rp - Pasir pasang 0.0030 m3 203,500.00Rp 610.50Rp - Semen warna 0.1000 kg 4,200.00Rp 420.00Rp

Jumlah (1). 8,411.93Rp

b. Upah: - Pekerja 0.0900 hari 66,000.00Rp 5,940.00Rp - Tukang 0.0900 hari 100,000.00Rp 9,000.00Rp - Kepala Tukang 0.0090 hari 120,000.00Rp 1,080.00Rp - Mandor 0.0045 hari 100,000.00Rp 450.00Rp

Jumlah (2). 16,470.00Rp

Jumlah (1) + (2) 24,881.93RpKeuntungan 10% 2,488.19RpJumlah 27,370.12Rp

KodeM.93 1m' Plin keramik 10x30cm Dibulatkan 27,300.00Rp

M.94 1m' Stair tangga 10x30cm

a. Bahan: - Keramik Stair noozing 10x30 standar 3.5000 bh 18,745.00 65,607.50 - Sement / PC kwalitas 3 Roda 1.6500 zk 1,360.00 2,244.00 - Pasir pasang 0.0032 m3 203,500.00 651.20 - Semen grouting / nat 0.0167 kg 4,200.00 70.00

Jumlah (1). 68,572.70

b. Upah: - Pekerja 0.0300 hari 66,000.00 1,980.00 - Tukang 0.0300 hari 100,000.00 3,000.00 - Kepala Tukang 0.0010 hari 120,000.00 120.00 - Mandor 0.0010 hari 100,000.00 100.00

Jumlah (2). 5,200.00

Jumlah (1) + (2) 73,772.70Keuntungan 10% 7,377.27Jumlah 81,149.97

KodeM.94 1m' Stair tangga 10x30cm Dibulatkan 81,100.00

M.95 1m' Meja Pantry & wastafel

a. Meja beton ringan tul. M8-150, 1:2:3

Page 204: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

G.27. - Besi WM8-150 2.8921 kg 17,300.00 50,034.18G.32. - Bekisting plat 0.6000 m2 424,900.00 254,940.00G.5. - Beton campuran 1pc : 2ps : 3krl 0.0600 m3 806,500.00 48,390.00

Jumlah (1). 353,364.18

M.44. b. Pasangan keramik 20x20cm Gol.A KW1: 1.5200 m2 183,200.00 278,464.00Jumlah (2). 278,464.00

Jumlah (1) + (2) 631,828.18

KodeM.95 1m' Meja Pantry & wastafel Dibulatkan 631,800.00

M.96. 1m' Pasangan cansteen 15x30x60 cm

a. Bahan:- Cansteen 15x30x60 cm 1.6667 bh 39,160.00Rp 65,266.67Rp

E.3. - Pas. Spesi 1 : 3 0.1656 m2 58,600.00Rp 9,702.36RpJumlah (1). 74,969.03Rp

b. Upah: - Pekerja 0.2500 hari 66,000.00Rp 16,500.00Rp - Tukang 0.1500 hari 100,000.00Rp 15,000.00Rp - Kepala Tukang 0.0200 hari 120,000.00Rp 2,400.00Rp - Mandor 0.0020 hari 100,000.00Rp 200.00Rp

Jumlah (2). 34,100.00Rp

Jumlah (1) + (2) 109,069.03Rp

KodeM.96. 1m' Pasangan cansteen 15x30x60 cm Dibulatkan 109,000.00Rp

M.97. 1m2 Pasang grass block t:6 cm

a. Bahan: - Paving Grassblock t. 6 cm 8.6234 bh 9,290.00 80,111.41 - Pasir urug 0.1265 m3 148,500.00 18,781.77 - Tanah humus 0.0690 m3 87,500.00 6,036.38 - Rumput gajah 0.2300 m2 50,000.00 11,497.87

Jumlah (1). 116,427.43

b. Upah: - Kepala Tukang 0.0250 hari 66,000.00 1,650.00 - Tukang 0.2500 hari 100,000.00 25,000.00 - Pekerja 0.2500 hari 120,000.00 30,000.00 - Mandor 0.0030 hari 100,000.00 300.00

Jumlah (2). 56,950.00

Jumlah (1) + (2) 173,377.43Keuntungan 10% 17,337.74Jumlah 190,715.17

KodeM.97. 1m2 Pasang grass block t:6 cm Dibulatkan 190,700.00

M.98. 1m2 LAPISAN HOTMIX T.5CM

a. Bahan: Secrean + split 1/2 0.0264 m3 225,000.00 5,940.00 Aspal 5.0000 kg 12,650.00 63,250.00 Kayu bakar 0.0160 m3 1,718,510.00 27,496.16 Peralatan bantu 1.0000 ls 19,337.23 19,337.23

