backup of backup of peta sebaran ntt(revisi terbaru)

2
ke TimTim S o E Manufui KUPANG Bolok Tenau TIMTIM P. TIMOR Bts. TimTim Olisina Naikilu Eban Kapan Kukak Sulamu Bokong Oelamasi Oinlasi Batuputih Nikiniki Besikama Kolbano Putain Nunkolo Boking Webua Nesam Bitauni Lakafehan Halilulik Maubesi Manamas Bismark Sakato Baun Wini Noelmuti Oesao Oesapa Mena Oekabiti Bupuh Burain Junction Boronubaen Onu Lelogama Puka Bokis Oenaek Nenuk Barate Oepoli Panite Oemoro Betun Atapupu Non Wanibesak Atambua Amol Oelfaub Kukun Manenu Kefamenanu KAB TTS KAB TTU Motomasin Mota'ain Silawan Haliwen TIM TIM Keliting Weluli LB. BAJO BAJAWA ENDE Reo Poma Waeklambu Waepana Terang Pota Malwatar Mbazang Nabe Gako Magepanda Km. 210 Malanuza Moropokat Iteng Km. 180 P. FLORES P. LEMBATA Danga Bealaing Sp. Wangkung Naga Dampek Waebela Mangulewa Nila Kondo Bari Hita Bambor Li Poka Mano Nangarawa Aimere Sawu Ekomawo Jerebuu Dere Wolokuku Kisanata Malapare Boanari Saga Nggorang RUTENG Maumbawa BORONG Kotabaru Napungmali Mudajebak Waepare Lianunu Atawai Loang Balauring Wairiang Lamalera Sagu Nuabosi Detuwija Wologai Nggela DetukeliWarundari Bola Lela Tanarawa Muroona     T    o     b     i    w    u     t    u    n    g Lato D.Kelimutu Hepang Wologai Woloara Sp Sagu Lewoleba Aemali Kaburea Waelengga Nangaroro Puukungu Sokoria Ranakolo Detusuko W olowaru Tendeleo Maurole Hangalande MAUMERE LARANTUKA Waiklibang Waerunu Hikong Nebe Nangalili Kenari P. RINCA P.KOMODO Riung Poma Aegela Aeramo Towak Pausolek Sawu Pau Dere Menanga Nusadane Lewohedo Ritaebang Riangsungai Lamakera P. ADONARA Witihama Kolilanang Waiwerang Waiwuring Waiwadan Waihama Wailebe KAB MANGGARAI KAB NGADA KAB ENDE KAB SIKKA KAB FLORES TIMUR Kedindi Reo Nita Junction  N WAIKABUBAK Waikelo  G  a  u r  a     L    o     k    o    r     i WAITABULA Km. 35 LEWA P. SUMBA     K    a    w    a    n    g    u Bukambani Wonoroto     T    a    m     b    o     l    a     k    a Praipaha Tidas Aukakehok Umananu Kananggar Lumbung Malahar Wahang Kanta Ramuk Tanarara Sp. Mahubokul Ngadulanggi Kabanda Langgi Kataka Tamma     W    a     t    u    m     b    a     k    a Kamanggih Maubokul Kota Liu Bondokodi P  a  t  i    a l    a W  a n  o k  a k  a Memboro     K    e     t    e    w    e    r Radamata Lolangbokul Mangnipa P  a  d  e  d  e w  a  t   u Wikit Pero P  a n  a   g   g  o  d  e  S   p .  a h  e l    e Waikapoda Rita Tanambanas Maubangga Ubupede Wawarongo Tombo Waibakul Katura Kondamara Lenang Padedeweri Dolo Tossi Belagar     M    a     h    u     b    o     k    u     l Kawangohari WAINGAPU Km. 35 LEWA Nggongi P. SUMBA     K    a Praipaha Mbaing Tidas Aukakehok Umananu Melolo Kananggar Ngalu Hambautang Lumbung Malahar Wahang Kanta Ramuk Tanarara Sp. Mahubokul Petawang Ngadulanggi Kabanda Langgi Rende Kataka Tamma     W    u Kamanggih Maujawa Maubokul Kota Liu Lolangbokul Tanambanas Rambangaru Praikarambua Kondamara     M    a     h    u WAINGAPU Lidewatu Target Biaya KAB SUMBABARAT KAB SUMBATIMUR P. PANTAR P. ALOR Taramana Bukapiting Lelahomi Apui Mainang Kokar Lantoka Kabir KALABAHI P. ALOR Taramana Maritaing Bukapiting Lelahomi Apui Mainang Mataraben Lapter. Mali Lantoka KALABAHI P. PANTAR Baranusa KAB KUPANG KAB B E LU Paket Peningkatan Jalan Oesapa Oesao U Bolow Ledeana Triwu Beh Namu Mananga Seba Mesara Ege 068 069 P SABU  RAIJUA Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,35 Km.Eff : Rp. 5.321.995.000 APBN : PT Waskita Karya : : Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,34 Km.Eff : Rp. 2.147.768.000 APBN : PT Waskita Karya : 3 Mei 2010 : 29 