rap uang muka

Upload: sembadha

Post on 03-Apr-2018

264 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Rap Uang Muka

    1/25

    1 Adukan K-175 readymix m 3 757,900.00Rp

    2 Adukan K-225 readymix m 3 790,600.00Rp

    3 Air Tawar ltr 3,300.00Rp

    4 Ampelas lbr 3,400.00Rp

    5 Aspal RC 70 (Cilacap) kg 11,700.00Rp

    6 Bambu Dia. 5 cm s.d 7 cm btg 25,400.00Rp

    7 Batu Belah m 3 208,100.00Rp

    8 Batu pecah mesin 2/3 m 3 261,400.00Rp

    9 Batu pecah mesin 5/7 m 3 261,400.00Rp

    10 Besi Beton Rata-rata U.32 Ulir kg 11,700.00Rp11 Besi Cahanel/siku/Profil m 1 13,100.00Rp

    12 Cat Menie Besi "JAGUAR" kg 30,000.00Rp

    13 Cat Minyak kg 32,700.00Rp

    14 Cat Plafond sekelas "PROPAINT" kg 60,100.00Rp

    15 Grease/gemuk kg 34,700.00Rp

    16 Kabel dan lampu ls 99,000.00Rp

    17 Kansteen Jalan (0.6 m) m 1 28,000.00Rp

    18 Karung Plastik bh 6,200.00Rp

    19 Kaso 5/7 Kayu "Lokal" m 3 1,568,200.00Rp

    20 Kaso 5/7 Kayu Lokal (2x) 50% m 3 784,100.00Rp

    21 Kawat Beton kg 24,800.00Rp22 Kawat Las kg 28,200.00Rp

    23 Kayu Bakar m 3 1,698,800.00Rp

    24 Kayu Balok Borneo Super m 3 4,965,800.00Rp

    25 Kayu Balok Kamper Medan m 3 7,579,400.00Rp

    26 Kayu Balok Lokal m 3 2,025,500.00Rp

    27 Kayu Papan Borneo Super m 3 5,096,500.00Rp

    28 Kayu Papan Kamper Banjar m 3 8,265,500.00Rp

    29 Kayu Terentang Lokal m 3 1,698,800.00Rp

    30 Kayu Stoot btg 14,900.00Rp

    31 Kerosin ltr 11,100.00Rp

    32 Kwas 3" bh 12,900.00Rp33 Lem Kuning kg 35,800.00Rp

    34 Lem Paralon tb 8,600.00Rp

    35 Lem Putih (FOX) kg 13,400.00Rp

    36 Multipleks 9 mm (2x) 50% lbr 179,000.00Rp

    37 Material Pipa Beton dia. 400 mm t=80 mm m 1 213,500.00Rp

    38 Paku 1 s/d 3 cm kg 22,300.00Rp

    39 Paku 5 s/d 7 cm kg 24,400.00Rp

    40 Paku 8 s/d 12 cm kg 23,400.00Rp

    DAFTAR HARGA SATUAN BAHAN BANGUNAN

    PEMBANGUNAN LANDING AREA DI CALINCING WADUK CIRATA

    CALINCING KABUPATEN CIANJUR

    NO. JENIS BAHAN

    S A T U A N

    HARGASATUAN

  • 7/28/2019 Rap Uang Muka

    2/25

    NO. JENIS BAHAN

    S A T U A N

    HARGASATUAN

    41 Papan Terentang (2xpakai) 75% m 3 65,300.00Rp

    42 Pasir Beton m 3 215,600.00Rp

    43 Pasir Pasang m3

    209,100.00Rp44 Pasir Urug m 3 65,300.00Rp

    45 PC "SEMEN TIGA RODA" 50 kg zak 63,900.00Rp

    46 Pelumas ltr 39,200.00Rp

    47 PPPK ls 16,900.00Rp

    48 Readimix Beton K175, berikut selang m 3 757,900.00Rp

    49 Readimix Beton K225, berikut selang m 3 790,600.00Rp

    50 Solar ltr 4,500.00Rp

    51 Tanah urug m 3 73,200.00Rp

    52 Oxygen tbg 118,800.00Rp

    53 Acetylene tbg 108,900.00Rp

    Tasikmlaya, 1 Oktober 2012

    Kuasa Direktur

    PT. SENTOSA SAPUTRA INDAH

    IMAN HANDIMAN, MT

    0

  • 7/28/2019 Rap Uang Muka

    3/25

  • 7/28/2019 Rap Uang Muka

    4/25

    1 Sewa Compactor (8V-40) hari 313,000.00Rp2 Alat Pancang (leader dan Hammer) jam 3,300.00Rp3 Sewa Compressor hari 142,800.00Rp4 Sewa Concrete Mixer 500 l hari 179,000.00Rp5 Sewa Genset hari 338,100.00Rp7 Sewa Pompa Air hari 142,800.00Rp8 Sewa Stamper hari 179,000.00Rp9 Sewa Tandem Steel Roller hari 429,500.00Rp

