rencana anggaran biaya.xls

68
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT PROPINSI : ACEH KOTA : LANGSA TAHUN ANGGARAN : 2010 PAKET : SEKTOR AIR BERSIH DAN DRAINASE PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE KOTA LANGSA No. Uraian Jenis Satuan Harga (Rp) A. UPAH U01 Pekerja Org/ Hari 49,700.00 U02 Mandor Org/ Hari 82,300.00 U03 Tukang Org/ Hari 78,700.00 U04 Kepala Tukang Org/ Hari 94,500.00 U05 Operator Org/ Hari 122,300.00 U06 Pembantu Operator Org/ Hari 75,000.00 U07 Mekanik Org/ Hari 122,300.00 U08 Mekanik Pembantu Org/ Hari 75,000.00

Upload: agdi2013

Post on 26-Oct-2015

3.057 views

Category:

Documents


646 download

DESCRIPTION

xzde

TRANSCRIPT

Page 1: RENCANA ANGGARAN BIAYA.xls

DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KOTA LANGSA

No. Uraian Jenis Satuan Harga (Rp)

A. UPAH

U01 Pekerja Org/ Hari 49,700.00 U02 Mandor Org/ Hari 82,300.00 U03 Tukang Org/ Hari 78,700.00 U04 Kepala Tukang Org/ Hari 94,500.00 U05 Operator Org/ Hari 122,300.00 U06 Pembantu Operator Org/ Hari 75,000.00 U07 Mekanik Org/ Hari 122,300.00 U08 Mekanik Pembantu Org/ Hari 75,000.00

Page 2: RENCANA ANGGARAN BIAYA.xls

DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KOTA LANGSA

No. Uraian Jenis Satuan Harga (Rp)

B. BAHAN

M01 Air Bersih Pengecoran Liter 150.00

M02 Angker Bolt D22+Mur+Ring Bh 42,000.00

M03 Bar Pengaman Unit 1,200,000.00 M04 Baja profil Kg 28,300.00

M05 Bambu Btg 34,100.00

M06 Batu Bata Buah 600.00

M07 Batukali / Batu Belah (Sungai / Gunung) 202,800.00

M08 Batu pecah 3 - 5 cm 290,950.00

M09 Batu pecah 2 - 3 cm 647,600.00

M10 Baut dan Mur Steel 1 1/2" Bh 22,000.00

M11 Bh 12,000.00

M12 Base Plat 16 mm Bh 170,000.00

M13 Besi beton polos Kg 16,200.00

M14 Besi beton ulir/strip Kg 24,800.00 M15 Cat Tembok Kg 25,900.00

M16 Cat Menie Besi Kg 22,200.00 M17 Filter Bh 400,000.00 M18 Formite/penjaga jarak bekisting/spacer Bh 4,000.00 M19 Ijuk Kg 13,600.00 M20 Kantor Lapangan (Type C) 2,220,000.00 M21 Kawat beton Kg 10,500.00 M22 Kawat Bronjong dia. 5 mm Kg 22,800.00 M23 Kawat las Kg 16,000.00 M24 Koral Beton 141,100.00 M25 Balok Kayu Klas II 3,926,100.00 M26 Kayu Klas III (Borneo) 3,553,900.00 M27 Kayu Klas IV (Sengon) untuk Papan Begesting 2,948,100.00 M28 Btg 62,500.00 M29 Lempengan Rumput 28,100.00 M30 Minyak Bensin Ltr 8,100.00 M31 Minyak cat Ltr 21,700.00 M32 Minyak Solar Ltr 8,100.00 M33 Minyak Tanah Ltr 6,700.00 M34 Minyak Bekisting Ltr 3,800.00 M35 Paku Kayu Kg 11,600.00 M36 Pasir beton/Kerikil 141,100.00 M37 Pasir Pasang 129,600.00 M38 Pasir urug 112,500.00 M39 Paving blok 83,700.00 M40 Pelumas / Oli Ltr 36,200.00 M41 Plywood 9 mm Lbr 150,500.00 M42 Btg 71,900.00 M43 Semen Portland (@ 40 Kg) Zak 50,300.00 M44 Tanah Timbun 51,700.00 M45 Tanah Timbun Pilihan 122,600.00 M46 Plat Baja, t = 5 mm m2 25,700.00

M47 Pintu Air Sorong (B = 0,7 H = 1,0) Lengkap+pemasangan Set 3,000,000.00

M48 Pintu Air Koklep (B = 0,7 H = 1,25) Lengkap+pemasanga Set 4,000,000.00 M49 M' 96,006.00 M50 M' 200,946.00 M51 M' 272,689.50 M52 M' 344,433.00

M3

M3

M3

Baut Picer Ø16 mm

M2

M3

M3

M3

M3

Kayu Dolken Ø 8-10 cm (panjang 4 M)M2

M3

M3

M3

M2

Pipa PVC Ø 1 12"

M3

M3

Pipa GIP ¢ 75 mmPipa GIP ¢ 100 mmPipa GIP ¢ 150 mmPipa GIP ¢ 200 mm

Page 3: RENCANA ANGGARAN BIAYA.xls

DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KOTA LANGSAM53 M' 544,978.00 Pipa GIP ¢ 250 mm

Page 4: RENCANA ANGGARAN BIAYA.xls

DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KOTA LANGSA

M54 Bh 1,854,412.00 M55 Bh 1,954,412.00 M56 Bh 3,384,171.00 M57 Bh 4,813,930.00 M58 Bh 7,220,895.00 M59 Bh 459,900.00 M60 Bh 179,100.00 M61 Bh 199,477.00 M62 Bh 248,240.00 M63 Bh 258,373.00 M64 Bh 442,349.00 M65 Bh 316,185.00 M66 Bh 626,325.00 M67 Bh 708,768.00 M68 Bh 1,310,750.00 M69 Bh 1,337,500.00 M70 Blinde Flange Bh 326,500.00 M71 Set 52,034.00 M72 Set 89,276.00 M73 Set 208,098.00 M74 Clamp dia. 200 mm dan Angker Bolt+Mur+Ring Set 250,098.00 M75 Clamp dia. 150 mm dan Angker Bolt+Mur+Ring Set 131,276.00 M76 Clamp dia. 100 mm dan Angker Bolt+Mur+Ring Set 94,034.00 M77 Bh 268,796.00 M78 Bh 383,994.00 M79 Bh 499,192.00 M80 Bh 100,000.00 M81 Bh 130,000.00 M82 Bh 165,000.00 M83 Bh 200,000.00 M84 Flange Socket GIP dia. 200 mm Bh 590,392.00 M85 Flange Socket GIP dia. 150 mm Bh 419,400.00 M86 Flange Socket GIP dia. 100 mm Bh 248,408.00 M87 Los Flange GIP dia. 100 mm Bh 56,900.00 M88 Los Flange GIP dia. 150 mm Bh 110,700.00 M89 Los Flange GIP dia. 200 mm Bh 164,500.00 M90 Bh 798,200.00 M91 Bh 798,200.00 M92 Bh 855,754.00 M93 Bh 1,702,905.00 M94 Bh 2,822,393.00 M95 Set 35,450.00 M96 Set 127,600.00 M97 Set 137,500.00 M98 Bh 250,352.00 M99 Bh 330,737.00

M100 Bh 421,791.00 M101 Bh 162,822.00 M102 Bh 187,450.00 M103 Dop Flange GIP dia. 200 mm Bh 516,000.00 M104 Bh 972,162.00 M105 Bh 1,069,378.00 M106 Bh 1,069,378.00 M107 Bh 972,162.00 M108 Bh 612,254.00 M109 Bh 991,890.00 M110 Bh 1,030,410.00 M111 Bh 1,049,670.00

Air Realease CI Ø 50 mmAir Realease CI Ø 75 mmAir Realease CI Ø 100 mmAir Realease CI Ø 150 mmAir Realease CI Ø 200 mm

All Range Bend 45°

Bend CI 22.5° Ø 75 mmBend CI 45° Ø 75 mmBend CI 90° Ø 75 mmBend CI 45° Ø 100 mmBend CI 45° Ø 150 mmBend CI 90° Ø 100 mmBend CI 45° Ø 200 mmBend CI 90° Ø 200 mmBend CI 45° Ø 250 mmBend CI 90° Ø 250 mm

Clamp Ø 100 mmClamp Ø 150 mmClamp Ø 200 mm

Dop GIP Ø 100 mmDop GIP Ø 150 mmDop GIP Ø 200 mmFlange GIP Ø 75 mmFlange GIP Ø 100 mmFlange GIP Ø 150 mmFlange GIP Ø 200 mm

