perencan hotel 7 lantai berbasis metode softwa re tekla …

22
TUGASA PERENCAN HOTEL 7 LANTAI BERBASIS METODE BUILJJING INFORMATION MODELLING MENGGUN JUL_....... SOFTWA RE TEKLA STRUCTURES DAN TEKLA STRUCTURAL DESIGNER Disusun Oleh : LUCKY ITSNANI SEPTILIANDRI NBI : 1431700068 PROGRAM STUDI TEKNIK SIPIL UN __ FAKULTAS TEKNIK · IVERSI fAS 17 AGUSTUS 1945 SURABAYA 2021

Upload: others

Post on 27-Apr-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

TUGASA

PERENCAN HOTEL 7 LANTAI BERBASIS METODE BUILJJING INFORMATION MODELLING

MENGGUN JUL_....... SOFTWARE TEKLA STRUCTURES DAN TEKLA STRUCTURAL DESIGNER

Disusun Oleh : LUCKY ITSNANI SEPTILIANDRI

NBI : 1431700068

PROGRAM STUDI TEKNIK SIPIL UN __ FAKULTAS TEKNIK

· IVERSI fAS 17 AGUSTUS 1945 SURABAYA

2021

Page 2: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

TUGASAKHIR

pERENCANAAN HOTEL 7 LANTAI BERBASIS METODE BUILDING INFORMATION MODELLING

MENGGUNAKAN SOFTWARE TEKLA STRUCTURES DAN TEKLA STRUCTURAL DESIGNER

Disusun Oleh :

Luckv Itsnani Septiliandri 1431700068

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS 17 AGUSTUS 1945 SURABAYA

2021

Page 3: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

'.\ama ,01

PROGR.\\I STrn, Tf.K~lk ~,rn. F.\Kl'l.T \~ TEK,IK

l'~I\.E.R~ll .\~ 17 .\Gl'STl ~ 194~ ~l H \8.\ \' .\

tE,18.\R Pl~Ct:~.\11 .\\ Tl(, .\~ .\~1111{

: l.t CKY IT~'.\\ ,1 ~EP I. II.I\ '\lllU ~ 1-0170000)1

rr~ram Studt f akultas

: T dmlk ,tpll : Tdmlk

Judul : PERE\CA~.\.-\N HOTEL 7 L.\ \ T.\I B£RB.\~1S \l[lODl Bl ILDI.\Ci l.\fOR.\I. t TIO.\' \/ODELL/ \(i ,t[\(jt;l'~_\K.\~ SOPTJL tRL TEKL .1 STRt CTl 'RES 0.\~ TEKL. i STRl CTl R tL l)l:'SJG.\ER

\ll'tl~\'t.thul \kn~ ttutut

Dosrn r rmhlmbln1! I

Retno l rlmm tlnlngt -.. T · ,\I.I . 't•r. U"l'!(IIL\t<iO!

Ol.kan ra"'utt~,, l l'1'nl\... l n\Hn\ta, 1 • \ gn,tu s tq.i~

~uraha~ .,

,.. ... ,,, ...-; ._. »' <-

kdua r, •ti!' .111, ,tutti 1, i..uti.. ,1pll l 111, l r,\h,, t"' \ fu,rn, \ 4~~

'-UI JIU\ a

d f \ \\tohl.11111. \1. "c Or. Ir. ,al\\ o, rr. ~o~ _\ll.~· .1111.\ ,,•r. ~0410/-m.

\

Page 4: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

SURAT PERNY AT AAN

Saya yang bertanda tangan di bawah ini :

: Lucky Itsnani Septiliandri : 1431700068

Nama

NBI Alamat : Manukan Krido III 5H/10, Kel. Manukan Kulon, Kee. Tandes, Surabya Telp/Hp : 085735713268

Menyatakan bahwa "TUGAS AKHIR" yang saya buat untuk memenuhi persyaratan kelulusan Strata (Sl) Teknik Sipil - Program Sarjana - Universitas 17 Agustus 1945 Surabaya dengan Judul Tugas Akhir

"PERENCANAAN HOTEL 7 LANTAI BERBASIS METODE BUILDING INFORMATION MODELLING MENGGUNAKAN SOFTWARE TEKLA STRUCTURES DAN TEKLA STRUCTURAL DESIGNER" Adalah hasil karya saya sendiri dan bukan duplikasi dari hasil karya orang

lain. Selanjutnya apabila dikemudian hari klaim dari pihak lain bukan tanggung jawab pembimbing dan atau pengelola program tetapi menjadi tanggung jawab

saya sendiri. Atas hal tersebut saya bersedia menerima sanksi, sesuai dengan hukum atau

aturan yang berlaku di Indonesia. Demikian pernyataan ini saya buat dengan sebenamya tanpa paksaan dari

siapapun.

