PROGRAM NASIONAL PEMBERDAYAAN MASYARAKATMANDIRI PERDESAAN

TAHUN 2012

DESAIN DAN

RENCANA ANGGARAN BIAYA

Jenis Kegiatan : Pembangunan Gedung PKDVolume : 7 x 11 M'Lokasi : Dusun ………….Desa : Tajug

KECAMATAN KARANGMONCOLKABUPATEN PURBALINGGA

PROVINSI JAWA TENGAH

Page 2: Polindes Rab Contoh

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN (PNPM-MP)ANALISA KEBUTUHAN DAN BIAYA

Kabupaten : Purbalingga Jenis Prasarana : Gdg PKDKecamatan : Karangmoncol Lokasi :Desa : Tajug Luas : 11 x 7 m

No Koefisien URAIAN PEKERJAAN Volume Satuan

A PEKERJAAN PERSIAPAN 01 I.SNI-7 Pembersihan 44.000 Ls

0.0500 Ka. Kelompok 2.200 Ls1.0000 Pekerja Biasa 44.000 Ls

Sub Total (1) 02 SI.02 Pemasangan Bowplank 44.000 M'

0.0120 Kayu 5/7 Bekisting (sengon) 0.528 M³0.0060 Papan 2/20 bekisting (sengon) 0.264 M³0.0200 Paku 0.880 Kg0.0050 Ka. Kelompok 0.220 HOK0.0100 Ka Tukang 0.440 HOK0.1000 Tukang Kayu 4.400 HOK0.1000 Pekerja Biasa 4.400 HOK

Sub Total (2) 0B PEKERJAAN PONDASI 0

3 TA.01 Galian Tanah 30.538 M³0.0400 Ka. Kelompok 1.222 HOK0.4000 Pekerja Biasa 12.215 HOK

Sub Total (3) 04 TA.12 Urugan Tanah Kembali 9.161 M³

0.0190 Ka. Kelompok 0.174 HOK0.1920 Pekerja Biasa 1.759 HOK

Sub Total (4) 05 PO.03 Pas. Batu Kosong 5.557 M³

1.2000 Batukali 6.669 M³0.3000 Pasir Urug 1.667 M³0.0390 Ka. Kelompok 4.335 HOK0.0390 Ka Tukang 2.167 HOK0.3900 Tukang Batu 0.217 HOK0.7800 Pekerja Biasa 0.217 HOK

Sub Total (5) 06 PO.01 Pas. Batu Kali 16.200 M³

1.1000 Batukali 17.820 M³2.7200 Potland Cemen 50 kg 44.064 Zak0.5440 Pasir pasang 8.813 M³0.0750 Ka. Kelompok 1.215 HOK0.0600 Ka Tukang 0.972 HOK0.6000 Tukang Batu 9.720 HOK0.1500 Pekerja Biasa 2.430 HOK

Sub Total (6) 0C PEKERJAAN BETON BERTULANG (1pc : 2ps : 3kr) 0

7 BT.11 Bekisting Sloof 32.000 M²0.0450 Papan 2/20 bekisting (sengon) 1.440 M³0.3000 Paku 9.600 Kg0.1000 Minyak Bekisting 3.200 lt0.0050 Ka. Kelompok 0.160 HOK0.0260 Ka Tukang 0.832 HOK0.2600 Tukang Kayu 8.320 HOK0.3000 Pekerja Biasa 9.600 HOK

Sub Total (7) 0

Page 3: Polindes Rab Contoh

8 VII.SNI - 5 Beton Sloof 15/20 2.400 M³4.6400 Potland Cemen 50 kg 11.136 Zak0.5200 Pasir pasang 1.248 M³0.7800 Split 1/2 1.872 M³0.0800 Ka. Kelompok 0.192 HOK0.0250 Ka Tukang 0.060 HOK0.2500 Tukang Batu 0.600 HOK1.6500 Pekerja Biasa 3.960 HOK

Sub Total (8) 09 BT.12 Bekisting Kolom 36.000 M²

0.0400 Papan 2/20 bekisting (sengon) 1.440 M³0.4000 Paku 14.400 kg0.2000 Minyak Bekisting 7.200 lt0.0150 Kayu 5/7 Bekisting (sengon) 0.540 M³0.3500 Tripleks 4 mm 12.600 lbr2.0000 Bambu apus Ø 8 72.000 Btg0.0066 Ka. Kelompok 0.238 HOK0.0330 Ka Tukang 1.188 HOK0.3300 Tukang Kayu 11.880 HOK0.3000 Pekerja Biasa 10.800 HOK

Sub Total (9) 010 VII.SNI - 5 Beton Kolom 15/15 1.350 M³

4.6400 Potland Cemen 50 kg 6.264 Zak0.5200 Pasir pasang 0.702 M³0.7800 Split 1/2 1.053 M³0.0800 Ka. Kelompok 0.108 HOK0.0250 Ka Tukang 0.034 HOK0.2500 Tukang Batu 0.337 HOK1.6500 Pekerja Biasa 2.227 HOK

Sub Total (10) 011 BT.11 Bekisting Ringbalk 32.000 0.00

0.0450 Papan 2/20 bekisting (sengon) 1.440 M³0.3000 Paku 9.600 Kg0.1000 Minyak Bekisting 3.200 lt0.0050 Ka. Kelompok 0.160 HOK0.0260 Ka Tukang 0.832 HOK0.2600 Tukang Kayu 8.320 HOK0.3000 Pekerja Biasa 9.600 HOK

Sub Total (11) 012 VII.SNI - 5 Beton Ringbalk 15/20 2.400 M³

4.6400 Potland Cemen 50 kg 11.136 Zak0.5200 Pasir pasang 1.248 M³0.7800 Split 1/2 1.872 M³0.0800 Ka. Kelompok 0.192 HOK0.0250 Ka Tukang 0.060 HOK0.2500 Tukang Batu 0.600 HOK1.6500 Pekerja Biasa 3.960 HOK

Sub Total (12) 013 BT.11 Bekisting Tower Air 0.49 M²

0.0400 Papan 2/20 bekisting (sengon) 0.020 M³0.4000 Paku 0.196 Kg0.2000 Minyak Bekisting 0.098 lt0.0150 Kayu 5/7 Bekisting (sengon) 0.007 M³0.3500 Tripleks 4 mm 0.171 lbr6.0000 Bambu apus Ø 8 2.940 Btg0.0060 Ka. Kelompok 0.003 HOK0.0330 Ka Tukang 0.016 HOK0.3300 Tukang Kayu 0.162 HOK0.3200 Pekerja Biasa 0.157 HOK

Sub Total (13) 0

Page 4: Polindes Rab Contoh

14 VII.SNI - 5 Beton Tower 0.35 M³

4.6400 Potland Cemen 50 kg 1.634 Zak0.5200 Pasir pasang 0.183 M³0.7800 Split 1/2 0.275 M³0.0800 Ka. Kelompok 0.028 HOK0.0250 Ka Tukang 0.009 HOK0.2500 Tukang Batu 0.088 HOK1.6500 Pekerja Biasa 0.581 HOK

Sub Total (14) 0D PEKERJAAN TULANGAN/PEMBESIAN 0

15 VII.SNI - 25 Pembesian 779.147 Kg1.0500 818.105 Kg1.0000 Besi Ukuran Ǿ 10 76.129 Btg1.0000 Besi Ukuran Ǿ 6 80.344 Btg0.0003 Ka. Kelompok 0.234 HOK0.0007 Ka Tukang 0.545 HOK0.0070 Tukang Besi 5.454 HOK0.0070 Pekerja Biasa 5.454 HOK

Sub Total (15) 0E PEKERJAAN DINDING 1/2 BATA 0

16 DD.03 Pas. Bata Merah 180.864 M²70.0000 Bata merah 12,660.468 Bh

0.1664 Potland Cemen 50 kg 30.096 Zak0.0490 Pasir pasang 8.862 M³0.0150 Ka. Kelompok 2.713 HOK0.0100 Ka Tukang 1.809 HOK0.1000 Tukang Batu 18.086 HOK0.3200 Pekerja Biasa 57.876 HOK

Sub Total (14) 015 PL.01 Plesteran Dinding 15mm + Aci 350.478 M²

0.0736 Potland Cemen 50 kg 25.795 zak0.0230 Pasir pasang 8.061 M³0.0100 Ka. Kelompok 3.505 HOK0.0150 Ka Tukang 5.257 HOK0.1500 Tukang Batu 52.572 HOK0.2000 Pekerja Biasa 70.096 HOK

Sub Total (15) 0F PEKERJAAN KAYU 0

16SNI 03-3434-2002-3Kusen Kayu 6/15 1.031 M³1.2000 Kayu 6/12 Akasia 1.238 M³0.3000 Ka. Kelompok 0.309 HOK2.0000 Ka Tukang 2.063 HOK

18.0000 Tukang Kayu 18.565 HOK6.0000 Pekerja Biasa 6.188 HOK

Sub Total (16) 017SNI 03-3434-2002-30Kuda-Kuda 1.208 M³

1.1000 Kayu 8/12 Akasia 1.328 M³15.0000 Besi Strip 18.115 Kg

0.8000 Paku 0.966 Kg0.2000 Ka. Kelompok 0.242 HOK1.2000 Ka Tukang 1.449 HOK

12.0000 Tukang Kayu 14.492 HOK4.0000 Pekerja Biasa 4.831 HOK

Sub Total (17) 0G PEKERJAAN ATAP DAN DAUN 0

18SNI 03-3434-2002-36Rangka Usuk 5/7 dan Reng 2/3 106.400 M²0.0120 Kayu akasia, 5/7,2/3 1.277 M³0.1500 Paku 15.960 Kg0.0050 Ka. Kelompok 0.532 HOK0.0100 Ka Tukang 1.064 HOK0.1000 Tukang Kayu 10.640 HOK0.1000 Pekerja Biasa 10.640 HOK

Sub Total (18) 0

Page 5: Polindes Rab Contoh

19SNI 03-3434-2002-53Lisplank 41.200 M0.0088 Kayu Listplank 0.363 M³0.0600 Paku 2.472 Kg0.0500 Ka. Kelompok 2.060 HOK0.0100 Ka Tukang 0.412 HOK0.1000 Tukang Kayu 4.120 HOK0.1000 Pekerja Biasa 4.120 HOK

Sub Total (19) 020SNI 03-3436-2002-1Tutup Atap (Genteng) 106.400 M²

25.0000 Genteng palentong 2,660.000 Bh0.0080 Ka. Kelompok 0.851 HOK0.0080 Ka Tukang 0.851 HOK0.0750 Tukang Kayu 7.980 HOK0.1500 Pekerja Biasa 15.960 HOK

Sub Total (20) 021SNI 03-3436-2002-4Kerpus/Bubungan 11.800 M

4.0000 Wuwung Palentong 47.200 Bh0.1600 Potland Cemen 50 kg 1.888 Zak0.0320 Pasir pasang 0.378 M³0.0020 Ka. Kelompok 0.024 HOK0.0200 Ka Tukang 0.236 HOK0.2000 Tukang Kayu 2.360 HOK0.4000 Pekerja Biasa 4.720 HOK

Sub Total (21) 022SNI 03-2639-2002-20bPas. Plafon Triplek + Rangka 106.400 M²

0.0120 Kayu 2/3 Akasia 1.277 M³0.0600 Paku biasa 6.384 Kg0.5116 Triplek (2,4x0,9) 54.437 Lbr0.0090 Ka. Kelompok 0.958 HOK0.0320 Ka Tukang 3.405 HOK0.3200 Tukang Kayu 34.048 HOK0.1800 Pekerja Biasa 19.152 HOK

Sub Total (22) 023SNI 03-3434-2002-10Daun Pintu, Jendela kaca dan Jalusi 14.016 M²

0.0640 Papan Daun 3/20 Kruing 0.897 M³0.5000 Ka. Kelompok 7.008 HOK0.3000 Ka Tukang 4.205 HOK3.0000 Tukang Kayu 42.048 HOK1.0000 Pekerja Biasa 14.016 HOK

Sub Total (23) 0H PEKERJAAN ASESORIES 0

24 XII.SNI - 1 Pas. Kunci Tanam 7.000 bh1.0000 Kunci pintu tanam 7.000 bh0.0030 Ka. Kelompok 0.021 HOK0.0600 Ka Tukang 0.420 HOK0.6000 Tukang Kayu 4.200 HOK0.0600 Pekerja Biasa 0.420 HOK

Sub Total (24) 025 XII.SNI - 5 Pas. Engsel Pintu 7.000 Ps

1.0000 Engsel pintu 4" 7.0000.0008 Ka. Kelompok 0.0050.0150 Ka Tukang 0.1050.1500 Tukang Kayu 1.0500.0150 Pekerja Biasa 0.105

Sub Total (25) 026 XII.SNI - 6 Pas.Engsel Jendela 4.000 Psg

1.0000 Engsel Jendela 4.0000.0005 Ka. Kelompok 0.0020.0100 Ka Tukang 0.0400.1000 Tukang Kayu 0.4000.0100 Pekerja Biasa 0.040

Sub Total (26) 0

Page 6: Polindes Rab Contoh

27 XII.SNI - 9 Pas. Kait Angin dan Tarikan Jendela 4.000 Psg1.0000 Hak angin 4.000 Psg1.0000 Tarikan Jendela 4.000 bh0.0008 Ka. Kelompok 0.003 HOK0.0150 Ka Tukang 0.060 HOK0.1500 Tukang Kayu 0.600 HOK0.0150 Pekerja Biasa 0.060 HOK

Sub Total (27) 028 XII.SNI - 17 Pas. Kaca Polos 5 mm 3.902 M²

1.1000 Kaca bening 5 mm 4.293 M²0.0008 Ka. Kelompok 0.003 HOK0.0150 Ka Tukang 0.059 HOK0.1500 Tukang Kayu 0.585 HOK0.0150 Pekerja Biasa 0.059 HOK

