Page 1: BOQ alfamart medan

R E K A P I T U L A S IPROYEK : GUDANG DC MEDANLOKASI :MEDAN

NO URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN

II PEKERJAAN TIANG PANCANG

III PEKERJAAN GUDANG UTAMA

1 PEKERJAAN STRUKTUR

2 PEKERJAAN ARSITEKTUR

IV PEKERJAAN KANTOR CABANG

1 PEKERJAAN STRUKTUR

2 PEKERJAAN ARSITEKTUR

V PEKERJAAN BANGUNAN PENUNJANG

VI PEKERJAAN EKSTERNAL

VII PEKERJAAN M/E

T O T A L = -

DIBULATKAN = -

PPN 10% = -

G R A N D T O T A L = -

Page 2: BOQ alfamart medan

Persiapan 2

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC MEDAN

LOKASI : MEDAN

NO URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA

I PEKERJAAN PERSIAPAN1 Site Management Ls 1.00 - 2 Mobilisasi & Demobilisasi Alat Kerja Ls 1.00 - 3 Pekerjaan Pengukuran & Bowplank Ls 1.00 - 4 Pembersihan Lapangan/Proyek Ls 1.00 - 5 Pagar Proyek Ls 1.00 - 6 Papan Nama Proyek Ls 1.00 - 7 Direksi Keet Owner (berikut Perlengkapan) Ls 1.00 - 8 Keet Kontraktor dan gudang material (Warehouse & Barak) Ls 1.00 - 9 Dokumen Kontrak, As built drawing, laporan, foto, dll Ls 1.00 - 10 Air Kerja Ls 1.00 - 11 Listrik Kerja Ls 1.00 - 12 Keamanan Proyek Ls 1.00 - 13 Telepon Ls 1.00 - 14 Keselamatan Kerja Ls 1.00 - 15 Testing Material Ls 1.00 - 16 Astek Ls 1.00 -

-

HARGA SATUAN

Page 3: BOQ alfamart medan

REKAPITULASIPROYEK : GUDANG DC MEDANLINGKUP : PANCANGLOKASI : MEDAN

NO PEKERJAAN JUMLAH HARGA

PEKERJAAN PANCANG

A PEKRJAAN PDA TES

B BANGUNAN GUDANG UTAMA

C KANTOR CABANG

D R. GENSET

E GROUND TANK / TOWER

TOTAL = 0

Page 4: BOQ alfamart medan

Pekerjaan Pancang 4

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC MEDANLINGKUP: PANCANGLOKASI : MEDAN

NO URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA

II PEKERJAAN TIANG PANCANGA PEKRJAAN PDA TES1 PDA Test ttk -

B BANGUNAN GUDANG UTAMA

1 m1 15,064.00 -

2 Pemancangan dengan Hidrolik m1 - 3 Handling tiang m1 - 5 Mob demob tiang pancang unit - 6 Welding 25x25cm2 set - 7 Join 30x30 cm2 set -

- C KANTOR CABANG

1 m1 1,792.00 -

2 Pemancangan dengan Hidrolik m1 - 3 Handling tiang m1 - 4 Welding 25x25cm2 set - 5 Join 25x25 cm2 set -

- D R. GENSET -

1 m1 42.00 -

2 Pemancangan dengan Hidrolik m1 - 3 Handling tiang m1 -

-

E GROUND TANK / TOWER

1 m1 24.00 -

2 Pemancangan dengan Hidrolik m1 - 3 Handling tiang m1 -

F SHEET PILEi Sheet pile W 325 B 1000 L - 12 m m ii Sheet pile W 325 B 1000 L - 9 m m - iii Handling m - iv jasa pemancangan m

-

HARGA SATUAN

Tiang Pancang 250mm x 250mm L = 14 m (Heavy Duty)

Tiang Pancang 250mm x 250mm L = 14 m (Heavy Duty)

Tiang Pancang 250mm x 250mm L = 6m diganti 7m (Heavy Duty)

Tiang Pancang 250mm x 250mm L = 6 m (Heavy Duty)

Page 5: BOQ alfamart medan

REKAPITULASIPROYEK : GUDANG DC MEDANLINGKUP : BANGUNAN UTAMALOKASI : MEDAN

NO PEKERJAAN JUMLAH HARGA

BANGUNAN UTAMA

A PEKERJAAN STRUKTURAL 0

0

B PEKERJAAN ARSITEKTUR 0

0

0

0

0

TOTAL = 0

Page 6: BOQ alfamart medan

Bangunan Utama6

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC MEDANLINGKUP: BANGUNAN UTAMALOKASI : MEDAN

PT. PIM KONTRAKTOR

NO URAIAN PEKERJAAN SAT VOLUME VOLUME VOLUME

III BANGUNAN UTAMAIII.1 PEKERJAAN STRUKTUR

BOBOK TIANG PANCANGi Bobokan Kepala Tiang Pancang titik 1,076.00

A PEKERJAAN TANAH 1 Galian tanah

i Galian Pile Cap m3 941.50 ii Galian Tie Beam m3 941.12 iii Galian Pit Tabel Lifter m3 14.20 iv Galian Batu Kali m3 132.69

2 Urugan Tanah Ex Galian m3 82.59 3 Buangan Tanah Ex Galian m3 50.10 4 Urugan Tanah luar merah + Pemadatan CBR 8% m3 5,312.00

B PEKERJAAN PONDASI BATU KALIi Urugan pasir tanah T:10cm m3 13.54 ii Pasangan Batu Kali m3 36.56 iii Angkur Besi U24 kg 3.29

C PEKERJAAN STRUKTUR BETON1 Pile Caps PC1 K 350

i Beton pile cap m3 148.83 ii Pembesian kg 827.12 iii Bekisting Bata m2 1,771.20 iv Urug pasir, t = 10 cm m3 2.98 v Lantai kerja, t = 5 cm m3 14.88

2 Pile Caps PC2 K 350i Beton pile cap m3 13.59 ii Pembesian kg 203.11 iii Bekisting Bata m2 125.40 iv Urug pasir, t = 10 cm m3 0.27 v Lantai kerja, t = 5 cm m3 1.36

3 Pile Caps PC1a K 350i Beton pile cap m3 13.46 ii Pembesian kg 142.82 iii Bekisting Bata m2 160.20 iv Urug pasir, t = 10 cm m3 0.27 v Lantai kerja, t = 5 cm m3 1.35

4 Pile Caps PC2a K 350i Beton pile cap m3 1.79 ii Pembesian kg 53.07 iii Bekisting bata m2 16.50 iv Urug pasir, t = 10 cm m3 0.04 v Lantai kerja, t = 5 cm m3 0.18

5 Tie beam 30x50cmK 350i Beton tie beam m3 81.11 ii Pembesian kg 690.69 iii Bekisting bata m2 594.83 iv Urug pasir, t = 10 cm m3 1.62 v Lantai kerja, t = 5 cm m3 8.11

6 Tie beam 20x40cmK 350i Beton tie beam m3 0.52 ii Pembesian bata kg 3.88 iii Bekisting bata m2 5.15 iv Urug pasir, t = 10 cm m3 0.01 v Lantai kerja, t = 5 cm m3 0.06

7 Slab lantai T: 30cm K 350i Beton slab lantai m3 23.86 ii Pembesian kg 1,772.23 iv Urug pasir, t = 10 cm m3 79.53 v Lantai kerja, t = 5 cm m.3 39.77 vi Plastic Sheet m2 795.30

8 Slab lantai T: 7cm K 350i Beton slab lantai m3 19.15 ii Wiremesh M8 - 150 (1 lapis) kg 50.21

HARGA SATUAN

Page 7: BOQ alfamart medan

Bangunan Utama7

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC MEDANLINGKUP: BANGUNAN UTAMALOKASI : MEDAN

PT. PIM KONTRAKTOR

NO URAIAN PEKERJAAN SAT VOLUME VOLUME VOLUME HARGA

SATUAN

iv Urug pasir, t = 10 cm m3 27.36 v Lantai kerja, t = 5 cm m2 13.68 vi kg 0.64 vii Plastic Sheet m2 273.60

9 Ramp beton i Beton K-350 m3 2.50 ii Pembesian kg 11.66 iii Bekisting m2 1.79 iv Urug pasir, t = 10 cm m3 0.36 v Lantai kerja, t = 5 cm m3 1.79 vi Plastic Sheet m2 35.75

10 Dinding Tepii Beton K-350 m3 102.96 ii Pembesian kg 69.00 iii Bekisting m2 178.00 iv Urug pasir, t = 10 cm m3 17.16 v Lantai kerja, t = 5 cm m3 85.80

11 Pedestal C1 K 350i Beton pedestal m3 0.40 ii Besi D 19 kg 2.04 iii Bekisting bata m2 0.02 iv Bekisting Multiplek m2 5.40

12 Pedestal C1a K 350i Beton pedestal m3 0.40 ii Besi D 19 kg 2.04 iii Bekisting bata m2 0.02 iv Bekisting Multiplek m2 5.40

13 Pedestal C2 K 350i Beton pedestal m3 5.88 ii Besi D 19 kg 49.69 iii Bekisting bata m2 0.02 iv Bekisting Multiplek m2 80.00

14 Pedestal C2a K 350i Beton pedestal m3 1.04 ii Besi D 19 kg 5.78 iii Bekisting bata m2 0.02 iv Bekisting Multiplek m2 5.40

15 Pedestal C3 K 350i Beton pedestal m3 1.71 ii Besi D 19 kg 9.42 iii Bekisting bata m2 0.02 iv Bekisting Multiplek m2 23.80

16 Pedestal C3a K 350i Beton pedestal m3 0.32 ii Besi D 19 kg 2.51 iii Bekisting bata m2 0.01 iv Bekisting Multiplek m2 2.40

17 Pedestal C4 K 350i Beton pedestal m3 2.69 ii Besi D 19 kg 13.61 iii Bekisting bata m2 0.02 iv Bekisting Multiplek m2 36.00

18 Pedestal C4a K 350i Beton pedestal m3 2.77 ii Besi D 19 kg 15.43 iii Bekisting bata m2 0.02 iv Bekisting Multiplek m2 14.40

19 Pedestal C5K 350i Beton pedestal m3 ii Besi D 19 kg iii Bekisting bata m2 iv Bekisting Multiplek m2

20 Pedestal C5a K 350i Beton pedestal m3 ii Besi D 19 kg iii Bekisting bata m2

Besi Dowel Ø 10

Page 8: BOQ alfamart medan

Bangunan Utama8

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC MEDANLINGKUP: BANGUNAN UTAMALOKASI : MEDAN

PT. PIM KONTRAKTOR

NO URAIAN PEKERJAAN SAT VOLUME VOLUME VOLUME HARGA

SATUAN

iv Bekisting Multiplek m2 21 Pedestal C6a K 350

i Beton pedestal m3 ii Besi D 19 kg iii Bekisting bata m2 iv Bekisting Multiplek m2

22 Pit Table Lifter 2450x3050 K 350i Beton pit tabel lifter m3 4.48 ii Besi D 13 kg 24.18 iii Bekisting m2 14.95 iv Urug pasir, t = 10 cm m3 0.15 v Lantai kerja, t = 5 cm m3 0.75

23 dinding Pit table Lifter 2450x3050i Beton pit tabel lifter K-350 m3 2.64 ii Besi D 13 kg 121.46 iii Bekisting bata m2 5.50 iv Bekisting Multiplek m2 5.50 v Urug pasir, t = 10 cm m3 0.01 vi Lantai kerja, t = 5 cm m2 0.07 vii L 70.70.7 kg 81.18

24 Kolom 120x250mm i Beton ramp m3 4.29 ii Besi D 13 kg 1,754.87 iii Bekisting m2 0.74 iv Urug pasir, t = 10 cm m3 0.04 v Lantai kerja, t = 5 cm m2 0.02

25 Sloof 150x200mmi Beton ramp m3 4.06 ii Besi D 13 kg 22.82 iii Bekisting m2 54.46

C PEKERJAAN STRUKTUR BAJA1 Kolom

i WF -500 x 200 x 10 x 16 kg 46,233.60 ii WF -450 x 200 x 9 x 14 kg iii WF -400 x 200 x 8 x 13 kg iv WF -350 X 175 X 7 X 11 (9) = 49,60 kg/m' kg

v kg 24,463.12

vi WF -250 X 125 X 6 X 9 (11) = 29,60 kg/m' kg vii H -250x 9 x 14 (H.350.350.12.9) kg 28,540.96 viii Base plate & Rib kg 3,908.02 ix Angkur baut Ø19 bh 138.00 x Angkur baut Ø25 bh 484.00 xi Non-shrinkage grouting titik 77.00 xii Plat sambungan Kolom H250 dengan WF 250 kg xiii Plat sambungan Kolom H450 dengan WF 400ix Baut HTB M19x Baut HTB M20

2 Struktur Rangka Atap Utamai WF -500 X 200 X 10 X 16 kg 35,931.44 ii WF -200 X 100 X 5.5 X 8 kg 6,074.76 iii HCB -600 X 300 X 12 X 20 kg 25,821.00 iv WF -400 X 200 X 8 X 13 kg 5,28 v WF -300 X 150 X 6.5 X 9 kg 293,60 vi WF -250 X 125 X 6 X 9 kg vii WF -150 X 75 X 5 X 7 kg 16,282.00 viii WF -900 X 300 X 12 X 20 kg 9,712.80 ix C -125 X 50 X 20 X 3.2 kg 45,783.75 x Trekstang kg 4,083.32 xi Ikatan Angin L 60.60.6 kg 8,659.42 xii L 60. 60.5 kg 2,656.82 xiii L 40.40.4 kg 6,017.55 xiv Turn Buckle bh xv Pelat kg 3,727.17 xvi Baut M12 bh 2,656.00

WF -300 X 150 X 6,5 X 9 (10a) - kingcross = 73.40 kg/m'

Page 9: BOQ alfamart medan

Bangunan Utama9

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC MEDANLINGKUP: BANGUNAN UTAMALOKASI : MEDAN

PT. PIM KONTRAKTOR

NO URAIAN PEKERJAAN SAT VOLUME VOLUME VOLUME HARGA

SATUAN

xvii Baut M16 bh 1,276.00 xviii Baut M22 bh 1,020.00

3 PEKERJAAN RANGKA ATAP MONITORi KOLOM WF 150. X 75 X 5 X 7 kg 685.44 ii WF 150 X 75 X 5 X 7 kg 2,273.60 iii Gording CNP 125 x 50 x 20 x 3.2 kg 6,087.09 iv L 60 x 60 x 5 kg v L 40 40 4 kg vi Trekstang kg 394.00 vii Ikatan angin kg 402.11 viii Turn buckle bh 28.00 ix Plat (Stifnir, end plate dan rib) kg 273.40

x Baut M16 bh

xi Baut M12 bh 3,096.00

4 Struktur Rangka Atap Canopy

i WF -400 x 200 x 8 x 13 kg

ii WF -300 x 150 x 6.5 x 9 kg

iii WF -200 X 100 X 5.5 X 8 kg 5,834.07

iv WF -150 X 75 X 5 X 7 kg 5,208.00

v C -125 X 50 X 20 X 3.2 kg 6,159.42

vi Trekstang kg 16.70

vii kg 40.23

viii Turn buckle bh 64.00 ix Pelat (stifner, end plate dan Rib) kg 1,032.62 x Baut M12 bh 396.00 xi Baut M16 bh 264.00 xii Baut M19 bh

5 Struktur Rangka Atap Monitor (Jack Roof)i WF -200 x 100 x 5,5 x 8 ( 12 ) = 21,33 kg/m' kg ii WF -150 x 75 x 5 x 7 ( 13 ) = 14,00 kg/m' (ring balok) kg iii C -150 x 65 x 20 x 3,2 ( 32 ) = 7,58 kg/m' kg iv Sagrod Ø 10 kg v Wind Bracing Ø 19 + Turn Buckle; L= 7,14 m' bh

