RENCANA WAKTU PELAKSANAAN RENCANA WAKTU PELAKSANAAN ( S - CURVE ) PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE SUMBER DANA : DAK TAHUN ANGGARAN : 2009 VOLUME : 1 (Satu) Unit LOKASI : KECAMATAN TIMANG GAJAH KABUPATEN BENER MERIAH DISIAPKAN OLEH : CV. AFIFI PUTRI NO URAIAN JENIS PEKERJAAN JUMLAH HARGA % BOBOT BULAN KE I BULAN KE II BULAN KE III (RP) PEK. I. PEKERJAAN PERSIAPAN Rp 4,190,500.00 2.24 II. PEKERJAAN TANAH Rp 2,505,759.20 1.34 III. PEKERJAAN BATU, PASANGAN, DAN PLASTERAN Rp 45,371,263.10 24.26 IV. PEKERJAAN BETON BERTULANG Rp 51,677,093.88 27.64 V. PEKERJAAN KUSEN, PINTU, JALUSI DAN PLAFOND Rp 17,966,121.80 9.61 VI. PEKERJAAN KUDA KUDA DAN ATAP Rp 34,457,681.00 18.43 VII. PEKERJAAN LANTAI Rp 11,111,520.44 5.94 VIII. PEKERJAAN SANITASI AIR Rp 3,174,864.90 1.70 IX. PEKERJAAN INSTALASI LISTRIK Rp 4,456,300.00 2.38 X PEKERJAAN FINISHING DAN PENGECATAN Rp 7,485,453.10 4.00 XI PEKERJAAN WASTAPLE DAN DAPUR Rp 2,751,494.20 1.47 XII. PEKERJAAN LAIN LAIN Rp 1,850,000.00 0.99 JUMLAH TOTAL Rp 186,998,051.62 100.00 BOBOT RENCANA 1.20 1.20 2.54 4.93 9.53 9.53 12.74 17.34 12.49 12.26 9.35 BOBOT RENCANA KOMULATIF - 1.20 3.73 8.66 18.20 27.73 40.47 57.81 70.30 82.56 91.91 BENE M 1 M 2 M 3 M 4 M 5 M 6 M 7 M 8 M 9 M 10 M 11 1 2 3 4 5 6 7 8 9 10 11 12 - 1.20 3.73 8.66 18.20 27.73 40.47 57.81 70.30 82.56 91.91

Upload: mario-nocherino

Post on 05-Dec-2014

112 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Boq Polindes Kp Setie

RENCANA WAKTU PELAKSANAAN

RENCANA WAKTU PELAKSANAAN ( S - CURVE )PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE SUMBER DANA : DAK TAHUN ANGGARAN : 2009 VOLUME : 1 (Satu) Unit LOKASI : KECAMATAN TIMANG GAJAH KABUPATEN BENER MERIAH DISIAPKAN OLEH : CV. AFIFI PUTRI

NO URAIAN JENIS PEKERJAAN JUMLAH HARGA % BOBOT BULAN KE I BULAN KE II BULAN KE IIIKET

(RP) PEK. M13 -1 Hari I. PEKERJAAN PERSIAPAN Rp 4,190,500.00 2.24

MA

SA

PEM

ELIH

AR

AA

N 1

80 H

AR

I

II. PEKERJAAN TANAH Rp 2,505,759.20 1.34

III. PEKERJAAN BATU, PASANGAN, DAN PLASTERAN Rp 45,371,263.10 24.26

IV. PEKERJAAN BETON BERTULANG Rp 51,677,093.88 27.64

V. PEKERJAAN KUSEN, PINTU, JALUSI DAN PLAFOND Rp 17,966,121.80 9.61

VI. PEKERJAAN KUDA KUDA DAN ATAP Rp 34,457,681.00 18.43

VII. PEKERJAAN LANTAI Rp 11,111,520.44 5.94

VIII. PEKERJAAN SANITASI AIR Rp 3,174,864.90 1.70

IX. PEKERJAAN INSTALASI LISTRIK Rp 4,456,300.00 2.38

X PEKERJAAN FINISHING DAN PENGECATAN Rp 7,485,453.10 4.00

XI PEKERJAAN WASTAPLE DAN DAPUR Rp 2,751,494.20 1.47

XII. PEKERJAAN LAIN LAIN Rp 1,850,000.00 0.99

JUMLAH TOTAL Rp 186,998,051.62 100.00

BOBOT RENCANA 1.20 1.20 2.54 4.93 9.53 9.53 12.74 17.34 12.49 12.26 9.35 6.46 1.55

BOBOT RENCANA KOMULATIF - 1.20 3.73 8.66 18.20 27.73 40.47 57.81 70.30 82.56 91.91 98.38 100.00

BENER MERIAH, 18 AGUSTUS 2009

PENAWAR

CV. AFIFI PUTRI

SUNARDI

KUASA DIREKTUR

MASA PEMELIHARAAN M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12

1 2 3 4 5 6 7 8 9 10 11 12 13 - 1.20

3.73

8.66

18.20

27.73

40.47

57.81

70.30

82.56

91.91

98.38 100.00

D4
Author:
Page 2: Boq Polindes Kp Setie

RENCANA WAKTU PELAKSANAAN

RENCANA WAKTU PELAKSANAAN ( TIME SCHEDULE )

PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE SUMBER DANA : DAK TAHUN ANGGARAN : 2009 VOLUME : 1 (Satu) Unit DISIAPKAN OLEH : CV. AFIFI PUTRI

NO URAIAN JENIS PEKERJAAN JUMLAH HARGA % BOBOT BULAN KE I BULAN KE II BULAN KE III KET

(RP) PEK.

I. PEKERJAAN PERSIAPAN Rp 4,190,500.00 2.24 1.12 1.12 1.12

MA

SA

PEM

ELIH

AR

AA

N 1

80 H

AR

I

II. PEKERJAAN TANAH Rp 2,505,759.20 1.34 1.34

III. PEKERJAAN BATU, PASANGAN, DAN PLASTERAN Rp 45,371,263.10 24.26 4.85 4.85 4.85 4.85 4.85

IV. PEKERJAAN BETON BERTULANG Rp 51,677,093.88 27.64 4.61 4.61 4.61 4.61 4.61 4.61

V. PEKERJAAN KUSEN, PINTU, JALUSI DAN PLAFOND Rp 17,966,121.80 9.61 3.20 3.20 3.20

VI. PEKERJAAN KUDA KUDA DAN ATAP Rp 34,457,681.00 18.43 4.61 4.61 4.61 4.61

VII. PEKERJAAN LANTAI Rp 11,111,520.44 5.94 2.97 2.97

VIII. PEKERJAAN SANITASI AIR Rp 3,174,864.90 1.70 1.70

IX. PEKERJAAN INSTALASI LISTRIK Rp 4,456,300.00 2.38 2.38

X PEKERJAAN FINISHING DAN PENGECATAN Rp 7,485,453.10 4.00 4.00

XI PEKERJAAN WASTAPLE DAN DAPUR Rp 2,751,494.20 1.47 1.47

XII. PEKERJAAN LAIN LAIN Rp 1,850,000.00 0.99 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

JUMLAH TOTAL Rp 186,998,051.62 100.00

BOBOT RENCANA 1.20 1.20 2.54 4.93 9.53 9.53 12.74 17.34 12.49 12.26 9.35 6.46 1.55

BOBOT RENCANA KOMULATIF 1.20 3.73 8.66 18.20 27.73 40.47 57.81 70.30 82.56 91.91 98.38 100.00

BENER MERIAH, 18 AGUSTUS 2009

PENAWARCV. AFIFI PUTRI

SUNARDI

KUASA DIREKTUR

MASA PEMELIHARAAN M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12

M13 -1 Hari

Page 3: Boq Polindes Kp Setie

REKAPITULASI DAFTAR KUANTITAS DAN HARGA

NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KESEHATAN

KABUPATEN BENER MERIAH

PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE

SUMBER DANA : DAK

TAHUN ANGGARA : 2009

VOLUME : 1 (Satu) Unit

LOKASI : KECAMATAN TIMANG GAJAH KABUPATEN BENER MERIAH

DISIAPKAN OLEH : CV. AFIFI PUTRI

NO URAIAN / JENIS PEKERJAAN

1 2 3

I. PEKERJAAN PERSIAPAN 4,190,500.00

II. PEKERJAAN TANAH 2,505,759.20

III. PEKERJAAN BATU, PASANGAN, DAN PLASTERAN 45,371,263.10

IV. PEKERJAAN BETON BERTULANG 51,677,093.88

V. PEKERJAAN KUSEN, PINTU, JALUSI DAN PLAFOND 17,966,121.80

VI. PEKERJAAN KUDA KUDA DAN ATAP 34,457,681.00

VII. PEKERJAAN LANTAI 11,111,520.44

VIII. PEKERJAAN SANITASI AIR 3,174,864.90

IX. PEKERJAAN INSTALASI LISTRIK 4,456,300.00

X PEKERJAAN FINISHING DAN PENGECATAN 7,485,453.10

XI PEKERJAAN WASTAPLE DAN DAPUR 2,751,494.20

XII. PEKERJAAN LAIN LAIN 1,850,000.00

JUMLAH 186,998,051.62

PPN 10 % 18,699,805.16

TOTAL 205,697,856.78

DIBULATKAN 205,697,000.00

Terbilang : Dua Ratus Lima Juta Sembilan Ratus Enam Puluh Tujuh Ribu Rupiah

BENER MERIAH, 18 AGUSTUS 2009

PENAWAR

CV. AFIFI PUTRI

SUNARDI

KUASA DIREKTUR

JUMLAH HARGA SATUAN (Rp)

