1 EXCAVATOR/BACKHOE Nama Alat Excavator/Backhoe Tipe Alat Hydraulic 320D LRR tahun 2010 Volume Bucket 0.9 Kondisi Alat Baik Sekali Jenis Tanah Tanah Biasa Kondisi Operator Baik Sekali Faktor Bucket (K) 0.8 Efisiensi Kerja 0.81 Waktu Gali 13 Waktu Buang 5 Waktu Putar 8 2 Dump Truck Nama Alat Tipe Alat Kapasitas Bak (c) Kondisi Alat Kondisi Operator Jarak Angkut Cycle Time Excavator Kapasitas Bucket Excavator Kecepatan Rata-rata isi Kecepatan rata-rata kosong

Upload: dicki-dian-purnama

Post on 15-Dec-2015

227 views

Category:

Documents


0 download

DESCRIPTION

sip

TRANSCRIPT

Page 1: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

1 EXCAVATOR/BACKHOENama Alat Excavator/BackhoeTipe Alat Hydraulic 320D LRR tahun 2010Volume Bucket 0.9Kondisi Alat Baik SekaliJenis Tanah Tanah BiasaKondisi Operator Baik SekaliFaktor Bucket (K) 0.8Efisiensi Kerja 0.81Waktu Gali 13Waktu Buang 5Waktu Putar 8

2 Dump TruckNama AlatTipe AlatKapasitas Bak (c) Kondisi AlatKondisi OperatorJarak AngkutCycle Time ExcavatorKapasitas Bucket ExcavatorKecepatan Rata-rata isiKecepatan rata-rata kosong

Page 2: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015
Page 3: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

URAIAN ANALISA ALAT

No URAIAN

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga

3 Kapasitas

4 Alat Baru : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

5 Alat Yang Dipakai : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A'

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D

W '

b. Asuransi dll = 0,002 x B '

W '

Biaya Pasti Perjam = ( E + F )

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Ja

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam )

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B '

W '

4 Operator = ( 1 org / Jam ) x U1

5 Pembantu Operator ( 1 org / Jam ) x U2

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M

Page 4: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P )

V LAIN LAIN

1 Tingkat suku bunga

2 Upah Operator / Sopir

3 Upah Pembantu Operator / Pembantu Sopir

4 Bahan bakar bensin

5 Bahan bakar solar

6 Minyak Pelumas

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga

3 Kapasitas

4 Alat Baru : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

5 Alat Yang Dipakai : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A'

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D

W '

b. Asuransi dll = 0,002 x B '

W '

Biaya Pasti Perjam = ( E + F )

Page 5: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Ja

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam )

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B '

W '

4 Operator = ( 1 org / Jam ) x U1

5 Pembantu Operator ( 1 org / Jam ) x U2

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P )

V LAIN LAIN

1 Tingkat suku bunga

2 Upah Operator / Sopir

3 Upah Pembantu Operator / Pembantu Sopir

4 Bahan bakar bensin

5 Bahan bakar solar

6 Minyak Pelumas

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga

3 Kapasitas

4 Alat Baru : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

5 Alat Yang Dipakai : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

Page 6: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A'

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D

W '

b. Asuransi dll = 0,002 x B '

W '

Biaya Pasti Perjam = ( E + F )

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Ja

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam )

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B '

W '

4 Operator = ( 1 org / Jam ) x U1

5 Pembantu Operator ( 1 org / Jam ) x U2

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P )

V LAIN LAIN

1 Tingkat suku bunga

2 Upah Operator / Sopir

3 Upah Pembantu Operator / Pembantu Sopir

4 Bahan bakar bensin

5 Bahan bakar solar

6 Minyak Pelumas

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN

Page 7: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga

3 Kapasitas

4 Alat Baru a Umur Ekonomis

b Jam Kerja dalam 1 Tahun

c Harga Alat

5 Alat yang dipakai a Umur Ekonomis

b Jam Kerja dalam 1 Tahun

c Harga Alat

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A'

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D

W '

b. Asuransi dll = 0,002 x B '

W '

Biaya Pasti Perjam = ( E + F )

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Ja

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam )

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B '

W '

4 Operator = ( 1 org / Jam ) x U1

5 Pembantu Operator ( 1 org / Jam ) x U2

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P )

