program dan kegiatan deputi bidang perumahan · pdf filejuta asset ruangan ≥ 9m2/orang ......
TRANSCRIPT
PROGRAM DAN KEGIATAN
DEPUTI BIDANG PERUMAHAN SWADAYA
TAHUN 2014
Today’s TalkDay Two – Session 2
• Background
– Housings condition of the poor
– Philosophy of the housing assistance
• Design of housing assistance
• Implementation
2
CONDITIONS OF THE POORS’ HOUSINGS
3
7,9 MILLION UNIT*
DO NOT MEET MINIMUM STANDARD
* SUMBER BPS 2010
** DIOLAH KEMENPERA 2012
(Berdasarkan jumlah penduduk miskin
perkotaan dan perdesaan Data BPS Mei 2012)
5,0 MILLION** RURAL
URBAN2,9 MILLION**
4
MOST OF POOR’S HOUSINGS DO NOT MEET
STANDARD
HOUSEHOLDS DO NOT HAVE ADEQUATE
TOILET
26,85 % URBAN
57,27 % RURAL
Sumber : BPS TAHUN 2012
5
NO CLEAN WATER
55,94 %
POOR
HOUSEHOLDS
IN RURAL
61,89 %
POOR HOUSEHOLDS IN URBAN
Sumber : BPS TAHUN 2012
6
NO ELECTRICITY
1,06%
14,58 %
Sumber : BPS TAHUN 2010
7
IN URBAN
IN RURAL
NO HOUSING CERTIFICATES
27,83 % URBAN
11,97 % RURAL
Sumber : BPS TAHUN 2012
8
HOUSING ASSISTANCE PROGRAM
LEGAL ASPECTS
Law on Housing and
Housing Complex (No.
1/2011)
Medium Term Development
Plan
Presidential
Decree 15/2010
Poverty
Reduction
Acceleration
Law on Budgets
Weakness and
ChallengesNot all
locations have
necessary local
institutions (SKPD)
Lack of support from
local government
Imperfect
Household
Data,
especially
on housings
Limited HRD specialized in local housing development
Limited Budget from
Central Government
WEAKNESS AND CHALLENGES
11
STRATEGIES
Community
Empowerment: Villages level
Social Assistance as stimulant for
poor households
Funding Scheme
Government and Private
Cooperation and synergy
with local government
Systematic approach:
Complete village, then
sub-district
STRATEGIES
12
Stimulant Assistance
Building by the community from their own initiatives or Government initiatives
Housing assistance
Do not use professional contractors
13
MECHANISMS
14
UNIT COST
ACTIVITIES 2012 2013 2014
1. NEW BUILDINGS (PB) Rp. 11.000.000 Rp. 15.000.000 -
2. SPECIFICATION CURRENT REHABILITATED HOUSINGS (PK)
A. HEAVY REHABILITATIONB. MEDIUMC. LIGHT
-Rp. 6.000.000
-
-Rp. 7.500.000
-
Rp. 20.000.000Rp. 10.000.000
Rp. 5.000.000
D. PAPUA AND WEST PAPUA
- Rp. 30.000.000 Rp. 40.000.000
Unit Cost BSPS 2012, 2013, and 2014
3. PSU CONSTRUCTION - - Rp. 4.000.000
• Poverty level
• Disadvantage Regions
General Criteria
• Under presidential directive
Specific Criteria
15
DISTRICT OR CITIES CRITERIA
IndonesianHave income
(steady or not)Family Land owner Own house
Living in the house (going to be
rehabilitated)
Never have similar stimulant
Poor HH Strong willingness
Priority to those who get
Community Empowerment
Penerima