Surabaya, 07 Juli 2021 {',;•;ft

i;~ l ~p, Jtl? ~ - .~ / i i. l 10l 20 ::, ,, I ME 1 i,~t '"'"'I I \4~ A5AJX344343292

:-('

Lucky ltsnani Septiliandri 1431700068

Page 5: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

PERNYATAAN PERSETUJUAN

PUBLIKASI KARY A ILMIAH

UNTUK KEPENTINGAN AKADEMIS

yang bertanda tangan di bawah ini, saya mahasiswa :

N ama : Lucky Itsnani Septiliandri

NBI : 1431700068

Demi pengembangan ilmu pengetahuan, saya memberikan kepada Badan

Perpustakaan Universitas 17 Agustus 1945 Surabaya karya ilmiah saya yang

berjudul :

"PERENCANAAN HOTEL 7 LANTAI BERBASIS METODE BUILDING

INFORMATION MODELLING MENGGUNAKAN SOFTWARE TEKLA

STRUCTURES DAN TEKLA STRUCTURAL DESIGNER''

Dengan demikian saya memberikan ilmu pengetahuan Perpustakaan

Universitas 17 Agustus 1945 Surabaya hak untuk menyimpan: mengalihkan

dalam bentuk media lain, mengelolanya dalam bentuk pangkalan ~

mendistribusikan secara terbatas, dan mempublikasikannya di internet atau media

lain untuk kepentingan akademis tanpa perlu meminta izin dari saya maupun

memberi royalti kepada saya selama tetap mencantumkan nama saya sebagai

penulis. Demikian pernyataan ini saya buat dengan sebenamya tanpa paksaan dari

s1apapun.

Surabay~ 07 Juli 2021

Yang menyatakan

,~-1 ~C I ji-i•i: ~ ~~= ~,Jal -L ME ; if; AJX344343293

Luck~-· Itsnani Septiliandri

Page 6: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

i

KATA PENGANTAR

Puji syukur Alhamdulillah terpanjatkan atas kehadirat Allah SWT atas

rahmat, hidayah dan karunia-Nya, sehingga penulis dapat menyelesaikan tugas

akhir yang berjudul “PERENCANAAN HOTEL 7 LANTAI BERBASIS

METODE BUILDING INFORMATION MODELLING MENGGUNAKAN

SOFTWARE TEKLA STRUCTURES DAN TEKLA STRUCTURAL DESIGNER”.

Laporan tugas akhir ini disusun untuk memenuhi salah satu syarat guna

memperoleh gelar sarjana teknik pada jurusan Teknik Sipil Universitas 17

Agustus 1945 Surabaya.

Tersusunnya tugas akhir ini juga tidak terlepas dari dukungan dan

motivasi dari berbagai pihak yang telah banyak membantu dan memberi masukan

serta arahan. Untuk itu begitu banyak ucapan terimakasih kepada:

1. Orang tua penulis serta saudara tercinta sebagai penyemangat dan telah

memberikan dukungan moril maupun meteril serta doa.

2. Ibu Retno Trimurtiningrum, ST., MT. selaku dosen pembimbing yang telah

memberikan bimbingan, arahan dan petunjuk hingga selesainya Tugas

Akhir Ini

3. Teman – teman satu bimbingan yang telah memberikan banyak referensi

dalam pengerjaan tugas akhir ini.

4. Teman - Teman terdekat yang tidak bisa disebutkan satu persatu, terima

kasih atas bantuan dan saran selama proses pengerjaan tugas akhir ini.

Penulis menyadari bahwasannya dalam penulisan tugas akhir ini masih

terdapat banyak kekurangan dan jauh dari kata sempurna, untuk itu di harapkan

kritik dan saran yang membangun demi kesempurnaan tugas akhir ini.

Surabaya, 25 Juni 2021

Penulis,

Page 7: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

ii

PERENCANAAN HOTEL 7 LANTAI BERBASIS

METODE BUILDING INFORMATION MODELLING

MENGGUNAKAN SOFTWARE TEKLA STRUCTURES

DAN TEKLA STRUCTURAL DESIGNER

Nama Mahasiswa : Lucky Itsnani Septiliandri

NBI : 1431700068

Dosen Pembimbing : Retno Trimurtiningrum, ST., MT.

ABSTRAK

Building Information Modelling (BIM) adalah suatu sistem yang dapat

mengorganisasikan pekerjaan – pekerjaan dalam proyek untuk merealisasikan

sebuah proyek. Di dalam Building Information Modelling (BIM) sendiri terdapat

pengembangan pemodelan termasuk kedalam dimensi kedua (2D) dokumen

perencanaan yang berkembang menjadi bentuk tiga dimensi (3D), waktu

pelaksanaan (4D), perhitungan volume dan biaya (5D), analisa dampak

lingkungan (6D), masa operasional dan perwatan (7D)

Dalam penyusunan tugas akhir ini, penulis merencanakan gedung hotel 7

lantai yang menggunakan struktur beton bertulang dan menggunakan metode

Building Information Modelling (BIM) dimana penulis juga mengacu pada SNI

2847:2019 dan 1727:2019. Struktur yang di dimodelkan meliputi pondasi, kolom,

balok, plat lantai, dak atap. Dengan menggunakan software Tekla Structures yang

digunakan untuk permodelan 3D, dan software Tekla Structural Designer untuk

analisa struktur.