September 2010 Paket Peningkatan Jalan Bokong - Batu Putih Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,96 Km.Eff : Rp. 6.414.414.000 APBN : PT Hutama Karya : 3 Mei 2010 : 29 Oktober 2010 Paket Peningkatan Jalan Niki Niki - Noelmuti Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,77 Km.Eff : Rp. 2.583.432.000 APBN : PT Waskita Karya : 3 Mei 2010 : 29 Sept 2010 Paket Berkala Jalan Oesao - Bokong Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,65 Km.Eff : Rp. 3.936.582.000 APBN : PT Alam Indah CLestari : : Paket Berkala Jalan Sp.Oesapa - Lap.Terbang Eltari Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,53 Km.Eff : Rp. 5.266.012.000 APBN : PT Alam Indah CLestari : : Paket Berkala Jalan Jln. Raya Eltari Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,05 Km.Eff : Rp. 4.915.838.000 APBN : PT Ramayana Cipta Perkasa : 3 Mei 2010 : Paket Peningkatan Jalan Noelmuti  - Kefamenanu KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,46 Km.Eff : Rp. 3.886.688.000 APBN : PT Hutama Karya : 3 Mei 2010 : Paket Peningkatan Jalan Jln. Pattimura, Cs KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,13 Km.Eff : Rp. 3.491.700.000 APBN : PT Dian Nusa Lestari : : Paket Peningkatan Jalan Kefamenanu - Maubesi Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,13 Km.Eff : Rp. 3.111.413.000 APBN : PT Waskita Karya : 3 mei 2010 : 30 Sept 2010 Paket Berkala Jalan Jln. Gajah Mada (Soe) KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,83 Km.Eff : Rp. 2.960.500.000 APBN : PT Nindya Karya : 3 Mei 2010 : Paket Peningkatan Jalan Maubesi - Nesam KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,13 Km.Eff : Rp. 3.339.481.000 APBN : PT Waskita Karya : 3 Mei 2010 : 30 September 2010 Paket Peningkatan Jalan Atambua - Motaain Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,66 Km.Eff : Rp. 4.294.005.000 APBN : PT Teratai : 3 Mei 2010 : 29 Oktober 2010 Paket Peningkatan Jalan Jln. Matawi Amahul (Waingapu) Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,05 Km.Eff : Rp. 4.978.870.000 APBN : PT Teratai : 3 Mei 2010 : 29 Oktober 2010 Paket Peningkatan Jalan Waingapu - Km. 35 Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,77 Km.Eff : Rp. 2.640.346.000 APBN : PT Nusa Jaya Abadi : 3 Mei 2010 : 29 September 2010 Paket Berkala Jalan Jln. Suprapto, Cs (Waingapu) Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,21 Km.Eff : Rp. 3.304.200.000 APBN : PT Teratai : : Paket Berkala Jalan Km. 35 - Bts. Sumba Timur Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,55 Km.Eff : Rp. 5.980.599.000 APBN : PT Sahabat Baru Sejahtera : 3 Mei 2010 : 29 Oktober 2010 Paket Peningkatan Jalan Bts. Sumba Timur - Waikabubak Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 4,88 Km.Eff : Rp. 7.982.104.000 APBN : PT Bumi Indah : 3 Mei 2010 : 29 Oktober 2010 Paket Peningkatan Jalan Waitabula - Waikelo Target Biaya Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,20 Km.Eff : Rp. 4.578.981.000 APBN : PT Mitra : 3 Mei 2010 : 29 Oktober 2010 Paket Berkala Jalan Bts. Sumba Timur - Waikabubak Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,53 Km.Eff : Rp. 4.466.665.000 APBN : PT Tiga Dara Karya Sejahtera : 3 Mei 2010 : 29 September 2010 Paket Berkala Jalan Kalabahi - Taraman a Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 24,00 m.Eff : Rp. 3.456.788.000 APBN : PT Sumber Oeluan : 3 Mei 2010 : 5 Sept 2010 Paket Peningkatan Jembatan Loho Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 10,00 m.Eff : Rp. 1.478.163.000 APBN : PT Alam Flores Kso PT Ezra : 3 Mei 2010 : 28 November 2010 Paket Peningkatan