D A F T A R A N A L I S A A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN 1 1M Pagar Sementara dari Kayu Setinggi 2 Meter Bahan : 1.250 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 22,000.00 0.050 Zak Semen Portland @ Rp. 43,155.00 = Rp. 2,157.75 0.005 Pasir Beton @ Rp. 165,000.00 = Rp. 825.00 0.009 Koral Beton @ Rp. 137,500.00 = Rp. 1,237.50 0.072 Kayu 5/7 @ Rp. 880,000.00 = Rp. 63,360.00 0.060 Kg Paku Biasa 2 " - 5 " @ Rp. 7,700.00 = Rp. 462.00 0.400 Lt Residu @ Rp. = Rp. 0.00 Upah : 0.200 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 5,700.00 0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00 0.020 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 560.00 0.020 Oh Mandor @ Rp. 30,000.00 = Rp. 600.00 2 1M Pagar Sementara dari Seng Golombang Tinggi 2 Meter Bahan : 1.250 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 22,000.00 0.050 Zak Semen Portland @ Rp. 43,155.00 = Rp. 2,157.75 1.200 Lbr Seng Gelombang 3 " - 5 " @ Rp. 31,000.00 = Rp. 37,200.00 0.005 Pasir Beton @ Rp. 165,000.00 = Rp. 825.00 0.009 Koral Beton @ Rp. 137,500.00 = Rp. 1,237.50 0.072 Kayu 5/7 @ Rp. 880,000.00 = Rp. 63,360.00 0.060 Kg Paku Biasa 2 " - 5 " @ Rp. 7,700.00 = Rp. 462.00 0.450 Kg Meni besi @ Rp. 12,650.00 = Rp. 5,692.50 Upah : 0.200 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 5,700.00 0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00 0.020 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 560.00 0.020 Oh Mandor @ Rp. 30,000.00 = Rp. 600.00 3 1M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter Bahan : 1.000 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 17,600.00 0.040 Zak Semen Portland @ Rp. 43,155.00 = Rp. 1,726.20 25.000 Kg Kawat Duri @ Rp. 50,000.00 = Rp. 1,250,000.00 0.005 Pasir Beton @ Rp. 165,000.00 = Rp. 825.00 0.009 Koral Beton @ Rp. 137,500.00 = Rp. 1,237.50 0.060 Kg Paku Biasa 2 " - 5 " @ Rp. 7,700.00 = Rp. 462.00 Upah : 0.200 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 5,700.00 0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00 0.020 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 560.00 0.020 Oh Mandor @ Rp. 30,000.00 = Rp. 600.00 4 Pengukuran dan Pemasangan Bouplank Bahan : 0.012 Kayu 5/7 @ Rp. 880,000.00 = Rp. 10,560.00 0.020 Kg Paku Biasa 2" - 5 " @ Rp. 7,700.00 = Rp. 154.00 0.007 Kayu Papan 3/20 @ Rp. 990,000.00 = Rp. 6,930.00 Jumlah I Rp. 17,644.00 Upah : 0.100 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 2,850.00 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00 0.010 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 280.00 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3

Upload: abdullah-basalamah

Post on 29-Nov-2015

33 views

Category:

Documents


2 download

DESCRIPTION

file estiminasi

TRANSCRIPT

Page 1: bayu (2) estiminasi

D A F T A R A N A L I S A

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN1 1M Pagar Sementara dari Kayu Setinggi 2 Meter

Bahan :

1.250 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 22,000.00

0.050 Zak Semen Portland @ Rp. 43,155.00 = Rp. 2,157.75

0.005 Pasir Beton @ Rp. 165,000.00 = Rp. 825.00

0.009 Koral Beton @ Rp. 137,500.00 = Rp. 1,237.50

0.072 Kayu 5/7 @ Rp. 880,000.00 = Rp. 63,360.00

0.060 Kg Paku Biasa 2 " - 5 " @ Rp. 7,700.00 = Rp. 462.00

0.400 Lt Residu @ Rp. = Rp. 0.00 = Rp.

Upah :

0.200 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 5,700.00

0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00

0.020 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 560.00

0.020 Oh Mandor @ Rp. 30,000.00 = Rp. 600.00 = Rp.

= Rp.

2 1M Pagar Sementara dari Seng Golombang Tinggi 2 Meter

Bahan :

1.250 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 22,000.00

0.050 Zak Semen Portland @ Rp. 43,155.00 = Rp. 2,157.75

1.200 Lbr Seng Gelombang 3 " - 5 " @ Rp. 31,000.00 = Rp. 37,200.00

0.005 Pasir Beton @ Rp. 165,000.00 = Rp. 825.00

0.009 Koral Beton @ Rp. 137,500.00 = Rp. 1,237.50

0.072 Kayu 5/7 @ Rp. 880,000.00 = Rp. 63,360.00

0.060 Kg Paku Biasa 2 " - 5 " @ Rp. 7,700.00 = Rp. 462.00

0.450 Kg Meni besi @ Rp. 12,650.00 = Rp. 5,692.50 = Rp.

Upah :

0.200 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 5,700.00

0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00

0.020 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 560.00

0.020 Oh Mandor @ Rp. 30,000.00 = Rp. 600.00 = Rp.

= Rp.

3 1M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter

Bahan :

1.000 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 17,600.00

0.040 Zak Semen Portland @ Rp. 43,155.00 = Rp. 1,726.20

25.000 Kg Kawat Duri @ Rp. 50,000.00 = Rp. 1,250,000.00

0.005 Pasir Beton @ Rp. 165,000.00 = Rp. 825.00

0.009 Koral Beton @ Rp. 137,500.00 = Rp. 1,237.50

0.060 Kg Paku Biasa 2 " - 5 " @ Rp. 7,700.00 = Rp. 462.00 = Rp.

Upah :

0.200 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 5,700.00

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.020 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 560.00

0.020 Oh Mandor @ Rp. 30,000.00 = Rp. 600.00 = Rp.

= Rp.

4 Pengukuran dan Pemasangan Bouplank

Bahan :

0.012 Kayu 5/7 @ Rp. 880,000.00 = Rp. 10,560.00

0.020 Kg Paku Biasa 2" - 5 " @ Rp. 7,700.00 = Rp. 154.00

0.007 Kayu Papan 3/20 @ Rp. 990,000.00 = Rp. 6,930.00 = Rp.

Jumlah I Rp. 17,644.00

Upah :

0.100 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 2,850.00

0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.010 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 280.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 = Rp.

= Rp.

5

Bahan :

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran

Page 2: bayu (2) estiminasi

1.250 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 22,000.00

0.180 Kayu @ Rp. 880,000.00 = Rp. 158,400.00

0.850 Kayu Biasa @ Rp. 880,000.00 = Rp. 748,000.00

1.100 Kg Besi Strip @ Rp. 20,000.00 = Rp. 22,000.00

0.700 Zak Semen Portland @ Rp. 43,155.00 = Rp. 30,208.50

0.150 Pasir Pasang @ Rp. 145,000.00 = Rp. 21,750.00

0.100 Pasir Beton @ Rp. 165,000.00 = Rp. 16,500.00

0.150 Koral Beton @ Rp. 137,500.00 = Rp. 20,625.00

30.000 Bh Bata Merah @ Rp. 900.00 = Rp. 27,000.00

0.250 Lbr Seng Plat @ Rp. 25,000.00 = Rp. 6,250.00

2.000 Bh Jendela Nako @ Rp. 27,500.00 = Rp. 55,000.00

0.080 Kaca Polos @ Rp. 22,000.00 = Rp. 1,760.00

0.150 Bh Kunci Tanam @ Rp. 50,550.00 = Rp. 7,582.50

0.060 Lbr Plywood 4 mm @ Rp. 70,000.00 = Rp. 4,200.00 = Rp.

Upah :

2.000 Oh Tukang Kayu setengah Terampil @ Rp. 28,500.00 = Rp. 57,000.00

1.000 Oh Tukang Batu setengah terampil @ Rp. 28,000.00 = Rp. 28,000.00

2.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.00

0.300 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 8,400.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

6

Bahan :

1.700 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 29,920.00

0.210 Kayu @ Rp. 880,000.00 = Rp. 184,800.00

0.300 Kg Paku Biasa @ Rp. 9,100.00 = Rp. 2,730.00

0.210 Zak Semen Portland @ Rp. 43,155.00 = Rp. 9,062.55

0.030 Pasir Beton @ Rp. 165,000.00 = Rp. 4,950.00

0.050 Koral Beton @ Rp. 137,500.00 = Rp. 6,875.00

1.500 Lbr Seng Gelombang Bjls 32 @ Rp. 35,000.00 = Rp. 52,500.00 = Rp.

Upah :

2.000 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 57,000.00

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

0.200 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 5,600.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

7

Bahan :

3.000 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 52,800.00

0.276 Kayu @ Rp. 880,000.00 = Rp. 242,880.00

0.700 Kg Paku Biasa @ Rp. 9,100.00 = Rp. 6,370.00

1.500 Lbr Seng Gelombang Bjls 32 @ Rp. 35,000.00 = Rp. 52,500.00 = Rp.

Upah :

1.500 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 42,750.00

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

0.150 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 4,200.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

8

Upah :

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

9

Bahan :

1.250 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 22,000.00

0.186 Kayu @ Rp. 880,000.00 = Rp. 163,680.00

0.300 Kg Paku Biasa @ Rp. 9,100.00 = Rp. 2,730.00

0.360 Zak Semen Portland @ Rp. 43,155.00 = Rp. 15,535.80

0.030 Pasir Beton @ Rp. 165,000.00 = Rp. 4,950.00

0.050 Koral Beton @ Rp. 137,500.00 = Rp. 6,875.00

1.500 Lbr Seng Gelombang Bjls 32 @ Rp. 31,000.00 = Rp. 46,500.00

1.350 Lbr Plywood @ Rp. 70,000.00 = Rp. 94,500.00 = Rp.

M3

M3

M3

M3

M3

M2

1 M2 Pembuatan Gudang Semen dan alat - alat

M3

M3

M3

1 M2 Pembuatan Rumah Jaga / Konstruksi Kayu

M3

1 M2 Membersihkan Lapangan dan Peralatan

1 M2 Pembuatan Bedeng Buruh

M3

M3

M3

Page 3: bayu (2) estiminasi

Upah :

2.000 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 57,000.00

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

0.200 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 5,600.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

10

Bahan :

0.036 Kayu Terentang @ Rp. 715,000.00 = Rp. 25,740.00

0.080 Kg Paku Biasa @ Rp. 9,100.00 = Rp. 728.00

1.000 Btg Kaso 5/7 @ Rp. 17,600.00 = Rp. 17,600.00 = Rp.

Upah :

0.300 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 8,550.00

0.0015 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00 = Rp.

= Rp.

11

Bahan :

1.000 Btg Bambu 0 6 -10/600 Cm @ Rp. 8,250.00 = Rp. 8,250.00

0.250 Kg Tali Ijuk @ Rp. 27,500.00 = Rp. 6,875.00 = Rp.

Upah :

0.017 Oh Tukang Kayu @ Rp. 28,500.00 = Rp. 484.50

0.002 Oh Pekerja @ Rp. 24,000.00 = Rp. 48.00

0.250 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 7,000.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00 = Rp.

= Rp.

12

Bahan :

0.150 Batu Belah 15/20 @ Rp. 95,000.00 = Rp. 14,250.00

0.090 Batu Pecah 5/7 @ Rp. 110,000.00 = Rp. 9,900.00

0.010 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,450.00 = Rp.

Upah :

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

13

Upah :

6.667 Oh Pekerja @ Rp. 24,000.00 = Rp. 160,008.00

0.333 Oh Mandor @ Rp. 30,000.00 = Rp. 9,990.00 = Rp.

= Rp.

14

Upah :

6.667 Oh Pekerja @ Rp. 24,000.00 = Rp. 160,008.00

0.033 Oh Mandor @ Rp. 30,000.00 = Rp. 990.00 = Rp.

= Rp.

15 1 M Pagar Kawat Jaring Galvanis, Tinggi 1.00 Meter

Bahan :

0.434 Lbr Pagar Kawat Jaring @ Rp. 15,000.00 = Rp. 6,510.00 = Rp.

Upah :

0.042 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,008.00

0.004 Oh Kepala Tukang @ Rp. 28,000.00 = Rp. 112.00

0.042 Oh Tukang @ Rp. 28,000.00 = Rp. 1,176.00

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00 = Rp.

= Rp.

16 1 M Pagar Beton Pracetak (5x50x213) Cm

Bahan :

0.986 Lbr Panel Beton Pracetak @ Rp. 715,000.00 = Rp. 704,990.00

0.525 Btg Kolom Beton Pracetak @ Rp. 17,600.00 = Rp. 9,240.00

0.074 Pasir Beton @ Rp. 165,000.00 = Rp. 12,210.00

0.146 Koral 2/3 @ Rp. 137,500.00 = Rp. 20,075.00

45.000 Kg Semen Abu - abu @ Rp. 3,200.00 = Rp. 144,000.00 = Rp.

Upah :

0.125 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 3,500.00

0.375 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,000.00

1 M2 Pembuatan Bak Adukan Ukuran (40x50x20) Cm

M3

1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm

1 M2 Pembuatan Jalan Sementara

M3

M3

M3

1 M3 Bongkaran Beton Bertulang

1 M3 Bongkaran Dinding Tembok Bata Merah

M3

M3

Page 4: bayu (2) estiminasi

0.012 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 342.00

0.019 Oh Mandor @ Rp. 30,000.00 = Rp. 570.00 = Rp.

= Rp.

B. PEKERJAAN TANAH

1

Upah :

0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00 = Rp.

= Rp.

2

Upah :

0.526 Oh Pekerja @ Rp. 24,000.00 = Rp. 12,624.00

0.052 Oh Mandor @ Rp. 30,000.00 = Rp. 1,560.00 = Rp.

= Rp.

3 1 m³ Galian Tanah Biasa sedalam 3 Meter

Upah :

0.735 Oh Pekerja @ Rp. 24,000.00 = Rp. 17,640.00

0.073 Oh Mandor @ Rp. 30,000.00 = Rp. 2,190.00 = Rp.

= Rp.

4 1 m³ Galian Tanah Keras sedalam 1 Meter

Upah :

0.625 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,000.00

0.062 Oh Mandor @ Rp. 30,000.00 = Rp. 1,860.00 = Rp.

= Rp.

5 1 m³ Galian Tanah Cadas sedalam 1 Meter

Upah :

1.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 30,000.00

0.125 Oh Mandor @ Rp. 30,000.00 = Rp. 3,750.00 = Rp.

= Rp.

6 1 m³ Galian Tanah Lumpur sedalam 1 Meter

Upah :

0.823 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,752.00

0.083 Oh Mandor @ Rp. 30,000.00 = Rp. 2,490.00 = Rp.

= Rp.

7

Upah :

0.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 = Rp.

= Rp.

8

Upah :

0.516 Oh Pekerja @ Rp. 24,000.00 = Rp. 12,384.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

9

Upah :

0.192 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,608.00

0.019 Oh Mandor @ Rp. 30,000.00 = Rp. 570.00 = Rp.

= Rp.

10

Upah :

0.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 12,000.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

11

Bahan :

1.200 Pasir Urug @ Rp. 130,000.00 = Rp. 156,000.00 = Rp.

Upah :

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00 = Rp.

= Rp.

12

Bahan :

1 m³ Galian Tanah Biasa sedalam 1 Meter

1 m³ Galian Tanah Biasa sedalam 2 Meter

1 m² Pekerjaan Stripping Setinggi 1 Meter

1 M3 Pembuangan Tanah Sejauh 150 Meter

1 M3 Urugan Kembali

1 M3 Pemadatan Tanah

1 M3 Urugan Pasir

1 M3 Lapisan Pudel Camp. 1 Kp : 3 Ps : 7 TL

Page 5: bayu (2) estiminasi

0.330 Oh Pasir Urug @ Rp. 130,000.00 = Rp. 42,900.00

0.109 Oh Kapur Padam @ Rp. 27,500.00 = Rp. 2,997.50

0.763 Oh Tanah Liat @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

0.833 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,992.00

0.416 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 9,984.00

0.040 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,140.00

0.083 Oh Mandor @ Rp. 30,000.00 = Rp. 2,490.00 = Rp.

= Rp.

13

Bahan :

0.200 Oh Kapur Padam @ Rp. 27,500.00 = Rp. 5,500.00

1.000 Oh Tanah Liat @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

0.833 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,992.00

0.416 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 9,984.00

0.041 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,168.50

0.081 Oh Mandor @ Rp. 30,000.00 = Rp. 2,430.00 = Rp.

= Rp.

15

Bahan :

1.200 Oh Ijuk @ Rp. 27,500.00 = Rp. 33,000.00 = Rp.

Upah :

0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

16

Bahan :

1.200 Oh Sirtu @ Rp. 110,000.00 = Rp. 132,000.00 = Rp.

Upah :

0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.025 Oh Mandor @ Rp. 30,000.00 = Rp. 750.00 = Rp.

= Rp.

17

Bahan :

0.275 Oh Batu Belah @ Rp. 95,000.00 = Rp. 26,125.00

0.030 Oh Kerikil @ Rp. 137,500.00 = Rp. 4,125.00

0.050 Oh Pasir Urug @ Rp. 130,000.00 = Rp. 6,500.00 = Rp.

Upah :

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

0.040 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,140.00

0.100 Oh Mandor @ Rp. 30,000.00 = Rp. 3,000.00 = Rp.

= Rp.

C ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

1

Bahan :

1.200 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 114,000.00

0.300 Pasir Urug @ Rp. 130,000.00 = Rp. 39,000.00 = Rp.

Upah :

0.780 Oh Pekerja @ Rp. 24,000.00 = Rp. 18,720.00

0.300 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 9,000.00

0.039 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,111.50

0.039 Oh Mandor @ Rp. 30,000.00 = Rp. 1,170.00 = Rp.

= Rp.

2

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

7.840 Zak Semen Portland @ Rp. 43,155.00 = Rp. 338,335.20

0.314 Pasir Pasang @ Rp. 145,000.00 = Rp. 45,530.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

1 M3 Lapisan Pudel Camp. 1 Kp : 5 TL

1 M3 Pemasangan Lapisan Ijuk

1 M3 Pemasangan Lapisan Ijuk

1 M2 Pembuatan Jalan Sementara, Tebal 25 Cm

1 M3 Pasangan Pondasi Batu Kosong

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 1 Ps

M3

M3

Page 6: bayu (2) estiminasi

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

3

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

5.340 Zak Semen Portland @ Rp. 43,155.00 = Rp. 230,447.70

0.427 Pasir Pasang @ Rp. 145,000.00 = Rp. 61,915.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

4

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

5.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 215,775.00

0.314 Pasir Pasang @ Rp. 145,000.00 = Rp. 45,530.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

5

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

4.040 Zak Semen Portland @ Rp. 43,155.00 = Rp. 174,346.20

0.485 Pasir Pasang @ Rp. 145,000.00 = Rp. 70,325.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

6

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

3.260 Zak Semen Portland @ Rp. 43,155.00 = Rp. 140,685.30

0.520 Pasir Pasang @ Rp. 145,000.00 = Rp. 75,400.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

7

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

2.720 Zak Semen Portland @ Rp. 43,155.00 = Rp. 117,381.60

0.544 Pasir Pasang @ Rp. 145,000.00 = Rp. 78,880.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

8

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

2.340 Zak Semen Portland @ Rp. 43,155.00 = Rp. 100,982.70

0.561 Pasir Pasang @ Rp. 145,000.00 = Rp. 81,345.00 = Rp.

Upah :

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 2 Ps

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 2.5 Ps

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 3 Ps

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 6 Ps

M3

M3

Page 7: bayu (2) estiminasi

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

9

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

1.820 Zak Semen Portland @ Rp. 43,155.00 = Rp. 78,542.10

0.561 Pasir Pasang @ Rp. 145,000.00 = Rp. 81,345.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

10

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

0.229 Kg Kapur Pasang @ Rp. 165,000.00 = Rp. 37,785.00

0.229 Kg Semen Merah @ Rp. 78,400.00 = Rp. 17,953.60

0.544 Pasir Pasang @ Rp. 145,000.00 = Rp. 78,880.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

11

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

0.170 Kg Kapur Pasang @ Rp. 165,000.00 = Rp. 28,050.00

0.170 Semen Merah @ Rp. 78,400.00 = Rp. 13,328.00

0.340 Pasir Pasang @ Rp. 145,000.00 = Rp. 49,300.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

12

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

3.120 Zak Semen Portland @ Rp. 43,155.00 = Rp. 134,643.60

0.032 Kapur Pasang @ Rp. 27,500.00 = Rp. 880.00

0.584 Pasir Pasang @ Rp. 145,000.00 = Rp. 84,680.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

13

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

1.220 Zak Semen Portland @ Rp. 43,155.00 = Rp. 52,649.10

0.147 Kapur Pasang @ Rp. 27,500.00 = Rp. 4,042.50

0.492 Pasir Pasang @ Rp. 145,000.00 = Rp. 71,340.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 8 Ps

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Kp : 1 Sm : 1 Ps

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Kp : 1 Sm : 2 Ps

M3

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 1/4 Kp : 4 Ps

M3

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 3 Pc : 3 Kp : 10 Ps

M3

M3

M3

Page 8: bayu (2) estiminasi

= Rp.

14

Bahan :

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.00

0.820 Zak Semen Portland @ Rp. 43,155.00 = Rp. 35,387.10

0.131 Kapur Pasang @ Rp. 27,500.00 = Rp. 3,602.50

0.523 Pasir Pasang @ Rp. 145,000.00 = Rp. 75,835.00 = Rp.

Upah :

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.00

0.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.00

0.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.00

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp.

= Rp.

15

Bahan :

75.000 Kg Besi Beton @ Rp. 5,850.00 = Rp. 438,750.00

4.04 Zak Semen Portland @ Rp. 43,155.00 = Rp. 174,346.20

0.320 Pasir Beton @ Rp. 165,000.00 = Rp. 52,800.00

0.490 Koral Beton @ Rp. 137,500.00 = Rp. 67,375.00

0.800 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 10,400.00 = Rp.

Upah :

3.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 72,000.00

0.850 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 25,500.00

0.085 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 2,677.50

0.150 Oh Mandor @ Rp. 30,000.00 = Rp. 4,500.00 = Rp.

= Rp.

16

Bahan :

0.450 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 42,750.00

5.60 Zak Semen Portland @ Rp. 43,155.00 = Rp. 241,668.00

0.450 Pasir Beton @ Rp. 165,000.00 = Rp. 74,250.00

0.670 Koral Beton @ Rp. 137,500.00 = Rp. 92,125.00 = Rp.

Upah :

2.380 Oh Pekerja @ Rp. 24,000.00 = Rp. 57,120.00

0.300 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 9,000.00

0.030 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 945.00

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

17 Pembuatan Tiang Pancang (40x40) Cm, Beton Bertulang

Bahan :

0.019 Pasir Urug Darat @ Rp. 130,000.00 = Rp. 2,470.00

0.09 Pasir Beton @ Rp. 165,000.00 = Rp. 15,510.00

0.150 Koral Beton @ Rp. 137,500.00 = Rp. 20,625.00

1.21 Zak Semen Portland @ Rp. 43,155.00 = Rp. 52,217.55

45.00 Kg Besi Beton @ Rp. 5,850.00 = Rp. 263,250.00

0.90 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 11,700.00

0.032 Kayu Kaso 5/7 @ Rp. 715,000.00 = Rp. 22,880.00

0.120 Kg Paku @ Rp. 9,100.00 = Rp. 1,092.00

0.090 Lt Minyak Bekisting @ Rp. 18,050.00 = Rp. 1,624.50

0.240 Kg Plamuur Tembok @ Rp. 35,000.00 = Rp. 8,400.00 = Rp.

Upah :

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

0.670 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 20,100.00

0.067 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 2,110.50

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp.

= Rp.

18 Pembuatan Tiang Pancang (35x35) Cm, Beton Bertulang

Bahan :

0.016 Pasir Urug Darat @ Rp. 130,000.00 = Rp. 2,080.00

0.08 Pasir Beton @ Rp. 165,000.00 = Rp. 13,200.00

0.125 Koral Beton @ Rp. 137,500.00 = Rp. 17,187.50

0.98 Zak Semen Portland @ Rp. 43,155.00 = Rp. 42,291.90

34.50 Kg Besi Beton @ Rp. 5,850.00 = Rp. 201,825.00

1 M3 Pasangan Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps

M3

M3

M3

1 M3 Pasang Pondasi Siklop 40 % Batu Kali

M3

M3

1 M3 Pasang Pondasi Sumuran Diameter 100 Cm

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 9: bayu (2) estiminasi

0.700 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 9,100.00

0.027 Kayu Kaso 5/7 @ Rp. 880,000.00 = Rp. 23,760.00

0.120 Kg Paku @ Rp. 9,350.00 = Rp. 1,122.00

0.090 Lt Minyak Bekisting @ Rp. 18,050.00 = Rp. 1,624.50

0.200 Kg Plamuur Tembok @ Rp. 35,000.00 = Rp. 7,000.00 = Rp.

Upah :

0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

0.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 15,000.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00 = Rp.

= Rp.

D Analisa Biaya Konstruksi Pekerjaan Beton

1

Bahan :

5.620 Zak Semen Portland @ Rp. 43,155.00 = Rp. 242,531.10

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.870 Koral Beton @ Rp. 137,500.00 = Rp. 119,625.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

2

Bahan :

3.940 Zak Semen Portland @ Rp. 43,155.00 = Rp. 170,030.70

0.470 Pasir Beton @ Rp. 165,000.00 = Rp. 77,550.00

0.940 Koral Beton @ Rp. 137,500.00 = Rp. 129,250.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

3

Bahan :

3.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 149,316.30

0.570 Pasir Beton @ Rp. 165,000.00 = Rp. 94,050.00

0.870 Koral Beton @ Rp. 137,500.00 = Rp. 119,625.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

4

Bahan :

0.200 Zak Semen Portland @ Rp. 43,155.00 = Rp. 8,631.00

0.026 Pasir Beton @ Rp. 165,000.00 = Rp. 4,290.00

0.044 Koral Beton @ Rp. 137,500.00 = Rp. 6,050.00 = Rp.

Upah :

1.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 27,600.00

0.020 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 600.00

0.002 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

5

Bahan :

4.640 Zak Semen Portland @ Rp. 43,155.00 = Rp. 200,239.20

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

M3

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr

M3

M3

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr

M3

M3

1 M3 Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr

M3

M3

1 M3 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr

M3

M3

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 3 Kr

M3

M3

Page 10: bayu (2) estiminasi

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

6

Bahan :

5.600 Zak Semen Portland @ Rp. 43,155.00 = Rp. 241,668.00

0.450 Pasir Beton @ Rp. 165,000.00 = Rp. 74,250.00

0.900 Koral Beton @ Rp. 137,500.00 = Rp. 123,750.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

7

Bahan :

7.040 Zak Semen Portland @ Rp. 43,155.00 = Rp. 303,811.20

0.560 Pasir Beton @ Rp. 165,000.00 = Rp. 92,400.00

0.700 Koral Beton @ Rp. 137,500.00 = Rp. 96,250.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

8

Bahan :

7.140 Zak Semen Portland @ Rp. 43,155.00 = Rp. 308,126.70

0.420 Pasir Beton @ Rp. 165,000.00 = Rp. 69,300.00

0.540 Koral Beton @ Rp. 137,500.00 = Rp. 74,250.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

9

Bahan :

7.720 Zak Semen Portland @ Rp. 43,155.00 = Rp. 333,156.60

0.470 Pasir Beton @ Rp. 165,000.00 = Rp. 77,550.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

10

Bahan :

9.580 Zak Semen Portland @ Rp. 43,155.00 = Rp. 413,424.90

0.370 Pasir Beton @ Rp. 165,000.00 = Rp. 61,050.00

0.740 Koral Beton @ Rp. 137,500.00 = Rp. 101,750.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

11

Bahan :

8.800 Zak Semen Portland @ Rp. 43,155.00 = Rp. 379,764.00

0.500 Pasir Beton @ Rp. 165,000.00 = Rp. 82,500.00

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 4 Kr

M3

M3

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 2.5 Kr

M3

M3

1 M3 Membuat Beton Bertulang, 1 Pc : 5 Ps : 3 Kr

M3

M3

1 M3 Membuat Beton Bertulang, 1 Pc : 1,5 Ps : 2.5 Kr

M3

M3

1 M3 Membuat Beton Bertulang, 1 Pc : 1 Ps : 2 Kr

M3

M3

1 M3 Membuat Tiang Pancang Prestressed Beton

M3

Page 11: bayu (2) estiminasi

0.800 Koral Beton @ Rp. 137,500.00 = Rp. 110,000.00

2.460 Gln Rapidrant @ Rp. = Rp. 0.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

12

Bahan :

6.720 Zak Semen Portland @ Rp. 43,155.00 = Rp. 290,001.60

0.540 Pasir Beton @ Rp. 165,000.00 = Rp. 89,100.00

0.810 Koral Beton @ Rp. 137,500.00 = Rp. 111,375.00

1.000 Ltr Puzzdith - 100 XR @ Rp. = Rp. 0.00 = Rp.

Upah :

1.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 39,600.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.080 Oh Mandor @ Rp. 30,000.00 = Rp. 2,400.00 = Rp.

= Rp.

13

Bahan :

6.720 Zak Semen Portland @ Rp. 43,155.00 = Rp. 290,001.60

0.540 Pasir Beton @ Rp. 165,000.00 = Rp. 89,100.00

0.810 Koral Beton @ Rp. 137,500.00 = Rp. 111,375.00 = Rp.

Upah :

2.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

1.000 Oh Mandor @ Rp. 30,000.00 = Rp. 30,000.00 = Rp.

= Rp.

14

Bahan :

5.820 Zak Semen Portland @ Rp. 43,155.00 = Rp. 251,162.10

0.470 Pasir Beton @ Rp. 165,000.00 = Rp. 77,550.00

0.930 Koral Beton @ Rp. 137,500.00 = Rp. 127,875.00 = Rp.

Upah :

2.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

1.000 Oh Mandor @ Rp. 30,000.00 = Rp. 30,000.00 = Rp.

= Rp.

15

Bahan :

7.340 Zak Semen Portland @ Rp. 43,155.00 = Rp. 316,757.70

0.440 Pasir Beton @ Rp. 165,000.00 = Rp. 72,600.00

0.880 Koral Beton 2/3 @ Rp. 137,500.00 = Rp. 121,000.00 = Rp.

Upah :

2.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

1.000 Oh Mandor @ Rp. 30,000.00 = Rp. 30,000.00 = Rp.

= Rp.

16

Bahan :

8.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 345,240.00

0.480 Pasir Beton @ Rp. 165,000.00 = Rp. 79,200.00

0.880 Koral Beton 2/3 @ Rp. 137,500.00 = Rp. 121,000.00 = Rp.

Upah :

2.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

1.000 Oh Mandor @ Rp. 30,000.00 = Rp. 30,000.00 = Rp.

M3

1 M3 Membuat Beton dengan Puzzdith - 100 XR

M3

M3

1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr

M3

M3

1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr

M3

M3

1 M3 Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3 Kr

M3

M3

1 M3 Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr

M3

M3

Page 12: bayu (2) estiminasi

= Rp.

17

Bahan :

12.300 Zak Semen Portland @ Rp. 43,155.00 = Rp. 530,806.50

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.520 Koral Beton @ Rp. 137,500.00 = Rp. 71,500.00 = Rp.

Upah :

2.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

1.000 Oh Mandor @ Rp. 30,000.00 = Rp. 30,000.00 = Rp.

= Rp.

18

Bahan :

8.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 345,240.00

0.480 Pasir Beton @ Rp. 165,000.00 = Rp. 79,200.00

0.800 Koral Beton @ Rp. 137,500.00 = Rp. 110,000.00

1.200 Kg Strorox - 100 @ Rp. = Rp. 0.00 = Rp.

Upah :

2.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

1.000 Oh Mandor @ Rp. 30,000.00 = Rp. 30,000.00 = Rp.

= Rp.

19 1 M' Memasang PVC Waterstop Lebar 150 mm

Bahan :

1.050 Waterstop Lebar 150 mm @ Rp. 150,000.00 = Rp. 157,500.00 = Rp.

Upah :

0.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00 = Rp.

= Rp.

20 1 M' Memasang PVC Waterstop Lebar 200 mm

Bahan :

1.050 Waterstop Lebar 200 mm @ Rp. 155,000.00 = Rp. 162,750.00 = Rp.

Upah :

0.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00 = Rp.

= Rp.

21 1 M' Memasang PVC Waterstop Lebar 230 mm

Bahan :

1.050 Waterstop Lebar 230 mm @ Rp. 155,000.00 = Rp. 162,750.00 = Rp.

Upah :

0.550 Oh Pekerja @ Rp. 24,000.00 = Rp. 13,200.00

0.035 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,050.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00 = Rp.

= Rp.

22 1 M' Memasang PVC Waterstop Lebar 250 mm

Bahan :

1.050 Waterstop Lebar 250 mm @ Rp. 155,000.00 = Rp. 162,750.00 = Rp.

Upah :

0.550 Oh Pekerja @ Rp. 24,000.00 = Rp. 13,200.00

0.035 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,050.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00 = Rp.

= Rp.

23 1 M' Memasang PVC Waterstop Lebar 300 mm

Bahan :

1.050 Waterstop Lebar 300 mm @ Rp. 155,000.00 = Rp. 162,750.00 = Rp.

Upah :

0.550 Oh Pekerja @ Rp. 24,000.00 = Rp. 13,200.00

1 M3 Membuat Beton Bertulang 1 Pc : 1 Ps : 1 Kr

M3

M3

1 M3 Membuat Beton Kedap Air dengan Strorox - 100

M3

M3

M1

M1

M1

M1

M1

Page 13: bayu (2) estiminasi

0.035 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,050.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00 = Rp.

= Rp.

24 1 M' Memasang PVC Waterstop Lebar 320 mm

Bahan :

1.050 Waterstop Lebar 320 mm @ Rp. 155,000.00 = Rp. 162,750.00 = Rp.

Upah :

0.550 Oh Pekerja @ Rp. 24,000.00 = Rp. 13,200.00

0.035 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,050.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00 = Rp.

= Rp.

25 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir

Bahan :

1.050 Kg Besi Beton ( Polos/ Ulir ) @ Rp. 5,850.00 = Rp. 6,142.50

0.015 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 195.00 = Rp.

Upah :

0.007 Oh Pekerja @ Rp. 24,000.00 = Rp. 168.00

0.007 Oh Tukang Besi @ Rp. 30,000.00 = Rp. 210.00

0.0007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 22.05

0.0003 Oh Mandor @ Rp. 30,000.00 = Rp. 9.00 = Rp.

= Rp.

26 1 Kg Kabel Presstressed Polos / Strands

Bahan :

1.050 Kg Besi Presstressed Polos @ Rp. 5,850.00 = Rp. 6,142.50

0.010 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 130.00 = Rp.

Upah :

0.005 Oh Pekerja @ Rp. 24,000.00 = Rp. 120.00

0.005 Oh Tukang Besi @ Rp. 30,000.00 = Rp. 150.00

0.0005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 15.75

0.0003 Oh Mandor @ Rp. 30,000.00 = Rp. 9.00 = Rp.

= Rp.

27 1 Kg Jaring Kawat Baja

Bahan :

1.020 Kg Besi Jaring Kawat Baja @ Rp. 75,000.00 = Rp. 76,500.00

0.805 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 10,465.00 = Rp.

Upah :

0.025 Oh Pekerja @ Rp. 24,000.00 = Rp. 600.00

0.025 Oh Tukang Besi @ Rp. 30,000.00 = Rp. 750.00

0.0025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 78.75

0.0015 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00 = Rp.

= Rp.

28

Bahan :

0.040 Kayu Terentang @ Rp. 715,000.00 = Rp. 28,600.00

0.300 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 2,475.00

0.100 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 1,805.00 = Rp.

Upah :

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.260 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 7,280.00

0.026 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 741.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 = Rp.

= Rp.

29

Bahan :

0.045 Kayu Terentang @ Rp. 715,000.00 = Rp. 32,175.00

0.300 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 2,475.00

0.100 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 1,805.00 = Rp.

Upah :

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.260 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 7,280.00

0.026 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 741.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 = Rp.

= Rp.

M1

1 M2 Pasangan Bekisting untuk Pondasi

M3

1 M2 Pasangan Bekisting untuk Sloof

M3

Page 14: bayu (2) estiminasi

30

Bahan :

0.040 Kayu Terentang @ Rp. 715,000.00 = Rp. 28,600.00

0.400 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 3,300.00

0.200 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 3,610.00

0.015 Balok kayu Borneo @ Rp. 880,000.00 = Rp. 13,200.00

0.350 Lbr Plywood Tebal 9 mm @ Rp. 70,000.00 = Rp. 24,500.00

2.000 Btg Dolken kayu Galam o - 8-10/4 m @ Rp. 17,600.00 = Rp. 35,200.00 = Rp.

Upah :

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.330 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 9,240.00

0.033 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 940.50

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

31

Bahan :

0.040 Kayu Terentang @ Rp. 715,000.00 = Rp. 28,600.00

0.400 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 3,300.00

0.200 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 3,610.00

0.018 Balok kayu Borneo @ Rp. 880,000.00 = Rp. 15,840.00

0.350 Lbr Plywood Tebal 9 mm @ Rp. 70,000.00 = Rp. 24,500.00

2.000 Btg Dolken kayu Galam o - 8-10/4 m @ Rp. 17,600.00 = Rp. 35,200.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.330 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 9,240.00

0.033 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 940.50

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

32

Bahan :

0.040 Kayu Terentang @ Rp. 715,000.00 = Rp. 28,600.00

0.400 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 3,300.00

0.200 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 3,610.00

0.015 Balok kayu Borneo @ Rp. 880,000.00 = Rp. 13,200.00

0.350 Lbr Plywood Tebal 9 mm @ Rp. 70,000.00 = Rp. 24,500.00

6.000 Btg Dolken kayu Galam o - 8-10/4 m @ Rp. 17,600.00 = Rp. 105,600.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.330 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 9,240.00

0.033 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 940.50

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

33

Bahan :

0.030 Kayu Terentang @ Rp. 715,000.00 = Rp. 21,450.00

0.400 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 3,300.00

0.200 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 3,610.00

0.020 Balok kayu Borneo @ Rp. 880,000.00 = Rp. 17,600.00

0.350 Lbr Plywood Tebal 9 mm @ Rp. 70,000.00 = Rp. 24,500.00

3.000 Btg Dolken kayu Galam o - 8-10/4 m @ Rp. 17,600.00 = Rp. 52,800.00

4.000 Bh Formtie/ Penjaga jarak Bekisting/ Spacer @ Rp. = Rp. 0.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.330 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 9,240.00

0.033 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 940.50

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

34

Bahan :

0.030 Kayu Terentang @ Rp. 715,000.00 = Rp. 21,450.00

0.400 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 3,300.00

0.150 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 2,707.50

0.015 Balok kayu Borneo @ Rp. 880,000.00 = Rp. 13,200.00

1 M2 Pasangan Bekisting untuk Kolom

M3

M3

1 M2 Pasangan Bekisting untuk Balok

M3

M3

1 M2 Pasangan Bekisting untuk Lantai

M3

M3

1 M2 Pasangan Bekisting untuk Dinding

M3

M3

1 M2 Pasangan Bekisting untuk Tangga

M3

M3

Page 15: bayu (2) estiminasi

0.350 Lbr Plywood Tebal 9 mm @ Rp. 70,000.00 = Rp. 24,500.00

2.000 Btg Dolken kayu Galam o - 8-10/4 m @ Rp. 17,600.00 = Rp. 35,200.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.330 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 9,240.00

0.033 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 940.50

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

35

Bahan :

7.760 Zak Semen Portland @ Rp. 43,155.00 = Rp. 334,882.80

0.650 Pasir Beton @ Rp. 165,000.00 = Rp. 107,250.00

0.650 Koral Beton @ Rp. 137,500.00 = Rp. 89,375.00 = Rp.

Upah :

6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

1.000 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 30,000.00

0.100 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,150.00

0.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00 = Rp.