6 Pengecatan baja kg(sesuai spek teknis)

TOTAL III.1

Ikatan Angin Ø 19

Page 10: BOQ alfamart medan

Bangunan Utama10

JUMLAH HARGA

Page 11: BOQ alfamart medan

Bangunan Utama11

JUMLAH HARGA

Page 12: BOQ alfamart medan

Bangunan Utama12

JUMLAH HARGA

Page 13: BOQ alfamart medan

Bangunan Utama13

JUMLAH HARGA

-

Page 14: BOQ alfamart medan

REKAPITULASIPROYEK : GUDANG DC JEMBERLINGKUP : KANTOR CABANGLOKASI : MEDAN

NO PEKERJAAN JUMLAH HARGA

KANTOR CABANG

A PEKERJAAN STRUKTURAL 0

0

B PEKERJAAN ARSITEKTUR 0

0

0

0

0

TOTAL = 0

Page 15: BOQ alfamart medan

Kantor Cabang 15

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC JEMBERLINGKUP: KANTOR CABANGLOKASI : MEDAN

PT. PIM PT. Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA

IV KANTOR CABANGIV.1 PEKERJAAN STRUKTUR

IV.1. A LANTAI DASAR1 PEKERJAAN TANAH DAN PONDASI : -

a Galian tanah untuk pondasi dan tie beam m3 153.59 - b Urugan tanah kembali m3 116.19 - c Pemadatan Tanah m2 2,326.00 - d Bobokan Kepala tiang titik 128.00

2 PEKERJAAN PILECAP : - a Pondasi type PC1 -

i Pembesian kg 1.68 - ii Bekisting Pas. Bata m2 3.60 - iii m3 0.30 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.03 - v Pasir urug, t= 10 cm m3 0.01 -

b Pondasi type PC1a - i Pembesian kg 16.05 - ii Bekisting Pas. Bata m2 18.00 - iii m3 1.51 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.15 - v Pasir urug, t= 10 cm m3 0.03 -

c Pondasi type PC2 - i Pembesian kg 187.07 - ii Bekisting Pas. Bata m2 115.50 - iii m3 12.51 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 1.25 - v Pasir urug, t= 10 cm m3 0.25 -

d Pondasi type PC2a - i Pembesian kg 233.49 - ii Bekisting Pas. Bata m2 72.60 - iii m3 7.87 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.79 - v Pasir urug, t= 10 cm m3 0.16 -

3 PEKERJAAN KOLOM PEDESTAL - a Pondasi Type C5 -

i Pembesian kg 12.25 - ii Bekisting Multiplek m2 32.40 - iii m3 2.43 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm 0.17 v Pasir urug, t= 10 cm 0.03

b Pondasi Type C5a - i Pembesian kg 7.71 - ii Bekisting Multiplek m2 7.20 - iii m3 1.39 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.04 v Pasir urug, t= 10 cm m3 0.01

c Pondasi Type C6 - i Pembesian kg 66.87 - ii Bekisting Multiplek m2 38.00 - iii m3 7.18 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.20 v Pasir urug, t= 10 cm m3 0.04

d Pondasi Type C7 - i Pembesian kg 3.81 - ii Bekisting Multiplek m2 3.40 - iii m3 0.63 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.02 v Pasir urug, t= 10 cm m3 0.00

e Pondasi Type C8 - i Pembesian kg 7.54 - ii Bekisting Multiplek m2 7.20 - iii m3 0.95 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.03 v Pasir urug, t= 10 cm m3 0.01

4 PEKERJAAN TIE BEAM DAN RETAINING WALL : - a Tie Beam type 300/500mm -

i Pembesian kg 236.81 - ii Bekisting m2 203.94 - iii m3 27.81 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 2.78 - v Pasir urug, t= 10 cm m3 0.56 -

HARGA SATUAN

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Beton readymix K-350

Page 16: BOQ alfamart medan

Kantor Cabang 16

PT. PIM PT. Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA

SATUAN

b Tie Beam type 200/400 - i Pembesian kg 4.85 - ii Bekisting m2 6.44 - iii m3 0.64 - iv Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.08 - v Pasir urug, t= 10 cm m3 0.02 -

c Retaining Wall 200/1700 - i Pembesian kg 111.70 - ii Bekisting m2 26.00 -

iii m3 20.00 -

Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm

urugan kembali

galian tanah

Pasir urug, t= 10 cm

5 PEKERJAAN PONDASI BATU KALI

a Pondasi batu kali area dalam office

i Pasir urug, t= 10 cm m3 33.28

ii Pas batu kali m3 89.86

iii Angkur besi U24 kg 8.10

b Tangga batu kali

i Pasir urug, t= 10 cm m3 4.61

ii Pas batu kali m3 21.35

iii Angkur besi U24 kg 0.07

6 PEKERJAAN SLOOF 200X150

i Pembesian kg 56.91

ii Bekisting m2 133.42

iii Beton K-350 m3 9.98

6 PEKERJAAN SLAB LANTAI - a SLAB LANTAI T: 30cm Lantai 1

i Beton slab lantai m3 - ii Pembesian kg - iv Urug pasir, t = 10 cm m3 - v Lantai kerja, t = 5 cm m3 - vi Plastic Sheet m3 -

b PEKERJAAN SLAB LANTAI i Beton slab lantai m3 162.82 ii Wiremesh M6 - 150 (1 lapis) m2 2,326.00 iii Urug pasir, t = 10 cm m3 232.60 iv Lantai kerja, t = 5 cm m3 116.30 v kg 40.64 vi Plastic Sheet m2 2,326.00 -

PEKERJAAN SLAB LANTAI T:12cm lantai 2i Beton slab lantai k350 m3 279.12 ii Combidex t=0.75mm m2 2,110.00 iii Pembesian U24 kg 533.42 iv Shear Conectore dia 10mm - 200 kg 39.27

e Ramp Entrance - i Pembesian kg 2.64 - ii m3 0.57 - iii Lantai kerja Adukan 1 : 5 : 7, tebal = 5 cm m3 0.41 - iv Pasir urug, t= 10 cm m3 0.08 -

v Tanah urug, t= 90 cm m3 0.73 -

vi Plastic sheet m2 8.10 -

PEKERJAAN BAJA

a Kolom baja

H 150.150.7.10

i WF 500,200,10,16 kg 19,734.00

ii K 350,350,12,19 kg 11,968.00 iii WF 450,200,9,14 kg 11,407.60 iv WF 400,200,8,13 kg v WF 250.125.6.9 kg 2,655.12 vi WF 300,150,65,9 kg vii H 250,250,9,14 kg 6,494.28

viii Base Plat & Rib kg 4,611.64

ix Angkur D25 bh 400.00

x Angkur D19 bh 150.00

Angkur D16

xi Grouting titik 93.00

xii Pengecatan

b Balok Baja

i WF 150.75.5.7 kg 3,287.34

ii WF 250.125.6.9 kg 1,417.84

iii WF 300.150.6,5.9 kg 2,238.70

Beton readymix K-350

Beton readymix K-350

Besi Dowel Ø 10

Beton readymix K-350

Page 17: BOQ alfamart medan

Kantor Cabang 17

PT. PIM PT. Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA

SATUAN

iv WF 200.100.5,5.7 kg 981.93

v WF 450,200,9,14 kg 83,995.20

vi WF 500.200.10.16 kg 23,528.96

vii Baut M22 bh 7,268.00

viii Baut M16 bh 7,038.00

ix Baut M12 bh 1,240.00

x Baut M20 bh 912.00

xi Plat (stifner, Rib dan end plate) kg 3,899.88

xii Pengecatan

c Rangka Atap Kantor

i WF 400,200,8,13 kg 23,192.40

ii WF 250.125.6.9 kg 1,184.00

iii WF 200.100.5,5.7 kg 10,926.90

iv WF 150.75.5.7 kg

v Gording CNP 125.50.20.3,2 kg 16,213.85

vi Trekstang kg 24.38

vii kg 56.63

viii Turn Buckle bh 116.00

ix Pelat (stifner, rib, dan end plate) kg 850.26

x Baut M12 bh 684.00

xi Baut M16 bh 864.00

xii Baut M22 bh 1,064.00

xiii Pengecatan

d Canopy enterance

i WF 300.150.6,5.9 kg 803.73

ii WF 400,200,8,13 kg 1,122.00

iii WF 200.100.5,5.7 kg 187.44

iv H 250.250 kg 535.76

v bh 84.00

vi Pelat (stifner, rib, dan end plate) kg 105.16

vii Pengecatan

PEKERJAAN TALANG BETON

a Pelat lantai talang

i Beton K350 m3 12.67

ii Besi U24 kg 11.94

iii Bekisting m2 23.51

b Balok 250x600mm

i Beton K350 m3 15.83

ii Pembesian kg 66.99

iii Bekisting m2 127.17

c Balok 200x400 mm

Beton K350 m3 8.44

Pembesian kg 41.91

Bekisting m2 84.85

d Lisplank 120x130mm

Beton K350 m3 16.47

Pembesian m3 108.88

Bekisting kg 274.70

TOTAL V.1 -

IV.2A PEKERJAAN ARSITEKTURI LANTAI DASAR '1 LANTAI :

a Lantai Keramik :

i m2 42.58 -

ii m2 133.76 - iii Keramik 40x40 ex Roman m2 1,686.10 - iv Keramik 20x20 ex Roman area KM/WC m2 86.74 -

b Keramik Tangga :

i Keramik Tangga 40x40 ex Roman + step noosing m2 47.30 -

ii m2 33.40 -

iii m2 121.80 - c Plint Kayu pada Pas dinding bata :

i Plint Kayu Kamper 2x10 cm fin Cat Minyak m1 195.22 - d Garis sersan untuk Ram m2 1.80 - g kanstin area selasar K. Cabang m 222.10 -

2 DINDING :a Pas. Dinding :

i Pas. Bata merah ex Lokal m2 946.49 -

Ikatan angin Ø19

Baut Ø19

Homogeniuos Tile 40x40 Salsa Crystal Black ex Granito area Lobby + Teras Homogeniuos Tile 40x40 Salsa Pearl White ex Granito area Lobby + Teras

Homogenious Tile 40x40 Salsa Crystal Black ex Granito n + StepnossingPaving Blok t = 8 cm Type 4 ex CI area selasar K. Cabang

Page 18: BOQ alfamart medan

Kantor Cabang 18

PT. PIM PT. Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA

SATUAN

ii Pas. Bata Ringan Ex Primacon m2 465.46 iii Plaster Aci Bata m2 1,564.27 - v Plaster aci Bata ringan (MU) m2 1,037.12

b Beton :i Kolom Praktis uk. 13x13 cm tul. 4Ø10; Ø8-200 m3 18.76 - ii Balok Praktis 13x15 cm tul. 4Ø10; Ø8-250 m3 7.89 -

c Cat Dinding :i Dinding Interior Acrylic Emulsion ex Catylac m2 2,171.27 - ii Dinding Eksterior Weathershield ex Dulux m2 483.70 -

d m3 14.35 -

e Keramik Dinding :

i m2 28.76 -

ii m2 328.71 -

iii m1 195.22 -

iv m2 176.01 -

f m1 195.22 - 3 DINDING PARTISI

a m2 257.11 -

b m2 118.02 - c Partisi GRC 9 mm Fuel Rangka Metal Stud Finish Cat m2 d Cat Partisi Acrylic Emulsion ex Catylac m2 375.13 - e Plint Kayu Kamper 2x10 cm fin Cat Minyak m1 323.56 - f List Topping kayu kamper fin Melamik m1 66.58 - g Beton Kanopi kusen t: 10cm m3 13.13 -

4 KUSEN, PINTU, JENDELA (Harga Satuan termasuk assesories, lockset, beton praktis dan pemasangan)

a Pintu Jendela i Type PJ1- 02 unit 2.00 - ii Type PJ2-02 unit 1.00 - iii Type PJ3-02 unit 2.00 - iv Type PJ4-02 unit 1.00 - v Type PJ5-02 2.00

b Pintu Alumunium dan kayui Type P1-01B unit 4.00 - ii Type P2-01B unit 17.00 - iii Type P3-01B unit 10.00 -

iv Type P4-01B unit 12.00 -

Type P5-01B 1.00 c Jendela

i Type J1-01B unit 2.00 - ii Type J2-01B unit 38.00 - iii Type J3-01B unit 2.00 - vi Type BV1 unit -

d Pintu Besii PB1 unit 1.00

5 PLAFOND :

a m2 1,844.12 - b Plafond Acrilic Tile t = 10 mm ex Intex m2 26.34 -

c m2 19.62 -

d Cat Plafond m2 2,021.40 - e Beton Expose m2 131.33 -

7 SANITARYa Closet Jongkok type CE 6ex TOTO unit 4.00 - b Closet Duduk Type CW 421 J/SW 420 JP Ex TOTO unit 6.00 - c Shower Spray S 75C Ex San EI unit 6.00 - d Urinoir type U57M ex TOTO unit 6.00 - e Partition Urinal A100 ex TOTO unit 5.00 - f Wastafel Meja Type L521V1A ex TOTO unit 11.00 - g Kran Air type Y20c ex San Ei unit 7.00 - h Floor Drain dia. 4" type H51 ex San Ei unit 10.00 - i Kitchen Zink ex Royal unit 2.00 - j Kran Air type A10C ex San Ei u/ Kitchen Zink unit 1.00 - k Kaca Cermin 6 mm + Bevel m2 5.99 -

8 ENTRANCE AREA a Atap Canopy

Meja Beton t = 10 cm lebar 60 cm fin Keramik ex Roman type G 227058 (pantry dan wastafel)Keramik 20x25 cm type W25552 ex Roman area KM/WC dan JanitorKeramik 20x25 cm type W25592 ex Roman area KM/WC List Keramik 6x20 cm type Palermo Deiva Beige ex RomanKeramik 20x20cm ex Roman type 447106 dinding Corridor H : 16000mm dan tempat wudhuNaad 3x1 cm fin Cat Weathershield ex Dulux (tampak Depan)Partisi Full Double Gypsump t = 9 mm + Rangka Metal Stud Partisi h = 140 cm Double Gypsump t = 9 mm + Rangka Metal Stud

Plafond Gypsump Tile t = 9 mm ex Jayaboard + Rangka Cross Tee main TeePlafond Gypsumpboard t = 9 mm + Rangka Hollow + List Shadow Line area Lobby

Page 19: BOQ alfamart medan

Kantor Cabang 19

PT. PIM PT. Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA

SATUAN

i m2 113.97 - ii Flasing Zincalume 0.45 TCT m1 17.00 - iii Talang Zincalume 0.45 TCT m1 17.00 - iv Roof Drain ex Antasan bh 2.00 - v Pipa Air hujan PVC type AW ex Wavin dia. 4" m1 8.70 -

d Plafond Canopy Alumunium Spandrel + Rangka m2 123.74 c Alumunium Composite Panel ex Alucopan + Rangka : -

i Lisplank Canopy dan kolom m2 11.90 - d Planter Box :

i Pondasi Rollag m1 - ii Pasangan Bata (termasuk Beton Praktis) m2 36.66 - iii Plaster Aci m2 36.66 - iv Naad 3x1 cm fin Cat Weathershield ex Dulux m1 18.80 - v Topping concrete t = 5 cm m1 18.80 - vi Cat Dinding Weathershield ex Dulux m2 36.66 -

I LANTAI 2 '1 LANTAI :

a Lantai Keramik :

i m2 157.27 -

ii m2 1,686.10 -

iii m2 86.74 - b Plint dinding bata] :

i Plint Kayu Kamper 2x10 cm fin Cat Minyak m1 323.56 - 2 DINDING :

a Pas. Dinding :i Pas. Bata merah ex Lokal (dinding interior) m2 703.22 - ii Pas. Bata Ringan Ex Primacon (dinding exterior) m2 358.55 iii Plaster Aci Bata m2 1,077.74 - v Plaster aci Bata ringan (MU) m2 823.29

b Beton :i Kolom Praktis uk. 12x12 cm tul. 4Ø10; Ø8-200 m3 14.25 - ii Balok Praktis 13x15 cm tul. 4Ø10; Ø8-250 m3 7.89 -

c Cat Dinding :i Dinding Interior Acrylic Emulsion ex Catylac m2 1,577.82 - ii Dinding Eksterior Weathershield ex Dulux m2 376.79 -

d m3 14.35 -

e Keramik Dinding :

i m2 28.76 -

ii m2 328.71 -

iii m1 195.22 -

iv m2 28.76 -

f m1 -

3 DINDING PARTISI

a m2 257.11 -

b m2 118.02 -

c m2 -

d Cat Partisi Acrylic Emulsion ex Catylac m2 375.13 - e Plint Kayu Kamper 2x10 cm fin Cat Minyak m1 323.56 - f List Topping kayu kamper fin Melamik m1 66.58 - g Beton Kanopi kusen t: 10cm m3 13.13 -