    10 Sewa Theodolite hari 187,800.00Rp17 Crane 25 ton jam 133,700.00Rp

    18 Mesin Las Listrik 18 PK jam 47,000.00Rp

    19 Sewa Asphalt Sprayer hari 358,100.00Rp

    20 Sewa Dump Truck hari 572,300.00Rp21 Sewa Excavator Backhoe jam 343,000.00Rp22 Mesin Bor Listrik jam 23,300.00Rp

    Tasikmlaya, 1 Oktober 2012Kuasa Direktur

    PT. SENTOSA SAPUTRA INDAH

    IMAN HANDIMAN, MT0

    DAFTAR HARGA SATUAN ALATPEMBANGUNAN LANDING AREA DI CALINCING WADUK CIRATA

    NO. JENIS ALAT

    S A T U A N

    HARGASATUAN

    CALINCING KABUPATEN CIANJUR

  • 7/28/2019 Rap Uang Muka

    5/25

    1 Juru Gambar H.O 75,000.00Rp2 Juru Ukur H.O 89,000.00Rp3 Kepala Tukang Batu H.O 50,000.00Rp4 Kepala Tukang Besi Beton H.O 54,000.00Rp5 Kepala Tukang Besi Profil H.O 54,000.00Rp6 Kepala Tukang Cat/Pelitur H.O 52,000.00Rp7 Kepala Tukang Kayu H.O 54,000.00Rp8 Mandor H.O 60,000.00Rp9 Mekanik H.O 50,000.00Rp

    10 Operator H.O 55,000.00Rp11 Pekerja H.O 38,000.00Rp

    12 Pekerja Setengah Terampil H.O 42,500.00Rp13 Pekerja Terampil H.O 45,000.00Rp14 SatPam H.O 45,000.00Rp15 Tukang Batu Setengah Terampil H.O 45,500.00Rp16 Tukang Batu Terampil H.O 48,000.00Rp17 Tukang Besi Beton Setengah Terampil H.O 47,500.00Rp18 Tukang Besi Beton Terampil H.O 50,000.00Rp19 Tukang Besi Profil Terampil H.O 50,000.00Rp20 Tukang Besi Profil Setengah Terampil H.O 47,500.00Rp21 Tukang Cat/Pelitur Setengah Terampil H.O 45,500.00Rp22 Tukang Cat/Pelitur Terampil H.O 48,000.00Rp23 Tukang Kayu Setengah Terampil H.O 47,500.00Rp24 Tukang Kayu Terampil H.O 50,000.00Rp

    25 Tukang Pancang H.O 60,000.00Rp

    Tasikmlaya, 1 Oktober 2012Kuasa Direktur

    PT. SENTOSA SAPUTRA INDAH

    IMAN HANDIMAN, MT0

    DAFTAR HARGA SATUAN UPAHPEMBANGUNAN LANDING AREA DI CALINCING WADUK CIRATA

    NO. JENIS UPAH

    S A T U A N

    HARGASATUAN

    CALINCING KABUPATEN CIANJUR

  • 7/28/2019 Rap Uang Muka

    6/25

    No.Item

    JENIS PEKERJAAN S A T U A N

    K O E F I S I E N

    HARGA SATUAN(Rp.)

    SUB TOTALUPAH KERJA

    (Rp.)

    S

    b c d e f = (d x e) g =37 48 m' Pemancangan Tiang

    MaterialKayu Terentang Lokal m 3 0.110 1,698,800.00Rp RpOlie,gemuk dll m' 48.000 39,200.00Rp RpSolar ltr 800.000 4,500.00Rp Rp

    PekerjaOperator org 2.000 55,000.00Rp 110,000.00RpPekerja org 6.000 38,000.00Rp 228,000.00RpMekanik org 4.000 50,000.00Rp 200,000.00RpTukang pancang org 2.000 60,000.00Rp 120,000.00Rp

    PeralatanCrane 25 ton jam 10.000 133,700.00Rp Rp

    Alat Pancang (leader dan Hammer) jam 10.000 3,300.00Rp RpGenset jam 10.000 338,100.00Rp RpTotal Harga 658,000.00Rp Rp

    1 m 1 Pemancangan Tiang38 1bh Pemotongan Tiang Pancang

    MaterialOxygen tbg 0.750 118,800.00Rp Rp

    Acetylene tbg 0.850 108,900.00Rp RpPekerja

    Tukang Kayu Terampil org 0.150 50,000.00Rp 7,500.00RpPekerja org 0.050 38,000.00Rp 1,900.00RpMandor org 0.050 60,000.00Rp 3,000.00Rp

    PeralatanMesin Las Listrik 18 PK jam 0.500 47,000.00Rp Rp Alat bantu ls 0.500 33,810.00Rp RpGenset jam 0.500 338,100.00Rp RpTotal Harga 12,400.00Rp Rp

    39 1bh Penyambungan Tiang PancangMaterial

    Kawat las kg 5.000 28,200.00Rp RpBesi chanel / siku / profil kg 22.500 13,100.00Rp Rp

    PekerjaTukang Kayu Terampil org 0.300 50,000.00Rp 15,000.00RpPekerja org 0.600 38,000.00Rp 22,800.00RpMandor org 0.050 60,000.00Rp 3,000.00Rp

    PeralatanMesin Las Listrik 18 PK jam 0.500 47,000.00Rp RpGenset jam 0.500 338,100.00Rp RpTotal Harga 40,800.00Rp Rp

    40 1m 1 Pengangkutan Tiang Pancang Ke Titik PancangMaterial

    Olie,gemuk dll ltr 0.140 39,200.00Rp RpSolar ltr 6.250 4,500.00Rp RpGrease/gemuk kg 0.056 34,700.00Rp Rp

    PekerjaOperator org 0.028 55,000.00Rp 1,540.00RpPekerja org 0.112 38,000.00Rp 4,256.00Rp

