PT. TIARA METROPOLITAN JAYAPROYEK CENTRAL PARK - JAKARTA
HARGA SATUAN PEK. UMUM
NO PEKERJAAN SAT KESEPAKATAN
HARGA KONTRAKTOR
A PEKERJAAN UMUM
1 BUANG SAMPAH
Colt diesel 4 ban rit 90,000
Colt diesel 6 ban rit 170,000
2 Bobok beton & Buang
Bobok balok beton & buang puing m3 400,000
Bobok beton lantai & buang puing m2 125,000
3 Pasangan dinding Celcon
a. Bobok pasangan dinding Celcon + m2 17,500
buang puing masukkan dlm karung sampai bersih
b. Pasang bata ringan ex. Primacon, Hebel, Leichtbrick
termasuk balok & kolom praktis (per 12 m2)
tebal dinding 7.5 cm m2 100,000
tebal dinding 10 cm m2 110,000
c. Plester acian m2 43,000
d. Perapihan sisi bekas bobokan m 8,000
Pasang Partisi
a. Triplek 4 mm 1 muka Rp/m2 rangka kaso 40x60 m2 95,000
b. Gypsum 12 mm 1 muka rangka hollow 40x40 m2 125,000
(t = 0.75 mm)
c. Gypsum 12 mm 2 muka rangka hollow 40x40 m2 150,000
(t = 0.75 mm)
d. Gypsum 9 mm 1 muka rangka hollow 40x40 m2 100,000
(t = 0.75 mm)
e. Gypsum 9 mm 2 muka rangka hollow 40x40 m2 125,000
(t = 0.75 mm)
f. Gypsum 12 mm 1 muka rangka hollow 40x40 + m2 135,000
+ tatakan tripleks + cove + support (khusus utk hording)
(t = 0.75 mm)
g. Pintu bahan tripleks t=5mm 1 sisi rangka kaso 4x6 bh 250,000
+ kusen + engsel + gembok (uk. 0,8 x 2,2 m)
4 Bongkar Partisi & Pembersihkan m2 7,500
5 Cat emulsi Catylac (touch up, aneka warna) m2 13,500
Upah pekerjaan cat emulsi Catylac (material by project) m2 7,000
6 Cat minyak Ftalit (touch up, aneka warna) m2 17,500
Cat minyak Ftalit (material by project) m2 8,500
7 Upah ganti Bohlam (material bohlam by owner)
a. Tinggi s/d 3 m bh 5,000
b. Tinggi s/d 6 m bh 15,000
c. Tinggi s/d 9 m bh 30,000
8 Pindahkan pohon (gali & tanam kembali)
a. Tinggi 1 m bh 60,000
b. Tinggi 2 m bh 90,000
c. Tinggi 3 m bh 120,000
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN, PROTEKSI, DLL)
2/14
HARGA SATUAN PEK. UMUM
NO PEKERJAAN SAT KESEPAKATAN
HARGA KONTRAKTOR
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN, PROTEKSI, DLL)
d. Diluar Pohon (semak & perdu) m2 20,000
9 Lain-lain
Penyiraman jalan dengan air bogor 5.000 liter mobil 450,000
Penyiraman jalan dengan air bogor 8.000 liter mobil 550,000
Cleaning Jalanan m2 7,500
3/14
HARGA SATUAN PEK. UMUM
NO PEKERJAAN SAT KESEPAKATAN
HARGA KONTRAKTOR
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN, PROTEKSI, DLL)
10 a. Bongkar pasang Homogenous Tile termasuk adhesive + m2 80,000
naad grouting, eks bongkaran dibuang sampai bersih (material by owner)
b. Bongkar pasang Ceramic Tile semua ukuran termasuk adhesive + m2 70,000
naad grouting, eks bongkaran dibuang sampai bersih (material by owner)
c. Bongkar pasang Marmer semua ukuran termasuk adhesive + m2 120,000
naad grouting, eks bongkaran dibuang sampai bersih (material by owner)
11 Repair Bocor plat KM/dinding KM
- Waterproofing coating (2 x coating) termasuk test rendam m2 50,000
- Waterproofing membrane (1 layer) m2 80,000
- Bongkar pasang keramik m2 70,000
- Perapihan & Pembersihan m2 5,000
12 Geser/pindah titik-titik ME radius max. 3 m termasuk perapihan :
a. Lampu (termasuk tambahan kabel max. 3 m) titik 75,000
b. Stop kontak (termasuk tambahan kabel max. 3 m) titik 75,000
13 Bongkar pasang pintu kayu unit 175,000