V LAIN LAIN

1 Tingkat suku bunga

Page 8: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

2 Upah Operator / Sopir

3 Upah Pembantu Operator / Pembantu Sopir

4 Bahan bakar bensin

5 Bahan bakar solar

6 Minyak Pelumas

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga

3 Kapasitas

4 Alat Baru Umur Ekonomis

Jam Kerja dalam 1 Tahun

Harga Alat

5 Alat yang dipakai a Umur Ekonomis

b Jam Kerja dalam 1 Tahun

c Harga Alat

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A'

( 1 + i )^A'-1

3 Biaya pasti per jam

a. Biaya Pengembalian Modal = ( B - C ) x D

W '

b. Asuransi dll = 0,002 x B '

W '

Biaya Pasti Perjam = ( E + F )

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Ja

Page 9: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam )

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B '

W '

4 Operator = ( 1 org / Jam ) x U1

5 Pembantu Operator ( 1 org / Jam ) x U2

Biaya Operasi Per jam =( H1 + H2 + I + K + L + M )

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P )

V LAIN LAIN

1 Tingkat suku bunga

2 Upah Operator / Sopir

3 Upah Pembantu Operator / Pembantu Sopir

4 Bahan bakar bensin

5 Bahan bakar solar

6 Minyak Pelumas

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No URAIAN

I URAIAN PERALATAN

1 Jenis Peralatan

2 Tenaga

3 Kapasitas

4 Alat Baru : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

5 Alat Yang Dipakai : a. Umur Ekonomis

b. Jam Kerja dalam 1 Tahun

c. Harga Alat

II BIAYA PASTI PER JAM KERJA

1 Nila sisa alat = 10 % x B

Page 10: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

2 Faktor angsuran Modal = i x ( 1 + i ) ^ A'

( 1 + i )^A'-1

3 Biaya pasti per jam

a Biaya Pengembalian Modal = ( B - C ) x D

W '

b Asuransi dll = 0,002 x B '

W '

Biaya Pasti Perjam = ( E + F )

III BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = ( 0,125 - 0,175 ltr / HP / Ja

2 Pelumas = ( 0,01 - 0,02 ltr / HP / Jam )

3 Perawatan dan perbaikan = ( 12,5 % - 17,5 % ) x B '

W '

4 Operator = ( 1 org / Jam ) x U1

5 Pembantu Operator ( 1 org / Jam ) x U2

Biaya Operasi Per jam = ( H1 + H2 + I + K + L + M

IV TOTAL BIAYA SEWA ALAT / JAM ( G + P )

V LAIN LAIN

1 Tingkat suku bunga

2 Upah Operator / Sopir

3 Upah Pembantu Operator / Pembantu Sopir

4 Bahan bakar bensin

5 Bahan bakar solar

6 Minyak Pelumas

7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Page 11: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

URAIAN ANALISA ALAT

URAIAN KODE KOEF. SATUAN KET.

BULLDOZER 100 -150 HP E04

Pw 140.00 HP

Cp Ton

A 5.00 Tahun

W 2,000 Jam

B 1,025,000,000.00 Rupiah

A ' 12.00 Tahun Alat Baru

W ' 2,000.00 Jam Alat Baru

B ' 1,025,000,000.00 Rupiah Alat Baru

C 102,500,000.00 Rupiah

D 1.19814 -

E 552,643.43 Rupiah

F 1,025.00 Rupiah

G 553,668.43 Rupiah

( 0,125 - 0,175 ltr / HP / Ja H1 259,000.00 Rupiah

( 0,01 - 0,02 ltr / HP / Jam ) I 19,600.00 Rupiah

K 64,062.50 Rupiah

L 15,000.00 Rupiah

M 10,000.00 Rupiah

( H1 + H2 + I + K + L + M P 367,662.50 Rupiah

Page 12: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

T 921,330.93 Rupiah

( i ) 20.00 % / Tahun

U1 15,000.00 Rp / Jam

U2 10,000.00 Rp / Jam

Mb 16,000.00 Liter

Ms 14,800.00 Liter

Mp 14,000.00 Liter

URAIAN ANALISA ALAT

URAIAN KODE KOEF. SATUAN KET.