Flexible Joint Ø 150 mmFlexible Joint Ø 200 mmGate Valve CI Ø 100 mmGate Valve CI Ø 150 mmGate Valve CI Ø 200 mmPerangkat Mur, Baut & Ring Flange Ø 100 mmPerangkat Mur, Baut & Ring Flange Ø 150 mmPerangkat Mur, Baut & Ring Flange Ø 200 mmReducer GIP Ø 100-75 mmReducer GIP Ø 150-100 mmReducer GIP Ø 200-100 mmSocket GIP Ø 100 mmSocket GIP Ø 150 mm

Tee GIP Ø 150-150-150 mmTee GIP Ø 200-200-200 mmTee GIP Ø 200 - 100 - 200 mmTee GIP Ø 150 - 100 - 150 mmTee All Flange CI Ø 150-100-150 mmTee All Flange CI Ø 200-100-200 mmTee All Flange CI Ø 200-150-200 mmTee All Flange CI Ø 200-200-200 mm

Page 5: RENCANA ANGGARAN BIAYA.xls

DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KOTA LANGSA

Page 6: RENCANA ANGGARAN BIAYA.xls

DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KOTA LANGSA

M112 Bh 425,000.00 M113 M' 41,578.00 M114 M' 70,495.00 M115 M' 132,932.50 M116 M' 195,370.00 M117 M' 307,188.00 M118 Bh 56,528.00 M119 Bh 62,528.00 M120 Bh 68,507.00 M121 Bh 93,723.00 M122 Bh 96,111.00 M123 Bh 99,871.00 M124 Bh 117,219.00 M125 Bh 274,733.00 M126 Bh 290,533.00 M127 Bh 335,333.00 M128 Bh 390,532.00 M129 Bh 586,300.00 M130 Bh 629,200.00 M131 Bh 1,015,938.00 M132 Bh 1,206,693.00 M133 Bh 27,214.00 M134 Bh 96,428.00 M135 Bh 199,675.00 M136 Bh 302,922.00 M137 Bh 102,185.00 M138 Bh 122,863.00 M139 Bh 294,691.50 M140 Bh 466,520.00 M141 Bh 64,228.00 M142 Bh 337,425.00 M143 Bh 337,425.00 M144 Bh 60,324.00 M145 Bh 81,133.00 M146 Bh 275,088.00 M147 Bh 339,546.00 M148 Bh 1,800,000.00 M149 Bh 2,160,000.00 M150 Street Box Bh 225,000.00 M151 Water Meter Box Bh 5,000,000.00 M152 Bh 28,269,400.00 M153 Bh 15,471,000.00

Wall Flange Ø 200 mm

Pipa PVC RRJ S 12.5 ¢ 75 mmPipa PVC RRJ S 12.5 ¢ 100 mmPipa PVC RRJ S 12.5 ¢ 150 mmPipa PVC RRJ S 12.5 ¢ 200 mmPipa PVC RRJ S 12.5 ¢ 250 mmBend 11.25° PVC Ø 75 mmBend 45° PVC Ø 75 mmBend 90° PVC Ø 75 mmBend 11.25° PVC Ø 100 mmBend 22.5° PVC Ø 100 mmBend 45° PVC Ø 100 mmBend 90° PVC Ø 100 mmBend 11.25° PVC Ø 200 mmBend 22.5° PVC Ø 200 mmBend 45° PVC Ø 200 mmBend 90° PVC Ø 200 mmBend 11.25° PVC Ø 250 mmBend 22.5° PVC Ø 250 mmBend 45° PVC Ø 250 mmBend 90° PVC Ø 250 mmDop PVC Ø 75 mmDop PVC Ø 100 mmDop PVC Ø 150 mmDop PVC Ø 200 mmFlange Socket PVC Ø 75 mmFlange Socket PVC Ø 100 mmFlange Socket PVC Ø 150 mmFlange Socket PVC Ø 200 mmReducer PVC Ø 100-75 mmReducer PVC Ø 200-75 mmReducer PVC Ø 200-100 mmSocket PVC Ø 75 mmSocket PVC Ø 100 mmSocket PVC Ø 200 mmTee PVC Ø 100-100-100 mmTee PVC Ø 200-100-200 mmTee PVC Ø 200-200-200 mm

Meter Air Ø 300 mmMeter Air Ø 150 mm

Page 7: RENCANA ANGGARAN BIAYA.xls

DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

KOTA LANGSA

No. Uraian Jenis Satuan Harga (Rp)

C. SEWA ALATA01 Alat Pengetesan Pipa Hk 75,000.00 A02 Jack Hammer Hk 150,000.00 A03 Concrete Mixer dan Vibrator Hk 100,000.00 A04 Stamper Hk 150,000.00 A05 Excavator Jam 343,208.28 A06 Buldozer Jam 547,125.46 A07 Vibro roller Jam 267,913.36 A08 Mesin Las Hk 100,000.00 A09 Alat Bantu Perpipaan (tracker & katrol) Hk 50,000.00

Page 8: RENCANA ANGGARAN BIAYA.xls

PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA

Page 9: RENCANA ANGGARAN BIAYA.xls

PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan EXCAVATOR 80-140 HP A05 2. Tenaga Pw 80.0 HP 3. Kapasitas Cp 0.5 M3 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 770,000,000 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 2,000 Jam Alat Baru c. Harga Alat (*) B' 770,000,000 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 77,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -(1 + i)^A' - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B' - C ) x D E 115,862.57 Rupiah

W'

b. Asuransi, dll = 0.002 x B' F 770.00 RupiahW'

Biaya Pasti per Jam = ( E + F ) G 116,632.57 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 97,200.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 43,440.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 57,750.00 Rupiah perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 17,471.43 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 226,575.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 343,208.28 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 20.00 % / Tahun 2. Upah Operator / Sopir U1 17,471.43 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam 4. Bahan Bakar Bensin Mb 8,100.00 Liter 5. Bahan Bakar Solar Ms 8,100.00 Liter 6. Minyak Pelumas Mp 36,200.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 10: RENCANA ANGGARAN BIAYA.xls

PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN 1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. A07 2. Tenaga Pw 75.0 HP 3. Kapasitas Cp 7.0 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam c. Harga Alat B 431,200,000 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat b. Jam Kerja Dalam 1 Tahun W' 1,280 Jam Sewa Alat c. Harga Alat (*) B' 287,466,667 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 43,120,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -(1 + i)^A' - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B' - C ) x D E 73,740.98 Rupiah

W'

b. Asuransi, dll = 0.002 x B' F 449.17 RupiahW'

Biaya Pasti per Jam = ( E + F ) G 74,190.15 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 91,125.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 40,725.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 33,687.50 Rupiah perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 17,471.43 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 193,723.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 267,913.36 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 20.00 % / Tahun 2. Upah Operator / Sopir U1 17,471.43 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam 4. Bahan Bakar Bensin Mb 8,100.00 Liter 5. Bahan Bakar Solar Ms 8,100.00 Liter 6. Minyak Pelumas Mp 36,200.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 11: RENCANA ANGGARAN BIAYA.xls

PERHITUNGAN PRODUKSI ALAT

1. BULDOZER

Kapasitas bucket = 4.40 m3Beban = 4.4 x 1.65 = 7.26 tonKoefisien traksi = 0.7Reaksi kritis = 0.7 x 7.26 = 5.08 tonKecepatan maju = 4.7 km/jam = 78.33 m/menitKecepatan mundur = 5.5 km/jam = 91.67 m/menitJarak dorong rata-rata = 50.00 mWaktu maju (Wp) = 0.64 menitWaktu mundur (Wj) = 0.55 menitWaktu buang/pindah, dll = 0.30 menitTotal waktu (Ws) = 1.48 menitTrip perjam = 40.44 tripProduksi maks. alat = 4.4 x 40.44 = 177.93 m3

Faktor koreksi (Fk)Efisiensi kerja siang (a) = 0.75Ketrampilan operator (b) = 0.75Cuaca cerah (C) = 0.90Cara kerja (d) = 0.90Kekerasan tanah (e) = 0.75Total Fk = a x b x c x d x e = 0.34Taksiran produksi = 177.93 x 0.34 = 60.80 m3/jamDibulatkan 61.00 m3/jam

1 m3 tanah diperlukan faktor alat (buldozer) = 0.0164 jam1 m2 tanah diperlukan faktor alat (buldozer) = 0.0049 jam = 203.33 m2/jam1 Ha tanah diperlukan faktor alat (buldozer) = 49.1803 jam