Jembatan Lendewacu 2 (Sumba Barat) Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 10,00 m.Eff : Rp. 1.308.488.000 APBN : PT Anggrek Merah : 3 Mei 2010 : 29 September 2010 Paket Peningkatan Jembatan Takaliliang(Alor) Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 10,00 m.Eff : Rp. 294.050.000 APBN : CV Alva Angkasa : : Paket Berkala Jembatan Kalembukuni Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 160,90 m.Eff : Rp. 4.813.700.000 APBN : PT Dian Nusa Lestari : : Paket Berkala Jembatan P. Timor Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,44 Km.Eff : Rp. 3.948.685.000 APBN : PT Yetty Darmawan : 26 April 2010 : 21 November 2010 Paket Peningkatan Jalan Ende - Detusoko KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,44 Km.Eff : Rp. 3.934.966.000 APBN : PT Yetty Darmawan : 26 April 2010 : 21 November 2010 Paket Peningkatan Jalan Junction - Woloaru KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,44 Km.Eff : Rp. 3.939.998.000 APBN : PT Nindya Karya : 26 April 2010 : 21 November 2010 Paket Peningkatan Jalan Lianunu - Hepang KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,44 Km.Eff : Rp. 3.900.523.000 APBN : PT Nindya Karya : 26 April 2010 : 21 November 2010 Paket Berkala Jalan Woloaru - Lianunu KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 14,00 m.Eff : Rp. 1.673.175.000 APBN : PT Novita Karya Taga : 26 April 2010 : 21 November 2010 Paket Peningkatan Jembatan Mengulewa 1 KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 341,10 m.Eff : Rp. 10.215.000.000 APBN : PT Usaha Karya Buana : : Paket Berkala Jembatan P. Flores KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,83 Km.Eff : Rp. 2.890.594.000 APBN : PT Waekuli Saranamega : 26 April 2010 : 17 Oktober 2010  Paket Peningkatan Jalan Km. 210 - Ruteng Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,04 Km.Eff : Rp. 3.145.620.000 APBN : PT Floresco Aneka Indah : 26 April 2010 : 17 Oktober 2010 Paket Peningkatan Jalan A. Yani Cs. - Ruteng KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 4,42 Km.Eff : Rp. 6.466.792.000 APBN : PT Waekuli Saranamega : 14 April 2010 : 10 Oktober 2010 : Paket Berkala Jalan Bts. Manggarai - Km. 210 KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,05 Km.Eff : Rp. 4.961.504.000 APBN : PT Waekuli Saranamega : 14 April 2010 : 10 Oktober 2010 : Paket Peningkatan Jalan Bts. Manggarai - Km. 210 Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 4,42 Km.Eff : Rp. 6.643.592.000 APBN : PT Waekuli Saranamega : 26 April 2010 : 16 November 2010 Paket Berkala Jalan Km. 210 - Ruteng KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,08 Km.Eff : Rp. 4.596.789.000 APBN : PT Kencana SNusantara : 26 April 2010 : 21 November 2010 Paket Berkala Jalan Sp. Bajawa - Bts. Manggarai KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,23 Km.Eff : Rp. 5.284.002.000 APBN : PT Alam Flores : 26 April 2010 : 21 November 2010 Paket Peningkatan Jalan Waepare - Km. 180 KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,44 Km.Eff : Rp. 3.873.307.000 APBN : PT Talenta Jaya Rentalindo : 26 April 2010 : 21 November 2010 Paket Peningkatan Jalan Km. 180 - Waenunu Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,98 Km.Eff : Rp. 4.436.345.000 APBN : PT Alam Flores : 26 April 2010 : 21 Novemebr 2010 Paket Berkala Jalan Maumere - Waepare KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,86 Km.Eff : Rp. 4.270.000.000 APBN : PT Talenta Jaya Rentalindo : : Paket Berkala Jalan Waerunu - Larantuka KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,90 Km.Eff : Rp. 6.600.000.000 