= Rp.

36

Bahan :

8.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 345,240.00

0.400 Pasir Beton @ Rp. 165,000.00 = Rp. 66,000.00

0.820 Koral Beton @ Rp. 137,500.00 = Rp. 112,750.00 = Rp.

Upah :

6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

1.000 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 30,000.00

0.100 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,150.00

0.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00 = Rp.

= Rp.

37

Bahan :

0.0264 Kayu Terentang @ Rp. 715,000.00 = Rp. 18,876.00

0.600 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 4,620.00

0.500 Btg Dolken kayu Galam o - 8-10/4 m @ Rp. 17,600.00 = Rp. 8,800.00 = Rp.

Upah :

0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.050 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 1,400.00

0.005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 157.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00 = Rp.

= Rp.

38

Bahan :

0.200 Kayu Terentang @ Rp. 715,000.00 = Rp. 143,000.00

1.500 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 11,550.00

0.400 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 7,220.00

150.000 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 877,500.00

2.250 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 29,250.00

6.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp.

Upah :

3.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 93,600.00

0.350 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 9,800.00

1.040 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 29,120.00

1.050 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 29,400.00

0.245 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 6,982.50

0.165 Oh Mandor @ Rp. 30,000.00 = Rp. 4,950.00 = Rp.

= Rp.

39

Bahan :

0.270 Kayu Terentang @ Rp. 715,000.00 = Rp. 193,050.00

2.000 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 15,400.00

1 M3 Membuat Beton dengan Mutu K225

M3

M3

1 M3 Membuat Beton dengan Mutu K275

M3

M3

1 M2 Pasangan Jembatan Cor

M3

1 M3 Membuat Pondasi Beton Bertulang (150 Kg Besi dan Bekisting)

M3

M3

M3

1 M3 Membuat Pondasi Beton Bertulang (200 Kg Besi dan Bekisting)

M3

Page 16: bayu (2) estiminasi

0.600 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 10,830.00

200.000 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 1,170,000.00

3.000 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 39,000.00

6.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp.

Upah :

4.850 Oh Pekerja @ Rp. 24,000.00 = Rp. 116,400.00

0.350 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 9,800.00

1.560 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 43,680.00

1.400 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 39,200.00

0.331 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 9,433.50

0.170 Oh Mandor @ Rp. 30,000.00 = Rp. 5,100.00 = Rp.

= Rp.

40

Bahan :

0.320 Kayu Terentang @ Rp. 715,000.00 = Rp. 228,800.00

3.200 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 24,640.00

1.600 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 28,880.00

200.000 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 1,170,000.00

3.000 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 39,000.00

6.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.140 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 123,200.00

2.800 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 196,000.00

16.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 281,600.00 = Rp.

Upah :

5.960 Oh Pekerja @ Rp. 24,000.00 = Rp. 143,040.00

0.350 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 9,800.00

2.800 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 78,400.00

1.400 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 39,200.00

0.455 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 12,967.50

0.208 Oh Mandor @ Rp. 30,000.00 = Rp. 6,240.00 = Rp.

= Rp.

41

Bahan :

0.320 Kayu Terentang @ Rp. 715,000.00 = Rp. 228,800.00

3.200 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 24,640.00

1.600 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 28,880.00

150.000 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 877,500.00

2.250 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 29,250.00

6.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.120 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 105,600.00

2.800 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 196,000.00

32.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 563,200.00 = Rp.

Upah :

5.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 139,200.00

0.350 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 9,800.00

2.800 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 78,400.00

1.050 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 29,400.00

0.420 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 11,970.00

0.185 Oh Mandor @ Rp. 30,000.00 = Rp. 5,550.00 = Rp.

= Rp.

42

Bahan :

0.240 Kayu Terentang @ Rp. 715,000.00 = Rp. 171,600.00

3.200 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 24,640.00

1.600 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 28,880.00

150.000 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 877,500.00

2.250 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 29,250.00

M3

M3

1 M3 Membuat Balok Beton Bertulang (200 Kg Besi dan Bekisting)

M3

M3

M3

M3

1 M3 Membuat Balok Beton Bertulang (150 Kg Besi dan Bekisting)

M3

M3

M3

M3

1 M3 Membuat Dinding Beton Bertulang (150 Kg Besi dan Bekisting)

M3

Page 17: bayu (2) estiminasi

6.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.160 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 140,800.00

2.800 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 196,000.00

24.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 422,400.00 = Rp.

Upah :

5.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 134,400.00

0.350 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 9,800.00

2.640 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 73,920.00

1.050 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 29,400.00

0.400 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 11,400.00

0.193 Oh Mandor @ Rp. 30,000.00 = Rp. 5,790.00 = Rp.

= Rp.

43

Bahan :

0.250 Kayu Terentang @ Rp. 715,000.00 = Rp. 178,750.00

3.000 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 23,100.00

1.200 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 21,660.00

200.000 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 1,170,000.00

3.000 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 39,000.00

6.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.105 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 92,400.00

2.500 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 175,000.00

14.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 246,400.00 = Rp.

Upah :

5.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 134,400.00

0.350 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 9,800.00

2.300 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 64,400.00

1.400 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 39,200.00

0.405 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 11,542.50

0.202 Oh Mandor @ Rp. 30,000.00 = Rp. 6,060.00 = Rp.

= Rp.

44 1 M' Membuat Kolom Penguat Beton Bertulang ( 11 x 11 ) Cm

Bahan :

0.002 Kayu Terentang @ Rp. 715,000.00 = Rp. 1,430.00

0.010 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 77.00

3.000 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 17,550.00

0.450 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 5,850.00

0.080 Zak Semen Portland @ Rp. 43,155.00 = Rp. 3,452.40

0.006 Pasir Beton @ Rp. 165,000.00 = Rp. 990.00

0.009 Koral Beton @ Rp. 137,500.00 = Rp. 1,237.50 = Rp.

Upah :

0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.020 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 560.00

0.020 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 560.00

0.020 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 560.00

0.006 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 171.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00 = Rp.

= Rp.

45 1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) Cm

Bahan :

0.003 Kayu Terentang @ Rp. 715,000.00 = Rp. 2,145.00

0.020 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 154.00

3.600 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 21,060.00

0.050 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 650.00

0.110 Zak Semen Portland @ Rp. 43,155.00 = Rp. 4,747.05

0.009 Pasir Beton @ Rp. 165,000.00 = Rp. 1,485.00

0.015 Koral Beton @ Rp. 137,500.00 = Rp. 2,062.50 = Rp.

Upah :

0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

M3

M3

M3

1 M3 Membuat Tangga Beton Bertulang (200 Kg Besi dan Bekisting)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 18: bayu (2) estiminasi

0.033 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 924.00

0.033 Oh Tukang Kayu @ Rp. 28,000.00 = Rp. 924.00

0.033 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 924.00

0.010 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 285.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 = Rp.

= Rp.

E ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALLUMINIUM

1 1 Kg Pasang Rangka Atap Baja

Bahan :

1.100 Kg Besi Profil WF @ Rp. 0.00 = Rp. 0.00

0.080 Kg Meni Besi @ Rp. 12,650.00 = Rp. 1,012.00 = Rp.

Upah :

0.006 Oh Tukang Besi @ Rp. 30,000.00 = Rp. 180.00

0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.0003 Oh Mandor @ Rp. 30,000.00 = Rp. 9.00 = Rp.

= Rp.

2

Bahan :

1.000 Pintu Besi Baja @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

0.650 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 19,500.00

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.065 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 2,047.50

0.032 Oh Mandor @ Rp. 30,000.00 = Rp. 960.00 = Rp.

= Rp.

3

Bahan :

1.000 Jendela Besi @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

1.050 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 31,500.00

1.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 25,200.00

0.105 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,307.50

0.00525 Oh Mandor @ Rp. 30,000.00 = Rp. 157.50 = Rp.

= Rp.

4

Bahan :

1.000 Jendela Besi Tahan Api @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

1.200 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 36,000.00

1.022 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,528.00

0.120 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,780.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

5

Bahan :

1.000 Pintu Gulung Besi @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

1.200 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 36,000.00

1.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 28,800.00

0.120 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,780.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp.

= Rp.

6

Bahan :

1.000 Pintu Lipat @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

1.050 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 31,500.00

1.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 25,200.00

0.105 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,307.50

0.0052 Oh Mandor @ Rp. 30,000.00 = Rp. 156.00 = Rp.

= Rp.

7

1 M2 Pasang Pintu Besi Baja

M2

1 M2 Pasang Jendela Besi

M2

1 M2 Pasang Jendela Besi Tahan Api

M2

1 M2 Pasang Pintu Gulung Besi

M2

1 M2 Pasang Pintu Lipat

M2

1 M2 Pasang Pintu Sunscreen Alluminium

Page 19: bayu (2) estiminasi

Bahan :

1.000 Sunscreen Alluminium @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

0.800 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 24,000.00

0.080 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,920.00

0.080 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 2,520.00

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00 = Rp.

= Rp.

8

Bahan :

1.000 Rolling Door @ Rp. = Rp. 0.00 = Rp.

Upah :

1.500 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 45,000.00

1.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 25,200.00

0.105 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,307.50

0.0052 Oh Mandor @ Rp. 30,000.00 = Rp. 156.00 = Rp.

= Rp.

9

Bahan :

1.000 Pintu Alluminium @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

1.050 Oh Tukang Besi Konstruksi @ Rp. 30,000.00 = Rp. 31,500.00

1.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 25,200.00

0.105 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,307.50

0.0052 Oh Mandor @ Rp. 30,000.00 = Rp. 156.00 = Rp.

= Rp.

10

Bahan :

1.000 Venetion Blinds @ Rp. = Rp. 0.00 = Rp.

Upah :

0.350 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 10,500.00

0.350 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,400.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.00175 Oh Mandor @ Rp. 30,000.00 = Rp. 52.50 = Rp.

= Rp.

11

Bahan :

1.000 Vertikal Blinds @ Rp. = Rp. 0.00 = Rp.

Upah :

0.350 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 10,500.00

0.350 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,400.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.00175 Oh Mandor @ Rp. 30,000.00 = Rp. 52.50 = Rp.

= Rp.

12

Bahan :

11.500 Besi Strip 2x3 @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

1.200 Oh Tukang Las @ Rp. 27,000.00 = Rp. 32,400.00

1.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 28,800.00

0.012 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 342.00

0.0006 Oh Mandor @ Rp. 30,000.00 = Rp. 18.00 = Rp.

= Rp.

13

Bahan :

1.100 Kawat Harmonika @ Rp. 75,000.00 = Rp. 82,500.00

0.020 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 165.00

0.0018 Kayu Kamper, Papan @ Rp. 715,000.00 = Rp. 1,287.00 = Rp.

Upah :

0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0005 Oh Mandor @ Rp. 30,000.00 = Rp. 15.00 = Rp.

M2

1 M2 Pasang Pintu Rolling Door

M2

1 M2 Pasang Pintu Alluminium

M2

1 M2 Pasang Venetions Blinds

M2

1 M2 Pasang Vertikal Blinds

M2

1 M2 Pasang Terali Besi

M'

1 M2 Pasang Kawat Harmonika

M2

M3

Page 20: bayu (2) estiminasi

= Rp.

14

Bahan :

1.100 Kawat Nyamuk @ Rp. 12,000.00 = Rp. 13,200.00

0.020 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 165.00

0.0018 Kayu Kamper, Papan @ Rp. 715,000.00 = Rp. 1,287.00 = Rp.

Upah :

0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0005 Oh Mandor @ Rp. 30,000.00 = Rp. 15.00 = Rp.

= Rp.

15

Bahan :

1.100 Kawat Nyamuk @ Rp. 12,000.00 = Rp. 13,200.00

0.020 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 165.00

0.0018 Kayu Kamper, Papan @ Rp. 715,000.00 = Rp. 1,287.00 = Rp.

Upah :

0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0005 Oh Mandor @ Rp. 30,000.00 = Rp. 15.00 = Rp.

= Rp.

16

Bahan :

1.100 Kawat Burung @ Rp. 13,000.00 = Rp. 14,300.00

0.020 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 165.00

0.0018 Kayu Kamper, Papan @ Rp. 715,000.00 = Rp. 1,287.00 = Rp.

Upah :

0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0005 Oh Mandor @ Rp. 30,000.00 = Rp. 15.00 = Rp.

= Rp.

17

Bahan :

1.100 Jendela Nako @ Rp. 27,500.00 = Rp. 30,250.00

0.020 Kg Paku Biasa 1/2" - 1" atau Skrup @ Rp. 8,250.00 = Rp. 165.00

0.025 Besi Strip @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.001 Oh Mandor @ Rp. 30,000.00 = Rp. 30.00 = Rp.

= Rp.

18 1 M' Pasang Talang Datar, Seng Bjls 28

Bahan :

0.500 Lbr Seng Plat 3'x6' Bjls 28 @ Rp. 26,400.00 = Rp. 13,200.00

0.015 Kg Paku Biasa 1/2" - 1" @ Rp. 19,600.00 = Rp. 294.00

0.0096 Kayu Borneo, Papan @ Rp. 715,000.00 = Rp. 6,864.00

0.250 Kg Flincote / Meni Besi @ Rp. 12,650.00 = Rp. 3,162.50 = Rp.

Upah :

0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.400 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 12,000.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.00125 Oh Mandor @ Rp. 30,000.00 = Rp. 37.50 = Rp.

= Rp.

19 1 M' Pasang Talang Miring, Seng Bjls 28

Bahan :

0.50 Lbr Seng Plat 3'x6' Bjls 28 @ Rp. 26,400.00 = Rp. 13,200.00

0.015 Kg Paku Biasa 1/2" - 1" @ Rp. 19,600.00 = Rp. 294.00

0.019 Kayu Borneo, Papan @ Rp. 715,000.00 = Rp. 13,585.00

0.300 Kg Flincote / Meni Besi @ Rp. 12,650.00 = Rp. 3,795.00 = Rp.

1 M2 Pasang Kawat Nyamuk

M2

M3

1 M2 Pasang Kawat Kassa

M2

M3

1 M2 Pasang Kawat Burung

M2

M3

1 M2 Pasang Jendela Nako dan Tralis

M2

M2

M3

M3

Page 21: bayu (2) estiminasi

Upah :

0.040 Oh Pekerja @ Rp. 24,000.00 = Rp. 960.00

0.400 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 12,000.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.00125 Oh Mandor @ Rp. 30,000.00 = Rp. 37.50 = Rp.

= Rp.

20 1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 28

Bahan :

0.300 Lbr Seng Plat 3'x6' Bjls 28 @ Rp. 26,400.00 = Rp. 7,920.00

0.100 Kg Paku Biasa 1/2" - 1" @ Rp. 19,600.00 = Rp. 1,960.00

0.019 Kayu Borneo, Papan @ Rp. 715,000.00 = Rp. 13,585.00

0.500 Kg Besi Strip @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.00125 Oh Mandor @ Rp. 30,000.00 = Rp. 37.50 = Rp.

= Rp.

21 1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 24

Bahan :

0.300 Lbr Seng Plat 3'x6' Bjls 24 @ Rp. 26,400.00 = Rp. 7,920.00

0.100 Kg Paku Biasa 1/2" - 1" @ Rp. 19,600.00 = Rp. 1,960.00

0.019 Kayu Borneo, Papan @ Rp. 715,000.00 = Rp. 13,585.00

0.500 Kg Besi Strip @ Rp. 0.00 = Rp. 0.00 = Rp.

Upah :

0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.00125 Oh Mandor @ Rp. 30,000.00 = Rp. 37.50 = Rp.

= Rp.

F ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

1

Bahan :

140.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 140,000.00

1.281 Zak Semen Portland @ Rp. 43,155.00 = Rp. 55,264.29

0.059 Pasir Pasang @ Rp. 145,000.00 = Rp. 8,555.00 = Rp.

Upah :

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 = Rp.

= Rp.

2

Bahan :

140.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 140,000.00

0.872 Zak Semen Portland @ Rp. 43,155.00 = Rp. 37,631.16

0.080 Pasir Pasang @ Rp. 145,000.00 = Rp. 11,600.00 = Rp.

Upah :

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 = Rp.

= Rp.

3

Bahan :

140.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 140,000.00

0.659 Zak Semen Portland @ Rp. 43,155.00 = Rp. 28,439.15

0.091 Pasir Pasang @ Rp. 145,000.00 = Rp. 13,195.00 = Rp.

Upah :

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 = Rp.

M3

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps

M3

Page 22: bayu (2) estiminasi

= Rp.

4

Bahan :

140.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 140,000.00

0.531 Zak Semen Portland @ Rp. 43,155.00 = Rp. 22,915.31

0.093 Pasir Pasang @ Rp. 145,000.00 = Rp. 13,485.00 = Rp.

Upah :

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 = Rp.

= Rp.

5

Bahan :

140.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 140,000.00

0.444 Zak Semen Portland @ Rp. 43,155.00 = Rp. 19,160.82

0.102 Pasir Pasang @ Rp. 145,000.00 = Rp. 14,790.00 = Rp.

Upah :

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 = Rp.

= Rp.

6

Bahan :

140.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 140,000.00

0.355 Zak Semen Portland @ Rp. 43,155.00 = Rp. 15,328.66

0.112 Pasir Pasang @ Rp. 145,000.00 = Rp. 16,240.00 = Rp.

Upah :

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 = Rp.

= Rp.

7

Bahan :

140.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 140,000.00

0.202 Zak Semen Portland @ Rp. 43,155.00 = Rp. 8,700.05

0.093 Pasir Pasang @ Rp. 145,000.00 = Rp. 13,412.50

0.0275 Kapur Pasang @ Rp. 165,000.00 = Rp. 4,537.50 = Rp.

Upah :

0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 = Rp.

= Rp.

8

Bahan :

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.556 Zak Semen Portland @ Rp. 43,155.00 = Rp. 23,994.18

0.028 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,060.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

9

Bahan :

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.379 Zak Semen Portland @ Rp. 43,155.00 = Rp. 16,355.75

0.038 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,510.00 = Rp.

Upah :

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6Ps

M3

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps

M3

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2Ps

M3

Page 23: bayu (2) estiminasi

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

10

Bahan :

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.287 Zak Semen Portland @ Rp. 43,155.00 = Rp. 12,402.75

0.040 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,800.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

11

Bahan :

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.230 Zak Semen Portland @ Rp. 43,155.00 = Rp. 9,925.65

0.043 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,235.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

12

Bahan :

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.194 Zak Semen Portland @ Rp. 43,155.00 = Rp. 8,354.81

0.045 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,525.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

13

Bahan :

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.166 Zak Semen Portland @ Rp. 43,155.00 = Rp. 7,180.99

0.049 Pasir Pasang @ Rp. 145,000.00 = Rp. 7,105.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

14

Bahan :

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

6.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 280,507.50

0.050 Pasir Pasang @ Rp. 145,000.00 = Rp. 7,250.00 = Rp.

Upah :

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp.

= Rp.

15

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

4.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 194,197.50

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps

Page 24: bayu (2) estiminasi

0.050 Pasir Pasang @ Rp. 145,000.00 = Rp. 7,250.00

0.015 Kapur Padam @ Rp. 165,000.00 = Rp. 2,475.00

Jumlah I Rp. 273,922.50

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 285,367.50

16

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

27.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 1,199,709.00

0.028 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,060.00

Jumlah I Rp. 1,273,769.00

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 1,285,214.00

17

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

18.950 Kg Semen Portland @ Rp. 43,155.00 = Rp. 817,787.25

0.038 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,510.00

Jumlah I Rp. 893,297.25

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 904,742.25

18

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

14.370 Kg Semen Portland @ Rp. 43,155.00 = Rp. 620,137.35

0.040 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,800.00

Jumlah I Rp. 695,937.35

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 707,382.35

19

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

11.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 496,282.50

0.043 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,235.00

M3

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps

M3

Page 25: bayu (2) estiminasi

Jumlah I Rp. 572,517.50

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 583,962.50

20

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

9.680 Kg Semen Portland @ Rp. 43,155.00 = Rp. 417,740.40

0.045 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,525.00

Jumlah I Rp. 494,265.40

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 505,710.40

21

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

8.320 Kg Semen Portland @ Rp. 43,155.00 = Rp. 359,049.60

0.049 Pasir Pasang @ Rp. 145,000.00 = Rp. 7,105.00

Jumlah I Rp. 436,154.60

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 447,599.60

22

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

6.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 280,507.50

0.050 Pasir Pasang @ Rp. 145,000.00 = Rp. 7,250.00

Jumlah I Rp. 357,757.50

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 369,202.50

23

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

4.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 194,197.50

0.050 Pasir Pasang @ Rp. 145,000.00 = Rp. 7,250.00

0.015 Kapur Padam @ Rp. 165,000.00 = Rp. 2,475.00

Jumlah I Rp. 273,922.50

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 285,367.50

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps

M3

M3

Page 26: bayu (2) estiminasi

24

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.018 Kg Semen Merah/Bata Merah Tumbuk @ Rp. 78,400.00 = Rp. 1,411.20

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

0.018 Kapur Padam @ Rp. 165,000.00 = Rp. 2,970.00

Jumlah I Rp. 76,991.20

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 88,436.20

25

Bahan 70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 1,000.00 = Rp. 70,000.00

0.014 Kg Semen Merah/Bata Merah Tumbuk @ Rp. 78,400.00 = Rp. 1,097.60

0.028 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,060.00

0.014 Kapur Padam @ Rp. 165,000.00 = Rp. 2,310.00

Jumlah I Rp. 77,467.60

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 88,912.60

26

Bahan 12.500 Bh Hollowblock Hb 20 @ Rp. = Rp. 0.00

13.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 582,592.50

0.048 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,960.00

1.950 Kg Besi Beton Polos @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 589,552.50

Tenaga 0.350 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,400.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.017 Oh Mandor @ Rp. 30,000.00 = Rp. 510.00

Jumlah II Rp. 13,882.50

Jumlah I + II Rp. 603,435.00

27

Bahan 12.500 Bh Hollowblock Hb 15 @ Rp. = Rp. 0.00

10.450 Kg Semen Portland @ Rp. 43,155.00 = Rp. 450,969.75

0.038 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,510.00

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps

M3

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps

M3

M3

1 M2 Pasangan Dinding Hollowblock ( Hb 20 )

M3

1 M2 Pasangan Dinding Hollowblock ( Hb 15 )

M3

Page 27: bayu (2) estiminasi

1.950 Besi Beton Polos @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 456,479.75

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 12,108.00

Jumlah I + II Rp. 468,587.75

28

Bahan 12.500 Bh Hollowblock Hb 10 @ Rp. = Rp. 0.00

7.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 323,662.50

0.027 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,915.00

1.950 Besi Beton Polos @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 327,577.50

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 11,445.00

Jumlah I + II Rp. 339,022.50

29

Bahan 12.500 Bh Concreate Block Cb 20 @ Rp. = Rp. 0.00

14.050 Kg Semen Portland @ Rp. 43,155.00 = Rp. 606,327.75

0.004 Pasir Beton @ Rp. 165,000.00 = Rp. 660.00

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

3.870 Kg Besi Beton Polos @ Rp. 0.00 = Rp. 0.00

0.006 Kg Paku Biasa 2 " - 5 " @ Rp. 9,350.00 = Rp. 56.10

0.001 Kayu Terentang @ Rp. 715,000.00 = Rp. 715.00

0.030 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 390.00

0.005 Koral Beton @ Rp. 165,000.00 = Rp. 825.00

Jumlah I Rp. 615,063.85

Tenaga 0.370 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,880.00

0.157 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 4,396.00

0.007 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 196.00

0.0164 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 467.40

0.0185 Oh Mandor @ Rp. 30,000.00 = Rp. 555.00

Jumlah II Rp. 14,494.40

Jumlah I + II Rp. 629,558.25

30

Bahan 12.500 Bh Concreate Block Cb 15 @ Rp. = Rp. 0.00

10.460 Kg Semen Portland @ Rp. 43,155.00 = Rp. 451,401.30

0.003 Pasir Beton @ Rp. 165,000.00 = Rp. 495.00

0.032 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,640.00

0.870 Kg Besi Beton Polos @ Rp. 0.00 = Rp. 0.00

0.004 Kg Paku Biasa 2 " - 5 " @ Rp. 9,350.00 = Rp. 37.40

0.001 Kg Kayu Terentang @ Rp. 715,000.00 = Rp. 715.00

0.020 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 260.00

0.004 Koral Beton @ Rp. 165,000.00 = Rp. 660.00

M3

1 M2 Pasangan Dinding Hollowblock ( Hb 10 )

M3

M3

1 M2 Pasangan Dinding Conblock ( Cb 20 )

M3

M3

M3

M3

1 M2 Pasangan Dinding Conblock ( Cb 15 )

M3

M3

M3

Page 28: bayu (2) estiminasi

Jumlah I Rp. 458,208.70

Tenaga 0.340 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,160.00

0.130 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 3,640.00

0.007 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 196.00

0.0137 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 390.45

0.0170 Oh Mandor @ Rp. 30,000.00 = Rp. 510.00

Jumlah II Rp. 12,896.45

Jumlah I + II Rp. 471,105.15

31

Bahan 12.500 Bh Concreate Block Cb 10 @ Rp. = Rp. 0.00

7.200 Kg Semen Portland @ Rp. 43,155.00 = Rp. 310,716.00

0.002 Pasir Beton @ Rp. 165,000.00 = Rp. 330.00

0.021 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,045.00

2.540 Kg Besi Beton Polos @ Rp. 0.00 = Rp. 0.00

0.003 Kg Paku Biasa 2 " - 5 " @ Rp. 9,350.00 = Rp. 28.05

0.001 Kg Kayu Terentang @ Rp. 715,000.00 = Rp. 715.00

0.015 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 195.00

0.003 Koral Beton @ Rp. 165,000.00 = Rp. 495.00

Jumlah I Rp. 315,524.05

Tenaga 0.340 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,160.00

0.107 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 2,996.00

0.007 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 196.00

0.0114 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 324.90

0.017 Oh Mandor @ Rp. 30,000.00 = Rp. 510.00

Jumlah II Rp. 12,186.90

Jumlah I + II Rp. 327,710.95

32

Bahan 2.500 Bh Bondbeam 40x20x20 Cm @ Rp. = Rp. 0.00

5.100 Kg Semen Portland @ Rp. 43,155.00 = Rp. 220,090.50

0.080 Pasir Beton @ Rp. 165,000.00 = Rp. 13,200.00

1.500 Kg Besi Beton Polos @ Rp. 0.00 = Rp. 0.00

0.150 Koral Beton @ Rp. 165,000.00 = Rp. 24,750.00

Jumlah I Rp. 258,040.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.030 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 840.00

0.030 Oh Tukang Besi @ Rp. 28,000.00 = Rp. 840.00

0.006 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 171.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 4,401.00

Jumlah I + II Rp. 262,441.50

33

Bahan 36.000 Bh Roster Terawang @ Rp. = Rp. 0.00

12.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 552,384.00

0.035 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,075.00

Jumlah I Rp. 557,459.00

1 M2 Pasangan Dinding Conblock ( Cb 10 )

M3

M3

M3

1 M2 Pasangan Dinding Lantai

M3

M3

1 M2 Pasangan Dinding Roster/Terawang (12x11x24)Cm

M3

Page 29: bayu (2) estiminasi

Tenaga 0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 10,965.00

Jumlah I + II Rp. 568,424.00

34

Bahan 80.000 Bh Bata Berongga @ Rp. 1,550.00 = Rp. 124,000.00

23.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 1,020,615.75

0.570 Pasir Pasang @ Rp. 145,000.00 = Rp. 82,650.00

Jumlah I Rp. 1,227,265.75

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 13,102.50

Jumlah I + II Rp. 1,240,368.25

35

Bahan 1.500 Bilik Bambu @ Rp. 11,000.00 = Rp. 16,500.00

0.014 Kayu 5/7 @ Rp. 880,000.00 = Rp. 12,320.00

0.012 Kg Paku @ Rp. 9,100.00 = Rp. 109.20

0.003 List Kayu 2/4 @ Rp. = Rp. 0.00

Jumlah I Rp. 28,929.20

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.050 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,500.00

0.005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 157.50

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00

Jumlah II Rp. 4,117.50

Jumlah I + II Rp. 33,046.70

G Analisa Biaya Konstruksi Pekerjaan Plesteran

1

Bahan 12.920 Kg Semen Portland @ Rp. 43,155.00 = Rp. 557,562.60

0.013 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,885.00

Jumlah I Rp. 559,447.60

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 569,520.10

2

Bahan 8.520 Kg Semen Portland @ Rp. 43,155.00 = Rp. 367,680.60

0.017 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,465.00

Jumlah I Rp. 370,145.60

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 380,218.10

3

Bahan 6.480 Kg Semen Portland @ Rp. 43,155.00 = Rp. 279,644.40

0.019 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,755.00

1 M2 Pasang Bata Berongga Ukuran (5x11x24) Cm

M3

1 M2 Pasang Dinding Anyaman Bambu, Rangka Kayu

M3

M3

M3

1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm

M3

Page 30: bayu (2) estiminasi

Jumlah I Rp. 282,399.40

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 292,471.90

4

Bahan 5.200 Kg Semen Portland @ Rp. 43,155.00 = Rp. 224,406.00

0.02 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,900.00

Jumlah I Rp. 227,306.00

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 237,378.50

5

Bahan 4.320 Kg Semen Portland @ Rp. 43,155.00 = Rp. 186,429.60

0.022 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,190.00

Jumlah I Rp. 189,619.60

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 199,692.10

6

Bahan 3.680 Kg Semen Portland @ Rp. 43,155.00 = Rp. 158,810.40

0.023 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,335.00

Jumlah I Rp. 162,145.40

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 172,217.90

7

Bahan 2.880 Kg Semen Portland @ Rp. 43,155.00 = Rp. 124,286.40

0.024 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,480.00

Jumlah I Rp. 127,766.40

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 6 Ps, Tebal 15 mm

M3

1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm

M3

Page 31: bayu (2) estiminasi

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 137,838.90

8

Bahan 5.760 Kg Semen Portland @ Rp. 43,155.00 = Rp. 248,572.80

0.003 Kapur Padam @ Rp. 27,500.00 = Rp. 82.50

0.013 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,885.00

Jumlah I Rp. 250,540.30

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 260,612.80

9

Bahan 1.840 Kg Semen Portland @ Rp. 43,155.00 = Rp. 79,405.20

0.006 Kapur Padam @ Rp. 27,500.00 = Rp. 165.00

0.014 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,030.00

Jumlah I Rp. 81,600.20

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 91,672.70

10

Bahan 3.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 129,465.00

0.005 Kapur Padam @ Rp. 27,500.00 = Rp. 137.50

0.019 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,755.00

Jumlah I Rp. 132,357.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 142,430.00

11

Bahan 0.009 Kg Semen Merah @ Rp. 78,400.00 = Rp. 705.60

0.009 Kapur Padam @ Rp. 27,500.00 = Rp. 247.50

0.009 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,305.00

Jumlah I Rp. 2,258.10

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

1 M2 Plesteran 1 Pc : 0.5 Kp : 3 Ps, Tebal 15 mm

M3

M3

1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, Tebal 15 mm

M3

M3

1 M2 Plesteran 0.5 Pc : 1 Kp : 4 Ps, Tebal 15 mm

M3

M3

1 M2 Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm

M3

M3

Page 32: bayu (2) estiminasi

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 12,330.60

12

Bahan 0.007 Kg Semen Merah @ Rp. 78,400.00 = Rp. 548.80

0.007 Kapur Padam @ Rp. 27,500.00 = Rp. 192.50

0.015 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,175.00

Jumlah I Rp. 2,916.30

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 10,072.50

Jumlah I + II Rp. 12,988.80

13

Bahan 14.280 Kg Semen Portland @ Rp. 43,155.00 = Rp. 616,253.40

0.023 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,335.00

Jumlah I Rp. 619,588.40

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 13,005.00

Jumlah I + II Rp. 632,593.40

14

Bahan 10.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 466,074.00

0.026 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,770.00

Jumlah I Rp. 469,844.00

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 13,005.00

Jumlah I + II Rp. 482,849.00

15

Bahan 8.680 Kg Semen Portland @ Rp. 43,155.00 = Rp. 374,585.40

0.028 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,060.00

Jumlah I Rp. 378,645.40

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 13,005.00

Jumlah I + II Rp. 391,650.40

16

1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 15 mm

M3

M3

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm

Page 33: bayu (2) estiminasi

Bahan 7.290 Kg Semen Portland @ Rp. 43,155.00 = Rp. 314,599.95

0.028 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,060.00

Jumlah I Rp. 318,659.95

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 13,005.00

Jumlah I + II Rp. 331,664.95

17

Bahan 6.240 Kg Semen Portland @ Rp. 43,155.00 = Rp. 269,287.20

0.030 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,350.00

Jumlah I Rp. 273,637.20

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 13,005.00

Jumlah I + II Rp. 286,642.20

18

Bahan 0.009 Kg Semen Merah @ Rp. 78,400.00 = Rp. 705.60

0.009 Kapur Padam @ Rp. 165,000.00 = Rp. 1,485.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

Jumlah I Rp. 4,800.60

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 13,005.00

Jumlah I + II Rp. 17,805.60

19

Bahan 15.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 668,902.50

0.013 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,885.00

Jumlah I Rp. 670,787.50

Tenaga 0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 14,220.00

Jumlah I + II Rp. 685,007.50

20

Bahan 11.750 Kg Semen Portland @ Rp. 43,155.00 = Rp. 507,071.25

0.035 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,075.00

Jumlah I Rp. 512,146.25

Tenaga 0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 14,220.00

Jumlah I + II Rp. 526,366.25

21

Bahan 9.480 Kg Semen Portland @ Rp. 43,155.00 = Rp. 409,109.40

0.038 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,510.00

M3

1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 20 mm

M3

M3

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 25 mm

M3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 25 mm

M3

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 25 mm

M3

Page 34: bayu (2) estiminasi

Jumlah I Rp. 414,619.40

Tenaga 0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 14,220.00

Jumlah I + II Rp. 428,839.40

22

Bahan 7.940 Kg Semen Portland @ Rp. 43,155.00 = Rp. 342,650.70

0.039 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,655.00

Jumlah I Rp. 348,305.70

Tenaga 0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 14,220.00

Jumlah I + II Rp. 362,525.70

23

Bahan 18.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 804,840.75

0.035 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,075.00

Jumlah I Rp. 809,915.75

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 16,417.50

Jumlah I + II Rp. 826,333.25

24

Bahan 14.150 Kg Semen Portland @ Rp. 43,155.00 = Rp. 610,643.25

0.039 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,655.00

Jumlah I Rp. 616,298.25

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 16,417.50

Jumlah I + II Rp. 632,715.75

25

Bahan 11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

Jumlah I Rp. 497,193.90

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 25 mm

M3

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 30 mm

M3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 30 mm

M3

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 30 mm

M3

Page 35: bayu (2) estiminasi

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 16,417.50

Jumlah I + II Rp. 513,611.40

26

Bahan 8.190 Kg Semen Portland @ Rp. 43,155.00 = Rp. 353,439.45

0.045 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,525.00

Jumlah I Rp. 359,964.45

Tenaga 0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.00

0.250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 16,417.50

Jumlah I + II Rp. 376,381.95

27

Bahan 7.070 Kg Semen Portland @ Rp. 43,155.00 = Rp. 305,105.85

0.021 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,045.00

Jumlah I Rp. 308,150.85

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.070 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 6,160.50

Jumlah I + II Rp. 314,311.35

28

Bahan 5.670 Kg Semen Portland @ Rp. 43,155.00 = Rp. 244,688.85

0.023 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,335.00

Jumlah I Rp. 248,023.85

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.070 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 6,160.50

Jumlah I + II Rp. 254,184.35

29

Bahan 9.300 Kg Semen Portland @ Rp. 43,155.00 = Rp. 401,341.50

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

Jumlah I Rp. 403,951.50

Tenaga 0.260 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,240.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 13,260.00

Jumlah I + II Rp. 417,211.50

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 30 mm

M3

1 M2 Barapen 1 Pc : 3 Ps, Tebal 30 mm

M3

1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm

M3

1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm

M3

Page 36: bayu (2) estiminasi

30

Bahan 7.070 Kg Semen Portland @ Rp. 43,155.00 = Rp. 305,105.85

0.021 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,045.00

Jumlah I Rp. 308,150.85

Tenaga 0.260 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,240.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 13,260.00

Jumlah I + II Rp. 321,410.85

31

Bahan 0.500 Kg Semen Portland @ Rp. 43,155.00 = Rp. 21,577.50

0.002 Pasir Pasang @ Rp. 145,000.00 = Rp. 290.00

Jumlah I Rp. 21,867.50

Tenaga 0.057 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,368.00

0.038 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,140.00

0.038 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,197.00

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00

Jumlah II Rp. 3,765.00

Jumlah I + II Rp. 25,632.50

32

Bahan 0.144 Kg Pc Warna @ Rp. 3,200.00 = Rp. 460.80

15.000 Kg Batu Granito @ Rp. = Rp. 0.00

Jumlah I Rp. 460.80

Tenaga 0.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.020 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 600.00

0.002 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 2,013.00

Jumlah I + II Rp. 2,473.80

33

Bahan 0.440 Kg Pc Warna @ Rp. 3,200.00 = Rp. 1,408.00

15.000 Kg Batu Teraso @ Rp. = Rp. 0.00

Jumlah I Rp. 1,408.00

Tenaga 0.450 Oh Pekerja @ Rp. 24,000.00 = Rp. 10,800.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.025 Oh Mandor @ Rp. 30,000.00 = Rp. 750.00

Jumlah II Rp. 18,180.00

Jumlah I + II Rp. 19,588.00

34

Bahan 4.320 Kg Semen Portland @ Rp. 43,155.00 = Rp. 186,429.60

0.016 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,320.00

1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm

M3

1 M2 Plesteran Skoning 1 Pc : 2 Ps

M3

1 M2 Plesteran Granito, 1 Pc Warna : 2 Granito, Tebal 10 mm

1 M2 Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, Tebal 10 mm

1 M2 Plesteran Ciprat 1 Pc : 2 Ps

M3

Page 37: bayu (2) estiminasi

Jumlah I Rp. 188,749.60

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 9,765.00

Jumlah I + II Rp. 198,514.60

35

Bahan 4.320 Kg Semen Portland @ Rp. 43,155.00 = Rp. 186,429.60

0.016 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,320.00

Jumlah I Rp. 188,749.60

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.070 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 6,160.50

