rab rap rumah pak sony kusen rinci.xls

90
DAFTAR UPAH TENAGA KERJA RUMAH PAK SONY SEMARANG UPAH TENAGA KERJA 1 Pekerja =Rp. 40,000.00 2 Mandor =Rp. 55,000.00 3 Tukang besi, batu, kayu =Rp. 45,000.00 4 Kepala tukang batu, besi, kayu =Rp. 50,000.00

Upload: v-persie

Post on 23-Oct-2015

354 views

Category:

Documents


91 download

TRANSCRIPT

Page 1: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR UPAH TENAGA KERJARUMAH PAK SONY

SEMARANG

UPAH TENAGA KERJA1 Pekerja =Rp. 40,000.00 /hari2 Mandor =Rp. 55,000.00 /hari3 Tukang besi, batu, kayu =Rp. 45,000.00 /hari4 Kepala tukang batu, besi, kayu =Rp. 50,000.00 /hari

Page 2: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR HARGA BAHANRUMAH PAK SONY

SEMARANG

BAHAN BANGUNAN1 Tanah urug =Rp. 40,000.00 /m32 Pasir urug =Rp. 80,000.00 /m33 Pasir pasang =Rp. 135,000.00 /m34 Pasir beton (Lokal + muntilan ) =Rp. 150,000.00 /m35 Batu belah =Rp. 115,000.00 /m36 Batu bata merah =Rp. 450.00 /bh7 Spliet 2/3 =Rp. 168,000.00 /m38 Portland Cement =Rp. 48,000.00 /zak/40kg

=Rp. 1,200.00 /kg9 Paku usuk / reng =Rp. 12,500.00 /kg

10 Kawat bendrat =Rp. 20,000.00 /kg11 Besi beton polos =Rp. 9,250.00 /kg12 Kayu cetakan kayu meranti =Rp. 700,000.00 /m313 Kayu jati kelas I =Rp. 6,500,000.00 /m314 Papan kayu jati Kelas I =Rp. 7,500,000.00 /m315 Keramik 20/25 cm =Rp. 45,000.00 /m216 Keramik 20/20 cm =Rp. 42,500.00 /m217 Keramik 40/40 cm =Rp. 48,000.00 /m218 Kaca tebal 5mm =Rp. 90,000.00 /m219 Genteng Beton =Rp. 4,500.00 /bh20 Genteng Bubungan =Rp. 4,500.00 /bh21 PC Warna =Rp. 9,000.00 /kg22 PC Putih =Rp. 2,500.00 /kg23 Cat kayu Penutup =Rp. 55,000.00 /kg24 Cat kayu Dasar =Rp. 30,000.00 /kg25 Cat tembok Penutup interior =Rp. 45,000.00 /kg26 Cat tembok Dasar interior =Rp. 55,000.00 /kg27 Cat etmbok Luar penutup =Rp. 60,000.00 /kg28 Cat tembok luar dasar =Rp. 65,000.00 /kg29 Politur kayu =Rp. 55,000.00 /ltr30 Dempul kayu =Rp. 35,000.00 /kg31 Plamur tembok =Rp. 20,000.00 /kg32 Meni =Rp. 17,500.00 /kg33 Minyak cat =Rp. 35,000.00 /liter34 Tanah urug =Rp. 40,000.00 /m335 Paving =Rp. 43,000.00 /m236 =Rp. 6,250.00 /m'37 Pipa PVC 3" =Rp. 40,000.00 /m'38 Pipa PVC 4" =Rp. 45,000.00 /m'39 Lem PVC =Rp. 25,000.00 /kg40 Amplas =Rp. 5,000.00 /lbr

Pipa PVC ¾"

Page 3: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR ANALISARUMAH PAK SONY

SEMARANG

PEKERJAAN TANAH DAN PERSIAPAN

1 Galian tanah biasa sedalam 1m per m3 SK SNI T- 01 1991 030.0400 mandor @Rp. 55,000.00 Rp. 2,200.00 0.4000 pekerja @Rp. 40,000.00 Rp. 16,000.00

Rp. 18,200.00

2 Mengurug tanah kembali per m3 -SK SNI T -01 -1991 030.0190 mandor @Rp. 55,000.00 Rp. 1,045.00 0.1920 pekerja @Rp. 40,000.00 Rp. 7,680.00

Rp. 8,725.00

3 Urugan tanah dan dipadatkan per m3 - ( BOW )1.2000 m3 tanah urug @Rp. 40,000.000 Rp. 48,000.00 0.0500 mandor @Rp. 55,000.00 Rp. 2,750.00 0.5000 pekerja @Rp. 40,000.00 Rp. 20,000.00

Rp. 70,750.00

4 Urugan pasir per m3 - SK SNI T-01-1991-031.2000 m3 pasir urug @Rp. 80,000.00 Rp. 96,000.00 0.0100 mandor @Rp. 55,000.00 Rp. 550.00 0.3000 pekerja @Rp. 40,000.00 Rp. 12,000.00

Rp. 108,550.00

PEKERJAAN PASANGAN

1 Pasangan batu kosong tebal 20 cm per 1 m3 - SK SNI T-02-1991-031.2000 m3 batu belah @Rp. 115,000.000 Rp. 138,000.00 0.0390 mandor @Rp. 55,000.00 Rp. 2,145.00 0.0390 kepala tukang batu @Rp. 50,000.00 Rp. 1,950.00 0.3900 tukang batu @Rp. 45,000.00 Rp. 17,550.00 0.7800 pekerja @Rp. 40,000.00 Rp. 31,200.00

Rp. 190,845.00

2 Pasangan batu belah dengan 1 pc : 6 ps per 1 m3 - SK SNI T-02-1991-031.1000 m3 batu belah @Rp. 115,000.000 Rp. 126,500.00

### kg PC @Rp. 1,200.00 Rp. 140,400.00 0.5610 m3 pasir pasang @Rp. 135,000.00 Rp. 75,735.00 0.0750 mandor @Rp. 55,000.00 Rp. 4,125.00 0.0600 kepala tukang batu @Rp. 50,000.00 Rp. 3,000.00 0.6000 tukang batu @Rp. 45,000.00 Rp. 27,000.00 1.5000 pekerja @Rp. 40,000.00 Rp. 60,000.00

Rp. 436,760.00

3 a Pasang lantai keramik 40 x 40 cm per 1 m2 - BOW1.0000 m2 keramik 40 x 40 cm @Rp. 48,000.000 Rp. 48,000.00

11.3800 kg PC @Rp. 1,200.00 Rp. 13,656.00 0.0420 m3 pasir pasang @Rp. 135,000.00 Rp. 5,670.00 1.5000 kg Semen Warna @Rp. 9,000.00 Rp. 13,500.00 0.0300 mandor @Rp. 55,000.00 Rp. 1,650.00 0.0350 kepala tukang batu @Rp. 50,000.00 Rp. 1,750.00 0.3500 tukang batu @Rp. 45,000.00 Rp. 15,750.00 0.6200 pekerja @Rp. 40,000.00 Rp. 24,800.00

Rp. 124,776.00

Page 4: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR ANALISARUMAH PAK SONY

SEMARANG

b Pasang dinding keramik 20 x 25 cm per 1 m2 - BOW1.0000 m2 keramik 20 x 25 cm @Rp. 45,000.000 Rp. 45,000.00

11.3800 kg PC @Rp. 1,200.00 Rp. 13,656.00 0.0420 m3 pasir pasang @Rp. 135,000.00 Rp. 5,670.00 1.5000 kg Semen Warna @Rp. 9,000.00 Rp. 13,500.00 0.0300 mandor @Rp. 55,000.00 Rp. 1,650.00 0.0350 kepala tukang batu @Rp. 50,000.00 Rp. 1,750.00 0.3500 tukang batu @Rp. 45,000.00 Rp. 15,750.00 0.6200 pekerja @Rp. 40,000.00 Rp. 24,800.00

Rp. 121,776.00

c Pasang list keramik dinding motif per 1 m1 - BOW5.3000 bh keramik 8 x 20 cm @Rp. 3,500.000 Rp. 18,550.00 1.2000 kg PC @Rp. 1,200.00 Rp. 1,440.00 0.0300 m3 pasir pasang @Rp. 135,000.00 Rp. 4,050.00 0.1900 kg Semen Warna @Rp. 9,000.00 Rp. 1,710.00 0.0030 mandor @Rp. 55,000.00 Rp. 165.00 0.0030 kepala tukang batu @Rp. 50,000.00 Rp. 150.00 0.0300 tukang batu @Rp. 45,000.00 Rp. 1,350.00 0.0600 pekerja @Rp. 40,000.00 Rp. 2,400.00

Rp. 29,815.00

d Pasang keramik 30 x 30 cm per 1 m2 - BOW1.0000 m2 keramik 30 x 30 cm @Rp. 36,000.000 Rp. 36,000.00

11.3800 kg PC @Rp. 1,200.00 Rp. 13,656.00 0.0420 m3 pasir pasang @Rp. 135,000.00 Rp. 5,670.00 1.5000 kg Semen Warna @Rp. 9,000.00 Rp. 13,500.00 0.0300 mandor @Rp. 55,000.00 Rp. 1,650.00 0.0350 kepala tukang batu @Rp. 50,000.00 Rp. 1,750.00 0.3500 tukang batu @Rp. 45,000.00 Rp. 15,750.00 0.6200 pekerja @Rp. 40,000.00 Rp. 24,800.00

Rp. 112,776.00

4 Pasangan batu bata dengan 1 pc : 5 ps per 1 m2 - BOW70.000 bh batu bata @Rp. 450.000 Rp. 31,500.00

9.680 kg PC @Rp. 1,200.00 Rp. 11,616.00 0.0450 m3 pasir pasang @Rp. 135,000.00 Rp. 6,075.00 0.0150 mandor @Rp. 55,000.00 Rp. 825.00 0.0100 kepala tukang batu @Rp. 50,000.00 Rp. 500.00 0.1000 tukang batu @Rp. 45,000.00 Rp. 4,500.00 0.3200 pekerja @Rp. 40,000.00 Rp. 12,800.00

Rp. 67,816.00

PEKERJAAN BETON DAN ATAP

1 Pekerjaan beton dengan 1 pc : 2 ps : 3 kr per 1 m3 ( BOW )330.000 kg PC @Rp. 1,200.00 Rp. 396,000.00

0.8200 m3 split @Rp. 168,000.00 Rp. 137,760.00 0.5400 m3 pasir beton @Rp. 150,000.00 Rp. 81,000.00 1.0000 mandor @Rp. 55,000.00 Rp. 55,000.00 0.0350 kepala tukang batu @Rp. 50,000.00 Rp. 1,750.00 0.3500 tukang batu @Rp. 45,000.00 Rp. 15,750.00 1.0000 pekerja @Rp. 40,000.00 Rp. 40,000.00

Rp. 727,260.00

2 Pekerjaan beton dengan 1 pc : 3 ps : 5 kr per 1 m3 ( BOW )227.000 kg PC @Rp. 1,200.00 Rp. 272,400.00

1.0000 m3 split @Rp. 168,000.00 Rp. 168,000.00 0.5000 m3 pasir beton @Rp. 150,000.00 Rp. 75,000.00 1.0000 mandor @Rp. 55,000.00 Rp. 55,000.00 0.0350 kepala tukang batu @Rp. 50,000.00 Rp. 1,750.00 0.3500 tukang batu @Rp. 45,000.00 Rp. 15,750.00