APBN : PT Talenta Jaya Rentalindo : : Paket Berkala Jalan Basuki Rahmat Cs. ( Larantuka) KAB KUPANG Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,99 Km.Eff : Rp. 4.791.343.000 APBN : PT Floresco Aneka Indah : 26 April 2010 : 21 November 2010 Paket Peningkatan Jalan Malwatar - Labuhan Bajo Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,65 Km.Eff : Rp. 3.923.351.000 APBN : PT Floresco Aneka Indah : 26 April 2010 : 21 November 2010 Paket Berkala Jalan Ruteng - Malwatar Paket Pembangunan Jalan Oesapa Oesao Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,50 Km.Eff : Rp. 5.621.209.000 APBN : PT Waskita Karya : : Paket Pembangunan Jalan Oesapa Bokong Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,00 Km.Eff : Rp. 6.889.375.000 APBN : PT Waskita Karya : 19 April 2010 : 18 Oktober 2010 Paket Pembangunan Jalan Soe  Niki Niki Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,00 Km.Eff : Rp. 4.414.413.000 APBN : PT Hutama Karya : 21 April 2010 : 17 Oktober 2010 Paket Pembangunan Jalan Junction  Mali Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,05 Km.Eff : Rp. 2.051.875.000 APBN : PT Adhi Karya : 21 April 2010 : 29 Oktober 2010 Paket Pembangunan Jalan Taramana Lantoka  Maritaing Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,00 Km.Eff : Rp. 4.913.483.000 APBN : PT Adhi Karya : 21 April 2010 : 17 Oktober 2010 Paket Pembangunan Jalan Halilulik  Atambua Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,00 Km.Eff : Rp. 6.917.700.000 APBN : PT Nindya Karya : 21 April 2010 : 18 Oktober 2010 Paket Pembangunan Jalan Lingkar Luar Kota Kupang Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,00 Km.Eff : Rp. 7.166.291.000 APBN : PT Alam Indah CLestari : : Paket Pembangunan Jalan Ende Detusoko Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,00 Km.Eff : Rp. 7.168.919.000 APBN : PT Yetty Darmawan : 16 April 2010 : 11 November 2010 KAB KUPANG aket Pembangunan Jalan Detusoko Wologai Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,00 Km.Eff : Rp. 6.535.041.000 APBN : PT Yetty Darmawan : 16 April 2010 : 11 November 2010 Paket Pembangunan Jalan Reo Dampek Pota Riung Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,00 Km.Eff : Rp. 4.984.599.000 APBN : PT Sinar99 : 16 April 2010 : 11 November 2010 KAB KUPANG Paket Pembangunan Jalan Nggorang Terang Target Nilai Kontrak Kontraktor SPMK : 16 April 2010 Renc. PHO : 11 November 2010 : 1,80 Km.Eff : Rp. 4.469.003.000 APBN : PT Putra Mas Pratama Paket Pembangunan Jalan Ruteng Reo Kedindi Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 4,80 Km.Eff : Rp. 11.960.999.000 APBN : PT Menara Armada Pratama : 16 April 2010 : 11 Desember 2010 Paket Pembangunan Jalan Waerunu Larantuka Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 3,40 Km.Eff : Rp. 8.500.000.000 APBN : PT Talenta Jaya Rentalindo : : KAB KUPANG Paket Pembangunan Jalan Nita Woloara Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 2,84 Km.Eff : Rp. 7.090.882.000 APBN : PT Nindya Karya : 26 April 2010 : 12 November 2010 Paket Pembangunan Jalan Waitabula Waikabubak Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,60 Km.Eff : Rp. 3.984.846.000 APBN : PT Bumi Indah : 20 April 2010 : 16 September 2010 Paket Pembangunan Jalan Waingapu Km. 35.00 Target Nilai Kontrak Kontraktor SPMK Renc. PHO : 1,83 Km.Eff : Rp. 4.536.578.000 APBN : PT Teratai : : SNVT PRESERVASI JALAN DAN JEMBATAN NTT KETERANGAN : SNVT PRESERVASI JALAN DAN JEMBATAN FLORES SNVT PEMBANGUNAN JALAN DAN JEMBATAN NTT SNVT PEMBANGUNAN JALAN DAN JEMBATAN FLORES SNVT PEMBANGUNAN JALAN DAN JEMBATAN SUMBA