    PeralatanCrane 25 ton jam 0.069 133,700.00Rp Rp

    Alat Bantu ls 1.000 13,370.00Rp Rp

    ANALISA HARGA SATUAN PEKERJAANPEMBANGUNAN LANDING AREA DI CALINCING WADUK CIRATA

    CALINCING KABUPATEN CIANJUR

  • 7/28/2019 Rap Uang Muka

    7/25

    1 2 3 4 5 6 = (4 x 5) 7

    1a 1Ls Mobilisasi - Demobilisasi Peralatan Pek Jalan

    Peralatan

    Dumptruck bh 4.000 5,000,000.00 20,000,000.00

    Genset bh 1.000 2,000,000.00 2,000,000.00

    Vibrator beton bh 4.000 500,000.00 2,000,000.00

    Compressor bh 2.000 1,000,000.00 2,000,000.00

    Fasikitas pendukung lainnya ls 1.000 3,500,000.00 3,500,000.00

    Total Harga 29,500,000.00

    1b 1Ls Mobilisasi - Demobilisasi Peralatan Landing

    Peralatan

    Crane pancang bh 1.000 12,000,000.00 12,000,000.00

    Alat Pancang bh 1.000 12,000,000.00 12,000,000.00

    Dumptruck bh 2.000 5,000,000.00 10,000,000.00

    Genset bh 1.000 2,000,000.00 2,000,000.00

    Mesin las bh 1.000 500,000.00 500,000.00

    Beton molen bh 2.000 1,000,000.00 2,000,000.00

    Vibrator beton bh 1.000 500,000.00 500,000.00

    Compressor bh 1.000 1,000,000.00 1,000,000.00

    Pompa air bh 1.000 1,000,000.00 1,000,000.00

    Total Harga 41,000,000.00

    1c 1m 2 PEK. PENGUKURAN KEMBALI (SITE)

    Tukang Batu Terampil m 0.005 48,000.00 240.00

    Pekerja Terampil org 0.006 45,000.00 270.00

    Peralatan ls 1.000 400.00

    Total Harga 510.00

    1d 1 bh PAPAN NAMA PROYEK

    Kayu Balok Lokal m 3 0.130 2,025,500.00

    Paku 5 s/d 7 cm kg 0.250 24,400.00

    Cat Minyak kg 0.800 32,700.00

    Penulisan ls 1.000 10,000.00 10,000.00

    Ongkos pasang ls 1.000 8,000.00 8,000.00

    Total Harga 18,000.00

    1e Ls PENERANGAN DAN KESELAMATAN KERJA

    Kabel Dan Lampu ls 1.000 99,000.00

    Pelumas ltr 1.000 39,200.00

    PPPK ls 1.000 16,900.00

    Mekanik org 2.000 50,000.00 100,000.00

    Sewa Genset hari 25.000 338,100.00

    Total Harga 100,000.00 8

    11m

    3

    GALIAN / KUPASAN TANAH (ALAT BERAT)Pekerja org 0.267 38,000.00 10,133.33

    Mandor org 0 027 60 000 00 1 600 00

    ANALISA HARGA SATUAN PEKERJAAN

    PEMBANGUNAN LANDING AREA DI CALINCING WADUK CIRATA

    CALINCING KABUPATEN CIANJUR

    S A T U A N

    K O E

    F I S I E N

    NO. JENIS PEKERJAANHARGASATUAN

    (Rp.)

    SUB TOTALUPAH KERJA

    (Rp.)

  • 7/28/2019 Rap Uang Muka

    8/25

  • 7/28/2019 Rap Uang Muka

    9/25

    1 2 3 4 5 6 = (4 x 5) 7

    S A T U A N

    K O E F I S I E N

    NO. JENIS PEKERJAANHARGA

    SATUAN(Rp.)

    SUB TOTALUPAH KERJA

    (Rp.)

    24 1M3 COR BETON K-175 READY MIX BERIKUT SLANG

    Adukan K-175 readymix m3 1.000 757,900.00

    Pekerja org 2.500 38,000.00 95,000.00

    Tukang batu setengah terampil org 0.250 45,500.00 11,375.00

    Kepala Tukang batu org 0.100 50,000.00 5,000.00

    Mandor org 0.010 60,000.00 600.00

    Alat bantu (slang+tes lab) lot 0.045 50,000.00

    Total Harga 111,975.00

    25 1M3 COR BETON K-225 READY MIX BERIKUT SLANG

    Adukan K-225 readymix m3 1.000 790,600.00

    Pekerja org 2.500 38,000.00 95,000.00

    Tukang batu setengah terampil org 0.250 45,500.00 11,375.00Kepala Tukang batu org 0.100 50,000.00 5,000.00

    Mandor org 0.010 60,000.00 600.00

    Alat bantu (slang+tes lab) lot 0.045 50,000.00

    Total Harga 111,975.00

    26 1 kg BESI BETON TERPASANG U.30

    Besi Beton Rata-rata U.32 Ulir kg 1.000 11,700.00

    Kawat Beton kg 0.010 24,800.00

    Peralatan ls 1.000 500.00

    Tukang Besi Beton Setengah Terampil org 0.025 47,500.00 1,187.50

    Tukang Besi Beton Terampil org 0.015 50,000.00 750.00

    Kepala Tukang Besi Beton org 0.010 54,000.00 540.00Mandor org 0.005 60,000.00 300.00

