PROGRAM : PEMBINAAN DAN PENGEMBANGAN BIDANG KETENAGALISTRIKAN KEGIATAN : PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) PEKERJAAN : PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDESAAN LOKASI : DUSUN SANGKE DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKADAU SUMBER BIAYA : DAK/DAU TAHUN ANGGARAN : 2012 A PEKERJAAN KONSTRUKSI SIPIL I PEKERJAAN PERSIAPAN 946,342.52 II PEKERJAAN BENDUNG/INTEK 120,509,145.94 III PEKERJAAN BAK PENENANG 25,325,667.29 IV PEKERJAAN PIPA PESAT 165,368,520.88 V RUMAH PEMBANGKIT&DUDUKAN TURBIN 61,933,395.54 VI TANGGA INSPEKS 38,320,501.34 JUMLAH (A ) 412,403,573.51 B PEKERJAAN MEKANIKAL ELEKTRIKAL I PERALATAN MEKANIKAL ELEKTRIKAL 203,000,000.00 II TRANSMISI DAN DISTRIBUSI 180,050,000.00 JUMLAH (B ) 383,050,000.00 JUMLAH ( A ) + ( B ) 795,453,573.51 PPN 10 % 79,545,357.35 TOTAL JUMLAH (A) + (B) + PPN 10% 874,998,930.86 DIBULATKAN 874,998,000.00 Terbilang : Sekadau, Mei 2012 Mengetahui /Menyetujui : Dibuat Oleh: REKAPITULASI RENCANA ANGGARAN BIAYA NO URAIAN JENIS PEKERJAAN JUMLAH HARGA (Rp.) 1 2 3 Delapan Ratus Tujuh Puluh Empat Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Upload: iwan-supardi

Post on 21-Jul-2015

1.265 views

Category:

Documents


23 download

TRANSCRIPT

REKAPITULASI RENCANA ANGGARAN BIAYAPROGRAM KEGIATAN PEKERJAAN LOKASI SUMBER BIAYA TAHUN ANGGARAN : : : : : : PEMBINAAN DAN PENGEMBANGAN BIDANG KETENAGALISTRIKAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDESAAN DUSUN SANGKE DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKADAU DAK/DAU 2012 JUMLAH HARGA (Rp.) 3

NO 1 A I II III IV V VI

URAIAN JENIS PEKERJAAN 2 PEKERJAAN KONSTRUKSI SIPIL PEKERJAAN PERSIAPAN PEKERJAAN BENDUNG/INTEK PEKERJAAN BAK PENENANG PEKERJAAN PIPA PESAT RUMAH PEMBANGKIT&DUDUKAN TURBIN TANGGA INSPEKS JUMLAH ( A ) B I II PEKERJAAN MEKANIKAL ELEKTRIKAL PERALATAN MEKANIKAL ELEKTRIKAL TRANSMISI DAN DISTRIBUSI JUMLAH ( B ) JUMLAH ( A ) + ( B ) PPN 10 % TOTAL JUMLAH (A) + (B) + PPN 10% DIBULATKAN

946,342.52 120,509,145.94 25,325,667.29 165,368,520.88 61,933,395.54 38,320,501.34 412,403,573.51

203,000,000.00 180,050,000.00 383,050,000.00 795,453,573.51 79,545,357.35 874,998,930.86 874,998,000.00

Terbilang :

Delapan Ratus Tujuh Puluh Empat Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Sekadau, Mei 2012 Mengetahui / Menyetujui : Dibuat Oleh :

RENCANA ANGGARAN BIAYAPROGRAM KEGIATAN PEKERJAAN LOKASI SUMBER BIAYA TAHUN ANGGARAN : : : : : : PEMBINAAN DAN PENGEMBANGAN BIDANG KETENAGALISTRIKAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDESAAN DUSUN SANGKE DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKADAU DAK/DAU 2012 KODE ANALISA HARGA SATUAN (Rp.) 5 JUMLAH H A R G A (Rp.) 6

NO 1

URAIAN JENIS PEKERJAAN

SATUAN VOLUME 3 4

A

2 PEKERJAAN KONSTRUKSI SIPIL I. PEKERJAAN PERSIAPAN 1 Mobilisasi/Demobilisasi 2 Pembersihan Lapangan dan Perataan 3 Pengukuran dan Pemasangan Bowplank PEKERJAAN BENDUNG/INTEK Galian Tanah Cadas Pondasi Cor Beton K-225 Bendung Cor Beton K-225 Pasangan Batu 1 : 2 Plesteran 1:2 dan Acian Urugan Tanah Kembali Pintu Kuras Air PEKERJAAN BAK PENENANG Cor Beton K-225 Plesteran 1:2 dan Acian Pintu Air Saringan Pipa Penguras 4 inc Elbow 4 inc Stop Kran 4 inc PEKERJAAN PIPA PESAT Galian Tanah Cadas Pasangan Batu 1 : 2 Plesteran 1:2 dan Acian Pipa Pesat dia 12 inc Pipe Conduit 12 inct Clamp Pipa Pesat Lem PVC Pembungkus Pipa PVC RUMAH PEMBANGKIT&DUDUKAN TURBIN Galian Tanah Pasangan Batu Kali (Saluran Pembuangan dan Pondasi) Cor Beton Bertulang (Kolom & Balok) Pasangan Batako Plesteran 1:2 dan Acian Pek Pasangan Gerendel Pintu Pek Pasangan Kunci Pintu Pek Pasangan Pintu Panel Pek Pesangan Engsel Pintu Pengecatan Tembok Pekerjaan Jendela Pemasangan Kuda-kuda Pasangan Atapseng BJLS Pasangan Perabung Ventilasi Pasangan List Plank Papan

M2 M1

1,120.00 40.00

666.38 5,000.00

746,342.52 200,000.00 946,342.52 11,751,671.25 47,431,780.59 43,646,649.21 8,950,946.55 4,994,468.69 307,066.64 3,426,563.00 120,509,145.94 13,822,976.06 2,024,248.24 3,426,563.00 5,400,000.00 371,880.00 80,000.00 200,000.00 25,325,667.29 6,120,662.11 12,093,723.35 3,351,696.43 126,948,900.00 500,000.00 3,800,000.00 178,539.00 12,375,000.00 165,368,520.88 3,000,000.00 6,365,117.55 10,517,312.44 23,098,180.88 4,939,342.10 39,210.81 48,004.51 750,000.00 96,009.02 4,097,202.96 150,000.00 3,200,528.60 2,748,933.66 584,299.82 200,000.00 2,099,253.20 61,933,395.54

II. 1 2 3 4 5 6 7 IV. 1 2 3 4 5 6 7 V. 1 2 3 4 5 6 7 8 VI. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

M3 M3 M M M3 3 2

72.00 31.50 28.99 6.75 113.25 14.40 1.00

163,217.66 1,505,770.81 1,505,770.81 1,326,066.16 44,101.27 21,324.07 3,426,563.00

M3 Bh

M3 M2 Set Set M1 bh bh

9.18 45.90 1.00 1.00 6.00 1.00 1.00

1,505,770.81 44,101.27 3,426,563.00 5,400,000.00 61,980.00 80,000.00 200,000.00

M3 M3 M2 M1 bh Set Klg M2

37.50 9.12 76.00 150.00 1.00 38.00 3.00 225.00

163,217.66 1,326,066.16 44,101.27 846,326.00 500,000.00 100,000.00 59,513.00 55,000.00

M3 M3 M3 M2 M2 Set Bh Bh Set M2 Bh M3 M2 M1 M2 M1

20.00 4.80 3.00 56.00 112.00 1.00 1.00 1.00 2.00 112.00 1.00 0.42 33.00 6.00 2.00 22.00

150,000.00 1,326,066.16 3,505,770.81 412,467.52 44,101.27 39,210.81 48,004.51 750,000.00 48,004.51 36,582.17 150,000.00 7,577,009.00 83,301.02 97,383.30 100,000.00 95,420.60

VII 1 2 4 6

TANGGA INSPEKS Galian Tanah Cadas Pondasi Cor Beton K-225 Pengecatan cat minyak Urugan Tanah Kembali

M3 M3 M2 M3

60.00 17.50 52.50 12.00

163,217.66 1,505,770.81 36,582.17 21,324.07

9,793,059.38 26,350,989.22 1,920,563.89 255,888.86 38,320,501.34 412,403,573.51

JUMLAH PEKERJAAN SIPIL ( A ) B I 1 2 3 4 5 6 7 8 II 1 2 3 4 5 PEKERJAAN MEKANIKAL ELEKTRIKAL PERALATAN MEKANIKAL ELEKTRIKAL Turbin Crossflow lengkap Generator (Brushess, 3 Sinkronus Alternator + AVR) Kontrol , Electronic Load Control Ballast Load Transmisi Mekanik + Aksesoris Erektion Grounding, wiring, penangkal petir Tool Kits TRANSMISI DAN DISTRIBUSI Tiang Beton (6 m) Lokal Kabel Twisted 3 x 35 + 1 x 25 Aksesories Erection Persiapan Uji Coba (Comisioning)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

90,000,000.00 30,000,000.00 50,000,000.00 20,000,000.00 5,000,000.00 3,000,000.00 2,000,000.00 3,000,000.00

90,000,000.00 30,000,000.00 50,000,000.00 20,000,000.00 5,000,000.00 3,000,000.00 2,000,000.00 3,000,000.00 203,000,000.00 32,400,000.00 125,400,000.00 16,200,000.00 4,050,000.00 2,000,000.00 180,050,000.00 383,050,000.00

81.00 4,000.00 81.00 81.00 1.00

400,000.00 31,350.00 200,000.00 50,000.00 2,000,000.00

JUMLAH PEKERJAAN MEKANIKAL ELEKTRIKAL (B)

P Pembersihan Lapangan dan Perataan Bendung Penstok Power House Tangga Inspeksi Bouplank Bendung Power House PEKERJAAN BENDUNG Galian Tanah Cadas Pondasi Cor Beton K-225 Bendung Cor Beton K-225 Sayap Bendung Pasangan Batu 1 : 2 Plesteran 1:2 dan Acian Urugan Tanah Kembali PEKERJAAN BAK PENENANG Intake Cor Beton K-225 Plesteran 1:2 dan Acian Urugan Tanah Kembali Pintu Air PEKERJAAN PIPA PESAT Galian Tanah Cadas Pasangan Batu 1 : 2 Plesteran 1:2 dan Acian Pipa Pesat dia 12 inc Pembungkus Pipa PVC RUMAH PEMBANGKIT&DUDUKAN TURBIN Galian Tanah Pasangan Batu Kali Saluran Pembuang Pasangan Batu Kali Pondasi Sloop 8 Kolom Praktis Ring Balok Pondasi Turbin Pasangan Batako Plesteran 1:2 dan Acian 20 150 10 200

L 6 2 10 3

T

L 120 300 100 600 1120

20 10

6 10

20 15 13.65 8 15 15

6 3.5 1.15 0.4 1.5 7.55

0.6 0.6 1.5 1.7 0.3 113.25 20%

13.5 27

0.4

1.7 1.7

45.9

150 0.6 1.2 150

0.5 0.4 0.8 1.5

0.5 1 1

76 225

5 14 5 14 0.1 14 2 14 28

4 0.3 0.3 0.2 0.1 0.2 1

1 0.5 1.8 0.3 4 0.3 0.5 4 4

56 112

Pek Pasangan Gerendel Pintu Pek Pasangan Kunci Pintu Pek Pasangan Pintu Panel Pek Pesangan Engsel Pintu Pengecatan 3 X jalan Pekerjaan Jendela Ventilasi Pemasangan Kuda-kuda Pasangan Atapseng BJLS Pasangan Perabung Pasangan List Plank PapanTANGGA INSPEKS Galian Tanah Cadas Pondasi Cor Beton K-225 Pengecatan cat minyak Urugan Tanah Kembali

4 6 8 2

28 1 1 4 6 6 6 22

4 0.5 0.08 0.06 2.75

112 2

0.1 0.08 33

150 175 175

1 1 0.3

0.4 0.1 52.5

V

Kel

52 40 92 72.00 31.50 23.55 5.44 6.75 14.40

9.18

37.50 9.12

37.5

20.00 2.10 2.70 0.84 0.32 0.84 1.00

0.192 0.2304

60 17.5 12

DAFTAR HARGA BAHAN DAN UPAH KERJA KABUPATEN SANGGAU TAHUN ANGGARAN 2011A. No. 1 HARGA BAHAN / MATERIAL BANGUNAN Jenis Bahan / Material Bangunan 2 I. BAHAN PASIR, BATU & TANAH ( SAND, STONE & SOIL ) Pasir Urug Pasir Beton Batu gunung atau quarry Batu Quarry - Royalti Kerikil galian - Royalti Kerikil Sungai Royalti Batu Belah ukuran Batu Belah ukuran Batu Belah ukuran Batu Belah ukuran Batu Belah ukuran Batu Belah ukuran Batu Belah ukuran Stone Dust Gorong-Gorong Beton Diameter 40 Cm Gorong-Gorong Beton Diameter 60 Cm Gorong-Gorong Beton Diameter 80 Cm Gorong-Gorong Beton Diameter 100 Cm Sirtu ( Tak Ayak) Sirtu - Royalti timbunan Pilihan Aspal Bitumen Minyak Aspal Minyak tanah Kayu Bakar Kapur Bakar Cat Jembatan Baja Teralis Terpal Kawat Bronjong Baut Baja Besi Profil Baja Konstruksi / Profil (galvanisir Untuk jembatan ) Paku Jembatan Besi Tulangan Beton Kawat baja ( Binrat ) Kayu Untuk Perancah Teer Minyak Diesel / solar Bensin premium Minyak Pelumas / Oli Beugel Besi Spoor Plank Timbunan Pilihan Setempat Baut Kayu pancang ( Dolken ) Dia. 10/15 Panjang 2,5 M Bata Merah Batako Cetak Terawang / Rooster Batako Paving Block ( Harga Industri ) ( Harga Industri ) 10 - 15 cm 7 - 10 cm 5 - 7 cm 3 - 5 cm 2 - 3 cm 1 - 2 cm 0,5 - 1 cm (Kerikil Beton) Satuan 3 Harga Bahan Dengan Jasa & Tanpa Jasa & Pajak Pajak (Rp.) (Rp.) 4 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M' M' M' M' M3 M3 M3 Kg Lt Lt M3 M3 Kg Kg M Kg Buah Kg Kg Kg Kg Kg M3 Lt Lt Lt Lt Batang Buah M3 Buah Batang Buah Buah Buah Buah