Sub Total (28) 0I PEKERJAAN LANTAI DAN KERAMIK 0

29 XIII.SNI-47 Lantai Keramik 30x30 78.000 M²1.0000 Keramik 30 x 30 putih 78.000 M²0.2276 Potland Cemen 50 kg 17.753 Zak0.0420 Pasir pasang 3.276 M³1.5000 Semen Warna 117.000 Kg0.0300 Ka. Kelompok 2.340 HOK0.0350 Ka Tukang 2.730 HOK0.3500 Tukang Batu 27.300 HOK0.6200 Pekerja Biasa 48.360 HOK

Sub Total (29) 030 XIII.SNI-69 Keramik Lantai KM 20x20 7.000 M²

1.0000 Keramik KM 20x20 7.000 M²0.2276 Potland Cemen 50 kg 1.593 Zak0.0420 Pasir pasang 0.294 M³1.5000 Semen Warna 10.500 Kg0.0300 Ka. Kelompok 0.210 HOK0.0350 Ka Tukang 0.245 HOK0.3500 Tukang Batu 2.450 HOK0.6200 Pekerja Biasa 4.340 HOK

Sub Total (30) 031 XIII.SNI-69 Keramik Dinding KM 20x25 23.800 M²

1.0000 Keramik KM 20x25 23.800 M²0.2276 Potland Cemen 50 kg 5.417 Zak0.0420 Pasir pasang 1.000 M³1.5000 Semen Warna 35.700 Kg0.0300 Ka. Kelompok 0.714 HOK0.0350 Ka Tukang 0.833 HOK0.3500 Tukang Batu 8.330 HOK0.6200 Pekerja Biasa 14.756 HOK

Sub Total (31) 0J PEKERJAAN PENGECATAN 0

32 XIV.SNI - 14 Pengecatan Dinding 350.478 M²0.1000 Plamir 35.048 Kg0.1000 Cat Putih Dasar Tembok 35.048 Kg0.2600 Cat tembok 91.124 Kg0.0025 Ka. Kelompok 0.876 Kg0.0063 Ka Tukang 2.208 HOK0.0630 Tukang Cat 22.080 HOK0.0200 Pekerja Biasa 7.010 HOK

Sub Total (32) 033 Pengecatan Plafond 106.400 M²

0.1000 Plamir 10.640 Kg0.1000 Cat Putih Dasar Tembok 10.640 Kg0.2600 Cat tembok 27.664 Kg0.0025 Ka. Kelompok 0.266 Kg0.0063 Ka Tukang 0.670 HOK0.0630 Tukang Cat 6.703 HOK0.0200 Pekerja Biasa 2.128 HOK

Page 7: Polindes Rab Contoh

Sub Total (33) 0

Page 8: Polindes Rab Contoh

34 SNI - 8 Pengecatan Kusen dan Daun 20.227 M²1 lapis Cat Dasar, 2 lapis Cat Penutup

0.2000 Meni kayu 4.045 Kg0.1500 Plamir 3.034 Kg0.1700 Cat Putih Dasar Kayu 3.439 Kg0.2600 Cat kayu 5.259 Kg0.0025 Ka. Kelompok 0.051 HOK0.0060 Ka Tukang 0.121 HOK0.0090 Tukang Cat 0.182 HOK0.0700 Pekerja Biasa 1.416 HOK

Sub Total (34) 0K INSTALANSI AIR BERSIH 0

35 X.SNI - 26 Pas. Pipa PVC D1/2" 7.000 M'1.2000 Pipa PVC 1/2" 8.400 M'

knee drat 1/2" 2.000 Bhknee 1/2 " 2.000 Bhreducer 1/2-3/4" 2.000 Bhlem pipa 0.500 Bh

0.0018 Ka. Kelompok 0.013 HOK0.0060 Ka Tukang 0.042 HOK0.0600 Tukang Besi 0.420 HOK0.0360 Pekerja Biasa 0.252 HOK

Sub Total (35) 036 X.SNI - 35 Pas. Pipa PVC D3/4" 3.000 M'

1.2000 Pipa PVC 3/4" 3.600 M'knee 3/4 " 1.000 bhlem pipa 0.500 bh

0.0018 Ka. Kelompok 0.005 HOK0.0060 Ka Tukang 0.018 HOK0.0600 Tukang Besi 0.180 HOK0.0360 Pekerja Biasa 0.108 HOK

Sub Total (36) 037 X.SNI - 35 Pas. Pipa D4" 2.000 Bh

1.2000 Pipa PVC 4" 2.400 BhKeni 4' 2.000 BhSh0ck 4" 3.000 Bhlem pipa 0.500 Bh

0.0041 Ka. Kelompok 0.008 HOK0.0135 Ka Tukang 0.027 HOK0.1350 Tukang Batu 0.270 HOK0.0810 Pekerja Biasa 0.162 HOK

Sub Total (37) 038 X.SNI - 35 Pas. Kran 1/2 " 3.000 bh

1.0000 Kran biasa 3.000 Bh0.0250 Sealtape 0.075 Bh0.0050 Ka. Kelompok 0.015 HOK0.0100 Ka Tukang 0.030 HOK0.1000 Tukang Batu 0.300 HOK0.0100 Pekerja Biasa 0.030 HOK

Sub Total (38) 039 X.SNI - 5 Pas. Wastafel 1.000 unit

1.0000 Wastafel 1.000 Bh0.1200 knee 1/2 " 0.120 Bh6.0000 Semen Warna 6.000 Kg0.0100 Pasir pasang 0.010 HOK0.1000 Ka. Kelompok 0.100 HOK0.1500 Ka Tukang 0.150 HOK1.4500 Tukang Batu 1.450 HOK1.2000 Pekerja Biasa 1.200 HOK

Sub Total (39) 0

Page 9: Polindes Rab Contoh

L SUMUR, WC DAN SEPTICKTANK 040 Pas.Sumur + Pompa Air

Sumur (eksiting) 7.000 M'Pasang Kluwung (buisbeton+tutup) 28.000 BhMesin Pompa Air 1.000 BhTangki air 1.000 Bh

Sub Total (40) 0M PEKERJAAN INSTALASI LISTRIK 0

42 Pasang KWH 1.000 unit Lampu TL 10.000 BhKabel 74.500 M'Vitting 9.000 BhSaklar 9.000 BhStop Kontak 9.000 Bh

Sub Total (41) 0N PERALATAN DAN BIAYA LAIN 0

41 Kebutuhan Alat 1.000 Bh 2.0000 Benang 2.000 Bh

10.0000 Ember kecil 10.000 Bh3.0000 Cetok 3.000 Bh2.0000 Skop 2.000 Bh4.0000 Cangkul 4.000 Bh2.0000 Palu 2.000 Bh1.0000 Ayakan 1.000 Bh2.0000 Tang 2.000 Bh2.0000 Gergaji 2.000 Bh

Sub Total (41) 042 Biaya Lain 1.000 Bh

1.0000 Papan Proyek 1.000 Bh1.0000 Prasasti dan Admins 1.000 unit

Sub Total (42) 00

Page 10: Polindes Rab Contoh

I.SNI-7 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAANPekerja 1.000 ohMandor 0.050 oh

SI.02 1 M1 PEK. PASANG BOUWPLANKKayu kasau 5/7 sengon 0.012 Kayu papan 3/20 sengon 0.006 Paku 5 - 7 0.020 Tukang Kayu 0.1000Pekerja 0.1000 orgKepala Tukang 0.0100 orgMandor 0.0050

TA.01 1 M3 PEK GALIAN TANAH BIASA MAX KEDALAM orgPekerja 0.400 orgMandor 0.040

TA.09 1 M3 PEK URUGAN KEMBALI m3Pekerja 0.192 zakMandor 0.019 oh

ohPO.03 1 M3 PEK PASANG PONDASI BATU KOSONGoh

Batu belah 15/20 cm 1.200 ohPasir urug 0.300 Pekerja 0.780 Tukang batu 0.3900 m3Kepala tukang 0.0390 zakMandor 0.0390 m3

ohSNI 03-2836-200 1 M3 PASANG PONDASI BATU KALI, 1 PC : oh

Batu belah/batu gunung 1.100 ohSemen Portland 117.000 ohPasir pasang 0.561 hokPekerja 1.5000Tukang batu 0.6000 m3Kepala tukang 0.0600 kgMandor 0.0750 lt

Pekerja oh

VII.SNI - 29 1 M2 PASANG BEKISTING UNTUK SLOOF ohKayu Tahun 0.045 ohPaku biasa 2' - 5" 0.300 ohMinyak bekisting 0.100 m3Pekerja 0.3000Tukang kayu 0.2600Kepala tukang 0.0260 kgMandor 0.0050 m3

m3VII.SNI - 5 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr

Page 11: Polindes Rab Contoh

4.64 Semen portland 232.000 oh 54.984 Zak 53000Pasir beton 0.520 oh 6.162 M³ 90000Batu pecah 1 - 2 cm 0.7800 oh 9.24 M³ 175000Pekerja 1.6500 0.95 HOK 35000Tukang batu 0.2500 0.30 HOK 35000Kepala tukang 0.0250 m3 2.96 HOK 35000Mandor 0.0800 kg 19.55 HOK 25000

BT.12 1 M2 PEK BEKISTING KOLOM lbrKayu papan terentang 0.040 btPaku biasa 0.400 ohMinyak bekisting 0.200 ohKayu balok kruing 0.0150 ohMultipleks tebal 9 mm 0.3500 oh

2.0000Pekerja 0.3000Tukang kayu 0.3300Kepala Tukang kayu 0.0330Mandor 0.0066

VII.SNI - 29 1 M2 PASANG BEKISTING UNTUK SLOOF ohKayu Tahun 0.045 ohPaku biasa 2' - 5" 0.300 ohMinyak bekisting 0.100 m3Pekerja 0.3000Tukang kayu 0.2600Kepala tukang 0.0260 kgMandor 0.0050 m3

m3VII.SNI - 5 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr

4.64 Semen portland 232.000 kgPasir beton 0.520 m3Batu pecah 1 - 2 cm 0.780 m3Pekerja 1.6500 ohTukang batu 0.2500 ohKepala tukang 0.0250 ohMandor 0.0800 oh

oh

VII.SNI - 32 1 M2 PASANG BEKISTING UNTUK LANTAI

Kayu Tahun 0.040 m3Paku biasa 2' - 5" 0.400 kgMinyak bekisting 0.200 LtKayu tahun 0.015 m3Multiplek 9 mm 0.350 lbrKayu Ø 8/ 4 m 6.000 btgPekerja 0.320 ohTukang batu 0.330 ohKepala tukang 0.033 ohMandor 0.006 oh

Bambu apus Ø 8-10 / 4 m1

Page 12: Polindes Rab Contoh

VII.SNI - 25 1 KG PEMBESIAN DENGAN BESI POLOS ATAU ULIR

Besi beton (polos/ulir) 1.050 kg0 Kawat beton 0.015 kg

Pekerja 0.0070 ohTukang besi 0.0070 ohKepala tukang 0.0007 ohMandor 0.0003 oh

SNI 03-6897-200 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 6 PSBata merah 5 x 11 x 22 cm 70.000 bh

0.1664 Semen Portland 8.320 kgPasir pasang 0.049 m3Pekerja 0.320 ohTukang batu 0.100 oh ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Kepala tukang 0.010 ohMandor 0.0150 oh

SNI 03-2837-200 1 M2 PEKERJAAN PLESTERAN 1 PC : 6 PS TEBAL 15 MMPortand Cement (Pc) 3.680 kgPasir pasang 0.023 m3Pekerja 0.200 ohTukang batu 0.150 ohKepala tukang 0.0150 ohMandor 0.0100 oh

SNI 03-3434-2002-31 M3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO, KRUWINGKayu borneo, kruing, bal 1.200 m3 230769231Pekerja 6.000 ohTukang kayu 18.000 ohKepala tukang 2.0000 ohMandor 0.3000 oh

SNI 03-3434-200 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KRUWINGKayu Kruing, balok 1.100 m3Besi strip 15.000 kgPaku biasa 2" - 5" 0.800 kgPekerja 4.000 ohTukang kayu 12.000 ohKepala tukang 1.2000 ohMandor 0.2000 oh

SNI 03-3434-2002-321 M2 PASANG KASAO + RENG GENTENG PLENTONG, KAYU KRUINGKayu Kruing, balok 0.012 m3Paku biasa 2" - 5" 0.150 kgPekerja 0.100 ohTukang kayu 0.100 ohKepala tukang 0.0100 ohMandor 0.0050 oh

Page 13: Polindes Rab Contoh

SNI 03-3434-200 1 M' PASANG LISPLANG UKURAN 2 x ( 2 x 20 ) CM, KAYU KRUINGKayu kruing, papan 0.009 m3Paku biasa 2" - 5" 0.060 kgPekerja 0.100 ohTukang kayu 0.100 ohKepala tukang 0.0100 ohMandor 0.0500 oh

SNI 03-3436-200 1 M2 PASANG ATAP GENTENG PALENTONGGenteng palentong 25.000 bhPekerja 0.150 ohTukang kayu 0.075 ohKepala tukang 0.0080 ohMandor 0.0080 oh

SNI 03-3436-200 1 M2 PASANG ATAP GENTENG KREPUSGenteng Krepus 5.000 bhSemen portland 8.000 kgPasir pasang 0.032 m3Pekerja 0.400 ohTukang kayu 0.200 ohKepala tukang 0.0200 ohMandor 0.0020 oh