    Total Harga 2,777.50

    39 1 m 3 BETON BETON BERTULANG U/ PLAT K 225

    Tulangan utama 4 buah dia 12 mm kg 27.506

    Beugel jarak 20 cm dia. 10 mm kg 3.083 85.63

    BESI BETON TERPASANG U.30 kg 85.634 15,225.50

    BEKISTING DENGAN MULTIPLEKS m 2 5.000 124,500.46

    COR BETON SITE MIX K 225 m 3 1.000 904,825.00

    STOOT WERK m 2 0.450 255,364.00

    Total Harga

    40 1 m3

    BETON BERTULANG U/ BALOK INDUK K 225Tulangan utama 4 buah dia 12 mm kg 78.912

    Beugel jarak 20 cm dia. 10 mm kg 83.844

    BESI BETON TERPASANG U.30 kg 200.908 15,225.50

    BEKISTING DENGAN MULTIPLEKS m 2 5.000 124,500.46

    COR BETON SITE MIX K 225 m 3 1.000 904,825.00

    STOOT WERK m 2 0.450 255,364.00

    Total Harga

    41 1 m 3 BETON BERTULANG U/ BALOK ANAK K 225

    Tulangan utama 4 buah dia 16 mm kg 52.608

    Beugel jarak 20 cm dia. 12 mm kg 38.840

    BESI BETON TERPASANG U.30 kg 192.259 15,225.50BEKISTING DENGAN MULTIPLEKS m 2 5.000 124,500.46

    3

  • 7/28/2019 Rap Uang Muka

    10/25

    1 2 3 4 5 6 = (4 x 5)

    S A T U A N

    K O E F I S I E N

    NO. JENIS PEKERJAANHARGA

    SATUAN(Rp.)

    SUB TOTALUPAH KERJA

    (Rp.)

    421 m

    3

    BETON BERTULANG U/ BALOK ABUTMENT K 225Tulangan utama 4 buah dia 16 mm kg 52.608

    Beugel jarak 20 cm dia. 12 mm kg 38.840

    BESI BETON TERPASANG U.30 kg 183.754 15,225.50

    BEKISTING DENGAN MULTIPLEKS m 2 5.000 124,500.46

    COR BETON SITE MIX K 225 m 3 1.000 904,825.00

    STOOT WERK m 2 0.450 255,364.00

    Total Harga

    43 1 m 3 BETON BERTULANG U/ PILE CAP K 225

    Tul panjang jarak 20 cm dia. 14 mm kg 60.417

    Tul pendek jarak 20 cm dia. 14 mm kg 60.417

    Tul sengkang dia. 14 mm kg 10.875 BESI BETON TERPASANG U.30 kg 206.808 15,225.50

    BEKISTING DENGAN MULTIPLEKS m 2 5.000 124,500.46

    COR BETON SITE MIX K 225 m 3 1.000 904,825.00

    STOOT WERK m 2 0.450 255,364.00

    Total Harga

    44 1 m 3 BETON BERTULANG U/ KOLOM K 225

    Tul panjang jarak 20 cm dia. 14 mm kg 107.408

    Tul pendek jarak 20 cm dia. 14 mm kg 80.556

    Tul sengkang dia. 14 mm kg 8.700

    BESI BETON TERPASANG U.30 kg 187.204 15,225.50

    BEKISTING DENGAN MULTIPLEKS m2

    5.000 124,500.46COR BETON SITE MIX K 225 m 3 1.000 904,825.00

    STOOT WERK m 2 0.450 255,364.00

    Total Harga

    45 1 m 3 BETON BERTULANG U/ BALOK FENDER K 225

    Tul panjang jarak 20 cm dia. 14 mm kg 107.408

    Tul pendek jarak 20 cm dia. 14 mm kg 80.556

    Tul sengkang dia. 14 mm kg 8.700

    BESI BETON TERPASANG U.30 kg 201.361 15,225.50

    BEKISTING DENGAN MULTIPLEKS m 2 5.000 124,500.46

    COR BETON SITE MIX K 225 m 3 1.000 904,825.00

    STOOT WERK m2

    0.450 255,364.00Total Harga

    46 1 m 3 BETON BERTULANG U/ PENGISI TIANG PANCANG K 225

    Tul panjang jarak 20 cm dia. 14 mm kg 107.408

    Tul pendek jarak 20 cm dia. 14 mm kg 80.556

    Tul sengkang dia. 14 mm kg 8.700

    BESI BETON TERPASANG U.30 kg 145.615 15,225.50

    BEKISTING DENGAN MULTIPLEKS m 2 4.000 124,500.46

    COR BETON SITE MIX K 225 m 3 1.000 904,825.00

    STOOT WERK m 2 0.450 255,364.00

    Total Harga

    49 1 m 3 LANTAI KERJA 1PC:3PS:5KRLPC "SEMEN TIGA RODA" 50 kg zak 3.956 63,900.00

  • 7/28/2019 Rap Uang Muka

    11/25

    1 2 3 4 5 6 = (4 x 5) 7

    S A T U A N

    K O E F I S I E N

    NO. JENIS PEKERJAANHARGASATUAN

    (Rp.)

    SUB TOTALUPAH KERJA

    (Rp.)