= 0.0203 Ha/jam

Sumber : Hasil Perhitungan

2. EXCAVATOR

Kapasitas bucket = 0.80 m3Beban = 0.8 x 1.65 = 1.32 tonBerat excavator = 18.50 tonBerat total = 19.82 tonKoefisien traksi = 0.55Reaksi kritis = 0.55 x 19.82 = 10.90 tonKecepatan maju = - km/jam = - m/menitKecepatan mundur = - km/jam = - m/menitJarak dorong rata-rata = - mWaktu maju (Wp) = - menitWaktu mundur (Wj) = - menitWaktu buang/pindah, dll = 0.62 menitTotal waktu (Ws) = 0.62 menitTrip perjam = 96.77 tripProduksi maks. alat = 0.8 x 96.77 = 77.42 m3

Faktor koreksi (Fk)Efisiensi kerja siang (a) = 0.80Ketrampilan operator (b) = 0.80Cuaca cerah (C) = 0.90Faktor muat (d) = 0.90Kekerasan tanah (e) = -Total Fk = a x b x c x d = 0.52Taksiran produksi = 77.42 x 0.52 = 40.13 m3/jamDibulatkan 40.00 m3/jam

1 m3 tanah diperlukan faktor alat (buldozer) = 0.0250 jam1 m2 tanah diperlukan faktor alat (buldozer) = 0.0075 jam = 133.33 m2/jam1 Ha tanah diperlukan faktor alat (buldozer) = 75.0000 jam

= 0.0133 Ha/jam1 m3 tanah diperlukan faktor alat (excavator) = 0.0250 jam

Sumber : Hasil Perhitungan

Page 12: RENCANA ANGGARAN BIAYA.xls

PERHITUNGAN PRODUKSI ALAT

3. VIBRATOR ROLLER

Kecepatan alat (V) = 3.00 km/jamLebar efektif pemadatan (B) = 1.10 mEffisiensi (E) = 0.80Faktor kembang (Fk) = 1.20Tebal hamparan (t) = 0.30 mJumlah lintasan (N) = 10.00

Produksi alat = (V x B x t x E) / (N x Fk) = 66.00 m3/jam

1 m3 tanah diperlukan faktor alat (Vibrator roller) = 0.0152 jam

Sumber : Hasil Perhitungan

Page 13: RENCANA ANGGARAN BIAYA.xls

PEMERINTAH ACEHDINAS BINA MARGA DAN CIPTA KARYA

Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915

BIDANG PROGRAM DAN PELAPORANPERENCANAAN PENGEMBANGAN INFRASTRUKTUR

ENGINEER ESTIMATE (EE)

KONSULTAN PERENCANA

A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA -

SMA 2 LANGSA

Page 14: RENCANA ANGGARAN BIAYA.xls

PEMERINTAH ACEHDINAS BINA MARGA DAN CIPTA KARYA

Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915

CV. ZIYAD IDOLA CONSULTANTKONSULTAN PERENCANAAN UMUM DAN PENGAWASAN

Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh

Page 15: RENCANA ANGGARAN BIAYA.xls

PEMERINTAH ACEHDINAS BINA MARGA DAN CIPTA KARYA

Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915

BIDANG PROGRAM DAN PELAPORANPERENCANAAN PENGEMBANGAN INFRASTRUKTUR

ENGINEER ESTIMATE (EE)

NOMOR KONTRAK : 07-AC/CTR/BPP.P-OTSUS/DBC/APBA/2010TANGGAL : 20 MEI 2010PEKERJAAN : Perencanaan Pengembangan Infrastruktur (KOTA LANGSA)KODE PAKET : PR INFRA 13/2010NILAI KONTRAK : Rp. 162.923.000,-NILAI KONTRAK FISIK : Rp. 6.447.585.000,-SUMBER DANA : OTSUSDPA SKPA : TAHUN ANGGARAN 2010

KONSULTAN PERENCANA

CV. ZIYAD IDOLA CONSULTANTKONSULTAN PERENCANAAN UMUM DAN PENGAWASAN

Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh

Page 16: RENCANA ANGGARAN BIAYA.xls

REKAPITULASI TOTAL

KEGIATAN : PERENCANAAN PENGEMBANGAN INFRASTRUKTUR (KOTA LANGSA) LOKASI : KOTA LANGSATAHUN ANGGARAN : 2010

NO. U R A I A N TOTAL HARGA (Rp.)

A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA-SMA2

LANGSA Rp. 2,370,121,110.20

B. SISTEM DRAINASE KOMPLEK PERUMAHAN SUNGAI PAOH KECAMATAN

LANGSA BARAT Rp. 3,491,320,400.74

TOTAL Rp. 5,861,441,510.94

PPn 10% Rp. 586,144,151.09

JUMLAH SELURUHNYA Rp. 6,447,585,662.03

DIBULATKAN Rp. 6,447,585,000.00

Terbilang : Enam Milyar Empat Ratus Empat Puluh Tujuh Juta Lima Ratus Delapan Puluh Lima Ribu Rupiah,-

Disetujui Oleh : Banda Aceh, September 2010Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Perencana,Perencanaan Pengembangan Infrastruktur CV. ZIYAD IDOLA CONSULTANTDinas Bina Marga dan Cipta Karya Aceh

Mawaddah Noer, ST Abdullah, STNip. 197404142006042002 Direktur

Mengetahui ;Kepala Bidang Program dan Pelaporan

Dinas Bina Marga dan Cipta Karya Kuasa Pengguna Anggaran / Kuasa Pengguna Barang

Ir. Mohd. Sanusi, M.SiPembina Tk. I / Nip. 19560707 198703 1 002

Page 17: RENCANA ANGGARAN BIAYA.xls

DAFTAR KUANTITAS DAN HARGA

Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa BaratPekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Lokasi : Kecamatan Langsa Barat, Kota LangsaTahun Anggaran : 2010

NO. URAIAN PEKERJAAN SATHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)1 2 3 4 6 7 = 4 x 6

I. PEKERJAAN PERSIAPAN

1 Mobilisasi dan Demobilisasi Ls 1.00 A.1 21,000,000.00 21,000,000.00

2 Pembersihan Lapangan Ls 1.00 Taksir 2,000,000.00 2,000,000.00

3 Dewatering Ls 1.00 Taksir 6,500,000.00 6,500,000.00

4 Sewa Direksi Keet Unit 1.00 Taksir 2,000,000.00 2,000,000.00

5 Papan Nama Proyek Unit 1.00 Taksir 750,000.00 750,000.00

6 Adm. / Gbr. Lap / Dok. / Pas. Profil Ls 1.00 Taksir 4,500,000.00 4,500,000.00

36,750,000.00

II. PEKERJAAN TANGGUL BANJIR

1 Timbunan Tanah Didatangkan dan

dipadatkan dengan Alat Berat 3,099.57 B.6 156,697.00 485,693,320.29

2 Pasangan Gebalan Rumput 3,334.38 B.8 42,535.00 141,827,853.30

627,521,173.59

III. PEKERJAAN SALURAN DRAINASE

1 Galian Tanah Biasa 2,057.62 B.2 48,434.00 99,658,767.08

2 Timbunan Tanah Hasil Galian 685.87 1/3 x B.2 16,144.67 11,073,196.34

3 Urugan Pasir 62.16 B.7 150,733.00 9,369,563.28

4 Pasangan Batu Kosong (aanstamping) 248.65 D.2 364,629.00 90,665,000.85

5 Beton Tumbuk Lantai Kerja K.100 62.16 C.1 598,775.00 37,219,854.00

6 Beton Struktur K.225 420.43 C.3 1,184,505.00 498,001,437.15

7 Pekerjaan Besi Kg 44,035.67 C.4 18,165.00 799,907,945.55

8 Bekisting 2,179.31 C.7 511,321.00 1,114,326,968.51

9 Pipa Drain Hole PVC dia. 1 1/2" Bh 457.00 D.5 22,501.00 10,282,957.00

2,670,505,689.76

IV. PEKERJAAN PINTU AIR (1 UNIT)

1 Galian Tanah Biasa 19.78 B.2 48,434.00 958,024.52

2 Timbunan Tanah Hasil Galian 4.95 1/3 x B.2 16,144.67 79,835.38

3 Urugan Pasir 8.71 B.7 150,733.00 1,312,884.43

4 Pasangan Batu Kosong (aanstamping) 17.42 D.2 364,629.00 6,351,837.18

5 Beton Tumbuk Lantai Kerja K.100 8.35 C.1 598,775.00 4,999,771.25

6 Beton Cor K.175 15.68 C.2 739,466.00 11,594,826.88

7 Beton Struktur K.225 31.02 C.3 1,184,505.00 36,743,345.10

8 Pekerjaan Besi Kg 842.66 C.4 18,165.00 15,306,918.90

9 Bekisting 123.75 C.7 511,321.00 63,275,973.75

10 M' 20.00 M49 96,006.00 1,920,120.00

11 Pintu Air Sorong (B = 0,7 H = 1,0) Set 2.00 M47 3,000,000.00 6,000,000.00

12 Pintu Air Koklep (B = 0,7 H = 1,25) Set 2.00 M48 4,000,000.00 8,000,000.00

156,543,537.39

KUANTITAS KODE ANALISA

Jumlah Harga Pekerjaan I (dipindah ke lembar Rekapitulasi)

