yang mao tssr

Upload: vu-thai-chi

Post on 06-Apr-2018

243 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/3/2019 Yang Mao TSSR

    1/10

    Site ID / M s trm:

    Site Name/Tn trm Yang MaoSite Type/Cu hnh Indoor

    Longitude / Kinh :Latitude / V :

    Region / Vng: Krong Bng

    Province / Tnh: c LcSite Address / a ch:

    Site manager / Q.L trm: A.Cng

    Tel: 0913411487

    Accepted byZTE Coporation Qun l Mng Tnh Phng K thut Khai thc, VMS3

    Name: Name: Name:

    Date: Date: Date:

    TECHNICAL SITE SURVEY REPORT/BIN BN KHO ST TRM

    VMS Uni-RAN Project

    Split Site

    BVH x Yang Mao, Krong Bng, c Lc

    108.568411

    12.453199

  • 8/3/2019 Yang Mao TSSR

    2/10

    CONTENT

    A. SITE & EQUIPMENT INFORMATION

    1. SITE LOCATION / A IM TRM

    2. SURVEYORS INFORMATION / THNG TIN V NHM KHO ST

    3. SITE INFORMATION / THNG TIN V TRM

    4. SITE ACCESS INFORMATION / THNG TIN VO TRM

    5. SITE EXISTING INFORMATION

    B. NEW EQUIPMENT

    NEW EQUIPMENT INFORMATION / THNG TIN V THIT B MI

    C. PHOTOS

    Existing Site View (Attachment "A") - nh chp a im (Ph lc "A")

    Panoramic View (Attachment "B") - nh chp ton cnh (Ph lc "B")

    Photoes for Power and Equipment room (Attachment "C") - nh chp ca ngun v phng thit b ( Ph lc "C")

    Photoes for Other Survey Details (Attachment "D") - nh chp cc chi tit kho st khc (Ph lc "D")

    D. Survey Memorandum

  • 8/3/2019 Yang Mao TSSR

    3/10

    A. SITE & EQUIPMENT INFORMATION

    1. SITE LOCATION / A IM TRM

    Site ID/ M s trm: 0 Longitude / Kinh :

    Region/ Vng: Krong Bng Latitude / V :

    Province/ Tnh: c Lc Altitude /Cao so mc n

    Site Address/ a ch:

    Site manager/ Q.L trm: A.Cng Tel: 0913411487

    2. SURVEYORS INFORMATION / THNG TIN V NHM KHO ST

    3. SITE INFORMATION / THNG TIN V TRM

    Inbuiding

    VMSLocal

    Rooftop / Mi nh

    Equip.room floor no/ Tng th

    Greenfield / Mt t

    Rooftop / Mi nh

    Tower.location floor no/ Tng th

    Greenfield / Mt t

    Tower foundation column above Grounding Level. /Cao mng thp so vi

    Tower height /Chiu cao thp

    Total structure height /Tng chiu cao (From ground to top of the tower /T

    From /T 0m To /n 42 m From /T

    From /T To /n From /T

    Note /Ghi ch: From bottom of tower leg /T y chn thp

    4. SITE ACCESS INFORMATION / THNG TIN VO TRM

    How to entry to the site by Car

    Need Key /Cn cha kha vo phng XHH

    Parking space available /Khng gian trng

    Equipment delivery method /Cch thc nhn thit b

    5. SITE EXISTING INFORMATION

    2G Transmission cable Optical fiber HDSL cable

    Total E1 Qty / Tng s lng E1 : Enough Spare E1 port (Y/

    Participant Name / Tn thnh vin

    Site Access Information /

    Thng tin vo trm

    Comments / Ghi ch

    V Thi Ch

    Company/ Cng ty Cell Phone

    Mobitechs

    Property type / c imt t trm

    Structure Height / Chiucao cng trnh

    Equipment room location

    and type / V tr phngthit b v loi

    BVH x Yang Mao, Krong Bng, c Lc

    Nhn vin k thut 91674

    Function / Chc nng

    Tower type / Loi thp

    Site Key / Cha kha votrm

    Space availability on the

    tower / Khong trng trnthp

    Other / Vn khc

    Transmission / Truyndn

    Comments / Ghi ch

  • 8/3/2019 Yang Mao TSSR

    4/10

    B. NEW EQUIPMENT

    NEW EQUIPMENT INFORMATION / THNG TIN V THIT B MI

    Ericsson

    Alcatel

    GSM900: DCS1800:

