Biaya Perizinan
No Jenis retribusi Biaya
1 - Surat Ijin Gangguan 300,000,000
2 - Surat Ijin Pemakaian Jalan 500,000,000
3 - Surat Ijin Usaha Penambangan 750,000,000
4 - Surat Pengajuan Tenaga Kerja 200,000,000
5 - Surat Usaha Perdagangan 500,000,000
6 - Surat Ijin Pengangkutan dan Penggunaan Alat 450,000,000
7 - Surat Ijin Kepolisian 350,000,000
8 - Surat Ijin Membangun Bangunan 750,000,000
9 - Surat Ijin Tempat Usaha 900,000,000
Total 4,700,000,000
BIAYA PENGURUSAN PERIJINAN DAN EKSPLORASI
Jenis Kegiatan Jumlah Biaya Biaya total
a. Biaya Eksplorasi
- Survey 1,000,000,000
- Eksplorasi 900,000,000
- Studi kelayakan 1,200,000,000
- Studi AMDAL 1,000,000,000
- Biaya Pengujian 60 2,000,000 120,000,000
- Biaya Pemboran 1,300,000,000
Sub Total 5,520,000,000
b. Pembebasan Lahan
- Pembebasan Tanah/hektar 30 ha 2,000,000,000 60,000,000,000
- Ganti Rugi Rumah 20 unit 500,000,000 10,000,000,000
- Ganti tanaman/ hektar 40 ha 60,000,000 2,400,000,000
- Ganti Rugi Pohon
Jati 345 pohon 2,000,000 690,000,000
kakao 300 pohon 700,000 210,000,000
Mahoni 333 pohon 800,000 266,400,000
kelapa 448 pohon 950,000 425,600,000
Total 1,592,000,000
Sub Total 73,992,000,000
total 79,512,000,000
Biaya Konstruksi dan Rekayasa
Deskripsi Jumlah Biaya(Rupiah)
a. Sarana Pendukung Tambang - Kantor 1 unit 760,000,000.00
- Tangki Bahan Bakar 3 unit 450,000,000.00- Mess 2 unit 1,000,000,000.00
- Kantin 1 unit 600,000,000.00 - Mushola 1 unit 300,000,000.00 - Stock Yard 1 unit 195,000,000.00 - Bengkel 1 unit 200,000,000.00 - Pos Keamanan 5 unit 25,000,000.00
Sub Totalb. Sarana Layanan Tambang - Settling Pond 2500 m2 2,000,000.00
Sub Totalc. Infrastruktur - Jalan Tambang - Instalasi Jaringan Listrik - Instalasi Jaringan Air - Instalasi Jaringan Telepon
Sub TotalTotal
Biaya Konstruksi dan Rekayasa
Biaya total (Rupiah)
760,000,000.001,350,000,000.002,000,000,000.00
600,000,000.00300,000,000.00195,000,000.00200,000,000.00125,000,000.00
5,530,000,000.00
5,000,000,000.005,000,000,000.00
2,500,000,000.001,000,000,000.00
900,000,000.00700,000,000.00
5,100,000,000.0015,630,000,000.00
Biaya Pembelian Peralatan Operasi (Investasi awal peralatan)
Jenis Alat Jumlah (unit)Harga Satuan/Unit (Rp)
A. Peralatan tambangJack hammer 8 950,000,000 Track loader 6 750,000,000 Back hoe 7 800,000,000 Dump truck 22 1,300,000,000
Sub TotalB. PengolahanJaw Crusher 1 750,000,000 Hopper 1 250,000,000 Feeder 1 430,000,000 Belt conveyor 2 350,000,000 Hammer mill 1 90,000,000
Sub TotalC. Peralatan di Bengkel
- Dongkrak 5 50,000,000.00 - Alat las dan patri 2 12,000,000.00 - Alat bengkel 4 10,000,000.00 - Kompresor 2 16,500,000.00
Sub TotalD. Peralatan Pendukung Operasional
- Genset 4 30,000,000.00 - Mobil Operasional 7 700,500,000.00 - Sepeda Motor 5 21,000,000.00 - Bola Lampu Ruangan 80 60,000.00 - HT 25 1,000,000.00
Sub TotalE. Peralatan K3
- Helm pengaman 105 95,000.00- Sepatu pengaman 105 350,000.00- Kacamata pelindung 120 250,000.00- Ear Protector 120 40,000.00- Masker debu 250 25,000.00- Ambulans 1 200,000,000.00- Perlengkapan P3K 4 1,000,000.00
Sub TotalTOTAL INVESTASI PERALATAN
Biaya Pembelian Peralatan Operasi (Investasi awal peralatan)
Harga Total (Rp) Umur AlatA. Peralatan tambang
7,600,000,000 5 4,500,000,000 5 5,600,000,000 5 28,600,000,000 5 46,300,000,000
750,000,000 5 250,000,000 5 430,000,000 5 700,000,000 5 90,000,000 5 2,220,000,000
250,000,000.00 5 24,000,000.00 5 40,000,000.00 5 33,000,000.00 5 347,000,000
120,000,000.00 5 4,903,500,000.00 5 105,000,000.00 5 4,800,000.00 1 25,000,000.00 5
5,158,300,000
9,975,000 236,750,000 130,000,000 14,800,000 16,250,000 1
200,000,000 54,000,000 2