M3

M2

Jumlah Harga Pekerjaan II (dipindah ke lembar Rekapitulasi)

M3

M3

M3

M3

M3

M3

M2

Jumlah Harga Pekerjaan III (dipindah ke lembar Rekapitulasi)

M3

M3

M3

M3

M3

M3

M3

M2

Pipa Sandaran Galvanis Ø3"

Jumlah Harga Pekerjaan IV (dipindah ke lembar Rekapitulasi)

Page 18: RENCANA ANGGARAN BIAYA.xls

DAFTAR KUANTITAS DAN HARGA

Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa BaratPekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Lokasi : Kecamatan Langsa Barat, Kota LangsaTahun Anggaran : 2010

NO. URAIAN PEKERJAAN SATHARGA JUMLAHSATUAN HARGA

(Rp) (Rp)1 2 3 4 6 7 = 4 x 6

KUANTITAS KODE ANALISA

REKAPITULASIDAFTAR KUANTITAS DAN HARGA

Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa BaratPekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Lokasi : Kecamatan Langsa Barat, Kota LangsaTahun Anggaran : 2010

NO. URAIAN PEKERJAANJUMLAHHARGA KET.

(Rp)1 2 3 4

I. PEKERJAAN PERSIAPAN 36,750,000.00

II. PEKERJAAN TANGGUL BANJIR 627,521,173.59

III. PEKERJAAN SALURAN DRAINASE 2,670,505,689.76

IV. PEKERJAAN PINTU AIR (1 UNIT) 156,543,537.39

A. Jumlah Harga 3,491,320,400.74

B. Pajak Pertambahan Nilai (PPn) = 10 % (A) 349,132,040.07

C. Jumlah (A) + (B) 3,840,452,440.81

D. DIBULATKAN 3,840,452,000.00

Terbilang : Tiga Milyar Delapan Ratus Empat Puluh Juta Empat Ratus Lima Puluh Dua Ribu Rupiah,-

Page 19: RENCANA ANGGARAN BIAYA.xls

ENGINEER'S ESTIMATE

KEGIATAN : PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA

PEKERJAAN : INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA

LOKASI : KOTA LANGSA

TAHUN ANGGARAN : 2010

No URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA

HARGA JUMLAH

SATUAN HARGA

(Rp) (Rp)

1 2 3 4 5 6 7

A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH -

LANGSA LAMA - SMA 2 LANGSA

I. PEKERJAAN PERSIAPAN

1 Direksi keet (sewa) 1.000 Ls Ditaksir 3,000,000.00 3,000,000.00

2 Pembersihan Lokasi Pekerjaan 1.000 Ls Ditaksir 1,700,000.00 1,700,000.00

3 Pematokan/Pengukuran (setting out) 1.000 Ls Ditaksir 4,850,000.00 4,850,000.00

4 Mobilisasi dan Demobilisasi 1.000 Ls Ditaksir 5,000,000.00 5,000,000.00

5 Administrasi, Dokumentasi dan Pelaporan 1.000 Ls Ditaksir 2,500,000.00 2,500,000.00

6 Papan Nama Proyek 1.000 Ls Ditaksir 750,000.00 750,000.00

7 Gambar Pekerjaan Selesai (As Built Drawing) 1.000 Ls Ditaksir 3,000,000.00 3,000,000.00

Jumlah (I) 20,800,000.00

II. PENGADAAN PIPA

1 Pengadaan Pipa GIP Panjang efektif 6 m'/batang

- Pipa GIP dia. 150 mm 27.000 M' M51 272,689.50 7,362,616.50

- Pipa GIP dia. 200 mm 202.000 M' M52 344,433.00 69,575,466.00

2 Pipa PVC lengkap dengan Rubber Ring Joint

Panjang efektif 6 m'/batang (seri S-12,5)

- Pipa PVC dia. 200 mm 4,002.000 M' M116 195,370.00 781,870,740.00

- Pipa PVC dia. 150 mm 515.000 M' M115 132,932.50 68,460,237.50

- Pipa PVC dia. 100 mm 95.000 M' M114 70,495.00 6,697,025.00

Jumlah (II) 933,966,085.00

III. PENGADAAN ASESORIES

(Lengkap dengan Baut, Mur, Rubber Ring dan Gasket)

1 Tee RRJ GIP dia. 150 mm 1.00 Bh M104 972,162.00 972,162.00

2 Bend GIP dia. 200 mm x 90 1.00 Bh M67 708,768.00 708,768.00

3 5.00 Bh M128 390,532.00 1,952,660.00

4 8.00 Bh M127 335,333.00 2,682,664.00

5 3.00 Bh M126 290,533.00 871,599.00

6 Gate Valve GIP dia. 200 mm 1.00 Bh M94 2,822,393.00 2,822,393.00

7 Gate Valve GIP dia. 150 mm 2.00 Bh M93 1,702,905.00 3,405,810.00

8 Flange Socket PVC dia. 200 mm 11.00 Bh M140 466,520.00 5,131,720.00

9 Flange Socket PVC dia. 150 mm 9.00 Bh M139 294,691.50 2,652,223.50

10 Flange Socket GIP dia. 200 mm 8.00 Bh M84 590,392.00 4,723,136.00

11 Flange Socket GIP dia. 150 mm 10.00 Bh M85 419,400.00 4,194,000.00

12 Loos Flange GIP dia. 200 mm 10.00 Bh M89 164,500.00 1,645,000.00

13 Loos Flange GIP dia. 150 mm 10.00 Bh M88 110,700.00 1,107,000.00

14 Dop PVC dia. 150 mm 1.000 Bh M135 199,675.00 199,675.00

Jumlah (III) 33,068,810.50

IV. PEMASANGAN PIPA

1 Pekerjaan Tanah

a. Galian Tanah 2,523.760 B.3 52,334.00 132,078,455.84

b. Urugan Kembali 2,092.685 1/3 x B3 17,444.67 36,506,192.26

c. Urugan Pasir 258.180 B.7 150,733.00 38,916,245.94

2 Pekerjaan Beton

- Beton Cor K175 (trust block) 2.400 C.2 739,466.00 1,774,718.40

3 Pipa PVC lengkap dengan Rubber Ring Joint

Panjang efektif 6 m'/batang (seri S-12,5)

a - Pipa PVC dia. 200 mm 4,002.000 M' E.4 23,413.00 93,698,826.00

b - Pipa PVC dia. 150 mm 515.000 M' E.3 19,514.00 10,049,710.00

4 Pengetesan Aliran Pipa 4,517.000 Ls (E.12+E.13)/2 5,623.50 25,401,349.50

Bend PVC dia. 200 mm x 90º

Bend PVC dia. 200 mm x 45º

Bend PVC dia. 200 mm x 22.5º

Page 20: RENCANA ANGGARAN BIAYA.xls

Jumlah (IV) 338,425,497.94

Page 21: RENCANA ANGGARAN BIAYA.xls

No URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA

HARGA JUMLAH

SATUAN HARGA

(Rp) (Rp)

1 2 3 4 5 6 7

V. PERLINTASAN PIPA

1 Perlintasan Pipa dia. 200 mm (5 unit) ### - Pipa GIP dia. 200 mm 32.000 M' M52 344,433.00 11,021,856.00

Asesories :