SNI 03-2639-200 1 M2 LANGIT-LANGIT ETERNIT POLOS (1,00 X 1,00 )M, RANGKA KAYU TAHUNKayu Tahun, balok 0.012 m3Paku biasa 0.060 kgEternit Polos 1.100 lbrPekerja 0.180 ohTukang kayu 0.320 ohKepala tukang 0.0320 ohMandor 0.0090 oh

SNI 03-3434-200 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPERKayu Kamper, papan 0.035 m3Pekerja 0.800 ohTukang kayu 2.000 ohKepala tukang 0.2000 ohMandor 0.0400 oh

XII.SNI - 1 1 BUAH PASANG KUNCI TANAM ANTIKKunci tanam artistik 1.000 bhPekerja 0.060 ohTukang kayu 0.600 ohKepala tukang 0.0600 ohMandor 0.0030 oh

XII.SNI - 5 1 BUAH PASANG ENGSEL PINTUEngsel pintu nilon 1.000 bhPekerja 0.015 ohTukang kayu 0.150 ohKepala tukang 0.0150 ohMandor 0.0008 oh

XII.SNI - 6 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPUEngsel jendela Nilon 1.000 bhPekerja 0.010 ohTukang kayu 0.100 ohKepala tukang 0.0100 ohMandor 0.0005 oh

Page 14: Polindes Rab Contoh

XII.SNI - 9 1 BUAH PASANG KAIT ANGINKait angin 1.000 psngTarikan Jendela 1.000 BhPekerja 0.015 ohTukang kayu 0.150 ohKepala tukang 0.0150 ohMandor 0.0008 oh

XII.SNI - 17 1 M2 PASANG KACA, TEBAL 5 MMKaca 1.100 m2Pekerja 0.015 ohTukang kayu 0.150 ohKepala tukang 0.0150 ohMandor 0.0008 oh

XIII.SNI-47 1 M2 PASANG LANTAI KERAMIK 30x30 CMUbin keramik 30x30 cm 1.000 m2Semen portland 11.380 KgPasir pasang 0.042 M3Semen warna 1.500 KgPekerja 0.620 ohTukang batu 0.350 ohKepala tukang 0.0350 ohMandor 0.0300 oh

XIII.SNI - 44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CMUbin keramik artistik 20 x 1.000 M2

0.2276 Porland Cement (PC) 11.380 kgPasir pasang 0.042 m3Semen warna 1.500 kgPekerja 0.6200 ohTukang batu 0.350 ohKepala tukang 0.0350 ohMandor 0.0300 oh

XIII.SNI-69 1 M2 PASANG DINDING KERAMIK 10x20 CM Keramik 10x20 cm 50.000 BhSemen abu - abu 9.300 KgPasir pasang 0.018 M3Semen warna 1.500 KgPekerja 0.6000 ohTukang batu 0.125 ohKepala tukang 0.0125 ohMandor 0.0300 oh

XIV.SNI - 14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)Plamir 0.100 kgCat dasar 0.100 kgCat penutup 2 kali 0.260 kgPekerja 0.020 ohTukang cat 0.0630 ohKepala tukang 0.0063 ohMandor 0.003 oh

1500 12

375000

Page 15: Polindes Rab Contoh

SNI - 8 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUPCat meni 0.200 kgPlamir 0.150 kgCat dasar 0.170 kgCat penutup 2 kali 0.2600 kgPekerja 0.0700 ohTukang cat 0.009 ohKepala tukang 0.0060 ohMandor 0.0025 oh

X.SNI - 26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3/4"Pipa PVC 1.200 m'Perlengkapan 35% harga pipa Pekerja 0.036 oh

Tukang batu 0.060 ohKepala tukang 0.0060 ohMandor 0.0018 oh

X.SNI - 32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"Pipa PVC 1.200 m'Perlengkapan 35,0% harga pipa Pekerja 0.081 ohTukang batu 0.135 ohKepala tukang 0.0135 ohMandor 0.0041 oh

X.SNI - 35 MEMASANG 1 BUAH KRAN DIAMETER 3/4" Kran air 1.0000 bhSeal tape 0.025 bhPekerja 0.010 ohTukang batu 0.100 ohKepala tukang 0.010 ohMandor 0.0050 oh

X.SNI - 5 MEMASANG 1 BUAH WASTAFELWastafel 1.000 bhPerlengkapan 12% harga wastafel Semen abu-abu 6.000 kgPasir pasang 0.010 m3Pekerja 1.200 ohTukang batu 1.450 ohKepala tukang 0.150 ohMandor 0.100 oh

XIII.SNI-47 1 M2 PASANG LANTAI KERAMIK 30x30 CM

Page 16: Polindes Rab Contoh

100000

70.0000 Bata merah 4.6400 Semen 50 kg0.1664 Semen 50 kg 0.5200 Pasir pasang0.0490 Pasir pasang 0.7800 Split 2/3

0

Page 17: Polindes Rab Contoh

2914152554580

161752533180

10368.75103687.5488812.5

Page 18: Polindes Rab Contoh

,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

Page 19: Polindes Rab Contoh

Desa : TajugKecamatan : KarangmoncolKabupaten : Purbalingga

Jenis Prasarana : Gedung Polindes : Gdg PolindesLokasi :Panjang : 11 m' :11 m' 11 m'

Lebar : 7 m' : 7 m' 7 m'

Luas : 77 M² : 77 M² 77 M²Volume : M³

Ketua TPK :Kepala Desa :Dibuat Oleh :Tanggal Survey :

BLM : 200000000Swadaya : 10000000

Page 20: Polindes Rab Contoh

7.2

3.5

1.8

12.5

Page 21: Polindes Rab Contoh

DAFTAR SURVEY HARGA BAHAN DAN ALAT UPAH DAN TENAGA

DESA : TajugKECAMATAN : KarangmoncolKABUPATEN : Purbalingga

No Uraian Satuan HARGA SATUAN

A BAHAN / MATRIAL :1 Bata merah Bh 400 4002 Potland Cemen 50 kg Zak 53,000 53,0003 Semen Warna Kg 2,500 2,5004 Pasir Urug M³ 70,000 70,0005 Pasir pasang M³ 95,000 95,0006 Minyak Bekisting M³ 5,000 5,0007 Split 1/2 M³ 150,000 150,0008 Batukali M³ 90,000 90,0009 Besi Ø 12 Btg 78,000 78,000

10 Besi Ø 10 Btg 60,000 60,00011 Besi Ø 6 Btg 24,000 24,00012 Kawat beton Kg 14,000 14,00013 Paku Kg 14,000 14,00014 Kayu 5/7 Bekisting (sengon) M³ 1,500,000 1,500,00015 Papan 2/20 bekisting (sengon) M³ 1,500,000 1,500,00016 Kayu 6/12 Akasia M³ 3,000,000 3,000,00017 Kayu 8/12 Akasia M³ 3,000,000 3,000,00018 Kayu 5/7 Akasia M³ 3,000,000 3,000,00019 Kayu 2/3 Akasia M³ 3,000,000 3,000,00020 Bambu apus Ø 8 Btg 5,000 5,00021 Papan Daun 3/20 Kruing M³ 4,500,000 4,500,00022 Kayu Listplank M³ 3,000,000 3,000,00023 Besi Strip Bh 20,000 20,00024 Tripleks 4 mm Lbr 70,000 70,00025 Tripleks 3 mm Lbr 65,000 65,00026 Lem kayu Kg 5,000 5,00027 Keramik 30 x 30 putih M² 30,000 30,00028 Keramik KM 20x20 M² 35,000 35,00029 Keramik KM 20x25 M² 35,000 35,00030 Kaca bening 5 mm M² 20,000 20,00031 Kunci pintu tanam Bh 100,000 100,00032 Engsel pintu 4" Bh 50,000 50,00033 Engsel pintu 3" Psg 40,000 40,00034 Engsel Jendela Psg 25,000 25,00035 Hak angin Psg 15,000 15,00036 Tarikan Jendela Bh 5,000 5,00037 Genteng palentong Bh 900 90038 Wuwung Palentong Bh 1,500 1,50039 Kabel NYM 2 x 1,5 mm M' 4,000 4,00040 Saklar Tunggal Bh 3,000 3,00041 Saklar Ganda Bh 3,500 3,50042 Stop kontak Bh 4,000 4,00043 Fitting Plafond Bh 3,000 3,00044 Box + MCB Bh 25,000 25,00045 Isolasi Bh 5,000 5,00046 Sealtape Bh 2,500 2,50047 Lampu TL 10 watt Bh 15,000 15,00048 Daun Pintu + kusen KM/WC bahan PVC Bh 120,000 120,00049 Bak mandi fiber Bh 250,000 250,00050 Wastafel Bh 300,000 300,00051 Kloset jongkok Bh 90,000 90,00052 Pipa PVC 1/2" Btg 8,000 8,000

JARAK S/D DESA

(KM)

ONGKOS ANGKUT/SAT

UAN (RP)

HARGA DITERIMA DI

TMPT

D8
Dedy:
Page 22: Polindes Rab Contoh

53 Pipa PVC 3/4" Btg 11,000 11,00054 Pipa PVC 1" Btg 15,000 15,00055 Pipa PVC 2" Btg 20,000 20,00056 Pipa PVC 4" Btg 35,000 35,00057 Pipa PVC Listrik 5/8" Btg 5,000 5,00058 Knee drat dalam 1/2" Bh 2,500 2,50059 Knee 1/2" Bh 2,000 2,00060 Knee 3/4" Bh 3,000 3,00061 Shock 4" Bh 7,000 7,00062 Knee 4" Bh 7,000 7,00063 Tee 1/2" Bh 3,000 3,00064 Tee 2 1/2" Bh 7,500 7,50065 Tee 4" Bh 8,000 8,00066 Reduser 1/2" - 1/4" Bh 3,000 3,00067 Lem pipa Kg 2,500 2,50068 Kran biasa Bh 10,000 10,00069 Plamir Kg 10,000 10,00070 Meni kayu Kg 5,000 5,00071 Cat Putih Dasar Kayu Kg 15,000 15,00072 Cat Putih Dasar Tembok Kg 10,000 10,00073 Minyak Cat Ltr 5,000 5,00074 Cat tembok Kg 13,000 13,00075 Cat kayu Kg 20,000 20,00076 Mesin pompa / 60 watt Bh 250,000 250,00077 Tangki air Bh 500,000 500,00078 Kluwung Bh 30,000 30,000

PERALATAN1 Benang Bh 5,000 5,0002 Ember kecil Bh 5,000 5,0003 Cetok Bh 15,000 15,0004 Skop Bh 60,000 60,0005 Cangkul Bh 40,000 40,0006 Palu Bh 15,000 - 15,0007 Ayakan Bh 50,000 - 50,0008 Tang Bh 30,000 - 30,0009 Gergaji Bh 40,000 40,000

-TENAGA KERJA :

1 Ka. Kelompok HOK 35,000 35,0002 Ka Tukang HOK 35,000 35,0003 Tukang Kayu HOK 35,000 35,0004 Tukang Batu HOK 35,000 35,0005 Tukang Besi HOK 35,000 35,0006 Tukang Cat HOK 35,000 35,0007 Pekerja Biasa HOK 25,000 25,000

Ketua TPK

0

Page 23: Polindes Rab Contoh

PNPM - MD Form 19

Kabupaten Purbalingga Jenis Prasarana : Gedung PKDKecamatan Karangmoncol TAKE OF SHEET Lokasi : …………….Desa Tajug Luas : 77 M² 7 x 11 m

No SKET GAMBARPERHITUNGAN VOLUME

Panjang Lebar Tinggi Luas Volume

A PEKERJAAN PERSIAPAN

1 Pembersihan 44.00 LsGedung Utama 22 14 36 M'Teras 4 4 8 M'

2 Pemasangan Bowplank Keliling 44.00 M'Panjang Luar 22 14 36 M'

4 4 8 M'

B PEKERJAAN PONDASI

3 Galian Tanah 74.5 0.6 0.6 30.54 M³

Panjang Keliling Galian 74.5Lebar Galian 0.6Tinggi Galian 0.6Footplat Tower 0.7 0.7 0.7 0.34 M³Sapticktank dan peresapan 1.5 1.5 1.5 3.38 M³

4 Urugan Tanah Kembali 30.54 0.3 9.16 M³

5 Pas. Batu Kosong 5.56 M³Panjang Keliling (-teras&km) 61.75Lebar 0.6Tinggi 0.15

6 Pas. Batu Kali 80.00 0.45 0.45 16.20 M³Panjang 74.50 3.50 2.00 80.00Lebar (0,3+0,6)/2 0.45Tinggi Pondasi (-batu kosong) 0.45

C PEKERJAAN BETON BERTULANG (1pc : 2ps : 3kr)

7 Bekisting Sloof 80.00 0.15 0.2 32.00 M² M³x 2

8 Beton Sloof 15/20 80.00 0.15 0.2 2.4 M³Ukuran Beton 0,15x0,2 Panjang keliling 59,25 80 198.40 KgUkuran Tulangan 0,10 x 0,15 Ǿ 10 320 M' 0.62Jumlah Besi Tulangan (Ǿ10) 4 bh 4 Ǿ 10 26.67 BtgJumlah Besi begel (Ǿ6)=(59,25/0,15)+1 534.33 336.63 M'Panjang 1 Begel (2x0,12+2x0,17+0,05) 0.63 Ǿ 6 28.05 Btg 74.06 kg

0.22

0,6

0,60

3

3 3 3

4

2 2

1,5

1 4

0,45

0,60

4.002.00

7.00

11.00

15

0,20

4Ø10 mm

Ø 6 mm - 15 cm

beton 1:2:3

0,15

0,60

1.50

1.75

1.75

3.50 3.50

3.00

4.00

3.50

4.00

2.50

2.00

2.00

Page 24: Polindes Rab Contoh

15

Page 25: Polindes Rab Contoh

9 Bekisting Kolom 60.00 0.15 4.00 36.00 M²

Panjang 60Lebar 0.15

10 Beton Kolom 15/15 60.00 0.15 0.15 M² 1.35 M³Jumlah Kolom/Tiang 20.00 80.00 6.67Jumlah Besi 4.00Tinggi Tiang 3.20 Ǿ 10 21.33 Btg 158.72 Kg