BSPS 2010
BSPS 2011
BSPS 2012
BSPS2013
16
HOUSEHOLDS CRITERIA
SKPD : Satuan Kerja Perangkat DaerahKPB : Kelompok Penerima Bantuan
TPM : Tenaga Pendamping Masyarakat17
FUNDING MECHANISM
17
INTERVENT 8 OUT OF 15 POOR INDICATORS
BATAKO,
PAPAN KELAS 3
WALLSSENG
ROOFRABAT BETON, PLESTER HALUS
FLOOR
MEMILIKI RUMAH DAN TANAH
BERSERTIPIKAT DENGAN NILAI > 6
JUTA
ASSET
RUANGAN ≥ 9M2/ORANG
AREA
ADA AIR BERSIH
(Sumur Bor)
DRINKING WATERMEMILIKI WC/MCK
(Individual/Komunal
TOILETPLN /SOLAR CELL
ELECTRICITY
EXPECTED OUTPUTS
18
IMPLEMENTATION
Desa Sukamekarsari, Kab. Lebak
Foto 0% Foto 100%
Desa Cilengkrang, Kab. Bandung Barat
Foto 100%Foto 0%Desa Mundu Pesisir, Kab. Cirebon
Foto 0% Foto 100%
Desa Melati, Kabupaten Mojokerto
Foto 100%Foto 0%
Desa Pegerluyung, Kab. Mojokerto
Foto 0% Foto 100%
Desa Palasari, Kota Bandung
Foto 0% Foto 100% 19
TERIMA KASIH
REGIONAL JAWA
LAMPIRANHOUSING ASSISTANCE 2010-2012
AND PLANNING IN 2014
1. SEBARAN REALISASI KEGIATAN 2010-2012
22
BANTEN
1. BSPS 15.245
PB : 400
PK : 14.845
2. SHAT : 1.222
3. PSU : 2.100
Banten
DKI Jakarta
Jawa Barat
DIY
Jawa Tengah
Jawa Timur
DKI JAKARTA
1. BSPS :1.280
PB : 155
PK : 1.125
2. SHAT : -
3. PSU : 750
JAWA BARAT
1. BSPS : 41.074
PB : 3.218
PK : 37.854
2. SHAT : 2.429
3. PSU : 6.500
JAWA TENGAH1. BSPS
:43.972
PB : 3.828
PK : 40.144
2. SHAT : 2.777
3. PSU : 6.300
JAWA TIMUR
1. BSPS :3.723
PB : 2.582
PK : 34.298
2. SHAT : 2.873
3. PSU : 5.275
DIY
1. BSPS :8.911
PB : 283
PK : 8.628
2. SHAT : 800
3. PSU : 750
23
2. RINCIAN REALISASI KEGIATAN 2010-2012
PB PK Kab/Kota Bidang Kab/Kota Unit Kab/Kota PB PK Kab/Kota Bidang Kab/Kota Unit Kab/Kota
1 Banten 100 750 5 472 3 600 5 300 1.500 6 300 3 1.500 5
2 Jawa Barat 150 2.250 19 1.204 5 1.100 8 1.075 5.400 16 475 4 5.400 16
3 DKI Jakarta - 350 4 - - 200 2 - 550 1 - - 550 1
4 Jawa Tengah 125 2.800 20 761 8 1.200 9 1.425 5.100 24 866 8 5.100 23
5 Jawa Timur 50 1.650 14 903 4 900 8 1.225 4.375 19 570 6 4.375 19
6 DIY - 475 4 334 3 200 2 150 550 3 246 3 550 3
425 8.275 66 3.674 23 4.200 34 4.175 17.475 69 2.457 24 17.475 67
No Provinsi
Tahun 2010 Tahun 2011
BSPS (unit) SHAT PSU BSPS (unit) SHAT PSU
TOTAL
PB PK Kab/Kota Bidang Kab/Kota
1 Banten - 12.595 5 450 2 -
2 Jawa Barat 1.993 30.206 20 750 3 -
3 DKI Jakarta 155 225 3 - - -
4 Jawa Tengah 2.278 32.244 24 1.150 5 -
5 Jawa Timur 1.307 28.273 18 1.400 5 -
6 DIY 133 7.603 5 300 1 -
5.866 111.146 75 4.050 16 -
No Provinsi
Tahun 2012
BSPS (unit) SHAT PSU
(unit)
TOTAL
ANCAR-ANCAR BSPS TAHUN 2014
24
BantenDKI Jakarta
Jawa Barat
DIY
Jawa Tengah
Jawa Timur
33.700 unit
8.000unit
400unit
2.500unit
21.700unit
28.600unit
Total ancar-ancar wilayah Jawa : 94.900 unit