291,775,00054,317,075,000
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Jenis Alat Jumlah (unit) Harga Satuan/Unit (Rp)
A. Peralatan tambang
Jack hammer 8 950,000,000.00
Track loader 6 750,000,000.00
Back hoe 7 800,000,000.00
Dump truck 22 1,300,000,000.00
Sub TotalB. Pengolahan
Jaw Crusher 1 750,000,000.00
Hopper 1 250,000,000.00
Feeder 1 430,000,000.00
Belt conveyor 2 350,000,000.00
Hammer mill 1 90,000,000.00
Sub Total
C. Peralatan di Bengkel
- Dongkrak 5 50,000,000.00
- Alat las dan patri 2 12,000,000.00
- Alat bengkel 4 10,000,000.00
- Kompresor 2 16,500,000.00
Sub Total
D. Peralatan Pendukung Operasional
- Genset 4 30,000,000.00
- Mobil Operasional 7 700,500,000.00
- Sepeda Motor 5 21,000,000.00
- Bola Lampu Ruangan 80 60,000.00
- HT 25 1,000,000.00
Sub TotalE. Peralatan K3- Helm pengaman 105 95,000.00 - Sepatu pengaman 105 350,000.00 - Kacamata pelindung 120 250,000.00 - Ear Protector 120 40,000.00 - Masker debu 250 25,000.00 - Ambulans 1 200,000,000.00 - Perlengkapan P3K 4 1,000,000.00
Sub Total
TOTAL INVESTASI PERALATAN
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Harga Total (Rp) Umur AlatTahun ke
1 2 3A. Peralatan tambang
7,600,000,000 5
4,500,000,000 5
5,600,000,000 5
28,600,000,000 5
46,300,000,000
750,000,000 5
250,000,000 5
430,000,000 5
700,000,000 5
90,000,000 5
2,220,000,000.00
250,000,000 5
24,000,000 5
40,000,000 5
33,000,000 5
347,000,000.00
120,000,000 5
4,903,500,000 5
105,000,000 5
4,800,000 1 4,800,000.00 4,800,000.00 4,800,000.00
25,000,000 5
5,158,300,000 4,800,000 4,800,000 4,800,000
9,975,000 2 9,975,000
36,750,000 1 36,750,000 36,750,000 36,750,000
30,000,000 1 30,000,000 30,000,000 30,000,000
4,800,000 1 4,800,000 4,800,000 4,800,000
6,250,000 1 6,250,000 6,250,000 6,250,000
200,000,000 5
4,000,000 2 4,000,000
291,775,000 77,800,000 91,775,000 77,800,00054,317,075,000 82,600,000 96,575,000 82,600,000
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Tahun ke4
4,800,000.00
4,800,000
9,975,000
36,750,000
30,000,000
4,800,000
6,250,000
4,000,000
91,775,000 96,575,000
BIAYA INVENTARIS
Deskripsi JumlahTotal (Rp )
1. Inventaris Kantor
- meja 60 650,000 39,000,000 5
- Kursi 75 250,000 18,750,000 5
- Meja & kursi untuk rapat 9 4,000,000 36,000,000 5
- Lemari arsip 10 2,500,000 25,000,000 5
- Rak buku 10 2,500,000 25,000,000 5
- Komputer 55 6,000,000 330,000,000 5
- Printer kecil 6 1,000,000 6,000,000 5
- Printer besar 4 6,500,000 26,000,000 5
- Televisi 4 1,000,000 4,000,000 5
- Faximile 4 600,000 2,400,000 5
- Mesin Fotokopi 3 4,000,000 12,000,000 5
- Dispenser 6 500,000 3,000,000 5
- White Board 7 400,000 2,800,000 5
- Telephone 8 300,000 2,400,000 5
- Genset 4 12,600,000 50,400,000 5
- Proyektor 6 2,300,000 13,800,000 5
- CCTV 20 500,000 10,000,000 5
- Tempat Sampah 8 30,000 240,000 5
- AC 6 2,500,000 15,000,000 5
sub total 621,790,000
2. Inventaris Kantor Keamanan
- Meja 3 300,000 900,000 5
- Kursi 6 100,000 600,000 5
- Telephone 2 300,000 600,000 5
- Dispenser 2 400,000 800,000 5
- Tempat Sampah 5 30,000 150,000 5
- HT 25 500,000 12,500,000 2
- Televisi 2 500,000 1,000,000 5
subtotal 16,550,000
3. Inventaris Mess Karyawan
- Tempat tidur + kasur 70 3,500,000 245,000,000 5
- Televisi 35 700,000 24,500,000 5
- Lemari 35 600,000 21,000,000 5
- Kipas Angin 35 180,000 6,300,000 5
- Telephone 2 300,000 600,000 5
- Dispenser 5 500,000 2,500,000 5
subtotal 299,900,000
Harga Satuan (Rp)
Umur Alat
4. Inventaris Kantin
- Meja + Kursi 60.00 2,000,000 120,000,000 5
- Meja Prasmanan 1.00 3,000,000 3,000,000 5
- Peralatan Masak 1.00 5,000,000 5,000,000 5
- Peralatan Makan 7.00 130,000 910,000 5