Jumlah I + II Rp. 194,910.10

36

Bahan 0.500 Kg Semen Merah @ Rp. 78,400.00 = Rp. 39,200.00

2.900 Kg Batacote @ Rp. 1,210.00 = Rp. 3,509.00

0.006 Pasir Pasang @ Rp. 145,000.00 = Rp. 870.00

Jumlah I Rp. 43,579.00

Tenaga 0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.00

0.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.0150 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00

Jumlah II Rp. 14,280.00

Jumlah I + II Rp. 57,859.00

H Analisa Biaya Konstruksi Pekerjaan Kayu

1

Bahan 1.100 Kayu Jati @ Rp. 1,485,000.00 = Rp. 1,633,500.00

Jumlah I Rp. 1,633,500.00

Tenaga 6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

20.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 600,000.00

2.000 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63,000.00

0.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00

Jumlah II Rp. 816,000.00

Jumlah I + II Rp. 2,449,500.00

2

Bahan 1.200 Kayu kamper, Balok @ Rp. 880,000.00 = Rp. 1,056,000.00

Jumlah I Rp. 1,056,000.00

Tenaga 6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

18.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 540,000.00

2.000 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63,000.00

0.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00

Jumlah II Rp. 756,000.00

Jumlah I + II Rp. 1,812,000.00

3

Bahan 1.200 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 1,056,000.00

Jumlah I Rp. 1,056,000.00

1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps

M3

1 M2 Plesteran Waterfroof Batacote 3 Lapis

M3

1 M3 Pasang Kusen Pintu dan Jendela Kayu Jati

M3

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper

M3

1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo

M3

Page 38: bayu (2) estiminasi

Tenaga 6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

18.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 540,000.00

2.000 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63,000.00

0.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00

Jumlah II Rp. 756,000.00

Jumlah I + II Rp. 1,812,000.00

4

Bahan 1.200 Kayu Damar laut, Balok @ Rp. 880,000.00 = Rp. 1,056,000.00

Jumlah I Rp. 1,056,000.00

Tenaga 6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

18.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 540,000.00

2.000 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63,000.00

0.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00

Jumlah II Rp. 756,000.00

Jumlah I + II Rp. 1,812,000.00

5

Bahan 0.036 Kayu Kamper, Papan @ Rp. 1,200,000.00 = Rp. 43,200.00

0.050 Kg Paku Biasa 2" - 5 " @ Rp. 8,250.00 = Rp. 412.50

Jumlah I Rp. 43,612.50

Tenaga 0.350 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,400.00

1.050 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 31,500.00

0.105 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,307.50

0.018 Oh Mandor @ Rp. 30,000.00 = Rp. 540.00

Jumlah II Rp. 43,747.50

Jumlah I + II Rp. 87,360.00

6

Bahan 0.036 Kayu Borneo, Papan @ Rp. 1,200,000.00 = Rp. 43,200.00

0.050 Kg Paku Biasa 2" - 5 " @ Rp. 8,250.00 = Rp. 412.50

Jumlah I Rp. 43,612.50

Tenaga 0.350 Oh Pekerja @ Rp. 24,000.00 = Rp. 8,400.00

1.050 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 31,500.00

0.105 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,307.50

0.018 Oh Mandor @ Rp. 30,000.00 = Rp. 540.00

Jumlah II Rp. 43,747.50

Jumlah I + II Rp. 87,360.00

7

Bahan 0.040 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 58,000.00

Jumlah I Rp. 58,000.00

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

2.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 75,000.00

0.250 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 7,875.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00

Jumlah II Rp. 108,375.00

Jumlah I + II Rp. 166,375.00

1 M3 Pasang Kusen Pintu dan Jendela Kayu Damar Laut

M3

1 M2 Pasang Pintu Klam Kayu Kamper

M3

1 M2 Pasang Pintu Klam Kayu Borneo

M3

1 M2 Pasang Pintu Panel kayu jati

M3

Page 39: bayu (2) estiminasi

8

Bahan 0.040 Kayu Kamper, Papan @ Rp. 1,200,000.00 = Rp. 48,000.00

Jumlah I Rp. 48,000.00

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

2.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 75,000.00

0.250 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 7,875.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00

Jumlah II Rp. 108,375.00

Jumlah I + II Rp. 156,375.00

9

Bahan 0.035 Kayu Jati , Papan @ Rp. 1,450,000.00 = Rp. 50,750.00

Jumlah I Rp. 50,750.00

Tenaga 0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00

Jumlah II Rp. 86,700.00

Jumlah I + II Rp. 137,450.00

10

Bahan 0.035 Kayu Kamper , Papan @ Rp. 1,200,000.00 = Rp. 42,000.00

Jumlah I Rp. 42,000.00

Tenaga 0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00

Jumlah II Rp. 86,700.00

Jumlah I + II Rp. 128,700.00

11

Bahan 0.035 Kayu Borneo , Papan @ Rp. 1,200,000.00 = Rp. 42,000.00

Jumlah I Rp. 42,000.00

Tenaga 0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00

Jumlah II Rp. 86,700.00

Jumlah I + II Rp. 128,700.00

12

Bahan 0.064 Kayu Jati , Papan @ Rp. 1,450,000.00 = Rp. 92,800.00

Jumlah I Rp. 92,800.00

1 M2 Pasang Pintu Panel kamper jati

M3

1 M2 Pasang Pintu dan Jendela Kayu jati

M3

1 M2 Pasang Pintu dan Jendela Kayu Kamper

M3

1 M2 Pasang Pintu dan Jendela Kayu Borneo

M3

1 M2 Pasang Pintu dan Jendela Jalusi Kayu jati

M3

Page 40: bayu (2) estiminasi

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

3.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 90,000.00

0.300 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 9,450.00

0.500 Oh Mandor @ Rp. 30,000.00 = Rp. 15,000.00

Jumlah II Rp. 138,450.00

Jumlah I + II Rp. 231,250.00

13

Bahan 0.064 Kayu Kamper , Papan @ Rp. 1,200,000.00 = Rp. 76,800.00

Jumlah I Rp. 76,800.00

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

3.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 90,000.00

0.300 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 9,450.00

0.500 Oh Mandor @ Rp. 30,000.00 = Rp. 15,000.00

Jumlah II Rp. 138,450.00

Jumlah I + II Rp. 215,250.00

14

Bahan 0.0196 Kayu Jati , Papan @ Rp. 1,450,000.00 = Rp. 28,420.00

0.030 Kg Paku Biasa 1/2" - 1 " @ Rp. 8,250.00 = Rp. 247.50

0.300 Lt Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Plywood 4'x3'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00

Jumlah I Rp. 98,667.50

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 81,600.00

Jumlah I + II Rp. 180,267.50

15

Bahan 0.0196 Kayu Kamper , Papan @ Rp. 1,200,000.00 = Rp. 23,520.00

0.030 Kg Paku Biasa 1/2" - 1 " @ Rp. 8,250.00 = Rp. 247.50

0.300 Lt Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Plywood 4'x3'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00

Jumlah I Rp. 93,767.50

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 81,600.00

Jumlah I + II Rp. 175,367.50

16

Bahan 0.0196 Kayu Kamper , Papan @ Rp. 1,200,000.00 = Rp. 23,520.00

0.030 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 231.00

0.300 Lt Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Plywood 4'x3'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00

1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper

M3

1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Jati

M3

1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kamper

M3

1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Borneo

M3

Page 41: bayu (2) estiminasi

Jumlah I Rp. 93,751.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 81,600.00

Jumlah I + II Rp. 175,351.00

17

Bahan 0.060 Kayu Jati , Papan @ Rp. 1,450,000.00 = Rp. 87,000.00

0.150 Kg Paku Biasa 1/2" - 1" @ Rp. 7,700.00 = Rp. 1,155.00

Jumlah I Rp. 88,155.00

Tenaga 0.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 12,000.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.300 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 9,450.00

0.025 Oh Mandor @ Rp. 30,000.00 = Rp. 750.00

Jumlah II Rp. 82,200.00

Jumlah I + II Rp. 170,355.00

18

Bahan 0.060 Kayu Kamper , Papan @ Rp. 1,200,000.00 = Rp. 72,000.00

0.150 Kg Paku Biasa 1/2" - 1" @ Rp. 7,700.00 = Rp. 1,155.00

Jumlah I Rp. 73,155.00

Tenaga 0.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 12,000.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.300 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 9,450.00

0.025 Oh Mandor @ Rp. 30,000.00 = Rp. 750.00

Jumlah II Rp. 82,200.00

Jumlah I + II Rp. 155,355.00

19

Bahan 0.0196 Kayu Jati , Papan @ Rp. 1,450,000.00 = Rp. 28,420.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

0.300 Lt Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Teakwood 4'x8'x4 mm @ Rp. 67,000.00 = Rp. 67,000.00

Jumlah I Rp. 97,730.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 81,600.00

Jumlah I + II Rp. 179,330.00

20

Bahan 0.0196 Kayu Kamper , Papan @ Rp. 1,200,000.00 = Rp. 23,520.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

0.300 Lt Lem Kayu @ Rp. = Rp. 0.00

1 M2 Pasang Jalusi Mati Kusen kayu Jati

M3

1 M2 Pasang Jalusi Mati Kusen kayu Kamper

M3

1 M2 Pasang Pintu Teakwood Rangkap, Rangka Kayu Jati

M3

1 M2 Pasang Pintu Teakwood Rangkap, Rangka Kayu Kamper

M3

Page 42: bayu (2) estiminasi

1.000 Lbr Teakwood4'x8'x4 mm @ Rp. 67,000.00 = Rp. 67,000.00

Jumlah I Rp. 92,830.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

2.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 60,000.00

0.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 6,300.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 81,600.00

Jumlah I + II Rp. 174,430.00

21

Bahan 0.0196 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 28,420.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

0.800 Ltr Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Plywood 4'x8'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00

0.500 Lbr Formika @ Rp. 85,000.00 = Rp. 42,500.00

Jumlah I Rp. 143,230.00

Tenaga 0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

2.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 75,000.00

0.250 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 7,875.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00

Jumlah II Rp. 103,275.00

Jumlah I + II Rp. 246,505.00

22

Bahan 0.0196 Kayu Kamper, Papan @ Rp. 1,200,000.00 = Rp. 23,520.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

0.800 Ltr Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Plywood 4'x8'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00

0.500 Lbr Formika 4' x 3' @ Rp. 85,000.00 = Rp. 42,500.00

Jumlah I Rp. 138,330.00

Tenaga 0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

2.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 75,000.00

0.250 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 7,875.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00

Jumlah II Rp. 103,275.00

Jumlah I + II Rp. 241,605.00

23

Bahan 0.0196 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 28,420.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

0.800 Ltr Lem Kayu @ Rp. = Rp. 0.00

0.500 Lbr Teakwood 4'x8'x4 mm @ Rp. 67,000.00 = Rp. 33,500.00

0.500 Lbr Formika 4' x 8' @ Rp. 85,000.00 = Rp. 42,500.00

Jumlah I Rp. 106,730.00

Tenaga 0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

2.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 75,000.00

0.250 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 7,875.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00

Jumlah II Rp. 103,275.00

Jumlah I + II Rp. 210,005.00

24

Bahan 0.0196 Kayu Kamper, Papan @ Rp. 1,200,000.00 = Rp. 23,520.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

1 M2 Pasang Pintu Plywood dan Formika, Rangka Kayu Jati

M3

1 M2 Pasang Pintu Plywood dan Formika, Rangka Kayu Kamper

M3

1 M2 Pasang Pintu Teakwood dan Formika, Rangka Kayu Jati

M3

1 M2 Pasang Pintu Teakwood dan Formika, Rangka Kayu Kamper

M3

Page 43: bayu (2) estiminasi

0.800 Ltr Lem Kayu @ Rp. = Rp. 0.00

0.500 Lbr Teakwood 4'x8'x4 mm @ Rp. 67,000.00 = Rp. 33,500.00

0.500 Ltr Vernis @ Rp. 22,000.00 = Rp. 11,000.00

0.500 Lbr Formika 4' x 8' @ Rp. 85,000.00 = Rp. 42,500.00

Jumlah I Rp. 112,830.00

Tenaga 0.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 19,200.00

2.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 75,000.00

0.250 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 7,875.00

0.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00

Jumlah II Rp. 103,275.00

Jumlah I + II Rp. 216,105.00

25

Bahan 0.0196 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 28,420.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

1.200 Ltr Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Plywood 4'x8'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00

1.000 Lbr Formika 4' x 8' @ Rp. 85,000.00 = Rp. 85,000.00

Jumlah I Rp. 185,730.00

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

2.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 78,000.00

0.260 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 8,190.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00

Jumlah II Rp. 111,690.00

Jumlah I + II Rp. 297,420.00

26

Bahan 0.0196 Kayu Kamper, Papan @ Rp. 1,200,000.00 = Rp. 23,520.00

0.300 Kg Paku Biasa 1/2" - 1 " @ Rp. 7,700.00 = Rp. 2,310.00

1.200 Ltr Lem Kayu @ Rp. = Rp. 0.00

1.000 Lbr Plywood 4'x8'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00

1.000 Lbr Formika 4' x 8' @ Rp. 85,000.00 = Rp. 85,000.00

Jumlah I Rp. 180,830.00

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

2.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 78,000.00

0.260 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 8,190.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00

Jumlah II Rp. 111,690.00

Jumlah I + II Rp. 292,520.00

27

Bahan 1.100 Kayu Jati, Balok @ Rp. 1,800,000.00 = Rp. 1,980,000.00

15.000 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.00

0.800 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 7,480.00

Jumlah I Rp. 2,287,480.00

Tenaga 4.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 96,000.00

12.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 360,000.00

1.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 37,800.00

0.200 Oh Mandor @ Rp. 30,000.00 = Rp. 6,000.00

Jumlah II Rp. 499,800.00

Jumlah I + II Rp. 2,787,280.00

1 M2 Pasang Pintu Formika Double, Rangka Kayu Jati

M3

1 M2 Pasang Pintu Formika Double, Rangka Kayu Kamper

M3

1 M3 Pasang Konstruksi Kuda - Kuda Kayu Jati

M3

Page 44: bayu (2) estiminasi

28

Bahan 1.100 Kayu Kamper, Balok @ Rp. 1,200,000.00 = Rp. 1,320,000.00

15.000 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.00

0.800 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 7,480.00

Jumlah I Rp. 1,627,480.00

Tenaga 4.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 96,000.00

12.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 360,000.00

1.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 37,800.00

0.200 Oh Mandor @ Rp. 30,000.00 = Rp. 6,000.00

Jumlah II Rp. 499,800.00

Jumlah I + II Rp. 2,127,280.00

29

Bahan 1.100 Kayu Borneo, Balok @ Rp. 1,200,000.00 = Rp. 1,320,000.00

15.000 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.00

0.800 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 7,480.00

Jumlah I Rp. 1,627,480.00

Tenaga 4.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 96,000.00

12.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 360,000.00

1.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 37,800.00

0.200 Oh Mandor @ Rp. 30,000.00 = Rp. 6,000.00

Jumlah II Rp. 499,800.00

Jumlah I + II Rp. 2,127,280.00

30

Bahan 1.100 Kayu Kruing, Balok @ Rp. 1,200,000.00 = Rp. 1,320,000.00

15.000 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.00

0.800 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 7,480.00

Jumlah I Rp. 1,627,480.00

Tenaga 4.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 96,000.00

12.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 360,000.00

1.200 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 37,800.00

0.200 Oh Mandor @ Rp. 30,000.00 = Rp. 6,000.00

Jumlah II Rp. 499,800.00

Jumlah I + II Rp. 2,127,280.00

31

Bahan 0.012 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 10,560.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

Jumlah I Rp. 11,962.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 5,865.00

Jumlah I + II Rp. 17,827.50

32

Bahan 0.012 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 10,560.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

Jumlah I Rp. 11,962.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper

M3

1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo

M3

1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kruing

M3

1 M2 Pasang Kaso dan Reng Genteng Kodok kayu Kamper

M3

1 M2 Pasang Kaso dan Reng Genteng Kodok kayu Borneo

M3

Page 45: bayu (2) estiminasi

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 5,865.00

Jumlah I + II Rp. 17,827.50

33

Bahan 0.014 Kayu Jati, Balok @ Rp. 1,600,000.00 = Rp. 22,400.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

Jumlah I Rp. 23,802.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 5,865.00

Jumlah I + II Rp. 29,667.50

34

Bahan 0.014 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 12,320.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

Jumlah I Rp. 13,722.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 5,865.00

Jumlah I + II Rp. 19,587.50

35

Bahan 0.014 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 12,320.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

Jumlah I Rp. 13,722.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 5,865.00

Jumlah I + II Rp. 19,587.50

36

Bahan 0.165 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 145,200.00

0.200 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,870.00

Jumlah I Rp. 147,070.00

Tenaga 0.120 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,880.00

0.120 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 7,038.00

Jumlah I + II Rp. 154,108.00

37

Bahan 0.165 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 145,200.00

0.200 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,870.00

Jumlah I Rp. 147,070.00

Tenaga 0.120 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,880.00

0.120 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 7,038.00

Jumlah I + II Rp. 154,108.00

1 M2 Pasang Kaso dan Reng Genteng Monier kayu Jati

M3

1 M2 Pasang Kaso dan Reng Genteng Monier kayu Kamper

M3

1 M2 Pasang Kaso dan Reng Genteng Beton kayu Borneo

M3

1 M2 Pasang Kaso dan Reng Atap Sirap kayu Kamper

M3

1 M2 Pasang Kaso dan Reng Atap Sirap kayu Borneo

M3

Page 46: bayu (2) estiminasi

38

Bahan 0.012 Kayu Jati, Balok @ Rp. 1,600,000.00 = Rp. 19,200.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

Jumlah I Rp. 20,135.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00

Jumlah II Rp. 14,137.50

Jumlah I + II Rp. 34,272.50

39

Bahan 0.012 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 10,560.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

Jumlah I Rp. 11,495.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00

Jumlah II Rp. 14,137.50

Jumlah I + II Rp. 25,632.50

40

Bahan 0.012 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 10,560.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

Jumlah I Rp. 11,495.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00

Jumlah II Rp. 14,137.50

Jumlah I + II Rp. 25,632.50

41

Bahan 0.023 Kayu Jati, Balok @ Rp. 1,600,000.00 = Rp. 36,800.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

Jumlah I Rp. 38,202.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.300 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 9,000.00

0.030 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 945.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 15,045.00

Jumlah I + II Rp. 53,247.50

42

Bahan 0.023 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 20,240.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu jati

M3

1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper

M3

1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Borneo

M3

1 M2 Pasang Rangka Langit - langit (30x60) Cm, Kayu Jati

M3

1 M2 Pasang Rangka Langit - langit (30x60) Cm, Kayu Kamper

M3

Page 47: bayu (2) estiminasi

Jumlah I Rp. 21,642.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.300 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 9,000.00

0.030 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 945.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 15,045.00

Jumlah I + II Rp. 36,687.50

43

Bahan 0.023 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 20,240.00

0.150 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,402.50

Jumlah I Rp. 21,642.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.300 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 9,000.00

0.030 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 945.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 15,045.00

Jumlah I + II Rp. 36,687.50

44

Bahan 0.027 Kayu Jati, Balok @ Rp. 1,600,000.00 = Rp. 43,200.00

0.200 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,870.00

Jumlah I Rp. 45,070.00

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.350 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 17,977.50

Jumlah I + II Rp. 63,047.50

45

Bahan 0.027 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 23,760.00

0.200 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,870.00

Jumlah I Rp. 25,630.00

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.350 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 17,977.50

Jumlah I + II Rp. 43,607.50

46

Bahan 0.027 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 23,760.00

0.200 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 1,870.00

Jumlah I Rp. 25,630.00

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.350 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 10,500.00

1 M2 Pasang Rangka Langit - langit (30x60) Cm, Kayu Borneo

M3

1 M2 Pasang Rangka Langit - langit (30x30) Cm, Kayu Jati

M3

1 M2 Pasang Rangka Langit - langit (30x30) Cm, Kayu Kamper

M3

1 M2 Pasang Rangka Langit - langit (30x30) Cm, Kayu Borneo

M3

Page 48: bayu (2) estiminasi

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 17,977.50

Jumlah I + II Rp. 43,607.50

47 1 M' Pasang Lisplang (3x20) Cm, Kayu Jati

Bahan 0.0072 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 10,440.00

0.050 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 467.50

Jumlah I Rp. 10,907.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.0050 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 9,337.50

Jumlah I + II Rp. 20,245.00

48 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper

Bahan 0.0072 Kayu Kamper, Papan @ Rp. 800,000.00 = Rp. 5,760.00

0.050 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 467.50

Jumlah I Rp. 6,227.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.0050 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 9,337.50

Jumlah I + II Rp. 15,565.00

49 1 M' Pasang Lisplang (3x30) Cm, Kayu Jati

Bahan 0.011 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 15,950.00

0.050 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 467.50

Jumlah I Rp. 16,417.50

Tenaga 0.110 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,640.00

0.220 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,600.00

0.022 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 693.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 10,083.00

Jumlah I + II Rp. 26,500.50

50 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper

Bahan 0.011 Kayu Kamper, Papan @ Rp. 800,000.00 = Rp. 8,800.00

0.050 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 467.50

Jumlah I Rp. 9,267.50

Tenaga 0.110 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,640.00

0.220 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,600.00

0.022 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 693.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 10,083.00

Jumlah I + II Rp. 19,350.50

M3

M3

M3

M3

Page 49: bayu (2) estiminasi

51 1 M' Pasang Lisplang Ukuran 2x(3x20) Cm, Kayu Kamper

Bahan 0.0145 Kayu Kamper, Papan @ Rp. 800,000.00 = Rp. 11,600.00

0.060 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 561.00

Jumlah I Rp. 12,161.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00

Jumlah II Rp. 14,137.50

Jumlah I + II Rp. 26,298.50

52 1 M' Pasang Lisplang Ukuran 2x(2x20) Cm, Kayu Kamper

Bahan 0.0086 Kayu Kamper, Papan @ Rp. 800,000.00 = Rp. 6,880.00

0.060 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 561.00

Jumlah I Rp. 7,441.00

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00

Jumlah II Rp. 7,215.00

Jumlah I + II Rp. 14,656.00

53 1 M' Pasang Lisplang Ukuran 2x(2x20) Cm, Kayu Borneo

Bahan 0.0088 Kayu Borneo, Papan @ Rp. 800,000.00 = Rp. 7,040.00

0.060 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 561.00

Jumlah I Rp. 7,601.00

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00

Jumlah II Rp. 7,215.00

Jumlah I + II Rp. 14,816.00

54

Bahan 0.0195 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 17,160.00

0.007 Kayu Kamper, Papan @ Rp. 800,000.00 = Rp. 5,600.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

Jumlah I Rp. 23,695.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.450 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00

Jumlah II Rp. 20,767.50

Jumlah I + II Rp. 44,462.50

55

Bahan 0.0195 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 17,160.00

0.007 Kayu Borneo, Papan @ Rp. 800,000.00 = Rp. 5,600.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

Jumlah I Rp. 23,695.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.450 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00

Jumlah II Rp. 20,767.50

Jumlah I + II Rp. 44,462.50

M3

M3

M3

1 M2 Pasang Rangka Dinding Pemisah Kayu kamper

M3

M3

1 M2 Pasang Rangka Dinding Pemisah Kayu Borneo

M3

M3

Page 50: bayu (2) estiminasi

56

Bahan 0.0195 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 17,160.00

0.007 Kayu Kamper, Papan @ Rp. 800,000.00 = Rp. 5,600.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

Jumlah I Rp. 23,695.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.450 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00

Jumlah II Rp. 20,767.50

Jumlah I + II Rp. 44,462.50

57

Bahan 0.0195 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 17,160.00

0.007 Kayu Kamper, Papan @ Rp. 800,000.00 = Rp. 5,600.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

0.560 Kg Lem Kayu @ Rp. = Rp. 0.00

1.000 Kg Plywood 4'x8'x4mm @ Rp. 70,000.00 = Rp. 70,000.00

Jumlah I Rp. 93,695.00

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 18,000.00

0.060 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,890.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 24,990.00

Jumlah I + II Rp. 118,685.00

58

Bahan 0.007 Kayu Jati, Balok @ Rp. 1,450,000.00 = Rp. 10,150.00

0.100 Kg Paku Biasa 2" - 5" @ Rp. 9,350.00 = Rp. 935.00

0.150 Kg Paku Skrup 3,5" @ Rp. 7,150.00 = Rp. 1,072.50

Jumlah I Rp. 12,157.50

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

1.800 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 54,000.00

0.180 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 5,670.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 74,970.00

Jumlah I + II Rp. 87,127.50

59

Bahan 0.400 Plywood 4'x8'x4mm @ Rp. 70,000.00 = Rp. 28,000.00

0.050 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 412.50

Jumlah I Rp. 28,412.50

Tenaga 0.025 Oh Pekerja @ Rp. 24,000.00 = Rp. 600.00

0.075 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,250.00

0.0075 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 236.25

0.0013 Oh Mandor @ Rp. 30,000.00 = Rp. 39.00

Jumlah II Rp. 3,125.25

Jumlah I + II Rp. 31,537.75

60 1 M' Pasang List Plafon - Kayu Profil

1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu kamper

M3

M3

1 M2 Pasang Dinding Pemisah Pluwood Rangkap, Rangka Kayu kamper

M3

M3

1 M2 Pasang Dinding Lambrizing dari Papan jati

M3

1 M2 Pasang Plywood Tebal 4 mm, untuk Dinding

M3

Page 51: bayu (2) estiminasi

Bahan 1.050 M' Kayu Profil @ Rp. 5,000.00 = Rp. 5,250.00

Jumlah I Rp. 5,250.00

Tenaga 0.021 Oh Pekerja @ Rp. 24,000.00 = Rp. 504.00

0.021 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 630.00

0.002 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63.00

0.001 Oh Mandor @ Rp. 30,000.00 = Rp. 30.00

Jumlah II Rp. 1,227.00

Jumlah I + II Rp. 6,477.00

I Analisa Biaya Konstruksi Pekerjaan Kunci dan Kaca

1 1 Buah Pasang Kunci Tanam Antik

Bahan 1.000 Bh Kunci Tanam Antik @ Rp. 86,000.00 = Rp. 86,000.00

Jumlah I Rp. 86,000.00

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 18,000.00

0.060 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,890.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 21,420.00

Jumlah I + II Rp. 107,420.00

2 1 Buah Pasang Kunci Tanam Biasa

Bahan 1.000 Bh Kunci Tanam Biasa @ Rp. 50,550.00 = Rp. 50,550.00

Jumlah I Rp. 50,550.00

Tenaga 0.010 Oh Pekerja @ Rp. 24,000.00 = Rp. 240.00

0.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 15,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 15,705.00

Jumlah I + II Rp. 66,255.00

3 1 Buah Pasang Kunci Tanam Kamar Mandi

Bahan 1.000 Bh Kunci Tanam Kamar Mandi @ Rp. 50,550.00 = Rp. 50,550.00

Jumlah I Rp. 50,550.00

Tenaga 0.005 Oh Pekerja @ Rp. 24,000.00 = Rp. 120.00

0.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 15,000.00

0.005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 157.50

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 15,352.50

Jumlah I + II Rp. 65,902.50

4 1 Buah Pasang Kunci Silinder

Bahan 1.000 Bh Kunci Silinder @ Rp. 44,000.00 = Rp. 44,000.00

Jumlah I Rp. 44,000.00

Tenaga 0.005 Oh Pekerja @ Rp. 24,000.00 = Rp. 120.00

0.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 15,000.00

0.005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 157.50

0.00025 Oh Mandor @ Rp. 30,000.00 = Rp. 7.50

Jumlah II Rp. 15,285.00

Jumlah I + II Rp. 59,285.00

5 1 Buah Pasang Engsel Pintu

Page 52: bayu (2) estiminasi

Bahan 1.000 Bh Engsel Pintu @ Rp. 7,200.00 = Rp. 7,200.00

Jumlah I Rp. 7,200.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 12,555.00

6 1 Buah Pasang Engsel Jendela Kupu - Kupu

Bahan 1.000 Bh Engsel Jendela @ Rp. 8,000.00 = Rp. 8,000.00

Jumlah I Rp. 8,000.00

Tenaga 0.010 Oh Pekerja @ Rp. 24,000.00 = Rp. 240.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0005 Oh Mandor @ Rp. 30,000.00 = Rp. 15.00

Jumlah II Rp. 3,570.00

Jumlah I + II Rp. 11,570.00

7 1 Buah Pasang Engsel Angin

Bahan 1.000 Bh Engsel Angin @ Rp. 8,000.00 = Rp. 8,000.00

Jumlah I Rp. 8,000.00

Tenaga 0.010 Oh Pekerja @ Rp. 24,000.00 = Rp. 240.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0005 Oh Mandor @ Rp. 30,000.00 = Rp. 15.00

Jumlah II Rp. 3,570.00

Jumlah I + II Rp. 11,570.00

8 1 Buah Pasang Sping Knip

Bahan 1.000 Bh Sping Knip @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 5,355.00

9 1 Buah Pasang Kait Angin

Bahan 1.000 Bh Kait Angin @ Rp. 8,000.00 = Rp. 8,000.00

Jumlah I Rp. 8,000.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 13,355.00

10 1 Buah Pasang Door Closer

Bahan 1.000 Bh Door Closer @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Page 53: bayu (2) estiminasi

Tenaga 0.05 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 15,000.00

0.05 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 17,850.00

Jumlah I + II Rp. 17,850.00

11 1 Buah Pasang Kunci Selot

Bahan 1.000 Bh Kunci Selot @ Rp. 1,100.00 = Rp. 1,100.00

Jumlah I Rp. 1,100.00

Tenaga 0.020 Oh Pekerja @ Rp. 24,000.00 = Rp. 480.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.001 Oh Mandor @ Rp. 30,000.00 = Rp. 30.00

Jumlah II Rp. 7,140.00

Jumlah I + II Rp. 8,240.00

12 1 Buah Pasang Pegangan Pintu / Door Holder

Bahan 1.000 Bh Door Holder @ Rp. Engsel Kupu - Kup = Rp. #VALUE!

Jumlah I Rp. #VALUE!

Tenaga 0.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 15,000.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 17,850.00

Jumlah I + II Rp. #VALUE!

13 1 Buah Pasang Door Stop

Bahan 1.000 Bh Door Stop @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.010 Oh Pekerja @ Rp. 24,000.00 = Rp. 240.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0005 Oh Mandor @ Rp. 30,000.00 = Rp. 15.00

Jumlah II Rp. 3,570.00

Jumlah I + II Rp. 3,570.00

14 1 Buah Pasang Rel Pintu Dorong

Bahan 1.000 Bh Rel Pintu Dorong @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 18,000.00

0.060 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,890.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 21,420.00

Jumlah I + II Rp. 21,420.00

15 1 Buah Pasang Kunci Lemari

Bahan 1.000 Bh Kunci Lemari @ Rp. 44,000.00 = Rp. 44,000.00

Jumlah I Rp. 44,000.00

Tenaga 0.025 Oh Pekerja @ Rp. 24,000.00 = Rp. 600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.00125 Oh Mandor @ Rp. 30,000.00 = Rp. 37.50

Jumlah II Rp. 8,925.00

Jumlah I + II Rp. 52,925.00

Page 54: bayu (2) estiminasi

16

Bahan 1.100 Kaca @ Rp. 27,500.00 = Rp. 30,250.00

Jumlah I Rp. 30,250.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 35,605.00

17

Bahan 1.100 Kaca @ Rp. 130,200.00 = Rp. 143,220.00

Jumlah I Rp. 143,220.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 148,575.00

18

Bahan 1.100 Kaca Polos @ Rp. 44,000.00 = Rp. 48,400.00

Jumlah I Rp. 48,400.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 53,755.00

19

Bahan 1.100 Kaca Buram @ Rp. 130,200.00 = Rp. 143,220.00

0.050 Kg Sealent @ Rp. = Rp. 0.00

Jumlah I Rp. 143,220.00

Tenaga 0.025 Oh Pekerja @ Rp. 24,000.00 = Rp. 600.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.00125 Oh Mandor @ Rp. 30,000.00 = Rp. 37.50

Jumlah II Rp. 8,925.00

Jumlah I + II Rp. 152,145.00

20

Bahan 1.100 Kaca Cermin @ Rp. 130,200.00 = Rp. 143,220.00

Jumlah I Rp. 143,220.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 148,575.00

21

1 M2 Buah Pasang Kaca, Tebal 3 mm

M2

1 M2 Buah Pasang Kaca, Tebal 5 mm

M2

1M2 Buah Pasang Kaca, Tebal 8 mm

M2

1M2 Buah Pasang Kaca Buram , Tebal 12 mm

M2

1M2 Buah Pasang Kaca Cermin , Tebal 5 mm

M2

1M2 Buah Pasang Kaca Cermin , Tebal 6 mm

Page 55: bayu (2) estiminasi

Bahan 1.100 Kaca Cermin @ Rp. 130,200.00 = Rp. 143,220.00

Jumlah I Rp. 143,220.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 148,575.00

22

Bahan 1.100 Kaca Cermin @ Rp. 130,200.00 = Rp. 143,220.00

Jumlah I Rp. 143,220.00

Tenaga 0.0165 Oh Pekerja @ Rp. 24,000.00 = Rp. 396.00

0.165 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,950.00

0.0165 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 519.75

0.0008 Oh Mandor @ Rp. 30,000.00 = Rp. 24.00

Jumlah II Rp. 5,889.75

Jumlah I + II Rp. 149,109.75

23

Bahan 1.100 Kaca Wireglass @ Rp. 49,500.00 = Rp. 143,220.00

Jumlah I Rp. 143,220.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 148,575.00

24

Bahan 1.100 Kaca Wireglass @ Rp. 49,500.00 = Rp. 143,220.00

Jumlah I Rp. 143,220.00

Tenaga 0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50

Jumlah II Rp. 5,355.00

Jumlah I + II Rp. 148,575.00

J Analisa Biaya Konstruksi Pekerjaan Langit - Langit

1

Bahan 1.100 Lbr Pelat Asbes Tebal 6 mm @ Rp. 24,000.00 = Rp. 26,400.00

0.010 Kg Paku @ Rp. 9,350.00 = Rp. 93.50

Jumlah I Rp. 26,493.50

Tenaga 0.030 Oh Pekerja @ Rp. 24,000.00 = Rp. 720.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.0015 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00

Jumlah II Rp. 3,085.50

Jumlah I + II Rp. 29,579.00

2

Bahan 1.100 Lbr Pelat Asbes Tebal 5 mm @ Rp. 24,000.00 = Rp. 26,400.00

M2

1M2 Buah Pasang Kaca Cermin , Tebal 8 mm

M2

1M2 Buah Pasang Kaca Wireglass , Tebal 5 mm

M2

1M2 Buah Pasang Kaca Patri , Tebal 5 mm

M2

1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 6 mm

1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 5 mm

Page 56: bayu (2) estiminasi

0.010 Kg Paku @ Rp. 9,350.00 = Rp. 93.50

Jumlah I Rp. 26,493.50

Tenaga 0.030 Oh Pekerja @ Rp. 24,000.00 = Rp. 720.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.0015 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00

Jumlah II Rp. 3,085.50

Jumlah I + II Rp. 29,579.00

3

Bahan 1.100 Lbr Pelat Asbes Tebal 4 mm @ Rp. 24,000.00 = Rp. 26,400.00

0.010 Kg Paku @ Rp. 9,350.00 = Rp. 93.50

Jumlah I Rp. 26,493.50

Tenaga 0.030 Oh Pekerja @ Rp. 24,000.00 = Rp. 720.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.0015 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00

Jumlah II Rp. 3,085.50

Jumlah I + II Rp. 29,579.00

4

Bahan 1.100 Lbr Pelat Asbes Tebal 3.5 mm @ Rp. 24,000.00 = Rp. 26,400.00

0.010 Kg Paku @ Rp. 9,350.00 = Rp. 93.50

Jumlah I Rp. 26,493.50

Tenaga 0.030 Oh Pekerja @ Rp. 24,000.00 = Rp. 720.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.0015 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00

Jumlah II Rp. 3,085.50

Jumlah I + II Rp. 29,579.00

5

Bahan 5.800 Lbr Akustik ukuran 30x30 Cm @ Rp. 54,000.00 = Rp. 313,200.00

0.050 Kg Paku @ Rp. 7,700.00 = Rp. 385.00

Jumlah I Rp. 313,585.00

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

1.00 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 30,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 31,845.00

Jumlah I + II Rp. 345,430.00

6

Bahan 5.800 Lbr Akustik ukuran 30x60 Cm @ Rp. 54,000.00 = Rp. 313,200.00

0.050 Kg Paku @ Rp. 7,700.00 = Rp. 385.00

Jumlah I Rp. 313,585.00

1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 4 mm

1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 3.5 mm

1 M2 Langit - langit Akustik (30x30) Cm

1 M2 Langit - langit Akustik (30x60) Cm

Page 57: bayu (2) estiminasi

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

1.00 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 30,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 31,845.00

Jumlah I + II Rp. 345,430.00

7

Bahan 1.500 Lbr Akustik Arm Strong ukuran 60x120 Cm @ Rp. 54,000.00 = Rp. 81,000.00

0.050 Kg Paku @ Rp. 7,700.00 = Rp. 385.00

Jumlah I Rp. 81,385.00

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

1.00 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 30,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 31,845.00

Jumlah I + II Rp. 113,230.00

8

Bahan 0.360 Lbr Plywood 4"x8"x4 mm @ Rp. 70,000.00 = Rp. 25,200.00

0.030 Kg Paku @ Rp. 7,700.00 = Rp. 231.00

Jumlah I Rp. 25,431.00

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0035 Oh Mandor @ Rp. 30,000.00 = Rp. 105.00

Jumlah II Rp. 5,100.00

Jumlah I + II Rp. 30,531.00

9

Bahan 0.360 Lbr Plywood 4"x8"x6 mm @ Rp. 70,000.00 = Rp. 25,200.00

0.030 Kg Paku @ Rp. 9,350.00 = Rp. 280.50

Jumlah I Rp. 25,480.50

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0035 Oh Mandor @ Rp. 30,000.00 = Rp. 105.00

Jumlah II Rp. 5,100.00

Jumlah I + II Rp. 30,580.50

10

Bahan 0.375 Lbr Plywood 4"x8"x4 mm @ Rp. 70,000.00 = Rp. 26,250.00

0.030 Kg Paku @ Rp. 9,350.00 = Rp. 280.50

Jumlah I Rp. 26,530.50

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0035 Oh Mandor @ Rp. 30,000.00 = Rp. 105.00

Jumlah II Rp. 5,100.00

Jumlah I + II Rp. 31,630.50

1 M2 Langit - langit Akustik (60x120) Cm

1 M2 Langit - langit Plywood (30x60) Cm, Tebal 4 mm

1 M2 Langit - langit Plywood (30x60) Cm, Tebal 6 mm

1 M2 Langit - langit Plywood (60x120) Cm, Tebal 4 mm

Page 58: bayu (2) estiminasi

11

Bahan 0.375 Lbr Plywood 4"x8"x6 mm @ Rp. 70,000.00 = Rp. 26,250.00

0.030 Kg Paku @ Rp. 9,350.00 = Rp. 280.50

Jumlah I Rp. 26,530.50

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0035 Oh Mandor @ Rp. 30,000.00 = Rp. 105.00