a. Pintu Panel unit 175,000
b. Pintu double teakwood unit 150,000
14 Skim coat m2 30,000
15 Repair trowel finish lantai parkir m2 30,000
16 Bongkar pasang wire mesh diatas celcon m 20,000
17 Repair sealant façade (diluar sewa gondola) m 17,000
(untuk alum, precast & GRC)
18 Pembersihan façade dari kotoran cat, dll m2 5,000
19 Perbaikan batu alam di area landscape (material by owner) m2 25,000
20 Bongkar dan pasang Island m2 40,000
Bongkar pasang car Stopper di area Parkir termasuk angkur epoxy bh 80,000
21 Cat thermoplastic untuk marka di area parkir m1 12,000
Pek Polish Lantai Marmer m2 11,000
Pek Pembersihan (bapping) Lantai Keramik m2 2,500
23 Pek. Pengecatan Ballustrade m1 10,000
24 Pek. Pengecatan Handrail m1 10,000
25 Pek. Penggantian Kaca Interior (upah) -> resiko pecah by contractor m2 100,000
26 Cleaning daun pintu bh 15,000
Cleaning dinding kaca dalam m2 5,000
Repair daun pintu bh 25,000
Cleaning Escalator (step & cladding) unit 50,000
Cleaning Travelator (step & cladding) unit 75,000
Cleaning Car lift unit 50,000
28 Bongkar pasang plafon gypsumboard (termasuk ganti gypsum) m2 50,000
29 Coring lantai dia. 6" + grouting titik 127,000
30 Coring lantai dia. 4" + grouting titik 110,000
31 Screeding lantai 5-7cm m2 35,000
32 Pasang dinding wiremesh M4 (material + upah + material support) m2 140,000
33 Riser lantai (peninggian lantai), tbl. 10-20cm bahan pasir urug m2 40,000
34 Upah pasang sanitair (termasuk sealant) unit
- Monobloc unit 75,000
- Wastafel unit 50,000
4/14
HARGA SATUAN PEK. UMUM
NO PEKERJAAN SAT KESEPAKATAN
HARGA KONTRAKTOR
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN, PROTEKSI, DLL)
- Urinoir unit 50,000
- Kran set, shower spray unit 20,000
- Floor drain unit 20,000
- Tempat sambun unit 10,000
- Tempat tisue unit 10,000
5/14
HARGA SATUAN PEK. UMUM
NO PEKERJAAN SAT KESEPAKATAN
HARGA KONTRAKTOR
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN, PROTEKSI, DLL)
35 Bongkar pasang sanitair (material lama masih bisa dipasang)
- Monobloc unit 93,750
- Wastafel unit 62,500
- Urinoir unit 62,500
PEKERJAAN ME
1 Penarikan kabel feeder + kabel grounding
- uk. NA2XY 4 x120mm2 + Al PVC 70 mm2 meter -
- uk. NA2XY 4 x95mm2 + Al PVC 50 mm2 meter -
- uk. NA2XY 4 x70mm2 + Al PVC 35 mm2 meter -
- uk. NYY 4x50mm2 + BC meter -
- uk. NYY 4x35mm2 + BC meter -
- uk. NYY 4x25mm2 + BC meter -
2 Testing & commissioning
- Instalasi listrik ls -
- Test tekan ls -
- Test gelontor ls -
3 Pengadaan & pemasangan MCCB ex. ABB
dalam variable BC (breaking capacity)
- 630A / 3phase unit 7,331,940
- 400A / 3phase unit 4,887,960
- 250A / 3phase unit 1,925,560
- 200A / 3phase unit 1,925,560
- 125A / 3phase unit 1,502,360
- 100A / 3phase unit 1,280,180
- 80A / 3phase unit 1,280,180
- 63A / 3phase unit 1,280,180
- 50A / 3phase unit 1,280,180
- 40A / 3phase unit 1,280,180
- 32A / 3phase unit 1,280,180
- 25A / 3phase unit 1,142,640
- 20A / 3phase unit 814,660
- 16A / 3phase unit 814,660
- 10A / 3phase unit 814,660
4 Pengadaan & pemasangan panel listrik unit -
Pengadaan & pemasangan panel listrik inch -
5 Arde tanah / grounding panel titik -
dalam variable kapasitas panel
6 Pengadaan & pemasangan KWH meter unit -