72,500.00 72,500.00 110,000.00 110,000.00 125,000.00 150,000.00 228,571.00 257,143.00 275,000.00 425,000.00 512,000.00 515,000.00 550,000.00 440,000.00 335,000.00 525,000.00 650,000.00 975,000.00 72,500.00 84,166.67 21,600.00 10,350.00 1,500.00 3,750.00 60,000.00 6,000.00 27,500.00 9,300.00 12,000.00 25,000.00 21,000.00 16,000.00 32,000.00 22,500.00 9,900.00 25,000.00 350,000.00 6,000.00 7,977.00 9,747.00 27,000.00 22,500.00 22,500.00 21,600.00 6,500.00 9,600.00 1,300.00 1,200.00 1,600.00 1,650.00

90,625.00 90,625.00 137,500.00 137,500.00 156,250.00 187,500.00 285,713.75 321,428.75 343,750.00 531,250.00 640,000.00 643,750.00 687,500.00 550,000.00 418,750.00 656,250.00 812,500.00 1,218,750.00 90,625.00 105,208.34 27,000.00 12,937.50 1,875.00 4,687.50 75,000.00 7,500.00 34,375.00 11,625.00 15,000.00 31,250.00 26,250.00 20,000.00 40,000.00 28,125.00 12,375.00 31,250.00 437,500.00 7,500.00 9,971.25 12,183.75 33,750.00 28,125.00 28,125.00 27,000.00 8,125.00 12,000.00 1,625.00 1,500.00 2,000.00 2,062.50

No. 1

Jenis Bahan / Material Bangunan 2 II. BAHAN SEMEN ( CEMENT ) Semen PC Semen Warna / Oker III. BAHAN KAYU ( TIMBER, WOODS ) Kayu Belian Kayu Belian ( Ketam ) 8/8 Kayu Kls. I Kayu Kls. I ( Ketam ) 8/8 Kayu Kls. II Papan Kayu Belian Papan Kayu Belian ( Ketam ) Papan Kayu Kls. I Papan Kayu Kls. I (Ketam ) Papan Kayu Kls. II Papan Bekisting / Mal Kayu Kls. III Papan Jalusie / Renglat Kayu Kls. I Kayu Belian uk. 15 cm x 15 cm / Btg Rp. 1.015.000,IV. BAHAN UBIN ( TILE, CERAMIC, GRANITE, MARBLE ) Keramik Porselin uk. 20 x 20 Polos Keramik Porselin uk. 20 x 20 Warna Keramik Porselin uk. 20 x 20 Warna Anti Slip Keramik Porselin uk. 20 x 25 Warna Keramik Porselin uk. 30 x 30 Warna Keramik Porselin uk. 30 x 30 Polos Anti Slip Keramik Porselin uk. 30 x 30 Warna Anti Slip Keramik Porselin uk. 40 x 40 Anti Gores ( KW 1 ) Keramik Porselin uk. 40 x 40 Anti Gores ( KW 2 ) Keramik Porselin uk. 60 x 60 Anti Gores ( KW 1 ) Keramik Porselin uk. 60 x 60 Unpolished Lis Dinding Keramik WC uk. 8 x 20 cm Lis Dinding Keramik WC uk. 10 x 40 cm Porselin uk. 11 x 11 Putih Porselin uk. 10 x 10 Warna V. BAHAN LANGIT - LANGIT ( PLAFOND, ACOUSTIC ) Lis Profil Gypsum 8 cm Lis Profil Gypsum 10 cm Lis Profil Gypsum 12 cm Lis Profil Gypsum 14 cm Bunga Gypsum dia. 80 cm Bunga Gypsum dia. 90 cm Triplek tebal 3 mm Triplek tebal 2 mm GRC Board 3 mm Gypsum Board tebal 9 mm Pintu WC PVC Pintu Double Alumunium Pintu Panel kayu Kls. I Pintu Panel Kayu Kls. II Kusen Alumunium VI. BAHAN ATAP ( ROOF ) Genteng Kodok / Glazuur Dengan Cat Bubungan Genteng Kodok / Glazuur Seng Gelombang BJLS 0,30 Seng Gelombang BJLS 0,20 Genteng Metal Warna Berpasir Genteng Metal Warna Polos Genteng Metal Warna Berpasir Genteng Metal Warna Polos Genteng Metal Multi Sirap Type Borneo Nok Genteng Metal Warna Berpasir Nok Genteng Metal Warna Polos Nok Genteng Metal Multi Sirap Seng Datar BJLS 0,30 Seng Datar BJLS 0,20 Atap Fibreglass Gelombang 3 mm Pagar Besi Hollo Pagar Besi Stainlish Huruf Stainlish T = 8 mm Huruf Stainlish T = 6 mm uk. 0.88 x 0.88 M2, tebal 0.35 mm uk. 0.88 x 0.88 M2, tebal 0.35 mm uk. 0.88 x 0.44 M2, tebal 0.35 mm uk. 0.88 x 0.44 M2, tebal 0.35 mm uk. 7.00 x 0.50 M2, tebal 0.40 mm uk. 1.00 x 0.91 M2, tebal 0.35 mm uk. 1.00 x 0.91 M2, tebal 0.35 mm uk. 0.46 x 0.23 M2, tebal 0.40 mm

Satuan 3 50 Kg / Zak Kg M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Buah Buah M2 M2 M' M' M' M' Buah Buah Lembar Lembar Lembar Lembar Buah Buah Buah Buah M' Buah Buah Lembar Lembar Buah/2 susun Buah/2 susun Buah/1 susun Buah/1 susun Buah Buah Buah Buah Lembar Lembar Lembar M' M' Cm Cm

Harga Bahan Dengan Jasa & Tanpa Jasa & Pajak Pajak (Rp.) (Rp.) 4 75,000.00 7,500.00 7,750,000.00 9,690,000.00 4,030,000.00 5,130,000.00 3,410,000.00 7,750,000.00 9,690,000.00 4,485,000.00 4,830,000.00 4,140,000.00 2,553,000.00 3,300,000.00 11,165,000.00 40,000.00 42,000.00 45,000.00 54,000.00 51,200.00 50,000.00 60,000.00 115,000.00 100,000.00 160,000.00 146,000.00 3,800.00 15,000.00 42,500.00 45,000.00 9,000.00 10,500.00 11,000.00 11,000.00 300,000.00 375,000.00 55,000.00 42,000.00 57,500.00 67,500.00 250,000.00 800,000.00 800,000.00 650,000.00 85,000.00 2,500.00 5,500.00 65,500.00 37,500.00 70,000.00 60,000.00 36,000.00 25,500.00 240,000.00 70,000.00 65,000.00 48,000.00 66,500.00 38,000.00 67,500.00 450,000.00 650,000.00 8,500.00 7,000.00 5 93,750.00 9,375.00 9,687,500.00 12,112,500.00 5,037,500.00 6,412,500.00 4,262,500.00 9,687,500.00 12,112,500.00 5,606,250.00 6,037,500.00 5,175,000.00 3,191,250.00 4,125,000.00 13,956,250.00 50,000.00 52,500.00 56,250.00 67,500.00 64,000.00 62,500.00 75,000.00 143,750.00 125,000.00 200,000.00 182,500.00 4,750.00 18,750.00 53,125.00 56,250.00 11,250.00 13,125.00 13,750.00 13,750.00 375,000.00 468,750.00 68,750.00 52,500.00 71,875.00 84,375.00 312,500.00 1,000,000.00 1,000,000.00 812,500.00 106,250.00 3,125.00 6,875.00 81,875.00 46,875.00 87,500.00 75,000.00 45,000.00 31,875.00 300,000.00 87,500.00 81,250.00 60,000.00 83,125.00 47,500.00 84,375.00 562,500.00 812,500.00 10,625.00 8,750.00

1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

No. 1

Jenis Bahan / Material Bangunan 2 VII. BAHAN KACA ( GLASS ) Naco + Bingkai ( 80 x 15 cm ) 10 Daun Polos Naco + Bingkai ( 80 x 15 cm ) 10 Daun Rayban Kaca Polos Kaca Polos 3 mm 5 mm

Satuan 3 Set Set M2 M2 M2 M2 M2 M2 M2 M2 Lembar Kg Kaleng/5kg Kg Kg Kg Kg Kaleng/5ltr Liter Liter Liter Liter Liter Kg Kg Kg

Harga Bahan Dengan Jasa & Tanpa Jasa & Pajak Pajak (Rp.) (Rp.) 4 250,000.00 260,000.00 90,000.00 120,000.00 150,000.00 175,000.00 200,000.00 110,000.00 145,000.00 225,000.00 2,500.00 23,000.00 35,000.00 27,000.00 27,000.00 33,000.00 42,500.00 90,000.00 45,000.00 55,000.00 37,500.00 15,000.00 42,300.00 16,000.00 9,900.00 20,000.00 350,000.00 13,000.00 18,000.00 25,000.00 2,000,000.00 2,400,000.00 3,040,000.00 288,000.00 9,618.00 22,500.00 7,500.00 75,000.00 15,000.00 20,000.00 17,000.00 29,000.00 6,000.00 20,000.00 26,000.00 2,500.00 6,500.00 200,000.00 175,000.00 36,300.00 36,500.00 12,500.00 5 312,500.00 325,000.00 112,500.00 150,000.00 187,500.00 218,750.00 250,000.00 137,500.00 181,250.00 281,250.00 3,125.00 28,750.00 43,750.00 33,750.00 33,750.00 41,250.00 53,125.00 112,500.00 56,250.00 68,750.00 46,875.00 18,750.00 52,875.00 20,000.00 12,375.00 25,000.00 437,500.00 16,250.00 22,500.00 31,250.00 2,500,000.00 3,000,000.00 3,800,000.00 360,000.00 12,022.50 28,125.00 9,375.00 93,750.00 18,750.00 25,000.00 21,250.00 36,250.00 7,500.00 25,000.00 32,500.00 3,125.00 8,125.00 250,000.00 218,750.00 45,375.00 45,625.00 15,625.00

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Kaca Warna 3 mm Kaca Buram 3 mm Kaca Buram Warna 3 mm Kaca Rayban 3 mm Kaca Rayban 5 mm Kaca Cermin 3 mm VIII. BAHAN CAT ( PAINT ) Amplas Kayu / Besi / Tembok Dempul Cat Dasar Tembok Cat Dasar Kayu Meni Besi Cat Kilat Plamur Cat Khusus Tembok Luar Pelitur Melamic Vernis Minyak Cat / Thinner Ter / Residu IX. BAHAN BESI , ALUMINIUM & KAWAT ( IRON, ALUMUNIUM & WIRE ) Besi Simpai Kawat Besi Tulangan Beton Kawat Ikat Beton Kawat Harmonika Kawat Nyamuk / Besi Kawat Nyamuk / Plastik (Kassa) Kawat Ikat Beronjong / Galvanis Wiremesh Besi Ulir diam. 4 mm Wiremesh Besi Ulir diam. 5 mm Wiremesh Besi Ulir diam. 6 mm Multi Truss ( Rangka Atap Baja Ringan ) Besi Plat T = 1.00 mm L = 2 cm ( Besi Strip ) Beugel Alumunium Foil Alumunium Tape X. BAHAN PENGGANTUNG, KUNCI & PEREKAT ( NAILS, KEYS & GLUE ) Paku Campuran 1" - 5 " Paku Atap Seng / Paku Payung Paku Genteng Metal Multi Sirap Paku Gypsum Paku Sekrup Paku Beton Paku Tripleks Sekrup / Baut / Mur Baut Besar Kunci Pintu Tanam Antik Kunci Pintu Tanam Kunci Pintu Tanam KM / WC Kunci Silinder Kunci Lemari uk. 60,00 x 1,25 M2 1 Gulung = 2.10 x 54.00 M2 1 Gulung = 2.10 x 54.00 M2 1 Gulung = 2.10 x 54.00 M2 bentang < 12.00 M 1 Roll = 5.0 x 5.0 M2

Roll M2 M2 Kg Gulung Gulung Gulung M2 Batang Batang M2 Roll Kg Kg Kg Kg Buah Kotak/100 Bh Kg Kg Buah Buah Buah Buah Buah Buah

No. 1 15 16 17 18 19 20 21 22 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

