REKAPITULASI PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 04 sd LT. ATAP PROYEK : BANGUNAN SAYAP KWK JAKSEL No. Lantai Kolom K1 Uk. K 2 Uk. K 3 Uk. K 4 Uk. K 11 Uk. K 12 Uk. Beton Bekisting Besi 1 Lantai 4 8.00 70 x 70 1.00 60 x 30 18.00 70 x 70 1.00 70 x 70 - - 40.84 258.40 408.82 2 Lantai 5 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65 3 Lantai 6 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 10,804.65 4 Lantai 7 8.00 60 x 60 1.00 50 x 30 18.00 60 x 60 1.00 60 x 60 - - 39.48 265.60 8,506.96 5 Lantai 8 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19 6 Lantai 9 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 8,144.19 7 Lantai 10 8.00 50 x 50 1.00 40 x 30 18.00 50 x 50 1.00 50 x 50 - - 27.48 221.60 5,956.36 8 Lantai Atap 8.00 30 x 3 2.00 30 x 3 17.00 30 x 3 - 30 x 3 ### 2.00 10.53 140.40 3,313.62 Jumlah 64.00 9.00 143.00 7.00 ### 2.00 252.25 1,860.40 56,083.45

Upload: merpati-putih

Post on 20-Nov-2014

86 views

Category:

Documents


1 download

TRANSCRIPT

REKAPITULASI PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 04 sd LT. ATAP PROYEK : BANGUNAN SAYAP KWK JAKSEL Kolom No. Lantai K1 Uk. K2 Uk. K3 Uk. K4 Uk. K 11 Uk. K 12 Uk. Beton Bekisting Besi

1 2 3 4 5 6 7 8

Lantai 4 Lantai 5 Lantai 6 Lantai 7 Lantai 8 Lantai 9 Lantai 10 Lantai Atap

8.00 8.00 8.00 8.00 8.00 8.00 8.00

70 x 70 60 x 60 60 x 60 60 x 60 50 x 50 50 x 50 50 x 50

1.00 1.00 1.00 1.00 1.00 1.00 1.00

60 x 30 50 x 30 50 x 30 50 x 30 40 x 30 40 x 30 40 x 30

18.00 18.00 18.00 18.00 18.00 18.00 18.00

70 x 70 60 x 60 60 x 60 60 x 60 50 x 50 50 x 50 50 x 50

1.00 70 x 70 1.00 60 x 60 1.00 60 x 60 1.00 60 x 60 1.00 50 x 50 1.00 50 x 50 1.00 50 x 50 30 x 30

17.00

2.00

40.84 39.48 39.48 39.48 27.48 27.48 27.48 10.53

258.40 265.60 265.60 265.60 221.60 221.60 221.60 140.40

408.82 10,804.65 10,804.65 8,506.96 8,144.19 8,144.19 5,956.36 3,313.62

8.00 30 x 30

2.00 30 x 30

17.00 30 x 30

Jumlah

64.00

9.00

143.00

7.00

17.00

2.00

252.25

1,860.40

56,083.45

Panjang

112.00 112.00 112.00 112.00 112.00 112.00 112.00 117.00

901.00

PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. ATAP PROYEK : BANGUNAN SAYAP KWK JAKSEL No. Type Kolom Dimensi Kolom (M) Hor 0.30 Ver 0.30 Jumlah Kolom Pembesian Lokasi Diameter Tump. Lap. Tump. (Bh) Main Ring 22 10 22 10 16 10 16 10 T 100 O 200 100 100 200 100 16 ### ### ### 100 200 100 8 9.00 9.00 9.00 100 200 100 8 9.00 9.00 9.00 8 ### ### ### Posisi Besi Jumlah Break Down Panjang (M) Unit/Pjg Total 6.88 1.14 0.36 0.36 3.88 1.14 0.36 0.36 3.64 1.14 0.36 0.36 6.64 1.14 0.36 0.36 Berat (KG) Unit Total 164.23 33.73 92.62 18.98 45.96 18.98 167.67 33.73 10.53 140.40 1.08 14.40 4.59 61.20 0.54 7.20 Beton Begisting (M3) 4.32 (M2) 57.60

Panjang (Bh) 6.00 8 8.00

1

K1

55.04 2.98 54.72 30.78 30.78 54.72 0.62 0.62 0.62 0.62 -

8.00 Extra Hor 8.00 Extra Ver 2 K2 0.30 0.30 3.00 2 2.00 Main Ring

31.04 2.98

2.00 Extra Hor 2.00 Extra Ver 5 K11 0.30 0.30 3.00 17 ### Main Ring

29.12 1.58

### Extra Hor ### Extra Ver 6 K12 0.30 0.30 6.00 2 2.00 Main Ring

106.24 1.58

2.00 Extra Hor 2.00 Extra Ver

T A L

Besi Beton (KG) 1,583.73 Rata2

Dimensi Kolom Panjang Kolom 70 x 70 x 60 x 30 x 50 x 30 x 60 x 30 x 60 60 60 50 50 60 30 60 48.00 8.00 -