Dalam penelitian ini menghasilkan output dimensi kolom LT.1 75/75,

LT.2 60/60, LT.3 55/55, LT.4 45/45, LT.5 40/40, LT.6 35/35, LT.7 35/35 dan

dimensi balok memanjang 30/45, balok melintang 25/35. Dan total kebutuhan

tulangan kolom seberat 1.456,18 kg mass, untuk total kebutuhan tulangan balok

seberat 2420,54 kg mass. Serta berupa gambar detail, bar bending, dan

menjelaskan cara dalam pengaplikasian software Tekla Structures dan Tekla

Strucutural Designer dalam mendesain bangunan gedung.

Kata kunci : Building Information Modelling, Tekla Structures, Tekla Structural

Designer, SNI 2847-2019, SNI 1726-2019

Page 8: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

iii

DESIGN OF 7 STORIES HOTEL BASED ON THE

BUILDING INFORMATION MODELLING METHOD

USING TEKLA STRUCTURES AND TEKLA

STRUCTURAL DESIGNER SOFTWARE

Name of Student : Lucky Itsnani Septiliandri

Number of Student : 1431700068

Advisor : Retno Trimurtiningrum, ST., MT.

ABSTRACT

Building Information Modeling (BIM) is a system that can organize work

in projects to realize a project. Within the Building Information Modeling (BIM)

itself, there is modeling development including the second dimension (2D) of

planning documents that develop into a three-dimensional (3D) form,

implementation time (4D), volume and cost calculations (5D), environmental

impact analysis (6D). ), operational and maintenance life (7D)

In the preparation of this final project, the author plans a 7-storey hotel

building that uses a reinforced concrete structure and uses the Building

Information Modeling (BIM) method where the author also refers to SNI

2847:2019 and 1727:2019. The modeled structure includes foundations, columns,

beams, floor slabs, and roofs. By using Tekla Structures software which is used

for 3D modeling, and Tekla Structural Designer software for structural analysis.

In this study, the output dimensions of the columns are LT.1 75/75, LT.2

60/60, LT.3 55/55, LT.4 45/45, LT.5 40/40, LT.6 35/35, LT. .7 35/35 and

dimensions of longitudinal beams 30/45, beams transverse 25/35. And the total

need for column reinforcement weighing 1,456.18 kg mass, for the total need for

beam reinforcement weighing 2420.54 kg mass. As well as in the form of detailed

drawings, bending bars, and explaining how to apply the Tekla Structures and

Tekla Strucutural Designer software in designing buildings.

Keywords: Building Information Modelling, Tekla Structures, Tekla Structural

Designer, SNI 2847-2019, SNI 1726-2019

Page 9: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

iv

DAFTAR ISI

KATA PENGANTAR ............................................................................ i

ABSTRAK ............................................................................................. ii

ABSTRACT ........................................................................................... iii

DAFTAR ISI .......................................................................................... iv

DAFTAR TABEL .................................................................................. vi

DAFTAR GAMBAR .............................................................................. ix

LAMPIRAN ........................................................................................... xiii

DAFTAR NOTASI ................................................................................ xiv

BAB I PENDAHULUAN ...................................................................... 1

1.1 Latar Belakang .................................................................................. 1

1.2 Rumusan Masalah ............................................................................ 3

1.3 Tujuan ............................................................................................... 3

1.4 Batasan Masalah ............................................................................... 3

1.5 Manfaat Penelitian ............................................................................ 3

BAB II TINJUAN PUSTAKA ............................................................... 5

2.1 Penelitian Terdahulu ......................................................................... 5

2.2 Permodelan Struktur ......................................................................... 14

2.2.1 Permodelan Struktur 2D ................................................................ 14

2.2.2 Permodelan Struktur 3D ................................................................ 14

2.3 Building Information Modelling (BIM) ........................................... 14

2.4 Tekla Structures ................................................................................ 16

2.4.1 Pengenalan Tekla Structures ......................................................... 16

2.4.2 Kelebihan Tekla Structure ............................................................. 16

2.4.3 Permodelan 3D Tekla Structures ................................................... 18

2.5 Pembebanan ...................................................................................... 19

2.5.1 Beban Mati .................................................................................... 19

2.5.2 Beban Hidup .................................................................................. 20

2.5.3 Beban Angin .................................................................................. 20

2.5.4 Beban Gempa ................................................................................ 23

2.5.4.1 Kriteria beban gempa menurut SNI 1726:2019 .......................... 24

2.5.4.2 Metode Gempa Respon Spektrum .............................................. 28

2.5.5 Kombinasi Pembebanan ................................................................ 32

2.6 Komponen Struktur .......................................................................... 32

Page 10: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

v

2.6.1 Lower Structurres (Struktur BAwah) ............................................ 32

2.6.2 Upper Structures (Struktur Atas) ................................................... 34

2.7 Desain Kapasitas .............................................................................. 35

2.8 Sistem Rangka Pemikul Momen Khusus (SRPMK) ........................ 37

2.9 Desain Elemen Struktur ................................................................... 38

2.9.1 Preliminary Desain ........................................................................ 38

2.9.2 Pondasi .......................................................................................... 39

2.10 Simpangan ...................................................................................... 39

BAB III METODE PENELITIAN ......................................................... 41

3.1Bagian alir penelitian (Flow Chart) ................................................... 41