Jenis Bahan / Material Bangunan 2 Selot Pintu Selot Jendela Engsel Pintu Engsel Jendela Engsel Pintu Engsel Jendela Kait Angin Handle Pintu & Jendela Lem Kayu / Tripleks Lem PVC Lem Genteng Metal Multi Sirap Seal Tape XI. BAHAN SANITAIR ( SANITARY ) Kloset Duduk / Monoblok Kloset Jongkok Standar Urinoir Bidet Wastafel Keramik Bak Mandi Fibreglass Badkip / Bathtub Porselin Badkip / Bathtub Porselin Panjang Sudut Biasa Biasa Kuningan Kuningan

Satuan 3 Buah Buah Buah Buah Buah Buah Buah Buah Kg Kg Cup Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Set Buah

Harga Bahan Dengan Jasa & Tanpa Jasa & Pajak Pajak (Rp.) (Rp.) 4 13,500.00 5,000.00 7,000.00 6,000.00 12,500.00 10,000.00 7,500.00 5,000.00 37,500.00 46,500.00 20,000.00 5,000.00 1,375,000.00 150,000.00 950,000.00 0.00 475,000.00 1,500,000.00 2,750,000.00 7,200,000.00 1,400,000.00 366,250.00 375,000.00 85,000.00 37,500.00 12,500.00 17,500.00 1,850,000.00 233,500.00 188,000.00 151,000.00 117,000.00 55,000.00 2,394,750.00 1,506,700.00 1,385,550.00 933,000.00 724,500.00 575,000.00 312,750.00 402,500.00 322,500.00 279,600.00 154,000.00 118,000.00 78,500.00 49,200.00 33,750.00 24,100.00 176,500.00 119,500.00 91,250.00 76,000.00 47,250.00 28,350.00 14,500.00 11,250.00 6,250.00 4,500.00 4,500.00 166,700.00 166,700.00 5 16,875.00 6,250.00 8,750.00 7,500.00 15,625.00 12,500.00 9,375.00 6,250.00 46,875.00 58,125.00 25,000.00 6,250.00 1,718,750.00 187,500.00 1,187,500.00 0.00 593,750.00 1,875,000.00 3,437,500.00 9,000,000.00 1,750,000.00 457,812.50 468,750.00 106,250.00 46,875.00 15,625.00 21,875.00 2,312,500.00 291,875.00 235,000.00 188,750.00 146,250.00 68,750.00 2,993,437.50 1,883,375.00 1,731,937.50 1,166,250.00 905,625.00 718,750.00 390,937.50 503,125.00 403,125.00 349,500.00 192,500.00 147,500.00 98,125.00 61,500.00 42,187.50 30,125.00 220,625.00 149,375.00 114,062.50 95,000.00 59,062.50 35,437.50 18,125.00 14,062.50 7,812.50 5,625.00 5,625.00 208,375.00 208,375.00

Bak Air Fibreglass vol. 1 m3 Bak Cuci Piring Stainless Steel Double Water Drain + Acessories Shower ( Tray ) Tempat Sabun / Soap Dish Kran Air Lokal 3/4 " Floor Drain Pemanas Air / Water Heater + Lapisan Anti Karat kap. 15 liter XII. BAHAN PIPA ( PIPES ) Pipa GIP class medium Pipa GIP class medium Pipa GIP class medium Pipa GIP class medium Pipa GIP class medium Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa Flexibel Pipa Flexibel diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter 200 mm ( 8 " ) 150 mm ( 6 " ) 100 mm ( 4 " ) 75 mm ( 3 " ) 50 mm ( 2 " ) 630mm ( 24 " ) 500 mm ( 20 " ) 450 mm ( 18 " ) 400 mm ( 16 " ) 355 mm ( 14 " ) 300 mm ( 12 " ) 275 mm ( 11 " ) 250 mm ( 10 " ) 225 mm ( 9 " ) 200 mm ( 8 " ) 150 mm ( 6 " ) 125 mm ( 5 " ) 100 mm ( 4 " ) 75 mm ( 3 " ) 65 mm ( 2,5 " ) 50 mm ( 2 " ) 250 mm ( 10 " ) 200 mm ( 8 " ) 150 mm ( 6 " ) 125 mm ( 5 " ) 100 mm ( 4 " ) 75 mm ( 3 " ) 50 mm ( 2 " ) 40 mm ( 1,5 " ) 25 mm ( 1 " ) 18.75 mm ( 3/4 " ) 12.5 mm ( 1/2 " ) 150 mm ( 6 " ) 100 mm ( 4 " ) 1 lubang

Buah Buah Buah Buah M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M'

No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Jenis Bahan / Material Bangunan 2 XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES ) All Socket Tee PVC dia 200 x 200 mm All Socket Tee PVC dia 200 x 160 mm All Socket Tee PVC dia 200 x 110 mm All Socket Tee PVC dia 200 x 90 mm All Socket Tee PVC dia 150 x 150 mm All Socket Tee PVC dia 150 x 100 mm All Socket Tee PVC dia 160 x 90 mm All Socket Tee PVC dia 150 x 75 mm All Socket Tee PVC dia 110 x 90 mm All Socket Tee PVC dia 100 x 50 mm All Socket Tee PVC dia 75 x 75 mm All Socket Tee PVC dia 75 x 50 mm All Socket Tee PVC dia 50 x 50 mm All Flanged Gate Valve dia 250 mm All Flanged Gate Valve dia 200 mm All Flanged Gate Valve dia 150 mm All Flanged Gate Valve dia 100 mm All Flanged Gate Valve dia 75 mm All Flanged Gate Valve dia 50 mm

Satuan 3 Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah

Harga Bahan Dengan Jasa & Tanpa Jasa & Pajak Pajak (Rp.) (Rp.) 4 1,000,000.00 850,000.00 750,000.00 600,000.00 581,800.00 504,800.00 900,000.00 800,000.00 320,000.00 275,000.00 200,000.00 175,000.00 130,000.00 4,200,000.00 2,782,500.00 1,575,000.00 787,500.00 630,000.00 420,000.00 1,100,000.00 1,890,000.00 1,365,000.00 840,000.00 400,000.00 287,500.00 172,500.00 660,000.00 800,000.00 1,379,300.00 1,365,000.00 1,050,000.00 945,000.00 735,000.00 630,000.00 525,000.00 420,000.00 0.00 0.00 0.00 0.00 0.00 185,000.00 105,000.00 55,400.00 0.00 37,850.00 0.00 31,500.00 26,500.00 472,500.00 367,500.00 236,500.00 0.00 420,000.00 0.00 0.00 275,000.00 580,200.00 420,000.00 262,500.00 302,000.00 126,000.00 80,000.00 70,000.00 46,050.00 5 1,250,000.00 1,062,500.00 937,500.00 750,000.00 727,250.00 631,000.00 1,125,000.00 1,000,000.00 400,000.00 343,750.00 250,000.00 218,750.00 162,500.00 5,250,000.00 3,478,125.00 1,968,750.00 984,375.00 787,500.00 525,000.00 1,375,000.00 2,362,500.00 1,706,250.00 1,050,000.00 500,000.00 359,375.00 215,625.00 825,000.00 1,000,000.00 1,724,125.00 1,706,250.00 1,312,500.00 1,181,250.00 918,750.00 787,500.00 656,250.00 525,000.00 0.00 0.00 0.00 0.00 0.00 231,250.00 131,250.00 69,250.00 0.00 47,312.50 0.00 39,375.00 33,125.00 590,625.00 459,375.00 295,625.00 0.00 525,000.00 0.00 0.00 343,750.00 725,250.00 525,000.00 328,125.00 377,500.00 157,500.00 100,000.00 87,500.00 57,562.50

17 18 19 20 21 22 23 24 25 26 27

All Flanged Spigot PVC dia 300 mm All Flanged Spigot PVC dia 250 mm All Flanged Spigot PVC dia 200 mm All Flanged Spigot PVC dia 160 mm All Flanged Spigot PVC dia 110 mm All Flanged Spigot PVC dia 90 mm All Flanged Spigot PVC dia 63 mm All Flange Bend GIP All Flange Bend GIP 45 x 150 mm 90 x 150 mm 90 90 45 22,5 90 45 22,5 90 45 22,5 90 45 22,5 90 45 90 45 90 45 90 45 Diameter 100 mm Diameter 75 mm Diameter 50 mm diam. 250 x 200 mm diam. 250 x 150 mm diam. 200 x 150 mm diam. 200 x 100 mm diam. 150 x 100 mm

All Socket Bend PVC dia 315 mm All Socket Bend PVC dia 250 mm All Socket Bend PVC dia 250 mm All Socket Bend PVC dia 250 mm

28

All Socket Bend PVC dia 200 mm All Socket Bend PVC dia 200 mm All Socket Bend PVC dia 200 mm

29

All Socket Bend PVC dia 160 mm All Socket Bend PVC dia 160 mm All Socket Bend PVC dia 160 mm

30

All Socket Bend PVC dia 140 mm All Socket Bend PVC dia 140 mm All Socket Bend PVC dia 140 mm

31 32 33 34

All Socket Bend PVC dia 110 mm All Socket Bend PVC dia 110 mm All Socket Bend PVC dia 90 mm All Socket Bend PVC dia 90 mm All Socket Bend PVC dia 75 mm All Socket Bend PVC dia 75 mm All Socket Bend PVC dia 63 mm All Socket Bend PVC dia 63 mm Flage Socket PVC Flage Socket PVC Flage Socket PVC

35

All Flange Reducer GIP All Flange Reducer GIP All Flange Reducer GIP All Flange Reducer GIP All Flange Reducer GIP

36 37 38 39 40 41 42

All Flange Reducer PVC dia 315 x 250 mm All Flange Reducer PVC dia 250 x 200 mm All Flange Reducer PVC dia 200 x 150 mm All Flange Reducer PVC dia 200 x 100 mm All Flange Reducer PVC dia 160 x 110 mm All Flange Reducer PVC dia 110 x 90 mm All Flange Reducer PVC dia 110 x 63 mm All Flange Reducer PVC dia 90 x 63 mm

XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES ) Bend 90GIP Bend 45GIP Bend 22,5GIP Bend 90GIP Bend 45GIP Bend 22,5GIP Bend 90GIP Bend 45GIP Bend 22,5GIP Bend 90GIP Bend 45GIP Bend 90GIP Bend 45GIP Bend 90GIP Bend 45GIP 43 44 45 46 47 1 2 3 4 5 6 7 Flange GIP Flange GIP Flange GIP Flange GIP Flexibel Joint Hidran Umum Polyethylene ( PE ) Hidran Umum Polyethylene ( PE ) Hidran Umum Polyethylene ( PE ) Hidran Umum Fibreglass ( FRP ) Hidran Umum Fibreglass ( FRP ) Hidran Umum Fibreglass ( FRP ) Water Meter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter 250 mm 250 mm 250 mm 200 mm 200 mm 200 mm 150 mm 150 mm 150 mm 100 mm 100 mm 75 mm 75 mm 50 mm 50 mm Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Unit Unit Unit Unit Unit Unit Unit 577,500.00 0.00 0.00 294,000.00 0.00 0.00 0.00 0.00 0.00 50,000.00 0.00 0.00 0.00 0.00 0.00 30,000.00 33,000.00 40,000.00 75,000.00 1,280,000.00 2,925,000.00 5,680,000.00 7,530,000.00 1,700,000.00 2,800,000.00 3,800,000.00 365,000.00 721,875.00 0.00 0.00 367,500.00 0.00 0.00 0.00 0.00 0.00 62,500.00 0.00 0.00 0.00 0.00 0.00 37,500.00 41,250.00 50,000.00 93,750.00 1,600,000.00 3,656,250.00 7,100,000.00 9,412,500.00 2,125,000.00 3,500,000.00 4,750,000.00 456,250.00

diam. 50 mm diam. 75 mm diam. 100 mm diam. 150 mm diam. 150 mm vol. 1,0 m3 vol. 2,0 m3 vol. 3,0 m3 vol. 1,0 m3 vol. 2,0 m3 vol. 3,0 m3

XIV. BAHAN TANKI AIR UNTUK HIDRAN UMUM ( WATER TANKS )

Harga Bahan No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B. Jenis Bahan / Material Bangunan Satuan Tanpa Jasa & Pajak (Rp.) 2 XV. BAHAN ELEKTRIKAL ( ELECTRICAL, CABLES, LAMPS ) Sekring Biasa Sekring Otomatic 16 A ( Jerman ) Stop Kontak Saklar Lampu Pijar 10 Watt Lampu Pijar 25 Watt Lampu Pijar 60 Watt Lampu Neon (TL) 10 Watt Lampu Neon (TL) 20 Watt Lampu Kap Baret Lampu Sorot Lengkap 120 Watt Lampu SL 18 Watt Lampu SL 20 Watt Lampu SL 50 Watt UPAH KERJA Upah Kerja No. Jenis Pekerja / Tukang Satuan Tanpa Jasa & Pajak (Rp.) 1 1 2 3 4 5 6 7 8 9 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mandor lapangan Mekanik Mekanik pembantu Tukang kepala Tukang Operator terlatih Operator kurang terlatih Pembantu operator Supir material Supir personil Pembantu sopir / kernet Buruh lapangan tak terlatih Buruh lapangan semi terlatih Buruh lapangan terlatih 2 Pekerja Mandor Kepala Tukang Tukang Kayu Tukang Semen Tukang Batu Tukang Besi Tukang Pipa Tukang Cat 2 L061 L071 L072 L073 L079 L081 L082 L083 L091 L092 L099 L101 L103 L106 3 Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari 3 Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari 4 70,950.00 98,230.00 91,630.00 77,990.00 77,990.00 77,990.00 77,990.00 77,990.00 77,990.00 4 75,600.00 63,000.00 59,000.00 63,000.00 59,000.00 63,000.00 59,000.00 55,000.00 63,000.00 60,000.00 52,500.00 45,000.00 47,500.00 53,000.00 Dengan Jasa & Pajak (Rp.) 5 88,687.50 122,787.50 114,537.50 97,487.50 97,487.50 97,487.50 97,487.50 97,487.50 97,487.50 5 94,500.00 78,750.00 73,750.00 78,750.00 73,750.00 78,750.00 73,750.00 68,750.00 78,750.00 75,000.00 65,625.00 56,250.00 59,375.00 66,250.00 3 Buah Buah Buah Buah Buah Buah Buah Set Set Set Set Buah Buah Buah 4 25,000.00 18,000.00 15,000.00 15,600.00 4,800.00 6,000.00 6,000.00 10,100.00 12,000.00 132,000.00 156,000.00 30,000.00 35,000.00 95,000.00 Dengan Jasa & Pajak (Rp.) 5 31,250.00 22,500.00 18,750.00 19,500.00 6,000.00 7,500.00 7,500.00 12,620.00 15,000.00 165,000.00 195,000.00 37,500.00 43,750.00 118,750.00

