tugas - activity based costing

7
 TUGAS AKUNTANSI MANAJEMEN  NAMA : GEORGE THERRY L. KORO  NIM : 1191661009  NOMOR : 8 PROGRAM PASCASARJANA UNIVERSITAS UDAYANA DENPASAR 

Upload: georgeterry1

Post on 11-Jul-2015

920 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TUGAS - Activity Based Costing

5/11/2018 TUGAS - Activity Based Costing - slidepdf.com

http://slidepdf.com/reader/full/tugas-activity-based-costing 1/7

TUGAS

AKUNTANSI MANAJEMEN

  NAMA : GEORGE THERRY L. KORO

  NIM : 1191661009

  NOMOR : 8

PROGRAM PASCASARJANA

UNIVERSITAS UDAYANA

DENPASAR 

Page 2: TUGAS - Activity Based Costing

5/11/2018 TUGAS - Activity Based Costing - slidepdf.com

http://slidepdf.com/reader/full/tugas-activity-based-costing 2/7

 Jawaban Soal No. 1

1. Tarif Aktivitas

Pul BiayaAktivitas

UkuranAktivitas

EstimasiBiaya

OverheadTotal

Aktivitas

Hubs

Sprockets

PemasanganMesin

 JumlahPemasangan 72.000 400 100 300

PemrosesanKhusus Jam Mesin 200.000 5.000

5.000 0

Pabrik Umum Jam TK Langsung 816.000 24.000

8.000 16.000

UkuranAktivitas

EstimasiBiaya

OverheadTotal

Tarif Per

Aktivitas

 JumlahPemasangan 72.000 400 180

  Jam Mesin 200.000 5.000 40 Jam TK Langsung 816.000 24.000 34

BOP Hubs

UkuranAktivitas

Tarif PerAktivitas

 JumlahAktivitas

Tarif Per

Aktivitas

 JumlahPemasangan 180 100 18.000

  Jam Mesin 40 5.000200.00

0 Jam TK 

Langsung 34 8.000

272.00

0

 Jumlah490.0

00

BOP Sprockets

UkuranAktivitas

Tarif PerAktivitas

 JumlahAktivitas

Tarif Per

Aktivitas

 Jumlah

Pemasangan 180 300 54.000  Jam Mesin 40 0 0

Page 3: TUGAS - Activity Based Costing

5/11/2018 TUGAS - Activity Based Costing - slidepdf.com

http://slidepdf.com/reader/full/tugas-activity-based-costing 3/7

 Jam TK Langsung 34 16.000

544.000

 Jumlah598.0

00

Page 4: TUGAS - Activity Based Costing

5/11/2018 TUGAS - Activity Based Costing - slidepdf.com

http://slidepdf.com/reader/full/tugas-activity-based-costing 4/7

2. Total Biaya Produksi

HubsSprock 

etsUnit yangdiproduksi 10.000 40.000

Biaya bahan bakuPerUnit 32 18

 Total320.00

0 720.000 Tenaga kerjalangsung

 Jam Per Unit 15 15 Total Jam 8.000 16.000

 Total Biaya120.00

0 240.000Biaya OverheadPabrik

PemasanganMesin 18.000 54.000PemrosesanKhusus

200.000 0

Pabrik Umum

272.00

0 544.000

 Total BOP490.00

0 598.000Total BiayaProduksi

930.000

1.558.000

3. Biaya Produksi Per Unit

Hub = total biaya produksi/unit produksi

= 930.000/10.000

= $ 93/unit

Sprocket = total biaya produksi/unit produksi

=1.558.000/40.000

= $ 38,95/unit

Page 5: TUGAS - Activity Based Costing

5/11/2018 TUGAS - Activity Based Costing - slidepdf.com

http://slidepdf.com/reader/full/tugas-activity-based-costing 5/7

 Jawaban Soal No. 2

a.

