baja 1.doc

5

Click here to load reader

Upload: inasept

Post on 22-Jun-2015

8 views

Category:

Documents


1 download

DESCRIPTION

baja

TRANSCRIPT

Page 1: BAJA 1.doc

DEPARTEMEN PENDIDIKAN DAN KEBUDAYAAN FAKULTAS TEKNIK JURUSAN TEKNIK SIPIL

UNIVERSITAS LAMPUNGJl. Prof. Dr. Sumantri Brojonegoro No. 1 Bandar Lampung

SOAL TUGAS BESAR STRUKTUR BAJA 1 (T.A. 2013/2014)

NAMA : EDDY RISTANTO NPM : 1215011030

Diketahui rangka atap :

A. TIPE 1

B. TIPE 2

m

m

L2

H2

H1

L2

H2

H1

L1

L1

L1

L1

Page 2: BAJA 1.doc

C. TIPE 3

D. TIPE 4

L2

H2

L2

H2

H1

H1

H1

L1

L1

L1

L1

L1

L2

L1

Page 3: BAJA 1.doc

E. TIPE 5

TAMPAK ATAS RANGKA ATAS SEMUA TIPE

L

B1

B2

H2

H1

L1

L2 L1

Page 4: BAJA 1.doc

Ketentuan :

Penutup atap = zincalume Jarak kuda-kuda = 4 m. Jenis sambungan = baut Beban angin = 25 kg/m². Beban Hujan = kg/m². Mutu baja = BJ 41 Panjang bentang (L) = 13 m. Tinggi kolom (H1) = 8 m. Tinggi kuda-kuda (H2) = 6 m Lebar konstruksi (B1)(B2) = 4 m

Tugas:

1.Analisis gaya-gaya dalam dengan metode buhul/Cremona/ritter dan SAP 2000!

2.Rencanakan detail sambungan dan dimensi keseluruhan bangunan dengan menggunakan SNI !

3.Gambar detail titik buhul rancangan rangka tersebut pada kalkir A3!

Peraturan : Perencanaan atap di atas menggunakan spesifikasi “LRFD Method (SNI

2002)”.

Jadwal pengerjaan :

No. Materi Waktu

1 Analisis pembebanan

2 Perhitungan gaya-gaya pada rangka

3 Perhitungan sambungan

4 Gambar rencana

Catatan :Melanggar jadwal pengerjaan diatas dianggap mengundurkan diri !!!

Bandar Lampung, 24 Desember 2013

Asisten

Page 5: BAJA 1.doc

3... 66,8 3M ... 67.44