EXCAVATOR 80 - 140 HP E10

Pw 80.00 HP

Cp 0.50 M3

A 5.00 Tahun

W 2,000.00 Jam

B 735,000,000.00 Rupiah

A ' 13.00 Tahun Alat Baru

W ' 2,000.00 Jam Alat Baru

B ' 735,000,000.00 Rupiah Alat Baru

C 73,500,000.00 Rupiah

D 1.43777 -

E 475,542.93 Rupiah

F 735.00 Rupiah

G 476,277.93 Rupiah

Page 13: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

( 0,125 - 0,175 ltr / HP / Ja H1 148,000.00 Rupiah

( 0,01 - 0,02 ltr / HP / Jam ) I 11,200.00 Rupiah

K 45,937.50 Rupiah

L 15,000.00 Rupiah

M 10,000.00 Rupiah

( H1 + H2 + I + K + L + M P 230,137.50 Rupiah

T 706,415.43 Rupiah

( i ) 20.00 % / Tahun

U1 15,000.00 Rp / Jam

U2 10,000.00 Rp / Jam

Mb 16,000.00 Liter

Ms 14,800.00 Liter

Mp 14,000.00 Liter

URAIAN ANALISA ALAT

URAIAN KODE KOEF. SATUAN KET.

DUMP TRUCK E09

Pw 125.00 HP

Cp 8.00 Ton

A 5.00 Tahun

W 2,000.00 Jam

B 500,000,000.00 Rupiah

A ' 5.00 Tahun Alat Baru

W ' 2,000.00 Jam Alat Baru

B ' 500,000,000.00 Rupiah Alat Baru

Page 14: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

C 50,000,000.00 Rupiah

D 0.33438 -

E 75,235.43 Rupiah

F 500.00 Rupiah

G 75,735.43 Rupiah

( 0,125 - 0,175 ltr / HP / Ja H1 231,250.00 Rupiah

( 0,01 - 0,02 ltr / HP / Jam ) I 17,500.00 Rupiah

K 31,250.00 Rupiah

L 15,000.00 Rupiah

M 10,000.00 Rupiah

( H1 + H2 + I + K + L + M P 305,000.00 Rupiah

T 380,735.43 Rupiah

( i ) 20.00 % / Tahun

U1 15,000.00 Rp / Jam

U2 10,000.00 Rp / Jam

Mb 16,000.00 Liter

Ms 14,800.00 Liter

Mp 14,000.00 Liter

URAIAN ANALISA ALAT

URAIAN KODE KOEF. SATUAN KET.

Page 15: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

MOTOR GRADER > 100 HP E12

Pw 125.00 HP

Cp - -

A 5.00 Tahun

W 2,000.00 Jam

B 880,000,000.00 Rupiah

A ' 12.00 Tahun Alat Baru

W ' 2,000.00 Jam Alat Baru

B ' 880,000,000.00 Rupiah Alat Baru

C 88,000,000.00 Rupiah

D 1.19814 -

E 474,464.60 Rupiah

F 880.00 Rupiah

G 475,344.60 Rupiah

( 0,125 - 0,175 ltr / HP / Ja H1 231,250.00 Rupiah

( 0,01 - 0,02 ltr / HP / Jam ) I 17,500.00 Rupiah

K 55,000.00 Rupiah

L 15,000.00 Rupiah

M 10,000.00 Rupiah

( H1 + H2 + I + K + L + M P 328,750.00 Rupiah

T 804,094.60 Rupiah

( i ) 20.00 % / Tahun

Page 16: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

U1 15,000.00 Rp / Jam

U2 10,000.00 Rp / Jam

Mb 16,000.00 Liter

Ms 14,800.00 Liter

Mp 14,000.00 Liter

URAIAN ANALISA ALAT

URAIAN KODE KOEF. SATUAN KET.