Page 5: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR ANALISARUMAH PAK SONY

SEMARANG

1.0000 pekerja @Rp. 40,000.00 Rp. 40,000.00 Rp. 627,900.00

3 Pekerjaan tulangan besi 1 kg ( BOW )1.050 kg besi @Rp. 9,250.000 Rp. 9,712.50

0.0150 kg kawat besi @Rp. 20,000.00 Rp. 300.00 0.0003 mandor @Rp. 55,000.00 Rp. 16.50 0.0007 kepala tukang besi @Rp. 50,000.00 Rp. 35.00 0.0070 tukang besi @Rp. 45,000.00 Rp. 315.00 0.0070 pekerja @Rp. 40,000.00 Rp. 280.00

Rp. 10,659.00

4 Pekerjaan 10 M2 cetakan beton untuk I m3 beton bertulang - BOW0.0400 m3 kayu cetakan @Rp. 700,000.00 Rp. 28,000.00 4.0000 kg paku @Rp. 12,500.00 Rp. 50,000.00 0.0500 mandor @Rp. 55,000.00 Rp. 2,750.00 0.0500 kepala tukang kayu @Rp. 50,000.00 Rp. 2,500.00 0.5000 tukang kayu @Rp. 45,000.00 Rp. 22,500.00 0.2500 pekerja @Rp. 40,000.00 Rp. 10,000.00 0.500 pek.bogkr.& siram beton @Rp. 40,000.00 Rp. 20,000.00

Rp. 135,750.00

Jadi 1 m2 cetakan beton 1/10 0.10 x Rp. 135,750.00 Rp. 13,575.00

5 1 m3 Tiang perancah :(untuk lantai, balok, List plank beton)

0.500 m3 kayu cetakan / dolken @Rp. 700,000.00 Rp. 350,000.00 7.000 kg paku @Rp. 12,500.00 Rp. 87,500.00 0.005 mandor @Rp. 55,000.00 Rp. 275.00 0.040 kepala tukang @Rp. 50,000.00 Rp. 2,000.00 0.400 tukang kayu @Rp. 45,000.00 Rp. 18,000.00 0.750 pekerja @Rp. 40,000.00 Rp. 30,000.00

--------- -------------------- Rp. 487,775.00 1 m2 plat lantai tebal 12,5 cm = 8.33 m2 dihitung = 8.00

Jadi 1 m2 Perancah = Rp. 487,775.00 : 8.00 Rp. 60,971.88

6 Pekerjaan Betona 1 m3 beton bertulang 1:2:3 dg besi 225 kg/m3 (Beton Kolom struktur) :

1.000 m3 beton cor 1:2:3 @Rp. 727,260.00 Rp. 727,260.00 ### kg besi @Rp. 10,659.00 Rp. 2,398,275.00

5.000 m2 begisting @Rp. 13,575.00 Rp. 67,875.00 --------- -------------------- Rp. 3,193,410.00

b 1 m3 beton bertulang 1:2:3 dg besi 115 kg/m3 (plat lantai) :1.000 m3 beton cor 1:2:3 @Rp. 727,260.00 Rp. 727,260.00

### kg besi @Rp. 10,659.00 Rp. 1,225,785.00 5.000 m2 begisting @Rp. 13,575.00 Rp. 67,875.00 5.000 m2 perancah @Rp. 60,971.88 Rp. 304,859.38

--------- -------------------- Rp. 2,325,779.38

c 1 m3 beton bertulang 1:2:3 dg besi 80 kg/m3 (Beton Kolom praktis) :1.000 m3 beton cor 1:2:3 @Rp. 727,260.00 Rp. 727,260.00

80.000 kg besi @Rp. 10,659.00 Rp. 852,720.00 5.000 m2 begisting @Rp. 13,575.00 Rp. 67,875.00

--------- -------------------- Rp. 1,647,855.00

d 1 m3 beton bertulang 1:2:3 dg besi 215 kg/m3 (Balok Struktur) :1.000 m3 beton cor 1:2:3 @Rp. 727,260.00 Rp. 727,260.00

### kg besi @Rp. 10,659.00 Rp. 2,291,685.00 5.000 m2 begisting @Rp. 13,575.00 Rp. 67,875.00 5.000 m2 perancah @Rp. 60,971.88 Rp. 304,859.38

--------- -------------------- Rp. 3,391,679.38

Page 6: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR ANALISARUMAH PAK SONY

SEMARANG

e 1 m3 beton bertulang 1:2:3 dg besi 150 kg/m3 (Sloof Struktur) :1.000 m3 beton cor 1:2:3 @Rp. 727,260.00 Rp. 727,260.00

### kg besi @Rp. 10,659.00 Rp. 1,598,850.00 5.000 m2 begisting @Rp. 13,575.00 Rp. 67,875.00

--------- -------------------- Rp. 2,393,985.00

f 1 m3 beton bertulang 1:2:3 dg besi 200 kg/m3 (Pondasi Foot plat) :1.000 m3 beton cor 1:2:3 @Rp. 727,260.00 Rp. 727,260.00

### kg besi @Rp. 10,659.00 Rp. 2,131,800.00 5.000 m2 begisting @Rp. 13,575.00 Rp. 67,875.00

--------- -------------------- Rp. 2,926,935.00

7 Pekerjaan Atapa Pasang Atap Genteng Beton

11.0000 Lbr Genteng Beton Standar@Rp. 4,500.00 Rp. 49,500.00 0.0300 Kg Paku Biasa @Rp. 12,500.00 Rp. 375.00 0.0100 mandor @Rp. 55,000.00 Rp. 550.00 0.0100 kepala tukang kayu @Rp. 50,000.00 Rp. 500.00 0.1000 tukang kayu @Rp. 45,000.00 Rp. 4,500.00 0.2000 pekerja @Rp. 40,000.00 Rp. 8,000.00

Rp. 63,425.00

Page 7: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR ANALISARUMAH PAK SONY

SEMARANG

PEKERJAAN PLESTERAN

1 Plesteran tebal 15 mm dg 1 Pc : 5 Ps per 1 m2 SK SNI 03-2837-20024.3200 Kg PC @Rp. 1,200.00 Rp. 5,184.00 0.0220 m3 pasir pasang @Rp. 135,000.00 Rp. 2,970.00 0.0100 mandor @Rp. 55,000.00 Rp. 550.00 0.0150 kepala tukang batu @Rp. 50,000.00 Rp. 750.00 0.1500 tukang batu @Rp. 45,000.00 Rp. 6,750.00 0.2000 pekerja @Rp. 40,000.00 Rp. 8,000.00

Rp. 24,204.00

2 Pekerjaan plesteran sudut dg 1 Pc : 2 Ps per m'0.5000 kg PC @Rp. 1,200.00 Rp. 600.00 0.0020 m3 pasir pasang @Rp. 135,000.00 Rp. 270.00 0.0040 mandor @Rp. 55,000.00 Rp. 220.00 0.0760 kepala tukang batu @Rp. 50,000.00 Rp. 3,800.00 0.0760 tukang batu @Rp. 45,000.00 Rp. 3,420.00 0.1000 pekerja @Rp. 40,000.00 Rp. 4,000.00

Rp. 12,310.00

PEKERJAAN CAT

1 Pekerjaan cat tembok interior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )0.2600 kg Cat Penutup 2 kali @Rp. 90,000.00 Rp. 23,400.00 0.1000 Cat Dasar @Rp. 55,000.00 Rp. 5,500.00 0.1000 kg plamur @Rp. 20,000.00 Rp. 2,000.00 0.0025 mandor @Rp. 55,000.00 Rp. 137.50 0.0063 kepala tukang cat @Rp. 50,000.00 Rp. 315.00 0.0630 tukang cat @Rp. 45,000.00 Rp. 2,835.00 0.0200 pekerja @Rp. 40,000.00 Rp. 800.00

Rp. 34,987.50

2 Pekerjaan cat tembok exterior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )0.2600 kg Cat Penutup 2 kali @Rp. 120,000.00 Rp. 31,200.00 0.1000 Cat Dasar @Rp. 65,000.00 Rp. 6,500.00 0.1000 kg plamur @Rp. 20,000.00 Rp. 2,000.00 0.0025 mandor @Rp. 55,000.00 Rp. 137.50 0.0063 kepala tukang cat @Rp. 50,000.00 Rp. 315.00 0.0630 tukang cat @Rp. 45,000.00 Rp. 2,835.00 0.0200 pekerja @Rp. 40,000.00 Rp. 800.00

Rp. 43,787.50

Page 8: RAB RAP RUMAH PAK SONY kusen rinci.xls

DAFTAR HARGA SATUAN PEKERJAANRUMAH PAK SONY

SEMARANG

PEKERJAAN TANAH DAN PERSIAPAN

1 Galian tanah biasa sedalam 1m per m3 SK SNI T- 01 1991 03 Rp. 18,200.002 Mengurug tanah kembali per m3 -SK SNI T -01 -1991 03 Rp. 8,725.003 Urugan tanah dan dipadatkan per m3 - ( BOW ) Rp. 70,750.004 Urugan pasir per m3 - SK SNI T-01-1991-03 Rp. 108,550.00

PEKERJAAN PASANGAN

1 Pasangan batu kosong tebal 20 cm per 1 m3 - SK SNI T-02-1991 Rp. 190,845.002 Pasangan batu belah dengan 1 pc : 6 ps per 1 m3 - SK SNI T-02 Rp. 436,760.003 a Pasang lantai keramik 40 x 40 cm per 1 m2 - BOW Rp. 124,776.00

b Pasang dinding keramik 20 x 25 cm per 1 m2 - BOW Rp. 121,776.00c Pasang list keramik dinding motif per 1 m1 - BOW Rp. 29,815.00d Pasang keramik 30 x 30 cm per 1 m2 - BOW Rp. 112,776.00

4 Pasangan batu bata dengan 1 pc : 5 ps per 1 m2 - BOW Rp. 67,816.00

PEKERJAAN BETON DAN ATAP

1 Pekerjaan beton dengan 1 pc : 2 ps : 3 kr per 1 m3 ( BOW ) Rp. 727,260.002 Pekerjaan beton dengan 1 pc : 3 ps : 5 kr per 1 m3 ( BOW ) Rp. 627,900.003 Pekerjaan tulangan besi 1 kg ( BOW ) Rp. 10,659.004 Pekerjaan 10 M2 cetakan beton untuk I m3 beton bertulang - B Rp. 135,750.005 1 m3 Tiang perancah : Rp. 487,775.006 Pekerjaan Beton

a 1 m3 beton bertulang 1:2:3 dg besi 225 kg/m3 (Beton Kolom struk Rp. 3,193,410.00b 1 m3 beton bertulang 1:2:3 dg besi 115 kg/m3 (plat lantai) : Rp. 2,325,779.38c 1 m3 beton bertulang 1:2:3 dg besi 80 kg/m3 (Beton Kolom prakti Rp. 1,647,855.00d 1 m3 beton bertulang 1:2:3 dg besi 215 kg/m3 (Balok Struktur) : Rp. 3,391,679.38e 1 m3 beton bertulang 1:2:3 dg besi 150 kg/m3 (Sloof Struktur) : Rp. 2,393,985.00f 1 m3 beton bertulang 1:2:3 dg besi 200 kg/m3 (Pondasi Foot plat Rp. 2,926,935.00

