  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    1/37

    Department of Civil &epartment of Civil &Environmental Engineeringnvironmental Engineering Fall 2010 Geotechnical &all 2010 Geotechnical &Structural Seminar Seriestructural Seminar Series

    Full-Depth Reclamation &

    Roller-Compacted ConcreteA Municipal Perspective

    Ariel Soriano, PEEngineering ManagerCity of Chattanooga

    Department of Public Works

    October 14, 2010

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    2/37

    Pavement Managementavement ManagementA Cooperative EffortCooperative Effort

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    3/37

    Civil &Geotechnical

    Engineering

    MaterialsEngineering

    EngineeringEconomics

    ConstructionOperations

    FailureAnalysis

    ProjectManagement

    StatisticalQA/QC

    PavementDesign &

    Mechanics

    PAVEMENT

    MANAGEMENT

    PHILOSOPHY

    Pavement Managementavement ManagementTeam Capabilitieseam Capabilities

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    4/37

    Pavement Managementavement ManagementTeam Objectiveeam Objective

    Develop and Implement Long-Term PavementManagement Strategies With Contributions From:

    Consultants

    Contractors Industry Associations Materials Suppliers

    In Other Words:

    Maintain what weve got & build and/or rebuild our roads to last longer

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    5/37

    Engineering Managementngineering Management

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    6/37

    Present & Futureresent & FutureConstruction Issuesonstruction Issues

    Liquids Asphalt Cements Asphalt Emulsions

    (Tack Coats) Foamed Asphalts Fuels

    Lubricants Solvents Paints Etc.

    Solids Plastic Drainage

    Mats & Pipes Turf Reinforcement

    Mats Erosion Control

    Blankets Geotextiles Geogrids Tires Etc.

    Escalating Cost Of Petroleum-Based Productsscalating Cost Of Petroleum-Based Products

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    7/37

    Present & Futureresent & FutureConstruction Issuesonstruction Issues

    (Cont.)Cont.)207% Increase In 5-Years

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    8/37

    Present & Futureresent & FutureConstruction Issuesonstruction Issues

    (Cont.)Cont.)Assume $1-Million ForHMA Placement

    For The 1991 2004 Time-Adjusted Price Of$27.75/Ton

    31.0-Miles Of 24-Ft Wide Roadway w/ 1Overlay

    For The 2009 Price Of $82.87/Ton 10.4-Miles Of 24-Ft Wide Roadway w/ 1

    Overlay

    A 66% Reduction

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    9/37

    Innovative Constructionnnovative ConstructionMaterials & Practicesaterials & Practices

    For Longer Performanceor Longer Performance

    Full-Depth Pavement Reclamation w/

    and w/o a Modifier and/or Stabilizer(FDRC & FDR)

    Roller-Compacted Concrete (RCC)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    10/37

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    11/37

    FDRC At Hixson Ball FieldsDRC At Hixson Ball FieldsAcross From Hixson Middlecross From Hixson Middle

    School (Cont.)chool (Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    12/37

    FDRC At Hixson Ball Fields AcrossDRC At Hixson Ball Fields AcrossFromrom

    Hixson Middle School (Cont.)ixson Middle School (Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    13/37

    FDRC At Hixson Ball Fields AcrossDRC At Hixson Ball Fields AcrossFrom Hixson Middle School (Cont.)rom Hixson Middle School (Cont.) ConventionalConstruction

    Remove ExistingPavementMaterials

    Prepare Subgrade Build New

    ConventionalPavementStructure

    ~ 2 3 Weeks

    ~ $130,000

    FDRC Materials Cost -

    $15,387.99 Staff & Equipment

    Cost -

    $26,875.41 5-Day Construction

    3-DaysReclaiming /Grading /

    MixingCement/Compacting

    2-Days Paving

    $42,263.40FDRC: ~ 33% Of Conventional Cost & Time

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    14/37

    FDR At Manufacturers RoadDR At Manufacturers Road

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    15/37

    FDR At Manufacturers RoadDR At Manufacturers Road(Cont.)Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    16/37

    FDR At Manufacturers RoadDR At Manufacturers Road(Cont.)Cont.)

    950-ft x 42-ft x 1.2-ft = 47,880-ft50-ft x 42-ft x 1.2-ft = 47,880-ft3 (1,775-yd(1,775-yd3) Conventional

    Removal 7-Days

    Haul To A

    ConstructionMaterials WasteSite

    Haul New Material

    In To MaintainTraffic AndProvide SiteAccess

    FDR Removal 3-Days

    Used ReclaimedMaterial To

    Maintain Traffic &Provide SiteAccess

    Stockpiled ExcessReclaimedMaterial For UseWith Cement OnAnother Project

    FDR Removal: Less Than 45% Of The

    Time Required For Conventional Removal

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    17/37

    RCC At The North AccessCC At The North AccessRoad Recycle Centeroad Recycle Center

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    18/37

    RCC At North AccessCC At North AccessRoad Recycle Centeroad Recycle Center

    (Cont.)Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    19/37

    RCC At North AccessCC At North AccessRoad Recycle Centeroad Recycle Center

    (Cont.)Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    20/37

    Tight Longitudinal JointTight Longitudinal Joint Header JointHeader Joint Poor Longitudinal JointPoor Longitudinal Joint

    RCC At North AccessCC At North AccessRoad Recycle Centeroad Recycle Center

    (Cont.)Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    21/37

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    22/37

    FDRC & RCC At Tyner Ball FieldsFDRC & RCC At Tyner Ball FieldsParking Lot (ConParking Lot (Cont.)t.)