- Dispenser 2 200,000 400,000 5
- Kulkas 1 1,500,000 1,500,000 5
- TV 1 900,000 900,000 5
- Tempat Sampah 3 10,000 30,000 5
subtotal 131,740,000.0
Total 1,069,980,000
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Jenis Alat Jumlah (unit) Harga Satuan/Unit (Rp)
A. Peralatan tambang
Jack hammer 8 950,000,000.00
Track loader 6 750,000,000.00
Back hoe 7 800,000,000.00
Dump truck 22 1,300,000,000.00
Sub TotalB. Pengolahan
Jaw Crusher 1 750,000,000.00
Hopper 1 250,000,000.00
Feeder 1 430,000,000.00
Belt conveyor 2 350,000,000.00
Hammer Mill 1 90,000,000.00
Sub Total
C. Peralatan di Bengkel
- Dongkrak 5 50,000,000.00
- Alat las dan patri 2 12,000,000.00
- Alat bengkel 4 10,000,000.00
- Kompresor 2 16,500,000.00
Sub Total
D. Peralatan Pendukung Operasional
- Genset 4 30,000,000.00
- Mobil Operasional 7 700,500,000.00
- Sepeda Motor 5 21,000,000.00
-Bola Lampu ruangan 80 60,000.00
- HT 25 1,000,000.00
Sub TotalE. Peralatan K3
- Helm pengaman 105 95,000.00
- Sepatu pengaman 105 350,000.00
- Kacamata pelindung 120 250,000.00
- Ear Protector 120 40,000.00
- Masker debu 250 25,000.00
- Ambulans 1 200,000,000.00 - Perlengkapan P3K 4 1,000,000.00
Sub Total
TOTAL INVESTASI PERALATAN
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Nilai Sisa/Unit Nilai Sisa Total Umur Alat Depresiasi/unit
190,000,000 1,520,000,000 5 152,000,000.00
150,000,000 900,000,000 5 120,000,000.00
160,000,000 1,120,000,000 5 128,000,000.00
260,000,000 5,720,000,000 5 208,000,000.00
760,000,000 9,260,000,000 608,000,000
150,000,000 150,000,001 5 120,000,000.00
50,000,000 50,000,001 5 40,000,000.00
86,000,000 86,000,001 5 68,800,000.00
70,000,000 140,000,000 5 56,000,000.00
18,000,000 18,000,001 5 14,400,000.00
374,000,000 444,000,004 299,200,000
10,000,000 50,000,000 5 8,000,000.00
2,400,000 4,800,000 5 1,920,000.00
5
3,300,000 6,600,000 5 2,640,000.00
15,700,000 61,400,000 12,560,000
6,000,000 24,000,000 5 4,800,000.00
140,100,000 980,700,000 5 112,080,000.00
4,200,000 21,000,000 5 3,360,000.00
1
5
150,300,000 1,025,700,000 120,240,000
2
1
1
1
1
40,000,000 40,000,000 5 32,000,000.00
2
40,000,000 40,000,000 32,000,000
1,340,000,000 10,831,100,004 1,072,000,000
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Tahun ke1 2 3
1,216,000,000.00 1,216,000,000.00 1,216,000,000.00 720,000,000.00 720,000,000.00 720,000,000.00 896,000,000.00 896,000,000.00 896,000,000.00 4,576,000,000.00 4,576,000,000.00 4,576,000,000.00 7,408,000,000.00 7,408,000,000.00 7,408,000,000.00
- - 120,000,000.00 120,000,000.00 120,000,000.00 40,000,000.00 40,000,000.00 40,000,000.00 68,800,000.00 68,800,000.00 68,800,000.00 112,000,000.00 112,000,000.00 112,000,000.00 14,400,000.00 14,400,000.00 14,400,000.00 355,200,000.00 355,200,000.00 355,200,000.00
- - 40,000,000.00 40,000,000.00 40,000,000.00 3,840,000.00 3,840,000.00 3,840,000.00
- - 5,280,000.00 5,280,000.00 5,280,000.00 49,120,000.00 49,120,000.00 49,120,000.00
- - 19,200,000.00 19,200,000.00 19,200,000.00 784,560,000.00 784,560,000.00 784,560,000.00 16,800,000.00 16,800,000.00 16,800,000.00
- - - -
820,560,000.00 820,560,000.00 820,560,000.00 -
- - - - - - - - - -
32,000,000.00 32,000,000.00 32,000,000.00 - -
32,000,000.00 32,000,000.00 32,000,000.00 8,664,880,000.00 8,664,880,000.00 8,664,880,000.00
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
Tahun ke4 5