7 Pekerjaan Atapa Pasang Atap Genteng Beton Rp. 63,425.00

PEKERJAAN PLESTERAN

1 Plesteran tebal 15 mm dg 1 Pc : 5 Ps per 1 m2 SK SNI 03-2837-2 Rp. 24,204.002 Pekerjaan plesteran sudut dg 1 Pc : 2 Ps per m' Rp. 43,787.50

PEKERJAAN CAT

1 Pekerjaan cat tembok interior per m2 ( 1 lap. Plamir, 1 Lap. Cat Rp. 34,987.502 Pekerjaan cat tembok exterior per m2 ( 1 lap. Plamir, 1 Lap. Cat Rp. 43,787.50

Page 9: RAB RAP RUMAH PAK SONY kusen rinci.xls

RENCANA ANGGARAN BIAYA (RAB)MASJID ASY SYUKUR

PEKERJAAN : PEMBANGUNAN MASJID ASY SYUKURLOKASI : NGALIYANTAHUN : 2012

I. PEKERJAAN BANGUNAN

HARGA JUMLAH JUMLAHNO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA TOTAL

( Rp ) ( Rp ) ( Rp ) 1 2 4 5 6 7 8

RAB

A PEKERJAAN PERSIAPAN1 Pembersihan lokasi 1.00 ls 500,000.00 500,000.002 Pemasangan bowplank 1.00 ls 1,000,000.00 1,000,000.00

Sub Jumlah 1,500,000.00B PEKERJAAN TANAH & PONDASI

1 Galian tanah pondasi 47.66 m3 18,200.00 867,480.252 Urugan pasir bawah pondasi 5.61 m3 108,550.00 608,694.133 Aanstamping 7.09 m3 190,845.00 1,352,613.944 Pondasi batu kali 1 : 6 18.15 m3 436,760.00 7,925,556.155 Urugan tanah kembali 14.30 m3 8,725.00 124,759.876 Urugan tanah peninggian lantai (memakai tanah sisa galian) 30.35 m3 70,750.00 2,147,439.387 Urugan pasir bawah lantai 5.06 m3 108,550.00 549,127.31

Sub Jumlah 13,575,671.02C PEKERJAAN KONST. BETON

1 Rabat Beton 5.06 m3 627,900.00 3,176,389.132 Sloof 15/20 2.65 m3 3,193,410.00 8,454,552.983 Kolom praktis 15/15 3.31 m3 3,193,410.00 10,562,203.584 Ring balk 15/15 2.98 m3 3,193,410.00 9,527,538.745 Plat Lantai 0.99 m3 2,325,779.38 2,302,521.586 Talang Beon 1.34 m3 2,325,779.38 3,116,497.85

Sub Jumlah 37,139,703.84D PEKERJAAN PASANGAN & PLESTERAN

1 Pasangan bata 1 : 5 266.65 m2 67,816.00 18,082,932.952 Plesteran 1 : 5 507.54 m2 24,204.00 12,284,594.983 Pasangan Bata Ekspose 25.75 m2 90,000.00 2,317,500.004 Pasangan Batu Tempel 32.83 m2 160,000.00 5,252,000.005 Sponengan 267.18 m' 43,787.50 11,699,144.256 Acian 507.54 m2 7,500.00 3,806,580.00

Sub Jumlah 53,442,752.18E PEKERJAAN ATAP

1 Genteng beton 131.44 m2 63,425.00 8,336,708.852 Bubungan Genteng Beton 36.99 m' #REF! #REF!3 Listplank beton/woodplank 39.87 m' 35,000.00 1,395,450.004 Atap polycarbonate tanpa rangka 14.58 m2 110,000.00 1,603,800.005 Atap Rangka Baja Ringan 131.44 m2 115,000.00 15,115,830.00

Sub Jumlah #REF!F PEKERJAAN PLAFOND

1 Plafond gypsum rangka hollow galvanis 101.18 m2 70,000.00 7,082,250.002 List plafond 79.75 m' 12,000.00 957,000.00

Sub Jumlah 8,039,250.00

Page 10: RAB RAP RUMAH PAK SONY kusen rinci.xls

G PEKERJAAN PINTU & JENDELA1 Kusen pintu & jendela ky keras (mahoni)

a. Pintu PJ1 1.00 bh 700,000.00 700,000.00b. Pintu P2 1.00 bh 150,000.00 150,000.00c. Jendela J1 10.00 bh 350,000.00 3,500,000.00

2 Daun pintua. PJ1 (80) Angzdoor 2.00 bh 350,000.00 700,000.00b. P2 2.00 bh 100,000.00 200,000.00

3 Pintu PVC Kamar Mandi (kusen & daun) 1.00 bh 200,000.00 200,000.004 Daun jendela kaca rk ky keras

a. Daun Jendela PJ1 2.00 bh 175,000.00 350,000.00b. Daun Jendela J1 10.00 bh 125,000.00 1,250,000.00

5 Kaca 3mm 5.27 m2 #REF! #REF!6 Kunci pintu Kayu 1.00 bh 250,000.00 250,000.007 Engsel pintu 6.00 bh 9,000.00 54,000.008 Engsel jendela 24.00 bh 9,000.00 216,000.009 Grendel 22.00 bh 12,500.00 275,000.00

10 Penyangga Jendela 44.00 bh 8,500.00 374,000.00Sub Jumlah #REF!

H PEKERJAAN LANTAI1 Keramik lantai 40 x 40 Ruang Sholat 80.18 m2 124,776.00 10,003,915.802 Keramik Lantai 40 x 40 Teras 15.00 m2 124,776.00 1,871,640.003 Keramik Plint 10x40 (Pakai potongan keramik 40 x 40 ) 59.75 m' 29,815.00 1,781,446.254 Keramik KM/WC 20x20 Motif Mulia 6.00 m2 112,776.00 676,656.005 Keramik dinding 20x25 Polos Mulia 33.56 m2 121,776.00 4,086,802.566 List Keramik dinding Motif 14.54 m' 21,500.00 312,610.007 Pasang paving 8.84 m2 #REF! #REF!

Sub Jumlah #REF!I PEKERJAAN SANITAIR

1 Closed duduk 1.00 bh 600,000.00 600,000.002 Kran air 9.00 bh 10,000.00 90,000.003 Floor drain 3.00 bh 20,000.00 60,000.004 Septictank + peresapan 1.00 ls 1,500,000.00 1,500,000.005 Bak Mandi Batu Bata 1.00 unit 750,000.00 750,000.006 Instalasi air bersih pipa pvc dia. 3/4" 25.50 m' #REF! #REF!7 Instalasi air kotor pipa pvc dia. 3" 12.50 m' #REF! #REF!8 Instalasi air kotor pipa pvc dia. 4" (kotor) 12.00 m' #REF! #REF!

Sub Jumlah #REF!J PEKERJAAN CAT-CATAN

1 Cat dindingPekerjaan Cat Tembok 507.54 m2 34,987.50 17,757,695.70Pekerjaan Cat Plafon (masuk dalam pekerjaan plafond) 101.18 m2 #REF! #REF!Pekerjaan Cat Kusen, daun pintu, daun jendela Duco 50.12 m2 175,000.00 8,770,510.00

2 Cat Bata Ekspose, coating 25.75 m2 15,000.00 386,250.003 Cat Batu Tempel, coating 32.83 m2 15,000.00 492,375.004 Cat listplank, cat minyak 9.97 m2 10,000.00 99,675.005 Cat genteng beton, tamitex 131.44 m2 8,500.00 1,117,257.00

Sub Jumlah #REF!K PEKERJAAN INSTALASI LISTRIK

1 Penyambungan daya baru 1.00 ls 1,800,000.00 1,800,000.002 Instalasi titik lampu 16.00 ttk 90,000.00 1,440,000.003 Saklar double 4.00 bh 45,000.00 180,000.004 Stop kontak 2.00 bh 90,000.00 180,000.005 MCB 1.00 bh 130,000.00 130,000.00

Sub Jumlah 3,730,000.00K PEKERJAAN FINISHING

1 Pemasangan huruf stainless 1.00 ls 3,000,000.00 3,000,000.00Sub Jumlah 3,000,000.00

#REF!

Purwodadi, Nopember 2012Dibuat Oleh,

Page 11: RAB RAP RUMAH PAK SONY kusen rinci.xls

Mariyana Prastiwi

Page 12: RAB RAP RUMAH PAK SONY kusen rinci.xls

RENCANA ANGGARAN BIAYA (RAB)

RUMAH PAK SONYPEKERJAAN : RUMAH PAK SONYLOKASI : SEMARANGTAHUN : 2013

I. PEKERJAAN BANGUNAN

RAB (RENCANA ANGGARAN BIAYA)

HARGA JUMLAH JUMLAHNO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA TOTAL

( Rp ) ( Rp ) ( Rp ) 1 2 4 5 6 7 8

RAB

A PEKERJAAN PERSIAPAN1 Pembersihan lokasi (sebelum dan setelash selesai pekerjaan) 1.00 ls 1,000,000.00 1,000,000.002 Pemasangan bowplank 1.00 ls 1,500,000.00 1,500,000.00

Sub Jumlah 2,500,000.00B PEKERJAAN TANAH & PONDASI

1 Galian tanah pondasi 78.72 m3 18,200.00 1,432,704.002 Urugan pasir bawah pondasi 7.77 m3 108,550.00 843,216.403 Aanstamping 18.27 m3 190,845.00 3,486,738.154 Pondasi batu kali 1 : 6 40.64 m3 436,760.00 17,747,742.605 Pondasi Foot Plat K.250 12.80 m3 2,926,935.00 37,469,451.106 Urugan tanah kembali 23.62 m3 8,725.00 206,049.607 Urugan tanah peninggian lantai 109.20 m3 70,750.00 7,725,900.008 Urugan pasir bawah lantai 18.41 m3 108,550.00 1,998,880.41

Sub Jumlah 70,910,682.25C PEKERJAAN KONST. BETON

1 Rabat Beton bawah pondasi lajur dan foot plat 7.77 m3 627,900.00 4,877,527.202 Sloof 20/40 dan 15/40 9.74 m3 2,393,985.00 23,326,989.843 Kolom Struktur 20/40 8.13 m3 3,193,410.00 25,952,843.074 Kolom praktis 15/15 5.57 m3 1,647,855.00 9,172,043.325 Balok 20/40, 20/30, 20/25 6.47 m3 3,391,679.38 21,937,382.206 Ring balk 15/20 1.29 m3 3,391,679.38 4,375,266.397 Plat lantai utama 10.21 m3 2,325,779.38 23,736,904.308 Tangga beton dan bordes beton 1.00 Ls 4,750,000.00 4,750,000.00

