DED Pantai KahonaLuas Kawasan = 8,2 Ha 82000
NO KUALIFIKASI PERSONILVOLUME SATUAN HARGA
TOTAL SAT.
A BIAYA SURVEY LAPANGAN PANTAI KAHONA
1 Penginapan & Mobilisasi Alat 1 LS Rp 6,000,000.00
2 Theodolit Kawasana. Topografi Kawasan 8.2 Ha Rp 3,500,000.00
b. Batimetri Kolam/ Pantai 8.2 Ha Rp 4,000,000.00 Rp 11,183,333 3 Sondir 10 Ttk Rp 2,000,000.00 2 Rp 2,000,000 Rp 4,000,000 4 Boring /m Rp 300,000.00 30 Rp 300,000.00 Rp 9,000,000.00 5 SPT /m Rp 200,000.00 30 Rp 200,000.00 Rp 6,000,000.00 6 UDS /m Rp 200,000.00 30 Rp 200,000.00 Rp 6,000,000.00 7 Lab Tabung Rp 700,000.00 Rp 36,183,333.33
Sub Jumlah A Rp -
B BIAYA JASA KONSULTAN DED
1 DED KOLAM 1 LS Rp 50,000,000.00 Rp 500,000,000.00
2 DED HOTEL/PENGINAPAN 1 LS Rp 200,000,000.00
3 DED AMPHITEATER 1 LS Rp 200,000,000.00
4 DED WAVE BREAKER/PEMECAH OMBAK 1 LS Rp 250,000,000.00
5 DED KIOS /PUSAT JAJANAN 1 LS Rp 30,000,000.00
6 DED LANSCAPE KAWASAN 1 LS Rp 250,000,000.00
7 DED PELABUHAN/DOCKING KAPAL 1 LS Rp 200,000,000.00 Sub Jumlah B Rp 500,000,000.00
JUMLAH BIAYA A+B Rp 500,000,000.00 TERBILANG: SATU MILYAR DUA RATUS TIGA BELAS JUTA LIMA RATUS RIBU RUPIAH
Rp 200,000,000.00 Rp 300,000,000.00