Upload: rudy-alfonso-simanjuntak

Post on 06-Jul-2015

146 views

Category:

Documents


1 download

TRANSCRIPT

5/7/2018 Backup of Backup of Peta Sebaran NTT(Revisi Terbaru) - slidepdf.com

http://slidepdf.com/reader/full/backup-of-backup-of-peta-sebaran-nttrevisi-terbaru 1/1

 

ke TimTim

S o E

Manufui

KUPANG

 

Bolok

Tenau

TIMTIM

P. TIMOR 

Bts.TimTim

Olisina

NaikiluEban

Kapan

Kukak

SulamuBokong

Oelamasi

Oinlasi

Batuputih

Nikiniki

Besikama

Kolbano

Putain

Nunkolo

Boking

WebuaNesam

Bitauni

Lakafehan

Halilulik

Maubesi

Manamas

Bismark

Sakato

Baun

Wini

Noelmuti

Oesao

Oesapa

Mena

Oekabiti

Bupuh

Burain

Junction

Boronubaen

Onu

Lelogama Puka

Bokis

Oenaek

Nenuk

Barate

Oepoli

PaniteOemoro

Betun

Atapupu

Non

Wanibesak

Atambua

Amol

Oelfaub

Kukun

Manenu

Kefamenanu

KAB. TTS.

KAB. TTU.

 

Motomasin

Mota'ain

SilawanHaliwen

TIM TIM

Keliting

Weluli

 

LB.BAJO

BAJAWA

ENDE

Reo

Poma

Waeklambu

Waepana

Terang

 

Pota

Malwatar 

Mbazang

Nabe

Gako

Magepanda

 

Km.210

Malanuza

Moropokat

Iteng

Km.180P. FLORES

P. LEMBATA

Danga

Bealaing

Sp.Wangkung

Naga

Dampek

Waebela

 

Mangulewa

NilaKondo

Bari

Hita

Bambor 

Li

PokaMano

Nangarawa

Aimere

Sawu

 

Ekomawo

Jerebuu

Dere

Wolokuku

Kisanata

Malapare

Boanari

 

Saga

Nggorang

RUTENG

Maumbawa

 

BORONG

Kotabaru

Napungmali

Mudajebak

Waepare

Lianunu

Atawai

Loang

Balauring

Wairiang

Lamalera

Sagu

Nuabosi

Detuwija

Wologai

Nggela

DetukeliWarundariBola

Lela

Tanarawa

Muroona

    T   o    b    i   w   u    t   u   n   g

Lato

D.Kelimutu

HepangWologai

Woloara

Sp Sagu

Lewoleba

Aemali

Kaburea

Waelengga

Nangaroro

Puukungu

Sokoria

Ranakolo

Detusuko

W

 

olowaru

Tendeleo

Maurole

HangalandeMAUMERE

LARANTUKA

Waiklibang

Waerunu

Hikong Nebe

Nangalili

KenariP.RINCA

P.KOMODO

Riung

Poma

Aegela

AeramoTowak

Pausolek

Sawu

PauDere

MenangaNusadane

Lewohedo

RitaebangRiangsungai

Lamakera

P. ADONARA

WitihamaKolilanang

Waiwerang

Waiwuring

WaiwadanWaihama

Wailebe

KAB. MANGGARAI

KAB. NGADAKAB. ENDE

KAB. SIKKA

KAB. FLORES TIMUR

Kedindi

 

Reo

Nita

Junction

ENDE

WAIKABUBAK

Waikelo

 G a ur  a

    L   o    k   o   r    i

WAITABULA

Km. 35LEWA

P. SUMBA

    K   a   w   a   n   g   u

 

Bukambani Wonoroto

    T   a   m    b   o    l   a    k   a

Praipaha

Tidas

Aukakehok

Umananu

Kananggar 

Lumbung

Malahar 

Wahang

Kanta

Ramuk

Tanarara

Sp. Mahubokul

 

Ngadulanggi

Kabanda

Langgi

Kataka

Tamma

    W   a    t   u   m    b   a    k   a

Kamanggih

Maubokul

Kota Liu

Bondokodi

P  a t  i    al    a

W an ok  ak  a

Memboro    K   e    t   e   w   e   r

Radamata

Lolangbokul

Mangnipa

P  a d  e d  ew a t   u

Wikit

Pero

P  an an  g  g o d  e

 S   p.K ah  el    e

Waikapoda

Rita

Tanambanas

MaubanggaUbupede

Wawarongo

Tombo

Waibakul

Katura

Kondamara

Lenang

Padedeweri

Dolo

Tossi

Belagar 

    M   a    h   u    b   o    k   u    l

Kawangohari

WAINGAPU

 

Km. 35LEWA

Nggongi

P. SUMBA

    K   a

 