256 M'Total PanjangBegel/Sengkang (80/0,15)+1 534.3333 283.20 M' 62.30 KgPjg Begel (2x0,12+2x0,12+0,05) 0.53 Ǿ 6 23.60 Btg

11 Bekisting Ringbalk 80.00 0.15 0.20 32.00 M² M³x 2

12 Beton Ringbalk 15/20 80.00 0.15 0.20 2.40 M³(sama dengan sloof)

320 M' Ǿ 10 26.67 Btg 198.40 Kg336.63 M' Ǿ 6 28.05 Btg 74.06 kg

13 Bekisting Tower Air(plat) Footplat

Tiang 2.5 0.25 0.63 M²lantai 0.7 0.70 0.15 0.49 M²

14 Beton Tower 0.35 M³footplat 0.7 0.70 0.25 0.12 M³

Tiang 2.5 0.25 0.25 0.16 M³Lantai 0.7 0.7 0.15 0.07 M³

Tulangan Footplat Ǿ10=(0,62/0,2+1) Ǿ 10 4.1 7.38 0.61 Btg 4.58 KgTotal+tinggi tulangan = 0,20x4,1x2(kn&kr)x2 Ǿ 10 3.28Jumlah Besi Tiang (Ǿ10) 4 bh x tinggi 4 2.80 11.20 0.34 Btg 6.94 KgBegel tiang (Ǿ6)= 2,8/0,15+1, uk 0,17x0,17 19.66667 0.39 7.67 0.64 Btg 1.69 KgTulangan lantai Ǿ10=(0,62/0,2+1) 4.10 6.07 0.51 Btg 3.76 kgTotal+tinggi tulangan = 0,12x4,1x2(kn&kr)x2 Ǿ 10 1.97 16.97 Kg

D PEKERJAAN TULANGAN/PEMBESIAN

15 Pembesian 779.15 KgBesi Ukuran Ǿ 10 914.58 M' Ǿ 10 76.13 Btg

567.04 KgBesi Ukuran Ǿ 6 964.13 M' Ǿ 6 80.34 Btg

212.108 Kg

E PEKERJAAN DINDING 1/2 BATA

16 Pas. Bata Merah 180.86 M²(Keliling)-(teras) 74.50 8 199.50 M²Tinggi dinding 32 Gunungan Utama (1/2 alas x Tinggi) 3 5.193 M²

Tg 30' = 0,577 0.577Tinggi Gunungan 1.731

Luas Gunungan teras 3 0.577 1.01 1.51462 M²Luas Kusen 30.9688Luas total (dinding+Gunungan-Kusen) 175.24Dinding Septictank 1.5 1.50 2.25 M²

2.00

11.00

4.00

7.00

11.00

7.00

0,20

0,15

4Ø10 mm

Ø 6 mm - 15 cmbeton 1:2:3

0,70

2,50

0,70

0,70

0,25

1.50

1.75

1.75

3.50 3.50

3.00

4.00

3.50

4.00

2.50

2.00

2.00

Page 26: Polindes Rab Contoh

Sekat antar Septictank 1.5 0.75 1.125 M²Lantai Septicktank 1.5 1.50 2.25 M²

Page 27: Polindes Rab Contoh

17 Plesteran Dinding 15mm + Aci 175.24 2.00 350.478 M²Luas Total dinding X 2 Pintu 1 /utama (2,42x1,52) 1 2.42 1.52 3.6784 M² 3.6784

Pintu 2 /biasa (2,42x0,82) 4 2.42 0.82 1.9844 M² 7.9376Pintu 3 /KM (2.00x0,70) 2 2 0.7 1.4 M² 2.8Jendela 1 (1,5x1,62) 5 1.5 1.62 2.43 M² 12.15Jendela 2 (0,72x1,62) 2 0.72 1.62 1.1664 M² 2.3328bouven 1 (0,90x0,50) 3 0.9 0.5 0.45 M² 1.35bouven 2 /KM (0,60x0,40) 3 0.6 0.4 0.24 M² 0.72

30.9688 M²

F PEKERJAAN KAYU

18 Kusen Kayu 6/15 1.03 M³P1 =2,42x2+(1,52+0,2)x2 8.28 M²P2 =(2,42x2+(0,82+0,2)x2)x4 27.52 M²P3 =(2x2+(0,7+0,2)x2)x2 11.6 M²J1 =(1,5x2+(1,62+0,2)x3)*5 42.3 M²J2 =(0,72x2+(1,62+0,2)x3)*2 13.8 M²B1 =0,9x2+(0,5+0,2)x3 3.9 M²B2 =(0,6x2+(0,4+0,2)x3)x3 7.2

114.60 M³Ukuran kayu 0,06x0,15 0.009

1.0314

19 Kuda-Kuda Kayu Kuda2 8/12 1.21 M³K1= (7+1,8+2x4+2x2)x2 41.6 0.08 0.12 52.50 M 0.504K2= (4+0,9+2x2+1x2) 10.9Gording utama (11,6x5) 58 0.08 0.12 65.2 M 0.62592Gording Teras (2,4x3) 7.2Gapit 6/12 10.8 0.06 0.12 0.07776 M³

Total Kayu 8/12 0.50Total balok 1.21 M³

G PEKERJAAN ATAP DAN DAUN

20 Rangka Usuk 5/7 dan Reng 2/3 106.40 M²Luas AtapUtama 11.8 4 2 94.4 M²Teras 2.4 2.5 2 12 M²

21 Lisplank 41.20 m'4,5x4+8x2+1,5x4x0,03x0,3 23.6 8.00

4.8 4.80

22 Tutup Atap (Genteng) 2.50 M²

106.40 M²

23 Kerpus/Bubungan 11.8 m'

24 Pas. Plafon Triplek + Rangka 106.40 M²

25 Daun Pintu, Jendela kaca dan Jalusi 14.016 M²P1 1 pintu 1 242 x 152 4 3.6784P2 4 pintu 2 242 x 82 2 7.9376P3 2 Pintu K 200 x 60 1.2 2.4

8/128/12

2,0

7 m

8/12

4, 0

Kaso & Gording &

Reng

4

11

Genteng

4

11

Page 28: Polindes Rab Contoh

H PEKERJAAN ASESORIES

26 Pas. Kunci Tanam 7.00 bh

27 Pas. Engsel Pintu 7 Ps

28 Pas.Engsel Jendela 4 Psg

29 Pas. Kait Angin dan Tarikan Jendela 4 Psg

30 Pas. Kaca Polos 5 mm 3.9024 M²jendela 3.1824bouven 0.72

I PEKERJAAN LANTAI DAN KERAMIK

31 Lantai Keramik 30x30 78.00 M²Luas Lantai dalam 77Luas Teras 8Luas Kamar mandi 7Luas Total - luas lantai KM 78 M²

32 Keramik Lantai KM 20x20Luas lantai 3.5 2 7 M²

33 Keramik Dinding KM 20x25 23.8 M²Dinding Keramik (P) 3.15 2 2 12.6Dinding Keramik (L) 1.7 4 2 13.6Luas Pintu 2 0.6 2 2.4

J PEKERJAAN PENGECATAN

34 Pengecatan Dinding 350.478 M²

35 Pengecatan Plafond 106.4 M²

36 Pengecatan Kusen dan Daun 20.2272 M²

K INSTALANSI AIR BERSIH

37 Pas. Pipa PVC D1/2" Pipa 1/2 " 7 M'knee drat 1/2" 2 bhknee 1/2 " 2 bhreducer 1/2-3/4" 2 bhlem pipa 0.5 bh

38 Pas. Pipa PVC D3/4" Pipa 3/4 " 3 M'knee 3/4 " 1 bhlem pipa 0.5 bh

39 Pas. Pipa D4" Pipa 4 " 3 M'. Keni 4' 2 Bh

Sh0ck 4" 3 bhlem pipa 0.5 bh

40 Pas. Kran 1/2 " 2 bh

41 Pas. Wastafel 1 Bh

L SUMUR, WC DAN SEPTICKTANK

42 Pas.Sumur + Pompa Air. Pasang Kluwung (buisbeton+tutup) 28 unit

Mesin Pompa 1 unit

2,0

3,5

Page 29: Polindes Rab Contoh

M PEKERJAAN INSTALASI LISTRIK43 Pasang KWH

Lampu TL 10 BhKabel 74.50 M'Vitting 9 BhSaklar 9 BhStop Kontak 9 Bh

Page 30: Polindes Rab Contoh

63

0.61666667

74.61965

0.616667

0.222

1.50

1.75

1.75

3.50 3.50

3.00

4.00

3.50

4.00

2.50

2.00

2.00

Page 31: Polindes Rab Contoh

0.009

Page 32: Polindes Rab Contoh

m1 1.200

bh 1.000 hok 0.135

hok 0.135

unit 1.000 unit 1.000

bh 1.000 hok 0.035

Page 33: Polindes Rab Contoh

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN (PNPM-MP)ANALISA KEBUTUHAN DAN BIAYA

Kabupaten : Purbalingga Jenis Prasarana : Gdg PKDKecamatan : Karangmoncol Lokasi :Desa : Tajug Luas : 11 x 7 m

No Koefisien URAIAN PEKERJAAN Volume Satuan Harga TOTAL

A PEKERJAAN PERSIAPAN 2,664,4201 I.SNI-7 Pembersihan 44.000 Ls

0.0500 Ka. Kelompok 2.200 Ls 35,000 77,0001.0000 Pekerja Biasa 44.000 Ls 25,000 1,100,000

Sub Total (1) 1,177,0002 SI.02 Pemasangan Bowplank 44.000 M'

0.0120 Kayu 5/7 Bekisting (sengon) 0.528 M³ 1,500,000 792,0000.0060 Papan 2/20 bekisting (sengon) 0.264 M³ 1,500,000 396,0000.0200 Paku 0.880 Kg 14,000 12,3200.0050 Ka. Kelompok 0.220 HOK 35,000 7,7000.0100 Ka Tukang 0.440 HOK 35,000 15,4000.1000 Tukang Kayu 4.400 HOK 35,000 154,0000.1000 Pekerja Biasa 4.400 HOK 25,000 110,000

Sub Total (2) 1,487,420B PEKERJAAN PONDASI 6,609,605

3 TA.01 Galian Tanah 30.538 M³0.0400 Ka. Kelompok 1.222 HOK 35,000 42,7530.4000 Pekerja Biasa 12.215 HOK 25,000 305,380

Sub Total (3) 348,1334 TA.12 Urugan Tanah Kembali 9.161 M³

0.0190 Ka. Kelompok 0.174 HOK 35,000 6,0920.1920 Pekerja Biasa 1.759 HOK 25,000 43,975

Sub Total (4) 50,0675 PO.03 Pas. Batu Kosong 5.557 M³

1.2000 Batukali 6.669 M³ 90,000 600,2100.3000 Pasir Urug 1.667 M³ 70,000 116,7070.0390 Ka. Kelompok 4.335 HOK 35,000 151,7200.0390 Ka Tukang 2.167 HOK 35,000 75,8600.3900 Tukang Batu 0.217 HOK 35,000 7,5860.7800 Pekerja Biasa 0.217 HOK 25,000 5,419

Sub Total (5) 957,5026 PO.01 Pas. Batu Kali 16.200 M³

1.1000 Batukali 17.820 M³ 90,000 1,603,8002.7200 Potland Cemen 50 kg 44.064 Zak 53,000 2,335,3920.5440 Pasir pasang 8.813 M³ 95,000 837,2160.0750 Ka. Kelompok 1.215 HOK 35,000 42,5250.0600 Ka Tukang 0.972 HOK 35,000 34,0200.6000 Tukang Batu 9.720 HOK 35,000 340,2000.1500 Pekerja Biasa 2.430 HOK 25,000 60,750

Sub Total (6) 5,253,903C PEKERJAAN BETON BERTULANG (1pc : 2ps : 3kr) 13,884,418

7 BT.11 Bekisting Sloof 32.000 M²0.0450 Papan 2/20 bekisting (sengon) 1.440 M³ 1,500,000 2,160,0000.3000 Paku 9.600 Kg 14,000 134,4000.1000 Minyak Bekisting 3.200 lt 5,000 16,0000.0050 Ka. Kelompok 0.160 HOK 35,000 5,6000.0260 Ka Tukang 0.832 HOK 35,000 29,1200.2600 Tukang Kayu 8.320 HOK 35,000 291,2000.3000 Pekerja Biasa 9.600 HOK 25,000 240,000

Sub Total (7) 2,876,320

Harga Satuan

Page 34: Polindes Rab Contoh

8 VII.SNI - 5 Beton Sloof 15/20 2.400 M³4.6400 Potland Cemen 50 kg 11.136 Zak 53,000 590,2080.5200 Pasir pasang 1.248 M³ 95,000 118,5600.7800 Split 1/2 1.872 M³ 150,000 280,8000.0800 Ka. Kelompok 0.192 HOK 35,000 6,7200.0250 Ka Tukang 0.060 HOK 35,000 2,1000.2500 Tukang Batu 0.600 HOK 35,000 21,0001.6500 Pekerja Biasa 3.960 HOK 25,000 99,000