Jumlah II Rp. 5,100.00

Jumlah I + II Rp. 31,630.50

12

Bahan 0.360 Lbr Teakwood 4"x8"x4 mm @ Rp. 67,000.00 = Rp. 24,120.00

0.030 Kg Paku @ Rp. 9,350.00 = Rp. 280.50

Jumlah I Rp. 24,400.50

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0035 Oh Mandor @ Rp. 30,000.00 = Rp. 105.00

Jumlah II Rp. 5,100.00

Jumlah I + II Rp. 29,500.50

13

Bahan 0.375 Lbr Teakwood 4"x8"x4 mm @ Rp. 67,000.00 = Rp. 25,125.00

0.030 Kg Paku @ Rp. 9,350.00 = Rp. 280.50

Jumlah I Rp. 25,405.50

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.0035 Oh Mandor @ Rp. 30,000.00 = Rp. 105.00

Jumlah II Rp. 5,100.00

Jumlah I + II Rp. 30,505.50

14

Bahan 0.024 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 34,800.00

0.010 Kg Paku @ Rp. 7,700.00 = Rp. 77.00

0.050 Kg Paku Sekrup @ Rp. 7,150.00 = Rp. 357.50

Jumlah I Rp. 35,234.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 18,000.00

0.060 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,890.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 24,990.00

Jumlah I + II Rp. 60,224.50

15

Bahan 0.024 Kayu Ramin @ Rp. 990,000.00 = Rp. 23,760.00

0.010 Kg Paku @ Rp. 7,700.00 = Rp. 77.00

0.050 Kg Paku Sekrup @ Rp. 7,150.00 = Rp. 357.50

Jumlah I Rp. 24,194.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 18,000.00

0.060 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,890.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 24,990.00

1 M2 Langit - langit Plywood (60x120) Cm, Tebal 6 mm

1 M2 Langit - langit Teakwood (30x60) Cm, Tebal 4 mm

1 M2 Langit - langit Teakwood (60x120) Cm, Tebal 4 mm

1 M2 Langit - langit Lat Kayu Jati

M3

1 M2 Langit - langit Lat Kayu Ramin

M3

Page 59: bayu (2) estiminasi

Jumlah I + II Rp. 49,184.50

16

Bahan 0.024 Kayu Kamper, Papan @ Rp. 990,000.00 = Rp. 23,760.00

0.010 Kg Paku @ Rp. 7,700.00 = Rp. 77.00

0.050 Kg Paku Sekrup @ Rp. 7,150.00 = Rp. 357.50

Jumlah I Rp. 24,194.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.600 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 18,000.00

0.060 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,890.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 24,990.00

Jumlah I + II Rp. 49,184.50

17

Bahan 0.350 Lbr Kayu Kamper, Papan @ Rp. 990,000.00 = Rp. 346,500.00

0.030 Kg Paku Biasa @ Rp. 7,700.00 = Rp. 231.00

Jumlah I Rp. 346,731.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 17,805.00

Jumlah I + II Rp. 364,536.00

18

Bahan 3.600 M' Profi Alluminium "T" @ Rp. 80,000.00 = Rp. 288,000.00

0.150 Kg Kawat Seng Polos @ Rp. 13,000.00 = Rp. 1,950.00

1.000 Bh Ramset/ Dina Bolt @ Rp. = Rp. 0.00

1.500 Lbr Akustik Arm Strong 60x120 Cm @ Rp. 54,000.00 = Rp. 81,000.00

Jumlah I Rp. 370,950.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.500 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 15,000.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.0075 Oh Mandor @ Rp. 30,000.00 = Rp. 225.00

Jumlah II Rp. 20,400.00

Jumlah I + II Rp. 391,350.00

19

Bahan 1.100 M' List Kayu Profil @ Rp. 5,000.00 = Rp. 5,500.00

0.010 Kg Paku @ Rp. 7,700.00 = Rp. 77.00

Jumlah I Rp. 5,577.00

Tenaga 0.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.050 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 1,500.00

0.005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 157.50

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 2,947.50

Jumlah I + II Rp. 8,524.50

20

Bahan 0.012 Kayu Borneo, Balok @ Rp. 880,000.00 = Rp. 10,560.00

0.060 Kg Paku Biasa @ Rp. 7,700.00 = Rp. 462.00

1 M2 Langit - langit Lat Kayu Kamper

M3

1 M2 Langit - langit Soft Board

1 M2 Langit - langit Akustik 60x120 Cm dan Rangka alluminium

1 M1 List Langit - langit Kayu Profil

1 M2 List Langit - langit Asbes (1.00x1.00) m, Tebal 3.2 mm, Rangka Borneo

M3

Page 60: bayu (2) estiminasi

1.100 Lbr Asbes 1.00x1.00 m @ Rp. 24,000.00 = Rp. 26,400.00

Jumlah I Rp. 37,422.00

Tenaga 0.180 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,320.00

0.320 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 9,600.00

0.320 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 10,080.00

0.009 Oh Mandor @ Rp. 30,000.00 = Rp. 270.00

Jumlah II Rp. 24,270.00

Jumlah I + II Rp. 61,692.00

21

Bahan 0.023 Kayu Borneo @ Rp. 880,000.00 = Rp. 20,240.00

0.060 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 462.00

0.390 Lbr Plywood 4"x8"x4 mm @ Rp. 70,000.00 = Rp. 27,300.00

Jumlah I Rp. 48,002.00

Tenaga 0.270 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,480.00

0.400 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 12,000.00

0.040 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,260.00

0.0135 Oh Mandor @ Rp. 30,000.00 = Rp. 405.00

Jumlah II Rp. 20,145.00

Jumlah I + II Rp. 68,147.00

22

Bahan 0.023 Kayu Borneo @ Rp. 880,000.00 = Rp. 20,240.00

0.060 Kg Paku Biasa @ Rp. 7,700.00 = Rp. 462.00

5.800 Lbr Akustik 30x60 Cm @ Rp. 54,000.00 = Rp. 313,200.00

Jumlah I Rp. 333,902.00

Tenaga 0.260 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,240.00

0.400 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 12,000.00

0.040 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,260.00

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 19,890.00

Jumlah I + II Rp. 353,792.00

23

Bahan 0.027 Kayu Borneo @ Rp. 880,000.00 = Rp. 23,760.00

0.060 Kg Paku Biasa @ Rp. 7,700.00 = Rp. 462.00

11.500 Lbr Akustik 30x30 Cm @ Rp. 54,000.00 = Rp. 621,000.00

Jumlah I Rp. 645,222.00

Tenaga 0.310 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,440.00

0.470 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 14,100.00

0.047 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,480.50

0.0155 Oh Mandor @ Rp. 30,000.00 = Rp. 465.00

Jumlah II Rp. 23,485.50

Jumlah I + II Rp. 668,707.50

24

Bahan 0.364 Lbr Gypsum Board (120x240x9) @ Rp. = Rp. 0.00

0.110 Kg Paku Sekrup @ Rp. 7,150.00 = Rp. 786.50

Jumlah I Rp. 786.50

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.050 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 1,500.00

1 M2 List Langit - langit Plywood 4 mm dan Rangka Kayu Borneo

M3

1 M2 List Langit - langit Akustik (30x60) Cm dan Rangka Kayu Borneo

M3

1 M2 List Langit - langit Akustik (30x30) Cm dan Rangka Kayu Borneo

M3

1 M2 List Langit - langit Gypsum Board, Tebal 9 mm

Page 61: bayu (2) estiminasi

0.005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 157.50

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 4,207.50

Jumlah I + II Rp. 4,994.00

K Analisa Biaya Konstruksi Pekerjaan Penutup Atap

1

Bahan 25.000 Bh Genteng Pelentong @ Rp. 2,500.00 = Rp. 62,500.00

Jumlah I Rp. 62,500.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.075 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,250.00

0.008 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 252.00

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 6,342.00

Jumlah I + II Rp. 68,842.00

2

Bahan 25.000 Bh Genteng Kodok @ Rp. 2,500.00 = Rp. 62,500.00

Jumlah I Rp. 62,500.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.075 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,250.00

0.008 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 252.00

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 6,342.00

Jumlah I + II Rp. 68,842.00

3

Bahan 12.000 Bh Genteng Kodok @ Rp. 2,500.00 = Rp. 30,000.00

Jumlah I Rp. 30,000.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.060 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 1,800.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 5,829.00

Jumlah I + II Rp. 35,829.00

4

Bahan 5.000 Bh Genteng Bubungan Pelentong @ Rp. 2,500.00 = Rp. 12,500.00

8.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 345,240.00

0.032 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,640.00

Jumlah I Rp. 362,380.00

Tenaga 0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00

Jumlah II Rp. 16,290.00

Jumlah I + II Rp. 378,670.00

1 M2 Pasang Atap Genteng Pelentong Kecil

1 M2 Pasang Atap Genteng Kodok / Glazzur

1 M2 Pasang Atap Genteng Pelentong Super / Besar

1 M2 Pasang Genteng Bubungan Palentong

M3

Page 62: bayu (2) estiminasi

5 1 M' Pasang Bubung Genteng Kodok Glazuur

Bahan 5.000 Bh Genteng Bubungan Kodok @ Rp. 2,500.00 = Rp. 12,500.00

8.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 345,240.00

0.032 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,640.00

Jumlah I Rp. 362,380.00

Tenaga 0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00

Jumlah II Rp. 16,290.00

Jumlah I + II Rp. 378,670.00

6 1 M' Pasang Bubung Genteng Palentong Besar

Bahan 4.000 Bh Genteng Bubungan Pelentong @ Rp. 2,500.00 = Rp. 10,000.00

8.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 345,240.00

0.032 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,640.00

Jumlah I Rp. 359,880.00

Tenaga 0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00

Jumlah II Rp. 16,290.00

Jumlah I + II Rp. 376,170.00

7

Bahan 0.600 Lbr Roof Light Fiberglass @ Rp. = Rp. 0.00

0.050 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 412.50

Jumlah I Rp. 412.50

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 6,213.00

8

Bahan 0.500 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 33,000.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 34,092.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.075 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,250.00

0.008 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 252.00

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 6,102.00

Jumlah I + II Rp. 40,194.00

9

Bahan 0.600 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 39,600.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 40,692.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.075 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,250.00

0.008 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 252.00

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 6,102.00

Jumlah I + II Rp. 46,794.00

10

Bahan 0.600 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 39,600.00

M3

M3

1 M2 Pasang Roof Ligt Fiberglass ( 180 x 90 ) Cm

1 M2 Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) x 5 mm

1 M2 Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) x 5 mm

1 M2 Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) x 5 mm

Page 63: bayu (2) estiminasi

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 40,692.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,890.50

Jumlah I + II Rp. 46,582.50

11

Bahan 0.750 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 49,500.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 50,592.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,890.50

Jumlah I + II Rp. 56,482.50

12

Bahan 0.350 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 23,100.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 24,192.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,890.50

Jumlah I + II Rp. 30,082.50

13

Bahan 0.420 Lbr Asbes Gelombang @ Rp. 55,000.00 = Rp. 23,100.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 24,192.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,890.50

Jumlah I + II Rp. 30,082.50

14

Bahan 0.440 Lbr Asbes Gelombang @ Rp. 39,600.00 = Rp. 17,424.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 18,516.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

1 M2 Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) x 5 mm

1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.05 m ) x 4 mm

1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.05 m ) x 4 mm

1 M2 Pasang Atap Asbes Gelombang ( 2.40 x 1.05 m ) x 4 mm

Page 64: bayu (2) estiminasi

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 24,316.50

15

Bahan 0.510 Lbr Asbes Gelombang @ Rp. 33,000.00 = Rp. 16,830.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 17,922.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 23,722.50

16

Bahan 0.800 Lbr Asbes Gelombang @ Rp. 24,000.00 = Rp. 19,200.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 20,292.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 26,092.50

17

Bahan 0.370 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 24,420.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 25,512.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 31,312.50

18

Bahan 0.380 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 25,080.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 26,172.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 31,972.50

1 M2 Pasang Atap Asbes Gelombang ( 2.10 x 1.05 m ) x 4 mm

1 M2 Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) x 4 mm

1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) x 6 mm

1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.08 m ) x 6 mm

Page 65: bayu (2) estiminasi

19

Bahan 0.460 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 30,360.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 31,452.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 37,252.50

20

Bahan 0.490 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 32,340.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 33,432.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 39,232.50

21

Bahan 0.570 Lbr Asbes Gelombang @ Rp. 66,000.00 = Rp. 37,620.00

0.120 Kg Paku Pancing 60 x 230 @ Rp. 9,100.00 = Rp. 1,092.00

Jumlah I Rp. 38,712.00

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.067 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,010.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 5,800.50

Jumlah I + II Rp. 44,512.50

22 1 M' Pasang Bubungan Stel Gelombang 0.92 m

Bahan 2.400 Lbr Bubungan Stel Gelombang @ Rp. 24,000.00 = Rp. 57,600.00

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 100,500.00

Tenaga 0.084 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,016.00

0.125 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 6,295.50

Jumlah I + II Rp. 106,795.50

23 1 M' Pasang Nok Stel Gelombang 1.05 m

Bahan 2.100 Lbr Nok Stel Gelombang @ Rp. 24,000.00 = Rp. 50,400.00

1 M2 Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) x 6 mm

1 M2 Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) x 6 mm

1 M2 Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) x 6 mm

Page 66: bayu (2) estiminasi

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 93,300.00

Tenaga 0.084 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,016.00

0.125 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 6,295.50

Jumlah I + II Rp. 99,595.50

24 1 M' Pasang Nok Stel Gelombang 1.08 m

Bahan 2.050 Lbr Nok Stel Gelombang @ Rp. 24,000.00 = Rp. 49,200.00

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 92,100.00

Tenaga 0.084 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,016.00

0.125 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 6,295.50

Jumlah I + II Rp. 98,395.50

25 1 M' Pasang Nok Paten 0.92 m

Bahan 1.200 Lbr Nok Paten @ Rp. 24,000.00 = Rp. 28,800.00

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 71,700.00

Tenaga 0.084 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,016.00

0.125 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 6,295.50

Jumlah I + II Rp. 77,995.50

26 1 M' Pasang Nok Paten 1.05 m

Bahan 1.200 Lbr Nok Paten @ Rp. 24,000.00 = Rp. 28,800.00

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 71,700.00

Tenaga 0.084 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,016.00

0.125 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 6,295.50

Jumlah I + II Rp. 77,995.50

27 1 M' Pasang Nok Paten 1.08 m

Bahan 1.200 Lbr Nok Paten @ Rp. 24,000.00 = Rp. 28,800.00

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 71,700.00

Tenaga 0.084 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,016.00

0.125 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 6,295.50

Jumlah I + II Rp. 77,995.50

28 1 M' Pasang Nok Stel Rata 0.92 m

Bahan 1.100 Lbr Nok Stel Rata @ Rp. 24,000.00 = Rp. 26,400.00

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 69,300.00

Page 67: bayu (2) estiminasi

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 7,429.50

Jumlah I + II Rp. 76,729.50

29 1 M' Pasang Nok Stel Rata 1.05 m

Bahan 1.100 Lbr Nok Stel Rata @ Rp. 24,000.00 = Rp. 26,400.00

6.000 Bh Paku Sekrup 3,5" @ Rp. 7,150.00 = Rp. 42,900.00

Jumlah I Rp. 69,300.00

Tenaga 0.084 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,016.00

0.125 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 6,295.50

Jumlah I + II Rp. 75,595.50

30

Bahan 11.000 Bh Genteng Beton @ Rp. 2,500.00 = Rp. 27,500.00

0.030 Kg Paku 2" - 5" @ Rp. 9,350.00 = Rp. 280.50

Jumlah I Rp. 27,780.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 8,415.00

Jumlah I + II Rp. 36,195.50

31

Bahan 6.900 Lbr Genteng Aspal @ Rp. 4,000.00 = Rp. 27,600.00

0.350 Lbr Plywood 4"x 8"x 6 mm @ Rp. 70,000.00 = Rp. 24,500.00

0.030 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 247.50

0.500 Bh Plastic Aerator @ Rp. = Rp. 0.00

Jumlah I Rp. 52,347.50

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.300 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 9,000.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 14,194.50

Jumlah I + II Rp. 66,542.00

32

Bahan 1.020 Bh Genteng Metal @ Rp. 35,000.00 = Rp. 35,700.00

0.200 Kg Paku 2" - 5" @ Rp. 9,350.00 = Rp. 1,870.00

Jumlah I Rp. 37,570.00

Tenaga 0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.00

0.100 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,000.00

1 M2 Pasang Atap Genteng Beton

1 M2 Pasang Atap Genteng Aspal

1 M2 Pasang Atap Genteng Metal

Page 68: bayu (2) estiminasi

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 8,415.00

Jumlah I + II Rp. 45,985.00

33

Bahan 60.000 Bh Genteng Sirap @ Rp. = Rp. 0.00

0.200 Kg Paku 1/2" - 1" @ Rp. 8,250.00 = Rp. 1,650.00

Jumlah I Rp. 1,650.00

Tenaga 0.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 0.00

0.166 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,980.00

0.250 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 7,875.00

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 13,095.00

Jumlah I + II Rp. 14,745.00

34 1 M' Pasang Nok Genteng Beton

Bahan 3.500 Bh Genteng Sirap @ Rp. = Rp. 0.00

0.050 Kg Paku 2" x 5" @ Rp. 9,350.00 = Rp. 467.50

10.800 Kg Semen Abu - abu @ Rp. = Rp. 0.00

0.032 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,640.00

1.000 Kg Semen Warna @ Rp. 3,200.00 = Rp. 3,200.00

Jumlah I Rp. 8,307.50

Tenaga 0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.00

0.200 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 6,000.00

0.020 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 630.00

0.020 Oh Mandor @ Rp. 30,000.00 = Rp. 600.00

Jumlah II Rp. 16,830.00

Jumlah I + II Rp. 25,137.50

35 1 M' Pasang Nok Genteng Aspal

Bahan 2.000 Bh Genteng Aspal @ Rp. 4,000.00 = Rp. 8,000.00

0.050 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 412.50

0.0035 Kayu Borneo Balok @ Rp. 880,000.00 = Rp. 3,080.00

Jumlah I Rp. 11,492.50

Tenaga 0.125 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,000.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.50

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 11,467.50

Jumlah I + II Rp. 22,960.00

36 1 M' Pasang Nok Genteng Metal

Bahan 1.100 Bh Genteng Derca Bond @ Rp. 35,000.00 = Rp. 38,500.00

0.050 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 412.50

Jumlah I Rp. 38,912.50

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.150 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 11,362.50

Jumlah I + II Rp. 50,275.00

1 M2 Pasang Atap Sirap

M3

M3

Page 69: bayu (2) estiminasi

37 1 M' Pasang Nok Sirap

Bahan 0.400 Lbr Seng Plat 3"x 6" Bjls 28 @ Rp. 31,000.00 = Rp. 12,400.00

0.060 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 495.00

0.050 Kg Paku Biasa 2" - 5" @ Rp. 7,700.00 = Rp. 385.00

0.004 Kayu Borneo, Papan Tebal 3 Cm @ Rp. 990,000.00 = Rp. 3,960.00

Jumlah I Rp. 17,240.00

Tenaga 0.125 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,000.00

0.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 12,255.00

Jumlah I + II Rp. 29,495.00

38

Bahan 0.700 Lbr Seng Gelombang 3"x 6" Bjls 28 @ Rp. 26,400.00 = Rp. 18,480.00

0.020 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 165.00

Jumlah I Rp. 18,645.00

Tenaga 0.120 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,880.00

0.060 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 1,800.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 5,049.00

Jumlah I + II Rp. 23,694.00

39

Bahan 0.300 Lbr Seng Plat 3"x 6" Bjls 28 @ Rp. 31,000.00 = Rp. 9,300.00

0.040 Kg Paku Biasa 1/2" - 1" @ Rp. 8,250.00 = Rp. 330.00

Jumlah I Rp. 9,630.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.070 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.00

0.008 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 252.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 6,132.00

Jumlah I + II Rp. 15,762.00

40

Bahan 1.050 Atap Alluminium Gelombang Tebal 0.55 @ Rp. = Rp. 0.00

0.020 Kg Paku Hak Panjang 15 Cm @ Rp. 9,350.00 = Rp. 187.00

Jumlah I Rp. 187.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.750 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 22,500.00

0.008 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 252.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 26,532.00

Jumlah I + II Rp. 26,719.00

41

Bahan 1.200 Nok Standar 40 Cm 18, Swg 22 @ Rp. 31,000.00 = Rp. 37,200.00

0.040 Kg Paku Hak Panjang 15 Cm @ Rp. 9,350.00 = Rp. 374.00

Jumlah I Rp. 37,574.00

M3

1 M2 Pasang Atap Seng Gelombang

1 M2 Pasang Atap Nok Seng

1 M2 Pasang Atap Alluminium

M2

1 M2 Pasang Nok Alluminium

M2

Page 70: bayu (2) estiminasi

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

1.000 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 30,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 33,015.00

Jumlah I + II Rp. 70,589.00

42

Bahan 1.050 Sisalation / Alluminium Foil @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.050 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 1,500.00

0.005 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 157.50

0.008 Oh Mandor @ Rp. 30,000.00 = Rp. 240.00

Jumlah II Rp. 5,497.50

Jumlah I + II Rp. 5,497.50

L Analisa Biaya Konstruksi Pekerjaan Penutup Lantai dan Dinding

1

Bahan 6.630 Bh Ubin Abu - Abu 40 x 40 Cm @ Rp. 0.00 = Rp. 0.00

9.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 422,919.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

Jumlah I Rp. 426,036.50

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 436,389.50

2

Bahan 11.870 Bh Ubin Abu - Abu 30 x 30 Cm @ Rp. 0.00 = Rp. 0.00

10.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 431,550.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

Jumlah I Rp. 434,667.50

Tenaga 0.260 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,240.00

0.125 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,750.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 393.75

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 10,773.75

Jumlah I + II Rp. 445,441.25

3

Bahan 26.500 Bh Ubin Abu - Abu 20 x 20 Cm @ Rp. 0.00 = Rp. 0.00

10.400 Kg Semen Portland @ Rp. 43,155.00 = Rp. 448,812.00

0.0135 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,957.50

Jumlah I Rp. 450,769.50

Tenaga 0.270 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,480.00

0.130 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,900.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.0135 Oh Mandor @ Rp. 30,000.00 = Rp. 405.00

Jumlah II Rp. 11,194.50

Jumlah I + II Rp. 461,964.00

4

Bahan 6.63 Bh Ubin Warna 40 x 40 Cm @ Rp. 0.00 = Rp. 0.00

8.16 Kg Semen Portland @ Rp. 43,155.00 = Rp. 352,144.80

0.023 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,335.00

0.900 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

1 M2 Pasang Alluminium Foil / Sisalation

M2

1 M2 Pasang Lantai Ubin Pc Abu - Abu Ukuran 40x40 Cm

M3

1 M2 Pasang Lantai Ubin Pc Abu - Abu Ukuran 30x30 Cm

M3

1 M2 Pasang Lantai Ubin Pc Abu - Abu Ukuran 20x20 Cm

M3

1 M2 Pasang Lantai Ubin Warna Ukuran 40x40 Cm

M3

Page 71: bayu (2) estiminasi

Jumlah I Rp. 355,479.80

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 365,832.80

5

Bahan 11.87 Bh Ubin Warna 30 x 30 Cm @ Rp. 0.00 = Rp. 0.00

8.36 Kg Semen Portland @ Rp. 43,155.00 = Rp. 360,775.80

0.023 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,335.00

0.900 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 364,110.80

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 374,463.80

6

Bahan 26.500 Bh Ubin Warna 20 x 20 Cm @ Rp. 0.00 = Rp. 0.00

8.760 Kg Semen Portland @ Rp. 43,155.00 = Rp. 378,037.80

0.023 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,335.00

0.900 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 381,372.80

Tenaga 0.270 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,480.00

0.130 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,900.00

0.013 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 409.50

0.0135 Oh Mandor @ Rp. 30,000.00 = Rp. 405.00

Jumlah II Rp. 11,194.50

Jumlah I + II Rp. 392,567.30

7

Bahan 6.250 Bh Ubin Teraso 40 x 40 Cm @ Rp. 0.00 = Rp. 0.00

8.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 379,764.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

0.900 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 382,881.50

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 393,234.50

8

Bahan 1.870 Bh Ubin Teraso 30 x 30 Cm @ Rp. 0.00 = Rp. 0.00

10.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 431,550.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

1.540 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 434,667.50

1 M2 Pasang Lantai Ubin Warna Ukuran 30x30 Cm

M3

1 M2 Pasang Lantai Ubin Warna Ukuran 20x20 Cm

M3

1 M2 Pasang Lantai Ubin Teraso Ukuran 40x40 Cm

M3

1 M2 Pasang Lantai Ubin Teraso Ukuran 30x30 Cm

M3

Page 72: bayu (2) estiminasi

Tenaga 0.260 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,240.00

0.125 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,750.00

0.0125 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 393.75

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 10,773.75

Jumlah I + II Rp. 445,441.25

9

Bahan 6.930 Bh Ubin Teraso 40 x 40 Cm @ Rp. 0.00 = Rp. 0.00

9.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 422,919.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

1.300 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 426,036.50

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 436,389.50

10

Bahan 11.870 Bh Ubin Teraso 30 x 30 Cm @ Rp. 0.00 = Rp. 0.00

10.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 431,550.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 434,667.50

Tenaga 0.260 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,240.00

0.125 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,750.00

0.0125 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 393.75

0.013 Oh Mandor @ Rp. 30,000.00 = Rp. 390.00

Jumlah II Rp. 10,773.75

Jumlah I + II Rp. 445,441.25

11

Bahan 6.250 Bh Ubin Teralux Kerang 40 x 40 Cm @ Rp. 0.00 = Rp. 0.00

8.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 379,764.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

1.300 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 382,881.50

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.0120 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 393,234.50

12

1 M2 Pasang Lantai Ubin Granito Ukuran 40x40 Cm

M3

1 M2 Pasang Lantai Ubin Granito Ukuran 30x30 Cm

M3

1 M2 Pasang Lantai Ubin Teralux Kerang Ukuran 40x40 Cm

M3

1 M2 Pasang Lantai Ubin Teralux Kerang Ukuran 30x30 Cm

Page 73: bayu (2) estiminasi

Bahan 11.807 Bh Ubin Teralux Kerang 30 x 30 Cm @ Rp. 0.00 = Rp. 0.00

10.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 431,550.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

1.125 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 434,667.50

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.0120 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 445,020.50

13

Bahan 5.600 Bh Ubin Teralux Marmer 60 x 60 Cm @ Rp. 0.00 = Rp. 0.00

8.190 Kg Semen Portland @ Rp. 43,155.00 = Rp. 353,439.45

0.045 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,525.00

1.000 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 359,964.45

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.0120 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00

Jumlah II Rp. 10,353.00

Jumlah I + II Rp. 370,317.45

14

Bahan 5.250 Bh Ubin Teralux Marmer 40 x 40 Cm @ Rp. 0.00 = Rp. 0.00

8.800 Kg Semen Portland @ Rp. 43,155.00 = Rp. 379,764.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

1.300 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 382,881.50

Tenaga 0.672 Oh Pekerja @ Rp. 24,000.00 = Rp. 16,128.00

0.224 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,720.00

0.022 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 693.00

0.034 Oh Mandor @ Rp. 30,000.00 = Rp. 1,020.00

Jumlah II Rp. 24,561.00

Jumlah I + II Rp. 407,442.50

15

Bahan 11.870 Bh Ubin Teralux Marmer 30 x 30 Cm @ Rp. 0.00 = Rp. 0.00

10.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 431,550.00

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.50

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 434,667.50

Tenaga 0.700 Oh Pekerja @ Rp. 24,000.00 = Rp. 16,800.00

0.340 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,200.00

M3

1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 60x60 Cm

M3

1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 40x40 Cm

M3

1 M2 Pasang Lantai Ubin Teralux Marmer Ukuran 30x30 Cm

M3

Page 74: bayu (2) estiminasi

0.034 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,071.00

0.035 Oh Mandor @ Rp. 30,000.00 = Rp. 1,050.00

Jumlah II Rp. 29,121.00

Jumlah I + II Rp. 463,788.50

16

Bahan 5.300 Bh Plin Ubin 15 x 20 Cm @ Rp. 0.00 = Rp. 0.00

1.560 Kg Semen Portland @ Rp. 43,155.00 = Rp. 67,321.80

0.004 Pasir Pasang @ Rp. 145,000.00 = Rp. 580.00

Jumlah I Rp. 67,901.80

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 2,524.50

Jumlah I + II Rp. 70,426.30

17 1 M' Pasang Plin Ubin Pc Ukuran 10x30 Cm

Bahan 3.530 Bh Plin Ubin 10 x 30 Cm @ Rp. 0.00 = Rp. 0.00

1.560 Kg Semen Portland @ Rp. 43,155.00 = Rp. 67,321.80

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

Jumlah I Rp. 67,756.80

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 2,524.50

Jumlah I + II Rp. 70,281.30

18 1 M' Pasang Plin Ubin Pc Abu - Abu Ukuran 10x40 Cm

Bahan 2.650 Bh Plin Ubin 10 x 40 Cm @ Rp. 0.00 = Rp. 0.00

1.560 Kg Semen Portland @ Rp. 43,155.00 = Rp. 67,321.80

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

Jumlah I Rp. 67,756.80

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 2,524.50

Jumlah I + II Rp. 70,281.30

19 1 M' Pasang Plin Ubin Pc Warna Ukuran 10x20 Cm

Bahan 5.300 Bh Plin Ubin Pc Warna 10 x 20 Cm @ Rp. 0.00 = Rp. 0.00

1.200 Kg Semen Portland @ Rp. 43,155.00 = Rp. 51,786.00

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

0.190 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 52,221.00

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 2,524.50

Jumlah I + II Rp. 54,745.50

1 M''Pasang Plin Ubin Pc Ukuran 15x20 Cm

M3

M3

M3

M3

Page 75: bayu (2) estiminasi

20 1 M' Pasang Plin Ubin Pc Warna Ukuran 10x30 Cm

Bahan 3.330 Bh Plin Ubin Pc Warna 10 x 30 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 2,524.50

Jumlah I + II Rp. 74,194.25

21 1 M' Pasang Plin Ubin Pc Warna Ukuran 10x40 Cm

Bahan 2.650 Bh Plin Ubin Pc Warna 10 x 40 Cm @ Rp. 0.00 = Rp. 0.00

1.200 Kg Semen Portland @ Rp. 43,155.00 = Rp. 51,786.00

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 52,221.00

Tenaga 0.080 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,920.00

0.040 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,200.00

0.004 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 126.00

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 3,366.00

Jumlah I + II Rp. 55,587.00

22 1 M' Pasang Plin Ubin Teraso Ukuran 10x30 Cm

Bahan 3.530 Bh Plin Ubin Teraso 10 x 30 Cm @ Rp. 0.00 = Rp. 0.00

1.560 Kg Semen Portland @ Rp. 43,155.00 = Rp. 67,321.80

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

0.190 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 67,756.80

Tenaga 0.080 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,920.00

0.040 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,200.00

0.004 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 126.00

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 3,366.00

Jumlah I + II Rp. 71,122.80

23 1 M' Pasang Plin Ubin Teraso Ukuran 10x40 Cm

Bahan 2.650 Bh Plin Ubin Teraso 10 x 40 Cm @ Rp. 0.00 = Rp. 0.00

1.200 Kg Semen Portland @ Rp. 43,155.00 = Rp. 51,786.00

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 52,221.00

Tenaga 0.080 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,920.00

0.040 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,200.00

0.004 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 126.00

M3

M3

M3

M3

Page 76: bayu (2) estiminasi

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 3,366.00

Jumlah I + II Rp. 55,587.00

24 1 M' Pasang Plin Ubin Granito Ukuran 10x40 Cm

Bahan 2.650 Bh Plin Ubin Granito 10 x 40 Cm @ Rp. 0.00 = Rp. 0.00

1.200 Kg Semen Portland @ Rp. 43,155.00 = Rp. 51,786.00

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 52,221.00

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.003 Oh Mandor @ Rp. 30,000.00 = Rp. 90.00

Jumlah II Rp. 2,524.50

Jumlah I + II Rp. 54,745.50

25 1 M' Pasang Plin Ubin Granito Ukuran 10x30 Cm

Bahan 3.330 Bh Plin Ubin Granito 10 x 30 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 24,718.50

Jumlah I + II Rp. 96,388.25

26 1 M' Pasang Plin Ubin Teralux Kerang Ukuran 10x40 Cm

Bahan 2.500 Bh Plin Ubin Teralux Kerang 10 x 40 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah I Rp. 24,718.50

Jumlah I + II Rp. 96,388.25

27 1 M' Pasang Plin Ubin Teralux Kerang Ukuran 10x30 Cm

Bahan 3.330 Bh Plin Ubin Teralux Kerang 10 x 30 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

M3

M3

M3

M3

Page 77: bayu (2) estiminasi

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 24,718.50

Jumlah I + II Rp. 96,388.25

28 1 M' Pasang Plin Ubin Teralux Marmer Ukuran 10x60 Cm

Bahan 1.700 Bh Plin Ubin Teralux Marmer 10 x 60 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 24,718.50

Jumlah I + II Rp. 96,388.25

29 1 M' Pasang Plin Ubin Teralux Marmer Ukuran 10x40 Cm

Bahan 2.500 Bh Plin Ubin Teralux Marmer 10 x 40 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 24,718.50

Jumlah I + II Rp. 96,388.25

30 1 M' Pasang Plin Ubin Teralux Marmer Ukuran 10x30 Cm

Bahan 3.330 Bh Plin Ubin Teralux Marmer 10 x 30 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 24,718.50

M3

M3

M3

Page 78: bayu (2) estiminasi

Jumlah I + II Rp. 96,388.25

31

Bahan 0.0036 Bahan Teraso Cor @ Rp. 40,400.00 = Rp. 145.44

Jumlah I Rp. 145.44

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 24,718.50

Jumlah I + II Rp. 24,863.94

32

Bahan 0.0036 Bahan Teralux Cor @ Rp. 40,400.00 = Rp. 145.44

Jumlah I Rp. 145.44

Tenaga 0.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 21,600.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 24,718.50

Jumlah I + II Rp. 24,863.94

33

Bahan 1.050 Ubin Tahan Asam @ Rp. 40,400.00 = Rp. 42,420.00

14.140 Kg Semen Tahan Asam @ Rp. 0.00 = Rp. 0.00

0.040 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,800.00

Jumlah I Rp. 48,220.00

Tenaga 0.270 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,480.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.0135 Oh Mandor @ Rp. 30,000.00 = Rp. 405.00

Jumlah II Rp. 11,857.50

Jumlah I + II Rp. 60,077.50

34

Bahan 50.000 Bh Ubin Keramik Artistik 10x20 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

35

Bahan 50.000 Bh Ubin Keramik Artistik 10x10 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

2.000 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

1 M2 Pasang Teraso Cor ditempat

M3

1 M2 Pasang Teralux Cor ditempat, Tebal 3 Cm

M3

1 M2 Pasang Ubin Tahan Asam

M2

M3

1 M2 Pasang Lantai Keramik Artistik 10x20 Cm

M3

1 M2 Pasang Lantai Keramik Artistik 10x10 Cm

M3

Page 79: bayu (2) estiminasi

Jumlah I + II Rp. 524,576.40

36

Bahan 100.000 Bh Ubin Keramik Artistik 5x20 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

37 1 M' Pasang Plint Keramik Artistik 10x20 Cm

Bahan 5.00 Bh Plint Keramik Artistik 10x20 Cm @ Rp. 0.00 = Rp. 0.00

1.65 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.100 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.090 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,160.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 5,278.50

Jumlah I + II Rp. 76,948.25

38 1 M' Pasang Plint Keramik Artistik 10x10 Cm

Bahan 0.000 Bh Plint Keramik Artistik 10x10 Cm @ Rp. 0.00 = Rp. 0.00

1.650 Kg Semen Portland @ Rp. 43,155.00 = Rp. 71,205.75

0.0032 Pasir Pasang @ Rp. 145,000.00 = Rp. 464.00

0.120 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 71,669.75

Tenaga 0.090 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,160.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 5,278.50

Jumlah I + II Rp. 76,948.25

39 1 M' Pasang Plint Keramik Artistik 5x20 Cm

Bahan 5.000 Bh Plint Keramik Artistik 5x20 Cm @ Rp. 0.00 = Rp. 0.00

0.850 Kg Semen Portland @ Rp. 43,155.00 = Rp. 36,681.75

0.0022 Pasir Pasang @ Rp. 145,000.00 = Rp. 319.00

0.080 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 37,000.75

Tenaga 0.090 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,160.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0045 Oh Mandor @ Rp. 30,000.00 = Rp. 135.00

Jumlah II Rp. 5,278.50

Jumlah I + II Rp. 42,279.25

1 M2 Pasang Lantai Keramik Artistik 5x20 Cm

M3

M3

M3

M3

Page 80: bayu (2) estiminasi

40 1 M' Internal Cove Artistik ( 5x5x20) Cm

Bahan 10.000 Bh Internal Cove (5x5x20) Cm @ Rp. = Rp. 0.00

1.415 Kg Semen Portland @ Rp. 43,155.00 = Rp. 61,064.33

0.039 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,655.00

1.200 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 66,719.33

Tenaga 0.750 Oh Pekerja @ Rp. 24,000.00 = Rp. 18,000.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.0375 Oh Mandor @ Rp. 30,000.00 = Rp. 1,125.00

Jumlah II Rp. 34,042.50

Jumlah I + II Rp. 100,761.83

41 1 M' Pasang Plint Vinyil Tanpa Adukan

Bahan 3.500 Bh Lt Vinyil karet 30x30 Kwl I @ Rp. 17,416.67 = Rp. 60,958.34

0.080 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 240.00

Jumlah I Rp. 61,198.34

Tenaga 0.080 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,920.00

0.080 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,400.00

0.008 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 252.00

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 4,692.00

Jumlah I + II Rp. 65,890.35

42

Bahan 50.000 Bh Ubin Keramik Artistik 10x20 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

43

Bahan 44.000 Bh Ubin Keramik 15x15 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

M3

1 M2 Pasang Lantai Keramik 10x20 Cm

M3

1 M2 Pasang Lantai Keramik 15x15 Cm

M3

Page 81: bayu (2) estiminasi

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

44

Bahan 25.000 Bh Ubin Keramik 20x20 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

45

Bahan 16.000 Bh Ubin Keramik 25x25 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

46

Bahan 35.00 Bh Ubin Keramik 15x20 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

47

1 M2 Pasang Lantai Keramik 20x20 Cm

M3

1 M2 Pasang Lantai Keramik 25x25 Cm

M3

1 M2 Pasang Lantai Keramik 15x20 Cm

M3

1 M2 Pasang Lantai Keramik 33x33 Cm

Page 82: bayu (2) estiminasi

Bahan 10.000 Bh Ubin Keramik 33x33 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

48

Bahan 10.000 Bh Ubin Keramik 33x33 Cm Anti Slip @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