    501m

    3

    PASANGAN AANSTAMPINGBatu Belah m 3 1.100 208,100.00

    Pasir urug m 3 0.100 65,300.00

    Pekerja org 0.500 38,000.00 19,000.00

    Tukang Batu Setengah Terampil org 0.563 45,500.00 25,593.75

    Kepala Tukang Batu org 0.075 50,000.00 3,750.00

    Mandor org 0.056 60,000.00 3,360.00

    Total Harga 51,703.75

    53 1 m 3 PASANGAN BATU KALI 1 : 3

    Kepala Tukang Batu org 0.113 50,000.00 5,625.00

    Tukang Batu Setengah Terampil org 0.500 45,500.00 22,750.00

    Pekerja org 1.250 38,000.00 47,500.00Mandor org 0.017 60,000.00 1,014.00

    Batu Belah m 3 1.200 208,100.00

    PC "Semen Tiga Roda" 50 kg zak 1.420 63,900.00

    Pasir pasang m 3 0.400 209,100.00

    Total Harga 76,889.00

    60 1 m 2 SIARAN

    Kepala Tukang Batu org 0.020 50,000.00 1,000.00

    Tukang Batu Setengah Terampil org 0.088 45,500.00 4,004.00

    Mandor org 0.003 60,000.00 180.00

    PC "Semen Tiga Roda" 50 kg zak 0.216 63,900.00

    Total Harga 5,184.0099 1 m 2 PEK. CERUCUK BAMBU

    Bambu Dia. 5 cm s.d 7 cm btg 1.500 25,400.00

    Pekerja org 0.250 38,000.00 9,500.00

    Mandor org 0.010 60,000.00 600.00

    Peralatan ls 1.000 1,000.00

    Total Harga 10,100.00

    100 1 m2 PASANGAN STOOT WERK

    Kayu stoot bt 9.000 14,900.00

    Kayu Papan Borneo Super m3 0.016 5,096,500.00

    Paku 5 s/d 7 cm kg 0.500 24,400.00

    Pekerja org 0.150 38,000.00 5,700.00Tukang kayu terampil org 0.200 50,000.00 10,000.00

    Kepala tukang kayu org 0.200 54,000.00 10,800.00

    Mandor org 0.017 60,000.00 1,020.00

    Total Harga 27,520.00

    102 1 m 2 PEMADATAN LAPISAN TERATAS / Sub Grade Min. CBR 4

    Pekerja org 0.020 38,000.00 760.00

    Mandor org 0.100 60,000.00 6,000.00

    Sewa Tandem Steel Roller jam 0.080 429,500.00

    Total Harga 6,760.00

    103 1m2 Pasangan Onderlag Batu Belah t = 20 cm

    Pasir Pasang m 3 0.150 209,100.00Batu Belah m 3 0.250 208,100.00

  • 7/28/2019 Rap Uang Muka

    12/25

    1 2 3 4 5 6 = (4 x 5) 7

    S A T U A N

    K O E F I S I E N

    NO. JENIS PEKERJAANHARGA

    SATUAN(Rp.)

    SUB TOTALUPAH KERJA

    (Rp.)

    107 1 m2 LAPIS PEREKAT (TACK COAT)

    Pekerja org 0.034 38,000.00 1,307.20

    , Mandor org 0.007 60,000.00 414.00

    Aspal RC 70 (Cilacap) kg 0.862 11,700.00

    Kerosin lt 0.258 11,100.00

    Sewa Asphalt Sprayer hari 0.003 358,100.00

    Sewa Compressor hari 0.006 142,800.00

    Sewa Dump Truck (4 - 6 ton) hari 0.003 572,300.00

    Total Harga 1,721.20

    108 1m 1 Pek. Kansteen

    Kansteen Jalan (0.6 m) bh 1.400 28,000.00

    PC "Semen Tiga Roda" 50 kg zak 0.130 63,900.00

    Pasir Pasang m 3 0.210 209,100.00

    Kepala Tukang Batu org 0.250 50,000.00 12,500.00

    Tukang Batu Setengah Terampil org 0.500 45,500.00 22,750.00

    Pekerja org 0.025 38,000.00 950.00

    Mandor org 0.003 60,000.00 180.00

    Alat Bantu ls 1.000 1,000.00

    Total Harga 36,380.00

  • 7/28/2019 Rap Uang Muka

    13/25

    JUMLAHHARGA

    (Rp)a b c d11 Batu kali 1 : 3 m 3 500,987.002 Bekisting dengan multiplek 9 mm m2 124,500.463 Bekisting dengan papan m 2 53,516.904 Besi beton terpasang u.30 Kg 15,225.505 Beton bertulang u/ balok induk ( K225) m3 4,701,164.166 Beton bertulang u/ kepala pondasi (abutment) ( K225) m3 4,439,991.977 Beton bertulang u/ kolom ( K225) m3 4,492,513.748 Beton bertulang u/ pengisi tiang pancang ( K225) m3 3,734,801.819 Beton bertulang u/ pile cap ( K225) m3 4,790,998.68

    10 Beton bertulang u/ plat ( K225) m3 2,946,067.3811 Cerucuk bambu m 2 49,200.0012 Cor beton k-175 ready mix berikut slang m 3 872,125.0013 Cor beton k-225 ready mix berikut slang m 3 904,825.0014 Galian / kupasan tanah (alat berat) m 3 35,743.3315 Lantai kerja 1pc:3ps:5krl m 3 719,153.9916 Lapis perekat (tack coat) ltr 18,738.0817 Lapisan pengisi/penutup m 2 12,542.8018 Mobilisasi - demobilisasi peralatan ls 70,500,000.0019 Onderlag batu belah m 2 95,140.0020 Papan nama proyek bh 313,575.0021 Pasangan aanstamping m 3 287,143.7522 Pasangan kisdam m 3 155,888.1023 Pek. Pemasangan besi/baja kg 16,747.9024 Pekerjaan Kansteen m 1 128,823.5625 Pemadatan lapisan teratas / sub grade min. Cbr 4 m 2 41,120.0026 Pemancangan tiang m1 230,780.5827 Pemotongan tiang pancang bh 403,520.0028 Penerangan dan keselamatan kerja LS 8,707,600.0029 Pengangkutan tiang pancang ke titik pancang m1 63,947.5030 Pengukuran kembali (site) m 2 910.0031 Pengurasan air m 1 11,698.4032 Penyambungan tiang pancang bh 669,100.0033 Siaran m 2 18,986.4034 Stoot werk m 2 255,364.0035 Tiang pancang beton f 400 mm, t = 80 mm m1 558,500.0036 Urugan pasir di bawah lantai & pondasi m 3 236,310.00

    Tasikmlaya, 1 Oktober 2012

    Kuasa Direktur PT. SENTOSA SAPUTRA INDAH

    IMAN HANDIMAN, MT0

    No. JENIS PEKERJAAN SATUAN

    RESUME HARGA SATUAN PEKERJAANPEMBANGUNAN LANDING AREA DI CALINCING WADUK CIRATA

    CALINCING KABUPATEN CIANJUR

  • 7/28/2019 Rap Uang Muka

    14/25

  • 7/28/2019 Rap Uang Muka

    15/25

    NO. URAIAN PEKERJAAN

    V O L U M E

    S A T U A N

    HARGA SATUAN(Rp.)

