REKAPITULASI ANGGARAN RENOVASI RUANG KAMAR
RUMAH JABATAN BUPATI KABUPATEN MAMUJU UTARA
NO JENIS PEKERJAAN JUMLAH HARGA
I. PEKERJAAN PERSIAPAN 8,932,500.00
II. PEKERJAAN KERAMIK 25,786,000.00
III. PEKERJAAN DINDING KAMAR 22,676,250.00
IV. PEKERJAAN PLAFOND 15,715,625.00
V. PEKERJAAN MEKANIKAL 6,565,000.00
VI. PEKERJAAN KAMAR MANDI 31,089,375.00
VII. PEKERJAAN FURNITUR 19,235,250.00
JUMLAH 130,000,000.00
ANGGARAN KOTRAKTOR 30,000,000.00
ANGGARAN PERENCANAAN 10,000,000.00
PPN 12.5% 12,150,000.00
TOTAL 182,150,000.00
7/21/2019 Rekapitulasi Anggaran Renovasi Ruang Kamar Rujab Bupati Mamuju Utara
http://slidepdf.com/reader/full/rekapitulasi-anggaran-renovasi-ruang-kamar-rujab-bupati-mamuju-utara 2/4
NO JENIS PEKERJAAN VOLUME SATUANHARGA
SATUANJUMLAH
I.PEK. PERSIAPAN 8,932,500.00
1. Pek. Bongkar Plafond 24.00m2
100,000.00 2,400,000.00
2. Pek. Bongkar dinding WC 22.50 m2
125,000.00 2,812,500.00
3. Pek. Bongkar lantai WC 8.00m2
125,000.00 1,000,000.00
4. Pek. Bongkar Lantai kamar 16.00m2
95,000.00 1,520,000.00
5. Pembersihan 24.00m2
50,000.00 1,200,000.00
II.PEKERJAAN KERAMIK 25,786,000.00
1. Pas. Lantai Keramik Wc 40x40cm 8.00m2
249,000.00 1,992,000.00
2. Keramik Dinding Cream 30x30cm 18.00m2
363,000.00 6,534,000.00
3. Keramik Dinding Gelap 30x30cm 12.00m2
363,000.00 4,356,000.00
4. Lantai Keramik Kamar 60x60 16.00m2
619,000.00 9,904,000.00
5. Upah 24.00m2
125,000.00 3,000,000.00
III.PEKERJAAN DINDING KAMAR 22,676,250.00
1. Pas. Bata Fin. Aci, Cat 1.35m2
615,000.00 830,250.00
2. Pas. Rangka Hollow 40x40x1mm 35.00Btg
90,000.00 3,150,000.00
3. Pas. Multipleks 15mm 48.00m2
167,000.00 8,016,000.00
4. Pas. Wallpaper Totem(M2502) 18.00m2
85,000.00 1,530,000.00
5. Pas. Wallpaper Totem(M228) 30.00
m2
85,000.00 2,550,000.00
6. Sekrup 5cm 4.00Pcs
100,000.00 400,000.00
7. Sekrup 2.5cm 4.00Pcs
50,000.00 200,000.00
8. Upah 48.00m2
125,000.00 6,000,000.00
7/21/2019 Rekapitulasi Anggaran Renovasi Ruang Kamar Rujab Bupati Mamuju Utara
http://slidepdf.com/reader/full/rekapitulasi-anggaran-renovasi-ruang-kamar-rujab-bupati-mamuju-utara 3/4
IV.PEKERJAAN PLAFOND 15,715,625.00
1. Pas.Rangka Hollow WC
40x40x0.6mm 36.00Btg
110,000.00 3,960,000.00
2. Pas.Rangka Hollow WC
20x40x0.6mm 34.00Btg
80,000.00 2,720,000.00
3. Pas. Gypsum 9mm 33.00m2
40,625.00 1,340,625.00
4. Pek. Finishing Cat Putih Mowilex 33.00m2
90,000.00 2,970,000.00
6. Sekrup 5cm 4.00Pcs
100,000.00 400,000.00
7. Sekrup 2.5cm 4.00Pcs
50,000.00 200,000.00
8. Upah 33.00m2
125,000.00 4,125,000.00
V.PEKERJAAN MEKANIKAL 6,565,000.00
1. Pas. Lampu Philips 7 Watt 4.00Titik
120,000.00 480,000.00
2. Pas. Lampu Philips 9 Watt 6.00Titik
160,000.00 960,000.00
3. Pas. Saklar Ilmunasi B Wide
Panasonic 5.00Titik
25,000.00 125,000.00
4. Pas. Stop Kontak Panasonic 5.00Titik
30,000.00 150,000.00
5. Kabel listrik 50.00m1
350,000.00
6. Upah 1.00Ls
4,500,000.00 4,500,000.00
VI.PEKERJAAN KAMAR MANDI 31,089,375.00
1. Westafel Toto 1.00Bh
2,307,000.00 2,307,000.00
2. Kloset Duduk Toto 1.00Bh
3,656,500.00 3,656,500.00
3. Bathub Toto 1.00Bh
9,310,000.00 9,310,000.00
4. Pas. Batu Alam 12.00m2
150,000.00 1,800,000.00
5. Pas. Dinding Kaca Tempered
10mm 6.00m2
350,000.00 2,100,000.00
6. Kran Air Toto Panas Dingin 1.00Bh
110,875.00 110,875.00
7/21/2019 Rekapitulasi Anggaran Renovasi Ruang Kamar Rujab Bupati Mamuju Utara
http://slidepdf.com/reader/full/rekapitulasi-anggaran-renovasi-ruang-kamar-rujab-bupati-mamuju-utara 4/4
7. Kran Shower Kloset Onda S 75 1.00Bh
165,000.00 165,000.00
8. Kran Shower Set Toto
Tx417sembr 1.00Bh
2,450,000.00 2,450,000.00
9. Floor Drain 2.00Bh
150,000.00 300,000.00
10. Tempat Sabun 1.00Bh
100,000.00 100,000.00
11. Tempat Tissu 1.00Bh
250,000.00 250,000.00
12. Pipa PVC 3/4" 8.00m1
120,000.00 960,000.00
13. Pipa PVC 4" 12.00m1
160,000.00 1,920,000.00
15. Upah Batu Alam 12.00m2
30,000.00 360,000.00
16. Upah Batu Alam 6.00 m2
50,000.00 300,000.00
17. Upah Plumbing 1.00Ls
5,000,000.00 5,000,000.00
VII.PEKERJAAN FURNITUR 19,235,250.00
1. Spring Bed 1.00Bh
1,250,000.00 1,250,000.00
2. Lampu Baca Hias 2.00Bh
600,000.00 1,200,000.00
3. Pek. Nakas Tempat Tidur 2.00Ls
650,000.00 1,300,000.00
4. Pek. Lemari set 5.32m2
750,000.00 3,986,250.00
5. Pas. Lampu selang led Indirect 1.00Ls
500,000.00 500,000.00
6. Led TV 32 In Samsung 1.00Bh
5,499,000.00 5,499,000.00
7. Cermin 90x100 2.00Bh
500,000.00 1,000,000.00
8. Upah 1.00Ls
4,500,000.00 4,500,000.00
TOTAL 130,000,000.00