Sub Jumlah 118,128,956.33D PEKERJAAN PASANGAN & PLESTERAN

1 Pasangan bata 1 : 5 713.02 m2 67,816.00 48,354,218.572 Plesteran 1 : 5 1,497.34 m2 24,204.00 36,241,706.433 Pasangan Batu Tempel (batu kali tempel) 25.78 m2 175,000.00 4,511,062.504 Pasangan batu teracota 66.61 m2 195,000.00 12,989,583.755 Sponengan 267.18 m' 43,787.50 11,699,144.256 Acian 1,497.34 m2 8,000.00 11,978,749.44

Sub Jumlah 125,774,464.94E PEKERJAAN ATAP

1 Genteng beton 329.22 m2 63,425.00 20,880,654.822 Listplank beton/woodplank 110.01 m' 35,000.00 3,850,297.503 Bubungan genting (Zinkalum) 63.63 m' 45,000.00 2,863,350.004 Konsol Kayu 27.00 Bh 275,000.00 7,425,000.005 Atap Rangka Baja Ringan 329.22 m2 120,000.00 39,506,166.00

Sub Jumlah 74,525,468.32F PEKERJAAN PLAFOND

1 Plafond gypsum rangka hollow galvanis 235.99 m2 75,000.00 17,699,062.502 List plafond 294.53 m' 15,000.00 4,417,875.00

Sub Jumlah 22,116,937.50

Page 13: RAB RAP RUMAH PAK SONY kusen rinci.xls

HARGA JUMLAH JUMLAHNO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA TOTAL

( Rp ) ( Rp ) ( Rp ) 1 2 4 5 6 7 8G PEKERJAAN PINTU & JENDELA (incld finishing)

1 Kusen pintu & jendela ky keras (mahoni)Jendela J1 0.684 m3 9,108,750.00 6,230,385.00Jendela J2 0.0864 m3 9,108,750.00 786,996.00Jendela J3 0.1008 m3 9,108,750.00 918,162.00Jendela J4 0.0306 m3 9,108,750.00 278,727.75Jendela J5 0.0945 m3 9,108,750.00 860,776.88Jendela J6 0.0396 m3 9,108,750.00 360,706.50Jendela J7 0.072 m3 9,108,750.00 655,830.00Jendela J8 0.0522 m3 9,108,750.00 475,476.75Jendela J9 0.0306 m3 9,108,750.00 278,727.75Pintu P1 0.16794 m3 9,108,750.00 1,529,723.48Pintu P2 0.04968 m3 9,108,750.00 452,522.70Pintu P3 0.34146 m3 9,108,750.00 3,110,273.78Pintu P4 0.14364 m3 9,108,750.00 1,308,380.85Pintu P5 0.1332 m3 9,108,750.00 1,213,285.50Pintu P6 1 Bh 200,000.00 200,000.00Daun Pintu dan jendelaJendela J1 0.17952 m3 10,208,750.00 1,832,674.80Jendela J2 0.017952 m3 10,208,750.00 183,267.48Jendela J3 0.02304 m3 10,208,750.00 235,209.60Jendela J4 0.01728 m3 10,208,750.00 176,407.20Jendela J5 0.0096 m3 10,208,750.00 98,004.00Jendela J6 0.00912 m3 10,208,750.00 93,103.80Jendela J7 0.008688 m3 10,208,750.00 88,693.62Jendela J8 0.012288 m3 10,208,750.00 125,445.12Jendela J9 0.00624 m3 10,208,750.00 63,702.60Pintu P1 0.36036 m3 10,208,750.00 3,678,825.15Pintu P2 0.07392 m3 10,208,750.00 754,630.80Pintu P3 0.47124 m3 10,208,750.00 4,810,771.35Pintu P4 0.18216 m3 10,208,750.00 1,859,625.90Pintu P5 0.09216 m3 10,208,750.00 940,838.40Pintu P6 1 Bh 250,000.00 250,000.00

Pekerjaan kaca 28.8848 m2 139,472.50 4,028,635.27Finishing Kusen (melamin/ clear gloss) 109.5842 m2 66,000.00 7,232,557.20

3 Kunci pintu Kayu 15.00 bh 250,000.00 3,750,000.004 Engsel pintu 72.00 bh 9,000.00 648,000.005 Engsel jendela 60.00 bh 9,000.00 540,000.006 Grendel 60.00 bh 12,500.00 750,000.007 Penyangga Jendela (kait angin) 60.00 bh 8,500.00 510,000.00

Sub Jumlah 51,310,367.21H PEKERJAAN LANTAI

1 Keramik lantai 40 x 40 (Lt.1 dan 2) 259.35 m2 124,776.00 32,360,655.602 Keramik Lantai 30x30 KM/WC (lt.1 dan 2) 2.25 m2 112,776.00 253,746.003 Keramik dinding 20x25 KM/WC , dapur (Lt.1 dan 2) 115.24 m2 121,776.00 14,033,161.804 List Keramik dinding Motif 28.00 m' 29,815.00 834,820.005 Urugan pasir bawah lantai T. 5cm 13.08 m3 108,550.00 1,419,834.006 Rabat beton bawah lantai T. 5cm 13.08 m3 627,900.00 8,212,932.00

Sub Jumlah 57,115,149.40I PEKERJAAN SANITAIR

1 Closed duduk (Totto) 4.00 bh 1,750,000.00 7,000,000.002 Kran air 12.00 bh 15,000.00 180,000.003 Floor drain 7.00 bh 25,000.00 175,000.004 Septictank + peresapan 2.00 ls 2,750,000.00 5,500,000.005 Bak Mandi Batu Bata 1.00 unit 650,000.00 650,000.00

Page 14: RAB RAP RUMAH PAK SONY kusen rinci.xls

HARGA JUMLAH JUMLAHNO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA TOTAL

( Rp ) ( Rp ) ( Rp ) 1 2 4 5 6 7 8

6 Bak persiapan bathup 3.00 Unit 850,000.00 2,550,000.007 Bak kontrol 2.00 Bh 250,000.00 500,000.008 Tandon atas 1000l 1.00 Bh 1,500,000.00 1,500,000.009 Instalasi air bersih pipa pvc dia. 3/4" 1.00 Ls 2,000,000.00 2,000,000.00

10 Instalasi air kotor pipa pvc dia. 3" 1.00 Ls 1,750,000.00 1,750,000.0011 Instalasi air kotor pipa pvc dia. 4" (kotor) 1.00 Ls 1,600,000.00 1,600,000.00

Sub Jumlah 23,405,000.00J PEKERJAAN CAT-CATAN

1 Cat dindingPekerjaan Cat Tembok (interior) 748.67 m2 34,987.50 26,194,156.00Pekerjaan Cat Tembok (exterior) 723.77 m2 43,787.50 31,691,876.58Pekerjaan Cat Plafon 235.99 m2 34,987.50 8,256,612.66

3 Cat Batu Tempel, coating 92.39 m2 17,500.00 1,616,838.134 Cat listplank, cat minyak 22.00 m2 35,000.00 770,059.50

Sub Jumlah 68,529,542.86K PEKERJAAN INSTALASI LISTRIK

1 Penyambungan daya baru 1.00 ls 2,500,000.00 2,500,000.002 Instalasi titik lampu 55.00 ttk 125,000.00 6,875,000.003 Instalasi stop kontak biasa 16.00 ttk 135,000.00 2,160,000.004 Instalasi stop kontak AC 5.00 ttk 145,000.00 725,000.005 Instalasi Antena 3.00 ttk 70,000.00 210,000.006 Armateur dan lampu Tl 23 w 55.00 Bh 75,000.00 4,125,000.007 Saklar tunggal (Panasonic) 7.00 Bh 35,000.00 245,000.008 Saklar ganda (Panasonic) 13.00 Bh 45,000.00 585,000.009 Stop kontak biasa (Panasonic) 16.00 Bh 55,000.00 880,000.00

10 Stop kontak AC (Panasonic) 5.00 Bh 75,000.00 375,000.0011 Stop kontak antena (Panasonic) 3.00 Bh 35,000.00 105,000.0012 MCB dan Box 1.00 bh 350,000.00 350,000.00

Sub Jumlah 19,135,000.00K PEKERJAAN LAIN - LAIN

1 Tangga putar besi 1.00 Ls 3,500,000.00 3,500,000.002 Beton sikat taman 1.00 Ls 2,750,000.00 2,750,000.003 Penataan taman 1.00 ls 3,000,000.00 3,000,000.00

Sub Jumlah 9,250,000.00JUMLAH 642,701,568.82

PPN 10% 64,270,156.88

TOTAL 706,971,725.70

Catatan :1. Mbak di gambar denah ada pintu yang tembus taman belakang, nampak dipotongan seperti pintu besi tapi di denah pintu dan jendela pintu

tersebut ga muncul jadi maaf belum tak masukkan RAB.

Page 15: RAB RAP RUMAH PAK SONY kusen rinci.xls

RENCANA ANGGARAN BIAYA (RAB)

RUMAH PAK SONY

RAP (RENCANA ANGGARAN PELAKSANAAN)

HARGA JUMLAH JUMLAHSATUAN HARGA TOTAL ( Rp ) ( Rp ) ( Rp )

6 7 8RAP

1,000,000.00 1,000,000.001,000,000.00 1,000,000.00

Sub Jumlah 2,000,000.00

15,000.00 1,180,800.0090,000.00 699,120.00

110,000.00 2,009,700.00300,000.00 12,190,500.00

2,400,000.00 30,723,840.005,000.00 118,080.00

17,500.00 1,911,000.0090,000.00 1,657,293.75

Sub Jumlah 50,490,333.75

500,000.00 3,884,000.002,250,000.00 21,924,000.002,400,000.00 19,504,800.001,500,000.00 8,349,075.002,600,000.00 16,816,800.002,600,000.00 3,354,000.002,000,000.00 20,412,000.004,500,000.00 4,500,000.00

Sub Jumlah 98,744,675.00

50,000.00 35,651,040.0017,500.00 26,203,514.40

160,000.00 4,124,400.00170,000.00 11,324,252.5012,000.00 3,206,160.007,500.00 11,230,077.60

Sub Jumlah 91,739,444.50

55,000.00 18,106,992.7535,000.00 3,850,297.5042,500.00 2,704,275.00

240,000.00 6,480,000.00115,000.00 37,860,075.75

Sub Jumlah 69,001,641.00

70,000.00 16,519,125.0012,000.00 3,534,300.00

Sub Jumlah 20,053,425.00

Page 16: RAB RAP RUMAH PAK SONY kusen rinci.xls

HARGA JUMLAH JUMLAHSATUAN HARGA TOTAL ( Rp ) ( Rp ) ( Rp )

6 7 8

7,742,437.50 5,295,827.257,742,437.50 668,946.607,742,437.50 780,437.707,742,437.50 236,918.597,742,437.50 731,660.347,742,437.50 306,600.527,742,437.50 557,455.507,742,437.50 404,155.247,742,437.50 236,918.597,742,437.50 1,300,264.957,742,437.50 384,644.307,742,437.50 2,643,732.717,742,437.50 1,112,123.727,742,437.50 1,031,292.67

170,000.00 170,000.00

8,677,437.50 1,557,773.588,677,437.50 155,777.368,677,437.50 199,928.168,677,437.50 149,946.128,677,437.50 83,303.408,677,437.50 79,138.238,677,437.50 75,389.588,677,437.50 106,628.358,677,437.50 54,147.218,677,437.50 3,127,001.388,677,437.50 641,436.188,677,437.50 4,089,155.658,677,437.50 1,580,682.028,677,437.50 799,712.64