Praipaha

Mbaing

Tidas

Aukakehok

Umananu

Melolo

Kananggar 

Ngalu

Hambautang

Lumbung

Malahar 

Wahang

Kanta

Ramuk

Tanarara

Sp. Mahubokul

Petawang

Ngadulanggi

Kabanda

Langgi

RendeKataka

Tamma

    W

   u

Kamanggih

Maujawa

Maubokul

Kota Liu

Lolangbokul

Tanambanas Rambangaru

Praikarambua Kondamara

    M   a    h   u

WAINGAPU

Lidewatu

Target

Biaya

KAB. SUMBABARAT

KAB. SUMBATIMUR

 

P. PANTAR 

P. ALOR 

Taramana

Bukapiting

Lelahomi

Apui

Mainang

Kokar 

Lantoka

Kabir 

KALABAHI

 

P. ALOR 

Taramana

Maritaing

Bukapiting

Lelahomi

Apui

Mainang

Mataraben

Lapter.Mali

Lantoka

KALABAHI

P. PANTAR 

Baranusa

KAB. KUPANG

KAB. B E LU

Paket Peningkatan JalanOesapa - Oesao

U

Bolow

Ledeana

Tr iwu

Beh

Namu

Mananga Seba

Mesara

Ege

068 069

P SABURAIJUA

 

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,35 Km.Eff : Rp. 5.321.995.000 APBN: PT Waskita Karya::

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,34 Km.Eff : Rp. 2.147.768.000 APBN: PT Waskita Karya: 3 Mei 2010: 29 September 2010

Paket Peningkatan JalanBokong - Batu Putih

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,96 Km.Eff : Rp. 6.414.414.000 APBN: PT Hutama Karya: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan Jalan

Niki Niki - Noelmuti

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,77 Km.Eff : Rp. 2.583.432.000 APBN: PT Waskita Karya: 3 Mei 2010: 29 Sept 2010

Paket Berkala JalanOesao - Bokong

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,65 Km.Eff : Rp. 3.936.582.000 APBN: PTAlam IndahC Lestari

::

Paket Berkala JalanSp.Oesapa - Lap.Terbang Eltari

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,53 Km.Eff : Rp. 5.266.012.000 APBN: PTAlam IndahC Lestari

::

Paket Berkala JalanJln. Raya Eltari

TargetNilai KontrakKontraktor 

SPMKRenc. PHO

: 3,05 Km.Eff : Rp. 4.915.838.000 APBN: PTRamayana Cipta Perkasa

: 3 Mei 2010:

Paket Peningkatan JalanNoelmuti - Kefamenanu

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,46 Km.Eff : Rp. 3.886.688.000 APBN: PT Hutama Karya: 3 Mei 2010:

Paket Peningkatan JalanJln. Pattimura, Cs

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,13 Km.Eff : Rp. 3.491.700.000 APBN: PT Dian Nusa Lestari::

Paket Peningkatan JalanKefamenanu - Maubesi

TargetNilai Kontrak

Kontraktor SPMKRenc. PHO

: 2,13 Km.Eff : Rp. 3.111.413.000 APBN

: PT Waskita Karya: 3 mei 2010: 30 Sept 2010

Paket Berkala JalanJln. Gajah Mada (Soe)

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,83 Km.Eff : Rp. 2.960.500.000 APBN: PT Nindya Karya: 3 Mei 2010:

Paket Peningkatan JalanMaubesi - Nesam

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,13 Km.Eff : Rp. 3.339.481.000 APBN: PT Waskita Karya: 3 Mei 2010: 30 September 2010

Paket Peningkatan JalanAtambua - Motaain

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,66 Km.Eff : Rp. 4.294.005.000 APBN: PT Teratai: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanJln. Matawi Amahul (Waingapu)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,05 Km.Eff : Rp. 4.978.870.000 APBN: PT Teratai: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanWaingapu - Km. 35

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,77 Km.Eff : Rp. 2.640.346.000 APBN: PT Nusa Jaya Abadi: 3 Mei 2010: 29 September 2010

Paket Berkala JalanJln. Suprapto, Cs (Waingapu)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,21 Km.Eff : Rp. 3.304.200.000 APBN: PT Teratai::

Paket Berkala JalanKm. 35 - Bts. Sumba Timur 

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,55 Km.Eff : Rp. 5.980.599.000 APBN: PT Sahabat Baru Sejahtera

: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanBts. Sumba Timur - Waikabubak