1,216,000,000.00 1,216,000,000.00 720,000,000.00 720,000,000.00 896,000,000.00 896,000,000.00 4,576,000,000.00 4,576,000,000.00 7,408,000,000.00 7,408,000,000.00 - - 120,000,000.00 120,000,000.00 40,000,000.00 40,000,000.00 68,800,000.00 68,800,000.00 112,000,000.00 112,000,000.00 14,400,000.00 14,400,000.00 355,200,000.00 355,200,000.00 - - 40,000,000.00 40,000,000.00 3,840,000.00 3,840,000.00 - - 5,280,000.00 5,280,000.00 49,120,000.00 49,120,000.00 - - 19,200,000.00 19,200,000.00 784,560,000.00 784,560,000.00 16,800,000.00 16,800,000.00 - - - - 820,560,000.00 820,560,000.00 - - - - - - - - - - - - 32,000,000.00 32,000,000.00 - - 32,000,000.00 32,000,000.00 8,664,880,000.00 8,664,880,000.00
BIAYA AMORTISASI
No Jenis retribusi1 2
1 - Surat Ijin Gangguan 300,000,000 300,000,000
2 - Surat Ijin Pemakaian Jalan 500,000,000 500,000,000
3 - Surat Ijin Usaha Penambangan 750,000,000 750,000,000
4 - Surat Pengajuan Tenaga Kerja 200,000,000 200,000,000
5 - Surat Usaha Perdagangan 500,000,000 500,000,000
6 - Surat Ijin Pengangkutan dan Penggunaan Alat 450,000,000 450,000,000
7 - Surat Ijin Kepolisian 350,000,000 350,000,000
8 - Surat Ijin Membangun Bangunan 750,000,000 750,000,000
9 - Surat Ijin Tempat Usaha 900,000,000 900,000,000
Total 4,700,000,000 4,700,000,000
BIAYA AMORTISASI
3 4 5
300,000,000 300,000,000 300,000,000
500,000,000 500,000,000 500,000,000
750,000,000 750,000,000 750,000,000
200,000,000 200,000,000 200,000,000
500,000,000 500,000,000 500,000,000
450,000,000 450,000,000 450,000,000
350,000,000 350,000,000 350,000,000
750,000,000 750,000,000 750,000,000
900,000,000 900,000,000 900,000,000
4,700,000,000 4,700,000,000 4,700,000,000
BIAYA PERBAIKAN DAN PERAWATAN ALAT
JENIS PERAWATANTAHUN
11. Biaya Perawatan Peralatan ( 15 % Depresiasi) - Peralatan Tambang 1,111,200,000.00 - Peralatan Pengolahan 53,280,000.00 - Peralatan Bengkel 7,368,000.00 - Peralatan Pendukung Operasional 123,084,000.00 - Peralatan K3 4,800,000.00
sub total 1,299,732,000.002. Biaya Perawatan Bangunan (20 % Biaya Kontruksi) - Kantor 152,000,000.00
- Tangki Bahan Bakar 270,000,000.00- Mess 400,000,000.00
- Kantin 120,000,000.00 - Mushola 60,000,000.00 - Stock Yard 39,000,000.00 - Bengkel 40,000,000.00 - Pos Keamanan 25,000,000.00
sub total 1,106,000,000
- Jalan Tambang 125,000,000.00
- Instalasi Jaringan Listrik 50,000,000.00 - Instalasi Jaringan Air 45,000,000.00 - Instalasi Jaringan Telepon 35,000,000.00
sub total 255,000,000TOTAL 2,660,732,000.00
TAHUN 1Total Tereskalasi 2,660,732,000 Tereskalasi 5%
4. Biaya Perawatan Infrastruktur (5 % biaya Infrastruktur)
BIAYA PERBAIKAN DAN PERAWATAN ALAT
TAHUN2 3 4
1,111,200,000.00 1,111,200,000.00 1,111,200,000.00 53,280,000.00 53,280,000.00 53,280,000.007,368,000.00 7,368,000.00 7,368,000.00
123,084,000.00 123,084,000.00 123,084,000.004,800,000.00 4,800,000.00 4,800,000.00
1,299,732,000.00 1,299,732,000.00 1,299,732,000.00
152,000,000.00 152,000,000.00 152,000,000.00270,000,000.00 270,000,000.00 270,000,000.00400,000,000.00 400,000,000.00 400,000,000.00120,000,000.00 120,000,000.00 120,000,000.00
60,000,000.00 60,000,000.00 60,000,000.0039,000,000.00 39,000,000.00 39,000,000.0040,000,000.00 40,000,000.00 40,000,000.0025,000,000.00 25,000,000.00 25,000,000.001,106,000,000 1,106,000,000 1,106,000,000
125,000,000.00 125,000,000.00 125,000,000.00
50,000,000.00 50,000,000.00 50,000,000.0045,000,000.00 45,000,000.00 45,000,000.0035,000,000.00 35,000,000.00 35,000,000.00
255,000,000 255,000,000 255,000,0002,660,732,000.00 2,660,732,000.00 2,660,732,000.00
2 3 4 2,793,768,600 2,933,457,030 3,080,129,882
BIAYA PERBAIKAN DAN PERAWATAN ALAT
TAHUN5
1,111,200,000.00 53,280,000.007,368,000.00
123,084,000.004,800,000.00
1,299,732,000.00
152,000,000.00270,000,000.00400,000,000.00120,000,000.00
60,000,000.0039,000,000.0040,000,000.0025,000,000.001,106,000,000
125,000,000.00