4 KUSEN, PINTU, JENDELA (Harga Satuan termasuk assesories, lockset, beton praktis dan pemasangan)

a Pintu Jendela i Type PJ2-01B unit 1.00 - ii Type PJ3-01B unit 2.00 - iii Type PJ4-01B unit 1.00 -

b Pintu Alumunium dan kayui Type P1-01B unit 4.00 - ii Type P2-01B unit 17.00 - iii Type P3-01B unit 10.00 - iv Type P3A-01B unit -

v Type P4-01B unit 12.00 -

vi Type P5-01B unit 1.00 -

Penutup Atap Zincalume Klip Panel 0.5 TCT ex Union tanpa sambungan

Homogeniuos Tile 40x40 Salsa Crystal Black ex Granito area Lobby + Teras Keramik 40x40 ex Roman

Keramik 20x20 ex Roman area KM/WC

Meja Beton t = 10 cm lebar 60 cm fin Keramik ex Roman type G 227058Keramik 20x25 cm type W25552 ex Roman area KM/WC dan JanitorKeramik 20x25 cm type W25592 ex Roman area KM/WC List Keramik 6x20 cm type Palermo Deiva Beige ex RomanKeramik 20x20cm ex Roman type 447106 dinding Corridor H : 16000mm dan tempat wudhuNaad 3x1 cm fin Cat Weathershield ex Dulux (tampak Depan)Partisi Full Double Gypsump t = 9 mm + Rangka Metal Stud Partisi h = 140 cm Double Gypsump t = 9 mm + Rangka Metal Stud Partisi GRC 9 mm Fuel Rangka Metal Stud Finish Cat

Page 20: BOQ alfamart medan

Kantor Cabang 20

PT. PIM PT. Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA

SATUAN

c Pintu Besi

i PB1-01B unit 1.00 d Jendela

i Type J1-01B unit 2.00 - ii Type J2-01B unit 38.00 - iii Type J3-01B unit 2.00 - iv Type J4-01B unit - - vi Type BV1 unit 5.00 - vi Type BV2 unit 19.00 - vii Type BV3 unit - viii Type BV4 unit -

5 PLAFOND :

a m2 1,844.12 -

b m2 26.34 -

c m2 19.62 -

d Cat Plafond m2 2,021.40 -

e Beton Expose kanopi m2 131.33 - 7 SANITARY

a Closet Jongkok type CE 6ex TOTO unit 4.00 - b Closet Duduk Type CW 421 J/SW 420 JP Ex TOTO unit 6.00 - c Shower Spray S 75C Ex San EI unit 6.00 - d Urinoir type U57M ex TOTO unit 6.00 - e Partition Urinal A100 ex TOTO unit 5.00 - f Wastafel Meja Type L521V1A ex TOTO unit 11.00 - g Kran Air type Y20c ex San Ei unit 7.00 - h Floor Drain dia. 4" type H51 ex San Ei unit 10.00 - i Kitchen Zink ex Royal unit 2.00 - j Kran Air type A10C ex San Ei u/ Kitchen Zink unit 1.00 - k Kaca Cermin 6 mm + Bevel m2 5.99 -

9 ATAP :

a i m2 153,79 -

ii m2

b m2 276.13 -

c m2 137,286.00 -

d m1 10.20 - e m1 102.60 - f bh 21.00 - g m1 102.70 - h m1 1.70 -

- 10 LAIN-LAIN

a Bak Kontrol bh -

b m2 -

c Tangga Baja Samping bh 2.00 - d Waterproofing membran untuk talang canopy m2 17.00 e Cover kolom baja Alcopanel rangka hollow 50.50.5 m2 36.66 f Gawangan Stainlees Steel ls

TOTAL V.2 -

Plafond Gypsump Tile t = 9 mm ex Jayaboard + Rangka Cross Tee main TeePlafond Acrilic Tile t = 10 mm ex IndoagraPlafond Gypsumpboard t = 9 mm + Rangka Hollow + List Shadow Line area Lobby

Atap Zincalume 0,50 TCT Klip Panel ex Union (tanpa sambungan)Atap Skylight ex Indo Agra KharismaInsulation Alumunium Foil 2 sided + Glasswool 16kg/m2 t = 2" + Alumunium Foil Single sided + Kawat mesh 50x50x2

Clading zincalum MP Deck 0.45 TCT termasukNok Atap Zincalume 0.5 TCT ex Union tanpa sambunganFlasing Zincalume 0.45 TCTRoof Drain ex AntasanPipa Air hujan PVC type AW ex Wavin dia. 4"Talang Zincalume 0.45 TCT

Perforated diameter lubang 10mm 5 baris termasuk rangka u/ penutup samping kolom pada tampak depan dan samping

Page 21: BOQ alfamart medan

REKAPITULASIPROYEK : GUDANG DC MEDANLINGKUP : EXTERNALLOKASI : MEDAN

NO PEKERJAAN JUMLAH HARGA

III PEKERJAAN EKSTERNAL

A PEKERJAAN PAGAR DAN PINTU GERBANG

B PEKERJAAN TANAH DAN DINDING PENAHAN TANAH

C PEKERJAAN DRAINASE

D PEKERJAAN PERKERASAN DAN MARKA JALAN

E PEKERJAAN TOWER AIR

F PEKERJAAN POS PENGINTAI

G PEKERJAAN TEMPAT SAMPAH

H PEKERJAAN SEPTICTANK DAN RESAPAN

I PEKERJAAN PENGHIJAUAN

J GARDU PEMADAM

K GARDU LISTRIK

L GROUND WATER TANK DAN RUANG POMPA

M TIANG BENDERA

N PARKIR MOTOR

TOTAL = 0

Page 22: BOQ alfamart medan

Bangunan External 22

RENCANA ANGGARAN BIAYAPROYEK : GUDANG DC SAT MEDANLINGKUP : PEKERJAAN EKSTERNALLOKASI : TANJUNG MORAWA - MEDAN

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA

II PEKERJAAN EKSTERNAL

A PEKERJAAN PAGAR DAN PINTU GERBANG

1 PAGAR DEPAN

a. Pekerjaan Pondasi

i. Galian tanah m3 108.72

ii. Pasir urug t=100mm m3 4.53

iii. Anstamping m3 27.18

iv. Pondasi batu kali m3 27.18

v. Urugan tanah kembali m3 36.24

b. Pekerjaan Beton

i. Sloof 150x200mm 4Ø10 stirrup Ø8-150 m3 4.53

ii. Kolom 150x150mm 4Ø10 stirrup Ø8-150 m3 1.87

iii. Ring balk 150x200mm besi 4Ø10 stirrup Ø8-150 m3 4.53

c. Dinding Pagar

i. Pas. bata merah m2 377.50

ii. Plaster aci m2 755.00

iii. Cat dinding Weathershield ex Dulux m2 755.00

iv. Naad 4x1 cm fin Cat Weathershield ex Dulux m1 151.00

v. Pipa 2" Galvanis Finish Cat minyak Warna Silver m1 97.07

vi. Angkur besi Ø10 jarak 1000mm kg 15.00

2 PINTU GERBANG a. i. Pintu Gerbang Utama unit 2.00

b. Pekerjaan Tanah

i. Galian Tanah m3 17.28

ii. Urugan Tanah Kembali m3 5.76

iii. Pasir urug t= 10cm m3 0.72 iv. Lean concrete t= 5cm m3 1.44

c. Pekerjaan Betoni. m3 0.58 ii. m3 1.10

d. Finishing Kolomi. Plaster aci dan naad m2 17.60 ii. Cat dinding Weathershield ex Dulux m2 250.00

e. Dinding Depan Gerbang i. Aanstamping m3 17.50 ii. Pasangan batu kali adukan 1:5 m3 22.50 iii. Sloof 150x200mm 4Ø10 stirrup Ø8-150 m3 3.75 iv. Kolom 150x150mm 4Ø10 stirrup Ø8-150 m3 4.42 v. Ring balk 150x200mm besi 4Ø10 stirrup Ø8-150 m3 3.75 vi. Pasangan bata merah m2 250.00 vii. Plaster aci m2 500.00

3 PAGAR KELILING

a. Urugan pasir t=100mm m3 38.76 b. Pekerjaan beton m2

i Lantai kerja t= 50mm m2 19.38 ii m3 11.63 iii Sloof beton 150x250 besi 4Ø12 stirrup Ø8-200 m3 24.22 iv Ring balok beton 150x250 besi 4Ø12 stirrup Ø8-200 m3 24.22 v m3 15.14

c. Pasangan dinding batako m2 1,554.44 d. kg 287.47 e. Angkur kolom besi Ø10 L=600mm kg 60.08 f. Besi siku 40.40.4; jarak L = 2,0m; P = 750mm kg 969.00 g. Pemasangan pagar kawat duri (5 baris) m1 646.00

SUB TOTAL A :

B PEKERJAAN TANAH DAN DINDING PENAHAN TANAH

1 PEKERJAAN GRADINGa. Pekerjaan Pengukuran dan setting out

b. Stripping lapis humus 30 cm

c. Pembuangan tanah hasil stripping

d.

HARGA SATUAN

Rangka Utama Hollow 100.100.5, rangka pembagi 40.20.2 fin zincromat + cat minyak termasuk roda dan rel

Pondasi tapak besi Ø12-150

Kolom beton K1 250x250mm besi 4D13 stirrup Ø8-200

Pondasi tapak besi Ø12-150

Kolom beton 150x250 besi 4Ø12 stirrup Ø8-200

Angkur sloof besi Ø12 L=500mm jarak 1000mm

Urugan tanah merah dipadatkan lapis demi lap,is max 30 cm/lapis hingga mencapai kepadatan 95 %

Page 23: BOQ alfamart medan

Bangunan External 23

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA SATUAN

e.

topping sheet pile

2 DPT 1

a. Galian tanah m3 490.00

b. Urugan pasir m3 22.05

c. Pasangan batu kali m3 238.88

d. Urugan sirtu m3 36.75

e. Pasang anyaman bambu/gedek m2 367.50

f. Sloof 30x20

i. a. Beton K350 m3 14.70

ii. b. Besi BJTD 40 kg 1,019.20

iii. c. Besi BJTP 24 kg 490.00

iv. d. Angkur besi Ø 10 kg 91.14

g. Drain pipa Ø 1" ditutup ijuk bh 49.00

3 DPT 2

a. Galian tanah m3 90.72

b. Urugan pasir m3 2.88

c. Lantai kerja m3 1.44

d. Urugan koral m3 6.70

e. Pasang anyaman bambu/gedek m2 40.80

f. Beton

i. Beton K350 m3 14.40

ii. Besi BJTD 40 kg 924.99

iii. Besi BJTP 24 kg 518.40

iv. Bekisting m2 96.00

g. Drain pipa Ø 1" ditutup ijuk bh 2.50

4 DPT 3

a. Pengadaan & pemancangan tp 32x32x32 L:14m bh 32.00

b. Galian tanah m3 115.00

c. Urugan pasir m3 10.00

d. Lantai kerja m3 5.00

e. Urugan koral m3 20.00

f. Pasang anyaman bambu/gedek m2 115.00

g. Beton

i. Beton K350 m3 65.00

ii. Besi BJTD 40 kg 3,364.71

iii. Besi BJTP 24 kg 1,620.00

iv. Bekisting m2 350.00

h. Drain pipa Ø 1" ditutup ijuk bh 15.00

5 DPT 4

a. Pengadaan & pemancangan tp 32x32x32 L:14m bh 106.00

b. Galian tanah m3 365.70

c. Urugan pasir m3 31.80

d. Lantai kerja m3 15.90

e. Urugan koral m3 63.60

f. Pasang anyaman bambu/gedek m2 365.70

g. Beton

i. Beton K350 m3 206.70

ii. Besi BJTD 40 kg 10,699.76

iii. Besi BJTP 24 kg 5,151.60

iv. Bekisting m2 1,113.00

h. Drain pipa Ø 1" ditutup ijuk bh 50.00

6 DPT 5

a. Pengadaan & pemancangan tp 32x32x32 L:14m bh 12.00

b. Galian tanah m3 133.00

c. Urugan pasir m3 3.80

d. Lantai kerja m3 1.90

e. Urugan koral m3 7.60

f. Pasang anyaman bambu/gedek m2 43.70

g. Beton

i. a. Beton K350 m3 24.70

ii. b. Besi BJTD 40 kg 1,278.59

iii. c. Besi BJTP 24 kg 615.60

iv. d. Bekisting m2 133.00

h. Drain pipa Ø 1" ditutup ijuk bh 4.00

Test kepadatan urugan 95 % standard proctore dengan sandcone test setiap 200/m2per 30 cm ketebelan

Page 24: BOQ alfamart medan

Bangunan External 24

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA SATUAN

7 DPT 6

a. Pengadaan & pemancangan tp 32x32x32 L:14m bh 18.00

b. Galian tanah m3 182.00

c. Urugan pasir m3 5.20

d. Lantai kerja m3 2.60

e. Urugan koral m3 13.00

f. Pasang anyaman bambu/gedek m2 83.20

g. Beton

i. a. Beton K350 m3 33.80

ii. b. Besi BJTD 40 kg 1,749.65

iii. c. Besi BJTP 24 kg 842.40

iv. d. Bekisting m2 182.00

h. Drain pipa Ø 1" ditutup ijuk bh 17.00

8 DPT 7

a. Pengadaan & pemancangan tp 32x32x32 L:14m bh 26.00

b. Galian tanah m3 253.50

c. Urugan pasir m3 9.75

d. Lantai kerja m3 4.88

e. Urugan koral m3 27.30

f. Pasang anyaman bambu/gedek m2 117.00

g. Beton

i. a. Beton K350 m3 136.50

ii. b. Besi BJTD 40 kg 2,624.47

iii. c. Besi BJTP 24 kg 1,263.60

iv. d. Bekisting m2 429.00

h. Drain pipa Ø 1" ditutup ijuk bh 18.50

SUB TOTAL B :