TargetNilai Kontrak

Kontraktor SPMKRenc. PHO

: 4,88 Km.Eff : Rp. 7.982.104.000 APBN

: PT Bumi Indah: 3 Mei 2010: 29 Oktober 2010

Paket Peningkatan JalanWaitabula - Waikelo

Target

Biaya

TargetNilai Kontrak

Kontraktor SPMKRenc. PHO

: 3,20 Km.Eff : Rp. 4.578.981.000 APBN

: PT Mitra: 3 Mei 2010: 29 Oktober 2010

Paket Berkala JalanBts. Sumba Timur - Waikabubak

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,53 Km.Eff : Rp. 4.466.665.000 APBN: PTTiga Dara Karya Sejahtera

: 3 Mei 2010: 29 September 2010

Paket Berkala JalanKalabahi - Taramana

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 24,00 m.Eff : Rp. 3.456.788.000 APBN: PT Sumber Oeluan: 3 Mei 2010: 5 Sept 2010

Paket Peningkatan JembatanLoho

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 10,00 m.Eff : Rp. 1.478.163.000 APBN: PTAlam Flores KsoPTEzra

: 3 Mei 2010: 28 November 2010

Paket Peningkatan JembatanLendewacu 2 (Sumba Barat)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 10,00 m.Eff : Rp. 1.308.488.000 APBN: PT Anggrek Merah: 3 Mei 2010: 29 September 2010

Paket Peningkatan JembatanTakaliliang (Alor)

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 10,00 m.Eff : Rp. 294.050.000 APBN: CV Alva Angkasa::

Paket Berkala JembatanKalembukuni

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 160,90 m.Eff : Rp. 4.813.700.000 APBN: PT Dian Nusa Lestari::

Paket Berkala JembatanP. Timor 

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.948.685.000 APBN: PT Yetty Darmawan: 26 April 2010: 21 November 2010

Paket Peningkatan JalanEnde - Detusoko

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.934.966.000 APBN: PT Yetty Darmawan: 26 April 2010: 21 November 2010

Paket Peningkatan JalanJunction - Woloaru

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.939.998.000 APBN: PT Nindya Karya: 26 April 2010: 21 November 2010

Paket Peningkatan JalanLianunu - Hepang

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.900.523.000 APBN: PT Nindya Karya: 26 April 2010: 21 November 2010

Paket Berkala JalanWoloaru - Lianunu

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 14,00 m.Eff : Rp. 1.673.175.000 APBN: PT Novita Karya Taga: 26 April 2010: 21 November 2010

Paket Peningkatan JembatanMengulewa 1

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 341,10 m.Eff : Rp. 10.215.000.000 APBN: PT Usaha Karya Buana::

Paket Berkala JembatanP. Flores

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,83 Km.Eff : Rp. 2.890.594.000 APBN: PT Waekuli Saranamega: 26 April 2010: 17 Oktober 2010 

Paket Peningkatan JalanKm. 210 - Ruteng

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,04 Km.Eff : Rp. 3.145.620.000 APBN: PT Floresco Aneka Indah

: 26 April 2010: 17 Oktober 2010

Paket Peningkatan JalanA. Yani Cs. - Ruteng

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 4,42 Km.Eff : Rp. 6.466.792.000 APBN: PT Waekuli Saranamega: 14 April 2010: 10 Oktober 2010:

Paket Berkala JalanBts. Manggarai - Km. 210

KAB. KUPANG

TargetNilai KontrakKontraktor 

SPMKRenc. PHO

: 3,05 Km.Eff : Rp. 4.961.504.000 APBN: PT Waekuli Saranamega

: 14 April 2010: 10 Oktober 2010:

 

Paket Peningkatan JalanBts. Manggarai - Km. 210

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 4,42 Km.Eff : Rp. 6.643.592.000 APBN: PT Waekuli Saranamega: 26 April 2010: 16 November 2010

Paket Berkala JalanKm. 210 - Ruteng

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,08 Km.Eff : Rp. 4.596.789.000 APBN: PTKencana S Nusantara

: 26 April 2010: 21 November 2010

Paket Berkala JalanSp. Bajawa - Bts. Manggarai

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,23 Km.Eff : Rp. 5.284.002.000 APBN: PT Alam Flores: 26 April 2010: 21 November 2010

Paket Peningkatan JalanWaepare - Km. 180

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,44 Km.Eff : Rp. 3.873.307.000 APBN: PT Talenta Jaya Rentalindo

: 26 April 2010: 21 November 2010

Paket Peningkatan JalanKm. 180 - Waenunu

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,98 Km.Eff : Rp. 4.436.345.000 APBN: PT Alam Flores: 26 April 2010: 21 Novemebr 2010