Diameter Berat Besi ( Kg ) 25 22 ### 185.24 ### 19 16 781.29 335.34 ### 13 10 269.88 37.95 322.59 67.47 ###

366.60

223.19

413.31

6.00

-

-

-

-

-

-

2.00

-

-

1,103.88

240.50

51.00

-

-

-

-

-

-

###

-

-

402.81

372.98

12.00

-

-

-

-

-

-

2.00

-

-

3,313.62

314.68

117.00

-

-

-

-

-

-

###

-

-

PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 10 PROYEK : BANGUNAN SAYAP KWK JAKSEL Type Kolom Dimensi Kolom (M) Hor 1 K1 0.50 Jumlah Kolom Pembesian Lokasi Diameter Tump. Lap. Tump. (Bh) Main Ring 22 10 22 10 22 10 22 10 100 200 100 100 200 100 12 ### ### ### 100 200 100 12 ### ### ### 100 200 100 10 ### ### ### 12 ### ### ### Posisi Besi Jumlah Break Down Panjang (M) Unit/Pjg Total 4.88 1.94 0.56 0.56 4.88 1.34 0.46 0.36 4.88 1.94 0.56 0.56 4.88 1.94 0.56 0.56 Berat (KG) Unit Total ### 39.47 ### 27.26 ### 39.47 ### 39.47 27.48 221.60 1.00 8.00 18.00 144.00 0.48 5.60 Beton Begisting (M3) 8.00 (M2) 64.00

No.

Ver Panjang (Bh) 0.50 4.00 8 8.00

58.56 2.98 64.02 44.22 64.02 64.02 0.62 0.62 0.62 0.62 -

8.00 Extra Hor 8.00 Extra Ver 2 K2 0.40 0.30 4.00 1 1.00 Main Ring

48.80 2.98

1.00 Extra Hor 1.00 Extra Ver 3 K3 0.50 0.50 4.00 18 ### Main Ring

58.56 2.98

### Extra Hor ### Extra Ver 4 K4 0.50 0.50 4.00 1 1.00 Main Ring

58.56 2.98

1.00 Extra Hor 1.00 Extra Ver

T

O

T

A

L

Besi Beton (KG) 1,713.63 214.20 Rata2

172.87

360.15

3,855.66

214.20

214.20

214.20

5,956.36

216.75

Diameter Dimensi Kolom Panjang Kolom 70 x 70 x 60 x 30 x 50 x 30 x 60 x 60 25 60 60 50 50 60 60 22 32.00 8.00 4.00 72.00 ### 4.00 1.00 112.00 ### ### 145.61 ### 174.73 ###

Berat Besi ( Kg ) 19 16 13 10 315.75 27.26 710.43 39.47 ### ### OK

PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 08 dan LT. 09 PROYEK : BANGUNAN SAYAP KWK JAKSEL No. Type Kolom Dimensi Kolom (M) Hor 0.50 Ver 0.50 Jumlah Kolom Pembesian Lokasi Diameter Tump. Lap. Tump. (Bh) Main Ring 22 10 10 10 22 10 22 10 10 10 22 10 10 10 T * Catatan : Total di kalikan 2 untuk dua lantai 100 100 100 O 200 200 200 T A 100 100 100 L 1 1 100 100 100 200 200 200 100 100 100 1 1 16 ### ### ### ### ### ### ### ### ### 100 200 100 16 ### ### ### ### ### ### ### ### ### 100 100 100 200 200 200 100 100 100 1 1 10 ### ### ### 16 ### ### ### ### ### ### ### ### ### Posisi Besi Jumlah Break Down Panjang (M) Unit/Pjg Total 4.88 1.94 0.56 0.56 4.88 1.34 0.46 0.36 4.88 1.94 0.56 0.56 4.88 1.94 0.56 0.56 78.08 64.02 18.48 18.48 48.80 44.22 78.08 64.02 18.48 18.48 78.08 64.02 18.48 18.48 Berat (KG) Unit 2.98 0.62 0.62 0.62 2.98 0.62 2.98 0.62 0.62 0.62 2.98 0.62 0.62 0.62 Total ### 39.47 11.39 11.39 ### 27.26 ### 39.47 11.39 11.39 ### 39.47 11.39 11.39 27.48 221.60 1.00 8.00 18.00 144.00 0.48 5.60 Beton Begisting (M3) 8.00 (M2) 64.00