49

Bahan 33.000 Bh Ubin Keramik 10x33 Cm @ Rp. 0.00 = Rp. 0.00

11.380 Kg Semen Portland @ Rp. 43,155.00 = Rp. 491,103.90

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 497,193.90

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 524,576.40

50

Bahan 12.000 Bh Mosaik 30x30 Cm @ Rp. 0.00 = Rp. 0.00

14.150 Kg Semen Portland @ Rp. 43,155.00 = Rp. 610,643.25

0.039 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,655.00

2.000 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 616,298.25

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 643,680.75

M3

1 M2 Pasang Lantai Keramik 33x33 Cm Anti Slip

M3

1 M2 Pasang Lantai Keramik 10x33 Cm

M3

1 M2 Pasang Lantai Mosaik 30x30 Cm, Ex Lokal

M3

Page 83: bayu (2) estiminasi

51 Plint Lantai

1 M' Pasang Plin Lantai

Bahan 3.530 Bh Plin @ Rp. 0.00 = Rp. 0.00

1.560 Kg Semen Portland @ Rp. 43,155.00 = Rp. 67,321.80

0.003 Pasir Pasang @ Rp. 145,000.00 = Rp. 435.00

0.190 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 67,756.80

Tenaga 0.080 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,920.00

0.040 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,200.00

0.004 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 126.00

0.004 Oh Mandor @ Rp. 30,000.00 = Rp. 120.00

Jumlah II Rp. 3,366.00

Jumlah I + II Rp. 71,122.80

52

Bahan 1.050 Feltex Carpet 100 % Wool T-21 @ Rp. 66,000.00 = Rp. 69,300.00

0.350 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 1,050.00

Jumlah I Rp. 70,350.00

Tenaga 0.170 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,080.00

0.170 Oh Tukang @ Rp. = Rp. 0.00

0.017 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 484.50

0.0085 Oh Mandor @ Rp. 30,000.00 = Rp. 255.00

Jumlah II Rp. 4,819.50

Jumlah I + II Rp. 75,169.50

53

Bahan 1.050 Carpet 80 % Wool, 20% Nylon @ Rp. 49,500.00 = Rp. 51,975.00

0.350 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 1,050.00

Jumlah I Rp. 53,025.00

Tenaga 0.170 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,080.00

0.170 Oh Tukang @ Rp. = Rp. 0.00

0.017 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 484.50

0.0085 Oh Mandor @ Rp. 30,000.00 = Rp. 255.00

Jumlah II Rp. 4,819.50

Jumlah I + II Rp. 57,844.50

54

Bahan 1.050 Underlyer Tebal 6 mm / Rubber Corrugated @ Rp. 44,000.00 = Rp. 46,200.00

Jumlah I Rp. 46,200.00

Tenaga 0.120 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,880.00

0.120 Oh Tukang @ Rp. = Rp. 0.00

0.012 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 342.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 3,402.00

Jumlah I + II Rp. 49,602.00

55

Bahan 1.050 Carpet @ Rp. 44,000.00 = Rp. 46,200.00

0.35 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 1,050.00

Jumlah I Rp. 47,250.00

Tenaga 0.170 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,080.00

0.170 Oh Tukang @ Rp. = Rp. 0.00

0.017 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 484.50

0.0085 Oh Mandor @ Rp. 30,000.00 = Rp. 255.00

M3

1 M2 Pasang Lantai Karpet 100 % Wool

M2

1 M2 Pasang Lantai Karpet 80 % Wool, 20% Nylon

M2

1 M2 Pasang Underlyer, Tebal 6 mm

M2

1 M2 Pasang Lantai Karpet

M2

Page 84: bayu (2) estiminasi

Jumlah II Rp. 4,819.50

Jumlah I + II Rp. 52,069.50

56

Bahan 1.050 Parguet Jati @ Rp. 44,000.00 = Rp. 46,200.00

0.60 Kg Lem Vinyil @ Rp. 30,000.00 = Rp. 18,000.00

Jumlah I Rp. 64,200.00

Tenaga 0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.350 Oh Tukang @ Rp. = Rp. 0.00

0.035 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 997.50

0.0325 Oh Mandor @ Rp. 30,000.00 = Rp. 975.00

Jumlah II Rp. 17,572.50

Jumlah I + II Rp. 81,772.50

57

Bahan 1.050 Gymfloor @ Rp. 44,000.00 = Rp. 46,200.00

0.60 Kg Lem Vinyil @ Rp. 30,000.00 = Rp. 18,000.00

Jumlah I Rp. 64,200.00

Tenaga 0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.350 Oh Tukang @ Rp. = Rp. 0.00

0.035 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 997.50

0.0325 Oh Mandor @ Rp. 30,000.00 = Rp. 975.00

Jumlah II Rp. 17,572.50

Jumlah I + II Rp. 81,772.50

58

Bahan 83.000 Bh Porseli 11x11 Cm, Putih @ Rp. 57,200.00 = Rp. 4,747,600.00

9.300 Kg Semen Abu - Abu @ Rp. 0.00 = Rp. 0.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 4,750,210.00

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 15,000.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 32,355.00

Jumlah I + II Rp. 4,782,565.00

59

Bahan 83.000 Bh Porseli 11x11 Cm, Warna @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 15,000.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 32,355.00

1 M2 Pasang Lantai Parguet Jati

M2

1 M2 Pasang Gymfloor

M2

1 M2 Pasang Dinding Porselin 11x11 Cm, Putih

M3

1 M2 Pasang Dinding Porselin 11x11 Cm, Warna

M3

Page 85: bayu (2) estiminasi

Jumlah I + II Rp. 313,965.00

60

Bahan 45.000 Bh Porseli 15x15 Cm, Putih @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

61

Bahan 45.000 Bh Porseli 15x15 Cm, Warna @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

62

Bahan 50.000 Bh Porseli 10x20 Cm, Warna @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

63

Bahan 25.000 Bh Porseli 20x20 Cm, Warna @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1 M2 Pasang Dinding Porselin 15x15 Cm, Putih

M3

1 M2 Pasang Dinding Porselin 15x15 Cm, Warna

M3

1 M2 Pasang Dinding Porselin 10x20 Cm, Warna

M3

1 M2 Pasang Dinding Porselin 20x20 Cm, Warna

M3

Page 86: bayu (2) estiminasi

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

64

Bahan 100.000 Bh Keramik Artistik 20x20 Cm @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

65

Bahan 100.000 Bh Keramik Artistik 5x20 Cm @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

66

Bahan 50.000 Bh Keramik 10x20 Cm @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

1 M2 Pasang Dinding Keramik Artistik 10x20 Cm

M3

1 M2 Pasang Dinding Keramik Artistik 5x20 Cm

M3

1 M2 Pasang Dinding Keramik 10x20 Cm

M3

Page 87: bayu (2) estiminasi

67

Bahan 45.000 Bh Keramik 15x15 Cm @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 30,000.00 = Rp. 279,000.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 281,610.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 13,500.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 30,217.50

Jumlah I + II Rp. 311,827.50

68

Bahan 25.000 Bh Keramik 20x20 Cm @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 29,760.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 32,370.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

1.000 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 30,000.00

0.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 46,717.50

Jumlah I + II Rp. 79,087.50

67

Bahan 50.000 Bh Keramik 10x20 Cm @ Rp. 0.00 = Rp. 0.00

9.300 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 29,760.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 32,370.00

Tenaga 0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.00

0.1250 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,750.00

0.0125 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 393.75

1.500 Oh Mandor @ Rp. 30,000.00 = Rp. 45,000.00

Jumlah II Rp. 63,543.75

Jumlah I + II Rp. 95,913.75

68

Bahan 1.020 Marmer @ Rp. = Rp. 0.00

2.000 Bh Pacu Pancing 60x230 @ Rp. 16,850.00 = Rp. 33,700.00

12.440 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 39,808.00

0.025 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,625.00

1.500 Kg Semen Warna @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 77,133.00

Tenaga 0.720 Oh Pekerja @ Rp. 24,000.00 = Rp. 17,280.00

0.650 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 19,500.00

0.065 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 2,047.50

0.035 Oh Mandor @ Rp. 30,000.00 = Rp. 1,050.00

Jumlah II Rp. 39,877.50

Jumlah I + II Rp. 117,010.50

69

Bahan 60.000 Bh Bata Pelapis Dinding @ Rp. 900.00 = Rp. 54,000.00

12.440 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 39,808.00

0.025 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,625.00

1 M2 Pasang Dinding Keramik 15x15 Cm

M3

1 M2 Pasang Dinding Keramik 20x20 Cm

M3

1 M2 Pasang Dinding Keramik 10x20 Cm

M3

1 M2 Pasang Dinding Marmer

M2

M3

1 M2 Pasang Dinding Bata Pelapis 7x3x24 Cm

M3

Page 88: bayu (2) estiminasi

Jumlah I Rp. 97,433.00

Tenaga 0.650 Oh Pekerja @ Rp. 24,000.00 = Rp. 15,600.00

0.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 15,000.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 33,075.00

Jumlah I + II Rp. 130,508.00

70

Bahan 80.000 Bh Bata Pelapis Klinker @ Rp. 900.00 = Rp. 72,000.00

12.440 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 39,808.00

0.025 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,625.00

Jumlah I Rp. 115,433.00

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 142,815.50

71

Bahan 1.050 Batu Poros @ Rp. 95,000.00 = Rp. 99,750.00

11.750 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 37,600.00

0.035 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,075.00

Jumlah I Rp. 142,425.00

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 169,807.50

72

Bahan 1.050 Batu Tempel Hitam @ Rp. 95,000.00 = Rp. 99,750.00

11.750 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 37,600.00

0.035 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,075.00

Jumlah I Rp. 142,425.00

Tenaga 0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.00

0.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.00

0.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.50

0.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00

Jumlah II Rp. 27,382.50

Jumlah I + II Rp. 169,807.50

73

Bahan 11.050 Bh Vinyil Karet 30x30 Cm KLI @ Rp. 17,416.67 = Rp. 192,454.20

1 M2 Pasang Dinding Bata Klinker 5x5x24 Cm

M3

1 M2 Pasang Dinding Batu Poros

M2

M3

1 M2 Pasang Dinding Batu Tempel Hitam

M2

M3

1 M2 Pasang Lantai Vinyil Karet 30x30 Cm KLI

Page 89: bayu (2) estiminasi

0.350 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 1,050.00

Jumlah I Rp. 193,504.20

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.0075 Oh Mandor @ Rp. 30,000.00 = Rp. 225.00

Jumlah II Rp. 8,797.50

Jumlah I + II Rp. 202,301.70

74

Bahan 11.050 Bh Vinyil Karet 30x30 Cm KLII @ Rp. 17,416.67 = Rp. 192,454.20

0.350 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 1,050.00

Jumlah I Rp. 193,504.20

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.0075 Oh Mandor @ Rp. 30,000.00 = Rp. 225.00

Jumlah II Rp. 8,797.50

Jumlah I + II Rp. 202,301.70

75

Bahan 11.050 Bh Vinyil Asbes 30x30 Cm @ Rp. 0.00 = Rp. 0.00

0.350 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 1,050.00

Jumlah I Rp. 1,050.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.0075 Oh Mandor @ Rp. 30,000.00 = Rp. 225.00

Jumlah II Rp. 8,797.50

Jumlah I + II Rp. 9,847.50

76

Bahan 11.050 Bh Vinyil Motif Kembang Ex DN @ Rp. = Rp. 0.00

0.350 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 1,050.00

Jumlah I Rp. 1,050.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.150 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,500.00

0.015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 472.50

0.0075 Oh Mandor @ Rp. 30,000.00 = Rp. 225.00

Jumlah II Rp. 8,797.50

Jumlah I + II Rp. 9,847.50

77

Bahan 1.100 Bh Vinyil Wall Covering, Lebar 50 Cm @ Rp. = Rp. 0.00

0.250 Kg Lem Vinyil @ Rp. 3,000.00 = Rp. 750.00

Jumlah I Rp. 750.00

Tenaga 0.750 Oh Pekerja @ Rp. 24,000.00 = Rp. 18,000.00

0.170 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 5,100.00

0.017 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 535.50

0.0085 Oh Mandor @ Rp. 30,000.00 = Rp. 255.00

1 M2 Pasang Lantai Vinyil Karet 30x30 Cm KLII

1 M2 Pasang Lantai Vinyil Asbes 30x30 Cm

1 M2 Pasang Lantai Vinyil Motif Kembang 30x30 Cm

1 M2 Pasang Wall Covering Lebar 50 Cm

Page 90: bayu (2) estiminasi

Jumlah II Rp. 23,890.50

Jumlah I + II Rp. 24,640.50

78

Bahan 3.000 Kg Floor Hardener Ferrovax @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.120 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,880.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 7,038.00

Jumlah I + II Rp. 7,038.00

79

Bahan 5.000 Kg Mastercron "S" @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.120 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,880.00

0.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 7,038.00

Jumlah I + II Rp. 7,038.00

80

Bahan 0.0024 M3 Kayu Jati, Papan @ Rp. 1,450,000.00 = Rp. 3,480.00

0.050 Kg Paku Skrup 3,5" 7,150.00 = Rp. 357.50

Jumlah I Rp. 3,837.50

Tenaga 0.120 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,880.00

0.120 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 3,600.00

0.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 7,038.00

Jumlah I + II Rp. 10,875.50

M Analisa Biaya Konstruksi Pekerjaan Pengecatan

1 M2 Floor Hardener Ferrovax

1 M2 Floor Hardener Mastercron

1 M2 Plint Kayu 2x10 Cm

Page 91: bayu (2) estiminasi

1

Bahan 0.050 Kg Soda Api @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

Oh Tukang Cat @ Rp. 28,000.00 = Rp. 0.00

Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 0.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 3,675.00

Jumlah I + II Rp. 3,675.00

2

Bahan 0.050 Kg Sabun @ Rp. 5,000.00 = Rp. 250.00

Jumlah I Rp. 250.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

Oh Tukang Cat @ Rp. 28,000.00 = Rp. 0.00

Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 0.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 3,675.00

Jumlah I + II Rp. 3,925.00

3

Bahan 0.050 Kg Sabun @ Rp. 5,000.00 = Rp. 250.00

Jumlah I Rp. 250.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

Oh Tukang Cat @ Rp. 28,000.00 = Rp. 0.00

Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 0.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 3,675.00

Jumlah I + II Rp. 3,925.00

4

Bahan 0.050 Kg Sabun @ Rp. 5,000.00 = Rp. 250.00

Jumlah I Rp. 250.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

Oh Tukang Cat @ Rp. 28,000.00 = Rp. 0.00

Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 0.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 3,675.00

Jumlah I + II Rp. 3,925.00

5

Bahan 40.000 Kg Pasir Silika @ Rp. 165,000.00 = Rp. 6,600,000.00

10.000 Ltr BBM @ Rp. 2,200.00 = Rp. 22,000.00

Jumlah I Rp. 6,622,000.00

Tenaga 1.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 38,400.00

1.600 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 44,800.00

0.800 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 22,800.00

0.500 Oh Mandor @ Rp. 30,000.00 = Rp. 15,000.00

Jumlah II Rp. 121,000.00

Jumlah I + II Rp. 6,743,000.00

6

Bahan 0.080 Kg Dempul Jadi @ Rp. 13,200.00 = Rp. 1,056.00

0.020 Kg Minyak Cat @ Rp. 2,750.00 = Rp. 55.00

0.010 Kg Batu Apung @ Rp. = Rp. 0.00

Jumlah I Rp. 1,111.00

1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama

1 M2 Mencuci Bidang Permukaan Tembok yang Pernah di Cat

1 M2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual

1 M2 Menyabun Permukaan Tembok Lama

1 M2 Mengerok Karat atau Cat Lama Permukaan Baja dengan Pancar

Pasir (Sanblasting) dengan Tingkat Kebersihan Sa 2 1/2

1 M2 Mendempul dan Menggosok Kayu

Page 92: bayu (2) estiminasi

Tenaga 0.040 Oh Pekerja @ Rp. 24,000.00 = Rp. 960.00

0.040 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,120.00

0.004 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 114.00

0.0024 Oh Mandor @ Rp. 30,000.00 = Rp. 72.00

Jumlah II Rp. 2,266.00

Jumlah I + II Rp. 3,377.00

7

Bahan 0.150 Kg Plamir @ Rp. 0.00 = Rp. 0.00

0.170 Kg Cat Dasar @ Rp. 11,000.00 = Rp. 1,870.00

0.170 Kg Cat Penutup @ Rp. 231,000.00 = Rp. 39,270.00

Jumlah I Rp. 41,140.00

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.075 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 2,100.00

0.0075 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 213.75

0.0024 Oh Mandor @ Rp. 30,000.00 = Rp. 72.00

Jumlah II Rp. 4,065.75

Jumlah I + II Rp. 45,205.75

8

2 Lapis Cat Penutup

Bahan 0.200 Kg Cat Meni @ Rp. 12,650.00 = Rp. 2,530.00

0.150 Kg Plamir @ Rp. 0.00 = Rp. 0.00

0.170 Kg Cat Dasar @ Rp. 11,000.00 = Rp. 1,870.00

0.260 Kg Cat Penutup 2 Kali @ Rp. 231,000.00 = Rp. 60,060.00

Jumlah I Rp. 64,460.00

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.009 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 252.00

0.006 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 171.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 2,178.00

Jumlah I + II Rp. 66,638.00

9

3 Lapis Cat Penutup

Bahan 0.200 Kg Cat Meni @ Rp. 12,650.00 = Rp. 2,530.00

0.150 Kg Plamir @ Rp. 0.00 = Rp. 0.00

0.170 Kg Cat Dasar @ Rp. 11,000.00 = Rp. 1,870.00

0.350 Kg Cat Penutup 3 Kali @ Rp. 231,000.00 = Rp. 80,850.00

Jumlah I Rp. 85,250.00

Tenaga 0.070 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,680.00

0.105 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 2,940.00

0.004 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 114.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 4,809.00

Jumlah I + II Rp. 90,059.00

10

1 M2 Pengecatan Bidang Kayu lama

1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar,

1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar,

1 M2 Pelaburan Bidang Kayu dengan Teak Oil

Page 93: bayu (2) estiminasi

Bahan 0.360 Ltr Teak Oil @ Rp. 18,050.00 = Rp. 6,498.00

Jumlah I Rp. 6,498.00

Tenaga 0.040 Oh Pekerja @ Rp. 24,000.00 = Rp. 960.00

0.063 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,764.00

0.063 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,795.50

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 4,594.50

Jumlah I + II Rp. 11,092.50

11

Bahan 0.150 Ltr Politur @ Rp. 22,000.00 = Rp. 3,300.00

0.372 Ltr Politur Jadi @ Rp. 22,000.00 = Rp. 8,184.00

2.000 Lbr Ampelas @ Rp. 1,980.00 = Rp. 3,960.00

Jumlah I Rp. 15,444.00

Tenaga Oh Pekerja @ Rp. 24,000.00 = Rp. 0.00

0.060 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,680.00

0.016 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 456.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 2,211.00

Jumlah I + II Rp. 17,655.00

12

Bahan 0.350 Ltr Residu atau Ter @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.00

Oh Tukang Cat @ Rp. 28,000.00 = Rp. 0.00

Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 0.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 2,580.00

Jumlah I + II Rp. 2,580.00

13

Bahan 0.150 Ltr Vernis @ Rp. 22,000.00 = Rp. 3,300.00

0.050 Kg Dempul @ Rp. 13,200.00 = Rp. 660.00

0.100 Lbr Ampelas @ Rp. 1,980.00 = Rp. 198.00

0.010 Bh Kuas @ Rp. 5,500.00 = Rp. 55.00

Jumlah I Rp. 4,213.00

Tenaga 0.160 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,840.00

0.160 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 4,480.00

0.016 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 456.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 8,851.00

Jumlah I + II Rp. 13,064.00

1 M2 Pelaburan Bidang Kayu dengan Politur

1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter

1 M2 Pelaburan Bidang Kayu dengan Vernis

Page 94: bayu (2) estiminasi

14

Cat Penutup)

Bahan 0.100 Kg Plamir @ Rp. 0.00 = Rp. 0.00

0.100 Kg Cat Dasar @ Rp. 11,000.00 = Rp. 1,100.00

0.260 Kg Cat Penutup 2 Kali @ Rp. 231,000.00 = Rp. 60,060.00

Jumlah I Rp. 61,160.00

Tenaga 0.020 Oh Pekerja @ Rp. 24,000.00 = Rp. 480.00

0.063 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,764.00

0.0063 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 179.55

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 2,498.55

Jumlah I + II Rp. 63,658.55

15

Cat Penutup)

Bahan 0.100 Kg Plamir @ Rp. 0.00 = Rp. 0.00

0.100 Kg Cat Dasar @ Rp. 11,000.00 = Rp. 1,100.00

0.260 Kg Cat Penutup 2 Kali @ Rp. 231,000.00 = Rp. 60,060.00

Jumlah I Rp. 61,160.00

Tenaga 0.020 Oh Pekerja @ Rp. 24,000.00 = Rp. 480.00

0.063 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,764.00

0.0063 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 179.55

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 2,498.55

Jumlah I + II Rp. 63,658.55

16

Bahan 0.120 Kg Cat Dasar @ Rp. 11,000.00 = Rp. 1,320.00

0.180 Kg Cat Penutup 2 Kali @ Rp. 231,000.00 = Rp. 41,580.00

Jumlah I Rp. 42,900.00

Tenaga 0.028 Oh Pekerja @ Rp. 24,000.00 = Rp. 672.00

0.042 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,176.00

0.0042 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 119.70

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 2,042.70

Jumlah I + II Rp. 44,942.70

17

Bahan 0.100 Kg Kalkarium @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.028 Oh Pekerja @ Rp. 24,000.00 = Rp. 672.00

0.042 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,176.00

0.0042 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 119.70

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 2,042.70

Jumlah I + II Rp. 2,042.70

18

Bahan 0.100 Lbr Ampelas @ Rp. 4,500.00 = Rp. 450.00

0.250 Ikat Alang - Alang @ Rp. = Rp. 0.00

0.002 Perancah Kayu @ Rp. 880,000.00 = Rp. 1,760.00

1 M2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis

1 M2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis

1 M2 Pengecatan Tembok Baru (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

1 M2 Melebur Tembok dengan Kalkarium

1 M2 Melebur Tembok dengan Kapur Sirih

M3

Page 95: bayu (2) estiminasi

0.150 Kg Kapur Sirih @ Rp. 27,500.00 = Rp. 4,125.00

Jumlah I Rp. 6,335.00

Tenaga 0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.00

0.001 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 28.00

0.0001 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 2.85

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 3,705.85

Jumlah I + II Rp. 10,040.85

19

Bahan 0.002 Perancah Kayu @ Rp. 880,000.00 = Rp. 1,760.00

0.300 Kg Kapur Sirih @ Rp. 27,500.00 = Rp. 8,250.00

Jumlah I Rp. 10,010.00

Tenaga 0.040 Oh Pekerja @ Rp. 24,000.00 = Rp. 960.00

0.005 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 140.00

0.0005 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 14.25

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 1,189.25

Jumlah I + II Rp. 11,199.25

20

Bahan 1.200 Wall Paper @ Rp. = Rp. 0.00

0.200 Kg Perekat @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.020 Oh Pekerja @ Rp. 24,000.00 = Rp. 480.00

0.200 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 5,600.00

0.002 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 57.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 6,212.00

Jumlah I + II Rp. 6,212.00

21

Bahan 0.100 Kg Meni Besi @ Rp. 12,650.00 = Rp. 1,265.00

0.010 Bh Kuas @ Rp. 5,500.00 = Rp. 55.00

Jumlah I Rp. 1,320.00

Tenaga 0.020 Oh Pekerja @ Rp. 24,000.00 = Rp. 480.00

0.200 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 5,600.00

0.02 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 570.00

0.01 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00

Jumlah II Rp. 6,950.00

Jumlah I + II Rp. 8,270.00

22

Bahan 0.100 Kg Meni Besi @ Rp. 12,650.00 = Rp. 1,265.00

0.010 Bh Kuas @ Rp. 5,500.00 = Rp. 55.00

0.002 Perancah Kayu @ Rp. 1,485,000.00 = Rp. 2,970.00

Jumlah I Rp. 4,290.00

Tenaga 0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.00

0.225 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 6,300.00

0.0225 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 641.25

0.0075 Oh Mandor @ Rp. 30,000.00 = Rp. 225.00

Jumlah II Rp. 13,166.25

Jumlah I + II Rp. 17,456.25

23

Sistim 4 Lapis Cat Konfensional dengan Tebal 200 Um

Bahan 0.100 Kg Meni (Read Lead) A @ Rp. 12,650.00 = Rp. 1,265.00

0.100 Kg Meni (Read Lead) B @ Rp. 12,650.00 = Rp. 1,265.00

0.040 Kg Alluminium C @ Rp. = Rp. 0.00

1 M2 Melebur Tembok Lama dengan Kapur Sirih ( untuk Pemeliharaan )

M3

1 M2 Pemasangan Wall Paper

M3

1 M2 Pengecatan Permukaan Baja dengan Meni Besi

1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah

M3

1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual

Page 96: bayu (2) estiminasi

0.040 Kg Alluminium A @ Rp. = Rp. 0.00

0.010 Ltr Pengencer @ Rp. 2,750.00 = Rp. 27.50

0.002 Perancah Kayu @ Rp. 880,000.00 = Rp. 1,760.00

Jumlah I Rp. 4,317.50

Tenaga 0.006 Oh Pekerja @ Rp. 24,000.00 = Rp. 144.00

0.006 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 168.00

0.0225 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 641.25

0.0075 Oh Mandor @ Rp. 30,000.00 = Rp. 225.00

Jumlah II Rp. 1,178.25

Jumlah I + II Rp. 5,495.75

24

Sistim 1 Lapis Cat Mutakhir dengan Tebal 200 Um

Bahan 0.300 Kg Cat @ Rp. 0.00 = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga 0.006 Oh Pekerja @ Rp. 24,000.00 = Rp. 144.00

0.060 Oh Tukang Cat @ Rp. 28,000.00 = Rp. 1,680.00

0.012 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 342.00

0.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00

Jumlah II Rp. 2,346.00

Jumlah I + II Rp. 2,346.00

N Analisa Biaya Konstruksi Pekerjaan Sanitasi

1

Bahan 1.00 Bh Kloset Duduk/ Monoblok @ Rp. 198,000.00 = Rp. 198,000.00

6%Harga ClosetPerlengkapan @ Rp. 11,880.00 = Rp. 712.80

Jumlah I Rp. 198,712.80

Tenaga 3.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 79,200.00

1.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 33,000.00

0.001 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 31.50

0.160 Oh Mandor @ Rp. 30,000.00 = Rp. 4,800.00

Jumlah II Rp. 117,031.50

Jumlah I + II Rp. 315,744.30

2 Memasang 1 Buah Closet Jongkok Porselen

Bahan 1.000 Bh Kloset Jongkok Porselen @ Rp. 66,000.00 = Rp. 66,000.00

6.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 258,930.00

0.160 Pasir Pasang @ Rp. 145,000.00 = Rp. 23,200.00

Jumlah I Rp. 348,130.00

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

1.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 45,000.00

1.500 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 47,250.00

0.160 Oh Mandor @ Rp. 30,000.00 = Rp. 4,800.00

Jumlah II Rp. 121,050.00

Jumlah I + II Rp. 469,180.00

3 Memasang 1 Buah Closet Jongkok Teraso

Bahan 1.000 Bh Kloset Jongkok Teraso @ Rp. 33,000.00 = Rp. 33,000.00

7.000 Bh Bata Merah 5x11x22 Cm @ Rp. 900.00 = Rp. 6,300.00

6.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 258,930.00

0.010 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,450.00

Jumlah I Rp. 299,680.00

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

1.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 45,000.00

0.300 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 9,450.00

M3

1 M2 Pengecatan Permukaan Baja Lapis Seng (Galbani) Secara Manual

Memasang 1 Buah Closet Duduk/ Monoblok

M3

M3

Page 97: bayu (2) estiminasi

0.110 Oh Mandor @ Rp. 30,000.00 = Rp. 3,300.00

Jumlah II Rp. 81,750.00

Jumlah I + II Rp. 381,430.00

4 Memasang 1 Buah Urinoir

Bahan 1.000 Bh Urinoir @ Rp. 442,450.00 = Rp. 442,450.00

30%Harga UrinoirPerlengkapan @ Rp. 132,735.00 = Rp. 39,820.50

6.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 258,930.00

0.010 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,450.00

Jumlah I Rp. 742,650.50

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

1.000 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 30,000.00

0.100 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,150.00

0.100 Oh Mandor @ Rp. 30,000.00 = Rp. 3,000.00

Jumlah II Rp. 60,150.00

Jumlah I + II Rp. 802,800.50

5 Memasang 1 Buah Urinoir

Bahan 1.000 Bh Urinoir @ Rp. 442,450.00 = Rp. 442,450.00

30%Harga UrinoirPerlengkapan @ Rp. 132,735.00 = Rp. 39,820.50

6.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 258,930.00

0.010 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,450.00

Jumlah I Rp. 742,650.50

Tenaga 1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.00

1.000 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 30,000.00

0.100 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 3,150.00

0.100 Oh Mandor @ Rp. 30,000.00 = Rp. 3,000.00

Jumlah II Rp. 60,150.00

Jumlah I + II Rp. 802,800.50

6 Memasang 1 Buah Wastafel

Bahan 1.000 Bh Urinoir @ Rp. 192,500.00 = Rp. 192,500.00

12%Harga ClosetPerlengkapan @ Rp. 23,100.00 = Rp. 2,772.00

6.000 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 19,200.00

0.010 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,450.00

Jumlah I Rp. 215,922.00

Tenaga 1.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 28,800.00

1.450 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 43,500.00

0.150 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 4,725.00

0.100 Oh Mandor @ Rp. 30,000.00 = Rp. 3,000.00

Jumlah II Rp. 80,025.00

Jumlah I + II Rp. 295,947.00

7

Bahan 1.000 Bh Bak Teraso @ Rp. 88,000.00 = Rp. 88,000.00

6.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 258,930.00

0.010 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,450.00

Jumlah I Rp. 348,380.00

Tenaga 2.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 50,400.00

0.750 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 22,500.00

0.070 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 2,205.00

0.110 Oh Mandor @ Rp. 30,000.00 = Rp. 3,300.00

Jumlah II Rp. 78,405.00

Jumlah I + II Rp. 426,785.00

M3

M3

M3

Memasang 1 Buah Bak Mandi Teraso Volume 0.30 M3

M3

Page 98: bayu (2) estiminasi

8

Bahan 1.000 1 Bh Bak Fiberglass @ Rp. 66,000.00 = Rp. 66,000.00

18% Harga Bak Perlengkapan @ Rp. 11,880.00 = Rp. 2,138.40

Jumlah I Rp. 68,138.40

Tenaga 1.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 43,200.00

2.700 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 81,000.00

0.540 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 17,010.00

0.110 Oh Mandor @ Rp. 30,000.00 = Rp. 3,300.00

Jumlah II Rp. 144,510.00

Jumlah I + II Rp. 212,648.40

9

Bahan 0.400 Batu bata @ Rp. 1,210.00 = Rp. 484.00

120.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 5,178,600.00

0.300 Pasir Pasang @ Rp. 145,000.00 = Rp. 43,500.00

360.000 Bh Porselen (11x11) Cm @ Rp. 55,000.00 = Rp. 19,800,000.00

6.000 Kg Semen Nat @ Rp. = Rp. 0.00

Jumlah I Rp. 25,022,584.00

Tenaga 6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

3.000 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 90,000.00

0.300 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 9,450.00

0.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00

Jumlah II Rp. 252,450.00

Jumlah I + II Rp. 25,275,034.00

10 Memasang 1 Buah Badkip Porselen

Bahan 1.000 Bh Badkip @ Rp. = Rp. 0.00

20%Harga BadkipPerlengkapan @ Rp. = Rp. 0.00

Jumlah I Rp. 0.00

Tenaga Oh Pekerja @ Rp. 24,000.00 = Rp. 0.00

0.075 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,250.00

0.750 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 23,625.00

0.250 Oh Mandor @ Rp. 30,000.00 = Rp. 7,500.00

Jumlah II Rp. 33,375.00

Jumlah I + II Rp. 33,375.00

11

Bahan 0.900 @ Rp. 1,210.00 = Rp. 1,089.00

180.000 Kg Besi Beton @ Rp. 0.00 = Rp. 0.00

1.100 Kayu cetakan @ Rp. 715,000.00 = Rp. 786,500.00

5.000 Ubin Porselen @ Rp. 0.00 = Rp. 0.00

10%H. Total BahanPerlengkapan @ Rp. 30,600.00 = Rp. 3,060.00

Jumlah I Rp. 790,649.00

Memasang 1 Buah Bak Mandi Fiberglass Volume 0.30 M3

Memasang 1 Buah Bak Mandi Batu Bata Volume 0.30 M3

M3

M3

Membuat 1 Buah Bak Beton Volume 1 M3 Air

M3 Beton 1 : 1 1/2 : 2 1/2

M3

M2

Page 99: bayu (2) estiminasi

Tenaga 3.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 84,000.00

4.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 135,000.00

0.900 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 28,350.00

0.900 Oh Mandor @ Rp. 30,000.00 = Rp. 27,000.00

Jumlah II Rp. 274,350.00

Jumlah I + II Rp. 1,064,999.000

12

Bahan 1.000 Bh Bak Fiberglass @ Rp. 66,000.00 = Rp. 66,000.00

12%H. Total BahanPerlengkapan @ Rp. 7,920.00 = Rp. 950.40

Jumlah I Rp. 66,950.40

Tenaga 3.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 72,000.00

4.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 135,000.00

0.900 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 28,350.00

0.900 Oh Mandor @ Rp. 30,000.00 = Rp. 27,000.00

Jumlah II Rp. 262,350.00

Jumlah I + II Rp. 329,300.400

13 Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 Cm

Bahan 1.600 Bh Pipa Tanah @ Rp. 150,000.00 = Rp. 240,000.00

0.680 Kg Semen portland @ Rp. 43,155.00 = Rp. 29,345.40

0.013 Pasir Pasang @ Rp. 145,000.00 = Rp. 1,885.00

0.011 Pasir Urug @ Rp. 130,000.00 = Rp. 1,430.00

Jumlah I Rp. 272,660.40

Tenaga 0.060 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,440.00

0.030 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 900.00

0.003 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 94.50

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 2,509.50

Jumlah I + II Rp. 275,169.90

14 Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm

Bahan 1.600 Bh Pipa Tanah @ Rp. 155,000.00 = Rp. 248,000.00

0.870 Kg Semen portland @ Rp. 43,155.00 = Rp. 37,544.85

0.014 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,030.00

0.014 Pasir Urug @ Rp. 130,000.00 = Rp. 1,820.00

Jumlah I Rp. 289,394.85

Tenaga 0.080 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,920.00

0.040 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,200.00

0.004 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 126.00

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Jumlah II Rp. 3,456.00

Jumlah I + II Rp. 292,850.85

15 Memasang 1 M' Pipa Beton, Diameter 15 Cm - 20 Cm

Bahan 1.100 Bh Pipa Beton @ Rp. 150,000.00 = Rp. 165,000.00

0.027 Batu Bata @ Rp. 900.00 = Rp. 24.30

3.920 Kg Semen portland @ Rp. 43,155.00 = Rp. 169,167.60

0.056 Pasir Pasang @ Rp. 145,000.00 = Rp. 8,120.00

0.024 Pasir Urug @ Rp. 130,000.00 = Rp. 3,120.00

Jumlah I Rp. 345,431.90

Tenaga 0.140 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,360.00

0.070 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,100.00

0.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.50

0.007 Oh Mandor @ Rp. 30,000.00 = Rp. 210.00

Membuat 1 Buah Bak Fiberglass Volume 1 M3 Air

M3

M3

M3

M3

M3

M3

M3

Page 100: bayu (2) estiminasi

Jumlah II Rp. 5,890.50

Jumlah I + II Rp. 351,322.40

16 Memasang 1 M' Pipa Beton, Diameter 30 Cm - 100 Cm

Bahan 1.100 Bh Pipa Beton @ Rp. 155,000.00 = Rp. 170,500.00

0.550 Batu Bata @ Rp. 900.00 = Rp. 495.00

10.300 Kg Semen portland @ Rp. 43,155.00 = Rp. 444,496.50

0.061 Pasir Pasang @ Rp. 145,000.00 = Rp. 8,845.00

0.069 Pasir Urug @ Rp. 130,000.00 = Rp. 8,970.00

Jumlah I Rp. 633,306.50

Tenaga 0.380 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,120.00

0.190 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 5,700.00

0.019 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 598.50

0.019 Oh Mandor @ Rp. 30,000.00 = Rp. 570.00

Jumlah II Rp. 15,988.50

Jumlah I + II Rp. 649,295.00

17 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30x30) Cm, Tinggi 35 Cm

Bahan 0.145 Batu Bata @ Rp. 900.00 = Rp. 130.50

44.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 1,898,820.00

0.070 Pasir Pasang @ Rp. 145,000.00 = Rp. 10,150.00

0.070 Kerikil Beton @ Rp. 137,500.00 = Rp. 9,625.00

1.600 Kg Besi Beton @ Rp. 0.00 = Rp. 0.00

0.060 Pasir Beton @ Rp. 165,000.00 = Rp. 9,900.00

Jumlah I Rp. 1,928,625.50

Tenaga 3.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 76,800.00

1.015 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 30,450.00

0.0015 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 47.25

0.016 Oh Mandor @ Rp. 30,000.00 = Rp. 480.00

Jumlah II Rp. 107,777.25

Jumlah I + II Rp. 2,036,402.750

18 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45x45) Cm, Tinggi 50 Cm

Bahan 0.250 Batu Bata @ Rp. 900.00 = Rp. 225.00

77.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 3,322,935.00

0.130 Pasir Pasang @ Rp. 145,000.00 = Rp. 18,850.00

0.020 Kerikil Beton @ Rp. 137,500.00 = Rp. 2,750.00

2.600 Kg Besi Beton @ Rp. 0.00 = Rp. 0.00

0.090 Pasir Beton @ Rp. 165,000.00 = Rp. 14,850.00

Jumlah I Rp. 3,359,610.00

Tenaga 1.420 Oh Pekerja @ Rp. 24,000.00 = Rp. 34,080.00

0.473 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 14,190.00

0.047 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,480.50

0.071 Oh Mandor @ Rp. 30,000.00 = Rp. 2,130.00

Jumlah II Rp. 51,880.50

Jumlah I + II Rp. 3,411,490.500

19 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60x60) Cm, Tinggi 50 Cm

Bahan 0.371 Batu Bata @ Rp. 900.00 = Rp. 333.90

114.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 4,919,670.00

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 101: bayu (2) estiminasi

0.184 Pasir Pasang @ Rp. 145,000.00 = Rp. 26,680.00

0.033 Kerikil Beton @ Rp. 137,500.00 = Rp. 4,537.50

4.850 Kg Besi Beton @ Rp. 0.00 = Rp. 0.00

0.120 Pasir Beton @ Rp. 165,000.00 = Rp. 19,800.00

Jumlah I Rp. 4,971,021.40

Tenaga 2.160 Oh Pekerja @ Rp. 24,000.00 = Rp. 51,840.00

0.720 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 21,600.00

0.072 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 2,268.00

0.108 Oh Mandor @ Rp. 30,000.00 = Rp. 3,240.00

0.100 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 2,400.00

Jumlah II Rp. 81,348.00

Jumlah I + II Rp. 5,052,369.400

20 Memasang 1 M' Pipa Galvanis Diameter 1/2"

Bahan 1.200 M' Pipa Galvanis @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 1,085.00 = Rp. 379.75