Page 4: Boq Polindes Kp Setie

DAFTAR KUANTITAS DAN HARGA

NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KESEHATAN: KABUPATEN BENER MERIAH

PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE SUMBER DANA : DAK TAHUN ANGGARAN : 2009 VOLUME : 1 (Satu) Unit LOKASI : KECAMATAN TIMANG GAJAH KABUPATEN BENER MERIAH DISIAPKAN OLEH : CV. AFIFI PUTRI

NO URAIAN / JENIS PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5 6 7

I. PEKERJAAN PERSIAPAN 1 Pembersihan Lapangan 113.000 M2 SNI-03-2835-6.8 6,500.00 734,500.00 2 Pengukuran Dan Pemasangan Bowplank 40.000 M1 SNI-03-2835-6.4 61,400.00 2,456,000.00 3 Mobilisasi dan Demobilisasi 1.000 Ls Taksir 500,000.00 500,000.00 4 Pondok Kerja (Sewa) 1.000 Ls Taksir 500,000.00 500,000.00

Jumlah 4,190,500.00 II. PEKERJAAN TANAH 1 Galian Tanah Pondasi 54.735 M3 SNI-03-2829-6.1 18,000.00 985,230.00 2 Urugan Kembali Bekas Galian 13.683 M3 SNI-03-2829-6.9 8,600.00 117,673.80 3 Urugan Tanah Dalam Bangunan 9.680 M3 SNI-03-2829-6.9,A 62,000.00 600,160.00 4 Urugan Pasir Untuk Pondasi 3.219 M3 SNI-03-2829-6.11 86,600.00 278,765.40 5 Urugan Pasir Dalam Bangunan 6.050 M3 SNI-03-2829-6.11 86,600.00 523,930.00

Jumlah 2,505,759.20

III. PEKERJAAN BATU, PASANGAN, DAN PLASTERAN 1 Pasangan Batu Kosong / Aanstamping 6.439 M3 SNI-03-2836-6.14 182,300.00 1,173,829.70 2 Pasangan Pondasi Batu Kali 1 : 3 25.042 M3 SNI-03-2836-6.5 428,200.00 10,722,984.40 3 Pasangan Dinding Bata (1/2 Bata) 1 : 4 186.707 M2 SNI-03-2838-6.11 71,800.00 13,405,562.60 4 Plasteran Dinding Bata 1 : 4 347.765 M2 SNI-03-2837-6.15 27,100.00 9,424,431.50 5 Pasangan Dinding Bata (1/2 Bata) 1 : 2 27.775 M2 SNI-03-2838-6.9 79,800.00 2,216,445.00 6 Plasteran Dinding Bata 1 : 2 43.781 M2 SNI-03-2837-6.2 30,600.00 1,339,698.60 7 Plasteran Plat Dag 1 : 2 46.000 M2 SNI-03-2837-6.15 27,100.00 1,246,600.00 8 Plasteran Kolom Balok teras 1 : 4 12.927 M2 SNI-03-2830-6.1 451,900.00 5,841,711.30

Jumlah 45,371,263.10

IV PEKERJAAN BETON BERTULANG 1 Sloof 1 : 2 : 3 15/18 Cm 1.775 M3 SNI-03-2830-6.39 4,059,077.00 7,204,861.68 2 Kolom 15/15 Cm 1.440 M3 SNI-03-2830-6.40 7,090,500.00 10,210,320.00 3 Kolom 13/13 Cm 0.676 M3 SNI-03-2830-6.40 7,090,500.00 4,793,178.00 4 Ring Balok 15/18 Cm 1.039 M3 SNI-03-2830-6.41 7,090,500.00 7,367,029.50 5 Ring Balok 13/18 Cm 0.817 M3 SNI-03-2830-6.42 4,833,800.00 3,949,214.60 6 Ring Balok Late 10/10 Cm 0.212 M3 SNI-03-2830-6.42 4,833,800.00 1,024,765.60 7 Balok List Plank Plat dak 7/20 0.300 M3 SNI-03-2830-6.42 4,833,800.00 1,450,140.00 8 Plat Dag Untuk Atap 2.299 M3 SNI-03-2830-6.43 4,630,100.00 10,644,599.90 9 Roof Drain 2.000 M3 Taksir 2,410,000.00 4,820,000.00 10 Plat Dak Untuk Kanopy 0.046 M3 SNI-03-2830-6.43 4,630,100.00 212,984.60

Jumlah 51,677,093.88 V PEKERJAAN KUSEN, PINTU, JALUSI DAN PLAFOND 1 Pemasangan Kusen Pintu, Jendela 0.885 M3 SNI-03-3434-6.2 4,965,800.00 4,394,733.00 2 Pemasangan Screen Kayu 0.126 Unit SNI-03-3434-6.2 4,965,800.00 625,690.80 3 Pemasangan Pintu Type P1 + Acsesories 2.000 Unit Taksir 550,000.00 1,100,000.00 4 Pemasangan Pintu Type P2 + Acsesories 4.000 Unit Taksir 470,000.00 1,880,000.00 5 Pemasangan Pintu Type P3 + Acsesories 2.000 Unit Taksir 400,000.00 800,000.00 6 Pemasangan Pintu Type P4 + Acsesories 1.000 Unit Taksir 352,000.00 352,000.00 7 Pemasangan Jendela Kaca Type J1 + Acsesiories 6.000 Bh Taksir 250,500.00 1,503,000.00 8 Pemasangan Jendela Kaca Type J2 + Acsesiories 1.000 Bh Taksir 230,000.00 230,000.00 9 Pemasangan Jendela Kaca Type J3 + Acsesiories 1.000 Bh Taksir 200,000.00 200,000.00 10 Pemasangan Jendela Kaca Type J4 + Acsesiories 2.000 Bh Taksir 150,000.00 300,000.00 11 Pemasangan Plafon Playwood 3 mm 60.540 M2 SNI-03-2839-B.6.21 108,700.00 6,580,698.00

Jumlah 17,966,121.80 VI PEKERJAAN KUDA KUDA DAN ATAP 1 Pemasangan Kuda - Kuda Baja Ringan 124.270 M2 Taksir 160,000.00 19,883,200.00 2 Pemasangan Atap Genteng Metal 129.270 M3 SNI-03-3436-6.32 64,700.00 8,363,769.00 3 Listplank apan 3/20 Cm 78.350 M' SNI-03-3434-6.48 40,000.00 3,134,000.00 4 Konsol Kayu 0.380 M3 SNI-03-3434-6.28 5,052,400.00 1,919,912.00 5 Pemasangan Rabung Atap 16.500 M' SNI-03-3436-6.36 39,200.00 646,800.00

HARGA SATUAN

(Rp)

JUMLAH SATUAN

(Rp)

Page 5: Boq Polindes Kp Setie

6 Pekerjaan Kayu Profil Plafond 102.000 M' Taksir 5,000.00 510,000.00 Jumlah 34,457,681.00

Page 6: Boq Polindes Kp Setie

NO URAIAN / JENIS PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5 6 7

VII PEKERJAAN LANTAI 1 Pekerjaan Lantai Ruangan t = 5 Cm 3.000 M3 SNI-03-2830-6.1 451,900.00 1,355,700.00 2 Pekerjaan Lantai Teras t = 5 Cm 0.670 M3 SNI-03-2830-6.1 451,900.00 302,773.00 3 Pekerjaan Lantai Keramik Ruangan 30 x 30 Cm 60.500 M2 SNI-03-2833-6.50 116,300.00 7,036,150.00 4 Pekerjaan Lantai Keramik Kasar Untuk WC 20 x 20 Cm 2.540 M2 SNI-03-2833-6.44.a 116,600.00 296,164.00 5 Pekerjaan Lantai Keramik Untuk Teras Uk. 20 x 20 Cm 16.030 M2 SNI-03-2833-6.44 119,600.00 1,917,188.00 6 Pekerjaan Bon Bon Keramik Untuk Teras & Kamar Mandi 14.400 M2 Taksir 14,135.10 203,545.44

Jumlah 11,111,520.44

VIII. PEKERJAAN SANITASI AIR 1 Pemasangan Kloset Jongkok KIA 2.000 Bh SNI-03-2839-6.2 385,400.00 770,800.00 2 Kran Air 1/2'' 2.000 Bh Taksir 10,000.00 20,000.00 3 Floor Drain 2.000 Bh Taksir 45,000.00 90,000.00 4 Dop Penguras 2.000 Bh Taksir 5,000.00 10,000.00 5 Septiktank + Resapan 1.000 Ls Taksir 1,290,000.00 1,290,000.00 6 Instalasi Air Kotor

- Pemasangan Pipa PVC Ø 3'' 6.000 M1 SNI-03-2839-6.31 45,800.00 274,800.00 - Pipa PVC Ø 4'' 6.000 M1 SNI-03-2839-6.32 69,500.00 417,000.00 - Pemasangan Elbow 3'' 2.000 M3 Taksir 25,000.00 50,000.00

7 Pembuatan Bak Kontrol- Pasangan Bata (1/2 Bata) 1 : 2 0.560 M2 SNI-03-2838-6.9 79,800.00 44,688.00 - Plasteran 1 : 2 1.190 M2 SNI-03-2837-6.15 27,100.00 32,249.00 - Beton Cor Lantai dan Penutup Atas 0.041 M3 SNI-03-2830-6.1 451,900.00 18,527.90