3.2 Penjelasan Flowchart........................................................................ 44

BAB IV ANALISI DAN PEMBAHASAN ........................................... 49

4.1 Pengumpulan data ............................................................................ 49

4.2 Premilinary design ........................................................................... 49

4.2.1 Balok (SNI 2847 : 2019 pasal 9.3.1) ............................................. 49

4.2.2 Kolom (SNI 2847 : 2019 Pasal 10.3.1) ......................................... 51

4.2.3 Plat lantai (SNI 2847 : 2019 Pasal 8.3.1) ...................................... 53

4.3 Penentuan Pembebanan .................................................................... 57

4.3.1 Beban mati .................................................................................... 57

4.3.2 Beban hidup .................................................................................. 62

4.3.3 Beban angin ................................................................................... 66

4.3.4 Beban Gempa ................................................................................ 70

4.4 Modelling Tekla Structures .............................................................. 83

4.4.1 Configuration ................................................................................ 83

4.4.2 Struktur bawah (Lower structure) ................................................. 86

4.4.3 Struktur atas (Upper Structure) ..................................................... 94

4.5 Tekla structural designer .................................................................. 103

4.6 Pembebanan Pada Software Tekla Structural Designer ................... 106

4.7 Kontrol gaya geser dinamis (Base Shear) ........................................ 118

4.8 Analisa hasil simpangan (SNI 1726:2019, 7.8.6) ............................. 119

4.9 Cek kapasitas elemen struktur primer .............................................. 136

4.10 Gambar detail struktur dan bar bending ......................................... 192

BAB V KESIMPULAN DAN SARAN ................................................. 195

5.1 Kesimpulan ...................................................................................... 195

5.2 Saran ................................................................................................. 195

DAFTAR PUSTAKA ............................................................................ 197

Page 11: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

vi

DAFTAR TABEL

Tabel 2.1 Penelitian terdahulu ................................................................ 5

Tabel 2.2 Penelitian terdahulu (Lanjutan) .............................................. 6

Tabel 2.3 Penelitian terdahulu (Lanjutan) .............................................. 7

Tabel 2.4 Penelitian terdahulu (Lanjutan) .............................................. 8

Tabel 2.5 Penelitian terdahulu (Lanjutan) .............................................. 9

Tabel 2.6 Penelitian terdahulu (Lanjutan) .............................................. 10

Tabel 2.7 Penelitian terdahulu (Lanjutan) .............................................. 11

Tabel 2.8 Penelitian terdahulu (Lanjutan) .............................................. 12

Tabel 2.9 Penelitian terdahulu (Lanjutan) .............................................. 13

Tabel 2.10 Beban Mati ........................................................................... 19

Tabel 2.11 Beban hidup .......................................................................... 20

Tabel 2.12 Faktor kepentingan angina, Iw ............................................. 21

Tabel 2.13 Faktor arah angina, Kd ......................................................... 21

Tabel 2.14 Koefisien tekanan external ................................................... 22

Tabel 2.15 Koefisien tekanan external atap, Cp ..................................... 23

Tabel 2.16 Kategori Gedung non Gedung beban gempa ....................... 24

Tabel 2.17 Kategori Gedung non Gedung beban gempa (lanjutan) ..... 25

Tabel 2.18 Faktor keutamaan gempa ...................................................... 26

Tabel 2.19 KDS respons percepatan pada periode pendek ..................... 26

Tabel 2.20 Kategori respons percepatan periode 1 detik ........................ 26

Tabel 2.21 20 Kategori respons percepatan pada 1 detik (Lanjutan) ..... 27

Tabel 2.22 tingkat resiko gempa............................................................. 27

Tabel 2.23 Faktor R, Ω dan Cd untuk Penahan Gaya Gempa Lanjutan . 27

Tabel 2.24 Klasifikasi situs .................................................................... 28

Tabel 2.25 Koefisien respon seismic ...................................................... 30

Tabel 2.26 Koefisien respon seismik (Lanjutan) .................................... 40

Tabel 4.1 Rekap prelimianry design ....................................................... 57

Tabel 4.2 Beban mati pada bangunan ..................................................... 58

Tabel 4.3 Perhitungan beban mati Lt.1 ................................................... 58

Tabel 4.4 Perhitungan beban mati Lt.1 (Lanjutan) ................................. 59

Tabel 4.5 Perhitungan beban mati Lt.2 ................................................... 59

Tabel 4.6 Perhitungan beban mati Lt.3 ................................................... 60

Tabel 4.7 Perhitungan beban mati Lt.4 ................................................... 60

Page 12: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

vii

Tabel 4.8 Perhitungan beban mati Lt. 5 ................................................. 61

Tabel 4.9 Perhitungan beban mati Lt. 6 ................................................. 61

Tabel 4.10 Perhitungan beban mati dak atap ......................................... 62

Tabel 4.11 Beban hidup pada bangunan ................................................ 62

Tabel 4.12 Beban hidup pada bangunan (Lanjutan) ............................... 63

Tabel 4.13 Perhitungan beban hidup Lt.1 .............................................. 63

Tabel 4.14 Perhitungan beban hidup Lt 2 – 5 ........................................ 64

Tabel 4.15 Perhitungan beban hidup Lt. 6 ............................................. 64

