tugas bill of quantity irigasi chek dam
Post on 12-Jul-2015
509 Views
Preview:
TRANSCRIPT
BILL OF QUANTITYDAFTAR KUANTITAS DAN HARGATUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK ANGKATAN : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : 2009 - 2010 HARGA SATUAN PEKERJAAN (Rp.)
NO
URAIAN PEKERJAAN
SATUAN
VOLUME
JUMLAH (Rp.)
I
PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi 2 Pembersihan Lapangan Unit Ls 1.00 1.00 7,700,000.00 3,200,000.00 7,700,000.00 3,200,000.00
II 1 2 3 4 5 6 7 8
PEKERJAAN CHECK DAM Galian Tanah Berbatu Dengan Alat Timbunan Tanah Dipadatkan (Manual) Kisdam Lantai Kerja (Beton B0) Pasangan Batu 1 : 4 Beton Konstruksi K-175 Kg/cm2 Plesteran 1 : 3 Bronjong M3 M3 M3 M3 M3 M3 M2 M3 415.00 57.50 14.00 39.00 674.00 140.50 282.50 150.00 21,296.00 77,110.00 449,284.00 1,097,140.00 902,896.50 3,592,930.00 55,861.30 772,222.00 8,837,840.00 4,433,825.00 6,289,976.00 42,788,460.00 608,552,241.00 504,806,665.00 15,780,817.25 115,833,300.00
JUMLAH PPN 10 % JUMLAH DIBULATKAN Terbilang : ( Satu Milyar Empat Ratus Lima Puluh Juta Rupiah )
1,318,223,124.25 131,822,312.43 1,450,045,436.68 1,450,000,000.00
7
ANALISA HARGA SATUAN PEKERJAAN GALIAN TANAH BERBATU DENGAN ALAT EXCAVATORUraian Pekerjaan Satuan Mata Pembayaran Hasil per / Jam : GALIAN TANAH DENGAN ALAT : m3 : 32.12 M3
A. DATA PERALATAN1. 2. 3. 4. 5. 6. 7. 8. Jenis Alat / Nama Kapasitas ( backet ) Produksi Alat per Jam Umur Ekonomis Alat Jam Kerja Pertahun Harga Pokok Alat Nilai Sisa Harga Penyusutan : Hydraulic Excavator : 0.54 : : 5 : 2,000.00 : 1,300,000,000.00 : 130,000,000.00 : 1,170,000,000.00 M3 Tahun..( a ) Jam / Tahun ..( b ) .( c ) ( 10 % x c ) ..( d ) ( c - d ) ..( e )
B. BIAYA KERJA ALAT PER JAMBIAYA LANGSUNG a. Biaya Penyusutan b. Biaya Operasi 1 2 3 4 5 6 7 Bahan Bakar Pelumas Engine Hydraulic Oil Grease Gear Oil Bahan Pelengkap Biaya Tenaga Kerja Operator Mekanik Crew = = = = = = = = = 0.248 0.130 0.250 0.500 0.01 x x x x x 160.00 x x x x 1.75 x 5,500.00 20,000.00 40,000.00 41,500.00 30,000.00 = = = = = = 218,240.00 2,600.00 10,000.00 20,750.00 525.00 10,000.00 (e) (a) x (b) 1,170,000,000.00 10,000.00 =
=
117,000.00
1.00 0.15 2.00 Jumlah Jam Kerja per hari
x x x
70,000.00 = 90,000.00 = 45,000.00 = = = Biaya Tenaga Kerja =
70,000.00 13,500.00 90,000.00 173,500.00 8.00 173,500.00 = 8.00 =
Jam 21,687.50 / Jam
JUMLAH BIAYA KERJA ALAT PER JAM c. Biaya perbaikan = 0.00013 x 0.9 x
283,802.50 152,100.00
1,300,000,000.00 =
BIAYA TIDAK LANGSUNG d. Bunga Modal - Faktor Pengembalian = 19 % x ( 1+19% ) ^ 5 ( 1+19% ) ^ ( 5 - 1 ) - Biaya Pengembalian = (c - d ) xD b 0.002 x d b 117,000.00 283,802.50 152,100.00 130,970.15 130.00 684,002.65
=
D
=
0.45 2.01 130,970.15
=
0.224
=
261,940,298.51 = 2,000.00 260,000.000 = 2,000.00
e. Asuransi Jadi biaya Langsung a. Biaya Penyusutan b. Biaya Operasi c. Biaya Perbaikan d. Bunga Modal e. Asuransi TOTAL B I A Y A Produksi Alat
=
=
130.00
= = = = = = =
60 x 60 x Volume Backet x Efesiensi Waktu Kerja - Efisiensi ( % ) Backet Operator Waktu Alat
- Waktu Kerja ( det ) Swing Isi Buang Jumlah
= = = =
8.00 8.00 7.00 23.00
= = = =