8 Pemasangan Instalasi Air Bersih- Pipa PVC Ø 1/2'' 6.000 M1 SNI-03-2839-6.25 12,800.00 76,800.00

9 Tempat Sabun 2.000 Bh Taksir 40,000.00 80,000.00 Jumlah 3,174,864.90

IX. PEKERJAAN INSTALASI LISTRIK 1 Pemasangan Lampu TL 1 x 20 Cm 8.000 Bh Taksir 80,200.00 641,600.00 2 Pemasangan Lampu Pijar 40 Watt 5.000 Bh Taksir 25,000.00 125,000.00 3 Pemasangan saklar Tunggal 5.000 Bh Taksir 36,000.00 180,000.00 4 Pemasangan saklar Ganda 4.000 Bh Taksir 54,000.00 216,000.00 5 Pemasangan Stop Kontak + Instalasi 7.000 Ls Taksir 14,900.00 104,300.00 6 Pemasangan Instalasi 13.000 titik Taksir 75,000.00 975,000.00 7 Pemasangan Box Zekering 1.000 Bh Taksir 214,400.00 214,400.00 8 Pemasangan Arus Listrik 4 Ampere 1.000 Titik Taksir 2,000,000.00 2,000,000.00

Jumlah 4,456,300.00

X. PEKERJAAN FINISHING DAN PENGECATAN 1 Pengecatan Dinding Bata Dengan Cat tembok 391.546 M2 SNI-03-2834-6.14 12,700.00 4,972,634.20 2 Pengecatan Plat Dag, Kolom dan Balok Teras 35.927 M2 SNI-03-2834-6.14 12,700.00 456,272.90 3 Pengecatan Plafond Dengan Cat Tembok Warna Putih 60.500 M2 SNI-03-2834-6.14 12,700.00 768,350.00 4 Pengecatan Minyak Kusen, Pintu/Jalusi, Listplank, Skreen Kayu 49.546 M2 SNI-03-2834-6.8 26,000.00 1,288,196.00

Jumlah 7,485,453.10 XI. PEKERJAAN WASTAPLE DAN DAPUR 1 Pemasangan Batu Kali 1 : 3 0.162 M3 SNI-03-2836-6.5 428,200.00 69,368.40 2 Pemasangan Dinding Bata 1/2 1 : 4 0.750 M2 SNI-03-2838-6.11 71,800.00 53,850.00 3 Pekerjaan Plasteran 3.200 M2 SNI-03-2837-6.15 27,100.00 86,720.00 4 Kolom 10/10 Cm 0.053 M3 SNI-03-2830-6.40 7,090,500.00 375,796.50 5 Ring Balok 10/10 Cm 0.092 M3 SNI-03-2830-6.42 4,833,800.00 444,709.60 6 Beton Cor 0.095 M3 SNI-03-2830-6.43 4,630,100.00 439,859.50 7 Floor Drain 1.000 Ls Taksir 45,000.00 45,000.00 8 Pemasangan Pipa PVC Ø 3'' 4.000 M1 SNI-03-2839-6.31 45,800.00 183,200.00

Pemasangan Pipa PVC Ø 1/2'' 4.000 M1 SNI-03-2839-6.25 12,800.00 51,200.00 9 Pemasangan Elbow 3'' 1.000 Ls Taksir 25,000.00 25,000.00 10 Pemasangan Kran Air 1.000 Ls Taksir 15,000.00 15,000.00

Keramik 20 x 20 Cm 1.200 M2 SNI-03-2830-6.44 119,600.00 143,520.00 Pemasangan Bonbon Keramik 2.000 M1 Taksir 14,135.10 28,270.20

11 Pemasangan Wastaple 1.000 Ls Taksir 790,000.00 790,000.00 Jumlah 2,751,494.20

HARGA SATUAN

(Rp)

JUMLAH SATUAN

(Rp)

Page 7: Boq Polindes Kp Setie

NO URAIAN / JENIS PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5 6 7

XII. PEKERJAAN LAIN LAIN 1 Papan Nama Proyek (Uk. 90 Cm x 120 Cm) 1.000 Ls Taksir 350,000.00 350,000.00 2 Papan Nama Polindes (Uk. 100 Cm x 150 Cm) 1.000 Ls Taksir 500,000.00 500,000.00 3 P 3 K 1.000 Ls Taksir 250,000.00 250,000.00 4 Administrasi / Dokumentasi 1.000 Ls Taksir 750,000.00 750,000.00

Jumlah 1,850,000.00

BENER MERIAH, 18 AGUSTUS 2009 PENAWAR

CV. AFIFI PUTRI

SUNARDI KUASA DIREKTUR

HARGA SATUAN

(Rp)

JUMLAH SATUAN

(Rp)

Page 8: Boq Polindes Kp Setie

REKAPITULASI ANALISA HARGA SATUAN

NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KESEHATANKABUPATEN BENER MERIAH

PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE SUMBER DANA : DAK TAHUN ANGGARAN: 2009 VOLUME : 1 (Satu) Unit LOKASI : KECAMATAN TIMANG GAJAH KABUPATEN BENER MERIAH DISIAPKAN OLEH : CV. AFIFI PUTRI

NO SATUAN URAIAN / JENIS DAFTAR ANALISA PEKERJAAN ANALISA

1 2 3 4 5

1 1-M3 Pembersihan Lapangan dan Peralatan SNI-03-2835-6.8 6,500.00

2 1-M1 PENGUKURAN DAN PEMASANGAN BOWPLANK SNI-03-2835-6.4 61,400.00

3 1-M3 GALIAN TANAH BIASA SEDALAM 1 METER SNI-03-2829-6.1 18,000.00

4 1-M3 Urugan Kembali SNI-03-2829-6.9 8,600.00

5 1-M3 Timbunan Tanah Biasa SNI-03-2829-6.9 A 62,000.00

6 1-M3 Urugan Pasir SNI-03-2829-6.11 86,600.00

7 1-M3 Pasangan Pondasi Batu Kali 1 Pc : 4 Ps SNI-03-2836-6.5 428,200.00

8 1-M3 Pasangan Pondasi Batu Kosong SNI-03-2836-6.14 182,300.00

9 1-M2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 2 Ps SNI-03-2838-6.9 79,800.00

10 1-M2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 4 Ps SNI-03-2838-6.11 71,800.00

11 1-M2 Plasteran 1 Pc : 2 Ps, Tebal 15 mm SNI-03-2837-6.2 30,600.00

12 1-M2 Plasteran 1 Pc : 4 Ps, Tebal 15 mm SNI-03-2837-6.15 27,100.00

13 1-M3 Membuat Beton Cor 1 Pc : 3 Ps : 5 Kr SNI-03-2830-6.1 451,900.00

14 1-M3 Membuat Beton Dengan Mutu K 225 SNI-03-2830-6.35 819,900.00

15 1-M3 Membuat Beton Dengan Mutu K 275 SNI-03-2830-6.36 882,900.00

16 1-M3 Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting) SNI-03-2830-6.39 4,059,077.00

17 1-M3 Membuat Kolom Beton Bertulang (300 Kg Besi + Bekisting) SNI-03-2830-6.40 7,090,500.00

18 1-M3 Membuat Balok Beton Bertulang (200 Kg Besi + Bekisting) SNI-03-2830-6.41 5,338,900.00

19 1-M3 Membuat Balok Beton Bertulang (150 Kg Besi + Bekisting) SNI-03-2830-6.42 4,833,800.00

20 1-M3 Membuat Dinding Beton Bertulang (150 Kg Besi + Bekisting) SNI-03-2830-6.43 4,630,100.00

21 1-M3 Pasang Konstruksi Kuda Kuda Kayu Kemper SNI-03-3434-6.28 5,052,400.00

22 1-M3 Pasang Kusen Pintu dan Jendela SNI-03-3434-6.2 4,965,800.00

23 1-M2 Langit - Langit Multiplek 3 mm + Rangka Kayu Borneo SNI-03-2839-B-6.21 108,700.00

24 1-M2 Pasangan Atap Genteng Metal SNI-03-3436-6-32 64,700.00

25 1-M2 Pasangan Bubung Genteng Metal SNI-03-3436-6-36 39,200.00

26 1-M2 Pasangan Listplank Papan (3x20) Cm, Kayu Kemper SNI-03-3434-6-48 40,000.00

27 1-M2 Pasangan Lantai Keramik Ukuran 20 x 20 Cm Permukaan Halus SNI-03-2833-6.44 119,600.00

28 1-M2 Pasangan Lantai Keramik Ukuran 20 x 20 Cm Permukaan Kasar SNI-03-2833-6.44.a 116,600.00

29 1-M2 Pasangan Lantai Keramik Mosaik Uk 30 x 30 Cm #NAME? 116,300.00

30 1-M2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir SNI-03-2834-6.8 26,000.00

31 1-M2 Pengecatan Tembok Baru ( 1 Lapis Plamir) SNI-03-2834-6.14 12,700.00

32 1- Bh Memasang Kloset Jongkok Proslen SNI-03-2839.6.2 385,400.00

33 1-M1 Memasang Pipa PVC Ø 1/2 '' SNI-03-2839.6.25 12,800.00

34 1-M2 Memasang Pipa PVC Ø 3 '' SNI-03-2839.6.31 45,800.00

35 1-M3 Memasang Pipa PVC Ø 4 '' SNI-03-2839.6.32 69,500.00

36 1-M4 Pemasangan Bob Bon Keramik TAKSIR 14,135.10

BENER MERIAH, 18 AGUSTUS 2009PENAWAR

CV. AFIFI PUTRI

SUNARDIKUASA DIREKTUR

HARGA SATUAN (Rp)