212,500.00 212,500.00

118,551.63 3,424,339.9856,100.00 6,147,673.62

175,000.00 2,625,000.008,000.00 576,000.008,000.00 480,000.00

12,000.00 720,000.007,500.00 450,000.00

Sub Jumlah 43,196,512.13

100,000.00 25,935,000.00100,000.00 225,000.0095,000.00 10,947,562.5021,500.00 602,000.0090,000.00 1,177,200.00

500,000.00 6,540,000.00

Sub Jumlah 45,426,762.50

1,600,000.00 6,400,000.0015,000.00 180,000.0020,000.00 140,000.00

1,500,000.00 3,000,000.00750,000.00 750,000.00

Page 17: RAB RAP RUMAH PAK SONY kusen rinci.xls

HARGA JUMLAH JUMLAHSATUAN HARGA TOTAL ( Rp ) ( Rp ) ( Rp )

6 7 8800,000.00 2,400,000.00200,000.00 400,000.00

1,250,000.00 1,250,000.001,150,000.00 1,150,000.001,300,000.00 1,300,000.001,450,000.00 1,450,000.00

Sub Jumlah 18,420,000.00

20,000.00 14,973,436.8025,000.00 18,094,134.5020,000.00 4,719,750.0015,000.00 1,385,861.2530,000.00 660,051.00

Sub Jumlah 39,833,233.55

1,800,000.00 1,800,000.0090,000.00 4,950,000.00

105,000.00 1,680,000.00125,000.00 625,000.0060,000.00 180,000.0065,000.00 3,575,000.0032,500.00 227,500.0042,000.00 546,000.0050,000.00 800,000.0067,500.00 337,500.0030,000.00 90,000.00

150,000.00 150,000.00Sub Jumlah 14,961,000.00

3,000,000.00 3,000,000.002,500,000.00 2,500,000.003,000,000.00 3,000,000.00

Sub Jumlah 8,500,000.00502,367,027.4350,236,702.74

552,603,730.17

Purwodadi, Maret 2013Dibuat Oleh,

Mariyana Prastiwi

Page 18: RAB RAP RUMAH PAK SONY kusen rinci.xls

REKAP KEBUTUHAN BAHAN

NO URAIAN1 Tanah Urug

-

2 Pasir Urug

-

3 Batu Belah

-

-

4 Semen----------

5 Pasir Pasang

-

-

-

-

-

-

-

-

6 Keramik 40 x 40

-

7 Semen Warna----

8 Keramik 20 x 25

Page 19: RAB RAP RUMAH PAK SONY kusen rinci.xls

-

9 List keramik 8x20-

10 Keramik 30 x 30

-

11 Batu Bata-

12 Split

-

-

13 Pasir Beton

-

-

14 Besi

------

15 Kawat Besi------

16 Kayu cetakan

-

-

17 Paku---

18 Genteng beton

Page 20: RAB RAP RUMAH PAK SONY kusen rinci.xls

-

19 Cat tembok interior-

20 Cat tembok dasar interior-

21 Cat tembok exterior-

22 Cat tembok dasar exterior-

23 Plamur--

24 Batu tempel

-

25 Woodplank

-

26 Kunci pintu Kayu27 Engsel pintu28 Engsel jendela29 Grendel30 Penyangga Jendela (kait angin)31 Closed duduk (Totto)32 Kran air33 Floor drain34 Armateur dan lampu Tl 23 w35 Saklar tunggal (Panasonic)36 Saklar ganda (Panasonic)37 Stop kontak biasa (Panasonic)38 Stop kontak AC (Panasonic)39 Stop kontak antena (Panasonic)40 MCB dan Box

Page 21: RAB RAP RUMAH PAK SONY kusen rinci.xls

REKAP KEBUTUHAN BAHAN

URAIANTanah Urug

Urugan tanah dan dipadatkan per m3 - ( BOW )

Pasir Urug

Urugan pasir per m3 - SK SNI T-01-1991-03

Batu Belah

Pasangan batu kosong tebal 20 cm per 1 m3 - SK SNI T-02-1991-03

Pasangan batu belah dengan 1 pc : 6 ps per 1 m3 - SK SNI T-02-1991-03

SemenPasangan batu belah dengan 1 pc : 6 ps per 1 m3 - SK SNI T-02-1991-03Pasang lantai keramik 40 x 40 cm per 1 m2 - BOWPasang dinding keramik 20 x 25 cm per 1 m2 - BOWPasang list keramik dinding motif per 1 m1 - BOWPasang keramik 30 x 30 cm per 1 m2 - BOWPasangan batu bata dengan 1 pc : 5 ps per 1 m2 - BOWPekerjaan beton dengan 1 pc : 2 ps : 3 kr per 1 m3 ( BOW )Pekerjaan beton dengan 1 pc : 3 ps : 5 kr per 1 m3 ( BOW )Plesteran tebal 15 mm dg 1 Pc : 5 Ps per 1 m2 SK SNI 03-2837-2002Pekerjaan plesteran sudut dg 1 Pc : 2 Ps per m'

Pasir Pasang

Pasangan batu belah dengan 1 pc : 6 ps per 1 m3 - SK SNI T-02-1991-03

Pasang lantai keramik 40 x 40 cm per 1 m2 - BOW

Pasang dinding keramik 20 x 25 cm per 1 m2 - BOW

Pasang list keramik dinding motif per 1 m1 - BOW

Pasang keramik 30 x 30 cm per 1 m2 - BOW

Pasangan batu bata dengan 1 pc : 5 ps per 1 m2 - BOW

Plesteran tebal 15 mm dg 1 Pc : 5 Ps per 1 m2 SK SNI 03-2837-2002

Pekerjaan plesteran sudut dg 1 Pc : 2 Ps per m'

Keramik 40 x 40

Pasang lantai keramik 40 x 40 cm per 1 m2 - BOW

Semen WarnaPasang lantai keramik 40 x 40 cm per 1 m2 - BOWPasang dinding keramik 20 x 25 cm per 1 m2 - BOWPasang list keramik dinding motif per 1 m1 - BOWPasang keramik 30 x 30 cm per 1 m2 - BOW

Keramik 20 x 25

Page 22: RAB RAP RUMAH PAK SONY kusen rinci.xls

Pasang dinding keramik 20 x 25 cm per 1 m2 - BOW

List keramik 8x20Pasang list keramik dinding motif per 1 m1 - BOW

Keramik 30 x 30

Pasang keramik 30 x 30 cm per 1 m2 - BOW

Batu BataPasangan batu bata dengan 1 pc : 5 ps per 1 m2 - BOW

Split

Pekerjaan beton dengan 1 pc : 2 ps : 3 kr per 1 m3 ( BOW )

Pekerjaan beton dengan 1 pc : 3 ps : 5 kr per 1 m3 ( BOW )

Pasir Beton

Pekerjaan beton dengan 1 pc : 2 ps : 3 kr per 1 m3 ( BOW )

Pekerjaan beton dengan 1 pc : 3 ps : 5 kr per 1 m3 ( BOW )

Besi

1 m3 beton bertulang 1:2:3 dg besi 225 kg/m3 (Beton Kolom struktur) :1 m3 beton bertulang 1:2:3 dg besi 115 kg/m3 (plat lantai) :1 m3 beton bertulang 1:2:3 dg besi 80 kg/m3 (Beton Kolom praktis) :1 m3 beton bertulang 1:2:3 dg besi 215 kg/m3 (Balok Struktur) :1 m3 beton bertulang 1:2:3 dg besi 150 kg/m3 (Sloof Struktur) :1 m3 beton bertulang 1:2:3 dg besi 200 kg/m3 (Pondasi Foot plat) :

Kawat Besi1 m3 beton bertulang 1:2:3 dg besi 225 kg/m3 (Beton Kolom struktur) :1 m3 beton bertulang 1:2:3 dg besi 115 kg/m3 (plat lantai) :1 m3 beton bertulang 1:2:3 dg besi 80 kg/m3 (Beton Kolom praktis) :1 m3 beton bertulang 1:2:3 dg besi 215 kg/m3 (Balok Struktur) :1 m3 beton bertulang 1:2:3 dg besi 150 kg/m3 (Sloof Struktur) :1 m3 beton bertulang 1:2:3 dg besi 200 kg/m3 (Pondasi Foot plat) :

Kayu cetakan

Pekerjaan 10 M2 cetakan beton untuk I m3 beton bertulang - BOW

m2 perancah

PakuPekerjaan 10 M2 cetakan beton untuk I m3 beton bertulang - BOWm2 perancahPasang Atap Genteng Beton

Genteng beton

Page 23: RAB RAP RUMAH PAK SONY kusen rinci.xls

Pasang Atap Genteng Beton

Cat tembok interiorPekerjaan cat tembok interior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )

Cat tembok dasar interiorPekerjaan cat tembok interior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )

Cat tembok exteriorPekerjaan cat tembok exterior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )

Cat tembok dasar exteriorPekerjaan cat tembok exterior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )

PlamurPekerjaan cat tembok interior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )Pekerjaan cat tembok exterior per m2 ( 1 lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup )

Batu tempel

Pasangan Batu Tempel (batu kali tempel)

Woodplank

Listplank beton/woodplank

Kunci pintu KayuEngsel pintuEngsel jendelaGrendelPenyangga Jendela (kait angin)Closed duduk (Totto)Kran airFloor drainArmateur dan lampu Tl 23 wSaklar tunggal (Panasonic)Saklar ganda (Panasonic)Stop kontak biasa (Panasonic)Stop kontak AC (Panasonic)Stop kontak antena (Panasonic)MCB dan Box

Page 24: RAB RAP RUMAH PAK SONY kusen rinci.xls

REKAP KEBUTUHAN BAHAN

VOLUME VOLUME TOTAL

110.40

110.40

47.11

47.11

21.92

44.70

66.62

4,754.30 kg 2,951.40 kg 1,311.40 kg 33.60 kg 25.61 kg 6,902.04 kg 17,886.87 kg 4,732.50 kg 6,468.52 kg 133.59 kg

45,066.24 kg = 901.32 zak (@50 Kg)

22.80

10.89

4.84

0.84

0.09

32.09

32.94

0.53

105.03

259.35

259.35

389.03 kg 172.86 kg 5.32 kg 3.38 kg

570.58 kg

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

Page 25: RAB RAP RUMAH PAK SONY kusen rinci.xls

115.24

115.24

148.40 bh 115.24

2.25 2.25

49,911.46 bh 49,911.46 bh

44.45

20.85

65.29 PERINCIAN BAHAN PEMBESIAN

29.27

10.42 KOLOM STRUKTUR (30X30)

39.69 60% 18.32755 40%D16 ø12

Berat Batang Berat 1,920.00 kg 1,159.25 Kg 63.25 Btng 760.76 1,232.37 kg BALOK STRUKTUR (20X40) 467.55 kg 60% 18.32755 40% 1,751.37 kg D16 ø12 1,534.68 kg Berat Batang Berat 2,688.34 kg 1,057.43 Kg 57.70 Btng 693.94

