house.perbaikan kolom k3a'k3b

Post on 21-Dec-2015

213 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Metode perbaikan kolom

TRANSCRIPT

OWNER CM CONSULTANT Project : THE PAKUBUWONO HOUSE KONTRAKTOR PELAKSANAJl. Pakubuwono VI, Kebayoran Baru

THE PAKUBUWONO DEVELOPMENT Jakarta Selatan

PROPOSAL COVER SHEETDate : 12-Nov-12 No : /MS/TPHs/AI/XI/12Raised to : PT JAYA CM (MK) Submission Date : 12-Nov-12

Attn. Bapak Heru Purwadi Requested :Subject : Metode Kerja Perbaikan Posisi Voute Balok Lt.3 Return Date :

as S.C/ (S.6 -S.7) Total page(s) include this page :

CONSTRUCTION METODE STATEMENT & CALCULATION

METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS S.C/ (S.6 – S.7)

PT. ACSET INDONUSA

Notes :For Approved

Dengan hormat,

Demikian kami sampaikan, atas perhatiannya kami ucapkan terima kasih.

Mengetahui disusun oleh,

Kurniadji Purwoko Sonny Hendrawan J. ReinaldiProject manager Engineering Manager Construction Manager

Revision Reviewed By Approved By

R0Heru Purwadi

Comment :

Date : Approved by Project Director :

Bersama ini kami kirimkan Metode Kerja Perbaikan Posisi Voute Balok Lt.3 as S.C/ (S.6 -S.7) untuk pelaksanaan pekerjaan di lapangan. Mohon untuk segera direview, sehingga kami dapat segera melaksanakan pekerjaan di lapangan.

Replied By : Signature :Signature :

METHODE KERJA

THE PAKUBUWONO HOUSE

Revision Date Prepared Checked Approved Authorizedby by by by

R0 11/12/2012

METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS (S.C/ (S.6 – S.7)

METHODE KERJA

THE PAKUBUWONO HOUSE

Revision Date Prepared Checked Approved Authorizedby by by by

R0 10/11/2012

METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS (S.C/ (S.6 – S.7)

OWNER CM CONSULTANT Project : THE PAKUBUWONO HOUSE KONTRAKTOR PELAKSANAJl. Pakubuwono VI, Kebayoran Baru

THE PAKUBUWONO DEVELOPMENT Jakarta Selatan

PROPOSAL COVER SHEETDate : 11 Oktober 2012 No : /MS/TPHs/AI/X/12Raised to : PT JAYA CM (MK) Submission Date : 11 Oktober 2012

Attn. Bapak Heru Purwadi Requested :Subject : Metode Kerja Perbaikan Posisi Voute Balok Lt.3 Return Date :

as S.C/ (S.6 -S.7) Total page(s) include this page :

CONSTRUCTION METODE STATEMENT & CALCULATION

METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS S.C/ (S.6 – S.7)

PT. ACSET INDONUSA

Notes :For Approved

Dengan hormat,

Demikian kami sampaikan, atas perhatiannya kami ucapkan terima kasih.

Mengetahui disusun oleh,

Kurniadji Purwoko Sonny Hendrawan J. ReinaldiProject manager Engineering Manager Construction Manager

Revision Reviewed By Approved By

R0Heru Purwadi

Comment :

Date : Approved by Project Director :

Bersama ini kami kirimkan Metode Kerja Perbaikan Posisi Voute Balok Lt.3 as S.C/ (S.6 -S.7) untuk pelaksanaan pekerjaan di lapangan. Mohon untuk segera direview, sehingga kami dapat segera melaksanakan pekerjaan di lapangan.

Replied By : Signature :Signature :

top related