Page 9: Boq Polindes Kp Setie
Page 10: Boq Polindes Kp Setie

ANALISA SATUAN PEKERJAAN

NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KESEHATANKABUPATEN BENER MERIAH

PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE SUMBER DANA : DAK TAHUN ANGGARAN : 2009 VOLUME : 1 (Satu) Unit LOKASI : KECAMATAN TIMANG GAJAH KABUPATEN BENER MERIAH DISIAPKAN OLEH : CV. AFIFI PUTRI

NO DIMENSI ANALISA / URAIAN PEKERJAAN SATUAN KOEFISIEN

1 2 3 4 5 6 7

1 1- M3 SNI-03-2835-6.8Pembersihan Lapangan dan Peralatan

• Pekerja Orang 0.1000 40,000.00 4,000.00 • Mandor Orang 0.0500 50,000.00 2,500.00

Jumlah 6,500.00 Dibulatkan 6,500.00

2 1- M3 SNI-03-2835-6.4PENGUKURAN DAN PEMASANGAN BOWPLANK

• Pekerja Orang 0.1000 40,000.00 4,000.00 • Mandor Orang 0.0050 50,000.00 250.00 • Tukang Kayu Orang 0.1000 65,000.00 6,500.00 • Kepala Tukang Orang 0.0100 76,000.00 760.00 • Kayu 5/7 Setara Kelas IV M3 0.0120 2,500,000.00 30,000.00 • Paku Biasa 2'' - 5'' Kg 0.0200 15,000.00 300.00 • Kayu papan 3/20 Cm M3 0.0070 2,800,000.00 19,600.00

Jumlah 61,410.00 Dibulatkan 61,400.00

3 1- M3 SNI-03-2829-6.1GALIAN TANAH BIASA SEDALAM 1 METER

• Pekerja Orang 0.4000 40,000.00 16,000.00 • Mandor Orang 0.0400 50,000.00 2,000.00

Jumlah 18,000.00 Dibulatkan 18,000.00

4 1- M3 SNI-03-2829-6.9Urugan Kembali

• Pekerja Orang 0.1920 40,000.00 7,680.00 • Mandor Orang 0.0190 50,000.00 950.00

Jumlah 8,630.00 Dibulatkan 8,600.00

5 1- M3 SNI-03-2829-6.9 ATimbunan Tanah Biasa

• Pekerja Orang 0.1920 40,000.00 7,680.00 • Mandor Orang 0.0190 50,000.00 950.00 • Tanah Timbun M3 1.2000 44,500.00 53,400.00

Jumlah 62,030.00 Dibulatkan 62,000.00

6 1- M3 SNI-03-2829-6.11Urugan Pasir

• Pekerja Orang 0.1920 40,000.00 7,680.00 • Mandor Orang 0.0190 50,000.00 950.00 • Pasir Urug M3 1.2000 65,000.00 78,000.00

Jumlah 86,630.00 Dibulatkan 86,600.00

7 1- M3 SNI-03-2836-6.5Pasangan Pondasi Batu Kali 1 Pc : 4 Ps

• Pekerja Orang 1.5000 40,000.00 60,000.00 • Tukang batu Orang 0.6000 66,600.00 39,960.00 • Kepala Tukang Orang 0.0600 76,000.00 4,560.00 • Mandor Orang 0.0750 50,000.00 3,750.00 • Batu Belah 15/20 Cm M3 1.1000 84,000.00 92,400.00 • Semen Portland Kg 163.0000 1,125.00 183,375.00 • Pasir Pasang M3 0.5200 85,000.00 44,200.00

Jumlah 428,245.00 Dibulatkan 428,200.00

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN

(Rp)

Page 11: Boq Polindes Kp Setie

NO DIMENSI ANALISA / URAIAN PEKERJAAN SATUAN KOEFISIEN

1 2 3 4 5 6 7

8 1- M3 SNI-03-2836-6.14Pasangan Pondasi Batu Kosong

• Pekerja Orang 0.7800 40,000.00 31,200.00 • Tukang batu Orang 0.3900 66,600.00 25,974.00 • Kepala Tukang Orang 0.0390 76,000.00 2,964.00 • Mandor Orang 0.0390 50,000.00 1,950.00 • Batu Belah 15/20 Cm M3 1.2000 84,000.00 100,800.00 • Pasir Uruq M3 0.3000 65,000.00 19,500.00

Jumlah 182,388.00 Dibulatkan 182,300.00

9 1- M2 SNI-03-2838-6.9Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 2 Ps

• Pekerja Orang 0.3200 40,000.00 12,800.00 • Tukang batu Orang 0.1000 66,600.00 6,660.00 • Kepala Tukang Orang 0.0100 76,000.00 760.00 • Mandor Orang 0.0150 50,000.00 750.00 • Bata Merah 5 x 11 x 22 Cm M3 70.0000 490.00 34,300.00 • Semen Portland Kg 18.9500 1,125.00 21,318.75 • Pasir Pasang M3 0.0380 85,000.00 3,230.00

Jumlah 79,818.75 Dibulatkan 79,800.00

10 1- M2 SNI-03-2838-6.11Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 4 Ps

• Pekerja Orang 0.3200 40,000.00 12,800.00 • Tukang batu Orang 0.1000 66,600.00 6,660.00 • Kepala Tukang Orang 0.0100 76,000.00 760.00 • Mandor Orang 0.0150 50,000.00 750.00 • Bata Merah 5 x 11 x 22 Cm M3 70.0000 490.00 34,300.00 • Semen Portland Kg 11.5000 1,125.00 12,937.50 • Pasir Pasang M3 0.0430 85,000.00 3,655.00

Jumlah 71,862.50 Dibulatkan 71,800.00

11 1- M2 SNI-03-2837-6.2Plasteran 1 Pc : 2 Ps, Tebal 15 mm

• Pekerja Orang 0.2000 40,000.00 8,000.00 • Tukang batu Orang 0.1500 66,600.00 9,990.00 • Kepala Tukang Orang 0.0150 76,000.00 1,140.00 • Mandor Orang 0.0100 50,000.00 500.00 • Semen Portland Kg 8.5200 1,125.00 9,585.00 • Pasir Pasang M3 0.0170 85,000.00 1,445.00

Jumlah 30,660.00 Dibulatkan 30,600.00

12 1- M2 SNI-03-2837-6.15Plasteran 1 Pc : 4 Ps, Tebal 15 mm

• Pekerja Orang 0.2000 40,000.00 8,000.00 • Tukang batu Orang 0.1500 66,600.00 9,990.00 • Kepala Tukang Orang 0.0150 76,000.00 1,140.00 • Mandor Orang 0.0100 50,000.00 500.00 • Semen Portland Kg 5.2000 1,125.00 5,850.00 • Pasir Pasang M3 0.0200 85,000.00 1,700.00

Jumlah 27,180.00 Dibulatkan 27,100.00

13 1- M3 SNI-03-2830-6.1Membuat Beton Cor 1 Pc : 3 Ps : 5 Kr

• Pekerja Orang 1.6500 40,000.00 66,000.00 • Tukang batu Orang 0.2500 66,600.00 16,650.00 • Kepala Tukang Orang 0.0250 76,000.00 1,900.00 • Mandor Orang 0.0800 50,000.00 4,000.00 • Semen Portland Kg 218.0000 1,125.00 245,250.00 • Pasir Beton M3 0.5200 85,000.00 44,200.00 • Koral Beton M3 0.8700 85,000.00 73,950.00

Jumlah 451,950.00 Dibulatkan 451,900.00

14 1- M3 SNI-03-2830-6.35Membuat Beton Dengan Mutu K 225

• Pekerja Orang 6.0000 40,000.00 240,000.00 • Tukang batu Orang 1.0000 66,600.00 66,600.00 • Kepala Tukang Orang 0.1000 76,000.00 7,600.00 • Mandor Orang 0.3000 50,000.00 15,000.00 • Semen Portland Kg 338.0000 1,125.00 380,250.00 • Pasir Beton M3 0.6500 85,000.00 55,250.00 • Koral Beton M3 0.6500 85,000.00 55,250.00

Jumlah 819,950.00

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN

(Rp)

Page 12: Boq Polindes Kp Setie

Dibulatkan 819,900.00

Page 13: Boq Polindes Kp Setie

NO DIMENSI ANALISA / URAIAN PEKERJAAN SATUAN KOEFISIEN

1 2 3 4 5 6 7

15 1- M3 SNI-03-2830-6.36Membuat Beton Dengan Mutu K 275

• Pekerja Orang 6.0000 40,000.00 240,000.00 • Tukang batu Orang 1.0000 66,600.00 66,600.00 • Kepala Tukang Orang 0.1000 76,000.00 7,600.00 • Mandor Orang 0.3000 50,000.00 15,000.00 • Semen Portland Kg 400.0000 1,125.00 450,000.00 • Pasir Beton M3 0.4000 85,000.00 34,000.00 • Koral Beton M3 0.8200 85,000.00 69,700.00

Jumlah 882,900.00 Dibulatkan 882,900.00

16 1- M3 SNI-03-2830-6.39Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting)

