tugas modul iv nur lailatul fitriyah (11521092)

5
LAPORAN SEMENTARA PRAKTIKUM KOMPUTASI PROSES MODUL IV RUANG KAPILER DALAM BENANG Oleh: Nama : Nur Lailatul Fitriyah Nim : 11521092 Hari Praktikum : Selasa, April 2014 Waktu Praktikum : 15.30 – 17.00 WIB Mengetahui, Kalab. Komputasi Proses (Ir. Dalyono M., MSI, CText ATI) Asisten Pembimbing (Nur Khamidah)

Upload: fitriattamamy

Post on 22-Dec-2015

6 views

Category:

Documents


1 download

DESCRIPTION

Tugas Modul IV komputasi Proses

TRANSCRIPT

Page 1: Tugas Modul IV Nur Lailatul Fitriyah (11521092)

LAPORAN SEMENTARA

PRAKTIKUM KOMPUTASI PROSES

MODUL IV

RUANG KAPILER DALAM BENANG

Oleh:Nama : Nur Lailatul FitriyahNim : 11521092Hari Praktikum : Selasa, April 2014Waktu Praktikum : 15.30 – 17.00 WIB

Mengetahui,Kalab. Komputasi Proses

(Ir. Dalyono M., MSI, CText ATI)

Asisten Pembimbing

(Nur Khamidah)

LABORATORIUM KOMPUTASI PROSESJURUSAN TEKNIK KIMIA

KONSENTRASI TEKNIK TEKSTILFAKULTAS TEKNOLOGI INDUSTRIUNIVERSITAS ISLAM INDONESIA

YOGYAKARTA2014

Page 2: Tugas Modul IV Nur Lailatul Fitriyah (11521092)

A B C D E F G H1 Jumlah serat 19 37 61 91 127 169 2172 Total pori-pori serat 24 54 96 150 216 294 3843 Jumlah serat 92            4 -3.055555556 -0.7381 -0.0139 0.32407 0.51333 0.63131 -0.079  5 -1.291666667 -0.0185 0.38889 0.58333 0.69444 4.05556 0.82524  6 -0.033333333 0.5303 0.71296 0.80128 1.7381 2.29167 -3.8615  7 0.972222222 0.98718 0.99206 1.01389 1.01852 1.03333 152.403  8 1.833333333 1.38889 0.67593 0.61111 0.4697 0.02778 2.96413  9 2.604166667 0.48667 0.41667 0.28704 0.01282 -0.8333 -0.4761  10 0.368686869 0.30556 0.19872 0.00794 -0.3889 -1.6042 0.04256  11           Jumlah pori-pori 151.818  

Page 3: Tugas Modul IV Nur Lailatul Fitriyah (11521092)

A B C D E F G H1 Jumlah serat 19 37 61 91 127 169 2172 Total pori-pori

serat24 54 96 150 216 294 384

3 Jumlah serat 92            4

(92-37)/(19-37) (92-61)/(19-61) (92-91)/(19-91)(92-127)/(19-127)

(92-169)/(19-169)

(92-217)/(19-217)

-0.079  

5(92-61)/(37-61) (92-91)/(37-91)

(92-127)/(37-127)

(92-169)/(37-169)

(92-217)/(37-217)

(92-19)/(37-19) 0.82524  

6(92-91)/(61-91)

(92-127)/(61-127)

(92-169)/(61-169)

(92-217)/(61-217)

(92-19)/(61-19) (92-37)/(61-37) -3.8615  

7 (92-127)/(91-127)

(92-169)/(91-169)

(92-217)/(91-217)

(92-19)/(91-19) (92-37)/(91-37) (92-61)/(91-61) 152.403  

8 (92-169)/(127-169)

(92-217)/(127-217)

(92-19)/(127-19)

(92-37)/(127-37)

(92-61)/(127-61) (92-91)/(127-91) 2.96413  

9 (92-217)/(169-217)

(92-19)/(169-19)

(92-37)/(169-37)

(92-61)/(169-61)

(92-91)/(169-91)(92-127)/(169-127)

-0.4761  

10 (92-19)/(217-19)

(92-37)/(217-37)

(92-61)/(217-61)

(92-91)/(217-91)

(92-127)/(217-127)

(92-169)/(217-169)

0.04256  

11           Jumlah pori-pori 151.818