JADWAL PELAKSANAAN PEKERJAANSATUAN KERJA SEMENTARA BRR-INFRASTRUKTUR KAWASAN DAN PERMUKIMAN
NAMA PAKET : PRASARANA DASAR PERMUKIMAN KAWASAN GAMPONG BLANG-LAMJABATNO./KODE PAKET : IKP-I.1.1KONTRAKTOR : PT.YUDHA BAKTI UTAMALOKASI : PROVINSI NANGGROE ACEH DARUSSALAMKONSULTAN :
ITEM U R A I A N SAT. HARGA
KONTRAK AWALJADWAL KEGIATAN PEKERJAAN
TAHUN 2006 / 2007
VOLUME JUMLAH HARGA BOBOT %
,NOVEMBER 2006 DESEMBER 2006 JANUARI 2007 FEBRUARI 2007 KET.SATUAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 18
8 15 24 29 6 13 20 24 3 10 17 24 1 8 135 9 16 25 31 7 14 21 25 4 11 18 25 2 9
A. PEKERJAAN JALANI DIVISI 1. U M U M
1.2 MobilisasiLs 86,930,000.00 1.00 86,930,000.00 1.118
II DIVISI 3. PEKERJAAN TANAH
3.1 (1) Galian Biasa36,754.55 608.12 22,351,176.95 0.287
3.2 (1) Timbunan Biasa113,362.83 2,871.50 325,521,366.35 4.185
3.2 (2) Timbunan Pilihan52,228.29 9,080.50 474,258,987.35 6.097
3.3 Penyiapan Badan Jalan2,838.48 19,250.00 54,640,740.00 0.703
III DIVISI 5. PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A335,288.11 2,100.00 704,105,031.00 9.053
5.1 (2) Lapis Pondasi Agregat Kelas B276,079.11 2,800.00 773,021,508.00 9.939
IV DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap PengikatLtr 8,160.54 21,175.00 172,799,434.50 2.222
6.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm1,665,208.06 700.00 1,165,645,642.00 14.986
6.6 Lapis Penetrasi Macadam ( Permukaan )1,105,898.34 367.50 406,417,639.95 5.225
V DIVISI 7. STRUKTUR
7.9 Pasangan Batu525,804.16 661.00 347,556,549.76 4.468
VI DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4 (1) Marka Jalan Bukan Thermoplastic118,629.50 313.63 37,205,770.09 0.478
B. PEKERJAAN DRAINASE
1 Galian Tanah24,237.50 9,329.71 226,128,846.12 2.907
2 Urugan Pasir93,695.00 1,320.44 123,718,625.80 1.591
3 Pekerjaan Saluran Batu Belah510,346.00 1,225.44 625,398,402.24 8.041
4 Plesteran24,583.80 2,376.55 58,424,629.89 0.751
5 Pekerjaan Saluran Beton649,447.98 573.25 372,296,054.53 4.787
6 Acian7,524.00 11,105.71 83,559,362.04 1.074
7 Kerb101,816.50 1,057.50 107,670,948.75 1.384
8 Paving Block79,913.40 1,109.00 88,623,960.60 1.139
9 Suling-suling5,134.25 1,959.00 10,057,995.75 0.129
10 Beton Penutup Saluran2,450,230.00 184.50 452,067,435.00 5.812
11 Begisting Tutup Saluran69,657.50 36.37 2,533,443.28 0.033
C. PEKERJAAN AIR BERSIHI PEKERJAAN PERSIAPAN
1 Mobilisasi dan DemobilisasiLs 2,000,000.00 2.00 4,000,000.00 0.051
2 Pengukuran dan PematokanLs 1,000,000.00 2.00 2,000,000.00 0.026
II PEMASANGAN PIPA DAN ACCESSORIES
1 ND. 100 MMM 17,174.65 780.00 13,396,227.00 0.172
2 ND. 75 MMM 14,347.24 546.00 7,833,593.04 0.101
3 ND. 50 MMM 13,717.06 2,950.00 40,465,327.00 0.520
4 ND. 40 MMM 11,435.06 4,929.00 56,363,410.74 0.725
III PENGETESAN PIPA
1 ND. 100 MMM 1,255.00 780.00 978,900.00 0.013
2 ND. 75 MMM 1,013.00 546.00 553,098.00 0.007
3 ND. 50 MMM 784.00 2,950.00 2,312,800.00 0.030
4 ND. 40 MMM 784.00 4,929.00 3,864,336.00 0.050
IV DESINFEKSI PIPA
1 ND. 100 MMM 694.00 780.00 541,320.00 0.007
2 ND. 75 MMM 545.00 546.00 297,570.00 0.004
3 ND. 50 MMM 409.00 2,950.00 1,206,550.00 0.016
4 ND. 40 MMM 409.00 4,929.00 2,015,961.00 0.026
V PEMASANGAN SAMBUNGAN RUMAH
1 PEMASANGAN SAMBUNGAN RUMAHM 230,000.00 125.00 28,750,000.00 0.370
VI PEKERJAAN LAIN-LAIN
1 AS BUILT DRAWINGLs 200,000.00 2.00 400,000.00 0.005
D. PEKERJAAN AIR KOTOR
1 JUMLAH TOTAL PEKERJAAN AIR KOTORLs 87,369,122.71 1.00 87,369,122.71 1.123
E. PEKERJAAN PERSAMPAHAN
1 JUMLAH TOTAL PEKERJAAN PERSAMPAHANLs 97,881,664.87 1.00 97,881,664.87 1.258
F. PEKERJAAN LAND SCAPE
1 JUMLAH TOTAL PEKERJAAN LAND SCAPELs 706,853,127.36 1.00 706,853,127.36 9.088
(A) J U M L A H 7,778,016,557.66 100.00
(B) PPN 10 % (A x 10 %) 777,801,655.77
(C) JUMLAH TOTAL (A + B) 8,555,818,213.42
(D) DIBULATKAN 8,555,816,000.00
RENCANA PEKERJAAN PERMINGGU
RENCANA PEKERJAAN KOMULATIF ( PERMINGGU )
RENCANA PEKERJAAN PERMINGGU ( C.C.O )
RENCANA PEKERJAAN KOMULATIF ( C.C.O )
REALISASI KEMAJUAN KERJA PERMINGGU
REALISASI KEMAJUAN KERJA KOMULATIF ( PER MINGGU )
DEVIASI
Mengetahui Diperiksa Oleh Dibuat Oleh
Kepala Satuan Kerja Sementara Konsultan Pengawas Kontraktor Pelaksana
BRR - Infrastruktur Kawasan dan Permukiman NAD NAMA PERUSAHAAN NAMA PERUSAHAAN
N A M A N A M A N A M ANIP. Team Leader / Co Team Leader Direktur Utama/General Superintendent
M3
M3
M3
M2
M3
M3
M3
M3
M3
M1
M3
M3
M3
M2
M3
M2
M1
M2
M1
M3
M2