C PEKERJAAN DRAINASE

1 Saluran U 30x30

a. Galian tanah m3 11.23

b. Urugan pasir dibawah batu kali m3 3.12

c. Saluran type U 30x30 m1 104.00

2 Saluran U 30x40

a. Galian tanah m3 5.18

b. Urugan pasir dibawah batu kali m3 1.08

c. Saluran type U 30x40 m1 36.00

3 Saluran U 40x40

a. Galian tanah m3 18.24

b. Urugan pasir dibawah batu kali m3 3.80

c. Saluran type U 40x40 m1 95.00

4 Saluran U 50x50

a. Galian tanah m3 10.50

b. Urugan pasir dibawah batu kali m3 1.75

c. Saluran type U 50x50 m1 35.00

5 Saluran U 40x60

a. Galian tanah m3 27.07

b. Urugan pasir dibawah batu kali m3 3.76

c. Saluran type U 40x60 m1 94.00

6 Saluran U 60x60

a. Galian tanah m3 23.76

b. Urugan pasir dibawah batu kali m3 3.30

c. Saluran type U 60x60 m1 55.00

7 Saluran U 70x80

a. Galian tanah m3 205.63

b. Urugan pasir dibawah batu kali m3 21.42

c. Saluran type U 70x80 m1 306.00

8 Saluran U 70x100

a. Galian tanah m3 74.76

b. Urugan pasir dibawah batu kali m3 6.23

c. Saluran type U 70x100 m1 89.00

9 Saluran U 80x100

a. Galian tanah m3 152.64

b. Urugan pasir dibawah batu kali m3 12.72

c. Saluran type U 80x100 m1 159.00

10 Saluran box culvert 60x60

a. Galian tanah m3 51.84

b. Urugan pasir dibawah batu kali m3 7.20

c. Saluran box culvert 60x60 m1 120.00

11 Saluran box culvert 40x40

a. Galian tanah m3 18.05

b. Urugan pasir dibawah batu kali m3 3.76

Page 25: BOQ alfamart medan

Bangunan External 25

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA SATUAN

c. Saluran box culvert 40x40 m1 94.00

12 Saluran box culvert 30x40

a. Galian tanah m3 12.96

b. Urugan pasir dibawah batu kali m3 2.70

c. Saluran box culvert 40x40 m1 90.00

13 Saluran pot 7

a. Galian tanah m3 0.60

b. Urugan pasir m3 0.20

c. Lantai kerja m3 0.10

d. Beton K300 m3 1.00

e. Besi U24 kg 45.00

f. Bekisting m2 12.00

14 Bak kontrol

a. Galian tanah m3 3.24

b. Urugan pasir m3 0.54

c. Lantai kerja m3 0.27

d. Beton K300 m3 3.60

e. Besi BJTP 24 kg 180.00

f. Bekisting m2 1.44

15 Pondasi batu kali

a. Galian tanah m3 345.00

b. Urugan pasir m3 15.00

c. Pasangan batu kali m3 156.00

d. Angkur Besi BJTP24 kg 18.00

16 Sloof 15x20

a. Beton K350 m3 4.50

b. Besi BJTD40 kg 624.00

c. Besi BJTP24 kg 351.75

d. Bekisting m2 60.00

17 Drain pipa Ø 5" bh 60.00

SUB TOTAL C :

D PEKERJAAN PERKERASAN DAN MARKA JALAN

1 Pembentukan Badan Jalan m2 20,493.00

2 m2 16,394.40

Limestone 500mm to CBR 30% (perbaikan Tanah)

3 Lapis Perkerasan

a. Sirtu t : 250 mm CBR 35 m2 15,177.20

b. Batu pecah t : 125 mm CBR 85 m2 15,177.20

c. Sand Sheet t : 25 mm m2 15,177.20

d. Hotmix t : 50 mm m2 15,177.20

4 Test CBR Lapangan ttk 20.00

5 Paving blok m2

a. Pemadatan Tanah m2 1,432.00

b. Abu Batu t=50mm m2 1,432.00

c. Paving Blok t = 60 mm ex CI m2 1,432.00

6 Pekerjaan Kansteen K300

a. Galian tanah m3

b. Mortar t:50 mm m2

c. Kansteen

i Kansteen m1 859.20

ii Kansteen Mulut Air m1 128.88

7 Ramp

a. Urugan sirtu m3 111.60

b. Lantai kerja m3 18.60

c. Beton K350 m3 74.40

d. Besi BJTP 24 kg 5,580.00

e. Bekisting m2 33.48

8 Marka pejalan kaki L=1500mm m1 54.00

9 Cat garis parkir m1 163.00

10 Cat penunjuk arah unit 40.00

11 Zebra cross unit 4.00

car stopper

SUB TOTAL D :

E PEKERJAAN TOWER AIR

TOWER AIR TYPE 2

1 PONDASI

a. Galian tanah pondasi m3 0.48

b. Pasir urug t =100mm m3 0.04

c. Lantai kerja t=50mm m3 0.02

d. Urugan tanah kembali m3 0.16

e. Beton :

Grading dan compacting sub grade mod ≥ 98% & CBR ≥6%

D259
SONY: termasuk bangunan penunjang
D275
SONY: di cat full
Page 26: BOQ alfamart medan

Bangunan External 26

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA SATUAN

i. m3 0.29

ii. Lantai rabat beton t =100mm m3 0.32

iii. Kolom pedestal 200x200mm besi 4Ø10 stirrup Ø8-200 m3 0.14

iv. Beton Sloof 200x200mm besi 4Ø10 stirrup Ø8-200 m3 0.24

2 STRUKTUR BAJA

a. Base plat t=100mm uk.200x200mm kg 2.80

b. Plat bordes kasar t=2,3mm kg 161.00

c. unit 16.00

d. Grouting baseplat unit 4.00

e. Rangka Baja :

i. Siku 40.40.4 kg 22.00

ii. Siku 50.50.5 kg 27.00

iii. Siku 70.70.7 tiang utama kg 30.00

f. Tangga Siku 50.50.5 kg 15.00

g. Cat Baja + Zincromat kg 5.00

SUB TOTAL E:

F PEKERJAAN POS PENGINTAI

1 PONDASI

a. Galian tanah pondasi m3 0.48

b. Pasir urug t =100mm m3 0.04

c. Lantai kerja t=50mm m3 0.02

d. Urugan tanah kembali m3 0.16

e. Beton :

i. m3 0.29

ii. Lantai rabat beton t =100mm m3 0.32

iii. Kolom pedestal 200x200mm besi 4Ø10 stirrup Ø8-200 m3 0.14

iv. Beton Sloof 200x200mm besi 4Ø10 stirrup Ø8-200 m3 0.24

2 STRUKTUR BAJA

a. Base plat t=100mm uk.200x200mm kg 2.80

b. Plat bordes kasar t=2,3mm kg 161.00

c. unit 16.00

d. Grouting baseplat unit 4.00

e. Rangka Baja :

i. Siku 40.40.4 kg 28.60

ii. Siku 50.50.5 kg 35.10

iii. Siku 70.70.7 tiang utama kg 39.00

f. Tangga Siku 50.50.5 kg 19.50

g. Cat Baja + Zincromat kg 6.00

h. Atap Zincalume termasuk Nok m2 4.80

i. Cover tangga

i. Plat Strip m1 2.60

ii. Besi Ø8mm kg 3.00

j. Pengecatan Baja kg 6.00

SUB TOTAL F:

G PEKERJAAN TEMPAT SAMPAH

1 PONDASI

a. Galian Tanah Pondasi m3 0.79

b. Rollag Bata u/ Pondasi m1 44.00

2 BETON

a. Beton Sloof 150x200mm besi 4Ø10 stirrup Ø8-150 m3 1.32

b. Kolom 15x15 cm besi 4Ø10 stirrup Ø8-150 m3 0.41

c. Ring Balok 15x15 cm besi 4Ø10 stirrup Ø8-150 m3 0.99

3 PASANGAN

a. Rabat Beton t =100mm m3 1.50

b. Pas. Bata m2 52.80

c. Plaster aci dinding, kolom dan balok m2 105.60

d. Cat dinding Weathershield m2 105.60

4 PINTU

a. Pintu besi plat t = 2mm 1 Lapis Rangka Siku 40.40.4 fin Cat Min unit 4.00

5 T. PEMUSNAH SUSU

a. Galian Tanah m3 1.28

b. Buis Beton dia. 800mm h = 2000mm bh 4.00

c. Lapisan pengisi : pasir kasar, ijuk dan kerikil

i. Lapisan pasir kasar t=1000mm m3 0.50

ii. Lapisan ijuk t=600mm m3 0.30

iii. Lapisan batu kerikil t=200mm m3 0.10

d. Dinding pembatas cor beton m3 0.45

SUB TOTAL G :

H PEKERJAAN SEPTICTANK DAN RESAPAN

1 SEPTIK TANK + RESAPAN TYPE 1

Pondasi tapak 600x600mm besi Ø12-150

Anchor Bolt Ø12 P=500mm

Pondasi tapak 600x600mm besi Ø12-150

Anchor Bolt Ø12 P=500mm

Page 27: BOQ alfamart medan

Bangunan External 27

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA SATUAN

a. Galian Tanah m3 33.79

b. Urugan pasir t: 10cm m3 1.41

c. Lantai kerja t= 5 cm m3 0.70

d. m3 8.45

e. Pasangan dinding batako tanpa plester m2 16.00

f. Material resapan

- Kerikil 4/6 tebal 20cm m3 0.80

- Ijuk tebal 20cm m3 0.80

- Batu macadam 6/12 1 lapis m3 0.28

g. Manhole 500x500mm unit 1.00

h. Instalasi pipa

- Pipa PVC 6" m1 5.00

- Pipa PVC 4" m1 3.00 SEPTIC TANK Type 1 :

2 SEPTIK TANK + RESAPAN TYPE 2

a. Galian tanah m3 1.88

b. Rabat beton t: 100mm m3 0.08

c. unit 6.00

d. Cover beton t:100mm m3 0.09

e. Clean out Ø 4" unit 2.00

f. Outlet dan inlet ls 1.00

g. Macadam 10/15 t=500mm m3 0.79

h. Ijuk tebal 100mm ls 0.16 SEPTIC TANK Type 2 :

SUB TOTAL H:

I PEKERJAAN PENGHIJAUAN

Penghijauan gambar External dan Infrastruktur m2 704.00

Penghijauan include dengan pekerjaan penanaman pohon

rumput dan pengisian tanah.

SUB TOTAL I :

J GARDU PEMADAM

1 PEKERJAAN PONDASI

a. Galian Tanah m3 0.38

b. Pasir urug t= 100mm m3 0.02

c. bh 3.00

d. Beton K-250 Sitemix m3 0.31

e. Angkur (tulangan besi Ø10mm) kg 3.18

2 STRUKTUR

a. Pipa Besi Ø4 " kg 28.70

b. Steel plate t=1.5mm kg 15.75

c. Pengecatan kg 1.60

SUB TOTAL J :

K GARDU LISTRIK

1 Sesuai spek dari PLN Ls 1.00

SUB TOTAL K :

L GROUND WATER TANK DAN RUANG POMPA

1 PEKERJAAN PONDASI

Bobok kepala tiang pancang titik 4.00

2 PEKERJAAN TANAH

a. Galian tanah

i. Groundtank m3 402.00

ii. Rumah pompa m3 2.00

b. Urugan pasir t= 100mm

i. Groundtank m3 335.00

ii. Rumah pompa m3 7.20

c. Urugan tanah kembali m3 134.67

d. Buangan tanah dalam lokasi m3 267.33

3 PEKERJAAN BETON

i. Lantai kerja t= 5 cm m3 0.67

ii. Pipe Cap PC1 besi D13-150 m3 0.72

iii. m3 3.20

iv. m3 3.20

v. Slab groundtank t=300mm besi D13-150 2 lapis m3 4.80

vi. 44.80

vii. m3 3.20

viii. Manhole 500x500mm unit 1.00

4 PEKERJAAN WATERPROPING

i. Integral waterproofing m3 0.28

Beton K 250 sitemix t:150mm besi Ø12-200 2 lapis

Buis beton Ø1000mm

Buis Beton Ø500mm

Kolom K1 uk.200x400mm besi 8D13 stirrup Ø8-150-250

Balok B1 uk.250x400mm besi 7D13 Ø8-100

Dinding groundtank t=200mm besi hor.Ø8-150 ver.Ø10-150

Pelat atap groundtank t=200mm besi Ø10-150 2 lapis

Page 28: BOQ alfamart medan

Bangunan External 28

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA SATUAN

ii. Waterproofing membran ex Bitumat m2 56.00

iii. Screed waterproofing m2 56.00

5 PEKERJAAN RALLING

i. Tangga monyet pipa PVC 4" m 2.50

6 PEKERJAAN RUMAH POMPA

i. Screed trowel finish t=200mm+Wiremesh M6-150 2 lapis m2 4.00

ii. bh 16.00

iii. Baseplat t=10mm uk.100x100mm kg 7.00

iv. Pipa Galvanis dia. 2" m 7.20

v. Partisi wire mesh include rangka m2 14.40

vi. Pintu Wire mesh unit 1.00

vii. Gording CNP 60.30.10.1,5 kg 66.00

viii. Genteng Atap Metal m2 7.56

SUB TOTAL L:

Angkur Ø12 mm L=500mm

Page 29: BOQ alfamart medan

Bangunan External 29

PT.PIM Kontraktor

NO URAIAN PEKERJAAN SAT VOLUME VOLUME JUMLAH HARGA HARGA SATUAN

M TIANG BENDERA

1 PEKERJAAN PONDASI

a. Galian Tanah m3 0.58

b. Pasir urug t= 100mm m3 0.02

c. Beton K-250 Sitemix m3 0.49

d. Angkur besi D10mm kg 3.70

2 STRUKTUR

a. BSP Medium dia. 3 kg 9.00

b. BSP Medium dia. 4 kg 18.00

c. Besi Ø8mm kg 0.47

d. Baut Ø20mm kg 6.00

e. Pengecatan kg 1.80

SUB TOTAL M :

N PARKIR MOTOR

1 PEKERJAAN PONDASI

a. Galian Tanah m3 8.40

b. Pasir urug t= 100mm m3 65.60

c. bh 27.00

d. Beton K-250 Sitemix m3 6.38

e. Angkur (tulangan besi Ø10mm) kg 62.19

2 STRUKTUR

a. Pipa Besi Ø4" kg 708.50

b. Pipa Besi Ø2.5" kg 923.40

c. Pipa Besi Ø1.5" kg 661.50

d. Gording CNP 60.30.10.1,5 kg 1,041.39

e. Pelat t: 6mm kg

f. Pengecatan kg 33.35

g. Dynabolt Ø12 bh 42.00

h. Penutup atap zincalum t= 0,45 TCT ex Union m2 1,229.00

i. Ridge capping zincalum m1 57.00

j. Flasing zincalum m1 114.00

SUB TOTAL N :

Buis Beton Ø500mm

Page 30: BOQ alfamart medan

REKAPITULASIPROYEK : GUDANG DC JEMBERLINGKUP : PANCANGLOKASI : MAGLI - JEMBER

NO PEKERJAAN JUMLAH HARGA

VI BANGUNAN PENUNJANG

A Err:509 Err:509

B Err:509 Err:509

C Err:509 Err:509

D Err:509 Err:509

E Err:509 Err:509

F Err:509 Err:509

G Err:509 Err:509

H Err:509 Err:509

I Err:509 Err:509

J Err:509 Err:509

K Err:509 Err:509

T O T A L = Err:509

Page 31: BOQ alfamart medan

NO URAIAN PEKERJAAN SAT VOLUME

A GENSET

1 PEKERJAAN PONDASI

Bobok kepala tiang pancang titik 7.00

2 PEKERJAAN TANAH

a. Galian Tanah

i. Galian tanah pondasi m3 54.38

ii. Galian tanah gutter m3 16.00

b. Urugan pasir

- Bawah pondasi t: 10cm m3 4.35

- Bawah lantai t: 5cm m3 2.60

c. Urugan Tanah kembali m3 18.13

3 PEKERJAAN BETON

a. Lantai kerja

i Bawah pondasi t= 5 cm m3 2.18

ii Bawah lantai t=5 cm m3 2.60

b. Pondasi Telapak

i. m3 0.64

ii. m3 0.35

iii. m3 0.29

iv. m3 0.40

v. m3 0.29

vi. m3 0.40

vii. m3 0.39

c. Sloof

i. m3 2.42

ii. Sloof (SL2) uk.150x200 4D13, Ø8-250 m3 0.11

d. Kolom

i. Kolom K1 (200x200) besi 4D13, Ø8-250 m3 12.60

i. Kolom K2 (130x150) besi 4D10, Ø8-250 m3 4.10

II. Kolom KP(130x130) besi 4D10, Ø8-250 m3 4.73

e. Balok

i. Balok B1 (200x300) besi 8D13, Ø8-100 & 200 m3 1.47

ii. Balok B2 (150x250) besi 5D13, Ø8-150&250 m3 0.68

iii. Ring Balk(130x150) besi 4Ø10, Ø8-250 m3

f. Beton janggutan m3

g. Dack Beton T;100mm, besi D13-150 m3 6.25

h. Gutter

i. Beton gutter Type A m3 1.40

ii. Beton gutter Type B m3 1.42

iii Beton gutter Type C m3

i. Gutter R. Trafo

i. Gutter 1.425x600mm m3 0.09

ii. Gutter 400x400mm m3 0.16

iii Bak kontrol 400x400mm m3 0.16

j. Slab beton t=150mm m3 0.10

k. Pondasi Genset t= 350 mm dan D13-150 m3 1.55

4 DINDING

a. Pasangan dinding m2 130.31

b. Plaster aci m2 260.63

c. Plaster beton expose kolom m2 84.00

d. Plaster beton expose balok m2 12.50

e. Pengecatan

f. i. Cat Dinding Luar ex Dulux Weathershield m2 39.21

ii. Cat Dinding Dalam ex Catylac m2 78.43

g. Pasangan dinding chamber m2

Plaster Aci m2 261.42

h. Pasangan Roaster m2 15.50

i. Pasangan Glass Block m2 0.54

5 LANTAI

i. Rangka siku 50.50.5 kg 14.91

ii Checker Plate kg 42.25 iii Paving block t=6cm m2 16.50

iv. Kansteen m 9.00

6 PLAFOND

a. Plafond exposed m2 63.00

b. Cat Plafond m2 63.00

7 ATAP

a Waterproofing Membran + screed waterproofing m2 63.00

b. Roof Drain dia 4" bh

HARGA SATUAN

- PT1 (1600x1600) Ø13-150

- PT2 (1247x1400) Ø13-150

- PT3 (1200x1200) Ø13-150

- PT4 (1000x1000) Ø13-150

- PT3' (1200x1200) Ø13-100

- PT4' (1000x1000) Ø13-100

- PT5 (1400x1400) Ø13-150

Sloof (SL1) uk.200x300 7D13, Ø8-100 dan Ø8-200

Page 32: BOQ alfamart medan

c. Down Pipe Dia 4" m 7.50

8 KUSEN PINTU & JENDELA

a PINTU

i Type P1-07 unit 1.00

Type P2-07 unit 1.00

ii Type P3-07 unit 1.00

Type P4-07 unit 1.00

b. JENDELA

i Type J1-07 unit 1.00

ii Type LV1-07 unit

c. Exhaust fan unit 2.00

SUB TOTAL J:

B POS JAGA

1 PEKERJAAN TANAH

i Galian Tanah m3 10.00

ii Urugan pasir

- Bawah pondasi t: 10cm m3 0.80

- Bawah lantai t: 5cm m3 0.19

iii Urugan Tanah kembali m3 3.33

iv Urugan Tanah bawah lantai m3 2.63

2 PEKERJAAN PONDASI

a. Pondasi Batu Kali m3 3.52

b. Pondasi Aanstamping m3 1.60

c. Pondasi Rollag m 3.75

3 PEKERJAAN BETON

a. Sloof (S1) uk.200x150mm besi 4Ø 12 stirrup Ø 8-200 m3 0.24

b. Ring balk uk. 130x200mm besi 4Ø10 stirrup Ø8-200 m3 0.21

c. Ring balk uk. 130x130mm besi 4Ø8 stirrup Ø8-200 m3 0.22

d. Kanopi beton t:100mm m3 0.28

e. Balok deck atap m3 1.45

g. Kolom Praktis K1 uk.200x130mm, besi Ø410 stirrup Ø8-250 m3 0.26

h. Meja Beton m3 0.18

i. Ban-banan beton m3 10.00

4 PEKERJAAN DINDING

a. Pasangan dinding batako m2 8.06

b Plaster & aci m2 34.77

c. Pengecatan

i. Cat Dinding Luar ex Dulux Weathershield m2 12.82

ii. Cat Dinding Dalam ex Catylac m2 8.06

5 PEKERJAAN LANTAI

a. Wterproofing membran + screed waterproofing m2

b. Keramik meja beton 300x300mm m2 0.90

c. Keramik lantai 300x300mm

d. Paving m2 2.08

e. Kansteen m 9.39

6 PLAFOND

a. Plafond exposed m2 3.75

b. Cat Plafond m2 3.75

7 ATAP

a. Roof Drain bh 1.00

b. m 4.25

c. Waterproofing coating + screeding m2 13.89

8 KUSEN PINTU DAN JENDELA

a. Type PJ1 unit 1.00

b. Type J1 unit 2.00

c. Type J2 unit 1.00

SUB TOTAL H:

C POS SATPAM, R. LOKER, KW/WC

1 PEKERJAAN TANAH

a. Galian Tanah m3 19.50

b. Urugan pasir

i. - Bawah pondasi t: 10cm m3 0.33

ii. - Bawah lantai t: 5cm m3 1.65

c. Urugan Tanah

i. Urugan Tanah kembali m3 13.50

ii. Urugan Tanah bawah lantai m3 9.90

2 PEKERJAAN PONDASI

a. Pondasi Batu Kali m3 14.61

b. Pondasi Aanstamping m3 6.64

c. Pondasi Rollag m 12.00

3 PEKERJAAN BETON

Down pipe Ø 3"

Page 33: BOQ alfamart medan

a. Sloof uk.150x200mm, besi 4Ø12, Ø8-200 m3 1.00

b. Kolom uk.130x200mm, besi 4Ø10, Ø8-250 m3 1.37

c. Ringbalk uk.130x200mm, besi 4Ø10, Ø8-200 m3 0.91

d Ringbalk uk.130x1300mm, besi 4Ø8, Ø8-200 m3

e. Kanopi beton t=10cm m3 15.60

g. Talang beton t=10cm m3 6.69

h. Ban-banan beton t=10cm m 20.00

i. Meja Beton t=10cm m2 5.10

4 PEKERJAAN DINDING

a. Dinding batako m2 109.00

b. Plaster aci m2 179.40

c. Pengecatan

i. Cat Dinding Luar ex Dulux Weathershield m2 135.30

ii. Cat Dinding Dalam ex Catylac m2 121.77

d. Pasangan Keramik

i. Finish dinding keramik 200x200 H=600mm m2 12.32

ii. Finish dinding keramik 200x250mm H=1500 mm m2 2.16

e. Tanggulan m

5 LANTAI

a. Keramik lantai 400x400mm m2 26.64

b. Keramik lantai 200x200mm m2 6.60

c. Paving block t=6cm m2 30.00

d. Keramik meja satpam uk.300x300mm m2 5.01

6 PLAFOND

a. Gypsum Board 9mm, Rangka Hollow m2 33.00

b. Cat Plafond m2 33.00

7 ATAP

a. Rangka CNP 100.50.20.2,3 kg

b. Gording CNP 100.50.20.2,3 kg

c. Penutup atap Zincalum t= 0,45 TCT ex Union m2 32.00

d. Flasing zincalum m 26.60

e. Membran Waterproofing + screeed waterproofing m2

f. Roof drain bh 4.00

g. Down Pipe Ø3" m 13.60

8 KUSEN PINTU DAN JENDELA

a. Type P1 unit 2.00

b. Type P2 unit 1.00

c. Type J1 unit 2.00

d. Type J2 unit 1.00

e. Type BV unit 3.00

9 SANITARY

a. Closet Jongkok Type CE6 Ex Toto unit 1.00

b. Partition urinal Type A100 Ex Toto unit 1.00

c. Bak Fiber unit 1.00

d. Counter lavatory Type L521V1A Ex Toto unit

e. Kran Dinding Type Y 20JC Ex San Ei unit 2.00

f. Floor drain Dia 4" Type H51 Ex San Ei unit 1.00

g. Kaca Cermin Tebal t+ 6mm + bevel Ex. Asahimas m2 1.00

SUB TOTAL I:

D BENGKEL DAN TEMPAT CUCI MOBIL, WORKSHOP

1 PEKERJAAN TANAH

a. Galian Tanah m3 319.06

b. Urugan pasir

i. - Bawah pondasi t: 10cm m3 17.19

ii. - Bawah lantai t: 5cm m3 4.00

c. Urugan Tanah

i. Urugan Tanah kembali m3 194.23

2 PEKERJAAN PONDASI

a. Pondasi Batu Kali m3 70.26

b. Pondasi Aanstamping m3 35.02

c Pondasi Rollag m2 24.47

d. Pondasi Telapak

i. - Pondasi Type PT1 (1000x1000)mm, besi Ø10-150 m3

Beton m3 0.17

Besi kg 12.01

Bekisting m2 0.48

ii. - Pondasi Type PT2 ( 1000x750)mm, besi Ø10-150 m3

3 PEKERJAAN BETON

a. Lantai Kerja m3 4.74

b Sloof (S1) uk.200x150mm besi 4Ø 12 stirrup Ø 8-200 m3

Beton m3 2.35

D205
Heru Baskoro: Di gamabar uk 80 x 80 Hit. Uk 100 x 100
Page 34: BOQ alfamart medan

kg 278.89

Besi Φ 8 kg 252.39

Bekisting m2 31.40 kg 31.18

c Balok

i. Ring balk uk. 150x200mm besi 4Ø12 stirrup Ø8-200 m3

Beton m3 1.38 kg 163.42

Besi Φ 8 kg 147.90

Bekisting m2 25.30

ii. Ring Balk uk.130x200mm besi 4Ø10 stirrup Ø8-200 m3

Beton m3 2.54 kg 346.39

Besi Φ 8 kg 296.16

Bekisting m2 51.68

d. Kolom

i. Kolom K1 uk. 200x250mm besi 8Ø13 stirrup Ø8-250 m3

Beton m3 5.26 kg 820.25

Besi Φ 8 kg 163.70

Bekisting m2 94.74

ii. Kolom Praktis KP 130x130mm besi 4Ø10 stirrup Ø8-250 m3

Beton m3 2.32 kg 338.86

Besi Φ 4 kg 109.10

Bekisting m2 71.42

e. Beton Pit m3 2.45

f Beton Ramp m3 17.10

g. Slab beton t=150mm m3 11.34

h Slab beton t=100mm m3 8.95

i. Rabat beton m3 4.50

4 PEKERJAAN DINDING

a. Pasangan dinding batako m2 347.12

b. Pasangan Roaster m2 5.04

c. Plaster aci m2 680.79

d. Plaster beton expose m2 41.12

e. Finish dinding keramik 400x400 H=1600mm m2 39.04

f. Pengecatan

i. Cat Dinding Dalam ex Catylac m2 101.74

ii. Cat Dinding Luar ex Dulux Weathershield m2 178.55

5 PEKERJAAN LANTAI

a. Keramik 400x400mm m2 52.00

b. Garis sersan untuk Ramp (grove) m2 74.88

7 ATAP

a. Rangka Atap

i WF200x100x5.5x8 kg 709.29

ii Gording CNP 100.50.20.2,3 kg 1,108.56

iii kg

iv Base plate T=12mm kg

v Dyna Bolt M10

vi Baut dia 10mm

vii Pengecatan Baja kg

viii

b. Penutup atap

i Zincalum t= 0,45 TCT ex Union m2 250.80

ii Flasing Zincalume t = 0,45 TCT m 26.50

c. Lisplank Tipe A

i Besi Siku 40x40x4 21.05

ii Besi Siku 50x50x5 43.36

iii Lisplank zincalum 11.50

d. Lisplank Tipe B

i Besi Siku 40x40x4 27.45

ii Besi Siku 50x50x5 56.55

iii Lisplank zincalum 15.00

8 KUSEN PINTU DAN JENDELA

a. Type PB1 unit 1.00

Type PT1 1.00

Type PB2 1.00

Type jk1 5.00

SUB TOTAL G :

Besi Φ 12

Besi angkur Φ 12

Besi Φ 12

Besi Φ 12

Besi Φ 13

Besi Φ 10

Angur baut Ø16mm, L=500mm

Tie Rod Ø12

Page 35: BOQ alfamart medan

E MUSHOLA DAN RUANG TUNGGU SUPLIER

1 PEKERJAAN TANAH

a. i. Pekerjaan Galian pondasi batu kali m3 93.15

b. i. Urugan Pasir dibawah pondasi t: 10 cm m3 11.50

ii Urugan pasir dibawah lantai t: 5 cm m3 13.20

c. Urugan tanah

i. Urugan tanah kembali m3 65.21

ii. Urugan tanah bawah lantai m3 52.80

2 PEKERJAAN PONDASI

a Pondasi batu kali m3 50.60

b Aanstamping m3 23.00

d Pondasi Rollag m'

3 PEKERJAAN BETON

a. Sloof (S1) uk.200x150mm besi 4Ø 12 stirrup Ø 8-200 m3 3.45

b. Ring balk uk. 130x200mm besi 4Ø10 stirrup Ø8-200 m3 2.60

c Balok meja beton uk.130x300mm besi 4Ø10 strippup Ø8-200 m3 0.81

d. i. Kolom K1 uk. 200x250mm besi 6Ø13 stirrup Ø8-250 m3 1.73

ii. Kolom Praktis KP 130x130mm besi 4Ø10 stirrup Ø8-250 m3 1.81

e. Meja beton t=10cm m3 5.25

f. Kanopy Beton m3

4 PEKERJAAN DINDING

a. Pasangan dinding batako m2 354.13

b. Plaster aci m2 708.25

c. Pelapis dinding

i Pas. keramik dinding toilet dan t.wudhu uk.200x250mm m2 92.30

d. Tanggulan wudhu m 9.35

e. Pengecatan

i. Cat Dinding Dalam ex Catylac m2 130.00

ii Cat Dinding Luar ex Dulux Weathershield m2 164.38

f. Finishing batu tempel m2

5 PEKERJAAN LANTAI

a. Rabat beton t:10cm m3 35.20

b. Paving block t: 6cm m2 80.50

c. Pasangan Lantai

i. Keramik 400x400mm ex Roman m2 144.00

ii. Keramik 200x200mm Ex Roman m2 115.50

d. Kansten m 59.00

6 PLAFOND

a. Gypsum Board 9mm, Rangka Hollow m2 264.00

b. Cat Plafond m2 264.00

7 KUSEN PINTU DAN JENDELA

a. Pintu

i P1 unit 2.00

ii P2 unit 4.00

b. Jendela

BV1-06 unit 3.00

JK1 unit

8 RANGKA ATAP

a. WF.200. kg

b. Gording CNP 100.50.20.2,3 kg

c. Plat Stiffener t=9mm kg

d. Sagrot Ø 12 mm kg

e. Plat dudukan gording t=6 mm kg

f. Base plate t=12 mm kg

g. Angkur Baut Ø16mm L=600mm bh

h. Dina Bolt M10 bh

i. Pengecatan Baja kg

Rangka Atap Baja Ringan m3 313.60

9 PENUTUP ATAP

a. Penutup Atap Zincalum t= 0,45 TCT ex Union m2 313.60

b. Lisplank Zincalume t = 0,45 TCT m 80.00

c. Flasing m' 80.00

10 SANITARY

a. Closet Jongkok Type CE6 Ex Toto unit 4.00

b. Partition urinal Type A100 Ex Toto unit 2.00

c. Counter lavatory Type L521V1A Ex Toto unit 2.00

d. Kran Dinding Type Y 20JC Ex San Ei unit 15.00

e. Floor drain Dia 4" Type H51 Ex San Ei unit 7.00

f. Kaca Cermin Tebal t+ 6mm + bevel Ex. Asahimas m2 1.50

SUB TOTAL A:

Page 36: BOQ alfamart medan

F KANTIN, MUSHOLA, & TOILET

1 PEKERJAAN TANAH

a. Pekerjaan Galian pondasi batu kali m3 185.63

b. Urugan pasir

i - Bawah pondasi t: 10cm m3 13.60

ii - Bawah lantai t: 5cm m3 10.50

c. Urugan tanah

Urugan Tanah kembali m3 115.50

Urugan Tanah bawah lantai m3 22.00

2 PEKERJAAN PONDASI

a. Pondasi Batu Kali m3 76.23

b. Pondasi Aanstamping m3 16.41

c Pondasi Rollag m3

3 PEKERJAAN BETON

a. Sloof (S1) uk.200x150mm besi 4Ø 12 stirrup Ø 8-200 m3 3.77

b. Pekerjaan Balok

Ring balk uk. 130x200mm besi 4Ø10 stirrup Ø8-200 m3 3.06

c. Pekerjaan Kolom

i. Kolom K1 uk. 130x200mm besi 4Ø10 stirrup Ø8-250 m3 1.77

ii. Kolom Praktis KP 130x130mm besi 4Ø8 stirrup Ø8-200 m3 2.25

d. Beton meja cuci piring dan cuci tangan m3

e. Beton kongliong(opening) m3

f. Kanopy Beton m3

4 PEKERJAAN DINDING

a. Pasangan dinding batako m2 229.30

b. Plasteran

i. Plaster aci dinding m2 458.60

ii. Plaster beton expose m2

d Pasangan keramik dinding 200x250 m2

e. Tanggulan area toilet pria m 2.00

f. Pengecatan

i. Cat Dinding Dalam ex Catylac m2 263.50

ii. Cat Dinding Luar ex Dulux Weathershield m2 250.51

5 PEKERJAAN LANTAI

a. Rabat beton t:10cm m3

b. Keramik 400x400mm area kantin m2 40.00

c. Keramik 200x200mm Ex Roman area Toilet m2 24.00

d. Paving m2 63.85

e. Kansteen m 59.17

6 PLAFOND

a. Gypsum Board 9mm, Rangka Hollow m2 90.00

b. Cat Plafond m2 90.00

7 ATAP

a. Rangka Atap

i Rafter WF 200.100.5,5.8 kg

ii Rafter CNP 150.50.20.3,2 kg

iii Gording CNP 150.50.20.3,2 kg

iii Plat stifner t=9mm kg

iv Base plat t=12mm kg

v Plat dudukan gording t=6 mm kg

vi Angkur Ø16mm L=500mm bh

vii Baut Ø12mm bh

viii Dina Bolt M10 bh

ix Bracing bar Ø16mm kg

x Tierod Ø12mm kg

xi Grouting base plat m2

xii Pengecatan Baja kg

b. Penutup atap

i Zincalum MP Deck t= 0,45 TCT ex Union m2 228.30

ii Flasing Zincalume t = 0,45 TCT m 30.00

iii Clading zincalum T: 0.45 30.00

iv Roof drain bh 4.00

v Down pipe m 26.40

vi Talang m 30.00

8 KUSEN PINTU DAN JENDELA

a. Pintu

i Type P1 unit 2.00

ii Type P2 unit 3.00

b. Jendela

Type BV1 unit 4.00

c. Jendela kawat

Page 37: BOQ alfamart medan

Type JK1 unit 2.00

9 SANITARY

a. Closet Jongkok Type CE6 Ex Toto unit 3.00

b. Partition urinal Type A100 Ex Toto unit 2.00

c. Counter lavatory Type L521V1A Ex Toto unit 2.00

d. Kitchen Zink Singel Bowl Ex. Royal unit 2.00

e. Kran Pantry Model leher angsa A10C Ex. San Ei unit 4.00

f. Kran Dinding Type Y 20JC Ex San Ei unit 5.00

g. Floor drain Dia 4" Type H51 Ex San Ei unit 3.00

h. Kaca Cermin Tebal t+ 6mm + bevel Ex. Asahimas m2 0.72

SUB TOTAL B:

G GUDANG DUS BEKAS, GUDANG GALON, DAN RUANG TUNGGU SOPIR

1 PEKERJAAN TANAH

a. Galian Tanah m3 131.38

b. Urugan pasir

i - Bawah pondasi t: 10cm m3 6.51

ii - Bawah lantai t: 5cm m3 4.00

c. Urugan tanah

Urugan Tanah kembali m3 89.99

Urugan Tanah bawah lantai m3 4.00

2 PEKERJAAN PONDASI

a. Pondasi Batu Kali m3 28.77

b. Pondasi Aanstamping m3 14.24

c. Pondasi Telapak PT1 m3 -

3 PEKERJAAN BETON

a. Sloof (SL1) uk.200x300mm besi 4Ø 13 stirrup Ø 8-150-250 m3 -

Beton m3 2.11

kg 250.11

kg 226.35

Bekisting m3 28.16

Angkur kg 27.96

4 PEKERJAAN DINDING

a. Pasangan dinding batako m2 275.69

b. Plasteran

i. Plaster aci dinding m2 551.38

ii. Plaster beton expose m2 11.03

c. Cat Dinding Luar ex Dulux Weathershield m2 551.38

d. Ban-banan beton m

5 PEKERJAAN LANTAI

a Secreed trowel finish m2 168.00

b. Paving m2 56.00

c. kansteen m 30.00

6 PEKERJAAN BAJA

a Kolom

i Kolom Baja WF 250.125.6.9 kg

ii Grouting base plat kg

iii Base plat t=16mm kg

iv bh

v Stifner plat T=9mm kg

b. Balok

i WF 250x125x6x9 kg

ii Stiffener Plat T= 9mm kg

iii Plat T= 12mm kg

iv Baut Ø16mm A-325 bh

7 ATAP

a. Rangka Atap

Double CNP 150.50.20.3.2 kg

Gording CNP 100.50.20.2,3 kg

Tierod Ø 12 mm kg

Bracing bar Ø16mm

Plat dudukan gording t=6 mm kg

Dina Bolt M10 bh

Pengecatan Baja kg

b. Penutup atap

i Zincalum t= 0,45 TCT ex Union m2 308.00

ii Flasing Zincalume t = 0,45 TCT m 30.00

iii Lisplank Zincalume t = 0,45 TCT m2 12.00

c. Roof drain bh 4.00

d. Down pipe 4" m 14.00

8 KUSEN PINTU DAN JENDELA

Sloof (S1) uk.150x200mm besi 4Φ12 stirrup Ø 8-200

Besi 4Φ12

Besi Φ 8 - 200

Angkur Baut Ø16mm L=600mm

Page 38: BOQ alfamart medan

a. Type PB1 unit 2.00

b. Type PB2 unit

c. Type BN1 unit 5.00

d. Type BN2 unit

Type JK1 unit 1.00

SUB TOTAL C:

H

1 PEKERJAAN TANAH

a. Galian Tanah m3 164.23

b. Urugan pasir

- Bawah pondasi t: 10cm m3 8.14

- Bawah lantai t: 5cm m3 5.00

c. Urugan Tanah

i. Urugan Tanah kembali m3 112.49

ii. Urugan Tanah bawah lantai m3 5.00

2 PEKERJAAN PONDASI

a. Pondasi Batu Kali m3 35.96

b. Pondasi Aanstamping m3 17.80

c. Pondasi Rollag m

3 PEKERJAAN BETON

a Pile Cap PC1 uk. 800x800mm, Tul D13-150 m3

b. Sloof (S1) uk.250x400mm besi 6D16 stirrup Ø 10-150. tul extra 1D16 m3

Beton m3 2.64

kg 312.64

kg 282.94

Bekisting m3 35.20

Angkur kg 34.95

b. Sloof (S2) uk.250x400mm besi 4D13 stirrup Ø 8-150. tul extra 2D12 m3

c. Balok

i. Ring balk uk. 130x200mm besi 4Ø10 stirrup Ø8-200 m3

Beton m3 2.29

kg 217.11

kg 267.30

Bekisting m3 46.64

ii. Ring Balk uk.130x130mm besi 4Ø10 stirrup Ø8-250 m3iii. Balok sopi-sopi (RB1) uk.130x200mm besi 4Ø10 strippup Ø8-200 m3

Beton m3 0.48

kg 66.08

kg 56.50

Bekisting m3 9.86

d. Kolom

i Kolom K3 uk. 130x300mm besi 6Ø13 stirrup Ø8-150 m3

Kolom K1 uk. 130x200mm besi 4Ø10 stirrup Ø8-250

Beton m3 2.77

kg 262.95

kg 91.74

Bekisting m3 70.34

ii Kolom Praktis KP 130x130mm besi 4Ø10 stirrup Ø8-250 m3

Beton m3 1.78

kg 166.18

kg 84.04

Bekisting m3 54.73

iii m3

iv m3

e Kanopi beton T : 10cm m3

f Meja beton u/ wastafel

4 PEKERJAAN BAJA

a Pek Kolom

i Kolom H 200x200x8x12

ii Kolom WF 250x125x6x9

b. Pek. Balok

i WF 200.100.5,5.8

ii WF 250x125x6x9

iii WF 350x175x7x11

iv HC 350x200x9x14

c. Rangka Atap

i WF 350x175x7x11

ii WF 200.100.5,5.8

iii WF 250x125x6x9

iv Gording 150x50x20x3,2

GUDANG MARKETING, GA, ARSIP & R. TRAINING

Sloof (S1) uk.150x200mm besi 4Φ12 stirrup Ø 8-200

Besi 4Φ12

Besi Φ 8 - 200

Besi 4Φ12

Besi Φ 8 - 200

Besi 4Φ12

Besi Φ 8 - 200

Besi 4Φ10

Besi Φ 8 - 250

Besi 4Φ8Besi Φ 8 - 200

Kolom Pedestal K1uk. 200.300mm, 6D150 dan Ø10-150

Kolom Pedestal K2uk. 300.300mm, 8D150 dan Ø10-150

Page 39: BOQ alfamart medan

v

vi Ikatan angin besi 16+Trunbucle

5 PEKERJAAN DINDING

a. Pasangan dinding batako m2 344.61

b. Plaster aci m2 689.22

c. Plaster beton expose m2 10.77

d. Cat Dinding Luar ex Dulux Weathershield m2 344.61

d. Cat Dinding Dalam m2 344.61

e. Ban-banan beton m

f Keramik dinding 20x25 area toilet

6 PEKERJAAN LANTAI

a. Rabat Beton + Secreed trowel finish m3 5.00

b. Paving m2 53.70

c. Kansteen m 28.85

d. Keramik 40x40 cm (ruang Training) m2

e. Keramik 20x20 cm (Lantai Toilet) m2

f Tanggulan Toilet Pria finish keramik 20x20 m

7 PEKERJAAN PLAFOND

a. Gypsum Board 9mm, Rangka Hollow m2

b. Cat Plafond m2

8 PENUTUP ATAP

i Zincalum MP Deck t= 0,45 TCT ex Union m2 246.00

ii Flasing Zincalume t = 0,45 TCT m 30.00

iii Lisplank Zincalume t = 0,45 TCT m2 22.80

9 KUSEN PINTU DAN JENDELA

a. Type P1-11A unit

JK1 12.00

PB1 2.00

b. Type V1-11A unit

10 SANITARY

a. Closet Jongkok Type CE6 Ex Toto unit

b. Partition urinal Type A100 Ex Toto unit

c. Counter lavatory Type L521V1A Ex Toto unit

d. Kitchen Zink Singel Bowl Ex. Royal unit

e. Kran Pantry Model leher angsa A10C Ex. San Ei unit

f. Kran Dinding Type Y 20JC Ex San Ei unit

g. Floor drain Dia 4" Type H51 Ex San Ei unit

h. Kaca Cermin Tebal t+ 6mm + bevel Ex. Asahimas m2

SUB TOTAL D:

Tierod Ø12

Page 40: BOQ alfamart medan

JUMLAH HARGA

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 41: BOQ alfamart medan

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 42: BOQ alfamart medan

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 43: BOQ alfamart medan

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 44: BOQ alfamart medan

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 45: BOQ alfamart medan

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 46: BOQ alfamart medan

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Page 47: BOQ alfamart medan

-

-

-

-

Page 48: BOQ alfamart medan
Page 49: BOQ alfamart medan

REKAPITULASIPROYEK : GUDANG DC JEMBER

LINGKUP : MEKANIKAL & ELEKTRIKAL

LOKASI : MAGLI - JEMBER

NO PEKERJAAN JUMLAH HARGA

I PEKERJAAN MEKANIKAL #REF!

II PEKERJAAN ELEKTRIKAL #REF!

T O T A L = #REF!

Page 50: BOQ alfamart medan

EL :50

RENCANA ANGGARAN BIAYA PROYEK : DC SAT MEDANLOKASI : MEDANPAKET : ELEKTRIKAL

NO. URAIAN PEKERJAAN VOL SAT HARGA SATUAN TOTAL ( Rp )

I PEKERJAAN INSTALASI ELECTRICAL

1.01 AREA BANGUNAN UTAMA I.1A BANGUNAN UTAMA ( GUDANG UTAMA )

- AREA GUDANG+R.LOCKER 1 LAMPU TKO, TL 36W 289 bh 2 LAMPU TKO, TL 2X36W 341 bh 3 LAMPU TKI, TL 36W 38 bh 4 LAMPU DOWNLIGHT TL 18W bh 5 STOP KONTAK 1P 250W ex CLIPSAL 24 bh 6 STOP KONTAK 1P 1500W ex LEGRAND u/Palet mover 6 bh 7 STOP KONTAK 3P 1500W ex LEGRAND u/FORKLIFT 8 bh 8 SAKLAR TUNGGAL ex CLIPSAL 4 bh 9 SAKLAR GANDA ex CLIPSAL 11 bh 10 SAKLAR TRIPLE ex CLIPSAL 1 bh 11 GRID SWITCH 4 GANG 3 bh 13 GRID SWITCH 12 GANG 5 bh 14 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 7160 mtr 15 KABEL NYY 3x4mm2 u/ STOP KONTAK legrand 1P 210 mtr 16 KABEL NYY 5X4mm2 u/ STOP KONTAK legrand 3P 400 mtr 17 PIPA KONDUIT PVC dia. 20Mm + Pipa sparing CCTV 7885 mtr 18 CNP 100mm 1038 mtr 19 ASESORIS 1 lot

- AREA KANTOR GUDANG 1 LAMPU TKI, TL 36W 38 bh 2 LAMPU PLC 18W bh 3 STOP KONTAK 1P 250W ex CLIPSAL 6 bh 4 STOP KONTAK AC 1P 2000W ex CLIPSAL 19 bh 5 STOP KONTAK 3P 60 A ex LEGRAND u/RUANG PTL 1 bh 6 STOPKONTAK MEJA 1P ISI 4 ex.UTICON 19 bh 7 SAKLAR TUNGGAL ex CLIPSAL 5 bh 8 SAKLAR GANDA ex CLIPSAL 6 bh 9 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 755 mtr 10 KABEL NYM 4X35mm2 u/ STOP KONTAK 3P RUANG S 20 mtr 11 PIPA KONDUIT PVC dia. 20mm dan 775 mtr 12 ASESORIS 1 lot

I.1B KANTOR CABANG LANTAI 1

1 LAMPU TKI, TL 36W 205 bh 2 LAMPU TKO, TL 36W 2 bh 3 LAMPU DOWNLIGHT 18W 26 bh 4 LAMPU T5 28W 8 bh 5 LAMPU PLC 18W 2 bh 6 STOP KONTAK 1P 250W ex CLIPSAL 33 bh 7 STOPKONTAK MEJA 1P ISI 4 ex.UTICON 75 bh 8 STOP KONTAK AC 1P 2000W ex CLIPSAL 51 bh

STOP KONTAK AC 3P 4400W ex CLIPSAL 5 bh 9 STOP KONTAK 1P 60A ex LEGRAND u/Ruang server 2 bh 10 STOP KONTAK 1P 32A ex LEGRAND u/Ruang server 1 bh 11 STOP KONTAK TV + Antena TV bh 12 SAKLAR TUNGGAL ex CLIPSAL 14 bh 13 SAKLAR GANDA ex CLIPSAL 32 bh 14 SAKLAR TRIPLE ex CLIPSAL 1 bh 15 GRID SWITCH 6 GANG 1 bh 16 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 4815 mtr 17 KABEL NYM 5X2,5mm2 u/ STOPKONTAK AC CASSETE 100 mtr 18 KABEL NYM 3X10mm2 u/ STOP KONTAK 1P LEGRAND R 25 mtr 19 PIPA KONDUIT PVC dia. 20mm dan 4940 mtr 20 BUSBAR RUANG SERVER 50x600mm 1 lot 21 ASESORIS 1 lot