Jumlah (1). 116,023.39b. Upah:

- Pekerja 0.1300 hari 66,000.00 8,580.00 - Tukang 0.0600 hari 100,000.00 6,000.00 - Kepala Tukang 0.0020 hari 120,000.00 240.00 - Mandor 0.0010 hari 100,000.00 100.00

Jumlah (2). 14,920.00

Jumlah (1) + (2) 130,943.39Keuntungan 10% 13,094.34Jumlah 144,037.73

KodeM.98. 1m2 LAPISAN HOTMIX T.5CM Dibulatkan 144,000.00

Page 205: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

M.99. 1M2 Prime coat

a. Bahan: Prime coat 2.5000 ltr 5,410.00 13,525.00 Peralatan bantu 0.2000 ls 2,705.00 541.00

Jumlah (1). 14,066.00b. Upah:

- Pekerja 0.0325 hari 66,000.00 2,145.00 - Tukang 0.0150 hari 100,000.00 1,500.00 - Kepala Tukang 0.0005 hari 120,000.00 60.00 - Mandor 0.0003 hari 100,000.00 25.00

Jumlah (2). 3,730.00

Jumlah (1) + (2) 17,796.00Keuntungan 10% 1,779.60Jumlah 19,575.60

KodeM.99. 1M2 Prime coat Dibulatkan 19,500.00

M.100. 1m2 BATU SIKAT

a. Bahan: - Batu sikat 15.000 kg 6,050.00 90,750.00 - Sement / PC kwalitas 3 Roda 0.282 zk 1,360.00 383.52 - Pasir pasang 0.035 m3 203,500.00 7,122.50

Jumlah (1). 98,256.02b. Upah:

- Pekerja 0.700 hari 66,000.00 46,200.00 - Tukang 0.350 hari 100,000.00 35,000.00 - Kepala Tukang 0.035 hari 120,000.00 4,200.00 - Mandor 0.035 hari 100,000.00 3,500.00

Jumlah (2). 88,900.00

Jumlah (1) + (2) 187,156.02Keuntungan 10% 18,715.60Jumlah 205,871.62

KodeM.100. 1m2 BATU SIKAT Dibulatkan 205,800.00

M.101. 14 1 M² Hemogenouse tile dinding keramik 40x60 cm 559,435.00Hemogenouse tile 40x60 cm 4.3750 bh 115,200.00 504,000.00Semen abu-abu 0.1600 zak 74,000.00 11,840.00Pasir pasang 0.0180 m³ 135,000.00 2,430.00Semen grout 0.0100 zak 12,000.00 120.00Pekerja 0.0100 org 60,000.00 600.00Tukang batu 0.0130 org 65,000.00 845.00Kepala Tukang 0.0800 org 70,000.00 5,600.00Mandor 0.4000 org 85,000.00 34,000.00

Jumlah 559,435.00

Page 206: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.

PEKERJAAN PENGECATANRuang LingkupJenis pekerjaan yang dicakup meliputi :1. Pekerjaan mengerok/pembersihan permukaan dinding2. Pekerjaan mengecat dengan cat emulsi dan kapur putih3. Pekerjaan melabur permukaan dengan bahan vernis4. Pekerjaan mengecat permukaan baja dengan menie besi dan cat minyak

N.1. 1 m2 Mengikis/mengerok permukaan cat tembok lama1 Bahan

Soda api 0.0500 kg 68,370.00Rp. 3,418.50Rp.Jumlah (1). 3,418.50Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 10,150.00Rp.

Jumlah (1) + (2) 13,568.50Rp.Keuntungan 10% 1,356.85Rp.Jumlah 14,925.35Rp.

KodeN.1. 1 m2 Mengikis/mengerok permukaan cat tembok lama Dibulatkan 14,900.00Rp.

N.2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat1 Bahan

Sabun 0.0500 kg 24,750.00Rp. 1,237.50Rp.Jumlah (1). 1,237.50Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 10,150.00Rp.

Jumlah (1) + (2) 11,387.50Rp.Keuntungan 10% 1,138.75Rp.Jumlah 12,526.25Rp.

KodeN.2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat Dibulatkan 12,500.00Rp.

N.3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual1 Bahan

Sabun 0.0500 kg 24,750.00Rp. 1,237.50Rp.Jumlah (1). 1,237.50Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 10,150.00Rp.