9,594.31 kg SLOOF STRUKTUR64% 14.03203 36%

27.43 kg D14 ø10 17.61 kg Berat Batang Berat 6.68 kg 1,534.68 Kg 109.37 Btng 1,534.68 25.02 kg PONDASI FOOT PLAT 21.92 kg 60% 18.32755 40% 38.40 kg D16 ø12

137.06 kg Berat Batang Berat 1,613.00 Kg 88.01 Btng 1,075.33

10.84 KOLOM PRAKTIS

5.61 76% 10.31 24%

16.45 ø12 ø10Berat Batang Berat

1,084.05 kg 934.83 Kg 90.67879 Btng 297.54 78.59 kg 9.88 kg

1,172.52 kg

m2

m2

m2 m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 26: RAB RAP RUMAH PAK SONY kusen rinci.xls

3,621.40 lbr 3,621.40 lbr

256.01 kg 256.01 kg

98.47 kg 98.47 kg

188.18 kg 188.18 kg

72.38 kg 72.38 kg

98.47 kg 72.38 kg

170.84 kg

27.07

27.07

121.01

121.01 15.00 bh 72.00 bh 60.00 bh 60.00 bh 60.00 bh 4.00 bh 12.00 bh 7.00 bh 55.00 bh 7.00 bh 13.00 bh 16.00 bh 5.00 bh 3.00 bh 1.00 bh

m2

m2

m1

m1

Page 27: RAB RAP RUMAH PAK SONY kusen rinci.xls

PERINCIAN BAHAN PEMBESIAN

KOLOM STRUKTUR (30X30) PLAT LANTAI

10.31 10.31 ø12

Batang Berat BatangKg 73.79357 Btng 1,232.37 Kg 119.5407 Btng

BALOK STRUKTUR (20X40) 10.31

BatangKg 67.31223 Btng

SLOOF STRUKTUR 7.16

BatangKg 214.3647 Btng

PONDASI FOOT PLAT 10.31

BatangKg 104.3077 Btng

KOLOM PRAKTIS

7.1592

BatangKg 41.56 Btng

Page 28: RAB RAP RUMAH PAK SONY kusen rinci.xls

PERHITUNGAN VOLUME

GALIAN TANAH1 Galian tanah pondasi lajur type A

Panjang = 33 m= 19 m= 52 m

Dimensi galian = 0.5 x 1Volume galian = 0.5 x 1 x 52

Galian tanah pondasi lajur type BPanjang = 120 m

= m= 120 m

Dimensi galian = 0.75 x 1Volume galian = 0.75 x 1 x 120

2 galian tanah pondasi foot platJumlah pondasi = 20 BhDimensi galian = 1.2 x 1.2 x 2Volume galian = 1.2 x 1.2 x 2 x 20

Jumlah pondasi = 4 BhDimensi galian = 1.2 x 2.2 x 2Volume galian = 1.2 x 2.2 x 2 x 4

TOTAL GALIAN TANAH

URUGAN TANAH PENINGGIAN BANGUNANVolume = 0.5 x 13 x 16TOTAL URUGAN TANAH PENINGGIAN BANGUNAN x 1.05

URUGAN PASIR BAWAH LANTAI T.5CMLantai 1Tebal = 0.05 mBangunan RumahVolume = 0.05 x 13 x 16

Carport = 0.05 x 55.5

Page 29: RAB RAP RUMAH PAK SONY kusen rinci.xls

Lantai 2Volume = 0.05 x 87.25

Volume Urugan pasir bawah lantai 1 dan 2TOTAL URUGAN PASIR BAWAH LANTAI x 1.05

URUGAN PASIR BAWAH PONDASI 1 Urugan pasir pondasi lajur

Type APanjang = 52 mtebal urugan = 0.05 x 0.5Volume galian = 0.05 x 0.5 x 52

Type BPanjang = 120 mtebal urugan = 0.05 x 0.75Volume galian = 0.05 x 0.75 x 120

2 Urugan pasir pondasi foot platType AJumlah pondasi = 20 Bhtebal urugan = 1.2 x 1.2 x 0.05Volume urugan = 1.2 x 1.2 x 0.05 x 20

Type BJumlah pondasi = 4 BhDimensi galian = 1.2 x 2.2 x 0.05Volume galian = 1.2 x 2.2 x 0.05 x 4

Jumlah Urugan Pasir Bawah PondasiTOTAL URUGAN PASIR BAWAH PONDASI x 1.05

AANNSTAMPING BAWAH PONDASI BT. KALI1 Type A

Panjang = 52 mtebal aanstamping = 0.15Volume aanstamping = 0.15 x 0.5 x 52

Type BPanjang = 120 mtebal aanstamping = 0.15Volume aanstamping = 0.15 x 0.75 x 120

Page 30: RAB RAP RUMAH PAK SONY kusen rinci.xls

Volume AanstampingTOTAL AANSTAMPING BAWAH PONDASI LAJUR x 1.05

PONDASI BATU KALIPondasi bt. Kali (lajur)

Type ADimensi Pondasi = 0.375 x 0.6Panjang pondasi = 52 mVolume Pondasi Bt. Kali = 0.375 x 0.6 x 52

Type BDimensi Pondasi = 0.375 x 0.6Panjang pondasi = 120 mVolume Pondasi Bt. Kali = 0.375 x 0.6 x 120

Voluem Pondasi Bt. KaliTOTAL VOLUME PONDASI BT. KALI x 1.05

PONDASI FOOT PLATType AJumlah pondasi = 20 BhDimensi = 1.2 x 1.2 x 0.2Volume tapak = 1.2 x 1.2 x 0.2 x 20

panjang pedestal = 1.8Dimensi Pedestal = 0.3 x 0.3Volume pedestal = 0.3 x 0.3 x 1.8 x 20

Type BJumlah pondasi = 4 BhDimensi = 1.2 x 2.2 x 0.2Volume tapak = 1.2 x 2.2 x 0.2 x 4

panjang pedestal = 1.5Dimensi Pedestal = 0.3 x 0.3Volume pedestal = 0.3 x 0.3 x 1.5 x 4Jumalh pedestal dalam 1 pondasi = 2 x 0.54

Volume Beton pondasi Foot PlatTOTAL VOLUME PONDASI FOOT PLAT x 1.05

PEKERJAAN SLOOFType APanjang = 116 mDimensi = 0.2 x 0.4

Page 31: RAB RAP RUMAH PAK SONY kusen rinci.xls

Volume sloof type A = 0.2 x 0.4 x 116

TOTAL VOLUME PEKERJAAN SLOOF x 1.05

PEKERJAAN KOLOM1 Kolom Struktur

Dimensi = 0.3 x 0.3Tinggi = 4.3Jumlah kolom = 20 BhVolume = 0.3 x 0.3 x 4.3 x 20

Total Volume Kolom StrukturTOTAL VOLUME KOLOM STRUKTUR x 1.05

2 Kolom PraktisLt. 1Dimensi = 0.15 x 0.15Tinggi = 4.3 mJumlah = 32 BhVolume = 0.15 x 0.15 x 4.3 x 32

Lt. 2Dimensi = 0.15 x 0.15Tinggi = 3.5 mJumlah = 28 BhVolume = 0.15 x 0.15 x 3.5 x 28

Volume kolom praktisTOTAL VOLUME KOLOM PRAKTIS x 1.05

PEKERJAAN BALOKType B1 (20x40)Dimensi = 0.2 x 0.4Panjang = 45.5 mVolume = 0.2 x 0.4 x 45.5TOTAL VOLUME BALOK B1 (20X40) x 1.05

Type B2 (20x30)Dimensi = 0.2 x 0.3Panjang = 21 mVolume = 0.2 x 0.3 x 21TOTAL VOLUME BALOK B2 (20X40) x 1.05

Page 32: RAB RAP RUMAH PAK SONY kusen rinci.xls

Type BK (20x30)Dimensi = 0.2 x 0.3Panjang = 2 mVolume = 0.2 x 0.3 x 2TOTAL VOLUME BALOK B3 (20x30) x 1.05

Type Tandon dan jemuran (20x30)Dimensi = 0.2 x 0.3Panjang = 19 mVolume = 0.2 x 0.3 x 19TOTAL VOLUME BALOK B3 (20x30) x 1.05T0TAL VOLUME BALOK STRUKTUR

Ring balk (15x20)Dimensi = 0.15 x 0.2Panjang = 43 mVolume = 0.15 x 0.2 x 43

Volume balok dan Ring BalkTotal volume Ring Balk x 1.05

PEKERJAAN PLAT LANTAI DAN TOPI - TOPI BETONlantai utamatebal = 0.12Dimensi = 74.5 + 1 - 6Volume = 69.5 x 0.12

Jemurantebal = 0.12Dimensi = 2.5 x 3Volume = 2.5 x 3 x 0.12

tandon Airtebal = 0.12Dimensi = 2 x 2Volume = 2 x 2 x 0.12

Total Volume Plat Lantai x 1.05

PEKERJAAN TANGGA BETONVolume

Page 33: RAB RAP RUMAH PAK SONY kusen rinci.xls

PEKERJAAN PASANGAN1 PASANGAN BATU BATA

Lantai 1panjang = 126 m 101.5 16 6.4Tinggi = 4.3 m 4.3 2.5 1.3Volume Kotor = 126 x 4.3

Lantai 2panjang = 62.75 m 65Tinggi = 3.5 m 3.5Volume Kotor = 62.75 x 3.5

panjang = 22.5 m 25 Tinggi = 1.2 m 1.2Volume Kotor = 22.5 x 1.2

panjang = 4 mTinggi = 3.5 mVolume Kotor = 4 x 3.5 x 0.5

total volume pasangan bt. Bata lt. 2 kotor

Dimensi Kusen Lt.1 dan 2J1 = 1.6 x 1.4 x 10J2 = 1.9 x 1.4 x 1J3 = 0.8 x 1.9 x 2J4 = 1 x 0.6 x 1J5 = 1 x 3.6 x 1J6 = 0.7 x 1.4 x 1J7 = 1 x 1.4 x 1J8 = 1.9 x 0.6 x 1J9 = 1 x 0.6 x 1P1 = 1.72 x 2.2 x 3P2 = 1.02 x 2.2 x 1P3 = 0.92 x 2.2 x 7P4 = 0.82 x 2.2 x 3P5 = 4.6 x 2.5 x 1P6 = 0.62 x 2.11 x 1Total Lubang Kusen Lt.2

Volume pas Batu Bata Lt.1 dan Lt.2Total volume pas Batu Bata Lt.1 dan Lt.2 x 1.05

Page 34: RAB RAP RUMAH PAK SONY kusen rinci.xls

PEKERJAAN BATU TEMPELPekerjaan batu kali tempel exposeLantai 1Tinggi = 1.2 mPanjang = 22.2 mVolume = 22.2 x 1.2