MetodetradisionalBiaya produksi tipeABiaya bahan bakutipe A =

Biaya bahan baku xunit

Biaya bahan bakutipe A = $35 x 8.000 = $280,00Gaji tenaga kerjatipe A = $20 x 8.000 $160.000

BOP tipe A = Tarif x Jam mesin

$80 x 16.000 $1.280.000

B.Produksi tipe A =Bahan baku tipe A + Gaji tipe A +BOP tipe A

=$280.000 + $ 160.000 + $1.280.000

= $ 1.720.000

Biaya produksi perunit tipe A

= Biaya produksi Jumlah unitdiproduksi

= $ 1.720.000

8.000 unit

= $215/unit

Biaya produksi tipeBB.Bahan baku tipeB =

Biaya bahan baku xunit

B.Bahan baku tipeB = $60 x 15.000 = $900.000

Gaji tipe B = $20 x 15.000 $300.000BOP tipe B = Tarif x Jam mesin

$80 x 22.500 $1.800.000

B.Produksi tipe B =Bahan baku tipe B + Gaji tipe B +BOP tipe B

=$900.000 + $ 300.000 + $1.800.000

= $ 3.000.000B.Prod. per unittp.B = Biaya produksi

 Jumlah unit

diproduksi= $ 3.000.000

Page 6: TUGAS - Activity Based Costing

5/11/2018 TUGAS - Activity Based Costing - slidepdf.com

http://slidepdf.com/reader/full/tugas-activity-based-costing 6/7

15.000 unit

= $200/unit

b. Metode ABC

Biaya produksi tipeAB.Bahan baku tipeA =

Biaya bahan baku xunit

B.Bahan baku tipeA = $35 x 8.000 = $280.000

Gaji tipe A = $20 x 8.000 = $160.000

BOP tipe A

1. Setups = 50 x $672.000 = $420.000

80

2. Proses Mesin =16.000 x

$1.848.000 = $768.000

38.500

3. Kirim Barang = 100 x $560.000 = $320.000

175

 Jumlah BOP tipe A = $420.000+$768.000+$320.000

= $1.508.000

 Tot. B.Prod. tipe A = $280.000 + $160.000 + $1.508.000

$1.948.000

Biaya pe unit = $1.948.000

8.000

= $243,5/unit

Biaya produksi tipeBB.Bahan baku tipeB =

Biaya bahan baku xunit

B.Bahan baku tipeB = $60 x 15.000 = $900.000

Gaji tipe B = $20 x 15.000 = $300.000

BOP tipe B

1. Setups = 30 x $672.000 = $252.000

80

2. Proses Mesin =22.500 x

$1.848.000 = $1.080.000

38.500

3. Kirim Barang = 75 x $560.000 = $240.000

175 Jumlah BOP tipe B = $252.000+$1.080.000+$240.000

Page 7: TUGAS - Activity Based Costing

5/11/2018 TUGAS - Activity Based Costing - slidepdf.com

http://slidepdf.com/reader/full/tugas-activity-based-costing 7/7

= $1.572.000 Total biayaproduksi tipe B = $900.000 + $300.000 + $1.572.000

= $2.772.000

Biaya pe unit = $2.772.000

15.000

= $184,8/unit

c.

B.Bahan baku tipeA = $35 x 8.000 = $280.000

Gaji tipe A = $20 x 8.000 = $160.000

BOP tipe A

Pemrosesan mesin =16.000 x

$1.848.000 = $768.000

38.500 Total biayaproduksi = $280.000 + $160.000 + $768.000

8.000

= $151

Biaya overhead tipe A dengan menggunakan jam mesin($151) lebih kecil dibandingkan dengan biaya overheaddengan menggunakan metode ABC ($243,5)

Produk tipe A mengalami overstated karena biaya yangdibebankan sebesar $92,5 terlalu tinggi. Perhitungantersebut didapat dari ($243,5 - $151)

d. Total penjualan = $260 x 8.000 = $2.080.000

B.Produksi tipe A = $243.5 x 8.000

= 1.948.000 x 70%

= 1.363.600

Laba/rugi = Total penjualan - biaya produksi

=$2.080.000 -$1.363.600

= $716.400

 Jadi, rencana pemberian potongan harga sebesar 30% dapatdijalankan karena perusahaan masih mendapatkan laba sebesar$716.400.