Jumlah (1) + (2) 11,387.50Rp.Keuntungan 10% 1,138.75Rp.Jumlah 12,526.25Rp.

KodeN.3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual Dibulatkan 12,500.00Rp.

N.4. 1 m2 Menyabun permukaan tembok lama1 Bahan

Sabun 0.0500 kg 24,750.00Rp. 1,237.50Rp.Jumlah (1). 1,237.50Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 10,150.00Rp.

Jumlah (1) + (2) 11,387.50Rp.Keuntungan 10% 1,138.75Rp.Jumlah 12,526.25Rp.

ANALISA BIAYA KONTRUKSI (ABK) BANGUNAN GEDUNG DAN PERUMAHAN

KODE URAIAN PEKERJAAN

N.

Page 207: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeN.4. 1 m2 Menyabun permukaan tembok lama Dibulatkan 12,500.00Rp.

N.5. 1 m2

1 BahanPasir silika 40.0000 kg 8,410.00Rp. 336,400.00Rp.BBM 10.0000 ltr 4,950.00Rp. 49,500.00Rp.Peralatankompressor, blasting pot, selang, dan nozzle sewa 1.0000 hr 110,000.00Rp. 110,000.00Rp.

Jumlah (1). 495,900.00Rp.

2 TenagaPekerja 1.6000 oh 66,000.00Rp. 105,600.00Rp.Tukang cat 1.6000 oh 115,000.00Rp. 184,000.00Rp.Kepala tukang 0.8000 oh 120,000.00Rp. 96,000.00Rp.Mandor 0.5000 oh 100,000.00Rp. 50,000.00Rp.

Jumlah (2). 435,600.00Rp.

Jumlah (1) + (2) 931,500.00Rp.Keuntungan 10% 93,150.00Rp.Jumlah 1,024,650.00Rp.

KodeN.5. Dibulatkan 1,024,600.00Rp.

N.6. 1 m2 Mendempul dan menggosok kayu1 Bahan

Dempul jadi 0.0800 kg 5,330.00Rp. 426.40Rp.Minyak cat 0.0200 kg 8,600.00Rp. 172.00Rp.Batu apung 0.0100 kg 10,510.00Rp. 105.10Rp.

Jumlah (1). 703.50Rp.

2 TenagaPekerja 0.0400 oh 66,000.00Rp. 2,640.00Rp.Tukang cat 0.0400 oh 115,000.00Rp. 4,600.00Rp.Kepala tukang 0.0040 oh 120,000.00Rp. 480.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 7,970.00Rp.

Jumlah (1) + (2) 8,673.50Rp.Keuntungan 10% 867.35Rp.Jumlah 9,540.85Rp.

KodeN.6. 1 m2 Mendempul dan menggosok kayu Dibulatkan 9,500.00Rp.

N.7. 1 m2 Pengecatan bidang kayu lama1 Bahan

Plamir 0.1500 kg 11,540.00Rp. 1,731.00Rp.Cat dasar 0.1700 kg 40,710.00Rp. 6,920.70Rp.Cat penutup 0.1700 kg 40,710.00Rp. 6,920.70Rp.

Jumlah (1). 15,572.40Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang cat 0.0750 oh 115,000.00Rp. 8,625.00Rp.Kepala tukang 0.0075 oh 120,000.00Rp. 900.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 14,395.00Rp.

Jumlah (1) + (2) 29,967.40Rp.Keuntungan 10% 2,996.74Rp.Jumlah 32,964.14Rp.

KodeN.7. 1 m2 Pengecatan bidang kayu lama Dibulatkan 32,900.00Rp.

N.8. 1 m2 Pengecatan bidang kayu baru ( 1 lapis lamir), 1 lapis cat dasar, 2 lapis cat penutup1 Bahan

Cat menie 0.2000 kg 25,370.00Rp. 5,074.00Rp.Plamir 0.1500 kg 11,540.00Rp. 1,731.00Rp.Cat dasar 0.1700 kg 40,710.00Rp. 6,920.70Rp.Cat penutup 2 kali 0.2600 kg 40,710.00Rp. 10,584.60Rp.

Jumlah (1). 24,310.30Rp.

2 Tenaga

Mengerok karat atau cat lama permukaan baja dengan pancarpasir (sandblasting) dengan tingkat kebersihan Sa 2 1/2 %

1 m2 Mengerok karat atau cat lama permukaan baja dengan pancar pasir(sandblasting) dengan tingkat kebersihan Sa 2 1/2 %

Page 208: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Pekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang cat 0.0090 oh 115,000.00Rp. 1,035.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 6,625.00Rp.