Panjang (Bh) 4.00 8 8.00

1

K1

8.00 Extra Hor 8.00 Extra Ver 2 K2 0.40 0.30 4.00 1 1.00 Main Ring

1.00 Extra Hor 1.00 Extra Ver 3 K3 0.50 0.50 4.00 18 ### Main Ring

### Extra Hor ### Extra Ver 4 K4 0.50 0.50 4.00 1 1.00 Main Ring

1.00 Extra Hor 1.00 Extra Ver

Besi Beton (KG) 2,361.87 295.23 Rata2

172.87

360.15

5,314.21

295.23

295.23

295.23

8,144.19 296.37

Dimensi Kolom Panjang Kolom 70 x 70 x 60 x 30 x 50 x 30 x 60 x 60 60 60 50 50 60 60 32.00 8.00 -

Diameter Berat Besi ( Kg ) 25 22 ### 145.61 ### 232.98 ### 19 16 13 10 315.75 91.14 91.14 27.26 710.43 205.07 205.07 39.47 11.39 11.39 ###

4.00

-

-

-

-

-

-

-

-

72.00

-

-

-

###

-

-

-

-

4.00

-

-

-

1.00

-

-

-

-

112.00 ### -

-

-

-

PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 07 PROYEK : BANGUNAN SAYAP KWK JAKSEL Type No. Kolom Dimensi Kolom (M) Hor 0.60 Ver 0.60 Jumlah Kolom Pembesian Lokasi Diameter Tump. Lap. Tump. (Bh) Main Ring 22 10 10 10 22 10 22 10 10 10 22 10 10 10 100 100 100 T O 200 200 200 T A 100 100 100 L 1 1 100 100 100 200 200 200 100 100 100 1 1 16 ### ### ### ### ### ### ### ### ### 100 200 100 16 ### ### ### ### ### ### ### ### ### 100 100 100 200 200 200 100 100 100 1 1 12 ### ### ### 16 ### ### ### ### ### ### ### ### ### Posisi Besi Jumlah Break Down Panjang (M) Unit/Pjg 4.88 2.34 0.66 0.66 4.88 1.54 0.56 0.36 4.88 2.34 0.66 0.66 4.88 2.34 0.66 0.66 Total 78.08 77.22 21.78 21.78 58.56 50.82 78.08 77.22 21.78 21.78 78.08 77.22 21.78 21.78 Berat (KG) Unit 2.98 0.62 0.62 0.62 2.98 0.62 2.98 0.62 0.62 0.62 2.98 0.62 0.62 0.62 Total ### 47.61 13.43 13.43 ### 31.33 ### 47.61 13.43 13.43 ### 47.61 13.43 13.43 39.48 265.60 1.44 9.60 25.92 172.80 0.60 6.40 Beton Begisting (M3) 11.52 (M2) 76.80

Panjang (Bh) 4.00 8 8.00

1

K1

8.00 Extra Hor 8.00 Extra Ver 2 K2 0.50 0.30 4.00 1 1.00 Main Ring

1.00 Extra Hor 1.00 Extra Ver 3 K3 0.60 0.60 4.00 18 ### Main Ring

### Extra Hor ### Extra Ver 4 K4 0.60 0.60 4.00 1 1.00 Main Ring

1.00 Extra Hor 1.00 Extra Ver

Besi Beton (KG) ### Rata2

###

206.07

###

###

###

307.44

###

###

###

Dimensi Kolom Panjang Kolom 70 x 70 x 60 x 30 x 50 x 30 x 60 x 60 60 60 50 50 60 60 32.00 8.00 -

Diameter Berat Besi ( Kg ) 25 22 ### 174.73 ### 232.98 ### 19 16 13 10 380.85 107.42 107.42 31.33 856.91 241.69 241.69 47.61 13.43 13.43 ### ### ERROR

4.00

-

-

-

-

1.00

1.00

1.00

-

72.00

-

###

-

-

-

-

-

-

4.00

-

1.00

-

-

-

-

-

-

1.00 112.00 ### 1.00

1.00 1.00

1.00 1.00

-

PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 05 dan LT. 06 PROYEK : BANGUNAN SAYAP KWK JAKSEL No. Type Kolom Jumlah Dimensi Kolom (M) Kolom Hor Ver Panjang (Bh) Pembesian Lokasi Diameter Tump. Lap. Tump. Posisi Besi Jumlah (Bh) BREAK DOWN Panjang (M) Unit/Pjg Total Berat (KG) Unit Total Beton Begisting (M3) (M2)

1

K1

0.60

0.60

4.00

8 8.00

Main Ring

22 10 10 10 22 10 22 10 10 10 22 10 10 10 100 100 100 200 200 200 100 100 100 100 100 100 200 200 200 100 100 100 100 200 100 100 100 100 200 200 200 100 100 100

20 ### ### ### 2 2 12 ### ### ### 20 ### ### ### 2 2 20 ### ### ### 2 2 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

