soal bundaran
DESCRIPTION
Untuk menghitung volume, kapasitas dan kategori bundaranTRANSCRIPT
Latihan Soal
Menghitung Volume Bundaran
Mencari Kapasitas Bundaran
Mencari Kategori Bundaran
by
Widodo Budi Dermawan
Menghitung Volume Bundaran
Menghitung Volume di Bundaran bisa dengan 2 cara :
- Metode FHWA (Federal Highway Administration)
- Metode HCM (Highway Capacity Manual)
Bundaran didesain untuk dapat melayani persimpangan dengan mengurangi tundaan dan antrian.
Approach Capacity
200 400 600 800 1000 1200
Circulating Flow (pce/h)
Lower Bound
0
0
500
1000
1500
Upper Bound
Entr
y C
apacity (
pce/h
)
Approach Capacity
200 400 600 800 1000 1200
Circulating Flow (pce/h)
Lower Bound
0
0
500
1000
1500
Upper Bound
Entr
y C
apacity (
pce/h
)
FHWA
HCM
0
200
400
600
800
1000
1200
1400
0 400 800 1200 1600 2000 2400 Circulatory Flow (veh/h)
Maxim
um
En
try F
low
(veh
/h)
Entering and circulating flow = 1800 veh/h
Jenis Bundaran Menurut FHWA
Elemen dari Desain Bundaran
Entry width
Inscribed circle diameter
Exit width
Splitter island width
Circulatory roadway width
Langkah Menghitung Volume
• Konversi volume ke satuan mobil penumpang (smp)
• Menghitung volume masuk ke bundaran dari setiap kaki persimpangan
• Menghitung volume keluar dari bundaran ke setiap kaki persimpangan
• Menghitung volume putaran di bundaran pada ujung setiap kaki persimpangan
U
B
S
T a b c d
e f g h
i j k l
m n o p
Bm
Bm (Barat masuk bundaran)
Bm = a + b + c + d
Bk
Bk (Barat keluar bundaran)
Bk = d + f + k + m
BL
BL (Barat lingkar bundaran)
BL = e + i + j + n + o + p
118 377 150
54 258 107 ?
?
?
?
? ?
?
?
?
?
?
?
Latihan Soal
Volume di setiap kaki persimpangan dalam satuan kendaraan/jam. Diasumsikan semua kendaraan ringan
118 377 150
54 258 107 ?
?
?
?
?
?
?
?
Bm = 118 + 377 + 150 = 645
Um = 78 + 586 + 133 = 797
Tm = 54 + 258 + 107 = 419
Sm = 88 + 454 + 100 = 642
118 377 150
54 258 107 ?
?
?
?
Bk = 78 + 258 + 88 = 424
Uk = 118 + 54 + 454 = 626
Tk = 133 + 377 + 100 = 610
Sk = 150 + 586 + 107 = 843
118 377 150
54 258 107
Gerakan Kendaraan Volume Bundaran
BL = 454 + 100 + 54 = 608
UL = 100 + 377 + 150 = 627
TL = 150 + 78 + 586 = 814
SL = 258 + 54 + 78 = 390
Volume Bundaran Kategori Bundaran ?
?
Kalkulasi Kapasitas
60
8
Cek kapasitas setiap kaki persimpangan
Example: Capacity check grafik diasumsikan kendaraan ringan (smp)
0
200
400
600
800
1000
1200
1400
0 400 800 1200 1600 2000 2400
Circulatory Flow (veh/h)
Ma
xim
um
En
try F
low
(ve
h/h
)
Entering and circulating flow = 1800 veh/h
608
756
814
609
390
910
627
748
Volume-to-capacity ratio: Single-lane: Bm/Bm* = 645 / 756 = 0.85 Um/Um* = 797 / 748 = 1.06 Tm/Tm* = 419 / 609 = 0.68 Sm/Sm* = 642 / 790 = 0.81 * Dari grafik
0.85 0.68
0.81
1.06
Pada sisi kaki Utara volume kendaraan masuk melebihi kapasitas rencana, sehingga perlu dihitung untuk kategori bundaran lainnya
Urban Compact
Cek kategori single lane (garis merah)
0
200
400
600
800
1000
1200
1400
0 400 800 1200 1600 2000 2400
Circulatory Flow (veh/h)
Ma
xim
um
En
try F
low
(ve
h/h
)
Entering and circulating flow = 1800 veh/h
608
870
814
760
390
995
627
862
Volume-to-capacity ratio: Single-lane: Bm/Bm* = 645 / 879 = 0.73 Um/Um* = 797 / 862 = 0.92 Tm/Tm* = 419 / 760 = 0.55 Sm/Sm* = 642 / 995 = 0.64 * Dari grafik
0.73 0.55
0.64
0.92
Pada sisi kaki Utara volume kendaraan masuk melebihi kapasitas rencana, sehingga perlu dihitung untuk kategori bundaran lainnya
OK
Single-Lane