50,000,000.0045,000,000.0035,000,000.00
255,000,0002,660,732,000.00
5 3,234,136,376
LAMPIRAN H.6BIAYA KEBUTUHAN BBM
Harga BBM Solar/lt Rp 6900
Harga BBM Premium/lt Rp 7600
Kebutuhan BBMTrack loader, motor grader = 100 liter/shift
Dump truck = 100 liter/shift
Jenis Alat Jumlah EffisiensiKebutuhan/hari
Jumlah shift/thnKebutuhan /thn Biaya/Tahun
(liter) (liter) 1 2 3 4Track loader 6 80 120 30 27000 186,300,000.00 186,300,000.00 186,300,000.00 186,300,000.00 Back hoe 7 80 120 38 39900 275,310,000.00 275,310,000.00 275,310,000.00 275,310,000.00 Dump truck 22 80 120 38 125400 865,260,000.00 865,260,000.00 865,260,000.00 865,260,000.00 Kompresor 2 80 85 38 8075 55,717,500.00 55,717,500.00 55,717,500.00 55,717,500.00 Genset 4 80 65 38 12350 85,215,000.00 85,215,000.00 85,215,000.00 85,215,000.00 mobil Operasional 7 80 65 38 21612.5 164,255,000.00 164,255,000.00 164,255,000.00 164,255,000.00 Sepeda motor 5 80 65 38 15437.5 117,325,000.00 117,325,000.00 117,325,000.00 117,325,000.00 Ambulance 1 80 65 38 3087.5 23,465,000.00 23,465,000.00 23,465,000.00 23,465,000.00
Total 1,772,847,500.00 1,772,847,500.00 1,772,847,500.00 1,772,847,500.00
ekskalasi: 5%
` total biaya setelah ekskalasi Rp 1,772,847,500 Rp 1,861,489,875 Rp 1,954,564,369 Rp 2,052,292,587
Biaya/Tahun
5 186,300,000.00 275,310,000.00 865,260,000.00 55,717,500.00 85,215,000.00 164,255,000.00 117,325,000.00 23,465,000.00
1,772,847,500.00
Rp 2,154,907,217
BIAYA LISTRIK, TELEPON DAN AIR
Alat Elektronik Jumlah Daya (kilowatt) pemakaian jam/hr
- Komputer 55 0.14 8
- Printer kecil 6 0.48 4
- Printer besar 4 0.8 2
- Televisi 42 0.068 8
- Faximile 4 0.135 1
- Mesin Fotokopi 3 0.9 6
- Dispenser 15 0.394 12
- Genset 4 0.48 2
- Proyektor 6 0.18 3
- CCTV 20 0.01 24
- AC 6 0.43 8
- HT 25 0.005 8
- Kipas Angin 35 0.103 8
- Kulkas 1 0.348 24
- Lampu 80 0.02 8
TOTAL
Tahun Tahun 1 Tahun 2
Biaya Listrik Tereskalasi 5% 39,389,760 41,359,248
Alat Elektronik Jumlah biaya/detik pemakaian jam/hr
- Telephone 12 0.12 4Total
Tahun Tahun 1 Tahun 2
Biaya Telepon Tereskalasi 5% 6,220,800 6,531,840
Fasilitas tiap m3/Tahun
Kantor 10 27,000,000
Kantin 5 13,500,000
Mushola 6 16,200,000
Mess 30 81,000,000
Bengkel 2 5,400,000
Pos Keamanan 3 8,100,000
Total 151,200,000
Tahun Tahun 1 Tahun 2
Biaya Air Tereskalasi 5% 151,200,000 158,760,000
kebutuhan air (m3/hari)
BIAYA LISTRIK, TELEPON DAN AIR
total daya per hari (kw) biaya per hari biaya pertahun
62 29,568 8,870,400
12 5,530 1,658,880
6 3,072 921,600
23 10,967 3,290,112
1 259 77,760
16 7,776 2,332,800
71 34,042 10,212,480
4 1,843 552,960
3 1,555 466,560
5 2,304 691,200
21 9,907 2,972,160
1 480 144,000
29 13,843 4,152,960
8 4,009 1,202,688
13 6,144 1,843,200
TOTALDalam 1 Tahun = 39,389,760
Tahun 3 Tahun 4 Tahun 5
43,427,210 45,598,571 47,878,499
total pemakaian/hari (detik) biaya per hari biaya per tahun
172,800 20,736 6,220,800 Total Dalam 1 Tahun = 6,220,800
Tahun 3 Tahun 4 Tahun 5
6,858,432 7,201,354 7,561,421
Tahun 3 Tahun 4 Tahun 5
166,698,000 175,032,900 183,784,545
K3 DAN LINGKUNGAN
Tahap /tahun : 1 Diklat/Kursus K3 50,000,000 Safety Campaign 20,000,000 Pemasangan Rambu-rambu 15,000,000 Pemeriksaan kesehatan 90,000,000
Total 175,000,000
Pengembangan Masyarakat Tahap/Tahun 1
Pengembangan Masyarakat Perbaikan Sarana Pendidikan Perpustakaan Keliling 120,000,000 Penyelenggaraan Pertandingan Olahraga Pengadaan Sarana Olahraga Perbaikan Sarana Kesehatan 210,000,000 Perbaikan Sarana Keagamaan Pembangunan Sarana Air Bersih 145,000,000
Total 475,000,000
K3 DAN LINGKUNGAN