    Power

    Votage

    type:

    -48V

    Jum

    conn

    type

    2G BTS Installation Position Indoor outd

    Need Install swap site power Yes No Remark:

    Old BAT New Power in

    Alarm cable length: 6 m diameter: 16 mm^2

    AC cable / Chiu di cp AC

    New DC cable BTS-Rectifier(2 cables) / Chiu di cp cho BTS/NodeB-Retifier (2 ca

    New power groud cable

    New battery groud cable

    New Indoor Grounding Bar (I.G.B.) Qty. / S lng bng ng mi

    GND cable length from new I.G.B. to existing outdoor G.B. /Cp tip a t bng n

    New Tower Grounding Bar (O.G.B.) Qty. / S lng bng ng mi

    GND cable length from new Tower G.B. to existing outdoor G.B. /Cp tip a t b

    GND cable length from BTS to G.B. :

    Qty : 1 Type : 35mm2 Len

    Transmission cable type /Loi cp cho truyn dn : E1

    Transmission cable length /Chiu di cp truyn dn : 6m

    Transmission cable connector /Lin kt truyn dn : DDF

    BTS installation feeder length (BTS to Antenna) /Chiu di lp t cp Feeder (BTS Cell1 52 m Feeder type: 1/2"

    Cell2 52 m Feeder type: 1/2"

    Cell3 52 m Feeder type: 1/2"

    installation Jumper length (BTS-Feeder) installation Jumper

    Cell1 3.5m Jumper type: 1/2" Cell1

    Cell2 3.5m Jumper type: 1/2" Cell2

    Cell3 3.5m Jumper type: 1/2" Cell3

    connector type:_______ connector type:____

    indoor: 9 m width: 400 mm ou

    New feeder window 1 set PVC

    New 7/8 feeder connectors: 12 pcs

    Ohters new add materiral :

    New 2G

    Ant.Pole length Frequency Ant. Height An

    B

    Cell1 3m 900 34Cell2 3m 900 34

    Cell3 3m 900 34

    Power supply New Battery position New positon

    NSN_Flex

    BTS&ConfigMain device

    Site Type

    Huawei 3900

    Band 900

    m for indo

    Jumper cable

    Grounding / Tip a

    Transmission

    Feeder cable / Cpfeeder

    Comments

    Power Cable/ CpNgun in

    ZTE suggestion /xut ZTE

    Ant. Model

    Single band

    Single band

    Single band

    Installation Material

    New Cable ladder

  • 8/3/2019 Yang Mao TSSR

    5/10

    C. PHOTOS

    Site ID

    M TrmPicture Site Location A (Front View)

    V tr trm A (mt trc)Tower View A

    T

    Existing Site View (Attachment "A") - nh chp a im (Ph lc "A")

    Site ID

    M TrmPicture Site Location A (Front View)

    V tr trm A (mt trc)Tower View A

    Picture Tower View A (Antennas on tower)

    Cc ng ten treo trn thpCable Ladder on Tower (Show feeder line)

    Thang cp trn thpCable Bridge to

    Cu c

    Cable Ladder on Tower (Show feeder line)

    Thang cp trn thp

    Cable Bridge to B

    Cu cp

    Feeder entry (Show Feeder entry position)

    V tr l cu cpCable Bridge to BTS Room (Show Feeder line)

    ng cp chyPicture Propose

    Feeder entry (Show Feeder entry position)