- Flange GIP dia. 200 mm 8.000 Bh M83 200,000.00 1,600,000.00

- Flange GIP dia. 150 mm 8.000 Bh M82 165,000.00 1,320,000.00

- Tee GIP dia. 150 x 150 x 150 mm 1.000 Bh M104 972,162.00 972,162.00

1.000 Bh M94 2,822,393.00 2,822,393.00

1.000 Bh M93 1,702,905.00 1,702,905.00

8.000 Bh M66 626,325.00 5,010,600.00

- Los Flange GIP dia. 200 mm 12.000 Bh M89 164,500.00 1,974,000.00

- Flange Socket PVC RRJ dia. 200 mm 4.000 Bh M140 466,520.00 1,866,080.00

- Baut dan Mur Ring Flange dia. 200 mm 2.000 Set M97 137,500.00 275,000.00

- Trust Block 0.600 C.2 739,466.00 443,679.60

- Clamp dia. 200 mm dan Angker Bolt+Mur+Ring 10.000 Set M74 250,098.00 2,500,980.00

- Pabrikasi dan Pemasangan Perlintasan Jalan Pipa 5.000 Unit Ditaksir 8,500,000.00 42,500,000.00

(termasuk galian dan urugan)

2 Perlintasan Pipa dia. 150 mm (4 unit) ### - Pipa GIP dia. 150 mm 27.000 M' M51 272,689.50 7,362,616.50

Asesories :

12.000 Bh M64 442,349.00 5,308,188.00

- Los Flange GIP dia. 150 mm 6.000 Bh M88 110,700.00 664,200.00

- Flange Socket PVC RRJ dia. 150 mm 2.000 Bh M139 294,691.50 589,383.00

- Baut dan Mur Ring Flange dia. 150 mm 1.000 Set M96 127,600.00 127,600.00

- Trust Block 0.480 C.2 739,466.00 354,943.68

- Clamp dia. 150 mm dan Angker Bolt+Mur+Ring 8.000 Set M75 131,276.00 1,050,208.00

- Pabrikasi dan Pemasangan Perlintasan Jalan Pipa 4.000 Unit Ditaksir 7,000,000.00 28,000,000.00

(termasuk galian dan urugan)

Jumlah (V) 117,466,794.78

- Gate Valve CI dia. 200 mm x 90º

- Gate Valve CI dia. 150 mm x 90º

- Bend CI dia. 200 mm x 45º

- Bend CI dia. 150 mm x 45º

Page 22: RENCANA ANGGARAN BIAYA.xls

No URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA

HARGA JUMLAH

SATUAN HARGA

(Rp) (Rp)

1 2 3 4 5 6 7

VI. PEMBUATAN JEMBATAN PIPA (3 UNIT) + PERLINTASAN (1 UNIT)

1 Pekerjaan Tanah

- Galian Tanah 50.655 B.3 52,334.00 2,650,978.77

- Urugan Kembali 12.664 1/3 x B3 17,444.67 220,914.90

- Urugan Pasir 1.620 B.7 150,733.00 244,187.46

2 Pekerjaan Pasangan/Beton

- Pasangan Batu Kosong 1.620 D.2 364,629.00 590,698.98

- Beton Cor Lantai K100 0.810 C.1 598,775.00 485,007.75

- Beton Bertulang K225 24.696 C.3 1,184,505.00 29,252,535.48

- Pembesian 798.360 Kg C.4 18,165.00 14,502,209.40

- Bekisting Pondasi 31.740 C.6 194,462.00 6,172,223.88

3 Pemasangan Pipa dan Asesories

A. Pemasangan Pipa Jembatan

- Pipa PVC dia. 100 mm 144.000 M' M114 70,495.00 10,151,280.00

- Pipa GIP dia. 200 mm 92.000 M' M52 344,433.00 31,687,836.00

- Pipa GIP dia. 150 mm 102.000 M' ###

B. Asesories

- Flange Socket GIP dia. 200 mm 3.000 Bh M84 590,392.00 1,771,176.00

- Flange Socket GIP dia. 150 mm 5.000 Bh M85 419,400.00 2,097,000.00

- Flange Socket GIP dia. 100 mm 4.000 Bh M86 248,408.00 993,632.00

- Gate Valve CI dia. 200 mm 2.000 Bh M94 2,822,393.00 5,644,786.00

- Gate Valve CI dia. 150 mm 3.000 Bh M93 1,702,905.00 5,108,715.00

- Gate Valve CI dia. 100 mm 4.000 Bh M92 855,754.00 3,423,016.00

- Street Block 4.000 Bh M150 225,000.00 900,000.00

- Tee GIP dia. 200 - 100 - 200 mm 2.000 Bh M106 1,069,378.00 2,138,756.00

- Tee GIP dia. 150 - 100 - 150 mm 3.000 Bh M107 972,162.00 2,916,486.00

- Angker Bolt D22+Mur+Ring 36.000 Bh M02 42,000.00 1,512,000.00

- Bar Pengaman 8.000 Set M03 1,200,000.00 9,600,000.00

5.000 Bh M66 626,325.00 3,131,625.00

9.000 Bh M64 442,349.00 3,981,141.00

4.000 Bh M63 258,373.00 1,033,492.00

2.000 Bh M54 1,854,412.00 3,708,824.00

3.000 Bh M56 3,384,171.00 10,152,513.00

- Base Plat 16 mm 6.000 Bh M12 170,000.00 1,020,000.00

- Baja Profil H.70.30.1,3.2,4 15,540.000 Kg M04 28,300.00 439,782,000.00

- Baut dan Mur Steel 1 1/2" 42.000 Set M10 22,000.00 924,000.00

- Los Flange GIP dia. 200 mm 10.000 Bh M89 164,500.000 1,645,000.00

- Los Flange GIP dia. 150 mm 19.000 Bh M88 110,700.000 2,103,300.00

- Los Flange GIP dia. 100 mm 7.000 Bh M87 56,900.000 398,300.00

- Trust Block 0.960 C.2 739,466.00 709,887.36

- Pabrikasi dan Pemasangan Perlintasan Pipa Jembatan 4.000 Unit Ditaksir 12,000,000.00 48,000,000.00

Jumlah (VI) 648,653,521.98

VII. PEKERJAAN LAIN-LAIN

1 Pengadaan dan Pemasangan Pompa Centrifugal (termasuk panel, Instalasi

dan Asesories) dengan spesifikasi :

a. Pompa kapasitas 60 ltr/det, Head = 40 meter/37,5 kw/2900-3000 rpm 1.000 Unit Ditaksir 78,000,000.00 78,000,000.00

b. Pompa kapasitas 50 ltr/det, Head = 40 meter/30 kw/2900-3000 rpm 1.000 Unit Ditaksir 64,000,000.00 64,000,000.00

c. Pompa kapasitas 20 ltr/det, Head = 40 meter/18,5 kw/2900-3000 rpm 2.000 Unit Ditaksir 46,000,000.00 92,000,000.00

2 Pengadaan dan Pemasangan Meter air :

1.000 Unit M152 28,269,400.00 28,269,400.00

1.000 Unit M153 15,471,000.00 15,471,000.00

Jumlah (VII) 277,740,400.00

M2

- Bend CI dia. 200 mm x 45º

- Bend CI dia. 150 mm x 45º

- Bend CI dia. 100 mm x 45º

- Air Realease CI Ø 50 mm- Air Realease CI Ø 100 mm

a. Meter air Ø 300 mmb. Meter air Ø 300 mm

Page 23: RENCANA ANGGARAN BIAYA.xls

REKAPITULASIDAFTAR KUANTITAS DAN HARGA

KEGIATAN : PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA

PEKERJAAN : INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA

LOKASI : KOTA LANGSA

TAHUN ANGGARAN : 2010

NO. URAIAN PEKERJAAN

1 2

A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA

I. PEKERJAAN PERSIAPAN 20,800,000.00

II. PENGADAAN PIPA 933,966,085.00

III. PENGADAAN ASESORIES 33,068,810.50

IV. PEMASANGAN PIPA 338,425,497.94

V. PERLINTASAN PIPA 117,466,794.78

VI. PEMBUATAN JEMBATAN PIPA (3 UNIT) + PERLINTASAN (1 UNIT) 648,653,521.98

VII. PEKERJAAN LAIN-LAIN 277,740,400.00

A. Jumlah Harga 2,370,121,110.20

B. Pajak Pertambahan Nilai (PPn) = 10 % (A) 237,012,111.02

C. Jumlah (A) + (B) 2,607,133,221.22

D. DIBULATKAN 2,607,133,000.00

Terbilang : Dua Milyar Enam Ratus Tujuh Juta Seratus Tiga Puluh Tiga Ribu Rupiah,-

JUMLAH HARGA (Rp.)