    JUMLAH HARGA (Rp.)

    IV PEKERJAAN JALAN LANDING DAN PAS. BATU KALI

    7 Urugan pasir di bawah lantai & pondasi 73.92 m 3 236,310.00 17,468,035.20Rp

    8 Pasangan Aanstamping 295.68 m 3 287,143.75 84,902,664.00Rp

    9 Batu kali 1 : 3 250.00 m 3 500,987.00 125,246,750.00Rp

    227,617,449.20

    SUB TOTAL 493,237,521.35Rp

    PPN 10 % 49,323,752.14Rp

    JUMLAH 542,561,273.49Rp

    DIBULATKAN 542,500,000.00

    TERBILANG :

    Tasikmlaya, 1 Oktober 2012Kuasa Direktur

    PT. SENTOSA SAPUTRA INDAH

    IMAN HANDIMAN, MT

    Lima Ratus Empat Puluh Dua Juta Lima Ratus Ribu Rupiah

  • 7/28/2019 Rap Uang Muka

    16/25

    KEGIATAN : PENINGKATAN SARANA DAN PRASARANA KANTOR BPEKERJAAN : PEMBANGUNAN LANDING AREA DI CALINCING WADSUB PEKERJAAN : PEMBANGUNAN LANDING AREA

    LOKASI : CALINCING KABUPATEN CIANJUR

    NO URAIAN SAT VOLUME% 1 - 7 8 - 14 15 -

    I PEKERJAAN P ERSIAPAN1 Mobilisasi - Demobilisasi Peralatan ls 1.00 11.151 2.788 2.7882 Pengukuran kembali (site) ls 400.00 0.074 0.074 3 Papan Nama Proyek m2 1.00 0.064 0.064 4 Penerangan dan Keselamatan Kerja ls 1.00 1.765 0.196 0.196 0

    II PEKERJAAN TANAH - - - 1 Galian / kupasan tanah (alat berat) m3 576.00 4.174 2.087 2.087 2 Pasangan kisdam m3 103.68 3.277 0.468 03 Pengurasan Air m1 216.00 0.512 0.073 0

    III PEKERJAAN KONSTRUKSI - - -#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!

    3 Beton bertulang u/ pile cap ( K225) m3 2.05 1.9934 Beton bertulang u/ pengisi tiang pancang ( K225) m3 1.26 0.9545 Tiang pancang beton F 400 mm, t = 80 mm m1 162.00 18.343 18 6 Pengangkutan tiang pancang ke titik pancang m1 162.00 2.100 2.100 7 Pemancangan tiang m1 156.00 7.299 38 Pemotongan tiang pancang buah 6.00 0.4919 Penyambungan tiang pancang buah 12.00 1.62810 Pek. Pemasangan besi/baja kg 7.87 0.027

    #REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!

    IV PEKERJAAN JALAN LANDING DAN PAS. BATU KALI - - - #REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF! #REF!

    7 Urugan pasir di bawah lantai & pondasi m3 73.92 3.5428 Pasangan Aanstamping m3 295.68 17.2139 Batu kali 1 : 3 m3 250.00 25.393

    #REF! #REF! #REF! #REF! #REF!PROGRAM #REF! 5.208 7.713 22AKUMULATIF PROGRAM - 5.208 12.921 35REALISASI PROGRAMREALISASI AKUMULATIF PROGRAM - - -

    JADUAL PELAKSANAAN PEKE

    BOBOTBULAN I

  • 7/28/2019 Rap Uang Muka

    17/25

    KEGIATAN ::

    SUB PEKERJAAN : PEMBANGUNAN LANDING AREAVOLUME : 960 M2

    LOKASI : CALINCING KABUPATEN CIANJURTAHUN ANGGARAN : APBD 2012

    VOL

    I PEKERJAAN PERSIAPAN1 Mobilisasi - Demobilisasi Peralatan ls 70,500,000.00 1.002 Pengukuran kembali (site) ls 910.00 400.003 Papan Nama Proyek m 2 313,575.00 1.00

    4 Penerangan dan Keselamatan Kerja ls 8,707,600.00 1.00

    II PEKERJAAN TANAH

    1 Galian / kupasan tanah (alat berat) m 3 35,743.33 576.00

    2 Pasangan kisdam m 3 155,888.10 103.68

    3 Pengurasan Air m 1 11,698.40 216.00

    III PEKERJAAN KONSTRUKSI

    1 Beton bertulang u/ plat ( K225) m 3 2,946,067.38 192.00

    2 Beton bertulang u/ balok induk ( K225) m 3 4,701,164.16 15.70

    3 Beton bertulang u/ pile cap ( K225) m 3 4,790,998.68 2.05

    4 Beton bertulang u/ pengisi tiang pancang ( K225) m 3 3,734,801.81 1.26

    5 Tiang pancang beton F 400 mm, t = 80 mm m 1 558,500.00 162.00

    6 Pengangkutan tiang pancang ke titik pancang m 1 63,947.50 162.00

    7 Pemancangan tiang m 1 230,780.58 156.008 Pemotongan tiang pancang buah 403,520.00 6.009 Penyambungan tiang pancang buah 669,100.00 12.00