Paket Berkala JalanMaumere - Waepare

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,86 Km.Eff : Rp. 4.270.000.000 APBN: PT Talenta Jaya Rentalindo

::

Paket Berkala JalanWaerunu - Larantuka

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,90 Km.Eff : Rp. 6.600.000.000 APBN: PT Talenta Jaya Rentalindo

::

Paket Berkala JalanBasuki Rahmat Cs. ( Larantuka)

KAB. KUPANG

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,99 Km.Eff : Rp. 4.791.343.000 APBN: PT Floresco Aneka Indah: 26 April 2010: 21 November 2010

Paket Peningkatan JalanMalwatar - Labuhan Bajo

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,65 Km.Eff : Rp. 3.923.351.000 APBN: PT Floresco Aneka Indah

: 26 April 2010: 21 November 2010

Paket Berkala JalanRuteng - Malwatar 

Paket Pembangunan JalanOesapa - Oesao

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,50 Km.Eff : Rp. 5.621.209.000 APBN: PT Waskita Karya::

Paket Pembangunan JalanOesapa - Bokong

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,00 Km.Eff : Rp. 6.889.375.000 APBN: PT Waskita Karya: 19 April 2010: 18 Oktober 2010

Paket Pembangunan JalanSoe - Niki Niki

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 4.414.413.000 APBN: PT Hutama Karya: 21 April 2010: 17 Oktober 2010

Paket Pembangunan JalanJunction - Mali

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,05 Km.Eff : Rp. 2.051.875.000 APBN: PT Adhi Karya: 21 April 2010: 29 Oktober 2010

Paket Pembangunan JalanTaramana - Lantoka - Maritaing

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 4.913.483.000 APBN: PT Adhi Karya: 21 April 2010: 17 Oktober 2010

Paket Pembangunan JalanHalilulik - Atambua

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,00 Km.Eff : Rp. 6.917.700.000 APBN: PT Nindya Karya: 21 April 2010: 18 Oktober 2010

Paket Pembangunan JalanLingkar Luar Kota Kupang

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,00 Km.Eff : Rp. 7.166.291.000 APBN: PTAlam IndahC Lestari

::

Paket Pembangunan JalanEnde - Detusoko

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 7.168.919.000 APBN: PT Yetty Darmawan: 16 April 2010: 11 November 2010

KAB. KUPANGaket Pembangunan Jalan

Detusoko - Wologai

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 6.535.041.000 APBN: PT Yetty Darmawan: 16 April 2010: 11 November 2010

Paket Pembangunan JalanReo - Dampek - Pota - Riung

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,00 Km.Eff : Rp. 4.984.599.000 APBN: PT Sinar99: 16 April 2010: 11 November 2010

KAB. KUPANG

Paket Pembangunan JalanNggorang - Terang

TargetNilai KontrakKontraktor SPMK : 16 April 2010Renc. PHO : 11 November 2010

: 1,80 Km.Eff : Rp. 4.469.003.000 APBN: PT Putra Mas Pratama

Paket Pembangunan JalanRuteng - Reo - Kedindi

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 4,80 Km.Eff : Rp. 11.960.999.000 APBN: PT Menara Armada Pratama

: 16 April 2010: 11 Desember 2010

Paket Pembangunan JalanWaerunu - Larantuka

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 3,40 Km.Eff : Rp. 8.500.000.000 APBN: PT Talenta Jaya Rentalindo

::

KAB. KUPANGPaket Pembangunan JalanNita - Woloara

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 2,84 Km.Eff : Rp. 7.090.882.000 APBN: PT Nindya Karya: 26 April 2010: 12 November 2010

Paket Pembangunan JalanWaitabula - Waikabubak

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,60 Km.Eff : Rp. 3.984.846.000 APBN: PT Bumi Indah: 20 April 2010: 16 September 2010

Paket Pembangunan JalanWaingapu - Km. 35.00

TargetNilai KontrakKontraktor SPMKRenc. PHO

: 1,83 Km.Eff : Rp. 4.536.578.000 APBN: PT Teratai::

SNVT PRESERVASI JALAN DAN JEMBATAN NTT

KETERANGAN :

SNVT PRESERVASI JALAN DAN JEMBATAN FLORES

SNVT PEMBANGUNAN JALAN DAN JEMBATAN NTT

SNVT PEMBANGUNAN JALAN DAN JEMBATAN FLORES

SNVT PEMBANGUNAN JALAN DAN JEMBATAN SUMBA