DAFTAR HARGA UPAH KERJA BAHAN DAN

A. No 1 1 2 3 4 5 6 7 8 9 A.

UPAH KERJA Jenis Pekerja / Tukang 2 Pekerja Mandor Kepala Tukang Tukang Kayu Tukang Semen Tukang Batu Tukang Besi Tukang Pipa Tukang Cat Satuan 3 Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari Upah Kerja (Rp.) 4 70,950.00 98,230.00 91,630.00 77,990.00 77,990.00 77,990.00 77,990.00 77,990.00 77,990.00

HARGA BAHAN / MATERIAL BANGUNAN Jenis Bahan / Material No. Bangunan 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Batako Batu 0,5 - 1 (Kerikil Beton) Batu Belah 10 - 15 cm Baut Besi Strip Cat Dasar Tembok Cat Tembok Kayu Kelas I (Ketam) Kayu Kelas II Paku Paku Payung Papan Kayu Kelas I (Ketam) Papan Kayu Klas II Pasir Beton/Pasang Plamur Semen Portland Seng Datar BJLS 0,20 Seng Gelombang BJLS 0,20 Ensel Pintu Gerendel Pintu Kunci Tanam Biasa Turbin Crossflow lengkap Generator (Brushess, 3 Sinkronus Alternator + AVR) Kontrol , Electronic Load Control Ballast Load Transmisi Mekanik + Aksesoris Grounding, wiring, penangkal petir Tool Kits Tiang Beton Kabel Twisted 3 x 35 + 1 x 25 Aksesories Persiapan Uji Coba (Comisioning) Saringan Pipa PVC 4 inc (Penguras) Elbow 4 inc Stop Kran 4 inc Pipa PVC dia 12 inc (Pipa Pesat) Besi Beton (Polos/Ulir) Kawat Ikat Beton 2

Satuan 3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M' M' M' M' M3 M3 M3 Kg Unit Unit Unit M3 Kg Kg Btg M Set Kg Set M Bh Bh M Kg Kg

Harga Bahan (Rp.) 4 2,478.00 1,126,290.00 384,560.00

35,239.00 39,675.00 5,133,902.00 2,990,460.00 24,478.00 25,788.00 5,133,902.00 3,278,535.00 147,290.00 49,594.00 103,070.00 72,738.00 75,652.00 14,898.00 88,277.00 80,590.00 90,000,000.00 30,000,000.00 50,000,000.00 20,000,000.00

61,980.00 80,000.00 200,000.00 846,326.00 23,295.00 33,933.00

No.

Jenis Bahan / Material Bangunan

Satuan

Harga Bahan Tanpa Jasa & Pajak (Rp.)

1 1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Semen PC

2 II. BAHAN SEMEN ( CEMENT )

3 50 Kg / Zak Kg M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Kotak Buah Buah M2 M2 M' M' M' M' Buah Buah Lembar Lembar Lembar Lembar Buah Buah Buah Buah M' Buah Buah Lembar Lembar uk. 0.88 x 0.88 M2, tebal 0.35 mm uk. 0.88 x 0.88 M2, tebal 0.35 mm uk. 0.88 x 0.44 M2, tebal 0.35 mm uk. 0.88 x 0.44 M2, tebal 0.35 mm uk. 7.00 x 0.50 M2, tebal 0.40 mm uk. 1.00 x 0.91 M2, tebal 0.35 mm uk. 1.00 x 0.91 M2, tebal 0.35 mm uk. 0.46 x 0.23 M2, tebal 0.40 mm Buah/2 susun Buah/2 susun Buah/1 susun Buah/1 susun Buah Buah Buah Buah Lembar Lembar Lembar M' M' Cm Cm

4 75,000.00 7,500.00 7,750,000.00 9,690,000.00 4,030,000.00 5,130,000.00 3,410,000.00 7,750,000.00 9,690,000.00 4,485,000.00 4,830,000.00 4,140,000.00 2,553,000.00 3,300,000.00 11,165,000.00 40,000.00 42,000.00 45,000.00 54,000.00 51,200.00 50,000.00 60,000.00 115,000.00 100,000.00 160,000.00 146,000.00 3,800.00 15,000.00 42,500.00 45,000.00 9,000.00 10,500.00 11,000.00 11,000.00 300,000.00 375,000.00 55,000.00 42,000.00 57,500.00 67,500.00 250,000.00 800,000.00 800,000.00 650,000.00 85,000.00 2,500.00 5,500.00 65,500.00 37,500.00 70,000.00 60,000.00 36,000.00 25,500.00 240,000.00 70,000.00 65,000.00 48,000.00 66,500.00 38,000.00 67,500.00 450,000.00 650,000.00 8,500.00 7,000.00

Semen Warna / Oker III. BAHAN KAYU ( TIMBER, WOODS ) Kayu Belian Kayu Belian ( Ketam ) 8/8 Kayu Kls. I Kayu Kls. I ( Ketam ) 8/8 Kayu Kls. II Papan Kayu Belian Papan Kayu Belian ( Ketam ) Papan Kayu Kls. I Papan Kayu Kls. I (Ketam ) Papan Kayu Kls. II Papan Bekisting / Mal Kayu Kls. III Papan Jalusie / Renglat Kayu Kls. I Kayu Belian uk. 15 cm x 15 cm / Btg Rp. 1.015.000,IV. BAHAN UBIN ( TILE, CERAMIC, GRANITE, MARBLE ) Keramik Porselin uk. 20 x 20 Polos Keramik Porselin uk. 20 x 20 Warna Keramik Porselin uk. 20 x 20 Warna Anti Slip Keramik Porselin uk. 20 x 25 Warna Keramik Porselin uk. 30 x 30 Warna Keramik Porselin uk. 30 x 30 Polos Anti Slip Keramik Porselin uk. 30 x 30 Warna Anti Slip Keramik Porselin uk. 40 x 40 Anti Gores ( KW 1 ) Keramik Porselin uk. 40 x 40 Anti Gores ( KW 2 ) Keramik Porselin uk. 60 x 60 Anti Gores ( KW 1 ) Keramik Porselin uk. 60 x 60 Unpolished Lis Dinding Keramik WC uk. 8 x 20 cm Lis Dinding Keramik WC uk. 10 x 40 cm Porselin uk. 11 x 11 Putih Porselin uk. 10 x 10 Warna V. BAHAN LANGIT - LANGIT ( PLAFOND, ACOUSTIC ) Lis Profil Gypsum 8 cm Lis Profil Gypsum 10 cm Lis Profil Gypsum 12 cm Lis Profil Gypsum 14 cm Bunga Gypsum dia. 80 cm Bunga Gypsum dia. 90 cm Triplek tebal 3 mm Triplek tebal 2 mm GRC Board 3 mm Gypsum Board tebal 9 mm Pintu WC PVC Pintu Double Alumunium Pintu Panel kayu Kls. I Pintu Panel Kayu Kls. II Kusen Alumunium VI. BAHAN ATAP ( ROOF ) Genteng Kodok / Glazuur Dengan Cat Bubungan Genteng Kodok / Glazuur Seng Gelombang BJLS 0,30 Seng Gelombang BJLS 0,20 Genteng Metal Warna Berpasir Genteng Metal Warna Polos Genteng Metal Warna Berpasir Genteng Metal Warna Polos Genteng Metal Multi Sirap Type Borneo Nok Genteng Metal Warna Berpasir Nok Genteng Metal Warna Polos Nok Genteng Metal Multi Sirap Seng Datar BJLS 0,30 Seng Datar BJLS 0,20 Atap Fibreglass Gelombang 3 mm Pagar Besi Hollo Pagar Besi Stainlish Huruf Stainlish T = 8 mm Huruf Stainlish T = 6 mm

No.

Jenis Bahan / Material Bangunan

Satuan

Harga Bahan Tanpa Jasa & Pajak (Rp.)

1 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14

2 VII. BAHAN KACA ( GLASS ) Naco + Bingkai ( 80 x 15 cm ) 10 Daun Polos Naco + Bingkai ( 80 x 15 cm ) 10 Daun Rayban Kaca Polos Kaca Polos 3 mm 5 mm

3 Set Set M2 M2 M2 M2 M2 M2 M2 M2 Lembar Kg Kaleng/5kg Kg Kg Kg Kg Kaleng/5ltr Liter Liter Liter Liter Liter Kg Kg Kg 1 Roll = 5.0 x 5.0 M2 Roll M2 M2 Kg 1 Gulung = 2.10 x 54.00 M2 1 Gulung = 2.10 x 54.00 M2 1 Gulung = 2.10 x 54.00 M2 bentang < 12.00 M Gulung Gulung Gulung M2 Batang Batang uk. 60,00 x 1,25 M2 M2 Roll Kg Kg Kg Kg Buah Kotak/100 Bh Kg Kg Buah Buah Buah Buah Buah Buah

4 250,000.00 260,000.00 90,000.00 120,000.00 150,000.00 175,000.00 200,000.00 110,000.00 145,000.00 225,000.00 2,500.00 23,000.00 35,000.00 27,000.00 27,000.00 33,000.00 42,500.00 90,000.00 45,000.00 55,000.00 37,500.00 15,000.00 42,300.00 16,000.00 9,900.00 20,000.00 350,000.00 13,000.00 18,000.00 25,000.00 2,000,000.00 2,400,000.00 3,040,000.00 288,000.00 9,618.00 22,500.00 7,500.00 75,000.00 15,000.00 20,000.00 17,000.00 29,000.00 6,000.00 20,000.00 26,000.00 2,500.00 6,500.00 200,000.00 175,000.00 36,300.00 36,500.00 12,500.00

Kaca Warna 3 mm Kaca Buram 3 mm Kaca Buram Warna 3 mm Kaca Rayban 3 mm Kaca Rayban 5 mm Kaca Cermin 3 mm VIII. BAHAN CAT ( PAINT ) Amplas Kayu / Besi / Tembok Dempul Cat Dasar Tembok Cat Dasar Kayu Meni Besi Cat Kilat Plamur Cat Khusus Tembok Luar Pelitur Melamic Vernis Minyak Cat / Thinner Ter / Residu IX. BAHAN BESI , ALUMINIUM & KAWAT ( IRON, ALUMUNIUM & WIRE ) Besi Simpai Kawat Besi Tulangan Beton Kawat Ikat Beton Kawat Harmonika Kawat Nyamuk / Besi Kawat Nyamuk / Plastik (Kassa) Kawat Ikat Beronjong / Galvanis Wiremesh Besi Ulir diam. 4 mm Wiremesh Besi Ulir diam. 5 mm Wiremesh Besi Ulir diam. 6 mm Multi Truss ( Rangka Atap Baja Ringan ) Besi Plat T = 1.00 mm L = 2 cm ( Besi Strip ) Beugel Alumunium Foil Alumunium Tape X. BAHAN PENGGANTUNG, KUNCI & PEREKAT ( NAILS, KEYS & GLUE ) Paku Campuran 1" - 5 " Paku Atap Seng / Paku Payung Paku Genteng Metal Multi Sirap Paku Gypsum Paku Sekrup Paku Beton Paku Tripleks Sekrup / Baut / Mur Baut Besar Kunci Pintu Tanam Antik Kunci Pintu Tanam Kunci Pintu Tanam KM / WC Kunci Silinder Kunci Lemari

No.

Jenis Bahan / Material Bangunan

Satuan

Harga Bahan Tanpa Jasa & Pajak (Rp.)