    10 Pek. Pemasangan besi/baja kg 16,747.90 7.8711 Onderlag batu belah m 2 95,140.00 576.0012 Pemadatan lapisan teratas / sub grade min. Cbr 4 m 2 41,120.00 960.0013 Lapisan Pengisi/Penutup m 2 12,542.80 960.0014 Lantai kerja 1pc:3ps:5krl m 3 719,153.99 48.0015 Pekerjaan Kansteen m 1 128,823.56 160.0016 Lapis perekat (tack coat) m 1 18,738.08 160.00

    IV PEKERJAAN JALAN LANDING DAN PAS. BATU KALI1 Beton bertulang u/ plat ( K225) m 3 2,946,067.38 75.942 Pemadatan lapisan teratas / sub grade min. Cbr 4 m 2 41,120.00 379.68

    MUT

    PENINGKATAN SARANA DAN PRASARANA KANTORPEKERJAAN PEMBANGUNAN LANDING AREA DI CALINCING WADUK

    NO. URAIAN PEKERJAAN S A T U A

    NHARGA SATUAN

    (Rp.)

  • 7/28/2019 Rap Uang Muka

    18/25

    3 Lapisan Pengisi/Penutup m 2 12,542.80 379.684 Lantai kerja 1pc:3ps:5krl m 3 719,153.99 18.985 Pekerjaan Kansteen m 1 128,823.56 63.286 Cerucuk bambu m 2 49,200.00 50.627 Urugan pasir di bawah lantai & pondasi m 3 236,310.00 73.928 Pasangan Aanstamping m 3 287,143.75 295.689 Batu kali 1 : 3 m 3 500,987.00 358.55

    10 Siaran m 2 18,986.40 116.60

    SUB TOTALPPN 10 %JUMLAH

    DIBULATKAN

    31.6417.36

    62.68

  • 7/28/2019 Rap Uang Muka

    19/25

    JUMLAH HARGA(Rp.)

    BOBOT(%)

    VOLJUMLAH HARGA

    (Rp.)BOBOT

    (%)VOL

    70,500,000.00 4.3051 1.00 70,500,000.00 - 364,000.00 0.0222 400.00 364,000.00 - 313,575.00 0.0191 1.00 313,575.00 -

    8,707,600.00 0.5317 1.00 8,707,600.00 -

    79,885,175.00 4.88 79,885,175.00

    20,588,160.00 1.2572 576.00 20,588,160.00 -

    16,162,477.71 0.9870 103.68 16,162,477.71 -

    2,526,854.40 0.1543 216.00 2,526,854.40 -

    39,277,492.11 2.40 39,277,492.11

    565,644,937.46 34.5412 85.90 253,061,296.03 (106.10)

    73,789,472.73 4.5060 15.70 73,789,472.73 -

    9,831,129.28 0.6003 2.05 9,831,129.28 -

    4,705,850.29 0.2874 1.26 4,705,850.29 -

    90,477,000.00 5.5250 162.00 90,477,000.00 -

    10,359,495.00 0.6326 162.00 10,359,495.00 -

    36,001,771.00 2.1985 156.00 36,001,771.00 - 2,421,120.00 0.1478 6.00 2,421,120.00 - 8,029,200.00 0.4903 12.00 8,029,200.00 -

    131,839.47 0.0081 7.87 131,839.47 - 54,800,640.00 3.3464 576.00 54,800,640.00 - 39,475,200.00 2.4106 960.00 39,475,200.00 - 12,041,088.00 0.7353 960.00 12,041,088.00 - 34,519,391.70 2.1079 48.00 34,519,391.70 - 20,611,769.60 1.2587 160.00 20,611,769.60 -

    2,998,092.80 0.1831 160.00 2,998,092.80 - 965,837,997.33 58.98 653,254,355.90

    223,712,572.77 13.6611 75.936 223,712,572.77 - 15,612,441.60 0.9534 379.68 15,612,441.60 -

    MUTUAL CHEK = 0

    ENCANA ANGGARAN BIAYAAL CHEK NOL PROSEN ( MC = 0 )

    KONTRAK

  • 7/28/2019 Rap Uang Muka

    20/25

    4,762,250.30 0.2908 379.68 4,762,250.30 - 13,652,419.42 0.8337 18.98 13,652,419.42 -

    8,151,954.88 0.4978 63.28 8,151,954.88 - 2,490,700.80 0.1521 50.62 2,490,700.80 -

    17,468,035.20 1.0667 73.92 17,468,035.20 - 84,902,664.00 5.1846 295.68 84,902,664.00 -

    179,626,383.92 10.9689 358.55 179,626,383.92 - 2,213,814.24 0.1352 116.60 2,213,814.24 -

    552,593,237.12 33.74 552,593,237.12

    1,637,593,901.56 100.00 1,325,010,260.13 163,759,390.16 132,501,026.01

    1,801,353,291.72 1,457,511,286.15 1,801,300,000.00 1,457,500,000.00

    Cianjur, 13Kontraktor PT. Sento

    Tolib KiswProject Ma

  • 7/28/2019 Rap Uang Muka

    21/25

    JUMLAH HARGA(Rp.)