Lantai 2Tinggi = 1.2 mPanjang = 20 mVolume = 20 x 1.2

Total pekerjaan batu kali tempel expose = 1.05 x 24

Pekerjaan batu terakota exposeVolume = 2.5 x 6.55

1 x 6.550.5 x 7.550.5 x 7.550.5 x 7.550.5 x 7.55

1 x 4.20.5 x 7.550.5 x 7.55

1.15 x 2.550.5 x 7.850.5 x 7.85

Toatal pekerjaan batu teracota expose 1.1 x 60.56

PEKERJAAN PLAFONDLantai 1Volume = 135.5 - 32.75

Lantai 2Volume = 89.25 + 32.75

Volume pekerjaan plafondTotal volume pekerjaan plafond x 1.05

List Plafon Lt.1List Plafon Lt.2TOTAL PEKERJAAN LIST PLAFON KELILING x 1.05

Page 35: RAB RAP RUMAH PAK SONY kusen rinci.xls

PENUTUP ATAPAtap baja ringan = 10 x 6.5 x 1.05Genting beton penutup at = 10 x 6.5 x 1.05

PEKERJAAN PLESTERAN DAN ACIANlantai 1 dan 2 = 2 x 713 x 1.05Total plesteran dan acian

PEKERJAAN PENGECATAN INTERIORlantai 1 dan 2 = 1 x 713 x 1.05Total cat dalam ruangan

PEKERJAAN PENGECATAN EXTERIORlantai 1 dan 2 = 1 x 713 x 1.1pengurang = 1 x 60.56Total cat luar (exterior)

PEKERJAAN PASANGAN KERAMIK1 Keramik Lt. 1 (40x40)

Volume = 150.5 - 10

Keramik Lt. 2 (40x40)Volume = 89.25 - 4.5 + 8

Keramik tangga (40x40)Volume = 0.3 x 2.5 x 9

0.2 x 2.5 x 91 x 2.5

Volume Keramik lantai (40x40)Total Volume Keramik lantai (40x40) x 1.05

2 keramik Lt. KM/WC (30x30) lantai 1 dan 2Volume = 1.5 x 1.5

2.5 x 1.52 x 2

2.25 x 2

Total Volume pas. Keramik (40x40) = 1.05 x 14.5

Keramik dinding KM/WC Lt. 1 dan 2 (20x25)Tinggi = 3 m

Page 36: RAB RAP RUMAH PAK SONY kusen rinci.xls

Volume = 1.5 x 3 x 41.5 x 3 x 22.5 x 3 x 2

2 x 3 x 42.25 x 3 x 2

2 x 3 x 2

Keramik dapur (20x25)Tinggi = 2.5Volume = 2.5 x 5.5

0.6 x 5.50.6 x 2

TOTAL VOLUME KERAMIK DINDING KM/WC (20X25) x 1.05

PEKERJAAN ATAPPenutup Atap genting BetonVolume = 1.25 x 22.5

2 x 134.98 x 62.78 x 613.2 x 13.482.91 x 62.91 x 6

TOTAL PEKERJAAN PENUTUP ATAP GENTENG = 1.05 x 314

Bubungan ZinkalumVolume = 60.6 x 1.05

ListplankVolume = 104.8 x 1.05

Page 37: RAB RAP RUMAH PAK SONY kusen rinci.xls

Urugan pasir bawah lantaiLuas = 261.6 m2Tebal = 0.05 m1Volume = 0.05 x 261.6

Rabat beton bawah lantai keramikLuas = 261.6 m2Tebal = 0.05 m1Volume = 0.05 x 261.6

Pekerjaan pasangan batu tempel (batu serit)Volume = 1.95 x 7.45

= 1.25 x 9VolumeTOTAL VOLUME x 1.05

Page 38: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 26 m3

= 90 m3

= 57.6 m3

= 21.12 m3

= 78.72 m3

= 104 m3= 109.2 m3

= 10.4 m3

= 2.775 m3

Page 39: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 4.3625 m3

= 17.5375 m3= 18.41438 m3

= 1.3 m3

= 4.5 m3

= 1.44 m3

= 0.528 m3

7.768 m3= 8.1564 m3

= 3.9 m3

= 13.5 m3

Page 40: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 17.4 m3= 18.27 m3

= 11.7 m3

= 27 m3

= 38.7 m3= 40.635 m3

= 5.76 m3

= 3.24 m3

= 2.112 m3

= 0.54 m3= 1.08 m3

= 12.192 m3= 12.8016 m3

Page 41: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 9.28 m3

= 9.744 m3

= 7.74 m3

= 7.74 m3= 8.127 m3

= 3.096 m3

= 2.205 m3

= 5.301 m3= 5.56605 m3

= 3.64 m3= 3.822 m3

= 1.26 m3= 1.323 m3

Page 42: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 0.12 m3= 0.126 m3

= 1.14 m3= 1.197 m3= 6.468 m3

= 1.29 m3

= 1.29 m3= 1.3545 m3

= 8.34 m3

= 0.9 m3

= 0.48 m3

= 10.206 m3

= 1 Ls

Page 43: RAB RAP RUMAH PAK SONY kusen rinci.xls

5.575 2.35 4.5 2.251.2 1.65 1.95 1.6

= 541.8 m2 436.45 40 7.7 6.69 3.8775 8.775 3.85

= 219.625 m2 227.5

= 27 m2 30

= 7 m2

= 253.625 m2 257

= 22.4 m2= 2.66 m2= 3.04 m2= 0.6 m2= 3.6 m2= 0.98 m2= 1.4 m2= 1.14 m2= 0.6 m2= 11.352 m2= 2.244 m2= 14.168 m2= 5.412 m2= 11.5 m2= 1.3082 m2= 82.4042 m2

713.0208 m2 682.38 = 748.6718 m2 716.50 32.17

Page 44: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 26.64 m2

= 24 m2

= 25.2 m2

= 16.38 m2= 6.55 m2= 3.78 m2= 3.78 m2= 3.78 m2= 3.78 m2= 4.20 m2= 3.78 m2= 3.78 m2= 2.93 m2= 3.93 m2= 3.93 m2= 60.56 m2= 66.61 m2

= 102.75 m2

= 122 m2

= 224.75 m2= 235.9875 m2

= 138.5 m1= 142 m1= 294.525 m1

Page 45: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 68.25 m2= 68.25 m2

= 1497.344 m2= 1497.344 m2

= 748.6718 m2= 748.6718 m2

= 784.3229 m2= 60.5575 m2= 723.7654 m2

= 140.5 m2

= 92.75 m2

= 6.75 m2= 4.5 m2= 2.5 m2= 13.75 m2

247 m2= 259.35 m2

= 2.25 m2= 3.75 m2= 4 m2= 4.5 m2= 14.5 m2= 15.225 m2

Page 46: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 18 m2= 9 m2= 15 m2= 24 m2= 13.5 m2= 12 m2

91.5 m2

= 13.75 m2= 3.3 m2= 1.2 m2= 18.25 m2

= 115.2375 m2

= 28.125 m2= 26 m2= 29.88 m2= 16.68 m2= 177.936 m2= 17.46 m2= 17.46 m2= 313.541 m2

= 329.2181 m2

= 63.63 m'

= 110.0085 m'

Page 47: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 13.08 m3

= 13.08 m3

= 14.5275 m2= 11.25 m2= 25.7775 m2= 25.7775 m2

Page 48: RAB RAP RUMAH PAK SONY kusen rinci.xls

507.3425

Page 49: RAB RAP RUMAH PAK SONY kusen rinci.xls

JUMLAH KAYU 6/15J1 = 10.00 1.700 x 2.000 x 0.060 x 0.150 =

1.400 x 3.000 x 0.060 x 0.150 =Jumlah =Volume kayu untuk 10 Kusen J1 =

=

KACA T. 5mm0.580 x 1.150 x 2.000 =Volume kaca T.5mm untuk 10 kusen J1 =

KAYU 6/15J2 = 1.00 2.000 x 2.000 x 0.060 x 0.150 =

1.400 x 4.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 10 Kusen J2 =

=

KACA T. 5mm0.460 x 1.150 x 2.000 =Volume kaca T.5mm untuk 10 kusen J2 =

KAYU 6/15J3 = 2.00 0.900 x 2.000 x 0.060 x 0.150 =

1.900 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 10 Kusen J3 =

=

KACA T. 5mm1.650 x 0.550 x 1.000 =Volume kaca T.5mm untuk 10 kusen J3 =

KAYU 6/15J4 = 1.00 1.100 x 2.000 x 0.060 x 0.150 =

0.600 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 10 Kusen J3 =

=

Page 50: RAB RAP RUMAH PAK SONY kusen rinci.xls

KACA T. 5mm0.000 x 0.000 x 1.000 =Volume kaca T.5mm untuk 10 kusen J4 =

KAYU 6/15J5 = 1.00 1.100 x 3.000 x 0.060 x 0.150 =

3.600 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 10 Kusen J3 =

=

KACA T. 5mm1.050 x 0.750 x 1.000 =2.260 x 0.900 x 1.000 =

=Volume kaca T.5mm untuk 10 kusen J3 =

KAYU 6/15J6 = 1.00 0.800 x 2.000 x 0.060 x 0.150 =

1.400 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 10 Kusen J3 =

=

KACA T. 5mm1.150 x 0.450 x 1.000 =Volume kaca T.5mm untuk 10 kusen J4 =

KAYU 6/15J7 = 1.00 1.900 x 2.000 x 0.060 x 0.150 =

1.400 x 3.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 1 Kusen J7 =

=

KACA T. 5mm1.150 x 0.450 x 1.000 =1.050 x 1.300 x 1.000 =Volume kaca T.5mm untuk 1 kusen J7 =

KAYU 6/15

Page 51: RAB RAP RUMAH PAK SONY kusen rinci.xls

J8 = 1.00 2.000 x 2.000 x 0.060 x 0.150 =0.600 x 3.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 1 Kusen J8 =

=

KACA T. 5mm0.730 x 0.350 x 2.000 =0.000 x 0.000 x 0.000 =Volume kaca T.5mm untuk 1 kusen J8 =

KAYU 6/15J9 = 1.00 1.100 x 2.000 x 0.060 x 0.150 =

0.600 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 1 Kusen J9 =

=

KACA T. 5mm0.750 x 0.350 x 1.000 =0.000 x 0.000 x 0.000 =Volume kaca T.5mm untuk 1 kusen J9 =

KAYU 6/15P1 = 3.00 1.820 x 1.000 x 0.060 x 0.150 =

2.200 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 3 Kusen P1 =

=

KAYU 6/15P2 = 1.00 1.120 x 1.000 x 0.060 x 0.150 =

2.200 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 1 Kusen P2 =

=

KAYU 6/15P3 = 7.00 1.020 x 1.000 x 0.060 x 0.150 =

2.200 x 2.000 x 0.060 x 0.150 =

Page 52: RAB RAP RUMAH PAK SONY kusen rinci.xls

Jumlah =Volume kayu untuk 7 Kusen P3 =

=

KAYU 6/15P4 = 3.00 0.920 x 1.000 x 0.060 x 0.150 =

2.200 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 3 Kusen P4 =

=

P5 = 1.00

KAYU 6/15P6 = 1.00 4.900 x 2.000 x 0.060 x 0.150 =

2.500 x 2.000 x 0.060 x 0.150 =

Jumlah =Volume kayu untuk 1 Kusen J9 =

=

KACA T. 5mm0.520 x 2.140 x 6.000 =0.000 x 0.000 x 0.000 =Volume kaca T.5mm untuk 1 kusen J9 =