1 15 16 17 18 19 20 21 22 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

2 Selot Pintu Selot Jendela Engsel Pintu Engsel Jendela Engsel Pintu Engsel Jendela Kait Angin Handle Pintu & Jendela Lem Kayu / Tripleks Lem PVC Lem Genteng Metal Multi Sirap Seal Tape XI. BAHAN SANITAIR ( SANITARY ) Kloset Duduk / Monoblok Kloset Jongkok Standar Urinoir Bidet Wastafel Keramik Bak Mandi Fibreglass Badkip / Bathtub Porselin Badkip / Bathtub Porselin Panjang Sudut Biasa Biasa Kuningan Kuningan

3 Buah Buah Buah Buah Buah Buah Buah Buah Kg Kg Cup Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Set Buah 1 lubang Buah Buah Buah Buah M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M'

4 13,500.00 5,000.00 7,000.00 6,000.00 12,500.00 10,000.00 7,500.00 5,000.00 37,500.00 46,500.00 20,000.00 5,000.00 1,375,000.00 150,000.00 950,000.00 0.00 475,000.00 1,500,000.00 2,750,000.00 7,200,000.00 1,400,000.00 366,250.00 375,000.00 85,000.00 37,500.00 12,500.00 17,500.00 1,850,000.00 233,500.00 188,000.00 151,000.00 117,000.00 55,000.00 2,394,750.00 1,506,700.00 1,385,550.00 933,000.00 724,500.00 575,000.00 312,750.00 402,500.00 322,500.00 279,600.00 154,000.00 118,000.00 78,500.00 49,200.00 33,750.00 24,100.00 176,500.00 119,500.00 91,250.00 76,000.00 47,250.00 28,350.00 14,500.00 11,250.00 6,250.00 4,500.00 4,500.00 166,700.00 166,700.00

Bak Air Fibreglass vol. 1 m3 Bak Cuci Piring Stainless Steel Double Water Drain + Acessories Shower ( Tray ) Tempat Sabun / Soap Dish Kran Air Lokal 3/4 " Floor Drain Pemanas Air / Water Heater + Lapisan Anti Karat kap. 15 liter XII. BAHAN PIPA ( PIPES ) Pipa GIP class medium Pipa GIP class medium Pipa GIP class medium Pipa GIP class medium Pipa GIP class medium Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC S - 12,5 RRJ Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa PVC Tipe AW Pipa Flexibel Pipa Flexibel diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter diameter 200 mm ( 8 " ) 150 mm ( 6 " ) 100 mm ( 4 " ) 75 mm ( 3 " ) 50 mm ( 2 " ) 630mm ( 24 " ) 500 mm ( 20 " ) 450 mm ( 18 " ) 400 mm ( 16 " ) 355 mm ( 14 " ) 300 mm ( 12 " ) 275 mm ( 11 " ) 250 mm ( 10 " ) 225 mm ( 9 " ) 200 mm ( 8 " ) 150 mm ( 6 " ) 125 mm ( 5 " ) 100 mm ( 4 " ) 75 mm ( 3 " ) 65 mm ( 2,5 " ) 50 mm ( 2 " ) 250 mm ( 10 " ) 200 mm ( 8 " ) 150 mm ( 6 " ) 125 mm ( 5 " ) 100 mm ( 4 " ) 75 mm ( 3 " ) 50 mm ( 2 " ) 40 mm ( 1,5 " ) 25 mm ( 1 " ) 18.75 mm ( 3/4 " ) 12.5 mm ( 1/2 " ) 150 mm ( 6 " ) 100 mm ( 4 " )

No.

Jenis Bahan / Material Bangunan

Satuan

Harga Bahan Tanpa Jasa & Pajak (Rp.)

1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2 XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES ) All Socket Tee PVC dia 200 x 200 mm All Socket Tee PVC dia 200 x 160 mm All Socket Tee PVC dia 200 x 110 mm All Socket Tee PVC dia 200 x 90 mm All Socket Tee PVC dia 150 x 150 mm All Socket Tee PVC dia 150 x 100 mm All Socket Tee PVC dia 160 x 90 mm All Socket Tee PVC dia 150 x 75 mm All Socket Tee PVC dia 110 x 90 mm All Socket Tee PVC dia 100 x 50 mm All Socket Tee PVC dia 75 x 75 mm All Socket Tee PVC dia 75 x 50 mm All Socket Tee PVC dia 50 x 50 mm All Flanged Gate Valve dia 250 mm All Flanged Gate Valve dia 200 mm All Flanged Gate Valve dia 150 mm All Flanged Gate Valve dia 100 mm All Flanged Gate Valve dia 75 mm All Flanged Gate Valve dia 50 mm

3 Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah

4 1,000,000.00 850,000.00 750,000.00 600,000.00 581,800.00 504,800.00 900,000.00 800,000.00 320,000.00 275,000.00 200,000.00 175,000.00 130,000.00 4,200,000.00 2,782,500.00 1,575,000.00 787,500.00 630,000.00 420,000.00 1,100,000.00 1,890,000.00 1,365,000.00 840,000.00 400,000.00 287,500.00 172,500.00 660,000.00 800,000.00 1,379,300.00 1,365,000.00 1,050,000.00 945,000.00 735,000.00 630,000.00 525,000.00 420,000.00 0.00 0.00 0.00 0.00 0.00 185,000.00 105,000.00 55,400.00 0.00 37,850.00 0.00 31,500.00 26,500.00 472,500.00 367,500.00 236,500.00 0.00 420,000.00 0.00 0.00 275,000.00 580,200.00 420,000.00 262,500.00 302,000.00 126,000.00 80,000.00 70,000.00 46,050.00

17 18 19 20 21 22 23 24 25 26 27

All Flanged Spigot PVC dia 300 mm All Flanged Spigot PVC dia 250 mm All Flanged Spigot PVC dia 200 mm All Flanged Spigot PVC dia 160 mm All Flanged Spigot PVC dia 110 mm All Flanged Spigot PVC dia 90 mm All Flanged Spigot PVC dia 63 mm All Flange Bend GIP All Flange Bend GIP 45 x 150 mm 90 x 150 mm 90 90 45 22,5 90 45 22,5 90 45 22,5 90 45 22,5 90 45 90 45 90 45 90 45 Diameter 100 mm Diameter 75 mm Diameter 50 mm diam. 250 x 200 mm diam. 250 x 150 mm diam. 200 x 150 mm diam. 200 x 100 mm diam. 150 x 100 mm

All Socket Bend PVC dia 315 mm All Socket Bend PVC dia 250 mm All Socket Bend PVC dia 250 mm All Socket Bend PVC dia 250 mm

28

All Socket Bend PVC dia 200 mm All Socket Bend PVC dia 200 mm All Socket Bend PVC dia 200 mm

29

All Socket Bend PVC dia 160 mm All Socket Bend PVC dia 160 mm All Socket Bend PVC dia 160 mm

30

All Socket Bend PVC dia 140 mm All Socket Bend PVC dia 140 mm All Socket Bend PVC dia 140 mm

31 32 33 34

All Socket Bend PVC dia 110 mm All Socket Bend PVC dia 110 mm All Socket Bend PVC dia 90 mm All Socket Bend PVC dia 90 mm All Socket Bend PVC dia 75 mm All Socket Bend PVC dia 75 mm All Socket Bend PVC dia 63 mm All Socket Bend PVC dia 63 mm Flage Socket PVC Flage Socket PVC Flage Socket PVC

35

All Flange Reducer GIP All Flange Reducer GIP All Flange Reducer GIP All Flange Reducer GIP All Flange Reducer GIP

36 37 38 39 40 41 42

All Flange Reducer PVC dia 315 x 250 mm All Flange Reducer PVC dia 250 x 200 mm All Flange Reducer PVC dia 200 x 150 mm All Flange Reducer PVC dia 200 x 100 mm All Flange Reducer PVC dia 160 x 110 mm All Flange Reducer PVC dia 110 x 90 mm All Flange Reducer PVC dia 110 x 63 mm All Flange Reducer PVC dia 90 x 63 mm

XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES ) Bend 90GIP Bend 45GIP Bend 22,5GIP Bend 90GIP Bend 45GIP Bend 22,5GIP Bend 90GIP Bend 45GIP Bend 22,5GIP Bend 90GIP Bend 45GIP Bend 90GIP Bend 45GIP Bend 90GIP Bend 45GIP 43 44 45 46 47 1 2 3 4 5 6 7 Flange GIP Flange GIP Flange GIP Flange GIP Flexibel Joint Hidran Umum Polyethylene ( PE ) Hidran Umum Polyethylene ( PE ) Hidran Umum Polyethylene ( PE ) Hidran Umum Fibreglass ( FRP ) Hidran Umum Fibreglass ( FRP ) Hidran Umum Fibreglass ( FRP ) Water Meter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter Diameter 250 mm 250 mm 250 mm 200 mm 200 mm 200 mm 150 mm 150 mm 150 mm 100 mm 100 mm 75 mm 75 mm 50 mm 50 mm Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Unit Unit Unit Unit Unit Unit Unit 577,500.00 0.00 0.00 294,000.00 0.00 0.00 0.00 0.00 0.00 50,000.00 0.00 0.00 0.00 0.00 0.00 30,000.00 33,000.00 40,000.00 75,000.00 1,280,000.00 2,925,000.00 5,680,000.00 7,530,000.00 1,700,000.00 2,800,000.00 3,800,000.00 365,000.00

diam. 50 mm diam. 75 mm diam. 100 mm diam. 150 mm diam. 150 mm vol. 1,0 m3 vol. 2,0 m3 vol. 3,0 m3 vol. 1,0 m3 vol. 2,0 m3 vol. 3,0 m3

XIV. BAHAN TANKI AIR UNTUK HIDRAN UMUM ( WATER TANKS )

Jenis Bahan / Material Bangunan 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B. 2 XV. BAHAN ELEKTRIKAL ( ELECTRICAL, CABLES, LAMPS ) Sekring Biasa Sekring Otomatic 16 A ( Jerman ) Stop Kontak Saklar Lampu Pijar 10 Watt Lampu Pijar 25 Watt Lampu Pijar 60 Watt Lampu Neon (TL) 10 Watt Lampu Neon (TL) 20 Watt Lampu Kap Baret Lampu Sorot Lengkap 120 Watt Lampu SL 18 Watt Lampu SL 20 Watt Lampu SL 50 Watt UPAH KERJA

Satuan 3 Buah Buah Buah Buah Buah Buah Buah Set Set Set Set Buah Buah Buah

Harga Bahan (Rp.) 4 25,000.00 18,000.00 15,000.00 15,600.00 4,800.00 6,000.00 6,000.00 10,100.00 12,000.00 132,000.00 156,000.00 30,000.00 35,000.00 95,000.00

ANALISA HARGA SATUANGalian Tanah Cadas / Padas yang banyak Batu / Kerikil sedalam 1 meter ( PT.03 / m 3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Pekerja OH 88,687.50 Mandor OH 122,787.50 Jumlah BAHAN Jumlah C D E Jumlah A + B Biaya Umum dan Keuntungan Harga / M3 10%

No. 1 A 1 2 B

No. 1 A 1 2 3 4 B 1 2 3 C D E

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( PBe.03 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Semen OH 631,000.00 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 3 Pasir Beton/Pasang 90,625.00 M Batu 0,5 - 1 (Kerikil Beton) 687,500.00 M3 Jumlah Jumlah A + B Biaya Umum dan Keuntungan 10% Harga Satuan

No. 1 A 1 2 3 4 B 1 2 3 C D E

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 2 Ps ( PPBC.07 / m ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 25,000.00 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 3 Batu Belah 10 - 15 cm 285,713.75 M Jumlah Jumlah A + B Biaya Umum dan Keuntungan 10% Harga Satuan Plesteran t = 1,5 cm, camp. 1 PC : 2 Ps ( PPs.04 / m2 )

3

No. 1 A 1 2 3 4 B

URAIAN PEKERJAAN 2 TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 12,620.00 88,687.50 114,537.50 122,787.50

BAHAN 1 Semen Portland 2 Pasir Beton/Pasang Jumlah C Jumlah A + B D Biaya Umum dan Keuntungan E Harga Satuan

Kg M3

1,875.00 90,625.00

10%

Urugan Kembali Tanah Galian ( PT.05 / m ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah C D E Jumlah A + B Biaya Umum dan Keuntungan Harga Satuan 10% SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50

3

Pekerjaan Rangka Badan Kayu Kelas I ( PK.08 / m3 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Kayu Kelas I (Ketam) 2 Paku Jumlah C Jumlah A + B D Biaya Umum dan Keuntungan E Harga Satuan M3 Kg 6,412,500.00 18,750.00 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50

10%

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.04 / m2 ) HARGA No. URAIAN PEKERJAAN SATUAN SATUAN

No. 1 A 1 2 3 4 B

URAIAN PEKERJAAN 2 TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah

SATUAN 3 OH OH OH OH ( Rp. ) 4 1,706,250.00 88,687.50 114,537.50 122,787.50

BAHAN 1 Batako 2 Semen Portland 3 Pasir Beton/Pasang Jumlah C Jumlah A + B D Biaya Umum dan Keuntungan E Harga Satuan

Bh Kg 3 M

1,500.00 1,875.00 90,625.00

10%

1 buah pasang kunci tanam biasaNo. 1 A 1 2 3 4 B 1 C D E URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kunci Tanam Biasa Jumlah Jumlah A + B Biaya Umum dan Keuntungan Harga Satuan Bh 1,500.00 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 590,625.00 88,687.50 114,537.50 122,787.50

10%

1 Pasang Gerendel PintuNo. 1 URAIAN PEKERJAAN 2 SATUAN 3 HARGA SATUAN ( Rp. ) 4

A 1 2 3 4 B

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah

OH OH OH OH

0.00 88,687.50 114,537.50 122,787.50

BAHAN 1 Gerendel Pintu Jumlah Jumlah A + B Biaya Umum dan Keuntungan Harga Satuan

Bh

1,500.00

C D E

10%

1 Pasang Engsel PintuNo. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Ensel Pintu Jumlah C D E Jumlah A + B Biaya Umum dan Keuntungan Harga Satuan 10% Bh 1,500.00 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 50,000.00 88,687.50 114,537.50 122,787.50

No. 1 A 1 2 3

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( PK.14 / m ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Kayu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50