    BOBOT(%)

    - - - - - -

    - -

    -

    - -

    - -

    - -

    -

    (312,583,641.43) (55.26) 195.744 34,893,222.08

    - - 38,502,534.51

    - - 0.342 0.684 3,277,043.09

    - - 0.21 0.42 1,568,616.76

    - - 27*2 30,159,000.00

    - - 3,453,165.00

    - - 26 12,000,590.33 - - 807,040.00 - - 1,338,200.00 - - 1.31 43,879.50 - - 2.62 960.72 - - - 9,622,080.00 - - 2,935,015.20 - - 8,414,101.73 - - (8,115,884.28) - - 730,785.12

    (312,583,641.43)

    - - 75.936 75.936- - 379.68

    PERUBAHAN CCO-01 (%)THD

    VOLUME

  • 7/28/2019 Rap Uang Muka

    22/25

    - - - - 18.984- - - - 63.28- - 0.8- - 24- - - -

    -

    (312,583,641.43) (312,583,641.43) (31,258,364.14)

    (343,842,005.57) (343,900,000.00)

    September 2012Pelaksanaa Saputra Indah

    andiager

  • 7/28/2019 Rap Uang Muka

    23/25

    530.5 429.49

  • 7/28/2019 Rap Uang Muka

    24/25

    KEGIATAN ::

    SUB PEKERJAAN : PEMBANGUNAN LANDING AREAVOLUME : 960 M2

    LOKASI : CALINCING KABUPATEN CIANJURTAHUN ANGGARAN : APBD 2012

    VOLJUMLAH HARGA

    (Rp.)BOBOT

    (%)

    I PEKERJAAN PERSIAPAN1 Mobilisasi - Demobilisasi Peralatan ls 70,500,000.00 1.00 70,500,000.00 4.30512 Pengukuran kembali (site) ls 910.00 400.00 364,000.00 0.0222

    3 Papan Nama Proyek m2 313,575.00 1.00 313,575.00 0.0191

    4 Penerangan dan Keselamatan Kerja ls 8,707,600.00 1.00 8,707,600.00 0.531779,885,175.00 4.8

    II PEKERJAAN TANAH

    1 Galian / kupasan tanah (alat berat) m3 35,743.33 576.00 20,588,160.00 1.2572

    2 Pasangan kisdam m3 155,888.10 103.68 16,162,477.71 0.9870

    3 Pengurasan Air m1 11,698.40 216.00 2,526,854.40 0.1543

    39,277,492.11 2.4

    III PEKERJAAN KONSTRUKSI

    1 Beton bertulang u/ plat ( K225) m3 2,946,067.38 192.00 565,644,937.46 34.5412

    2 Beton bertulang u/ balok induk ( K225) m3 4,701,164.16 15.70 73,789,472.73 4.5060

    3 Beton bertulang u/ pile cap ( K225) m3 4,790,998.68 2.05 9,831,129.28 0.6003

    4 Beton bertulang u/ pengisi tiang pancang ( K225) m3

    3,734,801.81 1.26 4,705,850.29 0.28745 Tiang pancang beton F 400 mm, t = 80 mm m1 558,500.00 162.00 90,477,000.00 5.5250

    6 Pengangkutan tiang pancang ke titik pancang m1 63,947.50 162.00 10,359,495.00 0.6326

    7 Pemancangan tiang m1 230,780.58 156.00 36,001,771.00 2.19858 Pemotongan tiang pancang buah 403,520.00 6.00 2,421,120.00 0.14789 Penyambungan tiang pancang buah 669,100.00 12.00 8,029,200.00 0.4903

    10 Pek. Pemasangan besi/baja kg 16,747.90 7.87 131,839.47 0.008111 Onderlag batu belah m2 95,140.00 576.00 54,800,640.00 3.346412 Pemadatan lapisan teratas / sub grade min. Cbr 4 m2 41,120.00 960.00 39,475,200.00 2.410613 Lapisan Pengisi/Penutup m2 12,542.80 960.00 12,041,088.00 0.735314 Lantai kerja 1pc:3ps:5krl m3 719,153.99 48.00 34,519,391.70 2.107915 Pekerjaan Kansteen m1 128,823.56 160.00 20,611,769.60 1.258716 Lapis perekat (tack coat) m1 18,738.08 160.00 2,998,092.80 0.1831

    965,837,997.33 58.98IV PEKERJAAN JALAN LANDING DAN PAS. BATU KALI1 Beton bertulang u/ plat ( K225) m3 2,946,067.38 75.94 223,712,572.77 13.66112 Pemadatan lapisan teratas / sub grade min. Cbr 4 m2 41,120.00 379.68 15,612,441.60 0.95343 Lapisan Pengisi/Penutup m2 12,542.80 379.68 4,762,250.30 0.29084 Lantai kerja 1pc:3ps:5krl m3 719,153.99 18.98 13,652,419.42 0.83375 Pekerjaan Kansteen m1 128,823.56 63.28 8,151,954.88 0.49786 Cerucuk bambu m2 49,200.00 50.62 2,490,700.80 0.15217 Urugan pasir di bawah lantai & pondasi m3 236,310.00 73.92 17,468,035.20 1.06678 Pasangan Aanstamping m3 287,143.75 295.68 84,902,664.00 5.1846

    NO.

    RENCANA ANGGARAN BIAMUTUAL CHEK NOL PROSEN ( M

    KONTRAKHARGA SATUAN

    (Rp.) S A T U A

    NURAIAN PEKERJAAN

    PENINGKATAN SARANA DAN PRASARANA KANTORPEKERJAAN PEMBANGUNAN LANDING AREA DI CALINCING

  • 7/28/2019 Rap Uang Muka

    25/25

    VOLJUMLAH HARGA

    (Rp.)BOBOT

    (%)NO.

    KONTRAKHARGA SATUAN

    (Rp.) S A T U A

    NURAIAN PEKERJAAN

    9 Batu kali 1 : 3 m3 500,987.00 358.55 179,626,383.92 10.968910 Siaran m2 18,986.40 116.60 2,213,814.24 0.1352

    552,593,237.12 33.74

    SUB TOTAL 1,637,593,901.56 100.00PPN 10 % 163,759,390.16JUMLAH 1,801,353,291.72

    DIBULATKAN 1,801,300,000.00