• Pekerja Orang 4.8500 40,000.00 194,000.00 • Tukang batu Orang 0.3500 66,600.00 23,310.00 • Kepala Tukang Orang 0.3310 76,000.00 25,156.00 • Mandor Orang 0.1700 50,000.00 8,500.00 • Tukang Kayu Orang 1.5600 66,600.00 103,896.00 • Tukang Besi Orang 1.4000 66,600.00 93,240.00 • Kayu Terentang M3 0.2700 2,500,000.00 675,000.00 • Paku Biasa 2'' - 5'' Kg 2.0000 15,000.00 30,000.00 • Minyak Bekisting Ltr 0.6000 3,000.00 1,800.00 • Besi Beton Polos Kg 200.0000 12,000.00 2,400,000.00 • Kawat Beton Kg 3.0000 10,100.00 30,300.00 • Semen Portland Kg 323.0000 1,125.00 363,375.00 • Pasir Beton M3 0.5200 85,000.00 44,200.00 • Koral Beton M3 0.7800 85,000.00 66,300.00

Jumlah 4,059,077.00 Dibulatkan 4,059,000.00

17 1- M3 SNI-03-2830-6.40Membuat Kolom Beton Bertulang (300 Kg Besi + Bekisting)

• Pekerja Orang 7.3000 40,000.00 292,000.00 • Tukang batu Orang 0.3500 66,600.00 23,310.00 • Kepala Tukang Orang 0.5700 76,000.00 43,320.00 • Mandor Orang 0.2500 50,000.00 12,500.00 • Tukang Kayu Orang 3.3000 66,600.00 219,780.00 • Tukang Besi Orang 2.1000 66,600.00 139,860.00 • Kayu Terentang Orang 0.4000 2,500,000.00 1,000,000.00 • Paku Biasa 2'' - 5'' Kg 4.0000 15,000.00 60,000.00 • Minyak Bekisting Ltr 2.0000 3,000.00 6,000.00 • Besi Beton Polos Kg 300.0000 12,000.00 3,600,000.00 • Kawat Beton Kg 4.5000 10,100.00 45,450.00 • Semen Portland Kg 323.0000 1,125.00 363,375.00 • Pasir Beton M3 0.5200 85,000.00 44,200.00 • Koral Beton M3 0.7800 85,000.00 66,300.00 • Balok kayu Borneo M3 0.1500 2,800,000.00 420,000.00 • Plywood Tebal 9 mm Lbr 3.5000 147,000.00 514,500.00 • Btg 20.0000 12,000.00 240,000.00

Jumlah 7,090,595.00 Dibulatkan 7,090,500.00

18 1- M3 SNI-03-2830-6.41Membuat Balok Beton Bertulang (200 Kg Besi + Bekisting)

• Pekerja Orang 5.9600 40,000.00 238,400.00 • Tukang batu Orang 0.3500 66,600.00 23,310.00 • Kepala Tukang Orang 0.4550 76,000.00 34,580.00 • Mandor Orang 0.2080 50,000.00 10,400.00 • Tukang Kayu Orang 2.8000 66,600.00 186,480.00 • Tukang Besi Orang 1.4000 66,600.00 93,240.00 • Kayu Terentang Orang 0.3200 2,500,000.00 800,000.00 • Paku Biasa 2'' - 5'' Kg 3.2000 15,000.00 48,000.00 • Minyak Bekisting Ltr 1.6000 3,000.00 4,800.00 • Besi Beton Polos Kg 200.0000 12,000.00 2,400,000.00 • Kawat Beton Kg 3.0000 10,100.00 30,300.00 • Semen Portland Kg 323.0000 1,125.00 363,375.00 • Pasir Beton M3 0.5200 85,000.00 44,200.00 • Koral Beton M3 0.7800 85,000.00 66,300.00 • Balok kayu Borneo M3 0.1400 2,800,000.00 392,000.00 • Plywood Tebal 9 mm Lbr 2.8000 147,000.00 411,600.00 • Btg 16.0000 12,000.00 192,000.00

Jumlah 5,338,985.00 Dibulatkan 5,338,900.00

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN

(Rp)

Dolken Kayu Galam Ø 8 / 4 m

Dolken Kayu Galam Ø 8 / 4 m

Page 14: Boq Polindes Kp Setie

NO DIMENSI ANALISA / URAIAN PEKERJAAN SATUAN KOEFISIEN

1 2 3 4 5 6 7 19 1- M3 SNI-03-2830-6.42

Membuat Balok Beton Bertulang (150 Kg Besi + Bekisting)• Pekerja Orang 5.8000 40,000.00 232,000.00 • Tukang batu Orang 0.3500 66,600.00 23,310.00 • Kepala Tukang Orang 0.4200 76,000.00 31,920.00 • Mandor Orang 0.1850 50,000.00 9,250.00 • Tukang Kayu Orang 2.8000 66,600.00 186,480.00 • Tukang Besi Orang 1.0500 66,600.00 69,930.00 • Kayu Terentang Orang 0.3200 2,500,000.00 800,000.00 • Paku Biasa 2'' - 5'' Kg 3.2000 15,000.00 48,000.00 • Minyak Bekisting Ltr 1.6000 3,000.00 4,800.00 • Besi Beton Polos Kg 150.0000 12,000.00 1,800,000.00 • Kawat Beton Kg 2.2500 10,100.00 22,725.00 • Semen Portland Kg 323.0000 1,125.00 363,375.00 • Pasir Beton M3 0.5200 85,000.00 44,200.00 • Koral Beton M3 0.7800 85,000.00 66,300.00 • Balok kayu Borneo M3 0.1200 2,800,000.00 336,000.00 • Plywood Tebal 9 mm Lbr 2.8000 147,000.00 411,600.00 • Btg 32.0000 12,000.00 384,000.00

Jumlah 4,833,890.00 Dibulatkan 4,833,800.00

20 1- M3 SNI-03-2830-6.43Membuat Dinding Beton Bertulang (150 Kg Besi + Bekisting)

• Pekerja Orang 5.6000 40,000.00 224,000.00 • Tukang batu Orang 0.3500 66,600.00 23,310.00 • Kepala Tukang Orang 0.4000 76,000.00 30,400.00 • Mandor Orang 0.1930 50,000.00 9,650.00 • Tukang Kayu Orang 2.6400 66,600.00 175,824.00 • Tukang Besi Orang 1.0500 66,600.00 69,930.00 • Kayu Terentang Orang 0.2400 2,500,000.00 600,000.00 • Paku Biasa 2'' - 5'' Kg 3.2000 15,000.00 48,000.00 • Minyak Bekisting Ltr 1.6000 3,000.00 4,800.00 • Besi Beton Polos Kg 150.0000 12,000.00 1,800,000.00 • Kawat Beton Kg 2.2500 10,100.00 22,725.00 • Semen Portland Kg 323.0000 1,125.00 363,375.00 • Pasir Beton M3 0.5200 85,000.00 44,200.00 • Koral Beton M3 0.7800 85,000.00 66,300.00 • Balok kayu Borneo M3 0.1600 2,800,000.00 448,000.00 • Plywood Tebal 9 mm Lbr 2.8000 147,000.00 411,600.00 • Btg 24.0000 12,000.00 288,000.00

Jumlah 4,630,114.00 Dibulatkan 4,630,100.00

21 1- M3 SNI-03-3434-6.28Pasang Konstruksi Kuda Kuda Kayu Kemper

• Pekerja Orang 4.0000 40,000.00 160,000.00 • Tukang Kayu Orang 12.0000 66,600.00 799,200.00 • Kepala Tukang Orang 1.2000 76,000.00 91,200.00 • Mandor Orang 0.2000 50,000.00 10,000.00 • Kayu Kemper, Balok M3 1.1000 2,800,000.00 3,080,000.00 • Besi Strip Kg 15.0000 60,000.00 900,000.00 • Paku Biasa 2'' - 5'' Kg 0.8000 15,000.00 12,000.00

Jumlah 5,052,400.00 Dibulatkan 5,052,400.00

22 1- M3 SNI-03-3434-6.2Pasang Kusen Pintu dan Jendela

• Pekerja Orang 6.0000 40,000.00 240,000.00 • Tukang Kayu Orang 18.0000 66,600.00 1,198,800.00 • Kepala Tukang Orang 2.0000 76,000.00 152,000.00 • Mandor Orang 0.3000 50,000.00 15,000.00 • Kayu Kemper, Balok M3 1.2000 2,800,000.00 3,360,000.00

Jumlah 4,965,800.00 Dibulatkan 4,965,800.00

23 1- M2 SNI-03-2839-B-6.21Langit - Langit Multiplek 3 mm + Rangka Kayu Borneo

• Pekerja Orang 0.2700 40,000.00 10,800.00 • Tukang Kayu Orang 0.4000 66,600.00 26,640.00 • Kepala Tukang Orang 0.0400 76,000.00 3,040.00 • Mandor Orang 0.0135 50,000.00 675.00 • Kayu Kelas IV Setara (Sangon/dll) M3 0.0230 2,800,000.00 64,400.00 • Paku Biasa Kg 0.0600 15,000.00 900.00 • Multyplek 1,2'' x 2,4" x 3 mm Lbr 0.0500 45,000.00 2,250.00