Jumlah I Rp. 379.75

Tenaga 0.054 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,296.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.027 Oh Mandor @ Rp. 30,000.00 = Rp. 810.00

Jumlah II Rp. 5,089.50

Jumlah I + II Rp. 5,469.25

21 Memasang 1 M' Pipa Galvanis Diameter 3/4"

Bahan 1.200 M' Pipa Galvanis @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 1,225.00 = Rp. 428.75

Jumlah I Rp. 428.75

Tenaga 0.054 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,296.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.027 Oh Mandor @ Rp. 30,000.00 = Rp. 810.00

Jumlah II Rp. 5,089.50

Jumlah I + II Rp. 5,518.250

22 Memasang 1 M' Pipa Galvanis Diameter 1"

Bahan 1.200 1.2 M' Pipa Galvanis @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 18,742.50 = Rp. 6,559.88

Jumlah I Rp. 6,559.88

Tenaga 0.054 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,296.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.027 Oh Mandor @ Rp. 30,000.00 = Rp. 810.00

Jumlah II Rp. 5,089.50

Jumlah I + II Rp. 11,649.38

23

Bahan 1.200 1.2 M' Pipa Galvanis @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 2,275.00 = Rp. 796.25

Jumlah I Rp. 796.25

Tenaga 0.108 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,592.00

0.180 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 5,400.00

M3

M3

M3

Memasang 1 M' Pipa Galvanis Diameter 11/2"

Page 102: bayu (2) estiminasi

0.018 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 567.00

0.0054 Oh Mandor @ Rp. 30,000.00 = Rp. 162.00

Jumlah II Rp. 8,721.00

Jumlah I + II Rp. 9,517.25

24 Memasang 1 M' Pipa Galvanis Diameter 3"

Bahan 1.200 1.2 M' Pipa Galvanis @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 4,242.00 = Rp. 1,484.70

Jumlah I Rp. 1,484.70

Tenaga 0.108 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,592.00

0.180 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 5,400.00

0.018 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 567.00

0.0054 Oh Mandor @ Rp. 30,000.00 = Rp. 162.00

Jumlah II Rp. 8,721.00

Jumlah I + II Rp. 10,205.70

25 Memasang 1 M' Pipa Galvanis Diameter 4"

Bahan 1.200 M' Pipa Galvanis @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 4,242.00 = Rp. 1,484.70

Jumlah I Rp. 1,484.70

Tenaga 0.135 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,240.00

0.225 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,750.00

0.0225 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 708.75

0.0068 Oh Mandor @ Rp. 30,000.00 = Rp. 204.00

Jumlah II Rp. 10,902.75

Jumlah I + II Rp. 12,387.450

26 Memasang 1 M' Pipa PVC Tipe AW Diameter 1/2"

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 196.00 = Rp. 68.60

Jumlah I Rp. 68.60

Tenaga 0.036 Oh Pekerja @ Rp. 24,000.00 = Rp. 864.00

0.060 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,800.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.0018 Oh Mandor @ Rp. 30,000.00 = Rp. 54.00

Jumlah II Rp. 2,907.00

Jumlah I + II Rp. 2,975.600

27 Memasang 1 M' Pipa PVC Tipe AW Diameter 3/4"

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 245.00 = Rp. 85.75

Jumlah I Rp. 85.75

Tenaga 0.036 Oh Pekerja @ Rp. 24,000.00 = Rp. 864.00

0.060 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,800.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.0018 Oh Mandor @ Rp. 30,000.00 = Rp. 54.00

Jumlah II Rp. 2,907.00

Page 103: bayu (2) estiminasi

Jumlah I + II Rp. 2,992.750

28 Memasang 1 M' Pipa PVC Tipe AW Diameter 1"

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 74.20 = Rp. 25.97

Jumlah I Rp. 25.97

Tenaga 0.036 Oh Pekerja @ Rp. 24,000.00 = Rp. 864.00

0.060 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,800.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.0018 Oh Mandor @ Rp. 30,000.00 = Rp. 54.00

Jumlah II Rp. 2,907.00

Jumlah I + II Rp. 2,932.97

29

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 74.20 = Rp. 25.97

Jumlah I Rp. 25.97

Tenaga 0.036 Oh Pekerja @ Rp. 24,000.00 = Rp. 864.00

0.060 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,800.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.0018 Oh Mandor @ Rp. 30,000.00 = Rp. 54.00

Jumlah II Rp. 2,907.00

Jumlah I + II Rp. 2,932.97

30 Memasang 1 M' Pipa PVC Tipe AW Diameter 2"

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 102.90 = Rp. 36.02

Jumlah I Rp. 36.02

Tenaga 0.054 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,296.00

0.090 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 2,700.00

0.009 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 283.50

0.0027 Oh Mandor @ Rp. 30,000.00 = Rp. 81.00

Jumlah II Rp. 4,360.50

Jumlah I + II Rp. 4,396.515

31

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 1,108.57 = Rp. 388.00

Jumlah I Rp. 388.00

Tenaga 0.036 Oh Pekerja @ Rp. 24,000.00 = Rp. 864.00

0.060 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,800.00

0.006 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 189.00

0.0018 Oh Mandor @ Rp. 30,000.00 = Rp. 54.00

Jumlah II Rp. 2,907.00

Jumlah I + II Rp. 3,295.00

32 Memasang 1 M' Pipa PVC Tipe AW Diameter 3"

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 174.30 = Rp. 61.01

Jumlah I Rp. 61.01

Tenaga 0.081 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,944.00

0.135 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,050.00

0.0135 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 425.25

0.0041 Oh Mandor @ Rp. 30,000.00 = Rp. 123.00

Jumlah II Rp. 6,542.25

Jumlah I + II Rp. 6,603.255

Memasang 1 M' Pipa PVC Tipe AW Diameter 11/2"

Memasang 1 M' Pipa PVC Tipe AW Diameter 21/2"

Page 104: bayu (2) estiminasi

33 Memasang 1 M' Pipa PVC Tipe AW Diameter 4"

Bahan 1.200 M' Pipa PVC @ Rp. 0.00 = Rp. 0.00

35.0 % Harga Pipa Perlengkapan @ Rp. 263.20 = Rp. 92.12

Jumlah I Rp. 92.12

Tenaga 0.081 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,944.00

0.135 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 4,050.00

0.0135 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 425.25

0.0041 Oh Mandor @ Rp. 30,000.00 = Rp. 123.00

Jumlah II Rp. 6,542.25

Jumlah I + II Rp. 6,634.370

34 Memasang 1 Buah Bak Cuci Piring Stainless Steel

Bahan 1.000 Bh Bak Cuci Stainless Steel @ Rp. 286,000.00 = Rp. 286,000.00

1.000 Set Water Drain dan Asesories @ Rp. 13,000.00 = Rp. 13,000.00

Jumlah I Rp. 299,000.00

Tenaga 0.030 Oh Pekerja @ Rp. 24,000.00 = Rp. 720.00

0.300 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 9,000.00

0.030 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 945.00

0.0015 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00

Jumlah II Rp. 10,710.00

Jumlah I + II Rp. 309,710.00

35 Memasang 1 Buah Bak Cuci Piring Teraso

Bahan 1.000 Bh Bak Cuci Teraso @ Rp. 88,000.00 = Rp. 88,000.00

1.000 Bh Water Drain dan Asesories @ Rp. 13,000.00 = Rp. 13,000.00

20.000 Kg Semen Portland @ Rp. 43,155.00 = Rp. 863,100.00

0.0025 Pasir @ Rp. 165,000.00 = Rp. 412.50

Jumlah I Rp. 964,512.50

Tenaga 0.050 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,200.00

0.500 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 15,000.00

0.050 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,575.00

0.0025 Oh Mandor @ Rp. 30,000.00 = Rp. 75.00

Jumlah II Rp. 17,850.00

Jumlah I + II Rp. 982,362.50

36 Memasang 1 Buah Kran Diameter 3/4" atau 1/2"

Bahan 1.000 Bh Kran Air @ Rp. 23,450.00 = Rp. 23,450.00

0.025 Bh Seal Tape @ Rp. 1,500.00 = Rp. 37.50

Jumlah I Rp. 23,487.50

Tenaga 0.010 Oh Pekerja @ Rp. 24,000.00 = Rp. 240.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 3,705.00