Tabel 4.16 Perhitungan beban hidup dak atap ....................................... 65

Tabel 4.17 Pembebanan Tekla structure designer .................................. 65

Tabel 4.18 Pembebanan Tekla structural designer ................................. 66

Tabel 4.19 Faktor kepentingan B. Angin, Iw ......................................... 66

Tabel 4.20 Prakiraan cuaca wilayah batu 05/03/2021 ............................ 67

Tabel 4.21 Faktor arah angin, Kd ........................................................... 67

Tabel 4.22 Koefisien tekanan internal (GCpi) ....................................... 68

Tabel 4.23 Koefisien tekanan eksternal dinding, Cp .............................. 69

Tabel 4.24 Koefisien tekanan eksternal atap, Cp ................................... 69

Tabel 4.25 Olahan data SPT ................................................................... 70

Tabel 4.26 Data respon spektrum tanah lunak ....................................... 71

Tabel 4.27 Data respon spektrum tanah lunak ....................................... 71

Tabel 4.28 Data respon spektrum tanah lunak ....................................... 72

Tabel 4.29 Data respon spektrum tanah lunak ....................................... 73

Tabel 4.30 Data respo spektrum tanah lunak ......................................... 74

Tabel 4.31 Data respon spektrum tanah lunak ....................................... 75

Tabel 4.32 Data respon spektrum tanah lunak ....................................... 76

Tabel 4.33 Data respon spektrum tanah lunak ....................................... 77

Tabel 4.34 Faktor resiko struktur ........................................................... 78

Tabel 4.35 Kategori seismic respons percepatan pada periode 1 detik .. 78

Tabel 4.36 KDS respons percepatan pada periode pendek .................... 79

Tabel 4.37 Tingkat resiko gempa ........................................................... 79

Tabel 4.38 Faktor R,CD ......................................................................... 81

Tabel 4.39 Perhitungan gaya gempa ...................................................... 82

Tabel 4.40 Simpangn Izin ...................................................................... 121

Tabel 4.41 Rekapitulasi Kontrol Simpangan Arah – X .......................... 128

Tabel 4.42 Rekapitulasi Kontrol Simpangan Arah – Y .......................... 135

Tabel 4.43 Data Tanah ........................................................................... 170

Tabel 4.44 Perhitungan Tahanan Gesek Nominal Tiang ....................... 171

Page 13: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

viii

Tabel 4.45 Perhitungan Tahanan Gesek Nominal Tiang ........................ 173

Tabel 4.46 Data Hasil Uji SPT ............................................................... 174

Tabel 4.47 Rekap Tahanan Aksial Tiang Pancang ................................. 175

Tabel 4.48 Kohesi Tanah Di Sepanjang Tiang ....................................... 176

Tabel 4.49 Rekap Tahanan Lateral Tiang .............................................. 177

Tabel 4.50 Susunan Tiang Pancang ........................................................ 178

Page 14: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

ix

DAFTAR GAMBAR

Gambar 2.1 Konsep BIM ....................................................................... 15

Gambar 2.2 Arah tekan external ............................................................ 22

Gambar 2.3 Desain respons spektrum .................................................... 30

Gambar 2.4 Sendi plastis struktur bangunan .......................................... 36

Gambar 2.5 Mekanisme keruntuhan lokal dan global ............................ 36

Gambar 2.6 Simpangan antar lantai ....................................................... 39

Gambar 3.1 Diagram alir / flowchart ..................................................... 41

Gambar 3.2 Diagram alir / flowchart (Lanjutan) ................................... 42

Gambar 3.3 Diagram alir / flowchart (Lanjutan) ................................... 43

Gambar 3.4 Diagram alir / flowchart (Lanjutan) ................................... 44

Gambar 4.1 Prelimanry balok ................................................................ 50

Gambar 4.2 Prelimanry kolom ............................................................... 51

Gambar 4.3 Preliminary Pelat lantai ...................................................... 53

Gambar 4.4 Lebar efektif balok memanjang .......................................... 54

Gambar 4.5 Lebar efektif balok melintang ............................................ 55

Gambar 4.6 Denah ................................................................................. 58

Gambar 4.7 Denah ................................................................................. 63

Gambar 4.8 Arah tekanan eksternal dinding dan atap ............................ 68

Gambar 4.9 Hasil Tekla ......................................................................... 82

Gambar 4.10 Setting Awal ..................................................................... 83

Gambar 4.11 Option (a) ......................................................................... 84

Gambar 4.12 Option (b) ......................................................................... 85

Gambar 4.13 Grid (a) ............................................................................. 85

Gambar 4.14 grid (a) .............................................................................. 86

Gambar 4.15 Foundation (a) .................................................................. 87

Gambar 4.16 Foundation (b) .................................................................. 87

Gambar 4.17 Foundation (c) .................................................................. 88

Gambar 4.18 Foundation (d) .................................................................. 88

Gambar 4.19 Foundation (e) .................................................................. 89

Gambar 4.20 Foundation (f) ................................................................... 89

Gambar 4.21 Foundation (g) .................................................................. 90

Gambar 4.22 Pile Cap (a) ....................................................................... 90