Sub Total (8) 1,118,3889 BT.12 Bekisting Kolom 36.000 M²

0.0400 Papan 2/20 bekisting (sengon) 1.440 M³ 1,500,000 2,160,0000.4000 Paku 14.400 kg 14,000 201,6000.2000 Minyak Bekisting 7.200 lt 5,000 36,0000.0150 Kayu 5/7 Bekisting (sengon) 0.540 M³ 1,500,000 810,0000.3500 Tripleks 4 mm 12.600 lbr 70,000 882,0002.0000 Bambu apus Ø 8 72.000 Btg 5,000 360,0000.0066 Ka. Kelompok 0.238 HOK 35,000 8,3160.0330 Ka Tukang 1.188 HOK 35,000 41,5800.3300 Tukang Kayu 11.880 HOK 35,000 415,8000.3000 Pekerja Biasa 10.800 HOK 25,000 270,000

Sub Total (9) 5,185,29610 VII.SNI - 5 Beton Kolom 15/15 1.350 M³

4.6400 Potland Cemen 50 kg 6.264 Zak 53,000 331,9920.5200 Pasir pasang 0.702 M³ 95,000 66,6900.7800 Split 1/2 1.053 M³ 150,000 157,9500.0800 Ka. Kelompok 0.108 HOK 35,000 3,7800.0250 Ka Tukang 0.034 HOK 35,000 1,1810.2500 Tukang Batu 0.337 HOK 35,000 11,8121.6500 Pekerja Biasa 2.227 HOK 25,000 55,687

Sub Total (10) 629,09311 BT.11 Bekisting Ringbalk 32.000 0.00

0.0450 Papan 2/20 bekisting (sengon) 1.440 M³ 1,500,000 2,160,0000.3000 Paku 9.600 Kg 14,000 134,4000.1000 Minyak Bekisting 3.200 lt 5,000 16,0000.0050 Ka. Kelompok 0.160 HOK 35,000 5,6000.0260 Ka Tukang 0.832 HOK 35,000 29,1200.2600 Tukang Kayu 8.320 HOK 35,000 291,2000.3000 Pekerja Biasa 9.600 HOK 25,000 240,000

Sub Total (11) 2,876,32012 VII.SNI - 5 Beton Ringbalk 15/20 2.400 M³

4.6400 Potland Cemen 50 kg 11.136 Zak 53,000 590,2080.5200 Pasir pasang 1.248 M³ 95,000 118,5600.7800 Split 1/2 1.872 M³ 150,000 280,8000.0800 Ka. Kelompok 0.192 HOK 35,000 6,7200.0250 Ka Tukang 0.060 HOK 35,000 2,1000.2500 Tukang Batu 0.600 HOK 35,000 21,0001.6500 Pekerja Biasa 3.960 HOK 25,000 99,000

Sub Total (12) 1,118,38813 BT.11 Bekisting Tower Air 0.49 M²

0.0400 Papan 2/20 bekisting (sengon) 0.020 M³ 1,500,000 29,4000.4000 Paku 0.196 Kg 14,000 2,7440.2000 Minyak Bekisting 0.098 lt 5,000 4900.0150 Kayu 5/7 Bekisting (sengon) 0.007 M³ 1,500,000 11,0250.3500 Tripleks 4 mm 0.171 lbr 70,000 12,0056.0000 Bambu apus Ø 8 2.940 Btg 5,000 14,7000.0060 Ka. Kelompok 0.003 HOK 35,000 1030.0330 Ka Tukang 0.016 HOK 35,000 5660.3300 Tukang Kayu 0.162 HOK 35,000 5,6590.3200 Pekerja Biasa 0.157 HOK 25,000 3,920

Sub Total (13) 80,612

Page 35: Polindes Rab Contoh

14 VII.SNI - 5 Beton Tower 0.35 M³

4.6400 Potland Cemen 50 kg 1.634 Zak 53,000 86,6250.5200 Pasir pasang 0.183 M³ 95,000 17,4010.7800 Split 1/2 0.275 M³ 150,000 41,2130.0800 Ka. Kelompok 0.028 HOK 35,000 9860.0250 Ka Tukang 0.009 HOK 35,000 3080.2500 Tukang Batu 0.088 HOK 35,000 3,0821.6500 Pekerja Biasa 0.581 HOK 25,000 14,530

Sub Total (14) 164,147D PEKERJAAN TULANGAN/PEMBESIAN 6,905,046

15 VII.SNI - 25 Pembesian 779.147 Kg1.0500 818.105 Kg 9,000 7,362,9441.0000 Besi Ukuran Ǿ 10 76.129 Btg 60,000 4,567,7401.0000 Besi Ukuran Ǿ 6 80.344 Btg 24,000 1,928,2530.0003 Ka. Kelompok 0.234 HOK 35,000 8,1810.0007 Ka Tukang 0.545 HOK 35,000 19,0890.0070 Tukang Besi 5.454 HOK 35,000 190,8910.0070 Pekerja Biasa 5.454 HOK 35,000 190,891

Sub Total (15) 6,905,046E PEKERJAAN DINDING 1/2 BATA 15,771,373

16 DD.03 Pas. Bata Merah 180.864 M²70.0000 Bata merah 12,660.468 Bh 400 5,064,187

0.1664 Potland Cemen 50 kg 30.096 Zak 53,000 1,595,0740.0490 Pasir pasang 8.862 M³ 95,000 841,9210.0150 Ka. Kelompok 2.713 HOK 35,000 94,9540.0100 Ka Tukang 1.809 HOK 35,000 63,3020.1000 Tukang Batu 18.086 HOK 35,000 633,0230.3200 Pekerja Biasa 57.876 HOK 25,000 1,446,911

Sub Total (14) 9,739,37215 PL.01 Plesteran Dinding 15mm + Aci 350.478 M²

0.0736 Potland Cemen 50 kg 25.795 zak 53,000 1,367,1430.0230 Pasir pasang 8.061 M³ 95,000 765,7940.0100 Ka. Kelompok 3.505 HOK 35,000 122,6670.0150 Ka Tukang 5.257 HOK 35,000 184,0010.1500 Tukang Batu 52.572 HOK 35,000 1,840,0080.2000 Pekerja Biasa 70.096 HOK 25,000 1,752,388

Sub Total (15) 6,032,001F PEKERJAAN KAYU 9,648,904

16SNI 03-3434-2002-3Kusen Kayu 6/15 1.031 M³1.2000 Kayu 6/12 Akasia 1.238 M³ 3,000,000 3,713,0400.3000 Ka. Kelompok 0.309 HOK 35,000 10,8302.0000 Ka Tukang 2.063 HOK 35,000 72,198

18.0000 Tukang Kayu 18.565 HOK 35,000 649,7826.0000 Pekerja Biasa 6.188 HOK 25,000 154,710

Sub Total (16) 4,600,56017SNI 03-3434-2002-30Kuda-Kuda 1.208 M³

1.1000 Kayu 8/12 Akasia 1.328 M³ 3,000,000 3,985,34415.0000 Besi Strip 18.115 Kg 20,000 362,304

0.8000 Paku 0.966 Kg 14,000 13,5260.2000 Ka. Kelompok 0.242 HOK 35,000 8,4541.2000 Ka Tukang 1.449 HOK 35,000 50,723

12.0000 Tukang Kayu 14.492 HOK 35,000 507,2264.0000 Pekerja Biasa 4.831 HOK 25,000 120,768

Sub Total (17) 5,048,344G PEKERJAAN ATAP DAN DAUN 23,641,895

18SNI 03-3434-2002-36Rangka Usuk 5/7 dan Reng 2/3 106.400 M²0.0120 Kayu akasia, 5/7,2/3 1.277 M³ 3,000,000 3,830,4000.1500 Paku 15.960 Kg 14,000 223,4400.0050 Ka. Kelompok 0.532 HOK 35,000 18,6200.0100 Ka Tukang 1.064 HOK 35,000 37,2400.1000 Tukang Kayu 10.640 HOK 35,000 372,4000.1000 Pekerja Biasa 10.640 HOK 25,000 266,000

Sub Total (18) 4,748,100

Page 36: Polindes Rab Contoh

19SNI 03-3434-2002-53Lisplank 41.200 M0.0088 Kayu Listplank 0.363 M³ 3,000,000 1,087,6800.0600 Paku 2.472 Kg 14,000 34,6080.0500 Ka. Kelompok 2.060 HOK 35,000 72,1000.0100 Ka Tukang 0.412 HOK 35,000 14,4200.1000 Tukang Kayu 4.120 HOK 35,000 144,2000.1000 Pekerja Biasa 4.120 HOK 25,000 103,000

Sub Total (19) 1,456,00820SNI 03-3436-2002-1Tutup Atap (Genteng) 106.400 M²

25.0000 Genteng palentong 2,660.000 Bh 900 2,394,0000.0080 Ka. Kelompok 0.851 HOK 35,000 29,7920.0080 Ka Tukang 0.851 HOK 35,000 29,7920.0750 Tukang Kayu 7.980 HOK 35,000 279,3000.1500 Pekerja Biasa 15.960 HOK 25,000 399,000

Sub Total (20) 3,131,88421SNI 03-3436-2002-4Kerpus/Bubungan 11.800 M

4.0000 Wuwung Palentong 47.200 Bh 1,500 70,8000.1600 Potland Cemen 50 kg 1.888 Zak 53,000 100,0640.0320 Pasir pasang 0.378 M³ 95,000 35,8720.0020 Ka. Kelompok 0.024 HOK 35,000 8260.0200 Ka Tukang 0.236 HOK 35,000 8,2600.2000 Tukang Kayu 2.360 HOK 35,000 82,6000.4000 Pekerja Biasa 4.720 HOK 25,000 118,000

Sub Total (21) 416,42222SNI 03-2639-2002-20bPas. Plafon Triplek + Rangka 106.400 M²

0.0120 Kayu 2/3 Akasia 1.277 M³ 1,500,000 1,915,2000.0600 Paku biasa 6.384 Kg 14,000 89,3760.5116 Triplek (2,4x0,9) 54.437 Lbr 70,000 3,810,6050.0090 Ka. Kelompok 0.958 HOK 35,000 33,5160.0320 Ka Tukang 3.405 HOK 35,000 119,1680.3200 Tukang Kayu 34.048 HOK 35,000 1,191,6800.1800 Pekerja Biasa 19.152 HOK 25,000 478,800

Sub Total (22) 7,638,34523SNI 03-3434-2002-10Daun Pintu, Jendela kaca dan Jalusi 14.016 M²

0.0640 Papan Daun 3/20 Kruing 0.897 M³ 4,500,000 4,036,6080.5000 Ka. Kelompok 7.008 HOK 35,000 245,2800.3000 Ka Tukang 4.205 HOK 35,000 147,1683.0000 Tukang Kayu 42.048 HOK 35,000 1,471,6801.0000 Pekerja Biasa 14.016 HOK 25,000 350,400

Sub Total (23) 6,251,136H PEKERJAAN ASESORIES 1,597,299

24 XII.SNI - 1 Pas. Kunci Tanam 7.000 bh1.0000 Kunci pintu tanam 7.000 bh 100,000 700,0000.0030 Ka. Kelompok 0.021 HOK 35,000 7350.0600 Ka Tukang 0.420 HOK 35,000 14,7000.6000 Tukang Kayu 4.200 HOK 35,000 147,0000.0600 Pekerja Biasa 0.420 HOK 25,000 10,500

Sub Total (24) 872,93525 XII.SNI - 5 Pas. Engsel Pintu 7.000 Ps

1.0000 Engsel pintu 4" 7.000 50,000 350,0000.0008 Ka. Kelompok 0.005 35,000 1840.0150 Ka Tukang 0.105 35,000 3,6750.1500 Tukang Kayu 1.050 35,000 36,7500.0150 Pekerja Biasa 0.105 25,000 2,625

Sub Total (25) 393,23426 XII.SNI - 6 Pas.Engsel Jendela 4.000 Psg

1.0000 Engsel Jendela 4.000 25,000 100,0000.0005 Ka. Kelompok 0.002 35,000 700.0100 Ka Tukang 0.040 35,000 1,4000.1000 Tukang Kayu 0.400 35,000 14,0000.0100 Pekerja Biasa 0.040 25,000 1,000

Sub Total (26) 116,470

Page 37: Polindes Rab Contoh

27 XII.SNI - 9 Pas. Kait Angin dan Tarikan Jendela 4.000 Psg1.0000 Hak angin 4.000 Psg 15,000 60,0001.0000 Tarikan Jendela 4.000 bh 5,000 20,0000.0008 Ka. Kelompok 0.003 HOK 35,000 1050.0150 Ka Tukang 0.060 HOK 35,000 2,1000.1500 Tukang Kayu 0.600 HOK 35,000 21,0000.0150 Pekerja Biasa 0.060 HOK 25,000 1,500

Sub Total (27) 104,70528 XII.SNI - 17 Pas. Kaca Polos 5 mm 3.902 M²

1.1000 Kaca bening 5 mm 4.293 M² 20,000 85,8530.0008 Ka. Kelompok 0.003 HOK 35,000 1020.0150 Ka Tukang 0.059 HOK 35,000 2,0490.1500 Tukang Kayu 0.585 HOK 35,000 20,4880.0150 Pekerja Biasa 0.059 HOK 25,000 1,463

Sub Total (28) 109,955I PEKERJAAN LANTAI DAN KERAMIK 8,839,265

29 XIII.SNI-47 Lantai Keramik 30x30 78.000 M²1.0000 Keramik 30 x 30 putih 78.000 M² 30,000 2,340,0000.2276 Potland Cemen 50 kg 17.753 Zak 53,000 940,8980.0420 Pasir pasang 3.276 M³ 95,000 311,2201.5000 Semen Warna 117.000 Kg 2,500 292,5000.0300 Ka. Kelompok 2.340 HOK 35,000 81,9000.0350 Ka Tukang 2.730 HOK 35,000 95,5500.3500 Tukang Batu 27.300 HOK 35,000 955,5000.6200 Pekerja Biasa 48.360 HOK 25,000 1,209,000