3

4 Mandor Jumlah BAHAN 1 Kayu Kelas I (Ketam) Jumlah C Jumlah A + B D Biaya Umum dan Keuntungan E Harga Satuan B

OH

122,787.50

M

3

6,412,500.00

10%

Pekerjaan Konstruksi Rangka Kuda-kuda ( PK.15 / m ) No. 1 A 1 2 3 4 B 1 2 3 4 C D E URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Besi Strip Baut Paku Jumlah Jumlah A + B Biaya Umum dan Keuntungan Harga Satuan Pemasangan Rangka Atap Seng ( PK.16 / m2 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Tukang Kayu 2 Pekerja 3 Kepala Tukang SATUAN 3 OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 10% M3 Btg Bh Kg 4,262,500.00 12,022.50 8,125.00 18,750.00 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50

3

4 Mandor Jumlah B BAHAN 1 Kayu Kelas II 2 Paku Jumlah C D E Jumlah A + B Biaya Umum dan Keuntungan Harga Satuan

OH

122,787.50

M Kg

3

4,262,500.00 18,750.00

10%

No. 1 A 1 2 3 4 B 1 2 C D E

Pemasangan Lisplang uk. 2 x (2 x 20) cm, Kayu Kelas I ( PK.20 / m' ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Kayu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Papan Kayu Kelas I (Ketam) 6,037,500.00 M3 Paku Kg 18,750.00 Jumlah Jumlah A + B Biaya Umum dan Keuntungan 10% Harga Satuan Pemasangan Atap Seng Gelombang BJLS 0,20 ( PPA.05 / m2 )

No. 1 A 1 2 3 4

URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50

BAHAN 1 Seng Gelombang BJLS 0,20 2 Paku Payung Jumlah C Jumlah A + B D Biaya Umum dan Keuntungan E Harga Satuan

B

Lbr Kg

81,875.00 25,000.00

10%

No. 1 A 1 2 3 4 B 1 2 3 C D E

Pemasangan Bubungan / Nok Atap Seng Gelombang ( PPA.06 / m' ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Kayu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Papan Kayu Klas II 5,175,000.00 M3 Seng Datar BJLS 0,20 Lbr 47,500.00 Paku Kg 18,750.00 Jumlah Jumlah A + B Biaya Umum dan Keuntungan 10% Harga Satuan Pengecatan Tembok Baru (1 Lapis Plamur), 1 Lapis Cat Dasar, 1 Lapis Cat Penutup ( PC.05 / m2 ) HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50

No. 1 A 1 2 3 4

URAIAN PEKERJAAN 2 TENAGA Tukang Cat Pekerja Kepala Tukang Mandor Jumlah

SATUAN 3 OH OH OH OH

BAHAN 1 Plamur 2 Cat Dasar Tembok 3 Cat Tembok Jumlah C Jumlah A + B D Biaya Umum dan Keuntungan E Harga Satuan

B

Kg Kg Ltr

53,125.00 43,750.00 112,500.00

10%

No. 1 A 1 2 3 4 B 1 2 C D E

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( PBe.04 / kg ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Besi OH 77,990.00 Pekerja OH 70,950.00 Kepala Tukang OH 91,630.00 Mandor OH 98,230.00 Jumlah BAHAN Besi Beton (Polos/Ulir) Kg 23,295.00 Kawat Ikat Beton Kg 33,933.00 Jumlah Jumlah A + B Biaya Umum dan Keuntungan 10% Harga Satuan Pemasangan Bekisting / Cetakan Beton ( PBe.06 / m2 )

No. 1 A 1 2 3 4 B

URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50

1 Papan Kayu Bekisting 2 Paku Jumlah C Jumlah A + B D

M Kg

3

3,191,250.00 18,750.00

Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.28 Galian Tanah Biasa sedalam 1 meter ( PT.01 / m )3

No. 1 A

URAIAN PEKERJAAN 2

SATUAN 3 OH OH

HARGA SATUAN ( Rp. ) 4 70,950.00 98,230.00

TENAGA 1 Pekerja 2 Mandor Jumlah BAHAN Jumlah

B

C D E

Jumlah A + B Biaya Umum dan Keuntungan Harga Satuan

10%

UAN

meter ( PT.03 / m3 ) KUANTITAS 5 1.500 0.125 BIAYA SATUAN ( Rp. ) 6 133,031.25 15,348.44 148,379.69

0.00 148,379.69 14,837.97 163,217.66

KUANTITAS 5 0.250 1.650 0.025 0.080

BIAYA SATUAN ( Rp. ) 6 157,750.00 146,334.38 2,863.44 9,823.00 316,770.81 605,625.00 47,125.00 536,250.00 1,189,000.00 1,505,770.81 150,577.08 1,505,770.81

323.000 0.520 0.780

KUANTITAS 5 1.200 3.600 0.120 0.180

BIAYA SATUAN ( Rp. ) 6 30,000.00 319,275.00 13,744.50 22,101.75 385,121.25 495,937.50 38,742.19 285,713.75 820,393.44 1,205,514.69 120,551.47 1,326,066.16Pekerja Tukang Batu Kepala Tukang Mandor JUMLAHBAHAN

Hari/Orang Hari/Orang Hari/Orang Hari/Orang

264.500 0.4275 1.000

Batu belah 10/15 cm Semen Portland Pasir pasang

M3 Kg M3

KUANTITAS 5 0.150 0.200 0.015 0.010

BIAYA SATUAN ( Rp. ) 6 1,893.00 17,737.50 1,718.06 1,227.88 22,576.44 15,975.00 1,540.63 17,515.63 40,092.06 4,009.21 44,101.27

8.520 0.017

KUANTITAS 5 0.192 0.0192

BIAYA SATUAN ( Rp. ) 6 17,028.00 2,357.52 19,385.52

0.00 19,385.52 1,938.55 21,324.07

KUANTITAS 5 24.000 8.000 2.400 0.400

BIAYA SATUAN ( Rp. ) 6 2,339,700.00 709,500.00 274,890.00 49,115.00 3,373,205.00 7,053,750.00 937.50 7,054,687.50 10,427,892.50 1,042,789.25 11,470,681.75

1.100 0.050

KUANTITAS

BIAYA SATUAN

KUANTITAS 5 0.150 0.450 0.015 0.0225 ( Rp. ) 6 255,937.50 39,909.38 1,718.06 2,762.72 300,327.66 33,000.00 38,625.00 3,017.81 74,642.81 374,970.47 37,497.05 412,467.52

22.000 20.600 0.0333

KUANTITAS 50.500 0.010 0.010 0.005

BIAYA SATUAN ( Rp. ) 6 295,312.50 886.88 1,145.38 613.94 297,958.69 33,000.00 33,000.00 330,958.69 33,095.87 364,054.56

22.000

KUANTITAS 5

BIAYA SATUAN ( Rp. ) 6

0.500 0.010 0.010 0.005

0.00 886.88 1,145.38 613.94 2,646.19 33,000.00 33,000.00 35,646.19 3,564.62 39,210.81

22.000

KUANTITAS 50.150 0.015 0.015 0.00075

BIAYA SATUAN ( Rp. ) 6 7,500.00 1,330.31 1,718.06 92.09 10,640.47 33,000.00 33,000.00 43,640.47 4,364.05 48,004.51Pekerja Tukang Kayu Kepala Tukang Mandor Hari/Orang Hari/Orang Hari/Orang Hari/Orang

22.000

KUANTITAS 5 18.000 6.000 2.000

BIAYA SATUAN ( Rp. ) 6 1,754,775.00 532,125.00 229,075.00

0.300

36,836.25 2,552,811.25 7,053,750.00 7,053,750.00 9,606,561.25 960,656.13 10,567,217.38

1.100

KUANTITAS 5 12.000 4.000 1.200 0.200

BIAYA SATUAN ( Rp. ) 6 1,169,850.00 354,750.00 137,445.00 24,557.50 1,686,602.50 4,688,750.00 180,337.50 325,000.00 7,500.00 5,201,587.50 6,888,190.00 688,819.00 7,577,009.00

1.100 15.000 40.000 0.400

KUANTITAS 5 0.100 0.150 0.010

BIAYA SATUAN ( Rp. ) 6 9,748.75 13,303.13 1,145.38

0.0075

920.91 25,118.16 47,361.11 1,875.00 49,236.11 74,354.27 7,435.43 81,789.69

0.0111 0.100

KUANTITAS 5 0.100 0.100 0.010 0.050

BIAYA SATUAN ( Rp. ) 6 9,748.75 8,868.75 1,145.38 6,139.38 25,902.25 60,375.00 468.75 60,843.75 86,746.00 8,674.60 95,420.60

0.010 0.025

KUANTITAS 5 0.060 0.120 0.006 0.006

BIAYA SATUAN ( Rp. ) 6 5,849.25 10,642.50 687.23 736.73 17,915.70

0.700 0.020

57,312.50 500.00 57,812.50 75,728.20 7,572.82 83,301.02

KUANTITAS 5 0.070 0.150 0.008 0.006

BIAYA SATUAN ( Rp. ) 6 6,824.13 13,303.13 916.30 736.73 21,780.28 51,750.00 14,250.00 750.00 66,750.00 88,530.28 8,853.03 97,383.30

0.010 0.300 0.040

KUANTITAS 5 0.063 0.020 0.0063 0.0025

BIAYA SATUAN ( Rp. ) 6 6,141.71 1,773.75 721.59 306.97 8,944.02

0.100 0.100 0.130

5,312.50 4,375.00 14,625.00 24,312.50 33,256.52 3,325.65 36,582.17

KUANTITAS 5 0.007 0.007 0.0007 0.0003

BIAYA SATUAN ( Rp. ) 6 545.93 496.65 64.14 29.47 1,136.19 24,459.75 509.00 24,968.75 26,104.94 2,610.49 28,715.43

1.050 0.015

KUANTITAS 5 0.260 0.300 0.026 0.005

BIAYA SATUAN ( Rp. ) 6 25,346.75 26,606.25 2,977.98 613.94 55,544.91

0.040 0.300

127,650.00 5,625.00 133,275.00 188,819.91 188,819.91

KUANTITAS 5 0.0075 0.0008

BIAYA SATUAN ( Rp. ) 6 532.13 73.67 605.80

0.00 605.80 60.58 666.38

1.500 0.600 0.060 0.075

1.100 267.000 0.427

0.015 0.150 0.015 0.00075

DAFTAR ANALISA HARGA SATUAN Galian Tanah Biasa sedalam 1 meter ( PT.01 / m3 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah Jumlah A + B Harga Satuan Galian sedalam > 1 meter Acuan : SNI.2835.b - 6.1 & SNI.2835.b - 6.2 0.00 40,386.50 40,386.50 53,108.25 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50 KUANTITAS 5 0.400 0.040 BIAYA SATUAN ( Rp. ) 6 35,475.00 4,911.50 40,386.50

C D E

40,386.50

1.315

Galian Tanah Keras / Liat sedalam 1 meter ( PT.02 / m3 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah C D E Jumlah A + B Harga Satuan Galian sedalam > 1 meter Acuan : SNI.2835.b - 6.4 & PT.01 0.00 63,103.91 63,103.91 82,981.64 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50 KUANTITAS 5 0.625 0.0625 BIAYA SATUAN ( Rp. ) 6 55,429.69 7,674.22 63,103.91

63,103.91

1.315

No. 1 A 1 2 B

Galian Tanah Cadas / Padas yang banyak Batu / Kerikil sedalam 1 meter ( PT.03 / m3 ) HARGA URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN ( Rp. ) 2 3 4 5 TENAGA Pekerja OH 88,687.50 1.500 Mandor OH 122,787.50 0.125 Jumlah BAHAN Jumlah Jumlah A + B Biaya Umum dan Keuntungan Harga / M3 Acuan : SNI.2835.b - 6.5 & PT.01

BIAYA SATUAN ( Rp. ) 6 133,031.25 15,348.44 148,379.69

C D E

10%

0.00 148,379.69 14,837.97 163,217.66

Galian Tanah Lumpur sedalam 1 meter ( PT.04 / m3 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah Jumlah A + B Harga Satuan Galian sedalam > 1 meter Acuan : SNI.2835.b - 6.6 & PT.01 0.00 83,095.22 83,095.22 109,270.22 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50 KUANTITAS 5 0.823 0.0823 BIAYA SATUAN ( Rp. ) 6 72,989.81 10,105.41 83,095.22

C D E

83,095.22

1.315

Urugan Kembali Tanah Galian ( PT.05 / m3 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2835.b - 6.9 0.00 19,385.52 19,385.52 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50 KUANTITAS 5 0.192 0.0192 BIAYA SATUAN ( Rp. ) 6 17,028.00 2,357.52 19,385.52

0 D

Menimbun dengan Tanah Datang secara Manual ( PT.06 / m3 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50 KUANTITAS 5 0.192 0.0192 BIAYA SATUAN ( Rp. ) 6 17,028.00 2,357.52 19,385.52 32,400.00 32,400.00 51,785.52 51,785.52

Jumlah BAHAN 1 Tanah Urug/Tanah Datang Jumlah C Jumlah A + B D Harga Satuan Acuan : Tenaga = SNI.2835.b - 6.9 B

M3

27,000.00

1.200

Bahan = SNI.2835.b - 6.11

Pemadatan Tanah secara Manual ( PT.07 / m3 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2835.b - 6.10 0.00 50,483.13 50,483.13 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50 KUANTITAS 5 0.500 0.050 BIAYA SATUAN ( Rp. ) 6 44,343.75 6,139.38 50,483.13

C D

No. 1 A 1 2 B 1 C D

Urugan Pasir di Bawah Lantai Bangunan/Alas Jalan, Terhitung Penyiramannya ( PT.08 / m 3 ) HARGA URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN ( Rp. ) 2 3 4 5 TENAGA Pekerja OH 88,687.50 0.300 Mandor OH 122,787.50 0.010 Jumlah BAHAN Pasir Urug 90,625.00 1.200 M3 Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2835.b - 6.11

