tugas lembar 1

1
7/23/2019 Tugas lembar 1 http://slidepdf.com/reader/full/tugas-lembar-1 1/1 OKT NOV DES JAN FEB Maret APRIL MEI 2 1 3.190.000,000  8  75  75 335.000,000  3  100  100 5.200,000  2  100  100 74.429.500,000  6  100  100 494.700,000  3  100  100 6.157.000,000  6  83  50 291.000,000  4  100  50 1.477.000,000  5  80  60 25.324.000,000  6  67  50 15.892.000,000  5  100  80 16.306.000,000  6  67  50 308.000,000  1  0  0 1 U MU M 2 PEMBERSIHAN TEMPAT KERJA 3 PEMBONGKARAN 4 PEKERJAAN TANAH 5 GALIAN STRUKTUR 6 DRAINASE 7 SUB GRADE 8 SUB BASE 9 PERKERASAN 10 STRUKTUR BETON 11 PEKERJAAN LAIN-LAIN 12 PEK. LAMPU LALU LINTAS dan PEK. LISTRIK 13 PLAZA TOL 62.000,000  1  0  0 144.271.400,000 14.427.140,000 Total Biaya Bab.1 s/d 13 Ppn 10 % Total Biaya 158.698.540,000 BCWS  12.917.933,333 17.287.400,000 24.591.283,333 24.479.616,667 23.215.800,000 12.803.666,667 BCWP ACWP  13.000.000,000 17.000.000,000 25.000.000,000 24.500.000,000 23.000.000,000 13.000.000,000 Progres Laporan (%) Progres Rencana (%) Durasi (month) Monitoring baseline akhir bulan ke-6 LAPORAN BULANAN (PROJECT MONITORING) SAMPAI BULAN KE-6 No. Uraian Pekerjaan Total Harga (Rp) OKT NOV DES JAN FEB Maret APRIL MEI 2 1 3.190.000,000 8 335.000,000 3 5.200,000 2 74.429.500,000 6 494.700,000 3 6.157.000,000 6 291.000,000 4 1.477.000,000 5 25.324.000,000 6 15.892.000,000 5 16.306.000,000 6 308.000,000 1 1 UMUM 2 PEMBERSIHAN TEMPAT KERJA 3 PE MB ON GK AR AN 4 PEK ER JA AN TA NA H 5 GALIAN STRUKTUR 6 DRAINASE 7 SUB GRADE 8 SUB BASE 9 PERKERASAN 10 STRUKTUR BETON 11 PEKERJAAN LAIN-LAIN 12 PEK. LAMPU LALU LINTAS dan PEK. LISTRIK 13 PLAZA TOL 62.000,000 1 144.271.400,000 14.427.140,000 Total Biaya Bab.1 s/d 13 Ppn 10 % Total Biaya 158.698.540,000 BCWS 12 .9 17 .93 3, 333 17 .28 7.4 00, 000 24 .5 91 .28 3, 333 24 .47 9.6 16, 667 24 .31 4. 71 6, 667 24 .31 4.7 16, 667 BCWP ACWP 13 .0 00 .00 0, 000 17 .00 0.0 00, 000 25 .0 00 .00 0, 000 24 .50 0.0 00, 000 24 .50 0. 00 0, 000 24 .50 0.0 00, 000 Berdasarkan laporan bulanan akan dilakukan monitoring pada akhir bulan ke-6 dengan progres masing-masing pekerjaan sebagai berikut: Pekerjaan urnum telah dikenakan 75%, pekerjaan pembersihan tempat, pekerjaan pembongkaran, pekerjaan tanah dan pekerjaan galian struktur telah telah selesai 100 % dikerjakan, dan pekerjaan drainase telah dikerjakan 5%, untuk pekerjaan subgrade dan subbase masing-masing 50% dan 60%, progres untuk pekerjaan perkerasan 50%, pekerjaan beton 80%, pekerjaan lain-lain 50% sementara untuk pekerjaan lampu dan  plaza tol belum mulai dikerjakan (progres 0%) Durasi Total Harga (Rp) (month) No. Uraian Pekerjaan LATIHAN SOAL PROJECT MONITORING Monitoring baseline akhir bulan ke-6 Aji Santiko 21010113120008 Kelas B Perencanaan, Pengendalian, & Manajemen Proyek 