0.70 0.85 0.80 0.80 0.38 0.38 = 32.12 M3 / Jam
Produksi Alat
=
60 x 60 23.00
x
0.54 x
Harga Galian Tanah / M3
=
684,002.65 = 32.12
21,296.38
/ M3
HSP GALIAN TANAH PER M3
=
21,296.0014
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Kisdam / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA 1 Pekerja 2 Mandor BAHAN Tanah timbunan Tali Kawat Karung Plastik Paku biasa Kayu cerucuk PERALATAN
Org/Hari Org/Hari
3.00 0.150
50,000.00 80,000.00
150,000.00 12,000.00
II 1 2 3 4 5 III
M3 Kg Bh Kg Btg
1.10 4.00 30.00 1.50 5.00
65,000.00 12,000.00 1,298.00 12,000.00 14,000.00
71,500.00 48,000.00 38,940.00 18,000.00 70,000.00
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan
408,440.00 40,844.00 449,284.00 449,284.00
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Mobilisasi dan Demobilisasi / Unit SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA
II
BAHAN
III
PERALATAN 1 Tronton
Unit
2.00
3,500,000.00
7,000,000.00
Jumlah ( I + II + III ) Biaya Keuntungan 10 % Harga Satuan Pekerjaan Dibulatkan
7,000,000.00 700,000.00 7,700,000.00 7,700,000.00
8
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Beton Konstruksi Mutu K-175 / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN
I II. III.
Beton Mutu K-175 Pembesian Begisting
M3 Kg M3
1.0000 70.0000 5.0000
1,225,125.00 24,464.00 131,065.00
1,225,125.00 1,712,480.00 655,325.00
Jumlah ( I + II + III ) Harga Satuan Pekerjaan, per m3 Dibulatkan
3,592,930.00 3,592,930.00 3,592,930.00
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Beton Konstruksi K-175 Kg/cm 2 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA Pekerja Mandor Tukang Kepala Tukang
Org/Hari Org/Hari Org/Hari Org/Hari
4.8000 0.2400 0.4000 0.0400
50,000.00 80,000.00 70,000.00 80,000.00
240,000.00 19,200.00 28,000.00 3,200.00
BAHAN 1. Semen 2. Pasir 3. Kerikil PERALATAN 1. Concrete Mixer / Molen 2. Vibrator Concrete
Zak M3 M3
5.9700 0.4800 0.9600
75,000.00 70,000.00 300,000.00
447,750.00 33,600.00 288,000.00
III.
Unit/Hari Unit/Hari
0.200 0.200
190,000.00 80,000.00
38,000.00 16,000.00
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan
1,113,750.00 111,375.00 1,225,125.00 1,225,125.00
9
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Besi Tulang / Kg SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA 1. Pekerja 2. Tukang 3. Kepala Tukang BAHAN 1. Besi Beton 2. Kawat Beton PERALATAN
Org/Hari Org/Hari Org/Hari
0.0675 0.0675 0.0225
50,000.00 70,000.00 80,000.00
3,375.00 4,725.00 1,800.00
II.
Kg Kg
1.1000 0.0200
11,000.00 12,000.00
12,100.00 240.00
III.
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan, per Kg Dibulatkan
22,240.00 2,224.00 24,464.00 24,464.00
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Begisting/Cetakan Beton / M2 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA Pekerja Tukang Mandor Kepala Tukang
Org/Hari Org/Hari Org/Hari Org/Hari
0.6000 0.5000 0.0100 0.0500
50,000.00 70,000.00 80,000.00 80,000.00
30,000.00 35,000.00 800.00 4,000.00
BAHAN 1. Paku 2. Multiplek 3. Kayu Begisting PERALATAN
Kg Lbr M3
0.4000 0.3500 0.0320
12,000.00 45,000.00 900,000.00
4,800.00 15,750.00 28,800.00
III.