7 Pasang pipa air kotor, air bekas
- PVC dia. 6" AW meter 160,949
- PVC dia. 4" AW meter 84,529
- PVC dia. 3" AW meter 57,273
- PVC dia. 2½" AW meter 44,335
- PVC dia. 2" AW meter 37,550
- PVC dia. 1½" AW meter 19,690
6/14
HARGA SATUAN PEK. UMUM
NO PEKERJAAN SAT KESEPAKATAN
HARGA KONTRAKTOR
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN, PROTEKSI, DLL)
- PVC dia. 1" AW meter 15,720
7/14
HARGA SATUAN PEK. UMUM
NO PEKERJAAN SAT KESEPAKATAN
HARGA KONTRAKTOR
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN, PROTEKSI, DLL)
8 Pasang pipa gas
- GIP dia. 25mm meter 81,188
* Sch 40 BSP Sch 40 (Alt) meter 262,877
- GIP dia. 32mm meter 106,674
* Sch 40 BSP Sch 40 (Alt) meter 316,434
- GIP dia. 50mm meter 168,804
* Sch 40 BSP Sch 40 (Alt) 427,565
- Meter gas
* Dia. 1" unit -
* Dia. 3/4" unit -
- Panel Detector unit -
- Valve Gate
- 25 unit 254,380
- 32 unit 604,448
- 50 unit 1,258,392
9 Pasang pipa air bersih
- GIP dia. 25mm meter 81,188
* Sch 40 BSP Sch 40 (Alt) meter 262,877
- GIP dia. 32mm meter 106,674
* Sch 40 BSP Sch 40 (Alt) meter 316,434
- GIP dia. 50mm meter 168,804
* Sch 40 BSP Sch 40 (Alt) 427,565
- Meter air unit -
- Valve unit -
10 Pengadaan & pemasangan ducting (non insulation)
- BJLS 50 LOKFOM m2 157,850
- BJLS 60 LOKFOM m2 179,830
- BJLS 80 LOKFOM m2 223,750
- BJLS 100 LOKFOM m2 264,130
- BJLS 120 LOKFOM m2 306,160
11 Pengadaan & pemasangan ducting + insulation ABBWOOL
- BJLS 50 LOKFOM m2 220,000
- BJLS 60 LOKFOM m2 255,000
- BJLS 80 LOKFOM m2 300,000
- BJLS 100 LOKFOM m2 375,000
- BJLS 120 LOKFOM m2 475,000
8/14
HARGA UNTUK
TENANT
110,000
200,000
460,000
150,000
30,000
120,000
130,000
50,000
10,000
110,000
150,000
180,000
120,000
150,000
160,000
290,000
10,000
20,000
10,000
30,000
10,000
10,000
20,000
40,000
70,000
110,000
140,000
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN,
9/14
HARGA UNTUK
TENANT
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN,
30,000
520,000
640,000
10,000
10/14
HARGA UNTUK
TENANT
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN,
100,000
90,000
140,000
60,000
100,000
90,000
10,000
90,000
90,000
210,000
210,000
180,000
40,000
40,000
30,000
20,000
10,000
30,000
50,000
100,000
20,000
20,000
10,000
20,000
20,000
120,000
20,000
10,000
30,000
60,000
90,000
60,000
60,000
150,000
130,000
50,000
170,000
50,000
90,000
60,000
11/14
HARGA UNTUK
TENANT
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN,
60,000
30,000
30,000
20,000
20,000
12/14
HARGA UNTUK
TENANT
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN,
110,000
80,000
80,000
-
-
-
-
-
-
-
-
-
8,440,000
5,630,000
2,220,000
2,220,000
1,730,000
1,480,000
1,480,000
1,480,000
1,480,000
1,480,000
1,480,000
1,320,000
940,000
940,000
940,000
-
-
-
-
-
190,000
100,000
70,000
60,000
50,000
30,000
13/14
HARGA UNTUK
TENANT
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN,
20,000
14/14
HARGA UNTUK
TENANT
(HARGA SATUAN SUDAH TERMASUK SEMUA PEKERJAAN PERSIAPAN, AIR, LISTRIK KERJA, ASURANSI PEKERJA, PEMBERSIHAN,
100,000
310,000
130,000
370,000
200,000
500,000
-
-
-
300,000
700,000
1,450,000
100,000
310,000
130,000
370,000
200,000
500,000
-
-
190,000
210,000
260,000
310,000
360,000
260,000
300,000
350,000
440,000
550,000