KET

Page 24: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : MOBILISASI/DEMOBILISASISATUAN PEKERJAAN : LSKODE ANALISA : A.1

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A MOBILISASI ALAT & PERSONIL1 Excavator bh 1.000 3,500,000.00 3,500,000.00 2 Buldozer bh 1.000 3,500,000.00 3,500,000.00 3 Vibro roller bh 1.000 3,500,000.00 3,500,000.00 45

B DEMOBILISASI ALAT & PERSONIL1 Excavator bh 1.000 3,500,000.00 3,500,000.00 2 Buldozer bh 1.000 3,500,000.00 3,500,000.00 3 Vibro roller bh 1.000 3,500,000.00 3,500,000.00 45

Jumlah (termasuk biaya umum dan keuntungan) 21,000,000.00 Harga pekerjaan (diluar PPN) 21,000,000.00 Jumlah dibulatkan 21,000,000.00

Sumber : Hasil Perhitungan

Page 25: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : PASANGAN BATU 1 : 4 (TERMASUK SIAR 1 : 3)SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 1.5000 49,700.00 74,550.00 2 Tukang OH 0.6000 78,700.00 47,220.00 3 Kepala Tukang OH 0.0600 94,500.00 4 Mandor OH 0.0750 82,300.00 6,172.50

B B A H A N1 PC kg 163.0000 1,257.50 204,972.50 2 Batu Kali m3 1.2000 202,800.00 243,360.00 3 Pasir Pasang m3 0.5200 129,600.00 67,392.00

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 643,667.00 Harga pekerjaan (diluar PPN) 643,667.00 Jumlah dibulatkan 643,667.00

JENIS PEKERJAAN : PASANGAN BATU KOSONG (AANSTAMPING)SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.7800 49,700.00 38,766.00 2 Tukang OH 0.3900 78,700.00 30,693.00 3 Kepala Tukang OH 0.0390 94,500.00 4 Mandor OH 0.0390 82,300.00 3,209.70

B B A H A N1 Batu Kali m3 1.2000 202,800.00 243,360.00 2 Pasir Urug m3 0.4320 112,500.00 48,600.00

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 364,628.70 Harga pekerjaan (diluar PPN) 364,628.70 Jumlah dibulatkan 364,629.00

Page 26: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : PLESTERAN 1 : 3SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.2000 49,700.00 9,940.00 2 Tukang OH 0.1500 78,700.00 11,805.00 3 Kepala Tukang OH 0.0150 94,500.00 4 Mandor OH 0.0100 82,300.00 823.00

B B A H A N1 PC kg 7.7760 1,257.50 9,778.32 2 Pasir Pasang m3 0.0230 129,600.00 2,980.80 3

C PERALATAN1 -

Jumlah (termasuk biaya umum dan keuntungan) 35,327.12 Harga pekerjaan (diluar PPN) 35,327.12 Jumlah dibulatkan 35,327.00

JENIS PEKERJAAN : PLESTERAN 1 : 4SATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.2000 49,700.00 9,940.00 2 Tukang OH 0.1500 78,700.00 11,805.00 3 Kepala Tukang OH 0.0150 94,500.00 4 Mandor OH 0.0100 82,300.00 823.00

B B A H A N1 PC kg 6.2400 1,257.50 7,846.80 2 Pasir Pasang m3 0.0240 129,600.00 3,110.40 3

C PERALATAN1 -

Jumlah (termasuk biaya umum dan keuntungan) 33,525.20 Harga pekerjaan (diluar PPN) 33,525.20 Jumlah dibulatkan 33,525.00

Page 27: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : GALIAN TANAH BIASA SEDALAM 1 METERSATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.7500 49,700.00 37,275.00 2 Mandor OH 0.0250 82,300.00 2,057.50 3

B B A H A N1

C PERALATAN12

Jumlah (termasuk biaya umum dan keuntungan) 39,332.50 Harga pekerjaan (diluar PPN) 39,332.50 Jumlah dibulatkan 39,333.00

Sumber : Analisa SNI 2007

Page 28: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : GALIAN TANAH BIASA SEDALAM 2 METERSATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.9000 49,700.00 44,730.00 2 Mandor OH 0.0450 82,300.00 3,703.50 3

B B A H A N1

C PERALATAN12

Jumlah (termasuk biaya umum dan keuntungan) 48,433.50 Harga pekerjaan (diluar PPN) 48,433.50 Jumlah dibulatkan 48,434.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : GALIAN TANAH KERAS SEDALAM 1 METERSATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 1.0000 49,700.00 49,700.00 2 Mandor OH 0.0320 82,300.00 2,633.60 3

B B A H A N1

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 52,333.60 Harga pekerjaan (diluar PPN) 52,333.60 Jumlah dibulatkan 52,334.00

Sumber : Analisa SNI 2007

Page 29: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : GALIAN TANAH LUMPUR SEDALAM 1 METERSATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 1.2000 49,700.00 59,640.00 2 Mandor OH 0.0450 82,300.00 3,703.50 3

B B A H A N1

C PERALATAN1234

Jumlah (termasuk biaya umum dan keuntungan) 63,343.50 Harga pekerjaan (diluar PPN) 63,343.50 Jumlah dibulatkan 63,344.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : MEMADATKAN TANAH (PER 20 CM)SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.5000 49,700.00 24,850.00 2 Mandor OH 0.0500 82,300.00 4,115.00 34

B B A H A N1

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 28,965.00 Harga pekerjaan (diluar PPN) 28,965.00 Jumlah dibulatkan 28,965.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT

SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.3000 49,700.00 14,910.00 2 Mandor OH 0.0100 82,300.00 823.00 3 Operator OH 0.2905 122,300.00 35,528.15 4 Pembantu Operator OH 0.2905 75,000.00 21,787.50

Page 30: RENCANA ANGGARAN BIAYA.xls

B B A H A N1 Tanah Timbun m3 1.2000 51,700.00 62,040.00

C PERALATAN1 Excavator Jam 0.0250 343,208.28 8,580.21 2 Buldozer Jam 0.0164 547,125.46 8,969.27 3 Vibro roller Jam 0.0152 267,913.36 4,059.29

Jumlah (termasuk biaya umum dan keuntungan) 156,697.42 Harga pekerjaan (diluar PPN) 156,697.42 Jumlah dibulatkan 156,697.00

Sumber : Analisa SNI 2007

Page 31: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : TIMBUNAN PASIR URUGSATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.3000 49,700.00 14,910.00 2 Mandor OH 0.0100 82,300.00 823.00

B B A H A N1 Pasir urug m3 1.2000 112,500.00 135,000.00

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 150,733.00 Harga pekerjaan (diluar PPN) 150,733.00 Jumlah dibulatkan 150,733.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : PEKERJAAN GEBALAN RUMPUTSATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.1500 49,700.00 7,455.00 2 Mandor OH 0.0150 82,300.00 1,234.50 3 Alat bantu set 0.0125 10,000.00 125.00

B B A H A N1 Lempengan Rumput m2 1.2000 28,100.00 33,720.00

Jumlah (termasuk biaya umum dan keuntungan) 42,534.50 Harga pekerjaan (diluar PPN) 42,534.50 Jumlah dibulatkan ( B ) 42,535.00

Sumber : Hasil Perhitungan

Page 32: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : BETON K.175 (TANPA ACUAN)SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 1.6500 49,700.00 82,005.00 2 Tukang OH 0.2750 78,700.00 21,642.50 3 Kepala Tukang OH 0.0280 94,500.00 2,646.00 4 Mandor OH 0.0830 82,300.00 6,830.90 56

B B A H A N1 Pasir Beton kg 760.00 100.79 76,597.14 2 Kerikil kg 1,029.00 104.52 107,549.56 3 PC kg 326.00 1,257.50 409,945.00 4 Air Liter 215.00 150.00 32,250.00 56

C PERALATAN123

Jumlah (termasuk biaya umum dan keuntungan 739,466.10 Harga pekerjaan (diluar PPN) 739,466.10 Jumlah dibulatkan 739,466.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : BETON STRUKTUR K.225 (TANPA ACUAN)SATUAN PEKERJAAN : M3

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 1.6500 49,700.00 82,005.00 2 Tukang OH 0.2750 78,700.00 21,642.50 3 Kepala Tukang OH 0.0280 94,500.00 2,646.00 4 Mandor OH 0.0830 82,300.00 6,830.90 5

B B A H A N1 Kerikil (batu pecah 2-3 cm) kg 1,047.00 479.70 502,249.78 2 Pasir Beton kg 698.00 100.79 70,348.43 3 PC kg 371.00 1,257.50 466,532.50 4 Air Liter 215.00 150.00 32,250.00

C PERALATAN12

Jumlah (termasuk biaya umum dan keuntungan 1,184,505.11 Harga pekerjaan (diluar PPN) 1,184,505.11 Jumlah dibulatkan 1,184,505.00