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan, per m2 Dibulatkan
119,150.00 11,915.00 131,065.00 131,065.00
10
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. 1. 2. 3. III. 1. 2. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Lantai Kerja ( Beton B0) / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA Pekerja Mandor Tukang Kepala Tukang BAHAN Semen Pasir Kerikil PERALATAN Concrete Mixer / Molen Vibrator Concrete
Org/Hari Org/Hari Org/Hari Org/Hari Zak M3 M3 Unit/Hari Unit/Hari
4.80000 0.24000 0.40000 0.04000 4.24 0.50 1.00 0.20 0.20
50,000.00 80,000.00 70,000.00 80,000.00 75,000.00 70,000.00 300,000.00 190,000.00 80,000.00
240,000.00 19,200.00 28,000.00 3,200.00 318,000.00 35,000.00 300,000.00 38,000.00 16,000.00
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan
997,400.00 99,740.00 1,097,140.00 1,097,140.00
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Timbunan Tanah Dipadatkan / M3 (Manual ) SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN
I.
TENAGA KERJA 1 Pekerja 2 Mandor BAHAN
Org/Hari Org/Hari
1.3300 0.0450
50,000.00 80,000.00
66,500.00 3,600.00
II.
III.
PERALATAN
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan
70,100.00 7,010.00 77,110.00 77,110.00
11
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Pasangan Batu Kali Ad. 1 : 4 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA Pekerja Mandor Tukang Batu Kepala Tukang
Orang / Hari Orang / Hari Orang / Hari Orang / Hari
3.6000 0.1800 1.2000 0.1200
50,000.00 80,000.00 70,000.00 80,000.00
180,000.00 14,400.00 84,000.00 9,600.00
BAHAN 1. Semen Pc 2. Batu Belah/Kali 3. Pasir PERALATAN
Zak M3 M3
3.2570 1.2000 0.5220
75,000.00 210,000.00 70,000.00
244,275.00 252,000.00 36,540.00
III.
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan
820,815.00 82,081.50 902,896.50 902,896.50
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. 1. 2. 3. 4. II. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Plesteran Ad. 1 : 3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA Pekerja Mandor Tukang Kepala Tukang
Orang / Hari Orang / Hari Orang / Hari Orang / Hari
0.4000 0.0200 0.2000 0.0200
50,000.00 80,000.00 70,000.00 80,000.00
20,000.00 1,600.00 14,000.00 1,600.00
BAHAN 1. Semen Pc 2. Pasir PERALATAN
Zak M3
0.1630 0.0194
75,000.00 70,000.00
12,225.00 1,358.00
III.
Jumlah ( I + II + III ) Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan, per M2 Dibulatkan
50,783.00 5,078.30 55,861.30 55,861.30 12
ANALISA HARGA SATUANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK JENIS PEKERJAAN NO. I. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : Bronjong / M3 SATUAN KUANTITAS BIAYA SATUAN (Rp) JUMLAH (Rp)
URAIAN TENAGA KERJA 1. Pekerja 2. Mandor
Orang / Hari Orang / Hari
1.382 0.024
50,000.00 80,000.00
69,100.00 1,920.00 71,020.00
II.
BAHAN 1. Kawat Bronjong Pabrikan 2. Batu Belah / Kali
Unit M3
1.000 1.100
400,000.00 210,000.00
400,000.00 231,000.00 631,000.00
III.
PERALATAN
Jumlah (I + II) / 3 + III Biaya Umum & Keuntungan 10 % Harga Satuan Pekerjaan,per M3 Dibulatkan
702,020.00 70,202.00 772,222.00 772,222.00
13
DAFTAR UPAHTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK ANGKATAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : 2009 - 2010 SATUAN KUANTITAS HARGA SATUAN (Rp.) 70,000.00 45,000.00 90,000.00 45,000.00 45,000.00 50,000.00 80,000.00 70,000.00 80,000.00
URAIAN
1. 2. 3. 4. 4. 6. 7. 8. 9.
Operator Pembantu Operator Mekanik Pembantu Mekanik Oil Man / Crew Pekerja Mandor Tukang Kepala Tukang
Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
#REF! #REF!
#REF! #REF!