Jumlah (1) + (2) 30,935.30Rp.Keuntungan 10% 3,093.53Rp.Jumlah 34,028.83Rp.

KodeN.8. Dibulatkan 34,000.00Rp.

N.9. 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup1 Bahan

Cat menie 0.2000 kg 25,370.00Rp. 5,074.00Rp.Plamir 0.1500 kg 11,540.00Rp. 1,731.00Rp.Cat dasar 0.1700 kg 40,710.00Rp. 6,920.70Rp.Cat penutup 3 kali 0.3500 kg 40,710.00Rp. 14,248.50Rp.

Jumlah (1). 27,974.20Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang cat 0.0090 oh 115,000.00Rp. 1,035.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 6,625.00Rp.

Jumlah (1) + (2) 34,599.20Rp.Keuntungan 10% 3,459.92Rp.Jumlah 38,059.12Rp.

KodeN.9. Dibulatkan 38,000.00Rp.

N.10. 1 m2 Pelaburan bidang kayu dengan teak oil1 Bahan

Teak oil 0.3600 kg 4,200.00Rp. 1,512.00Rp.Jumlah (1). 1,512.00Rp.

2 TenagaPekerja 0.0700 oh 66,000.00Rp. 4,620.00Rp.Tukang cat 0.0090 oh 115,000.00Rp. 1,035.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 6,625.00Rp.

Jumlah (1) + (2) 8,137.00Rp.Keuntungan 10% 813.70Rp.Jumlah 8,950.70Rp.

KodeN.10. Dibulatkan 8,900.00Rp.

N.11. 1 m2 Pelaburan bidang kayu dengan politur1 Bahan

Politur 0.1500 kg 11,540.00Rp. 1,731.00Rp.Politur jadi 0.3720 ltr 35,260.00Rp. 13,116.72Rp.Ampelas 2.0000 lbr 4,800.00Rp. 9,600.00Rp.

Jumlah (1). 24,447.72Rp.

2 TenagaTukang politur 0.1600 oh 115,000.00Rp. 18,400.00Rp.Kepala tukang 0.0160 oh 120,000.00Rp. 1,920.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 20,570.00Rp.

Jumlah (1) + (2) 45,017.72Rp.Keuntungan 10% 4,501.77Rp.Jumlah 49,519.49Rp.

KodeN.11. Dibulatkan 49,500.00Rp.

N.12. 1 m2 Pelaburan bidang kayu dengan cat residu dan ter1 Bahan

1 m2 Pengecatan bidang kayu baru ( 1 lapis lamir), 1 lapis cat dasar, 2lapis cat penutup

1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 3lapis cat penutup

1 m2 Pelaburan bidang kayu dengan teak oil

1 m2 Pelaburan bidang kayu dengan politur

Page 209: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Residu atau ter 0.3500 ltr 4,300.00Rp. 1,505.00Rp.Jumlah (1). 1,505.00Rp.

2 TenagaPekerja 0.1000 oh 66,000.00Rp. 6,600.00Rp.Mandor 0.0060 oh 100,000.00Rp. 600.00Rp.

Jumlah (2). 7,200.00Rp.

Jumlah (1) + (2) 8,705.00Rp.Keuntungan 10% 870.50Rp.Jumlah 9,575.50Rp.

KodeN.12. Dibulatkan 9,500.00Rp.

N.13. 1 m2 Pelaburan bidang kayu dengan vernis1 Bahan

Vernis 0.1500 ltr 77,590.00Rp. 11,638.50Rp.Dempul 0.0500 kg 5,330.00Rp. 266.50Rp.Ampelas 0.1000 lbr 4,800.00Rp. 480.00Rp.Kuas 0.0100 bh 14,200.00Rp. 142.00Rp.

Jumlah (1). 12,527.00Rp.

2 TenagaPekerja 0.1600 oh 66,000.00Rp. 10,560.00Rp.Tukang cat 0.1600 oh 115,000.00Rp. 18,400.00Rp.Kepala tukang 0.0160 oh 120,000.00Rp. 1,920.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 31,130.00Rp.

Jumlah (1) + (2) 43,657.00Rp.Keuntungan 10% 4,365.70Rp.Jumlah 48,022.70Rp.

KodeN.13. Dibulatkan 48,000.00Rp.

