DED Pantai KahonaLuas Kawasan = 8,2 Ha 82000

NO KUALIFIKASI PERSONILVOLUME SATUAN HARGA

TOTAL SAT.

A BIAYA SURVEY LAPANGAN PANTAI KAHONA

1 Penginapan & Mobilisasi Alat 1 LS Rp 6,000,000.00

2 Theodolit Kawasana. Topografi Kawasan 8.2 Ha Rp 3,500,000.00

b. Batimetri Kolam/ Pantai 8.2 Ha Rp 4,000,000.00 Rp 11,183,333 3 Sondir 10 Ttk Rp 2,000,000.00 2 Rp 2,000,000 Rp 4,000,000 4 Boring /m Rp 300,000.00 30 Rp 300,000.00 Rp 9,000,000.00 5 SPT /m Rp 200,000.00 30 Rp 200,000.00 Rp 6,000,000.00 6 UDS /m Rp 200,000.00 30 Rp 200,000.00 Rp 6,000,000.00 7 Lab Tabung Rp 700,000.00 Rp 36,183,333.33

Sub Jumlah A Rp -

B BIAYA JASA KONSULTAN DED

1 DED KOLAM 1 LS Rp 50,000,000.00 Rp 500,000,000.00

2 DED HOTEL/PENGINAPAN 1 LS Rp 200,000,000.00

3 DED AMPHITEATER 1 LS Rp 200,000,000.00

4 DED WAVE BREAKER/PEMECAH OMBAK 1 LS Rp 250,000,000.00

5 DED KIOS /PUSAT JAJANAN 1 LS Rp 30,000,000.00

6 DED LANSCAPE KAWASAN 1 LS Rp 250,000,000.00

7 DED PELABUHAN/DOCKING KAPAL 1 LS Rp 200,000,000.00 Sub Jumlah B Rp 500,000,000.00

JUMLAH BIAYA A+B Rp 500,000,000.00 TERBILANG: SATU MILYAR DUA RATUS TIGA BELAS JUTA LIMA RATUS RIBU RUPIAH