Sumber : Analisa SNI 2007

Page 33: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : BESI TULANGAN POLOSSATUAN PEKERJAAN : 10 KG

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.0700 49,700.00 3,479.00 2 Tukang OH 0.0700 78,700.00 5,509.00

Kepala Tukang OH 0.0070 94,500.00 661.50 3 Mandor OH 0.0040 82,300.00 329.20

B B A H A N1 Besi beton polos kg 10.5000 16,200.00 170,100.00 2 Kawat Beton kg 0.1500 10,500.00 1,575.00

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan 181,653.70 Harga pekerjaan (diluar PPN) 181,653.70 Jumlah untuk 1 Kg Besi 18,165.37 Jumlah dibulatkan 18,165.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : BESI TULANGAN ULIRSATUAN PEKERJAAN : 10 KG

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.0700 49,700.00 3,479.00 2 Tukang OH 0.0700 78,700.00 5,509.00

Kepala Tukang OH 0.0070 94,500.00 661.50 3 Mandor OH 0.0040 82,300.00 329.20

B B A H A N1 Besi beton ulir kg 10.5000 24,800.00 260,400.00 2 Kawat Beton kg 0.1500 10,500.00 1,575.00

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan 271,953.70 Harga pekerjaan (diluar PPN) 271,953.70 Jumlah untuk 1 Kg Besi 27,195.37 Jumlah dibulatkan 27,195.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK PONDASISATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.5200 49,700.00 25,844.00 2 Tukang OH 0.2600 78,700.00 20,462.00 3 Kepala Tukang OH 0.0260 94,500.00 4 Mandor OH 0.0260 82,300.00 2,139.80

B B A H A N1 Paku kg 0.3000 11,600.00 3,480.00 2 Kayu kelas III m3 0.0400 3,553,900.00 142,156.00 3 Minyak bekisting liter 0.1000 3,800.00 380.00

C PERALATAN1 -

Page 34: RENCANA ANGGARAN BIAYA.xls

Jumlah (termasuk biaya umum dan keuntungan) 194,461.80 Harga pekerjaan (diluar PPN) 194,461.80 Jumlah dibulatkan 194,462.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK DINDINGSATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.6600 49,700.00 32,802.00 2 Tukang OH 0.3300 78,700.00 25,971.00 3 Kepala Tukang OH 0.0330 94,500.00 3,118.50 4 Mandor OH 0.0330 82,300.00 2,715.90

B B A H A N1 Paku kg 0.4000 11,600.00 4,640.00 2 Kayu kelas III m3 0.0300 3,553,900.00 106,617.00 3 Balok kayu kelas II m3 0.0200 3,926,100.00 78,522.00 4 Minyak bekisting liter 0.2000 3,800.00 760.00 5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00 6 Kayu dolken batang 3.0000 62,500.00 187,500.00 7 Formite/penjaga jarak bekisting/spacer buah 4.0000 4,000.00 16,000.00

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 511,321.40 Harga pekerjaan (diluar PPN) 511,321.40 Jumlah dibulatkan 511,321.00

Sumber : Analisa SNI 2007

JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK LANTAISATUAN PEKERJAAN : M2

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.

A TENAGA1 Pekerja OH 0.6600 49,700.00 32,802.00 2 Tukang OH 0.3300 78,700.00 25,971.00 3 Kepala Tukang OH 0.0330 94,500.00 3,118.50 4 Mandor OH 0.0330 82,300.00 2,715.90

B B A H A N1 Paku kg 0.4000 11,600.00 4,640.00 2 Kayu kelas III m3 0.0400 3,553,900.00 142,156.00 3 Balok kayu kelas II m3 0.0150 3,926,100.00 58,891.50 4 Minyak bekisting liter 0.2000 3,800.00 760.00 5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00 6 Kayu dolken batang 6.0000 62,500.00 375,000.00

-

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 698,729.90 Harga pekerjaan (diluar PPN) 698,729.90 Jumlah dibulatkan 698,730.00

Sumber : Analisa SNI 2007

Page 35: RENCANA ANGGARAN BIAYA.xls

Kebutuhan Waktu dan Tenaga untuk Pemasangan Tulangan PengelakTukanjam 0.27Besi Bkg 1.10produkg 4.12Satu hkg/hari 32.96Vol. bkg #REF!waktujam #REF!jika d hari #REF!Pekerja jam 0.13Besi Beton Ulir kg 1.10produksi 1jam tukang kg 8.27Satu hari (8 jam) kg/hari 66.17Vol. baja yang akan dikerjakan kg #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 50 orang hari #REF!Kebutuhan Waktu dan Tenaga untuk Pemasangan Bekisting dan Perancah PengelakPekerja jam 2.45Kayu acuan dan perancah m3 0.52produksi 1 jam pekerja m3/jam 0.21Satu hari (8 jam) m3/hari 1.68Vol. Bekisting dan perancah m3 #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 1 orang hari #REF!Kebutuhan Waktu dan Tenaga untuk Pemasangan Tulangan PeimpahTukanjam 0.27Besi Bkg 1.10produkg 4.12Satu hkg/hari 32.96Vol. bkg #REF!waktujam #REF!jika d hari #REF!Pekerja jam 0.13Besi Beton Ulir kg 1.10produksi 1jam tukang kg 8.27Satu hari (8 jam) kg/hari 66.17Vol. baja yang akan dikerjakan kg #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 50 orang hari #REF!Kebutuhan Waktu dan Tenaga untuk Pemasangan Bekisting dan Perancah PelimpahPekerja jam 2.45Kayu acuan dan perancah m3 0.52produksi 1 jam pekerja m3/jam 0.21Satu hari (8 jam) m3/hari 1.68Vol. Bekisting dan perancah m3 #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 1 orang hari #REF!

Page 36: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : PENGELASAN SATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Tukang OH 0.5000 49,700.00 24,850.00 2 Kepala Tukang OH 0.0210 82,300.00 1,728.30 3

B B A H A N1 Kawat Las Kg 2.3000 16,000.00 36,800.00 2 Solar Liter 0.7500 8,100.00 6,075.00

C PERALATAN1 Mesin Las (sewa) Jam 0.0710 14,285.71 1,014.29 2

Jumlah (termasuk biaya umum dan keuntungan) 70,467.59 Harga pekerjaan (diluar PPN) 70,467.59 Jumlah dibulatkan 70,468.00

Sumber : Hasil Perhitungan

Page 37: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 75 MM - 100 MMSATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.0810 49,700.00 4,025.70 2 Mandor OH 0.0041 82,300.00 337.43 3 Kepala Tukang OH 0.0135 94,500.00 1,275.75 4 Tukang OH 0.1350 78,700.00 10,624.50

B B A H A N1

C PERALATAN12

Jumlah (termasuk biaya umum dan keuntungan) 16,263.38 Harga pekerjaan (diluar PPN) 16,263.38 Jumlah dibulatkan 16,263.00

Sumber : Hasil Perhitungan

JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 150 MMSATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.0972 49,700.00 4,830.84 2 Mandor OH 0.0049 82,300.00 403.27 3 Kepala Tukang OH 0.0162 94,500.00 1,530.90 4 Tukang OH 0.1620 78,700.00 12,749.40

B B A H A N1

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 19,514.41 Harga pekerjaan (diluar PPN) 19,514.41 Jumlah dibulatkan 19,514.00

Sumber : Hasil Perhitungan

Page 38: RENCANA ANGGARAN BIAYA.xls

JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 200 MMSATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.1166 49,700.00 5,795.02 2 Tukang OH 0.1944 78,700.00 15,299.28 3 Kepala Tukang OH 0.0194 94,500.00 1,833.30 4 Mandor OH 0.0059 82,300.00 485.57

B B A H A N1

C PERALATAN1234

Jumlah (termasuk biaya umum dan keuntungan) 23,413.17 Harga pekerjaan (diluar PPN) 23,413.17 Jumlah dibulatkan 23,413.00

Sumber : Hasil Perhitungan

JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 250 MMSATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.1341 49,700.00 6,664.77 2 Mandor OH 0.2236 78,700.00 17,597.32 3 Kepala Tukang OH 0.0224 94,500.00 2,116.80 4 Mandor OH 0.0068 82,300.00 559.64

B B A H A N1

C PERALATAN1

Jumlah (termasuk biaya umum dan keuntungan) 26,938.53 Harga pekerjaan (diluar PPN) 26,938.53 Jumlah dibulatkan 26,939.00

Sumber : Hasil Perhitungan

JENIS PEKERJAAN : PEMASANGAN PIPA GSP/STEEL DIA. 75 MMSATUAN PEKERJAAN : M'

NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.