LANTAI 2 1 LAMPU TKI, TL 36W 205 bh 2 LAMPU TKO, TL 36W 2 bh 3 LAMPU DOWNLIGHT 18W 2 bh 4 LAMPU T5 28W 8 bh 5 LAMPU PLC 18W 2 bh 6 STOP KONTAK 1P 250W ex CLIPSAL 33 bh 7 STOPKONTAK MEJA 1P ISI 4 ex.UTICON 75 bh

Page 51: BOQ alfamart medan

EL :51

8 STOP KONTAK AC 1P 2000W ex CLIPSAL 51 bh STOP KONTAK AC 3P 4400W ex CLIPSAL 5 bh

9 STOP KONTAK 1P 60A ex LEGRAND u/Ruang server 2 bh 10 STOP KONTAK 1P 32A ex LEGRAND u/Ruang server 1 bh 11 STOP KONTAK TV + Antena TV bh 12 SAKLAR TUNGGAL ex CLIPSAL 14 bh 13 SAKLAR GANDA ex CLIPSAL 32 bh 14 SAKLAR TRIPLE ex CLIPSAL 2 bh 15 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 4575 mtr 16 KABEL NYM 5X2,5mm2 u/ STOPKONTAK AC CASSETE 100 mtr 17 KABEL NYM 3X10mm2 u/ STOP KONTAK 1P LEGRAND R 25 mtr 18 PIPA KONDUIT PVC dia. 20mm dan 4700 mtr 19 BUSBAR RUANG SERVER 50x600mm 1 lot 20 ASESORIS 1 lot

I.1C AREA BANGUNAN GENSET 1 LAMPU TKO, TL 36W 8 bh 2 LAMPU emergency 20 W 2 bh 3 STOP KONTAK 1P 250W ex CLIPSAL 3 bh 4 SAKLAR GANDA ex CLIPSAL 3 bh 5 SAKLAR EXHAUST FAN 2 bh 6 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 145 mtr 7 PIPA KONDUIT PVC dia. 20mm dan 145 mtr 8 ASESORIS 1 lot

I.1D AREA PENERANGAN JALAN + POS SATPAM + PARKIR MOTOR 1 LAMPU PENERANGAN JALAN ,HPLN 250W 8 bh 2 LAMPU PENERANGAN JALAN , HPLN 80W 66 bh 3 LAMPU BALK, TL 36W ( parkir motor ) 20 bh 4 LAMPU TKO, TL 20W 4 bh 5 LAMPU PLC, TL 18W 7 bh 6 STOP KONTAK 1P 250W ex CLIPSAL 4 bh 7 KABEL NYM 3X2,5mm2 u/ TL (+PARKIR MOTOR) & S 310 mtr 8 Kabel NYFGBY 4 x 6mm2 U/ LAMPU - 2275 mtr

PENERANGAN JALAN9 ASESORIS 1 lot 10 GALIAN TANAH & URUGAN 976 mtr 11 TIANG PJU SINGLE GALVANISHED 56 bh 12 TIANG PJU DOBLE GALVANISHED 9 bh

SAKLAR GANDA ex CLIPSAL 5 bh

I.1E AREA R.DRIVER,KANTIN, GD.GALON,GD.DUS BEKAS & BENGKEL 1 LAMPU TKI, TL 36W 35 bh 2 LAMPU TKO, TL 36W 19 bh 3 LAMPU PLC, TL 18W bh 4 STOP KONTAK 1P 250W ex CLIPSAL 17 bh

STOP KONTAK 3P 2000W ex CLIPSAL 1 bh 5 STOP KONTAK TV + Antena TV bh 6 SAKLAR TUNGGAL ex CLIPSAL 6 bh 7 SAKLAR GANDA ex CLIPSAL 9 bh 8 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 810 mtr 9 PIPA KONDUIT PVC dia. 20mm dan 810 mtr 10 ASESORIS 1 lot

I.1F AREA WORKSHOP, GUDANG GA & GD.MARKETING 1 LAMPU TKO, TL 36W 14 bh 2 STOP KONTAK 1P 250W ex CLIPSAL 10 bh

STOP KONTAK 3P 2000W ex CLIPSAL 2 bh 3 SAKLAR TUNGGAL ex CLIPSAL 1 bh 4 SAKLAR GANDA ex CLIPSAL 4 bh 5 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 320 mtr 6 PIPA KONDUIT PVC dia. 20mm dan 320 mtr 7 ASESORIS 1 lot

I.1G AREA RUANG TUNGGU SOPIR/ ARSIP 1 LAMPU TKI, TL 36W 9 bh 2 LAMPU TKO, TL 36W 23 bh 3 STOP KONTAK 1P 250W ex CLIPSAL 9 bh

STOP KONTAK TV + Antena TV 1 bh 4 SAKLAR TUNGGAL ex CLIPSAL 3 bh 5 SAKLAR GANDA ex CLIPSAL 5 bh 6 SAKLAR TRIPLE ex CLIPSAL bh 7 KABEL NYM 3X2,5mm2 u/ TL & STOP KONTAK 470 mtr 8 KABEL NYM 5X2,5mm2 u/ STOP KONTAK 3P mtr 9 PIPA KONDUIT PVC dia. 20mm dan 470 mtr 10 ASESORIS 1 lot

Page 52: BOQ alfamart medan

EL :52

II KABEL FEEDER KE PANEL - PANEL DI AREA LANTAI 1

1 Kabel NYY 4x95mm2 + BC50mm2 110 mtr Dari SDP-GUDANG ke LP-GUDANG

2 Kabel NYY 4x10mm2 + BC6mm2 10 mtr Dari SDP-GUDANG kePP-GUDANG

3 Kabel NYY 4x120mm2 + BC70mm2 181 mtr Dari SDP-GUDANG ke PP-FORKLIFT

4 Kabel NYY 4x10mm2 + BC 6mm2 93 mtr Dari SDP-GUDANG ke PP-KANTOR GUDANG

5 Kabel NYY 4x25mm2 + BC 10mm2 93 mtr Dari SDP-GUDANG ke PP-AC KANTOR GUDANG

6 Kabel NYY 4x35mm2 + BC16mm2 166 mtr Dari SDP-GUDANG ke PP-AC COKELAT

7 Kabel NYY 4x10mm2 + BC 6mm2 10 mtr Dari SDP-KANTOR ke LP-KANTOR CABANG1

8 Kabel NYY 4x50mm2 + BC 16mm2 10 mtr Dari SDP-KANTOR ke PP-KANTOR CABANG1

9 Kabel NYY 4x10mm2 + BC 6mm2 15 mtr Dari SDP-KANTOR ke LP-KANTOR CABANG2

10 Kabel NYY 4x50mm2 + BC 16mm2 15 mtr Dari SDP-KANTOR ke PP-KANTOR CABANG2

11 Kabel NYFGbY 4x300mm2 + BC 70mm2 10 mtr Dari SDP-AC ke PP-AC Kantor Cabang 1

12 Kabel NYFGbY 4x300mm2 + BC 70mm2 15 mtr Dari SDP-AC ke PP-AC Kantor Cabang 2

13 Kabel NYY 4x6mm2 + BC 6mm2 25 mtr Dari SDP-POMPA ke DEEPWEEL

14 Kabel NYY 4x6mm2 + BC 6mm2 15 mtr Dari SDP-POMPA ke POMPA BOOSTER

15 Kabel NYFGbY 4x10mm2 + BC 6mm2 288 mtr Dari LVMDP ke PP-KANTIN

16 Kabel NYY 4x6mm2 + BC 6mm2 20 mtr Dari LVMDP ke PP-GENSET

17 Kabel NYFGbY 4x10mm2 + BC 6mm2 35 mtr Dari LVMDP ke LP-PJU

18 Kabel NYFGbY 4x10mm2 + BC 6mm2 357 mtr Dari LVMDP ke PP-WORKSHOP

19 Kabel NYFGbY 4x2(1x150)mm2 + BC 70mm2 78 mtr Dari LVMDP keSDP-GUDANG

20 Kabel NYFGbY 4x35mm2 + BC 16mm2 60 mtr Dari LVMDP keSDP-KANTOR

21 Kabel NYFGbY 4x10mm2 + BC 6mm2 75 mtr Dari LVMDP ke SDP-POMPA

22 Kabel NYFGbY 4x50mm2 + BC 16mm2 165 mtr Dari LVMDP ke SDP-SERVER

23 Kabel NYFGbY 4x70mm2 + BC 35mm2 147 mtr Dari LVMDP ke SDP-SERVER PTL

24 Kabel NYFGbY 4x3(1x150)mm2 + BC 70mm2 60 mtr Dari LVMDP keSDP-AC

25 Kabel NYFGBY 4x6mm2 + BC 6mm2 55 mtr Dari LVMDP ke PP-RUANG TUNGGU SOPIR

26 Kabel NYY 3x5(1x150) mm2 + NYY 1x4(1x150)mm2 + BC 15 mtr dari TRAFO ke ATS ke LVMDP

27 Kabel NYY 3x4(1x150) mm2 + NYY 1x3(1x150)mm2 + BC 15 mtr by ownerdari GENSET ke PANEL ATS

28 Kabel N2XSY 3(1x70) mm2 15 mtr dari MVMDP ke TRAFO

29 Kabel XLPE 3x150mm2 + BC 16mm2 25 mtr dari gardu Ke MVMDP

30 TRAY 800mm 140 mtr 31 TRAY 600mm 274 mtr 32 TRAY 300mm ( DATA & LISTRIK ) 1088 mtr 33 CNP 60mm + Gantungan besi 302 mtr

SUB TOTAL 1

III PANEL – PANEL 1 PANEL LP-GUDANG

# Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS200N 3P 125A 1 bh # MCB NC45N 1P 20A 45 bh # ACESORIS 1 lot

2 PANEL PP-GUDANG # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 32A 1 bh# MCB NC45N 1P 20A 9 bh# ACESORIS 1 lot

Page 53: BOQ alfamart medan

EL :53

3 PANEL PP-FORKLIFT # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS250N 3P 160A 1 bh# MCB NC45N 3P 20A 9 bh# MCB NC45N 1P 20A 9 bh# ACESORIS 1 lot

4 PANEL PP-KANTOR GUDANG # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 32A 1 bh# MCB NC45N 1P 20A 13 bh# ACESORIS 1 lot

5 PANEL PAC- KANTOR GUDANG # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 50A 1 bh# MCB NC45N 1P 20A 12 bh# ACESORIS 1 lot

6 PANEL PP-AC COKELAT # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 63A 1 bh# MCB NC45N 1P 20A 11 bh# ACESORIS 1 lot

7 PANEL LP-KANTOR CABANG 1 # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 32A 1 bh# MCB NC45N 1P 20A 21 bh# ACESORIS 1 lot

8 PANEL PP-KANTOR CABANG 1 # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 80A 1 bh# MCB NC45N 1P 20A 35 bh# ACESORIS 1 lot

9 PANEL LP-KANTOR CABANG 2 # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 32A 1 bh# MCB NC45N 1P 20A 20 bh# ACESORIS 1 lot

10 PANEL PP-KANTOR CABANG 2 # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 80A 1 bh# MCB NC45N 1P 20A 35 bh# ACESORIS 1 lot

11 PANEL PP-AC KANTOR CABANG 1 # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS250N 3P 300A 1 bh# MCB NC45N 1P 20A 51 bh# MCB NC45N 3P 25A 5 bh# ACESORIS 1 lot

12 PANEL PP-AC KANTOR CABANG 2 # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS250N 3P 300A 1 bh# MCB NC45N 1P 20A 51 bh# MCB NC45N 3P 25A 5 bh# ACESORIS 1 lot

Page 54: BOQ alfamart medan

EL :54

13 PANEL PP-KANTIN # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 32A 1 bh# MCB NC45N 1P 20A 13 bh# ACESORIS 1 lot

14 PANEL PP-GENSET # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 20A 1 bh# MCB NC45N 1P 10A 6 bh# ACESORIS 1 lot

15 PANEL PP-WORKSHOP # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 32A 1 bh# MCB NC45N 3P 20A 1 bh# MCB NC45N 1P 20A 9 bh# ACESORIS 1 lot

16 PANEL LP-PJU # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 32A 1 bh# MCB NC45N 1P 20A 17 bh# LBS 32A 1 bh# CONTACTOR 32 A 1 bh# TIMER (0 - 24) JAM 1 bh# Acesoris 1 lot

17 PANEL PP-RUANG TUNGGU SOPIR # Box Panel 1 lot # Pilot Lamps dan Fuse RST 3 set# MCCB NS100N 3P 20A 1 bh# MCB NC45N 1P 20A 7 bh# ACESORIS 1 lot

18 PANEL SDP-GUDANG # Box Panel 1 lot# MCCB NS400N 3P 350A 1 bh# MCCB NS250N 3P 200A 1 bh# MCCB NS250N 3P 160A 1 bh# MCCB NS250N 3P 80A 1 bh# MCCB NS250N 3P 63A 1 bh# MCCB NS100N 3P 40A 2 bh# MCCB NS100N 3P 20A 3 bh # Pilot Lamps dan Fuse RST 3 set# AMPERMETER (0-300)A 1 bh# VOLTMETER (0-380)V 1 bh# VOLTAGE SELECTOR SWITCH (R-S-T) 1 bh# ACESORIS 1 lot

19 PANEL SDP-KANTOR # Box Panel 1 lot# MCCB NS250N 3P 200A 1 bh# MCCB NS250N 3P 100A 2 bh# MCCB NS100N 3P 40A 2 bh# MCCB NS100N 3P 20A 3 bh # Pilot Lamps dan Fuse RST 3 set# AMPERMETER (0-100)A 1 bh# VOLTMETER (0-380)V 1 bh# VOLTAGE SELECTOR SWITCH (R-S-T) 1 bh# ACESORIS 1 lot

20 PANEL PP- SERVER PTL # Box Panel 1 lot# MCCB NS250N 3P 100A 1 bh# MCCB NS100N 3P 80A 1 bh# MCCB NS100N 1P 20A 5 bh# Kontaktor 20A 2 bh# TIMER (0 - 24) JAM 2 bh# ACESORIS 1 lot

Page 55: BOQ alfamart medan

EL :55

21 PANEL PP-SERVER # Box Panel 1 lot# MCCB NS100N 3P 80A 3 bh# MCCB NS100N 1P 50A 2 bh# MCCB NS100N 1P 32A 4 bh# MCCB NS100N 1P 20A 4 bh# Kontaktor 20A 3 bh# TIMER (0 - 24) JAM 3 bh# ACESORIS 1 lot

22 PANEL SDP-POMPA # Box Panel 1 lot# MCCB NS100N 3P 25A 1 bh# MCCB NS100N 3P 16A 2 bh# MCCB NS100N 3P 10A 2 bh # Pilot Lamps dan Fuse RST 3 set# AMPERMETER (0-250)A 1 bh# VOLTMETER (0-380)V 1 bh# VOLTAGE SELECTOR SWITCH (R-S-T) 1 bh# ACESORIS 1 lot

23 PANEL SDP-KANTOR # Box Panel 1 lot# MCCB NS630N 3P 500A 1 bh# MCCB NS500N 3P 350A 2 bh# MCCB NS100N 3P 20A 3 bh # Pilot Lamps dan Fuse RST 3 set# AMPERMETER (0-100)A 1 bh# VOLTMETER (0-380)V 1 bh# VOLTAGE SELECTOR SWITCH (R-S-T) 1 bh# ACESORIS 1 lot

24 PANEL LVMDP # Box Panel 1 lot# MCCB NS1000N 3P 1000 A 1 bh# MCCB NS800N 3P 630 A 1 bh# MCCB NS800N 3P 400 A 1 bh# MCCB NS630N 3P 250 A 1 bh# MCCB NS250N 3P 125 A 1 bh# MCCB NS250N 3P 100 A bh# MCCB NS100N 3P 50 A 6 bh# MCCB NS100N 3P 40A 1 bh# MCCB NS100N 3P 32A 2 bh# MCCB NS100N 3P 25A 1 bh# CURRENT TRAFO 1000/5 A 3 bh# AMPERMETER (0-1000)A 1 bh# VOLTMETER (0-380)V 1 bh# VOLTAGE SELECTOR SWITCH (R-S-T) 1 bh# Kw meter 3P 1200A 1 bh# FREQUENCY METER 1 bh# PILOT LAMP & FUSE RST 3 bh# CONTACTOR 80 A 10 bh# MCCB NS100N 3P 63A 10 bh# CAPASITOR 30 KVAR 10 bh# LBS 3P, 1000A 1 bh# ACESORIS 1 lot