N.14. 1 m2 Pengecatan tembok baru (1 lapis plamir, 2 lapis cat penutup)1 Bahan

Plamir 0.1000 kg 11,540.00Rp. 1,154.00Rp.Kapek 0.0500 bh 11,000.00Rp. 550.00Rp.Cat penutup 2 x 0.4700 kg 16,940.00Rp. 7,961.80Rp.Amplas 0.5000 bh 4,800.00Rp. 2,400.00Rp.Roll cat 0.0100 bh 30,400.00Rp. 304.00Rp.

Jumlah (1). 12,369.80Rp.

2 TenagaPekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Tukang cat 0.0600 oh 115,000.00Rp. 6,900.00Rp.Kepala tukang 0.0060 oh 120,000.00Rp. 720.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 11,880.00Rp.

Jumlah (1) + (2) 24,249.80Rp.Keuntungan 10% 2,424.98Rp.Jumlah 26,674.78Rp.

KodeN.14. Dibulatkan 26,600.00Rp.

N.15. 1 m2 Pengecatan tembok lama (2 lapis cat penutup)1 Bahan

Roll cat 0.0100 bh 30,400.00Rp. 304.00Rp.Cat penutup 2 x 0.4700 kg 16,940.00Rp. 7,961.80Rp.

Jumlah (1). 8,265.80Rp.

2 TenagaPekerja 0.0400 oh 66,000.00Rp. 2,640.00Rp.Tukang cat 0.0300 oh 115,000.00Rp. 3,450.00Rp.Kepala tukang 0.0030 oh 120,000.00Rp. 360.00Rp.Mandor 0.0020 oh 100,000.00Rp. 200.00Rp.

Jumlah (2). 6,650.00Rp.

Jumlah (1) + (2) 14,915.80Rp.Keuntungan 10% 1,491.58Rp.Jumlah 16,407.38Rp.

1 m2 Pelaburan bidang kayu dengan cat residu dan ter

1 m2 Pelaburan bidang kayu dengan vernis

1 m2 Pengecatan tembok baru (1 lapis plamir, 2 lapis cat penutup)

Page 210: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

KodeN.15. Dibulatkan 16,400.00Rp.

N.17. 1 m2 Pengecatan langit-langit (1 lapis plamir, 2 lapis cat penutup)1 Bahan

Plamir 0.1000 kg 13,320.00Rp. 1,332.00Rp.Cat penutup 2 x 0.4700 kg 16,940.00Rp. 7,961.80Rp.Amplas 0.5000 bh 4,800.00Rp. 2,400.00Rp.Roll cat 0.0100 bh 30,400.00Rp. 304.00Rp.

Jumlah (1). 11,997.80Rp.

2 TenagaPekerja 0.0600 oh 66,000.00Rp. 3,960.00Rp.Tukang cat 0.0400 oh 115,000.00Rp. 4,600.00Rp.Kepala tukang 0.0040 oh 120,000.00Rp. 480.00Rp.Mandor 0.0030 oh 100,000.00Rp. 300.00Rp.

Jumlah (2). 9,340.00Rp.

Jumlah (1) + (2) 21,337.80Rp.Keuntungan 10% 2,133.78Rp.Jumlah 23,471.58Rp.

KodeN.17. Dibulatkan 23,400.00Rp.

N.18. 1 m2 Melabur tembok dengan kalkarium1 Bahan

Kalkarium 0.1000 kg 17,600.00Rp. 1,760.00Rp.Jumlah (1). 1,760.00Rp.

2 TenagaPekerja 0.0280 oh 66,000.00Rp. 1,848.00Rp.Tukang cat 0.0420 oh 115,000.00Rp. 4,830.00Rp.Kepala tukang 0.0042 oh 120,000.00Rp. 504.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 7,432.00Rp.

Jumlah (1) + (2) 9,192.00Rp.Keuntungan 10% 919.20Rp.Jumlah 10,111.20Rp.

KodeN.18. Dibulatkan 10,100.00Rp.

N.19. 1 m2 Melabur tembok dengan kapur sirih1 Bahan

Ampelas 0.1000 kg 4,800.00Rp. 480.00Rp.Alang-alang 0.2500 ikat 5,060.00Rp. 1,265.00Rp.Perancah kayu 0.0020 m3 2,812,100.00Rp. 5,624.20Rp.Kapur sirih 0.1500 kg 2,100.00Rp. 315.00Rp.

Jumlah (1). 7,684.20Rp.

2 TenagaPekerja 0.1500 oh 66,000.00Rp. 9,900.00Rp.Tukang cat 0.0010 oh 115,000.00Rp. 115.00Rp.Kepala tukang 0.0001 oh 120,000.00Rp. 12.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 10,277.00Rp.

Jumlah (1) + (2) 17,961.20Rp.Keuntungan 10% 1,796.12Rp.Jumlah 19,757.32Rp.

