Analisa EI 6.3.5 BaruAnalisa EI-635
FORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK:No. PAKET KONTRAK:NAMA PAKET:PROP / KAB / KODYA:ITEM PEMBAYARAN NO.: 6.3 (5)PERKIRAAN VOL. PEK.:10,000.00JENIS PEKERJAAN: Lapis Aus Aspal Beton (AC-WC) t = 4 CmTOTAL HARGA (Rp.):449,569,600.00SATUAN PEMBAYARAN: M2% THD. BIAYA PROYEK:40.50
PERKIRAANHARGAJUMLAHNO.KOMPONENSATUANKUANTITASSATUANHARGA(Rp.)(Rp.)
A.TENAGA
1.Pekerja(L01)Jam0.01522.Mandor(L03)Jam0.0022
JUMLAH HARGA TENAGA
B.BAHAN
1.Agregat Kasar(M03)M30.02582.Agregat Halus(M04)M30.02173.Filler(M05)Kg7.30624.Aspal(M10)Kg5.9063
JUMLAH HARGA BAHAN
C.PERALATAN1.Wheel Loader(E15)Jam0.00262.AMP(E01)Jam0.00223.Genset(E12)Jam0.00224.Dump Truck(E09)Jam0.08815.Asphalt Finisher (E02)Jam0.00276.Tandem Roller(E17)Jam0.00277.P. Tyre Roller(E18)Jam0.00278.Alat BantuLs1.0000
JUMLAH HARGA PERALATAN 0.00
D.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )0.00E.OVERHEAD & PROFIT% x D0.00F.HARGA SATUAN PEKERJAAN ( D + E )0.00Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranberat untuk bahan-bahan.2Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomormata pembayaran.3Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.4Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPNyang dibayar dari kontrak) dan biaya-biaya lainnya.