BIAYA SATUAN ( Rp. ) 6 26,606.25 1,227.88 27,834.13 108,750.00 108,750.00 136,584.13 136,584.13

Urugan Sirtu/Pasir Batu ( PT.09 / m3 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN 1 Sirtu/Pasir Batu Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2835.b - 6.15 M3 105,208.34 1.200 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 88,687.50 122,787.50 KUANTITAS 5 0.250 0.025 BIAYA SATUAN ( Rp. ) 6 22,171.88 3,069.69 25,241.56 126,250.01 126,250.01 151,491.57 151,491.57

C D

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.01 / m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Bata Merah Bh 1,625.00 Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2837.a - 6.9

KUANTITAS 5 0.100 0.320 0.010 0.015

BIAYA SATUAN ( Rp. ) 6 9,748.75 28,380.00 1,145.38 1,841.81 41,115.94 113,750.00 35,531.25 3,443.75 152,725.00 193,840.94 193,840.94

70.000 18.950 0.038

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 3 Ps ( PPBC.02 / m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Bata Merah Bh 1,625.00 Semen Portland Kg 1,875.00 3 Pasir Beton/Pasang 90,625.00 M Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2837.a - 6.10

KUANTITAS 5 0.100 0.320 0.010 0.015

BIAYA SATUAN ( Rp. ) 6 9,748.75 28,380.00 1,145.38 1,841.81 41,115.94 113,750.00 26,943.75 3,625.00 144,318.75 185,434.69 185,434.69

70.000 14.370 0.040

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 4 Ps ( PPBC.03 / m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Bata Merah Bh 1,625.00 Semen Portland Kg 1,875.00 3 Pasir Beton/Pasang 90,625.00 M Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2837.a - 6.11

KUANTITAS 5 0.100 0.320 0.010 0.015

BIAYA SATUAN ( Rp. ) 6 9,748.75 28,380.00 1,145.38 1,841.81 41,115.94 113,750.00 21,562.50 3,896.88 139,209.38 180,325.31 180,325.31

70.000 11.500 0.043

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.04 / m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Batako Bh 1,500.00 Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 Jumlah Jumlah A + B Harga Satuan Acuan : Tenaga = G.27 Bahan = G.33.l

KUANTITAS 5 0.150 0.450 0.015 0.0225

BIAYA SATUAN ( Rp. ) 6 14,623.13 39,909.38 1,718.06 2,762.72 59,013.28 33,000.00 38,625.00 3,017.81 74,642.81 133,656.09 133,656.09

22.000 20.600 0.0333

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 3 Ps ( PPBC.05 / m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Batako Bh 1,500.00 Semen Portland Kg 1,875.00 3 Pasir Beton/Pasang 90,625.00 M Jumlah Jumlah A + B Harga Satuan Acuan : Tenaga = G.27 Bahan = G.33.i

KUANTITAS 5 0.150 0.450 0.015 0.0225

BIAYA SATUAN ( Rp. ) 6 14,623.13 39,909.38 1,718.06 2,762.72 59,013.28 33,000.00 29,531.25 3,425.63 65,956.88 124,970.16 124,970.16

22.000 15.750 0.0378

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 4 Ps ( PPBC.06 / m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Batako Bh 1,500.00 Semen Portland Kg 1,875.00 3 Pasir Beton/Pasang 90,625.00 M Jumlah Jumlah A + B Harga Satuan Acuan : Tenaga = G.27 Bahan = G.33.h

KUANTITAS 5 0.150 0.450 0.015 0.0225

BIAYA SATUAN ( Rp. ) 6 14,623.13 39,909.38 1,718.06 2,762.72 59,013.28 33,000.00 23,718.75 3,679.38 60,398.13 119,411.41 119,411.41

22.000 12.650 0.0406

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 2 Ps ( PPBC.07 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 Batu Belah 10 - 15 cm 285,713.75 M3 Jumlah Jumlah A + B Harga Satuan Acuan : Tenaga = G.26 Bahan = G.32.k

KUANTITAS 5 1.200 3.600 0.120 0.180

BIAYA SATUAN ( Rp. ) 6 116,985.00 319,275.00 13,744.50 22,101.75 472,106.25 495,937.50 38,742.19 285,713.75 820,393.44 1,292,499.69 1,292,499.69

264.500 0.4275 1.000

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 3 Ps ( PPBC.08 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 Batu Belah 10 - 15 cm 285,713.75 M3 Jumlah Jumlah A + B Harga Satuan Acuan : Tenaga = G.26 Bahan = G.32.l

KUANTITAS 5 1.200 3.600 0.120 0.180

BIAYA SATUAN ( Rp. ) 6 116,985.00 319,275.00 13,744.50 22,101.75 472,106.25 375,000.00 41,325.00 285,713.75 702,038.75 1,174,145.00 1,174,145.00

200.000 0.456 1.000

No. 1 A 1 2 3 4 B 1 2 3 C D

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 4 Ps ( PPBC.09 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Batu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 Batu Belah 10 - 15 cm 285,713.75 M3 Jumlah Jumlah A + B Harga Satuan Acuan : Tenaga = G.26 Bahan = G.32.h

KUANTITAS 5 1.200 3.600 0.120 0.180

BIAYA SATUAN ( Rp. ) 6 116,985.00 319,275.00 13,744.50 22,101.75 472,106.25 305,625.00 47,306.25 285,713.75 638,645.00 1,110,751.25 1,110,751.25

163.000 0.522 1.000

Pasangan Rooster/Terawang ( PPBC.10/ m 2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Terawang/Rooster Batako 2 Semen Portland 3 Pasir Beton/Pasang Jumlah C Jumlah A + B D Harga Satuan Acuan : SNI.2837.a - 6.25 Bh Kg M3 2,000.00 1,875.00 90,625.00 25.000 12.800 0.035 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.100 0.300 0.010 0.015 BIAYA SATUAN ( Rp. ) 6 9,748.75 26,606.25 1,145.38 1,841.81 39,342.19 50,000.00 24,000.00 3,171.88 77,171.88 116,514.06 116,514.06

Pemasangan Paving Block, Pasir t = 10 cm ( PPBC.11 / m 2 ) No. 1 A URAIAN PEKERJAAN 2 TENAGA 1 Tukang Batu 2 Pekerja Jumlah B BAHAN 1 Paving Block 2 Pasir Urug Jumlah C D Jumlah A + B Harga Satuan Acuan : G.60 Bh M3 2,062.50 90,625.00 36.000 0.120 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 KUANTITAS 5 0.100 0.400 BIAYA SATUAN ( Rp. ) 6 9,748.75 35,475.00 45,223.75 74,250.00 10,875.00 85,125.00 130,348.75 130,348.75

Pemasangan Dinding Batu Alam ( PPBC.12 / m 2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Batu Pekerja Kepala Tukang Mandor SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.350 0.620 0.035 0.030 BIAYA SATUAN ( Rp. ) 6 34,120.63 54,986.25 4,008.81 3,683.63 96,799.31 4,987.50 22,031.25 3,171.88 30,190.63 126,989.94 126,989.94

Jumlah BAHAN 1 Batu Alam Marmo uk. 10 x 20 cm abu-abu 2 Semen Portland 3 Pasir Beton/Pasang

M2 Kg M3

4,750.00 1,875.00 90,625.00

1.050 11.750 0.035

C D

Jumlah A + B Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.74

Bronjong dengan Kawat Galvanis ( PPBC.13 / m 3 ) No. 1 A URAIAN PEKERJAAN 2 SATUAN 3 OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 122,787.50 KUANTITAS 5 2.000 6.100 0.155 BIAYA SATUAN ( Rp. ) 6 194,975.00 540,993.75 19,032.06 755,000.81 #REF! 857,141.25 #REF! #REF! #REF! #REF!

TENAGA 1 Tukang Anyam Bronjong 2 Pekerja 3 Mandor Jumlah B BAHAN 1 Kawat Galvanis 2 Batu Belah 10 - 15 cm Jumlah C Jumlah A + B D (Jumlah A + B) x 1/3 E Harga Satuan Acuan : G.5.a

Kg M3

#REF! 285,713.75

25.000 3.000

0.333

No. 1 A 1 2 3 4 B 1 2 3 4 5 C D

Dinding Plesteran Simpai t = 3 cm, Simpai Kawat, camp. 1 PC : 3 Ps ( PPs.01 / m2 ) HARGA URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN ( Rp. ) 2 3 4 5 TENAGA Tukang Semen OH 97,487.50 0.250 Pekerja OH 88,687.50 0.320 Kepala Tukang OH 114,537.50 0.025 Mandor OH 122,787.50 0.015 Jumlah BAHAN Semen Portland Kg 1,875.00 14.150 Pasir Beton/Pasang 90,625.00 0.039 M3 Besi Simpai Kawat Kg 20,000.00 0.250 3 Papan Mal Kayu Kls. III 3,191,250.00 0.020 M Paku Kg 18,750.00 0.150 Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2837.b - 6.24

BIAYA SATUAN ( Rp. ) 6 24,371.88 28,380.00 2,863.44 1,841.81 57,457.13 26,531.25 3,534.38 5,000.00 63,825.00 2,812.50 101,703.13 159,160.25 159,160.25

Plesteran t = 1 cm, camp. 1 PC : 2 Ps ( PPs.02 / m2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Semen Pekerja Kepala Tukang Mandor SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.150 0.200 0.015 0.010 BIAYA SATUAN ( Rp. ) 6 14,623.13 17,737.50 1,718.06 1,227.88 35,306.56 15,975.00 1,540.63 17,515.63 52,822.19 52,822.19 Bahan = G.50.h

Jumlah BAHAN 1 Semen Portland 2 Pasir Beton/Pasang Jumlah C Jumlah A + B D Harga Satuan Acuan : Tenaga = SNI.2837.b - 6.1

Kg M3

1,875.00 90,625.00

8.520 0.017

Plesteran t = 1 cm, camp. 1 PC : 3 Ps ( PPs.03 / m2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Semen Portland 2 Pasir Beton/Pasang Jumlah C Jumlah A + B D Harga Satuan Acuan : Tenaga = SNI.2837.b - 6.1 Kg M3 1,875.00 90,625.00 5.400 0.013 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.150 0.200 0.015 0.010 BIAYA SATUAN ( Rp. ) 6 14,623.13 17,737.50 1,718.06 1,227.88 35,306.56 10,125.00 1,178.13 11,303.13 46,609.69 46,609.69

Bahan = G.50.j

Plesteran t = 1,5 cm, camp. 1 PC : 2 Ps ( PPs.04 / m2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Semen Portland 2 Pasir Beton/Pasang Jumlah C Jumlah A + B D Harga Satuan Acuan : SNI.2837.b - 6.2 Kg M3 1,875.00 90,625.00 8.520 0.017 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.150 0.200 0.015 0.010 BIAYA SATUAN ( Rp. ) 6 14,623.13 17,737.50 1,718.06 1,227.88 35,306.56 15,975.00 1,540.63 17,515.63 52,822.19 52,822.19

Plesteran t = 1,5 cm, camp. 1 PC : 3 Ps ( PPs.05 / m2 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Jumlah Jumlah A + B Harga Satuan Acuan : SNI.2837.b - 6.3 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.150 0.200 0.015 0.010 BIAYA SATUAN ( Rp. ) 6 14,623.13 17,737.50 1,718.06 1,227.88 35,306.56 12,150.00 1,721.88 13,871.88 49,178.44 49,178.44

Kg M3

1,875.00 90,625.00

6.480 0.019

No. 1 A 1 2 3 4 B 1 2 3 C D

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Kerikil ( PBe.01 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Semen OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 3 Pasir Beton/Pasang 90,625.00 M Kerikil 187,500.00 M3 Jumlah Jumlah A + B Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.1

KUANTITAS 5 0.250 1.650 0.025 0.080

BIAYA SATUAN ( Rp. ) 6 24,371.88 146,334.38 2,863.44 9,823.00 183,392.69 408,750.00 47,125.00 163,125.00 619,000.00 802,392.69 802,392.69

218.000 0.520 0.870

No. 1 A 1 2 3 4 B 1 2 3 C D

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Batu Pecah ( PBe.02 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Semen OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 Batu Belah 0,5 - 1 (Kerikil Beton) 687,500.00 M3 Jumlah Jumlah A + B Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.1

KUANTITAS 5 0.250 1.650 0.025 0.080

BIAYA SATUAN ( Rp. ) 6 24,371.88 146,334.38 2,863.44 9,823.00 183,392.69 408,750.00 47,125.00 598,125.00 1,054,000.00 1,237,392.69 1,237,392.69

218.000 0.520 0.870

No. 1 A 1 2 3 4 B 1 2 3 C D

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( PBe.03 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Semen OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Semen Portland Kg 1,875.00 Pasir Beton/Pasang 90,625.00 M3 Batu Belah 0,5 - 1 (Kerikil Beton) 687,500.00 M3 Jumlah Jumlah A + B Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.5

KUANTITAS 5 0.250 1.650 0.025 0.080

BIAYA SATUAN ( Rp. ) 6 24,371.88 146,334.38 2,863.44 9,823.00 183,392.69 605,625.00 47,125.00 536,250.00 1,189,000.00 1,372,392.69 1,372,392.69

323.000 0.520 0.780

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( PBe.04 / kg ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Besi Pekerja Kepala Tukang Mandor SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.007 0.007 0.0007 0.0003 BIAYA SATUAN ( Rp. ) 6 682.41 620.81 80.18 36.84 1,420.24 12,993.75 375.00 13,368.75 14,788.99 14,788.99