Gambar 4.23 Pile Cap (b) ....................................................................... 91

Page 15: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

x

Gambar 4.24 Pile Cap (c) ....................................................................... 91

Gambar 4.25 Pile Cap (d) ....................................................................... 92

Gambar 4.26 Pile Cap (e) ....................................................................... 92

Gambar 4.27 Pile Cap (f) ........................................................................ 93

Gambar 4.28 Pile Cap (g) ....................................................................... 93

Gambar 4.29 Kolom (a) .......................................................................... 94

Gambar 4.30 Kolom (b) ......................................................................... 95

Gambar 4.31 Kolom (c) .......................................................................... 95

Gambar 4.32 Kolom (d) ......................................................................... 96

Gambar 4.33 Kolom (e) .......................................................................... 96

Gambar 4.34 Kolom (f) .......................................................................... 97

Gambar 4.35 Balok (a) ........................................................................... 98

Gambar 4.36 Balok (b) ........................................................................... 98

Gambar 4.37 Balok (c) ........................................................................... 99

Gambar 4.38 Balok (d) ........................................................................... 99

Gambar 4.39 Balok (e) ........................................................................... 100

Gambar 4.40 Pelat Lantai (a) .................................................................. 101

Gambar 4.41 Pelat Lantai (b) ................................................................. 101

Gambar 4.42 Pelat Lantai (c) .................................................................. 102

Gambar 4.43 Plat lantai (d)..................................................................... 102

Gambar 4.44 Langkah Pertama .............................................................. 103

Gambar 4.45 Langkah kedua .................................................................. 104

Gambar 4.46 Langkah Ketiga ................................................................. 105

Gambar 4.47 Langkah keempat .............................................................. 105

Gambar 4.48 Langkah Pertama (a) ......................................................... 106

Gambar 4.49 Langah pertama (b) ........................................................... 106

Gambar 4.50 Langkah kedua (a) ............................................................ 107

Gambar 4.51 Langkah kedua (b) ............................................................ 107

Gambar 4.52 Langkah kedua (c) ............................................................ 108

Gambar 4.53 Langkah ketiga (a) ............................................................ 108

Gambar 4.54 Langkah ketiga (b) ............................................................ 109

Gambar 4.55 Langkah keempat (a) ........................................................ 109

Gambar 4.56 Langkah keempat (b) ........................................................ 110

Gambar 4.57 Langkah keempat (c) ........................................................ 111

Gambar 4.58 Langkah Kelima (a) .......................................................... 112

Gambar 4.59 Langkah kelima (b) ........................................................... 112

Gambar 4.60 Langkah keenam (a) ......................................................... 112

Page 16: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

xi

Gambar 4.61 Langkah keenam (b) ......................................................... 113

Gambar 4.62 Langkah keenam (c) ......................................................... 113

Gambar 4.63 Langkah ketujuh (a) .......................................................... 114

Gambar 4.64 Langkah ketujuh (b) ......................................................... 114

Gambar 4.65 Langkah ketujuh (c) .......................................................... 114

Gambar 4.66 Langkah ketuhuh (d) ........................................................ 115

Gambar 4.67 Langkah kedelapan (a) ..................................................... 115

Gambar 4.68 Langkah kedelapan (b) ..................................................... 116

Gambar 4.69 Langkah pertama .............................................................. 116

Gambar 4.70 Langkah kedua ................................................................. 117

Gambar 4.71 Langkah ketiga ................................................................. 117

Gambar 4.72 Langkah keempat ............................................................. 117

Gambar 4.73 Langkkah kelima .............................................................. 117

Gambar 4.74 Base Shear (a) ................................................................... 118

Gambar 4.75 Base Shear (b) .................................................................. 118

Gambar 4.76 Base Shear (c) ................................................................... 118

Gambar 4.77 Base Shear (d) .................................................................. 119

Gambar 4.78 Simpangn antar lantai ....................................................... 120

Gambar 4.79 Report Seismic (a) ............................................................ 120

Gambar 4.80 Report Seismic (b) ............................................................ 120

Gambar 4.81 Stack 1 .............................................................................. 122

Gambar 4.82 Stack 2 .............................................................................. 123

Gambar 4.83 Stack 3 .............................................................................. 124

Gambar 4.84 Stack 4 .............................................................................. 125

Gambar 4.85 Stack 5 .............................................................................. 126

Gambar 4.86 Stack 6 .............................................................................. 127

Gambar 4.87 Stack 1 .............................................................................. 129

Gambar 4.88 Stack 2 .............................................................................. 130

Gambar 4.89 Stack 3 .............................................................................. 131

Gambar 4.90 Stack 4 .............................................................................. 132

Gambar 4.91 Stack 5 .............................................................................. 133

Gambar 4.92 Stack 6 .............................................................................. 134

Gambar 4.93 Mu Tumpuan .................................................................... 136

Gambar 4.94 Variasi Nilai Regangan Tulangan Tarik ........................... 140

Gambar 4.95 Variasi Nilai Regangan Tulangan Tarik ........................... 143

Gambar 4.96 Balok Lapangn ................................................................. 144

Gambar 4.97 Balok Lapangn ................................................................. 145