Sub Total (29) 6,226,56830 XIII.SNI-69 Keramik Lantai KM 20x20 7.000 M²

1.0000 Keramik KM 20x20 7.000 M² 35,000 245,0000.2276 Potland Cemen 50 kg 1.593 Zak 53,000 84,4400.0420 Pasir pasang 0.294 M³ 95,000 27,9301.5000 Semen Warna 10.500 Kg 2,500 26,2500.0300 Ka. Kelompok 0.210 HOK 35,000 7,3500.0350 Ka Tukang 0.245 HOK 35,000 8,5750.3500 Tukang Batu 2.450 HOK 35,000 85,7500.6200 Pekerja Biasa 4.340 HOK 25,000 108,500

Sub Total (30) 593,79531 XIII.SNI-69 Keramik Dinding KM 20x25 23.800 M²

1.0000 Keramik KM 20x25 23.800 M² 35,000 833,0000.2276 Potland Cemen 50 kg 5.417 Zak 53,000 287,0950.0420 Pasir pasang 1.000 M³ 95,000 94,9621.5000 Semen Warna 35.700 Kg 2,500 89,2500.0300 Ka. Kelompok 0.714 HOK 35,000 24,9900.0350 Ka Tukang 0.833 HOK 35,000 29,1550.3500 Tukang Batu 8.330 HOK 35,000 291,5500.6200 Pekerja Biasa 14.756 HOK 25,000 368,900

Sub Total (31) 2,018,902J PEKERJAAN PENGECATAN 4,089,690

32 XIV.SNI - 14 Pengecatan Dinding 350.478 M²0.1000 Plamir 35.048 Kg 10,000 350,4780.1000 Cat Putih Dasar Tembok 35.048 Kg 10,000 350,4780.2600 Cat tembok 91.124 Kg 13,000 1,184,6140.0025 Ka. Kelompok 0.876 Kg 35,000 30,6670.0063 Ka Tukang 2.208 HOK 35,000 77,2800.0630 Tukang Cat 22.080 HOK 35,000 772,8030.0200 Pekerja Biasa 7.010 HOK 25,000 175,239

Sub Total (32) 2,941,55933 Pengecatan Plafond 106.400 M²

0.1000 Plamir 10.640 Kg 10,000 106,4000.1000 Cat Putih Dasar Tembok 10.640 Kg 10,000 106,4000.2600 Cat tembok 27.664 Kg 13,000 359,6320.0025 Ka. Kelompok 0.266 Kg 35,000 9,3100.0063 Ka Tukang 0.670 HOK 35,000 23,4610.0630 Tukang Cat 6.703 HOK 35,000 234,6120.0200 Pekerja Biasa 2.128 HOK 25,000 53,200

Page 38: Polindes Rab Contoh

Sub Total (33) 893,015

Page 39: Polindes Rab Contoh

34 SNI - 8 Pengecatan Kusen dan Daun 20.227 M²1 lapis Cat Dasar, 2 lapis Cat Penutup

0.2000 Meni kayu 4.045 Kg 5,000 20,2270.1500 Plamir 3.034 Kg 10,000 30,3410.1700 Cat Putih Dasar Kayu 3.439 Kg 15,000 51,5790.2600 Cat kayu 5.259 Kg 20,000 105,1810.0025 Ka. Kelompok 0.051 HOK 35,000 1,7700.0060 Ka Tukang 0.121 HOK 35,000 4,2480.0090 Tukang Cat 0.182 HOK 35,000 6,3720.0700 Pekerja Biasa 1.416 HOK 25,000 35,398

Sub Total (34) 255,116K INSTALANSI AIR BERSIH 750,045

35 X.SNI - 26 Pas. Pipa PVC D1/2" 7.000 M'1.2000 Pipa PVC 1/2" 8.400 M' 8,000 67,200

knee drat 1/2" 2.000 Bh 2,500 5,000knee 1/2 " 2.000 Bh 2,000 4,000reducer 1/2-3/4" 2.000 Bh 3,000 6,000lem pipa 0.500 Bh 7,000 3,500

0.0018 Ka. Kelompok 0.013 HOK 35,000 4410.0060 Ka Tukang 0.042 HOK 35,000 1,4700.0600 Tukang Besi 0.420 HOK 35,000 14,7000.0360 Pekerja Biasa 0.252 HOK 25,000 6,300

Sub Total (35) 108,61136 X.SNI - 35 Pas. Pipa PVC D3/4" 3.000 M'

1.2000 Pipa PVC 3/4" 3.600 M' 11,000 39,600knee 3/4 " 1.000 bh 3,000 3,000lem pipa 0.500 bh 2,500 1,250

0.0018 Ka. Kelompok 0.005 HOK 35,000 1890.0060 Ka Tukang 0.018 HOK 35,000 6300.0600 Tukang Besi 0.180 HOK 35,000 6,3000.0360 Pekerja Biasa 0.108 HOK 25,000 2,700

Sub Total (36) 53,66937 X.SNI - 35 Pas. Pipa D4" 2.000 Bh

1.2000 Pipa PVC 4" 2.400 Bh 35,000 84,000Keni 4' 2.000 Bh 7,000 14,000Sh0ck 4" 3.000 Bh 7,000 21,000lem pipa 0.500 Bh 2,500 1,250

0.0041 Ka. Kelompok 0.008 HOK 35,000 2870.0135 Ka Tukang 0.027 HOK 35,000 9450.1350 Tukang Batu 0.270 HOK 35,000 9,4500.0810 Pekerja Biasa 0.162 HOK 25,000 4,050

Sub Total (37) 134,98238 X.SNI - 35 Pas. Kran 1/2 " 3.000 bh

1.0000 Kran biasa 3.000 Bh 10,000 30,0000.0250 Sealtape 0.075 Bh 2,500 1880.0050 Ka. Kelompok 0.015 HOK 35,000 5250.0100 Ka Tukang 0.030 HOK 35,000 1,0500.1000 Tukang Batu 0.300 HOK 35,000 10,5000.0100 Pekerja Biasa 0.030 HOK 25,000 750

Sub Total (38) 43,01339 X.SNI - 5 Pas. Wastafel 1.000 unit

1.0000 Wastafel 1.000 Bh 300,000 300,0000.1200 knee 1/2 " 0.120 Bh 36,000 4,3206.0000 Semen Warna 6.000 Kg 2,500 15,0000.0100 Pasir pasang 0.010 HOK 95,000 9500.1000 Ka. Kelompok 0.100 HOK 35,000 3,5000.1500 Ka Tukang 0.150 HOK 35,000 5,2501.4500 Tukang Batu 1.450 HOK 35,000 50,7501.2000 Pekerja Biasa 1.200 HOK 25,000 30,000

Sub Total (39) 409,770

Page 40: Polindes Rab Contoh

L SUMUR, WC DAN SEPTICKTANK 1,490,00040 Pas.Sumur + Pompa Air

Sumur (eksiting) 7.000 M'Pasang Kluwung (buisbeton+tutup) 28.000 Bh 30,000 840,000Mesin Pompa Air 1.000 Bh 250,000 250,000Tangki air 1.000 Bh 400000 400,000

Sub Total (40) 1,490,000M PEKERJAAN INSTALASI LISTRIK 2,631,000

42 Pasang KWH 1.000 unit 2,100,000 2,100,000Lampu TL 10.000 Bh 15,000 150,000Kabel 74.500 M' 3,000 223,500Vitting 9.000 Bh 3,000 27,000Saklar 9.000 Bh 7,000 63,000Stop Kontak 9.000 Bh 7,500 67,500

Sub Total (41) 2,631,000N PERALATAN DAN BIAYA LAIN 1,130,000

41 Kebutuhan Alat 1.000 Bh 2.0000 Benang 2.000 Bh 5,000 10,000

10.0000 Ember kecil 10.000 Bh 5,000 50,0003.0000 Cetok 3.000 Bh 15,000 45,0002.0000 Skop 2.000 Bh 60,000 120,0004.0000 Cangkul 4.000 Bh 40,000 160,0002.0000 Palu 2.000 Bh 15,000 30,0001.0000 Ayakan 1.000 Bh 50,000 50,0002.0000 Tang 2.000 Bh 30,000 60,0002.0000 Gergaji 2.000 Bh 40,000 80,000

Sub Total (41) 605,00042 Biaya Lain 1.000 Bh

1.0000 Papan Proyek 1.000 Bh 125,000 125,0001.0000 Prasasti dan Admins 1.000 unit 400,000 400,000

Sub Total (42) 525,000TOTAL BIAYA 99,652,957

Page 41: Polindes Rab Contoh

I.SNI-7 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAANPekerja 1.000 ohMandor 0.050 oh

SI.02 1 M1 PEK. PASANG BOUWPLANKKayu kasau 5/7 sengon 0.012 Kayu papan 3/20 sengon 0.006 Paku 5 - 7 0.020 Tukang Kayu 0.1000Pekerja 0.1000 orgKepala Tukang 0.0100 orgMandor 0.0050

TA.01 1 M3 PEK GALIAN TANAH BIASA MAX KEDALAM orgPekerja 0.400 orgMandor 0.040

TA.09 1 M3 PEK URUGAN KEMBALI m3Pekerja 0.192 zakMandor 0.019 oh

ohPO.03 1 M3 PEK PASANG PONDASI BATU KOSONGoh

Batu belah 15/20 cm 1.200 ohPasir urug 0.300 Pekerja 0.780 Tukang batu 0.3900 m3Kepala tukang 0.0390 zakMandor 0.0390 m3

ohSNI 03-2836-200 1 M3 PASANG PONDASI BATU KALI, 1 PC : oh

Batu belah/batu gunung 1.100 ohSemen Portland 117.000 ohPasir pasang 0.561 hokPekerja 1.5000Tukang batu 0.6000 m3Kepala tukang 0.0600 kgMandor 0.0750 lt

Pekerja oh

VII.SNI - 29 1 M2 PASANG BEKISTING UNTUK SLOOF ohKayu Tahun 0.045 ohPaku biasa 2' - 5" 0.300 ohMinyak bekisting 0.100 m3Pekerja 0.3000Tukang kayu 0.2600Kepala tukang 0.0260 kgMandor 0.0050 m3

m3VII.SNI - 5 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr

Page 42: Polindes Rab Contoh

4.64 Semen portland 232.000 oh 54.984 Zak 53000Pasir beton 0.520 oh 6.162 M³ 90000Batu pecah 1 - 2 cm 0.7800 oh 9.24 M³ 175000Pekerja 1.6500 0.95 HOK 35000Tukang batu 0.2500 0.30 HOK 35000Kepala tukang 0.0250 m3 2.96 HOK 35000Mandor 0.0800 kg 19.55 HOK 25000

BT.12 1 M2 PEK BEKISTING KOLOM lbrKayu papan terentang 0.040 btPaku biasa 0.400 ohMinyak bekisting 0.200 ohKayu balok kruing 0.0150 ohMultipleks tebal 9 mm 0.3500 oh

2.0000Pekerja 0.3000Tukang kayu 0.3300Kepala Tukang kayu 0.0330Mandor 0.0066

VII.SNI - 29 1 M2 PASANG BEKISTING UNTUK SLOOF ohKayu Tahun 0.045 ohPaku biasa 2' - 5" 0.300 ohMinyak bekisting 0.100 m3Pekerja 0.3000Tukang kayu 0.2600Kepala tukang 0.0260 kgMandor 0.0050 m3

m3VII.SNI - 5 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr

4.64 Semen portland 232.000 kgPasir beton 0.520 m3Batu pecah 1 - 2 cm 0.780 m3Pekerja 1.6500 ohTukang batu 0.2500 ohKepala tukang 0.0250 ohMandor 0.0800 oh

oh

VII.SNI - 32 1 M2 PASANG BEKISTING UNTUK LANTAI

Kayu Tahun 0.040 m3Paku biasa 2' - 5" 0.400 kgMinyak bekisting 0.200 LtKayu tahun 0.015 m3Multiplek 9 mm 0.350 lbrKayu Ø 8/ 4 m 6.000 btgPekerja 0.320 ohTukang batu 0.330 ohKepala tukang 0.033 ohMandor 0.006 oh

Bambu apus Ø 8-10 / 4 m1

Page 43: Polindes Rab Contoh

VII.SNI - 25 1 KG PEMBESIAN DENGAN BESI POLOS ATAU ULIR

Besi beton (polos/ulir) 1.050 kg6495993.33333 Kawat beton 0.015 kg

Pekerja 0.0070 ohTukang besi 0.0070 ohKepala tukang 0.0007 ohMandor 0.0003 oh

SNI 03-6897-200 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 6 PSBata merah 5 x 11 x 22 cm 70.000 bh

0.1664 Semen Portland 8.320 kgPasir pasang 0.049 m3Pekerja 0.320 ohTukang batu 0.100 oh ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,Kepala tukang 0.010 ohMandor 0.0150 oh

SNI 03-2837-200 1 M2 PEKERJAAN PLESTERAN 1 PC : 6 PS TEBAL 15 MMPortand Cement (Pc) 3.680 kgPasir pasang 0.023 m3Pekerja 0.200 ohTukang batu 0.150 ohKepala tukang 0.0150 ohMandor 0.0100 oh

SNI 03-3434-2002-31 M3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO, KRUWINGKayu borneo, kruing, bal 1.200 m3 230769231Pekerja 6.000 ohTukang kayu 18.000 ohKepala tukang 2.0000 ohMandor 0.3000 oh

SNI 03-3434-200 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KRUWINGKayu Kruing, balok 1.100 m3Besi strip 15.000 kgPaku biasa 2" - 5" 0.800 kgPekerja 4.000 ohTukang kayu 12.000 ohKepala tukang 1.2000 ohMandor 0.2000 oh