Jumlah BAHAN Besi Beton (Polos/Ulir) Kg Kawat Ikat Beton Kg Jumlah Jumlah A + B Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.25

12,375.00 25,000.00

1.050 0.015

No. 1 A 1 2 3 4 B 1 2 C D

Pekerjaan Pembesian dengan Wiremesh Besi Ulir ( PBe.05 / m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Besi OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Wiremesh Besi Ulir diam. 5 mm 33,509.70 M2 Kawat Ikat Beton Kg 25,000.00 Jumlah Jumlah A + B Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.25

KUANTITAS 5 0.007 0.007 0.0007 0.0003

BIAYA SATUAN ( Rp. ) 6 682.41 620.81 80.18 36.84 1,420.24 35,185.19 375.00 35,185.19 36,605.42 36,605.42

1.050 0.015

Pemasangan Bekisting / Cetakan Beton ( PBe.06 / m2 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.260 0.300 0.026 0.005 BIAYA SATUAN ( Rp. ) 6 25,346.75 26,606.25 2,977.98 613.94 55,544.91 127,650.00 5,625.00 133,275.00 188,819.91 188,819.91

Jumlah BAHAN Papan Kayu Bekisting 3,191,250.00 M3 Paku Kg 18,750.00 Jumlah Jumlah A + B Harga Satuan Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.28

0.040 0.300

Pemasangan Pondasi Tiang Tongkat Kayu Belian ( PK.01 / m3 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Belian (Tidak Ketam) Baut Jumlah Jumlah A + B Harga Satuan Acuan : F.1.b SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 5.000 5.000 0.500 0.250 BIAYA SATUAN ( Rp. ) 6 487,437.50 443,437.50 57,268.75 30,696.88 1,018,840.63 10,656,250.00 325,000.00 10,981,250.00 12,000,090.63 12,000,090.63

M3 Bh

9,687,500.00 8,125.00

1.100 40.000

Pemasangan Rangka Keep Kayu Belian ( PK.02 / m3 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Belian (Tidak Ketam) Paku Jumlah Jumlah A + B Harga Satuan Acuan : F.3 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 8.000 8.000 0.800 0.400 BIAYA SATUAN ( Rp. ) 6 779,900.00 709,500.00 91,630.00 49,115.00 1,630,145.00 10,656,250.00 56,250.00 10,712,500.00 12,342,645.00 12,342,645.00

M3 Kg

9,687,500.00 18,750.00

1.100 3.000

Pekerjaan Gelegar/Balok Lantai Kayu Belian ( PK.03 / m3 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Belian (Tidak Ketam) Paku Jumlah Jumlah A + B Harga Satuan Acuan : F.1 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 5.000 5.000 0.500 0.250 BIAYA SATUAN ( Rp. ) 6 487,437.50 443,437.50 57,268.75 30,696.88 1,018,840.63 10,656,250.00 56,250.00 10,712,500.00 11,731,340.63 11,731,340.63

M3 Kg

9,687,500.00 18,750.00

1.100 3.000

Pekerjaan Gelegar/Balok Lantai Kayu Kelas I ( PK.04 / m3 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Kayu Kelas I 2 Paku Jumlah C D Jumlah A + B Harga Satuan Acuan : F.1.a M3 Kg 5,037,500.00 18,750.00 1.100 3.000 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 5.000 5.000 0.500 0.250 BIAYA SATUAN ( Rp. ) 6 487,437.50 443,437.50 57,268.75 30,696.88 1,018,840.63 5,541,250.00 56,250.00 5,597,500.00 6,616,340.63 6,616,340.63

Pemasangan Lantai Papan Kayu Belian ( PK.05 / m2 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Belian (Ketam), t = 2 cm Paku Jumlah Jumlah A + B Harga Satuan Acuan : F.37 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.800 0.280 0.080 0.014 BIAYA SATUAN ( Rp. ) 6 77,990.00 24,832.50 9,163.00 1,719.03 113,704.53 242,250.00 1,875.00 244,125.00 357,829.53 357,829.53

M3 Kg

12,112,500.00 18,750.00

0.020 0.100

Pemasangan Lantai Papan Kayu Kelas I ( PK.06 / m2 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam), t = 2 cm Paku Jumlah Jumlah A + B Harga Satuan Acuan : F.37.a SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.800 0.280 0.080 0.014 BIAYA SATUAN ( Rp. ) 6 77,990.00 24,832.50 9,163.00 1,719.03 113,704.53 120,750.00 1,875.00 122,625.00 236,329.53 236,329.53

M3 Kg

6,037,500.00 18,750.00

0.020 0.100

Pekerjaan Rangka Badan Kayu Belian ( PK.07 / m3 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Belian (Ketam) Paku Jumlah Jumlah A + B Harga Satuan Acuan : F.27 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 24.000 8.000 2.400 0.400 BIAYA SATUAN ( Rp. ) 6 2,339,700.00 709,500.00 274,890.00 49,115.00 3,373,205.00 13,323,750.00 937.50 13,324,687.50 16,697,892.50 16,697,892.50

M3 Kg

12,112,500.00 18,750.00

1.100 0.050

Pekerjaan Rangka Badan Kayu Kelas I ( PK.08 / m3 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas I (Ketam) Paku Jumlah Jumlah A + B Harga Satuan Acuan : F.27.a SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 24.000 8.000 2.400 0.400 BIAYA SATUAN ( Rp. ) 6 2,339,700.00 709,500.00 274,890.00 49,115.00 3,373,205.00 7,053,750.00 937.50 7,054,687.50 10,427,892.50 10,427,892.50

M3 Kg

6,412,500.00 18,750.00

1.100 0.050

Pekerjaan Dinding Papan Kayu Belian ( PK.09 / m2 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Belian (Ketam), t = 2 cm Paku Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3434 - 6.55 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.450 0.150 0.045 0.075 BIAYA SATUAN ( Rp. ) 6 43,869.38 13,303.13 5,154.19 9,209.06 71,535.75 132,825.00 1,875.00 134,700.00 206,235.75 206,235.75

M3 Kg

6,037,500.00 18,750.00

0.022 0.100

Pekerjaan Dinding Papan Kayu Kelas I ( PK.10 / m3 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam), t = 2 cm Paku Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3434 - 6.54 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.450 0.150 0.045 0.075 BIAYA SATUAN ( Rp. ) 6 43,869.38 13,303.13 5,154.19 9,209.06 71,535.75 132,825.00 1,875.00 134,700.00 206,235.75 206,235.75

M3 Kg

6,037,500.00 18,750.00

0.022 0.100

Pemasangan Dinding Tripleks Satu Sisi, tebal 3 mm ( PK.11 / m2 ) Untuk bahan dinding lainnya, dapat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Tripleks tebal 3 mm 2 Paku Tripleks Jumlah C Jumlah A + B D Harga Satuan Acuan : SNI.3434 - 6.59 Lbr Kg 11,250.00 32,500.00 0.347 0.050 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.075 0.025 0.0075 0.0013 BIAYA SATUAN ( Rp. ) 6 7,311.56 2,217.19 859.03 159.62 10,547.41 3,906.23 1,625.00 5,531.23 16,078.63 16,078.63

Pemasangan Dinding Tripleks Rangkap, tebal 3 mm ( PK.12 / m ) Untuk bahan dinding lainnya, dapat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Tripleks tebal 3 mm Paku Tripleks Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3434 - 6.59 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.075 0.025 0.0075 0.0013 BIAYA SATUAN ( Rp. ) 6 7,311.56 2,217.19 859.03 159.62 10,547.41 7,812.45 3,250.00 11,062.45 21,609.86 21,609.86

2

Lbr Kg

11,250.00 32,500.00

0.694 0.100

Pemasangan Kusen Pintu dan Jendela Kayu Belian ( PK.13 / m3 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 18.000 6.000 2.000 0.300 BIAYA SATUAN ( Rp. ) 6 1,754,775.00 532,125.00 229,075.00 36,836.25 2,552,811.25 13,323,750.00 13,323,750.00 15,876,561.25 15,876,561.25

Jumlah BAHAN 1 Kayu Belian (Ketam) Jumlah C Jumlah A + B D Harga Satuan Acuan : SNI.3434 - 6.3

M3

12,112,500.00

1.100

No. 1 A 1 2 3 4 B 1 C D

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( PK.14 / m3 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Kayu OH 97,487.50 Pekerja OH 88,687.50 Kepala Tukang OH 114,537.50 Mandor OH 122,787.50 Jumlah BAHAN Kayu Kelas I (Ketam) 6,412,500.00 M3 Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3434 - 6.2

KUANTITAS 5 18.000 6.000 2.000 0.300

BIAYA SATUAN ( Rp. ) 6 1,754,775.00 532,125.00 229,075.00 36,836.25 2,552,811.25 7,053,750.00 7,053,750.00 9,606,561.25 9,606,561.25

1.100

Pekerjaan Konstruksi Rangka Kuda-kuda ( PK.15 / m3 ) Untuk memasang kembali kuda-kuda bongkaran, harga satuan pekerjaan diambil 1/3 dari analisa ini No. 1 A 1 2 3 4 B 1 2 3 4 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Besi Strip Baut Paku Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3434 - 6.27 M3 Btg Bh Kg 4,262,500.00 12,022.50 8,125.00 18,750.00 1.100 15.000 40.000 0.400 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 12.000 4.000 1.200 0.200 BIAYA SATUAN ( Rp. ) 6 1,169,850.00 354,750.00 137,445.00 24,557.50 1,686,602.50 4,688,750.00 180,337.50 325,000.00 7,500.00 5,201,587.50 6,888,190.00 6,888,190.00

Pemasangan Rangka Atap Seng ( PK.16 / m2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Kayu Kelas II 2 Paku Jumlah C D Jumlah A + B Harga Satuan Acuan : Tenaga = F.18 M3 Kg 4,262,500.00 18,750.00 0.0111 0.100 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.100 0.150 0.010 0.0075 BIAYA SATUAN ( Rp. ) 6 9,748.75 13,303.13 1,145.38 920.91 25,118.16 47,361.11 1,875.00 49,236.11 74,354.27 74,354.27

Bahan : F.19

Pemasangan Gording, Nok, Ikatan Angin ( PK.17 / m3 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Kayu Kelas II 2 Paku Jumlah C D Jumlah A + B Harga Satuan Acuan : F.22.a M3 Kg 4,262,500.00 18,750.00 1.100 2.000 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 18.000 6.000 1.800 0.300 BIAYA SATUAN ( Rp. ) 6 1,754,775.00 532,125.00 206,167.50 36,836.25 2,529,903.75 4,688,750.00 37,500.00 4,726,250.00 7,256,153.75 7,256,153.75

Pemasangan Kasau + Reng Atap Genteng/Metal ( PK.18 / m2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 Kayu Kelas II 2 Paku Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3434 - 6.31 M3 Kg 4,262,500.00 18,750.00 0.012 0.150 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.100 0.100 0.010 0.005 BIAYA SATUAN ( Rp. ) 6 9,748.75 8,868.75 1,145.38 613.94 20,376.81 51,150.00 2,812.50 53,962.50 74,339.31 74,339.31

C D

Pemasangan Lisplang uk. (2 x 30) cm, Kayu Kelas I ( PK.19 / m' ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam) Paku Jumlah Jumlah A + B Harga Satuan Acuan : Tenaga = SNI.3434 - 6.52 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.100 0.100 0.010 0.050 BIAYA SATUAN ( Rp. ) 6 9,748.75 8,868.75 1,145.38 6,139.38 25,902.25 40,245.98 281.25 40,527.23 66,429.48 66,429.48

M3 Kg

6,037,500.00 18,750.00

0.007 0.015

Bahan : SNI.3434 - 6.50

Pemasangan Lisplang uk. 2 x (2 x 20) cm, Kayu Kelas I ( PK.20 / m' ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam) Paku Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3434 - 6.52 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.100 0.100 0.010 0.050 BIAYA SATUAN ( Rp. ) 6 9,748.75 8,868.75 1,145.38 6,139.38 25,902.25 60,375.00 468.75 60,843.75 86,746.00 86,746.00

M3 Kg

6,037,500.00 18,750.00

0.010 0.025

Pemasangan Atap Genteng Kodok / Glazuur ( PPA.01 / m2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.075 0.150 0.0075 0.0075 BIAYA SATUAN ( Rp. ) 6 7,311.56 13,303.13 859.03 920.91 22,394.63 78,125.00 78,125.00 100,519.63 100,519.63

Jumlah BAHAN 1 Genteng Kodok/Glazuur Jumlah C Jumlah A + B D Harga Satuan Acuan : SNI.3436 - 6.2

Bh

3,125.00

25.000

Pemasangan Bubungan / Nok Atap Genteng Kodok / Glazuur ( PPA.02 / m' ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Bubungan Genteng Kodok/Glazuur Semen Portland Pasir Beton/Pasang Jumlah Jumlah A + B Harga Satuan Acuan : SNI.3436 - 6.5 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 97,487.50 88,687.50 114,537.50 122,787.50 KUANTITAS 5 0.200 0.400 0.020 0.002 BIAYA SATUAN ( Rp. ) 6 19,497.50 35,475.00 2,290.75 245.58 57,508.83 34,375.00 15,000.00 2,900.00 52,275.00 109,783.83 109,783.83

Bh Kg M3

6,875.00 1,875.00 90,625.00

5.000 8.000 0.032

Pemasangan Atap Genteng Metal ( PPA.03 / m2 ) No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tu