Jumlah 108,705.00 Dibulatkan 108,700.00

24 1- M2 SNI-03-3436-6-32Pasangan Atap Genteng Metal

• Pekerja Orang 0.2000 40,000.00 8,000.00 • Tukang Kayu Orang 0.1000 66,600.00 6,660.00 • Kepala Tukang Orang 0.0100 76,000.00 760.00 • Mandor Orang 0.0100 50,000.00 500.00 • Genteng Metal Multyroof M3 1.0200 43,000.00 43,860.00

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN

(Rp)

Dolken Kayu Galam Ø 8 / 4 m

Dolken Kayu Galam Ø 8 / 4 m

Page 15: Boq Polindes Kp Setie

• Paku Genteng Metal Kg 0.2000 25,000.00 5,000.00 Jumlah 64,780.00 Dibulatkan 64,700.00

Page 16: Boq Polindes Kp Setie

NO DIMENSI ANALISA / URAIAN PEKERJAAN SATUAN KOEFISIEN

1 2 3 4 5 6 7

25 1- M2 SNI-03-3436-6-36Pasangan Bubung Genteng Metal

• Pekerja Orang 0.2000 40,000.00 8,000.00 • Tukang Kayu Orang 0.1000 66,600.00 6,660.00 • Kepala Tukang Orang 0.0100 76,000.00 760.00 • Mandor Orang 0.0100 50,000.00 500.00 • Bubunga Genteng Metal M3 1.0200 18,000.00 18,360.00 • Paku Genteng Metal Kg 0.2000 25,000.00 5,000.00

Jumlah 39,280.00 Dibulatkan 39,200.00

26 1- M1 SNI-03-3434-6-48Pasangan Listplank Papan (3x20) Cm, Kayu Kemper

• Pekerja Orang 0.1000 40,000.00 4,000.00 • Tukang Batu Orang 0.2000 66,600.00 13,320.00 • Kepala Tukang Orang 0.0200 76,000.00 1,520.00 • Mandor Orang 0.0050 50,000.00 250.00 • Kayu Kemper, Papan M3 0.0072 2,800,000.00 20,160.00 • Paku Biasa 2''-5'' Kg 0.0500 15,000.00 750.00

Jumlah 40,000.00 Dibulatkan 40,000.00

27 1- M2 SNI-03-2833-6.44Pasangan Lantai Keramik Ukuran 20 x 20 Cm Permukaan Halus

• Pekerja Orang 0.6200 40,000.00 24,800.00 • Tukang Kayu Orang 0.3500 66,600.00 23,310.00 • Tukang Batu Orang 0.0350 76,000.00 2,660.00 • Mandor Orang 0.0300 50,000.00 1,500.00 • Keramik 20 x 20 Cm (Permukaan Halus) Bh 25.0000 1,800.00 45,000.00 • Semen Portland Kg 11.3800 1,125.00 12,802.50 • Pasir Pasang M3 0.0420 85,000.00 3,570.00 • Semen Warna Kg 1.5000 4,000.00 6,000.00

Jumlah 119,642.50 Dibulatkan 119,600.00

28 1- M2 SNI-03-2833-6.44.aPasangan Lantai Keramik Ukuran 20 x 20 Cm Permukaan Kasar

• Pekerja Orang 0.6200 40,000.00 24,800.00 • Tukang Batu Orang 0.3500 66,600.00 23,310.00 • Kepala Tukang Orang 0.0350 76,000.00 2,660.00 • Mandor Orang 0.0300 50,000.00 1,500.00 • Keramik 20 x 20 Cm (Permukaan Kasar) Bh 25.0000 1,680.00 42,000.00 • Semen Portland Kg 11.3800 1,125.00 12,802.50 • Pasir Pasang M3 0.0420 85,000.00 3,570.00 • Semen Warna Kg 1.5000 4,000.00 6,000.00

Jumlah 116,642.50 Dibulatkan 116,600.00

Pasangan Lantai Keramik Mosaik Uk 30 x 30 Cm• Pekerja Orang 0.6200 40,000.00 24,800.00 • Tukang Batu Orang 0.3500 66,600.00 23,310.00 • Kepala Tukang Orang 0.0350 76,000.00 2,660.00 • Mandor Orang 0.0300 50,000.00 1,500.00 • Keramik Mosaik 30 x 30 Cm Bh 6.2500 6,666.67 41,666.67 • Semen Portland Kg 11.3800 1,125.00 12,802.50 • Pasir Pasang M3 0.0420 85,000.00 3,570.00 • Semen Warna Kg 1.5000 4,000.00 6,000.00

Jumlah 116,309.17 Dibulatkan 116,300.00

30 1- M2 SNI-03-2834-6.8Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir1 Lapis Cat Dasar, 2 Lapis Cat Penutup

• Pekerja Orang 0.2000 40,000.00 8,000.00 • Tukang Cat Orang 0.0090 66,600.00 599.40 • Kepala Tukang Orang 0.0060 76,000.00 456.00 • Mandor Orang 0.0025 50,000.00 125.00 • Cat Meni Kg 0.2000 12,500.00 2,500.00 • Plamir Kg 0.1500 12,500.00 1,875.00 • Cat Dasar Kg 0.1700 12,500.00 2,125.00 • Cat Penutup 2 Kali Kg 0.2600 40,000.00 10,400.00

Jumlah 26,080.40 Dibulatkan 26,000.00

31 1- M2 SNI-03-2834-6.14Pengecatan Tembok Baru ( 1 Lapis Plamir)1 Lapis Cat Dasar, 2 Lapis Cat Penutup

• Pekerja Orang 0.0200 40,000.00 800.00 • Tukang Cat Orang 0.0630 66,600.00 4,195.80 • Kepala Tukang Orang 0.0063 76,000.00 478.80 • Mandor Orang 0.0025 50,000.00 125.00 • Plamir Kg 0.1000 12,500.00 1,250.00 • Cat Dasar Kg 0.1000 12,500.00 1,250.00 • Cat Penutup 2 Kali Kg 0.2600 18,000.00 4,680.00

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN

(Rp)

Page 17: Boq Polindes Kp Setie

Jumlah 12,779.60 Dibulatkan 12,700.00

Page 18: Boq Polindes Kp Setie

NO DIMENSI ANALISA / URAIAN PEKERJAAN SATUAN KOEFISIEN

1 2 3 4 5 6 7

32 1- Buah SNI-03-2839.6.2Memasang Kloset Jongkok Proslen

• Pekerja Orang 1.0000 40,000.00 40,000.00 • Tukang Batu Orang 1.5000 66,600.00 99,900.00 • Kepala Tukang Orang 1.5000 76,000.00 114,000.00 • Mandor Orang 0.1600 50,000.00 8,000.00 • Kloset Jongkok Proslen Bh 1.0000 115,900.00 115,900.00 • Semen Portland Kg 6.0000 1,125.00 6,750.00 • Pasir Pasang Kg 0.0100 85,000.00 850.00

Jumlah 385,400.00 Dibulatkan 385,400.00

33 1- M1 SNI-03-2839.6.25

• Pekerja Orang 0.0360 40,000.00 1,440.00 • Tukang Batu Orang 0.0600 66,600.00 3,996.00 • Kepala Tukang Orang 0.0060 76,000.00 456.00 • Mandor Orang 0.0018 50,000.00 90.00 • Pipa PVC 1/2 " M' 1.2000 4,400.00 5,280.00 • Perlengkapan 35% x Harga Pipa Ls 0.3500 4,400.00 1,540.00

Jumlah 12,802.00 Dibulatkan 12,800.00

34 1- M1 SNI-03-2839.6.31

• Pekerja Orang 0.0810 40,000.00 3,240.00 • Tukang Batu Orang 0.1350 66,600.00 8,991.00 • Kepala Tukang Orang 0.0135 76,000.00 1,026.00 • Mandor Orang 0.0041 50,000.00 205.00 • Pipa PVC 3 " M' 1.2000 20,900.00 25,080.00 • Perlengkapan 35% x Harga Pipa Ls 0.3500 20,900.00 7,315.00

Jumlah 45,857.00 Dibulatkan 45,800.00

35 1- M1 SNI-03-2839.6.32

• Pekerja Orang 0.0810 40,000.00 3,240.00 • Tukang Batu Orang 0.1350 66,600.00 8,991.00 • Kepala Tukang Orang 0.0135 76,000.00 1,026.00 • Mandor Orang 0.0041 50,000.00 205.00 • Pipa PVC 4 " M' 1.2000 36,160.00 43,392.00 • Perlengkapan 35% x Harga Pipa Ls 0.3500 36,160.00 12,656.00

Jumlah 69,510.00 Dibulatkan 69,500.00

36 1- M1 TAKSIRPemasangan Bob Bon Keramik

• Pekerja Orang 0.0820 40,000.00 3,280.00 • Tukang Batu Orang 0.0235 66,600.00 1,565.10 • Mandor Orang 0.0152 50,000.00 760.00 • Semen Warna Kg 0.1200 4,000.00 480.00 • Bon Bon Keramik M' 1.1500 7,000.00 8,050.00

Jumlah 14,135.10 Dibulatkan 14,100.00

BENER MERIAH, 18 AGUSTUS 2009 PENAWAR

CV. AFIFI PUTRI

SUNARDI KUASA DIREKTUR

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN

(Rp)

Memasang Pipa PVC Ø 1/2 ''

Memasang Pipa PVC Ø 3 ''

Memasang Pipa PVC Ø 4 ''

Page 19: Boq Polindes Kp Setie

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NAMA KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KESEHATAN