SNI 03-3434-2002-321 M2 PASANG KASAO + RENG GENTENG PLENTONG, KAYU KRUINGKayu Kruing, balok 0.012 m3Paku biasa 2" - 5" 0.150 kgPekerja 0.100 ohTukang kayu 0.100 ohKepala tukang 0.0100 ohMandor 0.0050 oh

Page 44: Polindes Rab Contoh

SNI 03-3434-200 1 M' PASANG LISPLANG UKURAN 2 x ( 2 x 20 ) CM, KAYU KRUINGKayu kruing, papan 0.009 m3Paku biasa 2" - 5" 0.060 kgPekerja 0.100 ohTukang kayu 0.100 ohKepala tukang 0.0100 ohMandor 0.0500 oh

SNI 03-3436-200 1 M2 PASANG ATAP GENTENG PALENTONGGenteng palentong 25.000 bhPekerja 0.150 ohTukang kayu 0.075 ohKepala tukang 0.0080 ohMandor 0.0080 oh

SNI 03-3436-200 1 M2 PASANG ATAP GENTENG KREPUSGenteng Krepus 5.000 bhSemen portland 8.000 kgPasir pasang 0.032 m3Pekerja 0.400 ohTukang kayu 0.200 ohKepala tukang 0.0200 ohMandor 0.0020 oh

SNI 03-2639-200 1 M2 LANGIT-LANGIT ETERNIT POLOS (1,00 X 1,00 )M, RANGKA KAYU TAHUNKayu Tahun, balok 0.012 m3Paku biasa 0.060 kgEternit Polos 1.100 lbrPekerja 0.180 ohTukang kayu 0.320 ohKepala tukang 0.0320 ohMandor 0.0090 oh

SNI 03-3434-200 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPERKayu Kamper, papan 0.035 m3Pekerja 0.800 ohTukang kayu 2.000 ohKepala tukang 0.2000 ohMandor 0.0400 oh

XII.SNI - 1 1 BUAH PASANG KUNCI TANAM ANTIKKunci tanam artistik 1.000 bhPekerja 0.060 ohTukang kayu 0.600 ohKepala tukang 0.0600 ohMandor 0.0030 oh

XII.SNI - 5 1 BUAH PASANG ENGSEL PINTUEngsel pintu nilon 1.000 bhPekerja 0.015 ohTukang kayu 0.150 ohKepala tukang 0.0150 ohMandor 0.0008 oh

XII.SNI - 6 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPUEngsel jendela Nilon 1.000 bhPekerja 0.010 ohTukang kayu 0.100 ohKepala tukang 0.0100 ohMandor 0.0005 oh

Page 45: Polindes Rab Contoh

XII.SNI - 9 1 BUAH PASANG KAIT ANGINKait angin 1.000 psngTarikan Jendela 1.000 BhPekerja 0.015 ohTukang kayu 0.150 ohKepala tukang 0.0150 ohMandor 0.0008 oh

XII.SNI - 17 1 M2 PASANG KACA, TEBAL 5 MMKaca 1.100 m2Pekerja 0.015 ohTukang kayu 0.150 ohKepala tukang 0.0150 ohMandor 0.0008 oh

XIII.SNI-47 1 M2 PASANG LANTAI KERAMIK 30x30 CMUbin keramik 30x30 cm 1.000 m2Semen portland 11.380 KgPasir pasang 0.042 M3Semen warna 1.500 KgPekerja 0.620 ohTukang batu 0.350 ohKepala tukang 0.0350 ohMandor 0.0300 oh

XIII.SNI - 44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CMUbin keramik artistik 20 x 1.000 M2

0.2276 Porland Cement (PC) 11.380 kgPasir pasang 0.042 m3Semen warna 1.500 kgPekerja 0.6200 ohTukang batu 0.350 ohKepala tukang 0.0350 ohMandor 0.0300 oh

XIII.SNI-69 1 M2 PASANG DINDING KERAMIK 10x20 CM Keramik 10x20 cm 50.000 BhSemen abu - abu 9.300 KgPasir pasang 0.018 M3Semen warna 1.500 KgPekerja 0.6000 ohTukang batu 0.125 ohKepala tukang 0.0125 ohMandor 0.0300 oh

XIV.SNI - 14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)Plamir 0.100 kgCat dasar 0.100 kgCat penutup 2 kali 0.260 kgPekerja 0.020 ohTukang cat 0.0630 ohKepala tukang 0.0063 ohMandor 0.003 oh

1500 12

375000

Page 46: Polindes Rab Contoh

SNI - 8 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUPCat meni 0.200 kgPlamir 0.150 kgCat dasar 0.170 kgCat penutup 2 kali 0.2600 kgPekerja 0.0700 ohTukang cat 0.009 ohKepala tukang 0.0060 ohMandor 0.0025 oh

X.SNI - 26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3/4"Pipa PVC 1.200 m'Perlengkapan 35% harga pipa Pekerja 0.036 oh

Tukang batu 0.060 ohKepala tukang 0.0060 ohMandor 0.0018 oh

X.SNI - 32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"Pipa PVC 1.200 m'Perlengkapan 35,0% harga pipa Pekerja 0.081 ohTukang batu 0.135 ohKepala tukang 0.0135 ohMandor 0.0041 oh

X.SNI - 35 MEMASANG 1 BUAH KRAN DIAMETER 3/4" Kran air 1.0000 bhSeal tape 0.025 bhPekerja 0.010 ohTukang batu 0.100 ohKepala tukang 0.010 ohMandor 0.0050 oh

X.SNI - 5 MEMASANG 1 BUAH WASTAFELWastafel 1.000 bhPerlengkapan 12% harga wastafel Semen abu-abu 6.000 kgPasir pasang 0.010 m3Pekerja 1.200 ohTukang batu 1.450 ohKepala tukang 0.150 ohMandor 0.100 oh

XIII.SNI-47 1 M2 PASANG LANTAI KERAMIK 30x30 CM

Page 47: Polindes Rab Contoh

100000

70.0000 Bata merah 4.6400 Semen 50 kg0.1664 Semen 50 kg 0.5200 Pasir pasang0.0490 Pasir pasang 0.7800 Split 2/3

1,581,793

Page 48: Polindes Rab Contoh

2914152554580

161752533180

10368.75103687.5488812.5

Page 49: Polindes Rab Contoh

,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

Page 50: Polindes Rab Contoh

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERDESAAN (PNPM-MP)RENCANA KEBUTUHAN (BAHAN, ALAT DAN UPAH)

Provinsi : Jawa Tengah No. RAB : 01Kabupaten : Purbalingga Jenis Prasarana : Gedung PKDKecamatan : Karangmoncol Lokasi 0Desa : Tajug Luas : L = 77 m2 (7 x 11 M)

NO URAIANVOLUME

Sat.BIAYA

TOTAL BULAT SWA BLM SWADAYA BLM TOTAL

A BAHAN BANGUNAN Rp1 Kayu 5/7 Bekisting (sengon) 1.08 1.1 1.1 M³ I-a 1,500,000 - 1,650,000 1,650,0002 Papan 2/20 bekisting (sengon 4.60 4.6 4.6 M³ I-a 1,500,000 - 6,900,000 6,900,0003 Paku 60.46 60.5 60.5 Kg I-b 17,500 - 1,058,750 1,058,7504 Pasir Urug 1.67 2.0 2.0 M³ I-a 65,000 - 130,000 130,0005 Batukali 24.49 25.0 25.0 M³ I-a 90,000 - 2,250,000 2,250,0006 Potland Cemen 50 kg 154.89 155.0 155.0 Zak I-b 58,000 - 8,990,000 8,990,0007 Pasir pasang 34.07 35.0 35.0 M³ I-a 96,000 - 3,360,000 3,360,0009 Minyak Bekisting 13.70 14.0 14.0 lt I-b 5,000 - 70,000 70,000

10 Split 1/2 5.07 6.0 3.00 3.0 M³ I-a 150,000 450,000 450,000 900,00011 Tripleks 4 mm 67.21 68.0 68.0 lbr I-b 70,000 - 4,760,000 4,760,00012 Bambu apus Ø 8 74.94 75.0 75.0 Btg I-a 8,000 - 600,000 600,00013 Besi Ukuran Ǿ 10 76.13 77.0 77.0 Btg I-b 57,000 - 4,389,000 4,389,00014 Besi Ukuran Ǿ 6 80.34 81.0 81.0 Btg I-b 27,000 - 2,187,000 2,187,00015 Bata merah 12,660.47 12,661.0 2,500.00 10,161.0 Bh I-a 600 1,500,000 6,096,600 7,596,60016 Kayu 6/12 Akasia 1.24 1.3 1.3 M³ I-a 3,000,000 - 3,900,000 3,900,00017 Kayu 8/12 Akasia 1.33 1.4 1.4 M³ I-a 3,000,000 - 4,200,000 4,200,00018 Besi Strip 18.12 19.0 19.0 Kg I-b 15,000 - 285,000 285,00019 Kayu 2/3 Akasia 2.55 2.6 2.6 M³ I-a 3,000,000 - 7,800,000 7,800,00020 Kayu Listplank 0.36 1.0 1.0 M³ I-a 3,000,000 - 3,000,000 3,000,00021 Genteng palentong 2,660.00 2,660.0 - 2,660.0 Bh I-a 1,200 - 3,192,000 3,192,00022 Wuwung Palentong 47.20 48.0 48.0 Bh I-a 2,700 - 129,600 129,60024 Papan Daun 3/20 Kruing 0.90 1.0 1.0 M³ I-a 4,500,000 - 4,500,000 4,500,00025 Kunci pintu tanam 7.00 7.0 7.0 bh I-b 100,000 - 700,000 700,00026 Engsel pintu 4" 7.00 7.0 7.0 0 I-b 50,000 - 350,000 350,00027 Engsel Jendela 4.00 4.0 4.0 0 I-b 25,000 - 100,000 100,00028 Hak angin 4.00 4.0 4.0 Psg I-b 15,000 - 60,000 60,00029 Tarikan Jendela 4.00 4.0 4.0 bh I-b 5,000 - 20,000 20,00030 Kaca bening 5 mm 4.29 5.0 5.0 M² I-b 20,000 - 100,000 100,00031 Keramik 30 x 30 putih 78.00 78.0 78.0 M² I-b 38,500 - 3,003,000 3,003,00032 Semen Warna 169.20 170.0 170.0 Kg I-b 2,500 - 425,000 425,00033 Keramik KM 20x20 7.00 7.0 7.0 M² I-b 35,000 - 245,000 245,00034 Keramik KM 20x25 23.80 24.0 24.0 M² I-b 35,000 - 840,000 840,00035 Plamir 48.72 49.0 49.0 Kg I-b 15,000 - 735,000 735,00036 Cat Putih Dasar Tembok 45.69 46.0 46.0 Kg I-b 12,000 - 552,000 552,00037 Cat tembok 118.79 119.0 119.0 Kg I-b 15,000 - 1,785,000 1,785,00038 Meni kayu 4.05 5.0 5.0 Kg I-b 5,000 - 25,000 25,00039 Cat Putih Dasar Kayu 3.44 4.0 4.0 Kg I-b 15,000 - 60,000 60,00040 Cat kayu 5.26 6.0 6.0 Kg I-b 20,000 - 120,000 120,00041 Pipa PVC 1/2" 8.40 9.0 9.0 M' I-b 8,000 - 72,000 72,00042 knee drat 1/2" 2.00 2.0 2.0 Bh I-b 2,500 - 5,000 5,00043 reducer 1/2-3/4" 2.00 2.0 2.0 Bh I-b 3,000 - 6,000 6,00044 lem pipa 0.50 1.0 1.0 Bh I-b 7,000 - 7,000 7,00045 Pipa PVC 3/4" 3.60 4.0 4.0 M' I-b 11,000 - 44,000 44,00046 knee 3/4 " 1.00 1.0 1.0 bh I-b 3,000 - 3,000 3,00047 Pipa PVC 4" 2.40 3.0 3.0 Bh I-b 35,000 - 105,000 105,00048 Keni 4' 2.00 2.0 2.0 Bh I-b 7,000 - 14,000 14,00049 Sh0ck 4" 3.00 3.0 3.0 Bh I-b 7,000 - 21,000 21,00050 Kran biasa 3.00 3.0 3.0 Bh I-b 10,000 - 30,000 30,00051 Sealtape 0.08 1.0 1.0 Bh I-b 2,500 - 2,500 2,50052 Wastafel 1.00 1.0 1.0 Bh I-b 300,000 - 300,000 300,00053 Kloset jongkok 2.00 2.0 2.0 Bh I-b 100,000 - 200,000 200,00054 Pasang Kluwung (buisbeton+ 28.00 28.0 28.0 Bh I-b 40,000 - 1,120,000 1,120,00055 Mesin Pompa Air 1.00 1.0 1.0 Bh I-b 300,000 - 300,000 300,00056 Tangki air 1.00 1.0 1.0 Bh I-b 550,000 - 550,000 550,00057 Pasang KWH 1.00 1.0 1.0 Bh I-b 2,700,000 2,700,000 2,700,00058 Lampu TL 10.00 10.0 10.0 Bh I-b 15,000 - 150,000 150,00059 Kabel 74.50 75.0 75.0 M' I-b 3,000 - 225,000 225,00060 Vitting 9.00 9.0 9.0 Bh I-b 3,000 - 27,000 27,00061 Saklar 9.00 9.0 9.0 Bh I-b 10,000 - 90,000 90,00062 Stop Kontak 9.00 9.0 9.0 Bh I-b 10,000 - 90,000 90,000