15
DAFTAR BAHANTUGAS FAKULTAS / JURUSAN PEKERJAAN KELOMPOK ANGKATAN NO. : EKONOMI TEKNIK : TEKNIK / SIPIL : PEMBANGUNAN CHECK DAM : I (SATU) : 2009 - 2010 SATUAN KUANTITAS HARGA SATUAN (Rp.) 41,500.00 20,000.00 5,500.00 5,500.00 40,000.00 30,000.00 11,000.00 25,000.00 1,298.00 14,000.00 900,000.00 12,000.00 9,500.00 400,000.00 25,000.00 900,000.00 300,000.00 210,000.00 12,000.00 70,000.00 75,000.00 65,000.00 45,000.00 5,000.00 KETERANGAN
URAIAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 28 29
Gress Retinak A Pelumas Engine Minyak Solar Minyak Premium Hidraulic Oil Gear Oil Besi beton Baja U Karung Plastik Kayu Cerucuk dia.15 Cm Kayu begisting Kawat Beton Kawat Bronjong Kawat Bronjong Pabrikan Kawat Las Kayu Papan Kelas.IV Kerikil / Batu Koral beton Batu Bela / Kali Paku Biasa Pasir Semen @ 50 Kg Tanah urugan / Timbunan Multiplk Ember
Kg Liter Liter Liter Liter Liter Kg Kg Bh Btg M3 Kg Kg Unit Kg M3 M3 M3 Kg M3 Zak M3 Lbr Bh
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan
#REF! #REF!
#REF! #REF!
16
DAFTAR HARGA PERALATANTUGAS : EKONOMI TEKNIK FAKULTAS / JURUSAN : TEKNIK / SIPIL PEKERJAAN : PEMBANGUNAN CHECK DAM KELOMPOK : I (SATU) ANGKATAN : 2009 - 2010 NO. URAIAN SATUAN KUANTITAS HARGA SATUAN (Rp.) 283,802.50 27,142.86 11,428.57 13,571.43 17,500.00 5,000.00 6,428.57 KETERANGAN
1. 2. 3. 4. 5. 6. 7.
Excavator Concrete Mixer Vibrator Concrete Mesin Las Gunting Pemotong Baja Kunci Pembengkok Baja Mesin Pompa Air
Jam Jam Jam Jam Buah Buah Jam
1.00 1.00 1.00 1.00 1.00 1.00 1.00
Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru Kondisi Baru
#REF! #REF!
#REF! #REF!
17
JADWAL WAKTU PELAKSANAANTUGAS : EKONOMI TEKNIK FAKULTAS / JURUSAN: TEKNIK / SIPIL PEKERJAAN : PEMBANGUNAN CHECK DAM KELOMPOK : I (SATU) ANGKATAN : 2009 - 2010
NO
URAIAN
SATUAN VOLUME BOBOT 1 2
BULAN I Minggu 3 4 5
BULAN II Minggu 6 7
8
21
BULAN III Minggu 22 23
KETERANGAN 24 100
I
PEKERJAAN PERSIAPAN 90 1 Mobilisasi dan Demobilisasi 2 Pembersihan Lapangan Unit Ls 1.00 1.00 0.584 0.243 0.29 0.12 0.29 0.12 80 70
II 1 2 3 4 5 6 7 8
PEKERJAAN CHECK DAM 60 Galian Tanah Berbatu Dengan Alat Timbunan Tanah Dipadatkan (Manual) Kisdam Lantai Kerja (Beton B0) Pasangan Batu 1 : 4 Beton Konstruksi K-175 Kg/cm2 Plesteran 1 : 3 Bronjong M3 M3 M3 M3 M3 M3 M2 M3 415.00 57.50 14.00 39.00 674.00 140.50 282.50 150.00 0.670 0.336 0.477 3.246 46.165 38.294 1.197 8.787 0.67 0.34 0.06 3.25 0.06 9.23 0.06 9.23 0.06 9.23 19.15 0.06 9.23 19.15 0.06 9.23 30 0.60 0.60 4.39 4.39 20 10 0 Total Kemajuan Rencana Komulatif Rencana 100.00 0.29 0.29 0.79 1.08 3.31 4.39 9.29 13.68 9.29 22.97 28.44 51.41 28.44 79.85 9.29 89.15 0.66 89.80 5.05 94.86 4.73 99.59 0.41 100.00 0.06 0.06 40 50
#
top related