2 3 4 5 60,000,000 70,000,000 80,000,000 90,000,000 20,000,000 20,000,000 20,000,000 20,000,000 15,000,000 15,000,000 15,000,000 15,000,000 90,000,000 90,000,000 90,000,000 90,000,000 185,000,000 195,000,000 205,000,000 215,000,000
Pengembangan Masyarakat2 3 4 5
120,000,000 40,000,000 30,000,000 40,000,000 40,000,000
40,000,000 55,000,000 150,000,000
120,000,000
190,000,000 190,000,000 215,000,000 40,000,000
Lampiran Gaji Karyawan
Pekerjaan Gaji per Bulan
Project Manager 30,000,000 1 30,000,000 30,000,000 1 30,000,000
Divisi Operasional - Kabag. Operasional 20,000,000 1 20,000,000
Supervisor Penambangan 8,000,000 1 8,000,000 5,000,000 2 10,000,000 5,000,000 2 10,000,000 5,000,000 6 30,000,000 5,000,000 7 35,000,000
Tenaga Ahli Alat Mekanik 4,000,000 2 8,000,000 Kabag. Perencanaan 15,000,000 1 15,000,000
Staf Perencanaan 8,500,000 6 51,000,000 Divisi Pengolahan - Kabag. Pengolahan 15,000,000 1 15,000,000
Staf Pengolahan 6,000,000 2 12,000,000 Divisi Administrasi dan Keuangan -
Kabag. Administrasi 20,000,000 1 20,000,000 Staf Administrasi 3,000,000 2 6,000,000 Kabag. Keuangan 15,000,000 1 15,000,000
Staf Keuangan 4,000,000 2 8,000,000 Personalia 4,000,000 2 8,000,000
4,000,000 1 4,000,000 -
Kabag. K3 15,000,000 1 15,000,000 Safety Officer 6,000,000 2 12,000,000 Tenaga Medis 5,000,000 2 10,000,000
Kabag. Lingkungan 15,000,000 1 15,000,000 Staf Lingkungan 5,000,000 3 15,000,000
Staf Humas 10,000,000 5 50,000,000 Lain-Lain -
Satpam 3,000,000 5 15,000,000 Sopir 4,000,000 16 64,000,000
Cleaning Service 4,000,000 6 24,000,000 Juru Masak 4,000,000 4 16,000,000
Total 277,500,000 87 571,000,000
GAJITAHUN
Total Tereskalasi
Jumlah Pekerja
Total Gaji Perbulan
Deputi Project Manager
Operator Back Hoe
Operator Wheel LoaderOperator Truck
Operator Rock Breaker
Staf MarketingDivisi K3, Lingkungan, dan
Community Development
Lampiran Gaji Karyawan
360,000,000 360,000,000 - 240,000,000
96,000,000
120,000,000 120,000,000 360,000,000 420,000,000 96,000,000 180,000,000
612,000,000
- 180,000,000 144,000,000 - 240,000,000 72,000,000 180,000,000 96,000,000 96,000,000 48,000,000 -
180,000,000 144,000,000 120,000,000
180,000,000 180,000,000 600,000,000 - 180,000,000 768,000,000 288,000,000 192,000,000 6,852,000,000
GAJITAHUN 1 2 3 4 5
5% 6,852,000,000 7,194,600,000 7,554,330,000 7,932,046,500 8,328,648,825
Total Gaji per Tahun
Biaya OperasiKomponen Biaya
- Biaya Variable
- Biaya Pemaikaian Listrik 39,389,760
- Biaya Pemaikaian Telepon 6,220,800
- Biaya Pemakaian Air 151,200,000
- Kebutuhan BBM 1,772,847,500
- Perawatan 2,660,732,000
- Kesehatan dan Keselamatan Kerja 175,000,000
- Pengembangan Masyarakat 475,000,000
-Biaya Tetap
- Depresiasi (UU No. 36 Tahun 2008) 8,664,880,000
- Amortisasi (UU No. 36 Tahun 2008) 4,700,000,000
- Gaji Pegawai 6,852,000,000
- Biaya PBB 1,563,000,000
Total Biaya Operasi 27,060,270,060
MODAL KERJA
Biaya Operasi 27,060,270,060 Modal Kerja 5,412,054,012
Bulan 1 Bulan 2 Bulan 3 Bulan 4
Modal Kerja 1,353,013,503 1,353,013,503 1,353,013,503 1,353,013,503
MODAL KERJA
Total
5,412,054,012
BIAYA JAMINAN MINE CLOSURE
No KEGIATAN1 Biaya Langsung
a Tapak Bekas Tambang
1 Pembongkaran Fasilitas Tambang
2 Reklamasi lahan bekas fasilitas tambang
3 Pembongkaran dan reklamasi Jalan Tambang
4 Reklamasi Tambang Permukaan (pit, waste dump)
5 Reklamasi lahan bekas kolam pengendap6 Pengamanan semua bukaan tambang yang berpotensi bahaya
terhadap manusia (shaft, raise, stope, edit, decline, tunnel, dan lain-lain)
b Fasilitas Pengolahan dan atau Pemurnian
1 Pembongkaran fasilitas pengolahan dan pemurnian
2 Reklamasi lahan bekas fasilitas pengolahan dan pemurnian
3 Reklamasi lahan bekas kolam tailing dan upaya stabilisasinya
