  • 7/26/2019 Copy of GUDANG TC PROGRES Harga Addendum - Pengajuan

    1/1

    Ongkos,

    Matrial ,

    Alat berat

    I PEKERJAAN PINTU GERBANG , PERKUATAN

    1 Satu Set pintu gerbang t. 2,5 m x 11 m (merah) 27.5 m2

    1,600,000 44,000,000 25,000,000

    - UNP 8

    - hollow 5 (3 mm)- siku 5

    - Plat galvanis 2 mm

    - ornamen

    - roda D14

    2 Satu Set pintu gerbang kupu- kupu t. 2,5 m x 9.3 m 23.3 m2

    1,600,000 37,200,000 37,200,000

    - UNP 8, hollow 2mm

    - Plat galvanis 2 mm

    - Dua (2) set tiang (full cor) 2.0 set 5,000,000 10,000,000 10,000,000

    3 Akses masuk -

    - Pengaspalan Jalan masuk

    * Hotmix/Sensit 15.2 ton 1,600,000 24,384,000 24,384,000

    * Primer 40.0 ltr 21,000 840,000 840,000

    * Upah gelar 39.2 m2

    25,000 980,000 980,000

    * Pemadatan (stum - sewa + mobdemob) 1.0 ls 4,000,000 4,000,000 4,000,000

    102,404,000

    II PEKERJAAN PEMINDAHAN TIANG

    1 Tiang Listrik- Material tiang listrik 1.0 set 4,213,000 4,213,000 4,213,000

    - Jasa pemindahan ls 1,897,371 1,897,371 1,897,371

    - Beban pemadaman ls 2,920,000 2,920,000 2,920,000

    2 Tiang Telpon 4.0 set 1,500,000 6,000,000 6,000,000

    15,030,371

    III PEKERJAAN SALURAN/ DRAINASE

    1 Gorong-gorong saluran

    - 2 Pipa beton diameter 40 cm x 13 m' 26.0 m' 500,000 13,000,000 13,000,000

    - Pancang 40 x 40 (dua sisi) x 13 m' 26.0 m' 500,000 13,000,000 13,000,000

    2 Valve (outlet) buangan air hujan 75.0 pcs 54,000 4,050,000 4,050,000

    3 Pekerjaan Pasangan Batu Kali 2 sisi (pemasangan + repair) 70.0 m' 675,000 47,250,000 47,250,000

    1 pc : 6 psr

    4 Tutup saluran (deker) 70.0 m' 320,000 22,400,000 22,400,000

    99,700,000

    IV PEKERJAAN PEMBONGKARAN PAGAR PANEL

    1 Pembongkaran panel (jasa + material loss) 14 m' 670,000 9,380,000 9,380,000

    2 Pembongkaran Ring balok (jasa + material loss) 14 m' 70,000 980,000 980,0003 Pembongkaran Sloof (jasa + material loss) 14 m' 95,000 1,330,000 1,330,000

    4 Pembongkaran Slab + Pancang (jasa + material loss) 12 m' 750,000 9,000,000 9,000,000

    - Sewa Excavator 25 jam (termasuk mobdemob, uang makan operator) 25 jam 7,500,000 7,500,000

    - Solar 25 jam 250 Ltr 11,900 2,975,000 2,975,000

    31,165,000

    V PEKERJAAN CUTTING DAN SILENT BETON

    (material aspal + jasa cutting beton dan aplikasi aspal)

    - Bentangan melintang 2,085.6 m' 32,000 66,739,840 66,739,840

    - Bentangan membujur 1,768.7 m' 32,000 56,597,440 56,597,440

    123,337,280

    Jumlah Total 371,636,651 -

    PENGAJUAN PENAWARAN ADDENDUM PEKERJAAN

    Bekasi, 08 Oktober 2015

    Eko Mustofa Wahyudi

    STOCK YARD PT CAHAYA INDOTAMA ENGINEERING CIBITUNG

    No. JENIS PEKERJAAN VOL SAT JUMLAH TOTAL