A TENAGA1 Pekerja OH 0.1080 49,700.00 5,367.60 2 Tukang OH 0.1800 78,700.00 14,166.00 3 Kepala tukang OH 0.0180 94,500.00 1,701.00 4 Mandor OH 0.0054 82,300.00 444.42

Page 39: RENCANA ANGGARAN BIAYA.xls

B B A H A N1 Pengelasan Keliling M' 0.2355 115,292.50 27,151.38

C PERALATAN1 Alat Bantu Ls 1.0000 75,000.00 75,000.00 23

Jumlah (termasuk biaya umum dan keuntungan) 123,830.40 Harga pekerjaan (diluar PPN) 123,830.40 Jumlah dibulatkan 123,830.00

Sumber : Hasil Perhitungan

Page 40: RENCANA ANGGARAN BIAYA.xls

REKAP ANALISA HARGA SATUAN PEKERJAAN

PROPINSI : ACEH

KOTA : LANGSA

TAHUN ANGGARAN : 2010

PAKET : SEKTOR AIR BERSIH DAN DRAINASE

PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE

URAIAN SATUAN

A PEKERJAAN PERSIAPAN

A.1 MOBILISASI/DEMOBILISASI LS

B PEKERJAAN TANAH

B.1 GALIAN TANAH BIASA SEDALAM 1 METER M3

B.2 GALIAN TANAH BIASA SEDALAM 2 METER M3

B.3 GALIAN TANAH KERAS SEDALAM 1 METER M3

B.4 GALIAN TANAH LUMPUR SEDALAM 1 METER M3

B.5 MEMADATKAN TANAH (PER 20 CM) M3

B.6 TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT M3

B.7 TIMBUNAN PASIR URUG M3

B.8 PEKERJAAN GEBALAN RUMPUT M2

C PEKERJAAN BETON

C.1 BETON NON STRUKTUR (K.100) M3

C.2 BETON K.175 (TANPA ACUAN) M3

C.3 BETON STRUKTUR K.225 (TANPA ACUAN) M3

C.4 BESI TULANGAN POLOS KG

C.5 BESI TULANGAN ULIR KG

C.6 ACUAN BETON/BEKISTING UNTUK PONDASI M2

C.7 ACUAN BETON/BEKISTING UNTUK DINDING M2

C.8 ACUAN BETON/BEKISTING UNTUK LANTAI M2

D PEKERJAAN PASANGAN

D.1 PASANGAN BATU 1 : 4 (TERMASUK SIAR 1 : 3) M3

D.2 PASANGAN BATU KOSONG (AANSTAMPING) M3

D.3 PLESTERAN 1 : 3 M2

D.4 PLESTERAN 1 : 4 M2

D.5 DRAIN HOLE BH

E PEKERJAAN PIPA

E.1 PENGELASAN M'

E.2 PEMASANGAN PIPA PVC DIA. 75 MM - 100 MM M'

E.3 PEMASANGAN PIPA PVC DIA. 150 MM M'

E.4 PEMASANGAN PIPA PVC DIA. 200 MM M'

E.5 PEMASANGAN PIPA PVC DIA. 250 MM M'

E.6 PEMASANGAN PIPA GSP/STEEL DIA. 75 MM M'

E.7 PEMASANGAN PIPA GSP/STEEL DIA. 100 MM M'

E.8 PEMASANGAN PIPA GSP/STEEL DIA. 150 MM M'

E.9 PEMASANGAN PIPA GSP/STEEL DIA. 200 MM M'

E.10 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 75 MM M'

E.11 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 100 MM M'

E.12 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 150 MM M'

E.13 PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 200 MM M'

Sumber : Hasil Perhitungan

KODE ANALISA

Page 41: RENCANA ANGGARAN BIAYA.xls

REKAP ANALISA HARGA SATUAN PEKERJAAN

HARGA SATUAN

Rp.

21,000,000.00

39,333.00

48,434.00

52,334.00

63,344.00

28,965.00

156,697.00

150,733.00

42,535.00

598,775.00

739,466.00

1,184,505.00

18,165.00

194,462.00

194,462.00

511,321.00

698,730.00

643,667.00

364,629.00

35,327.00

33,525.00

22,501.00

70,468.00

16,263.00

19,514.00

23,413.00

26,939.00

123,830.00

138,305.00

163,185.00

188,066.00

1,975.00

2,717.00

4,655.00

6,592.00

Page 42: RENCANA ANGGARAN BIAYA.xls

PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

PERSIAPAN LAHAN

1 hari 8 jam kerja

Waktu 7 hari kerja

56 jam kerja

Luas pembersihan 0.46 ha

Target produksi 0.008 m3/jam

Volume galian 916.80 m3

Target produksi 16.37 m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam 0.41 1

Dump truck #REF! m3/jam #REF! #REF!

Buldozer 0.0203 ha/jam 0.403 1

Sumber : Hasil Perhitungan

PEMBERSIHAN (LAND CLEARING)

1 hari 8 jam kerja

Waktu 45 hari kerja

360 jam kerja

Luas pembersihan #REF! ha

Target produksi #REF! ha/jam

Alat Produksi Jumlah alat

Buldozer 0.0203 ha/jam #REF! #REF!

Excavator 0.0133 ha/jam #REF! #REF!

Dump truck #REF! ha/jam #REF! #REF!

Sumber : Hasil Perhitungan

GALIAN TANAH DI DAERAH GENANGAN

1 hari 8 jam kerja

Waktu 60 hari kerja

480 jam kerja

Volume galian 35394.69 m3

Target produksi 73.74 m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam 1.84 2

Dump truck #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan

Page 43: RENCANA ANGGARAN BIAYA.xls

PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

TIMBUNAN KEDAP AIR DAN RANDOM DI DAERAH GENANGAN

1 hari 8 jam kerja

Waktu 75 hari kerja

600 jam kerja

Volume Timbunan #REF! m3

Target produksi #REF! m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam #REF! #REF!

Dump truck #REF! m3/jam #REF! #REF!

Bulldozer 61.00 m3/jam #REF! #REF!

Vibro roller 66.00 m3/jam #REF! #REF!

Water tanker #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan

GALIAN UNTUK INLET, SAL.PENGELAK DAN BANG. INTAKE

1 hari 8 jam kerja

Waktu 180 hari kerja

1440 jam kerja

Volume galian 155618.95 m3

Target produksi 108.07 m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam 2.70 3

Dump truck #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan

GALIAN PONDASI BENDUNGAN PENGELAK/COFFERDAM

1 hari 8 jam kerja

Waktu 7 hari kerja

56 jam kerja

Volume galian #REF! m3

Target produksi #REF! m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam #REF! #REF!

Dump truck #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan

TIMBUNAN CLAY BLANKET

1 hari 8 jam kerja

Waktu 45 hari kerja

360 jam kerja

Volume Timbunan #REF! m3

Target produksi #REF! m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam #REF! #REF!

Dump truck #REF! m3/jam #REF! #REF!

Bulldozer 61.00 m3/jam #REF! #REF!

Vibro roller 66.00 m3/jam #REF! #REF!

Page 44: RENCANA ANGGARAN BIAYA.xls

PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

Water tanker #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan

Page 45: RENCANA ANGGARAN BIAYA.xls

PERHITUNGAN PERKIRAAN KEBUTUHAN ALAT

TIMBUNAN TANAH RANDOM DI BLANKET

1 hari 8 jam kerja

Waktu 30 hari kerja

240 jam kerja

Volume Timbunan 21167.81 m3

Target produksi 88.20 m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam 2.20 3

Dump truck #REF! m3/jam #REF! #REF!

Bulldozer 61.00 m3/jam 1.45 2

Vibro roller 66.00 m3/jam 1.34 2

Water tanker #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan

PEMASANGAN RIP-RAP DI LERENG HULU COFFERDAM

1 hari 8 jam kerja

Waktu 7 hari kerja

56 jam kerja

Volume galian #REF! m3

Target produksi #REF! m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam #REF! #REF!

Dump truck #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan

GALIAN UNTUK BANG. PELIMPAH

1 hari 8 jam kerja

Waktu 90 hari kerja

720 jam kerja

Volume galian #REF! m3

Target produksi #REF! m3/jam

Alat Produksi Jumlah alat

Excavator 40.00 m3/jam #REF! #REF!

Dump truck #REF! m3/jam #REF! #REF!

Sumber : Hasil Perhitungan