Sub Total A 1,950,000 85,079,450 87,029,450

Kategori

Harga Satuan

Page 51: Polindes Rab Contoh

B PERALATAN1 Benang 4.00 4.0 4.00 0.0 Bh II-a 2,500 10,000 0 10,0002 Ember kecil 10.00 10.0 10.0 Bh II-a 5,500 - 55,000 55,0003 Cetok 8.00 8.0 5.00 3.0 Bh II-a 17,000 85,000 51,000 136,0004 Skop 2.00 2.0 1.00 1.0 Bh II-a 60,000 60,000 60,000 120,0005 Cangkul 4.00 4.0 4.0 Bh II-a 50,000 - 200,000 200,0006 Palu 2.00 2.0 2.00 0.0 Bh II-a 15,000 30,000 0 30,0007 Ayakan 1.00 1.0 1.0 Bh II-a 50,000 - 50,000 50,0008 Tang 2.00 2.0 2.00 0.0 Bh II-a 30,000 60,000 0 60,0009 Gergaji 2.00 2.0 2.00 0.0 Bh II-a 40,000 80,000 0 80,000

10 Papan Proyek 1.00 1.0 - 1.0 Bh II-b 150,000 - 150,000 150,00011 Prasasti dan Admins 1.00 1.0 - 1.0 unit II-b 325,000 - 325,000 325,000

Sub Total B 325,000 891,000 1,216,000C TENAGA KERJA

1 Ka. Kelompok 33.48 34.0 34.0 HOK III-a 35,000 - 1,190,000 1,190,0002 Tukang 364.0 364.0 HOK III-a 35,000 - 12,740,000 12,740,000

Ka Tukang 35.64 36.0 HOK III-a - 0 0Tukang Batu 122.23 123.0 HOK III-a - 0 0Tukang Kayu 169.61 170.0 HOK III-a - 0 0Tukang Besi 5.45 6.0 HOK III-a - 0 0Tukang Cat 28.97 29.0 HOK III-a - 0 0

3 Pekerja Biasa 398.61 399.0 399.0 HOK III-a 27,500 - 10,972,500 10,972,500 Sub Total C 0 24,902,500 24,902,500

Total Biaya : 113,147,950

SUMBER DANADari PNPM-MP 110,872,950 Swadaya 2,275,000

Catatan :- Sumbangan lahan tidak dimasukkan RAB tetapi dilaporkan dengan form 6a, 6b dan 6c- Sumbangan dalam bentuk bahan, upah dan alat tulis, di tulis dalam kolom volume dari swadaya- Operasional TPK di laporkan pada form Rekapitulasi

- Kategori Biaya- I.a. Pembelian bahan hasil tenaga manusia- I.b. Pembelian bahan hasil industri

- II.a. Pembelian alat tangan- II.b. Pembelian / penyewaan alat mesin

- III.a.Pembayaran tenaga kerja untuk konstruksi- III.b.Pembayaran tenaga kerja untuk pengumpulan bahan

……………………..., ………………... 20….

Di ketahui Diperiiksa, Di buat oleh,PJOK FT Kec. Ketua TPK

Parwoto Imam Setiyoko Supriwin P.PNIP. 19561231 198608 1002

Page 52: Polindes Rab Contoh

1240000

87,029,450

Page 53: Polindes Rab Contoh

1,216,000

1795999.206

Page 54: Polindes Rab Contoh

Analisa!D20+Analisa!D37+Analisa!D46+Analisa!D56+Analisa!D65+Analisa!D77+Analisa!D86+Analisa!D95+Analisa!D104+Analisa!D135+Analisa!D145+Analisa!D153+Analisa!D161+Analisa!D170+Analisa!D179+Analisa!D187+Analisa!D194+Analisa!D203+Analisa!D212+Analisa!D219+Analisa!D227+Analisa!D234+Analisa!D241+Analisa!D249+Analisa!D256+Analisa!D267+Analisa!D277+Analisa!D287+Analisa!D297+Analisa!D306+Analisa!D317+Analisa!D329+Analisa!D338+Analisa!D348+Analisa!D356+Analisa!D366Analisa!D38+Analisa!D47+Analisa!D66+Analisa!D87+Analisa!D105+Analisa!D146+Analisa!D154+Analisa!D268+Analisa!D278+Analisa!D288+Analisa!D349+Analisa!D357+Analisa!D367Analisa!D57+Analisa!D78+Analisa!D96+Analisa!D162+Analisa!D171+Analisa!D180+Analisa!D188+Analisa!D195+Analisa!D204+Analisa!D213+Analisa!D220+Analisa!D228+Analisa!D235+Analisa!D242+Analisa!D250+Analisa!D257Analisa!D136

Analisa!D298+Analisa!D307+Analisa!D318

361.899787

361.90

364

Page 55: Polindes Rab Contoh

RENCANA ANGGARAN BIAYA

REKAPITULASI RENCANA ANGGARAN BIAYA

Provinsi : Jawa Tengah Kecamatan : KarangmoncolKabupaten : Purbalingga Desa : Tajug

NO URAIAN

Kegiatan : Gedung PKD Kegiatan :

Jumlah TotalUkuran : L = 77 m2 (7 x 11 M) Ukuran :Jumlah : 1 Unit Jumlah :No. RAB : 01 No. RAB :

PNPM-MP Swadaya Total PNPM-MP Swadaya Total PNPM-MP Swadaya TOTALI. BAHAN 85,079,450 1,950,000 87,029,450 73.07 85,079,450 1,950,000 87,029,450 73.07

I-a. Hasil Tenaga Manusia 48,158,200 1,950,000 50,108,200 48,158,200 1,950,000 50,108,200 I-b. Hasil Industri 36,921,250 - 36,921,250 36,921,250 - 36,921,250

II. PERALATAN 891,000 325,000 1,216,000 1.02 891,000 325,000 1,216,000 1.02 II-a. Tangan Manusia - 325,000 325,000 - 325,000 325,000 II-b. Mesin 475,000 - 475,000 475,000 - 475,000

III. UPAH 24,902,500 - 24,902,500 20.91 24,902,500 - 24,902,500 20.91 III-a. Tenaga Kerja 24,902,500 - 24,902,500 24,902,500 - 24,902,500 III-b. Pengumpulan Bahan - - -

JUMLAH 110,872,950 2,275,000 113,147,950 95.00 110,872,950 2,275,000 113,147,950 95.00 IV. Operasional UPK 2 % 2,334,100 - 2,334,100 2.00 V. Operasional TPK 3 % 3,501,200 - 3,501,200 3.00

JUMLAH TOTAL 116,708,250 2,275,000 118,983,250 100 Jumlah Biaya Upah 24,902,500 - 24,902,500

Jumlah HOK Konstruksi 797 - 797 797 - 797 ………………….., ………. 20…..

Disetujui oleh,PNPM MPd KECAMATAN KARANGMONCOL Dibuat Oleh

PjOK Fasilitator Pemberdayaan Fasilitator Teknik TPK

Parwoto Drs. Kuswari Imam Setiyoko Supriwin P.PNIP. 19561231 198608 1002 FP-K FT-K Ketua

Bobot %

Bobot %

Bobot %

Page 56: Polindes Rab Contoh

PROPINSI : JAWA TENGAHKABUPATEN : PURBALINGGAKECAMATAN : KARANGMONCOL

DESA : TAJUG

JENIS PRASARANA

PKD

LOKASI

Dusun ………………..

GAMBAR

Denah Ruangan

Dibuat oleh :TPK

Supriwin Puji P

Diperiksa oleh :Fasilitator Teknik

Imam Setiyoko

Diketahui :PJOK

Parwoto

NIP. 19561231 198608 1002

No. Lembar Jumlah Lembar

3,50

1,75

1,75

2,50

3,00

2,00

Kantor danRuang obat

4,00

WC umum

Dapur

1,50 3,50 4,002,00

WC

Ruang periksa

Ruang tungguKamar bidan

Ruang Rawatinap

Teras

Denah Ruangan

Page 57: Polindes Rab Contoh
Page 58: Polindes Rab Contoh

PROPINSI : JAWA TENGAHKABUPATEN : PURBALINGGAKECAMATAN : KARANGMONCOL

DESA : TAJUG

JENIS PRASARANA

POLINDES

LOKASI

Dusun ………………..

GAMBAR

Denah Ruangan

Dibuat oleh :TPK

Supriwin Puji P

Diperiksa oleh :Fasilitator Teknik

Imam Setiyoko

Mengetahui :PJOK

Parwoto

NIP. 19561231 198608 1002

No. Lembar Jumlah Lembar

PNPM MP-2010

T. Depan Ruangan

T. Samping Kiri Ruangan

T. Samping Kanan

Page 59: Polindes Rab Contoh

PROPINSI : JAWA TENGAHKABUPATEN : PURBALINGGAKECAMATAN : KARANGMONCOL

DESA : TAJUG

JENIS PRASARANA

POLINDES

LOKASI

Dusun ………………..

GAMBAR

Denah Ruangan

Dibuat oleh :TPK

0

Diperiksa oleh :Fasilitator Teknik

Imam Setiyoko

Mengetahui :PJOK

Parwoto

NIP.

70

70

6

15

6

6 kaca3 mm

6

30

190

10

PVC

Page 60: Polindes Rab Contoh

No. Lembar Jumlah Lembar

Kode Keterangan jml PROPINSI : JAWA TENGAHP1 * Pintu Utama KABUPATEN : PURBALINGGA

*Panel 60cm 2 bh KECAMATAN : KARANGMONCOL

* Kusen K2 1 bh DESA : TAJUG

JENIS PRASARANA

P2 *Pintu kamar 4 bh POLINDES

* Panel 80 cm4 bh LOKASI

* Kusen K2 4 bh Dusun ………………..

GAMBAR

P3 * Pintu kamar 2 bh Denah Ruangan

( PVC ) Dibuat oleh :TPK

BV1 * Bovenligh 2 bh

BV2 * Bovenligh w 3 bh 0

J1 * Kusen jende1 bh Diperiksa oleh :Fasilitator Teknik

J2 * Kusen jende3 bh

Imam Setiyoko

J3 * Kusen jende1 bh Mengetahui :Bahan K2 Lokal PJOK

Parwoto

P1

P2

P2P2

J2 J2J

3

J1

J2BV2

BV2

BV2 BV1 BV1

P3

P3

Page 61: Polindes Rab Contoh

NIP.

No. Lembar Jumlah Lembar

Page 62: Polindes Rab Contoh

PROPINSI : JAWA TENGAHKABUPATEN : PURBALINGGAKECAMATAN : KARANGMONCOL

DESA : TAJUG

JENIS PRASARANA

POLINDES

LOKASI

Dusun ………………..

GAMBAR

Denah Ruangan

Dibuat oleh :TPK

0

Diperiksa oleh :Fasilitator Teknik

Imam Setiyoko

Mengetahui :PJOK

Parwoto

NIP.

No. Lembar Jumlah Lembar

157070 6 6

6

6

30

190

10

6 60 660

6

6

30

6

120

70 70 6 6 6

Page 63: Polindes Rab Contoh

PROPINSI : JAWA TENGAHKABUPATEN : PURBALINGGAKECAMATAN : KARANGMONCOL

DESA : TAJUG

JENIS PRASARANA

POLINDES

LOKASI

Dusun ………………..

GAMBAR

Denah Ruangan

Dibuat oleh :TPK

0

Diperiksa oleh :Fasilitator Teknik

Imam Setiyoko

Mengetahui :PJOK

Parwoto

NIP.

40

6

666

6

4020

Page 64: Polindes Rab Contoh

No. Lembar Jumlah Lembar

12

8

Bout Ø 12

Plat Baja 12

Bout Ø 12

120 cm

Wuwung

Genteng

Reng 2/3

Gording 6/12

Kaso 5/7

Balok 8/12

Adukan 1:5

Papan bubung

12

8

Page 65: Polindes Rab Contoh

8

1 meterTriplek 4 mm kaso penggantung

kaso 4/6

Gording 6/12

Kaso 5/7

Balok 8/12

Reng 2/3

12

Lisplank 8/12

plat baja t 4mm

Bout Ø 12

Gording 6/12

Kaso 5/7

Balok 8/12

Reng 2/3

Page 66: Polindes Rab Contoh

1 meterkaso 4/6

Page 67: Polindes Rab Contoh

Pasir Urug

Adukan 1:5

keramik 30/30

Tanah Urug

+ 0.00+ 0.03

- 0.15

- 0.70

20

4Ø10 mm

Ø 6 mm - 15 cmbeton 1:2:3

Page 68: Polindes Rab Contoh

80

aanstamping

Pasir Urug

- 0.70

- 0.85

- 0.90

Detail Pondasi

15

20

4Ø10 mm

Ø 6 mm - 15 cm

Detail beton Sloop

15

20

4Ø10 mm

Ø 6 mm - 15 cm

Detail Ring balok

20

Detail Kolom beton

beton 1:2:3

beton 1:2:3

Page 69: Polindes Rab Contoh

1.20

20

20

10

Pipa PVC Ø 3"

lobang Ø 1 cm lapisan ijuk

lap.kerikil

Pipa PVC Ø 3"

1.20

0.50

Page 70: Polindes Rab Contoh

2 m

1,20 m 0,6 m

Pipa PVC Diberi lobang Ø 1 cm

20

20

10

lap. ijuk

lap.kerikil

Page 71: Polindes Rab Contoh

KUDA-KUDA

USUK 4/6

RENG 2/3

GORDING 6/10

GENTENG

TEMBOK

Ring Balk 15/15

Page 72: Polindes Rab Contoh

50

Lantai

60

10

DETAIL PONDASI

70

400

Pasir Urug

10

Sloof 15/15

70

60

Rolag Pasir Urug

50

TANAH URUG 130

Page 73: Polindes Rab Contoh
Page 74: Polindes Rab Contoh
Page 75: Polindes Rab Contoh
Page 76: Polindes Rab Contoh
Page 77: Polindes Rab Contoh
Page 78: Polindes Rab Contoh
Page 79: Polindes Rab Contoh
Page 80: Polindes Rab Contoh