KodeN.19. Dibulatkan 19,700.00Rp.

N.20. 1 m2 Melabur tembok lama dengan kapur sirih (pemeliharaan)1 Bahan

Perancah kayu 0.0020 m3 2,812,100.00Rp. 5,624.20Rp.Kapur sirih 0.3000 kg 2,100.00Rp. 630.00Rp.

Jumlah (1). 6,254.20Rp.

2 TenagaPekerja 0.0400 oh 66,000.00Rp. 2,640.00Rp.Tukang cat 0.0050 oh 115,000.00Rp. 575.00Rp.Kepala tukang 0.0005 oh 120,000.00Rp. 60.00Rp.

1 m2 Pengecatan tembok lama (2 lapis cat penutup)

1 m2 Pengecatan langit-langit (1 lapis plamir, 2 lapis cat penutup)

1 m2 Melabur tembok dengan kalkarium

1 m2 Melabur tembok dengan kapur sirih

Page 211: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.Jumlah (2). 3,525.00Rp.

Jumlah (1) + (2) 9,779.20Rp.Keuntungan 10% 977.92Rp.Jumlah 10,757.12Rp.

KodeN.20. Dibulatkan 10,700.00Rp.

N.21. 1 m2 Pemasangan wall paper1 Bahan

Wall paper 1.2000 m2 91,690.00Rp. 110,028.00Rp.Perekat 0.2000 kg 7,670.00Rp. 1,534.00Rp.

Jumlah (1). 111,562.00Rp.

2 TenagaPekerja 0.0200 oh 66,000.00Rp. 1,320.00Rp.Tukang cat 0.2000 oh 115,000.00Rp. 23,000.00Rp.Kepala tukang 0.0020 oh 120,000.00Rp. 240.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 24,810.00Rp.

Jumlah (1) + (2) 136,372.00Rp.Keuntungan 10% 13,637.20Rp.Jumlah 150,009.20Rp.

KodeN.21. Dibulatkan 150,000.00Rp.

N.22. 1 m2 Pengecatan permukaan baja dengan meni besi1 Bahan

Meni besi 0.1000 kg 21,640.00Rp. 2,164.00Rp.Kuas 0.0100 bh 14,200.00Rp. 142.00Rp.

Jumlah (1). 2,306.00Rp.

2 TenagaPekerja 0.0200 oh 66,000.00Rp. 1,320.00Rp.Tukang cat 0.2000 oh 115,000.00Rp. 23,000.00Rp.Kepala tukang 0.0200 oh 120,000.00Rp. 2,400.00Rp.Mandor 0.0100 oh 100,000.00Rp. 1,000.00Rp.

Jumlah (2). 27,720.00Rp.

Jumlah (1) + (2) 30,026.00Rp.Keuntungan 10% 3,002.60Rp.Jumlah 33,028.60Rp.

KodeN.22. Dibulatkan 33,000.00Rp.

N.23. 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah1 Bahan

Meni besi 0.1000 kg 21,640.00Rp. 2,164.00Rp.Kuas 0.0100 bh 14,200.00Rp. 142.00Rp.Perancah kayu 0.0020 m3 2,812,100.00Rp. 5,624.20Rp.

Jumlah (1). 7,930.20Rp.

2 TenagaPekerja 0.2500 oh 66,000.00Rp. 16,500.00Rp.Tukang cat 0.2250 oh 115,000.00Rp. 25,875.00Rp.Kepala tukang 0.0225 oh 120,000.00Rp. 2,700.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 45,825.00Rp.

Jumlah (1) + (2) 53,755.20Rp.Keuntungan 10% 5,375.52Rp.Jumlah 59,130.72Rp.

KodeN.23. Dibulatkan 59,100.00Rp.

N.24. 1 m2

1 BahanMeni (read lead) A 0.1000 kg -Rp.Meni (read lead) B 0.1000 kg -Rp.Aluminium C 0.0400 kg -Rp.

1 m2 Melabur tembok lama dengan kapur sirih (pemeliharaan)

1 m2 Pemasangan wall paper

1 m2 Pengecatan permukaan baja dengan meni besi

1 m2 Pengecatan permukaan baja dengan meni besi dan perancah

Pengecatan permukaan baja lapis seng (galbani) secaramanual sistem 4 lapis cat konvensional dengan tebal 200 um

Page 212: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Aluminium B 0.0400 kg -Rp.Pengencer 0.0100 ltr -Rp.Perancah kayu 0.0020 m3 -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.0060 oh 66,000.00Rp. 396.00Rp.Tukang cat 0.0060 oh 115,000.00Rp. 690.00Rp.Kepala tukang 0.0225 oh 120,000.00Rp. 2,700.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 4,536.00Rp.