Jumlah I + II Rp. 27,192.50

37 Memasang 1 Buah Floor Drain

Bahan 1.000 Bh Floor Drain @ Rp. 5,750.00 = Rp. 5,750.00

Jumlah I Rp. 5,750.00

M3

Page 105: bayu (2) estiminasi

Tenaga 0.010 Oh Pekerja @ Rp. 24,000.00 = Rp. 240.00

0.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.00

0.010 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 315.00

0.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00

Jumlah II Rp. 3,705.00

Jumlah I + II Rp. 9,455.00

Page 106: bayu (2) estiminasi

D A F T A R A N A L I S A

90,042.25

16,460.00

106,502.25

132,934.75

16,460.00

149,394.75

1,271,850.70

14,060.00

1,285,910.70

17,644.00

5,680.00

23,324.00

Page 107: bayu (2) estiminasi

1,141,276.00

142,900.00

1,284,176.00

290,837.55

88,100.00

378,937.55

354,550.00

72,450.00

427,000.00

25,500.00

25,500.00

356,770.80

Page 108: bayu (2) estiminasi

88,100.00

444,870.80

44,068.00

8,595.00

52,663.00

15,125.00

7,922.50

23,047.50

25,600.00

25,500.00

51,100.00

169,998.00

169,998.00

160,998.00

160,998.00

6,510.00

2,356.00

8,866.00

890,515.00

Page 109: bayu (2) estiminasi

13,412.00

903,927.00

10,800.00

10,800.00

14,184.00

14,184.00

19,830.00

19,830.00

16,860.00

16,860.00

33,750.00

33,750.00

22,242.00

22,242.00

1,350.00

1,350.00

13,884.00

13,884.00

5,178.00

5,178.00

13,500.00

13,500.00

156,000.00

7,500.00

163,500.00

Page 110: bayu (2) estiminasi

45,897.50

33,606.00

79,503.50

5,500.00

33,574.50

39,074.50

33,000.00

4,050.00

37,050.00

132,000.00

6,750.00

138,750.00

36,750.00

28,140.00

64,890.00

153,000.00

30,001.50

183,001.50

488,365.20

Page 111: bayu (2) estiminasi

54,360.00

542,725.20

396,862.70

54,360.00

451,222.70

365,805.00

54,360.00

420,165.00

349,171.20

54,360.00

403,531.20

320,585.30

54,360.00

374,945.30

300,761.60

54,360.00

355,121.60

286,827.70

Page 112: bayu (2) estiminasi

54,360.00

341,187.70

264,387.10

54,360.00

318,747.10

239,118.60

54,360.00

293,478.60

195,178.00

54,360.00

249,538.00

324,703.60

54,360.00

379,063.60

232,531.60

54,360.00

Page 113: bayu (2) estiminasi

286,891.60

219,324.60

54,360.00

273,684.60

743,671.20

104,677.50

848,348.70

450,793.00

69,465.00

520,258.00

399,769.05

47,710.50

447,479.55

Page 114: bayu (2) estiminasi

319,190.90

36,975.00

356,165.90

447,956.10

50,287.50

498,243.60

376,830.70

50,287.50

427,118.20

376,830.70

50,287.50

427,118.20

18,971.00

28,443.00

47,414.00

393,289.20

Page 115: bayu (2) estiminasi

50,287.50

443,576.70

439,668.00

50,287.50

489,955.50

492,461.20

50,287.50

542,748.70

451,676.70

50,287.50

501,964.20

517,956.60

50,287.50

568,244.10

576,224.90

50,287.50

626,512.40

Page 116: bayu (2) estiminasi

572,264.00

50,287.50

622,551.50

490,476.60

50,287.50

540,764.10

490,476.60

89,602.50

580,079.10

456,587.10

89,602.50

546,189.60

510,357.70

89,602.50

599,960.20

545,440.00

89,602.50

Page 117: bayu (2) estiminasi

635,042.50

688,106.50

89,602.50

777,709.00

534,440.00

89,602.50

624,042.50

157,500.00

2,254.50

159,754.50

162,750.00

2,254.50

165,004.50

162,750.00

14,340.00

177,090.00

162,750.00

14,340.00

177,090.00

162,750.00

Page 118: bayu (2) estiminasi

14,340.00

177,090.00

162,750.00

14,340.00

177,090.00

6,337.50

409.05

6,746.55

6,272.50

294.75

6,567.25

86,965.00

1,473.75

88,438.75

32,880.00

15,371.00

48,251.00

36,455.00

15,371.00

51,826.00

Page 119: bayu (2) estiminasi

108,410.00

17,560.50

125,970.50

111,050.00

18,040.50

129,090.50

178,810.00

18,040.50

196,850.50

123,260.00

18,040.50

141,300.50

Page 120: bayu (2) estiminasi

100,357.50

18,040.50

118,398.00

531,507.80

186,150.00

717,657.80

523,990.00

186,150.00

710,140.00

32,296.00

5,367.50

37,663.50

1,540,351.30

173,852.50

1,714,203.80

Page 121: bayu (2) estiminasi

1,900,111.30

223,613.50

2,123,724.80

2,563,951.30

289,647.50

2,853,598.80

2,525,701.30

274,320.00

2,800,021.30

Page 122: bayu (2) estiminasi

2,362,901.30

264,710.00

2,627,611.30

2,418,141.30

265,402.50

2,683,543.80

30,586.90

3,381.00

33,967.90

32,303.55

Page 123: bayu (2) estiminasi

5,607.00

37,910.55

1,012.00

1,818.00

2,830.00

0.00

38,107.50

38,107.50

0.00

60,165.00

60,165.00

0.00

64,488.00

64,488.00

0.00

68,760.00

68,760.00

0.00

60,163.50

60,163.50

Page 124: bayu (2) estiminasi

0.00

28,560.00

28,560.00

0.00

73,663.50

73,663.50

0.00

60,163.50

60,163.50

0.00

20,055.00

20,055.00

0.00

20,055.00

20,055.00

0.00

61,560.00

61,560.00

83,952.00

5,730.00

Page 125: bayu (2) estiminasi

89,682.00

14,652.00

5,730.00

20,382.00

14,652.00

5,730.00

20,382.00

15,752.00

5,730.00

21,482.00

30,415.00

11,460.00

41,875.00

23,520.50

16,425.00

39,945.50

30,874.00

Page 126: bayu (2) estiminasi

13,785.00

44,659.00

23,465.00

11,925.00

35,390.00

23,465.00

11,925.00

35,390.00

203,819.29

23,130.00

226,949.29

189,231.16

23,130.00

212,361.16

181,634.15

23,130.00

Page 127: bayu (2) estiminasi

204,764.15

176,400.31

23,130.00

199,530.31

173,950.82

23,130.00

197,080.82

171,568.66

23,130.00

194,698.66

166,650.05

23,130.00

189,780.05

98,054.18

11,445.00

109,499.18

91,865.75

Page 128: bayu (2) estiminasi

11,445.00

103,310.75

88,202.75

11,445.00

99,647.75

86,160.65

11,445.00

97,605.65

84,879.81

11,445.00

96,324.81

84,285.99

11,445.00

95,730.99

357,757.50

11,445.00

369,202.50

Page 129: bayu (2) estiminasi

DAFTAR HARGA SATUAN UPAH, BAHAN

NO. JENIS UPAH / BAHAN MEREK MODEL / UKURAN SATUANHARGA

SATUAN

1 2 3 4 5

I. UPAH KERJA

1 Mandor Oh 30,000.00

2 Kepala Tukang Oh 28,500.00

3 Kepala Tukang Batu Oh 31,500.00

4 Tukang Batu Terampil Oh 30,000.00

5 Tukang Batu Setengah Terampil Oh 28,000.00

6 Kepala Tukang Kayu Oh 31,500.00

7 Tukang Kayu Terampil Oh 30,000.00

8 Tukang Kayu Setengah Terampil Oh 28,000.00

9 Kepala Tukang Besi Beton Oh 31,500.00

10 Kepala Tukang Besi Konstruksi / Profil Oh 31,500.00

11 Tukang Besi beton terampil Oh 30,000.00

12 Tukang Besi beton Setengah Terampil Oh 28,000.00

13 Tukang Besi IWF / Profil Terampil Oh 30,000.00

14 Tukang Besi IWF / Profil Setengah Terampil Oh 28,000.00

15 Tukang Cat Oh 28,000.00

16 Tukang Politur Oh 28,000.00

17 Tukang Pipa Oh 27,000.00

18 Pekerja Oh 24,000.00

19 Operator Oh 32,000.00

20 Pembantu Operator Oh 24,500.00

21 Supir Truck Oh 26,000.00

22 Kenek Truck Oh 24,500.00

23 Penjaga Malam Oh 25,000.00

II. BAHAN

I Minyak Pelumas

1 Solar Ltr 2,200.00

2 Bensin Ltr 2,400.00

3 Minyak Tanah Ltr 1,250.00

4 Pelumas / Oli Ltr 18,050.00

5 Gumuk / Fat Kg 12,550.00

II Kran / Saringan Air

1 Avor / Saringan Air Bh 14,050.00

2 Kran Air Bh 23,450.00

3 Floor Air Bh 5,750.00

4 Seal Tape Bh 1,500.00

III Kunci Pintu

1 Kunci Pintu 1 Slaag Cap Kuda Terbang Bh 50,550.00

2 Kunci Pintu 2 Slaag Kwalitas I Bh 86,000.00

3 Grendel Jendela Bh 5,500.00

4 Kait Angin Bh 8,000.00

5 Kertas Ampelas Bh 4,500.00

6 List Profil 5 Bh 4,650.00

7 Engsel Jendela Kuningan Bh 8,000.00

8 Engsel Pintu Kuningan Bh 7,200.00

IV Mur / Baut / Angker

1 Mur / Baut Kg 11,400.00

2 Baut / Beugel Kg 11,400.00

3 Angker / Baut Kg 11,400.00

V Meja / Kursi / Lemari

1 Meja Murid Standar Bh 225,000.00

2 Kursi Murid Standar Bh 150,000.00

3 Meja Guru Standar Bh 260,000.00

4 Kursi Guru Standar Bh 277,000.00

5 Lemari Buku / Arsip Standar Bh 600,000.00

6 Papan Tulis Triplex 2 Cm Standar Bh 450,000.00

7 Papan Data Lapis Fornika Bh 450,000.00

8 Meja Kursi Adimistrasi Psg 500,000.00

9 Meja Kursi Kepsek 1/2 Biro Psg 650,000.00

10 Meja Kursi Tama Standar Psg 400,000.00

VI Batu Kali

1 Batu Bulat (Utuh) 95,000.00

2 Batu Karang 90,000.00

3 Batu Bulat 15 Cm 95,000.00

4 Batu Pecah 10 / 5 Cm 110,000.00

5 Kerikil Beton / Bt Pecah 7 / 5 Cm 110,000.00

6 Kerikil Beton / Bt Pecah 2/3 2 / 3 Cm 137,500.00

7 Kerikil Beton / Bt Pecah 5/7 5 / 7 Cm 150,000.00

8 Kerikil Halus 0.5 / 1 Cm 155,000.00

9 Kerikil Kasar 3 / 5 Cm 165,000.00

VII Pasir Tanah

1 Pasir Urug 130,000.00

2 Pasir Pasang 145,000.00

3 Pasir Beton 165,000.00

4 Sirtu 110,000.00

5 Tanah Urug 105,000.00

6 Pasir Halus 165,000.00

VIII Batu Bata

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3 / Drum

M3

Page 130: bayu (2) estiminasi

1 Batu Bata Kls 1 Bh 1,000.00

2 Batu Bata Kls 2 Bh 500.00

3 Batu Bata Merah Bh 900.00

4 Paving Stone Bh 1,550.00

IX Kapur Aduk

1 Kapur Sirh Kg 27,500.00

2 Kapur Batu 165,000.00

3 Kapur Api Kg / Drum 192,500.00

X Semen

1 Semen Pc 50 Kg Zak 43,155.00

2 Semen Warna 1 Kg Kg 3,200.00

3 Semen merah 50 Kg Zak 78,400.00

4 Semen Portland 50 Kg Zak 43,155.00

5 Semen Bosowa 50 Kg Zak 40,000.00

6 Semen Cibinong 50 Kg Zak 40,000.00

7 Semen Tonasa 50 Kg Zak 43,155.00

8 Semen Padang 50 Kg Zak 43,155.00

9 Semen Anoda 50 Kg Zak 43,155.00

10 Semen Nusantara 50 Kg Zak 43,155.00

11 Semen Andalas 50 Kg Zak 43,155.00

12 Semen Putih 50 Kg Zak 78,400.00

13 Semen Tiga Roda 50 Kg Zak 40,000.00

XI Batako Cetak

1 Kwalitas 1 ( Pres ) Bh 1,210.00

2 Kwalitas 2 Bh 1,100.00

3 Kwalitas 3 Bh 825.00

XII Bahan Atap

1 Atap Nipa Rumbia Lbr 2,500.00

2 Geteng Besar Bh 4,000.00

3 Gentang Sedang Bh 3,500.00

4 Gentang Beton Bh 2,500.00

XIII Asbes Gelombang Kecil

1 300x92x0.5 mm Lbr 66,000.00

2 270x92x0.5 mm Lbr 55,000.00

3 240x92x0.5 mm Lbr 39,600.00

4 210x80x0.5 mm Lbr 33,000.00

5 150x92x0.5 mm Lbr 24,000.00

6 Nok Gelombang Kecil 22,000.00

XIV Seng

1 Seng Gelombang Bjls,0.20 Lbr 24,000.00

2 Seng Gelombang Bjls,0.27 Lbr 26,400.00

3 Seng Gelombang Bjls,0.30 Lbr 35,000.00

4 Seng Gelombang Bjls,0.25 Lbr 29,000.00

5 Seng Plat Bjls,0.30 Lbr 31,000.00

6 Seng Plat Bjls,0.25 Lbr 25,000.00

XV Ijuk

1 Ijuk Ikat 27,500.00

XVI Bahan Kayu

1 Kayu Besi 10/10x3 m' 1,800,000.00

2 Kayu Besi 5/10x3 m' 1,600,000.00

3 Kayu Besi 6/12x3 m' 1,700,000.00

4 Papan Kayu Besi 3/25x3 m' 1,450,000.00

XVII Kayu Linggua

1 Papan Tebal 4 Cm 1,400,000.00

2 Papan Tebal 3 Cm 1,200,000.00

3 Papan Tebal 2 Cm 800,000.00

XVIII Kayu Kelas II

1 Makila / Samama 10/10x3 m' 1,100,000.00

2 Makila / Samama 5/10x3 m' 1,045,000.00

3 Papan tebal 3 Cm 990,000.00

4 Papan tebal 2 Cm 715,000.00

XIX Reep / Lat

1 Kayu Kls I 5/7 Cm x 3 m' 1,485,000.00

2 Kayu Kls II 3/5 Cm x 3 m' 880,000.00

3 Kayu Kls I 2/5 Cm x 3 m' 1,485,000.00

4 Kayu Kls II 5/7 Cm x 3 m' 880,000.00

5 Kayu Kls II 3/5 Cm x 3 m' 880,000.00

6 Kayu Kls II 2/3 Cm x 3 m' 880,000.00

7 Kayu Tongko Disesuaikan 100,000.00

8 Kayu Profil M' 5,000.00

XX Bambu

1 Besar Mdl. 15 Cm Btg 11,000.00

2 Sedang Mdl. 10 Cm Btg 8,250.00

3 Kecil Mdl. 0.5 Cm Btg 8,250.00

XXI Beton Cetak

1 Lobang Air tembika Disesuaikan Bh

XXII Beton Buis

1 Mdl. 10 Cm x 1 M' Bh 19,800.00

2 Mdl. 15 Cm x 1 M' Bh 19,250.00

3 Mdl. 16 Cm x 1 M' Bh

4 Mdl. 20 Cm x 1 M' Bh 220,000.00

5 Mdl. 25 Cm x 1 M' Bh 231,000.00

6 Mdl. 30 Cm x 1 M' Bh 99,000.00

M3

M1

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 131: bayu (2) estiminasi

XXIII Bahan Lantai

1 Ubin Pc Abu - Abu 20 x 20 Cm Bh 42,000.00

2 Ubin Pc Warna 20 x 20 Cm Bh 42,000.00

3 Ubin Pc Warna 20 x 20 Cm Bh 9,900.00

4 Ubin Pc Warna 20 x 20 Cm Bh 8,250.00

5 Print Pc Abu - Abu 20 x 20 Cm Bh 6,600.00

6 Print Pc Warna 15 x 20 Cm Bh 5,500.00

7 Wafal Warna 20 x 20 Cm Bh 7,700.00

8 Wafal Warna 30 x 20 Cm Bh 9,900.00

9 Teraso 30 x 20 Cm Bh 9,900.00

XXIV Ubin Porselen

1 Lokal Putih 11 x 11 Cm Doos 57,200.00

2 Lokal Warna 11 x 11 Cm Doos 55,000.00

3 Lokal Kembang 11 x 11 Cm Doos 55,000.00

4 Lokal Putih 15 x 15 Cm Doos 52,800.00

5 Lokal Warna 15 x 15 Cm Doos 52,800.00

6 Lokal Kembang 15 x 15 Cm Doos 52,800.00

7 Mosaik Porselen Lokal Doos 33,000.00

8 Vinil Lapis Asbes Doos

9 Vinil Lapis Karet Doos 17,416.67

10 Vinil Roil 2 An 2 x 1 m' M'

11 Karpet Kls I M' 66,000.00

12 Karpet Kls II M' 49,500.00

13 Karpet Kls III M' 44,000.00

14 Lem Vinyil Kg 3,000.00

XXV Bahan Besi

1 Besi Beton Kg 5,850.00

Diameter 4.5" Staf 7,500.00

Diameter 5" Staf 9,950.00

Diameter 5.5" Staf 10,800.00

Diameter 6" Staf 13,000.00

Diameter 6.5" Staf 15,850.00

Diameter 6.8" Staf 16,900.00

Diameter 7" Staf 16,500.00

Diameter 8" Staf 21,000.00

Diameter 9" Staf 25,900.00

Diameter 10" Staf 33,000.00

Diameter 12" Staf 47,000.00

Diameter 13" Staf 59,150.00

Diameter 14" Staf 72,000.00

Diameter 15" Staf 83,000.00

Diameter 16" Staf 103,000.00

Diameter 18" Staf 117,200.00

Diameter 19" Staf 137,000.00

Diameter 20" Staf 147,400.00

Diameter 22" Staf 207,000.00

2 Besi beton Mdl. 4 mm - 12 m' M' 3,500.00

3 Besi beton Mdl. 6 mm - 12 m' M' 8,500.00

4 Besi beton Mdl. 8 mm - 12 m' M' 13,500.00

5 Besi beton Mdl. 18 mm - 12 m' M' 20,000.00

6 Besi beton Mdl. 12 mm - 12 m' M' 29,500.00

7 Besi beton Mdl. 19 mm - 12 m' M' 95,000.00

8 Besi beton Mdl. 25 mm - 12 m' M' 125,000.00

9 Besi Plat ( 3' x 6' ) Tbl. 0.7 mm M' 155,000.00

10 Besi Plat ( 3' x 6' ) Tbl. 1.2 mm M' 202,000.00

11 Besi Plat ( 4' x 8' ) Tbl. 0.9 mm M' 157,000.00

12 Besi Plat ( 4' x 8' ) Tbl. 0.8 mm M' 156,000.00

13 Besi Plat ( 4' x 8' ) Tbl. 0.3 mm Staf 225,000.00

14 Besi Plat ( 4' x 8' ) Tbl. 0.2 mm Staf 208,000.00

15 Besi Siku 30 x 30 x 3 Cm Staf 40,000.00

16 Besi Siku 40 x 40 x 4 Cm Staf 54,000.00

17 Besi Siku 50 x 50 x 5 Cm Staf 85,000.00

18 Besi Siku 60 x 60 x 6 Cm Staf 147,000.00

19 Besi Siku 100 x 100 x 10 Cm Staf 545,000.00

Z Plat Strip

1 3/4 x 1/8 x 6 M Lbr 20,000.00

2 3/4 x 3/8 x 6 M Lbr 24,500.00

3 1' x 1/8 x 6 M Lbr 25,000.00

4 1 x 3/6 x 6 M Lbr 27,000.00

XXVI Plat Alluminium

1 Ukuran 0.5 mm Lbr 98,000.00

2 Ukuran 0.6 mm Lbr 120,000.00

3 Ukuran 0.4 mm Lbr 80,000.00

XXVII Kawat

1 Ikat Beton (Bendrat) Kg 9,000.00

2 Nyamuk Plastik ( Kasa ) 12,000.00

3 Kawat Beton 13,000.00

4 Saringan Pasir ( Ayakan ) 15,000.00

5 Kawat Duri Rool 50,000.00

6 Kawat Bronjong 4 mm Rool 75,000.00

XXVIII Bahan Langit - Langit

1 Teakwood 3 mm Uk. 122 x 244 Cm Lembar 67,000.00

2 Triplex 3 mm Uk. 122 x 244 Cm Lembar 54,000.00

5 mm Uk. 122 x 244 Cm Lembar 55,000.00

M2

M2

M2

Page 132: bayu (2) estiminasi

8 mm Uk. 122 x 244 Cm Lembar 60,000.00

10 mm Uk. 122 x 244 Cm Lembar 78,000.00

20 mm Uk. 122 x 244 Cm Lembar 155,000.00

3 Enternit Kls I 4 x 8 ( 3 mm ) Lbr 125,000.00

4 Enternit Kls II 4 x 8 ( 3 mm ) Lbr 110,000.00

5 Hard Board 4 x 8 ( 3 mm ) Lbr 65,000.00

6 Soat Boart 4 x 8 ( 3 mm ) Lbr 70,000.00

7 Plywood 4 x 8 Lbr 70,000.00

8 Totalwood 4 x 7 Lbr 75,000.00

9 Jabarwood Polos 4 x 8 Lbr 60,000.00

10 Jabarwood Warna 4 x 8 Lbr 65,000.00

11 Formika Polos 3 x 6 Lbr 75,000.00

12 Formika Warna 3 x 6 Lbr 85,000.00

XXIX Bahan Pipa

1 Pipa Besi Galvanis Medium B Dia. 1/2" Medium B 77,500.00

Dia. 3/4" Medium B 87,500.00

Dia. 1" Medium B 108,000.00

Dia. 1/4" Medium B 142,500.00

Dia. 1/2" Medium B 162,500.00

Dia. 2" Medium B 197,000.00

Dia. 21/1" Medium B 248,000.00

Dia. 3" Medium B 303,000.00

2 Pipa Besi Galvanis Medium A Dia. 1/2" Medium A 82,500.00

Dia. 3/4" Medium A 112,000.00

Dia. 1" Medium A 153,000.00

Dia. 1/4" Medium A 197,000.00

Dia. 1/2" Medium A 223,000.00

Dia. 2" Medium A 322,000.00

Dia. 21/1" Medium A 412,500.00

Dia. 3" Medium A 428,000.00

3 Pipa PVc 1/2" AW 14,000.00

3/4" AW 17,500.00

1" AW 5,300.00

1/4" D 5,700.00

1/2" D 6,800.00

2" D 7,350.00

21/2" D 9,700.00

3" D 12,450.00

4" D 18,800.00

4 Pipa GIP Uk. Mdl. 8' Btg 700,000.00

5 Pipa GIP Uk. Mdl. 6' Btg 680,000.00

6 Pipa GIP Uk. Mdl. 4' Btg 670,000.00

7 Pipa GIP Uk. Mdl. 3' Btg 427,000.00

8 Pipa GIP Uk. Mdl. 3/4' Btg 112,000.00

9 Pipa GIP Uk. Mdl. 21/2' Btg 402,000.00

10 Pipa GIP Uk. Mdl. 2' Btg 325,000.00

11 Pipa GIP Uk. Mdl. 11/2' Btg 275,000.00

12 Pipa GIP Uk. Mdl. 1' Btg 270,000.00

13 Pipa GIP Uk. Mdl. 1/2' Btg 255,000.00

14 Pipa PVC Uk. Mdl. 8' Btg 155,000.00

15 Pipa PVC Uk. Mdl. 6' Btg 150,000.00

16 Pipa PVC Uk. Mdl. 4' Btg 143,000.00

17 Pipa PVC Uk. Mdl. 3' Btg 87,000.00

18 Pipa PVC Uk. Mdl. 3/4' Btg 80,000.00

19 Pipa PVC Uk. Mdl. 21/2' Btg 64,000.00

20 Pipa PVC Uk. Mdl. 2' Btg 43,000.00

21 Pipa PVC Uk. Mdl. 1/2' Btg 33,000.00

22 Pipa PVC Uk. Mdl. 1' Btg 19,000.00

23 Pipa PVC Uk. Mdl. 1/2' Btg 13,000.00

XXX Pipa Besi Persegi

Pipa Listrik PVC

1 Klute PVC Uk. Mdl. 1/2' Btg 6,160.00

2 Klute PVC Uk. Mdl. 3/4' Btg 4,950.00

3 Klute PVC Uk. Mdl. 1' Btg 6,160.00

4 Klute PVC Uk. Mdl. 11/4' Btg 8,360.00

5 Klute PVC Uk. Mdl. 11/2' Btg 3,960.00

6 Klute PVC Uk. Mdl. 3' Btg 6,380.00

7 Klute PVC Uk. Mdl. 4' Btg 4,400.00

8 Sook GIP Uk. Mdl. 11/2' Btg 4,950.00

9 Sook GIP Uk. Mdl. 1' Btg 2,750.00

10 Sook GIP Uk. Mdl. 1/2' Btg 1,100.00

XXXI Tegel Keramik

1 Tegel Semen 30 x 30 Cm Bh

20 x 20 Cm 1,950.00

2 Tegel Porselin 10 x 20 Cm 40,400.00

10 x 10 Cm

3 Tegel Keramik 10 x 10 Cm 42,050.00

20 x 20 Cm 42,050.00

20 x 25 Cm 53,650.00

30 x 30 Cm 42,050.00

40 x 40 Cm 50,350.00

4 Mulia Putih Polos 30 x 30 Polos 31,500.00

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M1

M2

M2

M2

Page 133: bayu (2) estiminasi

5 Kdi Grand Master 30 x 30 Polos 45,000.00

6 Mass Roma 6 30 x 30 Polos 40,000.00

7 Accura Vonda 40 x 40 Polos 38,000.00

8 Masterina Marun 40 x 40 Polos 37,000.00

9 Kia Putih 20 x 20 Polos 40,000.00

10 Accura Vonda 20 x 20 Polos 60,000.00

11 Accura Millinium Greend Pesso 30 x 30 Polos 37,500.00

12 Maestro Leonard Interium 30 x 30 Polos 450,000.00

XXXII Bahan Kaca

1 Kaca Raybend 3 mm Uk. 152 x 122 Cm 91,500.00

5 mm Uk. 152 x 122 Cm 130,200.00

2 Kaca Bening 2 mm Uk. 152 x 122 Cm 35,100.00

3 mm Uk. 152 x 122 Cm 77,150.00

5 mm Uk. 152 x 122 Cm 108,100.00

3 Polos Uk. Tbl. 2 mm 22,000.00

4 Polos Uk. Tbl. 3 mm 27,500.00

5 Polos Uk. Tbl. 5 mm 44,000.00

6 Es / Kembang Uk. Tbl. 2 mm 60,500.00

7 Es / Kembang Uk. Tbl. 3 mm 49,500.00

8 Es / Kembang Uk. Tbl. 5 mm 44,000.00

XXXIII Bahan Listrik

1 Kabel NM 2 x 1 1/2 mm M' 2,750.00

2 Kabel NM 3 x 1 1/2 mm M' 3,300.00

3 Sekring 1 Phase Bh 16,500.00

4 Sekring 1 Phase Bh 24,750.00

5 Saklar Tunggal Bh 10,500.00

6 Saklar Ganda Tanam Bh 25,500.00

7 Saklar Tunggal Timbul Bh 6,000.00

8 Saklar Ganda Timbul Bh 19,000.00

9 Kontak Tanam Bh 8,000.00

10 Saklar Kontak Timbul Bh 5,750.00

11 Saklar Engkel Bh 44,000.00

12 Saklar Double Bh 66,000.00

13 Stopkontak & Instalasi Bh 20,000.00

14 Lampu TL 10 Watt Bh 25,000.00

20 Watt Bh 25,000.00

40 Watt Bh 38,850.00

100 Watt Bh 38,950.00

15 Lampu Jari - Jari 7 Watt Philips Bh 38,950.00

9 Watt Philips Bh 38,950.00

11 Watt Philips Bh 38,950.00

14 Watt Philips Bh 44,450.00

18 Watt Philips Bh 50,000.00

25 Watt Philips Bh 49,750.00

16 Lampu Pijar 5 Watt Bh 2,650.00

10 Watt Bh 3,200.00

15 Watt Bh 3,200.00

25 Watt Bh 3,750.00

40 Watt Bh 4,050.00

60 Watt Bh 4,300.00

75 Watt Bh 4,850.00

100 Watt Bh 22,000.00

17 Lampu Neon ( Komplit ) TL 10 W Bh 27,500.00

18 Lampu Neon ( Komplit ) TL 20 W Bh 55,000.00

19 Lampu TL Lokal Putih Bh 37,750.00

20 Lampu TL Lokal Warna Bh 37,950.00

21 TL Bulat 20 W ( Komplit ) Bh 37,950.00

22 TL Bulat 40 W ( Komplit ) Bh 55,000.00

XXXIV Alat Penggantung Kunci

1 Union Elite ( Komplit ) Bh 82,500.00

2 Union Asli Bh 203,500.00

3 Yale Double Bh 60,500.00

4 Tezah Bh 132,000.00

5 Royal Bh 88,000.00

6 Kuda Terang Bh 44,000.00

XXXV Penggantung

1 Hak Angin Bh 1,650.00

2 Engsel Kupu - Kupu Bh 2,200.00

3 Engsel Nilon Ex Lokal Bh 4,950.00

4 Grendel Bh 1,100.00

5 Kunci Gembok Bh 13,200.00

6 Kunci Firo Bh 44,000.00

XXXVI Bahan Sanitair

1 Kloset Jongkok Lokal Bh 198,000.00

2 Kloset Duduk Ina / Toto Bh 431,400.00

3 Washtafel Ina / Toto Bh 442,450.00

4 Putih Bh 88,000.00

5 Teraso Bh 33,000.00

6 Porselin Bh 66,000.00

7 Warna Bh 88,000.00

8 Keramik Bh 66,000.00

9 Duduk Keramik Bh 88,000.00

10 Washtafel Lokal Putih Bh 192,500.00

11 Warna / Keramik Bh 203,500.00

12 Tempat Cuci 1 Lobang Bh 286,000.00

13 Tempat Cuci 2 Lobang Bh 495,000.00

14 Orincer Lokal Putih Bh 33,000.00

15 Orincer Lokal Warna Bh 88,000.00

16 Tempat Mandi Fiber Glass Bh 66,000.00

17 Lastik Bh 66,000.00

18 Teraso Bh 88,000.00

19 Porselin Bh 33,000.00

20 Saringan Air Besi Bh 22,000.00

21 Saringan Air Plastik Nasional Bh 13,750.00

22 Pompa Air 80 Watt Nasional Bh 29,700.00

23 Pompa Air Dragon Bh 23,700.00

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 134: bayu (2) estiminasi

24 Pompa Air 100 watt Sanyo Bh 77,000.00

25 Pompa Air Tangan Dragon Bh 231,000.00

26 Pompa Tangan Lokal Dragon Bh 220,000.00

XXXVII Aspal Panas

1 Aspal Dingin Drum 880,000.00

2 Aspal Drum Drum 660,000.00

Bahan Paku

1 Paku campur Kg 9,100.00

2 Paku Seng Doos 19,600.00

3 Paku Asbes Bh 19,600.00

4 Paku kait Bh 9,100.00

5 Paku Sumbat Bh 9,100.00

6 Paku Sekring Bh 9,100.00

7 Paku Reng Bh 9,100.00

8 Paku Triplex Kg 11,850.00

9 Paku beton Bh 16,850.00

10 Paku Ukuran 1 - 2 Cm Kg 7,700.00

11 Paku Ukuran 3 - 4 Cm Kg 8,250.00

12 Paku Ukuran 5 - 12 Cm Kg 9,350.00

13 Paku Sirap Kg 6,050.00

14 Paku Sekrup Kg 7,150.00

15 Beud seng Kg 7,425.00

XXXVIII Bahan Finishing

1 Ampelas Kayu / Besi Lbr 1,980.00

2 Dempul Kg 13,200.00

3 Spirtus Ltr

4 Minyak Cat Kg 2,750.00

5 Politur Kg 22,000.00

6 Teao Oil Kg 24,200.00

7 Okir Kg 16,500.00

8 Menie kayu /Besi Kg 12,650.00

9 Cat Meni Kg 12,650.00

10 Cat Besi Kg 24,200.00

11 Cat Dasar Kg 11,000.00

12 Merek Goltex Kg 24,200.00

13 Merek Patua Kg 35,200.00

14 Merek Danapaint Kg 231,000.00

15 Merek Pinotex 5 Kg 13,200.00

16 Plamir 5 Kg 35,000.00

17 Sabun Kg 5,000.00

18 Soda Api Kg

XXXIX Cat Tembok

1 Cat tembok Comilex 20 Kg 121,000.00

Avian 20 Kg 93,500.00

Cat dasar Matex Kg 187,000.00

Matex 5 Kg 38,500.00

Metrolite 5 Kg 60,000.00

2 Cat Kayu Mengikat Atlanta 5 Kg 24,200.00

3 Planton 1 Kg 23,100.00

4 Goltex 1 Kg 23,100.00

XXXX Slang

1 Nipon 1 / 2' Meter 3,300.00

2 Nipon 1 / 4' Meter 4,400.00

3 Biasa 1 / 2' Meter 5,500.00

XXXXI Palu

1 Besar Bh 23,000.00

2 Sedang Bh 27,500.00

3 Kecil Bh 22,000.00

XXXXII Kuas

1 Kuas 2 mm Bh 2,500.00

Bh 3,000.00

3 mm Bh 3,500.00

4 mm Bh 5,500.00

XXXXIII Skop

1 Skop Prowek Bh 27,000.00

2 Skop Ujung Rata Bh 22,000.00

XXXXIV Pacul

1 Pacul Cap Ayam Bh 37,500.00

XXXXV Linggis

1 Linggis Besar Bh 26,000.00

2 Linggis Kecil Bh 23,500.00

XXXXVI Ember

1 Ember Cor Lusin 45,000.00

XXXXVII Mesin Diesel

1 Mesin Diesel Kubota RD - 50 H ( 5 HP ) Bh 3,410,000.00

2 Mesin Diesel Kubota RD - 55 H ( 5 HP ) Bh 3,465,000.00

3 Mesin Diesel Kubota RD - 65 H ( 5 HP ) Bh 3,650,000.00

4 Mesin Diesel Kubota RD - 85 H ( 5 HP ) Bh 4,730,000.00

5 Mesin Diesel Kubota RD - 105 H ( 5 HP ) Bh 5,280,000.00

6 Mesin Diesel Kubota RD - 115 H ( 5 HP ) Bh 8,800,000.00

7 Mesin Diesel Kubota RD - 190 H ( 5 HP ) Bh 9,240,000.00

8 Mesin Diesel Kubota RD - 220 H ( 5 HP ) Bh 1,815,000.00

9 Mesin Diesel Ratna R - 140 H Bh 4,400,000.00

10 Gengset Kap. 2 KW Komplet RD - 50 / POND Bh 6,490,000.00

11 Gengset Kap. 5.5 KW Komplet H - 85 / POND Bh 7,150,000.00

12 Gengset Kap. 5 KW Komplet RD - 150 / POND Bh 7,260,000.00

13 Gengset Kap. 7.5 KW Komplet Bh 7,700,000.00

14 Gengset Kap. 2 KW Komplet KND - 220 H / POND Bh 13,200,000.00

15 Pompa Air TS - 50 ( 2" ) UK Komp RD - 50 / POND Bh 3,520,000.00

16 Pompa Air TS - 80 ( 3" ) UK Komp RD - 85 / POND Bh 4,730,000.00

17 Pompa Air TS - 100 ( 4" ) UK Komp RD - 155 / POND Bh 6,050,000.00

2 1/2 mm

Page 135: bayu (2) estiminasi

72,600.00

Page 136: bayu (2) estiminasi

DAFTAR HARGA SATUAN UPAH, BAHAN

NO. JENIS UPAH / BAHAN MEREK MODEL / UKURAN SATUANHARGA

SATUAN

1 2 3 4 5

I. UPAH KERJA

1 Mandor Oh 30,000.00

2 Kepala Tukang Oh 28,500.00

3 Kepala Tukang Batu Oh 31,500.00

4 Tukang Batu Terampil Oh 30,000.00

5 Tukang Batu Setengah Terampil Oh 28,000.00

6 Kepala Tukang Kayu Oh 31,500.00

7 Tukang Kayu Terampil Oh 30,000.00

8 Tukang Kayu Setengah Terampil Oh 28,000.00

9 Kepala Tukang Besi Beton Oh 31,500.00

10 Kepala Tukang Besi Konstruksi / Profil Oh 31,500.00

11 Tukang Besi beton terampil Oh 30,000.00

12 Tukang Besi beton Setengah Terampil Oh 28,000.00

13 Tukang Besi IWF / Profil Terampil Oh 30,000.00

14 Tukang Besi IWF / Profil Setengah Terampil Oh 28,000.00

15 Tukang Cat Oh 28,000.00

16 Tukang Politur Oh 28,000.00

17 Tukang Pipa Oh 27,000.00

18 Pekerja Oh 24,000.00

19 Operator Oh 32,000.00

20 Pembantu Operator Oh 24,500.00

21 Supir Truck Oh 26,000.00

22 Kenek Truck Oh 24,500.00

23 Penjaga Malam Oh 25,000.00

24 Tukang Gali Oh 24,000.00

II. BAHAN

I Minyak Pelumas

1 Solar Ltr 2,200.00

2 Bensin Ltr 2,400.00

3 Minyak Tanah Ltr 1,250.00

4 Pelumas / Oli Ltr 18,050.00

5 Gumuk / Fat Kg 12,550.00

6 Minyak Bekisting Ltr 18,050.00

7 Lem Kayu Ltr 3,200.008 Sealent Tube 34,250.00

III. Kran / Saringan Air

1 Kran Air Bh 23,450.002 Seal Tape Bh 1,500.00

IV. Bahan Batu

1 Koral Beton 137,500.00

2 Batu Belah 15 / 20 95,000.00

V Bahan Pasir

1 Pasir Pasang 145,000.00

2 Pasir Beton 165,000.00

3 Tanah Urug 105,000.00

M3

M3

M3

M3

M3

Page 137: bayu (2) estiminasi

4 Pasir Urug 130,000.00

VI Batu Bata1 Bata Merah 5x11x22 Cm Bh 900.00

2 Grass Block L8 Pcs 8,000.00VII. Semen

1 Semen Portland Zak 43,155.00

2 Semen Abu - Abu Kg 3,200.003 Semen Warna Kg 3,200.00

VIII. Bahan Kayu

1 Kayu Kamper Balok 8/12 1,200,000.00

2 Kayu 5/7 880,000.00

3 Plywood 4 mm 3/20 Lbr 70,000.00

4 Kayu Papan 990,000.00

5 Kayu Terentang 715,000.00

6 Kayu Borneo balok 880,000.00

7 Plywood 9 mm Lbr 70,000.00

8 Kayu Kamper, Papan 800,000.00

9 Kayu Kamper Balok 2/3-3/5 880,000.00

10 Balok 6/12 880,000.00

11 Papan (pek. plywood) 1,200,000.0012 Plywood 4'x3'x4 mm Lbr 70,000.00

13 Kayu 880,000.00

14 Kayu Biasa 880,000.00

15 Dolken 0 - 8 Cm/ 4 m Btg 17,600.00

IX. Bahan Lantai

1 Ubin Teraso 40 x 40 Cm 50,350.00

2 Ubin Keramik 20x20 Cm 42,050.00X. Bahan Besi

1 Besi Strip Kg 20,000.00

2 Besi Beton Polos Kg 5,850.00

XI. Kawat

1 Kawat Beton Kg 13,000.00

XII. Bahan Langit-Langit

1 Akustik Arm Strong ukuran 80x80 Cm Lbr 54,000.002 Kayu Profil M' 5,000.00

XIII. Bahan Kaca

1 Kaca Cermin 5mm 130,200.002 Jendela Nako Bh 27,500.00

3 Kaca Polos 22,000.00

XIV. Bahan Atap1 Genteng Metal Bh 350002 Seng Plat Lbr 25,000.00

XV. Paku1 Paku Ukuran 3-4 cm Kg 8,250.00

2 5 - 12 Cm Kg 9,350.00 3 1-2 cm Kg 7700

XVI Bahan Pipa1 Pipa PVC 3/4" AW M' 17,500.002 PVC 3" M' 12,450.00

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M2

Page 138: bayu (2) estiminasi

3 PVC 4" M' 18,800.00XVII Kunci

1 Kunci Tanam Bh 50,550.00

2 Sekur Fixer Bh 480.00

XVIII. Bahan Alumunium1 Kusen Alumunium M' 110000

Page 139: bayu (2) estiminasi

ANALISA HARGA SATUANNo Koef. Sat. Uraian Harga Satuan Biaya Jumlah Biaya

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN1

Bahan:1.250 Btg Dolken Kayu 0 8-10/400 Cm @ Rp. 17,600.00 = Rp. 22,000.00

0.180 Kayu @ Rp. 880,000.00 = Rp. 158,400.00

0.850 Kayu Biasa @ Rp. 880,000.00 = Rp. 748,000.001.100 Kg Besi Strip @ Rp. 0.00 = Rp. 0.000.700 Zak Semen Portland @ Rp. 43,155.00 = Rp. 30,208.50

0.150 Pasir Pasang @ Rp. 145,000.00 = Rp. 21,750.00

0.100 Pasir Beton @ Rp. 165,000.00 = Rp. 16,500.00

0.150 Koral Beton @ Rp. 137,500.00 = Rp. 20,625.0030.000 Bh Bata Merah @ Rp. 900.00 = Rp. 27,000.000.250 Lbr Seng Plat @ Rp. 25,000.00 = Rp. 6,250.002.000 Bh Jendela Nako @ Rp. 27,500.00 = Rp. 55,000.00

0.080 Kaca Polos @ Rp. 22,000.00 = Rp. 1,760.000.150 Bh Kunci Tanam @ Rp. 50,550.00 = Rp. 7,582.500.060 Lbr Plywood 4 mm @ Rp. 70,000.00 = Rp. 4,200.00 = Rp. 1,119,276.00

Upah :2.000 Oh Tukang Kayu setengah terampil @ Rp. 28,000.00 = Rp. 56,000.001.000 Oh Tukang Batu @ Rp. 28,000.00 = Rp. 28,000.002.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 48,000.000.300 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 8,550.000.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp. 142,050.00

= Rp. 1,261,326.00

2Upah:

1.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 24,000.000.050 Oh Mandor @ Rp. 30,000.00 = Rp. 1,500.00 = Rp. 25,500.00

= Rp. 25,500.00

3 1 M' Pengukuran dan Pemasangan BouplankBahan:

0.012 Kayu 5/7 @ Rp. 880,000.00 = Rp. 10,560.000.020 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 165.00

0.007 Kayu Papan 3/20 @ Rp. 990,000.00 = Rp. 6,930.00 = Rp. 17,655.00

Upah:0.100 Oh Tukang Kayu setengah terampil @ Rp. 28,000.00 = Rp. 2,800.000.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.000.010 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 285.000.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 = Rp. 5,635.00

= Rp. 23,290.00

B. PEKERJAAN TANAH1 1 m³ Galian Tanah Biasa sedalam 1 Meter

Upah:0.400 Oh Pekerja @ Rp. 24,000.00 = Rp. 9,600.000.040 Oh Mandor @ Rp. 30,000.00 = Rp. 1,200.00 = Rp. 10,800.00

= Rp. 10,800.00

2

1 M2 Pembuatan Kantor Sementaran (direksi keet)

M3

M3

M3

M3

M3

M2

1 M2 Membersihkan Lapangan dan Peralatan

M3

M3

1 M3 Urugan Pasir Bawah Pondasi Menerus

Page 140: bayu (2) estiminasi

Bahan:1.200 Oh Pasir Urug @ Rp. 130,000.00 = Rp. 156,000.00 = Rp. 156,000.00

Upah:0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.000.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00 = Rp. 7,500.00

= Rp. 163,500.00

3Bahan:

1.200 Oh Pasir Urug @ Rp. 130,000.00 = Rp. 156,000.00 = Rp. 156,000.00Upah:

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.000.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00 = Rp. 7,500.00

= Rp. 163,500.00

4Bahan:

1.200 Oh Pasir Urug @ Rp. 130,000.00 = Rp. 156,000.00 = Rp. 156,000.00Upah:

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.000.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00 = Rp. 7,500.00

= Rp. 163,500.00

5Bahan:

1.200 Oh Tanah Urug @ Rp. 105,000.00 = Rp. 126,000.00 = Rp. 126,000.00Upah:

0.300 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,200.000.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00 = Rp. 7,500.00

= Rp. 133,500.00

1 M3 Urugan Pasir Bawah Pondasi Setempat

1 M3 Urugan Pasir Bawah Lantai

1 M3 Urugan Peninggi Pail Lantai

Page 141: bayu (2) estiminasi

6Upah:

0.192 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,608.000.019 Oh Mandor @ Rp. 30,000.00 = Rp. 570.00 = Rp. 5,178.00

= Rp. 5,178.00

7Upah:

0.192 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,608.000.019 Oh Mandor @ Rp. 30,000.00 = Rp. 570.00 = Rp. 5,178.00

= Rp. 5,178.00

C PEKERJAAN PASANGAN

1Bahan:

1.200 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 114,000.00

0.300 Pasir Urug @ Rp. 130,000.00 = Rp. 39,000.00 = Rp. 153,000.00Upah:

0.780 Oh Pekerja @ Rp. 24,000.00 = Rp. 18,720.000.300 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 9,000.000.039 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,111.500.039 Oh Mandor @ Rp. 30,000.00 = Rp. 1,170.00 = Rp. 30,001.50

= Rp. 183,001.50

2Bahan:

1.100 Batu Belah 15 / 20 @ Rp. 95,000.00 = Rp. 104,500.002.720 Zak Semen Portland @ Rp. 43,155.00 = Rp. 117,381.60

0.544 Pasir Pasang @ Rp. 145,000.00 = Rp. 78,880.00 = Rp. 300,761.60Upah:

1.500 Oh Pekerja @ Rp. 24,000.00 = Rp. 36,000.000.600 Oh Tukang Gali @ Rp. 24,000.00 = Rp. 14,400.000.060 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1,710.000.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 = Rp. 54,360.00

= Rp. 355,121.60

1 M3 Urugan Kembali Pondasi Menerus

1 M3 Urugan Kembali Pondasi Setempat

1 M3 Pasangan Pondasi Batu Kosong

M3

M3

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps

M3

M3

Page 142: bayu (2) estiminasi

3Bahan:

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 900.00 = Rp. 63,000.000.287 Zak Semen Portland @ Rp. 43,155.00 = Rp. 12,402.75

0.040 Pasir Pasang @ Rp. 145,000.00 = Rp. 5,800.00 = Rp. 81,202.75Upah:

0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.000.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.000.010 Oh Kepala Tukang Batu @ Rp. 31,500.00 = Rp. 315.000.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 = Rp. 11,445.00

= Rp. 92,647.75

4Bahan

70.000 Bh Bata Merah 5x11x22 Cm @ Rp. 900.00 = Rp. 63,000.000.163 Zak Semen Portland @ Rp. 43,155.00 = Rp. 7,012.69

0.050 Pasir Pasang @ Rp. 145,000.00 = Rp. 7,250.00 Rp. 77,262.69

Upah:0.320 Oh Pekerja @ Rp. 24,000.00 = Rp. 7,680.000.100 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,000.000.010 Oh Kepala Tukang Batu @ Rp. 31,500.00 = Rp. 315.000.015 Oh Mandor @ Rp. 30,000.00 = Rp. 450.00 Rp. 11,445.00

Rp. 88,707.69

5Bahan

0.270 Zak Semen Portland @ Rp. 43,155.00 = Rp. 11,651.85

0.026 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,770.00 Rp. 15,421.85

Upah:0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.000.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.000.020 Oh Kepala Tukang Batu @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00 Rp. 13,005.00 Rp. 28,426.85

6Bahan:

0.130 Zak Semen Portland @ Rp. 43,155.00 = Rp. 5,610.15

0.030 Pasir Pasang @ Rp. 145,000.00 = Rp. 4,350.00 Rp. 9,960.15

Upah:0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.000.200 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 6,000.000.020 Oh Kepala Tukang Batu @ Rp. 31,500.00 = Rp. 630.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00 Rp. 13,005.00 Rp. 22,965.15

1 M2 Pasangan Bata Merah 1/2 Bata, 1 Pc : 3Ps

M3

1 M2 Pasangan Bata Merah Dinding Depan Tebal 1/2 Bata, 1 Pc : 8 Ps

M3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm

M3

1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm

M3

Page 143: bayu (2) estiminasi

7 1 M' Pekerjaan Pasangan Tali Air 1 Pc : 2 PsBahan

0.013 Zak Semen Portland @ Rp. 43,155.00 = Rp. 539.44

0.002 Pasir Pasang @ Rp. 145,000.00 = Rp. 290.00 Rp. 829.44

Tenaga0.057 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,368.000.038 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 1,140.000.038 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,197.000.002 Oh Mandor @ Rp. 30,000.00 = Rp. 60.00 Rp. 3,765.00

Rp. 4,594.44

D. PEKERJAAN BETON

1Bahan

0.200 Zak Semen Portland @ Rp. 43,155.00 = Rp. 8,631.00

0.026 Pasir Beton @ Rp. 165,000.00 = Rp. 4,290.00

0.044 Koral Beton @ Rp. 137,500.00 = Rp. 6,050.00 = Rp. 18,971.00Tenaga

1.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 27,600.000.020 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 600.000.002 Oh Kepala Tukang Batu @ Rp. 31,500.00 = Rp. 63.000.006 Oh Mandor @ Rp. 30,000.00 = Rp. 180.00 = Rp. 28,443.00

= Rp. 47,414.00

2Bahan:

0.200 Kayu Terentang @ Rp. 715,000.00 = Rp. 143,000.001.500 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 12,375.000.400 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 7,220.009.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 388,395.00

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp. 744,040.00Upah:

3.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 93,600.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.001.040 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 29,120.000.245 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 6,982.500.165 Oh Mandor @ Rp. 30,000.00 = Rp. 4,950.00 = Rp. 144,452.50

= Rp. 888,492.50

5Bahan:

0.200 Kayu Terentang @ Rp. 715,000.00 = Rp. 143,000.001.500 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 12,375.000.400 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 7,220.005.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 215,775.00

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp. 571,420.00Upah:

3.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 93,600.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.001.040 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 29,120.000.245 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 6,982.50

M3

1 M3 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr

M3

M3

1 M3 Membuat Pondasi Setempat Beton Bertulang(Beton K225 dan Bekisting)

M3

M3

M3

1 M3 Membuat Sloof 15/30 dan begesting dan Begesting

M3

M3

M3

Page 144: bayu (2) estiminasi

0.165 Oh Mandor @ Rp. 30,000.00 = Rp. 4,950.00 = Rp. 144,452.50= Rp. 715,872.50

Page 145: bayu (2) estiminasi

6Bahan:

0.200 Kayu Terentang @ Rp. 715,000.00 = Rp. 143,000.001.500 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 12,375.000.400 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 7,220.009.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 388,395.00

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp. 744,040.00Upah:

3.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 93,600.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.001.040 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 29,120.000.245 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 6,982.500.165 Oh Mandor @ Rp. 30,000.00 = Rp. 4,950.00 = Rp. 144,452.50

= Rp. 888,492.50

7Bahan:

0.200 Kayu Terentang @ Rp. 715,000.00 = Rp. 143,000.001.500 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 12,375.000.400 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 7,220.005.000 Zak Semen Portland @ Rp. 43,155.00 = Rp. 215,775.00

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00 = Rp. 571,420.00Upah:

3.900 Oh Pekerja @ Rp. 24,000.00 = Rp. 93,600.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.001.040 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 29,120.000.245 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 6,982.500.165 Oh Mandor @ Rp. 30,000.00 = Rp. 4,950.00 = Rp. 144,452.50

= Rp. 715,872.50

8Bahan:

0.320 Kayu Terentang @ Rp. 715,000.00 = Rp. 228,800.003.200 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 26,400.001.600 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 28,880.006.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.120 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 105,600.002.800 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 196,000.00

32.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 563,200.00 = Rp. 1,620,711.30Tenaaga:

5.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 139,200.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.002.800 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 78,400.000.420 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 11,970.000.185 Oh Mandor @ Rp. 30,000.00 = Rp. 5,550.00 = Rp. 244,920.00

= Rp. 1,865,631.30

9 Membuat Ring BalkBahan:

0.320 Kayu Terentang @ Rp. 715,000.00 = Rp. 228,800.00

1 M3 Kolom Struktur 15/30 (K225 dan Bekisting)

M3

M3

M3

1 M3 KOLOM Praktis 15/30 (K175 dan Begesting)

M3

M3

M3

1 M3 Membuat Beton K175

M3

M3

M3

M3

M3

Page 146: bayu (2) estiminasi

3.200 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 26,400.001.600 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 28,880.006.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.120 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 105,600.002.800 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 196,000.00

32.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 563,200.00 = Rp. 1,620,711.30Tenaaga:

5.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 139,200.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.002.800 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 78,400.000.420 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 11,970.000.185 Oh Mandor @ Rp. 30,000.00 = Rp. 5,550.00 = Rp. 244,920.00

= Rp. 1,865,631.30

10 1M³ Pekerjaan Beton Plat Lantai (Beton K225 dan Begesting)Bahan:

0.320 Kayu Terentang @ Rp. 715,000.00 = Rp. 228,800.003.200 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 26,400.001.600 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 28,880.006.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.120 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 105,600.007.000 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 490,000.00

32.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 563,200.00 = Rp. 1,914,711.30Tenaaga:

5.800 Oh Pekerja @ Rp. 24,000.00 = Rp. 139,200.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.002.800 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 78,400.000.420 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 11,970.000.185 Oh Mandor @ Rp. 30,000.00 = Rp. 5,550.00 = Rp. 244,920.00

= Rp. 2,159,631.30

11Bahan:

0.250 Kayu Terentang @ Rp. 715,000.00 = Rp. 178,750.003.000 Kg Paku Ukuran 3-4 cm @ Rp. 8,250.00 = Rp. 24,750.001.200 Ltr Minyak Bekisting @ Rp. 18,050.00 = Rp. 21,660.006.460 Zak Semen Portland @ Rp. 43,155.00 = Rp. 278,781.30

0.520 Pasir Beton @ Rp. 165,000.00 = Rp. 85,800.00

0.780 Koral Beton @ Rp. 137,500.00 = Rp. 107,250.00

0.105 Kayu Borneo balok @ Rp. 880,000.00 = Rp. 92,400.002.500 Lbr Plywood 9 mm @ Rp. 70,000.00 = Rp. 175,000.00

14.000 Btg Dolken o - 8 Cm/ 4 m @ Rp. 17,600.00 = Rp. 246,400.00 = Rp. 1,210,791.30Upah:

5.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 134,400.000.350 Oh Tukang Batu Setengah Terampil @ Rp. 28,000.00 = Rp. 9,800.002.300 Oh Tukang Kayu Setengah Terampil @ Rp. 28,000.00 = Rp. 64,400.000.405 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 11,542.500.202 Oh Mandor @ Rp. 30,000.00 = Rp. 6,060.00 = Rp. 226,202.50

= Rp. 1,436,993.80

M3

M3

M3

M3

M3

M3

M3

1 M3 Membuat Tangga Beton Bertulang (200 Kg Besi dan Bekisting)

M3

M3

M3

M3

Page 147: bayu (2) estiminasi

E. PEKERJAAN PEMBESIAN1 1 Kg Pembesian Polos (Harga Satuan Untuk Semua Item Pembesian)

Bahan:1.050 Kg Besi Beton Polos @ Rp. 5,850.00 = Rp. 6,142.500.015 Kg Kawat Beton @ Rp. 13,000.00 = Rp. 195.00 = Rp. 6,337.50

Upah:0.007 Oh Pekerja @ Rp. 24,000.00 = Rp. 168.000.007 Oh Tukang Besi Terampil @ Rp. 30,000.00 = Rp. 210.00

0.0007 Oh Kepala Tukang Besi Beton @ Rp. 31,500.00 = Rp. 22.050.0003 Oh Mandor @ Rp. 30,000.00 = Rp. 9.00 = Rp. 409.05

= Rp. 6,746.55

F. PEKERJAAN ATAP

1Bahan

1.100 Kayu Kamper, Balok 8/12 @ Rp. 1,200,000.00 = Rp. 1,320,000.0015.000 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.000.800 Kg Paku Ukuran 5 - 12 Cm @ Rp. 9,350.00 = Rp. 7,480.00 Rp. 1,627,480.00

Tenaga4.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 96,000.00

12.000 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 360,000.001.200 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 37,800.000.200 Oh Mandor @ Rp. 30,000.00 = Rp. 6,000.00 Rp. 499,800.00

Rp. 2,127,280.00

2Bahan

1.100 Kayu Kamper, Balok 8/12 @ Rp. 1,200,000.00 = Rp. 1,320,000.0015.000 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.000.800 Kg Paku Ukuran 5 - 12 Cm @ Rp. 9,350.00 = Rp. 7,480.00 Rp. 1,627,480.00

Tenaga4.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 96,000.00

12.000 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 360,000.001.200 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 37,800.000.200 Oh Mandor @ Rp. 30,000.00 = Rp. 6,000.00 Rp. 499,800.00

Rp. 2,127,280.00

3Bahan

1.100 Kayu Kamper, Balok 8/12 @ Rp. 1,200,000.00 = Rp. 1,320,000.0015.000 Kg Besi Strip @ Rp. 20,000.00 = Rp. 300,000.000.800 Kg Paku Ukuran 5 - 12 Cm @ Rp. 9,350.00 = Rp. 7,480.00 Rp. 1,627,480.00

Tenaga4.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 96,000.00

12.000 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 360,000.001.200 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 37,800.000.200 Oh Mandor @ Rp. 30,000.00 = Rp. 6,000.00 Rp. 499,800.00

Rp. 2,127,280.00

5Bahan

0.014 Kayu Kamper, Balok 2/3-3/5 @ Rp. 880,000.00 = Rp. 12,320.00

1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper

M3

1 M3 Pasang Gording Kayu Kamper

M3

1 M3 Pasang Jurai, Balok Tembok, Nok Balok Kayu Kamper

M3

1 M2 Pasang Kaso dan Reng, kayu Kamper

M3

Page 148: bayu (2) estiminasi

0.150 Kg Paku Ukuran 5 - 12 Cm @ Rp. 9,350.00 = Rp. 1,402.50 Rp. 13,722.50

Tenaga0.100 Oh Pekerja @ Rp. 24,000.00 = Rp. 2,400.000.100 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 3,000.000.010 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 315.000.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 Rp. 5,865.00

Rp. 19,587.50

6Bahan

12.000 Bh Genteng Kodok @ Rp. 2,500.00 = Rp. 30,000.00

Tenaga0.200 Oh Pekerja @ Rp. 24,000.00 = Rp. 4,800.000.100 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 3,000.000.010 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 315.000.010 Oh Mandor @ Rp. 30,000.00 = Rp. 300.00 Rp. 8,415.00

Rp. 38,415.00

G. PEKERJAAN KUSEN DAN DAUN JENDELA DAN PINTU

1Bahan:

1.200 Kayu kamper, Balok 6/12 @ Rp. 880,000.00 = Rp. 1,056,000.00 Rp. 1,056,000.00

Tenaga:6.000 Oh Pekerja @ Rp. 24,000.00 = Rp. 144,000.00

18.000 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 540,000.002.000 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 63,000.000.300 Oh Mandor @ Rp. 30,000.00 = Rp. 9,000.00 Rp. 756,000.00

Rp. 1,812,000.00

1 M2 Pasang Atap Pelentongan Besar

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper

M3

Page 149: bayu (2) estiminasi

2Bahan:

0.0196 Kayu Kamper , Papan @ Rp. 1,200,000.00 = Rp. 23,520.000.030 Kg Paku Biasa 3 - 4 cm @ Rp. 8,250.00 = Rp. 247.500.300 Lt Lem Kayu @ Rp. 3,200.00 = Rp. 960.001.000 Lbr Plywood 4'x3'x4 mm @ Rp. 70,000.00 = Rp. 70,000.00 Rp. 94,727.50

Tenaga:0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.002.000 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 60,000.000.200 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 6,300.000.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 Rp. 81,600.00

Rp. 176,327.50

3Bahan

1.100 Kaca Cermin @ Rp. 130,200.00 = Rp. 143,220.00 Rp. 143,220.00

Tenaga0.015 Oh Pekerja @ Rp. 24,000.00 = Rp. 360.000.150 Oh Tukang Kayu Terampil @ Rp. 30,000.00 = Rp. 4,500.000.015 Oh Kepala Tukang Kayu @ Rp. 31,500.00 = Rp. 472.50

0.00075 Oh Mandor @ Rp. 30,000.00 = Rp. 22.50 Rp. 5,355.00 Rp. 148,575.00

H. PEKERJAAN KERAMIK LATAI, KM/WC DAN PAVING

1Bahan

1.200 M² Ubin Teraso 40 x 40 Cm @ Rp. 50,350.00 = Rp. 60,420.000.220 Zak Semen Portland @ Rp. 43,155.00 = Rp. 9,494.10

0.0215 Pasir Pasang @ Rp. 145,000.00 = Rp. 3,117.500.900 Kg Semen Warna @ Rp. 3,200.00 = Rp. 2,880.00 Rp. 75,911.60

Tenaga0.250 Oh Pekerja @ Rp. 24,000.00 = Rp. 6,000.000.120 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 3,600.000.012 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 378.00

0.0125 Oh Mandor @ Rp. 30,000.00 = Rp. 375.00 Rp. 10,353.00 Rp. 86,264.60

1 M2 Pasang Pintu , Rangka Kayu Kamper

M3

1M2 Pasang Kaca Cermin , Tebal 5 mm

M2

1 M2 Pasang Lantai Ubin Teraso Ukuran 40x40 Cm

M3

Page 150: bayu (2) estiminasi

2Bahan

1.200 M² Ubin Keramik 20x20 Cm @ Rp. 42,050.00 = Rp. 50,460.000.285 Zak Semen Portland @ Rp. 43,155.00 = Rp. 12,277.60

0.042 Pasir Pasang @ Rp. 145,000.00 = Rp. 6,090.001.500 Kg Semen Warna @ Rp. 3,200.00 = Rp. 4,800.00 Rp. 73,627.60

Tenaga0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.000.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.000.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.500.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 Rp. 27,382.50

Rp. 101,010.10

3Bahan

25.000 Bh Keramik 20x20 Cm @ Rp. 42,050.00 = Rp. 1,051,250.009.300 Kg Semen Abu - Abu @ Rp. 3,200.00 = Rp. 29,760.00

0.018 Pasir Pasang @ Rp. 145,000.00 = Rp. 2,610.001.500 Kg Semen Warna @ Rp. 3,200.00 = Rp. 4,800.00 Rp. 1,088,420.00

Tenaga0.600 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,400.001.000 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 30,000.000.045 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,417.500.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 Rp. 46,717.50

Rp. 1,135,137.50

4 1 M² Pemasangan Paving BlockBahan:

7.4 Pcs Grass Block L8 @ Rp. 8,000.00 = Rp. 59200

0.05 Pasir Pasang @ Rp. 145,000.00 = Rp. 7250 Rp. 66,450.00

Tenaga0.620 Oh Pekerja @ Rp. 24,000.00 = Rp. 14,880.000.350 Oh Tukang Batu @ Rp. 30,000.00 = Rp. 10,500.000.035 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 1,102.500.030 Oh Mandor @ Rp. 30,000.00 = Rp. 900.00 Rp. 27,382.50

Rp. 27,382.50

I. INSTALASI AIR BERSIH1 Memasang 1 Buah Kran Diameter 3/4" atau 1/2"

Bahan1.000 Bh Kran Air @ Rp. 23,450.00 = Rp. 23,450.000.025 Bh Seal Tape @ Rp. 1,500.00 = Rp. 37.50 Rp. 23,487.50

Tenaga0.010 Oh Pekerja @ Rp. 24,000.00 = Rp. 240.000.100 Oh Tukang Pipa @ Rp. 27,000.00 = Rp. 2,700.000.010 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 285.000.005 Oh Mandor @ Rp. 30,000.00 = Rp. 150.00 Rp. 3,375.00

Rp. 26,862.50

1 M2 Pasang Lantai Keramik 20x20 Cm

M3

1 M2 Pasang Dinding Keramik 20x20 Cm

M3

M3

Page 151: bayu (2) estiminasi

2 Memasang 1 M' Pipa PVC Tipe AW Diameter 3/4"Bahan

1.200 M' Pipa PVC 3/4" @ Rp. 17,500.00 = Rp. 21,000.0035.0 %Harga PipaPerlengkapan @ Rp. 245.00 = Rp. 85.75 Rp. 21,085.75

Tenaga0.036 Oh Pekerja @ Rp. 24,000.00 = Rp. 864.000.060 Oh Tukang Pipa @ Rp. 27,000.00 = Rp. 1,620.000.006 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 171.00

0.0018 Oh Mandor @ Rp. 30,000.00 = Rp. 54.00 Rp. 2,709.00 Rp. 23,794.750

J. INSTALASI AIR KOTOR1 Memasang 1 M' Pipa PVC Tipe AW Diameter 3"

Bahan1.200 M' Pipa PVC 3" @ Rp. 12,450.00 = Rp. 14,940.00

35.0 %Harga PipaPerlengkapan @ Rp. 174.30 = Rp. 61.01 Rp. 15,001.01

Tenaga0.081 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,944.000.135 Oh Tukang Pipa @ Rp. 27,000.00 = Rp. 3,645.00

0.0135 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 384.750.0041 Oh Mandor @ Rp. 30,000.00 = Rp. 123.00 Rp. 6,096.75

Rp. 21,097.755

2 Memasang 1 M' Pipa PVC Tipe AW Diameter 4"Bahan

1.200 M' Pipa PVC 4" @ Rp. 18,800.00 = Rp. 22,560.0035.0 %Harga PipaPerlengkapan @ Rp. 263.20 = Rp. 92.12 Rp. 22,652.12

Tenaga0.081 Oh Pekerja @ Rp. 24,000.00 = Rp. 1,944.000.135 Oh Tukang Pipa @ Rp. 27,000.00 = Rp. 3,645.00

0.0135 Oh Kepala Tukang @ Rp. 28,500.00 = Rp. 384.750.0041 Oh Mandor @ Rp. 30,000.00 = Rp. 123.00 Rp. 6,096.75

Rp. 28,748.870

K. SAPTICTANK DAN RESAPAN

1 1 Unit Septictank

Bahan

770 bh Batu Bata @ Rp. 900.00 = Rp. 693000.00

12.0394 Zak Semen Portland @ Rp. 43,155.00 = Rp. 519560.31

0.18 M3 Pasir Pasang @ Rp. 145,000.00 = Rp. 26100.00

0.03 kg Kerikil Beton @ Rp. 137,500.00 = Rp. 4125.00

4.85 kg Besi Beton @ Rp. 5,850.00 = Rp. 28372.500.12 M3 Pasir Beton @ Rp. 165,000.00 = Rp. 19800.00 Rp. 1,290,957.81

Upah

2.26 oh Pekerja @ Rp. 24,000.00 = Rp. 54240.00

0.72 oh Tukang Batu @ Rp. 28,000.00 = Rp. 20160.00

0.07 oh Kepala Tukang @ Rp. 28,500.00 = Rp. 1995.000.11 oh Mandor @ Rp. 30,000.00 = Rp. 3300.00 Rp. 79,695.00

Rp. 1,370,652.81

Page 152: bayu (2) estiminasi

2 1 Unit ResapanBahan

500 bh Batu Bata @ Rp. 900.00 = Rp. 450000.007.09 Zak Semen Portland @ Rp. 43155.00 = Rp. 305968.950.18 M3 Pasir Pasang @ Rp. 145000.00 = Rp. 26100.00

0.015 kg Kerikil Beton @ Rp. 137500.00 = Rp. 2062.502.4 kg Besi Beton @ Rp. 5850.00 = Rp. 14040.00

0.06 M3 Pasir Beton @ Rp. 165000.00 = Rp. 9900.00 Rp. 808,071.45

Upah2.05 oh Pekerja @ Rp. 24000.00 = Rp. 49200.000.36 oh Tukang Batu @ Rp. 28000.00 = Rp. 10080.00

0.035 oh Kepala Tukang @ Rp. 28500.00 = Rp. 997.500.055 oh Mandor @ Rp. 30000.00 = Rp. 1650.00 Rp. 61927.50

Rp. 869,998.95

L. PEKERJAAN PLAFON1 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 6 mm

Bahan1.100 Lbr Pelat Asbes Tebal 6 mm @ Rp. 26,400.00 = Rp. 29,040.000.010 Kg Paku @ Rp. 9,350.00 = Rp. 93.50 Rp. 29,133.50

Tenaga0.030 Oh Pekerja @ Rp. 24,000.00 = Rp. 720.00

0.07 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 2,100.000.007 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 220.500.002 Oh Mandor @ Rp. 30,000.00 = Rp. 45.00 Rp. 3,085.50

Rp. 32,219.00

2 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu KamperBahan

0.012 Kayu Kamper, Balok @ Rp. 880,000.00 = Rp. 10,560.000.100 Kg Paku Biasa 2" - 5" @ Rp. 8,250.00 = Rp. 825.00 Rp. 11,385.00