    nReclaimed PavementReclaimed PavementnGraded to DrainGraded to Drainn

    nAdded Cement @ 4% By WeightAdded Cement @ 4% By Weight

    ( 3.5 to 4.0 psf)( 3.5 to 4.0 psf)n

    Reclaimed Again & Added WaterReclaimed Again & Added WaterThrough Distributor BarThrough Distributor BarnCompacted & Fine Graded MaterialCompacted & Fine Graded MaterialnPlaced 2-inch AC SurfacePlaced 2-inch AC Surface

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    23/37

    RCCRCC

    ~ 1-acre~ 1-acre

    DRC w/ AC SurfacingDRC w/ AC Surfacing1111//22-acre-acre

    n$400,000 Budgeted for AC Overlay On$400,000 Budgeted for AC Overlay On

    Failed Parking Lot & New AccessFailed Parking Lot & New AccessRoadRoad

    nWhat The City Did:What The City Did:

    New Parking Lot (FDRC w/ ACNew Parking Lot (FDRC w/ ACSurface)Surface)

    Doubled Parking w/ New RCC LotDoubled Parking w/ New RCC Lot

    New Access Road w/ RCCNew Access Road w/ RCC

    $360,000$360,00010% Reduction From10% Reduction From

    Conventional ConstructionConventional Construction

    White Asphalt ?!?!?!White Asphalt ?!?!?!NO Its RCC !NO Its RCC !

    Ball Fields Parking Lotall Fields Parking Lot(Cont.)Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    24/37

    RCC w/ AC Surface At TheCC w/ AC Surface At ThePatten Recycle Centeratten Recycle Center

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    25/37

    Patten Recycle Centeratten Recycle Center(Cont.)Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    26/37

    Patten Recycle Centeratten Recycle Center(Cont.)Cont.)

    Conventional Construction Undercut & Replace 2- to

    3-feet

    Place conventionalasphalt section

    4- to 6-weeks

    Cost $228,000

    RCC w/ Asphalt Surface Build Drainage

    Structures

    Lay Drainage Pipe Prepare subgrade to

    support paver

    Pave w/ RCC

    Place 2-inch AsphaltSurface

    Cost = $189,224.3317% Reduction From Conventional Construction17% Reduction From Conventional Construction

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    27/37

    RCC At NorthpointCC At NorthpointBoulevard Extensionoulevard Extension

    Phase IPhase I

    Phase IIPhase II

    Phase IIIPhase III

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    28/37

    Boulevard Extensionoulevard Extension(Cont.)Cont.) Conventional

    Arterial Design

    11

    /2 AC Surface 31/2 AC Binder

    15 AggregateBase

    $32.15/SY $269,513.45

    CTB Arterial Design

    11

    /2 AC Surface 2 AC Binder

    9 Aggregate Base

    $29.50/SY $247,298.50

    92% ofConventional

    RCC ArterialRCC Arterial

    DesignDesign

    n

    2 AC Surface2 AC Surfacen6 RCC6 RCCn

    23.35/SY23.35/SY

    $195,743.05$195,743.05

    73% of73% ofConventionalConventional

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    29/37

    Boulevard Extensionoulevard Extension(Cont.)Cont.)

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    30/37

    VW Connector RoadW Connector Road

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    31/37

    Other FDRC And/Or RCCther FDRC And/Or RCCProjectsrojects

    City Wide Services FDRC

    Utility TrenchSettlements

    City ParkingLots

    Road Base &SubgradeFailures

    RCC 2-Acres At

    PattenRecreation &RecycleCenter

    Contractors FDRC

    CommercialSites

    SubgradeStabilization Subdivision

    SubgradeStabilization

    RCC -Mile AlternateBid Item OnCity Contract

    Main RoadLeading ToFedEx

    Terminal

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    32/37

    Ongoing FDR & RCCngoing FDR & RCCTopicsopics

    Evaluate Construction Quality Control TestingEvaluate Construction Quality Control TestingAlternativesAlternatives

    Establish Appropriate FDR & RCC Specifications &Establish Appropriate FDR & RCC Specifications &StandardsStandards

    Put RCC Mix To SleepPut RCC Mix To Sleep

    Develop Structural Coefficients For Use In PavementDevelop Structural Coefficients For Use In PavementDesignDesign

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    33/37

    Verify Structural Designerify Structural DesignCoefficients/Parameters Foroefficients/Parameters For

    Use In Pavement Designse In Pavement Design

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    34/37

    Coefficients/Parameters Foroefficients/Parameters ForUse In Pavement Designse In Pavement Design

    (Cont.)Cont.)Deflection TestingDeflection Testing

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    35/37

    Coefficients/Parameters Foroefficients/Parameters ForUse In Pavement Designse In Pavement Design

    (Cont.)Cont.)Pavement LayerPavement Layer StructuralStructural

    CoefficientCoefficientGraded Aggregate BaseGraded Aggregate Base 0.140.14

    Cement Treated BaseCement Treated Base .18 - .24.18 - .24Asphalt ConcreteAsphalt Concrete 0.40 0.440.40 0.44

    FDR w/ CementFDR w/ Cement 0.16 0.340.16 0.34

    RCCRCC 0.64 0.730.64 0.73

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    36/37

    You can't build a reputationYou can't build a reputationon what you're going to do.on what you're going to do.

    Henry Ford

  • 8/8/2019 2010-10-14 UTK Geotechnical & Structural Seminar Series FDR & RCC

    37/37

    Any Questions?