    V tr l cu cpPicture Propose p

    xut v tr

    Anttena direction sugesstion - Hng xut anten

    Picture Propose position for Antenna Sector 1

    V tr xut ng ten 1Picture Propose position for Antenna Sector 2

    V tr xut ng ten 2Picture Propose

    V tr

    Yang Mao

  • 8/3/2019 Yang Mao TSSR

    6/10

    Hng pht anten 1Hng pht do i kho st xut

    Hng pht anten 2Hng pht do i kho st xut

    HngHng pht do

  • 8/3/2019 Yang Mao TSSR

    7/10

    View of 3300 View of 00

    Panorama View (Attachment "B") - nh chp ton cnh (Ph lc "B")

    View of 3300 View of 00

    View of 3000

    View of 3000

    0

    View of 2700

    View of 2700

    View of 2400

    View of 2100 View of 1800

    View of 2100 View of 1800

  • 8/3/2019 Yang Mao TSSR

    8/10

    Photoes for Power and Equipment room (Attachment "C") -nh chp ca ngun v phng thit b ( Ph lc "C")

    External View of BTS Room or shelter location

    Bn ngoi phng thit bInternal View of BTS Room (Photo 1)

    Bn trong phng BTS (nh 1)Internal V

    Bn tr

    External View of BTS Room or shelter location

    Bn ngoi phng thit bInternal View of BTS Room (Photo 1)

    Bn trong phng BTS (nh 1)Internal

    Bn

    Picture indoor ladder (Photo 1)

    Cu cp trong phng thit b (nh 1)Picture indoor ladder (Photo 2)

    Cu cp trong phng thit b (nh 2)Pictu

    Cu c

    Picture indoor ladder (Photo 1)

    Cu cp trong phng thit b (nh 1)Picture indoor ladder (Photo 2)

    Cu cp trong phng thit b (nh 2)Picture

    Cu cp t

    Internal View of BTS Room

    (Grounding Bar)

    Bn trong phng BTS (nh 3)

    Internal View of BTS Room

    (DC breaker)

    Bn trong phng BTS (nh 4)

    Int

    Bn

    Internal View of BTS Room

    (Grounding Bar)

    Bn trong phng BTS (nh 3)

    Picture Propose position for FEPIf need Picture Propose position for DDF Picture P

    Picture Propose position for FEP If needHnh chp xut l feeder (nu c)

    Picture Pro

    Hnh v

  • 8/3/2019 Yang Mao TSSR

    9/10

    View earthing bar TOP View earthing bar Middle View e

    Picture Propose position for BTS/BBU Picture Propose position for Rectifier Picture Propose

    Picture Propose position for BS8800/BBU

    xut v tr cho t BS8800/ BBUPicture Propose position for Rectifier

    xut v tr cho t ngunPicture Propose

    xut v tr

    Photoes for Other Survey Details (Attachment "D") -nh chp cc chi tit kho st khc (Ph lc "D")

    View earthing bar TOP

    Hnh chp tip a trn ctView earthing bar Middle

    Hnh chp tip a im un/ gia ctView ea

    Hnh chp tip a

    Existing Feeder Window Hole Existing rectifier Ex

    Existing rectifier

    H thng t ngun hin hu

    Exis

    Hnh t phn Chp chi ti

    Existing battery System ( Face ) View BTS equipmentInternal View

    Bn trong

    Existing battery System ( Face )

    Hnh h thng t/ gin Bnh,chp thm chi tit 1 nhn

    View BTS equipment

    Mt trc t BTS hin huExistin

  • 8/3/2019 Yang Mao TSSR

    10/10

    Survey Memorandum

    Date:

    Date:

    Date:

    VMS4 comments

    Note: This survey report provides the basic data for equipment commissioning, and shall

    not be modified once confirmed by 3 parties. If the user needs to modify the data due to

    special reasons, contact the local office of ZTE in time. ZTE shall not be responsible for the

    delay in project implementation due to the modification of the survey results required by the

    user/ Bn kho st ny bao gm nhng thng tin c bn gip ch cho vic bt trm, khng

    th thay i khi khng c s thng nht ca 3 bn. Khi cn thay i hoc chnh sa, vuilng lin h ZTE. Trng hp thay i, nu c nh hng lm chm tr trong vic trinkhai d n, ZTE s khng chu trch nhim.

    ZTEs comments

    Local VMS comments