Jumlah (1) + (2) 4,536.00Rp.Keuntungan 10% 453.60Rp.Jumlah 4,989.60Rp.

KodeN.24. Dibulatkan 4,900.00Rp.

N.25. 1 m2

1 BahanCat 0.3000 kg -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.0060 oh 66,000.00Rp. 396.00Rp.Tukang cat 0.0060 oh 115,000.00Rp. 690.00Rp.Kepala tukang 0.0225 oh 120,000.00Rp. 2,700.00Rp.Mandor 0.0075 oh 100,000.00Rp. 750.00Rp.

Jumlah (2). 4,536.00Rp.

Jumlah (1) + (2) 4,536.00Rp.Keuntungan 10% 453.60Rp.Jumlah 4,989.60Rp.

KodeN.25. Dibulatkan 4,900.00Rp.

N.26. 1 m2

1 BahanCat dasar 0.1100 kg -Rp.Cat antara 0.1700 kg -Rp.Cat penutup 0.0800 kg -Rp.

Jumlah (1). -Rp.

2 TenagaPekerja 0.5000 oh 66,000.00Rp. 33,000.00Rp.Tukang cat 0.8000 oh 115,000.00Rp. 92,000.00Rp.Kepala tukang 0.3000 oh 120,000.00Rp. 36,000.00Rp.Mandor 0.2000 oh 100,000.00Rp. 20,000.00Rp.

Jumlah (2). 181,000.00Rp.

Jumlah (1) + (2) 181,000.00Rp.Keuntungan 10% 18,100.00Rp.Jumlah 199,100.00Rp.

KodeN.26. Dibulatkan 199,100.00Rp.

N.27. 1 m2

1 BahanCat dasar 0.3000 kg 30,300.00Rp. 9,090.00Rp.

Jumlah (1). 9,090.00Rp.

2 TenagaPekerja 0.4000 oh 66,000.00Rp. 26,400.00Rp.Tukang cat 0.7000 oh 115,000.00Rp. 80,500.00Rp.

Pengecatan permukaan baja lapis seng (galvani) secara manualsistem 3 lapis cat konvensional dengan tebal 200 um

1 m2 Pengecatan permukaan baja lapis seng (galvani) secara manualsistem 3 lapis cat konvensional dengan tebal 200 um

Pengecatan permukaan baja lapis seng (galvani) secarasemprot (airless spray) dengan sistem 1 lapis cat mutakhirdengan tebal 200 um

1 m2 Pengecatan permukaan baja lapis seng (galbani) secara manualsistem 4 lapis cat konvensional dengan tebal 200 um

Pengecatan permukaan baja lapis seng (galbani) secaramanual sistem 4 lapis cat mutakhir dengan tebal 200 um

1 m2 Pengecatan permukaan baja lapis seng (galbani) secara manualsistem 4 lapis cat mutakhir dengan tebal 200 um

Page 213: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Kepala tukang 0.2000 oh 120,000.00Rp. 24,000.00Rp.Mandor 0.2000 oh 100,000.00Rp. 20,000.00Rp.

Jumlah (2). 150,900.00Rp.

Jumlah (1) + (2) 159,990.00Rp.Keuntungan 10% 15,999.00Rp.Jumlah 175,989.00Rp.

Kode

N.27. Dibulatkan 175,900.00Rp.

N.28. 1 m2 Melabur Water Profing1 Bahan

Aditif profing 0.5000 kg 135,000.00Rp. 67,500.00Rp.Jumlah (1). 67,500.00Rp.

2 TenagaPekerja 0.0280 oh 66,000.00Rp. 1,848.00Rp.Tukang cat 0.0420 oh 115,000.00Rp. 4,830.00Rp.Kepala tukang 0.0042 oh 120,000.00Rp. 504.00Rp.Mandor 0.0025 oh 100,000.00Rp. 250.00Rp.

Jumlah (2). 7,432.00Rp.

Jumlah (1) + (2) 74,932.00Rp.Keuntungan 10% 7,493.20Rp.Jumlah 82,425.20Rp.

KodeN.28. Dibulatkan 82,400.00Rp.

