PROYEK PEMBANGUNANGEDUNG MEDIK
RS. ST. CAROLUS BORROMEUSJAKARTA PUSAT
Tangerang, 19 Mei 2017
Kolom Pracetak
Balok Pracetak
Lantai Hollow Core Slab
STRUKTUR ATAS
Pondasi Inner Boring
Dinding Penahan Tanah PC Wall
STRUKTUR BAWAH
DATA TEKNIS
KOMPONEN PRACETAK
Kolom 368 buah
Balok 1038 buah
HCS (Hollow Core Slab) 2400 buah
JENIS DAN JUMLAH KOMPONEN PRACETAK
RS ST. CAROLUS (Elevation) - Original
RS ST. CAROLUS (Elevation) - Original
RS ST. CAROLUS (Elevation) - Pracetak
RETAINING WALL SYSTEM
• PC Wall• Waller Beam• Diagonal Strutting
STRUKTUR BASEMENT
• Kolom pracetak• Balok pracetak• Sambungan kuat
LANTAI B1
Original Design Proposed Design (HCS)
MODIFIKASI SISTEM LANTAI
LANTAI 2
Original Design Proposed Design (HCS)
MODIFIKASI SISTEM LANTAI
STRUKTUR ATAS • Kolom pracetak• Balok pracetak• HCS• PRESSS