TOTAL PEKERJAAN PEMASANGAN KACA T. 5mm= 28.885 M2

Page 53: RAB RAP RUMAH PAK SONY kusen rinci.xls

0.0600.1500.0601.0000.270 M2

1.000 = 0.060 X 0.150= 0.009= 111.111= 30.000 M2

2.027 = 60.799 M2

Page 54: RAB RAP RUMAH PAK SONY kusen rinci.xls

KAYU 6/15 KAYU 3/80.031 m3 1.300 x 4.000 x 0.030 x 0.080 = 0.012 m30.038 m3 0.570 x 4.000 x 0.030 x 0.080 = 0.005 m30.068 m3 = 0.018 m30.684 m3 = 0.180 m3

0.864 m3

KACA T. 5mm1.334 m2

13.340 m2

KAYU 6/15 KAYU 3/80.036 m3 1.300 x 4.000 x 0.030 x 0.080 = 0.012 m30.050 m3 0.570 x 4.000 x 0.030 x 0.080 = 0.005 m3

0.480 x 10.000 x 0.030 x 0.080 = 0.012 m30.086 m3 = 0.018 m30.086 m3 = 0.018 m3

0.104 m3

KACA T. 5mm1.058 m21.058 m2

KAYU 6/15 KAYU 3/80.016 m3 1.800 x 2.000 x 0.030 x 0.080 = 0.009 m30.034 m3 0.600 x 2.000 x 0.030 x 0.080 = 0.003 m3

0.050 m3 = 0.012 m30.101 m3 = 0.023 m3

0.124 m3

KACA T. 5mm0.908 m21.815 m2

KAYU 6/15 KAYU 3/80.020 m3 0.900 x 8.000 x 0.030 x 0.080 = 0.017 m30.011 m3

0.031 m3 = 0.017 m30.031 m3 = 0.017 m3

0.048 m3

Page 55: RAB RAP RUMAH PAK SONY kusen rinci.xls

KACA T. 5mm0.000 m20.000 m2

KAYU 6/15 KAYU 3/80.030 m3 1.200 x 2.000 x 0.030 x 0.080 = 0.006 m30.065 m3 0.800 x 2.000 x 0.030 x 0.080 = 0.004 m3

0.095 m3 = 0.010 m30.095 m3 = 0.010 m30.104 m3

KACA T. 5mm0.788 m22.034 m22.822 m22.822 m2

KAYU 6/15 KAYU 3/80.014 m3 1.300 x 2.000 x 0.030 x 0.080 = 0.006 m30.025 m3 0.600 x 2.000 x 0.030 x 0.080 = 0.003 m3

0.040 m3 = 0.009 m30.040 m3 = 0.009 m3

0.049 m3

KACA T. 5mm0.518 m20.518 m2

KAYU 6/15 KAYU 3/80.034 m3 1.300 x 2.000 x 0.030 x 0.080 = 0.006 m30.038 m3 0.510 x 2.000 x 0.030 x 0.080 = 0.002 m3

0.072 m3 = 0.009 m30.072 m3 = 0.009 m3

0.081 m3

KACA T. 5mm0.518 m21.365 m21.883 m2

KAYU 6/15 KAYU 3/8

Page 56: RAB RAP RUMAH PAK SONY kusen rinci.xls

0.036 m3 0.880 x 4.000 x 0.030 x 0.080 = 0.008 m30.016 m3 0.400 x 4.000 x 0.030 x 0.080 = 0.004 m3

0.052 m3 = 0.012 m30.052 m3 = 0.012 m3

0.064 m3

KACA T. 5mm0.511 m20.000 m20.511 m2

KAYU 6/15 KAYU 3/80.020 m3 0.900 x 2.000 x 0.030 x 0.080 = 0.004 m30.011 m3 0.400 x 2.000 x 0.030 x 0.080 = 0.002 m3

0.031 m3 = 0.006 m30.031 m3 = 0.006 m3

0.037 m3

KACA T. 5mm0.262 m20.000 m20.262 m2

KAYU 6/15 PAPAN 3/20 DAUN PINTU0.016 m3 1.820 x 2.200 x 0.030 = 0.120 m30.040 m3 0.000 x 0.000 x 0.000 = 0.000 m3

0.056 m3 = 0.120 m30.168 m3 = 0.360 m3

0.528 m3

KAYU 6/15 PAPAN 3/20 DAUN PINTU0.010 m3 1.120 x 2.200 x 0.030 = 0.074 m30.040 m3 0.000 x 0.000 x 0.000 = 0.000 m3

0.050 m3 = 0.074 m30.050 m3 = 0.074 m3

0.124 m3

KAYU 6/15 PAPAN 3/20 DAUN PINTU0.009 m3 1.020 x 2.200 x 0.030 = 0.067 m30.040 m3 0.000 x 0.000 x 0.000 = 0.000 m3

Page 57: RAB RAP RUMAH PAK SONY kusen rinci.xls

0.049 m3 = 0.067 m30.341 m3 = 0.471 m3

0.813 m3

KAYU 6/15 PAPAN 3/20 DAUN PINTU0.008 m3 0.920 x 2.200 x 0.030 = 0.061 m30.040 m3 0.000 x 0.000 x 0.000 = 0.000 m3

0.048 m3 = 0.061 m30.144 m3 = 0.182 m3

0.326 m3

KAYU 6/15 KAYU 3/80.088 m3 2.450 x 12.000 x 0.030 x 0.080 = 0.071 m30.045 m3 0.750 x 12.000 x 0.030 x 0.080 = 0.022 m3

0.133 m3 = 0.092 m30.133 m3 = 0.092 m3

0.225 m3

KACA T. 5mm6.677 m20.000 m26.677 m2

Page 58: RAB RAP RUMAH PAK SONY kusen rinci.xls

X 1.000

Page 59: RAB RAP RUMAH PAK SONY kusen rinci.xls

16 120.000201 0.000113

7200 72001.446912 0.813888

0.081

12.5jumlah tul utama 6Jumlah tul Pokok 83.33333

1.0789.16667

Koef 1.1

Plat dak7 Bh 5.6972167 Bh 5.697216

11.394432 Kg1m23sam dengan 8.33 m2 t.12 94.91561856 KgKoef 1.1 104.407180416Pembulatan 110 Kg

Sloof

KOLOM STRUKTUR 30 X 30dimensi kolom = 0.3 xVolume 1m3 dengan panjang = 11.111111111111 m

Page 60: RAB RAP RUMAH PAK SONY kusen rinci.xls

tulangan utama = 6D16sengkang = Ǿ12-150Berat besi D16r = 0.008L = 0.00020096Berat jenis besi = 7600berat 12 meter = 12 x

= 18.327552

Jumlah besi D16 dalam 1m3 beton = 6 x= 109.965312 Kg

SengkangǾ12-150r = 0.006L = 0.00011304Berat jenis besi = 7600berat 12 meter = 12 x

= 10.309248

panjang sengkang = 1.12 mJumlah sengkang = 11.111111111111 :

= 74.074074074074= 75 bh

Panjang besi sengkang = 75 x= 84 m

Berat besi = 72.164736 Kg

Berat bsei total = 182.130048

Plat beton t.12Luasan plat beton 1m3 = 1 :

= 8.3333333333333 m2Misal dimensi plat 2 x 4.2 = 2 xpanjang 4.2 = 2 :

= 6.6666666666667 Bh= 7 Bh= 14 Bh

Panjang tulangan = 4.2 x= 58.8 x

Page 61: RAB RAP RUMAH PAK SONY kusen rinci.xls

Berat tulangan = 50.5153152 Kg

Luasan plat beton 1m3 = 1 := 8.3333333333333 m2

Misal dimensi plat 2 x 4.2 = 2 xpanjang 4.2 = 4 :

= 13.333333333333 Bh= 14 Bh= 28 Bh

Panjang tulangan = 4.2 x= 117.6 x

Berat tulangan = 101.0306304 Kg

Total berat tulangan = 151.5459456= 150 Kg

Kolom Praktisdimensi kolom = 0.15 xVolume 1m3 dengan panjang = 44.444444444444 m

tulangan utama = 4Ǿ12sengkang = Ǿ10-150Berat besi D16r = 0.006L = 0.00011304Berat jenis besi = 7600berat 12 meter = 12 x

= 10.309248

Jumlah besi D12 dalam 1m3 beton = 6 x= 61.855488 Kg

SengkangǾ10-150r = 0.005L = 0.0000785Berat jenis besi = 7600berat 12 meter = 12 x

= 7.1592

panjang sengkang = 0.44 mJumlah sengkang = 44.444444444444 :

= 296.2962962963= 75 bh

Panjang besi sengkang = 75 x

Page 62: RAB RAP RUMAH PAK SONY kusen rinci.xls

= 33 mBerat besi = 19.6878 Kg

Berat bsei total = 81.543288

BALOK STRUKTUR 20X40dimensi balok 20x40 = 0.2 xVolume 1m3 dengan panjang = 12.5 m

tulangan utama = 6D16sengkang = Ǿ12-150Berat besi D16r = 0.008L = 0.00020096Berat jenis besi = 7600berat 12 meter = 12 x

= 18.327552

Jumlah besi D16 dalam 1m3 beton = 6 x= 109.965312 Kg

SengkangǾ12-150r = 0.006L = 0.00011304Berat jenis besi = 7600berat 12 meter = 12 x

= 10.309248

panjang sengkang = 1.12 mJumlah sengkang = 12.5 :

= 83.333333333333= 75 bh

Panjang besi sengkang = 75 x= 84 m

Berat besi = 72.164736 Kg

Berat bsei total = 182.130048

SLOOF STRUKTUR 20X40dimensi balok 20x40 = 0.2 x

Page 63: RAB RAP RUMAH PAK SONY kusen rinci.xls

Volume 1m3 dengan panjang = 12.5 m

tulangan utama = 6D14sengkang = Ǿ10-150Berat besi D16r = 0.007L = 0.00015386Berat jenis besi = 7600berat 12 meter = 12 x

= 14.032032

Jumlah besi D16 dalam 1m3 beton = 6 x= 84.192192 Kg

SengkangǾ10-150r = 0.005L = 0.0000785Berat jenis besi = 7600berat 12 meter = 12 x

= 7.1592

panjang sengkang = 1.08 mJumlah sengkang = 12.5 :

= 83.333333333333= 75 bh

Panjang besi sengkang = 75 x= 81 m

Berat besi = 48.3246 Kg

Berat bsei total = 132.516792

Page 64: RAB RAP RUMAH PAK SONY kusen rinci.xls

Bh 108.5184Bh

72.57168

181.0901199.1991

0.3

Page 65: RAB RAP RUMAH PAK SONY kusen rinci.xls

80.008

1.527296

18.3275560%

0.859104

0.15

1.12

40%

0.12

40.3

x 2

140.859104

Page 66: RAB RAP RUMAH PAK SONY kusen rinci.xls

0.12

40.3

x

280.859104

0.15

80.008

0.859104

10.3092576%

0.5966

0.15

0.44

Page 67: RAB RAP RUMAH PAK SONY kusen rinci.xls

24%

0.4

1.527296

18.3275560%

0.859104

0.15

1.12

40%

0.4

Page 68: RAB RAP RUMAH PAK SONY kusen rinci.xls

1.169336

14.0320364%

0.5966

0.15

1.08

36%