N.29 1 M2 Cat dinding exterior1. Bahan : - Alkalin (anti lumut) setara ICI Dulux 0.1500 Kg 70,220.00Rp 10,533.00Rp

- Cat dasar (Wathersealt) setara ICI Dulux 0.1500 Kg 34,330.00Rp 5,149.50Rp - Cat penutup (Wathersealt) setara ICI Dulux 0.2600 Kg 82,500.00Rp 21,450.00Rp - Amplas 0.2000 Lbr 5,320.00Rp 1,064.00Rp - Rool cat 0.0500 Bh 19,800.00Rp 990.00Rp

Jumlah (1). 39,186.50Rp

2. Upah : - Pekerja 0.0200 hari 66,000.00Rp 1,320.00Rp - Tukang cat 0.0630 hari 115,000.00Rp 7,245.00Rp - Kepala tukang 0.0063 hari 120,000.00Rp 756.00Rp - Mandor 0.0025 hari 100,000.00Rp 250.00Rp

Jumlah (2). 9,571.00Rp

Jumlah (1) + (2) 48,757.50Rp.Keuntungan 10% 4,875.75Rp.Jumlah 53,633.25Rp.

KodeN.29 1 M2 Cat dinding exterior Dibulatkan 53,600.00Rp.

N.30 1M2 Cat Kayu/besi Duco1. Bahan :- Meni 0.1920 kg 29,700.00 5,702.83

- Cat kayu DUCO setara mutu tinggi 0.2800 kg 74,250.00 20,786.84- Dempul duco setara mutu tinggi 0.1000 kg 50,380.00 5,038.00- Hampelas 0.4599 lb 5,320.00 2,446.75- Thiner ( minyak cat A ) 0.2300 ls 22,000.00 5,059.06

Jumlah (1). 39,033.48

2. Upah :- Pekerja 0.0500 org 66,000.00 3,300.00- Tukang Cat 0.0500 org 115,000.00 5,750.00- Kepala Tukang 0.1500 org 120,000.00 18,000.00- Mandor 0.0080 org 100,000.00 800.00

Jumlah (2). 27,850.00

Jumlah (1) + (2) 66,883.48Rp.Keuntungan 10% 6,688.35Rp.Jumlah 73,571.82Rp.

KodeN.30 1M2 Cat Kayu/besi Duco Dibulatkan 73,500.00Rp.

N.31 1m2 CAT MARKA JALAN LEBAR1. Bahan : - Cat marka KW1 1.1000 m2 74,740.00 82,214.00

1 m2 Melabur Water Profing

1 m2 Pengecatan permukaan baja lapis seng (galvani) secara semprot(airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal200 um

Page 214: ANALISA HARGA SATUAN BEKASI

HARGA JUMLAHKOEF. SAT. SATUAN HARGA

Rp. Rp.KODE URAIAN PEKERJAAN

Jumlah (1). 82,214.00

2. Upah : - Pekerja 0.120 hari 66,000.00 7,920.00 - Tukang cat 0.375 hari 115,000.00 43,125.00 - Kepala tukang 0.0375 hari 120,000.00 4,500.00 - Mandor 0.0060 hari 100,000.00 600.00

Jumlah (2). 56,145.00

Jumlah (1) + (2) 138,359.00Keuntungan 10% 13,835.90

Kode Jumlah 152,194.901m' Cat marka jalan l= 5 cm Dibulatkan 7,610.00

N.31 1m' Cat marka jalan l=10 cm Dibulatkan 15,219.001m' Cat marka jalan l=15 cm Dibulatkan 22,829.00

PEKERJAAN FINISHING CATN.32. 1 1 M² Cat Interior / Pengecatan Acrilyc Emulsion 18,480.00

Plamir tembok 0.1000 kg 11,000.00 1,100.00Cat dasar/alkaly polimer 0.1000 kg 25,000.00 2,500.00Cat penutup 2x setara vinilex 0.2600 kg 33,000.00 8,580.00Pekerja 0.0200 org 60,000.00 1,200.00Tukang cat 0.0630 org 70,000.00 4,410.00Kepala tukang 0.0063 org 75,000.00 472.50Mandor 0.0025 org 85,000.00 212.50

Jumlah 18,475.00N.33. 2 1 M² Pek. Pengecatan Eksterior setara cat weathershield 25,670.00

Cat dasar 0.1000 kg 25,000.00 2,500.00Cat penutup 2 kali 0.2600 kg 50,000.00 13,000.00Perancah kayu 1.0000 ls 3,875.00 3,875.00Pekerja 0.0200 org 60,000.00 1,200.00Tukang cat 0.0630 org 70,000.00 4,410.00Kepala Tukang 0.0063 org 75,000.00 472.50Mandor 0.0025 org 85,000.00 212.50

Jumlah 25,670.00