: KABUPATEN BENER MERIAH PEKERJAAN : PEMBANGUNAN POLINDES KP. SETIE SUMBER DANA : DAK TAHUN ANGGARAN : 2009 VOLUME : 1 (Satu) Unit LOKASI : KECAMATAN TIMANG GAJAH KABUPATEN BENER MERIAH DISIAPKAN OLEH : CV. AFIFI PUTRI

NO URIAN / JENIS BAHAN MATERIAL SATUAN KET

1 2 3 4 5

I UPAH

1 Mandor 50,000.00 Orang Per Orang2 Kepala Tukang Kayu / Cat 76,000.00 Orang Per Orang

3 Tukang Kayu/ Cat 65,000.00 Orang Per Orang

4 Laden Tukang Kayu/Cat 55,000.00 Orang Per Orang

5 Kepala Tukang Batu/Besi 76,000.00 Orang Per Orang

6 Tukang Batu / Besi 66,600.00 Orang Per Orang

7 Laden Tukang Batu / Besi 55,000.00 Orang Per Orang

8 Pekerja Galian Tanah 40,000.00 Orang Per Orang

9 Penjaga Malam / Satpam 40,000.00 Orang Per Orang

10 Penyelam 111,300.00 Orang Per Orang

11 Supir 60,000.00 Orang Per Orang

12 Oprator 103,700.00 Orang Per Orang

II BAHAN -BAHAN MATERIAL

1 PEMASUKAN ARUS LISTRIK 4 AMPERE 2,000,000.00 Titik Per Titik2 Asbest 100 x 100 Cm 17,500.00 Per M23 Alat Bantu 47,500.00 Set Per Set4 Aluminium 95,350.00 M' Per M'5 Aluminium Blade (Lisplank) 165,000.00 Per M26 Apron Flashing Dinding 119,000.00 Lbr Per Lbr7 Atap Multy Roof 43,000.00 Bh Per Bh8 Atap Genteng 45,000.00 Per M29 Atap Genteng Metal 45,000.00 Lbr Per Lbr

10 Atap Pioner 67,000.00 Per M211 Baja Propil 25,300.00 Kg Per Kg12 Batu Kali / Batu Gunung 84,000.00 Per M313 Batu Bata 490.00 Bh Per Bh14 Batu Apung 6,000.00 Kg Per Kg15 Batu Tempel Hitam / Marmoe 168,100.00 Per M316 Baja Canal 10,050.00 Kg Per Kg17 Baut Alat Bantu 15,000.00 Ls Per Ls18 Bak Mandi Terasso 150,000.00 Bh Per Bh19 Besi Beton Polos 12,000.00 Kg Per Kg20 Besi Beton Ulir 17,000.00 Kg Per Kg21 Besi Siku Canal 77,500.00 Kg Per Kg22 Besi Strip Sambungan Kuda-kuda 60,000.00 Kg Per Kg23 Beton Roster/Kerawang 4,900.00 Bh Per Bh24 Bubungan Genteng Metal 18,000.00 Per M125 Bubungan Genteng 57,000.00 Bh Per Bh26 Bubungan Seng 21,600.00 Lbr Per Lbr27 Bon Bon Keramik 7,000.00 M' Per M'28 Box Sekering 214,400.00 Bh Per Bh29 Cat Dasar Kayu 12,500.00 Kg Per Kg30 Cat Minie Kayu 12,500.00 Kg Per Kg31 Cat Minie Besi 12,500.00 Kg Per Kg32 Cat Minyak 40,000.00 Kg Per Kg33 Cat Tembok Dasar 18,000.00 Kg Per Kg34 Cat Tembok warna 5 Kg 18,000.00 Kg Per Kg35 Cat warna Sigma 18,000.00 Kg Per Kg36 Cat Acrylic Emultion Paint 18,000.00 Kg Per Kg37 Cat Synthetic Emultion 18,000.00 Kg Per Kg38 Cermin 60 x 80 Rangka Alumunium 225,000.00 Bh Per Bh39 Dempul 15,000.00 Kg Per Kg40 Engsel Pintu 15,000.00 Pasang Per Pasang41 Engsel Jendela 10,000.00 Pasang Per Pasang42 Floor Drain 45,000.00 Bh Per Bh43 Genteng Metal Ekatanal Gerad 1,750.00 Bh Per Bh

HARGA SATUAN (Rp)

M2

M2

M2

M2

M3

M3

M1

Page 20: Boq Polindes Kp Setie

44 Genteng Metal Ekatanal Gerard Polycolor 72,500.00 Lbr Per Lbr45 Genteng Pioner 13,900.00 Bh Per Bh

46 Genteng Biasa 5,700.00 Bh Per Bh

Page 21: Boq Polindes Kp Setie

NO URIAN / JENIS BAHAN MATERIAL SATUAN KET

1 2 3 4 5

47 Genteng Sakura Roof 30,000.00 Bh Per Bh48 Glass Grey 5 mm 175,000.00 Per M248 Gypsum Board 9 mm 19,752.75 Per M249 Gypsum Board 58,800.00 Lbr Per Lbr50 Ijuk Saringan 11,700.00 Kg Per Kg51 Kerikil 102,900.00 Per M352 Kabel NYY 4 x 6 mm2 22,500.00 M' Per M'53 Kabel NYM 3 x 2.5 mm2 5,250.00 M' Per M'54 Kawat Beton 10,100.00 Kg Per Kg55 Kawat Las 18,600.00 Kg Per Kg56 Kayu Terentang 2,500,000.00 Per M357 Kayu Dolken dia. 8- 10 cm panjang 4 meter 12,000.00 Btg Per Btg58 Kayu Rangka Plafond 2,500,000.00 Per M359 Kayu Bingkai Dinding Partisi 2,500,000.00 Per M360 Kayu Kelas I ( Seumantok ) 4,044,200.00 Per M361 Kayu Kelas II (Kemper / Kuruing dll) 2,800,000.00 Per M362 Kayu Kelas III ( Borneo / dll) 2,800,000.00 Per M363 Kayu Kelas IV (Sangon/Dll) 2,500,000.00 Per M3

Kayu Profil 12,000.00 M' Per M'Kayu Papan 2,800,000.00 Per M3Kayu 5 x 7 x 400 Cm 2,500,000.00 M³ Per M³

64 Kayu Jambu Batu 1,500,000.00 Per M365 Kertas Pasir 2,500.00 Lbr Per Lbr66 Kramik Uk : 40 x 40 Cm (Permukaan Halus) 37,000.00 Per M267 Kramik Uk : 40 x 40 Cm (Permukaan Kasar) 52,000.00 Per M268 Kramik Uk : 40 x 40 Cm Bermotif (Permukaan Halus) 71,000.00 Per M269 Kramik Uk : 40 x 40 Cm Bermotif (Permukaan Kasar) 65,000.00 Per M270 Kramik Uk : 20 x 20 Cm (Permukaan Halus) 45,000.00 Per M271 Kramik Uk : 20 x 20 Cm (Permukaan Kasar) 42,000.00 Per M272 Kramik Uk : 20 x 25 Cm Bermotif (Permukaan Halus) 47,000.00 Per M273 Kramik Uk : 20 x 20 Cm Bermotif (Permukaan Kasar) 47,000.00 Per M274 Kramik Uk : 30 x 30 Cm 40,000.00 Per M275 Kramik Uk : 15 x 30 Cm 46,000.00 Per M276 Kramik Uk : 15 x 15 Cm 41,300.00 Per M277 Kramik Uk : 10 x 20 Cm 42,500.00 Per M278 Kramik Uk : 30 x 30 Cm (Kulit Jeruk) 60,300.00 Per M279 Kapur Batu 3,300.00 Kg Per Kg80 Kunci Tanam Lengkap 112,000.00 Bh Per Bh81 Kunci 2 x Putar 125,000.00 Bh Per Bh82 Kran Air F 1/2 " 5,000.00 Bh Per Bh83 Kran Air F 3/4 " 7,000.00 Bh Per Bh84 Kran Air Setara Sun-Ei 105,000.00 Bh Per Bh85 Kuas 4,000.00 Bh Per Bh86 Kloset Jongkok KIA Type Rapl EX 275,000.00 Bh Per Bh87 Klosed Jongkok standar KIA 115,900.00 Bh Per Bh88 Closet Duduk Type C.721.PVI / TV.150.NS 110,500.00 Bh Per Bh89 Closet Duduk 1,323,500.00 Bh Per Bh90 Kaca Polos / Bening 5 mm 87,400.00 Per M291 Kaca Polos / Bening 4 mm 82,700.00 Per M292 Kaca Polos / Bening 3 mm 80,300.00 Per M293 Kaca Bening Kebiruan 5 mm 101,100.00 Per M294 Kaca Reybend 5 mm 103,200.00 Per M295 Kaca Reybent 4 mm 75,000.00 Per M296 Kaca Reybent 3 mm 80,400.00 Per M297 Kaca Cermin 185,000.00 Per M298 Kozen Alluminium 235,000.00 M' Per M'99 Koral Beton 85,000.00 99 Lampu Pilot 45,000.00 Unit Per Unit