Upload: prince-of-darkness

Post on 18-Feb-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tugas lembar 1

7/23/2019 Tugas lembar 1

http://slidepdf.com/reader/full/tugas-lembar-1 1/1

OKT NOV DES JAN FEB Maret APRIL MEI

21111111

3.190.000,000   8   75   75335.000,000   3   100   100

5.200,000   2   100   100

74.429.500,000   6   100   100

494.700,000   3   100   100

6.157.000,000   6   83   50

291.000,000   4   100   50

1.477.000,000   5   80   60

25.324.000,000   6   67   50

15.892.000,000   5   100   80

16.306.000,000   6   67   50

308.000,000   1   0   0

1 UMUM2 PEMBERSIHAN TEMPAT KERJA

3 PEMBONGKARAN

4 PEKERJAAN TANAH

5 GALIAN STRUKTUR 

6 DRAINASE

7 SUB GRADE

8 SUB BASE

9 PERKERASAN

10 STRUKTUR BETON

11 PEKERJAAN LAIN-LAIN

12 PEK. LAMPU LALU LINTAS dan PEK. LISTRIK 

13 PLAZA TOL 62.000,000   1   0   0

144.271.400,000

14.427.140,000

Total Biaya Bab.1 s/d 13

Ppn 10 %

Total Biaya 158.698.540,000

BCWS   12.917.933,333 17.287.400,000 24.591.283,333 24.479.616,667 23.215.800,000 12.803.666,667

BCWP

ACWP   13.000.000,000 17.000.000,000 25.000.000,000 24.500.000,000 23.000.000,000 13.000.000,000

Progres

Laporan (%)

Progres

Rencana (%)

Durasi

(month)

Monitoring baseline akhir bulan ke-6

LAPORAN BULANAN (PROJECT MONITORING) SAMPAI BULAN KE-6

No. Uraian Pekerjaan Total Harga (Rp)

OKT NOV DES JAN FEB Maret APRIL MEI

21111111

3.190.000,000 8

335.000,000 3

5.200,000 2

74.429.500,000 6

494.700,000 3

6.157.000,000 6

291.000,000 4

1.477.000,000 5

25.324.000,000 6

15.892.000,000 5

16.306.000,000 6

308.000,000 1

1 UMUM

2 PEMBERSIHAN TEMPAT KERJA

3 PEMBONGKARAN

4 PEKERJAAN TANAH

5 GALIAN STRUKTUR 

6 DRAINASE

7 SUB GRADE

8 SUB BASE

9 PERKERASAN

10 STRUKTUR BETON

11 PEKERJAAN LAIN-LAIN

12 PEK. LAMPU LALU LINTAS dan PEK. LISTRIK 

13 PLAZA TOL 62.000,000 1

144.271.400,000

14.427.140,000

Total Biaya Bab.1 s/d 13

Ppn 10 %

Total Biaya 158.698.540,000

BCWS 12.917.933,333 17.287.400,000 24.591.283,333 24.479.616,667 24.314.716,667 24.314.716,667

BCWP

ACWP 13.000.000,000 17.000.000,000 25.000.000,000 24.500.000,000 24.500.000,000 24.500.000,000

Berdasarkan laporan bulanan akan dilakukan monitoring pada akhir bulan ke-6 dengan progres masing-masing pekerjaan sebagai berikut:

Pekerjaan urnum telah dikenakan 75%, pekerjaan pembersihan tempat, pekerjaan pembongkaran, pekerjaan tanah dan pekerjaan galian struktur telah telah selesai 100 % dikerjakan, dan pekerjaan drainase telah

dikerjakan 5%, untuk pekerjaan subgrade dan subbase masing-masing 50% dan 60%, progres untuk pekerjaan perkerasan 50%, pekerjaan beton 80%, pekerjaan lain-lain 50% sementara untuk pekerjaan lampu dan

 plaza tol belum mulai dikerjakan (progres 0%)

DurasiTotal Harga (Rp)

(month)No. Uraian Pekerjaan

LATIHAN SOAL PROJECT MONITORING

Monitoring baseline akhir bulan ke-6

Aji Santiko

21010113120008

Kelas B

Perencanaan, Pengendalian, & Manajemen Proyek