Page 17: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

xii

Gambar 4.98 Mu Lapangan .................................................................... 145

Gambar 4.99 Variasi Nilai Regangan Tulangan Tarik ........................... 149

Gambar 4.100 Balok Lapangn ................................................................ 145

Gambar 4.101 Balok Lapangn ................................................................ 145

Gambar 4.102 Langkah pertama ............................................................ 161

Gambar 4.103 Langkah kedua ................................................................ 161

Gambar 4.104 Langkah ketiga................................................................ 162

Gambar 4.105 Langkah keempat ............................................................ 162

Gambar 4.106 Langkah kelima .............................................................. 163

Gambar 4.107 Langkah keempat (a) ...................................................... 163

Gambar 4.108 Langkah keempat (b) ...................................................... 164

Gambar 4.109 Langkah keempat (c) ...................................................... 164

Gambar 4.110 Langkah keempat (d) ...................................................... 164

Gambar 4.111 Langkah keempat (e) ...................................................... 164

Gambar 4.112 Langkah keempat (f) ....................................................... 164

Gambar 4.113 Langkah keempat (g) ...................................................... 165

Gambar 4.114 Langkah keempat (h) ...................................................... 166

Gambar 4.115 Foundation Detail ........................................................... 178

Gambar 4.116 Penentuan Dimensi Pondasi ........................................... 179

Gambar 4.117 Tinjauan Geser Arah X ................................................... 181

Gambar 4.118 Tinjauan Geser Arah Y ................................................... 183

Gambar 4.119 Tinjauan Geser Dua Arah ............................................... 184

Gambar 4.120 Tulangan Lentur Arah X ................................................. 185

Gambar 4.121 Tulangan Lentur Arah Y ................................................. 190

Gambar 4.122 Langkah Pertama ............................................................ 192

Gambar 4.123 Langkah Kedua ............................................................... 193

Gambar 4.124 Langkah Ketiga ............................................................... 193

Gambar 4.125 Langkah Keempat ........................................................... 194

Gambar 4.125 Langkah Keempat ........................................................... 194

Page 18: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

xiii

LAMPIRAN

Lampiran 1. ........................................................................................... 197

Lampiran 2. ........................................................................................... 201

Lampiran 3. ........................................................................................... 206

Lampiran 4. ........................................................................................... 210

Lampiran 5. ........................................................................................... 211

Lampiran 6. ........................................................................................... 214

Page 19: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

xiv

DAFTAR NOTASI

𝑓𝑐′ : Kuat tekan beton.

𝐸𝑠 : Modulus elastisitas.

𝑡𝑠 : Tebal selimut beton.

𝑠 : Spasi bersih antar tulangan.

𝐼𝑒 : Faktor keutamaan.

𝑆𝑠 : Percepatan batuan dasar pada periode pendek.

𝑆1 : Percepatan batuan pada periode 1 detik.

𝐹𝑎 : Faktor amplifikasi getaran percepatan mewakili periode pendek.

𝐹𝑣 : Faktor amplifikasi getaran percepatan mewakili 1 detik.

𝑆𝑀𝑆 : Parameter spektrum respons percepatan pada periode pendek.

𝑆𝐷𝑆 : Parameter percepatan spektral desain untuk perioda pendek.

𝑆𝐷1 : Parameter percepatan spektral desain untuk perioda 1 detik.

𝑇 : Perioda getar fundamental struktur.

𝑇𝑒 : Waktu getar efektif.

𝛿𝑇 : Target perpindahan.

𝐶0 : Faktor modifikasi untuk perpindahan spektral menjadi perpindahan

atap/puncak.

𝐶1 : Faktor modifikasi untuk menghubungkan

perpindahan inelastik maksimum dengan perpindahan yang

dihitung dari respon elastik linear.

𝐶2 : Faktor modifikasi yang mewakili efek dari bentuk

histerestis pada perpindahan maksimum, diambil

berdasarkan FEMA 356; Tabel 3-3.

𝐶3 : Koefisien unutk menghitungkan pembesaran lateral akibat 𝑃-∆ (P-

delta).

g : Percepatan gravitasi bumi (9,81 𝑚 𝑑𝑒𝑡𝑖𝑘2⁄ ).

𝑅 : Streght ratio.

𝑎 : Konstanta.

𝐶𝑠 : Koefisien respon seismik.

𝑊 : Berat seismik efektif.

𝑃𝑥 : Beban desain vertikal total pada dan di atas tingkat-x (kN).

∆ : Simpangan antar tingkat desain.

𝑉𝑥 : Gaya geser seismik yang bekerja antara tingkat-x dan x-1 (kN).

Page 20: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

xv

ℎ𝑠𝑥 : Tinggi tiap tingkat di bawah tingkat-x, (mm).

𝐶𝑑 : Faktor pembesaran defleksi.

𝑃𝑢 : Gaya aksial terfaktor (N).

𝐴𝑔 : Luas penampang bruto beton, (mm2).

𝑀𝑛 : Kekuatan lentur nominal pada penampang, (N-mm).

𝑀𝑢 : Momen ultimate pada penampang, (N-mm).

𝑇 : Gaya tarik tulangan tarik pada penampang beton, (N).