100 Lampu TL 1 x 40 Watt 94,200.00 Bh Per Bh101 Lampu TL 1 x 20 Watt 80,200.00 Bh Per Bh102 Lampu Pijar Setara Philip 25,000.00 Bh Per Bh103 Lampu TL 2 x 36 Watt Inbow Type RM 300 2.36 (Artoilet) 525,000.00 Unit Per Unit104 Lampu TL 4 x 36 Watt 750,000.00 Unit Per Unit105 Lampu TL 1 x 18 Watt Qutbow Type GM 1,18 (Artoilet) 287,100.00 Unit Per Unit106 Lampu Downlight PLS 9 Watt CD 4 RPL (Artoilet) 199,500.00 Unit Per Unit107 Lampu TK 2 x 40 Watt Inbow 125,000.00 Unit Per Unit108 Lampu TCS 2 x 40 Watt 155,000.00 Unit Per Unit109 Lampu CLSN S.32 Watt Milky White /Crystal 250,000.00 Unit Per Unit110 Lampu Type. CLBN. B. 32 Watt - Milky White / Crystal 320,000.00 Unit Per Unit111 Lampu SL 45,000.00 Unit Per Unit

112 Lambresering 17,400.00 Per M2

Ke Halaman …………….. 03

HARGA SATUAN (Rp)

M2

M2

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 22: Boq Polindes Kp Setie

NO URIAN / JENIS BAHAN MATERIAL SATUAN KET

1 2 3 4 5

113 List Kayu Profil 2.5 " x 2.5" 8,000.00 M' Per M'

114 List Kayu Profil 4 x 4 Cm 12,000.00 M' Per M'115 List Kayu Profil Siku 3 / 4 Cm 9,000.00 M' Per M'116 List Pinggang Dinding Partisi 27,500.00 M' Per M'117 Lem Kayu 22,400.00 Lt Per Lt118 Minyak Bekisting 3,000.00 Lt Per Lt119 Minyak Cat 17,500.00 Kg Per Kg120 Marmer 60 x 60 458,800.00 Per M2121 Marmer 40 x 40 458,800.00 Per M2122 Nok Genteng Metal Polycolor 48,800.00 Lbr Per Lbr123 Ornaman Kayu Motif Kerawang L = 7 Cm 500,000.00 M' Per M'124 Pasir Urug 65,000.00 Per M3125 Pasir Beton 85,000.00 Per M3126 Pasir Ayak 85,000.00 Per M3127 Pasir Cor 85,000.00 Per M3128 Pasir Pasang 85,000.00 Per M3129 Papan 2 x 20 x 400 Cm 2,580,000.00 Per M3130 Papan 2 x 20 x 400 Cm (Ketam) 3,500,000.00 Per M3131 Papan Lisplank 85,000.00 Per M2132 Papan Rider 25,000.00 Per M2133 Papan Bekesting 2,800,000.00 M3 Per M3134 Papan Talang 20,000.00 Lbr Per Lbr135 Papan Ukir 500,000.00 Per M2136 Pacu Pacing 60 x 230 Cm 35,000.00 Bh Per Bh

Paku dan Angker 10,000.00 kg Per kg137 Paku Biasa 15,000.00 Kg Per Kg138 Paku Seng 25,000.00 Kg Per Kg139 Paku Sumbat 1,000.00 Bh Per Bh140 Paku Asbest 12,300.00 Kg Per Kg141 Paku Skrup 2,000.00 Bh Per Bh142 Paku Genteng Metal 25,000.00 Kg Per Kg143 Paku Ripet 1,500.00 Bh Per Bh144 Paku Kait 1,000.00 Bh Per Bh145 Paku Khusus 950.00 Bh Per Bh146 Paku Triplek 15,000.00 Kg Per Kg147 Paku Kasau 9,300.00 Kg Per Kg148 Panel NCB 140,000.00 Bh Per Bh149 Plamur 12,500.00 Kg Per Kg150 Pemasukan Arus Listrik 1,860,000.00 Titik Per Titik151 Pintu Kaca Kozen Alumanium Lengkap (Uk. 80 x 250) 4,550,000.00 Unit Per Unit152 Pintu Kaca Kozen Alumanium Lengkap (Uk. 2 x 80 x 250) 9,100,000.00 Unit Per Unit153 Pipa PVC Kelas AW (Ins. Air Bersih dan Air Kotor)

Pipa PVC f 6 " 212,000.00 Batang Per Batang Pipa PVC f 5 " 225,800.00 Batang Per Batang Pipa PVC f 4 " 180,800.00 Batang Per Batang Pipa PVC f 3 " 104,500.00 Batang Per Batang Pipa PVC f 2 " 76,800.00 Batang Per Batang Pipa PVC f 1 " 29,700.00 Batang Per Batang Pipa PVC f 3/4 " 27,400.00 Batang Per Batang Pipa PVC f 1/2 " 22,000.00 Batang Per Batang

154 Pipa Besi Galpanis / GIP (Ins. Air Bersih) Pipa GIP f 6 " 1,161,900.00 Batang Per Batang Pipa GIP f 5 " 387,500.00 Batang Per Batang Pipa GIP f 4 " 616,500.00 Batang Per Batang Pipa GIP f 3 " 456,600.00 Batang Per Batang Pipa GIP f 2 " 260,400.00 Batang Per Batang Pipa GIP f 1,5 " 159,500.00 Batang Per Batang Pipa GIP f 1 " 121,500.00 Batang Per Batang Pipa GIP f 3/4 " 87,000.00 Batang Per Batang Pipa GIP f 1/2 " 69,100.00 Batang Per Batang

155 Play Wood 4 mm 65,000.00 Lembar Per Lembar156 Play Wood 3.4 mm 55,000.00 Lembar Per Lembar157 Play Wood 9 mm 147,000.00 Lembar Per Lembar158 Plapon Gymsumboard t = 9 mm 57,600.00 Per M2

- Plapon Pantastis Gypsum NCP. 12 Ø 620 mm 175,000.00 Unit Per Unit- Plapon Pantastis Gypsum NCP. 26 Ø 630 mm 250,000.00 Unit Per Unit- BL.021 & BC.021 13,750.00 M' Per M'

- Profil Gypsum NC. 2233 11,250.00 M' Per M'

Ke Halaman …………….. 04

HARGA SATUAN (Rp)

M2

M2

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

Page 23: Boq Polindes Kp Setie

NO URIAN / JENIS BAHAN MATERIAL SATUAN KET

1 2 3 4 5

159 Plapon Luxalon 120,000.00 Per M2

160 Plapon Allumanium Lamberesiring 168,000.00 Per M2161 Plint Keramik 10 x 20 Cm 2,400.00 Bh Per Bh162 Plint Keramik 5 x 10 Cm 2,100.00 Bh Per Bh

2 2 plint Keramik 5 X 20 cm 2,100.00 Bh Per Bh163 Rangka Atap Baja Ringan 150,000.00 M2 Per M2164 Residu 2,300.00 Kg Per Kg165 Rabung Genteng 57,000.00 M' Per M'166 Rabung Seng BJLS 0.30 21,600.00 M' Per M'167 Rabung Seng BJLS 0.20 21,000.00 M' Per M'168 Roof Light Fiberglass 230,000.00 Lbr Per Lbr

Roster/Terawang 15,000.00 Bh Per Bh169 Seng BJLS 0.30 30,800.00 Per M2170 Seng BJLS 0.20 31,400.00 Per M2171 Seng Plat BJLS 0.30 51,700.00 Lbr Per Lbr172 Semen PC 40 Kg 45,000.00 Zak Per Zak173 Semen PC 1 Kg 1,125.00 Kg Per Kg174 Semen Putih 50 Kg 180,000.00 Zak Per Zak175 Semen Putih 1 Kg 3,600.00 Kg Per Kg

Semen Warna 4,000.00 Kg Per Kg176 Saklar Seri 24,300.00 Bh Per Bh177 Saklar 1 Arah (Clipsal) 36,000.00 Bh Per Bh178 Saklar 2 Arah (Clipsal) 54,000.00 Bh Per Bh179 Saklar 3 Arah (Clipsal) 60,000.00 Bh Per Bh180 Saklar 4 Arah (Clipsal) 75,000.00 Bh Per Bh181 Saklar Tunggal 14,000.00 Bh Per Bh182 Stop Kontak 14,900.00 Bh Per Bh183 St. Steel Dia. 3 " Untuk Hendryl Tangga & Void 135,000.00 M' Per M'184 St. Steel Dia. 1.1/2 " Untuk Tiang Tangga & Void 95,000.00 M' Per M'185 Urinoir 883,400.00 Bh Per Bh186 Tanah uruq 44,500.00 Per M3187 Teer / Residu 2,300.00 Liter Per Liter188 Tegel PC Kepala Basah 30 x 30 Cm 31,100.00 Per M2189 Tegel PC Kepala Basah 30 x 30 Cm 31,100.00 Per M2190 Tegel Wafel 20 x 20 Cm 35,000.00 Per M2191 Tempat Sabun KIA 11 x 22 cm 50,625.00 Bh Per Bh192 Triplek 3 mm 45,000.00 Lembar Per Lembar193 Triplek 4 mm 65,000.00 Lembar Per Lembar194 Wastapel Dinding Type L.511.V3 / TL.511.EHP 820,000.00 Bh Per Bh195 Wastapel Dinding Type L.851.V1 / TL.851.MPRY 790,000.00 Bh Per Bh196 Waterstop 75,000.00 Kg Per Kg197 Jendela Nako 65,550.00 Bh Per Bh198 Walpaper 165,000.00 M2 Per M2

BENER MERIAH, 18 AGUSTUS 2009PENAWAR

CV. AFIFI PUTRI

SUNARDIKUASA DIREKTUR

0

HARGA SATUAN (Rp)

M2

M2

M2

M2

M3

M2

M2