4 Reklamasi lahan bekas timbunan konsentrat
5 Pemulihan (remediasi) tanah yang terkontaminasi bahan kimia
minyak dan Bahan Berbahaya dan Beracun (B3) serta Limbah B3
c Fasilitas Penunjang
1 Reklamasi lahan bekas landfill
2 Pembongkaran sisa bangunan, transmisi Iistrik, pipa, pelabuhan
(udara dan air), dan fasilitas lainnya
3 Reklamasi lahan bekas bangunan, transmisi listrik, pipa
pelabuhan (udara dan air), dan fasilitas lainnya
4 Pembongkaran peralatan, mesin, tangki SBM dan pelumas
5 Penanganan sisa BBM, pelumas, serta bahan kimia
6 Reklamasi lahan bekas sarana transportasi
7 Reklamasi lahan bekas bangunan dan pondasi beton
8 Pemulihan (remediasi) tanah yang terkontaminasi bahan kimia
minyak dan B3d Sosial dan Ekonomi
e Pemeliharaan dan Perawatan
f Pemantauan
g Lain-Lain
Sub Total 1
2 Biaya Tidak langsunga Biaya mobilisasi dan demobilisasi alatb Biaya perencanaan dan Kegiatan
PENDAPATAN
Produksi/Hari 666.666666666667 Ton
Produksi/Bulan 25 16666.7 Ton
Produksi/Tahun 12 200,000 Ton
Tahun 1 2 3
Sasaran produksi 200000 200000 200000
Produk Harga/Ton (Rp )Pendapatan
2 3
tahun 1
-50 mm 600,000.00 Rp 120,000,000,000 Rp 120,000,000,000 Rp 120,000,000,000
pendapatan tereskalasi Rp 120,000,000,000 Rp 126,000,000,000 Rp 132,300,000,000
eskalasi 5%
PENDAPATAN
4 5
200000 200000
4 5
Rp 120,000,000,000 Rp 120,000,000,000
Rp 138,915,000,000 Rp 145,860,750,000
BIAYA-BIAYA YANG DIBUTUHKAN PADA TAHUN 0 (Rp. 1000)
Bulan 0
A. BIAYA PERSIAPAN PEMBUKAAN TAMBANG
1 BIAYA EKSPLORASI
- Survey 1,000,000,000
- Pemetaan 900,000,000
- Study AMDAL
- Studi kelayakan
- Biaya pengujian
- Biaya pemboran
sub total 1,900,000,000
2 PEMBEBASAN LAHAN
- Pembebasan Lahan
- Ganti Rugi Rumah
- Ganti rugi tanaman
- Ganti rugi pohon
sub total
3 BIAYA PERIJINAN
- Surat Ijin Gangguan 300,000,000
- Surat Ijin Pemakaian Jalan
- Surat Ijin Usaha Penambangan
- Surat Pengajuan Tenaga Kerja
- Surat Usaha Perdagangan
- Surat Ijin Pengangkutan dan Penggunaan Alat
- Surat Ijin Kepolisian
- Surat Ijin Membangun Bangunan
- Surat Ijin Tempat Usaha
sub total 300,000,000
TOTAL 2,200,000,000
B BIAYA KONSTRUKSI DAN REKAYASA
1 Bangunan
- Kantor- Tangki Bahan Bakar- Mess
- Kantin - Mushola - Stock Yard - Bengkel - Pos Keamanan
2 Infrastruktur
- Jalan Tambang - Instalasi Jaringan Listrik - Instalasi Jaringan Air
- Instalasi Jaringan Telepon3 Sarana Layanan Tambang
- Settling Pond
TOTAL
C INVESTASI ALAT
1 Peralatan tambang
2 Peralatan pengolahan
3 Peralatan Inventaris
4 Peralatan bengkel
5 Peralatan K3
6 Peralatan Pendukung operasional
TOTAL
MODAL KERJA
Modal Kerja
DTOTAL
TOTAL INVESTASI 164,700,149,521
BIAYA-BIAYA YANG DIBUTUHKAN PADA TAHUN 0 (Rp. 1000)
1 2 3 4 5 6
1,000,000,000
1,200,000,000120,000,000
1,300,000,0003,620,000,000
60,000,000,000
10,000,000,000
2,400,000,000
1,592,000,000
73,992,000,000
500,000,000
750,000,000
500,000,000
450,000,000
350,000,000
750,000,000
900,000,000
1,100,000,000 1,350,000,000 1,750,000,000
4,720,000,000 75,342,000,000 1,750,000,000
760,000,000
1,350,000,000
2,000,000,000
600,000,000
300,000,000
195,000,000
200,000,000
125,000,000
2,500,000,000
1,000,000,000
900,000,000
700,000,000
5,000,000,000
4,400,000,000 6,230,000,000 5,000,000,000
46,300,000,000
1,069,980,000
347,000,000
47,716,980,000
5,412,054,012 1,353,013,503 1,353,013,503 1,353,013,503
10,132,054,012 76,695,013,503 3,103,013,503 1,353,013,503 47,716,980,000 0
BIAYA-BIAYA YANG DIBUTUHKAN PADA TAHUN 0 (Rp. 1000)
7 8 9 10 11 12
200,000,000
200,000,000
200,000,000
2,220,000,000
291,775,000
5,158,300,000
2,220,000,000 291,775,000 5,158,300,000
2,220,000,000 291,775,000 5,158,300,000 200,000,000 0 0