25 PANEL MVMDP #Cubical Incoming MG 1 bh# Cubical OutGoing 60A MG (tripping Unit) 1 bh# GROUNDING 1 bh

26 TRAFO 400 Kva 20Kv/0,4 Kv (TRAFINDO) 1 bh

27 GROUNDING

# Grounding server max 0,3 ohm 1 lot

# Grounding server PTL max 0,3 ohm 1 lot

# Grounding Genset max 2 ohm 1 lot

# Grounding Cubical / Trafo max 2 ohm 1 lot

# Grounding LVMDP max 2ohm 1 lot

SUB TOTAL 2

PEKERJAAN ELEKTRIKAL( SUB TOTAL 1 & 2 )

IV INSTALASI TELEPHONE 1 Box MDF + Terminal Telephone dgn Kunci 1 bh 2 PABX 6 PTT, 120EXT (TDN) PAHANASONIc set by owner

Page 56: BOQ alfamart medan

EL :56

3 Kabel UTC 2X2X0,6 mm2 untuk stop kontak 9300 mtr telephone

4 Kabel ITC JELLY 50 X2X0,6mm2 dari terminal Box 50 mtr Telkom ke MDF-TEL

5 Kabel UTP EX.Belden u/ Kabel data mtr by owner6 Pesawat Telephone Display bh by owner7 Pesawat Telephone Standard bh by owner8 Pipa Konduit dia 20mm2 dan Acesoris 1 lot 9 Stop Kontak telephone ex Clipsal 186 bh10 Stop Kontak data komputer ex Clipsal 301 bh11 CNP 100 u/ Kabel Telephone 460 mtr12 JUNCTION BOX 3 bh13 LINE TELEPHONE 30 line

SUB TOTAL TELEPHONE

V INSTALASI PENANGKAL PETIR

1 Head Penangkal Petir TYPE H6-CPT-3 NIMBUS 2 unit

2 GROUNDING PENANGKAL PETIR 2 OHM 2 bh

3 Kabel NYY 1x70mm2 100 meter

4 Pipa, Material , Asesoris 1 lot

SUB TOTAL PENANGKAL PETIR

VI INSTALASI PAGING GUDANG 1 Unit Amplifier ( Toa ) set by owner2 Mic Paging ( Toa ) set by owner3 Speaker set by owner4 Kabel dan Instalasi ( 1 speaker 1 tarikan kabel ) lot by owner

SUB TOTAL PEKERJAAN PAGING

VII PASANG BARU DAYA

Biaya Penyambungan PLN sampai menyala 1 lot

BPUJL dan Pengurusan345 KVA

Termasuk Biaya Resiko Over Blast, Penarikan Jaringan dan pengadaan Tiang

Sampai menyala 1 bulan sebelum serah terima

SUB TOTAL

VIII IJIN-IJIN BANGUNAN (IJIN DEPNAKER)

Ijin Penangkal Petir 1 ls

Ijin Pengeboran Tanah ( SIPA ) 1 ls

Ijin Genset 1 ls

Ijin Instalasi gedung 1 ls

SUB TOTAL

TOTAL PEKERJAAN ELEKTRIKAL

Page 57: BOQ alfamart medan

RENCANA ANGGARAN BIAYA PROYEK : GUDANG DC SAT MEDAN

LOKASI : MEKANIKAL

PAKET : TANJUNG MORAWA - MEDAN

PT.PIM

NO. URAIAN PEKERJAAN SAT VOLUME

II PEKERJAAN MECHANICAL

II.1 PEKERJAAN AC (AIR CONDITIONER )

A Area Kantor CabangJenis AC ½ PK ( EX LG Goldfin ) unitJenis AC 1 PK (Ex LG Goldfin) unitJenis AC 1,5 PK (Ex LG Goldfin) unitJenis AC 2 PK (Ex LG Goldfin) unitJenis AC 5 PK EX.General Cassete unitJenis AC 2 PK Panasonic Inverter unitTest dan Commisioning ls

B Area Kantor Gudang Induk Lantai DasarJenis AC 1 PK (Ex LG Goldfin) unitJenis AC 1,5 PK (Ex LG Goldfin) unitJenis AC 2 PK (Ex LG Goldfin) unitJenis AC 2 PK Panasonic Inverter unitTest dan Commisioning ls

C Area Ruang CoklatJenis AC 2 PK (Ex LG Goldfin) unitTest dan Commisioning ls

D Area Ruang TrainingJenis AC ½ PK ( EX LG Goldfin ) unitJenis AC 1 PK (Ex LG Goldfin) unitJenis AC 1,5 PK (Ex LG Goldfin) unitJenis AC 2 PK (Ex LG Goldfin) unitTest dan Commisioning ls

SUB TOTAL AC

Catatan :Harga sudah termasuk1. Pipa Tembaga 7. ISI FREON2. Bracket+Outdoor+Teralis+Gem8. SEMUA AC LOW WATTAGE3. Ducting 9. COVER PIPA OUTDOOR&PERAPIHAN PIPA4. Drainase5. Kabel kontrol6. Garansi

Page 58: BOQ alfamart medan

II.2 PEKERJAAN INSTALASI AIR BERSIH A PERALATAN UTAMA :1 Pompa GroundFos Jetpump di ruang pos satpam sum bh2 lot

Kedalaman, Jenis bor, ditentukan saat Aanwisjzzng (100m-150m)

Type : SP 8A – 24Total Head : 80 Meter 5 PK

3 Pompa Booster ( CR 3-5 Ex Groundfos ) unitKapasitas : 5,5 m3 / jamTotal Head : 80 meterPower : 2,2 KW/2900 PM/380 V/3 PH/ 50 HZSystem : 2X5,5m3/jam Paralel AlternatifType : Vertical Multistage(Termasuk panel pompa)

B MENARA AIR1 Water Torn Stainless 2000 liter bh2 Kabel WLC / Automatic Pompa ex. OMRON bh3 Pipa GIP Ø2” ( Inlet dari pompa ke tangki ) m4 Pipa PVC AW Rucika Ø1” ( Oultet pembuangan ke dra m5 Pipa PVC AW Rucika Ø3” untuk supply air bersih ( te m6 Pipa PVC AW Rucika Ø2” untuk supply air bersih ( te m7 Pipa PVC AW Rucika Ø1” untuk supply air bersih ( te m8 Ball Valve diameter 3” bh9 Ball Valve diameter 2” bh

10 Ball Valve diameter 1” bh11 Fitting & Accessories lot

SUB TOTAL A

B DISTRIBUSIB.1 AREA KANTOR CABANG B.1a TOILET LANTAI DASAR

B.1a1 TOILET AS 1-3/Q-RPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 1 ” m3 Pipa pvc diameter ½” m4 Gate valve diameter 2” bh

- Pekerjaaan pengeboran air tanah & PSPA GIP 06" & 0c4” & Screen Jhonson

Pompa Deepwell ke Groundtank (Ex. Groundfos) + Gate Valve + Pipa GIP Ø 2"

Page 59: BOQ alfamart medan

5 Gate valve diameter 1” bh6 Gate valve diameter 1/2” bh7 Fiting & Acessories lot

B.1a2 TOILET AS 12-14/Q-RPIPA PVC :

1 Pipa pvc diameter 2” mPipa pvc diameter 1 1/2” m

2 Pipa pvc diameter 1 ” m3 Pipa pvc diameter ½” m4 Gate valve diameter 2” bh5 Gate valve diameter 1” bh6 Gate valve diameter 1/2” bh7 Fiting & Acessories lot

B.1b TOILET LANTAI ATASB.1b1 TOILET AS 1-3/Q-R

PIPA PVC :1 Pipa pvc diameter 3” m2 Pipa pvc diameter 2” m3 Pipa pvc diameter 1 ” m4 Pipa pvc diameter ½” m5 Gate valve diameter 1” bh6 Gate valve diameter 1/2” bh7 Fiting & Acessories lot

B.1b2 TOILET AS 12-14/Q-RPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 1½” m3 Pipa pvc diameter 1 ” m4 Pipa pvc diameter ½” m5 Gate valve diameter 2” bh6 Gate valve diameter 11/2” bh7 Gate valve diameter 1” bh8 Gate valve diameter 1/2” bh9 Fiting & Acessories lot

B.1c MAINTENANCE AC1 Pipa pvc diameter ½” m2 Gate valve diameter 1/2” bh3 Kran air 1/2" Y70J-13 bh4 Fiting & Acessories lot

B.2 AREA GUDANG INDUKB.2a TOILET MUSHOLA GUDANG AS 22/M

PIPA PVC :1 Pipa pvc diameter 2” m

Page 60: BOQ alfamart medan

2 Pipa pvc diameter 1 ” m3 Pipa pvc diameter ½” m4 Gate valve diameter 2” bh5 Gate valve diameter 1 ” bh6 Gate valve diameter 1/ 2” bh7 Fiting & Acessories lot

B.2b TOILET KANTOR GUDANG INDUK AS 4-5/A-BPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 1 ” m3 Pipa pvc diameter ½” m4 Gate valve diameter 2” bh5 Gate valve diameter 1 ” bh6 Gate valve diameter 1/ 2” bh7 Fiting & Acessories lot

B.2c RUANG CONTAINER WASH PIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter ½” m3 Gate valve diameter 2 ” bh4 Gate valve diameter 1/ 2” bh5 Fiting & Acessories lot

B.3 MUSHOLLA, R.ARSIP DAN R.TUNGGU SOPIR1 Pipa pvc diameter 2” m2 Pipa pvc diameter 11/2” m3 Pipa pvc diameter ½” m4 Gate valve diameter 2” bh5 Gate valve diameter 11/ 2” bh6 Gate valve diameter 1/ 2” bh7 Fiting & Acessories lot

B.3 KANTIN DAN R.TUNGGU SOPIR1 Pipa pvc diameter 2” m

Pipa pvc diameter 1 1/2” m2 Pipa pvc diameter 1” m3 Pipa pvc diameter ½” m

Gate valve diameter 1 1/2” bh4 Gate valve diameter 1” bh5 Gate valve diameter 1/ 2” bh6 Fiting & Acessories lot

B.4 AREA BENGKEL1 Pipa pvc diameter 1” m2 Pipa pvc diameter ½” m3 Gate valve diameter 1” bh

Page 61: BOQ alfamart medan

4 Gate valve diameter 1/ 2” bh5 Fiting & Acessories lot

B.5 AREA POS SATPAM1 Pipa pvc diameter 3/4” m2 Pipa pvc diameter ½” m3 Gate valve diameter 3/4” bh4 Gate valve diameter 1/ 2” bh5 Fiting & Acessories lot

B.6 RUANG TRAINING1 Pipa pvc diameter 2” m2 Pipa pvc diameter 1” m3 Pipa pvc diameter ½” m4 Gate valve diameter 1” bh5 Gate valve diameter 1/ 2” bh6 Fiting & Acessories lot

B.7 EXTERNAL Pipa pvc diameter ½” mKran taman 1/2" Y70J-13 bh

SUB TOTAL B

TOTAL PEKERJAAN AIR BERSIH ( sub total A+B )

II.3 PEKERJAAN INSTALASI AIR KOTOR

A AREA KANTOR CABANG A.1 TOILET LANTAI DASARA.1a TOILET AS 1-3/Q-R

PIPA PVC :1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT bh5 Clean Out 4" bh6 Fiting & Acessories lot

A.1b TOILET AS 12-14/Q-RPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT bh5 Clean Out 4" bh6 Clean Out 3" bh

Page 62: BOQ alfamart medan

7 Fiting & Acessories lot

A.2 TOILET LANTAI ATASA.2a TOILET AS 1-3/Q-R

PIPA PVC :1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT bh5 Clean Out 4" bh6 Fiting & Acessories lot

A.2b TOILET AS 12-14/Q-RPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT bh5 Clean Out 4" bh6 Fiting & Acessories lot

B AREA GUDANG INDUKB.1 TOILET MUSHOLA GUDANG AS 22/M

PIPA PVC :1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT m5 Clean Out 4" bh6 Fiting & Acessories lot

B.2 TOILET KANTOR GUDANG INDUK AS 4-5/A-BPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT m5 Clean Out 4" bh6 Fiting & Acessories lot

C MUSHOLLA, R.ARSIP DAN R.TUNGGU SOPIRPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT m5 Clean Out 4" bh6 Clean Out 3" bh

Page 63: BOQ alfamart medan

7 Fiting & Acessories lot

D KANTIN DAN R.TUNGGU SOPIRPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT m5 Clean Out 4" bh6 Clean Out 3" bh7 Fiting & Acessories lot

E AREA POS SATPAMPIPA PVC :

1 Pipa pvc diameter 3” m2 Pipa pvc diameter 4” m3 Pipa PVC diameter 1” u/ VT m4 Clean Out 4" bh5 Fiting & Acessories lot

F RUANG TRAININGPIPA PVC :

1 Pipa pvc diameter 2” m2 Pipa pvc diameter 3” m3 Pipa pvc diameter 4” m4 Pipa PVC diameter 1” u/ VT m5 Clean Out 4" bh6 Clean Out 3" bh7 Fiting & Acessories lot

G AREA BENGKELPIPA PVC :

1 Pipa pvc diameter 2” m2 Floor drain bh3 Fiting & Acessories lot

TOTAL PEKERJAAN AIR KOTOR

II.4 EXHAUST FAN

A Area Kantor CabangPipa diameter 3” + Exhaust Fan 75 W unit

B Area Gudang KantorPipa diameter 3” + Exhaust Fan 75 W unit

C Area ForkliftDucting 40x40,40x60,80x60” + Exhaust Fan 200 W t unit

Page 64: BOQ alfamart medan

D Mushola, ruang arsip dan ruang tunggu sopirPipa diameter 3” + Exhaust Fan 75 W unit

E Kantin dan ruang tunggu sopirPipa diameter 3” + Exhaust Fan 75 W unit

F Ruang TrainingPipa diameter 3” + Exhaust Fan 75 W unit

G Area Genset Exhaust Fan 200 W unit

TOTAL PEKERJAAN EXHAUST FAN

II.5 PEKERJAAN FIRE EXTINGUISHER

A Area Kantor CabangType Solingen DM 3 kg bh

B Area Gudang & Gudang KantorType Solingen DM 3 kg bh

C Area Bangunan Penujang (Site Plan)Type Solingen DM 3 kg bhType Solingen DM 25 kg + Gardu bhType Solingen DM 25 kg Area Genset bh

TOTAL PEKERJAAN FIRE EXTINGUISHER

II.6 LAIN-LAIN Test Lab Air Sucofindo unit

TOTAL PEKERJAAN LAIN-LAIN

TOTAL PEKERJAAN MEKANIKAL

Page 65: BOQ alfamart medan

Kontraktor

VOLUME HARGA SATUAN JUMLAH HARGA

218

405

1

17211

81

-

9. COVER PIPA OUTDOOR&PERAPIHAN PIPA

Page 66: BOQ alfamart medan

11

2

43

31515770525187

8411

-

1422691

Page 67: BOQ alfamart medan

2141

141036114

14

231

781422692

141

141036114

1

2231

1

7

Page 68: BOQ alfamart medan

1360

2121

41254

2101

1428151

22463

2171

525138522

191

15171

Page 69: BOQ alfamart medan

21

2061

1

3618

-

-

3223253311

5026284811

Page 70: BOQ alfamart medan

1

3213203811

5021235311

2113151611

2433261811

3112221511

Page 71: BOQ alfamart medan

1

45281818121

3730511

2021

-

30

6

1

Page 72: BOQ alfamart medan

2

2

2

-

22

16

1941

-

1

-

-