4.88 2.34 0.66 0.66 4.88 1.54 0.56 0.36 4.88 2.34 0.66 0.66 4.88 2.34 0.66 0.66

97.60 77.22 43.56 43.56 58.56 50.82 97.60 77.22 43.56 43.56 97.60 77.22 43.56 43.56

2.98 0.62 0.62 0.62 2.98 0.62 2.98 0.62 0.62 0.62 2.98 0.62 0.62 0.62

### 47.61 26.85 26.85 ### 31.33 ### 47.61 26.85 26.85 ### 47.61 26.85 26.85

11.52

76.80

8.00 Extra Hor 8.00 Extra Ver 2 K2 0.50 0.30 4.00 1 1.00 Main Ring

0.60

6.40

1.00 Extra Hor 1.00 Extra Ver 3 K3 0.60 0.60 4.00 18 ### Main Ring

25.92

172.80

### Extra Hor ### Extra Ver 4 K4 0.60 0.60 4.00 1 1.00 Main Ring

1.44

9.60

1.00 Extra Hor 1.00 Extra Ver

T* Catatan : Total di kalikan 2 untuk dua lantai

O

T

A

L

39.48

265.60

Besi Beton (KG)

Rata2

3,140.32

272.60

206.07

343.44

7,065.73

272.60

392.54

272.60

### 273.67

PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 04 PROYEK : BANGUNAN SAYAP KWK JAKSEL Jumla Pembesian h Dimensi Kolom (M) Type No. Kolom Posisi Besi Jumlah Kolom Lokasi Diameter Hor Ver Panjang Tump. Lap. Tump. (Bh) (Bh) 1 K1 0.30 0.30 4.00 8 Main 8.00 Ring 8.00 Extra Hor 8.00 Extra Ver 1 Main 1.00 Ring 1.00 Extra Hor 1.00 Extra Ver 18 Main ### Ring ### Extra Hor ### Extra Ver 1 Main 1.00 Ring 1.00 Extra Hor 1.00 Extra Ver 22 10 10 10 22 10 10 10 22 10 10 10 22 10 10 10 20 100 100 100 100 100 100 100 100 100 100 100 100 200 200 200 200 200 200 200 200 200 200 200 200 100 100 100 100 100 100 100 100 100 100 100 100 2 2 14 2 2 20 2 2 20 2 2 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

Break Down

Panjang (M) Unit/Pjg Total 4.88 1.14 0.36 0.36 4.88 1.74 0.66 0.36 4.88 2.74 0.76 0.76 4.88 2.74 0.76 0.76 97.60 37.62 23.76 23.76 68.32 57.42 43.56 23.76 97.60 90.42 50.16 50.16 97.60 90.42 50.16 50.16

Berat (KG) Unit 2.98 0.62 0.62 0.62 2.98 0.62 0.62 0.62 2.98 0.62 0.62 0.62 2.98 0.62 0.62 0.62 Total ### 23.19 14.65 14.65 ### 35.40 26.85 14.65 ### 55.74 30.92 30.92 ### 55.74 30.92 30.92

Beton Begisting (M3) 2.88 (M2) 38.40

2

K2

0.60

0.30

4.00

0.72

7.20

3

K3

0.70

0.70

4.00

35.28

201.60

4

K4

0.70

0.70

4.00

1.96

11.20

T

O

T

A

L

40.84

258.40

Besi Beton ( Kg ) 2,749.71

Rata2

954.76

280.76

389.94

7,358.69

208.58

408.82

208.58

###

264.40

PERHITUNGAN VOLUME PEKERJAAN KOLOM LT. 1 TOILET TAMBAHAN PROYEK : BANGUNAN SAYAP KWK JAKSEL Jumla Pembesian h Dimensi Kolom (M) Type No. Kolom Posisi Besi Jumlah Kolom Lokasi Diameter Hor Ver Panjang Tump. Lap. Tump. (Bh) (Bh) 1 KT 1 0.30 0.30 4.00 4 Main 4.00 Ring 4.00 Extra Hor 4.00 Extra Ver 10 10 4 100 200 100 11.00 11.00 11.00 -

Break Down

Panjang (M) Unit/Pjg Total 4.40 1.14 0.36 0.36 17.60 37.62 -

T

O

T

A

L

Berat (KG) Unit 0.62 0.62 Total 10.85 23.19 -

Beton Begisting (M3) 1.44 (M2) 19.20

Besi Beton ( Kg ) 136.17

Rata2

Diameter Dimensi Kolom Panjan g 60 60 50 50 60 60 22 Kolom 70 x 70 x 60 x 30 x 50 x 30 x 60 x 60 25 16.00 -

Berat Besi ( Kg ) 19 -

94.56

1.44

19.20

136.17

94.56

16.00

-

-

-

-

-

-

Berat Besi ( Kg ) 16 13 10 43.40 92.77 ### ### OK