VIBRATORY ROLLER 5 - 8 T E19

Pw 75.00 HP

Cp 7.00 Ton

A 4.00 Tahun

W 2,000.00 Jam

B 500,000,000.00 Rupiah

A ' 12.00 Tahun Alat Baru

W ' 2,000.00 Jam Alat Baru

B ' 500,000,000.00 Rupiah Alat Baru

C 50,000,000.00 Rupiah

D 1.66097 -

E 373,718.82 Rupiah

F 500.00 Rupiah

G 374,218.82 Rp

( 0,125 - 0,175 ltr / HP / Ja H1 138,750.00 Rupiah

Page 17: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

( 0,01 - 0,02 ltr / HP / Jam ) I 10,500.00 Rupiah

K 31,250.00 Rupiah

L 15,000.00 Rupiah

M 10,000.00 Rupiah

P 205,500.00 Rp

T 579,718.82 Rp

( i ) 20.00 % / Tahun

U1 15,000.00 Rp / Jam

U2 10,000.00 Rp / Jam

Mb 16,000.00 Liter

Ms 14,800.00 Liter

Mp 14,000.00 Liter

URAIAN ANALISA ALAT

URAIAN KODE KOEF. SATUAN KET.

WATER TANK TRUCK 3000 - 4000 L E23

Pw 100.00 HP

Cp 4,000.00 Liter

A 5.00 Tahun

W 2,000.00 Jam

B 50,000,000.00 Rupiah

A ' 5.00 Tahun Alat Baru

W ' 2,000.00 Jam Alat Baru

B ' 50,000,000.00 Rupiah Alat Baru

C 5,000,000.00 Rupiah

Page 18: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

D 0.33438 -

E 7,523.54 Rupiah

F 50.00 Rupiah

G 7,573.54 Rp

( 0,125 - 0,175 ltr / HP / Ja H1 185,000.00 Rupiah

( 0,01 - 0,02 ltr / HP / Jam ) I 14,000.00 Rupiah

K 3,125.00 Rupiah

L 15,000.00 Rupiah

M 10,000.00 Rupiah

( H1 + H2 + I + K + L + M P 227,125.00 Rp

T 234,698.54 Rp

( i ) 20.00 % / Tahun

U1 15,000.00 Rp / Jam

U2 10,000.00 Rp / Jam

Mb 16,000.00 Liter

Ms 14,800.00 Liter

Mp 14,000.00 Liter

Page 19: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

ANALISA PRODUKTIVITAS ALAT

EXCAVATOR/BACKHOE

Kapasitas Bucket V 0.7 m3

Faktor Bucket Fb 1 -

Faktor Efisiensi Alat Fa 0.75 -

Faktor Konversi Galian Fv 1.3 -

Waktu menggali T1 15 detik

Waktu putar 2x T2 16 detik

Waktu buang T3 10 detik

Waktu siklus Ts1 41 detik

Produksi per jam = VxFbxFax3600 35.460 m3/jam

Ts1xFv

Koefisien Alat / m3 = 0.028 jam

DUMP TRUCK

Kapasitas Bak V 18 ton

Faktor Efisiensi Alat Fa 0.8 -

Faktor Pengembangan Tanah Fk 1.2 -

Berat isi material gembur D 1.8 ton/m3

kecepatan rerata bermuatan v1 15 km/jam

kecepatan rerata kosong v2 30 km/jam

Kapasitas Produksi Excavator Qex 35.460 m3/jam

Waktu muat T1 16.92 menit

Asumsi jarak lokasi muat-bongk L 1 km

Waktu tempuh isi T2 4 menit

Waktu tempuh kosong T3 2 menit

Waktu terbuang lain T4 2 menit

Waktu Siklus Ts 24.92 menit

Produksi per jam = VxFax60 19.261 m3/jam

DxTs

Koefisien Alat / m3 = 0.052 jam

Bulldozer

Tenaga Penggerak Pw 75 Hp

Blade L 2.51 m

Tinggi Pisau H 1.3 m

Kapasitas Pisau q 4.24 m3

Page 20: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

Faktor Piasu Fb 1 -

Faktor Efisiensi Alat Fa 0.75 -

Faktor kemiringan Pisau Fm 1 -

Kecepatan Mengupas Vf 120 m/menit

Kecepatan Mundur Vr 160 m/menit

Kapasitas Pisau q 4.24 m3

Lebar Overlap Lo 0.3 m

Jarak Pengupasan I 400 m

Jumlah lajur pengupasan n 3 lajur

Jumlah lintasan pengupasan N 2 lintasan

Waktu Gusur T1 3.33333 menit

Waktu Kembali T2 3 menit

Waktu lain-lain T3 1 menit

Waktu Siklus Ts 7 menit

Produksi Pengupasan per ja qxFbxFmxFax3600 27.934 m2/jam

Ts