BIAYA-BIAYA YANG DIBUTUHKAN PADA TAHUN 0 (Rp. 1000)
Total
1,000,000,000900,000,000
1,000,000,0001,200,000,000
120,000,0001,300,000,0005,520,000,000
060,000,000,00010,000,000,000
2,400,000,0001,592,000,000
73,992,000,0000
300,000,000500,000,000750,000,000200,000,000500,000,000450,000,000350,000,000750,000,000900,000,000
4,700,000,00084,212,000,000
760,000,0001,350,000,0002,000,000,000
600,000,000300,000,000195,000,000200,000,000125,000,000
02,500,000,0001,000,000,000
900,000,000
700,000,0000
5,000,000,000
15,630,000,000
46,300,000,000
2,220,000,000
1,069,980,000
347,000,000
291,775,000
5,158,300,000
55,387,055,000
9,471,094,521
164,700,149,521
INVESTASI TOTAL
No. Jenis Investasi Biaya1 Investasi Awal
- Biaya Persiapan 84,212,000,000 - Biaya Kontruksi & Rekayasa 15,630,000,000 - Investasi Alat 55,387,055,000
Sub Total 155,229,055,0002 Modal Kerja 5,412,054,012
Total 160,641,109,012
Angsuran Pinjaman
Investasi total 160,641,109,012
Modal sendiri 50% 80,320,554,506
Pinjaman 50% 80,320,554,506
Jangka Waktu Pinjam 4
Bunga Pinjaman/tahun 12.0% (Bank Mandiri)
Angsuran Pinjaman 33%
Tahun Pokok Pinjaman Angsuran Bunga
1 80,320,554,506 26,444,292,487 9,638,466,541
2 63,514,728,560 26,444,292,487 7,621,767,427
3 44,692,203,501 26,444,292,487 5,363,064,420
4 23,610,975,434 26,444,292,487 2,833,317,052
Pembayaran Bunga
1 2 3 4
9,638,466,541 7,621,767,427 5,363,064,420 2,833,317,052
Angsuran Pinjaman
1 2 3 4
26,444,292,487 26,444,292,487 26,444,292,487 26,444,292,487
Cicilan
1 2 3 4
16,805,825,946 18,822,525,059 21,081,228,066 23,610,975,434
Angsuran Pinjaman
Cicilan Sisa Pinjaman
16,805,825,946 63,514,728,560
18,822,525,059 44,692,203,501
21,081,228,066 23,610,975,434
23,610,975,434 0
Pembayaran Bunga
Angsuran Pinjaman
Cicilan
CASH FLOW
URAIAN0 1
Pendapatan
Hasil Penjualan 120,000,000,000
Royalti (7%) -84,000,000,000
Pendapatan Setelah Royalti 36,000,000,000
Nilai Sisa
Biaya Operasi
- Biaya Variable
- Biaya Pemaikaian Listrik -39,389,760
- Biaya Pemaikaian Telepon -6,220,800
- Biaya Pemakaian Air -151,200,000
- Kebutuhan BBM -1,772,847,500
- Perawatan -2,660,732,000
- Kesehatan dan Keselamatan Kerja -175,000,000
- Pengembangan Masyarakat -475,000,000
- Reklamasi dan Pasca Tambang -553,880,565
-Biaya Tetap
- Depresiasi (UU No. 36 Tahun 2008) -8,664,880,000
- Amortisasi (UU No. 36 Tahun 2008) -4,700,000,000
- Bunga Pinjaman -9,638,466,541
- Gaji Pegawai -6,852,000,000
- Jaminan Sosial Tenaga Kerja (5%)
- Biaya PBB
Total Biaya Operasi
Pendapatan Terpajak
Pajak
25%
Total Pajak
Pendapatan Bersih
Depresiasi
Amortisasi
Investasi Pengganti
Investasi Total
Modal Kerja Kembali
Modal Pinjaman
Angsuran Pinjaman
Jaminan Reklamasi dan Pasca Tambang Kembali
Net Cash Flow
Cumulative Cash Flow
i*=
Tahun
NPV=
IRR=
PBP=
PBP=
CASH FLOW
2 3 4 5
126,000,000,000 132,300,000,000 138,915,000,000 145,860,750,000
-88,200,000,000 -92,610,000,000 -97,240,500,000 -102,102,525,000
37,800,000,000 39,690,000,000 41,674,500,000 43,758,225,000
10,831,100,004
-41,359,248 -43,427,210 -45,598,571 -47,878,499
-6,531,840 -6,858,432 -7,201,354 -7,561,421
-158,760,000 -166,698,000 -175,032,900 -183,784,545
-1,861,489,875 -1,954,564,369 -2,052,292,587 -2,154,907,217
-2,793,768,600 -2,933,457,030 -3,080,129,882 -3,234,136,376
-185,000,000 -195,000,000 -205,000,000 -215,000,000
-190,000,000 -190,000,000 -215,000,000 -40,000,000
-1,661,641,695 -2,774,392,740 0 0
-8,664,880,000 -8,664,880,000 -8,664,880,000 -8,664,880,000
-4,700,000,000 -4,700,000,000 -4,700,000,000 -4,700,000,000
-7,621,767,427 -5,363,064,420 -2,833,317,052
-7,194,600,000 -7,554,330,000 -7,932,046,500 -8,328,648,825
tahun
bulan
hari