𝑑 : Tinggi efektif penampang balok beton bertulang, (mm).

𝑑′ : Jarak titik berat tulangan tekan ke serat terluar beton, (mm).

𝑑𝑏 : Diameter nominal batang tulangan sengkang, (mm).

𝜙 : Faktor reduksi kekuatan.

𝑉𝑛 : Gaya geser nominal, (N).

𝑉𝑐 : Gaya geser nominal yang di sumbangkan beton, (N).

𝑉𝑠 : Gaya geser nominal yang di sumbangkan tulangan, (N).

𝑉𝑢 : Gaya geser terfaktor pada penampang, (N).

𝐴𝑣 : Luas penampang tulangan geser, (mm2).

𝑓𝑦𝑡 : Mutu material dari tulangan, (MPa).

𝑎 : Sudut antara tulangan geser dan tulangan lentur.

𝜆 : Faktor modifikasi; beton normal = 1,0.

𝜌𝑤 : Rasio tulangan.

𝑏𝑤 : Lebar penampang balok, (mm).

𝑇𝑢 : Nilai torsi terfaktor dari hasil analisa struktur, (N-mm).

𝑇𝑡ℎ : Nilai torsi threshold, (N-mm).

𝐴𝑐𝑝 : Luas yang dibatasi oleh keliling luar penampang beton, (mm2).

𝑃𝑐𝑝 : Keliling luar penampang beton, (mm).

𝑇𝑛 : Kekuatan momen torsi nominal, (N-mm).

𝐴𝑜 : Luas bruto yang di lingkupi oleh alir geser, (mm).

𝐴𝑡 : Luas kaki sengkang tertutup yang menahan torsi dalam spasi , (mm).

𝐴𝑙 : Kekuatan momen torsi nominal, (N-mm).

𝑃ℎ : Keliling garis pusat tulangan torsi transversal tertutup terluar, (mm).

𝑓𝑦 : kekuatan leleh tulangan yang di syaratkan, (MPa).

𝜃 : 45o untuk balok nonprategang.

𝑘 : Faktor panjang efektif yang besarnyatergantung pada kekangan-

kekangan rotasional dan lateral ujung-ujungnya.

𝑙𝑢 : Panjang kolom yang tak terkekang.

𝑟 : Jari-jari girasi penampang.

Page 21: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

xvi

𝑀1 : Momen ujung terkecil pada elemen struktur tekan.

𝑀2 : Momen ujung terbesar pada elemen struktur tekan.

𝑀1𝑛𝑠 : Momen ujung terfaktor pada ujung dimana 𝑀1 bekerja akibat beban

yang mengakibatkan goyangan samping tidak besar.

𝑀2𝑛 : Momen ujung terfaktor pada ujung dimana 𝑀2 bekerja akibat beban

yang mengakibatkan goyangan samping tidak besar.

𝑀1𝑠 : Momen ujung terfaktor pada ujung dimana 𝑀1 bekerja akibat beban

yang mengakibatkan goyangan samping cukup besar.

𝑀2𝑠 : Momen ujung terfaktor pada ujung dimana 𝑀2 bekerja akibat beban

yang mengakibatkan goyangan samping cukup besar.

𝛿𝑠 : Faktor pembesaran momenuntuk rangka bergoyang.

𝛴𝑃𝑢 : Beban vertikal total.

𝑉𝑢𝑠 : Gaya geser lantai total pada tingkat yang ditinjau.

𝑙𝑐 : Panjang komponen tekan, diukur dari pusat ke pusat joint.

∆0 : Simpangan relatif antar tingkat orde pertama pada tingkat yang di

tinjau 𝑉𝑢𝑠.

𝑀𝑐 :Momen terfaktor orde pertama 𝑀2 yang diperbesar untuk

pengaruh kurvatur komponen struktur.

𝛿 :Faktor pembesar momen untuk mencerminkan pengaruh kurvatur

komponen struktur antara ujung-ujung komponen tekan.

𝑃𝑐 : Beban tekuk kritis.

𝐶𝑚 :Faktor yang menghubungkan diagram momen aktual ke diagram

momen seragam ekuivalen.

𝑁𝑢 : Gaya aksial terfaktor.

𝑤𝑢 : Beban terfaktor per unit luasan.

𝐿𝑛 : Bentang bersih.

𝐿1 : Bentang as ke as arah memanjang.

𝐿2 : Bentang as ke as arah memendek.

𝑎𝑓 : Rasio perbandingan kekakuan balok terhadap pelat.

𝐸𝑐𝑏 : Modulus elastisitas material beton dari balok.

𝐼𝑏 : Momen inersia penampang balok.

𝐸𝑐𝑠 : Modulus elastisitas material beton dari pelat.

𝐼𝑠 : Momen inersia penampang balok.

ℎ : Tinggi keseluruhan penampang balok.

𝑡 : Tebal pelat lantai.

𝑏𝑒 : Lebar efektif sayap.

Page 22: PERENCAN HOTEL 7 LANTAI BERBASIS METODE SOFTWA RE TEKLA …

xvii

𝑏𝑤 : Lebar penampang balok.

𝑤𝑢 : Beban terfaktor persatuan panjang, (N/m)