Koefisien Alat / m3 = 0.0358 jam

Produksi Perataan per jam Ix(n(L-Lo)+Lo)xFbxFmxFax36003042.4 m2/jam

NxnxTs

Koefisien Alat / m3 = 0.0003 jam

Motor Grader

Kapasitas Berat Operasi W 10800 kg

Tenaga Mesin Pw 135

Panjang Pisau L 2.7

Panjang Pisau Efektif b 2.1

Lebar Overlap b0 0.3

Panjang hamparan Lh 9 m

Faktor efisiensi kerja Fa 0.7

jumlah lintasan n 3 lintasan

jumlah pengupasan tiap lintasa N 2 kali lintasan

kecepatan rata-rata v 20 km/jam

Lebar pisau efektif b 2.4

Waktu 1 kali lintasan T1 0.027 menit

Waktu lain-lain T2 1 menit

Waktu Siklus Ts 1.027 menit

Produksi Perataan per jam Lhx(n(b-b0)+b0)xFax60 524.49 m2/jam

NxnxTs

Koefisien Alat / m3 = 0.0019 jam

Page 21: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

Faktor pengembangan bahan Fk 1.2

tebal hamparan padat t 0.15

Produksi Perataan hamparanLhx(n(b-b0)+b0)xFax60 65.561 m2/jam

NxnxTs

Koefisien Alat / m3 = 0.0153 jam

Vibrator Roller

Berat W 5 ton

Lebar Roda Pemadat b 1.68 m

Lebar efektif pemadatan be 1.48 m

lebar overlap b0 0.2 m

tebal pemadatan t 0.15 m

kecepatan rata-rata alat v 3 km/jam

jumlah lintasan n 8 lintasan

faktor efisiensi alat Fa 0.75 -

Produksi/jam bexvx1000xtxFa 62.437 m3/jam

n

Koefisien Alat / m3 = 0.016 jam

Page 22: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

kali lintasan

Page 23: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

ANALISIS HARGA SATUAN METODE SNI

A. Clearing & Stripping Manual

Kebutuhan SatuanKoefisien

Alat Chainsaw jam 0.84

Material - - 0

Tenaga Kerja Operator OH 0.033

Helper OH 0.033

Pekerja OH 0.022

Mandor OH 0.006

B. Clearing, Stripping, & Grubbing dengan Alat

Kebutuhan SatuanKoefisien

Alat Bulldozer jam 0.0358

Excavator jam 0.0282

Dump Truck jam 0.0519

Material - - 0

Tenaga Kerja Operator OH 0.033

Pembantu Operator OH 0.033

Sopir DT OH 0.083

Pembantu Supir DT OH 0.083

Pekerja OH 0.022

Mandor OH 0.0055

C. Excavation

Kebutuhan SatuanKoefisien

Alat Excavator jam 0.0282

Dump Truck jam 0.0519

Material - - 0

Tenaga Kerja Operator OH 0.105

Pembantu Operator OH 0.105

Sopir DT OH 0.105

Pembantu Supir DT OH 0.105

Pekerja OH 0.21

Page 24: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

Mandor OH 0.0525

D. Cutting, Filling, Compacting, & Dumping in site

Kebutuhan SatuanKoefisien

Alat Vibrator roller jam 0.0160

motor grader jam 0.0153

Excavator jam 0.0282

Dump Truck jam 0.0519

Material - - 0

Tenaga Kerja Operator OH 0.2625

Pembantu Operator OH 0.2625

Sopir DT OH 0.105

Pembantu Supir DT OH 0.105

Pekerja OH 0.21

Mandor OH 0.0525

E. Filling dengan Material Luar

Kebutuhan SatuanKoefisien

Alat Vibrator roller jam 0.0161

motor grader jam 0.0088

Dump Truck jam 0.1063

Material Tanah Timbunan m3 1.2

Tenaga Kerja Operator OH 0.2625

Pembantu Operator OH 0.2625

Sopir DT OH 0.105

Pembantu Supir DT OH 0.105

Pekerja OH 0.21

Mandor OH 0.0525

Page 25: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

ANALISIS HARGA SATUAN METODE SNI

Sumber : AHSP Bidang PU oleh Balitbang PU

Satuan : 1 m2

Harga Satuan Jumlah

(Rp/jam) (Rp/m2)