Upah :0.150 Oh Pekerja @ Rp. 24,000.00 = Rp. 3,600.000.250 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 7,500.000.025 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 787.500.075 Oh Mandor @ Rp. 30,000.00 = Rp. 2,250.00 Rp. 14,137.50

Rp. 25,522.50

3 1 M' Pasang List Plafon - Kayu ProfilBahan

1.050 M' Kayu Profil @ Rp. 5,000.00 = Rp. 5,250.00 Rp. 5,250.00

Tenaga0.021 Oh Pekerja @ Rp. 24,000.00 = Rp. 504.000.021 Oh Tukang Kayu @ Rp. 30,000.00 = Rp. 630.000.002 Oh Kepala Tukang @ Rp. 31,500.00 = Rp. 63.000.001 Oh Mandor @ Rp. 30,000.00 = Rp. 30.00 Rp. 1,227.00

Rp. 6,477.00

M3

Page 153: bayu (2) estiminasi

RENCANA ANGGARAN BIAYA(RAB)No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Total

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

1 Pembuatan Kantor Sementaran (direksi keet) 15 Rp 1,261,326.00 Rp 18,919,890.00

2 Membersihkan Lapangan dan Peralatan 550.00 Rp 25,500.00 Rp 14,025,000.00

3 Pengukuran dan Pemasangan Bouplank 94.00 M' Rp 23,290.00 Rp 2,189,260.00 Rp 35,134,150.00

B. PEKERJAAN TANAH

1 Galian Tanah Biasa sedalam 1 Meter 155.362 Rp 10,800.00 Rp 1,677,909.60

2 Urugan Pasir Bawah Pondasi Menerus 14.309 Rp 163,500.00 Rp 2,339,521.50

3 Urugan Pasir Bawah Pondasi Setempat 3.672 Rp 163,500.00 Rp 600,372.00

4 Urugan Pasir Bawah Lantai 14.6 Rp 163,500.00 Rp 2,387,100.00

5 Urugan Peninggi Pail Lantai 29.2 Rp 133,500.00 Rp 3,898,200.00

6 Urugan Kembali Pondasi Menerus 47.988 Rp 5,178.00 Rp 248,481.86

7 Urugan Kembali Pondasi Setempat 27.4176 Rp 5,178.00 Rp 141,968.33 Rp 11,293,553.30

C PEKERJAAN PASANGAN

1 Pasangan Pondasi Batu Kosong 28.362 Rp 183,001.50 Rp 5,190,288.54

2 Pasangan Pondasi Batu Kali 46.38 Rp 355,121.60 Rp 16,470,539.81

3 Pasangan Bata Merah 1/2 Bata, 1 Pc : 3Ps 720.32 Rp 92,647.75 Rp 66,736,025.12

4 Plesteran 1 Pc : 3 Ps, Tebal 20 mm 130.8 Rp 28,426.85 Rp 3,718,231.98

5 Plesteran 1 Pc : 6 Ps, Tebal 20 mm 1440.64 Rp 22,965.15 Rp 33,084,513.70

6 Pekerjaan Pasangan Tali Air 491.92 Rp 4,594.44 Rp 2,260,095.70 Rp 127,459,694.84

D. PEKERJAAN BETON

1 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr 1.224 Rp 47,414.00 Rp 58,034.74

2 Membuat Pondasi Setempat Beton Bertulang(Beton K225 dan Bekisting) 2.775 Rp 888,492.50 Rp 2,465,566.69

3 Membuat Sloof dan Begesting 4.3605 Rp 715,872.50 Rp 3,121,562.04

4 Kolom Struktur 3.8808 Rp 888,492.50 Rp 3,448,061.69

5 Kolom Praktis 3.7125 Rp 715,872.50 Rp 2,657,676.66

6 Membuat Beton Bertulang K175 2.881 Rp 1,865,631.30 Rp 5,374,883.78

7 Membuat Ring Balk 7.268 Rp 1,865,631.30 Rp 13,559,408.29

8 Pekerjaan Beton Plat Lantai 20.195 Rp 2,159,631.30 Rp 43,613,754.10

9 Membuat Tangga Beton Bertulang (200 Kg Besi dan Bekisting) 4.075 Rp 1,436,993.80 Rp 5,855,749.74 Rp 80,154,697.71

M2

M2

M3

M3

M3

M3

M3

M3

M3

M3

M3

M2

M2

M2

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 154: bayu (2) estiminasi

E. PEKERJAAN PEMBESIAN

1 Foot Plat 831.13 Kg Rp 6,746.55 Rp 5,607,260.10 2 Pembesian Sloof 1323.82 Kg Rp 6,746.55 Rp 8,931,217.82 3 Pembesian Kolom Struktur 903.728 Kg Rp 6,746.55 Rp 6,097,046.14 4 Pembesian Kolom Praktis 3.7125 Kg Rp 6,746.55 Rp 25,046.57 5 Pembesian pada Ring Balk 7.268 Kg Rp 6,746.55 Rp 49,033.93 6 Peembesian Plat Lantai 2402.33 Kg Rp 6,746.55 Rp 16,207,439.46

7 Pembesian pada Tangga 246.94 Kg Rp 6,746.55 Rp 1,665,993.06 Rp 38,583,037.07

F. PEKERJAAN ATAP

1 Pasang Konstruksi Kuda - Kuda Kayu Kamper 1.352 Rp 2,127,280.00 Rp 2,876,082.56

2 Pasang Gording Kayu Kamper 0.32 Rp 2,127,280.00 Rp 680,729.60

3 Pasang Jurai, Balok Tembok, Nok Balok Kayu Kamper 0.4458 Rp 2,127,280.00 Rp 948,341.42

4 Pasang Kaso dan Reng, kayu Kamper 153.4 Rp 19,587.50 Rp 3,004,722.50

5 Pasang Atap Genteng Metal 153.4 Rp 38,415.00 Rp 5,892,861.00 Rp 13,402,737.08

G. PEKERJAAN KUSEN DAN DAUN JENDELA DAN PINTU

1 Pasang Kusen Pintu dan Jendela Kayu Kamper 2.23435 Rp 1,812,000.00 Rp 4,048,642.20

2 Pasang Pintu , Rangka Kayu Kamper 97.4064 Rp 176,327.50 Rp 17,175,427.00

3 Pasang Kaca Cermin , Tebal 5 mm 83.7446 Rp 148,575.00 Rp 12,442,353.95 Rp 33,666,423.14

H. PEKERJAAN KERAMIK LATAI, KM/WC DAN PAVING

1 Pasang Lantai Ubin Teraso Ukuran 40x40 Cm 265.15 Rp 86,264.60 Rp 22,873,058.69

2 Pasang Lantai Keramik 20x20 Cm 16.5 Rp 101,010.10 Rp 1,666,666.61

3 Pasang Dinding Keramik 20x20 Cm 56.7 Rp 1,135,137.50 Rp 64,362,296.25

4 Pasangan Paving Block 34.9 Rp 27,382.50 Rp 955,649.25 Rp 89,857,670.80

I. INSTALASI AIR BERSIH

1 Kran Diameter 3/4" atau 1/2" 7 Bh Rp 26,862.50 Rp 188,037.50

2 Pipa PVC Tipe AW Diameter 1/2" 84.56 M' Rp 23,794.75 Rp 2,012,084.06 Rp 2,200,121.56

J. INSTALASI AIR KOTOR

1 Pipa PVC Tipe AW Diameter 3" 22.88 M' Rp 21,097.76 Rp 482,716.63

2 Pipa PVC Tipe AW Diameter 4" 42.67 M' Rp 28,748.87 Rp 1,226,714.28 Rp 1,709,430.92

K. SAPTICTANK DAN RESAPAN

1 Pembuatan Sumur Resapan 1 Unit Rp 869,998.95 Rp 869,998.95

2 Pembuatan Saptictank 1 Unit Rp 1,370,652.81 Rp 1,370,652.81 Rp 2,240,651.76

L. PEKERJAAN PLAFON

1 Langit - langit Akustik (100x100) Cm 285.66 Rp 32,219.00 Rp 9,203,679.54

2 Rangka Langit - langit (100x100) cm, Kayu Kamper 285.66 Rp 25,522.50 Rp 7,290,757.35

3 List Plafon - Kayu Profil 262 M' Rp 6,477.00 Rp 1,696,974.00

Rp 18,191,410.89

M. PEKERJAAN INSTALASI LISTRIK

1 Pemasangan Lampu Plafon 14 ttk Rp 52,850.00 Rp 739,900.00

M3

M3

M3

M2

M2

M3

M2

M2

M2

M2

M2

M2

M2

M2

Page 155: bayu (2) estiminasi

REKAPITULASI RENCANA ANGGARAN BIAYA(RAB)

Kode Uraian Pekerjaan Biaya Jumlah Biaya

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

1 Pembuatan Kantor Sementaran (direksi keet) Rp 18,919,890.00 2 Membersihkan Lapangan dan Peralatan Rp 14,025,000.00

3 Pengukuran dan Pemasangan Bouplank Rp 2,189,260.00 Rp 35,134,150.00

B. PEKERJAAN TANAH

1 Galian Tanah Biasa sedalam 1 Meter Rp 1,677,909.60 2 Urugan Pasir Bawah Pondasi Menerus Rp 2,339,521.50 3 Urugan Pasir Bawah Pondasi Setempat Rp 600,372.00 4 Urugan Pasir Bawah Lantai Rp 2,387,100.00 5 Urugan Peninggi Pail Lantai Rp 3,898,200.00 6 Urugan Kembali Pondasi Menerus Rp 248,481.86

7 Urugan Kembali Pondasi Setempat Rp 141,968.33 Rp 11,293,553.30

C PEKERJAAN PASANGAN

1 Pasangan Pondasi Batu Kosong Rp 5,190,288.54 2 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps Rp 16,470,539.81 3 Pasangan Bata Merah Selain KM/WC Tebal 1/2 Bata, 1 Pc : 3Ps Rp 66,736,025.12 4 Plesteran 1 Pc : 3 Ps, Tebal 20 mm Rp 3,718,231.98 5 Plesteran 1 Pc : 6 Ps, Tebal 20 mm Rp 33,084,513.70

6 Pekerjaan Pasangan Tali Air Rp 2,260,095.70 Rp 127,459,694.84

D. PEKERJAAN BETON

1 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr Rp 58,034.74 2 Membuat Pondasi Setempat Beton Bertulang(Beton K225 dan Bekisting) Rp 2,465,566.69 3 Membuat Sloof dan Begesting Rp 3,121,562.04 4 Kolom Struktur (K225 dan Bekisting) Rp 3,448,061.69 5 Kolom Praktis(K175 dan Begesting) Rp 2,657,676.66 6 Membuat Beton K175 Rp 5,374,883.78 7 Membuat Ring Balk Rp 13,559,408.29 8 Pekerjaan Beton Plat Lantai Rp 43,613,754.10

9 Membuat Tangga Beton Bertulang Rp 5,855,749.74 Rp 80,154,697.71

E. PEKERJAAN PEMBESIAN

1 Foot Plat Rp 5,607,260.10 2 Pembesian Sloof 15/20 Rp 8,931,217.82 3 Pembesian Kolom Struktur 35/35 Rp 6,097,046.14 4 Pembesian Kolom Praktis Lantai 1 15/15 Rp 25,046.57 5 Pembesian pada Balok 15/20 Rp 49,033.93 6 Peembesian Plat Lantai dan Plat Atap Garasi Rp 16,207,439.46

7 Pembesian pada Tangga Rp 1,665,993.06 Rp 38,583,037.07

F. PEKERJAAN ATAP

Pasang Konstruksi Kuda - Kuda Kayu Kamper Rp 2,876,082.56 2 Pasang Gording Kayu Kamper Rp 680,729.60 3 Pasang Jurai, Balok Tembok, Nok Balok Kayu Kamper Rp 948,341.42 4 Pasang Kaso dan Reng, kayu Kamper Rp 3,004,722.50

5 Pasang Atap Genteng Metal Rp 5,892,861.00 Rp 13,402,737.08

G. PEKERJAAN KUSEN DAN DAUN JENDELA DAN PINTU

Page 156: bayu (2) estiminasi

1 Pasang Kusen Pintu dan Jendela Kayu Kamper Rp 4,048,642.20 2 Pasang Pintu , Rangka Kayu Kamper Rp 17,175,427.00 3 Pasang Kaca Cermin , Tebal 5 mm Rp 12,442,353.95

Rp 33,666,423.14 H. PEKERJAAN KERAMIK LATAI, KM/WC DAN PAVING

1 Pasang Lantai Ubin Teraso Ukuran 40x40 Cm Rp 22,873,058.69 2 Pasang Lantai Keramik 20x20 Cm Rp 1,666,666.61 3 Pasang Dinding Keramik 20x20 Cm Rp 64,362,296.25

4 Pasangan Paving Block Rp 955,649.25 Rp 89,857,670.80

I. INSTALASI AIR BERSIH

1 Kran Diameter 3/4" atau 1/2" Rp 188,037.50

2 Pipa PVC Tipe AW Diameter 3/4" Rp 2,012,084.06 Rp 2,200,121.56

Page 157: bayu (2) estiminasi

J. INSTALASI AIR KOTOR

1 Pipa PVC Tipe AW Diameter 3" Rp 482,716.63

2 Pipa PVC Tipe AW Diameter 4" Rp 1,226,714.28 Rp 1,709,430.92

K. SAPTICTANK DAN RESAPAN

1 Pembuatan Resapan Rp 869,998.95

2 Pembuatan Saptictank Rp 1,370,652.81 2,240,651.76

L. PEKERJAAN PLAFON

1 Langit - langit Akustik (80x80) Cm Rp 9,203,679.54 2 Rangka Langit - langit (80x80) cm, Kayu Kamper Rp 7,290,757.35 3 List Plafon - Kayu Profil Rp 1,696,974.00

Rp 18,191,410.89

M. PEKERJAAN INSTALASI LISTRIK

1 Pemasangan Lampu Plafon Rp 739,900.00 2 Pemasanan Lampu Gantung Rp 300,000.00 3 Pemasangan Lampu Tanam Rp 92,250.00 4 Pemasangan Zekering Group Rp 571,000.00 5 Pemasangan Saklar Ganda Rp 319,500.00 6 Pemasangan Saklar Tunggal Rp 205,000.00

Rp 2,227,650.00 N PEKERJAAN PENGECATAN

1 1 M2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Rp 104,781,340.61 Rp 104,781,340.61

O PEKERJAAN UNCI, SLOT, DAN ENGSEL

1 1 Buah Pasang Engsel Pintu Rp 109,890.00 2 1 Buah Pasang Engsel Jendela Rp 221,340.00 3 1 Buah Pasang Kunci Slot Engkel Rp 31,080.00 4 1 Buah Pasang Grendel Pintu Rp 158,662.50 5 1 Buah Pasang Grendel Jendela Rp 180,127.50

Rp 701,100.00

TOTAL BIAYA Rp 561,603,669.68

Page 158: bayu (2) estiminasi

INVENTARIS BILL OF QUANTITY

NO URAIAN PEKERJAAN QUANTITY SATUANA PEKERJAAN PERSIAPAN1 Direksi keet 5x 3 15.00

2 Pembersihan Lokasi 550.003 Pekerjaan Eset 94.00 m

B PEKERJAAN TANAH1 Galian Tanah Pondasi Menerus 121.09

2 Galian Tanah Pondasi Setempat 34.272

3 Urukan Pasir Bawah Pondasi Menerus 14.309

4 Urukan Pasir Bawah Pondasi Setempat 3.672

5 Urukan Pasir Bawah Lantai 14.6

6 Urukan Peninggi Peil Lantai 29.2

7 Urukan Tanah Kembali Pondasi Menerus 47.988

8 Urukan Tanah Kembali Pondasi Setempat 27.4176

C PEKERJAAN PASANGAN DAN PLESTERAN1 Anstamping 28.3622 Pondasi Batu Kali 46.38 m³3 Trasraam 65.4 m³

4 Pasangan Bata biasa 720.32

5 Pekerjaan Plesteran Trasraam 1Pc : 3Ps 130.8

6 Pekerjaan Plesteran Biasa 1PC : 6Ps 1440.647 Pekerjaan Benangan Tali Air 491.92 m

D PEKERJAAN BETON1 Beton lantai kerja 1.224

2 Beton Pondasi Setempat 2.775

3 Beton sloof 15/30 4.3605

4 Beton kolom struktur 15/30 3.8808

5 Beton kolom praktis 15/30 3.7125

6 Beton ring balok10/15 7.268

7 Beton Leufel 2.881

8 Beton Pada Plat Lantai 20.195

9 Beton Tangga 4.075

E PEKERJAAN PEMBESIAN1 Pondasi Setempat 831.13 Kg2 Pembesian Sloof 1323.82 Kg3 Pembesian Kolom Struktur 903.728 Kg4 Pembesian Kolom Praktis 866.75 Kg5 Ring Balk 1261.68 Kg6 Pembesian Tangga 246.94 Kg7 Pembesian Plat 2402.33 Kg

F PEKERJAAN ATAP1 Kuda-kuda 1.352

2 Gording 0.32

3 Jurai, Nok, Reuter 0.4458

4 Reng dan Usuk 153.4

m²m²

m³m³m³m³m³m³m³m³

m²m²m²

m³m³m³m³m³m³m³m³m³

m³m³m³m³

Page 159: bayu (2) estiminasi

5 Genteng 153.4 m²

G PEKERJAAN KUSEN, DAUN JENDELA DAN PINTU1 Kusen 2.234352 Kayu Untuk Daun Pintu dan Jendela 97.4064 m²3 Kaca Untuk Daun Ointu dan Jendela 83.7446 m²

H PEKERJAAN PLAFONT1 Penutup Plafon 285.66 m²2 Rangka Plafon 285.66 m²3 list Plafon 262 m

I PEKERJAAN KUNCI, ENGSEL DAN SLOT1 slot kunci engkel 7 Set2 engsel pintu 9 Set3 engsel jendela 21 Set4 Grendel Pintu 15 Set5 Grendel Jendela 21 Set

J PEKERJAAN KERAMIK1 Keramik Lantai40/40 265.15 m²2 Keramik Lantai KM 20/20 16.5 m²3 Keramik Dinding 56.7 m²4 Paving 34.9 m²

K PEKERJAAN INSTALASI AIR BERSIH1 Sanitasi Air Bersih PVC 1/2" 84.56 m2 Kran 7 Buah

L INSTALASI AIR KOTOR3 Sanitasi Kotoran PVC 4" 22.88 m4 Sanitasi Air Kotor PVC 3" 42.67 m

M PEKERJAAN INSTALASI LISTRIK1 Lampu Plafon 14 Titik2 Lampu Gantung 4 Titik3 Lampu Tanam 3 Titik4 Stop Kontak 11 Titik5 Saklar Double 9 Titik6 Saklar Tunggal 10 Titik7 Sekring 2 Titik

N PEKERJAAN SEPTICKTANK1 Septictank 1 Titik2 Resapan 1 Titik

O PEKERJAN PENGECATAN1 Pengecatan 1571.44 m²

Page 160: bayu (2) estiminasi
Page 161: bayu (2) estiminasi

TENAGA KERJANO URAIAN PEKERJAAN Koefisien Volume Kebutuhan Waktu(hari) SDM

A PEKERJAAN PERSIAPAN

1 Pembersihan

Pekerja 1.00 550.00 550.000 12 46

Mandor 0.05 550.00 27.500 12 2

2 Bouwplank

Tukang Kayu 0.10 94.00 9.400 1 9

Pekerja 0.10 94.00 9.400 1 9

Kepala Tukang 0.01 94.00 0.940 1 1

Mandor 0.01 94.00 0.470 1 0

3 Direksi keet

Tukang Kayu setengah terampil 2.00 15 30.000 2 15

Tukang Batu 1.00 15 15.000 2 8

Pekerja 2.00 15 30.000 2 15

Kepala Tukang 0.30 15 4.500 2 2

Mandor 0.05 15 0.750 2 0

B PEKERJAAN TANAH

1 Galian Tanah

pekerja 0.40 155.36 62.145 3 21

mandor 0.04 155.36 6.214 3 2

2 Urugan Peninggi Pail Lantai

pekerja 0.300 29.20 8.760 2 4

mandor 0.010 29.20 0.292 2 0

3 Urugan Pasir Bawah Pondasi Setempat

pekerja 0.300 3.67 1.102 2 1

mandor 0.010 3.67 0.037 2 0

4 Urugan Pasir Bawah Pondasi Menerus

pekerja 0.300 14.309 4.293 1 4

mandor 0.010 14.309 0.143 1 0

5 Urugan Pasir Bawah Lantai

Pekerja 0.192 14.6 2.803 1 3

Mandor 0.019 14.6 0.277 1 0

6 Urugan Kembali Pondasi Menerus

Pekerja 0.192 47.988 9.214 1 9

Mandor 0.019 47.988 0.912 1 1

7 Urugan Kembali Pondasi Setempat

Pekerja 0.192 14.65 2.813 1 3

Mandor 0.019 14.65 2.813 1 3

C PEKERJAAN PASANGAN

1 Pasangan Pondasi Batu Kosong

Pekerja 0.780 28.362 22.122 3 7

Tukang Batu 0.300 28.362 8.509 3 3

Kepala Tukang 0.039 28.362 1.106 3 0

Mandor 0.039 28.362 1.106 3 0

2 Pasangan Pondasi Batu Kali

Pekerja 1.500 46.38 69.570 4 17

Tukang Gali 0.600 46.38 27.828 4 7

Kepala Tukang 0.060 46.38 2.783 4 1

Mandor 0.075 46.38 3.479 4 1

3 Pasangan Bata Merah 1/2 Bata, 1 Pc : 3Ps

Pekerja 0.320 720.32 230.502 12 19

Tukang Batu 0.100 720.32 72.032 12 6

Kepala Tukang 0.010 720.32 7.203 12 1

Mandor 0.015 720.32 10.805 12 1

Page 162: bayu (2) estiminasi

4 Plesteran 1 Pc : 3 Ps, Tebal 20 mm

Pekerja 0.250 130.8 32.700 5 7

Tukang Batu 0.200 130.8 26.160 5 5

Kepala Tukang Batu 0.020 130.8 2.616 5 1

Mandor 0.013 130.8 1.635 5 0

5 Plesteran 1 Pc : 6 Ps, Tebal 20 mm

Pekerja 0.250 1440.64 360.160 12 30

Tukang Batu 0.200 1440.64 288.128 12 24

Kepala Tukang 0.020 1440.64 28.813 12 2

Mandor 0.013 1440.64 18.008 12 2

6 Pekerjaan Tali Air

Tukang kayu 0.12 491.92 59.030 4 15

Mandor 0.01 491.92 4.919 4 1

D PEKERJAAN BETON

1 Lantai Kerja Beton Tumbuk

Pekerja 1.150 1.224 1.408 2 1

Tukang Batu 0.020 1.224 0.024 2 0

Kepala Tukang Batu 0.002 1.224 0.002 2 0

Mandor 0.006 1.224 0.007 2 0

2 Pondasi Setempat Beton Bertulang

Pekerja 3.900 2.775 10.823 2 5

Tukang Batu Setengah Terampil 0.350 2.775 0.971 2 0

Tukang Kayu Setengah Terampil 1.040 2.775 2.886 2 1

Kepala Tukang 0.245 2.775 0.680 2 0

Mandor 0.165 2.775 0.458 2 0

3 Pasangan Bekisting untuk Sloof dan beton sloof

Pekerja 0.300 4.3605 1.308 1 1

Tukang Kayu 0.260 4.3605 1.134 1 1

Kepala Tukang 0.026 4.3605 0.113 1 0

Mandor 0.005 4.3605 0.022 1 0

4 Pasangan Bekisting Kolom praktis dan beton kolomnya

Pekerja 3.900 3.7125 14.479 2 7

Tukang Batu Setengah Terampil 0.350 3.7125 1.299 2 1

Tukang Kayu Setengah Terampil 1.040 3.7125 3.861 2 2

Kepala Tukang 0.245 3.7125 0.910 2 0

Mandor 0.165 3.7125 0.613 2 0

5 Ring Balk

Pekerja 5.960 7.268 43.317 2 22

Tukang Batu 0.350 7.268 2.544 2 1

Tukang Kayu 2.800 7.268 20.350 2 10

Tukang Besi 1.400 7.268 10.175 2 5

Kepala Tukang 0.455 7.268 3.307 2 2

Mandor 0.208 7.268 1.512 2 1

6 Kolom Struktur

Pekerja 3.900 3.8808 15.135 2 8

Tukang Batu Setengah Terampil 0.350 3.8808 1.358 2 1

Tukang Kayu Setengah Terampil 1.040 3.8808 4.036 2 2

Kepala Tukang 0.245 3.8808 0.951 2 0

Mandor 0.165 3.8808 0.640 2 0

7 Pekerjaan Beton Plat Lantai

Pekerja 5.800 20.195 117.131 8 15

Tukang Batu Setengah Terampil 0.350 20.195 7.068 8 1

Tukang Kayu Setengah Terampil 2.800 20.195 56.546 8 7

Kepala Tukang 0.420 20.195 8.482 8 1

Mandor 0.185 20.195 3.736 8 0

8 Tangga Beton Bertulang

Pekerja 5.600 4.075 22.820 3 8

Page 163: bayu (2) estiminasi

Tukang Batu Setengah Terampil 0.350 4.075 1.426 3 0

Tukang Kayu Setengah Terampil 2.300 4.075 9.373 3 3

Kepala Tukang 0.405 4.075 1.650 3 1

Mandor 0.202 4.075 0.823 3 0

9 Membuat Beton K175

Pekerja 0.200 2.881 0.576 2 0

Tukang Batu Setengah Terampil 1.500 2.881 4.321 2 2

Tukang Kayu Setengah Terampil 0.400 2.881 1.152 2 1

Kepala Tukang 5.000 2.881 14.405 2 7

Mandor 0.520 2.881 1.498 2 1

E PEKERJAAN ATAP

1 Konstruksi Kuda - Kuda Kayu Jati

Pekerja 4.000 1.352 5.408 2 3

Tukang Kayu 12.000 1.352 16.224 2 8

Kepala Tukang 1.200 1.352 1.622 2 1

Mandor 0.200 1.352 0.270 2 0

2 Gording

Pekerja 4.000 0.32 1.280 2 1

Tukang Kayu Terampil 12.000 0.32 3.840 2 2

Kepala Tukang Kayu 1.200 0.32 0.384 2 0

Mandor 0.200 0.32 0.064 2 0

3 Kaso dan Reng Genteng

Pekerja 0.100 153.4 15.340 3 5

Tukang Kayu 0.100 153.4 15.340 3 5

Kepala Tukang 0.010 153.4 1.534 3 1

Mandor 0.005 153.4 0.767 3 0

4 Jurai, Nok dan Reuter

Pekerja 4.000 0.4458 1.783 1 2

Tukang Kayu Terampil 12.000 0.4458 5.350 1 5

Kepala Tukang Kayu 1.200 0.4458 0.535 1 1

Mandor 0.200 0.4458 0.089 1 0

7 1 M2 Pasang Atap Pelentongan Besar

Pekerja 0.200 135.28 27.056 4 7

Tukang Kayu 0.100 135.28 13.528 4 3

Kepala Tukang 0.010 135.28 1.353 4 0

Mandor 0.010 135.28 1.353 4 0

F PEKERJAAN PENUTUP ATAP

1 Rangka Plafond

Pekerja 0.150 285.66 42.849 4 11

Tukang Kayu 0.250 285.66 71.415 4 18

Kepala Tukang 0.025 285.66 7.142 4 2

Mandor 0.075 285.66 21.425 4 5

2 List Plafon

Pekerja 0.050 262 13.100 1 13

Tukang Kayu 0.050 262 13.100 1 13

Kepala Tukang 0.005 262 1.310 1 1

Mandor 0.003 262 0.786 1 1

3 Langit - langit Asbes

Pekerja 0.030 285.66 8.570 2 4

Tukang Kayu 0.070 285.66 19.996 2 10

Kepala Tukang 0.007 285.66 2.000 2 1

Mandor 0.0015 285.66 0.428 2 0

G. PEKERJAAN KUSEN, DAUN JENDELA DAN PINTU

1 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper

Pekerja 6.000 2.23435 13.406 6 2

Tukang Kayu 18.000 2.23435 40.218 6 7

Kepala Tukang 2.000 2.23435 4.469 6 1

Page 164: bayu (2) estiminasi

Mandor 0.300 2.23435 0.670 6 0

2 Kayu Untuk Daun Pintu dan Jendela

Pekerja 0.600 97.4064 58.444 7 8

Tukang Kayu 2.000 97.4064 194.813 7 28

Kepala Tukang 0.200 97.4064 19.481 7 3

Mandor 0.030 97.4064 2.922 7 0

2 Pasang Kaca

Pekerja 0.015 83.7446 1.256 2 1

Tukang Kayu 0.150 83.7446 12.562 1 13

Kepala Tukang 0.015 83.7446 1.256 1 1

Mandor 0.00075 83.7446 0.063 1 0

H. PEKERJAAN KUNCI, ENGSEL DAN SLOT

1 1 Buah Pasang Kunci Selot

Pekerja 0.020 7 0.140 1 0

Tukang Kayu 0.200 7 1.400 1 1

Kepala Tukang 0.020 7 0.140 1 0

Mandor 0.001 7 0.007 1 0

2 1 Buah Pasang Engsel Jendela

Pekerja 0.010 21 0.210 1 0

Tukang Kayu 0.100 21 2.100 1 2

Kepala Tukang 0.010 21 0.210 1 0

Mandor 0.0005 21 0.011 1 0

3 Pasang Grendel pintu

Pekerja 0.005 15 0.075 1 0

Tukang Kayu 0.500 15 7.500 1 8

Kepala Tukang 0.005 15 0.075 1 0

Mandor 0.0025 15 0.038 1 0

4 Engsel Pintu

Pekerja 0.015 10 0.150 1 0

Tukang Kayu 0.15 10 1.500 1 2

Kepala Tukang 0.015 10 0.150 1 0

Mandor 0.00075 10 0.008 1 0

5 Grendel Jendela

Pekerja 0.005 21 0.105 1 0

Tukang Kayu 0.100 21 2.100 1 2

Kepala Tukang 0.005 21 0.105 1 0

Mandor 0.0005 21 0.011 1 0

I PEKERJAAN INSTALASI AIR BERSIH

1 Pipa PVC Tipe AW Diameter 1/2"

Pekerja 0.036 84.56 3.044 1 3

Tukang Batu 0.060 84.56 5.074 1 5

Kepala Tukang 0.006 84.56 0.507 1 1

Mandor 0.0018 84.56 0.152 1 0

2 Kran

Pekerja 0.010 7 0.070 1 0

Tukang Batu 0.100 7 0.700 1 1

Kepala Tukang 0.010 7 0.070 1 0

Mandor 0.005 7 0.035 1 0

J. PEKERJAAN INSTALASI AIR KOTOR

1 Pipa PVC Tipe AW Diameter 3"

Pekerja 0.054 42.67 2.304 1 2

Tukang Batu 0.090 42.67 3.840 1 4

Kepala Tukang 0.009 42.67 0.384 1 0

Mandor 0.0027 42.67 0.115 1 0

2 Pipa PVC Tipe AW Diameter 4"

Pekerja 0.081 22.88 1.853 1 2

Tukang Batu 0.135 22.88 3.089 1 3

Page 165: bayu (2) estiminasi

Kepala Tukang 0.0135 22.88 0.309 1 0

Mandor 0.0041 22.88 0.094 1 0

K. PEKERJAAN PASANG SEPTICTANK DAN RESAPAN

1 Septictank

Pekerja 2.26 1 2.260 2 1

Tukang batu 0.72 1 0.720 2 0

Kepala tukang 0.07 1 0.070 2 0

Mandor 0.11 1 0.110 2 0

2 Resapan

Pekerja 1.52 1 1.520 1 2

T. batu 0.47 1 0.470 1 0

Kepala tukang 0.05 1 0.050 1 0

Mandor 0.07 1 0.070 1 0

L. PEKERJAAN INSTALASI LISTRIK

1 Lampu Plafond

kepala tukang 0.05 14 0.700 2 0

tukang listrik 1 14 14.000 2 7

pekerja 1 14 14.000 2 7

2 Saklar tunggal

kepala tukang 0.05 10 0.500 1 1

tukang listrik 0.5 10 5.000 1 5

pekerja 0.05 10 0.500 1 1

3 Saklar Ganda

kepala tukang 0.05 9 0.450 1 0

tukang listrik 0.5 9 4.500 1 5

pekerja 0.05 9 0.450 1 0

4 Pemasanan Lampu Gantung

kepala tukang 0.05 4 0.200 2 0

tukang listrik 1 4 4.000 2 2

pekerja 1 4 4.000 2 2

5 Pemasangan Lampu Tanam

kepala tukang 0.05 3 0.150 1 0

tukang listrik 0.5 3 1.500 1 2

pekerja 0.05 3 0.150 1 0

6 Stop Kontak

kepala tukang 0.05 11 0.550 1 1

tukang listrik 0.5 11 5.500 1 6

pekerja 0.05 11 0.550 1 1

7 Pemasangan Zekering Group

kepala tukang 0.05 2 0.100 1 0

tukang listrik 0.5 2 1.000 1 1

pekerja 0.05 2 0.100 1 0

M. PEKERJAAN PEMBESIAN

1 Sloof

Pekerja

Tukang Besi Terampil 0.007 1323.82 9.267 2 5

Kepala Tukang Besi Beton 0.007 1323.82 9.267 2 5

Mandor 0.0007 1323.82 0.927 2 0

2 Ring Balk

Pekerja

Tukang Besi Terampil 0.007 1261.68 8.832 2 4

Kepala Tukang Besi Beton 0.007 1261.68 8.832 2 4

Mandor 0.0007 1261.68 0.883 2 0

3 Kolom Praktis

Pekerja

Tukang Besi Terampil 0.007 866.75 6.067 2 3

Kepala Tukang Besi Beton 0.007 866.75 6.067 2 3

Page 166: bayu (2) estiminasi

Mandor 0.0007 866.75 0.607 2 0

4 Pelat lantai

Pekerja

Tukang Besi Terampil 0.007 2402.33 16.816 3 6

Kepala Tukang Besi Beton 0.007 2402.33 16.816 3 6

Mandor 0.0007 2402.33 1.682 3 1

5 Pondasi Setempat

Pekerja 0.007 831.13 5.818 2 3

Tukang Besi Terampil 0.007 831.13 5.818 2 3

Kepala Tukang Besi Beton 0.0007 831.13 0.582 2 0

Mandor 0.0003 831.13 0.249 2 0

6 Pembesian Kolom Struktur

Pekerja 0.007 903.728 6.326 2 3

Tukang Besi Terampil 0.007 903.728 6.326 2 3

Kepala Tukang Besi Beton 0.0007 903.728 0.633 2 0

Mandor 0.0003 903.728 0.271 2 0

7 Pembesian Tangga

Pekerja 0.007 246.94 1.729 1 2

Tukang Besi Terampil 0.007 246.94 1.729 1 2

Kepala Tukang Besi Beton 0.0007 246.94 0.173 1 0

Mandor 0.0003 246.94 0.074 1 0

N PEKERJAAN MEMASANG KERAMIK

1 1 M2 Pasang Lantai Ubin Teraso Ukuran 40x40 Cm

Pekerja 1.200 14.76 17.712 3 6

Tukang Batu 0.220 14.76 3.247 3 1

Kepala Tukang 0.0215 14.76 0.317 3 0

Mandor 0.900 14.76 13.284 3 4

2 1 M2 Pasang Lantai Keramik 20x20 Cm

Pekerja 0.620 16.5 10.230 2 5

Tukang Batu 0.350 16.5 5.775 2 3

Kepala Tukang 0.035 16.5 0.578 2 0

Mandor 0.030 16.5 0.495 2 0

3 1 M2 Pasang Dinding Keramik 20x20 Cm

Pekerja 0.600 15.00 9.000 2 5

Tukang Batu 1.000 15.00 15.000 2 8

Kepala Tukang 0.045 15.00 0.675 2 0

Mandor 0.030 15.00 0.450 2 0

4 1 M² Pemasangan Paving Block

Pekerja 0.620 34.90 21.638 2 11

Tukang Batu 0.350 34.90 12.215 2 6

Kepala Tukang 0.035 34.90 1.222 2 1

Mandor 0.030 34.90 1.047 2 1

O PENGECATAN

1 Pengecatan Tembok Baru

Pekerja 0.020 1571.44 31.429 6 5

Tukang Cat 0.063 1571.44 99.001 6 17

Kepala Tukang 0.0063 1571.44 9.900 6 2

Mandor 0.0025 1571.44 3.929 6 1

Page 167: bayu (2) estiminasi
Page 168: bayu (2) estiminasi
Page 169: bayu (2) estiminasi
Page 170: bayu (2) estiminasi
Page 171: bayu (2) estiminasi

KURVA S

NO JENIS PEKERJAAN Jumlah hargaBOBOT

DESEMBER - 10MINGGU KE-

(%) 1 2A PEKERJAAN PERSIAPAN Rp35,134,150.00 6.256 3.128 3.128B PEKERJAAN TANAH Rp11,293,553.30 2.011 1.005C PEKERJAAN PASANGAN Rp127,459,694.84 22.696D PEKERJAAN BETON Rp80,154,697.71 14.272 E PEKERJAAN PEMBESIAN Rp38,583,037.07 6.870F PEKERJAAN ATAP Rp13,402,737.08 2.387G PEKERJAAN KUSEN DAN DAUN JENDELA DAN PINTU Rp33,666,423.14 5.995H PEKERJAAN KERAMIK LATAI, KM/WC DAN PAVING Rp89,857,670.80 16.000I INSTALASI AIR BERSIH Rp2,200,121.56 0.392J INSTALASI AIR KOTOR Rp1,709,430.92 0.304

K. SAPTICTANK DAN RESAPAN Rp2,240,651.76 0.399L. PEKERJAAN PLAFON Rp18,191,410.89 3.239M. PEKERJAAN INSTALASI LISTRIK Rp2,227,650.00 0.397N. PEKERJAAN PENGECATAN Rp104,781,340.61 18.658O. PEKERJAAN UNCI, SLOT, DAN ENGSEL Rp701,100.00 0.125

TOTAL Rp561,603,669.68 100.000

Kumulatif Rencana 3.12802 4.133

Prosentase Kumulatif 3.12802 7.262

1485724

Page 172: bayu (2) estiminasi

KURVA SDESEMBER - 10 JANUARI - 2011 FEBRUARI - 2011 FEBRUARI - 2011

MINGGU KE-3 4 5 6 7 8 9 10 11 12 13 10 11 12

1.005

3.783 3.783 3.783 3.783 3.783 3.7833.568 3.568 3.568 3.568

3.435 3.435 1.193 1.193

2.997 2.9978.000 8.000

0.392 0.304

0.399 3.239

0.198 0.198 18.658

0.125

1.005 3.783 7.218 7.218 7.351 8.446 7.351 3.568 1.193 9.392 14.435 2.997 0.125 18.658

8.267 12.050 19.267 26.485 33.836 42.282 49.632 53.200 54.394 63.785 78.220 81.218 81.342 100.000