7,516.00 6,313.44

Subtotal ( a ) 6,313.44

- -

Subtotal ( b ) -

300,300.00 9,909.90

171,600.00 5,662.80

113,100.00 2,488.20

132,600.00 795.60

Subtotal ( c ) 18,856.50

TOTAL ( a + b + c ) 25,169.94

Satuan : 1 m2

Harga Satuan Jumlah

(Rp/jam) (Rp/m2)

921,330.93 32,981.87

706,415.43 19,921.66

380,735.43 19,767.02

Subtotal ( a ) 72,670.55

- -

Subtotal ( b ) -

300,300.00 9,909.90

171,600.00 5,662.80

163,200.00 13,545.60

120,120.00 9,969.96

113,100.00 2,488.20

132,600.00 729.30

Subtotal ( c ) 42,305.76

TOTAL ( a + b + c ) 114,976.31

Satuan : 1 m3

Harga Satuan Jumlah

(Rp/jam) (Rp/m3)

706,415.43 19,921.66

380,735.43 19,767.02

Subtotal ( a ) 39,688.68

- -

Subtotal ( b ) -

300,300.00 31,531.50

171,600.00 18,018.00

163,200.00 17,136.00

120,120.00 12,612.60

113,100.00 23,751.00

Page 26: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

132,600.00 6,961.50

Subtotal ( c ) 110,010.60

TOTAL ( a + b + c ) 149,699.28

Satuan : 1 m3

Harga Satuan Jumlah

(Rp/jam) (Rp/m3)

579,718.82 9,284.79

804,094.60 12,264.81

706,415.43 19,921.66

380,735.43 19,767.02

Subtotal ( a ) 61,238.28

- -

Subtotal ( b ) -

300,300.00 78,828.75

171,600.00 45,045.00

163,200.00 17,136.00

120,120.00 12,612.60

113,100.00 23,751.00

132,600.00 6,961.50

Subtotal ( c ) 184,334.85

TOTAL ( a + b + c ) 245,573.13

Satuan : 1 m3

Harga Satuan Jumlah

(Rp/jam) (Rp/m3)

579,718.82 9,333.47

804,094.60 7,076.03

380,735.43 40,472.18

Subtotal ( a ) 56,881.68

72,000.00 86,400.00

Subtotal ( b ) 86,400.00

300,300.00 78,828.75

171,600.00 45,045.00

163,200.00 17,136.00

120,120.00 12,612.60

113,100.00 23,751.00

132,600.00 6,961.50

Subtotal ( c ) 184,334.85

TOTAL ( a + b + c ) 327,616.53

Page 27: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

ANALISA VOLUME LEVELING +59SATUAN GALIAN TIMBUNAN

ZONE 1 m3 49515 0ZONE 2 m3 9969 18324ZONE 3 m3 600 45420ZONE 4 m3 23785.5 10732.5TOAL m3 83869.5 74476.5

Page 28: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

REKAPITULASI RAB PEKERJAAN TANAH

No Item of Work UoMPERHITUNGAN BASED ON SNI

Elv. +59

Vol Unit Price

A Mob Demob Equip ls 1 1,200,000,000.00

B Earth Work

Land Clearing & Grubbing m2 30,900.00 25,169.94

Cutting m3 83,869.50 114,976.31

Filling m3 74,476.50 245,573.13

TOTAL KESELURUHAN

Page 29: BN-I-EG- Analisa Harsat Alat Pek. Tanah 23 Feb 2015

REKAPITULASI RAB PEKERJAAN TANAH

PERHITUNGAN BASED ON SNI ASUMSI AWAL (PAK MIRZA)Elv. +59 Elv. +59

Total Price Vol Unit Price Total Price

1,200,000,000.00 1 1,200,000,000.00 1,200,000,000.00

777,751,146.00 190,000.00 6,000.00 1,140,000,000.00

9,643,005,963.60 95,000.00 75,000.00 7,125,000,000.00

18,289,427,154.32 285,000.00 75,000.00 21,375,000,000.00

29,910,184,263.92 30,840,000,000.00